The Commonwealth pays employees on a semi-monthly basis with a scheduled pay day on the 15th and 30th of each month. The two monthly pay periods are from the 1st to the 15th of the month and the 16th through the last day of the month. Pay check distribution is delayed by one pay period to allow for system processing. For example work performed during the 1st to the 15th day of the month is paid to the employee on the 30th of the month. Accordingly the cost accounting charges for labor costs posting in eMARS to operating accounts and highway projects are also delayed by approximately one pay period.
A good rule of measure is that the cost accounting charges for the pay period ending on the 15th of the month will post to eMARS by the 25th and those for the pay period ending on the last day of the month will post to eMARS by the 10th of the following month.

x close panel
Detailed Project Expenditure Report
Total E-MARS Expenditures for 9441001C = $16,333,852.99
Click here for Labor Costs Information
Year Month PBU Charge District Object Phase Program Code County Date ACT Activity Name Trans ID Reference # Vendor Name Expenditure Line Description
2024 10 FD52 06 E797 C 9441001C 008 4/25/2024 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P030K CTXCONST0922210590001K Riegler Blacktop, Inc. $246,989.80
2024 10 FD52 06 E229 C 9441001C 008 4/17/2024 4010 CONSTRUCTION ENGINEERING IET-XE13A162524101005210 $39.00
2024 10 FD52 06 E797 C 9441001C 008 4/10/2024 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P029K CTXCONST0922210590001K Riegler Blacktop, Inc. $291,962.00
2024 10 FD52 06 E121 C 9441001C 008 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001638 $1.06 000001087252-3562506210
2024 10 FD52 06 E122 C 9441001C 008 4/10/2024 5242 CONCRETE TESTING UNIT CA-XR041O1062410001638 $181.29 000001087252-3562506210
2024 10 FD52 06 E122 C 9441001C 008 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001638 $9.43 000001087252-3562506210
2024 10 FD52 06 E123 C 9441001C 008 4/10/2024 5242 CONCRETE TESTING UNIT CA-XR041O1062410001638 $57.15 000001087252-3562506210
2024 10 FD52 06 E123 C 9441001C 008 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001638 $2.94 000001087252-3562506210
2024 10 FD52 06 E111 C 9441001C 008 4/10/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR041O1062410001635 $394.03 000001086638-3562506210
2024 10 FD52 06 E111 C 9441001C 008 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001635 $20.48 000001086638-3562506210
2024 10 FD52 06 E121 C 9441001C 008 4/10/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR041O1062410001635 $29.60 000001086638-3562506210
2024 10 FD52 06 E121 C 9441001C 008 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001635 $1.54 000001086638-3562506210
2024 10 FD52 06 E122 C 9441001C 008 4/10/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR041O1062410001635 $260.57 000001086638-3562506210
2024 10 FD52 06 E122 C 9441001C 008 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001635 $13.55 000001086638-3562506210
2024 10 FD52 06 E123 C 9441001C 008 4/10/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR041O1062410001635 $57.15 000001086638-3562506210
2024 10 FD52 06 E123 C 9441001C 008 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001635 $2.94 000001086638-3562506210
2024 10 FD52 06 E111 C 9441001C 008 4/10/2024 4010 CONSTRUCTION ENGINEERING CA-XR041O1062410002106 $398.94 11113739-3562506340
2024 10 FD52 06 E111 C 9441001C 008 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410002106 $39.36 11113739-3562506340
2024 10 FD52 06 E121 C 9441001C 008 4/10/2024 4010 CONSTRUCTION ENGINEERING CA-XR041O1062410002106 $30.09 11113739-3562506340
2024 10 FD52 06 E121 C 9441001C 008 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410002106 $2.96 11113739-3562506340
2024 10 FD52 06 E122 C 9441001C 008 4/10/2024 4010 CONSTRUCTION ENGINEERING CA-XR041O1062410002106 $264.29 11113739-3562506340
2024 10 FD52 06 E122 C 9441001C 008 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410002106 $26.04 11113739-3562506340
2024 10 FD52 06 E123 C 9441001C 008 4/10/2024 4010 CONSTRUCTION ENGINEERING CA-XR041O1062410002106 $44.46 11113739-3562506340
2024 10 FD52 06 E123 C 9441001C 008 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410002106 $4.33 11113739-3562506340
2024 10 FD52 06 E111 C 9441001C 008 4/10/2024 5242 CONCRETE TESTING UNIT CA-XR041O1062410001638 $274.06 000001087252-3562506210
2024 10 FD52 06 E111 C 9441001C 008 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001638 $14.25 000001087252-3562506210
2024 10 FD52 06 E121 C 9441001C 008 4/10/2024 5242 CONCRETE TESTING UNIT CA-XR041O1062410001638 $20.43 000001087252-3562506210
2024 10 FD52 06 E143 C 9441001C 008 4/9/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400205032 PON22300001683 H W Lochner Inc $50,726.00 Boone Co. 6-444
2024 9 FD52 06 E797 C 9441001C 008 3/27/2024 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P028K CTXCONST0922210590001K Riegler Blacktop, Inc. $540,713.26
2024 9 FD52 06 E797 C 9441001C 059 3/27/2024 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P028K CTXCONST0922210590001K Riegler Blacktop, Inc. $3,000.00
2024 9 FD52 06 E797 C 9441001C 008 3/13/2024 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P027K CTXCONST0922210590001K Riegler Blacktop, Inc. $206,809.00
2024 9 FD52 06 E122 C 9441001C 008 3/11/2024 4010 CONSTRUCTION ENGINEERING CA-XR031O1062406810083 $362.58 000001086763-3562500680
2024 9 FD52 06 E122 C 9441001C 008 3/11/2024 4010 CONSTRUCTION ENGINEERING CA-XR031O1062406810366 $527.85 11093415-3562506340
2024 9 FD52 06 E122 C 9441001C 008 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810366 $10.91 11093415-3562506340
2024 9 FD52 06 E123 C 9441001C 008 3/11/2024 4010 CONSTRUCTION ENGINEERING CA-XR031O1062406810366 $88.77 11093415-3562506340
2024 9 FD52 06 E123 C 9441001C 008 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810366 $1.81 11093415-3562506340
2024 9 FD52 06 E122 C 9441001C 008 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810083 $40.12 000001086763-3562500680
2024 9 FD52 06 E123 C 9441001C 008 3/11/2024 4010 CONSTRUCTION ENGINEERING CA-XR031O1062406810083 $134.10 000001086763-3562500680
2024 9 FD52 06 E123 C 9441001C 008 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810083 $14.71 000001086763-3562500680
2024 9 FD52 00 E121 C 9441001C 008 3/11/2024 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR031O1062406810108 $0.20 000001091070-3562500640
2024 9 FD52 06 E111 C 9441001C 008 3/11/2024 4010 CONSTRUCTION ENGINEERING CA-XR031O1062406810366 $797.73 11093415-3562506340
2024 9 FD52 00 E121 C 9441001C 008 3/11/2024 5383 ASPHALT MIX DESIGN APPROVAL CA-XR031O1062406810108 $0.01 000001091079-3562500640
2024 9 FD52 06 E111 C 9441001C 008 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810366 $16.48 11093415-3562506340
2024 9 FD52 06 E121 C 9441001C 008 3/11/2024 4010 CONSTRUCTION ENGINEERING CA-XR031O1062406810366 $60.18 11093415-3562506340
2024 9 FD52 06 E121 C 9441001C 008 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810366 $1.25 11093415-3562506340
2024 9 FD52 06 E111 C 9441001C 008 3/11/2024 4010 CONSTRUCTION ENGINEERING CA-XR031O1062406810082 $548.06 000001086763-3562500680
2024 9 FD52 06 E111 C 9441001C 008 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810082 $60.64 000001086763-3562500680
2024 9 FD52 06 E121 C 9441001C 008 3/11/2024 4010 CONSTRUCTION ENGINEERING CA-XR031O1062406810082 $39.60 000001086763-3562500680
2024 9 FD52 06 E121 C 9441001C 008 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810082 $4.38 000001086763-3562500680
2024 9 FD52 06 E143 C 9441001C 008 3/8/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400179245 PON22300001683 H W Lochner Inc $45,168.00 Boone Co. 6-444
2024 8 FD52 06 E797 C 9441001C 008 2/28/2024 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P026K CTXCONST0922210590001K Riegler Blacktop, Inc. $267,467.55
2024 8 FD52 00 E122 C 9441001C 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408948 $17.80 000001091079-3562500640
2024 8 FD52 00 E229 C 9441001C 008 2/26/2024 5383 ASPHALT MIX DESIGN APPROVAL IET-XE13A162524056006810 $43.70
2024 8 FD52 00 E229 C 9441001C 008 2/26/2024 5062 SAMPLINGS & TESTING-AGGREGATE IET-XE13A162524056011860 $91.14
2024 8 FD52 06 E122 C 9441001C 008 2/26/2024 4010 CONSTRUCTION ENGINEERING CA-XR022O1062405408909 $148.77 000001086763-3562500680
2024 8 FD52 06 E122 C 9441001C 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408909 $23.96 000001086763-3562500680
2024 8 FD52 00 E111 C 9441001C 008 2/26/2024 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR022O1062405408947 $249.07 000001091070-3562500640
2024 8 FD52 06 E123 C 9441001C 008 2/26/2024 4010 CONSTRUCTION ENGINEERING CA-XR022O1062405408909 $46.95 000001086763-3562500680
2024 8 FD52 00 E115 C 9441001C 008 2/26/2024 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR022O1062405408947 $227.62 000001091070-3562500640
2024 8 FD52 06 E123 C 9441001C 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408909 $7.47 000001086763-3562500680
2024 8 FD52 00 E121 C 9441001C 008 2/26/2024 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR022O1062405408947 $35.02 000001091070-3562500640
2024 8 FD52 06 E124 C 9441001C 008 2/26/2024 4010 CONSTRUCTION ENGINEERING CA-XR022O1062405408909 $0.10 000001086763-3562500680
2024 8 FD52 00 E122 C 9441001C 008 2/26/2024 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR022O1062405408947 $315.43 000001091070-3562500640
2024 8 FD52 06 E124 C 9441001C 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408909 $0.01 000001086763-3562500680
2024 8 FD52 00 E123 C 9441001C 008 2/26/2024 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR022O1062405408947 $45.08 000001091070-3562500640
2024 8 FD52 00 E124 C 9441001C 008 2/26/2024 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR022O1062405408947 $0.09 000001091070-3562500640
2024 8 FD52 00 E123 C 9441001C 008 2/26/2024 5383 ASPHALT MIX DESIGN APPROVAL CA-XR022O1062405408948 $40.39 000001091079-3562500640
2024 8 FD52 00 E123 C 9441001C 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408948 $4.31 000001091079-3562500640
2024 8 FD52 00 E124 C 9441001C 008 2/26/2024 5383 ASPHALT MIX DESIGN APPROVAL CA-XR022O1062405408948 $0.09 000001091079-3562500640
2024 8 FD52 06 E111 C 9441001C 008 2/26/2024 5242 CONCRETE TESTING UNIT CA-XR022O1062405408911 $1,438.83 000001087252-3562506210
2024 8 FD52 06 E111 C 9441001C 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408911 $183.98 000001087252-3562506210
2024 8 FD52 00 E124 C 9441001C 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408948 $0.01 000001091079-3562500640
2024 8 FD52 06 E121 C 9441001C 008 2/26/2024 5242 CONCRETE TESTING UNIT CA-XR022O1062405408911 $104.24 000001087252-3562506210
2024 8 FD52 06 E121 C 9441001C 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408911 $13.17 000001087252-3562506210
2024 8 FD52 06 E122 C 9441001C 008 2/26/2024 5242 CONCRETE TESTING UNIT CA-XR022O1062405408911 $952.07 000001087252-3562506210
2024 8 FD52 06 E122 C 9441001C 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408911 $121.74 000001087252-3562506210
2024 8 FD52 06 E123 C 9441001C 008 2/26/2024 5242 CONCRETE TESTING UNIT CA-XR022O1062405408911 $270.83 000001087252-3562506210
2024 8 FD52 06 E123 C 9441001C 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408911 $35.80 000001087252-3562506210
2024 8 FD52 06 E124 C 9441001C 008 2/26/2024 5242 CONCRETE TESTING UNIT CA-XR022O1062405408911 $0.49 000001087252-3562506210
2024 8 FD52 06 E124 C 9441001C 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408911 $0.07 000001087252-3562506210
2024 8 FD52 06 E111 C 9441001C 008 2/26/2024 4010 CONSTRUCTION ENGINEERING CA-XR022O1062405408909 $224.26 000001086763-3562500680
2024 8 FD52 06 E111 C 9441001C 008 2/26/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR022O1062405408908 $249.07 000001086638-3562506210
2024 8 FD52 06 E121 C 9441001C 008 2/26/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR022O1062405408908 $18.58 000001086638-3562506210
2024 8 FD52 06 E111 C 9441001C 008 2/26/2024 4010 CONSTRUCTION ENGINEERING CA-XR022O1062405409296 $338.42 11087190-3562506340
2024 8 FD52 06 E122 C 9441001C 008 2/26/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR022O1062405408908 $164.81 000001086638-3562506210
2024 8 FD52 06 E111 C 9441001C 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405409296 $72.04 11087190-3562506340
2024 8 FD52 06 E123 C 9441001C 008 2/26/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR022O1062405408908 $51.92 000001086638-3562506210
2024 8 FD52 06 E121 C 9441001C 008 2/26/2024 4010 CONSTRUCTION ENGINEERING CA-XR022O1062405409296 $25.72 11087190-3562506340
2024 8 FD52 06 E124 C 9441001C 008 2/26/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR022O1062405408908 $0.09 000001086638-3562506210
2024 8 FD52 06 E121 C 9441001C 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405409296 $5.48 11087190-3562506340
2024 8 FD52 06 E122 C 9441001C 008 2/26/2024 4010 CONSTRUCTION ENGINEERING CA-XR022O1062405409296 $223.93 11087190-3562506340
2024 8 FD52 06 E122 C 9441001C 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405409296 $47.67 11087190-3562506340
2024 8 FD52 06 E123 C 9441001C 008 2/26/2024 4010 CONSTRUCTION ENGINEERING CA-XR022O1062405409296 $37.74 11087190-3562506340
2024 8 FD52 06 E123 C 9441001C 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405409296 $7.92 11087190-3562506340
2024 8 FD52 06 E124 C 9441001C 008 2/26/2024 4010 CONSTRUCTION ENGINEERING CA-XR022O1062405409296 $0.08 11087190-3562506340
2024 8 FD52 06 E111 C 9441001C 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408909 $36.20 000001086763-3562500680
2024 8 FD52 06 E124 C 9441001C 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405409296 $0.02 11087190-3562506340
2024 8 FD52 06 E121 C 9441001C 008 2/26/2024 4010 CONSTRUCTION ENGINEERING CA-XR022O1062405408909 $16.62 000001086763-3562500680
2024 8 FD52 06 E121 C 9441001C 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408909 $2.68 000001086763-3562500680
2024 8 FD52 00 E111 C 9441001C 008 2/26/2024 5383 ASPHALT MIX DESIGN APPROVAL CA-XR022O1062405408947 $248.94 000001091079-3562500640
2024 8 FD52 00 E111 C 9441001C 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408947 $26.90 000001091079-3562500640
2024 8 FD52 00 E121 C 9441001C 008 2/26/2024 5383 ASPHALT MIX DESIGN APPROVAL CA-XR022O1062405408947 $18.87 000001091079-3562500640
2024 8 FD52 00 E121 C 9441001C 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408947 $2.03 000001091079-3562500640
2024 8 FD52 00 E122 C 9441001C 008 2/26/2024 5383 ASPHALT MIX DESIGN APPROVAL CA-XR022O1062405408947 $164.81 000001091079-3562500640
2024 8 FD52 06 E121 C 9441001C 008 2/16/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907675 $4.93 000001086763-3562500680
2024 8 FD52 06 E122 C 9441001C 008 2/16/2024 4010 CONSTRUCTION ENGINEERING CA-XR021O1062403907675 $120.87 000001086763-3562500680
2024 8 FD52 06 E122 C 9441001C 008 2/16/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907675 $44.52 000001086763-3562500680
2024 8 FD52 06 E123 C 9441001C 008 2/16/2024 4010 CONSTRUCTION ENGINEERING CA-XR021O1062403907675 $38.21 000001086763-3562500680
2024 8 FD52 06 E123 C 9441001C 008 2/16/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907675 $13.91 000001086763-3562500680
2024 8 FD52 06 E143 C 9441001C 008 2/14/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400163324 PON22300001683 H W Lochner Inc $44,481.00 Boone Co. 6-444
2024 8 FD52 06 E797 C 9441001C 008 2/14/2024 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P025K CTXCONST0922210590001K Riegler Blacktop, Inc. $460,048.63
2024 8 FD52 06 E797 C 9441001C 059 2/14/2024 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P025K CTXCONST0922210590001K Riegler Blacktop, Inc. $1,500.00
2024 8 FD52 06 E229 C 9441001C 008 2/14/2024 4010 CONSTRUCTION ENGINEERING IET-XE13A162524041007330 $34.32
2024 8 FD52 06 E111 C 9441001C 008 2/9/2024 5242 CONCRETE TESTING UNIT CA-XR021O1062403907677 $228.32 000001087252-3562506210
2024 8 FD52 06 E121 C 9441001C 008 2/9/2024 5242 CONCRETE TESTING UNIT CA-XR021O1062403907677 $17.13 000001087252-3562506210
2024 8 FD52 06 E122 C 9441001C 008 2/9/2024 5242 CONCRETE TESTING UNIT CA-XR021O1062403907677 $151.08 000001087252-3562506210
2024 8 FD52 06 E123 C 9441001C 008 2/9/2024 5242 CONCRETE TESTING UNIT CA-XR021O1062403907677 $47.60 000001087252-3562506210
2024 8 FD52 06 E111 C 9441001C 008 2/9/2024 4010 CONSTRUCTION ENGINEERING CA-XR021O1062403908045 $664.76 11076249-3562506340
2024 8 FD52 06 E111 C 9441001C 008 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403908045 $15.07 11076249-3562506340
2024 8 FD52 06 E121 C 9441001C 008 2/9/2024 4010 CONSTRUCTION ENGINEERING CA-XR021O1062403908045 $50.14 11076249-3562506340
2024 8 FD52 06 E121 C 9441001C 008 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403908045 $1.14 11076249-3562506340
2024 8 FD52 06 E122 C 9441001C 008 2/9/2024 4010 CONSTRUCTION ENGINEERING CA-XR021O1062403908045 $439.87 11076249-3562506340
2024 8 FD52 06 E122 C 9441001C 008 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403908045 $9.97 11076249-3562506340
2024 8 FD52 06 E123 C 9441001C 008 2/9/2024 4010 CONSTRUCTION ENGINEERING CA-XR021O1062403908045 $73.98 11076249-3562506340
2024 8 FD52 06 E123 C 9441001C 008 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403908045 $1.66 11076249-3562506340
2024 8 FD52 06 E111 C 9441001C 008 2/9/2024 4010 CONSTRUCTION ENGINEERING CA-XR021O1062403907674 $182.61 000001086763-3562500680
2024 8 FD52 06 E111 C 9441001C 008 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907674 $67.28 000001086763-3562500680
2024 8 FD52 06 E121 C 9441001C 008 2/9/2024 4010 CONSTRUCTION ENGINEERING CA-XR021O1062403907674 $13.36 000001086763-3562500680
2024 8 FD52 06 E797 C 9441001C 008 2/5/2024 4580 CONSTRUCTION CONTRACTS JVC-2400000427 CTXCONST0922210590001K ($3,077,073.75) Change appr on 9441001C From Y240 lines 25-1, -2 to Y600 lines 22-1, -2
2024 8 FD52 06 E797 C 9441001C 008 2/5/2024 4580 CONSTRUCTION CONTRACTS JVC-2400000427 CTXCONST0922210590001K ($769,268.46) Change appr on 9441001C From Y240 lines 25-1, -2 to Y600 lines 22-1, -2
2024 8 FD52 06 E797 C 9441001C 008 2/5/2024 4580 CONSTRUCTION CONTRACTS JVC-2400000427 CTXCONST0922210590001K $3,077,073.75 Change appr on 9441001C From Y240 lines 25-1, -2 to Y600 lines 22-1, -2
2024 8 FD52 06 E797 C 9441001C 008 2/5/2024 4580 CONSTRUCTION CONTRACTS JVC-2400000427 CTXCONST0922210590001K $769,268.46 Change appr on 9441001C From Y240 lines 25-1, -2 to Y600 lines 22-1, -2
2024 7 FD52 06 E143 C 9441001C 008 1/31/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400150676 PON22300001683 H W Lochner Inc $42,188.50 Boone Co. 6-444
2024 7 FD52 06 E797 C 9441001C 008 1/31/2024 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P024K CTXCONST0922210590001K Riegler Blacktop, Inc. $142,329.96
2024 7 FD52 06 E797 C 9441001C 008 1/18/2024 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P023K CTXCONST0922210590001K Riegler Blacktop, Inc. $296,177.75
2024 7 FD52 06 E797 C 9441001C 059 1/18/2024 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P023K CTXCONST0922210590001K Riegler Blacktop, Inc. $3,064.00
2024 7 FD52 06 E111 C 9441001C 008 1/8/2024 4010 CONSTRUCTION ENGINEERING CA-XR011O1062400506014 $186.04 11062275-3562506340
2024 7 FD52 06 E111 C 9441001C 008 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400506014 $237.18 11062275-3562506340
2024 7 FD52 06 E121 C 9441001C 008 1/8/2024 4010 CONSTRUCTION ENGINEERING CA-XR011O1062400506014 $14.04 11062275-3562506340
2024 7 FD52 06 E121 C 9441001C 008 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400506014 $17.89 11062275-3562506340
2024 7 FD52 06 E122 C 9441001C 008 1/8/2024 4010 CONSTRUCTION ENGINEERING CA-XR011O1062400506014 $123.17 11062275-3562506340
2024 7 FD52 06 E122 C 9441001C 008 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400506014 $156.94 11062275-3562506340
2024 7 FD52 06 E123 C 9441001C 008 1/8/2024 4010 CONSTRUCTION ENGINEERING CA-XR011O1062400506014 $21.01 11062275-3562506340
2024 7 FD52 06 E123 C 9441001C 008 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400506014 $26.09 11062275-3562506340
2024 7 FD52 06 E797 C 9441001C 008 1/4/2024 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P022K CTXCONST0922210590001K Riegler Blacktop, Inc. $346,338.19
2024 7 FD52 06 E797 C 9441001C 059 1/4/2024 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P022K CTXCONST0922210590001K Riegler Blacktop, Inc. $7,500.00
2024 6 FD52 06 E122 C 9441001C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504625 $223.08 000001086638-3562506210
2024 6 FD52 06 E123 C 9441001C 008 12/22/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR122N1062335504625 $135.67 000001086638-3562506210
2024 6 FD52 06 E123 C 9441001C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504625 $57.44 000001086638-3562506210
2024 6 FD52 06 E124 C 9441001C 008 12/22/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR122N1062335504625 $0.27 000001086638-3562506210
2024 6 FD52 06 E124 C 9441001C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504625 $0.12 000001086638-3562506210
2024 6 FD52 06 E111 C 9441001C 008 12/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR122N1062335504626 $249.04 000001086763-3562500680
2024 6 FD52 06 E111 C 9441001C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504626 $32.54 000001086763-3562500680
2024 6 FD52 06 E121 C 9441001C 008 12/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR122N1062335504626 $18.46 000001086763-3562500680
2024 6 FD52 06 E121 C 9441001C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504626 $2.42 000001086763-3562500680
2024 6 FD52 06 E122 C 9441001C 008 12/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR122N1062335504626 $164.82 000001086763-3562500680
2024 6 FD52 06 E122 C 9441001C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504626 $21.53 000001086763-3562500680
2024 6 FD52 06 E123 C 9441001C 008 12/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR122N1062335504626 $45.08 000001086763-3562500680
2024 6 FD52 06 E123 C 9441001C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504626 $5.82 000001086763-3562500680
2024 6 FD52 06 E124 C 9441001C 008 12/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR122N1062335504626 $0.09 000001086763-3562500680
2024 6 FD52 06 E124 C 9441001C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504626 $0.01 000001086763-3562500680
2024 6 FD52 06 E111 C 9441001C 008 12/22/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR122N1062335504625 $855.93 000001086638-3562506210
2024 6 FD52 06 E111 C 9441001C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504625 $337.12 000001086638-3562506210
2024 6 FD52 06 E121 C 9441001C 008 12/22/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR122N1062335504625 $62.41 000001086638-3562506210
2024 6 FD52 06 E121 C 9441001C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504625 $24.24 000001086638-3562506210
2024 6 FD52 06 E122 C 9441001C 008 12/22/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR122N1062335504625 $566.52 000001086638-3562506210
2024 6 FD52 06 E797 C 9441001C 008 12/20/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P021K CTXCONST0922210590001K Riegler Blacktop, Inc. $368,574.04
2024 6 FD52 06 E797 C 9441001C 059 12/20/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P021K CTXCONST0922210590001K Riegler Blacktop, Inc. $48.40
2024 6 FD52 06 E143 C 9441001C 008 12/14/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400116585 PON22300001683 H W Lochner Inc $29,606.50 Boone Co. 6-444
2024 6 FD52 06 E122 C 9441001C 008 12/11/2023 5203 TESTING OF ASPHALT MIXTURES CA-XR121N1062334203660 $164.81 000001090164-3562506210
2024 6 FD52 06 E122 C 9441001C 008 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203660 $36.70 000001090164-3562506210
2024 6 FD52 06 E123 C 9441001C 008 12/11/2023 5203 TESTING OF ASPHALT MIXTURES CA-XR121N1062334203660 $45.13 000001090164-3562506210
2024 6 FD52 06 E123 C 9441001C 008 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203660 $9.92 000001090164-3562506210
2024 6 FD52 06 E111 C 9441001C 008 12/11/2023 5203 TESTING OF ASPHALT MIXTURES CA-XR121N1062334203659 $249.02 000001090164-3562506210
2024 6 FD52 06 E111 C 9441001C 008 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203659 $55.46 000001090164-3562506210
2024 6 FD52 06 E121 C 9441001C 008 12/11/2023 5203 TESTING OF ASPHALT MIXTURES CA-XR121N1062334203659 $18.57 000001090164-3562506210
2024 6 FD52 06 E121 C 9441001C 008 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203659 $4.13 000001090164-3562506210
2024 6 FD52 06 E797 C 9441001C 008 12/6/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P020K CTXCONST0922210590001K Riegler Blacktop, Inc. $506,864.07
2024 6 FD52 06 E797 C 9441001C 059 12/6/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P020K CTXCONST0922210590001K Riegler Blacktop, Inc. $17,767.60
2024 5 FD52 06 E111 C 9441001C 008 11/30/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR112N1062332502540 $199.26 000001088160-3562506210
2024 5 FD52 06 E111 C 9441001C 008 11/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502540 $40.85 000001088160-3562506210
2024 5 FD52 06 E121 C 9441001C 008 11/30/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR112N1062332502540 $14.23 000001088160-3562506210
2024 5 FD52 06 E121 C 9441001C 008 11/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502540 $2.92 000001088160-3562506210
2024 5 FD52 06 E122 C 9441001C 008 11/30/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR112N1062332502540 $131.83 000001088160-3562506210
2024 5 FD52 06 E122 C 9441001C 008 11/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502540 $27.03 000001088160-3562506210
2024 5 FD52 06 E123 C 9441001C 008 11/30/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR112N1062332502540 $36.10 000001088160-3562506210
2024 5 FD52 06 E123 C 9441001C 008 11/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502540 $7.31 000001088160-3562506210
2024 5 FD52 06 E124 C 9441001C 008 11/30/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR112N1062332502540 $0.08 000001088160-3562506210
2024 5 FD52 06 E124 C 9441001C 008 11/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502540 $0.01 000001088160-3562506210
2024 5 FD52 06 E229 C 9441001C 008 11/27/2023 4010 CONSTRUCTION ENGINEERING IET-XE13A162523329004230 $15.60
2024 5 FD52 06 E797 C 9441001C 008 11/22/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P019K CTXCONST0922210590001K Riegler Blacktop, Inc. $805,944.75
2024 5 FD52 06 E124 C 9441001C 008 11/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR112N1062332502830 $0.13 11038979-3562506340
2024 5 FD52 06 E124 C 9441001C 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502830 $0.02 11038979-3562506340
2024 5 FD52 06 E111 C 9441001C 008 11/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR112N1062332502830 $531.89 11038979-3562506340
2024 5 FD52 06 E111 C 9441001C 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502830 $86.05 11038979-3562506340
2024 5 FD52 06 E121 C 9441001C 008 11/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR112N1062332502830 $40.41 11038979-3562506340
2024 5 FD52 06 E121 C 9441001C 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502830 $6.54 11038979-3562506340
2024 5 FD52 06 E111 C 9441001C 008 11/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR112N1062332502530 $212.00 000001086763-3562500620
2024 5 FD52 06 E111 C 9441001C 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502530 $59.36 000001086763-3562500620
2024 5 FD52 06 E121 C 9441001C 008 11/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR112N1062332502530 $15.91 000001086763-3562500620
2024 5 FD52 06 E121 C 9441001C 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502530 $4.45 000001086763-3562500620
2024 5 FD52 06 E122 C 9441001C 008 11/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR112N1062332502530 $140.31 000001086763-3562500620
2024 5 FD52 06 E122 C 9441001C 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502530 $39.27 000001086763-3562500620
2024 5 FD52 06 E123 C 9441001C 008 11/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR112N1062332502530 $34.42 000001086763-3562500620
2024 5 FD52 06 E122 C 9441001C 008 11/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR112N1062332502830 $351.90 11038979-3562506340
2024 5 FD52 06 E123 C 9441001C 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502530 $9.48 000001086763-3562500620
2024 5 FD52 06 E124 C 9441001C 008 11/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR112N1062332502530 $0.11 000001086763-3562500620
2024 5 FD52 06 E124 C 9441001C 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502530 $0.02 000001086763-3562500620
2024 5 FD52 06 E122 C 9441001C 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502830 $56.94 11038979-3562506340
2024 5 FD52 06 E123 C 9441001C 008 11/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR112N1062332502830 $51.43 11038979-3562506340
2024 5 FD52 06 E123 C 9441001C 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502830 $8.19 11038979-3562506340
2024 5 FD52 06 E143 C 9441001C 008 11/8/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400093492 PON22300001683 H W Lochner Inc $39,390.50 Boone Co. 6-444
2024 5 FD52 06 E387 C 9441001C 008 11/8/2023 4010 CONSTRUCTION ENGINEERING PRC-2400090924 DO2400006556 K & K SYSTEMS INC $6,675.00
2024 5 FD52 06 E797 C 9441001C 008 11/8/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P018K CTXCONST0922210590001K Riegler Blacktop, Inc. $1,219,601.89
2024 5 FD52 06 E143 C 9441001C 008 11/8/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400093492 PON22300001683 H W Lochner Inc $6,052.00 Boone Co. 6-444
2024 4 FD52 06 E229 C 9441001C 008 10/27/2023 4010 CONSTRUCTION ENGINEERING IET-XE13A162523298004480 $19.50
2024 4 FD52 06 E143 C 9441001C 008 10/26/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400083669 PON22300001683 H W Lochner Inc $37,048.00 Boone Co. 6-444
2024 4 FD52 06 E143 C 9441001C 008 10/26/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400083669 PON22300001683 H W Lochner Inc $16,658.75 Boone Co. 6-444
2024 4 FD52 06 E797 C 9441001C 008 10/25/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P017K CTXCONST0922210590001K Riegler Blacktop, Inc. $577,613.73
2024 4 FD52 06 E797 C 9441001C 059 10/25/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P017K CTXCONST0922210590001K Riegler Blacktop, Inc. $30,000.00
2024 4 FD52 06 E797 C 9441001C 008 10/11/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P016K CTXCONST0922210590001K Riegler Blacktop, Inc. $385,595.25
2024 4 FD52 06 E229 C 9441001C 008 10/11/2023 4010 CONSTRUCTION ENGINEERING IET-XE13A162523283017060 $52.65
2024 4 FD52 06 E111 C 9441001C 008 10/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR101N1062328009706 $273.93 000001086763-3562500680
2024 4 FD52 06 E111 C 9441001C 008 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009706 $49.68 000001086763-3562500680
2024 4 FD52 06 E121 C 9441001C 008 10/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR101N1062328009706 $20.06 000001086763-3562500680
2024 4 FD52 06 E121 C 9441001C 008 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009706 $3.64 000001086763-3562500680
2024 4 FD52 06 E122 C 9441001C 008 10/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR101N1062328009706 $181.29 000001086763-3562500680
2024 4 FD52 06 E122 C 9441001C 008 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009706 $32.87 000001086763-3562500680
2024 4 FD52 06 E123 C 9441001C 008 10/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR101N1062328009706 $49.61 000001086763-3562500680
2024 4 FD52 06 E123 C 9441001C 008 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009706 $8.89 000001086763-3562500680
2024 4 FD52 06 E143 C 9441001C 008 10/5/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400068374 PON22300001683 H W Lochner Inc $44,763.00 Boone Co. 6-444
2024 4 FD52 06 E143 C 9441001C 008 10/5/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400068374 PON22300001683 H W Lochner Inc $19,053.00 Boone Co. 6-444
2024 3 FD52 06 E111 C 9441001C 008 9/29/2023 4010 CONSTRUCTION ENGINEERING CA-XR092N1062327208561 $332.38 11000801-3562506340
2024 3 FD52 06 E121 C 9441001C 008 9/29/2023 4010 CONSTRUCTION ENGINEERING CA-XR092N1062327208561 $25.07 11000801-3562506340
2024 3 FD52 06 E122 C 9441001C 008 9/29/2023 4010 CONSTRUCTION ENGINEERING CA-XR092N1062327208561 $219.94 11000801-3562506340
2024 3 FD52 06 E123 C 9441001C 008 9/29/2023 4010 CONSTRUCTION ENGINEERING CA-XR092N1062327208561 $32.06 11000801-3562506340
2024 3 FD52 06 E797 C 9441001C 008 9/27/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P015K CTXCONST0922210590001K Riegler Blacktop, Inc. $190,474.60
2024 3 FD52 06 E797 C 9441001C 008 9/13/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P014K CTXCONST0922210590001K Riegler Blacktop, Inc. $300,700.98
2024 3 FD52 06 E229 C 9441001C 008 9/13/2023 4010 CONSTRUCTION ENGINEERING IET-XE13A162523253003380 $23.40
2024 3 FD52 06 E122 C 9441001C 008 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106108 $15.72 000001086763-3562500680
2024 3 FD52 06 E123 C 9441001C 008 9/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR091N1062325106108 $38.56 000001086763-3562500680
2024 3 FD52 06 E123 C 9441001C 008 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106108 $4.25 000001086763-3562500680
2024 3 FD52 06 E111 C 9441001C 008 9/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR091N1062325106108 $213.10 000001086763-3562500680
2024 3 FD52 06 E111 C 9441001C 008 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106108 $23.75 000001086763-3562500680
2024 3 FD52 06 E121 C 9441001C 008 9/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR091N1062325106108 $15.60 000001086763-3562500680
2024 3 FD52 06 E121 C 9441001C 008 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106108 $1.74 000001086763-3562500680
2024 3 FD52 06 E122 C 9441001C 008 9/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR091N1062325106108 $141.01 000001086763-3562500680
2024 2 FD52 06 E797 C 9441001C 008 8/30/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P013K CTXCONST0922210590001K Riegler Blacktop, Inc. $456,734.57
2024 2 FD52 06 E229 C 9441001C 008 8/29/2023 4010 CONSTRUCTION ENGINEERING IET-XE13A162523237003480 $19.50
2024 2 FD52 06 E111 C 9441001C 008 8/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR082N1062323504958 $249.07 000001086763-3562500680
2024 2 FD52 06 E111 C 9441001C 008 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504958 $24.91 000001086763-3562500680
2024 2 FD52 06 E121 C 9441001C 008 8/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR082N1062323504958 $17.95 000001086763-3562500680
2024 2 FD52 06 E121 C 9441001C 008 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504958 $1.79 000001086763-3562500680
2024 2 FD52 06 E122 C 9441001C 008 8/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR082N1062323504958 $164.81 000001086763-3562500680
2024 2 FD52 06 E122 C 9441001C 008 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504958 $16.48 000001086763-3562500680
2024 2 FD52 06 E123 C 9441001C 008 8/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR082N1062323504958 $58.19 000001086763-3562500680
2024 2 FD52 06 E123 C 9441001C 008 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504958 $5.77 000001086763-3562500680
2024 2 FD52 06 E124 C 9441001C 008 8/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR082N1062323504958 $0.09 000001086763-3562500680
2024 2 FD52 06 E124 C 9441001C 008 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504958 $0.01 000001086763-3562500680
2024 2 FD52 06 E143 C 9441001C 008 8/18/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400033084 PON22300001683 H W Lochner Inc $39,654.00 Boone Co. 6-444
2024 2 FD52 06 E143 C 9441001C 008 8/18/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400033084 PON22300001683 H W Lochner Inc $12,223.75 Boone Co. 6-444
2024 2 FD52 06 E797 C 9441001C 008 8/16/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P012K CTXCONST0922210590001K Riegler Blacktop, Inc. $501,755.72
2024 2 FD52 06 E797 C 9441001C 059 8/16/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P012K CTXCONST0922210590001K Riegler Blacktop, Inc. $15,000.00
2024 2 FD52 00 E229 C 9441001C 059 8/11/2023 5082 INSP-PORTLAND CONCRETE STRUC IET-XE13A162523222007670 $81.81
2024 2 FD52 00 E121 C 9441001C 059 8/9/2023 5213 ASPHALT MIX DESIGN CA-XR081N1062322003882 $140.16 000001088014-3562500640
2024 2 FD52 00 E121 C 9441001C 059 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003882 $14.02 000001088014-3562500640
2024 2 FD52 00 E122 C 9441001C 059 8/9/2023 5213 ASPHALT MIX DESIGN CA-XR081N1062322003882 $1,318.49 000001088014-3562500640
2024 2 FD52 06 E111 C 9441001C 008 8/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR081N1062322004135 $362.70 10981755-3562506340
2024 2 FD52 06 E111 C 9441001C 008 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322004135 $67.68 10981755-3562506340
2024 2 FD52 06 E121 C 9441001C 008 8/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR081N1062322004135 $27.35 10981755-3562506340
2024 2 FD52 06 E121 C 9441001C 008 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322004135 $5.11 10981755-3562506340
2024 2 FD52 06 E122 C 9441001C 008 8/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR081N1062322004135 $239.93 10981755-3562506340
2024 2 FD52 00 E122 C 9441001C 059 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003882 $131.85 000001088014-3562500640
2024 2 FD52 06 E122 C 9441001C 008 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322004135 $44.78 10981755-3562506340
2024 2 FD52 06 E123 C 9441001C 008 8/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR081N1062322004135 $35.08 10981755-3562506340
2024 2 FD52 06 E123 C 9441001C 008 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322004135 $6.45 10981755-3562506340
2024 2 FD52 00 E123 C 9441001C 059 8/9/2023 5213 ASPHALT MIX DESIGN CA-XR081N1062322003882 $305.01 000001088014-3562500640
2024 2 FD52 00 E111 C 9441001C 059 8/9/2023 5082 INSP-PORTLAND CONCRETE STRUC CA-XR081N1062322003888 $249.07 000001088414-3562500640
2024 2 FD52 00 E111 C 9441001C 059 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003888 $24.91 000001088414-3562500640
2024 2 FD52 00 E121 C 9441001C 059 8/9/2023 5082 INSP-PORTLAND CONCRETE STRUC CA-XR081N1062322003888 $18.60 000001088414-3562500640
2024 2 FD52 00 E121 C 9441001C 059 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003888 $1.86 000001088414-3562500640
2024 2 FD52 00 E122 C 9441001C 059 8/9/2023 5082 INSP-PORTLAND CONCRETE STRUC CA-XR081N1062322003888 $164.82 000001088414-3562500640
2024 2 FD52 00 E122 C 9441001C 059 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003888 $16.48 000001088414-3562500640
2024 2 FD52 00 E123 C 9441001C 059 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003882 $30.09 000001088014-3562500640
2024 2 FD52 00 E123 C 9441001C 059 8/9/2023 5082 INSP-PORTLAND CONCRETE STRUC CA-XR081N1062322003888 $33.22 000001088414-3562500640
2024 2 FD52 00 E123 C 9441001C 059 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003888 $3.27 000001088414-3562500640
2024 2 FD52 00 E111 C 9441001C 059 8/9/2023 5213 ASPHALT MIX DESIGN CA-XR081N1062322003881 $1,992.60 000001088014-3562500640
2024 2 FD52 00 E111 C 9441001C 059 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003881 $199.26 000001088014-3562500640
2024 2 FD52 06 E797 C 9441001C 008 8/2/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P011K CTXCONST0922210590001K Riegler Blacktop, Inc. $336,473.32
2024 1 FD52 06 E229 C 9441001C 008 7/26/2023 4010 CONSTRUCTION ENGINEERING IET-XE13A162523206003220 $7.80
2024 1 FD52 06 E123 C 9441001C 008 7/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR072N1062320202697 $38.66 000001086653-3562506200
2024 1 FD52 06 E123 C 9441001C 008 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202697 $12.85 000001086653-3562506200
2024 1 FD52 06 E124 C 9441001C 008 7/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR072N1062320202697 $0.10 000001086653-3562506200
2024 1 FD52 06 E124 C 9441001C 008 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202697 $0.03 000001086653-3562506200
2024 1 FD52 06 E111 C 9441001C 008 7/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR072N1062320203211 $398.86 10975882-3562506340
2024 1 FD52 06 E111 C 9441001C 008 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320203211 $155.29 10975882-3562506340
2024 1 FD52 06 E121 C 9441001C 008 7/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR072N1062320203211 $30.31 10975882-3562506340
2024 1 FD52 06 E121 C 9441001C 008 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320203211 $11.81 10975882-3562506340
2024 1 FD52 06 E122 C 9441001C 008 7/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR072N1062320203211 $263.92 10975882-3562506340
2024 1 FD52 06 E122 C 9441001C 008 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320203211 $102.76 10975882-3562506340
2024 1 FD52 06 E123 C 9441001C 008 7/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR072N1062320203211 $38.69 10975882-3562506340
2024 1 FD52 06 E123 C 9441001C 008 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320203211 $14.79 10975882-3562506340
2024 1 FD52 06 E124 C 9441001C 008 7/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR072N1062320203211 $0.10 10975882-3562506340
2024 1 FD52 06 E124 C 9441001C 008 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320203211 $0.04 10975882-3562506340
2024 1 FD52 00 E111 C 9441001C 057 7/24/2023 5082 INSP-PORTLAND CONCRETE STRUC CA-XR072N1062320202729 $273.98 000001088455-3562500640
2024 1 FD52 00 E111 C 9441001C 057 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202729 $74.16 000001088455-3562500640
2024 1 FD52 00 E121 C 9441001C 057 7/24/2023 5082 INSP-PORTLAND CONCRETE STRUC CA-XR072N1062320202729 $20.45 000001088455-3562500640
2024 1 FD52 00 E121 C 9441001C 057 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202729 $5.54 000001088455-3562500640
2024 1 FD52 00 E122 C 9441001C 057 7/24/2023 5082 INSP-PORTLAND CONCRETE STRUC CA-XR072N1062320202729 $181.29 000001088455-3562500640
2024 1 FD52 00 E122 C 9441001C 057 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202729 $49.07 000001088455-3562500640
2024 1 FD52 00 E123 C 9441001C 057 7/24/2023 5082 INSP-PORTLAND CONCRETE STRUC CA-XR072N1062320202729 $36.63 000001088455-3562500640
2024 1 FD52 00 E123 C 9441001C 057 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202729 $9.74 000001088455-3562500640
2024 1 FD52 00 E124 C 9441001C 057 7/24/2023 5082 INSP-PORTLAND CONCRETE STRUC CA-XR072N1062320202729 $0.10 000001088455-3562500640
2024 1 FD52 00 E124 C 9441001C 057 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202729 $0.02 000001088455-3562500640
2024 1 FD52 06 E111 C 9441001C 008 7/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR072N1062320202697 $226.54 000001086653-3562506200
2024 1 FD52 06 E111 C 9441001C 008 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202697 $76.68 000001086653-3562506200
2024 1 FD52 06 E121 C 9441001C 008 7/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR072N1062320202697 $17.12 000001086653-3562506200
2024 1 FD52 00 E111 C 9441001C 059 7/24/2023 5213 ASPHALT MIX DESIGN CA-XR072N1062320202710 $2,465.84 000001088014-3562500640
2024 1 FD52 00 E111 C 9441001C 059 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202710 $273.98 000001088014-3562500640
2024 1 FD52 00 E121 C 9441001C 059 7/24/2023 5213 ASPHALT MIX DESIGN CA-XR072N1062320202710 $180.48 000001088014-3562500640
2024 1 FD52 00 E111 C 9441001C 059 7/24/2023 5082 INSP-PORTLAND CONCRETE STRUC CA-XR072N1062320202726 $273.98 000001088414-3562500640
2024 1 FD52 00 E121 C 9441001C 059 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202710 $20.05 000001088014-3562500640
2024 1 FD52 00 E111 C 9441001C 059 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202726 $74.16 000001088414-3562500640
2024 1 FD52 00 E122 C 9441001C 059 7/24/2023 5213 ASPHALT MIX DESIGN CA-XR072N1062320202710 $1,631.65 000001088014-3562500640
2024 1 FD52 00 E121 C 9441001C 008 7/24/2023 5203 TESTING OF ASPHALT MIXTURES CA-XR072N1062320202714 $0.11 000001088156-3562500640
2024 1 FD52 00 E121 C 9441001C 059 7/24/2023 5082 INSP-PORTLAND CONCRETE STRUC CA-XR072N1062320202726 $20.45 000001088414-3562500640
2024 1 FD52 00 E122 C 9441001C 059 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202710 $181.29 000001088014-3562500640
2024 1 FD52 00 E121 C 9441001C 059 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202726 $5.54 000001088414-3562500640
2024 1 FD52 00 E123 C 9441001C 059 7/24/2023 5213 ASPHALT MIX DESIGN CA-XR072N1062320202710 $377.49 000001088014-3562500640
2024 1 FD52 00 E122 C 9441001C 059 7/24/2023 5082 INSP-PORTLAND CONCRETE STRUC CA-XR072N1062320202726 $181.29 000001088414-3562500640
2024 1 FD52 00 E123 C 9441001C 059 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202710 $41.38 000001088014-3562500640
2024 1 FD52 00 E122 C 9441001C 059 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202726 $49.07 000001088414-3562500640
2024 1 FD52 00 E124 C 9441001C 059 7/24/2023 5213 ASPHALT MIX DESIGN CA-XR072N1062320202710 $0.90 000001088014-3562500640
2024 1 FD52 00 E123 C 9441001C 059 7/24/2023 5082 INSP-PORTLAND CONCRETE STRUC CA-XR072N1062320202726 $36.63 000001088414-3562500640
2024 1 FD52 06 E121 C 9441001C 008 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202697 $5.79 000001086653-3562506200
2024 1 FD52 00 E124 C 9441001C 059 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202710 $0.10 000001088014-3562500640
2024 1 FD52 00 E123 C 9441001C 059 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202726 $9.74 000001088414-3562500640
2024 1 FD52 00 E124 C 9441001C 059 7/24/2023 5082 INSP-PORTLAND CONCRETE STRUC CA-XR072N1062320202726 $0.10 000001088414-3562500640
2024 1 FD52 00 E124 C 9441001C 059 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202726 $0.02 000001088414-3562500640
2024 1 FD52 06 E115 C 9441001C 008 7/24/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR072N1062320202714 $190.87 000001088160-3562506210
2024 1 FD52 06 E121 C 9441001C 008 7/24/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR072N1062320202714 $14.31 000001088160-3562506210
2024 1 FD52 06 E122 C 9441001C 008 7/24/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR072N1062320202714 $148.88 000001088160-3562506210
2024 1 FD52 06 E122 C 9441001C 008 7/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR072N1062320202697 $149.84 000001086653-3562506200
2024 1 FD52 06 E122 C 9441001C 008 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202697 $50.75 000001086653-3562506200
2024 1 FD52 06 E797 C 9441001C 008 7/19/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P010K CTXCONST0922210590001K Riegler Blacktop, Inc. $325,666.64
2024 1 FD52 06 E143 C 9441001C 008 7/18/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400011641 PON22300001683 H W Lochner Inc $52,257.50 Boone Co. 6-444
2024 1 FD52 06 E143 C 9441001C 008 7/18/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400011641 PON22300001683 H W Lochner Inc $12,878.25 Boone Co. 6-444
2024 1 FD52 00 E111 C 9441001C 008 7/14/2023 5203 TESTING OF ASPHALT MIXTURES CA-XR071N1062319101579 $241.23 000001088156-3562500640
2024 1 FD52 00 E115 C 9441001C 008 7/14/2023 5203 TESTING OF ASPHALT MIXTURES CA-XR071N1062319101579 $244.95 000001088156-3562500640
2024 1 FD52 00 E121 C 9441001C 008 7/14/2023 5203 TESTING OF ASPHALT MIXTURES CA-XR071N1062319101579 $36.33 000001088156-3562500640
2024 1 FD52 00 E122 C 9441001C 008 7/14/2023 5203 TESTING OF ASPHALT MIXTURES CA-XR071N1062319101579 $379.22 000001088156-3562500640
2024 1 FD52 00 E123 C 9441001C 008 7/14/2023 5203 TESTING OF ASPHALT MIXTURES CA-XR071N1062319101579 $32.48 000001088156-3562500640
2024 1 FD52 06 E229 C 9441001C 008 7/12/2023 4010 CONSTRUCTION ENGINEERING IET-XE13A162523191007030 $21.45
2024 1 FD52 00 E111 C 9441001C 059 7/11/2023 5213 ASPHALT MIX DESIGN CA-XR071N1062319101573 $2,114.78 000001088014-3562500640
2024 1 FD52 00 E121 C 9441001C 059 7/11/2023 5213 ASPHALT MIX DESIGN CA-XR071N1062319101573 $147.99 000001088014-3562500640
2024 1 FD52 00 E122 C 9441001C 059 7/11/2023 5213 ASPHALT MIX DESIGN CA-XR071N1062319101573 $1,649.53 000001088014-3562500640
2024 1 FD52 00 E123 C 9441001C 059 7/11/2023 5213 ASPHALT MIX DESIGN CA-XR071N1062319101573 $342.71 000001088014-3562500640
2024 1 FD52 06 E111 C 9441001C 008 7/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR071N1062319101980 $980.70 10968023-3562506340
2024 1 FD52 06 E111 C 9441001C 008 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101980 $30.56 10968023-3562506340
2024 1 FD52 06 E121 C 9441001C 008 7/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR071N1062319101980 $73.92 10968023-3562506340
2024 1 FD52 06 E111 C 9441001C 008 7/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR071N1062319102110 $342.16 10971170-3562506340
2024 1 FD52 06 E121 C 9441001C 008 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101980 $2.31 10968023-3562506340
2024 1 FD52 06 E111 C 9441001C 008 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319102110 $10.49 10971170-3562506340
2024 1 FD52 06 E122 C 9441001C 008 7/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR071N1062319101980 $764.88 10968023-3562506340
2024 1 FD52 06 E121 C 9441001C 008 7/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR071N1062319102110 $25.79 10971170-3562506340
2024 1 FD52 06 E122 C 9441001C 008 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101980 $23.84 10968023-3562506340
2024 1 FD52 06 E121 C 9441001C 008 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319102110 $0.79 10971170-3562506340
2024 1 FD52 06 E123 C 9441001C 008 7/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR071N1062319101980 $100.34 10968023-3562506340
2024 1 FD52 06 E122 C 9441001C 008 7/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR071N1062319102110 $267.18 10971170-3562506340
2024 1 FD52 06 E123 C 9441001C 008 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101980 $3.08 10968023-3562506340
2024 1 FD52 06 E122 C 9441001C 008 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319102110 $8.18 10971170-3562506340
2024 1 FD52 06 E123 C 9441001C 008 7/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR071N1062319102110 $35.05 10971170-3562506340
2024 1 FD52 06 E123 C 9441001C 008 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319102110 $1.06 10971170-3562506340
2024 1 FD52 06 E797 C 9441001C 008 7/6/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P009K CTXCONST0922210590001K Riegler Blacktop, Inc. $590,468.53
2023 12 FD52 06 E111 C 9441001C 008 6/26/2023 4010 CONSTRUCTION ENGINEERING CA-XR062N1062317400457 $234.97 000001086763-3562500680
2023 12 FD52 06 E111 C 9441001C 008 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400457 $23.50 000001086763-3562500680
2023 12 FD52 06 E121 C 9441001C 008 6/26/2023 4010 CONSTRUCTION ENGINEERING CA-XR062N1062317400457 $16.75 000001086763-3562500680
2023 12 FD52 06 E121 C 9441001C 008 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400457 $1.68 000001086763-3562500680
2023 12 FD52 06 E122 C 9441001C 008 6/26/2023 4010 CONSTRUCTION ENGINEERING CA-XR062N1062317400457 $183.28 000001086763-3562500680
2023 12 FD52 06 E122 C 9441001C 008 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400457 $18.33 000001086763-3562500680
2023 12 FD52 06 E123 C 9441001C 008 6/26/2023 4010 CONSTRUCTION ENGINEERING CA-XR062N1062317400457 $58.19 000001086763-3562500680
2023 12 FD52 06 E123 C 9441001C 008 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400457 $5.77 000001086763-3562500680
2023 12 FD52 06 E124 C 9441001C 008 6/26/2023 4010 CONSTRUCTION ENGINEERING CA-XR062N1062317400457 $0.09 000001086763-3562500680
2023 12 FD52 06 E124 C 9441001C 008 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400457 $0.01 000001086763-3562500680
2023 12 FD52 00 E111 C 9441001C 008 6/26/2023 5213 ASPHALT MIX DESIGN CA-XR062N1062317400481 $234.98 000001088045-3562500640
2023 12 FD52 00 E121 C 9441001C 008 6/26/2023 5213 ASPHALT MIX DESIGN CA-XR062N1062317400481 $17.15 000001088045-3562500640
2023 12 FD52 00 E122 C 9441001C 008 6/26/2023 5213 ASPHALT MIX DESIGN CA-XR062N1062317400481 $183.29 000001088045-3562500640
2023 12 FD52 00 E123 C 9441001C 008 6/26/2023 5213 ASPHALT MIX DESIGN CA-XR062N1062317400481 $38.08 000001088045-3562500640
2023 12 FD52 00 E124 C 9441001C 008 6/26/2023 5213 ASPHALT MIX DESIGN CA-XR062N1062317400481 $0.10 000001088045-3562500640
2023 12 FD52 00 E111 C 9441001C 059 6/26/2023 5213 ASPHALT MIX DESIGN CA-XR062N1062317400479 $939.91 000001088014-3562500640
2023 12 FD52 00 E121 C 9441001C 059 6/26/2023 5213 ASPHALT MIX DESIGN CA-XR062N1062317400479 $68.60 000001088014-3562500640
2023 12 FD52 00 E122 C 9441001C 059 6/26/2023 5213 ASPHALT MIX DESIGN CA-XR062N1062317400479 $733.12 000001088014-3562500640
2023 12 FD52 00 E123 C 9441001C 059 6/26/2023 5213 ASPHALT MIX DESIGN CA-XR062N1062317400479 $152.31 000001088014-3562500640
2023 12 FD52 00 E124 C 9441001C 059 6/26/2023 5213 ASPHALT MIX DESIGN CA-XR062N1062317400479 $0.36 000001088014-3562500640
2023 12 FD52 06 E797 C 9441001C 008 6/21/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P008K CTXCONST0922210590001K Riegler Blacktop, Inc. $1,703,652.97
2023 12 FD52 06 E797 C 9441001C 059 6/21/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P008K CTXCONST0922210590001K Riegler Blacktop, Inc. $10,137.67
2023 12 FD52 06 E143 C 9441001C 008 6/12/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300243129 PON22300001683 H W Lochner Inc $42,438.00 Boone Co. 6-444
2023 12 FD52 06 E797 C 9441001C 008 6/7/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P007K CTXCONST0922210590001K Riegler Blacktop, Inc. $672,320.40
2023 11 FD52 06 E387 C 9441001C 008 5/31/2023 4010 CONSTRUCTION ENGINEERING PRC-2300232669 DO2300026221 IRON ARMOUR LLC $5,400.00
2023 11 FD52 06 E111 C 9441001C 008 5/30/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR052N1062314309067 $307.12 000001086638-3562506210
2023 11 FD52 06 E111 C 9441001C 008 5/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309067 $3.68 000001086638-3562506210
2023 11 FD52 06 E121 C 9441001C 008 5/30/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR052N1062314309067 $23.01 000001086638-3562506210
2023 11 FD52 06 E121 C 9441001C 008 5/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309067 $0.27 000001086638-3562506210
2023 11 FD52 06 E122 C 9441001C 008 5/30/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR052N1062314309067 $239.48 000001086638-3562506210
2023 11 FD52 06 E122 C 9441001C 008 5/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309067 $2.87 000001086638-3562506210
2023 11 FD52 06 E123 C 9441001C 008 5/30/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR052N1062314309067 $45.03 000001086638-3562506210
2023 11 FD52 06 E123 C 9441001C 008 5/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309067 $0.53 000001086638-3562506210
2023 11 FD52 06 E124 C 9441001C 008 5/30/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR052N1062314309067 $0.09 000001086638-3562506210
2023 11 FD52 06 E229 C 9441001C 008 5/26/2023 4010 CONSTRUCTION ENGINEERING IET-XE13A162523145002970 $54.60
2023 11 FD52 06 E387 C 9441001C 008 5/25/2023 4010 CONSTRUCTION ENGINEERING PRC-2300225706 DO2300024960 IRON ARMOUR LLC $72,750.00
2023 11 FD52 06 E387 C 9441001C 008 5/25/2023 4010 CONSTRUCTION ENGINEERING PRC-2300225706 DO2300024960 IRON ARMOUR LLC $111,250.00
2023 11 FD52 06 E387 C 9441001C 008 5/25/2023 4010 CONSTRUCTION ENGINEERING PRC-2300225706 DO2300024960 IRON ARMOUR LLC $8,600.00
2023 11 FD52 06 E387 C 9441001C 008 5/25/2023 4010 CONSTRUCTION ENGINEERING PRC-2300225706 DO2300024960 IRON ARMOUR LLC $7,600.00
2023 11 FD52 06 E387 C 9441001C 008 5/25/2023 4010 CONSTRUCTION ENGINEERING PRC-2300225706 DO2300024960 IRON ARMOUR LLC $8,750.00
2023 11 FD52 06 E387 C 9441001C 008 5/25/2023 4010 CONSTRUCTION ENGINEERING PRC-2300225706 DO2300024960 IRON ARMOUR LLC $31,500.00
2023 11 FD52 06 E387 C 9441001C 008 5/25/2023 4010 CONSTRUCTION ENGINEERING PRC-2300225706 DO2300024960 IRON ARMOUR LLC $1,505.00
2023 11 FD52 06 E387 C 9441001C 008 5/25/2023 4010 CONSTRUCTION ENGINEERING PRC-2300225706 DO2300024960 IRON ARMOUR LLC $945.00
2023 11 FD52 06 E797 C 9441001C 008 5/24/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P006K CTXCONST0922210590001K Riegler Blacktop, Inc. $49,936.61
2023 11 FD52 06 E111 C 9441001C 008 5/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR052N1062314309473 $621.95 10942503-3562506340
2023 11 FD52 06 E121 C 9441001C 008 5/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR052N1062314309473 $47.21 10942503-3562506340
2023 11 FD52 06 E111 C 9441001C 008 5/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR052N1062314309068 $234.97 000001086763-3562500680
2023 11 FD52 06 E122 C 9441001C 008 5/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR052N1062314309473 $485.12 10942503-3562506340
2023 11 FD52 06 E121 C 9441001C 008 5/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR052N1062314309068 $17.98 000001086763-3562500680
2023 11 FD52 06 E123 C 9441001C 008 5/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR052N1062314309473 $69.98 10942503-3562506340
2023 11 FD52 06 E122 C 9441001C 008 5/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR052N1062314309068 $183.28 000001086763-3562500680
2023 11 FD52 06 E124 C 9441001C 008 5/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR052N1062314309473 $0.18 10942503-3562506340
2023 11 FD52 06 E123 C 9441001C 008 5/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR052N1062314309068 $8.41 000001086763-3562500680
2023 11 FD52 06 E124 C 9441001C 008 5/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR052N1062314309068 $0.09 000001086763-3562500680
2023 11 FD52 06 E111 C 9441001C 008 5/16/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR051N1062312808087 $258.47 000001086638-3562506210
2023 11 FD52 06 E121 C 9441001C 008 5/16/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR051N1062312808087 $19.25 000001086638-3562506210
2023 11 FD52 06 E122 C 9441001C 008 5/16/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR051N1062312808087 $201.61 000001086638-3562506210
2023 11 FD52 06 E123 C 9441001C 008 5/16/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR051N1062312808087 $49.52 000001086638-3562506210
2023 11 FD52 06 E143 C 9441001C 008 5/12/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300219830 PON22300001683 H W Lochner Inc $41,910.00 Boone Co. 6-444
2023 11 FD52 06 E143 C 9441001C 008 5/12/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300219839 PON22300001683 H W Lochner Inc $37,679.50 Boone Co. 6-444
2023 11 FD52 06 E143 C 9441001C 008 5/12/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300219839 PON22300001683 H W Lochner Inc $15,249.00 Boone Co. 6-444
2023 11 FD52 06 E797 C 9441001C 008 5/10/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P005K CTXCONST0922210590001K Riegler Blacktop, Inc. $1,262,792.70
2023 11 FD52 06 E797 C 9441001C 059 5/10/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P005K CTXCONST0922210590001K Riegler Blacktop, Inc. $252,500.00
2023 11 FD52 06 E111 C 9441001C 008 5/9/2023 5242 CONCRETE TESTING UNIT CA-XR051N1062312808093 $516.94 000001087252-3562506210
2023 11 FD52 06 E121 C 9441001C 008 5/9/2023 5242 CONCRETE TESTING UNIT CA-XR051N1062312808093 $36.85 000001087252-3562506210
2023 11 FD52 06 E122 C 9441001C 008 5/9/2023 5242 CONCRETE TESTING UNIT CA-XR051N1062312808093 $403.22 000001087252-3562506210
2023 11 FD52 06 E123 C 9441001C 008 5/9/2023 5242 CONCRETE TESTING UNIT CA-XR051N1062312808093 $99.04 000001087252-3562506210
2023 11 FD52 06 E111 C 9441001C 008 5/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR051N1062312808341 $592.81 10934006-3562506340
2023 11 FD52 06 E111 C 9441001C 008 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808341 $16.42 10934006-3562506340
2023 11 FD52 06 E121 C 9441001C 008 5/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR051N1062312808341 $44.63 10934006-3562506340
2023 11 FD52 06 E121 C 9441001C 008 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808341 $1.23 10934006-3562506340
2023 11 FD52 06 E122 C 9441001C 008 5/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR051N1062312808341 $462.48 10934006-3562506340
2023 11 FD52 06 E122 C 9441001C 008 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808341 $12.81 10934006-3562506340
2023 11 FD52 06 E123 C 9441001C 008 5/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR051N1062312808341 $66.74 10934006-3562506340
2023 11 FD52 06 E123 C 9441001C 008 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808341 $1.82 10934006-3562506340
2023 11 FD52 06 E389 C 9441001C 008 5/4/2023 4260 SIGNAL PLANS-TRAF IET-XM005162523084001750 $249,864.65
2023 10 FD52 06 E229 C 9441001C 008 4/27/2023 4010 CONSTRUCTION ENGINEERING IET-XE13A162523115002810 $54.60
2023 10 FD52 06 E797 C 9441001C 008 4/26/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P004K CTXCONST0922210590001K Riegler Blacktop, Inc. $507,880.80
2023 10 FD52 06 E111 C 9441001C 008 4/24/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR042N1062311106964 $337.51 000001086638-3562506210
2023 10 FD52 06 E111 C 9441001C 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106964 $145.00 000001086638-3562506210
2023 10 FD52 06 E121 C 9441001C 008 4/24/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR042N1062311106964 $25.32 000001086638-3562506210
2023 10 FD52 06 E121 C 9441001C 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106964 $10.87 000001086638-3562506210
2023 10 FD52 06 E122 C 9441001C 008 4/24/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR042N1062311106964 $263.44 000001086638-3562506210
2023 10 FD52 06 E122 C 9441001C 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106964 $113.10 000001086638-3562506210
2023 10 FD52 06 E123 C 9441001C 008 4/24/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR042N1062311106964 $49.74 000001086638-3562506210
2023 10 FD52 06 E123 C 9441001C 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106964 $21.04 000001086638-3562506210
2023 10 FD52 06 E124 C 9441001C 008 4/24/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR042N1062311106964 $0.10 000001086638-3562506210
2023 10 FD52 06 E124 C 9441001C 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106964 $0.05 000001086638-3562506210
2023 10 FD52 06 E111 C 9441001C 008 4/24/2023 5242 CONCRETE TESTING UNIT CA-XR042N1062311106978 $258.55 000001087252-3562506210
2023 10 FD52 06 E111 C 9441001C 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106978 $13.44 000001087252-3562506210
2023 10 FD52 06 E121 C 9441001C 008 4/24/2023 5242 CONCRETE TESTING UNIT CA-XR042N1062311106978 $19.25 000001087252-3562506210
2023 10 FD52 06 E121 C 9441001C 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106978 $1.00 000001087252-3562506210
2023 10 FD52 06 E122 C 9441001C 008 4/24/2023 5242 CONCRETE TESTING UNIT CA-XR042N1062311106978 $202.19 000001087252-3562506210
2023 10 FD52 06 E122 C 9441001C 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106978 $10.48 000001087252-3562506210
2023 10 FD52 06 E123 C 9441001C 008 4/24/2023 5242 CONCRETE TESTING UNIT CA-XR042N1062311106978 $49.68 000001087252-3562506210
2023 10 FD52 06 E123 C 9441001C 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106978 $2.55 000001087252-3562506210
2023 10 FD52 06 E124 C 9441001C 008 4/24/2023 5242 CONCRETE TESTING UNIT CA-XR042N1062311106978 $0.08 000001087252-3562506210
2023 10 FD52 06 E124 C 9441001C 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106978 $0.01 000001087252-3562506210
2023 10 FD52 06 E111 C 9441001C 008 4/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR042N1062311107478 $684.26 10929231-3562506340
2023 10 FD52 06 E111 C 9441001C 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311107478 $78.90 10929231-3562506340
2023 10 FD52 06 E121 C 9441001C 008 4/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR042N1062311107478 $51.93 10929231-3562506340
2023 10 FD52 06 E121 C 9441001C 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311107478 $5.99 10929231-3562506340
2023 10 FD52 06 E122 C 9441001C 008 4/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR042N1062311107478 $533.98 10929231-3562506340
2023 10 FD52 06 E122 C 9441001C 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311107478 $61.54 10929231-3562506340
2023 10 FD52 06 E123 C 9441001C 008 4/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR042N1062311107478 $77.15 10929231-3562506340
2023 10 FD52 06 E123 C 9441001C 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311107478 $8.76 10929231-3562506340
2023 10 FD52 06 E124 C 9441001C 008 4/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR042N1062311107478 $0.20 10929231-3562506340
2023 10 FD52 06 E124 C 9441001C 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311107478 $0.02 10929231-3562506340
2023 10 FD52 06 E797 C 9441001C 008 4/12/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P003K CTXCONST0922210590001K Riegler Blacktop, Inc. $329,136.44
2023 10 FD52 06 E797 C 9441001C 059 4/12/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P003K CTXCONST0922210590001K Riegler Blacktop, Inc. $100.00
2023 10 FD52 06 E111 C 9441001C 008 4/10/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR041N1062309605793 $281.45 000001086638-3562506210
2023 10 FD52 06 E121 C 9441001C 008 4/10/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR041N1062309605793 $21.10 000001086638-3562506210
2023 10 FD52 06 E122 C 9441001C 008 4/10/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR041N1062309605793 $219.50 000001086638-3562506210
2023 10 FD52 06 E123 C 9441001C 008 4/10/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR041N1062309605793 $41.27 000001086638-3562506210
2023 10 FD52 06 E111 C 9441001C 008 4/10/2023 4010 CONSTRUCTION ENGINEERING CA-XR041N1062309606206 $570.12 10919951-3562506340
2023 10 FD52 06 E121 C 9441001C 008 4/10/2023 4010 CONSTRUCTION ENGINEERING CA-XR041N1062309606206 $42.91 10919951-3562506340
2023 10 FD52 06 E122 C 9441001C 008 4/10/2023 4010 CONSTRUCTION ENGINEERING CA-XR041N1062309606206 $444.70 10919951-3562506340
2023 10 FD52 06 E123 C 9441001C 008 4/10/2023 4010 CONSTRUCTION ENGINEERING CA-XR041N1062309606206 $64.15 10919951-3562506340
2023 9 FD52 06 E797 C 9441001C 008 3/29/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P002K CTXCONST0922210590001K Riegler Blacktop, Inc. $201,663.94
2023 9 FD52 06 E229 C 9441001C 008 3/29/2023 4010 CONSTRUCTION ENGINEERING IET-XE13A162523084004720 $7.80
2023 9 FD52 06 E111 C 9441001C 008 3/27/2023 4010 CONSTRUCTION ENGINEERING CA-XR032N1062308305188 $310.90 10914302-3562506340
2023 9 FD52 06 E111 C 9441001C 008 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308305188 $330.46 10914302-3562506340
2023 9 FD52 06 E121 C 9441001C 008 3/27/2023 4010 CONSTRUCTION ENGINEERING CA-XR032N1062308305188 $23.60 10914302-3562506340
2023 9 FD52 06 E121 C 9441001C 008 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308305188 $25.08 10914302-3562506340
2023 9 FD52 06 E122 C 9441001C 008 3/27/2023 4010 CONSTRUCTION ENGINEERING CA-XR032N1062308305188 $242.56 10914302-3562506340
2023 9 FD52 06 E122 C 9441001C 008 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308305188 $257.76 10914302-3562506340
2023 9 FD52 06 E123 C 9441001C 008 3/27/2023 4010 CONSTRUCTION ENGINEERING CA-XR032N1062308305188 $35.49 10914302-3562506340
2023 9 FD52 06 E123 C 9441001C 008 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308305188 $36.69 10914302-3562506340
2023 9 FD52 06 E124 C 9441001C 008 3/27/2023 4010 CONSTRUCTION ENGINEERING CA-XR032N1062308305188 $0.09 10914302-3562506340
2023 9 FD52 06 E124 C 9441001C 008 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308305188 $0.10 10914302-3562506340
2023 9 FD52 06 E111 C 9441001C 008 3/27/2023 4010 CONSTRUCTION ENGINEERING CA-XR032N1062308304675 $234.94 000001086763-3562500680
2023 9 FD52 06 E111 C 9441001C 008 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304675 $8.15 000001086763-3562500680
2023 9 FD52 06 E121 C 9441001C 008 3/27/2023 4010 CONSTRUCTION ENGINEERING CA-XR032N1062308304675 $17.97 000001086763-3562500680
2023 9 FD52 06 E121 C 9441001C 008 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304675 $0.63 000001086763-3562500680
2023 9 FD52 06 E122 C 9441001C 008 3/27/2023 4010 CONSTRUCTION ENGINEERING CA-XR032N1062308304675 $183.28 000001086763-3562500680
2023 9 FD52 06 E122 C 9441001C 008 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304675 $6.36 000001086763-3562500680
2023 9 FD52 06 E123 C 9441001C 008 3/27/2023 4010 CONSTRUCTION ENGINEERING CA-XR032N1062308304675 $8.43 000001086763-3562500680
2023 9 FD52 06 E123 C 9441001C 008 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304675 $0.28 000001086763-3562500680
2023 9 FD52 06 E124 C 9441001C 008 3/27/2023 4010 CONSTRUCTION ENGINEERING CA-XR032N1062308304675 $0.09 000001086763-3562500680
2023 9 FD52 06 E143 C 9441001C 008 3/21/2023 4010 CONSTRUCTION ENGINEERING PRC-2300176196 PON22300001683 H W Lochner Inc $24,324.00 Boone Co. 6-444
2023 9 FD52 06 E797 C 9441001C 008 3/15/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P001K CTXCONST0922210590001K Riegler Blacktop, Inc. $357,152.28
2023 9 FD52 06 E797 C 9441001C 059 3/15/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221059P001K CTXCONST0922210590001K Riegler Blacktop, Inc. $318,355.00
2023 9 FD52 06 E111 C 9441001C 008 3/9/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR031N1062306703684 $375.26 000001086638-3562506210
2023 9 FD52 06 E121 C 9441001C 008 3/9/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR031N1062306703684 $28.12 000001086638-3562506210
2023 9 FD52 06 E122 C 9441001C 008 3/9/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR031N1062306703684 $292.70 000001086638-3562506210
2023 9 FD52 06 E111 C 9441001C 008 3/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR031N1062306703685 $829.97 000001086653-3562506200
2023 9 FD52 06 E123 C 9441001C 008 3/9/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR031N1062306703684 $55.03 000001086638-3562506210
2023 9 FD52 06 E111 C 9441001C 008 3/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR031N1062306703690 $244.44 000001086763-3562500620
2023 9 FD52 06 E111 C 9441001C 008 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703690 $9.45 000001086763-3562500620
2023 9 FD52 06 E115 C 9441001C 008 3/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR031N1062306703690 $50.77 000001086763-3562500620
2023 9 FD52 06 E121 C 9441001C 008 3/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR031N1062306703690 $21.73 000001086763-3562500620
2023 9 FD52 06 E121 C 9441001C 008 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703690 $0.69 000001086763-3562500620
2023 9 FD52 06 E122 C 9441001C 008 3/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR031N1062306703690 $230.28 000001086763-3562500620
2023 9 FD52 06 E122 C 9441001C 008 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703690 $7.37 000001086763-3562500620
2023 9 FD52 06 E111 C 9441001C 008 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703685 $157.61 000001086653-3562506200
2023 9 FD52 06 E123 C 9441001C 008 3/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR031N1062306703690 $41.95 000001086763-3562500620
2023 9 FD52 06 E123 C 9441001C 008 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703690 $1.60 000001086763-3562500620
2023 9 FD52 06 E121 C 9441001C 008 3/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR031N1062306703685 $63.28 000001086653-3562506200
2023 9 FD52 06 E121 C 9441001C 008 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703685 $12.04 000001086653-3562506200
2023 9 FD52 06 E111 C 9441001C 008 3/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR031N1062306704008 $380.08 10905306-3562506340
2023 9 FD52 06 E121 C 9441001C 008 3/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR031N1062306704008 $28.61 10905306-3562506340
2023 9 FD52 06 E122 C 9441001C 008 3/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR031N1062306704008 $296.46 10905306-3562506340
2023 9 FD52 06 E122 C 9441001C 008 3/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR031N1062306703685 $647.48 000001086653-3562506200
2023 9 FD52 06 E123 C 9441001C 008 3/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR031N1062306704008 $42.77 10905306-3562506340
2023 9 FD52 06 E122 C 9441001C 008 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703685 $122.93 000001086653-3562506200
2023 9 FD52 06 E123 C 9441001C 008 3/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR031N1062306703685 $35.81 000001086653-3562506200
2023 9 FD52 06 E123 C 9441001C 008 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703685 $6.68 000001086653-3562506200