The Commonwealth pays employees on a semi-monthly basis with a scheduled pay day on the 15th and 30th of each month. The two monthly pay periods are from the 1st to the 15th of the month and the 16th through the last day of the month. Pay check distribution is delayed by one pay period to allow for system processing. For example work performed during the 1st to the 15th day of the month is paid to the employee on the 30th of the month. Accordingly the cost accounting charges for labor costs posting in eMARS to operating accounts and highway projects are also delayed by approximately one pay period.
A good rule of measure is that the cost accounting charges for the pay period ending on the 15th of the month will post to eMARS by the 25th and those for the pay period ending on the last day of the month will post to eMARS by the 10th of the following month.

x close panel
Detailed Project Expenditure Report
Total E-MARS Expenditures for 7921601U = $101,468.20
Click here for Labor Costs Information
Year Month PBU Charge District Object Phase Program Code County Date ACT Activity Name Trans ID Reference # Vendor Name Expenditure Line Description
2025 12 FD52 00 E111 U 7921601U 093 6/24/2025 3040 INSPECTION&SUPER-UTILITIES CA-XR062P1062517403901 $285.89 000001050243-3562500480
2025 12 FD52 00 E111 U 7921601U 093 6/24/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062P1062517403901 $40.33 000001050243-3562500480
2025 12 FD52 00 E121 U 7921601U 093 6/24/2025 3040 INSPECTION&SUPER-UTILITIES CA-XR062P1062517403901 $20.79 000001050243-3562500480
2025 12 FD52 00 E121 U 7921601U 093 6/24/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062P1062517403901 $2.95 000001050243-3562500480
2025 12 FD52 00 E122 U 7921601U 093 6/24/2025 3040 INSPECTION&SUPER-UTILITIES CA-XR062P1062517403901 $139.42 000001050243-3562500480
2025 12 FD52 00 E122 U 7921601U 093 6/24/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062P1062517403901 $19.66 000001050243-3562500480
2025 12 FD52 00 E123 U 7921601U 093 6/24/2025 3040 INSPECTION&SUPER-UTILITIES CA-XR062P1062517403901 $53.18 000001050243-3562500480
2025 12 FD52 00 E123 U 7921601U 093 6/24/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062P1062517403901 $6.14 000001050243-3562500480
2025 12 FD52 00 E124 U 7921601U 093 6/24/2025 3040 INSPECTION&SUPER-UTILITIES CA-XR062P1062517403901 $0.07 000001050243-3562500480
2025 12 FD52 00 E111 U 7921601U 093 6/9/2025 3040 INSPECTION&SUPER-UTILITIES CA-XR061P1062515702724 $87.75 000001050243-3562500480
2025 12 FD52 00 E111 U 7921601U 093 6/9/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061P1062515702724 $60.05 000001050243-3562500480
2025 12 FD52 00 E121 U 7921601U 093 6/9/2025 3040 INSPECTION&SUPER-UTILITIES CA-XR061P1062515702724 $6.25 000001050243-3562500480
2025 12 FD52 00 E121 U 7921601U 093 6/9/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061P1062515702724 $4.27 000001050243-3562500480
2025 12 FD52 00 E122 U 7921601U 093 6/9/2025 3040 INSPECTION&SUPER-UTILITIES CA-XR061P1062515702724 $42.45 000001050243-3562500480
2025 12 FD52 00 E122 U 7921601U 093 6/9/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061P1062515702724 $29.27 000001050243-3562500480
2025 12 FD52 00 E123 U 7921601U 093 6/9/2025 3040 INSPECTION&SUPER-UTILITIES CA-XR061P1062515702724 $25.58 000001050243-3562500480
2025 12 FD52 00 E123 U 7921601U 093 6/9/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061P1062515702724 $17.40 000001050243-3562500480
2025 10 FD52 00 E111 U 7921601U 093 4/14/2025 3040 INSPECTION&SUPER-UTILITIES CA-XR041P1062509808293 $87.83 000001050243-3562500480
2025 10 FD52 00 E111 U 7921601U 093 4/14/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041P1062509808293 $4.57 000001050243-3562500480
2025 10 FD52 00 E121 U 7921601U 093 4/14/2025 3040 INSPECTION&SUPER-UTILITIES CA-XR041P1062509808293 $6.25 000001050243-3562500480
2025 10 FD52 00 E121 U 7921601U 093 4/14/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041P1062509808293 $0.32 000001050243-3562500480
2025 10 FD52 00 E122 U 7921601U 093 4/14/2025 3040 INSPECTION&SUPER-UTILITIES CA-XR041P1062509808293 $42.80 000001050243-3562500480
2025 10 FD52 00 E122 U 7921601U 093 4/14/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041P1062509808293 $2.23 000001050243-3562500480
2025 10 FD52 00 E123 U 7921601U 093 4/14/2025 3040 INSPECTION&SUPER-UTILITIES CA-XR041P1062509808293 $25.60 000001050243-3562500480
2025 10 FD52 00 E123 U 7921601U 093 4/14/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041P1062509808293 $1.32 000001050243-3562500480
2025 8 FD52 00 E111 U 7921601U 093 2/24/2025 3040 INSPECTION&SUPER-UTILITIES CA-XR022P1062505204804 $96.64 000001050243-3562500480
2025 8 FD52 00 E111 U 7921601U 093 2/24/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022P1062505204804 $1.54 000001050243-3562500480
2025 8 FD52 00 E121 U 7921601U 093 2/24/2025 3040 INSPECTION&SUPER-UTILITIES CA-XR022P1062505204804 $6.88 000001050243-3562500480
2025 8 FD52 00 E121 U 7921601U 093 2/24/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022P1062505204804 $0.11 000001050243-3562500480
2025 8 FD52 00 E122 U 7921601U 093 2/24/2025 3040 INSPECTION&SUPER-UTILITIES CA-XR022P1062505204804 $47.08 000001050243-3562500480
2025 8 FD52 00 E122 U 7921601U 093 2/24/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022P1062505204804 $0.75 000001050243-3562500480
2025 8 FD52 00 E123 U 7921601U 093 2/24/2025 3040 INSPECTION&SUPER-UTILITIES CA-XR022P1062505204804 $28.16 000001050243-3562500480
2025 8 FD52 00 E123 U 7921601U 093 2/24/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022P1062505204804 $0.45 000001050243-3562500480
2025 8 FD52 00 E124 U 7921601U 093 2/24/2025 3040 INSPECTION&SUPER-UTILITIES CA-XR022P1062505204804 $0.03 000001050243-3562500480
2025 6 FD52 00 E111 U 7921601U 093 12/23/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR122O1062435500395 $154.39 000001050243-3562500480
2025 6 FD52 00 E111 U 7921601U 093 12/23/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122O1062435500395 $40.95 000001050243-3562500480
2025 6 FD52 00 E121 U 7921601U 093 12/23/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR122O1062435500395 $11.01 000001050243-3562500480
2025 6 FD52 00 E121 U 7921601U 093 12/23/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122O1062435500395 $2.92 000001050243-3562500480
2025 6 FD52 00 E122 U 7921601U 093 12/23/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR122O1062435500395 $75.32 000001050243-3562500480
2025 6 FD52 00 E122 U 7921601U 093 12/23/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122O1062435500395 $19.96 000001050243-3562500480
2025 6 FD52 00 E123 U 7921601U 093 12/23/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR122O1062435500395 $45.12 000001050243-3562500480
2025 6 FD52 00 E123 U 7921601U 093 12/23/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122O1062435500395 $11.86 000001050243-3562500480
2025 6 FD52 00 E124 U 7921601U 093 12/23/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR122O1062435500395 $0.05 000001050243-3562500480
2025 6 FD52 00 E124 U 7921601U 093 12/23/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122O1062435500395 $0.01 000001050243-3562500480
2025 4 FD52 00 E111 U 7921601U 093 10/9/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR101O1062428205189 $87.67 000001050243-3562500480
2025 4 FD52 00 E111 U 7921601U 093 10/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101O1062428205189 $14.75 000001050243-3562500480
2025 4 FD52 00 E121 U 7921601U 093 10/9/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR101O1062428205189 $6.25 000001050243-3562500480
2025 4 FD52 00 E121 U 7921601U 093 10/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101O1062428205189 $1.05 000001050243-3562500480
2025 4 FD52 00 E122 U 7921601U 093 10/9/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR101O1062428205189 $42.80 000001050243-3562500480
2025 4 FD52 00 E122 U 7921601U 093 10/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101O1062428205189 $7.19 000001050243-3562500480
2025 4 FD52 00 E123 U 7921601U 093 10/9/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR101O1062428205189 $25.62 000001050243-3562500480
2025 4 FD52 00 E123 U 7921601U 093 10/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101O1062428205189 $4.28 000001050243-3562500480
2025 1 FD52 00 E111 U 7921601U 093 7/16/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR071O1062419208610 $140.70 000001050243-3562500480
2025 1 FD52 00 E111 U 7921601U 093 7/16/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071O1062419208610 $39.75 000001050243-3562500480
2025 1 FD52 00 E121 U 7921601U 093 7/16/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR071O1062419208610 $10.00 000001050243-3562500480
2025 1 FD52 00 E121 U 7921601U 093 7/16/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071O1062419208610 $2.82 000001050243-3562500480
2025 1 FD52 00 E122 U 7921601U 093 7/16/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR071O1062419208610 $93.06 000001050243-3562500480
2025 1 FD52 00 E122 U 7921601U 093 7/16/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071O1062419208610 $26.30 000001050243-3562500480
2025 1 FD52 00 E123 U 7921601U 093 7/16/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR071O1062419208610 $42.31 000001050243-3562500480
2025 1 FD52 00 E123 U 7921601U 093 7/16/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071O1062419208610 $11.86 000001050243-3562500480
2024 11 FD52 00 E111 U 7921601U 093 5/23/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR052O1062414304960 $85.20 000001050243-3562500480
2024 11 FD52 00 E111 U 7921601U 093 5/23/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052O1062414304960 $1.36 000001050243-3562500480
2024 11 FD52 00 E121 U 7921601U 093 5/23/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR052O1062414304960 $6.06 000001050243-3562500480
2024 11 FD52 00 E121 U 7921601U 093 5/23/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052O1062414304960 $0.10 000001050243-3562500480
2024 11 FD52 00 E122 U 7921601U 093 5/23/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR052O1062414304960 $56.40 000001050243-3562500480
2024 11 FD52 00 E122 U 7921601U 093 5/23/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052O1062414304960 $0.90 000001050243-3562500480
2024 11 FD52 00 E123 U 7921601U 093 5/23/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR052O1062414304960 $25.60 000001050243-3562500480
2024 11 FD52 00 E123 U 7921601U 093 5/23/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052O1062414304960 $0.41 000001050243-3562500480
2024 11 FD52 00 E124 U 7921601U 093 5/23/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR052O1062414304960 $0.03 000001050243-3562500480
2024 9 FD52 00 E111 U 7921601U 093 3/25/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR032O1062408200380 $119.30 000001050243-3562500480
2024 9 FD52 00 E111 U 7921601U 093 3/25/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032O1062408200380 $4.09 000001050243-3562500480
2024 9 FD52 00 E121 U 7921601U 093 3/25/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR032O1062408200380 $8.48 000001050243-3562500480
2024 9 FD52 00 E121 U 7921601U 093 3/25/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032O1062408200380 $0.30 000001050243-3562500480
2024 9 FD52 00 E122 U 7921601U 093 3/25/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR032O1062408200380 $78.27 000001050243-3562500480
2024 9 FD52 00 E122 U 7921601U 093 3/25/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032O1062408200380 $2.71 000001050243-3562500480
2024 9 FD52 00 E123 U 7921601U 093 3/25/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR032O1062408200380 $35.55 000001050243-3562500480
2024 9 FD52 00 E123 U 7921601U 093 3/25/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032O1062408200380 $1.22 000001050243-3562500480
2024 9 FD52 00 E124 U 7921601U 093 3/25/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR032O1062408200380 $0.02 000001050243-3562500480
2024 8 FD52 00 E111 U 7921601U 093 2/9/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR021O1062403907638 $101.55 000001050243-3562500480
2024 8 FD52 00 E111 U 7921601U 093 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907638 $13.13 000001050243-3562500480
2024 8 FD52 00 E121 U 7921601U 093 2/9/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR021O1062403907638 $7.22 000001050243-3562500480
2024 8 FD52 00 E121 U 7921601U 093 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907638 $0.94 000001050243-3562500480
2024 8 FD52 00 E122 U 7921601U 093 2/9/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR021O1062403907638 $67.21 000001050243-3562500480
2024 8 FD52 00 E122 U 7921601U 093 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907638 $8.69 000001050243-3562500480
2024 8 FD52 00 E123 U 7921601U 093 2/9/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR021O1062403907638 $30.53 000001050243-3562500480
2024 8 FD52 00 E123 U 7921601U 093 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907638 $3.92 000001050243-3562500480
2024 6 FD52 00 E111 U 7921601U 093 12/14/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR121N1062334203596 $170.45 000001050243-3562500480
2024 6 FD52 00 E111 U 7921601U 093 12/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203596 $103.65 000001050243-3562500480
2024 6 FD52 00 E121 U 7921601U 093 12/14/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR121N1062334203596 $12.12 000001050243-3562500480
2024 6 FD52 00 E121 U 7921601U 093 12/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203596 $7.37 000001050243-3562500480
2024 6 FD52 00 E122 U 7921601U 093 12/14/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR121N1062334203596 $112.80 000001050243-3562500480
2024 6 FD52 00 E122 U 7921601U 093 12/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203596 $68.59 000001050243-3562500480
2024 6 FD52 00 E123 U 7921601U 093 12/14/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR121N1062334203596 $42.79 000001050243-3562500480
2024 6 FD52 00 E123 U 7921601U 093 12/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203596 $25.71 000001050243-3562500480
2024 4 FD52 00 E111 U 7921601U 093 10/2/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR092N1062327208383 $76.61 000001050243-3562500480
2024 4 FD52 00 E111 U 7921601U 093 10/2/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208383 $15.00 000001050243-3562500480
2024 4 FD52 00 E121 U 7921601U 093 10/2/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR092N1062327208383 $5.45 000001050243-3562500480
2024 4 FD52 00 E121 U 7921601U 093 10/2/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208383 $1.06 000001050243-3562500480
2024 4 FD52 00 E122 U 7921601U 093 10/2/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR092N1062327208383 $50.76 000001050243-3562500480
2024 4 FD52 00 E122 U 7921601U 093 10/2/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208383 $9.92 000001050243-3562500480
2024 4 FD52 00 E123 U 7921601U 093 10/2/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR092N1062327208383 $19.20 000001050243-3562500480
2024 4 FD52 00 E123 U 7921601U 093 10/2/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208383 $3.72 000001050243-3562500480
2024 4 FD52 00 E124 U 7921601U 093 10/2/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR092N1062327208383 $0.03 000001050243-3562500480
2024 3 FD52 00 E111 U 7921601U 093 9/11/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR091N1062325106067 $78.19 000001050243-3562500480
2024 3 FD52 00 E111 U 7921601U 093 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106067 $9.38 000001050243-3562500480
2024 3 FD52 00 E121 U 7921601U 093 9/11/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR091N1062325106067 $5.55 000001050243-3562500480
2024 3 FD52 00 E121 U 7921601U 093 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106067 $0.67 000001050243-3562500480
2024 3 FD52 00 E122 U 7921601U 093 9/11/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR091N1062325106067 $51.70 000001050243-3562500480
2024 3 FD52 00 E122 U 7921601U 093 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106067 $6.21 000001050243-3562500480
2024 3 FD52 00 E123 U 7921601U 093 9/11/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR091N1062325106067 $19.54 000001050243-3562500480
2024 3 FD52 00 E123 U 7921601U 093 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106067 $2.33 000001050243-3562500480
2023 12 FD52 00 E111 U 7921601U 093 6/26/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR062N1062317400402 $96.44 000001050243-3562500480
2023 12 FD52 00 E111 U 7921601U 093 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400402 $4.83 000001050243-3562500480
2023 12 FD52 00 E121 U 7921601U 093 6/26/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR062N1062317400402 $6.82 000001050243-3562500480
2023 12 FD52 00 E121 U 7921601U 093 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400402 $0.34 000001050243-3562500480
2023 12 FD52 00 E122 U 7921601U 093 6/26/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR062N1062317400402 $75.26 000001050243-3562500480
2023 12 FD52 00 E122 U 7921601U 093 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400402 $3.77 000001050243-3562500480
2023 12 FD52 00 E123 U 7921601U 093 6/26/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR062N1062317400402 $25.56 000001050243-3562500480
2023 12 FD52 00 E123 U 7921601U 093 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400402 $1.28 000001050243-3562500480
2023 12 FD52 00 E124 U 7921601U 093 6/26/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR062N1062317400402 $0.04 000001050243-3562500480
2023 10 FD52 00 E111 U 7921601U 093 4/14/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR041N1062309605741 $59.00 000001050243-3562500480
2023 10 FD52 00 E111 U 7921601U 093 4/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605741 $3.24 000001050243-3562500480
2023 10 FD52 00 E121 U 7921601U 093 4/14/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR041N1062309605741 $4.17 000001050243-3562500480
2023 10 FD52 00 E121 U 7921601U 093 4/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605741 $0.23 000001050243-3562500480
2023 10 FD52 00 E122 U 7921601U 093 4/14/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR041N1062309605741 $46.00 000001050243-3562500480
2023 10 FD52 00 E122 U 7921601U 093 4/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605741 $2.53 000001050243-3562500480
2023 10 FD52 00 E123 U 7921601U 093 4/14/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR041N1062309605741 $15.63 000001050243-3562500480
2023 10 FD52 00 E123 U 7921601U 093 4/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605741 $0.85 000001050243-3562500480
2023 7 FD52 00 E111 U 7921601U 093 1/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR012N1062302300385 $70.79 000001050243-3562500480
2023 7 FD52 00 E111 U 7921601U 093 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300385 $15.92 000001050243-3562500480
2023 7 FD52 00 E121 U 7921601U 093 1/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR012N1062302300385 $5.01 000001050243-3562500480
2023 7 FD52 00 E121 U 7921601U 093 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300385 $1.12 000001050243-3562500480
2023 7 FD52 00 E122 U 7921601U 093 1/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR012N1062302300385 $55.19 000001050243-3562500480
2023 7 FD52 00 E122 U 7921601U 093 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300385 $12.42 000001050243-3562500480
2023 7 FD52 00 E123 U 7921601U 093 1/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR012N1062302300385 $18.78 000001050243-3562500480
2023 7 FD52 00 E123 U 7921601U 093 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300385 $4.18 000001050243-3562500480
2023 7 FD52 00 E124 U 7921601U 093 1/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR012N1062302300385 $0.03 000001050243-3562500480
2023 7 FD52 00 E111 U 7921601U 093 1/12/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR011N1062300610229 $88.42 000001050243-3562500480
2023 7 FD52 00 E111 U 7921601U 093 1/12/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011N1062300610229 $42.78 000001050243-3562500480
2023 7 FD52 00 E121 U 7921601U 093 1/12/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR011N1062300610229 $6.25 000001050243-3562500480
2023 7 FD52 00 E121 U 7921601U 093 1/12/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011N1062300610229 $3.02 000001050243-3562500480
2023 7 FD52 00 E122 U 7921601U 093 1/12/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR011N1062300610229 $68.99 000001050243-3562500480
2023 7 FD52 00 E122 U 7921601U 093 1/12/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011N1062300610229 $33.38 000001050243-3562500480
2023 7 FD52 00 E123 U 7921601U 093 1/12/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR011N1062300610229 $23.51 000001050243-3562500480
2023 7 FD52 00 E123 U 7921601U 093 1/12/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011N1062300610229 $11.25 000001050243-3562500480
2023 5 FD52 00 E111 U 7921601U 093 11/7/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR111M1062230806127 $144.65 000001050243-3562500480
2023 5 FD52 00 E111 U 7921601U 093 11/7/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806127 $24.76 000001050243-3562500480
2023 5 FD52 00 E121 U 7921601U 093 11/7/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR111M1062230806127 $10.24 000001050243-3562500480
2023 5 FD52 00 E121 U 7921601U 093 11/7/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806127 $1.75 000001050243-3562500480
2023 5 FD52 00 E122 U 7921601U 093 11/7/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR111M1062230806127 $112.90 000001050243-3562500480
2023 5 FD52 00 E122 U 7921601U 093 11/7/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806127 $19.32 000001050243-3562500480
2023 5 FD52 00 E123 U 7921601U 093 11/7/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR111M1062230806127 $33.74 000001050243-3562500480
2023 5 FD52 00 E123 U 7921601U 093 11/7/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806127 $5.72 000001050243-3562500480
2023 3 FD52 00 E111 U 7921601U 093 9/12/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR091M1062225101591 $198.99 000001050243-3562500480
2023 3 FD52 00 E111 U 7921601U 093 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101591 $11.20 000001050243-3562500480
2023 3 FD52 00 E121 U 7921601U 093 9/12/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR091M1062225101591 $14.08 000001050243-3562500480
2023 3 FD52 00 E121 U 7921601U 093 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101591 $0.79 000001050243-3562500480
2023 3 FD52 00 E122 U 7921601U 093 9/12/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR091M1062225101591 $155.23 000001050243-3562500480
2023 3 FD52 00 E122 U 7921601U 093 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101591 $8.74 000001050243-3562500480
2023 3 FD52 00 E123 U 7921601U 093 9/12/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR091M1062225101591 $46.34 000001050243-3562500480
2023 3 FD52 00 E123 U 7921601U 093 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101591 $2.59 000001050243-3562500480
2022 12 FD52 00 E111 U 7921601U 093 6/9/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR061M1062215905683 $116.69 000001050243-3562500480
2022 12 FD52 00 E111 U 7921601U 093 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905683 $26.70 000001050243-3562500480
2022 12 FD52 00 E121 U 7921601U 093 6/9/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR061M1062215905683 $8.17 000001050243-3562500480
2022 12 FD52 00 E121 U 7921601U 093 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905683 $1.88 000001050243-3562500480
2022 12 FD52 00 E122 U 7921601U 093 6/9/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR061M1062215905683 $97.97 000001050243-3562500480
2022 12 FD52 00 E122 U 7921601U 093 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905683 $22.42 000001050243-3562500480
2022 12 FD52 00 E123 U 7921601U 093 6/9/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR061M1062215905683 $30.94 000001050243-3562500480
2022 12 FD52 00 E123 U 7921601U 093 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905683 $7.01 000001050243-3562500480
2022 3 FD52 00 E111 U 7921601U 093 9/13/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR091L1062125207949 $194.53 000001050243-3562500480
2022 3 FD52 00 E111 U 7921601U 093 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207949 $10.11 000001050243-3562500480
2022 3 FD52 00 E121 U 7921601U 093 9/13/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR091L1062125207949 $13.67 000001050243-3562500480
2022 3 FD52 00 E121 U 7921601U 093 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207949 $0.71 000001050243-3562500480
2022 3 FD52 00 E122 U 7921601U 093 9/13/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR091L1062125207949 $163.28 000001050243-3562500480
2022 3 FD52 00 E122 U 7921601U 093 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207949 $8.49 000001050243-3562500480
2022 3 FD52 00 E123 U 7921601U 093 9/13/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR091L1062125207949 $49.02 000001050243-3562500480
2022 3 FD52 00 E123 U 7921601U 093 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207949 $2.53 000001050243-3562500480
2021 11 FD52 05 E111 U 7921601U 093 5/24/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR052L1062114100355 $271.88 000001024066-3562505208
2021 11 FD52 05 E111 U 7921601U 093 5/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052L1062114100355 $15.59 000001024066-3562505208
2021 11 FD52 05 E121 U 7921601U 093 5/24/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR052L1062114100355 $20.59 000001024066-3562505208
2021 11 FD52 05 E121 U 7921601U 093 5/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052L1062114100355 $1.19 000001024066-3562505208
2021 11 FD52 05 E122 U 7921601U 093 5/24/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR052L1062114100355 $229.55 000001024066-3562505208
2021 11 FD52 05 E122 U 7921601U 093 5/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052L1062114100355 $13.16 000001024066-3562505208
2021 11 FD52 05 E123 U 7921601U 093 5/24/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR052L1062114100355 $34.53 000001024066-3562505208
2021 11 FD52 05 E123 U 7921601U 093 5/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052L1062114100355 $1.95 000001024066-3562505208
2021 11 FD52 05 E124 U 7921601U 093 5/24/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR052L1062114100355 $0.10 000001024066-3562505208
2021 8 FD52 00 E111 U 7921601U 093 2/12/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR021L1062103603354 $203.96 000001050243-3562500480
2021 8 FD52 00 E111 U 7921601U 093 2/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021L1062103603354 $22.56 000001050243-3562500480
2021 8 FD52 00 E121 U 7921601U 093 2/12/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR021L1062103603354 $14.15 000001050243-3562500480
2021 8 FD52 00 E121 U 7921601U 093 2/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021L1062103603354 $1.57 000001050243-3562500480
2021 8 FD52 00 E122 U 7921601U 093 2/12/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR021L1062103603354 $172.13 000001050243-3562500480
2021 8 FD52 00 E122 U 7921601U 093 2/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021L1062103603354 $19.05 000001050243-3562500480
2021 8 FD52 00 E123 U 7921601U 093 2/12/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR021L1062103603354 $58.85 000001050243-3562500480
2021 8 FD52 00 E123 U 7921601U 093 2/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021L1062103603354 $6.45 000001050243-3562500480
2021 4 FD52 00 E111 U 7921601U 093 10/14/2020 3040 INSPECTION&SUPER-UTILITIES CA-XR101K1062028205671 $342.83 000001050243-3562500480
2021 4 FD52 00 E111 U 7921601U 093 10/14/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101K1062028205671 $35.09 000001050243-3562500480
2021 4 FD52 00 E121 U 7921601U 093 10/14/2020 3040 INSPECTION&SUPER-UTILITIES CA-XR101K1062028205671 $24.08 000001050243-3562500480
2021 4 FD52 00 E121 U 7921601U 093 10/14/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101K1062028205671 $2.49 000001050243-3562500480
2021 4 FD52 00 E122 U 7921601U 093 10/14/2020 3040 INSPECTION&SUPER-UTILITIES CA-XR101K1062028205671 $290.15 000001050243-3562500480
2021 4 FD52 00 E122 U 7921601U 093 10/14/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101K1062028205671 $29.63 000001050243-3562500480
2021 4 FD52 00 E123 U 7921601U 093 10/14/2020 3040 INSPECTION&SUPER-UTILITIES CA-XR101K1062028205671 $67.94 000001050243-3562500480
2021 4 FD52 00 E123 U 7921601U 093 10/14/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101K1062028205671 $3.49 000001050243-3562500480
2021 1 FD52 00 E121 U 7921601U 093 7/30/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600321 $1.29 000001050243-3562500480
2021 1 FD52 00 E122 U 7921601U 093 7/30/2020 3040 INSPECTION&SUPER-UTILITIES CA-XR072K1062020600321 $156.57 000001050243-3562500480
2021 1 FD52 00 E122 U 7921601U 093 7/30/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600321 $15.64 000001050243-3562500480
2021 1 FD52 00 E123 U 7921601U 093 7/30/2020 3040 INSPECTION&SUPER-UTILITIES CA-XR072K1062020600321 $51.95 000001050243-3562500480
2021 1 FD52 00 E123 U 7921601U 093 7/30/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600321 $5.14 000001050243-3562500480
2021 1 FD52 00 E124 U 7921601U 093 7/30/2020 3040 INSPECTION&SUPER-UTILITIES CA-XR072K1062020600321 $0.09 000001050243-3562500480
2021 1 FD52 00 E124 U 7921601U 093 7/30/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600321 $0.01 000001050243-3562500480
2021 1 FD52 00 E111 U 7921601U 093 7/27/2020 3040 INSPECTION&SUPER-UTILITIES CA-XR072K1062020600320 $185.34 000001050243-3562500480
2021 1 FD52 00 E111 U 7921601U 093 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600320 $18.53 000001050243-3562500480
2021 1 FD52 00 E121 U 7921601U 093 7/27/2020 3040 INSPECTION&SUPER-UTILITIES CA-XR072K1062020600320 $12.90 000001050243-3562500480
2020 8 FD52 05 E111 U 7921601U 093 2/24/2020 3040 INSPECTION&SUPER-UTILITIES CA-XR022K1062005200389 $453.10 000001024066-3562505208
2020 8 FD52 05 E111 U 7921601U 093 2/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022K1062005200389 $15.59 000001024066-3562505208
2020 8 FD52 05 E121 U 7921601U 093 2/24/2020 3040 INSPECTION&SUPER-UTILITIES CA-XR022K1062005200389 $34.34 000001024066-3562505208
2020 8 FD52 05 E121 U 7921601U 093 2/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022K1062005200389 $1.18 000001024066-3562505208
2020 8 FD52 05 E122 U 7921601U 093 2/24/2020 3040 INSPECTION&SUPER-UTILITIES CA-XR022K1062005200389 $378.06 000001024066-3562505208
2020 8 FD52 05 E122 U 7921601U 093 2/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022K1062005200389 $13.01 000001024066-3562505208
2020 8 FD52 05 E123 U 7921601U 093 2/24/2020 3040 INSPECTION&SUPER-UTILITIES CA-XR022K1062005200389 $55.88 000001024066-3562505208
2020 8 FD52 05 E123 U 7921601U 093 2/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022K1062005200389 $1.89 000001024066-3562505208
2020 8 FD52 05 E124 U 7921601U 093 2/24/2020 3040 INSPECTION&SUPER-UTILITIES CA-XR022K1062005200389 $0.17 000001024066-3562505208
2020 8 FD52 05 E124 U 7921601U 093 2/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022K1062005200389 $0.01 000001024066-3562505208
2020 7 FD52 00 E111 U 7921601U 093 1/15/2020 3040 INSPECTION&SUPER-UTILITIES CA-XR011K1062000807894 $119.03 000001050243-3562500480
2020 7 FD52 00 E111 U 7921601U 093 1/15/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011K1062000807894 $105.10 000001050243-3562500480
2020 7 FD52 00 E121 U 7921601U 093 1/15/2020 3040 INSPECTION&SUPER-UTILITIES CA-XR011K1062000807894 $8.28 000001050243-3562500480
2020 7 FD52 00 E121 U 7921601U 093 1/15/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011K1062000807894 $7.31 000001050243-3562500480
2020 7 FD52 00 E122 U 7921601U 093 1/15/2020 3040 INSPECTION&SUPER-UTILITIES CA-XR011K1062000807894 $99.22 000001050243-3562500480
2020 7 FD52 00 E122 U 7921601U 093 1/15/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011K1062000807894 $87.68 000001050243-3562500480
2020 7 FD52 00 E123 U 7921601U 093 1/15/2020 3040 INSPECTION&SUPER-UTILITIES CA-XR011K1062000807894 $33.57 000001050243-3562500480
2020 7 FD52 00 E123 U 7921601U 093 1/15/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011K1062000807894 $29.17 000001050243-3562500480
2020 1 FD52 00 E111 U 7921601U 093 7/15/2019 3040 INSPECTION&SUPER-UTILITIES CA-XR071J1061919004746 $203.93 000001050243-3562500480
2020 1 FD52 00 E111 U 7921601U 093 7/15/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071J1061919004746 $8.43 000001050243-3562500480
2020 1 FD52 00 E121 U 7921601U 093 7/15/2019 3040 INSPECTION&SUPER-UTILITIES CA-XR071J1061919004746 $14.23 000001050243-3562500480
2020 1 FD52 00 E121 U 7921601U 093 7/15/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071J1061919004746 $0.59 000001050243-3562500480
2020 1 FD52 00 E122 U 7921601U 093 7/15/2019 3040 INSPECTION&SUPER-UTILITIES CA-XR071J1061919004746 $170.09 000001050243-3562500480
2020 1 FD52 00 E122 U 7921601U 093 7/15/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071J1061919004746 $7.03 000001050243-3562500480
2020 1 FD52 00 E123 U 7921601U 093 7/15/2019 3040 INSPECTION&SUPER-UTILITIES CA-XR071J1061919004746 $57.11 000001050243-3562500480
2020 1 FD52 00 E123 U 7921601U 093 7/15/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071J1061919004746 $2.33 000001050243-3562500480
2020 1 FD52 05 E111 U 7921601U 093 7/10/2019 3040 INSPECTION&SUPER-UTILITIES CA-XR071J1061919004737 $69.05 000001024066-3562505208
2020 1 FD52 05 E121 U 7921601U 093 7/10/2019 3040 INSPECTION&SUPER-UTILITIES CA-XR071J1061919004737 $5.23 000001024066-3562505208
2020 1 FD52 05 E122 U 7921601U 093 7/10/2019 3040 INSPECTION&SUPER-UTILITIES CA-XR071J1061919004737 $57.61 000001024066-3562505208
2020 1 FD52 05 E123 U 7921601U 093 7/10/2019 3040 INSPECTION&SUPER-UTILITIES CA-XR071J1061919004737 $8.94 000001024066-3562505208
2019 10 FD52 05 E111 U 7921601U 093 4/25/2019 3020 PREL ENGINEERING-UTILITIES CA-XR042J1061911410178 $95.36 000001034955-3562505208
2019 10 FD52 05 E111 U 7921601U 093 4/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042J1061911410178 $8.17 000001034955-3562505208
2019 10 FD52 05 E121 U 7921601U 093 4/25/2019 3020 PREL ENGINEERING-UTILITIES CA-XR042J1061911410178 $7.22 000001034955-3562505208
2019 10 FD52 05 E121 U 7921601U 093 4/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042J1061911410178 $0.62 000001034955-3562505208
2019 10 FD52 05 E122 U 7921601U 093 4/25/2019 3020 PREL ENGINEERING-UTILITIES CA-XR042J1061911410178 $79.53 000001034955-3562505208
2019 10 FD52 05 E122 U 7921601U 093 4/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042J1061911410178 $6.81 000001034955-3562505208
2019 10 FD52 05 E123 U 7921601U 093 4/25/2019 3020 PREL ENGINEERING-UTILITIES CA-XR042J1061911410178 $14.23 000001034955-3562505208
2019 10 FD52 05 E123 U 7921601U 093 4/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042J1061911410178 $1.20 000001034955-3562505208
2019 10 FD52 05 E124 U 7921601U 093 4/25/2019 3020 PREL ENGINEERING-UTILITIES CA-XR042J1061911410178 $0.04 000001034955-3562505208
2019 10 FD52 05 E111 U 7921601U 093 4/10/2019 3020 PREL ENGINEERING-UTILITIES CA-XR041J1061909909115 $119.84 000001034955-3562505208
2019 10 FD52 05 E111 U 7921601U 093 4/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041J1061909909115 $5.99 000001034955-3562505208
2019 10 FD52 05 E121 U 7921601U 093 4/10/2019 3020 PREL ENGINEERING-UTILITIES CA-XR041J1061909909115 $9.07 000001034955-3562505208
2019 10 FD52 05 E121 U 7921601U 093 4/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041J1061909909115 $0.45 000001034955-3562505208
2019 10 FD52 05 E122 U 7921601U 093 4/10/2019 3020 PREL ENGINEERING-UTILITIES CA-XR041J1061909909115 $99.98 000001034955-3562505208
2019 10 FD52 05 E122 U 7921601U 093 4/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041J1061909909115 $5.00 000001034955-3562505208
2019 10 FD52 05 E123 U 7921601U 093 4/10/2019 3020 PREL ENGINEERING-UTILITIES CA-XR041J1061909909115 $17.88 000001034955-3562505208
2019 10 FD52 05 E123 U 7921601U 093 4/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041J1061909909115 $0.88 000001034955-3562505208
2019 9 FD52 05 E111 U 7921601U 093 3/25/2019 3020 PREL ENGINEERING-UTILITIES CA-XR032J1061908107916 $285.99 000001034955-3562505208
2019 9 FD52 05 E121 U 7921601U 093 3/25/2019 3020 PREL ENGINEERING-UTILITIES CA-XR032J1061908107916 $21.64 000001034955-3562505208
2019 9 FD52 05 E122 U 7921601U 093 3/25/2019 3020 PREL ENGINEERING-UTILITIES CA-XR032J1061908107916 $238.60 000001034955-3562505208
2019 9 FD52 05 E123 U 7921601U 093 3/25/2019 3020 PREL ENGINEERING-UTILITIES CA-XR032J1061908107916 $42.65 000001034955-3562505208
2019 9 FD52 05 E124 U 7921601U 093 3/25/2019 3020 PREL ENGINEERING-UTILITIES CA-XR032J1061908107916 $0.13 000001034955-3562505208
2019 9 FD52 05 E111 U 7921601U 093 3/11/2019 3020 PREL ENGINEERING-UTILITIES CA-XR031J1061906706840 $199.78 000001034955-3562505208
2019 9 FD52 05 E111 U 7921601U 093 3/11/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031J1061906706840 $6.99 000001034955-3562505208
2019 9 FD52 05 E121 U 7921601U 093 3/11/2019 3020 PREL ENGINEERING-UTILITIES CA-XR031J1061906706840 $15.11 000001034955-3562505208
2019 9 FD52 05 E121 U 7921601U 093 3/11/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031J1061906706840 $0.53 000001034955-3562505208
2019 9 FD52 05 E122 U 7921601U 093 3/11/2019 3020 PREL ENGINEERING-UTILITIES CA-XR031J1061906706840 $166.64 000001034955-3562505208
2019 9 FD52 05 E122 U 7921601U 093 3/11/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031J1061906706840 $5.83 000001034955-3562505208
2019 9 FD52 05 E123 U 7921601U 093 3/11/2019 3020 PREL ENGINEERING-UTILITIES CA-XR031J1061906706840 $29.81 000001034955-3562505208
2019 9 FD52 05 E123 U 7921601U 093 3/11/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031J1061906706840 $1.03 000001034955-3562505208
2019 8 FD52 05 E111 U 7921601U 093 2/25/2019 3020 PREL ENGINEERING-UTILITIES CA-XR022J1061905305589 $1,607.00 000001034955-3562505200
2019 8 FD52 05 E111 U 7921601U 093 2/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022J1061905305589 $185.93 000001034955-3562505208
2019 8 FD52 05 E121 U 7921601U 093 2/25/2019 3020 PREL ENGINEERING-UTILITIES CA-XR022J1061905305589 $121.07 000001034955-3562505208
2019 8 FD52 05 E121 U 7921601U 093 2/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022J1061905305589 $14.04 000001034955-3562505200
2019 8 FD52 05 E122 U 7921601U 093 2/25/2019 3020 PREL ENGINEERING-UTILITIES CA-XR022J1061905305589 $1,340.66 000001034955-3562505208
2019 8 FD52 05 E122 U 7921601U 093 2/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022J1061905305589 $155.13 000001034955-3562505208
2019 8 FD52 05 E123 U 7921601U 093 2/25/2019 3020 PREL ENGINEERING-UTILITIES CA-XR022J1061905305589 $232.81 000001034955-3562505208
2019 8 FD52 05 E123 U 7921601U 093 2/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022J1061905305589 $27.06 000001034955-3562505208
2019 8 FD52 05 E124 U 7921601U 093 2/25/2019 3020 PREL ENGINEERING-UTILITIES CA-XR022J1061905305589 $0.68 000001034955-3562505208
2019 8 FD52 05 E124 U 7921601U 093 2/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022J1061905305589 $0.08 000001034955-3562505208
2019 8 FD52 05 E111 U 7921601U 093 2/14/2019 3020 PREL ENGINEERING-UTILITIES CA-XR021J1061903904468 $519.60 000001034955-3562505200
2019 8 FD52 05 E111 U 7921601U 093 2/14/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021J1061903904468 $55.34 000001034955-3562505200
2019 8 FD52 05 E121 U 7921601U 093 2/14/2019 3020 PREL ENGINEERING-UTILITIES CA-XR021J1061903904468 $39.41 000001034955-3562505200
2019 8 FD52 05 E121 U 7921601U 093 2/14/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021J1061903904468 $4.21 000001034955-3562505208
2019 8 FD52 05 E122 U 7921601U 093 2/14/2019 3020 PREL ENGINEERING-UTILITIES CA-XR021J1061903904468 $433.45 000001034955-3562505208
2019 8 FD52 05 E122 U 7921601U 093 2/14/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021J1061903904468 $46.17 000001034955-3562505208
2019 8 FD52 05 E123 U 7921601U 093 2/14/2019 3020 PREL ENGINEERING-UTILITIES CA-XR021J1061903904468 $59.67 000001034955-3562505208
2019 8 FD52 05 E123 U 7921601U 093 2/14/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021J1061903904468 $6.53 000001034955-3562505208
2019 7 FD52 05 E111 U 7921601U 093 1/24/2019 3020 PREL ENGINEERING-UTILITIES CA-XR012J1061902303357 $285.99 000001034955-3562505208
2019 7 FD52 05 E111 U 7921601U 093 1/24/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012J1061902303357 $63.74 000001034955-3562505208
2019 7 FD52 05 E121 U 7921601U 093 1/24/2019 3020 PREL ENGINEERING-UTILITIES CA-XR012J1061902303357 $21.64 000001034955-3562505208
2019 7 FD52 05 E121 U 7921601U 093 1/24/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012J1061902303357 $4.82 000001034955-3562505208
2019 7 FD52 05 E122 U 7921601U 093 1/24/2019 3020 PREL ENGINEERING-UTILITIES CA-XR012J1061902303357 $238.60 000001034955-3562505208
2019 7 FD52 05 E122 U 7921601U 093 1/24/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012J1061902303357 $53.18 000001034955-3562505208
2019 7 FD52 05 E123 U 7921601U 093 1/24/2019 3020 PREL ENGINEERING-UTILITIES CA-XR012J1061902303357 $42.79 000001034955-3562505208
2019 7 FD52 05 E123 U 7921601U 093 1/24/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012J1061902303357 $9.36 000001034955-3562505208
2019 7 FD52 05 E124 U 7921601U 093 1/24/2019 3020 PREL ENGINEERING-UTILITIES CA-XR012J1061902303357 $0.13 000001034955-3562505208
2019 7 FD52 05 E124 U 7921601U 093 1/24/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012J1061902303357 $0.02 000001034955-3562505208
2019 7 FD52 05 E111 U 7921601U 093 1/14/2019 3020 PREL ENGINEERING-UTILITIES CA-XR011J1061900902503 $217.84 000001034955-3562505208
2019 7 FD52 05 E111 U 7921601U 093 1/14/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011J1061900902503 $132.91 000001034955-3562505208
2019 7 FD52 05 E121 U 7921601U 093 1/14/2019 3020 PREL ENGINEERING-UTILITIES CA-XR011J1061900902503 $16.48 000001034955-3562505208
2019 7 FD52 05 E121 U 7921601U 093 1/14/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011J1061900902503 $10.05 000001034955-3562505208
2019 7 FD52 05 E122 U 7921601U 093 1/14/2019 3020 PREL ENGINEERING-UTILITIES CA-XR011J1061900902503 $181.57 000001034955-3562505208
2019 7 FD52 05 E122 U 7921601U 093 1/14/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011J1061900902503 $110.89 000001034955-3562505208
2019 7 FD52 05 E123 U 7921601U 093 1/14/2019 3020 PREL ENGINEERING-UTILITIES CA-XR011J1061900902503 $32.76 000001034955-3562505208
2019 7 FD52 05 E123 U 7921601U 093 1/14/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011J1061900902503 $19.52 000001034955-3562505208
2019 6 FD52 05 E111 U 7921601U 093 12/26/2018 3020 PREL ENGINEERING-UTILITIES CA-XR122I1061835401307 $239.69 000001034955-3562505208
2019 6 FD52 05 E111 U 7921601U 093 12/26/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122I1061835401307 $10.79 000001034955-3562505208
2019 6 FD52 05 E121 U 7921601U 093 12/26/2018 3020 PREL ENGINEERING-UTILITIES CA-XR122I1061835401307 $18.14 000001034955-3562505208
2019 6 FD52 05 E121 U 7921601U 093 12/26/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122I1061835401307 $0.81 000001034955-3562505208
2019 6 FD52 05 E122 U 7921601U 093 12/26/2018 3020 PREL ENGINEERING-UTILITIES CA-XR122I1061835401307 $199.97 000001034955-3562505208
2019 6 FD52 05 E122 U 7921601U 093 12/26/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122I1061835401307 $9.00 000001034955-3562505208
2019 6 FD52 05 E123 U 7921601U 093 12/26/2018 3020 PREL ENGINEERING-UTILITIES CA-XR122I1061835401307 $35.77 000001034955-3562505208
2019 6 FD52 05 E123 U 7921601U 093 12/26/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122I1061835401307 $1.58 000001034955-3562505208
2019 6 FD52 05 E124 U 7921601U 093 12/26/2018 3020 PREL ENGINEERING-UTILITIES CA-XR122I1061835401307 $0.11 000001034955-3562505208
2019 5 FD52 05 E111 U 7921601U 093 11/27/2018 3020 PREL ENGINEERING-UTILITIES CA-XR112I1061833009436 $204.22 000001034955-3562505208
2019 5 FD52 05 E111 U 7921601U 093 11/27/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112I1061833009436 $91.51 000001034955-3562505208
2019 5 FD52 05 E121 U 7921601U 093 11/27/2018 3020 PREL ENGINEERING-UTILITIES CA-XR112I1061833009436 $15.46 000001034955-3562505208
2019 5 FD52 05 E121 U 7921601U 093 11/27/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112I1061833009436 $6.93 000001034955-3562505208
2019 5 FD52 05 E122 U 7921601U 093 11/27/2018 3020 PREL ENGINEERING-UTILITIES CA-XR112I1061833009436 $170.43 000001034955-3562505208
2019 5 FD52 05 E122 U 7921601U 093 11/27/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112I1061833009436 $76.34 000001034955-3562505208
2019 5 FD52 05 E123 U 7921601U 093 11/27/2018 3020 PREL ENGINEERING-UTILITIES CA-XR112I1061833009436 $30.67 000001034955-3562505208
2019 5 FD52 05 E123 U 7921601U 093 11/27/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112I1061833009436 $13.44 000001034955-3562505208
2019 5 FD52 05 E124 U 7921601U 093 11/27/2018 3020 PREL ENGINEERING-UTILITIES CA-XR112I1061833009436 $0.09 000001034955-3562505208
2019 5 FD52 05 E124 U 7921601U 093 11/27/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112I1061833009436 $0.04 000001034955-3562505208
2019 5 FD52 05 E111 U 7921601U 093 11/15/2018 3020 PREL ENGINEERING-UTILITIES CA-XR111I1061831308314 $449.43 000001034955-3562505208
2019 5 FD52 05 E111 U 7921601U 093 11/15/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111I1061831308314 $18.23 000001034955-3562505208
2019 5 FD52 05 E121 U 7921601U 093 11/15/2018 3020 PREL ENGINEERING-UTILITIES CA-XR111I1061831308314 $33.99 000001034955-3562505208
2019 5 FD52 05 E121 U 7921601U 093 11/15/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111I1061831308314 $1.38 000001034955-3562505208
2019 5 FD52 05 E122 U 7921601U 093 11/15/2018 3020 PREL ENGINEERING-UTILITIES CA-XR111I1061831308314 $374.94 000001034955-3562505208
2019 5 FD52 05 E122 U 7921601U 093 11/15/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111I1061831308314 $15.21 000001034955-3562505208
2019 5 FD52 05 E123 U 7921601U 093 11/15/2018 3020 PREL ENGINEERING-UTILITIES CA-XR111I1061831308314 $67.06 000001034955-3562505208
2019 5 FD52 05 E123 U 7921601U 093 11/15/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111I1061831308314 $2.68 000001034955-3562505208
2019 4 FD52 05 E111 U 7921601U 093 10/25/2018 3020 PREL ENGINEERING-UTILITIES CA-XR102I1061829707169 $177.04 000001034955-3562505208
2019 4 FD52 05 E121 U 7921601U 093 10/25/2018 3020 PREL ENGINEERING-UTILITIES CA-XR102I1061829707169 $13.40 000001034955-3562505208
2019 4 FD52 05 E122 U 7921601U 093 10/25/2018 3020 PREL ENGINEERING-UTILITIES CA-XR102I1061829707169 $147.70 000001034955-3562505208
2019 4 FD52 05 E123 U 7921601U 093 10/25/2018 3020 PREL ENGINEERING-UTILITIES CA-XR102I1061829707169 $26.40 000001034955-3562505208
2019 4 FD52 05 E124 U 7921601U 093 10/25/2018 3020 PREL ENGINEERING-UTILITIES CA-XR102I1061829707169 $0.08 000001034955-3562505208
2019 4 FD52 05 E111 U 7921601U 093 10/10/2018 3020 PREL ENGINEERING-UTILITIES CA-XR101I1061828206153 $617.34 000001034955-3562505208
2019 4 FD52 05 E111 U 7921601U 093 10/10/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101I1061828206153 $145.21 000001034955-3562505208
2019 4 FD52 05 E121 U 7921601U 093 10/10/2018 3020 PREL ENGINEERING-UTILITIES CA-XR101I1061828206153 $46.44 000001034955-3562505208
2019 4 FD52 05 E121 U 7921601U 093 10/10/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101I1061828206153 $10.93 000001034955-3562505208
2019 4 FD52 05 E122 U 7921601U 093 10/10/2018 3020 PREL ENGINEERING-UTILITIES CA-XR101I1061828206153 $515.15 000001034955-3562505208
2019 4 FD52 05 E122 U 7921601U 093 10/10/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101I1061828206153 $121.14 000001034955-3562505208
2019 4 FD52 05 E123 U 7921601U 093 10/10/2018 3020 PREL ENGINEERING-UTILITIES CA-XR101I1061828206153 $90.64 000001034955-3562505208
2019 4 FD52 05 E123 U 7921601U 093 10/10/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101I1061828206153 $21.05 000001034955-3562505208
2019 3 FD52 05 E111 U 7921601U 093 9/27/2018 3020 PREL ENGINEERING-UTILITIES CA-XR092I1061826404980 $74.82 000001034955-3562505208
2019 3 FD52 05 E111 U 7921601U 093 9/27/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092I1061826404980 $11.69 000001034955-3562505208
2019 3 FD52 05 E121 U 7921601U 093 9/27/2018 3020 PREL ENGINEERING-UTILITIES CA-XR092I1061826404980 $5.66 000001034955-3562505208
2019 3 FD52 05 E121 U 7921601U 093 9/27/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092I1061826404980 $0.87 000001034955-3562505208
2019 3 FD52 05 E122 U 7921601U 093 9/27/2018 3020 PREL ENGINEERING-UTILITIES CA-XR092I1061826404980 $62.49 000001034955-3562505208
2019 3 FD52 05 E122 U 7921601U 093 9/27/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092I1061826404980 $9.75 000001034955-3562505208
2019 3 FD52 05 E123 U 7921601U 093 9/27/2018 3020 PREL ENGINEERING-UTILITIES CA-XR092I1061826404980 $11.20 000001034955-3562505208
2019 3 FD52 05 E123 U 7921601U 093 9/27/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092I1061826404980 $1.72 000001034955-3562505208
2019 3 FD52 05 E124 U 7921601U 093 9/27/2018 3020 PREL ENGINEERING-UTILITIES CA-XR092I1061826404980 $0.03 000001034955-3562505208
2019 3 FD52 05 E111 U 7921601U 093 9/13/2018 3020 PREL ENGINEERING-UTILITIES CA-XR091I1061825003802 $62.42 000001034955-3562505208
2019 3 FD52 05 E111 U 7921601U 093 9/13/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091I1061825003802 $1.75 000001034955-3562505208
2019 3 FD52 05 E121 U 7921601U 093 9/13/2018 3020 PREL ENGINEERING-UTILITIES CA-XR091I1061825003802 $4.73 000001034955-3562505208
2019 3 FD52 05 E121 U 7921601U 093 9/13/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091I1061825003802 $0.14 000001034955-3562505208
2019 3 FD52 05 E122 U 7921601U 093 9/13/2018 3020 PREL ENGINEERING-UTILITIES CA-XR091I1061825003802 $52.08 000001034955-3562505208
2019 3 FD52 05 E122 U 7921601U 093 9/13/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091I1061825003802 $1.46 000001034955-3562505208
2019 3 FD52 05 E123 U 7921601U 093 9/13/2018 3020 PREL ENGINEERING-UTILITIES CA-XR091I1061825003802 $9.32 000001034955-3562505208
2019 3 FD52 05 E123 U 7921601U 093 9/13/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091I1061825003802 $0.26 000001034955-3562505208
2019 2 FD52 05 E111 U 7921601U 093 8/27/2018 3020 PREL ENGINEERING-UTILITIES CA-XR082I1061823502567 $95.29 000001034955-3562505208
2019 2 FD52 05 E111 U 7921601U 093 8/27/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082I1061823502567 $6.81 000001034955-3562505208
2019 2 FD52 05 E121 U 7921601U 093 8/27/2018 3020 PREL ENGINEERING-UTILITIES CA-XR082I1061823502567 $7.22 000001034955-3562505208
2019 2 FD52 05 E121 U 7921601U 093 8/27/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082I1061823502567 $0.52 000001034955-3562505208
2019 2 FD52 05 E122 U 7921601U 093 8/27/2018 3020 PREL ENGINEERING-UTILITIES CA-XR082I1061823502567 $79.53 000001034955-3562505208
2019 2 FD52 05 E122 U 7921601U 093 8/27/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082I1061823502567 $5.68 000001034955-3562505208
2019 2 FD52 05 E123 U 7921601U 093 8/27/2018 3020 PREL ENGINEERING-UTILITIES CA-XR082I1061823502567 $14.23 000001034955-3562505208
2019 2 FD52 05 E123 U 7921601U 093 8/27/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082I1061823502567 $1.00 000001034955-3562505208
2019 2 FD52 05 E124 U 7921601U 093 8/27/2018 3020 PREL ENGINEERING-UTILITIES CA-XR082I1061823502567 $0.04 000001034955-3562505208
2019 2 FD52 05 E111 U 7921601U 093 8/9/2018 3020 PREL ENGINEERING-UTILITIES CA-XR081I1061822001427 $199.61 000001034955-3562505208
2019 2 FD52 05 E111 U 7921601U 093 8/9/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081I1061822001427 $156.29 000001034955-3562505208
2019 2 FD52 05 E121 U 7921601U 093 8/9/2018 3020 PREL ENGINEERING-UTILITIES CA-XR081I1061822001427 $15.11 000001034955-3562505208
2019 2 FD52 05 E121 U 7921601U 093 8/9/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081I1061822001427 $11.82 000001034955-3562505208
2019 2 FD52 05 E122 U 7921601U 093 8/9/2018 3020 PREL ENGINEERING-UTILITIES CA-XR081I1061822001427 $166.64 000001034955-3562505208
2019 2 FD52 05 E122 U 7921601U 093 8/9/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081I1061822001427 $130.40 000001034955-3562505208
2019 2 FD52 05 E123 U 7921601U 093 8/9/2018 3020 PREL ENGINEERING-UTILITIES CA-XR081I1061822001427 $30.14 000001034955-3562505208
2019 2 FD52 05 E123 U 7921601U 093 8/9/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081I1061822001427 $22.94 000001034955-3562505208
2019 1 FD52 05 E111 U 7921601U 093 7/25/2018 3020 PREL ENGINEERING-UTILITIES CA-XR072I1061820500377 $59.88 000001034955-3562505208
2019 1 FD52 05 E111 U 7921601U 093 7/25/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072I1061820500377 $11.39 000001034955-3562505208
2019 1 FD52 05 E121 U 7921601U 093 7/25/2018 3020 PREL ENGINEERING-UTILITIES CA-XR072I1061820500377 $4.53 000001034955-3562505208
2019 1 FD52 05 E121 U 7921601U 093 7/25/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072I1061820500377 $0.86 000001034955-3562505208
2019 1 FD52 05 E122 U 7921601U 093 7/25/2018 3020 PREL ENGINEERING-UTILITIES CA-XR072I1061820500377 $49.99 000001034955-3562505208
2019 1 FD52 05 E122 U 7921601U 093 7/25/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072I1061820500377 $9.50 000001034955-3562505208
2019 1 FD52 05 E123 U 7921601U 093 7/25/2018 3020 PREL ENGINEERING-UTILITIES CA-XR072I1061820500377 $8.96 000001034955-3562505208
2019 1 FD52 05 E123 U 7921601U 093 7/25/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072I1061820500377 $1.68 000001034955-3562505208
2019 1 FD52 05 E124 U 7921601U 093 7/25/2018 3020 PREL ENGINEERING-UTILITIES CA-XR072I1061820500377 $0.03 000001034955-3562505208
2019 1 FD52 05 E111 U 7921601U 093 7/12/2018 3020 PREL ENGINEERING-UTILITIES CA-XR071I1061818709315 $314.59 000001034955-3562505208
2019 1 FD52 05 E121 U 7921601U 093 7/12/2018 3020 PREL ENGINEERING-UTILITIES CA-XR071I1061818709315 $23.80 000001034955-3562505208
2019 1 FD52 05 E122 U 7921601U 093 7/12/2018 3020 PREL ENGINEERING-UTILITIES CA-XR071I1061818709315 $155.63 000001034955-3562505208
2019 1 FD52 05 E123 U 7921601U 093 7/12/2018 3020 PREL ENGINEERING-UTILITIES CA-XR071I1061818709315 $46.91 000001034955-3562505208
2019 1 FD52 00 E111 U 7921601U 093 7/11/2018 3040 INSPECTION&SUPER-UTILITIES CA-XR071I1061818709327 $203.78 000001050243-3562500480
2019 1 FD52 00 E111 U 7921601U 093 7/11/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071I1061818709327 $24.46 000001050243-3562500480
2019 1 FD52 00 E121 U 7921601U 093 7/11/2018 3040 INSPECTION&SUPER-UTILITIES CA-XR071I1061818709327 $14.25 000001050243-3562500480
2019 1 FD52 00 E121 U 7921601U 093 7/11/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071I1061818709327 $1.70 000001050243-3562500480
2019 1 FD52 00 E122 U 7921601U 093 7/11/2018 3040 INSPECTION&SUPER-UTILITIES CA-XR071I1061818709327 $100.86 000001050243-3562500480
2019 1 FD52 00 E122 U 7921601U 093 7/11/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071I1061818709327 $12.10 000001050243-3562500480
2019 1 FD52 00 E123 U 7921601U 093 7/11/2018 3040 INSPECTION&SUPER-UTILITIES CA-XR071I1061818709327 $66.30 000001050243-3562500480
2019 1 FD52 00 E123 U 7921601U 093 7/11/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071I1061818709327 $7.89 000001050243-3562500480
2019 1 FD52 05 E111 U 7921601U 093 7/9/2018 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR071I1061818709378 $224.71 000001063310-3562505208
2019 1 FD52 05 E121 U 7921601U 093 7/9/2018 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR071I1061818709378 $17.00 000001063310-3562505208
2019 1 FD52 05 E122 U 7921601U 093 7/9/2018 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR071I1061818709378 $111.16 000001063310-3562505208
2019 1 FD52 05 E123 U 7921601U 093 7/9/2018 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR071I1061818709378 $33.51 000001063310-3562505208
2019 1 FD52 05 E123 U 7921601U 093 7/9/2018 3020 PREL ENGINEERING-UTILITIES CA-XR061I1061815906964P $51.48 000001034955-3562505208
2019 1 FD52 05 E123 U 7921601U 093 7/9/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061I1061815906964P $9.53 000001034955-3562505208
2019 1 FD52 05 E111 U 7921601U 093 7/5/2018 3020 PREL ENGINEERING-UTILITIES CA-XR062I1061817208132 $326.85 000001034955-3562505208
2019 1 FD52 05 E111 U 7921601U 093 7/5/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062I1061817208132 $44.94 000001034955-3562505208
2019 1 FD52 05 E121 U 7921601U 093 7/5/2018 3020 PREL ENGINEERING-UTILITIES CA-XR062I1061817208132 $24.73 000001034955-3562505208
2019 1 FD52 05 E121 U 7921601U 093 7/5/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062I1061817208132 $3.39 000001034955-3562505208
2019 1 FD52 05 E122 U 7921601U 093 7/5/2018 3020 PREL ENGINEERING-UTILITIES CA-XR062I1061817208132 $161.69 000001034955-3562505208
2019 1 FD52 05 E122 U 7921601U 093 7/5/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062I1061817208132 $22.24 000001034955-3562505208
2019 1 FD52 05 E123 U 7921601U 093 7/5/2018 3020 PREL ENGINEERING-UTILITIES CA-XR062I1061817208132 $48.84 000001034955-3562505208
2019 1 FD52 05 E123 U 7921601U 093 7/5/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062I1061817208132 $6.60 000001034955-3562505208
2019 1 FD52 05 E124 U 7921601U 093 7/5/2018 3020 PREL ENGINEERING-UTILITIES CA-XR062I1061817208132 $0.15 000001034955-3562505208
2019 1 FD52 05 E124 U 7921601U 093 7/5/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062I1061817208132 $0.02 000001034955-3562505208
2018 11 FD52 05 E123 U 7921601U 093 5/24/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052I1061814305827 $2.76 000001034955-3562505208
2018 11 FD52 05 E124 U 7921601U 093 5/24/2018 3020 PREL ENGINEERING-UTILITIES CA-XR052I1061814305827 $0.05 000001034955-3562505208
2018 11 FD52 05 E124 U 7921601U 093 5/24/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052I1061814305827 $0.01 000001034955-3562505208
2018 11 FD52 05 E111 U 7921601U 093 5/24/2018 3040 INSPECTION&SUPER-UTILITIES CA-XR052I1061814305819 $204.28 000001024066-3562505208
2018 11 FD52 05 E111 U 7921601U 093 5/24/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052I1061814305819 $31.60 000001024066-3562505208
2018 11 FD52 05 E121 U 7921601U 093 5/24/2018 3040 INSPECTION&SUPER-UTILITIES CA-XR052I1061814305819 $15.46 000001024066-3562505208
2018 11 FD52 05 E121 U 7921601U 093 5/24/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052I1061814305819 $2.39 000001024066-3562505208
2018 11 FD52 05 E122 U 7921601U 093 5/24/2018 3040 INSPECTION&SUPER-UTILITIES CA-XR052I1061814305819 $101.06 000001024066-3562505208
2018 11 FD52 05 E122 U 7921601U 093 5/24/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052I1061814305819 $15.64 000001024066-3562505208
2018 11 FD52 05 E123 U 7921601U 093 5/24/2018 3040 INSPECTION&SUPER-UTILITIES CA-XR052I1061814305819 $30.53 000001024066-3562505208
2018 11 FD52 05 E123 U 7921601U 093 5/24/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052I1061814305819 $4.64 000001024066-3562505208
2018 11 FD52 05 E124 U 7921601U 093 5/24/2018 3040 INSPECTION&SUPER-UTILITIES CA-XR052I1061814305819 $0.09 000001024066-3562505208
2018 11 FD52 05 E124 U 7921601U 093 5/24/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052I1061814305819 $0.01 000001024066-3562505208
2018 11 FD52 05 E111 U 7921601U 093 5/24/2018 3020 PREL ENGINEERING-UTILITIES CA-XR052I1061814305826 $122.57 000001034955-3562505208
2018 11 FD52 05 E111 U 7921601U 093 5/24/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052I1061814305826 $18.79 000001034955-3562505208
2018 11 FD52 05 E121 U 7921601U 093 5/24/2018 3020 PREL ENGINEERING-UTILITIES CA-XR052I1061814305826 $9.28 000001034955-3562505208
2018 11 FD52 05 E121 U 7921601U 093 5/24/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052I1061814305826 $1.42 000001034955-3562505208
2018 11 FD52 05 E122 U 7921601U 093 5/24/2018 3020 PREL ENGINEERING-UTILITIES CA-XR052I1061814305826 $60.64 000001034955-3562505208
2018 11 FD52 05 E122 U 7921601U 093 5/24/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052I1061814305826 $9.29 000001034955-3562505208
2018 11 FD52 05 E123 U 7921601U 093 5/24/2018 3020 PREL ENGINEERING-UTILITIES CA-XR052I1061814305826 $18.32 000001034955-3562505208
2018 11 FD52 05 E111 U 7921601U 093 5/9/2018 3040 INSPECTION&SUPER-UTILITIES CA-XR051I1061812804793 $506.85 000001024066-3562505208
2018 11 FD52 05 E111 U 7921601U 093 5/9/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051I1061812804793 $50.69 000001024066-3562505208
2018 11 FD52 05 E112 U 7921601U 093 5/9/2018 3040 INSPECTION&SUPER-UTILITIES CA-XR051I1061812804793 $48.51 000001024066-3562505208
2018 11 FD52 05 E112 U 7921601U 093 5/9/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051I1061812804793 $5.77 000001024066-3562505208
2018 11 FD52 05 E121 U 7921601U 093 5/9/2018 3040 INSPECTION&SUPER-UTILITIES CA-XR051I1061812804793 $41.80 000001024066-3562505208
2018 11 FD52 05 E121 U 7921601U 093 5/9/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051I1061812804793 $4.26 000001024066-3562505208
2018 11 FD52 05 E122 U 7921601U 093 5/9/2018 3040 INSPECTION&SUPER-UTILITIES CA-XR051I1061812804793 $250.73 000001024066-3562505208
2018 11 FD52 05 E122 U 7921601U 093 5/9/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051I1061812804793 $25.07 000001024066-3562505208
2018 11 FD52 05 E123 U 7921601U 093 5/9/2018 3040 INSPECTION&SUPER-UTILITIES CA-XR051I1061812804793 $74.10 000001024066-3562505208
2018 11 FD52 05 E123 U 7921601U 093 5/9/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051I1061812804793 $7.29 000001024066-3562505208
2018 11 FD52 05 E111 U 7921601U 093 5/9/2018 3020 PREL ENGINEERING-UTILITIES CA-XR051I1061812804798 $1,010.73 000001034955-3562505208
2018 11 FD52 05 E111 U 7921601U 093 5/9/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051I1061812804798 $101.07 000001034955-3562505208
2018 11 FD52 05 E112 U 7921601U 093 5/9/2018 3020 PREL ENGINEERING-UTILITIES CA-XR051I1061812804798 $266.82 000001034955-3562505208
2018 11 FD52 05 E112 U 7921601U 093 5/9/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051I1061812804798 $31.72 000001034955-3562505208
2018 11 FD52 05 E121 U 7921601U 093 5/9/2018 3020 PREL ENGINEERING-UTILITIES CA-XR051I1061812804798 $96.62 000001034955-3562505208
2018 11 FD52 05 E121 U 7921601U 093 5/9/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051I1061812804798 $10.04 000001034955-3562505208
2018 11 FD52 05 E122 U 7921601U 093 5/9/2018 3020 PREL ENGINEERING-UTILITIES CA-XR051I1061812804798 $500.00 000001034955-3562505208
2018 11 FD52 05 E122 U 7921601U 093 5/9/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051I1061812804798 $50.00 000001034955-3562505208
2018 11 FD52 05 E123 U 7921601U 093 5/9/2018 3020 PREL ENGINEERING-UTILITIES CA-XR051I1061812804798 $149.36 000001034955-3562505208
2018 11 FD52 05 E123 U 7921601U 093 5/9/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051I1061812804798 $14.69 000001034955-3562505208
2018 10 FD52 05 E111 U 7921601U 093 4/24/2018 3020 PREL ENGINEERING-UTILITIES CA-XR042I1061811303739 $419.45 000001034955-3562505208
2018 10 FD52 05 E111 U 7921601U 093 4/24/2018 3040 INSPECTION&SUPER-UTILITIES CA-XR042I1061811303732 $430.86 000001024066-3562505208
2018 10 FD52 05 E112 U 7921601U 093 4/24/2018 3020 PREL ENGINEERING-UTILITIES CA-XR042I1061811303739 $90.96 000001034955-3562505208
2018 10 FD52 05 E112 U 7921601U 093 4/24/2018 3040 INSPECTION&SUPER-UTILITIES CA-XR042I1061811303732 $97.02 000001024066-3562505208
2018 10 FD52 05 E121 U 7921601U 093 4/24/2018 3020 PREL ENGINEERING-UTILITIES CA-XR042I1061811303739 $38.70 000001034955-3562505208
2018 10 FD52 05 E121 U 7921601U 093 4/24/2018 3040 INSPECTION&SUPER-UTILITIES CA-XR042I1061811303732 $40.03 000001024066-3562505208
2018 10 FD52 05 E122 U 7921601U 093 4/24/2018 3020 PREL ENGINEERING-UTILITIES CA-XR042I1061811303739 $207.50 000001034955-3562505208
2018 10 FD52 05 E122 U 7921601U 093 4/24/2018 3040 INSPECTION&SUPER-UTILITIES CA-XR042I1061811303732 $213.15 000001024066-3562505208
2018 10 FD52 05 E123 U 7921601U 093 4/24/2018 3020 PREL ENGINEERING-UTILITIES CA-XR042I1061811303739 $62.55 000001034955-3562505208
2018 10 FD52 05 E123 U 7921601U 093 4/24/2018 3040 INSPECTION&SUPER-UTILITIES CA-XR042I1061811303732 $64.78 000001024066-3562505208
2018 10 FD52 05 E124 U 7921601U 093 4/24/2018 3020 PREL ENGINEERING-UTILITIES CA-XR042I1061811303739 $0.19 000001034955-3562505208
2018 10 FD52 05 E124 U 7921601U 093 4/24/2018 3040 INSPECTION&SUPER-UTILITIES CA-XR042I1061811303732 $0.19 000001024066-3562505208
2018 10 FD52 05 E229 U 7921601U 093 4/23/2018 1420 DESIGN PART IN UTILITY PHASE IET-XE13A162518100007120 $32.34
2018 10 FD52 00 E111 U 7921601U 093 4/11/2018 3040 INSPECTION&SUPER-UTILITIES CA-XR041I1061809602580 $185.34 000001050243-3562500480
2018 10 FD52 00 E111 U 7921601U 093 4/11/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041I1061809602580 $24.96 000001050243-3562500480
2018 10 FD52 00 E121 U 7921601U 093 4/11/2018 3040 INSPECTION&SUPER-UTILITIES CA-XR041I1061809602580 $12.95 000001050243-3562500480
2018 10 FD52 00 E121 U 7921601U 093 4/11/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041I1061809602580 $1.75 000001050243-3562500480
2018 10 FD52 00 E122 U 7921601U 093 4/11/2018 3040 INSPECTION&SUPER-UTILITIES CA-XR041I1061809602580 $91.69 000001050243-3562500480
2018 10 FD52 00 E122 U 7921601U 093 4/11/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041I1061809602580 $12.35 000001050243-3562500480
2018 10 FD52 00 E123 U 7921601U 093 4/11/2018 3040 INSPECTION&SUPER-UTILITIES CA-XR041I1061809602580 $60.28 000001050243-3562500480
2018 10 FD52 00 E123 U 7921601U 093 4/11/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041I1061809602580 $8.05 000001050243-3562500480
2018 10 FD52 05 E111 U 7921601U 093 4/9/2018 1420 DESIGN PART IN UTILITY PHASE CA-XR041I1061809602635 $210.37 000001061967-3562505204
2018 10 FD52 05 E111 U 7921601U 093 4/9/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041I1061809602635 $30.58 000001061967-3562505204
2018 10 FD52 05 E121 U 7921601U 093 4/9/2018 1420 DESIGN PART IN UTILITY PHASE CA-XR041I1061809602635 $15.55 000001061967-3562505204
2018 10 FD52 05 E121 U 7921601U 093 4/9/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041I1061809602635 $2.21 000001061967-3562505204
2018 10 FD52 05 E122 U 7921601U 093 4/9/2018 1420 DESIGN PART IN UTILITY PHASE CA-XR041I1061809602635 $104.10 000001061967-3562505204
2018 10 FD52 05 E122 U 7921601U 093 4/9/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041I1061809602635 $15.12 000001061967-3562505204
2018 10 FD52 05 E123 U 7921601U 093 4/9/2018 1420 DESIGN PART IN UTILITY PHASE CA-XR041I1061809602635 $43.35 000001061967-3562505204
2018 10 FD52 05 E123 U 7921601U 093 4/9/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041I1061809602635 $7.59 000001061967-3562505204
2018 10 FD52 05 E111 U 7921601U 093 4/9/2018 3020 PREL ENGINEERING-UTILITIES CA-XR041I1061809602567 $776.26 000001034955-3562505208
2018 10 FD52 05 E111 U 7921601U 093 4/9/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041I1061809602567 $37.04 000001034955-3562505208
2018 10 FD52 05 E121 U 7921601U 093 4/9/2018 3020 PREL ENGINEERING-UTILITIES CA-XR041I1061809602567 $58.73 000001034955-3562505208
2018 10 FD52 05 E121 U 7921601U 093 4/9/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041I1061809602567 $2.80 000001034955-3562505208
2018 10 FD52 05 E122 U 7921601U 093 4/9/2018 3020 PREL ENGINEERING-UTILITIES CA-XR041I1061809602567 $384.02 000001034955-3562505208
2018 10 FD52 05 E122 U 7921601U 093 4/9/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041I1061809602567 $18.32 000001034955-3562505208
2018 10 FD52 05 E123 U 7921601U 093 4/9/2018 3020 PREL ENGINEERING-UTILITIES CA-XR041I1061809602567 $115.85 000001034955-3562505208
2018 10 FD52 05 E123 U 7921601U 093 4/9/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041I1061809602567 $5.44 000001034955-3562505208
2018 9 FD52 05 E111 U 7921601U 093 3/26/2018 3020 PREL ENGINEERING-UTILITIES CA-XR032I1061808201388 $370.69 000001034955-3562505208
2018 9 FD52 05 E111 U 7921601U 093 3/26/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032I1061808201388 $8.44 000001034955-3562505208
2018 9 FD52 05 E121 U 7921601U 093 3/26/2018 3020 PREL ENGINEERING-UTILITIES CA-XR032I1061808201388 $27.79 000001034955-3562505208
2018 9 FD52 05 E121 U 7921601U 093 3/26/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032I1061808201388 $0.64 000001034955-3562505208
2018 9 FD52 05 E122 U 7921601U 093 3/26/2018 3020 PREL ENGINEERING-UTILITIES CA-XR032I1061808201388 $183.36 000001034955-3562505208
2018 9 FD52 05 E122 U 7921601U 093 3/26/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032I1061808201388 $4.18 000001034955-3562505208
2018 9 FD52 05 E123 U 7921601U 093 3/26/2018 3020 PREL ENGINEERING-UTILITIES CA-XR032I1061808201388 $53.70 000001034955-3562505208
2018 9 FD52 05 E123 U 7921601U 093 3/26/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032I1061808201388 $1.24 000001034955-3562505208
2018 9 FD52 05 E124 U 7921601U 093 3/26/2018 3020 PREL ENGINEERING-UTILITIES CA-XR032I1061808201388 $0.15 000001034955-3562505208
2018 6 FD52 05 E124 U 7921601U 093 12/26/2017 3020 PREL ENGINEERING-UTILITIES CA-XR122H1061735505587 $0.03 000001034955-3562505208
2018 6 FD52 05 E111 U 7921601U 093 12/26/2017 3020 PREL ENGINEERING-UTILITIES CA-XR122H1061735505587 $64.85 000001034955-3562505208
2018 6 FD52 05 E121 U 7921601U 093 12/26/2017 3020 PREL ENGINEERING-UTILITIES CA-XR122H1061735505587 $4.91 000001034955-3562505208
2018 6 FD52 05 E122 U 7921601U 093 12/26/2017 3020 PREL ENGINEERING-UTILITIES CA-XR122H1061735505587 $32.08 000001034955-3562505208
2018 6 FD52 05 E123 U 7921601U 093 12/26/2017 3020 PREL ENGINEERING-UTILITIES CA-XR122H1061735505587 $10.06 000001034955-3562505208
2018 3 FD52 05 E111 U 7921601U 093 9/25/2017 3020 PREL ENGINEERING-UTILITIES CA-XR092H1061726509517 $240.88 000001034955-3562505208
2018 3 FD52 05 E111 U 7921601U 093 9/25/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092H1061726509517 $49.72 000001034955-3562505208
2018 3 FD52 05 E121 U 7921601U 093 9/25/2017 3020 PREL ENGINEERING-UTILITIES CA-XR092H1061726509517 $17.70 000001034955-3562505208
2018 3 FD52 05 E121 U 7921601U 093 9/25/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092H1061726509517 $3.67 000001034955-3562505208
2018 3 FD52 05 E122 U 7921601U 093 9/25/2017 3020 PREL ENGINEERING-UTILITIES CA-XR092H1061726509517 $119.20 000001034955-3562505208
2018 3 FD52 05 E122 U 7921601U 093 9/25/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092H1061726509517 $24.58 000001034955-3562505208
2018 3 FD52 05 E123 U 7921601U 093 9/25/2017 3020 PREL ENGINEERING-UTILITIES CA-XR092H1061726509517 $35.19 000001034955-3562505208
2018 3 FD52 05 E123 U 7921601U 093 9/25/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092H1061726509517 $7.23 000001034955-3562505208
2018 3 FD52 05 E124 U 7921601U 093 9/25/2017 3020 PREL ENGINEERING-UTILITIES CA-XR092H1061726509517 $0.10 000001034955-3562505208
2018 3 FD52 05 E124 U 7921601U 093 9/25/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092H1061726509517 $0.02 000001034955-3562505208
2018 3 FD52 05 E111 U 7921601U 093 9/11/2017 3040 INSPECTION&SUPER-UTILITIES CA-XR091H1061725108342 $179.53 000001024066-3562505208
2018 3 FD52 05 E111 U 7921601U 093 9/11/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091H1061725108342 $22.61 000001024066-3562505208
2018 3 FD52 05 E121 U 7921601U 093 9/11/2017 3040 INSPECTION&SUPER-UTILITIES CA-XR091H1061725108342 $12.98 000001024066-3562505208
2018 3 FD52 05 E121 U 7921601U 093 9/11/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091H1061725108342 $1.63 000001024066-3562505208
2018 3 FD52 05 E122 U 7921601U 093 9/11/2017 3040 INSPECTION&SUPER-UTILITIES CA-XR091H1061725108342 $88.78 000001024066-3562505208
2018 3 FD52 05 E122 U 7921601U 093 9/11/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091H1061725108342 $11.18 000001024066-3562505208
2018 3 FD52 05 E123 U 7921601U 093 9/11/2017 3040 INSPECTION&SUPER-UTILITIES CA-XR091H1061725108342 $25.35 000001024066-3562505208
2018 3 FD52 05 E123 U 7921601U 093 9/11/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091H1061725108342 $3.15 000001024066-3562505208
2018 3 FD52 05 E111 U 7921601U 093 9/11/2017 3020 PREL ENGINEERING-UTILITIES CA-XR091H1061725108348 $71.35 000001034955-3562505208
2018 3 FD52 05 E111 U 7921601U 093 9/11/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091H1061725108348 $9.28 000001034955-3562505208
2018 3 FD52 05 E121 U 7921601U 093 9/11/2017 3020 PREL ENGINEERING-UTILITIES CA-XR091H1061725108348 $5.39 000001034955-3562505208
2018 3 FD52 05 E121 U 7921601U 093 9/11/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091H1061725108348 $0.71 000001034955-3562505208
2018 3 FD52 05 E122 U 7921601U 093 9/11/2017 3020 PREL ENGINEERING-UTILITIES CA-XR091H1061725108348 $35.39 000001034955-3562505208
2018 3 FD52 05 E122 U 7921601U 093 9/11/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091H1061725108348 $4.59 000001034955-3562505208
2018 3 FD52 05 E123 U 7921601U 093 9/11/2017 3020 PREL ENGINEERING-UTILITIES CA-XR091H1061725108348 $11.09 000001034955-3562505208
2018 3 FD52 05 E123 U 7921601U 093 9/11/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091H1061725108348 $1.42 000001034955-3562505208
2018 2 FD52 05 E111 U 7921601U 093 8/24/2017 3020 PREL ENGINEERING-UTILITIES CA-XR082H1061723507190 $51.88 000001034955-3562505208
2018 2 FD52 05 E111 U 7921601U 093 8/24/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082H1061723507190 $8.56 000001034955-3562505208
2018 2 FD52 05 E121 U 7921601U 093 8/24/2017 3020 PREL ENGINEERING-UTILITIES CA-XR082H1061723507190 $3.92 000001034955-3562505208
2018 2 FD52 05 E121 U 7921601U 093 8/24/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082H1061723507190 $0.64 000001034955-3562505208
2018 2 FD52 05 E122 U 7921601U 093 8/24/2017 3020 PREL ENGINEERING-UTILITIES CA-XR082H1061723507190 $25.66 000001034955-3562505208
2018 2 FD52 05 E122 U 7921601U 093 8/24/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082H1061723507190 $4.24 000001034955-3562505208
2018 2 FD52 05 E123 U 7921601U 093 8/24/2017 3020 PREL ENGINEERING-UTILITIES CA-XR082H1061723507190 $8.07 000001034955-3562505208
2018 2 FD52 05 E123 U 7921601U 093 8/24/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082H1061723507190 $1.31 000001034955-3562505208
2018 2 FD52 05 E124 U 7921601U 093 8/24/2017 3020 PREL ENGINEERING-UTILITIES CA-XR082H1061723507190 $0.02 000001034955-3562505208
2018 1 FD52 05 E121 U 7921601U 093 7/24/2017 3020 PREL ENGINEERING-UTILITIES CA-XR072H1061720204961 $20.51 000001034955-3562505208
2018 1 FD52 05 E121 U 7921601U 093 7/24/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072H1061720204961 $5.14 000001034955-3562505208
2018 1 FD52 05 E122 U 7921601U 093 7/24/2017 3020 PREL ENGINEERING-UTILITIES CA-XR072H1061720204961 $134.10 000001034955-3562505208
2018 1 FD52 05 E122 U 7921601U 093 7/24/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072H1061720204961 $33.60 000001034955-3562505208
2018 1 FD52 05 E123 U 7921601U 093 7/24/2017 3020 PREL ENGINEERING-UTILITIES CA-XR072H1061720204961 $42.23 000001034955-3562505208
2018 1 FD52 05 E123 U 7921601U 093 7/24/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072H1061720204961 $10.38 000001034955-3562505208
2018 1 FD52 05 E124 U 7921601U 093 7/24/2017 3020 PREL ENGINEERING-UTILITIES CA-XR072H1061720204961 $0.13 000001034955-3562505208
2018 1 FD52 05 E124 U 7921601U 093 7/24/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072H1061720204961 $0.04 000001034955-3562505208
2018 1 FD52 05 E111 U 7921601U 093 7/24/2017 3020 PREL ENGINEERING-UTILITIES CA-XR072H1061720204961 $271.07 000001034955-3562505208
2018 1 FD52 05 E111 U 7921601U 093 7/24/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072H1061720204961 $67.92 000001034955-3562505208
2018 1 FD52 05 E111 U 7921601U 093 7/13/2017 3040 INSPECTION&SUPER-UTILITIES CA-XR071H1061718803788 $51.77 000001024066-3562505208
2018 1 FD52 05 E111 U 7921601U 093 7/13/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071H1061718803788 $12.45 000001024066-3562505208
2018 1 FD52 05 E121 U 7921601U 093 7/13/2017 3040 INSPECTION&SUPER-UTILITIES CA-XR071H1061718803788 $3.92 000001024066-3562505208
2018 1 FD52 05 E121 U 7921601U 093 7/13/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071H1061718803788 $0.95 000001024066-3562505208
2018 1 FD52 05 E122 U 7921601U 093 7/13/2017 3040 INSPECTION&SUPER-UTILITIES CA-XR071H1061718803788 $25.21 000001024066-3562505208
2018 1 FD52 05 E122 U 7921601U 093 7/13/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071H1061718803788 $6.05 000001024066-3562505208
2018 1 FD52 05 E123 U 7921601U 093 7/13/2017 3040 INSPECTION&SUPER-UTILITIES CA-XR071H1061718803788 $8.08 000001024066-3562505208
2018 1 FD52 05 E123 U 7921601U 093 7/13/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071H1061718803788 $1.90 000001024066-3562505208
2018 1 FD52 05 E111 U 7921601U 093 7/13/2017 3020 PREL ENGINEERING-UTILITIES CA-XR071H1061718803796 $77.72 000001034955-3562505208
2018 1 FD52 05 E111 U 7921601U 093 7/13/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071H1061718803796 $18.94 000001034955-3562505208
2018 1 FD52 05 E121 U 7921601U 093 7/10/2017 3020 PREL ENGINEERING-UTILITIES CA-XR071H1061718803797 $5.89 000001034955-3562505208
2018 1 FD52 05 E121 U 7921601U 093 7/10/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071H1061718803797 $1.43 000001034955-3562505208
2018 1 FD52 05 E122 U 7921601U 093 7/10/2017 3020 PREL ENGINEERING-UTILITIES CA-XR071H1061718803797 $37.29 000001034955-3562505208
2018 1 FD52 05 E122 U 7921601U 093 7/10/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071H1061718803797 $9.20 000001034955-3562505208
2018 1 FD52 05 E123 U 7921601U 093 7/10/2017 3020 PREL ENGINEERING-UTILITIES CA-XR071H1061718803797 $11.96 000001034955-3562505208
2018 1 FD52 05 E123 U 7921601U 093 7/10/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071H1061718803797 $2.90 000001034955-3562505208
2017 11 FD52 00 E111 U 7921601U 093 5/26/2017 3040 INSPECTION&SUPER-UTILITIES CA-XR052H1061714300421 $185.32 000001050243-3562500480
2017 11 FD52 00 E111 U 7921601U 093 5/26/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052H1061714300421 $3.46 000001050243-3562500480
2017 11 FD52 00 E121 U 7921601U 093 5/26/2017 3040 INSPECTION&SUPER-UTILITIES CA-XR052H1061714300421 $12.99 000001050243-3562500480
2017 11 FD52 00 E121 U 7921601U 093 5/26/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052H1061714300421 $0.25 000001050243-3562500480
2017 11 FD52 00 E122 U 7921601U 093 5/26/2017 3040 INSPECTION&SUPER-UTILITIES CA-XR052H1061714300421 $90.06 000001050243-3562500480
2017 11 FD52 00 E122 U 7921601U 093 5/26/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052H1061714300421 $1.68 000001050243-3562500480
2017 11 FD52 00 E123 U 7921601U 093 5/26/2017 3040 INSPECTION&SUPER-UTILITIES CA-XR052H1061714300421 $59.67 000001050243-3562500480
2017 11 FD52 00 E123 U 7921601U 093 5/26/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052H1061714300421 $1.11 000001050243-3562500480
2017 11 FD52 00 E124 U 7921601U 093 5/26/2017 3040 INSPECTION&SUPER-UTILITIES CA-XR052H1061714300421 $0.09 000001050243-3562500480
2017 10 FD52 00 E123 U 7921601U 093 4/27/2017 3040 INSPECTION&SUPER-UTILITIES CA-XR042H1061711108811 $65.68 000001050243-3562500480
2017 10 FD52 00 E123 U 7921601U 093 4/27/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042H1061711108811 $6.69 000001050243-3562500480
2017 10 FD52 00 E124 U 7921601U 093 4/27/2017 3040 INSPECTION&SUPER-UTILITIES CA-XR042H1061711108811 $0.10 000001050243-3562500480
2017 10 FD52 00 E124 U 7921601U 093 4/27/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042H1061711108811 $0.01 000001050243-3562500480
2017 10 FD52 00 E111 U 7921601U 093 4/27/2017 3040 INSPECTION&SUPER-UTILITIES CA-XR042H1061711108811 $203.87 000001050243-3562500480
2017 10 FD52 00 E111 U 7921601U 093 4/27/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042H1061711108811 $20.94 000001050243-3562500480
2017 10 FD52 00 E121 U 7921601U 093 4/27/2017 3040 INSPECTION&SUPER-UTILITIES CA-XR042H1061711108811 $14.29 000001050243-3562500480
2017 10 FD52 00 E121 U 7921601U 093 4/27/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042H1061711108811 $1.47 000001050243-3562500480
2017 10 FD52 00 E122 U 7921601U 093 4/27/2017 3040 INSPECTION&SUPER-UTILITIES CA-XR042H1061711108811 $99.06 000001050243-3562500480
2017 10 FD52 00 E122 U 7921601U 093 4/27/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042H1061711108811 $10.17 000001050243-3562500480
2017 8 FD52 05 E111 U 7921601U 093 2/27/2017 3040 INSPECTION&SUPER-UTILITIES CA-XR022H1061705304351 $275.12 000001024066-3562505208
2017 8 FD52 05 E111 U 7921601U 093 2/27/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022H1061705304351 $2.36 000001024066-3562505208
2017 8 FD52 05 E121 U 7921601U 093 2/27/2017 3040 INSPECTION&SUPER-UTILITIES CA-XR022H1061705304351 $20.25 000001024066-3562505208
2017 8 FD52 05 E121 U 7921601U 093 2/27/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022H1061705304351 $0.16 000001024066-3562505208
2017 8 FD52 05 E122 U 7921601U 093 2/27/2017 3040 INSPECTION&SUPER-UTILITIES CA-XR022H1061705304351 $133.65 000001024066-3562505208
2017 8 FD52 05 E122 U 7921601U 093 2/27/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022H1061705304351 $1.15 000001024066-3562505208
2017 8 FD52 05 E123 U 7921601U 093 2/27/2017 3040 INSPECTION&SUPER-UTILITIES CA-XR022H1061705304351 $43.11 000001024066-3562505208
2017 8 FD52 05 E123 U 7921601U 093 2/27/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022H1061705304351 $0.31 000001024066-3562505208
2017 8 FD52 05 E124 U 7921601U 093 2/27/2017 3040 INSPECTION&SUPER-UTILITIES CA-XR022H1061705304351 $0.12 000001024066-3562505208
2017 8 FD52 00 E111 U 7921601U 093 2/15/2017 3040 INSPECTION&SUPER-UTILITIES CA-XR021H1061703903321 $169.89 000001050243-3562500480
2017 8 FD52 00 E111 U 7921601U 093 2/15/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021H1061703903321 $22.42 000001050243-3562500480
2017 8 FD52 00 E121 U 7921601U 093 2/15/2017 3040 INSPECTION&SUPER-UTILITIES CA-XR021H1061703903321 $11.91 000001050243-3562500480
2017 8 FD52 00 E121 U 7921601U 093 2/15/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021H1061703903321 $1.56 000001050243-3562500480
2017 8 FD52 00 E122 U 7921601U 093 2/15/2017 3040 INSPECTION&SUPER-UTILITIES CA-XR021H1061703903321 $82.55 000001050243-3562500480
2017 8 FD52 00 E122 U 7921601U 093 2/15/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021H1061703903321 $10.89 000001050243-3562500480
2017 8 FD52 00 E123 U 7921601U 093 2/15/2017 3040 INSPECTION&SUPER-UTILITIES CA-XR021H1061703903321 $54.75 000001050243-3562500480
2017 8 FD52 00 E123 U 7921601U 093 2/15/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021H1061703903321 $7.17 000001050243-3562500480
2017 8 FD52 05 E111 U 7921601U 093 2/9/2017 3040 INSPECTION&SUPER-UTILITIES CA-XR021H1061703903278 $86.40 000001024066-3562505208
2017 8 FD52 05 E111 U 7921601U 093 2/9/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021H1061703903278 $7.78 000001024066-3562505208
2017 8 FD52 05 E121 U 7921601U 093 2/9/2017 3040 INSPECTION&SUPER-UTILITIES CA-XR021H1061703903278 $6.53 000001024066-3562505208
2017 8 FD52 05 E121 U 7921601U 093 2/9/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021H1061703903278 $0.59 000001024066-3562505208
2017 8 FD52 05 E122 U 7921601U 093 2/9/2017 3040 INSPECTION&SUPER-UTILITIES CA-XR021H1061703903278 $41.99 000001024066-3562505208
2017 8 FD52 05 E122 U 7921601U 093 2/9/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021H1061703903278 $3.78 000001024066-3562505208
2017 8 FD52 05 E123 U 7921601U 093 2/9/2017 3040 INSPECTION&SUPER-UTILITIES CA-XR021H1061703903278 $14.78 000001024066-3562505208
2017 8 FD52 05 E123 U 7921601U 093 2/9/2017 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021H1061703903278 $1.31 000001024066-3562505208
2017 6 FD52 05 E111 U 7921601U 093 12/12/2016 3040 INSPECTION&SUPER-UTILITIES CA-XR121G1061634309849 $113.05 000001024066-3562505208
2017 6 FD52 05 E121 U 7921601U 093 12/12/2016 3040 INSPECTION&SUPER-UTILITIES CA-XR121G1061634309849 $8.11 000001024066-3562505208
2017 6 FD52 05 E122 U 7921601U 093 12/12/2016 3040 INSPECTION&SUPER-UTILITIES CA-XR121G1061634309849 $54.93 000001024066-3562505208
2017 6 FD52 05 E123 U 7921601U 093 12/12/2016 3040 INSPECTION&SUPER-UTILITIES CA-XR121G1061634309849 $19.20 000001024066-3562505208
2017 2 FD52 05 E121 U 7921601U 093 8/30/2016 3040 INSPECTION&SUPER-UTILITIES CA-XR082G1061623603902 $7.02 000001024066-3562505208
2017 2 FD52 05 E122 U 7921601U 093 8/30/2016 3040 INSPECTION&SUPER-UTILITIES CA-XR082G1061623603902 $47.64 000001024066-3562505208
2017 2 FD52 05 E123 U 7921601U 093 8/30/2016 3040 INSPECTION&SUPER-UTILITIES CA-XR082G1061623603902 $16.65 000001024066-3562505208
2017 2 FD52 05 E124 U 7921601U 093 8/30/2016 3040 INSPECTION&SUPER-UTILITIES CA-XR082G1061623603902 $0.05 000001024066-3562505208
2017 2 FD52 05 E111 U 7921601U 093 8/24/2016 3040 INSPECTION&SUPER-UTILITIES CA-XR082G1061623603901 $98.04 000001024066-3562505208
2017 2 FD52 05 E111 U 7921601U 093 8/12/2016 0640 ENV STUDIES-GEN-CONSULT CA-XR081G1061622202973 $273.61 000001041005-3562505200
2017 2 FD52 05 E121 U 7921601U 093 8/12/2016 0640 ENV STUDIES-GEN-CONSULT CA-XR081G1061622202973 $19.22 000001041005-3562505200
2017 2 FD52 05 E122 U 7921601U 093 8/12/2016 0640 ENV STUDIES-GEN-CONSULT CA-XR081G1061622202973 $132.95 000001041005-3562505200
2017 2 FD52 05 E123 U 7921601U 093 8/12/2016 0640 ENV STUDIES-GEN-CONSULT CA-XR081G1061622202973 $42.71 000001041005-3562505200
2017 1 FD52 05 E111 U 7921601U 093 7/11/2016 3040 INSPECTION&SUPER-UTILITIES CA-XR071G1061619001160 $58.92 000001024066-3562505208
2017 1 FD52 05 E121 U 7921601U 093 7/11/2016 3040 INSPECTION&SUPER-UTILITIES CA-XR071G1061619001160 $4.22 000001024066-3562505208
2017 1 FD52 05 E122 U 7921601U 093 7/11/2016 3040 INSPECTION&SUPER-UTILITIES CA-XR071G1061619001160 $22.85 000001024066-3562505208
2017 1 FD52 05 E123 U 7921601U 093 7/11/2016 3040 INSPECTION&SUPER-UTILITIES CA-XR071G1061619001160 $10.01 000001024066-3562505208
2017 1 FD52 05 E111 U 7921601U 093 7/1/2016 3040 INSPECTION&SUPER-UTILITIES CA-XR062G1061617507382 $262.44 000001024066-3562505208
2017 1 FD52 05 E121 U 7921601U 093 7/1/2016 3040 INSPECTION&SUPER-UTILITIES CA-XR062G1061617507382 $18.80 000001024066-3562505208
2017 1 FD52 05 E122 U 7921601U 093 7/1/2016 3040 INSPECTION&SUPER-UTILITIES CA-XR062G1061617507382 $101.75 000001024066-3562505208
2017 1 FD52 05 E123 U 7921601U 093 7/1/2016 3040 INSPECTION&SUPER-UTILITIES CA-XR062G1061617507382 $44.52 000001024066-3562505208
2017 1 FD52 05 E124 U 7921601U 093 7/1/2016 3040 INSPECTION&SUPER-UTILITIES CA-XR062G1061617507382 $0.13 000001024066-3562505208
2017 1 FD52 00 E123 U 7921601U 093 7/1/2016 3040 INSPECTION&SUPER-UTILITIES CA-XR061G1061616006629P $113.25 000001050243-3562500480
2016 12 FD52 00 E111 U 7921601U 093 6/9/2016 3040 INSPECTION&SUPER-UTILITIES CA-XR061G1061616006629 $539.09 000001050243-3562500480
2016 12 FD52 00 E121 U 7921601U 093 6/9/2016 3040 INSPECTION&SUPER-UTILITIES CA-XR061G1061616006629 $33.81 000001050243-3562500480
2016 12 FD52 00 E122 U 7921601U 093 6/9/2016 3040 INSPECTION&SUPER-UTILITIES CA-XR061G1061616006629 $209.00 000001050243-3562500480
2016 11 FD52 00 E111 U 7921601U 093 5/23/2016 3030 INSPECTION&SUPER-RAILROAD CA-XR052G1061614105810 $539.29 000001049943-3562500480
2016 11 FD52 00 E121 U 7921601U 093 5/23/2016 3030 INSPECTION&SUPER-RAILROAD CA-XR052G1061614105810 $37.61 000001049943-3562500480
2016 11 FD52 00 E122 U 7921601U 093 5/23/2016 3030 INSPECTION&SUPER-RAILROAD CA-XR052G1061614105810 $209.09 000001049943-3562500480
2016 11 FD52 00 E123 U 7921601U 093 5/23/2016 3030 INSPECTION&SUPER-RAILROAD CA-XR052G1061614105810 $113.94 000001049943-3562500480
2016 11 FD52 00 E124 U 7921601U 093 5/23/2016 3030 INSPECTION&SUPER-RAILROAD CA-XR052G1061614105810 $0.34 000001049943-3562500480
2016 10 FD52 05 E111 U 7921601U 093 4/28/2016 3040 INSPECTION&SUPER-UTILITIES CA-XR042G1061611404011 ($107.87) 000001024066-3562505208
2016 10 FD52 05 E121 U 7921601U 093 4/28/2016 3040 INSPECTION&SUPER-UTILITIES CA-XR042G1061611404011 ($7.73) 000001024066-3562505208
2016 10 FD52 05 E122 U 7921601U 093 4/28/2016 3040 INSPECTION&SUPER-UTILITIES CA-XR042G1061611404011 ($41.83) 000001024066-3562505208
2016 10 FD52 05 E123 U 7921601U 093 4/28/2016 3040 INSPECTION&SUPER-UTILITIES CA-XR042G1061611404011 ($18.30) 000001024066-3562505208
2016 10 FD52 05 E111 U 7921601U 093 4/25/2016 0640 ENV STUDIES-GEN-CONSULT CA-XR042G1061611404029 $3.57 000001041005-3562505200
2016 10 FD52 05 E121 U 7921601U 093 4/25/2016 0640 ENV STUDIES-GEN-CONSULT CA-XR042G1061611404029 $0.25 000001041005-3562505200
2016 10 FD52 05 E122 U 7921601U 093 4/25/2016 0640 ENV STUDIES-GEN-CONSULT CA-XR042G1061611404029 $1.39 000001041005-3562505200
2016 10 FD52 05 E123 U 7921601U 093 4/25/2016 0640 ENV STUDIES-GEN-CONSULT CA-XR042G1061611404029 $0.57 000001041005-3562505200
2016 10 FD52 05 E111 U 7921601U 093 4/14/2016 3040 INSPECTION&SUPER-UTILITIES CA-XR041G1061609903173 $241.05 000001024066-3562505208
2016 10 FD52 05 E121 U 7921601U 093 4/14/2016 3040 INSPECTION&SUPER-UTILITIES CA-XR041G1061609903173 $17.27 000001024066-3562505208
2016 10 FD52 05 E122 U 7921601U 093 4/14/2016 3040 INSPECTION&SUPER-UTILITIES CA-XR041G1061609903173 $93.46 000001024066-3562505208
2016 10 FD52 05 E123 U 7921601U 093 4/14/2016 3040 INSPECTION&SUPER-UTILITIES CA-XR041G1061609903173 $40.89 000001024066-3562505208
2016 10 FD52 05 E111 U 7921601U 093 4/11/2016 0640 ENV STUDIES-GEN-CONSULT CA-XR041G1061609903187 $97.14 000001041005-3562505200
2016 10 FD52 05 E121 U 7921601U 093 4/11/2016 0640 ENV STUDIES-GEN-CONSULT CA-XR041G1061609903187 $6.82 000001041005-3562505200
2016 10 FD52 05 E122 U 7921601U 093 4/11/2016 0640 ENV STUDIES-GEN-CONSULT CA-XR041G1061609903187 $37.66 000001041005-3562505200
2016 10 FD52 05 E123 U 7921601U 093 4/11/2016 0640 ENV STUDIES-GEN-CONSULT CA-XR041G1061609903187 $15.14 000001041005-3562505200
2016 7 FD52 05 E111 U 7921601U 093 1/26/2016 0640 ENV STUDIES-GEN-CONSULT CA-XR012G1061602509142 $127.68 000001041005-3562505200
2016 7 FD52 05 E121 U 7921601U 093 1/26/2016 0640 ENV STUDIES-GEN-CONSULT CA-XR012G1061602509142 $8.97 000001041005-3562505200
2016 7 FD52 05 E122 U 7921601U 093 1/26/2016 0640 ENV STUDIES-GEN-CONSULT CA-XR012G1061602509142 $49.50 000001041005-3562505200
2016 7 FD52 05 E123 U 7921601U 093 1/26/2016 0640 ENV STUDIES-GEN-CONSULT CA-XR012G1061602509142 $19.91 000001041005-3562505200
2016 7 FD52 05 E124 U 7921601U 093 1/26/2016 0640 ENV STUDIES-GEN-CONSULT CA-XR012G1061602509142 $0.05 000001041005-3562505200
2016 7 FD52 05 E111 U 7921601U 093 1/11/2016 3040 INSPECTION&SUPER-UTILITIES CA-XR011G1061600808313 $299.14 000001024066-3562505208
2016 7 FD52 05 E121 U 7921601U 093 1/11/2016 3040 INSPECTION&SUPER-UTILITIES CA-XR011G1061600808313 $21.43 000001024066-3562505208
2016 7 FD52 05 E122 U 7921601U 093 1/11/2016 3040 INSPECTION&SUPER-UTILITIES CA-XR011G1061600808313 $115.98 000001024066-3562505208
2016 7 FD52 05 E123 U 7921601U 093 1/11/2016 3040 INSPECTION&SUPER-UTILITIES CA-XR011G1061600808313 $50.75 000001024066-3562505208
2016 6 FD52 05 E111 U 7921601U 093 12/21/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR122F1061535207410 $612.42 000001024066-3562505208
2016 6 FD52 05 E121 U 7921601U 093 12/21/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR122F1061535207410 $44.04 000001024066-3562505208
2016 6 FD52 05 E122 U 7921601U 093 12/21/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR122F1061535207410 $237.49 000001024066-3562505208
2016 6 FD52 05 E123 U 7921601U 093 12/21/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR122F1061535207410 $28.90 000001024066-3562505208
2016 6 FD52 05 E124 U 7921601U 093 12/21/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR122F1061535207410 $0.31 000001024066-3562505208
2016 3 FD52 05 E121 U 7921601U 093 9/9/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR091F1061525101428 $4.12 000001024066-3562505208
2016 3 FD52 05 E122 U 7921601U 093 9/9/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR091F1061525101428 $22.22 000001024066-3562505208
2016 3 FD52 05 E123 U 7921601U 093 9/9/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR091F1061525101428 $2.86 000001024066-3562505208
2016 3 FD52 05 E111 U 7921601U 093 9/9/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR091F1061525101427 $57.30 000001024066-3562505208
2016 2 FD52 05 E111 U 7921601U 093 8/24/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR082F1061523300411 $158.81 000001024066-3562505208
2016 2 FD52 05 E121 U 7921601U 093 8/24/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR082F1061523300411 $11.42 000001024066-3562505208
2016 2 FD52 05 E122 U 7921601U 093 8/24/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR082F1061523300411 $61.58 000001024066-3562505208
2016 2 FD52 05 E123 U 7921601U 093 8/24/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR082F1061523300411 $7.95 000001024066-3562505208
2016 2 FD52 05 E124 U 7921601U 093 8/24/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR082F1061523300411 $0.09 000001024066-3562505208
2016 2 FD52 05 E111 U 7921601U 093 8/14/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR081F1061521909453 $69.85 000001024066-3562505208
2016 2 FD52 05 E121 U 7921601U 093 8/14/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR081F1061521909453 $5.02 000001024066-3562505208
2016 2 FD52 05 E122 U 7921601U 093 8/14/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR081F1061521909453 $27.08 000001024066-3562505208
2016 2 FD52 05 E123 U 7921601U 093 8/14/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR081F1061521909453 $3.50 000001024066-3562505208
2016 1 FD52 05 E121 U 7921601U 093 7/27/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR072F1061520408499 $3.52 000001024066-3562505208
2016 1 FD52 05 E122 U 7921601U 093 7/27/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR072F1061520408499 $18.95 000001024066-3562505208
2016 1 FD52 05 E123 U 7921601U 093 7/27/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR072F1061520408499 $2.45 000001024066-3562505208
2016 1 FD52 05 E124 U 7921601U 093 7/27/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR072F1061520408499 $0.03 000001024066-3562505208
2016 1 FD52 05 E111 U 7921601U 093 7/27/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR072F1061520408499 $48.89 000001024066-3562505208
2016 1 FD52 05 E111 U 7921601U 093 7/9/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR071F1061518907565 $77.78 000001024066-3562505208
2016 1 FD52 05 E121 U 7921601U 093 7/9/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR071F1061518907565 $5.59 000001024066-3562505208
2016 1 FD52 05 E122 U 7921601U 093 7/9/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR071F1061518907565 $30.16 000001024066-3562505208
2016 1 FD52 05 E123 U 7921601U 093 7/9/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR071F1061518907565 $3.89 000001024066-3562505208
2016 1 FD52 05 E123 U 7921601U 093 7/1/2015 0640 ENV STUDIES-GEN-CONSULT CA-XR061F1061515905768P $6.96 000001041005-3562505200
2016 1 FD52 05 E111 U 7921601U 093 7/1/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR062F1061517006658 $133.43 000001024066-3562505208
2016 1 FD52 05 E121 U 7921601U 093 7/1/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR062F1061517006658 $9.60 000001024066-3562505208
2016 1 FD52 05 E122 U 7921601U 093 7/1/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR062F1061517006658 $51.73 000001024066-3562505208
2016 1 FD52 05 E123 U 7921601U 093 7/1/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR062F1061517006658 $7.41 000001024066-3562505208
2016 1 FD52 05 E124 U 7921601U 093 7/1/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR062F1061517006658 $0.06 000001024066-3562505208
2015 12 FD52 05 E111 U 7921601U 093 6/9/2015 0640 ENV STUDIES-GEN-CONSULT CA-XR061F1061515905768 $178.65 000001041005-3562505200
2015 12 FD52 05 E121 U 7921601U 093 6/9/2015 0640 ENV STUDIES-GEN-CONSULT CA-XR061F1061515905768 $12.98 000001041005-3562505200
2015 12 FD52 05 E122 U 7921601U 093 6/9/2015 0640 ENV STUDIES-GEN-CONSULT CA-XR061F1061515905768 $69.26 000001041005-3562505200
2015 11 FD52 05 E111 U 7921601U 093 5/26/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR052F1061514204776 $52.93 000001024066-3562505208
2015 11 FD52 05 E121 U 7921601U 093 5/26/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR052F1061514204776 $3.78 000001024066-3562505208
2015 11 FD52 05 E122 U 7921601U 093 5/26/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR052F1061514204776 $20.52 000001024066-3562505208
2015 11 FD52 05 E123 U 7921601U 093 5/26/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR052F1061514204776 $10.42 000001024066-3562505208
2015 11 FD52 05 E124 U 7921601U 093 5/26/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR052F1061514204776 $0.03 000001024066-3562505208
2015 11 FD52 05 E111 U 7921601U 093 5/11/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR051F1061512803839 $443.05 000001024066-3562505200
2015 11 FD52 05 E121 U 7921601U 093 5/11/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR051F1061512803839 $30.52 000001024066-3562505208
2015 11 FD52 05 E122 U 7921601U 093 5/11/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR051F1061512803839 $171.79 000001024066-3562505208
2015 11 FD52 05 E123 U 7921601U 093 5/11/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR051F1061512803839 $77.42 000001024066-3562505208
2015 10 FD52 05 E229 U 7921601U 093 4/28/2015 3040 INSPECTION&SUPER-UTILITIES IET-XE13A162515115023500 $6.60
2015 10 FD52 05 E111 U 7921601U 093 4/27/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR042F1061511302941 $212.93 000001024066-3562505200
2015 10 FD52 05 E121 U 7921601U 093 4/27/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR042F1061511302941 $15.31 000001024066-3562505200
2015 10 FD52 05 E122 U 7921601U 093 4/27/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR042F1061511302941 $82.55 000001024066-3562505200
2015 10 FD52 05 E123 U 7921601U 093 4/27/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR042F1061511302941 $12.85 000001024066-3562505200
2015 10 FD52 05 E124 U 7921601U 093 4/27/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR042F1061511302941 $0.11 000001024066-3562505200
2015 10 FD52 05 E111 U 7921601U 093 4/27/2015 0640 ENV STUDIES-GEN-CONSULT CA-XR042F1061511302975 $109.85 000001041005-3562505200
2015 10 FD52 05 E121 U 7921601U 093 4/27/2015 0640 ENV STUDIES-GEN-CONSULT CA-XR042F1061511302975 $7.98 000001041005-3562505200
2015 10 FD52 05 E122 U 7921601U 093 4/27/2015 0640 ENV STUDIES-GEN-CONSULT CA-XR042F1061511302975 $42.59 000001041005-3562505200
2015 10 FD52 05 E123 U 7921601U 093 4/27/2015 0640 ENV STUDIES-GEN-CONSULT CA-XR042F1061511302975 $4.29 000001041005-3562505200
2015 10 FD52 05 E124 U 7921601U 093 4/27/2015 0640 ENV STUDIES-GEN-CONSULT CA-XR042F1061511302975 $0.04 000001041005-3562505200
2015 10 FD52 05 E111 U 7921601U 093 4/9/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR041F1061509802070 $69.34 000001024066-3562505208
2015 10 FD52 05 E121 U 7921601U 093 4/9/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR041F1061509802070 $4.41 000001024066-3562505208
2015 10 FD52 05 E122 U 7921601U 093 4/9/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR041F1061509802070 $26.83 000001024066-3562505208
2015 10 FD52 05 E123 U 7921601U 093 4/9/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR041F1061509802070 $11.63 000001024066-3562505208
2015 10 FD52 05 E111 U 7921601U 093 4/9/2015 0640 ENV STUDIES-GEN-CONSULT CA-XR041F1061509802102 $251.68 000001041005-3562505200
2015 10 FD52 05 E121 U 7921601U 093 4/9/2015 0640 ENV STUDIES-GEN-CONSULT CA-XR041F1061509802102 $18.29 000001041005-3562505200
2015 10 FD52 05 E122 U 7921601U 093 4/9/2015 0640 ENV STUDIES-GEN-CONSULT CA-XR041F1061509802102 $97.58 000001041005-3562505200
2015 10 FD52 05 E123 U 7921601U 093 4/9/2015 0640 ENV STUDIES-GEN-CONSULT CA-XR041F1061509802102 $9.82 000001041005-3562505200
2015 9 FD52 05 E111 U 7921601U 093 3/24/2015 0640 ENV STUDIES-GEN-CONSULT CA-XR032F1061508201252 $101.37 000001041005-3562505200
2015 9 FD52 05 E121 U 7921601U 093 3/24/2015 0640 ENV STUDIES-GEN-CONSULT CA-XR032F1061508201252 $7.37 000001041005-3562505200
2015 9 FD52 05 E122 U 7921601U 093 3/24/2015 0640 ENV STUDIES-GEN-CONSULT CA-XR032F1061508201252 $39.30 000001041005-3562505200
2015 9 FD52 05 E123 U 7921601U 093 3/24/2015 0640 ENV STUDIES-GEN-CONSULT CA-XR032F1061508201252 $4.10 000001041005-3562505200
2015 9 FD52 05 E124 U 7921601U 093 3/24/2015 0640 ENV STUDIES-GEN-CONSULT CA-XR032F1061508201252 $0.04 000001041005-3562505200
2015 9 FD52 05 E111 U 7921601U 093 3/12/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR031F1061506500322 $86.08 000001024066-3562505208
2015 9 FD52 05 E121 U 7921601U 093 3/12/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR031F1061506500322 $5.48 000001024066-3562505208
2015 9 FD52 05 E122 U 7921601U 093 3/12/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR031F1061506500322 $33.38 000001024066-3562505208
2015 9 FD52 05 E123 U 7921601U 093 3/12/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR031F1061506500322 $14.42 000001024066-3562505208
2015 9 FD52 05 E111 U 7921601U 093 3/9/2015 0640 ENV STUDIES-GEN-CONSULT CA-XR031F1061506500365 $100.92 000001041005-3562505200
2015 9 FD52 05 E121 U 7921601U 093 3/9/2015 0640 ENV STUDIES-GEN-CONSULT CA-XR031F1061506500365 $7.33 000001041005-3562505200
2015 9 FD52 05 E122 U 7921601U 093 3/9/2015 0640 ENV STUDIES-GEN-CONSULT CA-XR031F1061506500365 $39.12 000001041005-3562505200
2015 9 FD52 05 E123 U 7921601U 093 3/9/2015 0640 ENV STUDIES-GEN-CONSULT CA-XR031F1061506500365 $4.08 000001041005-3562505200
2015 7 FD52 05 E111 U 7921601U 093 1/26/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR012F1061502307981 $645.02 000001024066-3562500019
2015 7 FD52 05 E121 U 7921601U 093 1/26/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR012F1061502307981 $42.95 000001024066-3562505208
2015 7 FD52 05 E122 U 7921601U 093 1/26/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR012F1061502307981 $250.09 000001024066-3562505208
2015 7 FD52 05 E123 U 7921601U 093 1/26/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR012F1061502307981 $123.95 000001024066-3562505208
2015 7 FD52 05 E124 U 7921601U 093 1/26/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR012F1061502307981 $0.26 000001024066-3562505208
2015 7 FD52 05 E111 U 7921601U 093 1/12/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR011F1061500907210 $107.88 000001024066-3562500019
2015 7 FD52 05 E121 U 7921601U 093 1/12/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR011F1061500907210 $7.67 000001024066-3562505208
2015 7 FD52 05 E122 U 7921601U 093 1/12/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR011F1061500907210 $41.79 000001024066-3562500019
2015 7 FD52 05 E123 U 7921601U 093 1/12/2015 3040 INSPECTION&SUPER-UTILITIES CA-XR011F1061500907210 $22.90 000001024066-3562500019
2015 6 FD52 05 E143 U 7921601U 093 12/22/2014 1550 DESIGN CONTRACTS-CONSULTANT PRC-1500117702 PON21400000280 GRW AERIAL SURVEYS INC $6,936.76 Letter Agreement No. 6X
2015 5 FD52 05 E111 U 7921601U 093 11/10/2014 3040 INSPECTION&SUPER-UTILITIES CA-XR111E1061431103856 $55.42 000001024066-3562505208
2015 5 FD52 05 E121 U 7921601U 093 11/10/2014 3040 INSPECTION&SUPER-UTILITIES CA-XR111E1061431103856 $3.90 000001024066-3562505208
2015 5 FD52 05 E122 U 7921601U 093 11/10/2014 3040 INSPECTION&SUPER-UTILITIES CA-XR111E1061431103856 $21.48 000001024066-3562505208
2015 5 FD52 05 E123 U 7921601U 093 11/10/2014 3040 INSPECTION&SUPER-UTILITIES CA-XR111E1061431103856 $14.41 000001024066-3562505208
2015 4 FD52 05 E111 U 7921601U 093 10/9/2014 3040 INSPECTION&SUPER-UTILITIES CA-XR101E1061428102077 $2.08 000001024066-3562505208
2015 4 FD52 05 E121 U 7921601U 093 10/9/2014 3040 INSPECTION&SUPER-UTILITIES CA-XR101E1061428102077 $0.15 000001024066-3562505208
2015 4 FD52 05 E122 U 7921601U 093 10/9/2014 3040 INSPECTION&SUPER-UTILITIES CA-XR101E1061428102077 $0.80 000001024066-3562505208
2015 2 FD52 05 E111 U 7921601U 093 8/28/2014 3040 INSPECTION&SUPER-UTILITIES CA-XR082E1061423405846 $100.79 000001024066-3562505208
2015 2 FD52 05 E121 U 7921601U 093 8/28/2014 3040 INSPECTION&SUPER-UTILITIES CA-XR082E1061423405846 $7.21 000001024066-3562505208
2015 2 FD52 05 E122 U 7921601U 093 8/28/2014 3040 INSPECTION&SUPER-UTILITIES CA-XR082E1061423405846 $39.08 000001024066-3562505208
2015 2 FD52 05 E123 U 7921601U 093 8/28/2014 3040 INSPECTION&SUPER-UTILITIES CA-XR082E1061423405846 $20.63 000001024066-3562505208
2015 2 FD52 05 E124 U 7921601U 093 8/28/2014 3040 INSPECTION&SUPER-UTILITIES CA-XR082E1061423405846 $0.09 000001024066-3562505208
2015 2 FD52 05 E111 U 7921601U 093 8/25/2014 3020 PREL ENGINEERING-UTILITIES CA-XR082E1061423405875 $80.63 000001034955-3562505208
2015 2 FD52 05 E121 U 7921601U 093 8/25/2014 3020 PREL ENGINEERING-UTILITIES CA-XR082E1061423405875 $5.76 000001034955-3562505208
2015 2 FD52 05 E122 U 7921601U 093 8/25/2014 3020 PREL ENGINEERING-UTILITIES CA-XR082E1061423405875 $31.26 000001034955-3562505208
2015 2 FD52 05 E123 U 7921601U 093 8/25/2014 3020 PREL ENGINEERING-UTILITIES CA-XR082E1061423405875 $16.49 000001034955-3562505208
2015 2 FD52 05 E124 U 7921601U 093 8/25/2014 3020 PREL ENGINEERING-UTILITIES CA-XR082E1061423405875 $0.07 000001034955-3562505208
2015 2 FD52 05 E121 U 7921601U 093 8/11/2014 3040 INSPECTION&SUPER-UTILITIES CA-XR081E1061422104884 $10.13 000001024066-3562505208
2015 2 FD52 05 E122 U 7921601U 093 8/11/2014 3040 INSPECTION&SUPER-UTILITIES CA-XR081E1061422104884 $61.49 000001024066-3562505208
2015 2 FD52 05 E123 U 7921601U 093 8/11/2014 3040 INSPECTION&SUPER-UTILITIES CA-XR081E1061422104884 $28.98 000001024066-3562505208
2015 2 FD52 05 E111 U 7921601U 093 8/11/2014 3040 INSPECTION&SUPER-UTILITIES CA-XR081E1061422104884 $158.60 000001024066-3562505208
2015 1 FD52 05 E229 U 7921601U 093 7/17/2014 3020 PREL ENGINEERING-UTILITIES IET-XE13A162514191014320 $11.40
2015 1 FD52 05 E111 U 7921601U 093 7/10/2014 3020 PREL ENGINEERING-UTILITIES CA-XR071E1061419103182 $118.00 000001034955-3562505208
2015 1 FD52 05 E121 U 7921601U 093 7/10/2014 3020 PREL ENGINEERING-UTILITIES CA-XR071E1061419103182 $7.89 000001034955-3562505208
2015 1 FD52 05 E122 U 7921601U 093 7/10/2014 3020 PREL ENGINEERING-UTILITIES CA-XR071E1061419103182 $31.60 000001034955-3562505208
2015 1 FD52 05 E123 U 7921601U 093 7/10/2014 3020 PREL ENGINEERING-UTILITIES CA-XR071E1061419103182 $22.59 000001034955-3562505208
2014 11 FD52 05 E143 U 7921601U 093 5/22/2014 1550 DESIGN CONTRACTS-CONSULTANT PRC-1400208256 PON21400000280 GRW AERIAL SURVEYS INC $40,922.40 Letter AG. 6 - Oldham Co. - 5-441.01 US 42
2014 9 FD52 05 E111 U 7921601U 093 3/24/2014 3040 INSPECTION&SUPER-UTILITIES CA-XR032E1061408007023 $123.92 000001024066-3562505208
2014 9 FD52 05 E121 U 7921601U 093 3/24/2014 3040 INSPECTION&SUPER-UTILITIES CA-XR032E1061408007023 $7.91 000001024066-3562505208
2014 9 FD52 05 E122 U 7921601U 093 3/24/2014 3040 INSPECTION&SUPER-UTILITIES CA-XR032E1061408007023 $33.20 000001024066-3562505208
2014 9 FD52 05 E123 U 7921601U 093 3/24/2014 3040 INSPECTION&SUPER-UTILITIES CA-XR032E1061408007023 $22.62 000001024066-3562505208
2014 9 FD52 05 E124 U 7921601U 093 3/24/2014 3040 INSPECTION&SUPER-UTILITIES CA-XR032E1061408007023 $0.07 000001024066-3562505208
2014 9 FD52 05 E111 U 7921601U 093 3/10/2014 3040 INSPECTION&SUPER-UTILITIES CA-XR031E1061406606229 $86.05 000001024066-3562505208
2014 9 FD52 05 E121 U 7921601U 093 3/10/2014 3040 INSPECTION&SUPER-UTILITIES CA-XR031E1061406606229 $5.49 000001024066-3562505208
2014 9 FD52 05 E122 U 7921601U 093 3/10/2014 3040 INSPECTION&SUPER-UTILITIES CA-XR031E1061406606229 $23.06 000001024066-3562505208
2014 9 FD52 05 E123 U 7921601U 093 3/10/2014 3040 INSPECTION&SUPER-UTILITIES CA-XR031E1061406606229 $15.71 000001024066-3562505208
2014 8 FD52 05 E111 U 7921601U 093 2/24/2014 3040 INSPECTION&SUPER-UTILITIES CA-XR022E1061405205336 ($2.19) 000001024066-3562505208
2014 8 FD52 05 E112 U 7921601U 093 2/24/2014 3040 INSPECTION&SUPER-UTILITIES CA-XR022E1061405205336 $159.66 000001024066-3562500009
2014 8 FD52 05 E121 U 7921601U 093 2/24/2014 3040 INSPECTION&SUPER-UTILITIES CA-XR022E1061405205336 $12.08 000001024066-3562500009
2014 8 FD52 05 E122 U 7921601U 093 2/24/2014 3040 INSPECTION&SUPER-UTILITIES CA-XR022E1061405205336 ($0.58) 000001024066-3562505208
2014 8 FD52 05 E123 U 7921601U 093 2/24/2014 3040 INSPECTION&SUPER-UTILITIES CA-XR022E1061405205336 ($0.44) 000001024066-3562505208
2014 8 FD52 05 E111 U 7921601U 093 2/10/2014 3040 INSPECTION&SUPER-UTILITIES CA-XR021E1061403904490 $69.04 000001024066-3562505208
2014 8 FD52 05 E112 U 7921601U 093 2/10/2014 3040 INSPECTION&SUPER-UTILITIES CA-XR021E1061403904490 $75.21 000001024066-3562500009
2014 8 FD52 05 E121 U 7921601U 093 2/10/2014 3040 INSPECTION&SUPER-UTILITIES CA-XR021E1061403904490 $10.11 000001024066-3562500009
2014 8 FD52 05 E122 U 7921601U 093 2/10/2014 3040 INSPECTION&SUPER-UTILITIES CA-XR021E1061403904490 $18.49 000001024066-3562505208
2014 8 FD52 05 E123 U 7921601U 093 2/10/2014 3040 INSPECTION&SUPER-UTILITIES CA-XR021E1061403904490 $13.94 000001024066-3562505208
2014 5 FD52 05 E111 U 7921601U 093 11/12/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR111D1061331210285 $152.85 000001024066-3562505208
2014 5 FD52 05 E121 U 7921601U 093 11/12/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR111D1061331210285 $10.04 000001024066-3562505208
2014 5 FD52 05 E122 U 7921601U 093 11/12/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR111D1061331210285 $40.95 000001024066-3562505208
2014 5 FD52 05 E123 U 7921601U 093 11/12/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR111D1061331210285 $21.35 000001024066-3562505208
2014 3 FD52 05 E229 U 7921601U 093 9/30/2013 3040 INSPECTION&SUPER-UTILITIES IET-XE13A162513253045310 $12.60
2014 3 FD52 05 E111 U 7921601U 093 9/9/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR091D1061324906819 $366.10 000001024066-3562505208
2014 3 FD52 05 E121 U 7921601U 093 9/9/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR091D1061324906819 $22.68 000001024066-3562505208
2014 3 FD52 05 E122 U 7921601U 093 9/9/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR091D1061324906819 $98.08 000001024066-3562505208
2014 3 FD52 05 E123 U 7921601U 093 9/9/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR091D1061324906819 $67.93 000001024066-3562505208
2014 1 FD52 05 E111 U 7921601U 093 7/24/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR072D1061320404059 $208.89 000001024066-3562505208
2014 1 FD52 05 E121 U 7921601U 093 7/24/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR072D1061320404059 $13.73 000001024066-3562505208
2014 1 FD52 05 E122 U 7921601U 093 7/24/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR072D1061320404059 $55.96 000001024066-3562505208
2014 1 FD52 05 E123 U 7921601U 093 7/24/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR072D1061320404059 $29.17 000001024066-3562505208
2014 1 FD52 05 E124 U 7921601U 093 7/24/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR072D1061320404059 $0.08 000001024066-3562505208
2014 1 FD52 05 E111 U 7921601U 093 7/9/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR071D1061318903218 $420.70 000001024066-3562505208
2014 1 FD52 05 E121 U 7921601U 093 7/9/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR071D1061318903218 $26.94 000001024066-3562505208
2014 1 FD52 05 E122 U 7921601U 093 7/9/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR071D1061318903218 $99.33 000001024066-3562505208
2014 1 FD52 05 E123 U 7921601U 093 7/9/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR071D1061318903218 $67.41 000001024066-3562505208
2014 1 FD52 05 E111 U 7921601U 093 7/1/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR062D1061317202313 $469.21 000001024066-3562505200
2014 1 FD52 05 E121 U 7921601U 093 7/1/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR062D1061317202313 $30.91 000001024066-3562505200
2014 1 FD52 05 E122 U 7921601U 093 7/1/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR062D1061317202313 $110.78 000001024066-3562505208
2014 1 FD52 05 E123 U 7921601U 093 7/1/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR062D1061317202313 $69.76 000001024066-3562505208
2014 1 FD52 05 E124 U 7921601U 093 7/1/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR062D1061317202313 $0.24 000001024066-3562505208
2014 1 FD52 05 E123 U 7921601U 093 7/1/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR061D1061315801409P $28.14 000001024066-3562505208
2013 12 FD52 05 E111 U 7921601U 093 6/11/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR061D1061315801409 $246.08 000001024066-3562505208
2013 12 FD52 05 E121 U 7921601U 093 6/11/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR061D1061315801409 $16.32 000001024066-3562505208
2013 12 FD52 05 E122 U 7921601U 093 6/11/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR061D1061315801409 $58.11 000001024066-3562505200
2013 11 FD52 05 E111 U 7921601U 093 5/23/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR052D1061314300441 $491.74 000001024066-3562505208
2013 11 FD52 05 E121 U 7921601U 093 5/23/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR052D1061314300441 $30.93 000001024066-3562505208
2013 11 FD52 05 E122 U 7921601U 093 5/23/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR052D1061314300441 $116.10 000001024066-3562505208
2013 11 FD52 05 E123 U 7921601U 093 5/23/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR052D1061314300441 $92.03 000001024066-3562505208
2013 11 FD52 05 E124 U 7921601U 093 5/23/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR052D1061314300441 $0.32 000001024066-3562505208
2013 11 FD52 05 E121 U 7921601U 093 5/9/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR051D1061312910121 $6.19 000001024066-3562505208
2013 11 FD52 05 E122 U 7921601U 093 5/9/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR051D1061312910121 $23.60 000001024066-3562505208
2013 11 FD52 05 E123 U 7921601U 093 5/9/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR051D1061312910121 $18.55 000001024066-3562505208
2013 11 FD52 05 E111 U 7921601U 093 5/9/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR051D1061312910120 $99.95 000001024066-3562505208
2013 10 FD52 05 E111 U 7921601U 093 4/24/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR042D1061311309241 $78.22 000001024066-3562505208
2013 10 FD52 05 E121 U 7921601U 093 4/24/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR042D1061311309241 $4.87 000001024066-3562505208
2013 10 FD52 05 E122 U 7921601U 093 4/24/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR042D1061311309241 $18.47 000001024066-3562505208