The Commonwealth pays employees on a semi-monthly basis with a scheduled pay day on the 15th and 30th of each month. The two monthly pay periods are from the 1st to the 15th of the month and the 16th through the last day of the month. Pay check distribution is delayed by one pay period to allow for system processing. For example work performed during the 1st to the 15th day of the month is paid to the employee on the 30th of the month. Accordingly the cost accounting charges for labor costs posting in eMARS to operating accounts and highway projects are also delayed by approximately one pay period.
A good rule of measure is that the cost accounting charges for the pay period ending on the 15th of the month will post to eMARS by the 25th and those for the pay period ending on the last day of the month will post to eMARS by the 10th of the following month.

x close panel
Detailed Project Expenditure Report
Total E-MARS Expenditures for 6183701D = $765,570.24
Click here for Labor Costs Information
Year Month PBU Charge District Object Phase Program Code County Date ACT Activity Name Trans ID Reference # Vendor Name Expenditure Line Description
2024 10 FD52 05 E111 D 6183701D 056 4/30/2024 0640 ENV STUDIES-GEN-CONSULT CA-XR042O1062411502801 $55.92 000001091833-3562505200
2024 10 FD52 05 E111 D 6183701D 056 4/30/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502801 $4.85 000001091833-3562505200
2024 10 FD52 05 E121 D 6183701D 056 4/30/2024 0640 ENV STUDIES-GEN-CONSULT CA-XR042O1062411502801 $3.91 000001091833-3562505200
2024 10 FD52 05 E121 D 6183701D 056 4/30/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502801 $0.33 000001091833-3562505200
2024 10 FD52 05 E122 D 6183701D 056 4/30/2024 0640 ENV STUDIES-GEN-CONSULT CA-XR042O1062411502801 $37.06 000001091833-3562505200
2024 10 FD52 05 E122 D 6183701D 056 4/30/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502801 $3.21 000001091833-3562505200
2024 10 FD52 05 E123 D 6183701D 056 4/30/2024 0640 ENV STUDIES-GEN-CONSULT CA-XR042O1062411502801 $13.98 000001091833-3562505200
2024 10 FD52 05 E123 D 6183701D 056 4/30/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502801 $1.20 000001091833-3562505200
2024 10 FD52 05 E124 D 6183701D 056 4/30/2024 0640 ENV STUDIES-GEN-CONSULT CA-XR042O1062411502801 $0.02 000001091833-3562505200
2024 9 FD52 05 E111 D 6183701D 056 3/11/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR031O1062406810053 $1,852.18 000001065165-3562505204
2024 9 FD52 05 E111 D 6183701D 056 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810053 $70.72 000001065165-3562505204
2024 9 FD52 05 E121 D 6183701D 056 3/11/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR031O1062406810053 $127.84 000001065165-3562505204
2024 9 FD52 05 E121 D 6183701D 056 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810053 $4.89 000001065165-3562505204
2024 9 FD52 05 E122 D 6183701D 056 3/11/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR031O1062406810053 $1,225.66 000001065165-3562505204
2024 9 FD52 05 E122 D 6183701D 056 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810053 $46.79 000001065165-3562505204
2024 9 FD52 05 E123 D 6183701D 056 3/11/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR031O1062406810053 $260.41 000001065165-3562505204
2024 9 FD52 05 E123 D 6183701D 056 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810053 $9.87 000001065165-3562505204
2024 8 FD52 05 E111 D 6183701D 056 2/26/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR022O1062405408872 $857.34 000001065165-3562505204
2024 8 FD52 05 E111 D 6183701D 056 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408872 $194.72 000001065165-3562505204
2024 8 FD52 05 E121 D 6183701D 056 2/26/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR022O1062405408872 $60.22 000001065165-3562505204
2024 8 FD52 05 E121 D 6183701D 056 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408872 $13.68 000001065165-3562505204
2024 8 FD52 05 E122 D 6183701D 056 2/26/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR022O1062405408872 $567.25 000001065165-3562505204
2024 8 FD52 05 E122 D 6183701D 056 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408872 $128.84 000001065165-3562505204
2024 8 FD52 05 E123 D 6183701D 056 2/26/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR022O1062405408872 $120.69 000001065165-3562505204
2024 8 FD52 05 E123 D 6183701D 056 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408872 $27.17 000001065165-3562505204
2024 8 FD52 05 E124 D 6183701D 056 2/26/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR022O1062405408872 $0.17 000001065165-3562505204
2024 8 FD52 05 E124 D 6183701D 056 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408872 $0.04 000001065165-3562505204
2024 7 FD52 05 E111 D 6183701D 056 1/24/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR012O1062402306557 $61.23 000001065165-3562505204
2024 7 FD52 05 E111 D 6183701D 056 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306557 $15.92 000001065165-3562505204
2024 7 FD52 05 E121 D 6183701D 056 1/24/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR012O1062402306557 $4.31 000001065165-3562505204
2024 7 FD52 05 E121 D 6183701D 056 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306557 $1.11 000001065165-3562505204
2024 7 FD52 05 E122 D 6183701D 056 1/24/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR012O1062402306557 $40.55 000001065165-3562505204
2024 7 FD52 05 E122 D 6183701D 056 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306557 $10.54 000001065165-3562505204
2024 7 FD52 05 E123 D 6183701D 056 1/24/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR012O1062402306557 $8.63 000001065165-3562505204
2024 7 FD52 05 E123 D 6183701D 056 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306557 $2.22 000001065165-3562505204
2024 7 FD52 05 E124 D 6183701D 056 1/24/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR012O1062402306557 $0.05 000001065165-3562505204
2024 7 FD52 05 E111 D 6183701D 056 1/10/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR011O1062400505703 $269.42 000001065165-3562505204
2024 7 FD52 05 E111 D 6183701D 056 1/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505703 $2,839.72 000001065165-3562505204
2024 7 FD52 05 E121 D 6183701D 056 1/10/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR011O1062400505703 $18.59 000001065165-3562505204
2024 7 FD52 05 E121 D 6183701D 056 1/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505703 $196.01 000001065165-3562505204
2024 7 FD52 05 E122 D 6183701D 056 1/10/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR011O1062400505703 $178.28 000001065165-3562505204
2024 7 FD52 05 E122 D 6183701D 056 1/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505703 $1,879.05 000001065165-3562505204
2024 7 FD52 05 E123 D 6183701D 056 1/10/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR011O1062400505703 $40.74 000001065165-3562505204
2024 7 FD52 05 E123 D 6183701D 056 1/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505703 $396.27 000001065165-3562505204
2024 7 FD52 00 E111 D 6183701D 056 1/8/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR011O1062400505692 $131.26 000001001026-3562500636
2024 7 FD52 00 E111 D 6183701D 056 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505692 $525.06 000001001026-3562500636
2024 7 FD52 00 E121 D 6183701D 056 1/8/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR011O1062400505692 $9.83 000001001026-3562500636
2024 7 FD52 00 E121 D 6183701D 056 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505692 $39.35 000001001026-3562500636
2024 7 FD52 00 E122 D 6183701D 056 1/8/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR011O1062400505692 $86.86 000001001026-3562500636
2024 7 FD52 00 E122 D 6183701D 056 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505692 $347.44 000001001026-3562500636
2024 7 FD52 00 E123 D 6183701D 056 1/8/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR011O1062400505692 $15.50 000001001026-3562500636
2024 7 FD52 00 E123 D 6183701D 056 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505692 $58.48 000001001026-3562500636
2024 6 FD52 05 E111 D 6183701D 056 12/22/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR122N1062335504583 $428.48 000001065165-3562505204
2024 6 FD52 05 E111 D 6183701D 056 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504583 $307.99 000001065165-3562505204
2024 6 FD52 05 E121 D 6183701D 056 12/22/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR122N1062335504583 $30.53 000001065165-3562505204
2024 6 FD52 05 E121 D 6183701D 056 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504583 $21.94 000001065165-3562505204
2024 6 FD52 05 E122 D 6183701D 056 12/22/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR122N1062335504583 $282.80 000001065165-3562505204
2024 6 FD52 05 E122 D 6183701D 056 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504583 $203.79 000001065165-3562505204
2024 6 FD52 05 E123 D 6183701D 056 12/22/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR122N1062335504583 $52.37 000001065165-3562505204
2024 6 FD52 05 E123 D 6183701D 056 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504583 $37.20 000001065165-3562505204
2024 6 FD52 05 E124 D 6183701D 056 12/22/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR122N1062335504583 $0.09 000001065165-3562505204
2024 6 FD52 05 E124 D 6183701D 056 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504583 $0.06 000001065165-3562505204
2024 6 FD52 05 E111 D 6183701D 056 12/11/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR121N1062334203599 $61.46 000001065165-3562505204
2024 6 FD52 05 E111 D 6183701D 056 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203599 $27.55 000001065165-3562505204
2024 6 FD52 05 E121 D 6183701D 056 12/11/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR121N1062334203599 $4.23 000001065165-3562505204
2024 6 FD52 05 E121 D 6183701D 056 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203599 $1.90 000001065165-3562505204
2024 6 FD52 05 E122 D 6183701D 056 12/11/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR121N1062334203599 $40.52 000001065165-3562505204
2024 6 FD52 05 E122 D 6183701D 056 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203599 $18.22 000001065165-3562505204
2024 6 FD52 05 E123 D 6183701D 056 12/11/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR121N1062334203599 $7.49 000001065165-3562505204
2024 6 FD52 05 E123 D 6183701D 056 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203599 $3.33 000001065165-3562505204
2024 4 FD52 05 E111 D 6183701D 056 10/9/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR101N1062328009673 $33.56 000001065165-3562505204
2024 4 FD52 05 E111 D 6183701D 056 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009673 $16.16 000001065165-3562505204
2024 4 FD52 05 E121 D 6183701D 056 10/9/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR101N1062328009673 $2.33 000001065165-3562505204
2024 4 FD52 05 E121 D 6183701D 056 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009673 $1.12 000001065165-3562505204
2024 4 FD52 05 E122 D 6183701D 056 10/9/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR101N1062328009673 $22.29 000001065165-3562505204
2024 4 FD52 05 E122 D 6183701D 056 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009673 $10.69 000001065165-3562505204
2024 4 FD52 05 E123 D 6183701D 056 10/9/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR101N1062328009673 $4.12 000001065165-3562505204
2024 4 FD52 05 E123 D 6183701D 056 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009673 $1.95 000001065165-3562505204
2023 11 FD52 05 E124 D 6183701D 056 5/24/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR052N1062314309015 $0.01 000001065165-3562505204
2023 11 FD52 00 E111 D 6183701D 056 5/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052N1062314309042 $20.47 000001082830-3562500636
2023 11 FD52 00 E121 D 6183701D 056 5/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052N1062314309042 $1.55 000001082830-3562500636
2023 11 FD52 00 E122 D 6183701D 056 5/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052N1062314309042 $15.97 000001082830-3562500636
2023 11 FD52 00 E123 D 6183701D 056 5/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052N1062314309042 $2.33 000001082830-3562500636
2023 11 FD52 00 E124 D 6183701D 056 5/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052N1062314309042 $0.01 000001082830-3562500636
2023 11 FD52 05 E111 D 6183701D 056 5/24/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR052N1062314309014 $26.36 000001065165-3562505204
2023 11 FD52 05 E111 D 6183701D 056 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309014 $4.20 000001065165-3562505204
2023 11 FD52 05 E121 D 6183701D 056 5/24/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR052N1062314309014 $1.92 000001065165-3562505204
2023 11 FD52 05 E121 D 6183701D 056 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309014 $0.30 000001065165-3562505204
2023 11 FD52 05 E122 D 6183701D 056 5/24/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR052N1062314309014 $20.48 000001065165-3562505204
2023 11 FD52 05 E122 D 6183701D 056 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309014 $3.28 000001065165-3562505204
2023 11 FD52 05 E123 D 6183701D 056 5/24/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR052N1062314309014 $2.84 000001065165-3562505204
2023 11 FD52 05 E123 D 6183701D 056 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309014 $0.45 000001065165-3562505204
2022 11 FD52 00 E111 D 6183701D 056 5/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052M1062214004698 $20.49 000001082830-3562500636
2022 11 FD52 00 E111 D 6183701D 056 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004698 $2.45 000001082830-3562500636
2022 11 FD52 00 E121 D 6183701D 056 5/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052M1062214004698 $1.55 000001082830-3562500636
2022 11 FD52 00 E121 D 6183701D 056 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004698 $0.19 000001082830-3562500636
2022 11 FD52 00 E122 D 6183701D 056 5/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052M1062214004698 $17.15 000001082830-3562500636
2022 11 FD52 00 E122 D 6183701D 056 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004698 $2.06 000001082830-3562500636
2022 11 FD52 00 E123 D 6183701D 056 5/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052M1062214004698 $2.36 000001082830-3562500636
2022 11 FD52 00 E123 D 6183701D 056 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004698 $0.28 000001082830-3562500636
2022 11 FD52 00 E124 D 6183701D 056 5/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052M1062214004698 $0.01 000001082830-3562500636
2022 1 FD52 05 E123 D 6183701D 056 7/1/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR061L1062116001445P $165.08 000001065165-3562505204
2022 1 FD52 05 E123 D 6183701D 056 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061L1062116001445P $25.04 000001065165-3562505204
2021 12 FD52 05 E111 D 6183701D 056 6/10/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR061L1062116001445 $1,580.32 000001065165-3562505204
2021 12 FD52 05 E111 D 6183701D 056 6/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061L1062116001445 $243.12 000001065165-3562505204
2021 12 FD52 05 E121 D 6183701D 056 6/10/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR061L1062116001445 $110.89 000001065165-3562505204
2021 12 FD52 05 E121 D 6183701D 056 6/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061L1062116001445 $17.07 000001065165-3562505204
2021 12 FD52 05 E122 D 6183701D 056 6/10/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR061L1062116001445 $1,334.25 000001065165-3562505204
2021 12 FD52 05 E122 D 6183701D 056 6/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061L1062116001445 $205.26 000001065165-3562505204
2021 11 FD52 05 E124 D 6183701D 056 5/24/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR052L1062114100369 $0.35 000001065165-3562505204
2021 11 FD52 05 E124 D 6183701D 056 5/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052L1062114100369 $0.01 000001065165-3562505204
2021 11 FD52 05 E111 D 6183701D 056 5/24/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR052L1062114100369 $1,390.76 000001065165-3562505204
2021 11 FD52 05 E111 D 6183701D 056 5/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052L1062114100369 $48.14 000001065165-3562505204
2021 11 FD52 05 E121 D 6183701D 056 5/24/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR052L1062114100369 $100.05 000001065165-3562505204
2021 11 FD52 05 E121 D 6183701D 056 5/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052L1062114100369 $3.47 000001065165-3562505204
2021 11 FD52 05 E122 D 6183701D 056 5/24/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR052L1062114100369 $1,174.14 000001065165-3562505204
2021 11 FD52 05 E122 D 6183701D 056 5/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052L1062114100369 $40.64 000001065165-3562505204
2021 11 FD52 05 E123 D 6183701D 056 5/24/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR052L1062114100369 $145.06 000001065165-3562505204
2021 11 FD52 05 E123 D 6183701D 056 5/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052L1062114100369 $4.96 000001065165-3562505204
2021 11 FD52 05 E111 D 6183701D 056 5/10/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR051L1062112709718 $1,385.80 000001065165-3562505204
2021 11 FD52 05 E111 D 6183701D 056 5/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709718 $333.57 000001065165-3562505204
2021 11 FD52 05 E121 D 6183701D 056 5/10/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR051L1062112709718 $97.24 000001065165-3562505204
2021 11 FD52 05 E121 D 6183701D 056 5/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709718 $23.41 000001065165-3562505204
2021 11 FD52 05 E122 D 6183701D 056 5/10/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR051L1062112709718 $1,170.04 000001065165-3562505204
2021 11 FD52 05 E122 D 6183701D 056 5/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709718 $281.63 000001065165-3562505204
2021 11 FD52 05 E123 D 6183701D 056 5/10/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR051L1062112709718 $144.92 000001065165-3562505204
2021 11 FD52 05 E123 D 6183701D 056 5/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709718 $34.35 000001065165-3562505204
2021 10 FD52 05 E111 D 6183701D 056 4/26/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR042L1062111308628 $972.60 000001065165-3562505204
2021 10 FD52 05 E111 D 6183701D 056 4/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308628 $698.73 000001065165-3562505204
2021 10 FD52 05 E121 D 6183701D 056 4/26/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR042L1062111308628 $69.96 000001065165-3562505204
2021 10 FD52 05 E121 D 6183701D 056 4/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308628 $50.26 000001065165-3562505204
2021 10 FD52 05 E122 D 6183701D 056 4/26/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR042L1062111308628 $821.07 000001065165-3562505204
2021 10 FD52 05 E122 D 6183701D 056 4/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308628 $589.95 000001065165-3562505204
2021 10 FD52 05 E123 D 6183701D 056 4/26/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR042L1062111308628 $102.28 000001065165-3562505204
2021 10 FD52 05 E123 D 6183701D 056 4/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308628 $71.97 000001065165-3562505204
2021 10 FD52 05 E124 D 6183701D 056 4/26/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR042L1062111308628 $0.24 000001065165-3562505204
2021 10 FD52 05 E124 D 6183701D 056 4/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308628 $0.17 000001065165-3562505204
2021 10 FD52 05 E111 D 6183701D 056 4/14/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR041L1062109907613 $1,849.70 000001065165-3562505204
2021 10 FD52 05 E111 D 6183701D 056 4/14/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041L1062109907613 $108.76 000001065165-3562505204
2021 10 FD52 05 E121 D 6183701D 056 4/14/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR041L1062109907613 $129.80 000001065165-3562505204
2021 10 FD52 05 E121 D 6183701D 056 4/14/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041L1062109907613 $7.63 000001065165-3562505204
2021 10 FD52 05 E122 D 6183701D 056 4/14/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR041L1062109907613 $1,561.76 000001065165-3562505204
2021 10 FD52 05 E122 D 6183701D 056 4/14/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041L1062109907613 $91.83 000001065165-3562505204
2021 10 FD52 05 E123 D 6183701D 056 4/14/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR041L1062109907613 $193.00 000001065165-3562505204
2021 10 FD52 05 E123 D 6183701D 056 4/14/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041L1062109907613 $11.20 000001065165-3562505204
2021 9 FD52 05 E111 D 6183701D 056 3/29/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR032L1062108206537 $1,118.45 000001065165-3562505204
2021 9 FD52 05 E111 D 6183701D 056 3/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032L1062108206537 $445.40 000001065165-3562505204
2021 9 FD52 05 E121 D 6183701D 056 3/29/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR032L1062108206537 $80.46 000001065165-3562505204
2021 9 FD52 05 E121 D 6183701D 056 3/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032L1062108206537 $32.04 000001065165-3562505204
2021 9 FD52 05 E122 D 6183701D 056 3/29/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR032L1062108206537 $944.24 000001065165-3562505204
2021 9 FD52 05 E122 D 6183701D 056 3/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032L1062108206537 $376.05 000001065165-3562505204
2021 9 FD52 05 E123 D 6183701D 056 3/29/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR032L1062108206537 $117.17 000001065165-3562505204
2021 9 FD52 05 E123 D 6183701D 056 3/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032L1062108206537 $45.88 000001065165-3562505204
2021 9 FD52 05 E124 D 6183701D 056 3/29/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR032L1062108206537 $0.28 000001065165-3562505204
2021 9 FD52 05 E124 D 6183701D 056 3/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032L1062108206537 $0.11 000001065165-3562505204
2021 9 FD52 05 E111 D 6183701D 056 3/10/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR031L1062106805507 $1,545.18 000001065165-3562505204
2021 9 FD52 05 E111 D 6183701D 056 3/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031L1062106805507 $540.82 000001065165-3562505204
2021 9 FD52 05 E121 D 6183701D 056 3/10/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR031L1062106805507 $108.42 000001065165-3562505204
2021 9 FD52 05 E121 D 6183701D 056 3/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031L1062106805507 $37.95 000001065165-3562505204
2021 9 FD52 05 E122 D 6183701D 056 3/10/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR031L1062106805507 $1,304.60 000001065165-3562505204
2021 9 FD52 05 E122 D 6183701D 056 3/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031L1062106805507 $456.61 000001065165-3562505204
2021 9 FD52 05 E123 D 6183701D 056 3/10/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR031L1062106805507 $161.79 000001065165-3562505204
2021 9 FD52 05 E123 D 6183701D 056 3/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031L1062106805507 $55.70 000001065165-3562505204
2021 8 FD52 05 E111 D 6183701D 056 2/26/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR022L1062105304383 $1,045.36 000001065165-3562505204
2021 8 FD52 05 E111 D 6183701D 056 2/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304383 $313.15 000001065165-3562505204
2021 8 FD52 05 E121 D 6183701D 056 2/26/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR022L1062105304383 $75.20 000001065165-3562505204
2021 8 FD52 05 E121 D 6183701D 056 2/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304383 $22.53 000001065165-3562505204
2021 8 FD52 05 E122 D 6183701D 056 2/26/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR022L1062105304383 $882.66 000001065165-3562505204
2021 8 FD52 05 E122 D 6183701D 056 2/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304383 $264.39 000001065165-3562505204
2021 8 FD52 05 E123 D 6183701D 056 2/26/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR022L1062105304383 $109.40 000001065165-3562505204
2021 8 FD52 05 E123 D 6183701D 056 2/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304383 $32.25 000001065165-3562505204
2021 8 FD52 05 E124 D 6183701D 056 2/26/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR022L1062105304383 $0.26 000001065165-3562505204
2021 8 FD52 05 E124 D 6183701D 056 2/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304383 $0.08 000001065165-3562505204
2021 8 FD52 05 E123 D 6183701D 056 2/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021L1062103603363 $55.87 000001065165-3562505204
2021 8 FD52 05 E111 D 6183701D 056 2/12/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR021L1062103603363 $2,005.57 000001065165-3562505204
2021 8 FD52 05 E111 D 6183701D 056 2/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021L1062103603363 $521.90 000001065165-3562505206
2021 8 FD52 05 E121 D 6183701D 056 2/12/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR021L1062103603363 $141.21 000001065165-3562505204
2021 8 FD52 05 E121 D 6183701D 056 2/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021L1062103603363 $36.75 000001065165-3562505206
2021 8 FD52 05 E122 D 6183701D 056 2/12/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR021L1062103603363 $1,693.48 000001065165-3562505206
2021 8 FD52 05 E122 D 6183701D 056 2/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021L1062103603363 $440.64 000001065165-3562505204
2021 8 FD52 05 E123 D 6183701D 056 2/12/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR021L1062103603363 $218.47 000001065165-3562505204
2021 7 FD52 05 E123 D 6183701D 056 1/28/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR012L1062102202339 $204.84 000001065165-3562505204
2021 7 FD52 05 E123 D 6183701D 056 1/28/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012L1062102202339 $63.45 000001065165-3562505204
2021 7 FD52 05 E124 D 6183701D 056 1/28/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR012L1062102202339 $0.49 000001065165-3562505204
2021 7 FD52 05 E124 D 6183701D 056 1/28/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012L1062102202339 $0.16 000001065165-3562505204
2021 7 FD52 05 E111 D 6183701D 056 1/28/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR012L1062102202338 $1,956.93 000001065165-3562505204
2021 7 FD52 05 E111 D 6183701D 056 1/28/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012L1062102202338 $616.09 000001065165-3562505204
2021 7 FD52 05 E121 D 6183701D 056 1/28/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR012L1062102202338 $140.80 000001065165-3562505204
2021 7 FD52 05 E121 D 6183701D 056 1/28/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012L1062102202338 $44.33 000001065165-3562505204
2021 7 FD52 05 E122 D 6183701D 056 1/28/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR012L1062102202338 $1,652.42 000001065165-3562505204
2021 7 FD52 05 E122 D 6183701D 056 1/28/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012L1062102202338 $520.16 000001065165-3562505204
2021 7 FD52 05 E111 D 6183701D 056 1/15/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR011L1062100801429 $133.72 000001065165-3562505204
2021 7 FD52 05 E111 D 6183701D 056 1/15/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011L1062100801429 $1,470.91 000001065165-3562505204
2021 7 FD52 05 E121 D 6183701D 056 1/15/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR011L1062100801429 $9.39 000001065165-3562505204
2021 7 FD52 05 E121 D 6183701D 056 1/15/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011L1062100801429 $103.23 000001065165-3562505204
2021 7 FD52 05 E122 D 6183701D 056 1/15/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR011L1062100801429 $112.90 000001065165-3562505204
2021 7 FD52 05 E122 D 6183701D 056 1/15/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011L1062100801429 $1,241.89 000001065165-3562505204
2021 7 FD52 05 E123 D 6183701D 056 1/15/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR011L1062100801429 $15.81 000001065165-3562505204
2021 7 FD52 05 E123 D 6183701D 056 1/15/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011L1062100801429 $151.50 000001065165-3562505204
2021 6 FD52 05 E111 D 6183701D 056 12/29/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR122K1062035700376 $1,981.29 000001065165-3562505204
2021 6 FD52 05 E111 D 6183701D 056 12/29/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700376 $362.26 000001065165-3562505204
2021 6 FD52 05 E121 D 6183701D 056 12/29/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR122K1062035700376 $143.24 000001065165-3562505204
2021 6 FD52 05 E121 D 6183701D 056 12/29/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700376 $26.19 000001065165-3562505204
2021 6 FD52 05 E122 D 6183701D 056 12/29/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR122K1062035700376 $1,672.95 000001065165-3562505204
2021 6 FD52 05 E122 D 6183701D 056 12/29/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700376 $305.86 000001065165-3562505204
2021 6 FD52 05 E123 D 6183701D 056 12/29/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR122K1062035700376 $201.10 000001065165-3562505204
2021 6 FD52 05 E123 D 6183701D 056 12/29/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700376 $36.23 000001065165-3562505204
2021 6 FD52 05 E124 D 6183701D 056 12/29/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR122K1062035700376 $0.49 000001065165-3562505204
2021 6 FD52 05 E124 D 6183701D 056 12/29/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700376 $0.09 000001065165-3562505204
2021 6 FD52 05 E111 D 6183701D 056 12/9/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR121K1062034309694 $1,142.68 000001065165-3562505204
2021 6 FD52 05 E111 D 6183701D 056 12/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309694 $496.95 000001065165-3562505204
2021 6 FD52 05 E121 D 6183701D 056 12/9/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR121K1062034309694 $80.66 000001065165-3562505204
2021 6 FD52 05 E121 D 6183701D 056 12/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309694 $35.08 000001065165-3562505204
2021 6 FD52 05 E122 D 6183701D 056 12/9/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR121K1062034309694 $964.77 000001065165-3562505204
2021 6 FD52 05 E122 D 6183701D 056 12/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309694 $419.58 000001065165-3562505204
2021 6 FD52 05 E123 D 6183701D 056 12/9/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR121K1062034309694 $116.34 000001065165-3562505204
2021 6 FD52 05 E123 D 6183701D 056 12/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309694 $49.70 000001065165-3562505204
2021 5 FD52 05 E123 D 6183701D 056 11/25/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508753 $62.95 000001065165-3562505204
2021 5 FD52 05 E124 D 6183701D 056 11/25/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR112K1062032508753 $0.45 000001065165-3562505204
2021 5 FD52 05 E124 D 6183701D 056 11/25/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508753 $0.16 000001065165-3562505204
2021 5 FD52 05 E111 D 6183701D 056 11/25/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR112K1062032508753 $1,791.84 000001065165-3562505204
2021 5 FD52 05 E111 D 6183701D 056 11/25/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508753 $629.54 000001065165-3562505204
2021 5 FD52 05 E121 D 6183701D 056 11/25/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR112K1062032508753 $129.54 000001065165-3562505204
2021 5 FD52 05 E121 D 6183701D 056 11/25/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508753 $45.51 000001065165-3562505204
2021 5 FD52 05 E122 D 6183701D 056 11/25/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR112K1062032508753 $1,512.84 000001065165-3562505204
2021 5 FD52 05 E122 D 6183701D 056 11/25/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508753 $531.52 000001065165-3562505204
2021 5 FD52 05 E123 D 6183701D 056 11/25/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR112K1062032508753 $182.24 000001065165-3562505204
2021 5 FD52 05 E111 D 6183701D 056 11/12/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR111K1062031107761 $3,039.05 000001065165-3562505204
2021 5 FD52 05 E111 D 6183701D 056 11/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111K1062031107761 $407.48 000001065165-3562505204
2021 5 FD52 05 E121 D 6183701D 056 11/12/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR111K1062031107761 $214.52 000001065165-3562505204
2021 5 FD52 05 E121 D 6183701D 056 11/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111K1062031107761 $28.76 000001065165-3562505204
2021 5 FD52 05 E122 D 6183701D 056 11/9/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR111K1062031107762 $2,565.87 000001065165-3562505204
2021 5 FD52 05 E122 D 6183701D 056 11/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111K1062031107762 $344.04 000001065165-3562505204
2021 5 FD52 05 E123 D 6183701D 056 11/9/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR111K1062031107762 $308.25 000001065165-3562505204
2021 5 FD52 05 E123 D 6183701D 056 11/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111K1062031107762 $40.74 000001065165-3562505204
2021 4 FD52 05 E111 D 6183701D 056 10/26/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR102K1062029706696 $2,589.27 000001065165-3562505204
2021 4 FD52 05 E111 D 6183701D 056 10/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102K1062029706696 $985.63 000001065165-3562505204
2021 4 FD52 05 E121 D 6183701D 056 10/26/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR102K1062029706696 $187.17 000001065165-3562505204
2021 4 FD52 05 E121 D 6183701D 056 10/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102K1062029706696 $71.25 000001065165-3562505204
2021 4 FD52 05 E122 D 6183701D 056 10/26/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR102K1062029706696 $2,186.13 000001065165-3562505204
2021 4 FD52 05 E122 D 6183701D 056 10/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102K1062029706696 $832.17 000001065165-3562505204
2021 4 FD52 05 E123 D 6183701D 056 10/26/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR102K1062029706696 $263.44 000001065165-3562505204
2021 4 FD52 05 E123 D 6183701D 056 10/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102K1062029706696 $98.56 000001065165-3562505204
2021 4 FD52 05 E124 D 6183701D 056 10/26/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR102K1062029706696 $0.65 000001065165-3562505204
2021 4 FD52 05 E124 D 6183701D 056 10/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102K1062029706696 $0.24 000001065165-3562505204
2021 4 FD52 05 E111 D 6183701D 056 10/12/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR101K1062028205679 $1,944.99 000001065165-3562505204
2021 4 FD52 05 E121 D 6183701D 056 10/12/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR101K1062028205679 $137.29 000001065165-3562505204
2021 4 FD52 05 E122 D 6183701D 056 10/12/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR101K1062028205679 $1,642.16 000001065165-3562505204
2021 4 FD52 05 E123 D 6183701D 056 10/12/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR101K1062028205679 $196.95 000001065165-3562505204
2021 3 FD52 05 E111 D 6183701D 056 9/24/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092K1062026704589 $2,261.05 000001065165-3562505204
2021 3 FD52 05 E111 D 6183701D 056 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704589 $1,291.96 000001065165-3562505204
2021 3 FD52 05 E121 D 6183701D 056 9/24/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092K1062026704589 $163.45 000001065165-3562505204
2021 3 FD52 05 E121 D 6183701D 056 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704589 $93.39 000001065165-3562505204
2021 3 FD52 05 E122 D 6183701D 056 9/24/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092K1062026704589 $1,909.00 000001065165-3562505204
2021 3 FD52 05 E122 D 6183701D 056 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704589 $1,090.80 000001065165-3562505204
2021 3 FD52 05 E123 D 6183701D 056 9/24/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092K1062026704589 $230.59 000001065165-3562505204
2021 3 FD52 05 E123 D 6183701D 056 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704589 $129.18 000001065165-3562505204
2021 3 FD52 05 E124 D 6183701D 056 9/24/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092K1062026704589 $0.56 000001065165-3562505204
2021 3 FD52 05 E124 D 6183701D 056 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704589 $0.32 000001065165-3562505204
2021 3 FD52 05 E111 D 6183701D 056 9/10/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR091K1062025303603 $3,379.42 000001065165-3562505204
2021 3 FD52 05 E111 D 6183701D 056 9/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091K1062025303603 $337.94 000001065165-3562505204
2021 3 FD52 05 E121 D 6183701D 056 9/10/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR091K1062025303603 $238.55 000001065165-3562505204
2021 3 FD52 05 E121 D 6183701D 056 9/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091K1062025303603 $23.85 000001065165-3562505204
2021 3 FD52 05 E122 D 6183701D 056 9/10/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR091K1062025303603 $2,853.25 000001065165-3562505204
2021 3 FD52 05 E122 D 6183701D 056 9/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091K1062025303603 $285.32 000001065165-3562505204
2021 3 FD52 05 E123 D 6183701D 056 9/10/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR091K1062025303603 $342.63 000001065165-3562505204
2021 3 FD52 05 E123 D 6183701D 056 9/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091K1062025303603 $33.79 000001065165-3562505204
2021 2 FD52 05 E111 D 6183701D 056 8/24/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR082K1062023402521 $3,102.25 000001065165-3562505204
2021 2 FD52 05 E111 D 6183701D 056 8/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082K1062023402521 $620.45 000001065165-3562505204
2021 2 FD52 05 E121 D 6183701D 056 8/24/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR082K1062023402521 $224.26 000001065165-3562505204
2021 2 FD52 05 E121 D 6183701D 056 8/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082K1062023402521 $44.85 000001065165-3562505204
2021 2 FD52 05 E122 D 6183701D 056 8/24/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR082K1062023402521 $2,619.24 000001065165-3562505204
2021 2 FD52 05 E122 D 6183701D 056 8/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082K1062023402521 $523.85 000001065165-3562505204
2021 2 FD52 05 E123 D 6183701D 056 8/24/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR082K1062023402521 $314.92 000001065165-3562505204
2021 2 FD52 05 E123 D 6183701D 056 8/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082K1062023402521 $62.04 000001065165-3562505204
2021 2 FD52 05 E124 D 6183701D 056 8/24/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR082K1062023402521 $0.77 000001065165-3562505204
2021 2 FD52 05 E124 D 6183701D 056 8/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082K1062023402521 $0.15 000001065165-3562505204
2021 2 FD52 05 E111 D 6183701D 056 8/13/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR081K1062022001430 $3,264.97 000001065165-3562505204
2021 2 FD52 05 E111 D 6183701D 056 8/13/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081K1062022001430 $318.25 000001065165-3562505204
2021 2 FD52 05 E121 D 6183701D 056 8/13/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR081K1062022001430 $230.46 000001065165-3562505204
2021 2 FD52 05 E121 D 6183701D 056 8/13/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081K1062022001430 $22.47 000001065165-3562505204
2021 2 FD52 05 E122 D 6183701D 056 8/13/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR081K1062022001430 $2,756.60 000001065165-3562505204
2021 2 FD52 05 E122 D 6183701D 056 8/13/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081K1062022001430 $268.70 000001065165-3562505204
2021 2 FD52 05 E123 D 6183701D 056 8/13/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR081K1062022001430 $331.01 000001065165-3562505204
2021 2 FD52 05 E123 D 6183701D 056 8/13/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081K1062022001430 $31.82 000001065165-3562505204
2021 1 FD52 05 E111 D 6183701D 056 7/27/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR072K1062020600334 $3,403.75 000001065165-3562505204
2021 1 FD52 05 E111 D 6183701D 056 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600334 $340.37 000001065165-3562505204
2021 1 FD52 05 E121 D 6183701D 056 7/27/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR072K1062020600334 $246.03 000001065165-3562505204
2021 1 FD52 05 E121 D 6183701D 056 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600334 $24.60 000001065165-3562505204
2021 1 FD52 05 E122 D 6183701D 056 7/27/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR072K1062020600334 $2,873.78 000001065165-3562505204
2021 1 FD52 05 E122 D 6183701D 056 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600334 $287.38 000001065165-3562505204
2021 1 FD52 05 E123 D 6183701D 056 7/27/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR072K1062020600334 $345.09 000001065165-3562505204
2021 1 FD52 05 E123 D 6183701D 056 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600334 $34.04 000001065165-3562505204
2021 1 FD52 05 E124 D 6183701D 056 7/27/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR072K1062020600334 $0.85 000001065165-3562505204
2021 1 FD52 05 E124 D 6183701D 056 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600334 $0.08 000001065165-3562505204
2020 2 FD52 05 E143 D 6183701D 056 8/14/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000024922 PON20700004958 HALL HARMON ENGINEERS INC $62,551.65 Add fifth lane for left turns from Timber Ridge Drive to River Road.
2020 1 FD52 05 E124 D 6183701D 056 7/29/2019 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR072J1061920405814 $0.05 000001065165-3562505204
2020 1 FD52 05 E124 D 6183701D 056 7/29/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072J1061920405814 $0.02 000001065165-3562505204
2020 1 FD52 05 E111 D 6183701D 056 7/29/2019 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR072J1061920405813 $194.50 000001065165-3562505204
2020 1 FD52 05 E111 D 6183701D 056 7/29/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072J1061920405813 $81.20 000001065165-3562505204
2020 1 FD52 05 E121 D 6183701D 056 7/29/2019 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR072J1061920405813 $14.17 000001065165-3562505204
2020 1 FD52 05 E121 D 6183701D 056 7/29/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072J1061920405813 $5.91 000001065165-3562505204
2020 1 FD52 05 E122 D 6183701D 056 7/29/2019 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR072J1061920405813 $162.27 000001065165-3562505204
2020 1 FD52 05 E122 D 6183701D 056 7/29/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072J1061920405813 $67.74 000001065165-3562505204
2020 1 FD52 05 E123 D 6183701D 056 7/29/2019 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR072J1061920405813 $19.80 000001065165-3562505204
2020 1 FD52 05 E123 D 6183701D 056 7/29/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072J1061920405813 $8.12 000001065165-3562505204
2019 4 FD52 05 E111 D 6183701D 056 10/29/2018 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR102I1061829707244 $121.75 000001065165-3562505204
2019 4 FD52 05 E111 D 6183701D 056 10/29/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102I1061829707244 $13.13 000001065165-3562505204
2019 4 FD52 05 E121 D 6183701D 056 10/29/2018 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR102I1061829707244 $8.93 000001065165-3562505204
2019 4 FD52 05 E121 D 6183701D 056 10/29/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102I1061829707244 $0.96 000001065165-3562505204
2019 4 FD52 05 E122 D 6183701D 056 10/29/2018 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR102I1061829707244 $101.42 000001065165-3562505204
2019 4 FD52 05 E122 D 6183701D 056 10/29/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102I1061829707244 $10.96 000001065165-3562505204
2019 4 FD52 05 E123 D 6183701D 056 10/29/2018 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR102I1061829707244 $12.33 000001065165-3562505204
2019 4 FD52 05 E123 D 6183701D 056 10/29/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102I1061829707244 $1.31 000001065165-3562505204
2019 4 FD52 05 E124 D 6183701D 056 10/29/2018 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR102I1061829707244 $0.03 000001065165-3562505204
2016 5 FD52 05 E111 D 6183701D 056 11/23/2015 1550 DESIGN CONTRACTS-CONSULTANT CA-XR112F1061532405904 $50.65 000001046678-3562505202
2016 5 FD52 05 E121 D 6183701D 056 11/23/2015 1550 DESIGN CONTRACTS-CONSULTANT CA-XR112F1061532405904 $3.68 000001046678-3562505202
2016 5 FD52 05 E122 D 6183701D 056 11/23/2015 1550 DESIGN CONTRACTS-CONSULTANT CA-XR112F1061532405904 $19.63 000001046678-3562505202
2016 5 FD52 05 E123 D 6183701D 056 11/23/2015 1550 DESIGN CONTRACTS-CONSULTANT CA-XR112F1061532405904 $1.45 000001046678-3562505202
2016 5 FD52 05 E124 D 6183701D 056 11/23/2015 1550 DESIGN CONTRACTS-CONSULTANT CA-XR112F1061532405904 $0.02 000001046678-3562505202
2014 7 FD52 05 E111 D 6183701D 056 1/27/2014 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012E1061402303699 $716.21 000001030636-3562505204
2014 7 FD52 05 E121 D 6183701D 056 1/27/2014 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012E1061402303699 $47.13 000001030636-3562505204
2014 7 FD52 05 E122 D 6183701D 056 1/27/2014 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012E1061402303699 $191.88 000001030636-3562505204
2014 7 FD52 05 E123 D 6183701D 056 1/27/2014 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012E1061402303699 $106.55 000001030636-3562505204
2014 7 FD52 05 E124 D 6183701D 056 1/27/2014 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012E1061402303699 $0.27 000001030636-3562505204
2014 1 FD52 05 E121 D 6183701D 056 7/12/2013 2010 RIGHT OF WAY ESTIMATES CA-XR071D1061318903186 $5.57 000001000712-3562505206
2014 1 FD52 05 E122 D 6183701D 056 7/12/2013 2010 RIGHT OF WAY ESTIMATES CA-XR071D1061318903186 $18.50 000001000712-3562505206
2014 1 FD52 05 E123 D 6183701D 056 7/12/2013 2010 RIGHT OF WAY ESTIMATES CA-XR071D1061318903186 $16.17 000001000712-3562505206
2014 1 FD52 05 E111 D 6183701D 056 7/9/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR071D1061318903232 $103.05 000001025990-3562505208
2014 1 FD52 05 E121 D 6183701D 056 7/9/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR071D1061318903232 $6.77 000001025990-3562505208
2014 1 FD52 05 E122 D 6183701D 056 7/9/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR071D1061318903232 $24.34 000001025990-3562505208
2014 1 FD52 05 E123 D 6183701D 056 7/9/2013 3040 INSPECTION&SUPER-UTILITIES CA-XR071D1061318903232 $14.40 000001025990-3562505208
2014 1 FD52 05 E111 D 6183701D 056 7/9/2013 2010 RIGHT OF WAY ESTIMATES CA-XR071D1061318903185 $78.33 000001000712-3562505206
2013 3 FD52 00 E111 D 6183701D 056 9/17/2012 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR091C1061225206239 $347.79 000001015073-3562500610
2013 3 FD52 00 E121 D 6183701D 056 9/17/2012 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR091C1061225206239 $24.15 000001015073-3562500610
2013 3 FD52 00 E122 D 6183701D 056 9/17/2012 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR091C1061225206239 $82.11 000001015073-3562500610
2013 3 FD52 00 E123 D 6183701D 056 9/17/2012 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR091C1061225206239 $48.88 000001015073-3562500610
2013 2 FD52 00 E111 D 6183701D 056 8/23/2012 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR082C1061223605266 $616.25 000001015073-3562500610
2013 2 FD52 00 E121 D 6183701D 056 8/23/2012 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR082C1061223605266 $44.20 000001015073-3562500610
2013 2 FD52 00 E122 D 6183701D 056 8/23/2012 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR082C1061223605266 $145.49 000001015073-3562500610
2013 2 FD52 00 E123 D 6183701D 056 8/23/2012 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR082C1061223605266 $75.73 000001015073-3562500610
2013 2 FD52 00 E124 D 6183701D 056 8/23/2012 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR082C1061223605266 $0.45 000001015073-3562500610
2013 2 FD52 00 E111 D 6183701D 056 8/13/2012 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR081C1061222104313 $428.41 000001015073-3562500610
2013 2 FD52 00 E121 D 6183701D 056 8/13/2012 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR081C1061222104313 $30.49 000001015073-3562500610
2013 2 FD52 00 E122 D 6183701D 056 8/13/2012 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR081C1061222104313 $101.13 000001015073-3562500610
2013 2 FD52 00 E123 D 6183701D 056 8/13/2012 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR081C1061222104313 $77.26 000001015073-3562500610
2013 1 FD52 05 E122 D 6183701D 056 7/10/2012 3020 PREL ENGINEERING-UTILITIES CA-XR071C1061219202455 $0.01 000001000816-3562505208
2013 1 FD52 00 E123 D 6183701D 056 7/10/2012 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR061C1061216000406P $21.04 000001015073-3562500610
2013 1 FD52 05 E121 D 6183701D 056 7/10/2012 3020 PREL ENGINEERING-UTILITIES CA-XR071C1061219202455 $0.18 000001000816-3562505208
2013 1 FD52 05 E123 D 6183701D 056 7/4/2012 3020 PREL ENGINEERING-UTILITIES CA-XR061C1061216000364P $132.31 000001000816-3562505208
2013 1 FD52 00 E111 D 6183701D 056 7/3/2012 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR062C1061217401459 ($6.91) 000001015073-3562500610
2013 1 FD52 00 E121 D 6183701D 056 7/3/2012 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR062C1061217401459 ($0.44) 000001015073-3562500610
2013 1 FD52 00 E122 D 6183701D 056 7/3/2012 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR062C1061217401459 ($1.37) 000001015073-3562500610
2013 1 FD52 00 E123 D 6183701D 056 7/3/2012 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR062C1061217401459 ($0.81) 000001015073-3562500610
2013 1 FD52 05 E111 D 6183701D 056 7/3/2012 3020 PREL ENGINEERING-UTILITIES CA-XR062C1061217401414 $159.05 000001000816-3562505208
2013 1 FD52 05 E121 D 6183701D 056 7/3/2012 3020 PREL ENGINEERING-UTILITIES CA-XR062C1061217401414 $10.13 000001000816-3562505208
2013 1 FD52 05 E122 D 6183701D 056 7/3/2012 3020 PREL ENGINEERING-UTILITIES CA-XR062C1061217401414 $31.53 000001000816-3562505208
2013 1 FD52 05 E123 D 6183701D 056 7/3/2012 3020 PREL ENGINEERING-UTILITIES CA-XR062C1061217401414 $45.44 000001000816-3562505208
2013 1 FD52 05 E124 D 6183701D 056 7/3/2012 3020 PREL ENGINEERING-UTILITIES CA-XR062C1061217401414 $0.15 000001000816-3562505208
2013 1 FD52 05 E229 D 6183701D 056 7/2/2012 3020 PREL ENGINEERING-UTILITIES IET-XE13A162512182016220 $30.00
2012 12 FD52 05 E111 D 6183701D 056 6/10/2012 3020 PREL ENGINEERING-UTILITIES CA-XR061C1061216000364 $462.97 000001000816-3562505208
2012 12 FD52 05 E115 D 6183701D 056 6/10/2012 3020 PREL ENGINEERING-UTILITIES CA-XR061C1061216000364 $78.29 000001000816-3562505208
2012 12 FD52 05 E121 D 6183701D 056 6/10/2012 3020 PREL ENGINEERING-UTILITIES CA-XR061C1061216000364 $34.30 000001000816-3562505208
2012 12 FD52 05 E122 D 6183701D 056 6/10/2012 3020 PREL ENGINEERING-UTILITIES CA-XR061C1061216000364 $107.28 000001000816-3562505208
2012 12 FD52 05 E124 D 6183701D 056 6/10/2012 3020 PREL ENGINEERING-UTILITIES CA-XR061C1061216000364 $0.03 000001000816-3562505208
2012 12 FD52 00 E111 D 6183701D 056 6/10/2012 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR061C1061216000406 $180.32 000001015073-3562500610
2012 12 FD52 00 E121 D 6183701D 056 6/10/2012 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR061C1061216000406 $11.47 000001015073-3562500610
2012 12 FD52 00 E122 D 6183701D 056 6/10/2012 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR061C1061216000406 $35.74 000001015073-3562500610
2012 11 FD52 05 E229 D 6183701D 056 5/29/2012 3020 PREL ENGINEERING-UTILITIES IET-XE13A162512146014620 $60.22
2012 11 FD52 05 E111 D 6183701D 056 5/23/2012 3020 PREL ENGINEERING-UTILITIES CA-XR052C1061214301231 $510.66 000001000816-3562505208
2012 11 FD52 05 E115 D 6183701D 056 5/23/2012 3020 PREL ENGINEERING-UTILITIES CA-XR052C1061214301231 $203.54 000001000816-3562505208
2012 11 FD52 05 E121 D 6183701D 056 5/23/2012 3020 PREL ENGINEERING-UTILITIES CA-XR052C1061214301231 $46.18 000001000816-3562505208
2012 11 FD52 05 E122 D 6183701D 056 5/23/2012 3020 PREL ENGINEERING-UTILITIES CA-XR052C1061214301231 $141.52 000001000816-3562505208
2012 11 FD52 05 E123 D 6183701D 056 5/23/2012 3020 PREL ENGINEERING-UTILITIES CA-XR052C1061214301231 $126.53 000001000816-3562505208
2012 11 FD52 05 E124 D 6183701D 056 5/23/2012 3020 PREL ENGINEERING-UTILITIES CA-XR052C1061214301231 $0.32 000001000816-3562505208
2012 11 FD52 00 E111 D 6183701D 056 5/14/2012 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR051C1061212900387 $716.61 000001015073-3562500610
2012 11 FD52 00 E121 D 6183701D 056 5/14/2012 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR051C1061212900387 $47.31 000001015073-3562500610
2012 11 FD52 00 E122 D 6183701D 056 5/14/2012 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR051C1061212900387 $142.03 000001015073-3562500610
2012 11 FD52 00 E123 D 6183701D 056 5/14/2012 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR051C1061212900387 $90.64 000001015073-3562500610
2012 11 FD52 05 E111 D 6183701D 056 5/8/2012 3020 PREL ENGINEERING-UTILITIES CA-XR051C1061212900337 $690.20 000001000816-3562505208
2012 11 FD52 05 E115 D 6183701D 056 5/8/2012 3020 PREL ENGINEERING-UTILITIES CA-XR051C1061212900337 $234.86 000001000816-3562505208
2012 11 FD52 05 E121 D 6183701D 056 5/8/2012 3020 PREL ENGINEERING-UTILITIES CA-XR051C1061212900337 $59.24 000001000816-3562505208
2012 11 FD52 05 E122 D 6183701D 056 5/8/2012 3020 PREL ENGINEERING-UTILITIES CA-XR051C1061212900337 $183.35 000001000816-3562505208
2012 11 FD52 05 E123 D 6183701D 056 5/8/2012 3020 PREL ENGINEERING-UTILITIES CA-XR051C1061212900337 $204.56 000001000816-3562505208
2012 11 FD52 05 E229 D 6183701D 056 5/4/2012 3020 PREL ENGINEERING-UTILITIES IET-XE13A162512116016460 $158.37
2012 10 FD52 05 E111 D 6183701D 056 4/25/2012 3020 PREL ENGINEERING-UTILITIES CA-XR042C1061211506356 $970.31 000001000816-3562505208
2012 10 FD52 05 E115 D 6183701D 056 4/25/2012 3020 PREL ENGINEERING-UTILITIES CA-XR042C1061211506356 $86.11 000001000816-3562505208
2012 10 FD52 05 E121 D 6183701D 056 4/25/2012 3020 PREL ENGINEERING-UTILITIES CA-XR042C1061211506356 $65.74 000001000816-3562505208
2012 10 FD52 05 E122 D 6183701D 056 4/25/2012 3020 PREL ENGINEERING-UTILITIES CA-XR042C1061211506356 $209.34 000001000816-3562505208
2012 10 FD52 05 E123 D 6183701D 056 4/25/2012 3020 PREL ENGINEERING-UTILITIES CA-XR042C1061211506356 $266.79 000001000816-3562505208
2012 10 FD52 05 E124 D 6183701D 056 4/25/2012 3020 PREL ENGINEERING-UTILITIES CA-XR042C1061211506356 $0.74 000001000816-3562505208
2012 10 FD52 05 E111 D 6183701D 056 4/6/2012 3020 PREL ENGINEERING-UTILITIES CA-XR041C1061209705328 $548.98 000001000816-3562505208
2012 10 FD52 05 E115 D 6183701D 056 4/6/2012 3020 PREL ENGINEERING-UTILITIES CA-XR041C1061209705328 $156.57 000001000816-3562505208
2012 10 FD52 05 E121 D 6183701D 056 4/6/2012 3020 PREL ENGINEERING-UTILITIES CA-XR041C1061209705328 $45.80 000001000816-3562505208
2012 10 FD52 05 E122 D 6183701D 056 4/6/2012 3020 PREL ENGINEERING-UTILITIES CA-XR041C1061209705328 $139.88 000001000816-3562505208
2012 10 FD52 05 E123 D 6183701D 056 4/6/2012 3020 PREL ENGINEERING-UTILITIES CA-XR041C1061209705328 $164.10 000001000816-3562505208
2012 10 FD52 05 E124 D 6183701D 056 4/6/2012 3020 PREL ENGINEERING-UTILITIES CA-XR041C1061209705328 ($0.03) 000001000816-3562505208
2012 9 FD52 05 E111 D 6183701D 056 3/23/2012 3020 PREL ENGINEERING-UTILITIES CA-XR032C1061208304288 $488.08 000001000816-3562505208
2012 9 FD52 05 E115 D 6183701D 056 3/23/2012 3020 PREL ENGINEERING-UTILITIES CA-XR032C1061208304288 $125.26 000001000816-3562505208
2012 9 FD52 05 E121 D 6183701D 056 3/23/2012 3020 PREL ENGINEERING-UTILITIES CA-XR032C1061208304288 $38.34 000001000816-3562505208
2012 9 FD52 05 E122 D 6183701D 056 3/23/2012 3020 PREL ENGINEERING-UTILITIES CA-XR032C1061208304288 $121.52 000001000816-3562505208
2012 9 FD52 05 E123 D 6183701D 056 3/23/2012 3020 PREL ENGINEERING-UTILITIES CA-XR032C1061208304288 $151.26 000001000816-3562505208
2012 9 FD52 05 E124 D 6183701D 056 3/23/2012 3020 PREL ENGINEERING-UTILITIES CA-XR032C1061208304288 $0.44 000001000816-3562505208
2012 9 FD52 05 E229 D 6183701D 056 3/14/2012 3020 PREL ENGINEERING-UTILITIES IET-XE13A162512074015580 $36.14
2012 9 FD52 05 E229 D 6183701D 056 3/14/2012 2010 RIGHT OF WAY ESTIMATES IET-XE13A162512074022920 $6.43
2012 9 FD52 05 E111 D 6183701D 056 3/8/2012 3020 PREL ENGINEERING-UTILITIES CA-XR031C1061206802276 $400.65 000001000816-3562505208
2012 9 FD52 05 E115 D 6183701D 056 3/8/2012 3020 PREL ENGINEERING-UTILITIES CA-XR031C1061206802276 $78.29 000001000816-3562505208
2012 9 FD52 05 E121 D 6183701D 056 3/8/2012 3020 PREL ENGINEERING-UTILITIES CA-XR031C1061206802276 $31.08 000001000816-3562505208
2012 9 FD52 05 E122 D 6183701D 056 3/8/2012 3020 PREL ENGINEERING-UTILITIES CA-XR031C1061206802276 $94.94 000001000816-3562505208
2012 9 FD52 05 E123 D 6183701D 056 3/8/2012 3020 PREL ENGINEERING-UTILITIES CA-XR031C1061206802276 $95.32 000001000816-3562505208
2012 9 FD52 05 E124 D 6183701D 056 3/8/2012 3020 PREL ENGINEERING-UTILITIES CA-XR031C1061206802276 ($0.02) 000001000816-3562505208
2012 8 FD52 05 E111 D 6183701D 056 2/23/2012 3020 PREL ENGINEERING-UTILITIES CA-XR022C1061205400388 $334.59 000001000816-3562505208
2012 8 FD52 05 E115 D 6183701D 056 2/23/2012 3020 PREL ENGINEERING-UTILITIES CA-XR022C1061205400388 $156.57 000001000816-3562505208
2012 8 FD52 05 E121 D 6183701D 056 2/23/2012 3020 PREL ENGINEERING-UTILITIES CA-XR022C1061205400388 $31.91 000001000816-3562505208
2012 8 FD52 05 E122 D 6183701D 056 2/23/2012 3020 PREL ENGINEERING-UTILITIES CA-XR022C1061205400388 $97.34 000001000816-3562505208
2012 8 FD52 05 E123 D 6183701D 056 2/23/2012 3020 PREL ENGINEERING-UTILITIES CA-XR022C1061205400388 $96.02 000001000816-3562505208
2012 8 FD52 05 E124 D 6183701D 056 2/23/2012 3020 PREL ENGINEERING-UTILITIES CA-XR022C1061205400388 $0.27 000001000816-3562505208
2012 8 FD52 05 E111 D 6183701D 056 2/8/2012 3020 PREL ENGINEERING-UTILITIES CA-XR021C1061203903170 $711.43 000001000816-3562505208
2012 8 FD52 05 E115 D 6183701D 056 2/8/2012 3020 PREL ENGINEERING-UTILITIES CA-XR021C1061203903170 $46.97 000001000816-3562505208
2012 8 FD52 05 E121 D 6183701D 056 2/8/2012 3020 PREL ENGINEERING-UTILITIES CA-XR021C1061203903170 $47.13 000001000816-3562505208
2012 8 FD52 05 E122 D 6183701D 056 2/8/2012 3020 PREL ENGINEERING-UTILITIES CA-XR021C1061203903170 $150.32 000001000816-3562505208
2012 8 FD52 05 E123 D 6183701D 056 2/8/2012 3020 PREL ENGINEERING-UTILITIES CA-XR021C1061203903170 $203.45 000001000816-3562505208
2012 8 FD52 05 E111 D 6183701D 056 2/8/2012 2010 RIGHT OF WAY ESTIMATES CA-XR021C1061203903169 $35.60 000001000712-3562505206
2012 8 FD52 05 E121 D 6183701D 056 2/8/2012 2010 RIGHT OF WAY ESTIMATES CA-XR021C1061203903169 $2.53 000001000712-3562505206
2012 8 FD52 05 E122 D 6183701D 056 2/8/2012 2010 RIGHT OF WAY ESTIMATES CA-XR021C1061203903169 $7.06 000001000712-3562505206
2012 8 FD52 05 E123 D 6183701D 056 2/8/2012 2010 RIGHT OF WAY ESTIMATES CA-XR021C1061203903169 $7.20 000001000712-3562505206
2012 7 FD52 05 E111 D 6183701D 056 1/24/2012 3020 PREL ENGINEERING-UTILITIES CA-XR012C1061202402297 $288.98 000001000816-3562505208
2012 7 FD52 05 E121 D 6183701D 056 1/24/2012 3020 PREL ENGINEERING-UTILITIES CA-XR012C1061202402297 $18.46 000001000816-3562505208
2012 7 FD52 05 E122 D 6183701D 056 1/24/2012 3020 PREL ENGINEERING-UTILITIES CA-XR012C1061202402297 $57.30 000001000816-3562505208
2012 7 FD52 05 E123 D 6183701D 056 1/24/2012 3020 PREL ENGINEERING-UTILITIES CA-XR012C1061202402297 $82.59 000001000816-3562505208
2012 7 FD52 05 E124 D 6183701D 056 1/24/2012 3020 PREL ENGINEERING-UTILITIES CA-XR012C1061202402297 $0.23 000001000816-3562505208
2012 7 FD52 05 E111 D 6183701D 056 1/9/2012 3020 PREL ENGINEERING-UTILITIES CA-XR011C1061200801395 ($28.90) 000001000816-3562505208
2012 7 FD52 05 E121 D 6183701D 056 1/9/2012 3020 PREL ENGINEERING-UTILITIES CA-XR011C1061200801395 ($1.89) 000001000816-3562505208
2012 7 FD52 05 E122 D 6183701D 056 1/9/2012 3020 PREL ENGINEERING-UTILITIES CA-XR011C1061200801395 ($5.73) 000001000816-3562505208
2012 7 FD52 05 E123 D 6183701D 056 1/9/2012 3020 PREL ENGINEERING-UTILITIES CA-XR011C1061200801395 ($8.10) 000001000816-3562505208
2012 7 FD52 05 E124 D 6183701D 056 1/9/2012 3020 PREL ENGINEERING-UTILITIES CA-XR011C1061200801395 ($0.02) 000001000816-3562505208
2012 6 FD52 05 E111 D 6183701D 056 12/19/2011 3020 PREL ENGINEERING-UTILITIES CA-XR122B1061135200393 $413.09 000001000816-3562505208
2012 6 FD52 05 E121 D 6183701D 056 12/19/2011 3020 PREL ENGINEERING-UTILITIES CA-XR122B1061135200393 $26.40 000001000816-3562505208
2012 6 FD52 05 E122 D 6183701D 056 12/19/2011 3020 PREL ENGINEERING-UTILITIES CA-XR122B1061135200393 $81.92 000001000816-3562505208
2012 6 FD52 05 E123 D 6183701D 056 12/19/2011 3020 PREL ENGINEERING-UTILITIES CA-XR122B1061135200393 $121.11 000001000816-3562505208
2012 6 FD52 05 E124 D 6183701D 056 12/19/2011 3020 PREL ENGINEERING-UTILITIES CA-XR122B1061135200393 $0.33 000001000816-3562505208
2012 4 FD52 05 E111 D 6183701D 056 10/30/2011 3020 PREL ENGINEERING-UTILITIES CA-XR102B1061129504661 $286.84 000001000816-3562505208
2012 4 FD52 05 E121 D 6183701D 056 10/30/2011 3020 PREL ENGINEERING-UTILITIES CA-XR102B1061129504661 $17.38 000001000816-3562505208
2012 4 FD52 05 E122 D 6183701D 056 10/30/2011 3020 PREL ENGINEERING-UTILITIES CA-XR102B1061129504661 $56.85 000001000816-3562505208
2012 4 FD52 05 E123 D 6183701D 056 10/30/2011 3020 PREL ENGINEERING-UTILITIES CA-XR102B1061129504661 $92.79 000001000816-3562505208
2012 4 FD52 05 E124 D 6183701D 056 10/30/2011 3020 PREL ENGINEERING-UTILITIES CA-XR102B1061129504661 $0.25 000001000816-3562505208
2012 4 FD52 05 E123 D 6183701D 056 10/10/2011 3020 PREL ENGINEERING-UTILITIES CA-XR101B1061128103594 $34.55 000001000816-3562505208
2012 4 FD52 05 E111 D 6183701D 056 10/10/2011 3020 PREL ENGINEERING-UTILITIES CA-XR101B1061128103594 $106.81 000001000816-3562505208
2012 4 FD52 05 E121 D 6183701D 056 10/10/2011 3020 PREL ENGINEERING-UTILITIES CA-XR101B1061128103594 $6.51 000001000816-3562505208
2012 4 FD52 05 E122 D 6183701D 056 10/10/2011 3020 PREL ENGINEERING-UTILITIES CA-XR101B1061128103594 $21.17 000001000816-3562505208
2012 3 FD52 05 E111 D 6183701D 056 9/9/2011 3020 PREL ENGINEERING-UTILITIES CA-XR091B1061125201454 ($1.85) 000001000816-3562505208
2012 3 FD52 05 E121 D 6183701D 056 9/9/2011 3020 PREL ENGINEERING-UTILITIES CA-XR091B1061125201454 ($0.13) 000001000816-3562505208
2012 3 FD52 05 E122 D 6183701D 056 9/9/2011 3020 PREL ENGINEERING-UTILITIES CA-XR091B1061125201454 ($0.37) 000001000816-3562505208
2012 3 FD52 05 E123 D 6183701D 056 9/9/2011 3020 PREL ENGINEERING-UTILITIES CA-XR091B1061125201454 ($0.58) 000001000816-3562505208
2012 3 FD52 05 E124 D 6183701D 056 9/9/2011 3020 PREL ENGINEERING-UTILITIES CA-XR091B1061125201454 ($0.01) 000001000816-3562505208
2012 2 FD52 05 E111 D 6183701D 056 8/24/2011 3020 PREL ENGINEERING-UTILITIES CA-XR082B1061123600409 $97.45 000001000816-3562505208
2012 2 FD52 05 E121 D 6183701D 056 8/24/2011 3020 PREL ENGINEERING-UTILITIES CA-XR082B1061123600409 $6.00 000001000816-3562505208
2012 2 FD52 05 E122 D 6183701D 056 8/24/2011 3020 PREL ENGINEERING-UTILITIES CA-XR082B1061123600409 $19.33 000001000816-3562505208
2012 2 FD52 05 E123 D 6183701D 056 8/24/2011 3020 PREL ENGINEERING-UTILITIES CA-XR082B1061123600409 $30.55 000001000816-3562505208
2012 2 FD52 05 E124 D 6183701D 056 8/24/2011 3020 PREL ENGINEERING-UTILITIES CA-XR082B1061123600409 $0.09 000001000816-3562505208
2012 2 FD52 05 E111 D 6183701D 056 8/8/2011 3020 PREL ENGINEERING-UTILITIES CA-XR081B1061121800289 $207.45 000001000816-3562505208
2012 2 FD52 05 E121 D 6183701D 056 8/8/2011 3020 PREL ENGINEERING-UTILITIES CA-XR081B1061121800289 $13.00 000001000816-3562505208
2012 2 FD52 05 E122 D 6183701D 056 8/8/2011 3020 PREL ENGINEERING-UTILITIES CA-XR081B1061121800289 $41.14 000001000816-3562505208
2012 2 FD52 05 E123 D 6183701D 056 8/8/2011 3020 PREL ENGINEERING-UTILITIES CA-XR081B1061121800289 $58.11 000001000816-3562505208
2012 2 FD52 05 E124 D 6183701D 056 8/8/2011 3020 PREL ENGINEERING-UTILITIES CA-XR081B1061121800289 $0.04 000001000816-3562505208
2012 1 FD52 05 E111 D 6183701D 056 7/25/2011 3020 PREL ENGINEERING-UTILITIES CA-XR072B1061120400350 $95.49 000001000816-3562505208
2012 1 FD52 05 E121 D 6183701D 056 7/25/2011 3020 PREL ENGINEERING-UTILITIES CA-XR072B1061120400350 $6.32 000001000816-3562505208
2012 1 FD52 05 E122 D 6183701D 056 7/25/2011 3020 PREL ENGINEERING-UTILITIES CA-XR072B1061120400350 $18.93 000001000816-3562505208
2012 1 FD52 05 E123 D 6183701D 056 7/25/2011 3020 PREL ENGINEERING-UTILITIES CA-XR072B1061120400350 $12.81 000001000816-3562505208
2012 1 FD52 05 E124 D 6183701D 056 7/25/2011 3020 PREL ENGINEERING-UTILITIES CA-XR072B1061120400350 $0.03 000001000816-3562505208
2012 1 FD52 05 E111 D 6183701D 056 7/25/2011 3020 PREL ENGINEERING-UTILITIES CA-XR072B1061120450197 $46.84 000001000816-3562505208
2012 1 FD52 05 E121 D 6183701D 056 7/25/2011 3020 PREL ENGINEERING-UTILITIES CA-XR072B1061120450197 $2.83 000001000816-3562505208
2012 1 FD52 05 E122 D 6183701D 056 7/25/2011 3020 PREL ENGINEERING-UTILITIES CA-XR072B1061120450197 $9.35 000001000816-3562505208
2012 1 FD52 05 E123 D 6183701D 056 7/25/2011 3020 PREL ENGINEERING-UTILITIES CA-XR072B1061120450197 $15.26 000001000816-3562505208
2012 1 FD52 05 E124 D 6183701D 056 7/25/2011 3020 PREL ENGINEERING-UTILITIES CA-XR072B1061120450197 $0.04 000001000816-3562505208
2012 1 FD52 05 E111 D 6183701D 056 7/25/2011 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR072B1061120400345 $131.44 000001000340-3562505204
2012 1 FD52 05 E121 D 6183701D 056 7/25/2011 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR072B1061120400345 $9.07 000001000340-3562505204
2012 1 FD52 05 E122 D 6183701D 056 7/25/2011 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR072B1061120400345 $22.32 000001000340-3562505204
2012 1 FD52 05 E123 D 6183701D 056 7/25/2011 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR072B1061120400345 $11.35 000001000340-3562505204
2012 1 FD52 05 E124 D 6183701D 056 7/25/2011 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR072B1061120400345 $0.05 000001000340-3562505204
2012 1 FD52 05 E111 D 6183701D 056 7/20/2011 3020 PREL ENGINEERING-UTILITIES CA-XR071B1061120100337 $489.33 000001000816-3562505208
2012 1 FD52 05 E121 D 6183701D 056 7/20/2011 3020 PREL ENGINEERING-UTILITIES CA-XR071B1061120100337 $33.39 000001000816-3562500009
2012 1 FD52 05 E122 D 6183701D 056 7/20/2011 3020 PREL ENGINEERING-UTILITIES CA-XR071B1061120100337 $44.54 000001000816-3562505208
2012 1 FD52 05 E123 D 6183701D 056 7/20/2011 3020 PREL ENGINEERING-UTILITIES CA-XR071B1061120100337 $81.59 000001000816-3562505208
2012 1 FD52 05 E143 D 6183701D 056 7/19/2011 1550 DESIGN CONTRACTS-CONSULTANT PRC-1200002238 PON20700004958 HALL HARMON ENGINEERS INC $58,185.50 Add fifth lane for left turns from Timber Ridge Drive to River Road.
2011 13 FD52 05 E124 D 6183701D 056 7/15/2011 3020 PREL ENGINEERING-UTILITIES CA-XS071B1061119475125 $0.05 000001000816-3562505208
2011 13 FD52 05 E111 D 6183701D 056 7/15/2011 3020 PREL ENGINEERING-UTILITIES CA-XS071B1061119475125 $2.23 000001000816-3562505208
2011 13 FD52 05 E121 D 6183701D 056 7/15/2011 3020 PREL ENGINEERING-UTILITIES CA-XS071B1061119475125 $5.89 000001000816-3562505208
2011 13 FD52 05 E122 D 6183701D 056 7/15/2011 3020 PREL ENGINEERING-UTILITIES CA-XS071B1061119475125 $16.76 000001000816-3562505208
2011 13 FD52 05 E123 D 6183701D 056 7/15/2011 3020 PREL ENGINEERING-UTILITIES CA-XS071B1061119475125 $34.53 000001000816-3562505208
2011 13 FD52 00 E111 D 6183701D 056 7/14/2011 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XS071B1061119365127 ($13.30) 000001001026-3562500636
2011 13 FD52 00 E121 D 6183701D 056 7/14/2011 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XS071B1061119365127 $0.47 000001001026-3562500636
2011 13 FD52 00 E122 D 6183701D 056 7/14/2011 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XS071B1061119365127 $1.10 000001001026-3562500636
2011 13 FD52 00 E123 D 6183701D 056 7/14/2011 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XS071B1061119365127 $0.23 000001001026-3562500636
2011 13 FD52 05 E111 D 6183701D 056 7/14/2011 2010 RIGHT OF WAY ESTIMATES CA-XS071B1061119365124 $0.01 000001000712-3562505206
2011 13 FD52 05 E121 D 6183701D 056 7/14/2011 2010 RIGHT OF WAY ESTIMATES CA-XS071B1061119365124 $0.68 000001000712-3562505206
2011 13 FD52 05 E122 D 6183701D 056 7/14/2011 2010 RIGHT OF WAY ESTIMATES CA-XS071B1061119365124 $1.90 000001000712-3562505206
2011 13 FD52 05 E123 D 6183701D 056 7/14/2011 2010 RIGHT OF WAY ESTIMATES CA-XS071B1061119365124 $4.74 000001000712-3562505206
2011 13 FD52 05 E124 D 6183701D 056 7/14/2011 2010 RIGHT OF WAY ESTIMATES CA-XS071B1061119365124 $0.01 000001000712-3562505206
2011 13 FD52 05 E111 D 6183701D 056 7/13/2011 3020 PREL ENGINEERING-UTILITIES CA-XS071B1061119365125 ($21.75) 000001000816-3562505208
2011 13 FD52 05 E121 D 6183701D 056 7/13/2011 3020 PREL ENGINEERING-UTILITIES CA-XS071B1061119365125 $10.03 000001000816-3562505208
2011 13 FD52 05 E122 D 6183701D 056 7/13/2011 3020 PREL ENGINEERING-UTILITIES CA-XS071B1061119365125 $24.68 000001000816-3562505208
2011 13 FD52 05 E123 D 6183701D 056 7/13/2011 3020 PREL ENGINEERING-UTILITIES CA-XS071B1061119365125 $25.72 000001000816-3562505208
2011 13 FD52 00 E111 D 6183701D 056 7/13/2011 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XS071B1061119475126 ($5.27) 000001000917-3562500630
2011 13 FD52 05 E124 D 6183701D 056 7/13/2011 3020 PREL ENGINEERING-UTILITIES CA-XS071B1061119365125 $0.07 000001000816-3562505208
2011 13 FD52 00 E121 D 6183701D 056 7/13/2011 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XS071B1061119475126 $6.63 000001000917-3562500630
2011 13 FD52 00 E122 D 6183701D 056 7/13/2011 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XS071B1061119475126 $17.25 000001000917-3562500630
2011 13 FD52 00 E123 D 6183701D 056 7/13/2011 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XS071B1061119475126 $21.28 000001000917-3562500630
2011 13 FD52 00 E124 D 6183701D 056 7/13/2011 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XS071B1061119475126 $0.02 000001000917-3562500630
2011 13 FD52 00 E121 D 6183701D 056 7/13/2011 1300 RDWAY PLANS REVIEW & CORRECTED CA-XS071B1061119480123 $1.48 000001000126-3562500632
2011 13 FD52 05 E121 D 6183701D 056 7/13/2011 3020 PREL ENGINEERING-UTILITIES CA-XS071B1061119355121 $9.87 000001000816-3562505208
2011 13 FD52 05 E122 D 6183701D 056 7/13/2011 3020 PREL ENGINEERING-UTILITIES CA-XS071B1061119355121 $25.42 000001000816-3562505208
2011 13 FD52 05 E123 D 6183701D 056 7/13/2011 3020 PREL ENGINEERING-UTILITIES CA-XS071B1061119355121 $20.66 000001000816-3562505208
2011 13 FD52 05 E124 D 6183701D 056 7/13/2011 3020 PREL ENGINEERING-UTILITIES CA-XS071B1061119355121 $0.04 000001000816-3562505208
2011 13 FD52 05 E111 D 6183701D 056 7/13/2011 2010 RIGHT OF WAY ESTIMATES CA-XS071B1061119310105 ($11.13) 000001000712-3562505206
2011 13 FD52 05 E121 D 6183701D 056 7/13/2011 2010 RIGHT OF WAY ESTIMATES CA-XS071B1061119310105 ($0.80) 000001000712-3562505206
2011 13 FD52 05 E122 D 6183701D 056 7/13/2011 2010 RIGHT OF WAY ESTIMATES CA-XS071B1061119310105 ($1.89) 000001000712-3562505206
2011 13 FD52 05 E123 D 6183701D 056 7/13/2011 2010 RIGHT OF WAY ESTIMATES CA-XS071B1061119310105 ($2.22) 000001000712-3562505206
2011 13 FD52 05 E111 D 6183701D 056 7/13/2011 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XS071B1061119355119 ($121.63) 000001000340-3562505204
2011 13 FD52 05 E121 D 6183701D 056 7/13/2011 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XS071B1061119355119 $150.21 000001000340-3562505204
2011 13 FD52 05 E122 D 6183701D 056 7/13/2011 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XS071B1061119355119 $365.19 000001000340-3562505204
2011 13 FD52 05 E123 D 6183701D 056 7/13/2011 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XS071B1061119355119 $181.54 000001000340-3562505204
2011 13 FD52 05 E124 D 6183701D 056 7/13/2011 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XS071B1061119355119 $0.05 000001000340-3562505204
2011 12 FD52 05 E111 D 6183701D 056 6/23/2011 3020 PREL ENGINEERING-UTILITIES CA-XR062B1061117200393 $537.34 000001000816-3562500009
2011 12 FD52 05 E121 D 6183701D 056 6/23/2011 3020 PREL ENGINEERING-UTILITIES CA-XR062B1061117200393 $30.93 000001000816-3562505208
2011 12 FD52 05 E122 D 6183701D 056 6/23/2011 3020 PREL ENGINEERING-UTILITIES CA-XR062B1061117200393 $44.22 000001000816-3562505208
2011 12 FD52 05 E123 D 6183701D 056 6/23/2011 3020 PREL ENGINEERING-UTILITIES CA-XR062B1061117200393 $34.95 000001000816-3562505208
2011 12 FD52 05 E124 D 6183701D 056 6/23/2011 3020 PREL ENGINEERING-UTILITIES CA-XR062B1061117200393 $0.09 000001000816-3562505208
2011 12 FD52 05 E111 D 6183701D 056 6/7/2011 3020 PREL ENGINEERING-UTILITIES CA-XR061B1061115800327 $613.84 000001000816-3562505208
2011 12 FD52 05 E121 D 6183701D 056 6/7/2011 3020 PREL ENGINEERING-UTILITIES CA-XR061B1061115800327 $27.35 000001000816-3562505208
2011 12 FD52 05 E122 D 6183701D 056 6/7/2011 3020 PREL ENGINEERING-UTILITIES CA-XR061B1061115800327 $71.81 000001000816-3562505208
2011 12 FD52 05 E123 D 6183701D 056 6/7/2011 3020 PREL ENGINEERING-UTILITIES CA-XR061B1061115800327 $92.43 000001000816-3562505208
2011 11 FD52 00 E111 D 6183701D 056 5/25/2011 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR052B1061114000417 $0.44 000001001026-3562500636
2011 11 FD52 00 E121 D 6183701D 056 5/25/2011 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR052B1061114000417 $41.61 000001001026-3562500636
2011 11 FD52 00 E122 D 6183701D 056 5/25/2011 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR052B1061114000417 $2.11 000001001026-3562500636
2011 11 FD52 05 E121 D 6183701D 056 5/25/2011 2010 RIGHT OF WAY ESTIMATES CA-XR052B1061114000408 $25.12 000001000712-3562505206
2011 11 FD52 00 E123 D 6183701D 056 5/25/2011 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR052B1061114000417 $0.43 000001001026-3562500636
2011 11 FD52 05 E122 D 6183701D 056 5/25/2011 2010 RIGHT OF WAY ESTIMATES CA-XR052B1061114000408 $1.89 000001000712-3562505206
2011 11 FD52 05 E123 D 6183701D 056 5/25/2011 2010 RIGHT OF WAY ESTIMATES CA-XR052B1061114000408 $2.21 000001000712-3562505206
2011 11 FD52 05 E111 D 6183701D 056 5/25/2011 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR052B1061114000396 $473.67 000001000340-3562505204
2011 11 FD52 05 E121 D 6183701D 056 5/25/2011 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR052B1061114000396 $221.10 000001000340-3562505204
2011 11 FD52 05 E122 D 6183701D 056 5/25/2011 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR052B1061114000396 $81.10 000001000340-3562505204
2011 11 FD52 05 E123 D 6183701D 056 5/25/2011 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR052B1061114000396 $40.82 000001000340-3562505204
2011 11 FD52 05 E124 D 6183701D 056 5/25/2011 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR052B1061114000396 $0.18 000001000340-3562505204
2011 11 FD52 00 E111 D 6183701D 056 5/25/2011 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR052B1061114000414 $0.76 000001000917-3562500630
2011 11 FD52 00 E121 D 6183701D 056 5/25/2011 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR052B1061114000414 $30.90 000001000917-3562500630
2011 11 FD52 00 E122 D 6183701D 056 5/25/2011 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR052B1061114000414 $0.67 000001000917-3562500630
2011 11 FD52 00 E123 D 6183701D 056 5/25/2011 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR052B1061114000414 $0.70 000001000917-3562500630
2011 11 FD52 05 E111 D 6183701D 056 5/24/2011 3020 PREL ENGINEERING-UTILITIES CA-XR052B1061114000411 $1,086.73 000001000816-3562505208
2011 11 FD52 05 E121 D 6183701D 056 5/24/2011 3020 PREL ENGINEERING-UTILITIES CA-XR052B1061114000411 $170.46 000001000816-3562505208
2011 11 FD52 05 E122 D 6183701D 056 5/24/2011 3020 PREL ENGINEERING-UTILITIES CA-XR052B1061114000411 $176.83 000001000816-3562505208
2011 11 FD52 05 E123 D 6183701D 056 5/24/2011 3020 PREL ENGINEERING-UTILITIES CA-XR052B1061114000411 $242.68 000001000816-3562505208
2011 11 FD52 05 E124 D 6183701D 056 5/24/2011 3020 PREL ENGINEERING-UTILITIES CA-XR052B1061114000411 $0.70 000001000816-3562505208
2011 11 FD52 00 E121 D 6183701D 056 5/23/2011 1300 RDWAY PLANS REVIEW & CORRECTED CA-XR052B1061114000391 $41.19 000001000126-3562500632
2011 11 FD52 00 E111 D 6183701D 056 5/17/2011 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR051B1061112900300 $78.44 000001001026-3562500636
2011 11 FD52 00 E122 D 6183701D 056 5/17/2011 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR051B1061112900300 $10.35 000001001026-3562500636
2011 11 FD52 00 E123 D 6183701D 056 5/17/2011 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR051B1061112900300 $2.10 000001001026-3562500636
2011 11 FD52 05 E122 D 6183701D 056 5/17/2011 2010 RIGHT OF WAY ESTIMATES CA-XR051B1061112900294 ($1.89) 000001000712-3562505206
2011 11 FD52 05 E123 D 6183701D 056 5/17/2011 2010 RIGHT OF WAY ESTIMATES CA-XR051B1061112900294 ($2.21) 000001000712-3562505206
2011 11 FD52 05 E111 D 6183701D 056 5/17/2011 3020 PREL ENGINEERING-UTILITIES CA-XR051B1061112900296 $139.11 000001000816-3562505208
2011 11 FD52 05 E122 D 6183701D 056 5/17/2011 3020 PREL ENGINEERING-UTILITIES CA-XR051B1061112900296 $17.91 000001000816-3562505208
2011 11 FD52 05 E123 D 6183701D 056 5/17/2011 3020 PREL ENGINEERING-UTILITIES CA-XR051B1061112900296 $36.39 000001000816-3562505208
2011 11 FD52 05 E124 D 6183701D 056 5/17/2011 3020 PREL ENGINEERING-UTILITIES CA-XR051B1061112900296 $0.01 000001000816-3562505208
2011 11 FD52 05 E111 D 6183701D 056 5/9/2011 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR051B1061112900286 $2,281.76 000001000340-3562505204
2011 11 FD52 05 E122 D 6183701D 056 5/9/2011 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR051B1061112900286 $85.52 000001000340-3562505204
2011 11 FD52 05 E123 D 6183701D 056 5/9/2011 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR051B1061112900286 $42.03 000001000340-3562505204
2011 11 FD52 05 E124 D 6183701D 056 5/9/2011 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR051B1061112900286 ($0.01) 000001000340-3562505204
2011 11 FD52 00 E111 D 6183701D 056 5/9/2011 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR051B1061112900298 ($0.76) 000001000917-3562500630
2011 11 FD52 00 E122 D 6183701D 056 5/9/2011 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR051B1061112900298 ($0.67) 000001000917-3562500630
2011 11 FD52 00 E123 D 6183701D 056 5/9/2011 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR051B1061112900298 ($0.70) 000001000917-3562500630
2011 10 FD52 00 E111 D 6183701D 056 4/28/2011 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR042B1061111400337 $60.40 000001001026-3562500636
2011 10 FD52 00 E122 D 6183701D 056 4/28/2011 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR042B1061111400337 $9.97 000001001026-3562500636
2011 10 FD52 00 E123 D 6183701D 056 4/28/2011 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR042B1061111400337 $2.03 000001001026-3562500636
2011 10 FD52 05 E111 D 6183701D 056 4/28/2011 3020 PREL ENGINEERING-UTILITIES CA-XR042B1061111400333 $742.75 000001000816-3562505208
2011 10 FD52 05 E122 D 6183701D 056 4/28/2011 3020 PREL ENGINEERING-UTILITIES CA-XR042B1061111400333 $119.39 000001000816-3562505208
2011 10 FD52 05 E123 D 6183701D 056 4/28/2011 3020 PREL ENGINEERING-UTILITIES CA-XR042B1061111400333 $250.21 000001000816-3562505208
2011 10 FD52 05 E124 D 6183701D 056 4/28/2011 3020 PREL ENGINEERING-UTILITIES CA-XR042B1061111400333 $0.67 000001000816-3562505208
2011 10 FD52 05 E111 D 6183701D 056 4/28/2011 2010 RIGHT OF WAY ESTIMATES CA-XR042B1061111400331 $244.96 000001000712-3562505206
2011 10 FD52 05 E122 D 6183701D 056 4/28/2011 2010 RIGHT OF WAY ESTIMATES CA-XR042B1061111400331 $39.70 000001000712-3562505206
2011 10 FD52 05 E123 D 6183701D 056 4/28/2011 2010 RIGHT OF WAY ESTIMATES CA-XR042B1061111400331 $71.75 000001000712-3562505206
2011 10 FD52 05 E124 D 6183701D 056 4/28/2011 2010 RIGHT OF WAY ESTIMATES CA-XR042B1061111400331 $0.26 000001000712-3562505206
2011 10 FD52 00 E112 D 6183701D 056 4/28/2011 1300 RDWAY PLANS REVIEW & CORRECTED CA-XR042B1061111400321 $63.74 000001000126-3562500632
2011 10 FD52 05 E111 D 6183701D 056 4/26/2011 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR042B1061111400324 $912.05 000001000340-3562505204
2011 10 FD52 05 E122 D 6183701D 056 4/26/2011 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR042B1061111400324 $120.45 000001000340-3562505204
2011 10 FD52 05 E123 D 6183701D 056 4/26/2011 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR042B1061111400324 $66.20 000001000340-3562505204
2011 10 FD52 05 E124 D 6183701D 056 4/26/2011 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR042B1061111400324 $0.28 000001000340-3562505204
2011 10 FD52 00 E111 D 6183701D 056 4/26/2011 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR042B1061111400335 $179.27 000001000917-3562500630
2011 10 FD52 00 E122 D 6183701D 056 4/26/2011 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR042B1061111400335 $24.35 000001000917-3562500630
2011 10 FD52 00 E123 D 6183701D 056 4/26/2011 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR042B1061111400335 $31.67 000001000917-3562500630
2011 10 FD52 00 E124 D 6183701D 056 4/26/2011 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR042B1061111400335 $0.09 000001000917-3562500630
2011 10 FD52 05 E111 D 6183701D 056 4/20/2011 3020 PREL ENGINEERING-UTILITIES CA-XR041B1061110100314 $827.25 000001000816
2011 10 FD52 05 E115 D 6183701D 056 4/20/2011 3020 PREL ENGINEERING-UTILITIES CA-XR041B1061110100314 $78.29 000001000816
2011 10 FD52 05 E122 D 6183701D 056 4/20/2011 3020 PREL ENGINEERING-UTILITIES CA-XR041B1061110100314 $152.74 000001000816
2011 10 FD52 05 E123 D 6183701D 056 4/20/2011 3020 PREL ENGINEERING-UTILITIES CA-XR041B1061110100314 $258.89 000001000816
2011 10 FD52 05 E111 D 6183701D 056 4/20/2011 2010 RIGHT OF WAY ESTIMATES CA-XR041B1061110100311 $133.51 000001000712
2011 10 FD52 05 E122 D 6183701D 056 4/20/2011 2010 RIGHT OF WAY ESTIMATES CA-XR041B1061110100311 $22.67 000001000712
2011 10 FD52 05 E123 D 6183701D 056 4/20/2011 2010 RIGHT OF WAY ESTIMATES CA-XR041B1061110100311 $26.48 000001000712
2011 10 FD52 00 E111 D 6183701D 056 4/11/2011 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR041B1061110100317 $399.71 000001000917
2011 10 FD52 00 E122 D 6183701D 056 4/11/2011 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR041B1061110100317 $55.81 000001000917
2011 10 FD52 00 E123 D 6183701D 056 4/11/2011 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR041B1061110100317 $65.99 000001000917
2011 10 FD52 00 E112 D 6183701D 056 4/11/2011 1300 RDWAY PLANS REVIEW & CORRECTED CA-XR041B1061110100296 $493.97 000001000126
2011 10 FD52 00 E111 D 6183701D 056 4/11/2011 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR041B1061110100319 $452.98 000001001026
2011 10 FD52 00 E122 D 6183701D 056 4/11/2011 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR041B1061110100319 $74.78 000001001026
2011 10 FD52 00 E123 D 6183701D 056 4/11/2011 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR041B1061110100319 $15.16 000001001026
2011 10 FD52 05 E111 D 6183701D 056 4/11/2011 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR041B1061110100300 $1,773.41 000001000340
2011 10 FD52 05 E122 D 6183701D 056 4/11/2011 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR041B1061110100300 $250.94 000001000340
2011 10 FD52 05 E123 D 6183701D 056 4/11/2011 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR041B1061110100300 $124.12 000001000340
2011 8 FD52 05 E143 D 6183701D 056 2/24/2011 1550 DESIGN CONTRACTS-CONSULTANT PRC-1100152880 PON20700004958 HALL HARMON ENGINEERS INC $174,556.51 Add fifth lane for left turns from Timber Ridge Drive to River Road.
2011 4 FD52 00 E154 D 6183701D 056 10/25/2010 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-X011150991029500541P $228.78 REG PAYROLL FOR PERIOD ENDING 10/15/10 *** LABOR DIST-LOC 00-CRW 061
2011 4 FD52 05 E154 D 6183701D 056 10/25/2010 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-X011150991029503724P $552.98 REG PAYROLL FOR PERIOD ENDING 10/15/10 *** LABOR DIST-LOC 05-CRW 204
2011 4 FD52 05 E154 D 6183701D 056 10/7/2010 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-X011130991028003902P $1,032.36 REG PAYROLL FOR PERIOD ENDING 09/30/10 *** LABOR DIST-LOC 05-CRW 204
2011 3 FD52 05 E143 D 6183701D 056 9/29/2010 1550 DESIGN CONTRACTS-CONSULTANT PRC-1100055854 PON20700004958 HALL HARMON ENGINEERS INC $79,151.66 Add fifth lane for left turns from Timber Ridge Drive to River Road.
2011 3 FD52 05 E154 D 6183701D 056 9/29/2010 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-X011110991027203734P $1,437.75 REG PAYROLL FOR PERIOD ENDING 09/15/10 *** LABOR DIST-LOC 05-CRW 204
2011 3 FD52 00 E154 D 6183701D 056 9/13/2010 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-X011090991025100545P $249.32 REG PAYROLL FOR PERIOD ENDING 08/31/10 *** LABOR DIST-LOC 00-CRW 061
2011 3 FD52 05 E154 D 6183701D 056 9/13/2010 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-X011090991025104259P $339.15 REG PAYROLL FOR PERIOD ENDING 08/31/10 *** LABOR DIST-LOC 05-CRW 204
2011 3 FD52 05 E154 D 6183701D 056 9/9/2010 3020 PREL ENGINEERING-UTILITIES JV2E-1100001444 TRANSPORTATION $956.62 X010350991007803565P CHANGE FUND
2011 3 FD52 05 E154 D 6183701D 056 9/9/2010 3020 PREL ENGINEERING-UTILITIES JV2E-1100001444 TRANSPORTATION $745.39 X010310991004903401P CHANGE FUND
2011 3 FD52 05 E154 D 6183701D 056 9/9/2010 3020 PREL ENGINEERING-UTILITIES JV2E-1100001444 TRANSPORTATION $458.70 X010330991006303128P CHANGE FUND
2011 2 FD52 05 E154 D 6183701D 056 8/23/2010 0640 ENV STUDIES-GEN-CONSULT CA-X011070991023203909P $968.17 REG PAYROLL FOR PERIOD ENDING 08/15/10 *** LABOR DIST-LOC 05-CRW 200
2011 2 FD52 05 E154 D 6183701D 056 8/18/2010 3020 PREL ENGINEERING-UTILITIES CA-X011050991021804135P $2,351.01 REG PAYROLL FOR PERIOD ENDING 07/31/10 *** LABOR DIST-LOC 05-CRW 208
2011 2 FD52 05 E229 D 6183701D 056 8/13/2010 3020 PREL ENGINEERING-UTILITIES IET-XE13A162510222017920 $7.53
2011 1 FD52 00 E154 D 6183701D 056 7/23/2010 0050 ENV STUDIES-TERRESTRIAL ECOL CA-X011030991020200467P $162.55 REG PAYROLL FOR PERIOD ENDING 07/15/10 *** LABOR DIST-LOC 00-CRW 061
2011 1 FD52 00 E154 D 6183701D 056 7/23/2010 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-X011030991020200468P $214.34 REG PAYROLL FOR PERIOD ENDING 07/15/10 *** LABOR DIST-LOC 00-CRW 061
2011 1 FD52 00 E154 D 6183701D 056 7/9/2010 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-X011010991018800458P $83.47 REG PAYROLL FOR PERIOD ENDING 06/30/10 *** LABOR DIST-LOC 00-CRW 061
2010 12 FD52 00 E154 D 6183701D 056 6/23/2010 0010 ENV STUDIES-UST/HZM CA-X010470991017200463P $96.34 REG PAYROLL FOR PERIOD ENDING 06/15/10 *** LABOR DIST-LOC 00-CRW 061
2010 12 FD52 00 E154 D 6183701D 056 6/23/2010 0020 ENV STUDIES-AIR QUALITY CA-X010470991017200464P $154.45 REG PAYROLL FOR PERIOD ENDING 06/15/10 *** LABOR DIST-LOC 00-CRW 061
2010 12 FD52 00 E154 D 6183701D 056 6/23/2010 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-X010470991017200465P $208.65 REG PAYROLL FOR PERIOD ENDING 06/15/10 *** LABOR DIST-LOC 00-CRW 061
2010 12 FD52 05 E154 D 6183701D 056 6/23/2010 0640 ENV STUDIES-GEN-CONSULT CA-X010470991017203957P $723.38 REG PAYROLL FOR PERIOD ENDING 06/15/10 *** LABOR DIST-LOC 05-CRW 200
2010 12 FD52 00 E229 D 6183701D 056 6/22/2010 0010 ENV STUDIES-UST/HZM IET-XE13A162510161034970 $49.06
2010 12 FD52 00 E154 D 6183701D 056 6/8/2010 0010 ENV STUDIES-UST/HZM CA-X010450991015500504P $180.64 REG PAYROLL FOR PERIOD ENDING 05/31/10 *** LABOR DIST-LOC 00-CRW 061
2010 12 FD52 00 E154 D 6183701D 056 6/8/2010 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-X010450991015500505P $111.28 REG PAYROLL FOR PERIOD ENDING 05/31/10 *** LABOR DIST-LOC 00-CRW 061
2010 12 FD52 05 E154 D 6183701D 056 6/8/2010 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-X010450991015504119P $502.50 REG PAYROLL FOR PERIOD ENDING 05/31/10 *** LABOR DIST-LOC 05-CRW 204
2010 11 FD52 00 E154 D 6183701D 056 5/21/2010 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-X010430991014100476P $61.19 REG PAYROLL FOR PERIOD ENDING 05/15/10 *** LABOR DIST-LOC 00-CRW 061
2010 11 FD52 00 E154 D 6183701D 056 5/21/2010 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-X010430991014100359P $412.22 REG PAYROLL FOR PERIOD ENDING 05/15/10 *** LABOR DIST-LOC 00-CRW 636
2010 11 FD52 05 E154 D 6183701D 056 5/21/2010 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-X010430991014103809P $1,162.18 REG PAYROLL FOR PERIOD ENDING 05/15/10 *** LABOR DIST-LOC 05-CRW 204
2010 10 FD52 05 E154 D 6183701D 056 4/22/2010 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-X010390991011103771P $1,105.51 REG PAYROLL FOR PERIOD ENDING 04/15/10 *** LABOR DIST-LOC 05-CRW 204
2010 10 FD52 05 E154 D 6183701D 056 4/12/2010 3020 PREL ENGINEERING-UTILITIES CA-X010370991009603836P $155.94 REG PAYROLL FOR PERIOD ENDING 03/31/10 *** LABOR DIST-LOC 05-CRW 208
2010 10 FD52 05 E229 D 6183701D 056 4/9/2010 2010 RIGHT OF WAY ESTIMATES IET-XE13A162510084033170 $6.43
2010 9 FD52 05 E255 D 6183701D 056 3/23/2010 1210 PUBLIC HEARINGS, ACTION PLAN PRC-1000168875 COURIER JOURNAL $1,088.99 PUBLIC MEETING
2010 9 FD52 05 E154 D 6183701D 056 3/22/2010 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-X010350991007803508P $1,058.46 REG PAYROLL FOR PERIOD ENDING 03/15/10 *** LABOR DIST-LOC 05-CRW 204
2010 9 FD52 05 E154 D 6183701D 056 3/22/2010 2010 RIGHT OF WAY ESTIMATES CA-X010350991007803544P $135.14 REG PAYROLL FOR PERIOD ENDING 03/15/10 *** LABOR DIST-LOC 05-CRW 206
2010 9 FD52 05 E154 D 6183701D 056 3/22/2010 3020 PREL ENGINEERING-UTILITIES CA-X010350991007803566P $1,483.88 REG PAYROLL FOR PERIOD ENDING 03/15/10 *** LABOR DIST-LOC 05-CRW 208
2010 9 FD52 05 E154 D 6183701D 056 3/8/2010 3020 PREL ENGINEERING-UTILITIES CA-X010330991006303130P $2,170.62 REG PAYROLL FOR PERIOD ENDING 02/28/10 *** LABOR DIST-LOC 05-CRW 208
2010 8 FD52 05 E229 D 6183701D 056 2/26/2010 1330 CONSULT SPV-RDWAY PLANS-FINAL IET-XE13A162510056003640 $27.85
2010 8 FD52 05 E229 D 6183701D 056 2/26/2010 3020 PREL ENGINEERING-UTILITIES IET-XE13A162510056013250 $36.73
2010 8 FD52 05 E229 D 6183701D 056 2/26/2010 1330 CONSULT SPV-RDWAY PLANS-FINAL IET-XE13A162510056031000 $30.10
2010 8 FD52 00 E154 D 6183701D 056 2/19/2010 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-X010310991004900333P $409.67 REG PAYROLL FOR PERIOD ENDING 02/15/10 *** LABOR DIST-LOC 00-CRW 636
2010 8 FD52 05 E154 D 6183701D 056 2/19/2010 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-X010310991004903356P $2,599.70 REG PAYROLL FOR PERIOD ENDING 02/15/10 *** LABOR DIST-LOC 05-CRW 204
2010 8 FD52 05 E154 D 6183701D 056 2/19/2010 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-X010310991004903365P $355.41 REG PAYROLL FOR PERIOD ENDING 02/15/10 *** LABOR DIST-LOC 05-CRW 204
2010 8 FD52 05 E154 D 6183701D 056 2/19/2010 3020 PREL ENGINEERING-UTILITIES CA-X010310991004903405P $2,312.00 REG PAYROLL FOR PERIOD ENDING 02/15/10 *** LABOR DIST-LOC 05-CRW 208
2010 8 FD52 05 E143 D 6183701D 056 2/12/2010 1550 DESIGN CONTRACTS-CONSULTANT PRC-1000143780 PON20700004958 HALL HARMON ENGINEERS INC $34,911.30 Add fifth lane for left turns from Timber Ridge Drive to River Road.
2010 8 FD52 05 E154 D 6183701D 056 2/8/2010 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-X010290991003503681P $3,114.76 REG PAYROLL FOR PERIOD ENDING 01/31/10 *** LABOR DIST-LOC 05-CRW 204
2010 7 FD52 05 E154 D 6183701D 056 1/26/2010 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-X010270991002103413P $2,683.09 REG PAYROLL FOR PERIOD ENDING 01/15/10 *** LABOR DIST-LOC 05-CRW 204
2010 7 FD52 05 E154 D 6183701D 056 1/8/2010 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-X010250991000703096P $909.30 REG PAYROLL FOR PERIOD ENDING 12/31/09 *** LABOR DIST-LOC 05-CRW 204
2010 6 FD52 05 E229 D 6183701D 056 12/28/2009 1330 CONSULT SPV-RDWAY PLANS-FINAL IET-XE13A162509359003510 $15.23
2010 6 FD52 05 E154 D 6183701D 056 12/17/2009 1210 PUBLIC HEARINGS, ACTION PLAN CA-X010230990935003541P $146.18 REG PAYROLL FOR PERIOD ENDING 12/15/09 *** LABOR DIST-LOC 05-CRW 200
2010 6 FD52 05 E154 D 6183701D 056 12/17/2009 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-X010230990935003463P $2,192.30 REG PAYROLL FOR PERIOD ENDING 12/15/09 *** LABOR DIST-LOC 05-CRW 204
2010 6 FD52 05 E154 D 6183701D 056 12/17/2009 1210 PUBLIC HEARINGS, ACTION PLAN CA-X010230990935003490P $286.80 REG PAYROLL FOR PERIOD ENDING 12/15/09 *** LABOR DIST-LOC 05-CRW 206
2010 6 FD52 05 E154 D 6183701D 056 12/17/2009 3020 PREL ENGINEERING-UTILITIES CA-X010230990935003518P $106.33 REG PAYROLL FOR PERIOD ENDING 12/15/09 *** LABOR DIST-LOC 05-CRW 208
2010 6 FD52 05 E154 D 6183701D 056 12/7/2009 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-X010210990933803265P $2,259.62 REG PAYROLL FOR PERIOD ENDING 11/30/09 *** LABOR DIST-LOC 05-CRW 204
2010 6 FD52 05 E229 D 6183701D 056 12/1/2009 2010 RIGHT OF WAY ESTIMATES IET-XE13A162509329023800 $23.25
2010 5 FD52 05 E154 D 6183701D 056 11/23/2009 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-X010190990932303448P $2,773.91 REG PAYROLL FOR PERIOD ENDING 11/15/09 *** LABOR DIST-LOC 05-CRW 204
2010 5 FD52 05 E154 D 6183701D 056 11/23/2009 2010 RIGHT OF WAY ESTIMATES CA-X010190990932303486P $2,032.75 REG PAYROLL FOR PERIOD ENDING 11/15/09 *** LABOR DIST-LOC 05-CRW 206
2010 5 FD52 05 E154 D 6183701D 056 11/23/2009 3020 PREL ENGINEERING-UTILITIES CA-X010190990932303502P $601.54 REG PAYROLL FOR PERIOD ENDING 11/15/09 *** LABOR DIST-LOC 05-CRW 208
2010 5 FD52 00 E154 D 6183701D 056 11/6/2009 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-X010170990930900355P $481.81 REG PAYROLL FOR PERIOD ENDING 10/31/09 *** LABOR DIST-LOC 00-CRW 636
2010 5 FD52 05 E154 D 6183701D 056 11/6/2009 2010 RIGHT OF WAY ESTIMATES CA-X010170990930903588P $1,049.39 REG PAYROLL FOR PERIOD ENDING 10/31/09 *** LABOR DIST-LOC 05-CRW 206
2010 5 FD52 05 E154 D 6183701D 056 11/6/2009 3020 PREL ENGINEERING-UTILITIES CA-X010170990930903603P $60.76 REG PAYROLL FOR PERIOD ENDING 10/31/09 *** LABOR DIST-LOC 05-CRW 208
2009 3 FD52 05 E154 D 6183701D 056 9/23/2008 0640 ENV STUDIES-GEN-CONSULT CA-X009110990826703955P $356.85 REG PAYROLL FOR PERIOD ENDING 09/15/08 *** LABOR DIST-LOC 05-CRW 200
2008 12 FD52 05 E143 D 6183701D 056 6/18/2008 1550 DESIGN CONTRACTS-CONSULTANT PRC-0800568084 PON20700004958 HALL HARMON ENGINEERS INC $17,455.65 Add fifth lane for left turns from Timber Ridge Drive to River Road.
2008 10 FD52 05 E143 D 6183701D 056 4/29/2008 1550 DESIGN CONTRACTS-CONSULTANT PRC-0800520167 PON20700004958 HALL HARMON ENGINEERS INC $23,274.20 Add fifth lane for left turns from Timber Ridge Drive to River Road.
2008 8 FD52 05 E143 D 6183701D 056 2/22/2008 1550 DESIGN CONTRACTS-CONSULTANT PRC-0800471941 PON20700004958 HALL HARMON ENGINEERS INC $87,278.25 Add fifth lane for left turns from Timber Ridge Drive to River Road.
2008 7 FD52 00 E154 D 6183701D 056 1/24/2008 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-X008270990802200393P $355.92 REG PAYROLL FOR PERIOD ENDING 01/15/08 *** LABOR DIST-LOC 00-CRW 636
2008 6 FD52 05 E154 D 6183701D 056 12/18/2007 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-X008230990735103978P $742.10 REG PAYROLL FOR PERIOD ENDING 12/15/07 *** LABOR DIST-LOC 05-CRW 610
2008 6 FD52 05 E154 D 6183701D 056 12/7/2007 0640 ENV STUDIES-GEN-CONSULT CA-X008210990734004060P $389.32 REG PAYROLL FOR PERIOD ENDING 11/30/07 *** LABOR DIST-LOC 05-CRW 610
2008 4 FD52 05 E154 D 6183701D 056 10/30/2007 0640 ENV STUDIES-GEN-CONSULT CA-X008150990729604526P $202.62 REG PAYROLL FOR PERIOD ENDING 10/15/07 *** LABOR DIST-LOC 05-CRW 610
2008 4 FD52 05 E154 D 6183701D 056 10/26/2007 0640 ENV STUDIES-GEN-CONSULT CA-X008130990729604510P $709.21 REG PAYROLL FOR PERIOD ENDING 09/30/07 *** LABOR DIST-LOC 05-CRW 610
2008 2 FD52 05 E154 D 6183701D 056 8/23/2007 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-X008070990723304898P $1,074.51 REG PAYROLL FOR PERIOD ENDING 08/15/07 *** LABOR DIST-LOC 05-CRW 610
2007 12 FD52 00 E154 D 6183701D 056 6/12/2007 0310 PROJECT DEVELOPMENT JV2E-0700012838 $6,745.30 Move charges to program number 6183701D
2007 8 FD52 05 E154 D 6183701D 056 2/1/2007 1330 CONSULT SPV-RDWAY PLANS-FINAL JV2E-0700006602 TRANSPORTATION $935.17 REF # 37237-37248 TALA QUINIO
2007 5 FD52 05 E154 D 6183701D 056 11/20/2006 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-X007050990631904772P $903.76 LABOR DIST-LOC 05-CRW 610
2007 3 FD52 00 E143 D 6183701D 056 9/8/2006 1550 DESIGN CONTRACTS-CONSULTANT PRC-0600044095 PON2M-04498977-1 WOOLPERT $12,669.24