The Commonwealth pays employees on a semi-monthly basis with a scheduled pay day on the 15th and 30th of each month. The two monthly pay periods are from the 1st to the 15th of the month and the 16th through the last day of the month. Pay check distribution is delayed by one pay period to allow for system processing. For example work performed during the 1st to the 15th day of the month is paid to the employee on the 30th of the month. Accordingly the cost accounting charges for labor costs posting in eMARS to operating accounts and highway projects are also delayed by approximately one pay period.
A good rule of measure is that the cost accounting charges for the pay period ending on the 15th of the month will post to eMARS by the 25th and those for the pay period ending on the last day of the month will post to eMARS by the 10th of the following month.

x close panel
Detailed Project Expenditure Report
Total E-MARS Expenditures for 1609101D = $326,182.74
Click here for Labor Costs Information
Year Month PBU Charge District Object Phase Program Code County Date ACT Activity Name Trans ID Reference # Vendor Name Expenditure Line Description
2024 10 FD52 05 E229 D 1609101D 093 4/17/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF IET-XE13A162524101002570 $5.55
2024 10 FD52 05 E111 D 1609101D 093 4/11/2024 0640 ENV STUDIES-GEN-CONSULT CA-XR041O1062410001634 $492.86 000001086407-3562505200
2024 10 FD52 05 E111 D 1609101D 093 4/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001634 $164.28 000001086407-3562505200
2024 10 FD52 05 E121 D 1609101D 093 4/11/2024 0640 ENV STUDIES-GEN-CONSULT CA-XR041O1062410001634 $33.57 000001086407-3562505200
2024 10 FD52 05 E121 D 1609101D 093 4/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001634 $11.19 000001086407-3562505200
2024 10 FD52 05 E122 D 1609101D 093 4/11/2024 0640 ENV STUDIES-GEN-CONSULT CA-XR041O1062410001634 $326.10 000001086407-3562505200
2024 10 FD52 05 E122 D 1609101D 093 4/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001634 $108.70 000001086407-3562505200
2024 10 FD52 05 E123 D 1609101D 093 4/11/2024 0640 ENV STUDIES-GEN-CONSULT CA-XR041O1062410001634 $123.24 000001086407-3562505200
2024 10 FD52 05 E123 D 1609101D 093 4/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001634 $40.72 000001086407-3562505200
2024 10 FD52 00 E122 D 1609101D 093 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001633 $14.94 000001086172-3562500636
2024 10 FD52 05 E111 D 1609101D 093 4/10/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041O1062410001633 $3,299.10 000001086187-3562505204
2024 10 FD52 05 E111 D 1609101D 093 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001633 $1,238.27 000001086187-3562505204
2024 10 FD52 05 E115 D 1609101D 093 4/10/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041O1062410001633 $20.90 000001086187-3562505204
2024 10 FD52 05 E121 D 1609101D 093 4/10/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041O1062410001633 $247.26 000001086187-3562505204
2024 10 FD52 05 E121 D 1609101D 093 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001633 $92.51 000001086187-3562505204
2024 10 FD52 05 E122 D 1609101D 093 4/10/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041O1062410001633 $2,196.84 000001086187-3562505204
2024 10 FD52 05 E122 D 1609101D 093 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001633 $819.37 000001086187-3562505204
2024 10 FD52 05 E123 D 1609101D 093 4/10/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041O1062410001633 $329.43 000001086187-3562505204
2024 10 FD52 00 E123 D 1609101D 093 4/10/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041O1062410001633 $11.87 000001086172-3562500636
2024 10 FD52 05 E123 D 1609101D 093 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001633 $112.63 000001086187-3562505204
2024 10 FD52 00 E123 D 1609101D 093 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001633 $2.51 000001086172-3562500636
2024 10 FD52 00 E111 D 1609101D 093 4/10/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041O1062410001632 $105.01 000001086172-3562500636
2024 10 FD52 00 E111 D 1609101D 093 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001632 $22.58 000001086172-3562500636
2024 10 FD52 00 E121 D 1609101D 093 4/10/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041O1062410001632 $7.87 000001086172-3562500636
2024 10 FD52 00 E121 D 1609101D 093 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001632 $1.69 000001086172-3562500636
2024 10 FD52 00 E122 D 1609101D 093 4/10/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041O1062410001632 $69.51 000001086172-3562500636
2024 9 FD52 05 E111 D 1609101D 093 3/11/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031O1062406810081 $656.37 000001086187-3562505204
2024 9 FD52 05 E111 D 1609101D 093 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810081 $98.19 000001086187-3562505204
2024 9 FD52 05 E121 D 1609101D 093 3/11/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031O1062406810081 $48.02 000001086187-3562505204
2024 9 FD52 05 E121 D 1609101D 093 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810081 $7.18 000001086187-3562505204
2024 9 FD52 05 E122 D 1609101D 093 3/11/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031O1062406810081 $434.29 000001086187-3562505204
2024 9 FD52 05 E122 D 1609101D 093 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810081 $64.98 000001086187-3562505204
2024 9 FD52 05 E123 D 1609101D 093 3/11/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031O1062406810081 $89.84 000001086187-3562505204
2024 9 FD52 05 E123 D 1609101D 093 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810081 $13.29 000001086187-3562505204
2024 8 FD52 05 E111 D 1609101D 093 2/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022O1062405408906 $1,051.39 000001086187-3562505204
2024 8 FD52 05 E111 D 1609101D 093 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408906 $69.11 000001086187-3562505204
2024 8 FD52 05 E121 D 1609101D 093 2/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022O1062405408906 $78.31 000001086187-3562505204
2024 8 FD52 05 E121 D 1609101D 093 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408906 $5.13 000001086187-3562505204
2024 8 FD52 05 E122 D 1609101D 093 2/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022O1062405408906 $695.66 000001086187-3562505204
2024 8 FD52 05 E122 D 1609101D 093 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408906 $45.73 000001086187-3562505204
2024 8 FD52 05 E123 D 1609101D 093 2/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022O1062405408906 $125.38 000001086187-3562505204
2024 8 FD52 05 E123 D 1609101D 093 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408906 $8.90 000001086187-3562505204
2024 8 FD52 05 E124 D 1609101D 093 2/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022O1062405408906 $0.30 000001086187-3562505204
2024 8 FD52 05 E124 D 1609101D 093 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408906 $0.02 000001086187-3562505204
2024 8 FD52 05 E111 D 1609101D 093 2/26/2024 0640 ENV STUDIES-GEN-CONSULT CA-XR022O1062405408907 $168.01 000001086407-3562505200
2024 8 FD52 05 E111 D 1609101D 093 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408907 $16.80 000001086407-3562505200
2024 8 FD52 05 E121 D 1609101D 093 2/26/2024 0640 ENV STUDIES-GEN-CONSULT CA-XR022O1062405408907 $11.73 000001086407-3562505200
2024 8 FD52 05 E121 D 1609101D 093 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408907 $1.17 000001086407-3562505200
2024 8 FD52 05 E122 D 1609101D 093 2/26/2024 0640 ENV STUDIES-GEN-CONSULT CA-XR022O1062405408907 $111.17 000001086407-3562505200
2024 8 FD52 05 E122 D 1609101D 093 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408907 $11.12 000001086407-3562505200
2024 8 FD52 05 E123 D 1609101D 093 2/26/2024 0640 ENV STUDIES-GEN-CONSULT CA-XR022O1062405408907 $41.95 000001086407-3562505200
2024 8 FD52 05 E123 D 1609101D 093 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408907 $4.16 000001086407-3562505200
2024 8 FD52 05 E124 D 1609101D 093 2/26/2024 0640 ENV STUDIES-GEN-CONSULT CA-XR022O1062405408907 $0.05 000001086407-3562505200
2024 8 FD52 05 E124 D 1609101D 093 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408907 $0.01 000001086407-3562505200
2024 8 FD52 05 E111 D 1609101D 093 2/9/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021O1062403907672 $701.18 000001086187-3562505204
2024 8 FD52 05 E111 D 1609101D 093 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907672 $133.90 000001086187-3562505204
2024 8 FD52 05 E121 D 1609101D 093 2/9/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021O1062403907672 $51.88 000001086187-3562505204
2024 8 FD52 05 E121 D 1609101D 093 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907672 $9.80 000001086187-3562505204
2024 8 FD52 05 E122 D 1609101D 093 2/9/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021O1062403907672 $463.97 000001086187-3562505204
2024 8 FD52 05 E122 D 1609101D 093 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907672 $88.60 000001086187-3562505204
2024 8 FD52 05 E123 D 1609101D 093 2/9/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021O1062403907672 $79.15 000001086187-3562505204
2024 8 FD52 05 E123 D 1609101D 093 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907672 $18.13 000001086187-3562505204
2024 8 FD52 05 E111 D 1609101D 093 2/9/2024 0640 ENV STUDIES-GEN-CONSULT CA-XR021O1062403907673 $136.88 000001086407-3562505200
2024 8 FD52 05 E111 D 1609101D 093 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907673 $12.32 000001086407-3562505200
2024 8 FD52 05 E121 D 1609101D 093 2/9/2024 0640 ENV STUDIES-GEN-CONSULT CA-XR021O1062403907673 $9.33 000001086407-3562505200
2024 8 FD52 05 E121 D 1609101D 093 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907673 $0.84 000001086407-3562505200
2024 8 FD52 05 E122 D 1609101D 093 2/9/2024 0640 ENV STUDIES-GEN-CONSULT CA-XR021O1062403907673 $90.59 000001086407-3562505200
2024 8 FD52 05 E122 D 1609101D 093 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907673 $8.15 000001086407-3562505200
2024 8 FD52 05 E123 D 1609101D 093 2/9/2024 0640 ENV STUDIES-GEN-CONSULT CA-XR021O1062403907673 $34.18 000001086407-3562505200
2024 8 FD52 05 E123 D 1609101D 093 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907673 $3.05 000001086407-3562505200
2024 7 FD52 05 E111 D 1609101D 093 1/24/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012O1062402306597 $208.80 000001086187-3562505204
2024 7 FD52 05 E111 D 1609101D 093 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306597 $96.19 000001086187-3562505204
2024 7 FD52 05 E121 D 1609101D 093 1/24/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012O1062402306597 $15.80 000001086187-3562505204
2024 7 FD52 05 E121 D 1609101D 093 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306597 $7.28 000001086187-3562505204
2024 7 FD52 05 E122 D 1609101D 093 1/24/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012O1062402306597 $138.19 000001086187-3562505204
2024 7 FD52 05 E122 D 1609101D 093 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306597 $63.64 000001086187-3562505204
2024 7 FD52 05 E123 D 1609101D 093 1/24/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012O1062402306597 $15.58 000001086187-3562505204
2024 7 FD52 05 E123 D 1609101D 093 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306597 $6.99 000001086187-3562505204
2024 7 FD52 05 E124 D 1609101D 093 1/24/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012O1062402306597 $0.08 000001086187-3562505204
2024 7 FD52 05 E124 D 1609101D 093 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306597 $0.03 000001086187-3562505204
2024 7 FD52 05 E111 D 1609101D 093 1/8/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011O1062400505726 $394.65 000001086187-3562505204
2024 7 FD52 05 E111 D 1609101D 093 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505726 $317.83 000001086187-3562505204
2024 7 FD52 05 E121 D 1609101D 093 1/8/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011O1062400505726 $29.20 000001086187-3562505204
2024 7 FD52 05 E121 D 1609101D 093 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505726 $23.79 000001086187-3562505204
2024 7 FD52 05 E122 D 1609101D 093 1/8/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011O1062400505726 $261.40 000001086187-3562505204
2024 7 FD52 05 E122 D 1609101D 093 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505726 $210.30 000001086187-3562505204
2024 7 FD52 05 E123 D 1609101D 093 1/8/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011O1062400505726 $44.37 000001086187-3562505204
2024 7 FD52 05 E123 D 1609101D 093 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505726 $27.74 000001086187-3562505204
2024 7 FD52 05 E111 D 1609101D 093 1/3/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121N1062334203630 $632.56 000001086187-3562505204
2024 7 FD52 05 E111 D 1609101D 093 1/3/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203630 $333.66 000001086187-3562505204
2024 7 FD52 05 E121 D 1609101D 093 1/3/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121N1062334203630 $46.27 000001086187-3562505204
2024 7 FD52 05 E121 D 1609101D 093 1/3/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203630 $24.42 000001086187-3562505204
2024 7 FD52 05 E122 D 1609101D 093 1/3/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121N1062334203630 $418.50 000001086187-3562505204
2024 7 FD52 05 E122 D 1609101D 093 1/3/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203630 $220.78 000001086187-3562505204
2024 7 FD52 05 E123 D 1609101D 093 1/3/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121N1062334203630 $75.39 000001086187-3562505204
2024 7 FD52 05 E123 D 1609101D 093 1/3/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203630 $39.11 000001086187-3562505204
2024 6 FD52 05 E123 D 1609101D 093 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504624 $1.61 000001086407-3562505200
2024 6 FD52 05 E124 D 1609101D 093 12/22/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR122N1062335504624 $0.02 000001086407-3562505200
2024 6 FD52 05 E111 D 1609101D 093 12/22/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR122N1062335504624 $49.78 000001086407-3562505200
2024 6 FD52 00 E111 D 1609101D 093 12/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122N1062335504622 $147.97 000001086172-3562500630
2024 6 FD52 00 E111 D 1609101D 093 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504622 $32.61 000001086172-3562500636
2024 6 FD52 00 E121 D 1609101D 093 12/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122N1062335504622 $11.16 000001086172-3562500630
2024 6 FD52 00 E121 D 1609101D 093 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504622 $2.47 000001086172-3562500630
2024 6 FD52 00 E122 D 1609101D 093 12/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122N1062335504622 $97.92 000001086172-3562500636
2024 6 FD52 00 E122 D 1609101D 093 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504622 $21.57 000001086172-3562500636
2024 6 FD52 00 E123 D 1609101D 093 12/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122N1062335504622 $15.04 000001086172-3562500630
2024 6 FD52 00 E123 D 1609101D 093 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504622 $3.22 000001086172-3562500636
2024 6 FD52 00 E124 D 1609101D 093 12/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122N1062335504622 $0.04 000001086172-3562500630
2024 6 FD52 05 E111 D 1609101D 093 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504624 $6.97 000001086407-3562505200
2024 6 FD52 05 E121 D 1609101D 093 12/22/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR122N1062335504624 $3.49 000001086407-3562505200
2024 6 FD52 05 E111 D 1609101D 093 12/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122N1062335504622 $877.81 000001086187-3562505204
2024 6 FD52 05 E111 D 1609101D 093 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504622 $175.59 000001086187-3562505204
2024 6 FD52 05 E121 D 1609101D 093 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504624 $0.48 000001086407-3562505200
2024 6 FD52 05 E121 D 1609101D 093 12/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122N1062335504622 $65.54 000001086187-3562505204
2024 6 FD52 05 E121 D 1609101D 093 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504622 $13.06 000001086187-3562505204
2024 6 FD52 05 E122 D 1609101D 093 12/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122N1062335504622 $580.77 000001086187-3562505204
2024 6 FD52 05 E122 D 1609101D 093 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504622 $116.20 000001086187-3562505204
2024 6 FD52 05 E123 D 1609101D 093 12/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122N1062335504622 $86.16 000001086187-3562505204
2024 6 FD52 05 E123 D 1609101D 093 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504622 $18.74 000001086187-3562505204
2024 6 FD52 05 E124 D 1609101D 093 12/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122N1062335504622 $0.26 000001086187-3562505204
2024 6 FD52 05 E124 D 1609101D 093 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504622 $0.05 000001086187-3562505204
2024 6 FD52 05 E122 D 1609101D 093 12/22/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR122N1062335504624 $32.97 000001086407-3562505200
2024 6 FD52 05 E122 D 1609101D 093 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504624 $4.61 000001086407-3562505200
2024 6 FD52 05 E123 D 1609101D 093 12/22/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR122N1062335504624 $11.65 000001086407-3562505200
2024 5 FD52 05 E111 D 1609101D 093 11/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112N1062332502526 $119.42 000001086187-3562505204
2024 5 FD52 05 E111 D 1609101D 093 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502526 $29.13 000001086187-3562505204
2024 5 FD52 05 E121 D 1609101D 093 11/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112N1062332502526 $8.83 000001086187-3562505204
2024 5 FD52 05 E121 D 1609101D 093 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502526 $2.16 000001086187-3562505204
2024 5 FD52 05 E122 D 1609101D 093 11/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112N1062332502526 $78.96 000001086187-3562505204
2024 5 FD52 05 E122 D 1609101D 093 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502526 $19.28 000001086187-3562505204
2024 5 FD52 05 E123 D 1609101D 093 11/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112N1062332502526 $14.18 000001086187-3562505204
2024 5 FD52 05 E123 D 1609101D 093 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502526 $3.42 000001086187-3562505204
2024 5 FD52 05 E124 D 1609101D 093 11/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112N1062332502526 $0.03 000001086187-3562505204
2024 5 FD52 05 E111 D 1609101D 093 11/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111N1062331201489 $113.22 000001086187-3562505204
2024 5 FD52 05 E121 D 1609101D 093 11/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111N1062331201489 $8.66 000001086187-3562505204
2024 5 FD52 05 E122 D 1609101D 093 11/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111N1062331201489 $74.92 000001086187-3562505204
2024 5 FD52 05 E123 D 1609101D 093 11/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111N1062331201489 $4.64 000001086187-3562505204
2024 4 FD52 05 E143 D 1609101D 093 10/18/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400073957 PON22300003619 PRIME AE Group, Inc. $68,134.64 Oldham Co. 5-8852
2024 3 FD52 05 E111 D 1609101D 093 9/29/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR092N1062327208427 $66.52 000001086407-3562505200
2024 3 FD52 05 E111 D 1609101D 093 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208427 $21.92 000001086407-3562505200
2024 3 FD52 05 E121 D 1609101D 093 9/29/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR092N1062327208427 $4.65 000001086407-3562505200
2024 3 FD52 05 E121 D 1609101D 093 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208427 $1.54 000001086407-3562505200
2024 3 FD52 05 E111 D 1609101D 093 9/29/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062327208425 $119.37 000001086187-3562505204
2024 3 FD52 05 E111 D 1609101D 093 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208425 $18.14 000001086187-3562505204
2024 3 FD52 05 E121 D 1609101D 093 9/29/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062327208425 $8.83 000001086187-3562505204
2024 3 FD52 05 E121 D 1609101D 093 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208425 $1.33 000001086187-3562505204
2024 3 FD52 05 E122 D 1609101D 093 9/29/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062327208425 $78.96 000001086187-3562505204
2024 3 FD52 05 E122 D 1609101D 093 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208425 $12.00 000001086187-3562505204
2024 3 FD52 05 E122 D 1609101D 093 9/29/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR092N1062327208427 $43.95 000001086407-3562505200
2024 3 FD52 05 E123 D 1609101D 093 9/29/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062327208425 $14.17 000001086187-3562505204
2024 3 FD52 05 E123 D 1609101D 093 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208425 $2.12 000001086187-3562505204
2024 3 FD52 05 E124 D 1609101D 093 9/29/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062327208425 $0.03 000001086187-3562505204
2024 3 FD52 05 E122 D 1609101D 093 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208427 $14.50 000001086407-3562505200
2024 3 FD52 05 E123 D 1609101D 093 9/29/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR092N1062327208427 $15.54 000001086407-3562505200
2024 3 FD52 05 E123 D 1609101D 093 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208427 $5.09 000001086407-3562505200
2024 3 FD52 05 E124 D 1609101D 093 9/29/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR092N1062327208427 $0.02 000001086407-3562505200
2024 3 FD52 05 E111 D 1609101D 093 9/28/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR092N1062326507076 ($66.52) 000001086407-3562505200
2024 3 FD52 05 E111 D 1609101D 093 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507076 ($21.92) 000001086407-3562505200
2024 3 FD52 05 E121 D 1609101D 093 9/28/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR092N1062326507076 ($4.65) 000001086407-3562505200
2024 3 FD52 05 E121 D 1609101D 093 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507076 ($1.54) 000001086407-3562505200
2024 3 FD52 05 E111 D 1609101D 093 9/28/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062326507074 ($119.37) 000001086187-3562505204
2024 3 FD52 05 E111 D 1609101D 093 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507074 ($18.14) 000001086187-3562505204
2024 3 FD52 05 E121 D 1609101D 093 9/28/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062326507074 ($8.83) 000001086187-3562505204
2024 3 FD52 05 E121 D 1609101D 093 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507074 ($1.33) 000001086187-3562505204
2024 3 FD52 05 E122 D 1609101D 093 9/28/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062326507074 ($78.96) 000001086187-3562505204
2024 3 FD52 05 E122 D 1609101D 093 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507074 ($12.00) 000001086187-3562505204
2024 3 FD52 05 E122 D 1609101D 093 9/28/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR092N1062326507076 ($43.95) 000001086407-3562505200
2024 3 FD52 05 E123 D 1609101D 093 9/28/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062326507074 ($14.17) 000001086187-3562505204
2024 3 FD52 05 E123 D 1609101D 093 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507074 ($2.12) 000001086187-3562505204
2024 3 FD52 05 E124 D 1609101D 093 9/28/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062326507074 ($0.03) 000001086187-3562505204
2024 3 FD52 05 E122 D 1609101D 093 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507076 ($14.50) 000001086407-3562505200
2024 3 FD52 05 E123 D 1609101D 093 9/28/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR092N1062326507076 ($15.54) 000001086407-3562505200
2024 3 FD52 05 E123 D 1609101D 093 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507076 ($5.09) 000001086407-3562505200
2024 3 FD52 05 E124 D 1609101D 093 9/28/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR092N1062326507076 ($0.02) 000001086407-3562505200
2024 3 FD52 05 E111 D 1609101D 093 9/25/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR092N1062326507076 $66.52 000001086407-3562505200
2024 3 FD52 05 E111 D 1609101D 093 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507076 $21.92 000001086407-3562505200
2024 3 FD52 05 E121 D 1609101D 093 9/25/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR092N1062326507076 $4.65 000001086407-3562505200
2024 3 FD52 05 E121 D 1609101D 093 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507076 $1.54 000001086407-3562505200
2024 3 FD52 05 E111 D 1609101D 093 9/25/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062326507074 $119.37 000001086187-3562505204
2024 3 FD52 05 E111 D 1609101D 093 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507074 $18.14 000001086187-3562505204
2024 3 FD52 05 E121 D 1609101D 093 9/25/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062326507074 $8.83 000001086187-3562505204
2024 3 FD52 05 E121 D 1609101D 093 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507074 $1.33 000001086187-3562505204
2024 3 FD52 05 E122 D 1609101D 093 9/25/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062326507074 $78.96 000001086187-3562505204
2024 3 FD52 05 E122 D 1609101D 093 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507074 $12.00 000001086187-3562505204
2024 3 FD52 05 E122 D 1609101D 093 9/25/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR092N1062326507076 $43.95 000001086407-3562505200
2024 3 FD52 05 E123 D 1609101D 093 9/25/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062326507074 $14.17 000001086187-3562505204
2024 3 FD52 05 E123 D 1609101D 093 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507074 $2.12 000001086187-3562505204
2024 3 FD52 05 E124 D 1609101D 093 9/25/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062326507074 $0.03 000001086187-3562505204
2024 3 FD52 05 E122 D 1609101D 093 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507076 $14.50 000001086407-3562505200
2024 3 FD52 05 E123 D 1609101D 093 9/25/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR092N1062326507076 $15.54 000001086407-3562505200
2024 3 FD52 05 E123 D 1609101D 093 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507076 $5.09 000001086407-3562505200
2024 3 FD52 05 E124 D 1609101D 093 9/25/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR092N1062326507076 $0.02 000001086407-3562505200
2024 3 FD52 05 E111 D 1609101D 093 9/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091N1062325106104 $50.32 000001086187-3562505204
2024 3 FD52 05 E111 D 1609101D 093 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106104 $5.53 000001086187-3562505204
2024 3 FD52 05 E121 D 1609101D 093 9/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091N1062325106104 $3.85 000001086187-3562505204
2024 3 FD52 05 E121 D 1609101D 093 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106104 $0.41 000001086187-3562505204
2024 3 FD52 05 E122 D 1609101D 093 9/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091N1062325106104 $33.30 000001086187-3562505204
2024 3 FD52 05 E122 D 1609101D 093 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106104 $3.65 000001086187-3562505204
2024 3 FD52 05 E123 D 1609101D 093 9/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091N1062325106104 $2.07 000001086187-3562505204
2024 3 FD52 05 E123 D 1609101D 093 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106104 $0.22 000001086187-3562505204
2024 2 FD52 00 E122 D 1609101D 093 8/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082N1062323504954 $47.38 000001086172-3562500636
2024 2 FD52 05 E111 D 1609101D 093 8/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082N1062323504954 $679.04 000001086187-3562505204
2024 2 FD52 05 E111 D 1609101D 093 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504954 $115.56 000001086187-3562505204
2024 2 FD52 05 E121 D 1609101D 093 8/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082N1062323504954 $50.46 000001086187-3562505204
2024 2 FD52 05 E121 D 1609101D 093 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504954 $8.69 000001086187-3562505204
2024 2 FD52 00 E122 D 1609101D 093 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504954 $7.90 000001086172-3562500636
2024 2 FD52 05 E122 D 1609101D 093 8/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082N1062323504954 $449.31 000001086187-3562505204
2024 2 FD52 05 E122 D 1609101D 093 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504954 $76.47 000001086187-3562505204
2024 2 FD52 00 E111 D 1609101D 093 8/24/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR082N1062323504957 $1,620.54 000001086656-3562500061
2024 2 FD52 05 E123 D 1609101D 093 8/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082N1062323504954 $74.28 000001086187-3562505204
2024 2 FD52 00 E111 D 1609101D 093 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504957 $71.77 000001086656-3562500061
2024 2 FD52 05 E123 D 1609101D 093 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504954 $9.50 000001086187-3562505204
2024 2 FD52 00 E121 D 1609101D 093 8/24/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR082N1062323504957 $117.27 000001086656-3562500061
2024 2 FD52 05 E124 D 1609101D 093 8/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082N1062323504954 $0.17 000001086187-3562505204
2024 2 FD52 00 E121 D 1609101D 093 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504957 $5.19 000001086656-3562500061
2024 2 FD52 05 E124 D 1609101D 093 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504954 $0.05 000001086187-3562505204
2024 2 FD52 00 E122 D 1609101D 093 8/24/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR082N1062323504957 $1,072.30 000001086656-3562500061
2024 2 FD52 00 E122 D 1609101D 093 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504957 $47.49 000001086656-3562500061
2024 2 FD52 00 E123 D 1609101D 093 8/24/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR082N1062323504957 $255.58 000001086656-3562500061
2024 2 FD52 00 E123 D 1609101D 093 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504957 $11.18 000001086656-3562500061
2024 2 FD52 00 E123 D 1609101D 093 8/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082N1062323504954 $7.02 000001086172-3562500636
2024 2 FD52 00 E124 D 1609101D 093 8/24/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR082N1062323504957 $0.59 000001086656-3562500061
2024 2 FD52 00 E124 D 1609101D 093 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504957 $0.03 000001086656-3562500061
2024 2 FD52 00 E123 D 1609101D 093 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504954 $1.16 000001086172-3562500636
2024 2 FD52 00 E124 D 1609101D 093 8/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082N1062323504954 $0.02 000001086172-3562500636
2024 2 FD52 00 E111 D 1609101D 093 8/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082N1062323504953 $71.69 000001086172-3562500636
2024 2 FD52 00 E111 D 1609101D 093 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504953 $11.93 000001086172-3562500636
2024 2 FD52 00 E121 D 1609101D 093 8/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082N1062323504953 $5.44 000001086172-3562500636
2024 2 FD52 00 E121 D 1609101D 093 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504953 $0.91 000001086172-3562500636
2024 2 FD52 00 E143 D 1609101D 093 8/9/2023 0410 TRANSPORTATION PLANNING PRC-2400019881 PON22200001014 HMB Engineers Inc $5,388.00 2F/LA F-04 5-8852.00/093
2024 2 FD52 05 E111 D 1609101D 093 8/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081N1062322003870 $468.09 000001086187-3562505204
2024 2 FD52 05 E111 D 1609101D 093 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003870 $36.75 000001086187-3562505204
2024 2 FD52 05 E121 D 1609101D 093 8/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081N1062322003870 $34.77 000001086187-3562505204
2024 2 FD52 05 E121 D 1609101D 093 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003870 $2.69 000001086187-3562505204
2024 2 FD52 05 E122 D 1609101D 093 8/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081N1062322003870 $309.74 000001086187-3562505204
2024 2 FD52 05 E122 D 1609101D 093 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003870 $24.31 000001086187-3562505204
2024 2 FD52 05 E123 D 1609101D 093 8/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081N1062322003870 $43.28 000001086187-3562505204
2024 2 FD52 05 E123 D 1609101D 093 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003870 $4.31 000001086187-3562505204
2024 1 FD52 05 E111 D 1609101D 093 7/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072N1062320202694 $45.29 000001086187-3562505218
2024 1 FD52 05 E111 D 1609101D 093 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202694 $9.05 000001086187-3562505218
2024 1 FD52 05 E121 D 1609101D 093 7/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072N1062320202694 $3.47 000001086187-3562505218
2024 1 FD52 05 E121 D 1609101D 093 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202694 $0.69 000001086187-3562505218
2024 1 FD52 05 E122 D 1609101D 093 7/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072N1062320202694 $29.97 000001086187-3562505218
2024 1 FD52 05 E122 D 1609101D 093 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202694 $5.99 000001086187-3562505218
2024 1 FD52 05 E123 D 1609101D 093 7/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072N1062320202694 $1.88 000001086187-3562505218
2024 1 FD52 05 E123 D 1609101D 093 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202694 $0.35 000001086187-3562505218
2024 1 FD52 05 E124 D 1609101D 093 7/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072N1062320202694 $0.03 000001086187-3562505218
2024 1 FD52 00 E143 D 1609101D 093 7/17/2023 0410 TRANSPORTATION PLANNING PRC-2400006806 PON22200001014 HMB Engineers Inc $20,512.00 1P/LA #F-04 5-8852/093
2024 1 FD52 00 E111 D 1609101D 093 7/11/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR071N1062319101561 $936.00 000001086656-3562500061
2024 1 FD52 00 E111 D 1609101D 093 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101561 $107.64 000001086656-3562500061
2024 1 FD52 00 E121 D 1609101D 093 7/11/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR071N1062319101561 $67.50 000001086656-3562500061
2024 1 FD52 00 E121 D 1609101D 093 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101561 $7.76 000001086656-3562500061
2024 1 FD52 00 E122 D 1609101D 093 7/11/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR071N1062319101561 $730.09 000001086656-3562500061
2024 1 FD52 00 E122 D 1609101D 093 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101561 $83.96 000001086656-3562500061
2024 1 FD52 00 E123 D 1609101D 093 7/11/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR071N1062319101561 $156.61 000001086656-3562500061
2024 1 FD52 00 E123 D 1609101D 093 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101561 $17.77 000001086656-3562500061
2024 1 FD52 05 E111 D 1609101D 093 7/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071N1062319101558 $206.57 000001086187-3562505204
2024 1 FD52 05 E111 D 1609101D 093 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101558 $36.61 000001086187-3562505204
2024 1 FD52 05 E121 D 1609101D 093 7/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071N1062319101558 $15.49 000001086187-3562505204
2024 1 FD52 05 E121 D 1609101D 093 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101558 $2.79 000001086187-3562505204
2024 1 FD52 05 E122 D 1609101D 093 7/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071N1062319101558 $161.14 000001086187-3562505218
2024 1 FD52 05 E122 D 1609101D 093 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101558 $28.56 000001086187-3562505218
2024 1 FD52 05 E123 D 1609101D 093 7/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071N1062319101558 $16.45 000001086187-3562505204
2024 1 FD52 05 E123 D 1609101D 093 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101558 $1.73 000001086187-3562505218
2023 12 FD52 05 E111 D 1609101D 093 6/26/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062N1062317400452 $605.43 000001086187-3562505218
2023 12 FD52 05 E111 D 1609101D 093 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400452 $203.61 000001086187-3562505218
2023 12 FD52 05 E121 D 1609101D 093 6/26/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062N1062317400452 $44.96 000001086187-3562505204
2023 12 FD52 05 E121 D 1609101D 093 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400452 $15.23 000001086187-3562505218
2023 12 FD52 05 E122 D 1609101D 093 6/26/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062N1062317400452 $472.30 000001086187-3562505218
2023 12 FD52 05 E122 D 1609101D 093 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400452 $158.83 000001086187-3562505204
2023 12 FD52 05 E123 D 1609101D 093 6/26/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062N1062317400452 $72.76 000001086187-3562505218
2023 12 FD52 05 E123 D 1609101D 093 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400452 $21.24 000001086187-3562505204
2023 12 FD52 05 E124 D 1609101D 093 6/26/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062N1062317400452 $0.23 000001086187-3562505218
2023 12 FD52 05 E124 D 1609101D 093 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400452 $0.07 000001086187-3562505204
2023 12 FD52 05 E111 D 1609101D 093 6/8/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061N1062315810156 $190.05 000001086187-3562505218
2023 12 FD52 05 E111 D 1609101D 093 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810156 $46.68 000001086187-3562505218
2023 12 FD52 05 E121 D 1609101D 093 6/8/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061N1062315810156 $14.53 000001086187-3562505218
2023 12 FD52 05 E121 D 1609101D 093 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810156 $3.57 000001086187-3562505218
2023 12 FD52 05 E122 D 1609101D 093 6/8/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061N1062315810156 $148.20 000001086187-3562505218
2023 12 FD52 05 E122 D 1609101D 093 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810156 $36.41 000001086187-3562505218
2023 12 FD52 05 E123 D 1609101D 093 6/8/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061N1062315810156 $10.95 000001086187-3562505218
2023 12 FD52 05 E123 D 1609101D 093 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810156 $2.50 000001086187-3562505218
2023 11 FD52 05 E111 D 1609101D 093 5/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052N1062314309063 $1,589.32 000001086187-3562505218
2023 11 FD52 05 E111 D 1609101D 093 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309063 $36.31 000001086187-3562505218
2023 11 FD52 05 E121 D 1609101D 093 5/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052N1062314309063 $121.16 000001086187-3562505218
2023 11 FD52 05 E121 D 1609101D 093 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309063 $2.78 000001086187-3562505218
2023 11 FD52 05 E122 D 1609101D 093 5/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052N1062314309063 $1,239.63 000001086187-3562505204
2023 11 FD52 05 E122 D 1609101D 093 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309063 $28.32 000001086187-3562505218
2023 11 FD52 05 E123 D 1609101D 093 5/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052N1062314309063 $102.12 000001086187-3562505218
2023 11 FD52 05 E123 D 1609101D 093 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309063 $2.36 000001086187-3562505218
2023 11 FD52 05 E124 D 1609101D 093 5/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052N1062314309063 $0.93 000001086187-3562505218
2023 11 FD52 05 E124 D 1609101D 093 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309063 $0.02 000001086187-3562505218
2023 11 FD52 05 E111 D 1609101D 093 5/9/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR051N1062312808085 $51.69 000001086407-3562505200
2023 11 FD52 05 E111 D 1609101D 093 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808085 $1.72 000001086407-3562505200
2023 11 FD52 05 E121 D 1609101D 093 5/9/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR051N1062312808085 $3.49 000001086407-3562505200
2023 11 FD52 05 E111 D 1609101D 093 5/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051N1062312808083 $1,984.39 000001086187-3562505204
2023 11 FD52 05 E121 D 1609101D 093 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808085 $0.11 000001086407-3562505200
2023 11 FD52 05 E111 D 1609101D 093 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808083 $216.99 000001086187-3562505218
2023 11 FD52 05 E122 D 1609101D 093 5/9/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR051N1062312808085 $40.32 000001086407-3562505200
2023 11 FD52 05 E121 D 1609101D 093 5/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051N1062312808083 $149.70 000001086187-3562505218
2023 11 FD52 05 E122 D 1609101D 093 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808085 $1.34 000001086407-3562505200
2023 11 FD52 05 E121 D 1609101D 093 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808083 $16.48 000001086187-3562505218
2023 11 FD52 05 E123 D 1609101D 093 5/9/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR051N1062312808085 $12.80 000001086407-3562505200
2023 11 FD52 05 E122 D 1609101D 093 5/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051N1062312808083 $1,547.83 000001086187-3562505218
2023 11 FD52 05 E123 D 1609101D 093 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808085 $0.42 000001086407-3562505200
2023 11 FD52 05 E122 D 1609101D 093 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808083 $169.25 000001086187-3562505218
2023 11 FD52 05 E123 D 1609101D 093 5/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051N1062312808083 $157.41 000001086187-3562505204
2023 11 FD52 05 E123 D 1609101D 093 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808083 $14.35 000001086187-3562505204
2023 10 FD52 00 E111 D 1609101D 093 4/24/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR042N1062311106964 $720.84 000001086656-3562500061
2023 10 FD52 00 E111 D 1609101D 093 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106964 $365.51 000001086656-3562500061
2023 10 FD52 00 E121 D 1609101D 093 4/24/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR042N1062311106964 $51.97 000001086656-3562500061
2023 10 FD52 00 E121 D 1609101D 093 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106964 $26.35 000001086656-3562500061
2023 10 FD52 00 E122 D 1609101D 093 4/24/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR042N1062311106964 $562.16 000001086656-3562500061
2023 10 FD52 00 E122 D 1609101D 093 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106964 $285.10 000001086656-3562500061
2023 10 FD52 00 E123 D 1609101D 093 4/24/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR042N1062311106964 $121.15 000001086656-3562500061
2023 10 FD52 00 E123 D 1609101D 093 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106964 $60.35 000001086656-3562500061
2023 10 FD52 00 E124 D 1609101D 093 4/24/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR042N1062311106964 $0.28 000001086656-3562500061
2023 10 FD52 00 E124 D 1609101D 093 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106964 $0.14 000001086656-3562500061
2023 10 FD52 05 E111 D 1609101D 093 4/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042N1062311106959 $1,393.63 000001086187-3562505204
2023 10 FD52 05 E111 D 1609101D 093 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106959 $727.10 000001086187-3562505218
2023 10 FD52 05 E121 D 1609101D 093 4/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042N1062311106959 $105.41 000001086187-3562505218
2023 10 FD52 05 E121 D 1609101D 093 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106959 $55.41 000001086187-3562505218
2023 10 FD52 05 E122 D 1609101D 093 4/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042N1062311106959 $1,087.07 000001086187-3562505204
2023 10 FD52 05 E122 D 1609101D 093 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106959 $567.14 000001086187-3562505218
2023 10 FD52 05 E123 D 1609101D 093 4/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042N1062311106959 $115.26 000001086187-3562505218
2023 10 FD52 05 E123 D 1609101D 093 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106959 $45.36 000001086187-3562505204
2023 10 FD52 05 E124 D 1609101D 093 4/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042N1062311106959 $0.72 000001086187-3562505218
2023 10 FD52 05 E124 D 1609101D 093 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106959 $0.43 000001086187-3562505204
2023 10 FD52 00 E111 D 1609101D 093 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605789 $6.75 000001086172-3562500636
2023 10 FD52 00 E121 D 1609101D 093 4/10/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041N1062309605789 $5.60 000001086172-3562500636
2023 10 FD52 00 E121 D 1609101D 093 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605789 $0.51 000001086172-3562500636
2023 10 FD52 00 E122 D 1609101D 093 4/10/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041N1062309605789 $58.54 000001086172-3562500636
2023 10 FD52 00 E122 D 1609101D 093 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605789 $5.27 000001086172-3562500636
2023 10 FD52 00 E123 D 1609101D 093 4/10/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041N1062309605789 $8.56 000001086172-3562500636
2023 10 FD52 00 E123 D 1609101D 093 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605789 $0.76 000001086172-3562500636
2023 10 FD52 05 E111 D 1609101D 093 4/10/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041N1062309605789 $2,104.34 000001086187-3562505218
2023 10 FD52 05 E111 D 1609101D 093 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605789 $700.31 000001086187-3562505204
2023 10 FD52 05 E121 D 1609101D 093 4/10/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041N1062309605789 $158.43 000001086187-3562505204
2023 10 FD52 05 E111 D 1609101D 093 4/10/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR041N1062309605791 $100.50 000001086407-3562505200
2023 10 FD52 05 E121 D 1609101D 093 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605789 $51.56 000001086187-3562505218
2023 10 FD52 05 E111 D 1609101D 093 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605791 $10.91 000001086407-3562505200
2023 10 FD52 05 E122 D 1609101D 093 4/10/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041N1062309605789 $1,641.39 000001086187-3562505204
2023 10 FD52 05 E121 D 1609101D 093 4/10/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR041N1062309605791 $6.79 000001086407-3562505200
2023 10 FD52 05 E122 D 1609101D 093 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605789 $546.24 000001086187-3562505218
2023 10 FD52 05 E121 D 1609101D 093 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605791 $0.73 000001086407-3562505200
2023 10 FD52 05 E123 D 1609101D 093 4/10/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041N1062309605789 $174.42 000001086187-3562505204
2023 10 FD52 05 E122 D 1609101D 093 4/10/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR041N1062309605791 $78.41 000001086407-3562505200
2023 10 FD52 05 E123 D 1609101D 093 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605789 $80.71 000001086187-3562505204
2023 10 FD52 05 E122 D 1609101D 093 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605791 $8.51 000001086407-3562505200
2023 10 FD52 05 E123 D 1609101D 093 4/10/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR041N1062309605791 $24.89 000001086407-3562505200
2023 10 FD52 05 E123 D 1609101D 093 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605791 $2.68 000001086407-3562505200
2023 10 FD52 00 E111 D 1609101D 093 4/10/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041N1062309605789 $75.05 000001086172-3562500636
2023 9 FD52 05 E121 D 1609101D 093 3/27/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032N1062308304668 $166.00 000001086187-3562505218
2023 9 FD52 05 E122 D 1609101D 121 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304687 $20.76 000001086982-3562500636
2023 9 FD52 05 E121 D 1609101D 093 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304668 $15.85 000001086187-3562505204
2023 9 FD52 05 E123 D 1609101D 121 3/27/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032N1062308304687 $18.70 000001086982-3562500636
2023 9 FD52 05 E122 D 1609101D 093 3/27/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032N1062308304668 $1,711.90 000001086187-3562505204
2023 9 FD52 05 E123 D 1609101D 121 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304687 $2.99 000001086982-3562500636
2023 9 FD52 05 E122 D 1609101D 093 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304668 $165.08 000001086187-3562505218
2023 9 FD52 05 E124 D 1609101D 121 3/27/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032N1062308304687 $0.05 000001086982-3562500636
2023 9 FD52 05 E123 D 1609101D 093 3/27/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032N1062308304668 $178.52 000001086187-3562505204
2023 9 FD52 05 E124 D 1609101D 121 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304687 $0.01 000001086982-3562500636
2023 9 FD52 05 E123 D 1609101D 093 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304668 $21.56 000001086187-3562505218
2023 9 FD52 05 E111 D 1609101D 093 3/27/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR032N1062308304669 $125.31 000001086407-3562505200
2023 9 FD52 05 E111 D 1609101D 093 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304669 $219.31 000001086407-3562505200
2023 9 FD52 05 E121 D 1609101D 093 3/27/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR032N1062308304669 $8.71 000001086407-3562505200
2023 9 FD52 05 E121 D 1609101D 093 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304669 $15.25 000001086407-3562505200
2023 9 FD52 05 E122 D 1609101D 093 3/27/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR032N1062308304669 $97.75 000001086407-3562505200
2023 9 FD52 05 E122 D 1609101D 093 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304669 $171.06 000001086407-3562505200
2023 9 FD52 05 E123 D 1609101D 093 3/27/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR032N1062308304669 $31.44 000001086407-3562505200
2023 9 FD52 05 E124 D 1609101D 093 3/27/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032N1062308304668 $1.14 000001086187-3562505218
2023 9 FD52 05 E123 D 1609101D 093 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304669 $53.83 000001086407-3562505200
2023 9 FD52 05 E124 D 1609101D 093 3/27/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR032N1062308304669 $0.05 000001086407-3562505200
2023 9 FD52 05 E124 D 1609101D 093 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304669 $0.08 000001086407-3562505200
2023 9 FD52 05 E124 D 1609101D 093 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304668 $0.09 000001086187-3562505204
2023 9 FD52 00 E111 D 1609101D 093 3/27/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR032N1062308304672 $1,755.01 000001086656-3562500061
2023 9 FD52 00 E111 D 1609101D 093 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304672 $516.36 000001086656-3562500061
2023 9 FD52 00 E121 D 1609101D 093 3/27/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR032N1062308304672 $126.56 000001086656-3562500061
2023 9 FD52 00 E121 D 1609101D 093 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304672 $37.24 000001086656-3562500061
2023 9 FD52 00 E122 D 1609101D 093 3/27/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR032N1062308304672 $1,368.91 000001086656-3562500061
2023 9 FD52 00 E122 D 1609101D 093 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304672 $402.76 000001086656-3562500061
2023 9 FD52 00 E123 D 1609101D 093 3/27/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR032N1062308304672 $294.27 000001086656-3562500061
2023 9 FD52 00 E123 D 1609101D 093 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304672 $85.26 000001086656-3562500061
2023 9 FD52 00 E124 D 1609101D 093 3/27/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR032N1062308304672 $0.68 000001086656-3562500061
2023 9 FD52 05 E111 D 1609101D 121 3/27/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032N1062308304686 $163.71 000001086982-3562500636
2023 9 FD52 00 E124 D 1609101D 093 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304672 $0.20 000001086656-3562500061
2023 9 FD52 05 E111 D 1609101D 121 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304686 $26.61 000001086982-3562500636
2023 9 FD52 05 E121 D 1609101D 121 3/27/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032N1062308304686 $12.43 000001086982-3562500636
2023 9 FD52 05 E111 D 1609101D 093 3/27/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032N1062308304667 $2,194.72 000001086187-3562505218
2023 9 FD52 05 E121 D 1609101D 121 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304686 $2.03 000001086982-3562500636
2023 9 FD52 05 E111 D 1609101D 093 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304667 $211.64 000001086187-3562505218
2023 9 FD52 05 E122 D 1609101D 121 3/27/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032N1062308304686 $127.73 000001086982-3562500636
2023 9 FD52 05 E121 D 1609101D 093 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703680 $0.54 000001086407-3562505200
2023 9 FD52 05 E122 D 1609101D 093 3/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031N1062306703678 $1,929.21 000001086187-3562505204
2023 9 FD52 05 E122 D 1609101D 093 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703678 $437.35 000001086187-3562505218
2023 9 FD52 05 E123 D 1609101D 093 3/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031N1062306703678 $225.19 000001086187-3562505218
2023 9 FD52 05 E123 D 1609101D 093 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703678 $61.62 000001086187-3562505204
2023 9 FD52 00 E111 D 1609101D 093 3/9/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR031N1062306703685 $667.60 000001086656-3562500061
2023 9 FD52 00 E111 D 1609101D 093 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703685 $83.20 000001086656-3562500061
2023 9 FD52 00 E121 D 1609101D 093 3/9/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR031N1062306703685 $48.38 000001086656-3562500061
2023 9 FD52 00 E121 D 1609101D 093 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703685 $6.04 000001086656-3562500061
2023 9 FD52 00 E122 D 1609101D 093 3/9/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR031N1062306703685 $520.84 000001086656-3562500061
2023 9 FD52 00 E122 D 1609101D 093 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703685 $64.89 000001086656-3562500061
2023 9 FD52 05 E122 D 1609101D 093 3/9/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR031N1062306703680 $164.28 000001086407-3562505200
2023 9 FD52 00 E123 D 1609101D 093 3/9/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR031N1062306703685 $109.99 000001086656-3562500061
2023 9 FD52 00 E123 D 1609101D 093 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703685 $13.44 000001086656-3562500061
2023 9 FD52 05 E122 D 1609101D 093 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703680 $6.27 000001086407-3562505200
2023 9 FD52 05 E123 D 1609101D 093 3/9/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR031N1062306703680 $52.13 000001086407-3562505200
2023 9 FD52 05 E123 D 1609101D 093 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703680 $1.97 000001086407-3562505200
2023 9 FD52 05 E111 D 1609101D 093 3/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031N1062306703678 $2,473.45 000001086187-3562505204
2023 9 FD52 00 E111 D 1609101D 093 3/9/2023 0010 ENV STUDIES-UST/HZM CA-XR031N1062306703684 $344.01 000001086648-3562500061
2023 9 FD52 00 E111 D 1609101D 093 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703684 $21.56 000001086648-3562500061
2023 9 FD52 00 E121 D 1609101D 093 3/9/2023 0010 ENV STUDIES-UST/HZM CA-XR031N1062306703684 $24.37 000001086648-3562500061
2023 9 FD52 00 E121 D 1609101D 093 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703684 $1.53 000001086648-3562500061
2023 9 FD52 00 E122 D 1609101D 093 3/9/2023 0010 ENV STUDIES-UST/HZM CA-XR031N1062306703684 $268.38 000001086648-3562500061
2023 9 FD52 00 E122 D 1609101D 093 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703684 $16.82 000001086648-3562500061
2023 9 FD52 00 E123 D 1609101D 093 3/9/2023 0010 ENV STUDIES-UST/HZM CA-XR031N1062306703684 $71.10 000001086648-3562500061
2023 9 FD52 00 E123 D 1609101D 093 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703684 $4.42 000001086648-3562500061
2023 9 FD52 05 E111 D 1609101D 093 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703678 $560.71 000001086187-3562505204
2023 9 FD52 05 E121 D 1609101D 093 3/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031N1062306703678 $185.22 000001086187-3562505218
2023 9 FD52 05 E121 D 1609101D 093 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703678 $41.42 000001086187-3562505218
2023 9 FD52 05 E111 D 1609101D 093 3/9/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR031N1062306703679 $210.61 000001086407-3562505200
2023 9 FD52 05 E111 D 1609101D 093 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703679 $8.04 000001086407-3562505200
2023 9 FD52 05 E121 D 1609101D 093 3/9/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR031N1062306703679 $14.22 000001086407-3562505200
2023 8 FD52 05 E122 D 1609101D 093 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302475 $1,845.06 000001086187-3562505204
2023 8 FD52 05 E122 D 1609101D 093 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302475 $38.96 000001086187-3562505204
2023 8 FD52 05 E123 D 1609101D 093 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302475 $194.50 000001086187-3562505218
2023 8 FD52 05 E123 D 1609101D 093 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302475 $6.82 000001086187-3562505204
2023 8 FD52 05 E124 D 1609101D 093 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302475 $1.22 000001086187-3562505218
2023 8 FD52 05 E124 D 1609101D 093 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302475 $0.02 000001086187-3562505204
2023 8 FD52 05 E111 D 1609101D 093 2/23/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR022N1062305302478 $375.88 000001086407-3562505200
2023 8 FD52 05 E111 D 1609101D 093 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302478 $48.87 000001086407-3562505200
2023 8 FD52 05 E121 D 1609101D 093 2/23/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR022N1062305302478 $26.15 000001086407-3562505200
2023 8 FD52 05 E121 D 1609101D 093 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302478 $3.39 000001086407-3562505200
2023 8 FD52 05 E122 D 1609101D 093 2/23/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR022N1062305302478 $293.25 000001086407-3562505200
2023 8 FD52 05 E122 D 1609101D 093 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302478 $38.12 000001086407-3562505200
2023 8 FD52 05 E123 D 1609101D 093 2/23/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR022N1062305302478 $93.12 000001086407-3562505200
2023 8 FD52 05 E123 D 1609101D 093 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302478 $12.00 000001086407-3562505200
2023 8 FD52 05 E124 D 1609101D 093 2/23/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR022N1062305302478 $0.15 000001086407-3562505200
2023 8 FD52 05 E124 D 1609101D 093 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302478 $0.02 000001086407-3562505200
2023 8 FD52 05 E111 D 1609101D 093 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302475 $2,365.42 000001086187-3562505218
2023 8 FD52 05 E111 D 1609101D 093 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302475 $49.94 000001086187-3562505204
2023 8 FD52 05 E121 D 1609101D 093 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302475 $178.83 000001086187-3562505204
2023 8 FD52 00 E111 D 1609101D 093 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302474 $253.56 000001086172-3562500636
2023 8 FD52 00 E111 D 1609101D 093 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302474 $97.95 000001086172-3562500636
2023 8 FD52 00 E121 D 1609101D 093 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302474 $19.07 000001086172-3562500630
2023 8 FD52 00 E121 D 1609101D 093 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302474 $7.36 000001086172-3562500630
2023 8 FD52 00 E122 D 1609101D 093 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302474 $197.29 000001086172-3562500630
2023 8 FD52 05 E121 D 1609101D 093 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302475 $3.68 000001086187-3562505204
2023 8 FD52 00 E122 D 1609101D 093 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302474 $76.40 000001086172-3562500630
2023 8 FD52 00 E123 D 1609101D 093 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302474 $30.02 000001086172-3562500636
2023 8 FD52 00 E123 D 1609101D 093 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302474 $11.50 000001086172-3562500630
2023 8 FD52 00 E124 D 1609101D 093 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302474 $0.08 000001086172-3562500630
2023 8 FD52 00 E124 D 1609101D 093 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302474 $0.03 000001086172-3562500636
2023 8 FD52 05 E111 D 1609101D 093 2/9/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR021N1062303901460 $43.17 000001086407-3562505200
2023 8 FD52 05 E111 D 1609101D 093 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901460 $9.76 000001086407-3562505200
2023 8 FD52 05 E121 D 1609101D 093 2/9/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR021N1062303901460 $2.91 000001086407-3562505200
2023 8 FD52 05 E111 D 1609101D 093 2/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021N1062303901448 $1,980.85 000001086187-3562505218
2023 8 FD52 05 E121 D 1609101D 093 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901460 $0.66 000001086407-3562505200
2023 8 FD52 05 E111 D 1609101D 093 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901448 $194.63 000001086187-3562505218
2023 8 FD52 05 E122 D 1609101D 093 2/9/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR021N1062303901460 $34.68 000001086407-3562505200
2023 8 FD52 05 E121 D 1609101D 093 2/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021N1062303901448 $149.63 000001086187-3562505218
2023 8 FD52 05 E122 D 1609101D 093 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901460 $7.61 000001086407-3562505200
2023 8 FD52 05 E121 D 1609101D 093 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901448 $14.65 000001086187-3562505204
2023 8 FD52 05 E123 D 1609101D 093 2/9/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR021N1062303901460 $11.07 000001086407-3562505200
2023 8 FD52 05 E122 D 1609101D 093 2/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021N1062303901448 $1,544.95 000001086187-3562505218
2023 8 FD52 05 E123 D 1609101D 093 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901460 $2.39 000001086407-3562505200
2023 8 FD52 05 E122 D 1609101D 093 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901448 $151.81 000001086187-3562505218
2023 8 FD52 05 E123 D 1609101D 093 2/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021N1062303901448 $152.82 000001086187-3562505204
2023 8 FD52 05 E123 D 1609101D 093 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901448 $15.35 000001086187-3562505218
2023 7 FD52 00 E111 D 1609101D 093 1/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012N1062302300458 $135.09 000001086172-3562500636
2023 7 FD52 00 E111 D 1609101D 093 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300458 $14.86 000001086172-3562500636
2023 7 FD52 00 E121 D 1609101D 093 1/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012N1062302300458 $10.25 000001086172-3562500636
2023 7 FD52 00 E121 D 1609101D 093 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300458 $1.12 000001086172-3562500636
2023 7 FD52 00 E122 D 1609101D 093 1/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012N1062302300458 $105.37 000001086172-3562500636
2023 7 FD52 00 E122 D 1609101D 093 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300458 $11.59 000001086172-3562500636
2023 7 FD52 00 E123 D 1609101D 093 1/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012N1062302300458 $15.42 000001086172-3562500636
2023 7 FD52 00 E123 D 1609101D 093 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300458 $1.67 000001086172-3562500636
2023 7 FD52 00 E124 D 1609101D 093 1/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012N1062302300458 $0.04 000001086172-3562500636
2023 7 FD52 05 E111 D 1609101D 093 1/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012N1062302300459 $202.47 000001086187-3562505204
2023 7 FD52 05 E111 D 1609101D 093 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300459 $50.44 000001086187-3562505204
2023 7 FD52 05 E121 D 1609101D 093 1/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012N1062302300459 $14.92 000001086187-3562505204
2023 7 FD52 05 E121 D 1609101D 093 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300459 $3.70 000001086187-3562505204
2023 7 FD52 05 E122 D 1609101D 093 1/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012N1062302300459 $156.64 000001086187-3562505204
2023 7 FD52 05 E122 D 1609101D 093 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300459 $39.34 000001086187-3562505204
2023 7 FD52 05 E123 D 1609101D 093 1/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012N1062302300459 $27.78 000001086187-3562505204
2023 7 FD52 05 E123 D 1609101D 093 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300459 $6.90 000001086187-3562505204
2023 7 FD52 05 E124 D 1609101D 093 1/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012N1062302300459 $0.02 000001086187-3562505204
2023 7 FD52 05 E124 D 1609101D 093 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300459 $0.02 000001086187-3562505204