The Commonwealth pays employees on a semi-monthly basis with a scheduled pay day on the 15th and 30th of each month. The two monthly pay periods are from the 1st to the 15th of the month and the 16th through the last day of the month. Pay check distribution is delayed by one pay period to allow for system processing. For example work performed during the 1st to the 15th day of the month is paid to the employee on the 30th of the month. Accordingly the cost accounting charges for labor costs posting in eMARS to operating accounts and highway projects are also delayed by approximately one pay period.
A good rule of measure is that the cost accounting charges for the pay period ending on the 15th of the month will post to eMARS by the 25th and those for the pay period ending on the last day of the month will post to eMARS by the 10th of the following month.

x close panel
Detailed Project Expenditure Report
Total E-MARS Expenditures for 1591901D = $559,738.36
Click here for Labor Costs Information
Year Month PBU Charge District Object Phase Program Code County Date ACT Activity Name Trans ID Reference # Vendor Name Expenditure Line Description
2024 10 FD52 00 E111 D 1591901D 018 4/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042O1062411502747 $47.67 000001085883-3562500636
2024 10 FD52 00 E111 D 1591901D 018 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502747 $6.68 000001085883-3562500636
2024 10 FD52 00 E121 D 1591901D 018 4/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042O1062411502747 $3.63 000001085883-3562500636
2024 10 FD52 00 E121 D 1591901D 018 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502747 $0.51 000001085883-3562500636
2024 10 FD52 00 E122 D 1591901D 018 4/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042O1062411502747 $31.58 000001085883-3562500636
2024 10 FD52 00 E122 D 1591901D 018 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502747 $4.42 000001085883-3562500636
2024 10 FD52 00 E123 D 1591901D 018 4/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042O1062411502747 $5.39 000001085883-3562500636
2024 10 FD52 00 E123 D 1591901D 018 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502747 $0.74 000001085883-3562500636
2024 10 FD52 00 E124 D 1591901D 018 4/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042O1062411502747 $0.01 000001085883-3562500636
2024 10 FD52 01 E143 D 1591901D 018 4/24/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400196196 PON22300002618 PALMER ENGINEERING CO $135,360.63 Calloway Co. 1-80200
2024 10 FD52 00 E111 D 1591901D 018 4/10/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041O1062410001631 $420.05 000001085883-3562500636
2024 10 FD52 00 E111 D 1591901D 018 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001631 $90.31 000001085883-3562500636
2024 10 FD52 00 E121 D 1591901D 018 4/10/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041O1062410001631 $31.48 000001085883-3562500636
2024 10 FD52 00 E111 D 1591901D 018 4/10/2024 0060 ENV STUDIES-ARCHAEOLOGY CA-XR041O1062410001664 $1,085.17 000001091175-3562500061
2024 10 FD52 00 E121 D 1591901D 018 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001631 $6.77 000001085883-3562500636
2024 10 FD52 00 E111 D 1591901D 018 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001664 $57.15 000001091175-3562500061
2024 10 FD52 00 E122 D 1591901D 018 4/10/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041O1062410001631 $277.95 000001085883-3562500636
2024 10 FD52 00 E121 D 1591901D 018 4/10/2024 0060 ENV STUDIES-ARCHAEOLOGY CA-XR041O1062410001664 $74.23 000001091175-3562500061
2024 10 FD52 00 E122 D 1591901D 018 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001631 $59.76 000001085883-3562500636
2024 10 FD52 00 E121 D 1591901D 018 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001664 $3.91 000001091175-3562500061
2024 10 FD52 00 E123 D 1591901D 018 4/10/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041O1062410001631 $47.45 000001085883-3562500636
2024 10 FD52 00 E122 D 1591901D 018 4/10/2024 0060 ENV STUDIES-ARCHAEOLOGY CA-XR041O1062410001664 $718.07 000001091175-3562500061
2024 10 FD52 00 E123 D 1591901D 018 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001631 $10.06 000001085883-3562500636
2024 10 FD52 00 E122 D 1591901D 018 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001664 $37.82 000001091175-3562500061
2024 10 FD52 00 E123 D 1591901D 018 4/10/2024 0060 ENV STUDIES-ARCHAEOLOGY CA-XR041O1062410001664 $337.98 000001091175-3562500061
2024 10 FD52 00 E123 D 1591901D 018 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001664 $17.69 000001091175-3562500061
2024 9 FD52 01 E143 D 1591901D 018 3/11/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400176417 PON22300002618 PALMER ENGINEERING CO $49,433.16 Calloway Co. 1-80200
2024 9 FD52 00 E111 D 1591901D 018 3/11/2024 0060 ENV STUDIES-ARCHAEOLOGY CA-XR031O1062406810111 $813.89 000001091175-3562500061
2024 9 FD52 00 E111 D 1591901D 018 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810111 $90.43 000001091175-3562500061
2024 9 FD52 00 E121 D 1591901D 018 3/11/2024 0060 ENV STUDIES-ARCHAEOLOGY CA-XR031O1062406810111 $55.67 000001091175-3562500061
2024 9 FD52 00 E121 D 1591901D 018 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810111 $6.18 000001091175-3562500061
2024 9 FD52 00 E122 D 1591901D 018 3/11/2024 0060 ENV STUDIES-ARCHAEOLOGY CA-XR031O1062406810111 $538.55 000001091175-3562500061
2024 9 FD52 00 E122 D 1591901D 018 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810111 $59.84 000001091175-3562500061
2024 9 FD52 00 E123 D 1591901D 018 3/11/2024 0060 ENV STUDIES-ARCHAEOLOGY CA-XR031O1062406810111 $253.57 000001091175-3562500061
2024 9 FD52 00 E111 D 1591901D 018 3/11/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031O1062406810080 $682.58 000001085883-3562500636
2024 9 FD52 00 E123 D 1591901D 018 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810111 $27.99 000001091175-3562500061
2024 9 FD52 00 E121 D 1591901D 018 3/11/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031O1062406810080 $51.16 000001085883-3562500636
2024 9 FD52 00 E122 D 1591901D 018 3/11/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031O1062406810080 $451.66 000001085883-3562500636
2024 9 FD52 00 E123 D 1591901D 018 3/11/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031O1062406810080 $76.91 000001085883-3562500636
2024 8 FD52 01 E143 D 1591901D 018 2/8/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400138240 PON22300002618 PALMER ENGINEERING CO $18,367.60 Calloway Co. 1-80200
2024 8 FD52 01 E143 D 1591901D 018 2/8/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400138263 PON22300002618 PALMER ENGINEERING CO $13,983.07 Calloway Co. 1-80200
2024 8 FD52 01 E143 D 1591901D 018 2/8/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400138281 PON22300002618 PALMER ENGINEERING CO $139,885.08 Calloway Co. 1-80200
2024 8 FD52 01 E143 D 1591901D 018 2/8/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400150816 PON22300002618 PALMER ENGINEERING CO $14,632.64 Calloway Co. 1-80200
2024 5 FD52 01 E143 D 1591901D 018 11/8/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400087306 PON22300002618 PALMER ENGINEERING CO $60,813.89 Calloway Co. 1-80200
2024 4 FD52 00 E111 D 1591901D 018 10/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101N1062328009702 $315.04 000001085883-3562500636
2024 4 FD52 00 E111 D 1591901D 018 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009702 $182.72 000001085883-3562500636
2024 4 FD52 00 E121 D 1591901D 018 10/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101N1062328009702 $23.61 000001085883-3562500636
2024 4 FD52 00 E121 D 1591901D 018 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009702 $13.69 000001085883-3562500636
2024 4 FD52 00 E122 D 1591901D 018 10/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101N1062328009702 $208.46 000001085883-3562500636
2024 4 FD52 00 E122 D 1591901D 018 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009702 $120.90 000001085883-3562500636
2024 4 FD52 00 E123 D 1591901D 018 10/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101N1062328009702 $31.02 000001085883-3562500636
2024 4 FD52 00 E123 D 1591901D 018 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009702 $17.62 000001085883-3562500636
2024 2 FD52 01 E143 D 1591901D 018 8/23/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400034629 PON22300002618 PALMER ENGINEERING CO $39,390.71 Calloway Co. 1-80200
2024 2 FD52 01 E143 D 1591901D 018 8/23/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400034631 PON22300002618 PALMER ENGINEERING CO $71,695.82 Calloway Co. 1-80200
2023 10 FD52 00 E111 D 1591901D 018 4/14/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041N1062309605786 $56.29 000001085883-3562500636
2023 10 FD52 00 E111 D 1591901D 018 4/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605786 $5.26 000001085883-3562500636
2023 10 FD52 00 E121 D 1591901D 018 4/14/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041N1062309605786 $4.21 000001085883-3562500636
2023 10 FD52 00 E121 D 1591901D 018 4/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605786 $0.39 000001085883-3562500636
2023 10 FD52 00 E122 D 1591901D 018 4/14/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041N1062309605786 $43.91 000001085883-3562500636
2023 10 FD52 00 E122 D 1591901D 018 4/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605786 $4.10 000001085883-3562500636
2023 10 FD52 00 E123 D 1591901D 018 4/14/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041N1062309605786 $6.42 000001085883-3562500636
2023 10 FD52 00 E123 D 1591901D 018 4/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605786 $0.59 000001085883-3562500636
2023 10 FD52 00 E111 D 1591901D 018 4/10/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR041N1062309605805 $472.51 000001087133-3562500061
2023 10 FD52 00 E121 D 1591901D 018 4/10/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR041N1062309605805 $34.98 000001087133-3562500061
2023 10 FD52 00 E122 D 1591901D 018 4/10/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR041N1062309605805 $368.54 000001087133-3562500061
2023 10 FD52 00 E123 D 1591901D 018 4/10/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR041N1062309605805 $96.21 000001087133-3562500061
2023 9 FD52 00 E111 D 1591901D 018 3/9/2023 0010 ENV STUDIES-UST/HZM CA-XR031N1062306703680 $252.24 000001086510-3562500061
2023 9 FD52 00 E111 D 1591901D 018 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703680 $16.06 000001086510-3562500061
2023 9 FD52 00 E121 D 1591901D 018 3/9/2023 0010 ENV STUDIES-UST/HZM CA-XR031N1062306703680 $17.87 000001086510-3562500061
2023 9 FD52 00 E121 D 1591901D 018 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703680 $1.14 000001086510-3562500061
2023 9 FD52 00 E122 D 1591901D 018 3/9/2023 0010 ENV STUDIES-UST/HZM CA-XR031N1062306703680 $196.80 000001086510-3562500061
2023 9 FD52 00 E122 D 1591901D 018 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703680 $12.53 000001086510-3562500061
2023 9 FD52 00 E123 D 1591901D 018 3/9/2023 0010 ENV STUDIES-UST/HZM CA-XR031N1062306703680 $52.13 000001086510-3562500061
2023 9 FD52 00 E123 D 1591901D 018 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703680 $3.29 000001086510-3562500061
2023 8 FD52 00 E111 D 1591901D 018 2/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021N1062303901445 $75.08 000001085883-3562500636
2023 8 FD52 00 E111 D 1591901D 018 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901445 $12.00 000001085883-3562500636
2023 8 FD52 00 E121 D 1591901D 018 2/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021N1062303901445 $5.60 000001085883-3562500636
2023 8 FD52 00 E121 D 1591901D 018 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901445 $0.90 000001085883-3562500636
2023 8 FD52 00 E122 D 1591901D 018 2/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021N1062303901445 $58.54 000001085883-3562500636
2023 8 FD52 00 E122 D 1591901D 018 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901445 $9.35 000001085883-3562500636
2023 8 FD52 00 E123 D 1591901D 018 2/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021N1062303901445 $8.57 000001085883-3562500636
2023 8 FD52 00 E123 D 1591901D 018 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901445 $1.35 000001085883-3562500636
2023 7 FD52 00 E111 D 1591901D 018 1/3/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122M1062235509199 $204.70 000001085883-3562500636
2023 7 FD52 00 E111 D 1591901D 018 1/3/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509199 $65.49 000001085883-3562500636
2023 7 FD52 00 E121 D 1591901D 018 1/3/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122M1062235509199 $15.53 000001085883-3562500636
2023 7 FD52 00 E121 D 1591901D 018 1/3/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509199 $4.98 000001085883-3562500636
2023 7 FD52 00 E122 D 1591901D 018 1/3/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122M1062235509199 $159.66 000001085883-3562500636
2023 7 FD52 00 E122 D 1591901D 018 1/3/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509199 $51.08 000001085883-3562500636
2023 7 FD52 00 E123 D 1591901D 018 1/3/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122M1062235509199 $21.53 000001085883-3562500636
2023 7 FD52 00 E123 D 1591901D 018 1/3/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509199 $6.76 000001085883-3562500636
2023 7 FD52 00 E124 D 1591901D 018 1/3/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122M1062235509199 $0.06 000001085883-3562500636
2023 7 FD52 00 E124 D 1591901D 018 1/3/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509199 $0.01 000001085883-3562500636