The Commonwealth pays employees on a semi-monthly basis with a scheduled pay day on the 15th and 30th of each month. The two monthly pay periods are from the 1st to the 15th of the month and the 16th through the last day of the month. Pay check distribution is delayed by one pay period to allow for system processing. For example work performed during the 1st to the 15th day of the month is paid to the employee on the 30th of the month. Accordingly the cost accounting charges for labor costs posting in eMARS to operating accounts and highway projects are also delayed by approximately one pay period.
A good rule of measure is that the cost accounting charges for the pay period ending on the 15th of the month will post to eMARS by the 25th and those for the pay period ending on the last day of the month will post to eMARS by the 10th of the following month.

x close panel
Detailed Project Expenditure Report
Total E-MARS Expenditures for 1545401D = $456,352.23
Click here for Labor Costs Information
Year Month PBU Charge District Object Phase Program Code County Date ACT Activity Name Trans ID Reference # Vendor Name Expenditure Line Description
2025 11 FD52 10 E143 D 1545401D 099 5/7/2025 1550 DESIGN CONTRACTS-CONSULTANT PRC-2500233661 PON22300001676 BURGESS AND NIPLE INC $18,376.40 Powell Cos. 10-176
2025 11 FD52 10 E143 D 1545401D 099 5/7/2025 1550 DESIGN CONTRACTS-CONSULTANT PRC-2500233661 PON22300001676 BURGESS AND NIPLE INC $109,650.79 10-176
2025 10 FD52 10 E229 D 1545401D 099 4/28/2025 1040 ROADWAY PLANS-PRELIMINARY-OFF IET-XE13A162525115011650 $24.20
2025 10 FD52 00 E111 D 1545401D 099 4/28/2025 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR042P1062511309439 $1,685.19 000001096030-3562500610
2025 10 FD52 00 E111 D 1545401D 099 4/28/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042P1062511309439 $34.82 000001096030-3562500610
2025 10 FD52 00 E121 D 1545401D 099 4/28/2025 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR042P1062511309439 $121.85 000001096030-3562500610
2025 10 FD52 00 E121 D 1545401D 099 4/28/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042P1062511309439 $2.52 000001096030-3562500610
2025 10 FD52 00 E122 D 1545401D 099 4/28/2025 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR042P1062511309439 $821.53 000001096030-3562500610
2025 10 FD52 00 E122 D 1545401D 099 4/24/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042P1062511309440 $16.98 000001096030-3562500610
2025 10 FD52 00 E123 D 1545401D 099 4/24/2025 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR042P1062511309440 $270.99 000001096030-3562500610
2025 10 FD52 00 E123 D 1545401D 099 4/24/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042P1062511309440 $5.58 000001096030-3562500610
2025 10 FD52 00 E124 D 1545401D 099 4/24/2025 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR042P1062511309440 $0.54 000001096030-3562500610
2025 10 FD52 00 E124 D 1545401D 099 4/24/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042P1062511309440 $0.01 000001096030-3562500610
2025 10 FD52 10 E111 D 1545401D 099 4/24/2025 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042P1062511309386 $1,203.77 000001084937-3562510200
2025 10 FD52 10 E111 D 1545401D 099 4/24/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042P1062511309386 $281.51 000001084937-3562510200
2025 10 FD52 10 E121 D 1545401D 099 4/24/2025 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042P1062511309386 $91.33 000001084937-3562510200
2025 10 FD52 10 E121 D 1545401D 099 4/24/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042P1062511309386 $21.36 000001084937-3562510200
2025 10 FD52 10 E122 D 1545401D 099 4/24/2025 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042P1062511309386 $586.89 000001084937-3562510200
2025 10 FD52 10 E122 D 1545401D 099 4/24/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042P1062511309386 $137.23 000001084937-3562510200
2025 10 FD52 10 E123 D 1545401D 099 4/24/2025 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042P1062511309386 $146.29 000001084937-3562510204
2025 10 FD52 10 E123 D 1545401D 099 4/24/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042P1062511309386 $26.95 000001084937-3562510200
2025 10 FD52 10 E124 D 1545401D 099 4/24/2025 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042P1062511309386 $0.36 000001084937-3562510204
2025 10 FD52 10 E124 D 1545401D 099 4/24/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042P1062511309386 $0.08 000001084937-3562510204
2025 10 FD52 10 E111 D 1545401D 099 4/9/2025 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041P1062509808311 $292.82 000001084937-3562510200
2025 10 FD52 10 E111 D 1545401D 099 4/9/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041P1062509808311 $29.28 000001084937-3562510200
2025 10 FD52 10 E121 D 1545401D 099 4/9/2025 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041P1062509808311 $22.21 000001084937-3562510200
2025 10 FD52 10 E121 D 1545401D 099 4/9/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041P1062509808311 $2.22 000001084937-3562510200
2025 10 FD52 10 E122 D 1545401D 099 4/9/2025 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041P1062509808311 $142.75 000001084937-3562510200
2025 10 FD52 10 E122 D 1545401D 099 4/9/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041P1062509808311 $14.27 000001084937-3562510200
2025 10 FD52 10 E123 D 1545401D 099 4/9/2025 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041P1062509808311 $40.39 000001084937-3562510200
2025 10 FD52 10 E123 D 1545401D 099 4/9/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041P1062509808311 $3.99 000001084937-3562510200
2025 10 FD52 00 E111 D 1545401D 099 4/9/2025 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR041P1062509808360 $387.18 000001096030-3562500610
2025 10 FD52 00 E121 D 1545401D 099 4/9/2025 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR041P1062509808360 $29.62 000001096030-3562500610
2025 10 FD52 00 E122 D 1545401D 099 4/9/2025 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR041P1062509808360 $188.76 000001096030-3562500610
2025 10 FD52 00 E123 D 1545401D 099 4/9/2025 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR041P1062509808360 $8.44 000001096030-3562500610
2025 9 FD52 10 E111 D 1545401D 099 3/10/2025 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031P1062506606041 $966.18 000001084937-3562510200
2025 9 FD52 10 E111 D 1545401D 099 3/10/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031P1062506606041 $23.19 000001084937-3562510200
2025 9 FD52 10 E121 D 1545401D 099 3/10/2025 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031P1062506606041 $73.31 000001084937-3562510200
2025 9 FD52 10 E121 D 1545401D 099 3/10/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031P1062506606041 $1.76 000001084937-3562510200
2025 9 FD52 10 E122 D 1545401D 099 3/10/2025 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031P1062506606041 $471.07 000001084937-3562510200
2025 9 FD52 10 E122 D 1545401D 099 3/10/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031P1062506606041 $11.31 000001084937-3562510200
2025 9 FD52 10 E123 D 1545401D 099 3/10/2025 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031P1062506606041 $133.17 000001084937-3562510200
2025 9 FD52 10 E123 D 1545401D 099 3/10/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031P1062506606041 $3.16 000001084937-3562510200
2025 8 FD52 10 E229 D 1545401D 099 2/26/2025 1040 ROADWAY PLANS-PRELIMINARY-OFF IET-XE13A162525056013800 $12.20
2025 8 FD52 00 E111 D 1545401D 099 2/26/2025 0070 ENV STUDIES-HIST/CULTURAL CA-XR022P1062505204848 $350.00 000001091537-3562500061
2025 8 FD52 00 E111 D 1545401D 099 2/26/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022P1062505204848 $102.55 000001091537-3562500061
2025 8 FD52 00 E121 D 1545401D 099 2/26/2025 0070 ENV STUDIES-HIST/CULTURAL CA-XR022P1062505204848 $24.74 000001091537-3562500061
2025 8 FD52 00 E121 D 1545401D 099 2/26/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022P1062505204848 $7.25 000001091537-3562500061
2025 8 FD52 00 E122 D 1545401D 099 2/26/2025 0070 ENV STUDIES-HIST/CULTURAL CA-XR022P1062505204848 $170.62 000001091537-3562500061
2025 8 FD52 00 E122 D 1545401D 099 2/26/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022P1062505204848 $49.99 000001091537-3562500061
2025 8 FD52 00 E123 D 1545401D 099 2/26/2025 0070 ENV STUDIES-HIST/CULTURAL CA-XR022P1062505204848 $112.82 000001091537-3562500061
2025 8 FD52 00 E123 D 1545401D 099 2/26/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022P1062505204848 $32.80 000001091537-3562500061
2025 8 FD52 00 E124 D 1545401D 099 2/26/2025 0070 ENV STUDIES-HIST/CULTURAL CA-XR022P1062505204848 $0.13 000001091537-3562500061
2025 8 FD52 00 E124 D 1545401D 099 2/26/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022P1062505204848 $0.04 000001091537-3562500061
2025 8 FD52 10 E111 D 1545401D 099 2/24/2025 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022P1062505204827 $579.69 000001084937-3562510200
2025 8 FD52 10 E111 D 1545401D 099 2/24/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022P1062505204827 $12.02 000001084937-3562510200
2025 8 FD52 10 E121 D 1545401D 099 2/24/2025 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022P1062505204827 $43.99 000001084937-3562510200
2025 8 FD52 10 E121 D 1545401D 099 2/24/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022P1062505204827 $0.91 000001084937-3562510200
2025 8 FD52 10 E122 D 1545401D 099 2/24/2025 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022P1062505204827 $282.64 000001084937-3562510200
2025 8 FD52 10 E122 D 1545401D 099 2/24/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022P1062505204827 $5.86 000001084937-3562510200
2025 8 FD52 10 E123 D 1545401D 099 2/24/2025 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022P1062505204827 $79.90 000001084937-3562510200
2025 8 FD52 10 E123 D 1545401D 099 2/24/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022P1062505204827 $1.64 000001084937-3562510200
2025 8 FD52 10 E124 D 1545401D 099 2/24/2025 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022P1062505204827 $0.18 000001084937-3562510200
2025 8 FD52 00 E111 D 1545401D 099 2/10/2025 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR021P1062503803723 $63.99 000001095015-3562500636
2025 8 FD52 00 E111 D 1545401D 099 2/10/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021P1062503803723 $7.67 000001095015-3562500636
2025 8 FD52 00 E121 D 1545401D 099 2/10/2025 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR021P1062503803723 $4.55 000001095015-3562500636
2025 8 FD52 00 E121 D 1545401D 099 2/10/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021P1062503803723 $0.54 000001095015-3562500636
2025 8 FD52 00 E122 D 1545401D 099 2/10/2025 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR021P1062503803723 $31.19 000001095015-3562500636
2025 8 FD52 00 E122 D 1545401D 099 2/10/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021P1062503803723 $3.74 000001095015-3562500636
2025 8 FD52 00 E123 D 1545401D 099 2/10/2025 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR021P1062503803723 $14.09 000001095015-3562500636
2025 8 FD52 00 E123 D 1545401D 099 2/10/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021P1062503803723 $1.68 000001095015-3562500636
2025 7 FD52 00 E111 D 1545401D 099 1/30/2025 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR012P1062502302534 $93.06 000001095015-3562500636
2025 7 FD52 00 E111 D 1545401D 099 1/30/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012P1062502302534 $34.90 000001095015-3562500636
2025 7 FD52 00 E121 D 1545401D 099 1/30/2025 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR012P1062502302534 $6.75 000001095015-3562500636
2025 7 FD52 00 E121 D 1545401D 099 1/30/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012P1062502302534 $2.53 000001095015-3562500636
2025 7 FD52 00 E122 D 1545401D 099 1/30/2025 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR012P1062502302534 $45.37 000001095015-3562500636
2025 7 FD52 00 E122 D 1545401D 099 1/30/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012P1062502302534 $17.01 000001095015-3562500636
2025 7 FD52 10 E229 D 1545401D 099 1/29/2025 1040 ROADWAY PLANS-PRELIMINARY-OFF IET-XE13A162525029000950 $24.30
2025 7 FD52 10 E229 D 1545401D 099 1/28/2025 1040 ROADWAY PLANS-PRELIMINARY-OFF IET-XE13A162525028009330 $12.40
2025 7 FD52 00 E123 D 1545401D 099 1/24/2025 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR012P1062502302535 $20.52 000001095015-3562500636
2025 7 FD52 10 E111 D 1545401D 099 1/24/2025 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012P1062502302475 $1,756.89 000001084937-3562510200
2025 7 FD52 00 E123 D 1545401D 099 1/24/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012P1062502302535 $7.63 000001095015-3562500636
2025 7 FD52 10 E111 D 1545401D 099 1/24/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012P1062502302475 $175.69 000001084937-3562510200
2025 7 FD52 10 E121 D 1545401D 099 1/24/2025 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012P1062502302475 $133.28 000001084937-3562510200
2025 7 FD52 10 E121 D 1545401D 099 1/24/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012P1062502302475 $13.33 000001084937-3562510200
2025 7 FD52 10 E122 D 1545401D 099 1/24/2025 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012P1062502302475 $856.48 000001084937-3562510200
2025 7 FD52 10 E122 D 1545401D 099 1/24/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012P1062502302475 $85.65 000001084937-3562510200
2025 7 FD52 10 E123 D 1545401D 099 1/24/2025 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012P1062502302475 $242.32 000001084937-3562510200
2025 7 FD52 10 E123 D 1545401D 099 1/24/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012P1062502302475 $23.93 000001084937-3562510200
2025 7 FD52 10 E124 D 1545401D 099 1/24/2025 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012P1062502302475 $0.55 000001084937-3562510200
2025 7 FD52 10 E124 D 1545401D 099 1/24/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012P1062502302475 $0.05 000001084937-3562510200
2025 7 FD52 00 E124 D 1545401D 099 1/24/2025 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR012P1062502302535 $0.02 000001095015-3562500636
2025 7 FD52 00 E124 D 1545401D 099 1/24/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012P1062502302535 $0.01 000001095015-3562500636
2025 7 FD52 10 E111 D 1545401D 099 1/9/2025 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011P1062500801497 $268.51 000001084937-3562510200
2025 7 FD52 10 E111 D 1545401D 099 1/9/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011P1062500801497 $191.47 000001084937-3562510200
2025 7 FD52 10 E121 D 1545401D 099 1/9/2025 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011P1062500801497 $20.36 000001084937-3562510200
2025 7 FD52 10 E121 D 1545401D 099 1/9/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011P1062500801497 $14.52 000001084937-3562510200
2025 7 FD52 10 E122 D 1545401D 099 1/9/2025 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011P1062500801497 $130.85 000001084937-3562510200
2025 7 FD52 10 E122 D 1545401D 099 1/9/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011P1062500801497 $93.34 000001084937-3562510200
2025 7 FD52 10 E123 D 1545401D 099 1/9/2025 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011P1062500801497 $37.28 000001084937-3562510200
2025 7 FD52 10 E123 D 1545401D 099 1/9/2025 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011P1062500801497 $26.07 000001084937-3562510200
2025 7 FD52 10 E229 D 1545401D 099 1/2/2025 1040 ROADWAY PLANS-PRELIMINARY-OFF IET-XE13A162524344009380 $24.30
2025 6 FD52 10 E111 D 1545401D 099 12/23/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122O1062435500419 $1,222.70 000001084937-3562510200
2025 6 FD52 00 E111 D 1545401D 099 12/23/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR122O1062435500442 $166.67 000001091537-3562500061
2025 6 FD52 10 E111 D 1545401D 099 12/23/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122O1062435500419 $262.32 000001084937-3562510200
2025 6 FD52 00 E121 D 1545401D 099 12/23/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR122O1062435500442 $11.73 000001091537-3562500061
2025 6 FD52 10 E121 D 1545401D 099 12/23/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122O1062435500419 $92.62 000001084937-3562510200
2025 6 FD52 00 E122 D 1545401D 099 12/23/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR122O1062435500442 $81.25 000001091537-3562500061
2025 6 FD52 10 E121 D 1545401D 099 12/23/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122O1062435500419 $19.84 000001084937-3562510200
2025 6 FD52 00 E123 D 1545401D 099 12/23/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR122O1062435500442 $56.31 000001091537-3562500061
2025 6 FD52 10 E122 D 1545401D 099 12/23/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122O1062435500419 $596.14 000001084937-3562510200
2025 6 FD52 00 E124 D 1545401D 099 12/23/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR122O1062435500442 $0.07 000001091537-3562500061
2025 6 FD52 10 E122 D 1545401D 099 12/23/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122O1062435500419 $127.88 000001084937-3562510204
2025 6 FD52 10 E123 D 1545401D 099 12/23/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122O1062435500419 $173.12 000001084937-3562510204
2025 6 FD52 10 E123 D 1545401D 099 12/23/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122O1062435500419 $37.28 000001084937-3562510204
2025 6 FD52 10 E124 D 1545401D 099 12/23/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122O1062435500419 $0.39 000001084937-3562510200
2025 6 FD52 10 E124 D 1545401D 099 12/23/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122O1062435500419 $0.08 000001084937-3562510204
2025 6 FD52 10 E229 D 1545401D 099 12/11/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF IET-XE13A162524345003750 $24.30
2025 6 FD52 00 E111 D 1545401D 099 12/9/2024 0060 ENV STUDIES-ARCHAEOLOGY CA-XR121O1062434109991 $564.47 000001085854-3562500061
2025 6 FD52 00 E111 D 1545401D 099 12/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121O1062434109991 $178.35 000001085854-3562500061
2025 6 FD52 00 E121 D 1545401D 099 12/9/2024 0060 ENV STUDIES-ARCHAEOLOGY CA-XR121O1062434109991 $42.13 000001085854-3562500061
2025 6 FD52 00 E121 D 1545401D 099 12/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121O1062434109991 $13.31 000001085854-3562500061
2025 6 FD52 00 E122 D 1545401D 099 12/9/2024 0060 ENV STUDIES-ARCHAEOLOGY CA-XR121O1062434109991 $275.15 000001085854-3562500061
2025 6 FD52 00 E122 D 1545401D 099 12/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121O1062434109991 $86.95 000001085854-3562500061
2025 6 FD52 00 E123 D 1545401D 099 12/9/2024 0060 ENV STUDIES-ARCHAEOLOGY CA-XR121O1062434109991 $89.07 000001085854-3562500061
2025 6 FD52 00 E123 D 1545401D 099 12/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121O1062434109991 $27.72 000001085854-3562500061
2025 6 FD52 10 E111 D 1545401D 099 12/9/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121O1062434109988 $1,059.72 000001084937-3562510200
2025 6 FD52 10 E111 D 1545401D 099 12/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121O1062434109988 $379.22 000001084937-3562510204
2025 6 FD52 10 E121 D 1545401D 099 12/9/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121O1062434109988 $80.07 000001084937-3562510200
2025 6 FD52 10 E121 D 1545401D 099 12/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121O1062434109988 $28.67 000001084937-3562510204
2025 6 FD52 10 E122 D 1545401D 099 12/9/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121O1062434109988 $516.49 000001084937-3562510200
2025 6 FD52 10 E122 D 1545401D 099 12/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121O1062434109988 $184.87 000001084937-3562510204
2025 6 FD52 10 E123 D 1545401D 099 12/9/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121O1062434109988 $133.22 000001084937-3562510200
2025 6 FD52 10 E123 D 1545401D 099 12/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121O1062434109988 $47.35 000001084937-3562510200
2025 6 FD52 10 E111 D 1545401D 099 12/2/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112O1062432608758 $940.76 000001071623-3562510200
2025 6 FD52 10 E121 D 1545401D 099 12/2/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112O1062432608758 $70.79 000001071623-3562510200
2025 6 FD52 10 E122 D 1545401D 099 12/2/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112O1062432608758 $458.66 000001071623-3562510200
2025 6 FD52 10 E123 D 1545401D 099 12/2/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112O1062432608758 $90.44 000001071623-3562510200
2025 6 FD52 10 E124 D 1545401D 099 12/2/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112O1062432608758 $0.22 000001071623-3562510200
2025 5 FD52 10 E229 D 1545401D 099 11/27/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF IET-XE13A162524330011330 $12.15
2025 5 FD52 10 E111 D 1545401D 099 11/25/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112O1062432608776 $1,841.51 000001084937-3562510200
2025 5 FD52 10 E111 D 1545401D 099 11/25/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112O1062432608776 $409.23 000001084937-3562510204
2025 5 FD52 10 E121 D 1545401D 099 11/25/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112O1062432608776 $139.74 000001084937-3562510204
2025 5 FD52 00 E111 D 1545401D 099 11/25/2024 0060 ENV STUDIES-ARCHAEOLOGY CA-XR112O1062432608779 $513.00 000001085854-3562500061
2025 5 FD52 10 E121 D 1545401D 099 11/25/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112O1062432608776 $31.05 000001084937-3562510204
2025 5 FD52 00 E111 D 1545401D 099 11/25/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112O1062432608779 $242.87 000001085854-3562500061
2025 5 FD52 10 E122 D 1545401D 099 11/25/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112O1062432608776 $897.78 000001084937-3562510200
2025 5 FD52 00 E121 D 1545401D 099 11/25/2024 0060 ENV STUDIES-ARCHAEOLOGY CA-XR112O1062432608779 $38.88 000001085854-3562500061
2025 5 FD52 10 E122 D 1545401D 099 11/25/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112O1062432608776 $199.50 000001084937-3562510200
2025 5 FD52 00 E121 D 1545401D 099 11/25/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112O1062432608779 $18.41 000001085854-3562500061
2025 5 FD52 10 E123 D 1545401D 099 11/25/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112O1062432608776 $242.25 000001084937-3562510204
2025 5 FD52 00 E122 D 1545401D 099 11/25/2024 0060 ENV STUDIES-ARCHAEOLOGY CA-XR112O1062432608779 $250.13 000001085854-3562500061
2025 5 FD52 10 E123 D 1545401D 099 11/25/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112O1062432608776 $53.07 000001084937-3562510200
2025 5 FD52 00 E122 D 1545401D 099 11/25/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112O1062432608779 $118.40 000001085854-3562500061
2025 5 FD52 10 E124 D 1545401D 099 11/25/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112O1062432608776 $0.54 000001084937-3562510200
2025 5 FD52 00 E123 D 1545401D 099 11/25/2024 0060 ENV STUDIES-ARCHAEOLOGY CA-XR112O1062432608779 $81.12 000001085854-3562500061
2025 5 FD52 10 E124 D 1545401D 099 11/25/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112O1062432608776 $0.12 000001084937-3562510204
2025 5 FD52 00 E123 D 1545401D 099 11/25/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112O1062432608779 $37.75 000001085854-3562500061
2025 5 FD52 00 E124 D 1545401D 099 11/25/2024 0060 ENV STUDIES-ARCHAEOLOGY CA-XR112O1062432608779 $0.18 000001085854-3562500061
2025 5 FD52 00 E124 D 1545401D 099 11/25/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112O1062432608779 $0.08 000001085854-3562500061
2025 5 FD52 10 E143 D 1545401D 099 11/19/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2500096292 PON22300001676 BURGESS AND NIPLE INC $24,048.80 Powell Cos. 10-176
2025 5 FD52 10 E143 D 1545401D 099 11/19/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2500096292 PON22300001676 BURGESS AND NIPLE INC $74,689.34 Powell Cos. 10-176
2025 5 FD52 10 E121 D 1545401D 099 11/12/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111O1062431307566 $5.56 000001084937-3562510200
2025 5 FD52 10 E122 D 1545401D 099 11/12/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111O1062431307566 $392.37 000001084937-3562510200
2025 5 FD52 10 E122 D 1545401D 099 11/12/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111O1062431307566 $35.77 000001084937-3562510200
2025 5 FD52 10 E123 D 1545401D 099 11/12/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111O1062431307566 $111.00 000001084937-3562510200
2025 5 FD52 10 E123 D 1545401D 099 11/12/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111O1062431307566 $9.99 000001084937-3562510200
2025 5 FD52 10 E111 D 1545401D 099 11/12/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111O1062431307566 $805.12 000001084937-3562510200
2025 5 FD52 10 E111 D 1545401D 099 11/12/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111O1062431307566 $73.37 000001084937-3562510200
2025 5 FD52 10 E121 D 1545401D 099 11/12/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111O1062431307566 $61.09 000001084937-3562510200
2025 5 FD52 10 E797 D 1545401D 121 11/8/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF PRC-2500097159 PON22400001009 Johnson, Mirmiran & Thompson Inc $2,480.00 JMT SW HWY & Bridge Const. Inspection 2024-02-5 R4
2025 5 FD52 10 E797 D 1545401D 121 11/8/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF PRC-2500098625 PON22400001009 Johnson, Mirmiran & Thompson Inc $2,480.00 SW Highway & Bridge Construction Inspection R4
2025 4 FD52 00 E111 D 1545401D 099 10/24/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR102O1062429706360 $268.25 000001091537-3562500061
2025 4 FD52 00 E111 D 1545401D 099 10/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102O1062429706360 $26.83 000001091537-3562500061
2025 4 FD52 00 E121 D 1545401D 099 10/24/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR102O1062429706360 $20.06 000001091537-3562500061
2025 4 FD52 00 E121 D 1545401D 099 10/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102O1062429706360 $2.01 000001091537-3562500061
2025 4 FD52 00 E122 D 1545401D 099 10/24/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR102O1062429706360 $130.78 000001091537-3562500061
2025 4 FD52 00 E122 D 1545401D 099 10/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102O1062429706360 $13.08 000001091537-3562500061
2025 4 FD52 00 E123 D 1545401D 099 10/24/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR102O1062429706360 $40.39 000001091537-3562500061
2025 4 FD52 00 E123 D 1545401D 099 10/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102O1062429706360 $3.99 000001091537-3562500061
2025 4 FD52 00 E124 D 1545401D 099 10/24/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR102O1062429706360 $0.09 000001091537-3562500061
2025 4 FD52 00 E124 D 1545401D 099 10/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102O1062429706360 $0.01 000001091537-3562500061
2025 4 FD52 10 E111 D 1545401D 099 10/9/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101O1062428205211 $335.17 000001084937-3562510204
2025 4 FD52 10 E121 D 1545401D 099 10/9/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101O1062428205211 $25.29 000001084937-3562510204
2025 4 FD52 10 E122 D 1545401D 099 10/9/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101O1062428205211 $163.40 000001084937-3562510204
2025 4 FD52 10 E123 D 1545401D 099 10/9/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101O1062428205211 $40.14 000001084937-3562510204
2025 3 FD52 10 E229 D 1545401D 099 9/27/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF IET-XE13A162524269011170 $46.10
2025 3 FD52 10 E229 D 1545401D 099 9/27/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF IET-XE13A162524269017890 $48.06
2025 3 FD52 10 E111 D 1545401D 099 9/25/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092O1062426804080 $1,584.52 000001084937-3562510204
2025 3 FD52 10 E111 D 1545401D 099 9/25/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092O1062426804080 $277.55 000001084937-3562510204
2025 3 FD52 10 E121 D 1545401D 099 9/25/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092O1062426804080 $119.75 000001084937-3562510204
2025 3 FD52 10 E121 D 1545401D 099 9/25/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092O1062426804080 $21.01 000001084937-3562510204
2025 3 FD52 10 E122 D 1545401D 099 9/25/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092O1062426804080 $772.19 000001084937-3562510204
2025 3 FD52 10 E122 D 1545401D 099 9/25/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092O1062426804080 $135.31 000001084937-3562510204
2025 3 FD52 10 E123 D 1545401D 099 9/25/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092O1062426804080 $233.49 000001084937-3562510204
2025 3 FD52 10 E123 D 1545401D 099 9/25/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092O1062426804080 $37.61 000001084937-3562510204
2025 3 FD52 10 E124 D 1545401D 099 9/25/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092O1062426804080 $0.50 000001084937-3562510204
2025 3 FD52 10 E124 D 1545401D 099 9/25/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092O1062426804080 $0.07 000001084937-3562510204
2025 3 FD52 10 E111 D 1545401D 099 9/12/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091O1062425002902 $403.64 000001084937-3562510204
2025 3 FD52 10 E121 D 1545401D 099 9/12/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091O1062425002902 $29.42 000001084937-3562510204
2025 3 FD52 10 E122 D 1545401D 099 9/12/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091O1062425002902 $196.77 000001084937-3562510204
2025 3 FD52 10 E123 D 1545401D 099 9/12/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091O1062425002902 $76.79 000001084937-3562510204
2025 3 FD52 00 E111 D 1545401D 099 9/9/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR091O1062425002927 $679.65 000001091537-3562500061
2025 3 FD52 00 E111 D 1545401D 099 9/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091O1062425002927 $30.05 000001091537-3562500061
2025 3 FD52 00 E121 D 1545401D 099 9/9/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR091O1062425002927 $50.20 000001091537-3562500061
2025 3 FD52 00 E121 D 1545401D 099 9/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091O1062425002927 $2.22 000001091537-3562500061
2025 3 FD52 00 E122 D 1545401D 099 9/9/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR091O1062425002927 $331.30 000001091537-3562500061
2025 3 FD52 00 E122 D 1545401D 099 9/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091O1062425002927 $14.65 000001091537-3562500061
2025 3 FD52 00 E123 D 1545401D 099 9/9/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR091O1062425002927 $102.25 000001091537-3562500061
2025 3 FD52 00 E123 D 1545401D 099 9/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091O1062425002927 $4.47 000001091537-3562500061
2025 2 FD52 00 E111 D 1545401D 099 8/12/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081O1062422200378 $106.58 000001084705-3562500636
2025 2 FD52 00 E111 D 1545401D 099 8/12/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081O1062422200378 $15.36 000001084705-3562500636
2025 2 FD52 00 E121 D 1545401D 099 8/12/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081O1062422200378 $7.59 000001084705-3562500636
2025 2 FD52 00 E121 D 1545401D 099 8/12/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081O1062422200378 $1.10 000001084705-3562500636
2025 2 FD52 00 E122 D 1545401D 099 8/12/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081O1062422200378 $51.98 000001084705-3562500636
2025 2 FD52 00 E122 D 1545401D 099 8/12/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081O1062422200378 $7.49 000001084705-3562500636
2025 2 FD52 00 E123 D 1545401D 099 8/12/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081O1062422200378 $23.48 000001084705-3562500636
2025 2 FD52 00 E123 D 1545401D 099 8/12/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081O1062422200378 $3.36 000001084705-3562500636
2025 1 FD52 00 E229 D 1545401D 099 7/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF IET-XE13A162524207002940 $41.42
2025 1 FD52 00 E111 D 1545401D 099 7/24/2024 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR072O1062420509803 $246.03 000001093021-3562500630
2025 1 FD52 00 E111 D 1545401D 099 7/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072O1062420509803 $267.46 000001093021-3562500630
2025 1 FD52 00 E121 D 1545401D 099 7/24/2024 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR072O1062420509803 $18.60 000001093021-3562500630
2025 1 FD52 00 E121 D 1545401D 099 7/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072O1062420509803 $20.24 000001093021-3562500630
2025 1 FD52 00 E122 D 1545401D 099 7/24/2024 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR072O1062420509803 $119.84 000001093021-3562500630
2025 1 FD52 00 E122 D 1545401D 099 7/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072O1062420509803 $130.39 000001093021-3562500630
2025 1 FD52 00 E123 D 1545401D 099 7/24/2024 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR072O1062420509803 $26.71 000001093021-3562500630
2025 1 FD52 00 E123 D 1545401D 099 7/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072O1062420509803 $28.35 000001093021-3562500630
2025 1 FD52 00 E124 D 1545401D 099 7/24/2024 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR072O1062420509803 $0.06 000001093021-3562500630
2025 1 FD52 00 E124 D 1545401D 099 7/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072O1062420509803 $0.07 000001093021-3562500630
2025 1 FD52 00 E111 D 1545401D 099 7/24/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072O1062420509744 $302.40 000001084705-3562500636
2025 1 FD52 00 E111 D 1545401D 099 7/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072O1062420509744 $78.17 000001084705-3562500636
2025 1 FD52 00 E121 D 1545401D 099 7/24/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072O1062420509744 $21.94 000001084705-3562500636
2025 1 FD52 00 E121 D 1545401D 099 7/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072O1062420509744 $5.66 000001084705-3562500636
2025 1 FD52 00 E122 D 1545401D 099 7/24/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072O1062420509744 $147.44 000001084705-3562500636
2025 1 FD52 00 E122 D 1545401D 099 7/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072O1062420509744 $38.10 000001084705-3562500636
2025 1 FD52 00 E123 D 1545401D 099 7/24/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072O1062420509744 $66.66 000001084705-3562500636
2025 1 FD52 00 E123 D 1545401D 099 7/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072O1062420509744 $17.10 000001084705-3562500636
2025 1 FD52 00 E124 D 1545401D 099 7/24/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072O1062420509744 $0.08 000001084705-3562500636
2025 1 FD52 00 E124 D 1545401D 099 7/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072O1062420509744 $0.02 000001084705-3562500636
2024 12 FD52 00 E111 D 1545401D 099 6/25/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR062O1062417607390 $440.76 000001085858-3562500061
2024 12 FD52 00 E121 D 1545401D 099 6/25/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR062O1062417607390 $33.31 000001085858-3562500061
2024 12 FD52 00 E122 D 1545401D 099 6/25/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR062O1062417607390 $291.65 000001085858-3562500061
2024 12 FD52 00 E123 D 1545401D 099 6/25/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR062O1062417607390 $88.75 000001085858-3562500061
2024 12 FD52 00 E124 D 1545401D 099 6/25/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR062O1062417607390 $0.20 000001085858-3562500061
2024 12 FD52 10 E111 D 1545401D 099 6/25/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062O1062417607386 $312.72 000001084937-3562510200
2024 12 FD52 10 E121 D 1545401D 099 6/25/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062O1062417607386 $23.72 000001084937-3562510200
2024 12 FD52 10 E122 D 1545401D 099 6/25/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062O1062417607386 $206.93 000001084937-3562510200
2024 12 FD52 10 E123 D 1545401D 099 6/25/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062O1062417607386 $44.38 000001084937-3562510200
2024 12 FD52 10 E124 D 1545401D 099 6/25/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062O1062417607386 $0.10 000001084937-3562510200
2024 12 FD52 10 E111 D 1545401D 099 6/10/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061O1062415906207 $781.85 000001084937-3562510200
2024 12 FD52 10 E111 D 1545401D 099 6/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061O1062415906207 $143.85 000001084937-3562510200
2024 12 FD52 10 E121 D 1545401D 099 6/10/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061O1062415906207 $59.30 000001084937-3562510200
2024 12 FD52 10 E121 D 1545401D 099 6/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061O1062415906207 $10.91 000001084937-3562510200
2024 12 FD52 10 E122 D 1545401D 099 6/10/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061O1062415906207 $517.31 000001084937-3562510200
2024 12 FD52 10 E122 D 1545401D 099 6/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061O1062415906207 $95.18 000001084937-3562510200
2024 12 FD52 10 E123 D 1545401D 099 6/10/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061O1062415906207 $111.17 000001084937-3562510200
2024 12 FD52 10 E123 D 1545401D 099 6/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061O1062415906207 $20.18 000001084937-3562510200
2024 11 FD52 10 E143 D 1545401D 099 5/31/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400234752 PON22300001676 BURGESS AND NIPLE INC $21,042.70 Powell Cos. 10-176
2024 11 FD52 10 E229 D 1545401D 099 5/28/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF IET-XE13A162524146011800 $24.30
2024 11 FD52 10 E111 D 1545401D 099 5/23/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052O1062414304990 $2,065.46 000001084937-3562510200
2024 11 FD52 10 E111 D 1545401D 099 5/23/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052O1062414304990 $174.01 000001084937-3562510200
2024 11 FD52 10 E121 D 1545401D 099 5/23/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052O1062414304990 $156.70 000001084937-3562510200
2024 11 FD52 10 E121 D 1545401D 099 5/23/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052O1062414304990 $13.19 000001084937-3562510204
2024 11 FD52 10 E122 D 1545401D 099 5/23/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052O1062414304990 $1,366.72 000001084937-3562510200
2024 11 FD52 10 E122 D 1545401D 099 5/23/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052O1062414304990 $115.14 000001084937-3562510200
2024 11 FD52 10 E123 D 1545401D 099 5/23/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052O1062414304990 $265.54 000001084937-3562510200
2024 11 FD52 10 E123 D 1545401D 099 5/23/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052O1062414304990 $22.26 000001084937-3562510204
2024 11 FD52 10 E124 D 1545401D 099 5/23/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052O1062414304990 $0.60 000001084937-3562510204
2024 11 FD52 10 E124 D 1545401D 099 5/23/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052O1062414304990 $0.06 000001084937-3562510204
2024 11 FD52 10 E229 D 1545401D 099 5/13/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF IET-XE13A162524131014160 $12.45
2024 11 FD52 00 E111 D 1545401D 099 5/13/2024 0060 ENV STUDIES-ARCHAEOLOGY CA-XR051O1062412903881 $248.91 000001085854-3562500061
2024 11 FD52 00 E111 D 1545401D 099 5/13/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051O1062412903881 $36.53 000001085854-3562500061
2024 11 FD52 00 E121 D 1545401D 099 5/13/2024 0060 ENV STUDIES-ARCHAEOLOGY CA-XR051O1062412903881 $18.58 000001085854-3562500061
2024 11 FD52 00 E121 D 1545401D 099 5/13/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051O1062412903881 $2.72 000001085854-3562500061
2024 11 FD52 00 E122 D 1545401D 099 5/13/2024 0060 ENV STUDIES-ARCHAEOLOGY CA-XR051O1062412903881 $164.82 000001085854-3562500061
2024 11 FD52 00 E122 D 1545401D 099 5/13/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051O1062412903881 $24.17 000001085854-3562500061
2024 11 FD52 00 E123 D 1545401D 099 5/13/2024 0060 ENV STUDIES-ARCHAEOLOGY CA-XR051O1062412903881 $40.41 000001085854-3562500061
2024 11 FD52 00 E123 D 1545401D 099 5/13/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051O1062412903881 $5.84 000001085854-3562500061
2024 11 FD52 10 E111 D 1545401D 099 5/9/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051O1062412903878 $1,782.61 000001084937-3562510200
2024 11 FD52 10 E111 D 1545401D 099 5/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051O1062412903878 $150.82 000001084937-3562510204
2024 11 FD52 10 E121 D 1545401D 099 5/9/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051O1062412903878 $134.76 000001084937-3562510200
2024 11 FD52 10 E121 D 1545401D 099 5/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051O1062412903878 $11.37 000001084937-3562510204
2024 11 FD52 10 E122 D 1545401D 099 5/9/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051O1062412903878 $1,179.54 000001084937-3562510200
2024 11 FD52 10 E122 D 1545401D 099 5/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051O1062412903878 $99.80 000001084937-3562510204
2024 11 FD52 10 E123 D 1545401D 099 5/9/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051O1062412903878 $241.64 000001084937-3562510200
2024 11 FD52 10 E123 D 1545401D 099 5/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051O1062412903878 $19.31 000001084937-3562510204
2024 10 FD52 10 E229 D 1545401D 099 4/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF IET-XE13A162524116013040 $36.45
2024 10 FD52 10 E111 D 1545401D 099 4/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042O1062411502743 $1,329.10 000001084937-3562510204
2024 10 FD52 10 E111 D 1545401D 099 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502743 $485.63 000001084937-3562510204
2024 10 FD52 10 E121 D 1545401D 099 4/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042O1062411502743 $100.42 000001084937-3562510204
2024 10 FD52 10 E121 D 1545401D 099 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502743 $36.80 000001084937-3562510204
2024 10 FD52 10 E122 D 1545401D 099 4/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042O1062411502743 $879.73 000001084937-3562510204
2024 10 FD52 10 E122 D 1545401D 099 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502743 $321.34 000001084937-3562510204
2024 10 FD52 10 E123 D 1545401D 099 4/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042O1062411502743 $181.60 000001084937-3562510204
2024 10 FD52 10 E123 D 1545401D 099 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502743 $62.72 000001084937-3562510204
2024 10 FD52 10 E124 D 1545401D 099 4/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042O1062411502743 $0.37 000001084937-3562510204
2024 10 FD52 10 E124 D 1545401D 099 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502743 $0.14 000001084937-3562510204
2024 10 FD52 10 E229 D 1545401D 099 4/17/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF IET-XE13A162524101014420 $50.70
2024 10 FD52 10 E122 D 1545401D 099 4/11/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041O1062410001628 $1,212.69 000001084937-3562510200
2024 10 FD52 10 E122 D 1545401D 099 4/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001628 $155.09 000001084937-3562510200
2024 10 FD52 10 E123 D 1545401D 099 4/11/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041O1062410001628 $243.51 000001084937-3562510204
2024 10 FD52 10 E123 D 1545401D 099 4/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001628 $31.02 000001084937-3562510204
2024 10 FD52 10 E111 D 1545401D 099 4/11/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041O1062410001628 $1,832.68 000001084937-3562510204
2024 10 FD52 10 E111 D 1545401D 099 4/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001628 $234.38 000001084937-3562510200
2024 10 FD52 10 E121 D 1545401D 099 4/11/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041O1062410001628 $138.34 000001084937-3562510204
2024 10 FD52 10 E121 D 1545401D 099 4/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001628 $17.70 000001084937-3562510204
2024 10 FD52 00 E111 D 1545401D 099 4/10/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR041O1062410001672 $286.38 000001091537-3562500061
2024 10 FD52 00 E111 D 1545401D 099 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001672 $40.48 000001091537-3562500061
2024 10 FD52 00 E121 D 1545401D 099 4/10/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR041O1062410001672 $21.14 000001091537-3562500061
2024 10 FD52 00 E121 D 1545401D 099 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001672 $2.99 000001091537-3562500061
2024 10 FD52 00 E122 D 1545401D 099 4/10/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR041O1062410001672 $189.57 000001091537-3562500061
2024 10 FD52 00 E122 D 1545401D 099 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001672 $26.78 000001091537-3562500061
2024 10 FD52 00 E123 D 1545401D 099 4/10/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR041O1062410001672 $44.45 000001091537-3562500061
2024 10 FD52 00 E123 D 1545401D 099 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001672 $6.19 000001091537-3562500061
2024 9 FD52 10 E111 D 1545401D 099 3/25/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032O1062408200410 $607.07 000001084937-3562510204
2024 9 FD52 10 E121 D 1545401D 099 3/25/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032O1062408200410 $44.58 000001084937-3562510204
2024 9 FD52 10 E122 D 1545401D 099 3/25/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032O1062408200410 $401.72 000001084937-3562510204
2024 9 FD52 10 E123 D 1545401D 099 3/25/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032O1062408200410 $128.75 000001084937-3562510204
2024 9 FD52 10 E124 D 1545401D 099 3/25/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032O1062408200410 $0.20 000001084937-3562510204
2024 8 FD52 10 E339 D 1545401D 099 2/12/2024 4580 CONSTRUCTION CONTRACTS PRC-2400162230 POWELL COUNTY CLERK $4.50
2024 8 FD52 00 E111 D 1545401D 099 2/9/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021O1062403907666 $40.39 000001084705-3562500636
2024 8 FD52 00 E111 D 1545401D 099 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907666 $14.58 000001084705-3562500636
2024 8 FD52 00 E121 D 1545401D 099 2/9/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021O1062403907666 $2.87 000001084705-3562500636
2024 8 FD52 00 E121 D 1545401D 099 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907666 $1.04 000001084705-3562500636
2024 8 FD52 00 E122 D 1545401D 099 2/9/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021O1062403907666 $26.81 000001084705-3562500636
2024 8 FD52 00 E122 D 1545401D 099 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907666 $9.65 000001084705-3562500636
2024 8 FD52 00 E123 D 1545401D 099 2/9/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021O1062403907666 $9.41 000001084705-3562500636
2024 8 FD52 00 E123 D 1545401D 099 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907666 $3.36 000001084705-3562500636
2024 7 FD52 00 E111 D 1545401D 099 1/24/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012O1062402306590 $88.46 000001084705-3562500636
2024 7 FD52 00 E111 D 1545401D 099 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306590 $22.98 000001084705-3562500636
2024 7 FD52 00 E121 D 1545401D 099 1/24/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012O1062402306590 $6.39 000001084705-3562500636
2024 7 FD52 00 E121 D 1545401D 099 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306590 $1.67 000001084705-3562500636
2024 7 FD52 00 E122 D 1545401D 099 1/24/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012O1062402306590 $58.80 000001084705-3562500636
2024 7 FD52 00 E122 D 1545401D 099 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306590 $15.20 000001084705-3562500636
2024 7 FD52 00 E123 D 1545401D 099 1/24/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012O1062402306590 $20.62 000001084705-3562500636
2024 7 FD52 00 E123 D 1545401D 099 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306590 $5.29 000001084705-3562500636
2024 7 FD52 00 E124 D 1545401D 099 1/24/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012O1062402306590 $0.02 000001084705-3562500636
2024 7 FD52 00 E124 D 1545401D 099 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306590 $0.01 000001084705-3562500636
2024 6 FD52 10 E111 D 1545401D 099 12/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122N1062335504615 $309.92 000001084937-3562510204
2024 6 FD52 10 E111 D 1545401D 099 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504615 $30.99 000001084937-3562510204
2024 6 FD52 10 E121 D 1545401D 099 12/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122N1062335504615 $23.54 000001084937-3562510204
2024 6 FD52 10 E121 D 1545401D 099 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504615 $2.36 000001084937-3562510204
2024 6 FD52 10 E122 D 1545401D 099 12/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122N1062335504615 $205.07 000001084937-3562510204
2024 6 FD52 10 E122 D 1545401D 099 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504615 $20.51 000001084937-3562510204
2024 6 FD52 10 E123 D 1545401D 099 12/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122N1062335504615 $34.85 000001084937-3562510204
2024 6 FD52 10 E123 D 1545401D 099 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504615 $3.43 000001084937-3562510204
2024 6 FD52 10 E124 D 1545401D 099 12/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122N1062335504615 $0.09 000001084937-3562510204
2024 6 FD52 10 E124 D 1545401D 099 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504615 $0.01 000001084937-3562510204
2024 5 FD52 10 E122 D 1545401D 099 11/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502559 $77.77 000001089766-3562510204
2024 5 FD52 10 E123 D 1545401D 099 11/30/2023 1030 FIELD SURVEY CA-XR112N1062332502559 $45.24 000001089766-3562510204
2024 5 FD52 10 E123 D 1545401D 099 11/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502559 $21.03 000001089766-3562510204
2024 5 FD52 10 E111 D 1545401D 099 11/30/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112N1062332502519 $289.24 000001084937-3562510204
2024 5 FD52 10 E111 D 1545401D 099 11/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502519 $49.18 000001084937-3562510204
2024 5 FD52 10 E121 D 1545401D 099 11/30/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112N1062332502519 $21.97 000001084937-3562510204
2024 5 FD52 10 E121 D 1545401D 099 11/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502519 $3.74 000001084937-3562510204
2024 5 FD52 10 E122 D 1545401D 099 11/30/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112N1062332502519 $191.40 000001084937-3562510204
2024 5 FD52 10 E122 D 1545401D 099 11/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502519 $32.54 000001084937-3562510204
2024 5 FD52 10 E124 D 1545401D 099 11/30/2023 1030 FIELD SURVEY CA-XR112N1062332502559 $0.09 000001089766-3562510204
2024 5 FD52 10 E123 D 1545401D 099 11/30/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112N1062332502519 $32.56 000001084937-3562510204
2024 5 FD52 10 E123 D 1545401D 099 11/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502519 $5.45 000001084937-3562510204
2024 5 FD52 10 E124 D 1545401D 099 11/30/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112N1062332502519 $0.08 000001084937-3562510204
2024 5 FD52 10 E124 D 1545401D 099 11/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502519 $0.01 000001084937-3562510204
2024 5 FD52 10 E124 D 1545401D 099 11/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502559 $0.04 000001089766-3562510204
2024 5 FD52 10 E111 D 1545401D 099 11/30/2023 1030 FIELD SURVEY CA-XR112N1062332502558 $249.30 000001089766-3562510204
2024 5 FD52 10 E111 D 1545401D 099 11/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502558 $117.56 000001089766-3562510204
2024 5 FD52 10 E121 D 1545401D 099 11/30/2023 1030 FIELD SURVEY CA-XR112N1062332502558 $18.58 000001089766-3562510204
2024 5 FD52 10 E121 D 1545401D 099 11/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502558 $8.77 000001089766-3562510204
2024 5 FD52 10 E122 D 1545401D 099 11/30/2023 1030 FIELD SURVEY CA-XR112N1062332502558 $164.81 000001089766-3562510204
2024 5 FD52 10 E229 D 1545401D 099 11/27/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF IET-XE13A162523329011760 $12.45
2024 5 FD52 10 E143 D 1545401D 099 11/20/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400100204 PON22300001676 BURGESS AND NIPLE INC $15,315.91 Powell Cos. 10-176
2024 5 FD52 10 E229 D 1545401D 099 11/14/2023 1030 FIELD SURVEY IET-XE13A162523314009620 $53.55
2024 5 FD52 10 E229 D 1545401D 099 11/14/2023 1030 FIELD SURVEY IET-XE13A162523314009770 $66.20
2024 5 FD52 10 E111 D 1545401D 099 11/9/2023 1030 FIELD SURVEY CA-XR111N1062331201522 $1,369.91 000001089766-3562510204
2024 5 FD52 10 E111 D 1545401D 099 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201522 $229.84 000001089766-3562510204
2024 5 FD52 10 E121 D 1545401D 099 11/9/2023 1030 FIELD SURVEY CA-XR111N1062331201522 $101.46 000001089766-3562510204
2024 5 FD52 10 E121 D 1545401D 099 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201522 $17.12 000001089766-3562510204
2024 5 FD52 10 E122 D 1545401D 099 11/9/2023 1030 FIELD SURVEY CA-XR111N1062331201522 $906.48 000001089766-3562510204
2024 5 FD52 10 E122 D 1545401D 099 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201522 $152.08 000001089766-3562510204
2024 5 FD52 10 E123 D 1545401D 099 11/9/2023 1030 FIELD SURVEY CA-XR111N1062331201522 $210.14 000001089766-3562510204
2024 5 FD52 10 E123 D 1545401D 099 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201522 $34.10 000001089766-3562510204
2024 4 FD52 10 E229 D 1545401D 099 10/27/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF IET-XE13A162523298020790 $66.15
2024 4 FD52 10 E111 D 1545401D 099 10/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102N1062329600421 $1,660.01 000001084937-3562510204
2024 4 FD52 10 E111 D 1545401D 099 10/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102N1062329600421 $198.58 000001084937-3562510204
2024 4 FD52 10 E121 D 1545401D 099 10/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102N1062329600421 $123.55 000001084937-3562510204
2024 4 FD52 10 E121 D 1545401D 099 10/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102N1062329600421 $14.90 000001084937-3562510204
2024 4 FD52 10 E122 D 1545401D 099 10/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102N1062329600421 $1,098.57 000001084937-3562510204
2024 4 FD52 10 E122 D 1545401D 099 10/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102N1062329600421 $131.40 000001084937-3562510204
2024 4 FD52 10 E123 D 1545401D 099 10/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102N1062329600421 $255.74 000001084937-3562510204
2024 4 FD52 10 E123 D 1545401D 099 10/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102N1062329600421 $27.83 000001084937-3562510204
2024 4 FD52 10 E124 D 1545401D 099 10/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102N1062329600421 $0.50 000001084937-3562510204
2024 4 FD52 10 E124 D 1545401D 099 10/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102N1062329600421 $0.06 000001084937-3562510204
2024 4 FD52 10 E229 D 1545401D 099 10/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF IET-XE13A162523283011950 $12.45
2024 4 FD52 00 E111 D 1545401D 099 10/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101N1062328009697 $194.48 000001084705-3562500636
2024 4 FD52 00 E111 D 1545401D 099 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009697 $18.48 000001084705-3562500636
2024 4 FD52 00 E121 D 1545401D 099 10/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101N1062328009697 $13.78 000001084705-3562500636
2024 4 FD52 00 E121 D 1545401D 099 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009697 $1.31 000001084705-3562500636
2024 4 FD52 00 E122 D 1545401D 099 10/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101N1062328009697 $128.69 000001084705-3562500636
2024 4 FD52 10 E111 D 1545401D 099 10/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101N1062328009698 $324.58 000001084937-3562510204
2024 4 FD52 00 E122 D 1545401D 099 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009697 $12.23 000001084705-3562500636
2024 4 FD52 10 E111 D 1545401D 099 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009698 $16.02 000001084937-3562510204
2024 4 FD52 00 E123 D 1545401D 099 10/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101N1062328009697 $37.51 000001084705-3562500636
2024 4 FD52 10 E121 D 1545401D 099 10/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101N1062328009698 $24.49 000001084937-3562510204
2024 4 FD52 00 E123 D 1545401D 099 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009697 $3.54 000001084705-3562500636
2024 4 FD52 10 E121 D 1545401D 099 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009698 $1.21 000001084937-3562510204
2024 4 FD52 10 E122 D 1545401D 099 10/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101N1062328009698 $214.83 000001084937-3562510204
2024 4 FD52 10 E122 D 1545401D 099 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009698 $10.60 000001084937-3562510204
2024 4 FD52 10 E123 D 1545401D 099 10/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101N1062328009698 $38.31 000001084937-3562510204
2024 4 FD52 10 E123 D 1545401D 099 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009698 $1.86 000001084937-3562510204
2024 3 FD52 10 E143 D 1545401D 099 9/18/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400050392 PON22300001676 BURGESS AND NIPLE INC $22,966.81 Powell Cos. 10-176
2023 12 FD52 10 E143 D 1545401D 099 6/21/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300236587 PON22300001676 BURGESS AND NIPLE INC $86,729.23 Powell Cos. 10-176
2023 11 FD52 10 E111 D 1545401D 099 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309054 $5.73 000001084937-3562510204
2023 11 FD52 10 E121 D 1545401D 099 5/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052N1062314309054 $66.29 000001084937-3562510204
2023 11 FD52 10 E121 D 1545401D 099 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309054 $0.41 000001084937-3562510204
2023 11 FD52 10 E122 D 1545401D 099 5/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052N1062314309054 $718.45 000001084937-3562510204
2023 11 FD52 10 E122 D 1545401D 099 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309054 $4.47 000001084937-3562510204
2023 11 FD52 10 E123 D 1545401D 099 5/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052N1062314309054 $191.69 000001084937-3562510204
2023 11 FD52 10 E123 D 1545401D 099 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309054 $1.18 000001084937-3562510204
2023 11 FD52 10 E124 D 1545401D 099 5/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052N1062314309054 $0.27 000001084937-3562510204
2023 11 FD52 10 E111 D 1545401D 099 5/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052N1062314309054 $921.02 000001084937-3562510204
2023 10 FD52 10 E111 D 1545401D 099 4/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042N1062311106949 $337.73 000001084937-3562510204
2023 10 FD52 10 E111 D 1545401D 099 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106949 $33.32 000001084937-3562510204
2023 10 FD52 10 E121 D 1545401D 099 4/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042N1062311106949 $24.31 000001084937-3562510204
2023 10 FD52 10 E121 D 1545401D 099 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106949 $2.40 000001084937-3562510204
2023 10 FD52 10 E122 D 1545401D 099 4/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042N1062311106949 $263.43 000001084937-3562510204
2023 10 FD52 10 E122 D 1545401D 099 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106949 $25.99 000001084937-3562510204
2023 10 FD52 10 E123 D 1545401D 099 4/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042N1062311106949 $70.33 000001084937-3562510204
2023 10 FD52 10 E123 D 1545401D 099 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106949 $6.88 000001084937-3562510204
2023 10 FD52 10 E124 D 1545401D 099 4/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042N1062311106949 $0.10 000001084937-3562510204
2023 10 FD52 10 E124 D 1545401D 099 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106949 $0.01 000001084937-3562510204
2023 10 FD52 10 E123 D 1545401D 099 4/10/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041N1062309605781 $117.33 000001084937-3562510204
2023 10 FD52 10 E123 D 1545401D 099 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605781 $26.13 000001084937-3562510204
2023 10 FD52 10 E111 D 1545401D 099 4/10/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041N1062309605780 $562.90 000001084937-3562510204
2023 10 FD52 10 E111 D 1545401D 099 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605780 $126.46 000001084937-3562510204
2023 10 FD52 10 E121 D 1545401D 099 4/10/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041N1062309605780 $40.37 000001084937-3562510204
2023 10 FD52 10 E121 D 1545401D 099 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605780 $9.07 000001084937-3562510204
2023 10 FD52 10 E122 D 1545401D 099 4/10/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041N1062309605780 $439.05 000001084937-3562510204
2023 10 FD52 10 E122 D 1545401D 099 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605780 $98.64 000001084937-3562510204
2023 9 FD52 10 E123 D 1545401D 099 3/27/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032N1062308304659 $63.89 000001084937-3562510204
2023 9 FD52 10 E124 D 1545401D 099 3/27/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032N1062308304659 $0.09 000001084937-3562510204
2023 9 FD52 10 E111 D 1545401D 099 3/27/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032N1062308304658 $307.03 000001084937-3562510204
2023 9 FD52 10 E121 D 1545401D 099 3/27/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032N1062308304658 $22.10 000001084937-3562510204
2023 9 FD52 10 E122 D 1545401D 099 3/27/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032N1062308304658 $239.48 000001084937-3562510204
2023 7 FD52 00 E111 D 1545401D 099 1/12/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR011N1062300610272 $171.82 000001085858-3562500061
2023 7 FD52 00 E111 D 1545401D 099 1/12/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011N1062300610272 $206.18 000001085858-3562500061
2023 7 FD52 00 E121 D 1545401D 099 1/12/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR011N1062300610272 $12.72 000001085858-3562500061
2023 7 FD52 00 E121 D 1545401D 099 1/12/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011N1062300610272 $15.26 000001085858-3562500061
2023 7 FD52 00 E122 D 1545401D 099 1/12/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR011N1062300610272 $134.02 000001085858-3562500061
2023 7 FD52 00 E122 D 1545401D 099 1/12/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011N1062300610272 $160.82 000001085858-3562500061
2023 7 FD52 00 E123 D 1545401D 099 1/12/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR011N1062300610272 $35.55 000001085858-3562500061
2023 7 FD52 00 E123 D 1545401D 099 1/12/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011N1062300610272 $41.44 000001085858-3562500061
2023 6 FD52 00 E111 D 1545401D 099 12/22/2022 0060 ENV STUDIES-ARCHAEOLOGY CA-XR122M1062235509197 $469.95 000001085854-3562500061
2023 6 FD52 00 E111 D 1545401D 099 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509197 $222.44 000001085854-3562500061
2023 6 FD52 00 E121 D 1545401D 099 12/22/2022 0060 ENV STUDIES-ARCHAEOLOGY CA-XR122M1062235509197 $35.58 000001085854-3562500061
2023 6 FD52 00 E121 D 1545401D 099 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509197 $16.83 000001085854-3562500061
2023 6 FD52 00 E122 D 1545401D 099 12/22/2022 0060 ENV STUDIES-ARCHAEOLOGY CA-XR122M1062235509197 $366.56 000001085854-3562500061
2023 6 FD52 00 E122 D 1545401D 099 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509197 $173.51 000001085854-3562500061
2023 6 FD52 00 E123 D 1545401D 099 12/22/2022 0060 ENV STUDIES-ARCHAEOLOGY CA-XR122M1062235509197 $64.72 000001085854-3562500061
2023 6 FD52 00 E123 D 1545401D 099 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509197 $29.99 000001085854-3562500061
2023 6 FD52 00 E124 D 1545401D 099 12/22/2022 0060 ENV STUDIES-ARCHAEOLOGY CA-XR122M1062235509197 $0.18 000001085854-3562500061
2023 6 FD52 00 E124 D 1545401D 099 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509197 $0.08 000001085854-3562500061
2023 6 FD52 00 E111 D 1545401D 099 12/22/2022 0010 ENV STUDIES-UST/HZM CA-XR122M1062235509196 $206.18 000001085837-3562500061
2023 6 FD52 00 E121 D 1545401D 099 12/22/2022 0010 ENV STUDIES-UST/HZM CA-XR122M1062235509196 $14.39 000001085837-3562500061
2023 6 FD52 00 E122 D 1545401D 099 12/22/2022 0010 ENV STUDIES-UST/HZM CA-XR122M1062235509196 $160.82 000001085837-3562500061
2023 6 FD52 00 E123 D 1545401D 099 12/22/2022 0010 ENV STUDIES-UST/HZM CA-XR122M1062235509196 $56.14 000001085837-3562500061
2023 6 FD52 00 E124 D 1545401D 099 12/22/2022 0010 ENV STUDIES-UST/HZM CA-XR122M1062235509196 $0.09 000001085837-3562500061
2023 6 FD52 00 E111 D 1545401D 099 12/22/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR122M1062235509197 $171.88 000001085858-3562500061
2023 6 FD52 00 E111 D 1545401D 099 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509197 $14.66 000001085858-3562500061
2023 6 FD52 00 E121 D 1545401D 099 12/22/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR122M1062235509197 $12.96 000001085858-3562500061
2023 6 FD52 00 E121 D 1545401D 099 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509197 $1.11 000001085858-3562500061
2023 6 FD52 00 E122 D 1545401D 099 12/22/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR122M1062235509197 $134.21 000001085858-3562500061
2023 6 FD52 00 E122 D 1545401D 099 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509197 $11.43 000001085858-3562500061
2023 6 FD52 00 E123 D 1545401D 099 12/22/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR122M1062235509197 $32.22 000001085858-3562500061
2023 6 FD52 00 E123 D 1545401D 099 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509197 $2.70 000001085858-3562500061
2023 6 FD52 00 E124 D 1545401D 099 12/22/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR122M1062235509197 $0.09 000001085858-3562500061
2023 6 FD52 00 E124 D 1545401D 099 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509197 $0.01 000001085858-3562500061
2023 6 FD52 00 E121 D 1545401D 099 12/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121M1062234208228 $14.94 000001084705-3562500636
2023 6 FD52 10 E123 D 1545401D 099 12/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121M1062234208229 $0.05 000001084937-3562510204
2023 6 FD52 10 E123 D 1545401D 099 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208229 $3.15 000001084937-3562510204
2023 6 FD52 00 E121 D 1545401D 099 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208228 $5.77 000001084705-3562500636
2023 6 FD52 00 E122 D 1545401D 099 12/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121M1062234208228 $167.33 000001084705-3562500636
2023 6 FD52 00 E122 D 1545401D 099 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208228 $64.70 000001084705-3562500636
2023 6 FD52 00 E123 D 1545401D 099 12/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121M1062234208228 $45.06 000001084705-3562500636
2023 6 FD52 00 E123 D 1545401D 099 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208228 $17.22 000001084705-3562500636
2023 6 FD52 10 E111 D 1545401D 099 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208229 $22.96 000001084937-3562510204
2023 6 FD52 10 E121 D 1545401D 099 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208229 $1.72 000001084937-3562510204
2023 6 FD52 10 E122 D 1545401D 099 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208229 $17.91 000001084937-3562510204
2023 6 FD52 00 E111 D 1545401D 099 12/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121M1062234208227 $214.48 000001084705-3562500636
2023 6 FD52 00 E111 D 1545401D 099 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208227 $82.95 000001084705-3562500636
2023 5 FD52 00 E124 D 1545401D 099 11/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112M1062232607178 $0.03 000001084705-3562500636
2023 5 FD52 00 E111 D 1545401D 099 11/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112M1062232607178 $89.43 000001084705-3562500636
2023 5 FD52 00 E111 D 1545401D 099 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607178 $17.16 000001084705-3562500636
2023 5 FD52 00 E121 D 1545401D 099 11/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112M1062232607178 $6.38 000001084705-3562500636
2023 5 FD52 00 E121 D 1545401D 099 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607178 $1.22 000001084705-3562500636
2023 5 FD52 00 E122 D 1545401D 099 11/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112M1062232607178 $69.72 000001084705-3562500636
2023 5 FD52 00 E122 D 1545401D 099 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607178 $13.39 000001084705-3562500636
2023 5 FD52 00 E123 D 1545401D 099 11/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112M1062232607178 $18.74 000001084705-3562500636
2023 5 FD52 00 E123 D 1545401D 099 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607178 $3.56 000001084705-3562500636
2023 5 FD52 10 E111 D 1545401D 099 11/7/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111M1062230806178 $229.65 000001084937-3562510204
2023 5 FD52 10 E121 D 1545401D 099 11/7/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111M1062230806178 $17.21 000001084937-3562510204
2023 5 FD52 10 E122 D 1545401D 099 11/7/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111M1062230806178 $179.09 000001084937-3562510204
2023 5 FD52 10 E123 D 1545401D 099 11/7/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111M1062230806178 $31.97 000001084937-3562510204
2023 4 FD52 10 E111 D 1545401D 099 10/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102M1062229405077 $252.56 000001084937-3562510204
2023 4 FD52 10 E111 D 1545401D 099 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405077 $27.95 000001084937-3562510204
2023 4 FD52 10 E121 D 1545401D 099 10/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102M1062229405077 $19.14 000001084937-3562510204
2023 4 FD52 10 E121 D 1545401D 099 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405077 $2.12 000001084937-3562510204
2023 4 FD52 10 E122 D 1545401D 099 10/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102M1062229405077 $197.00 000001084937-3562510204
2023 4 FD52 10 E122 D 1545401D 099 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405077 $21.80 000001084937-3562510204
2023 4 FD52 10 E123 D 1545401D 099 10/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102M1062229405077 $35.23 000001084937-3562510204
2023 4 FD52 10 E123 D 1545401D 099 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405077 $3.84 000001084937-3562510204
2023 4 FD52 10 E124 D 1545401D 099 10/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102M1062229405077 $0.10 000001084937-3562510204
2023 4 FD52 10 E124 D 1545401D 099 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405077 $0.01 000001084937-3562510204
2023 4 FD52 10 E111 D 1545401D 099 10/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101M1062228003970 $218.67 000001084937-3562510204
2023 4 FD52 10 E111 D 1545401D 099 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003970 $11.08 000001084937-3562510204
2023 4 FD52 10 E121 D 1545401D 099 10/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101M1062228003970 $16.37 000001084937-3562510204
2023 4 FD52 10 E121 D 1545401D 099 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003970 $0.83 000001084937-3562510204
2023 4 FD52 10 E122 D 1545401D 099 10/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101M1062228003970 $170.56 000001084937-3562510204
2023 4 FD52 10 E122 D 1545401D 099 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003970 $8.64 000001084937-3562510204
2023 4 FD52 10 E123 D 1545401D 099 10/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101M1062228003970 $32.00 000001084937-3562510204
2023 4 FD52 10 E123 D 1545401D 099 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003970 $1.60 000001084937-3562510204
2023 3 FD52 00 E111 D 1545401D 099 9/26/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092M1062226602812 $71.69 000001084705-3562500636
2023 3 FD52 00 E111 D 1545401D 099 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602812 $35.40 000001084705-3562500636
2023 3 FD52 00 E121 D 1545401D 099 9/26/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092M1062226602812 $5.10 000001084705-3562500636
2023 3 FD52 00 E121 D 1545401D 099 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602812 $2.51 000001084705-3562500636
2023 3 FD52 00 E122 D 1545401D 099 9/26/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092M1062226602812 $55.78 000001084705-3562500636
2023 3 FD52 00 E122 D 1545401D 099 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602812 $27.62 000001084705-3562500636
2023 3 FD52 00 E123 D 1545401D 099 9/26/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092M1062226602812 $15.04 000001084705-3562500636
2023 3 FD52 00 E123 D 1545401D 099 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602812 $7.34 000001084705-3562500636
2023 3 FD52 00 E124 D 1545401D 099 9/26/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092M1062226602812 $0.02 000001084705-3562500636
2023 3 FD52 00 E124 D 1545401D 099 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602812 $0.01 000001084705-3562500636