2024 |
10 |
FD52 |
00 |
E111 |
D |
1513501D |
098 |
4/26/2024 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR042O1062411502777 |
|
|
$889.64 |
000001090571-3562500610 |
2024 |
10 |
FD52 |
00 |
E111 |
D |
1513501D |
098 |
4/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042O1062411502777 |
|
|
$22.14 |
000001090571-3562500610 |
2024 |
10 |
FD52 |
00 |
E121 |
D |
1513501D |
098 |
4/26/2024 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR042O1062411502777 |
|
|
$65.89 |
000001090571-3562500610 |
2024 |
10 |
FD52 |
00 |
E121 |
D |
1513501D |
098 |
4/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042O1062411502777 |
|
|
$1.64 |
000001090571-3562500610 |
2024 |
10 |
FD52 |
00 |
E122 |
D |
1513501D |
098 |
4/26/2024 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR042O1062411502777 |
|
|
$588.73 |
000001090571-3562500610 |
2024 |
10 |
FD52 |
00 |
E122 |
D |
1513501D |
098 |
4/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042O1062411502777 |
|
|
$14.65 |
000001090571-3562500610 |
2024 |
10 |
FD52 |
00 |
E123 |
D |
1513501D |
098 |
4/26/2024 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR042O1062411502777 |
|
|
$141.33 |
000001090571-3562500610 |
2024 |
10 |
FD52 |
00 |
E123 |
D |
1513501D |
098 |
4/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042O1062411502777 |
|
|
$3.48 |
000001090571-3562500610 |
2024 |
10 |
FD52 |
00 |
E124 |
D |
1513501D |
098 |
4/26/2024 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR042O1062411502777 |
|
|
$0.27 |
000001090571-3562500610 |
2024 |
10 |
FD52 |
00 |
E124 |
D |
1513501D |
098 |
4/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042O1062411502777 |
|
|
$0.01 |
000001090571-3562500610 |
2024 |
10 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
4/26/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042O1062411502755 |
|
|
$249.08 |
000001087730-3562512204 |
2024 |
10 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
4/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042O1062411502755 |
|
|
$79.70 |
000001087730-3562512204 |
2024 |
10 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
4/26/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042O1062411502755 |
|
|
$18.61 |
000001087730-3562512204 |
2024 |
10 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
4/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042O1062411502755 |
|
|
$5.95 |
000001087730-3562512204 |
2024 |
10 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
4/26/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042O1062411502755 |
|
|
$164.81 |
000001087730-3562512204 |
2024 |
10 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
4/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042O1062411502755 |
|
|
$52.73 |
000001087730-3562512204 |
2024 |
10 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
4/26/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042O1062411502755 |
|
|
$37.88 |
000001087730-3562512204 |
2024 |
10 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
4/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042O1062411502755 |
|
|
$11.92 |
000001087730-3562512204 |
2024 |
10 |
FD52 |
12 |
E124 |
D |
1513501D |
098 |
4/26/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042O1062411502755 |
|
|
$0.09 |
000001087730-3562512204 |
2024 |
10 |
FD52 |
12 |
E124 |
D |
1513501D |
098 |
4/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042O1062411502755 |
|
|
$0.03 |
000001087730-3562512204 |
2024 |
10 |
FD52 |
00 |
E111 |
D |
1513501D |
098 |
4/11/2024 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR041O1062410001659 |
|
|
$1,939.98 |
000001090571-3562500610 |
2024 |
10 |
FD52 |
00 |
E111 |
D |
1513501D |
098 |
4/11/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041O1062410001659 |
|
|
$112.86 |
000001090571-3562500610 |
2024 |
10 |
FD52 |
00 |
E121 |
D |
1513501D |
098 |
4/11/2024 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR041O1062410001659 |
|
|
$144.14 |
000001090571-3562500610 |
2024 |
10 |
FD52 |
00 |
E121 |
D |
1513501D |
098 |
4/11/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041O1062410001659 |
|
|
$8.35 |
000001090571-3562500610 |
2024 |
10 |
FD52 |
00 |
E122 |
D |
1513501D |
098 |
4/11/2024 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR041O1062410001659 |
|
|
$1,283.65 |
000001090571-3562500610 |
2024 |
10 |
FD52 |
00 |
E122 |
D |
1513501D |
098 |
4/11/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041O1062410001659 |
|
|
$74.69 |
000001090571-3562500610 |
2024 |
10 |
FD52 |
00 |
E123 |
D |
1513501D |
098 |
4/11/2024 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR041O1062410001659 |
|
|
$282.27 |
000001090571-3562500610 |
2024 |
10 |
FD52 |
00 |
E123 |
D |
1513501D |
098 |
4/11/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041O1062410001659 |
|
|
$16.44 |
000001090571-3562500610 |
2024 |
10 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
4/10/2024 |
1030 |
FIELD SURVEY |
CA-XR041O1062410001672 |
|
|
$1,342.15 |
000001091546-3562512204 |
2024 |
10 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
4/10/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041O1062410001672 |
|
|
$1,033.82 |
000001091546-3562512204 |
2024 |
10 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
4/10/2024 |
1030 |
FIELD SURVEY |
CA-XR041O1062410001672 |
|
|
$97.22 |
000001091546-3562512204 |
2024 |
10 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
4/10/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041O1062410001672 |
|
|
$76.75 |
000001091546-3562512204 |
2024 |
10 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
4/10/2024 |
1030 |
FIELD SURVEY |
CA-XR041O1062410001672 |
|
|
$888.34 |
000001091546-3562512204 |
2024 |
10 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
4/10/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041O1062410001672 |
|
|
$684.08 |
000001091546-3562512204 |
2024 |
10 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
4/10/2024 |
1030 |
FIELD SURVEY |
CA-XR041O1062410001672 |
|
|
$242.76 |
000001091546-3562512204 |
2024 |
10 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
4/10/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041O1062410001672 |
|
|
$166.81 |
000001091546-3562512204 |
2024 |
10 |
FD52 |
00 |
E111 |
D |
1513501D |
098 |
4/1/2024 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR032O1062408200444 |
|
|
$940.63 |
000001090571-3562500610 |
2024 |
10 |
FD52 |
00 |
E111 |
D |
1513501D |
098 |
4/1/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032O1062408200444 |
|
|
$5.09 |
000001090571-3562500610 |
2024 |
10 |
FD52 |
00 |
E121 |
D |
1513501D |
098 |
4/1/2024 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR032O1062408200444 |
|
|
$69.73 |
000001090571-3562500610 |
2024 |
10 |
FD52 |
00 |
E121 |
D |
1513501D |
098 |
4/1/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032O1062408200444 |
|
|
$0.38 |
000001090571-3562500610 |
2024 |
10 |
FD52 |
00 |
E122 |
D |
1513501D |
098 |
4/1/2024 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR032O1062408200444 |
|
|
$622.42 |
000001090571-3562500610 |
2024 |
10 |
FD52 |
00 |
E122 |
D |
1513501D |
098 |
4/1/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032O1062408200444 |
|
|
$3.37 |
000001090571-3562500610 |
2024 |
10 |
FD52 |
00 |
E123 |
D |
1513501D |
098 |
4/1/2024 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR032O1062408200444 |
|
|
$149.22 |
000001090571-3562500610 |
2024 |
10 |
FD52 |
00 |
E123 |
D |
1513501D |
098 |
4/1/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032O1062408200444 |
|
|
$0.78 |
000001090571-3562500610 |
2024 |
10 |
FD52 |
00 |
E124 |
D |
1513501D |
098 |
4/1/2024 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR032O1062408200444 |
|
|
$0.30 |
000001090571-3562500610 |
2024 |
9 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
3/11/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031O1062406810087 |
|
|
$10.72 |
000001087730-3562512204 |
2024 |
9 |
FD52 |
00 |
E123 |
D |
1513501D |
098 |
3/11/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031O1062406810104 |
|
|
$10.25 |
000001090488-3562500636 |
2024 |
9 |
FD52 |
00 |
E111 |
D |
1513501D |
098 |
3/11/2024 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR031O1062406810104 |
|
|
$1,334.37 |
000001090571-3562500610 |
2024 |
9 |
FD52 |
00 |
E111 |
D |
1513501D |
098 |
3/11/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031O1062406810104 |
|
|
$20.88 |
000001090571-3562500610 |
2024 |
9 |
FD52 |
00 |
E121 |
D |
1513501D |
098 |
3/11/2024 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR031O1062406810104 |
|
|
$100.05 |
000001090571-3562500610 |
2024 |
9 |
FD52 |
00 |
E121 |
D |
1513501D |
098 |
3/11/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031O1062406810104 |
|
|
$1.56 |
000001090571-3562500610 |
2024 |
9 |
FD52 |
00 |
E122 |
D |
1513501D |
098 |
3/11/2024 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR031O1062406810104 |
|
|
$882.91 |
000001090571-3562500610 |
2024 |
9 |
FD52 |
00 |
E122 |
D |
1513501D |
098 |
3/11/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031O1062406810104 |
|
|
$13.82 |
000001090571-3562500610 |
2024 |
9 |
FD52 |
00 |
E123 |
D |
1513501D |
098 |
3/11/2024 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR031O1062406810104 |
|
|
$208.46 |
000001090571-3562500610 |
2024 |
9 |
FD52 |
00 |
E123 |
D |
1513501D |
098 |
3/11/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031O1062406810104 |
|
|
$3.28 |
000001090571-3562500610 |
2024 |
9 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
3/11/2024 |
0220 |
ENVIR IMPACT ST-GENERAL |
CA-XR031O1062406810092 |
|
|
$625.42 |
000001088605-3562512204 |
2024 |
9 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
3/11/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031O1062406810092 |
|
|
$8.34 |
000001088605-3562512204 |
2024 |
9 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
3/11/2024 |
0220 |
ENVIR IMPACT ST-GENERAL |
CA-XR031O1062406810092 |
|
|
$45.00 |
000001088605-3562512204 |
2024 |
9 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
3/11/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031O1062406810092 |
|
|
$0.60 |
000001088605-3562512204 |
2024 |
9 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
3/11/2024 |
0220 |
ENVIR IMPACT ST-GENERAL |
CA-XR031O1062406810092 |
|
|
$413.85 |
000001088605-3562512204 |
2024 |
9 |
FD52 |
00 |
E111 |
D |
1513501D |
098 |
3/11/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031O1062406810104 |
|
|
$49.69 |
000001090488-3562500636 |
2024 |
9 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
3/11/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031O1062406810092 |
|
|
$5.52 |
000001088605-3562512204 |
2024 |
9 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
3/11/2024 |
0220 |
ENVIR IMPACT ST-GENERAL |
CA-XR031O1062406810092 |
|
|
$107.66 |
000001088605-3562512204 |
2024 |
9 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
3/11/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031O1062406810092 |
|
|
$1.42 |
000001088605-3562512204 |
2024 |
9 |
FD52 |
00 |
E121 |
D |
1513501D |
098 |
3/11/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031O1062406810104 |
|
|
$3.54 |
000001090488-3562500636 |
2024 |
9 |
FD52 |
00 |
E122 |
D |
1513501D |
098 |
3/11/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031O1062406810104 |
|
|
$32.88 |
000001090488-3562500636 |
2024 |
9 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
3/11/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031O1062406810086 |
|
|
$1,864.79 |
000001087730-3562512204 |
2024 |
9 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
3/11/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031O1062406810086 |
|
|
$64.88 |
000001087730-3562512204 |
2024 |
9 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
3/11/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031O1062406810086 |
|
|
$137.41 |
000001087730-3562512204 |
2024 |
9 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
3/11/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031O1062406810086 |
|
|
$4.77 |
000001087730-3562512204 |
2024 |
9 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
3/11/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031O1062406810086 |
|
|
$1,233.91 |
000001087730-3562512200 |
2024 |
9 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
3/11/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031O1062406810086 |
|
|
$42.93 |
000001087730-3562512204 |
2024 |
9 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
3/11/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031O1062406810086 |
|
|
$215.67 |
000001087730-3562512204 |
2024 |
8 |
FD52 |
12 |
E143 |
D |
1513501D |
098 |
2/29/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400175247 |
PON22300001509 |
PRIME AE Group, Inc. |
$20,985.35 |
Letter Agreement 3 |
2024 |
8 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
2/26/2024 |
0220 |
ENVIR IMPACT ST-GENERAL |
CA-XR022O1062405408920 |
|
|
$568.57 |
000001088605-3562512204 |
2024 |
8 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
2/26/2024 |
0220 |
ENVIR IMPACT ST-GENERAL |
CA-XR022O1062405408920 |
|
|
$41.73 |
000001088605-3562512204 |
2024 |
8 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
2/26/2024 |
0220 |
ENVIR IMPACT ST-GENERAL |
CA-XR022O1062405408920 |
|
|
$376.22 |
000001088605-3562512204 |
2024 |
8 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
2/26/2024 |
0220 |
ENVIR IMPACT ST-GENERAL |
CA-XR022O1062405408920 |
|
|
$97.87 |
000001088605-3562512204 |
2024 |
8 |
FD52 |
12 |
E124 |
D |
1513501D |
098 |
2/26/2024 |
0220 |
ENVIR IMPACT ST-GENERAL |
CA-XR022O1062405408920 |
|
|
$0.18 |
000001088605-3562512204 |
2024 |
8 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
2/26/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022O1062405408913 |
|
|
$645.75 |
000001087730-3562512204 |
2024 |
8 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
2/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022O1062405408913 |
|
|
$100.70 |
000001087730-3562512204 |
2024 |
8 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
2/26/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022O1062405408913 |
|
|
$47.98 |
000001087730-3562512200 |
2024 |
8 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
2/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022O1062405408913 |
|
|
$7.46 |
000001087730-3562512204 |
2024 |
8 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
2/26/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022O1062405408913 |
|
|
$427.40 |
000001087730-3562512200 |
2024 |
8 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
2/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022O1062405408913 |
|
|
$66.64 |
000001087730-3562512204 |
2024 |
8 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
2/26/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022O1062405408913 |
|
|
$74.89 |
000001087730-3562512200 |
2024 |
8 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
2/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022O1062405408913 |
|
|
$9.99 |
000001087730-3562512200 |
2024 |
8 |
FD52 |
12 |
E124 |
D |
1513501D |
098 |
2/26/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022O1062405408913 |
|
|
$0.17 |
000001087730-3562512200 |
2024 |
8 |
FD52 |
12 |
E124 |
D |
1513501D |
098 |
2/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022O1062405408913 |
|
|
$0.02 |
000001087730-3562512200 |
2024 |
8 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
2/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021O1062403907685 |
|
|
$7.40 |
000001088605-3562512204 |
2024 |
8 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
2/9/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR021O1062403907679 |
|
|
$1,722.23 |
000001087730-3562512200 |
2024 |
8 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
2/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021O1062403907679 |
|
|
$282.27 |
000001087730-3562512200 |
2024 |
8 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
2/9/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR021O1062403907679 |
|
|
$126.75 |
000001087730-3562512204 |
2024 |
8 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
2/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021O1062403907679 |
|
|
$20.77 |
000001087730-3562512200 |
2024 |
8 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
2/9/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR021O1062403907679 |
|
|
$1,139.52 |
000001087730-3562512200 |
2024 |
8 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
2/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021O1062403907679 |
|
|
$186.77 |
000001087730-3562512200 |
2024 |
8 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
2/9/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR021O1062403907679 |
|
|
$240.50 |
000001087730-3562512200 |
2024 |
8 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
2/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021O1062403907679 |
|
|
$41.51 |
000001087730-3562512200 |
2024 |
8 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
2/9/2024 |
0220 |
ENVIR IMPACT ST-GENERAL |
CA-XR021O1062403907685 |
|
|
$2,553.71 |
000001088605-3562512204 |
2024 |
8 |
FD52 |
00 |
E111 |
D |
1513501D |
098 |
2/9/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR021O1062403907699 |
|
|
$207.02 |
000001090488-3562500636 |
2024 |
8 |
FD52 |
00 |
E111 |
D |
1513501D |
098 |
2/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021O1062403907699 |
|
|
$3.31 |
000001090488-3562500636 |
2024 |
8 |
FD52 |
00 |
E121 |
D |
1513501D |
098 |
2/9/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR021O1062403907699 |
|
|
$14.77 |
000001090488-3562500636 |
2024 |
8 |
FD52 |
00 |
E121 |
D |
1513501D |
098 |
2/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021O1062403907699 |
|
|
$0.23 |
000001090488-3562500636 |
2024 |
8 |
FD52 |
00 |
E111 |
D |
1513501D |
098 |
2/9/2024 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR021O1062403907700 |
|
|
$1,421.19 |
000001090571-3562500610 |
2024 |
8 |
FD52 |
00 |
E122 |
D |
1513501D |
098 |
2/9/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR021O1062403907699 |
|
|
$137.01 |
000001090488-3562500636 |
2024 |
8 |
FD52 |
00 |
E111 |
D |
1513501D |
098 |
2/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021O1062403907700 |
|
|
$20.88 |
000001090571-3562500610 |
2024 |
8 |
FD52 |
00 |
E122 |
D |
1513501D |
098 |
2/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021O1062403907699 |
|
|
$2.19 |
000001090488-3562500636 |
2024 |
8 |
FD52 |
00 |
E121 |
D |
1513501D |
098 |
2/9/2024 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR021O1062403907700 |
|
|
$105.31 |
000001090571-3562500610 |
2024 |
8 |
FD52 |
00 |
E123 |
D |
1513501D |
098 |
2/9/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR021O1062403907699 |
|
|
$42.70 |
000001090488-3562500636 |
2024 |
8 |
FD52 |
00 |
E121 |
D |
1513501D |
098 |
2/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021O1062403907700 |
|
|
$1.55 |
000001090571-3562500610 |
2024 |
8 |
FD52 |
00 |
E123 |
D |
1513501D |
098 |
2/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021O1062403907699 |
|
|
$0.68 |
000001090488-3562500636 |
2024 |
8 |
FD52 |
00 |
E122 |
D |
1513501D |
098 |
2/9/2024 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR021O1062403907700 |
|
|
$940.40 |
000001090571-3562500610 |
2024 |
8 |
FD52 |
00 |
E122 |
D |
1513501D |
098 |
2/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021O1062403907700 |
|
|
$13.82 |
000001090571-3562500610 |
2024 |
8 |
FD52 |
00 |
E123 |
D |
1513501D |
098 |
2/9/2024 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR021O1062403907700 |
|
|
$221.58 |
000001090571-3562500610 |
2024 |
8 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
2/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021O1062403907685 |
|
|
$43.43 |
000001088605-3562512204 |
2024 |
8 |
FD52 |
00 |
E123 |
D |
1513501D |
098 |
2/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021O1062403907700 |
|
|
$3.14 |
000001090571-3562500610 |
2024 |
8 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
2/9/2024 |
0220 |
ENVIR IMPACT ST-GENERAL |
CA-XR021O1062403907685 |
|
|
$183.73 |
000001088605-3562512204 |
2024 |
8 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
2/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021O1062403907685 |
|
|
$3.12 |
000001088605-3562512204 |
2024 |
8 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
2/9/2024 |
0220 |
ENVIR IMPACT ST-GENERAL |
CA-XR021O1062403907685 |
|
|
$1,689.88 |
000001088605-3562512204 |
2024 |
8 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
2/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021O1062403907685 |
|
|
$28.74 |
000001088605-3562512204 |
2024 |
8 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
2/9/2024 |
0220 |
ENVIR IMPACT ST-GENERAL |
CA-XR021O1062403907685 |
|
|
$439.65 |
000001088605-3562512204 |
2024 |
7 |
FD52 |
00 |
E123 |
D |
1513501D |
098 |
1/24/2024 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR012O1062402306635 |
|
|
$47.15 |
000001090571-3562500610 |
2024 |
7 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
1/24/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306606 |
|
|
$41.85 |
000001087730-3562512204 |
2024 |
7 |
FD52 |
00 |
E123 |
D |
1513501D |
098 |
1/24/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306635 |
|
|
$10.38 |
000001090571-3562500610 |
2024 |
7 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
1/24/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012O1062402306606 |
|
|
$988.88 |
000001087730-3562512204 |
2024 |
7 |
FD52 |
00 |
E124 |
D |
1513501D |
098 |
1/24/2024 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR012O1062402306635 |
|
|
$0.10 |
000001090571-3562500610 |
2024 |
7 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
1/24/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306606 |
|
|
$370.72 |
000001087730-3562512204 |
2024 |
7 |
FD52 |
00 |
E124 |
D |
1513501D |
098 |
1/24/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306635 |
|
|
$0.02 |
000001090571-3562500610 |
2024 |
7 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
1/24/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012O1062402306606 |
|
|
$227.43 |
000001087730-3562512204 |
2024 |
7 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
1/24/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306606 |
|
|
$83.83 |
000001087730-3562512204 |
2024 |
7 |
FD52 |
12 |
E124 |
D |
1513501D |
098 |
1/24/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012O1062402306606 |
|
|
$0.55 |
000001087730-3562512204 |
2024 |
7 |
FD52 |
12 |
E124 |
D |
1513501D |
098 |
1/24/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306606 |
|
|
$0.21 |
000001087730-3562512204 |
2024 |
7 |
FD52 |
00 |
E111 |
D |
1513501D |
098 |
1/24/2024 |
0091 |
ENV STUDIES-ENV PROJ MGR (EPM) |
CA-XR012O1062402306632 |
|
|
$400.75 |
000001090456-3562500061 |
2024 |
7 |
FD52 |
00 |
E111 |
D |
1513501D |
098 |
1/24/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306632 |
|
|
$88.95 |
000001090456-3562500061 |
2024 |
7 |
FD52 |
00 |
E121 |
D |
1513501D |
098 |
1/24/2024 |
0091 |
ENV STUDIES-ENV PROJ MGR (EPM) |
CA-XR012O1062402306632 |
|
|
$30.65 |
000001090456-3562500061 |
2024 |
7 |
FD52 |
00 |
E121 |
D |
1513501D |
098 |
1/24/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306632 |
|
|
$6.80 |
000001090456-3562500061 |
2024 |
7 |
FD52 |
00 |
E122 |
D |
1513501D |
098 |
1/24/2024 |
0091 |
ENV STUDIES-ENV PROJ MGR (EPM) |
CA-XR012O1062402306632 |
|
|
$265.30 |
000001090456-3562500061 |
2024 |
7 |
FD52 |
00 |
E122 |
D |
1513501D |
098 |
1/24/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306632 |
|
|
$58.86 |
000001090456-3562500061 |
2024 |
7 |
FD52 |
00 |
E123 |
D |
1513501D |
098 |
1/24/2024 |
0091 |
ENV STUDIES-ENV PROJ MGR (EPM) |
CA-XR012O1062402306632 |
|
|
$17.07 |
000001090456-3562500061 |
2024 |
7 |
FD52 |
00 |
E111 |
D |
1513501D |
098 |
1/24/2024 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR012O1062402306635 |
|
|
$296.50 |
000001090571-3562500610 |
2024 |
7 |
FD52 |
00 |
E123 |
D |
1513501D |
098 |
1/24/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306632 |
|
|
$3.53 |
000001090456-3562500061 |
2024 |
7 |
FD52 |
00 |
E124 |
D |
1513501D |
098 |
1/24/2024 |
0091 |
ENV STUDIES-ENV PROJ MGR (EPM) |
CA-XR012O1062402306632 |
|
|
$0.19 |
000001090456-3562500061 |
2024 |
7 |
FD52 |
00 |
E124 |
D |
1513501D |
098 |
1/24/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306632 |
|
|
$0.04 |
000001090456-3562500061 |
2024 |
7 |
FD52 |
00 |
E111 |
D |
1513501D |
098 |
1/24/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306635 |
|
|
$66.04 |
000001090571-3562500610 |
2024 |
7 |
FD52 |
00 |
E121 |
D |
1513501D |
098 |
1/24/2024 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR012O1062402306635 |
|
|
$21.96 |
000001090571-3562500610 |
2024 |
7 |
FD52 |
00 |
E111 |
D |
1513501D |
098 |
1/24/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012O1062402306632 |
|
|
$587.24 |
000001090488-3562500636 |
2024 |
7 |
FD52 |
00 |
E121 |
D |
1513501D |
098 |
1/24/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306635 |
|
|
$4.89 |
000001090571-3562500610 |
2024 |
7 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
1/24/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012O1062402306606 |
|
|
$1,494.36 |
000001087730-3562512204 |
2024 |
7 |
FD52 |
00 |
E111 |
D |
1513501D |
098 |
1/24/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306632 |
|
|
$383.08 |
000001090488-3562500636 |
2024 |
7 |
FD52 |
00 |
E121 |
D |
1513501D |
098 |
1/24/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012O1062402306632 |
|
|
$44.92 |
000001090488-3562500636 |
2024 |
7 |
FD52 |
00 |
E121 |
D |
1513501D |
098 |
1/24/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306632 |
|
|
$29.32 |
000001090488-3562500636 |
2024 |
7 |
FD52 |
00 |
E122 |
D |
1513501D |
098 |
1/24/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012O1062402306632 |
|
|
$388.60 |
000001090488-3562500636 |
2024 |
7 |
FD52 |
00 |
E122 |
D |
1513501D |
098 |
1/24/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306632 |
|
|
$253.48 |
000001090488-3562500636 |
2024 |
7 |
FD52 |
00 |
E122 |
D |
1513501D |
098 |
1/24/2024 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR012O1062402306635 |
|
|
$195.97 |
000001090571-3562500610 |
2024 |
7 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
1/24/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306606 |
|
|
$560.25 |
000001087730-3562512204 |
2024 |
7 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
1/24/2024 |
0220 |
ENVIR IMPACT ST-GENERAL |
CA-XR012O1062402306613 |
|
|
$568.57 |
000001088605-3562512204 |
2024 |
7 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
1/24/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306613 |
|
|
$147.83 |
000001088605-3562512204 |
2024 |
7 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
1/24/2024 |
0220 |
ENVIR IMPACT ST-GENERAL |
CA-XR012O1062402306613 |
|
|
$41.73 |
000001088605-3562512204 |
2024 |
7 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
1/24/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306613 |
|
|
$10.85 |
000001088605-3562512204 |
2024 |
7 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
1/24/2024 |
0220 |
ENVIR IMPACT ST-GENERAL |
CA-XR012O1062402306613 |
|
|
$376.24 |
000001088605-3562512204 |
2024 |
7 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
1/24/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306613 |
|
|
$97.82 |
000001088605-3562512204 |
2024 |
7 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
1/24/2024 |
0220 |
ENVIR IMPACT ST-GENERAL |
CA-XR012O1062402306613 |
|
|
$98.11 |
000001088605-3562512204 |
2024 |
7 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
1/24/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306613 |
|
|
$25.20 |
000001088605-3562512204 |
2024 |
7 |
FD52 |
12 |
E124 |
D |
1513501D |
098 |
1/24/2024 |
0220 |
ENVIR IMPACT ST-GENERAL |
CA-XR012O1062402306613 |
|
|
$0.18 |
000001088605-3562512204 |
2024 |
7 |
FD52 |
00 |
E122 |
D |
1513501D |
098 |
1/24/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306635 |
|
|
$43.70 |
000001090571-3562500610 |
2024 |
7 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
1/24/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012O1062402306606 |
|
|
$111.63 |
000001087730-3562512204 |
2024 |
7 |
FD52 |
12 |
E124 |
D |
1513501D |
098 |
1/24/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306613 |
|
|
$0.05 |
000001088605-3562512204 |
2024 |
7 |
FD52 |
12 |
E143 |
D |
1513501D |
098 |
1/16/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400140056 |
PON22300001509 |
PRIME AE Group, Inc. |
$20,985.35 |
Letter Agreement 3 |
2024 |
7 |
FD52 |
00 |
E124 |
D |
1513501D |
098 |
1/11/2024 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR122N1062335504661 |
|
|
$0.05 |
000001090280-3562500061 |
2024 |
7 |
FD52 |
00 |
E124 |
D |
1513501D |
098 |
1/11/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122N1062335504661 |
|
|
$0.02 |
000001090280-3562500061 |
2024 |
7 |
FD52 |
00 |
E111 |
D |
1513501D |
098 |
1/11/2024 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR122N1062335504661 |
|
|
$89.98 |
000001090280-3562500061 |
2024 |
7 |
FD52 |
00 |
E111 |
D |
1513501D |
098 |
1/11/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122N1062335504661 |
|
|
$19.78 |
000001090280-3562500061 |
2024 |
7 |
FD52 |
00 |
E121 |
D |
1513501D |
098 |
1/11/2024 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR122N1062335504661 |
|
|
$6.71 |
000001090280-3562500061 |
2024 |
7 |
FD52 |
00 |
E111 |
D |
1513501D |
098 |
1/11/2024 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR011O1062400505753 |
|
|
$995.88 |
000001090571-3562500610 |
2024 |
7 |
FD52 |
00 |
E111 |
D |
1513501D |
098 |
1/11/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011O1062400505753 |
|
|
$1,020.97 |
000001090571-3562500610 |
2024 |
7 |
FD52 |
00 |
E121 |
D |
1513501D |
098 |
1/11/2024 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR011O1062400505753 |
|
|
$73.77 |
000001090571-3562500610 |
2024 |
7 |
FD52 |
00 |
E121 |
D |
1513501D |
098 |
1/11/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011O1062400505753 |
|
|
$75.66 |
000001090571-3562500610 |
2024 |
7 |
FD52 |
00 |
E122 |
D |
1513501D |
098 |
1/11/2024 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR011O1062400505753 |
|
|
$658.88 |
000001090571-3562500610 |
2024 |
7 |
FD52 |
00 |
E122 |
D |
1513501D |
098 |
1/11/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011O1062400505753 |
|
|
$675.57 |
000001090571-3562500610 |
2024 |
7 |
FD52 |
00 |
E123 |
D |
1513501D |
098 |
1/11/2024 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR011O1062400505753 |
|
|
$157.07 |
000001090571-3562500610 |
2024 |
7 |
FD52 |
00 |
E123 |
D |
1513501D |
098 |
1/11/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011O1062400505753 |
|
|
$158.04 |
000001090571-3562500610 |
2024 |
7 |
FD52 |
00 |
E121 |
D |
1513501D |
098 |
1/11/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122N1062335504661 |
|
|
$1.48 |
000001090280-3562500061 |
2024 |
7 |
FD52 |
00 |
E122 |
D |
1513501D |
098 |
1/11/2024 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR122N1062335504661 |
|
|
$59.51 |
000001090280-3562500061 |
2024 |
7 |
FD52 |
00 |
E122 |
D |
1513501D |
098 |
1/11/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122N1062335504661 |
|
|
$13.08 |
000001090280-3562500061 |
2024 |
7 |
FD52 |
00 |
E123 |
D |
1513501D |
098 |
1/11/2024 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR122N1062335504661 |
|
|
$18.35 |
000001090280-3562500061 |
2024 |
7 |
FD52 |
00 |
E123 |
D |
1513501D |
098 |
1/11/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122N1062335504661 |
|
|
$3.96 |
000001090280-3562500061 |
2024 |
7 |
FD52 |
00 |
E121 |
D |
1513501D |
098 |
1/10/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011O1062400505750 |
|
|
$35.13 |
000001090488-3562500636 |
2024 |
7 |
FD52 |
00 |
E122 |
D |
1513501D |
098 |
1/10/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011O1062400505750 |
|
|
$394.58 |
000001090488-3562500636 |
2024 |
7 |
FD52 |
00 |
E122 |
D |
1513501D |
098 |
1/10/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011O1062400505750 |
|
|
$303.83 |
000001090488-3562500636 |
2024 |
7 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
1/10/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011O1062400505731 |
|
|
$1,075.10 |
000001087730-3562512204 |
2024 |
7 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
1/10/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011O1062400505731 |
|
|
$2,008.96 |
000001087730-3562512204 |
2024 |
7 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
1/10/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011O1062400505731 |
|
|
$79.46 |
000001087730-3562512204 |
2024 |
7 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
1/10/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011O1062400505731 |
|
|
$148.05 |
000001087730-3562512204 |
2024 |
7 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
1/10/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011O1062400505731 |
|
|
$711.40 |
000001087730-3562512204 |
2024 |
7 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
1/10/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011O1062400505731 |
|
|
$1,329.32 |
000001087730-3562512204 |
2024 |
7 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
1/10/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011O1062400505731 |
|
|
$155.66 |
000001087730-3562512204 |
2024 |
7 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
1/10/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011O1062400505731 |
|
|
$292.75 |
000001087730-3562512204 |
2024 |
7 |
FD52 |
00 |
E111 |
D |
1513501D |
098 |
1/8/2024 |
0091 |
ENV STUDIES-ENV PROJ MGR (EPM) |
CA-XR011O1062400505749 |
|
|
$440.75 |
000001090456-3562500061 |
2024 |
7 |
FD52 |
00 |
E111 |
D |
1513501D |
098 |
1/8/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011O1062400505749 |
|
|
$188.94 |
000001090456-3562500061 |
2024 |
7 |
FD52 |
00 |
E121 |
D |
1513501D |
098 |
1/8/2024 |
0091 |
ENV STUDIES-ENV PROJ MGR (EPM) |
CA-XR011O1062400505749 |
|
|
$33.72 |
000001090456-3562500061 |
2024 |
7 |
FD52 |
00 |
E121 |
D |
1513501D |
098 |
1/8/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011O1062400505749 |
|
|
$14.45 |
000001090456-3562500061 |
2024 |
7 |
FD52 |
00 |
E122 |
D |
1513501D |
098 |
1/8/2024 |
0091 |
ENV STUDIES-ENV PROJ MGR (EPM) |
CA-XR011O1062400505749 |
|
|
$291.65 |
000001090456-3562500061 |
2024 |
7 |
FD52 |
00 |
E122 |
D |
1513501D |
098 |
1/8/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011O1062400505749 |
|
|
$125.02 |
000001090456-3562500061 |
2024 |
7 |
FD52 |
00 |
E123 |
D |
1513501D |
098 |
1/8/2024 |
0091 |
ENV STUDIES-ENV PROJ MGR (EPM) |
CA-XR011O1062400505749 |
|
|
$18.96 |
000001090456-3562500061 |
2024 |
7 |
FD52 |
00 |
E123 |
D |
1513501D |
098 |
1/8/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011O1062400505749 |
|
|
$7.50 |
000001090456-3562500061 |
2024 |
7 |
FD52 |
00 |
E111 |
D |
1513501D |
098 |
1/8/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011O1062400505749 |
|
|
$596.48 |
000001090488-3562500636 |
2024 |
7 |
FD52 |
00 |
E111 |
D |
1513501D |
098 |
1/8/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011O1062400505749 |
|
|
$459.16 |
000001090488-3562500636 |
2024 |
7 |
FD52 |
00 |
E121 |
D |
1513501D |
098 |
1/8/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011O1062400505749 |
|
|
$45.62 |
000001090488-3562500636 |
2024 |
7 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
1/3/2024 |
0220 |
ENVIR IMPACT ST-GENERAL |
CA-XR121N1062334203643 |
|
|
$36.04 |
000001088605-3562512204 |
2024 |
7 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
1/3/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121N1062334203643 |
|
|
$2.21 |
000001088605-3562512204 |
2024 |
7 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
1/3/2024 |
0220 |
ENVIR IMPACT ST-GENERAL |
CA-XR121N1062334203643 |
|
|
$2.75 |
000001088605-3562512204 |
2024 |
7 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
1/3/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121N1062334203643 |
|
|
$0.17 |
000001088605-3562512204 |
2024 |
7 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
1/3/2024 |
0220 |
ENVIR IMPACT ST-GENERAL |
CA-XR121N1062334203643 |
|
|
$23.83 |
000001088605-3562512204 |
2024 |
7 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
1/3/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121N1062334203643 |
|
|
$1.46 |
000001088605-3562512204 |
2024 |
6 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
12/22/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR122N1062335504632 |
|
|
$913.28 |
000001087730-3562512204 |
2024 |
6 |
FD52 |
12 |
E124 |
D |
1513501D |
098 |
12/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122N1062335504632 |
|
|
$0.09 |
000001087730-3562512204 |
2024 |
6 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
12/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122N1062335504632 |
|
|
$245.74 |
000001087730-3562512204 |
2024 |
6 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
12/22/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR122N1062335504632 |
|
|
$65.67 |
000001087730-3562512204 |
2024 |
6 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
12/22/2023 |
0220 |
ENVIR IMPACT ST-GENERAL |
CA-XR122N1062335504640 |
|
|
$834.00 |
000001088605-3562512204 |
2024 |
6 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
12/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122N1062335504640 |
|
|
$111.81 |
000001088605-3562512204 |
2024 |
6 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
12/22/2023 |
0220 |
ENVIR IMPACT ST-GENERAL |
CA-XR122N1062335504640 |
|
|
$61.20 |
000001088605-3562512204 |
2024 |
6 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
12/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122N1062335504640 |
|
|
$8.21 |
000001088605-3562512204 |
2024 |
6 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
12/22/2023 |
0220 |
ENVIR IMPACT ST-GENERAL |
CA-XR122N1062335504640 |
|
|
$552.05 |
000001088605-3562512204 |
2024 |
6 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
12/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122N1062335504640 |
|
|
$73.98 |
000001088605-3562512204 |
2024 |
6 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
12/22/2023 |
0220 |
ENVIR IMPACT ST-GENERAL |
CA-XR122N1062335504640 |
|
|
$124.70 |
000001088605-3562512204 |
2024 |
6 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
12/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122N1062335504640 |
|
|
$16.50 |
000001088605-3562512204 |
2024 |
6 |
FD52 |
12 |
E124 |
D |
1513501D |
098 |
12/22/2023 |
0220 |
ENVIR IMPACT ST-GENERAL |
CA-XR122N1062335504640 |
|
|
$0.26 |
000001088605-3562512204 |
2024 |
6 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
12/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122N1062335504632 |
|
|
$17.65 |
000001087730-3562512204 |
2024 |
6 |
FD52 |
12 |
E124 |
D |
1513501D |
098 |
12/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122N1062335504640 |
|
|
$0.04 |
000001088605-3562512204 |
2024 |
6 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
12/22/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR122N1062335504632 |
|
|
$604.31 |
000001087730-3562512204 |
2024 |
6 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
12/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122N1062335504632 |
|
|
$162.61 |
000001087730-3562512204 |
2024 |
6 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
12/22/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR122N1062335504632 |
|
|
$119.58 |
000001087730-3562512204 |
2024 |
6 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
12/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122N1062335504632 |
|
|
$31.59 |
000001087730-3562512204 |
2024 |
6 |
FD52 |
12 |
E124 |
D |
1513501D |
098 |
12/22/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR122N1062335504632 |
|
|
$0.33 |
000001087730-3562512204 |
2024 |
5 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
11/22/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112N1062332502535 |
|
|
$413.33 |
000001087730-3562512200 |
2024 |
5 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
11/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112N1062332502535 |
|
|
$289.97 |
000001087730-3562512200 |
2024 |
5 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
11/22/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112N1062332502535 |
|
|
$30.80 |
000001087730-3562512200 |
2024 |
5 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
11/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112N1062332502535 |
|
|
$21.59 |
000001087730-3562512200 |
2024 |
5 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
11/22/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112N1062332502535 |
|
|
$273.57 |
000001087730-3562512200 |
2024 |
5 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
11/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112N1062332502535 |
|
|
$191.88 |
000001087730-3562512200 |
2024 |
5 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
11/22/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112N1062332502535 |
|
|
$34.63 |
000001087730-3562512200 |
2024 |
5 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
11/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112N1062332502535 |
|
|
$23.73 |
000001087730-3562512200 |
2024 |
5 |
FD52 |
12 |
E124 |
D |
1513501D |
098 |
11/22/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112N1062332502535 |
|
|
$0.09 |
000001087730-3562512200 |
2024 |
5 |
FD52 |
12 |
E124 |
D |
1513501D |
098 |
11/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112N1062332502535 |
|
|
$0.06 |
000001087730-3562512200 |
2024 |
5 |
FD52 |
12 |
E143 |
D |
1513501D |
098 |
11/21/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400102783 |
PON22300001509 |
PRIME AE Group, Inc. |
$20,985.35 |
Letter Agreement 3 |
2024 |
5 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
11/20/2023 |
0220 |
ENVIR IMPACT ST-GENERAL |
CA-XR111N1062331201505 |
|
|
$224.63 |
000001088605-3562512204 |
2024 |
5 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
11/20/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201505 |
|
|
$13.77 |
000001088605-3562512204 |
2024 |
5 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
11/20/2023 |
0220 |
ENVIR IMPACT ST-GENERAL |
CA-XR111N1062331201505 |
|
|
$16.08 |
000001088605-3562512204 |
2024 |
5 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
11/20/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201505 |
|
|
$0.99 |
000001088605-3562512204 |
2024 |
5 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
11/20/2023 |
0220 |
ENVIR IMPACT ST-GENERAL |
CA-XR111N1062331201505 |
|
|
$148.60 |
000001088605-3562512204 |
2024 |
5 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
11/20/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201505 |
|
|
$9.11 |
000001088605-3562512204 |
2024 |
5 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
11/20/2023 |
0220 |
ENVIR IMPACT ST-GENERAL |
CA-XR111N1062331201505 |
|
|
$38.92 |
000001088605-3562512204 |
2024 |
5 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
11/20/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201505 |
|
|
$2.36 |
000001088605-3562512204 |
2024 |
4 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
10/13/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR101N1062328009710 |
|
|
$273.98 |
000001087730-3562512204 |
2024 |
4 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
10/13/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR101N1062328009710 |
|
|
$19.38 |
000001087730-3562512204 |
2024 |
4 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
10/13/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR101N1062328009710 |
|
|
$181.30 |
000001087730-3562512204 |
2024 |
4 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
10/13/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR101N1062328009710 |
|
|
$35.72 |
000001087730-3562512204 |
2024 |
4 |
FD52 |
12 |
E143 |
D |
1513501D |
098 |
10/10/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400070927 |
PON22300001509 |
PRIME AE Group, Inc. |
$104,926.75 |
Letter Agreement 3 |
2024 |
4 |
FD52 |
00 |
E111 |
D |
1513501D |
098 |
10/2/2023 |
0093 |
ENV STUDIES-PERMITTING MITIGA |
CA-XR092N1062327208456 |
|
|
$547.88 |
000001089148-3562500061 |
2024 |
4 |
FD52 |
00 |
E111 |
D |
1513501D |
098 |
10/2/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208456 |
|
|
$58.81 |
000001089148-3562500061 |
2024 |
4 |
FD52 |
00 |
E121 |
D |
1513501D |
098 |
10/2/2023 |
0093 |
ENV STUDIES-PERMITTING MITIGA |
CA-XR092N1062327208456 |
|
|
$41.36 |
000001089148-3562500061 |
2024 |
4 |
FD52 |
00 |
E121 |
D |
1513501D |
098 |
10/2/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208456 |
|
|
$4.43 |
000001089148-3562500061 |
2024 |
4 |
FD52 |
00 |
E122 |
D |
1513501D |
098 |
10/2/2023 |
0093 |
ENV STUDIES-PERMITTING MITIGA |
CA-XR092N1062327208456 |
|
|
$362.57 |
000001089148-3562500061 |
2024 |
4 |
FD52 |
00 |
E122 |
D |
1513501D |
098 |
10/2/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208456 |
|
|
$38.91 |
000001089148-3562500061 |
2024 |
4 |
FD52 |
00 |
E123 |
D |
1513501D |
098 |
10/2/2023 |
0093 |
ENV STUDIES-PERMITTING MITIGA |
CA-XR092N1062327208456 |
|
|
$70.08 |
000001089148-3562500061 |
2024 |
4 |
FD52 |
00 |
E123 |
D |
1513501D |
098 |
10/2/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208456 |
|
|
$7.41 |
000001089148-3562500061 |
2024 |
4 |
FD52 |
00 |
E124 |
D |
1513501D |
098 |
10/2/2023 |
0093 |
ENV STUDIES-PERMITTING MITIGA |
CA-XR092N1062327208456 |
|
|
$0.18 |
000001089148-3562500061 |
2024 |
4 |
FD52 |
00 |
E124 |
D |
1513501D |
098 |
10/2/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208456 |
|
|
$0.02 |
000001089148-3562500061 |
2024 |
3 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
9/29/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092N1062327208435 |
|
|
$959.55 |
000001087730-3562512204 |
2024 |
3 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208435 |
|
|
$104.77 |
000001087730-3562512204 |
2024 |
3 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
9/29/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092N1062327208435 |
|
|
$69.20 |
000001087730-3562512204 |
2024 |
3 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208435 |
|
|
$7.55 |
000001087730-3562512204 |
2024 |
3 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
9/29/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092N1062327208435 |
|
|
$634.93 |
000001087730-3562512204 |
2024 |
3 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208435 |
|
|
$69.33 |
000001087730-3562512204 |
2024 |
3 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
9/29/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092N1062327208435 |
|
|
$134.43 |
000001087730-3562512204 |
2024 |
3 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208435 |
|
|
$14.76 |
000001087730-3562512204 |
2024 |
3 |
FD52 |
12 |
E124 |
D |
1513501D |
098 |
9/29/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092N1062327208435 |
|
|
$0.35 |
000001087730-3562512204 |
2024 |
3 |
FD52 |
12 |
E124 |
D |
1513501D |
098 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208435 |
|
|
$0.04 |
000001087730-3562512204 |
2024 |
3 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
9/28/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092N1062326507084 |
|
|
($959.55) |
000001087730-3562512204 |
2024 |
3 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
9/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507084 |
|
|
($104.77) |
000001087730-3562512204 |
2024 |
3 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
9/28/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092N1062326507084 |
|
|
($69.20) |
000001087730-3562512204 |
2024 |
3 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
9/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507084 |
|
|
($7.55) |
000001087730-3562512204 |
2024 |
3 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
9/28/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092N1062326507084 |
|
|
($634.93) |
000001087730-3562512204 |
2024 |
3 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
9/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507084 |
|
|
($69.33) |
000001087730-3562512204 |
2024 |
3 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
9/28/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092N1062326507084 |
|
|
($134.43) |
000001087730-3562512204 |
2024 |
3 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
9/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507084 |
|
|
($14.76) |
000001087730-3562512204 |
2024 |
3 |
FD52 |
12 |
E124 |
D |
1513501D |
098 |
9/28/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092N1062326507084 |
|
|
($0.35) |
000001087730-3562512204 |
2024 |
3 |
FD52 |
12 |
E124 |
D |
1513501D |
098 |
9/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507084 |
|
|
($0.04) |
000001087730-3562512204 |
2024 |
3 |
FD52 |
00 |
E229 |
D |
1513501D |
098 |
9/27/2023 |
0093 |
ENV STUDIES-PERMITTING MITIGA |
IET-XE13A162523268013290 |
|
|
$6.46 |
|
2024 |
3 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
9/25/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092N1062326507084 |
|
|
$959.55 |
000001087730-3562512204 |
2024 |
3 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
9/25/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507084 |
|
|
$104.77 |
000001087730-3562512204 |
2024 |
3 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
9/25/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092N1062326507084 |
|
|
$69.20 |
000001087730-3562512204 |
2024 |
3 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
9/25/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507084 |
|
|
$7.55 |
000001087730-3562512204 |
2024 |
3 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
9/25/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092N1062326507084 |
|
|
$634.93 |
000001087730-3562512204 |
2024 |
3 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
9/25/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507084 |
|
|
$69.33 |
000001087730-3562512204 |
2024 |
3 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
9/25/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092N1062326507084 |
|
|
$134.43 |
000001087730-3562512204 |
2024 |
3 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
9/25/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507084 |
|
|
$14.76 |
000001087730-3562512204 |
2024 |
3 |
FD52 |
12 |
E124 |
D |
1513501D |
098 |
9/25/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092N1062326507084 |
|
|
$0.35 |
000001087730-3562512204 |
2024 |
3 |
FD52 |
12 |
E124 |
D |
1513501D |
098 |
9/25/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507084 |
|
|
$0.04 |
000001087730-3562512204 |
2024 |
3 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
9/11/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091N1062325106113 |
|
|
$1,928.85 |
000001087730-3562512204 |
2024 |
3 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
9/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091N1062325106113 |
|
|
$15.26 |
000001087730-3562512204 |
2024 |
3 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
9/11/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091N1062325106113 |
|
|
$138.06 |
000001087730-3562512204 |
2024 |
3 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
9/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091N1062325106113 |
|
|
$1.15 |
000001087730-3562512204 |
2024 |
3 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
9/11/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091N1062325106113 |
|
|
$1,276.33 |
000001087730-3562512204 |
2024 |
3 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
9/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091N1062325106113 |
|
|
$10.10 |
000001087730-3562512204 |
2024 |
3 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
9/11/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091N1062325106113 |
|
|
$236.28 |
000001087730-3562512204 |
2024 |
3 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
9/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091N1062325106113 |
|
|
$1.27 |
000001087730-3562512204 |
2024 |
2 |
FD52 |
12 |
E143 |
D |
1513501D |
098 |
8/25/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400038834 |
PON22300001509 |
PRIME AE Group, Inc. |
$167,882.80 |
Letter Agreement 3 |
2024 |
2 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
8/24/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082N1062323504966 |
|
|
$1,494.45 |
000001087730-3562512204 |
2024 |
2 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
8/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082N1062323504966 |
|
|
$171.70 |
000001087730-3562512204 |
2024 |
2 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
8/24/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082N1062323504966 |
|
|
$107.46 |
000001087730-3562512204 |
2024 |
2 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
8/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082N1062323504966 |
|
|
$12.35 |
000001087730-3562512204 |
2024 |
2 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
8/24/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082N1062323504966 |
|
|
$988.88 |
000001087730-3562512204 |
2024 |
2 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
8/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082N1062323504966 |
|
|
$113.62 |
000001087730-3562512204 |
2024 |
2 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
8/24/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082N1062323504966 |
|
|
$195.24 |
000001087730-3562512204 |
2024 |
2 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
8/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082N1062323504966 |
|
|
$22.07 |
000001087730-3562512204 |
2024 |
2 |
FD52 |
12 |
E124 |
D |
1513501D |
098 |
8/24/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082N1062323504966 |
|
|
$0.55 |
000001087730-3562512204 |
2024 |
2 |
FD52 |
12 |
E124 |
D |
1513501D |
098 |
8/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082N1062323504966 |
|
|
$0.07 |
000001087730-3562512204 |
2024 |
2 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
8/9/2023 |
0220 |
ENVIR IMPACT ST-GENERAL |
CA-XR081N1062322003898 |
|
|
$244.98 |
000001088605-3562512204 |
2024 |
2 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
8/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081N1062322003898 |
|
|
$2.29 |
000001088605-3562512204 |
2024 |
2 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
8/9/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081N1062322003879 |
|
|
$614.76 |
000001087730-3562512204 |
2024 |
2 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
8/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081N1062322003879 |
|
|
$88.03 |
000001087730-3562512204 |
2024 |
2 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
8/9/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081N1062322003879 |
|
|
$44.30 |
000001087730-3562512204 |
2024 |
2 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
8/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081N1062322003879 |
|
|
$6.28 |
000001087730-3562512204 |
2024 |
2 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
8/9/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081N1062322003879 |
|
|
$406.44 |
000001087730-3562512204 |
2024 |
2 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
8/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081N1062322003879 |
|
|
$58.25 |
000001087730-3562512204 |
2024 |
2 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
8/9/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081N1062322003879 |
|
|
$72.55 |
000001087730-3562512204 |
2024 |
2 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
8/9/2023 |
0220 |
ENVIR IMPACT ST-GENERAL |
CA-XR081N1062322003898 |
|
|
$17.53 |
000001088605-3562512204 |
2024 |
2 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
8/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081N1062322003879 |
|
|
$10.79 |
000001087730-3562512204 |
2024 |
2 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
8/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081N1062322003898 |
|
|
$0.16 |
000001088605-3562512204 |
2024 |
2 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
8/9/2023 |
0220 |
ENVIR IMPACT ST-GENERAL |
CA-XR081N1062322003898 |
|
|
$162.10 |
000001088605-3562512204 |
2024 |
2 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
8/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081N1062322003898 |
|
|
$1.52 |
000001088605-3562512204 |
2024 |
2 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
8/9/2023 |
0220 |
ENVIR IMPACT ST-GENERAL |
CA-XR081N1062322003898 |
|
|
$42.43 |
000001088605-3562512204 |
2024 |
2 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
8/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081N1062322003898 |
|
|
$0.39 |
000001088605-3562512204 |
2023 |
12 |
FD52 |
12 |
E143 |
D |
1513501D |
098 |
6/29/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300260463 |
PON22300001509 |
PRIME AE Group, Inc. |
$62,956.05 |
Letter Agreement 3 |
2023 |
12 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
6/26/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062N1062317400467 |
|
|
$354.58 |
000001087730-3562512200 |
2023 |
12 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
6/26/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062N1062317400467 |
|
|
$26.29 |
000001087730-3562512200 |
2023 |
12 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
6/26/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062N1062317400467 |
|
|
$276.57 |
000001087730-3562512200 |
2023 |
12 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
6/26/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062N1062317400467 |
|
|
$34.30 |
000001087730-3562512200 |
2023 |
12 |
FD52 |
12 |
E124 |
D |
1513501D |
098 |
6/26/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062N1062317400467 |
|
|
$0.09 |
000001087730-3562512200 |
2023 |
12 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
6/15/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR061N1062315810174 |
|
|
$476.80 |
000001087730-3562512200 |
2023 |
12 |
FD52 |
12 |
E111 |
D |
1513501D |
098 |
6/15/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061N1062315810174 |
|
|
$127.41 |
000001087730-3562512200 |
2023 |
12 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
6/15/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR061N1062315810174 |
|
|
$35.15 |
000001087730-3562512200 |
2023 |
12 |
FD52 |
12 |
E121 |
D |
1513501D |
098 |
6/15/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061N1062315810174 |
|
|
$9.39 |
000001087730-3562512200 |
2023 |
12 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
6/15/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR061N1062315810174 |
|
|
$371.83 |
000001087730-3562512200 |
2023 |
12 |
FD52 |
12 |
E122 |
D |
1513501D |
098 |
6/15/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061N1062315810174 |
|
|
$99.38 |
000001087730-3562512200 |
2023 |
12 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
6/15/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR061N1062315810174 |
|
|
$46.29 |
000001087730-3562512200 |
2023 |
12 |
FD52 |
12 |
E123 |
D |
1513501D |
098 |
6/15/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061N1062315810174 |
|
|
$12.16 |
000001087730-3562512200 |