The Commonwealth pays employees on a semi-monthly basis with a scheduled pay day on the 15th and 30th of each month. The two monthly pay periods are from the 1st to the 15th of the month and the 16th through the last day of the month. Pay check distribution is delayed by one pay period to allow for system processing. For example work performed during the 1st to the 15th day of the month is paid to the employee on the 30th of the month. Accordingly the cost accounting charges for labor costs posting in eMARS to operating accounts and highway projects are also delayed by approximately one pay period.
A good rule of measure is that the cost accounting charges for the pay period ending on the 15th of the month will post to eMARS by the 25th and those for the pay period ending on the last day of the month will post to eMARS by the 10th of the following month.

x close panel
Detailed Project Expenditure Report
Total E-MARS Expenditures for 1498301D = $1,151,029.87
Click here for Labor Costs Information
Year Month PBU Charge District Object Phase Program Code County Date ACT Activity Name Trans ID Reference # Vendor Name Expenditure Line Description
2024 11 FD04 00 E111 D 1498301D 102 5/1/2024 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR042O1062411502750 $1,742.25 000001086575-3562500630
2024 11 FD04 00 E111 D 1498301D 102 5/1/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502750 $112.17 000001086575-3562500630
2024 11 FD04 00 E121 D 1498301D 102 5/1/2024 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR042O1062411502750 $131.78 000001086575-3562500630
2024 11 FD04 00 E121 D 1498301D 102 5/1/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502750 $8.48 000001086575-3562500630
2024 11 FD04 00 E122 D 1498301D 102 5/1/2024 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR042O1062411502750 $1,152.87 000001086575-3562500630
2024 11 FD04 00 E122 D 1498301D 102 5/1/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502750 $74.22 000001086575-3562500630
2024 11 FD04 00 E123 D 1498301D 102 5/1/2024 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR042O1062411502750 $192.63 000001086575-3562500630
2024 11 FD04 00 E123 D 1498301D 102 5/1/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502750 $12.25 000001086575-3562500630
2024 10 FD04 00 E124 D 1498301D 102 4/30/2024 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR042O1062411502751 $0.45 000001086575-3562500630
2024 10 FD04 00 E124 D 1498301D 102 4/30/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502751 $0.03 000001086575-3562500630
2024 10 FD04 00 E111 D 1498301D 102 4/10/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR041O1062410001679 $418.36 000001091666-3562500061
2024 10 FD04 00 E111 D 1498301D 102 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001679 $44.74 000001091666-3562500061
2024 10 FD04 00 E121 D 1498301D 102 4/10/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR041O1062410001679 $28.21 000001091666-3562500061
2024 10 FD04 00 E121 D 1498301D 102 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001679 $3.01 000001091666-3562500061
2024 10 FD04 00 E122 D 1498301D 102 4/10/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR041O1062410001679 $276.83 000001091666-3562500061
2024 10 FD04 00 E122 D 1498301D 102 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001679 $29.60 000001091666-3562500061
2024 10 FD04 00 E123 D 1498301D 102 4/10/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR041O1062410001679 $117.93 000001091666-3562500061
2024 10 FD04 00 E123 D 1498301D 102 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001679 $12.51 000001091666-3562500061
2024 10 FD04 08 E143 D 1498301D 102 4/4/2024 0640 ENV STUDIES-GEN-CONSULT PRC-2400200945 PON22200001938 QK4 INC $10,502.75 Letter Agreement 29-CLC & 29A-CLC
2024 9 FD04 00 E111 D 1498301D 102 3/11/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR031O1062406810086 $477.86 000001087555-3562500636
2024 9 FD04 00 E121 D 1498301D 102 3/11/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR031O1062406810086 $34.36 000001087555-3562500636
2024 9 FD04 00 E122 D 1498301D 102 3/11/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR031O1062406810086 $316.20 000001087555-3562500636
2024 9 FD04 00 E123 D 1498301D 102 3/11/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR031O1062406810086 $84.47 000001087555-3562500636
2024 8 FD04 08 E143 D 1498301D 102 2/22/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400171096 PON22300001492-1 Johnson, Mirmiran & Thompson Inc $74,510.45 Rockcastle Co. 8-80106
2024 8 FD04 08 E143 D 1498301D 102 2/7/2024 0640 ENV STUDIES-GEN-CONSULT PRC-2400157302 PON22200001938 QK4 INC $784.00 Letter Agreement 29-CLC & 29A-CLC
2024 7 FD04 00 E111 D 1498301D 102 1/24/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR012O1062402306605 $260.76 000001087555-3562500636
2024 7 FD04 00 E111 D 1498301D 102 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306605 $72.98 000001087555-3562500636
2024 7 FD04 00 E121 D 1498301D 102 1/24/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR012O1062402306605 $19.10 000001087555-3562500636
2024 7 FD04 00 E121 D 1498301D 102 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306605 $5.34 000001087555-3562500636
2024 7 FD04 00 E122 D 1498301D 102 1/24/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR012O1062402306605 $172.47 000001087555-3562500636
2024 7 FD04 00 E122 D 1498301D 102 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306605 $48.29 000001087555-3562500636
2024 7 FD04 00 E123 D 1498301D 102 1/24/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR012O1062402306605 $46.15 000001087555-3562500636
2024 7 FD04 00 E123 D 1498301D 102 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306605 $12.83 000001087555-3562500636
2024 7 FD04 00 E124 D 1498301D 102 1/24/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR012O1062402306605 $0.05 000001087555-3562500636
2024 7 FD04 00 E124 D 1498301D 102 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306605 $0.01 000001087555-3562500636
2024 7 FD04 00 E111 D 1498301D 102 1/11/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR122N1062335504616 $400.70 000001085194-3562500061
2024 7 FD04 00 E111 D 1498301D 102 1/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504616 $40.07 000001085194-3562500061
2024 7 FD04 00 E121 D 1498301D 102 1/11/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR122N1062335504616 $30.65 000001085194-3562500061
2024 7 FD04 00 E121 D 1498301D 102 1/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504616 $3.06 000001085194-3562500061
2024 7 FD04 00 E122 D 1498301D 102 1/11/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR122N1062335504616 $265.14 000001085194-3562500061
2024 7 FD04 00 E122 D 1498301D 102 1/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504616 $26.51 000001085194-3562500061
2024 7 FD04 00 E123 D 1498301D 102 1/11/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR122N1062335504616 $16.93 000001085194-3562500061
2024 7 FD04 00 E123 D 1498301D 102 1/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504616 $1.59 000001085194-3562500061
2024 7 FD04 00 E124 D 1498301D 102 1/11/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR122N1062335504616 $0.18 000001085194-3562500061
2024 7 FD04 00 E124 D 1498301D 102 1/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504616 $0.02 000001085194-3562500061
2024 7 FD04 00 E111 D 1498301D 102 1/3/2024 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR121N1062334203632 $1,951.38 000001086631-3562500061
2024 7 FD04 00 E111 D 1498301D 102 1/3/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203632 $433.64 000001086631-3562500061
2024 7 FD04 00 E121 D 1498301D 102 1/3/2024 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR121N1062334203632 $149.27 000001086631-3562500061
2024 7 FD04 00 E121 D 1498301D 102 1/3/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203632 $33.18 000001086631-3562500061
2024 7 FD04 00 E122 D 1498301D 102 1/3/2024 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR121N1062334203632 $1,291.23 000001086631-3562500061
2024 6 FD04 00 E122 D 1498301D 102 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203633 $286.94 000001086631-3562500061
2024 6 FD04 00 E123 D 1498301D 102 12/11/2023 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR121N1062334203633 $76.69 000001086631-3562500061
2024 6 FD04 00 E123 D 1498301D 102 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203633 $15.91 000001086631-3562500061
2024 5 FD04 00 E111 D 1498301D 102 11/30/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR112N1062332502534 $434.61 000001087555-3562500636
2024 5 FD04 00 E111 D 1498301D 102 11/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502534 $70.09 000001087555-3562500636
2024 5 FD04 00 E121 D 1498301D 102 11/30/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR112N1062332502534 $31.84 000001087555-3562500636
2024 5 FD04 00 E121 D 1498301D 102 11/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502534 $5.15 000001087555-3562500636
2024 5 FD04 00 E122 D 1498301D 102 11/30/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR112N1062332502534 $287.45 000001087555-3562500636
2024 5 FD04 00 E122 D 1498301D 102 11/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502534 $46.38 000001087555-3562500636
2024 5 FD04 00 E123 D 1498301D 102 11/30/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR112N1062332502534 $63.97 000001087555-3562500636
2024 5 FD04 00 E123 D 1498301D 102 11/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502534 $10.23 000001087555-3562500636
2024 5 FD04 00 E124 D 1498301D 102 11/30/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR112N1062332502534 $0.09 000001087555-3562500636
2024 5 FD04 00 E124 D 1498301D 102 11/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502534 $0.02 000001087555-3562500636
2024 5 FD04 08 E143 D 1498301D 102 11/28/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400106056 PON22300001492-1 Johnson, Mirmiran & Thompson Inc $106,858.02 Rockcastle Co. 8-80106
2024 5 FD04 00 E229 D 1498301D 102 11/27/2023 0050 ENV STUDIES-TERRESTRIAL ECOL IET-XE13A162523329016140 $29.70
2024 5 FD04 00 E111 D 1498301D 102 11/22/2023 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR112N1062332502529 $491.46 000001086631-3562500061
2024 5 FD04 00 E111 D 1498301D 102 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502529 $91.93 000001086631-3562500061
2024 5 FD04 00 E121 D 1498301D 102 11/22/2023 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR112N1062332502529 $37.60 000001086631-3562500061
2024 5 FD04 00 E121 D 1498301D 102 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502529 $7.04 000001086631-3562500061
2024 5 FD04 00 E122 D 1498301D 102 11/22/2023 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR112N1062332502529 $325.20 000001086631-3562500061
2024 5 FD04 00 E122 D 1498301D 102 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502529 $60.83 000001086631-3562500061
2024 5 FD04 00 E123 D 1498301D 102 11/22/2023 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR112N1062332502529 $19.28 000001086631-3562500061
2024 5 FD04 00 E123 D 1498301D 102 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502529 $3.37 000001086631-3562500061
2024 5 FD04 00 E124 D 1498301D 102 11/22/2023 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR112N1062332502529 $0.21 000001086631-3562500061
2024 5 FD04 00 E124 D 1498301D 102 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502529 $0.04 000001086631-3562500061
2024 4 FD04 08 E143 D 1498301D 102 10/17/2023 0640 ENV STUDIES-GEN-CONSULT PRC-2400072990 PON22200001938 QK4 INC $8,704.55 Letter Agreement 29-CLC
2024 3 FD04 00 E111 D 1498301D 102 9/29/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092N1062327208434 $567.03 000001087555-3562500636
2024 3 FD04 00 E111 D 1498301D 102 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208434 $278.56 000001087555-3562500636
2024 3 FD04 00 E121 D 1498301D 102 9/29/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092N1062327208434 $41.44 000001087555-3562500636
2024 3 FD04 00 E121 D 1498301D 102 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208434 $20.33 000001087555-3562500636
2024 3 FD04 00 E122 D 1498301D 102 9/29/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092N1062327208434 $375.28 000001087555-3562500636
2024 3 FD04 00 E122 D 1498301D 102 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208434 $184.32 000001087555-3562500636
2024 3 FD04 00 E123 D 1498301D 102 9/29/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092N1062327208434 $89.74 000001087555-3562500636
2024 3 FD04 00 E123 D 1498301D 102 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208434 $44.74 000001087555-3562500636
2024 3 FD04 00 E124 D 1498301D 102 9/29/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092N1062327208434 $0.13 000001087555-3562500636
2024 3 FD04 00 E124 D 1498301D 102 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208434 $0.07 000001087555-3562500636
2024 3 FD04 00 E111 D 1498301D 102 9/28/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092N1062326507083 ($567.03) 000001087555-3562500636
2024 3 FD04 00 E111 D 1498301D 102 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507083 ($278.56) 000001087555-3562500636
2024 3 FD04 00 E121 D 1498301D 102 9/28/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092N1062326507083 ($41.44) 000001087555-3562500636
2024 3 FD04 00 E121 D 1498301D 102 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507083 ($20.33) 000001087555-3562500636
2024 3 FD04 00 E122 D 1498301D 102 9/28/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092N1062326507083 ($375.28) 000001087555-3562500636
2024 3 FD04 00 E122 D 1498301D 102 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507083 ($184.32) 000001087555-3562500636
2024 3 FD04 00 E123 D 1498301D 102 9/28/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092N1062326507083 ($89.74) 000001087555-3562500636
2024 3 FD04 00 E123 D 1498301D 102 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507083 ($44.74) 000001087555-3562500636
2024 3 FD04 00 E124 D 1498301D 102 9/28/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092N1062326507083 ($0.13) 000001087555-3562500636
2024 3 FD04 00 E124 D 1498301D 102 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507083 ($0.07) 000001087555-3562500636
2024 3 FD04 00 E111 D 1498301D 102 9/25/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092N1062326507083 $567.03 000001087555-3562500636
2024 3 FD04 00 E111 D 1498301D 102 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507083 $278.56 000001087555-3562500636
2024 3 FD04 00 E121 D 1498301D 102 9/25/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092N1062326507083 $41.44 000001087555-3562500636
2024 3 FD04 00 E121 D 1498301D 102 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507083 $20.33 000001087555-3562500636
2024 3 FD04 00 E122 D 1498301D 102 9/25/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092N1062326507083 $375.28 000001087555-3562500636
2024 3 FD04 00 E122 D 1498301D 102 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507083 $184.32 000001087555-3562500636
2024 3 FD04 00 E123 D 1498301D 102 9/25/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092N1062326507083 $89.74 000001087555-3562500636
2024 3 FD04 00 E123 D 1498301D 102 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507083 $44.74 000001087555-3562500636
2024 3 FD04 00 E124 D 1498301D 102 9/25/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092N1062326507083 $0.13 000001087555-3562500636
2024 3 FD04 00 E124 D 1498301D 102 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507083 $0.07 000001087555-3562500636
2024 3 FD04 08 E143 D 1498301D 102 9/19/2023 0640 ENV STUDIES-GEN-CONSULT PRC-2400052600 PON22200001938 QK4 INC $1,416.04 Letter Agreement 29-CLC
2024 3 FD04 00 E111 D 1498301D 102 9/18/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR091N1062325106112 $398.22 000001087555-3562500636
2024 3 FD04 00 E121 D 1498301D 102 9/18/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR091N1062325106112 $28.64 000001087555-3562500636
2024 3 FD04 00 E122 D 1498301D 102 9/18/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR091N1062325106112 $263.50 000001087555-3562500636
2024 3 FD04 00 E123 D 1498301D 102 9/18/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR091N1062325106112 $58.56 000001087555-3562500636
2024 2 FD04 00 E111 D 1498301D 102 8/24/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR082N1062323504956 $262.53 000001086575-3562500630
2024 2 FD04 00 E111 D 1498301D 102 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504956 $63.01 000001086575-3562500630
2024 2 FD04 00 E121 D 1498301D 102 8/24/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR082N1062323504956 $19.85 000001086575-3562500630
2024 2 FD04 00 E121 D 1498301D 102 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504956 $4.76 000001086575-3562500630
2024 2 FD04 00 E122 D 1498301D 102 8/24/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR082N1062323504956 $173.71 000001086575-3562500630
2024 2 FD04 00 E122 D 1498301D 102 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504956 $41.69 000001086575-3562500630
2024 2 FD04 00 E123 D 1498301D 102 8/24/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR082N1062323504956 $25.24 000001086575-3562500630
2024 2 FD04 00 E123 D 1498301D 102 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504956 $5.96 000001086575-3562500630
2024 2 FD04 00 E111 D 1498301D 102 8/24/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR082N1062323504947 $200.34 000001085194-3562500061
2024 2 FD04 00 E124 D 1498301D 102 8/24/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR082N1062323504956 $0.07 000001086575-3562500630
2024 2 FD04 00 E121 D 1498301D 102 8/24/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR082N1062323504947 $15.32 000001085194-3562500061
2024 2 FD04 00 E124 D 1498301D 102 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504956 $0.02 000001086575-3562500630
2024 2 FD04 00 E122 D 1498301D 102 8/24/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR082N1062323504947 $132.57 000001085194-3562500061
2024 2 FD04 00 E123 D 1498301D 102 8/24/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR082N1062323504947 $8.41 000001085194-3562500061
2024 2 FD04 00 E124 D 1498301D 102 8/24/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR082N1062323504947 $0.09 000001085194-3562500061
2024 2 FD04 00 E111 D 1498301D 102 8/9/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR081N1062322003878 $434.58 000001087555-3562500636
2024 2 FD04 00 E111 D 1498301D 102 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003878 $104.26 000001087555-3562500636
2024 2 FD04 00 E121 D 1498301D 102 8/9/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR081N1062322003878 $31.24 000001087555-3562500636
2024 2 FD04 00 E121 D 1498301D 102 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003878 $7.50 000001087555-3562500636
2024 2 FD04 00 E111 D 1498301D 102 8/9/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR081N1062322003866 $200.34 000001085194-3562500061
2024 2 FD04 00 E122 D 1498301D 102 8/9/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR081N1062322003878 $288.21 000001087555-3562500636
2024 2 FD04 00 E122 D 1498301D 102 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003878 $68.99 000001087555-3562500636
2024 2 FD04 00 E123 D 1498301D 102 8/9/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR081N1062322003878 $64.16 000001087555-3562500636
2024 2 FD04 00 E123 D 1498301D 102 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003878 $15.22 000001087555-3562500636
2024 2 FD04 00 E121 D 1498301D 102 8/9/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR081N1062322003866 $15.32 000001085194-3562500061
2024 2 FD04 00 E122 D 1498301D 102 8/9/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR081N1062322003866 $132.56 000001085194-3562500061
2024 2 FD04 00 E123 D 1498301D 102 8/9/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR081N1062322003866 $8.46 000001085194-3562500061
2024 2 FD04 00 E111 D 1498301D 102 8/9/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR081N1062322003872 $357.91 000001086575-3562500630
2024 2 FD04 00 E111 D 1498301D 102 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003872 $52.03 000001086575-3562500630
2024 2 FD04 00 E121 D 1498301D 102 8/9/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR081N1062322003872 $27.08 000001086575-3562500630
2024 2 FD04 00 E121 D 1498301D 102 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003872 $3.94 000001086575-3562500630
2024 2 FD04 00 E122 D 1498301D 102 8/9/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR081N1062322003872 $236.89 000001086575-3562500630
2024 2 FD04 00 E122 D 1498301D 102 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003872 $34.43 000001086575-3562500630
2024 2 FD04 00 E123 D 1498301D 102 8/9/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR081N1062322003872 $34.37 000001086575-3562500630
2024 2 FD04 00 E123 D 1498301D 102 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003872 $4.92 000001086575-3562500630
2024 2 FD04 08 E143 D 1498301D 102 8/3/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400023496 PON22300001492-1 Johnson, Mirmiran & Thompson Inc $369,905.27 Rockcastle Co. 8-80106
2024 2 FD04 08 E143 D 1498301D 102 8/2/2023 0640 ENV STUDIES-GEN-CONSULT PRC-2400021956 PON22200001938 QK4 INC $17,310.50 Letter Agreement 29-CLC
2024 1 FD04 00 E111 D 1498301D 102 7/24/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR072N1062320202704 $477.79 000001087555-3562500636
2024 1 FD04 00 E111 D 1498301D 102 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202704 $61.17 000001087555-3562500636
2024 1 FD04 00 E121 D 1498301D 102 7/24/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR072N1062320202704 $35.03 000001087555-3562500636
2024 1 FD04 00 E121 D 1498301D 102 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202704 $4.49 000001087555-3562500636
2024 1 FD04 00 E122 D 1498301D 102 7/24/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR072N1062320202704 $316.20 000001087555-3562500636
2024 1 FD04 00 E122 D 1498301D 102 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202704 $40.48 000001087555-3562500636
2024 1 FD04 00 E123 D 1498301D 102 7/24/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR072N1062320202704 $70.35 000001087555-3562500636
2024 1 FD04 00 E123 D 1498301D 102 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202704 $8.93 000001087555-3562500636
2024 1 FD04 00 E124 D 1498301D 102 7/24/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR072N1062320202704 $0.10 000001087555-3562500636
2024 1 FD04 00 E124 D 1498301D 102 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202704 $0.01 000001087555-3562500636
2023 12 FD04 08 E143 D 1498301D 102 6/28/2023 0640 ENV STUDIES-GEN-CONSULT PRC-2300259474 PON22200001938 QK4 INC $8,478.35 Letter Agreement 29-CLC
2023 12 FD04 00 E111 D 1498301D 102 6/8/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR061N1062315810167 $854.02 000001087555-3562500636
2023 12 FD04 00 E111 D 1498301D 102 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810167 $131.15 000001087555-3562500636
2023 12 FD04 00 E121 D 1498301D 102 6/8/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR061N1062315810167 $60.74 000001087555-3562500636
2023 12 FD04 00 E121 D 1498301D 102 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810167 $9.32 000001087555-3562500636
2023 12 FD04 00 E122 D 1498301D 102 6/8/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR061N1062315810167 $665.98 000001087555-3562500636
2023 12 FD04 00 E122 D 1498301D 102 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810167 $102.30 000001087555-3562500636
2023 12 FD04 00 E123 D 1498301D 102 6/8/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR061N1062315810167 $146.59 000001087555-3562500636
2023 12 FD04 00 E123 D 1498301D 102 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810167 $22.33 000001087555-3562500636
2023 11 FD04 00 E111 D 1498301D 102 5/24/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR052N1062314309080 $372.57 000001087555-3562500636
2023 11 FD04 00 E121 D 1498301D 102 5/24/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR052N1062314309080 $27.12 000001087555-3562500636
2023 11 FD04 00 E122 D 1498301D 102 5/24/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR052N1062314309080 $290.61 000001087555-3562500636
2023 11 FD04 00 E123 D 1498301D 102 5/24/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR052N1062314309080 $63.89 000001087555-3562500636
2023 11 FD04 00 E124 D 1498301D 102 5/24/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR052N1062314309080 $0.09 000001087555-3562500636
2023 11 FD04 00 E111 D 1498301D 100 5/24/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR052N1062314309081 $122.89 000001087573-3562500630
2023 11 FD04 00 E111 D 1498301D 100 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309081 $13.10 000001087573-3562500630
2023 11 FD04 00 E121 D 1498301D 100 5/24/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR052N1062314309081 $9.27 000001087573-3562500630
2023 11 FD04 00 E121 D 1498301D 100 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309081 $0.99 000001087573-3562500630
2023 11 FD04 00 E122 D 1498301D 100 5/24/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR052N1062314309081 $95.79 000001087573-3562500630
2023 11 FD04 00 E122 D 1498301D 100 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309081 $10.22 000001087573-3562500630
2023 11 FD04 00 E123 D 1498301D 100 5/24/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR052N1062314309081 $13.75 000001087573-3562500630
2023 11 FD04 00 E123 D 1498301D 100 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309081 $1.44 000001087573-3562500630
2023 11 FD04 00 E124 D 1498301D 100 5/24/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR052N1062314309081 $0.04 000001087573-3562500630
2023 11 FD04 08 E143 D 1498301D 102 5/22/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300226647 PON22300001492-1 Johnson, Mirmiran & Thompson Inc $223,021.29 Rockcastle Co. 8-80106
2023 11 FD04 00 E111 D 1498301D 102 5/16/2023 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR051N1062312808087 $2,250.01 000001086631-3562500061
2023 11 FD04 00 E121 D 1498301D 102 5/16/2023 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR051N1062312808087 $172.13 000001086631-3562500061
2023 11 FD04 00 E122 D 1498301D 102 5/16/2023 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR051N1062312808087 $1,755.01 000001086631-3562500061
2023 11 FD04 00 E123 D 1498301D 102 5/16/2023 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR051N1062312808087 $92.60 000001086631-3562500061
2023 11 FD04 00 E111 D 1498301D 102 5/9/2023 0010 ENV STUDIES-UST/HZM CA-XR051N1062312808077 $453.60 000001085160-3562500061
2023 11 FD04 00 E121 D 1498301D 102 5/9/2023 0010 ENV STUDIES-UST/HZM CA-XR051N1062312808077 $30.35 000001085160-3562500061
2023 11 FD04 00 E122 D 1498301D 102 5/9/2023 0010 ENV STUDIES-UST/HZM CA-XR051N1062312808077 $353.81 000001085160-3562500061
2023 11 FD04 00 E123 D 1498301D 102 5/9/2023 0010 ENV STUDIES-UST/HZM CA-XR051N1062312808077 $140.57 000001085160-3562500061
2023 11 FD04 08 E143 D 1498301D 102 5/2/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300204890 PON22300001492-1 Johnson, Mirmiran & Thompson Inc $255,524.69 Rockcastle Co. 8-80106
2023 10 FD04 00 E123 D 1498301D 102 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106964 $30.63 000001086631-3562500061
2023 10 FD04 08 E143 D 1498301D 102 4/24/2023 0640 ENV STUDIES-GEN-CONSULT PRC-2300199257 PON22200001938 QK4 INC $7,015.41 Letter Agreement 29-CLC
2023 10 FD04 00 E124 D 1498301D 102 4/24/2023 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR042N1062311106964 $0.65 000001086631-3562500061
2023 10 FD04 00 E124 D 1498301D 102 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106964 $0.35 000001086631-3562500061
2023 10 FD04 00 E111 D 1498301D 102 4/24/2023 0010 ENV STUDIES-UST/HZM CA-XR042N1062311106951 $453.72 000001085160-3562500061
2023 10 FD04 00 E111 D 1498301D 102 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106951 $23.89 000001085160-3562500061
2023 10 FD04 00 E121 D 1498301D 102 4/24/2023 0010 ENV STUDIES-UST/HZM CA-XR042N1062311106951 $31.65 000001085160-3562500061
2023 10 FD04 00 E121 D 1498301D 102 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106951 $1.67 000001085160-3562500061
2023 10 FD04 00 E122 D 1498301D 102 4/24/2023 0010 ENV STUDIES-UST/HZM CA-XR042N1062311106951 $353.80 000001085160-3562500061
2023 10 FD04 00 E122 D 1498301D 102 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106951 $18.63 000001085160-3562500061
2023 10 FD04 00 E123 D 1498301D 102 4/24/2023 0010 ENV STUDIES-UST/HZM CA-XR042N1062311106951 $140.61 000001085160-3562500061
2023 10 FD04 00 E123 D 1498301D 102 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106951 $7.35 000001085160-3562500061
2023 10 FD04 00 E124 D 1498301D 102 4/24/2023 0010 ENV STUDIES-UST/HZM CA-XR042N1062311106951 $0.20 000001085160-3562500061
2023 10 FD04 00 E124 D 1498301D 102 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106951 $0.01 000001085160-3562500061
2023 10 FD04 00 E111 D 1498301D 102 4/24/2023 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR042N1062311106963 $1,462.51 000001086631-3562500061
2023 10 FD04 00 E111 D 1498301D 102 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106963 $787.50 000001086631-3562500061
2023 10 FD04 00 E121 D 1498301D 102 4/24/2023 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR042N1062311106963 $111.89 000001086631-3562500061
2023 10 FD04 00 E121 D 1498301D 102 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106963 $60.25 000001086631-3562500061
2023 10 FD04 00 E122 D 1498301D 102 4/24/2023 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR042N1062311106963 $1,140.76 000001086631-3562500061
2023 10 FD04 00 E122 D 1498301D 102 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106963 $614.25 000001086631-3562500061
2023 10 FD04 00 E123 D 1498301D 102 4/24/2023 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR042N1062311106963 $61.97 000001086631-3562500061
2023 10 FD04 00 E111 D 1498301D 102 4/10/2023 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR041N1062309605793 $1,462.51 000001086631-3562500061
2023 10 FD04 00 E111 D 1498301D 102 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605793 $391.25 000001086631-3562500061
2023 10 FD04 00 E121 D 1498301D 102 4/10/2023 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR041N1062309605793 $111.88 000001086631-3562500061
2023 10 FD04 00 E121 D 1498301D 102 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605793 $29.93 000001086631-3562500061
2023 10 FD04 00 E122 D 1498301D 102 4/10/2023 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR041N1062309605793 $1,140.76 000001086631-3562500061
2023 10 FD04 00 E122 D 1498301D 102 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605793 $305.18 000001086631-3562500061
2023 10 FD04 00 E123 D 1498301D 102 4/10/2023 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR041N1062309605793 $61.08 000001086631-3562500061
2023 10 FD04 00 E123 D 1498301D 102 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605793 $15.22 000001086631-3562500061
2023 10 FD04 00 E111 D 1498301D 102 4/10/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041N1062309605779 $341.62 000001084677-3562500636
2023 10 FD04 00 E111 D 1498301D 102 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605779 $30.97 000001084677-3562500636
2023 10 FD04 00 E121 D 1498301D 102 4/10/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041N1062309605779 $24.29 000001084677-3562500636
2023 10 FD04 00 E121 D 1498301D 102 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605779 $2.21 000001084677-3562500636
2023 10 FD04 00 E122 D 1498301D 102 4/10/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041N1062309605779 $266.39 000001084677-3562500636
2023 10 FD04 00 E122 D 1498301D 102 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605779 $24.16 000001084677-3562500636
2023 10 FD04 00 E123 D 1498301D 102 4/10/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041N1062309605779 $58.60 000001084677-3562500636
2023 10 FD04 00 E123 D 1498301D 102 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605779 $5.27 000001084677-3562500636
2023 9 FD04 08 E143 D 1498301D 102 3/30/2023 0640 ENV STUDIES-GEN-CONSULT PRC-2300172604 PON22200001938 QK4 INC $5,107.65 Letter Agreement 29-CLC
2023 9 FD04 08 E122 D 1498301D 121 3/27/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032N1062308304685 $290.61 000001086959-3562500636
2023 9 FD04 08 E123 D 1498301D 121 3/27/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032N1062308304685 $63.89 000001086959-3562500636
2023 9 FD04 08 E124 D 1498301D 121 3/27/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032N1062308304685 $0.09 000001086959-3562500636
2023 9 FD04 00 E111 D 1498301D 102 3/27/2023 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR032N1062308304672 $2,045.46 000001086631-3562500061
2023 9 FD04 00 E111 D 1498301D 102 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304672 $204.55 000001086631-3562500061
2023 9 FD04 00 E121 D 1498301D 102 3/27/2023 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR032N1062308304672 $156.48 000001086631-3562500061
2023 9 FD04 00 E121 D 1498301D 102 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304672 $15.65 000001086631-3562500061
2023 9 FD04 00 E122 D 1498301D 102 3/27/2023 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR032N1062308304672 $1,595.46 000001086631-3562500061
2023 9 FD04 00 E122 D 1498301D 102 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304672 $159.55 000001086631-3562500061
2023 9 FD04 00 E123 D 1498301D 102 3/27/2023 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR032N1062308304672 $84.65 000001086631-3562500061
2023 9 FD04 00 E123 D 1498301D 102 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304672 $7.95 000001086631-3562500061
2023 9 FD04 00 E124 D 1498301D 102 3/27/2023 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR032N1062308304672 $0.91 000001086631-3562500061
2023 9 FD04 00 E124 D 1498301D 102 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304672 $0.09 000001086631-3562500061
2023 9 FD04 08 E111 D 1498301D 121 3/27/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032N1062308304684 $372.57 000001086959-3562500636
2023 9 FD04 08 E121 D 1498301D 121 3/27/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032N1062308304684 $27.12 000001086959-3562500636
2023 9 FD04 00 E111 D 1498301D 102 3/15/2023 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR031N1062306703683 $1,883.34 000001086631-3562500061
2023 9 FD04 00 E111 D 1498301D 102 3/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703683 $366.67 000001086631-3562500061
2023 9 FD04 00 E121 D 1498301D 102 3/15/2023 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR031N1062306703683 $144.08 000001086631-3562500061
2023 9 FD04 00 E121 D 1498301D 102 3/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703683 $28.05 000001086631-3562500061
2023 9 FD04 00 E122 D 1498301D 102 3/15/2023 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR031N1062306703683 $1,469.01 000001086631-3562500061
2023 9 FD04 00 E122 D 1498301D 102 3/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703683 $286.00 000001086631-3562500061
2023 9 FD04 00 E123 D 1498301D 102 3/15/2023 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR031N1062306703683 $78.34 000001086631-3562500061
2023 9 FD04 00 E123 D 1498301D 102 3/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703683 $14.26 000001086631-3562500061
2023 9 FD04 00 E111 D 1498301D 102 3/9/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR031N1062306703682 $75.05 000001086575-3562500630
2023 9 FD04 00 E111 D 1498301D 102 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703682 $191.63 000001086575-3562500630
2023 9 FD04 00 E121 D 1498301D 102 3/9/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR031N1062306703682 $5.66 000001086575-3562500630
2023 9 FD04 00 E121 D 1498301D 102 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703682 $14.46 000001086575-3562500630
2023 9 FD04 00 E122 D 1498301D 102 3/9/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR031N1062306703682 $58.54 000001086575-3562500630
2023 9 FD04 00 E122 D 1498301D 102 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703682 $149.47 000001086575-3562500630
2023 9 FD04 00 E123 D 1498301D 102 3/9/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR031N1062306703682 $8.67 000001086575-3562500630
2023 9 FD04 00 E123 D 1498301D 102 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703682 $21.12 000001086575-3562500630
2023 9 FD04 00 E111 D 1498301D 102 3/1/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR022N1062305302485 $716.35 000001086575-3562500630
2023 9 FD04 00 E111 D 1498301D 102 3/1/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302485 $185.86 000001086575-3562500630
2023 9 FD04 00 E121 D 1498301D 102 3/1/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR022N1062305302485 $54.08 000001086575-3562500630
2023 9 FD04 00 E121 D 1498301D 102 3/1/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302485 $14.03 000001086575-3562500630
2023 9 FD04 00 E122 D 1498301D 102 3/1/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR022N1062305302485 $558.80 000001086575-3562500630
2023 9 FD04 00 E122 D 1498301D 102 3/1/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302485 $144.98 000001086575-3562500630
2023 9 FD04 00 E123 D 1498301D 102 3/1/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR022N1062305302485 $80.32 000001086575-3562500630
2023 9 FD04 00 E123 D 1498301D 102 3/1/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302485 $20.48 000001086575-3562500630
2023 9 FD04 00 E124 D 1498301D 102 3/1/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR022N1062305302485 $0.21 000001086575-3562500630
2023 9 FD04 00 E124 D 1498301D 102 3/1/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302485 $0.06 000001086575-3562500630
2023 8 FD04 00 E111 D 1498301D 102 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302463 $372.57 000001084677-3562500636
2023 8 FD04 00 E121 D 1498301D 102 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302463 $27.12 000001084677-3562500636
2023 8 FD04 00 E122 D 1498301D 102 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302463 $290.61 000001084677-3562500636
2023 8 FD04 00 E123 D 1498301D 102 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302463 $63.89 000001084677-3562500636
2023 8 FD04 00 E124 D 1498301D 102 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302463 $0.09 000001084677-3562500636
2023 7 FD04 00 E122 D 1498301D 102 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300436 $35.38 000001084677-3562500636
2023 7 FD04 00 E123 D 1498301D 102 1/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012N1062302300436 $70.34 000001084677-3562500636
2023 7 FD04 00 E123 D 1498301D 102 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300436 $7.72 000001084677-3562500636
2023 7 FD04 00 E124 D 1498301D 102 1/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012N1062302300436 $0.10 000001084677-3562500636
2023 7 FD04 00 E124 D 1498301D 102 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300436 $0.01 000001084677-3562500636
2023 7 FD04 00 E111 D 1498301D 102 1/24/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR012N1062302300439 $180.03 000001085194-3562500061
2023 7 FD04 00 E111 D 1498301D 102 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300439 $19.92 000001085194-3562500061
2023 7 FD04 00 E121 D 1498301D 102 1/24/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR012N1062302300439 $13.77 000001085194-3562500061
2023 7 FD04 00 E121 D 1498301D 102 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300439 $1.53 000001085194-3562500061
2023 7 FD04 00 E122 D 1498301D 102 1/24/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR012N1062302300439 $140.59 000001085194-3562500061
2023 7 FD04 00 E122 D 1498301D 102 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300439 $15.54 000001085194-3562500061
2023 7 FD04 00 E123 D 1498301D 102 1/24/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR012N1062302300439 $9.31 000001085194-3562500061
2023 7 FD04 00 E123 D 1498301D 102 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300439 $0.97 000001085194-3562500061
2023 7 FD04 00 E124 D 1498301D 102 1/24/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR012N1062302300439 $0.11 000001085194-3562500061
2023 7 FD04 00 E124 D 1498301D 102 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300439 $0.01 000001085194-3562500061
2023 7 FD04 00 E111 D 1498301D 102 1/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012N1062302300435 $410.01 000001084677-3562500636
2023 7 FD04 00 E111 D 1498301D 102 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300435 $45.36 000001084677-3562500636
2023 7 FD04 00 E121 D 1498301D 102 1/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012N1062302300435 $29.82 000001084677-3562500636
2023 7 FD04 00 E121 D 1498301D 102 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300435 $3.31 000001084677-3562500636
2023 7 FD04 00 E122 D 1498301D 102 1/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012N1062302300435 $319.66 000001084677-3562500636
2023 6 FD04 00 E111 D 1498301D 102 12/12/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR121M1062234208231 $490.90 000001085194-3562500061
2023 6 FD04 00 E111 D 1498301D 102 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208231 $109.09 000001085194-3562500061
2023 6 FD04 00 E121 D 1498301D 102 12/12/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR121M1062234208231 $37.56 000001085194-3562500061
2023 6 FD04 00 E121 D 1498301D 102 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208231 $8.34 000001085194-3562500061
2023 6 FD04 00 E122 D 1498301D 102 12/12/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR121M1062234208231 $382.91 000001085194-3562500061
2023 6 FD04 00 E122 D 1498301D 102 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208231 $85.09 000001085194-3562500061
2023 6 FD04 00 E123 D 1498301D 102 12/12/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR121M1062234208231 $25.56 000001085194-3562500061
2023 6 FD04 00 E123 D 1498301D 102 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208231 $5.30 000001085194-3562500061
2023 6 FD04 00 E111 D 1498301D 102 12/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121M1062234208227 $372.51 000001084677-3562500636
2023 6 FD04 00 E111 D 1498301D 102 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208227 $157.47 000001084677-3562500636
2023 6 FD04 00 E121 D 1498301D 102 12/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121M1062234208227 $26.54 000001084677-3562500636
2023 6 FD04 00 E121 D 1498301D 102 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208227 $11.21 000001084677-3562500636
2023 6 FD04 00 E122 D 1498301D 102 12/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121M1062234208227 $290.61 000001084677-3562500636
2023 6 FD04 00 E122 D 1498301D 102 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208227 $122.83 000001084677-3562500636
2023 6 FD04 00 E123 D 1498301D 102 12/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121M1062234208227 $56.34 000001084677-3562500636
2023 6 FD04 00 E123 D 1498301D 102 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208227 $23.53 000001084677-3562500636
2023 5 FD04 00 E111 D 1498301D 102 11/29/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR112M1062232607183 $403.71 000001085194-3562500061
2023 5 FD04 00 E111 D 1498301D 102 11/29/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607183 $65.24 000001085194-3562500061
2023 5 FD04 00 E121 D 1498301D 102 11/29/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR112M1062232607183 $30.88 000001085194-3562500061
2023 5 FD04 00 E121 D 1498301D 102 11/29/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607183 $5.00 000001085194-3562500061
2023 5 FD04 00 E122 D 1498301D 102 11/29/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR112M1062232607183 $314.84 000001085194-3562500061
2023 5 FD04 00 E122 D 1498301D 102 11/29/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607183 $50.89 000001085194-3562500061
2023 5 FD04 00 E111 D 1498301D 102 11/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112M1062232607177 $174.07 000001084677-3562500636
2023 5 FD04 00 E111 D 1498301D 102 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607177 $28.31 000001084677-3562500636
2023 5 FD04 00 E121 D 1498301D 102 11/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112M1062232607177 $12.65 000001084677-3562500636
2023 5 FD04 00 E121 D 1498301D 102 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607177 $2.06 000001084677-3562500636
2023 5 FD04 00 E122 D 1498301D 102 11/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112M1062232607177 $135.62 000001084677-3562500636
2023 5 FD04 00 E122 D 1498301D 102 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607177 $22.09 000001084677-3562500636
2023 5 FD04 00 E123 D 1498301D 102 11/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112M1062232607177 $26.24 000001084677-3562500636
2023 5 FD04 00 E123 D 1498301D 102 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607177 $4.23 000001084677-3562500636
2023 5 FD04 00 E124 D 1498301D 102 11/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112M1062232607177 $0.04 000001084677-3562500636
2023 5 FD04 00 E111 D 1498301D 102 11/14/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111M1062230806176 $372.43 000001084677-3562500636
2023 5 FD04 00 E111 D 1498301D 102 11/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806176 $9.44 000001084677-3562500636
2023 5 FD04 00 E121 D 1498301D 102 11/14/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111M1062230806176 $26.53 000001084677-3562500636
2023 5 FD04 00 E121 D 1498301D 102 11/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806176 $0.67 000001084677-3562500636
2023 5 FD04 00 E122 D 1498301D 102 11/14/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111M1062230806176 $290.60 000001084677-3562500636
2023 5 FD04 00 E122 D 1498301D 102 11/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806176 $7.36 000001084677-3562500636
2023 5 FD04 00 E123 D 1498301D 102 11/14/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111M1062230806176 $56.16 000001084677-3562500636
2023 5 FD04 00 E123 D 1498301D 102 11/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806176 $1.41 000001084677-3562500636
2023 5 FD04 00 E111 D 1498301D 102 11/7/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR111M1062230806182 $327.27 000001085194-3562500061
2023 5 FD04 00 E121 D 1498301D 102 11/7/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR111M1062230806182 $25.04 000001085194-3562500061
2023 5 FD04 00 E122 D 1498301D 102 11/7/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR111M1062230806182 $255.27 000001085194-3562500061
2023 4 FD04 00 E111 D 1498301D 102 10/31/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR102M1062229405090 $180.00 000001085194-3562500061
2023 4 FD04 00 E121 D 1498301D 102 10/31/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR102M1062229405090 $13.77 000001085194-3562500061
2023 4 FD04 00 E122 D 1498301D 102 10/31/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR102M1062229405090 $140.40 000001085194-3562500061
2023 4 FD04 00 E111 D 1498301D 102 10/31/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR102M1062229405090 $360.00 000001085197-3562500061
2023 4 FD04 00 E121 D 1498301D 102 10/31/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR102M1062229405090 $27.54 000001085197-3562500061
2023 4 FD04 00 E122 D 1498301D 102 10/31/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR102M1062229405090 $280.80 000001085197-3562500061
2023 4 FD04 00 E111 D 1498301D 102 10/24/2022 0010 ENV STUDIES-UST/HZM CA-XR102M1062229405088 $453.60 000001085160-3562500061
2023 4 FD04 00 E121 D 1498301D 102 10/24/2022 0010 ENV STUDIES-UST/HZM CA-XR102M1062229405088 $31.65 000001085160-3562500061
2023 4 FD04 00 E122 D 1498301D 102 10/24/2022 0010 ENV STUDIES-UST/HZM CA-XR102M1062229405088 $353.81 000001085160-3562500061
2023 4 FD04 00 E123 D 1498301D 102 10/24/2022 0010 ENV STUDIES-UST/HZM CA-XR102M1062229405088 $123.52 000001085160-3562500061
2023 4 FD04 00 E124 D 1498301D 102 10/24/2022 0010 ENV STUDIES-UST/HZM CA-XR102M1062229405088 $0.20 000001085160-3562500061
2023 3 FD04 00 E122 D 1498301D 102 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602810 $105.79 000001084677-3562500636
2023 3 FD04 00 E123 D 1498301D 102 9/26/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092M1062226602810 $56.24 000001084677-3562500636
2023 3 FD04 00 E123 D 1498301D 102 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602810 $20.26 000001084677-3562500636
2023 3 FD04 00 E124 D 1498301D 102 9/26/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092M1062226602810 $0.12 000001084677-3562500636
2023 3 FD04 00 E124 D 1498301D 102 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602810 $0.03 000001084677-3562500636
2023 3 FD04 00 E111 D 1498301D 102 9/26/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092M1062226602809 $372.43 000001084677-3562500636
2023 3 FD04 00 E111 D 1498301D 102 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602809 $135.62 000001084677-3562500636
2023 3 FD04 00 E121 D 1498301D 102 9/26/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092M1062226602809 $27.12 000001084677-3562500636
2023 3 FD04 00 E121 D 1498301D 102 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602809 $9.87 000001084677-3562500636
2023 3 FD04 00 E122 D 1498301D 102 9/26/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092M1062226602809 $289.78 000001084677-3562500636