Highway Plan Phase Info
Phase Funding FY Amount
Design SPP 2024 $1,996,800.00
Right of way SPP 2025 $5,865,000.00
Utility Relocation SPP 2026 $1,478,400.00
Construction SPP 2027 $12,000,000.00
Current Phase Info
Phase Funding Estimated Cost Scheduled FY Phase Funding Status
Authorized Date Authorized Amount
D SPP $0.00 2024 AUTHORIZED 8/3/2022 $1,200,000.00
R SPP $5,865,000.00 2025 ESTIMATED $0.00
U SPP $1,478,400.00 2026 ESTIMATED $0.00
C SPP $12,000,000.00 2027 ESTIMATED $0.00
Project Budget Info
Phase Authorization Number Program Code Project Budget Budget
Modifications
(e-MARS) Project Expenditures
(e-MARS) Encumbered Amount Remaining (e-MARS)
Unobligated Amount
D 15495 1549501D $1,200,000.00 $0.00 $278,570.04 $466,934.00 $462,812.75
R/W Clearance:
Utility Clearance:

Some critical dates have not been assigned. (Letting Date not Established)

Project Description: Provide connectivity, improve mobility, and reduce congestion along KY 536 from KY 17 to KY 16; include multi-modes. (2022CCN)
Location:
Route 1 Kenton County KY-536 from MP 4.6 to MP 6.06
Route 2 County - from MP to MP
Item #: 6-80217.00
Project Manager: KYTC\MIKE.BEZOLD
Road Engineer:
Type of Work: CONGESTION MITIGTN(O)
Concerns:
Bridge Engineer:
Bridge Structure Number:
Select the Structure Number for The NBI Kentucky Inventory and Appraisal Report
Bridge Suff. Rate:
NBI Rating:
Posting:
Project Manager: KYTC\MIKE.BEZOLD       Item #: 6-80217.00
Project Description: Provide connectivity, improve mobility, and reduce congestion along KY 536 from KY 17 to KY 16; include multi-modes. (2022CCN)

This Project has no Milesones defined.
Project Manager: KYTC\MIKE.BEZOLD       Item #: 6-80217.00
Project Description: Provide connectivity, improve mobility, and reduce congestion along KY 536 from KY 17 to KY 16; include multi-modes. (2022CCN)
Authoritative Source for Environmental Data:  EATS
This Project has no Environmental data.

No 401 – WQC Permit Data Available

No 402 – KPDES Permit Data Available

No 404 – USACE Permit Data Available

No Intergovernmental Review Permit Data Available

No LOP Permit Data Available

No Tennessee Valley Authority Permit Data Available
Project Manager: KYTC\MIKE.BEZOLD       Item #: 6-80217.00
Project Description: Provide connectivity, improve mobility, and reduce congestion along KY 536 from KY 17 to KY 16; include multi-modes. (2022CCN)
Authoritative Source for R/W Data: KROWDS
View Communicating All Promises (CAP) Report for Item# 6-80217.00
This Project has no Right Of Way Data available from RWMS.
This Project has no Right Of Way Data available from KROWDS.
Project Manager: KYTC\MIKE.BEZOLD       Item #: 6-80217.00
Project Description: Provide connectivity, improve mobility, and reduce congestion along KY 536 from KY 17 to KY 16; include multi-modes. (2022CCN)
Authoritative Source for Utilities and Rail Tracking Data: KURTS
This Project has no Utilities Data available.
Project Manager: KYTC\MIKE.BEZOLD       Item #: 6-80217.00
Project Description: Provide connectivity, improve mobility, and reduce congestion along KY 536 from KY 17 to KY 16; include multi-modes. (2022CCN)
This Project has no Vendors Assigned.