Some critical dates have not been assigned. (Letting Date not Established)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Description: WIDEN KY-245 FROM FLAGET HOSPITAL (MP 7.722) THROUGH COUNTY LINE (MP12.261 NELSON/MP0.000 BULLITT) TO HAPPY HOLLOW RD (MP 4.425). (2022CCN) Location: Route 1 Bullitt County KY-245 from MP 0 to MP 4.43 Route 2 90 County KY - from MP 7.72 to MP 12.26245 Item #: 4-8307.20 Project Manager: KYTC\KEVIN.BLAIN Road Engineer: Type of Work: MINOR WIDENING(O) Concerns:
Bridge Engineer: Bridge Structure Number: Select the Structure Number for The NBI Kentucky Inventory and Appraisal Report Bridge Suff. Rate: NBI Rating: Posting: |
Project Manager: KYTC\KEVIN.BLAIN Item #: 4-8307.20 Project Description: WIDEN KY-245 FROM FLAGET HOSPITAL (MP 7.722) THROUGH COUNTY LINE (MP12.261 NELSON/MP0.000 BULLITT) TO HAPPY HOLLOW RD (MP 4.425). (2022CCN) |
Milestones
|
Project Manager: KYTC\KEVIN.BLAIN Item #: 4-8307.20 Project Description: WIDEN KY-245 FROM FLAGET HOSPITAL (MP 7.722) THROUGH COUNTY LINE (MP12.261 NELSON/MP0.000 BULLITT) TO HAPPY HOLLOW RD (MP 4.425). (2022CCN) Authoritative Source for Environmental Data: EATS |
Requestor | Request Type | Request Date | Assigned Name | Assigned Date | Scheduled Completion Date |
Actual Completion Date | Expiration Date |
CE LVL 3 | 2/28/2023 | ||||||
Environmental Analysis | Overview | 6/16/2008 | 6/18/2008 | 6/30/2010 |
Project Manager: KYTC\KEVIN.BLAIN Item #: 4-8307.20 Project Description: WIDEN KY-245 FROM FLAGET HOSPITAL (MP 7.722) THROUGH COUNTY LINE (MP12.261 NELSON/MP0.000 BULLITT) TO HAPPY HOLLOW RD (MP 4.425). (2022CCN) Authoritative Source for R/W Data: KROWDS View Communicating All Promises (CAP) Report for Item# 4-8307.20 |
This Project has no Right Of Way Data available from RWMS.
This Project has no Right Of Way Data available from KROWDS.
|
Project Manager: KYTC\KEVIN.BLAIN Item #: 4-8307.20 Project Description: WIDEN KY-245 FROM FLAGET HOSPITAL (MP 7.722) THROUGH COUNTY LINE (MP12.261 NELSON/MP0.000 BULLITT) TO HAPPY HOLLOW RD (MP 4.425). (2022CCN) Authoritative Source for Utilities and Rail Tracking Data: KURTS |
Utility Companies | |
Utility Name | Facility Name |
Project Manager: KYTC\KEVIN.BLAIN Item #: 4-8307.20 Project Description: WIDEN KY-245 FROM FLAGET HOSPITAL (MP 7.722) THROUGH COUNTY LINE (MP12.261 NELSON/MP0.000 BULLITT) TO HAPPY HOLLOW RD (MP 4.425). (2022CCN) |
Phase | Vendor |
D | HDR ENGINEERING INC |