Some critical dates have not been assigned. (Letting Date not Established)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Description: MITIGATE OR ELIMINATE ROCKFALL HAZARDS AND IMPROVE ROADWAY FOR BETTER FLOW AND EFFICIENCY IN ORDER TO HANDLE THE EXPECTED CONGESTION ARISING FROM EVENTS AT THE EXPO CENTER. IDENTIFIED IN THE 1999 PIKEVILLE URBAN STUDY, FROM BILL KING RD. TO US 119. (2020 Location: Route 1 Pike County KY-1426 from MP 7.076 to MP 9.638 Route 2 County - from MP to MP Item #: 12-147.00 Project Manager: KYTC\JOHNM.JOHNSON Road Engineer: Type of Work: RECONSTRUCTION Concerns:
Bridge Engineer: Bridge Structure Number: 098B00024N Select the Structure Number for The NBI Kentucky Inventory and Appraisal Report Bridge Suff. Rate: 77 NBI Rating: Not Deficient Posting: NO |
Project Manager: KYTC\JOHNM.JOHNSON Item #: 12-147.00 Project Description: MITIGATE OR ELIMINATE ROCKFALL HAZARDS AND IMPROVE ROADWAY FOR BETTER FLOW AND EFFICIENCY IN ORDER TO HANDLE THE EXPECTED CONGESTION ARISING FROM EVENTS AT THE EXPO CENTER. IDENTIFIED IN THE 1999 PIKEVILLE URBAN STUDY, FROM BILL KING RD. TO US 119. (2020 |
Project Manager: KYTC\JOHNM.JOHNSON Item #: 12-147.00 Project Description: MITIGATE OR ELIMINATE ROCKFALL HAZARDS AND IMPROVE ROADWAY FOR BETTER FLOW AND EFFICIENCY IN ORDER TO HANDLE THE EXPECTED CONGESTION ARISING FROM EVENTS AT THE EXPO CENTER. IDENTIFIED IN THE 1999 PIKEVILLE URBAN STUDY, FROM BILL KING RD. TO US 119. (2020 Authoritative Source for Environmental Data: EATS |
Requestor | Request Type | Request Date | Assigned Name | Assigned Date | Scheduled Completion Date |
Actual Completion Date | Expiration Date |
Preliminary | 12/11/2023 |
Project Manager: KYTC\JOHNM.JOHNSON Item #: 12-147.00 Project Description: MITIGATE OR ELIMINATE ROCKFALL HAZARDS AND IMPROVE ROADWAY FOR BETTER FLOW AND EFFICIENCY IN ORDER TO HANDLE THE EXPECTED CONGESTION ARISING FROM EVENTS AT THE EXPO CENTER. IDENTIFIED IN THE 1999 PIKEVILLE URBAN STUDY, FROM BILL KING RD. TO US 119. (2020 Authoritative Source for R/W Data: KROWDS View Communicating All Promises (CAP) Report for Item# 12-147.00 |
This Project has no Right Of Way Data available from RWMS.
This Project has no Right Of Way Data available from KROWDS.
|
Project Manager: KYTC\JOHNM.JOHNSON Item #: 12-147.00 Project Description: MITIGATE OR ELIMINATE ROCKFALL HAZARDS AND IMPROVE ROADWAY FOR BETTER FLOW AND EFFICIENCY IN ORDER TO HANDLE THE EXPECTED CONGESTION ARISING FROM EVENTS AT THE EXPO CENTER. IDENTIFIED IN THE 1999 PIKEVILLE URBAN STUDY, FROM BILL KING RD. TO US 119. (2020 Authoritative Source for Utilities and Rail Tracking Data: KURTS |
Utility Companies | |
Utility Name | Facility Name |
Project Manager: KYTC\JOHNM.JOHNSON Item #: 12-147.00 Project Description: MITIGATE OR ELIMINATE ROCKFALL HAZARDS AND IMPROVE ROADWAY FOR BETTER FLOW AND EFFICIENCY IN ORDER TO HANDLE THE EXPECTED CONGESTION ARISING FROM EVENTS AT THE EXPO CENTER. IDENTIFIED IN THE 1999 PIKEVILLE URBAN STUDY, FROM BILL KING RD. TO US 119. (2020 |
Phase | Vendor |
D | PRIME AE Group, Inc. |