Some critical dates have not been assigned. (Letting Date not Established)
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Description: CONDUCT A PLANNING STUDY FOR EXTENDING US 60 FROM BARLOW, KY WEST TO I 57 NEAR FUTURE CITY, IL. (2022CCN) Location: Route 1 Ballard County CO-0 from MP to MP Route 2 County - from MP to MP Item #: 1-80250.00 Project Manager: KYTC\KYLE.POAT Road Engineer: Type of Work: FEASIBILITY STUDY(O) Concerns:
Bridge Engineer: Bridge Structure Number: Select the Structure Number for The NBI Kentucky Inventory and Appraisal Report Bridge Suff. Rate: NBI Rating: Posting: |
Project Manager: KYTC\KYLE.POAT Item #: 1-80250.00 Project Description: CONDUCT A PLANNING STUDY FOR EXTENDING US 60 FROM BARLOW, KY WEST TO I 57 NEAR FUTURE CITY, IL. (2022CCN) |
Project Manager: KYTC\KYLE.POAT Item #: 1-80250.00 Project Description: CONDUCT A PLANNING STUDY FOR EXTENDING US 60 FROM BARLOW, KY WEST TO I 57 NEAR FUTURE CITY, IL. (2022CCN) Authoritative Source for Environmental Data: EATS |
Requestor | Request Type | Request Date | Assigned Name | Assigned Date | Scheduled Completion Date |
Actual Completion Date | Expiration Date |
Preliminary | 8/9/2022 |
Project Manager: KYTC\KYLE.POAT Item #: 1-80250.00 Project Description: CONDUCT A PLANNING STUDY FOR EXTENDING US 60 FROM BARLOW, KY WEST TO I 57 NEAR FUTURE CITY, IL. (2022CCN) Authoritative Source for R/W Data: KROWDS View Communicating All Promises (CAP) Report for Item# 1-80250.00 |
This Project has no Right Of Way Data available from RWMS.
This Project has no Right Of Way Data available from KROWDS.
|
Project Manager: KYTC\KYLE.POAT Item #: 1-80250.00 Project Description: CONDUCT A PLANNING STUDY FOR EXTENDING US 60 FROM BARLOW, KY WEST TO I 57 NEAR FUTURE CITY, IL. (2022CCN) Authoritative Source for Utilities and Rail Tracking Data: KURTS |
Project Manager: KYTC\KYLE.POAT Item #: 1-80250.00 Project Description: CONDUCT A PLANNING STUDY FOR EXTENDING US 60 FROM BARLOW, KY WEST TO I 57 NEAR FUTURE CITY, IL. (2022CCN) |