IDENTIFICATION
|
|
(8) STRUCTURE NUMBER |
007B00084N |
(1) STATE NAME: |
KENTUCKY |
(5) INVERNTORY ROUTE: |
3100074 |
(2) DISTRICT AGENCY DISTRICT: |
11 |
(3) COUNTY CODE: 13 |
(4)PLACE CODE:00000 |
(6) FEATURES INTERSECTED : |
LITTLE YELLOW CREEK |
(9) LOCATION: |
.15 MI WEST OF JCT US 25E |
(7) FACILITY CARRIED: |
EAST CUMBERLAND AV |
(11) KILOMETER POINT : |
26.821 |
(12) BASE HIGHWAY NETWORK: |
0 |
(13) LRS INVENTORY ROUTE&SUBROUTE: |
|
(16) LATITUDE: |
363629 N DEGREES |
(17) LONGITUDE: |
834212 W DEGREES |
(98) BORDER BRIDGE STATE CODE: Not Applicable |
% shared: |
(99) BORDER BRIDGE STRUCTURE NUMBER: |
|
STRUCTURE TYPE AND MATERIAL |
|
(43) STRUCTURE TYPE MAIN: |
2 |
(44) STRUCTURE TYPE APPR: |
! |
(45) NUMBER OF SPANS IN MAIN UNIT: |
3 |
(46) NUMBER OF APPROACH SPANS: |
0 |
(107) DECK STRUCTURE TYPE: |
1 |
(108) WEARING SURFACE PROTECTION SYSTEM: |
6 |
(108A) TYPE OF WEARING SURFACE: |
6 |
(108B) TYPE OF MEMBRANE: |
0 |
(108C) TYPE OF DECK PROTECTION: |
0 |
AGE AND SERVICE |
|
(27) YEAR BUILT: |
1951 |
(106) YEAR RECONSTRUCTED: |
0 |
(42A) TYPE OF SERVICE-ON: |
CODE: 1 |
(42B) TYPE OF SERVICE-UNDER: |
CODE: 5 |
(28) LANES ON STRUCTURE : 4 |
LANES UNDER STRUCTURE: 0 |
(29) AVERAGE DAILY TRAFFIC: |
14768 |
(30) YEAR OF ADT: 2023 |
TRUCK ADT %16 |
(19) BYPASS, DETOUR LENGTH: |
0.6mi. |
GEOMETRIC DATA |
|
(48) LENGTH OF MAXIMUM SPAN: |
35m |
(49) STRUCTURE LENGTH: |
86m |
(50) CURB OR SIDEWALK LEFT:9.80 |
RIGHT:9.80 |
(51) BRIDGE ROADWAY CURB TO CURB: |
62.00m |
(52) DECK WIDTH OUT TO OUT: |
82.00m |
(32) APPROACH ROADWAY WIDTH(W/SHOULDERS): |
62.00m |
(33) BRIDGE MEDIAN: |
CODE: 0 |
(34) SKEW: |
25 |
(10) INVENTORY ROUTE MIN VERT CLEAR)Vclrinv): |
99.99m |
(47) INVENTORY ROUTE TOTAL HORIZ CLEAR (Vcllriv): |
62m |
(53) MIN VERT CLEAR OVER BRIDGE RDWY(vCLOVER): |
99.99m |
(54) MIN VER UNDERCLEAR REF(Refvuc): |
(a) N (b) 0 |
(55) MIN LAT UNDERCLEAR RT REF(Refhuc): |
(a) Nm (b) 0 m |
(56) MIN LAT UNDERCLEAR LEFT(Hclruit) |
0 m |
NAVIGATION DATA |
|
(38) NAVIGATION CONTROL: |
0 |
(111) PIER PROTECTION: |
|
(39) NAVIGATION VERTICAL CLEARANCE: |
0 |
(116) VERT-LIFT BRIDGE NAV MIN VERT CLEARANCE: |
0 |
(40) NAVIGATION HORZ CLEARANCE: |
0 |
SUFFICIENCY RATING: |
77.8 |
STATUS: |
0 |
CLASSIFICATION |
|
(112) NBIS BRIDGE LENGTH: |
Y |
(104) HIGHWAY SYSTEM: |
0 |
(26) FUNCTIONAL CLASS |
16 |
(100) STRAHNET HIGHWAY: |
0 |
(101) PARALLEL STRUCTURE: |
N |
(102) DIRECTION OF TRAFFIC: |
2 |
(103) TEMPORARY STRUCTURE: |
|
(105) FEDERAL LANDS HIGHWAY: |
0 |
(110) DESIGNATED NATIONAL NETWORK: |
0 |
(20) TOLL: |
3 |
(21) MAINTAIN: |
01 |
(22) OWNER: |
01 |
(37) HISTORICAL SIGNIFICANCE |
3 |
CONDITION |
|
(58) DECK: |
6 |
(59) SUPERSTRUCTURE: |
6 |
(60) SUBSTRUCTURE: |
6 |
(61) CHANNEL AND CHANNEL PROTECTION : |
5 |
(61) CULVERTS: |
N |
LOAD RATINGAND POSTING
|
|
(31) DESIGN LOAD: |
4 |
(63) OPERATING RATING METHOD: |
1 |
(64) OPERATING RATING: |
34.5 metrtic tons |
(65) INVENTORY RATING METHOD: |
1 |
(66) INVENTORY RATING: |
20.7 metric tons |
(70) BRIDGE POSTING: |
0 |
(41) STRUCTURE OPEN,POSTED OR CLOSED: |
P |
APPRAISAL |
|
(67) STRUCTURE EVALUATION: |
4 |
(68) DECK GEOMETRY: |
6 |
(69) UNDERCLEARANCE,VERTICAL & HORIZONTAL: |
N |
(71) WATERWAY ADEQUACY: |
6 |
(72) APPROACH ROADWAY ALIGNMENT: |
8 |
(36) TRAFFIC SAFETY FEATURES: |
0000 |
(113) SCOUR CRITICAL BRIDGES: |
8 |
PROPOSED IMPROVEMENTS
|
|
(75) TYPE OF WORK: |
Unknown |
(76) LENGTH OF STRUCTURE IMPROVEMENTS: |
0 |
(94) BRIDGE IMPROVEMENT COST: |
0 |
(95) ROADWAY IMPROVEMENT COST: |
0 |
(96) TOTAL PROJECT COST: |
0 |
(97) YEAR OF IMPROVEMENT COST ESTIMATE |
2000 |
(114) FUTURE ADT: |
14768 |
(115) YEAR OF FUTURE ADT: |
2043 |
INSPECTIONS |
|
(90) INSPECTION DATE: |
4/3/2024 |
(91) FREQUENCY: |
24 months |
(92A) FRACTURE CRITICAL DETAIL: |
N |
(92B) UNDERWATER INSPECTION: |
N |
(92C) OTHER SPECIAL INSPECTIONS: |
N |
(93A) |
1/1/1901 |
(93B) |
6/1/2006 |
(93C) |
4/15/2022 |