The Commonwealth pays employees on a semi-monthly basis with a scheduled pay day on the 15th and 30th of each month. The two monthly pay periods are from the 1st to the 15th of the month and the 16th through the last day of the month. Pay check distribution is delayed by one pay period to allow for system processing. For example work performed during the 1st to the 15th day of the month is paid to the employee on the 30th of the month. Accordingly the cost accounting charges for labor costs posting in eMARS to operating accounts and highway projects are also delayed by approximately one pay period.
A good rule of measure is that the cost accounting charges for the pay period ending on the 15th of the month will post to eMARS by the 25th and those for the pay period ending on the last day of the month will post to eMARS by the 10th of the following month.

x close panel
Detailed Project Expenditure Report
Total E-MARS Expenditures for 9504802C = $1,869,253.87
Click here for Labor Costs Information
Year Month PBU Charge District Object Phase Program Code County Date ACT Activity Name Trans ID Reference # Vendor Name Expenditure Line Description
2024 2 FD04 05 E797 C 9504802C 056 8/31/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092212605F010K CTXCONST0922126050001K M&M SERVICES CO INC $5,377.77
2023 7 FD04 05 E797 C 9504802C 056 1/24/2023 4010 CONSTRUCTION ENGINEERING PRC-2300125497 PON22200004162 QK4 INC $4,625.00 SW HWY & Bridge Construction Inspection Region 1
2023 3 FD04 05 E797 C 9504802C 056 9/29/2022 4010 CONSTRUCTION ENGINEERING PRC-2300055707 PON22200004162 QK4 INC $625.00 SW HWY & Bridge Construction Inspection Region 1
2023 3 FD04 05 E797 C 9504802C 056 9/28/2022 4010 CONSTRUCTION ENGINEERING PRC-2300055665 PON22200004162 QK4 INC $9,750.00 SW HWY & Bridge Construction Inspection Region 1
2023 3 FD04 05 E111 C 9504802C 056 9/12/2022 4010 CONSTRUCTION ENGINEERING CA-XR091M1062225101669 $112.55 10779847-3562505300
2023 3 FD04 05 E111 C 9504802C 056 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101669 $1.12 10779847-3562505300
2023 3 FD04 05 E121 C 9504802C 056 9/12/2022 4010 CONSTRUCTION ENGINEERING CA-XR091M1062225101669 $8.45 10779847-3562505300
2023 3 FD04 05 E121 C 9504802C 056 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101669 $0.09 10779847-3562505300
2023 3 FD04 05 E122 C 9504802C 056 9/12/2022 4010 CONSTRUCTION ENGINEERING CA-XR091M1062225101669 $87.81 10779847-3562505300
2023 3 FD04 05 E122 C 9504802C 056 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101669 $0.87 10779847-3562505300
2023 3 FD04 05 E123 C 9504802C 056 9/12/2022 4010 CONSTRUCTION ENGINEERING CA-XR091M1062225101669 $11.55 10779847-3562505300
2023 3 FD04 05 E123 C 9504802C 056 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101669 $0.11 10779847-3562505300
2023 2 FD04 05 E797 C 9504802C 056 8/1/2022 4010 CONSTRUCTION ENGINEERING PRC-2300015987 PON22100000777 QK4 INC $18,660.00 SW HWY & Bridge Construction Inspection Services
2023 1 FD04 05 E797 C 9504802C 056 7/21/2022 4010 CONSTRUCTION ENGINEERING PRC-2300011314 PON22100000777 QK4 INC $20,400.00 SW HWY & Bridge Construction Inspection Services
2023 1 FD04 05 E111 C 9504802C 056 7/12/2022 4010 CONSTRUCTION ENGINEERING CA-XR071M1062219207933 $19.02 10759603-3562505300
2023 1 FD04 05 E111 C 9504802C 056 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207933 $10.99 10759603-3562505300
2023 1 FD04 05 E121 C 9504802C 056 7/12/2022 4010 CONSTRUCTION ENGINEERING CA-XR071M1062219207933 $1.42 10759603-3562505300
2023 1 FD04 05 E121 C 9504802C 056 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207933 $0.83 10759603-3562505300
2023 1 FD04 05 E122 C 9504802C 056 7/12/2022 4010 CONSTRUCTION ENGINEERING CA-XR071M1062219207933 $15.91 10759603-3562505300
2023 1 FD04 05 E122 C 9504802C 056 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207933 $9.23 10759603-3562505300
2023 1 FD04 05 E123 C 9504802C 056 7/12/2022 4010 CONSTRUCTION ENGINEERING CA-XR071M1062219207933 $2.12 10759603-3562505300
2023 1 FD04 05 E123 C 9504802C 056 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207933 $1.20 10759603-3562505300
2023 1 FD04 05 E111 C 9504802C 056 7/12/2022 4010 CONSTRUCTION ENGINEERING CA-XR071M1062219208075 $133.30 10776376-3562505300
2023 1 FD04 05 E111 C 9504802C 056 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219208075 $13.33 10776376-3562505300
2023 1 FD04 05 E121 C 9504802C 056 7/12/2022 4010 CONSTRUCTION ENGINEERING CA-XR071M1062219208075 $9.23 10776376-3562505300
2023 1 FD04 05 E121 C 9504802C 056 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219208075 $0.92 10776376-3562505300
2023 1 FD04 05 E122 C 9504802C 056 7/12/2022 4010 CONSTRUCTION ENGINEERING CA-XR071M1062219208075 $111.93 10776376-3562505300
2023 1 FD04 05 E122 C 9504802C 056 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219208075 $11.19 10776376-3562505300
2023 1 FD04 05 E123 C 9504802C 056 7/12/2022 4010 CONSTRUCTION ENGINEERING CA-XR071M1062219208075 $44.95 10776376-3562505300
2023 1 FD04 05 E123 C 9504802C 056 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219208075 $4.45 10776376-3562505300
2022 12 FD04 05 E229 C 9504802C 056 6/27/2022 4010 CONSTRUCTION ENGINEERING IET-XE13A162522176034240 $89.00
2022 12 FD04 05 E111 C 9504802C 056 6/27/2022 4010 CONSTRUCTION ENGINEERING CA-XR062M1062217506773 $274.22 000001081763-3562500680
2022 12 FD04 05 E111 C 9504802C 056 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506773 $228.51 000001081763-3562500680
2022 12 FD04 05 E121 C 9504802C 056 6/27/2022 4010 CONSTRUCTION ENGINEERING CA-XR062M1062217506773 $20.79 000001081763-3562500680
2022 12 FD04 05 E121 C 9504802C 056 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506773 $17.32 000001081763-3562500680
2022 12 FD04 05 E122 C 9504802C 056 6/27/2022 4010 CONSTRUCTION ENGINEERING CA-XR062M1062217506773 $230.26 000001081763-3562500680
2022 12 FD04 05 E122 C 9504802C 056 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506773 $191.88 000001081763-3562500680
2022 12 FD04 05 E123 C 9504802C 056 6/27/2022 4010 CONSTRUCTION ENGINEERING CA-XR062M1062217506773 $32.52 000001081763-3562500680
2022 12 FD04 05 E123 C 9504802C 056 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506773 $26.39 000001081763-3562500680
2022 12 FD04 05 E124 C 9504802C 056 6/27/2022 4010 CONSTRUCTION ENGINEERING CA-XR062M1062217506773 $0.09 000001081763-3562500680
2022 12 FD04 05 E124 C 9504802C 056 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506773 $0.08 000001081763-3562500680
2022 12 FD04 05 E797 C 9504802C 056 6/22/2022 4580 CONSTRUCTION CONTRACTS PRC-XCONST092212605P009K CTXCONST0922126050001K M&M SERVICES CO INC $82,286.58
2022 12 FD04 05 E229 C 9504802C 056 6/13/2022 4010 CONSTRUCTION ENGINEERING IET-XE13A162522161017590 $286.90
2022 12 FD04 05 E111 C 9504802C 056 6/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR061M1062215905900 $77.63 10760230-3562505320
2022 12 FD04 05 E111 C 9504802C 056 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905900 $11.25 10760230-3562505320
2022 12 FD04 05 E121 C 9504802C 056 6/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR061M1062215905900 $5.34 10760230-3562505320
2022 12 FD04 05 E121 C 9504802C 056 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905900 $0.78 10760230-3562505320
2022 12 FD04 05 E122 C 9504802C 056 6/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR061M1062215905900 $65.14 10760230-3562505320
2022 12 FD04 05 E122 C 9504802C 056 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905900 $9.45 10760230-3562505320
2022 12 FD04 05 E111 C 9504802C 056 6/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR061M1062215905728 $251.56 000001081763-3562500680
2022 12 FD04 05 E123 C 9504802C 056 6/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR061M1062215905900 $27.48 10760230-3562505320
2022 12 FD04 05 E111 C 9504802C 056 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905728 $67.04 000001081763-3562500680
2022 12 FD04 05 E123 C 9504802C 056 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905900 $3.95 10760230-3562505320
2022 12 FD04 05 E121 C 9504802C 056 6/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR061M1062215905728 $18.98 000001081763-3562500680
2022 12 FD04 05 E121 C 9504802C 056 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905728 $5.06 000001081763-3562500680
2022 12 FD04 05 E122 C 9504802C 056 6/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR061M1062215905728 $211.07 000001081763-3562500680
2022 12 FD04 05 E122 C 9504802C 056 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905728 $56.30 000001081763-3562500680
2022 12 FD04 05 E123 C 9504802C 056 6/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR061M1062215905728 $29.57 000001081763-3562500680
2022 12 FD04 05 E123 C 9504802C 056 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905728 $7.75 000001081763-3562500680
2022 12 FD04 05 E111 C 9504802C 056 6/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR061M1062215905756 $277.91 10739744-3562505300
2022 12 FD04 05 E111 C 9504802C 056 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905756 $87.57 10739744-3562505300
2022 12 FD04 05 E121 C 9504802C 056 6/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR061M1062215905756 $20.83 10739744-3562505300
2022 12 FD04 05 E121 C 9504802C 056 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905756 $6.55 10739744-3562505300
2022 12 FD04 05 E122 C 9504802C 056 6/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR061M1062215905756 $233.41 10739744-3562505300
2022 12 FD04 05 E122 C 9504802C 056 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905756 $73.53 10739744-3562505300
2022 12 FD04 05 E123 C 9504802C 056 6/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR061M1062215905756 $30.96 10739744-3562505300
2022 12 FD04 05 E123 C 9504802C 056 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905756 $9.56 10739744-3562505300
2022 11 FD04 05 E797 C 9504802C 056 5/25/2022 4580 CONSTRUCTION CONTRACTS PRC-XCONST092212605P008K CTXCONST0922126050001K M&M SERVICES CO INC $149,672.35
2022 11 FD04 05 E111 C 9504802C 056 5/23/2022 4010 CONSTRUCTION ENGINEERING CA-XR052M1062214004712 $126.83 10739744-3562505300
2022 11 FD04 05 E111 C 9504802C 056 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004712 $36.97 10739744-3562505300
2022 11 FD04 05 E121 C 9504802C 056 5/23/2022 4010 CONSTRUCTION ENGINEERING CA-XR052M1062214004712 $9.55 10739744-3562505300
2022 11 FD04 05 E121 C 9504802C 056 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004712 $2.77 10739744-3562505300
2022 11 FD04 05 E122 C 9504802C 056 5/23/2022 4010 CONSTRUCTION ENGINEERING CA-XR052M1062214004712 $106.54 10739744-3562505300
2022 11 FD04 05 E122 C 9504802C 056 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004712 $31.05 10739744-3562505300
2022 11 FD04 05 E123 C 9504802C 056 5/23/2022 4010 CONSTRUCTION ENGINEERING CA-XR052M1062214004712 $16.25 10739744-3562505300
2022 11 FD04 05 E123 C 9504802C 056 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004712 $4.65 10739744-3562505300
2022 11 FD04 05 E124 C 9504802C 056 5/23/2022 4010 CONSTRUCTION ENGINEERING CA-XR052M1062214004712 $0.05 10739744-3562505300
2022 11 FD04 05 E124 C 9504802C 056 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004712 $0.02 10739744-3562505300
2022 11 FD04 05 E111 C 9504802C 056 5/23/2022 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR052M1062214004675 $32.73 000001080986-3562505210
2022 11 FD04 05 E111 C 9504802C 056 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004675 $1.97 000001080986-3562505210
2022 11 FD04 05 E121 C 9504802C 056 5/23/2022 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR052M1062214004675 $2.38 000001080986-3562505210
2022 11 FD04 05 E121 C 9504802C 056 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004675 $0.15 000001080986-3562505210
2022 11 FD04 05 E122 C 9504802C 056 5/23/2022 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR052M1062214004675 $27.52 000001080986-3562505210
2022 11 FD04 05 E122 C 9504802C 056 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004675 $1.66 000001080986-3562505210
2022 11 FD04 05 E123 C 9504802C 056 5/23/2022 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR052M1062214004675 $4.36 000001080986-3562505210
2022 11 FD04 05 E123 C 9504802C 056 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004675 $0.26 000001080986-3562505210
2022 11 FD04 05 E124 C 9504802C 056 5/23/2022 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR052M1062214004675 $0.01 000001080986-3562505210
2022 11 FD04 05 E797 C 9504802C 056 5/23/2022 4010 CONSTRUCTION ENGINEERING PRC-2200212871 PON22100000777 QK4 INC $16,265.50 SW HWY & Bridge Construction Inspection Services
2022 11 FD04 05 E229 C 9504802C 056 5/12/2022 4010 CONSTRUCTION ENGINEERING IET-XE13A162522130013600 $564.50
2022 11 FD04 05 E797 C 9504802C 056 5/11/2022 4580 CONSTRUCTION CONTRACTS PRC-XCONST092212605P007K CTXCONST0922126050001K M&M SERVICES CO INC $342,652.20
2022 11 FD04 05 E121 C 9504802C 056 5/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR051M1062212603994 $124.99 10748833-3562505320
2022 11 FD04 05 E122 C 9504802C 056 5/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR051M1062212603994 $1,522.19 10748833-3562505320
2022 11 FD04 05 E111 C 9504802C 056 5/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR051M1062212603686 $453.14 10720130-3562505300
2022 11 FD04 05 E111 C 9504802C 056 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603686 $122.89 10720130-3562505300
2022 11 FD04 05 E121 C 9504802C 056 5/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR051M1062212603686 $34.10 10720130-3562505300
2022 11 FD04 05 E121 C 9504802C 056 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603686 $9.25 10720130-3562505300
2022 11 FD04 05 E122 C 9504802C 056 5/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR051M1062212603686 $380.50 10720130-3562505300
2022 11 FD04 05 E122 C 9504802C 056 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603686 $103.19 10720130-3562505300
2022 11 FD04 05 E123 C 9504802C 056 5/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR051M1062212603686 $58.00 10720130-3562505300
2022 11 FD04 05 E123 C 9504802C 056 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603686 $15.44 10720130-3562505300
2022 11 FD04 05 E123 C 9504802C 056 5/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR051M1062212603994 $555.85 10748833-3562505320
2022 11 FD04 05 E115 C 9504802C 056 5/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR051M1062212603725 $128.91 10740931-3562505320
2022 11 FD04 05 E121 C 9504802C 056 5/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR051M1062212603725 $9.23 10740931-3562505320
2022 11 FD04 05 E121 C 9504802C 056 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603725 $0.25 10740931-3562505320
2022 11 FD04 05 E122 C 9504802C 056 5/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR051M1062212603725 $108.24 10740931-3562505320
2022 11 FD04 05 E122 C 9504802C 056 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603725 ($0.02) 10740931-3562505320
2022 11 FD04 05 E112 C 9504802C 056 5/9/2022 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR051M1062212603660 $306.00 000001081389-3562500009
2022 11 FD04 05 E112 C 9504802C 056 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603660 $34.00 000001081389-3562500009
2022 11 FD04 05 E121 C 9504802C 056 5/9/2022 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR051M1062212603660 $23.42 000001081389-3562500009
2022 11 FD04 05 E121 C 9504802C 056 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603660 $2.60 000001081389-3562500009
2022 11 FD04 00 E111 C 9504802C 056 5/9/2022 5182 INSP-MISCELLANEOUS MATERIALS CA-XR051M1062212603678 $202.34 000001082601-3562500640
2022 11 FD04 00 E115 C 9504802C 056 5/9/2022 5182 INSP-MISCELLANEOUS MATERIALS CA-XR051M1062212603678 $9.34 000001082601-3562500640
2022 11 FD04 00 E121 C 9504802C 056 5/9/2022 5182 INSP-MISCELLANEOUS MATERIALS CA-XR051M1062212603678 $16.00 000001082601-3562500640
2022 11 FD04 00 E122 C 9504802C 056 5/9/2022 5182 INSP-MISCELLANEOUS MATERIALS CA-XR051M1062212603678 $177.74 000001082601-3562500640
2022 11 FD04 00 E123 C 9504802C 056 5/9/2022 5182 INSP-MISCELLANEOUS MATERIALS CA-XR051M1062212603678 $35.35 000001082601-3562500640
2022 11 FD04 05 E111 C 9504802C 056 5/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR051M1062212603993 $1,571.07 10748833-3562505320
2022 11 FD04 05 E115 C 9504802C 056 5/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR051M1062212603993 $241.71 10748833-3562505320
2022 10 FD04 05 E797 C 9504802C 056 4/27/2022 4580 CONSTRUCTION CONTRACTS PRC-XCONST092212605P006K CTXCONST0922126050001K M&M SERVICES CO INC $143,669.25
2022 10 FD04 05 E229 C 9504802C 056 4/26/2022 4010 CONSTRUCTION ENGINEERING IET-XE13A162522115006520 $64.32
2022 10 FD04 05 E124 C 9504802C 056 4/25/2022 4010 CONSTRUCTION ENGINEERING CA-XR042M1062211203116 $0.05 10744443-3562505200
2022 10 FD04 05 E112 C 9504802C 056 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202546 $14.12 000001081389-3562500009
2022 10 FD04 05 E121 C 9504802C 056 4/25/2022 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR042M1062211202546 $18.73 000001081389-3562500009
2022 10 FD04 05 E121 C 9504802C 056 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202546 $1.08 000001081389-3562500009
2022 10 FD04 05 E124 C 9504802C 056 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211203116 $0.02 10744443-3562505200
2022 10 FD04 05 E111 C 9504802C 056 4/25/2022 4010 CONSTRUCTION ENGINEERING CA-XR042M1062211202549 $274.03 000001081763-3562500680
2022 10 FD04 05 E111 C 9504802C 056 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202549 $124.68 000001081763-3562500680
2022 10 FD04 05 E121 C 9504802C 056 4/25/2022 4010 CONSTRUCTION ENGINEERING CA-XR042M1062211202549 $20.79 000001081763-3562500680
2022 10 FD04 05 E121 C 9504802C 056 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202549 $9.45 000001081763-3562500680
2022 10 FD04 05 E122 C 9504802C 056 4/25/2022 4010 CONSTRUCTION ENGINEERING CA-XR042M1062211202549 $230.26 000001081763-3562500680
2022 10 FD04 05 E122 C 9504802C 056 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202549 $104.69 000001081763-3562500680
2022 10 FD04 05 E123 C 9504802C 056 4/25/2022 4010 CONSTRUCTION ENGINEERING CA-XR042M1062211202549 $32.34 000001081763-3562500680
2022 10 FD04 05 E123 C 9504802C 056 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202549 $14.40 000001081763-3562500680
2022 10 FD04 05 E124 C 9504802C 056 4/25/2022 4010 CONSTRUCTION ENGINEERING CA-XR042M1062211202549 $0.09 000001081763-3562500680
2022 10 FD04 05 E124 C 9504802C 056 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202549 $0.05 000001081763-3562500680
2022 10 FD04 05 E111 C 9504802C 056 4/25/2022 4010 CONSTRUCTION ENGINEERING CA-XR042M1062211202917 $629.48 10740931-3562505320
2022 10 FD04 05 E111 C 9504802C 056 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202917 $435.68 10740931-3562505320
2022 10 FD04 05 E115 C 9504802C 056 4/25/2022 4010 CONSTRUCTION ENGINEERING CA-XR042M1062211202917 $48.34 10740931-3562505320
2022 10 FD04 05 E121 C 9504802C 056 4/25/2022 4010 CONSTRUCTION ENGINEERING CA-XR042M1062211202917 $46.08 10740931-3562505320
2022 10 FD04 05 E121 C 9504802C 056 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202917 $29.63 10740931-3562505320
2022 10 FD04 05 E122 C 9504802C 056 4/25/2022 4010 CONSTRUCTION ENGINEERING CA-XR042M1062211202917 $569.17 10740931-3562505320
2022 10 FD04 05 E122 C 9504802C 056 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202917 $365.85 10740931-3562505320
2022 10 FD04 05 E123 C 9504802C 056 4/25/2022 4010 CONSTRUCTION ENGINEERING CA-XR042M1062211202917 $223.98 10740931-3562505320
2022 10 FD04 05 E123 C 9504802C 056 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202917 $152.86 10740931-3562505320
2022 10 FD04 05 E124 C 9504802C 056 4/25/2022 4010 CONSTRUCTION ENGINEERING CA-XR042M1062211202917 $0.36 10740931-3562505320
2022 10 FD04 05 E124 C 9504802C 056 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202917 $0.25 10740931-3562505320
2022 10 FD04 05 E115 C 9504802C 056 4/25/2022 4010 CONSTRUCTION ENGINEERING CA-XR042M1062211202604 $64.45 10731819-3562505320
2022 10 FD04 05 E121 C 9504802C 056 4/25/2022 4010 CONSTRUCTION ENGINEERING CA-XR042M1062211202604 $4.94 10731819-3562505320
2022 10 FD04 05 E122 C 9504802C 056 4/25/2022 4010 CONSTRUCTION ENGINEERING CA-XR042M1062211202604 $54.12 10731819-3562505320
2022 10 FD04 05 E111 C 9504802C 056 4/25/2022 4010 CONSTRUCTION ENGINEERING CA-XR042M1062211202841 $552.00 10739744-3562505300
2022 10 FD04 05 E111 C 9504802C 056 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202841 $53.06 10739744-3562505300
2022 10 FD04 05 E121 C 9504802C 056 4/25/2022 4010 CONSTRUCTION ENGINEERING CA-XR042M1062211202841 $41.53 10739744-3562505300
2022 10 FD04 05 E121 C 9504802C 056 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202841 $4.00 10739744-3562505300
2022 10 FD04 05 E111 C 9504802C 056 4/25/2022 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR042M1062211202542 $223.29 000001080986-3562505210
2022 10 FD04 05 E122 C 9504802C 056 4/25/2022 4010 CONSTRUCTION ENGINEERING CA-XR042M1062211202841 $463.52 10739744-3562505300
2022 10 FD04 05 E111 C 9504802C 056 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202542 $84.01 000001080986-3562505210
2022 10 FD04 05 E122 C 9504802C 056 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202841 $44.56 10739744-3562505300
2022 10 FD04 05 E121 C 9504802C 056 4/25/2022 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR042M1062211202542 $16.21 000001080986-3562505210
2022 10 FD04 05 E123 C 9504802C 056 4/25/2022 4010 CONSTRUCTION ENGINEERING CA-XR042M1062211202841 $70.48 10739744-3562505300
2022 10 FD04 05 E121 C 9504802C 056 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202542 $6.09 000001080986-3562505210
2022 10 FD04 05 E123 C 9504802C 056 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202841 $6.67 10739744-3562505300
2022 10 FD04 05 E112 C 9504802C 056 4/25/2022 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR042M1062211202546 $244.80 000001081389-3562500009
2022 10 FD04 05 E122 C 9504802C 056 4/25/2022 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR042M1062211202542 $187.62 000001080986-3562505210
2022 10 FD04 05 E124 C 9504802C 056 4/25/2022 4010 CONSTRUCTION ENGINEERING CA-XR042M1062211202841 $0.20 10739744-3562505300
2022 10 FD04 05 E122 C 9504802C 056 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202542 $70.54 000001080986-3562505210
2022 10 FD04 05 E124 C 9504802C 056 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202841 $0.02 10739744-3562505300
2022 10 FD04 05 E111 C 9504802C 056 4/25/2022 4010 CONSTRUCTION ENGINEERING CA-XR042M1062211203115 $153.28 10744443-3562505200
2022 10 FD04 05 E123 C 9504802C 056 4/25/2022 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR042M1062211202542 $29.87 000001080986-3562505210
2022 10 FD04 05 E111 C 9504802C 056 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211203115 $73.57 10744443-3562505200
2022 10 FD04 05 E123 C 9504802C 056 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202542 $10.99 000001080986-3562505210
2022 10 FD04 05 E121 C 9504802C 056 4/25/2022 4010 CONSTRUCTION ENGINEERING CA-XR042M1062211203115 $11.03 10744443-3562505200
2022 10 FD04 05 E124 C 9504802C 056 4/25/2022 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR042M1062211202542 $0.09 000001080986-3562505210
2022 10 FD04 05 E121 C 9504802C 056 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211203115 $5.30 10744443-3562505200
2022 10 FD04 05 E124 C 9504802C 056 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202542 $0.04 000001080986-3562505210
2022 10 FD04 05 E122 C 9504802C 056 4/25/2022 4010 CONSTRUCTION ENGINEERING CA-XR042M1062211203115 $128.71 10744443-3562505200
2022 10 FD04 05 E122 C 9504802C 056 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211203115 $61.77 10744443-3562505200
2022 10 FD04 05 E123 C 9504802C 056 4/25/2022 4010 CONSTRUCTION ENGINEERING CA-XR042M1062211203115 $28.16 10744443-3562505200
2022 10 FD04 05 E123 C 9504802C 056 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211203115 $13.37 10744443-3562505200
2022 10 FD04 05 E797 C 9504802C 056 4/21/2022 4010 CONSTRUCTION ENGINEERING PRC-2200188132 PON22100000777 QK4 INC $10,574.50 SW HWY & Bridge Construction Inspection Services
2022 10 FD04 05 E797 C 9504802C 056 4/21/2022 4010 CONSTRUCTION ENGINEERING PRC-2200188552 PON22100000777 QK4 INC $14,600.00 SW HWY & Bridge Construction Inspection Services
2022 10 FD04 05 E112 C 9504802C 056 4/13/2022 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR041M1062209801484 $54.40 000001081389-3562500009
2022 10 FD04 05 E797 C 9504802C 056 4/13/2022 4580 CONSTRUCTION CONTRACTS PRC-XCONST092212605P005K CTXCONST0922126050001K M&M SERVICES CO INC $213,412.32
2022 10 FD04 05 E229 C 9504802C 056 4/13/2022 4010 CONSTRUCTION ENGINEERING IET-XE13A162522100016010 $25.74
2022 10 FD04 05 E112 C 9504802C 056 4/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801484 $10.88 000001081389-3562500009
2022 10 FD04 05 E121 C 9504802C 056 4/13/2022 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR041M1062209801484 $4.16 000001081389-3562500009
2022 10 FD04 05 E121 C 9504802C 056 4/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801484 $0.84 000001081389-3562500009
2022 10 FD04 05 E111 C 9504802C 056 4/11/2022 4010 CONSTRUCTION ENGINEERING CA-XR041M1062209801743 $1,745.63 10731819-3562505320
2022 10 FD04 05 E115 C 9504802C 056 4/11/2022 4010 CONSTRUCTION ENGINEERING CA-XR041M1062209801743 $145.03 10731819-3562505320
2022 10 FD04 05 E121 C 9504802C 056 4/11/2022 4010 CONSTRUCTION ENGINEERING CA-XR041M1062209801743 $129.37 10731819-3562505320
2022 10 FD04 05 E122 C 9504802C 056 4/11/2022 4010 CONSTRUCTION ENGINEERING CA-XR041M1062209801743 $1,587.59 10731819-3562505320
2022 10 FD04 05 E123 C 9504802C 056 4/11/2022 4010 CONSTRUCTION ENGINEERING CA-XR041M1062209801743 $617.61 10731819-3562505320
2022 10 FD04 05 E111 C 9504802C 056 4/11/2022 4010 CONSTRUCTION ENGINEERING CA-XR041M1062209801515 $649.50 10720130-3562505300
2022 10 FD04 05 E111 C 9504802C 056 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801515 $90.32 10720130-3562505300
2022 10 FD04 05 E121 C 9504802C 056 4/11/2022 4010 CONSTRUCTION ENGINEERING CA-XR041M1062209801515 $48.93 10720130-3562505300
2022 10 FD04 05 E121 C 9504802C 056 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801515 $6.80 10720130-3562505300
2022 10 FD04 05 E122 C 9504802C 056 4/11/2022 4010 CONSTRUCTION ENGINEERING CA-XR041M1062209801515 $545.38 10720130-3562505300
2022 10 FD04 05 E122 C 9504802C 056 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801515 $75.84 10720130-3562505300
2022 10 FD04 05 E123 C 9504802C 056 4/11/2022 4010 CONSTRUCTION ENGINEERING CA-XR041M1062209801515 $82.97 10720130-3562505300
2022 10 FD04 05 E123 C 9504802C 056 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801515 $11.34 10720130-3562505300
2022 9 FD04 05 E797 C 9504802C 056 3/30/2022 4580 CONSTRUCTION CONTRACTS PRC-XCONST092212605P004K CTXCONST0922126050001K M&M SERVICES CO INC $51,000.00
2022 9 FD04 05 E111 C 9504802C 056 3/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR032M1062208200504 $1,265.60 10720130-3562505300
2022 9 FD04 05 E111 C 9504802C 056 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200504 $33.62 10720130-3562505300
2022 9 FD04 05 E121 C 9504802C 056 3/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR032M1062208200504 $94.47 10720130-3562505300
2022 9 FD04 05 E121 C 9504802C 056 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200504 $2.53 10720130-3562505300
2022 9 FD04 05 E122 C 9504802C 056 3/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR032M1062208200504 $1,062.73 10720130-3562505300
2022 9 FD04 05 E122 C 9504802C 056 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200504 $28.23 10720130-3562505300
2022 9 FD04 05 E123 C 9504802C 056 3/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR032M1062208200504 $192.74 10720130-3562505300
2022 9 FD04 05 E123 C 9504802C 056 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200504 $4.22 10720130-3562505300
2022 9 FD04 05 E124 C 9504802C 056 3/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR032M1062208200504 $0.49 10720130-3562505300
2022 9 FD04 05 E124 C 9504802C 056 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200504 $0.01 10720130-3562505300
2022 9 FD04 05 E115 C 9504802C 056 3/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR032M1062208200432 $39.51 10705393-3562505300
2022 9 FD04 05 E121 C 9504802C 056 3/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR032M1062208200432 $2.79 10705393-3562505300
2022 9 FD04 05 E122 C 9504802C 056 3/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR032M1062208200432 $33.17 10705393-3562505300
2022 9 FD04 05 E111 C 9504802C 056 3/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR032M1062208200644 $1,745.63 10722599-3562505320
2022 9 FD04 05 E115 C 9504802C 056 3/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR032M1062208200644 $161.14 10722599-3562505320
2022 9 FD04 05 E121 C 9504802C 056 3/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR032M1062208200644 $130.61 10722599-3562505320
2022 9 FD04 05 E122 C 9504802C 056 3/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR032M1062208200644 $1,601.11 10722599-3562505320
2022 9 FD04 05 E123 C 9504802C 056 3/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR032M1062208200644 $617.61 10722599-3562505320
2022 9 FD04 05 E124 C 9504802C 056 3/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR032M1062208200644 $1.00 10722599-3562505320
2022 9 FD04 05 E797 C 9504802C 056 3/16/2022 4580 CONSTRUCTION CONTRACTS PRC-XCONST092212605P003K CTXCONST0922126050001K M&M SERVICES CO INC $447,606.76
2022 9 FD04 05 E229 C 9504802C 056 3/11/2022 4010 CONSTRUCTION ENGINEERING IET-XE13A162522069013060 $208.05
2022 9 FD04 05 E111 C 9504802C 056 3/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR031M1062206709481 $335.16 000001081763-3562500680
2022 9 FD04 05 E121 C 9504802C 056 3/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR031M1062206709481 $25.42 000001081763-3562500680
2022 9 FD04 05 E122 C 9504802C 056 3/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR031M1062206709481 $281.43 000001081763-3562500680
2022 9 FD04 05 E123 C 9504802C 056 3/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR031M1062206709481 $39.28 000001081763-3562500680
2022 9 FD04 05 E111 C 9504802C 056 3/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR031M1062206709498 $237.78 10705393-3562505300
2022 9 FD04 05 E111 C 9504802C 056 3/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709498 $3.49 10705393-3562505300
2022 9 FD04 05 E121 C 9504802C 056 3/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR031M1062206709498 $16.52 10705393-3562505300
2022 9 FD04 05 E121 C 9504802C 056 3/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709498 $0.25 10705393-3562505300
2022 9 FD04 05 E122 C 9504802C 056 3/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR031M1062206709498 $199.66 10705393-3562505300
2022 9 FD04 05 E122 C 9504802C 056 3/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709498 $2.93 10705393-3562505300
2022 9 FD04 05 E123 C 9504802C 056 3/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR031M1062206709498 $68.63 10705393-3562505300
2022 9 FD04 05 E123 C 9504802C 056 3/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709498 $1.00 10705393-3562505300
2022 9 FD04 05 E112 C 9504802C 056 3/9/2022 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR031M1062206709471 $204.00 000001081389-3562500009
2022 9 FD04 05 E121 C 9504802C 056 3/9/2022 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR031M1062206709471 $15.61 000001081389-3562500009
2022 9 FD04 05 E111 C 9504802C 056 3/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR031M1062206709717 $1,745.63 10716433-3562505320
2022 9 FD04 05 E115 C 9504802C 056 3/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR031M1062206709717 $96.68 10716433-3562505320
2022 9 FD04 05 E121 C 9504802C 056 3/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR031M1062206709717 $125.68 10716433-3562505320
2022 9 FD04 05 E122 C 9504802C 056 3/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR031M1062206709717 $1,546.99 10716433-3562505320
2022 9 FD04 05 E123 C 9504802C 056 3/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR031M1062206709717 $617.61 10716433-3562505320
2022 9 FD04 05 E797 C 9504802C 056 3/8/2022 4010 CONSTRUCTION ENGINEERING PRC-2200140566 PON22100000777 QK4 INC $6,815.50 SW HWY & Bridge Construction Inspection Services
2022 9 FD04 05 E797 C 9504802C 056 3/3/2022 4580 CONSTRUCTION CONTRACTS PRC-XCONST092212605P002K CTXCONST0922126050001K M&M SERVICES CO INC $83,572.25
2022 8 FD04 05 E229 C 9504802C 056 2/28/2022 4010 CONSTRUCTION ENGINEERING IET-XE13A162522056013190 $184.80
2022 8 FD04 05 E122 C 9504802C 056 2/23/2022 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR022M1062205308430 $391.68 000001080986-3562505210
2022 8 FD04 05 E122 C 9504802C 056 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308430 $124.25 000001080986-3562505210
2022 8 FD04 05 E123 C 9504802C 056 2/23/2022 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR022M1062205308430 $92.55 000001080986-3562505210
2022 8 FD04 05 E111 C 9504802C 056 2/23/2022 5242 CONCRETE TESTING UNIT CA-XR022M1062205308443 $477.14 000001081562-3562505210
2022 8 FD04 05 E111 C 9504802C 056 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308443 $149.66 000001081562-3562505210
2022 8 FD04 05 E121 C 9504802C 056 2/23/2022 5242 CONCRETE TESTING UNIT CA-XR022M1062205308443 $35.28 000001081562-3562505210
2022 8 FD04 05 E121 C 9504802C 056 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308443 $11.09 000001081562-3562505210
2022 8 FD04 05 E122 C 9504802C 056 2/23/2022 5242 CONCRETE TESTING UNIT CA-XR022M1062205308443 $400.55 000001081562-3562505210
2022 8 FD04 05 E122 C 9504802C 056 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308443 $125.67 000001081562-3562505210
2022 8 FD04 05 E123 C 9504802C 056 2/23/2022 5242 CONCRETE TESTING UNIT CA-XR022M1062205308443 $93.62 000001081562-3562505210
2022 8 FD04 05 E123 C 9504802C 056 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308443 $29.01 000001081562-3562505210
2022 8 FD04 05 E124 C 9504802C 056 2/23/2022 5242 CONCRETE TESTING UNIT CA-XR022M1062205308443 $0.27 000001081562-3562505210
2022 8 FD04 05 E123 C 9504802C 056 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308430 $29.00 000001080986-3562505210
2022 8 FD04 05 E124 C 9504802C 056 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308443 $0.09 000001081562-3562505210
2022 8 FD04 05 E124 C 9504802C 056 2/23/2022 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR022M1062205308430 $0.26 000001080986-3562505210
2022 8 FD04 05 E111 C 9504802C 056 2/23/2022 4010 CONSTRUCTION ENGINEERING CA-XR022M1062205308584 $583.65 10705393-3562505300
2022 8 FD04 05 E111 C 9504802C 056 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308584 $333.58 10705393-3562505300
2022 8 FD04 05 E121 C 9504802C 056 2/23/2022 4010 CONSTRUCTION ENGINEERING CA-XR022M1062205308584 $40.48 10705393-3562505300
2022 8 FD04 05 E121 C 9504802C 056 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308584 $23.14 10705393-3562505300
2022 8 FD04 05 E122 C 9504802C 056 2/23/2022 4010 CONSTRUCTION ENGINEERING CA-XR022M1062205308584 $490.09 10705393-3562505300
2022 8 FD04 05 E122 C 9504802C 056 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308584 $280.10 10705393-3562505300
2022 8 FD04 05 E124 C 9504802C 056 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308430 $0.08 000001080986-3562505210
2022 8 FD04 05 E123 C 9504802C 056 2/23/2022 4010 CONSTRUCTION ENGINEERING CA-XR022M1062205308584 $169.24 10705393-3562505300
2022 8 FD04 05 E123 C 9504802C 056 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308584 $95.48 10705393-3562505300
2022 8 FD04 05 E124 C 9504802C 056 2/23/2022 4010 CONSTRUCTION ENGINEERING CA-XR022M1062205308584 $0.27 10705393-3562505300
2022 8 FD04 05 E124 C 9504802C 056 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308584 $0.16 10705393-3562505300
2022 8 FD04 05 E111 C 9504802C 056 2/23/2022 4010 CONSTRUCTION ENGINEERING CA-XR022M1062205308661 $1,428.24 10707119-3562505320
2022 8 FD04 05 E111 C 9504802C 056 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308661 $317.39 10707119-3562505320
2022 8 FD04 05 E115 C 9504802C 056 2/23/2022 4010 CONSTRUCTION ENGINEERING CA-XR022M1062205308661 $32.23 10707119-3562505320
2022 8 FD04 05 E121 C 9504802C 056 2/23/2022 4010 CONSTRUCTION ENGINEERING CA-XR022M1062205308661 $99.18 10707119-3562505320
2022 8 FD04 05 E121 C 9504802C 056 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308661 $21.55 10707119-3562505320
2022 8 FD04 05 E122 C 9504802C 056 2/23/2022 4010 CONSTRUCTION ENGINEERING CA-XR022M1062205308661 $1,226.36 10707119-3562505320
2022 8 FD04 05 E122 C 9504802C 056 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308661 $266.51 10707119-3562505320
2022 8 FD04 05 E123 C 9504802C 056 2/23/2022 4010 CONSTRUCTION ENGINEERING CA-XR022M1062205308661 $506.24 10707119-3562505320
2022 8 FD04 05 E123 C 9504802C 056 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308661 $111.37 10707119-3562505320
2022 8 FD04 05 E124 C 9504802C 056 2/23/2022 4010 CONSTRUCTION ENGINEERING CA-XR022M1062205308661 $0.82 10707119-3562505320
2022 8 FD04 05 E124 C 9504802C 056 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308661 $0.18 10707119-3562505320
2022 8 FD04 05 E111 C 9504802C 056 2/23/2022 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR022M1062205308429 $466.56 000001080986-3562505210
2022 8 FD04 05 E111 C 9504802C 056 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308429 $147.96 000001080986-3562505210
2022 8 FD04 05 E121 C 9504802C 056 2/23/2022 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR022M1062205308429 $34.54 000001080986-3562505210
2022 8 FD04 05 E121 C 9504802C 056 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308429 $10.98 000001080986-3562505210
2022 8 FD04 05 E797 C 9504802C 056 2/18/2022 4580 CONSTRUCTION CONTRACTS PRC-XCONST092212605P001K CTXCONST0922126050001K M&M SERVICES CO INC $185,079.75
2022 8 FD04 05 E111 C 9504802C 056 2/14/2022 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR021M1062203907462 $684.14 000001081389-3562505210
2022 8 FD04 05 E111 C 9504802C 056 2/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907462 $87.36 000001081389-3562505210
2022 8 FD04 05 E112 C 9504802C 056 2/14/2022 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR021M1062203907462 $204.00 000001081389-3562500009
2022 8 FD04 05 E112 C 9504802C 056 2/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907462 $20.40 000001081389-3562500009
2022 8 FD04 05 E121 C 9504802C 056 2/14/2022 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR021M1062203907462 $66.15 000001081389-3562505210
2022 8 FD04 05 E121 C 9504802C 056 2/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907462 $8.00 000001081389-3562505210
2022 8 FD04 05 E122 C 9504802C 056 2/14/2022 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR021M1062203907462 $574.43 000001081389-3562505210
2022 8 FD04 05 E122 C 9504802C 056 2/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907462 $73.35 000001081389-3562505210
2022 8 FD04 05 E123 C 9504802C 056 2/14/2022 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR021M1062203907462 $126.34 000001081389-3562505210
2022 8 FD04 05 E123 C 9504802C 056 2/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907462 $15.73 000001081389-3562505210
2022 8 FD04 05 E111 C 9504802C 056 2/9/2022 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR021M1062203907450 $2,206.90 000001080986-3562505210
2022 8 FD04 05 E111 C 9504802C 056 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907450 $375.20 000001080986-3562505210
2022 8 FD04 05 E121 C 9504802C 056 2/9/2022 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR021M1062203907450 $161.75 000001080986-3562505210
2022 8 FD04 05 E121 C 9504802C 056 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907450 $27.55 000001080986-3562505210
2022 8 FD04 05 E122 C 9504802C 056 2/9/2022 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR021M1062203907450 $1,853.12 000001080986-3562505210
2022 8 FD04 05 E122 C 9504802C 056 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907450 $315.07 000001080986-3562505210
2022 8 FD04 05 E123 C 9504802C 056 2/9/2022 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR021M1062203907450 $420.97 000001080986-3562505210
2022 8 FD04 05 E123 C 9504802C 056 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907450 $74.40 000001080986-3562505210
2022 8 FD04 05 E111 C 9504802C 056 2/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR021M1062203907486 $1,120.49 10688968-3562505300
2022 8 FD04 05 E111 C 9504802C 056 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907486 $323.62 10688968-3562505300
2022 8 FD04 05 E121 C 9504802C 056 2/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR021M1062203907486 $84.31 10688968-3562505300
2022 8 FD04 05 E121 C 9504802C 056 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907486 $24.35 10688968-3562505300
2022 8 FD04 05 E122 C 9504802C 056 2/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR021M1062203907486 $940.87 10688968-3562505300
2022 8 FD04 05 E122 C 9504802C 056 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907486 $271.73 10688968-3562505300
2022 8 FD04 05 E123 C 9504802C 056 2/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR021M1062203907486 $143.45 10688968-3562505300
2022 8 FD04 05 E123 C 9504802C 056 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907486 $40.64 10688968-3562505300
2022 8 FD04 05 E111 C 9504802C 056 2/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR021M1062203907653 $983.90 10698734-3562505320
2022 8 FD04 05 E111 C 9504802C 056 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907653 $98.39 10698734-3562505320
2022 8 FD04 05 E121 C 9504802C 056 2/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR021M1062203907653 $66.67 10698734-3562505320
2022 8 FD04 05 E121 C 9504802C 056 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907653 $6.66 10698734-3562505320
2022 8 FD04 05 E122 C 9504802C 056 2/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR021M1062203907653 $826.18 10698734-3562505320
2022 8 FD04 05 E122 C 9504802C 056 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907653 $82.62 10698734-3562505320
2022 8 FD04 05 E123 C 9504802C 056 2/9/2022 4010 CONSTRUCTION ENGINEERING CA-XR021M1062203907653 $348.39 10698734-3562505320
2022 8 FD04 05 E123 C 9504802C 056 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907653 $34.52 10698734-3562505320
2022 7 FD04 05 E122 C 9504802C 056 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106770 $151.86 10691570-3562505320
2022 7 FD04 05 E111 C 9504802C 056 1/24/2022 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR012M1062202106463 $661.63 000001080986-3562505210
2022 7 FD04 05 E111 C 9504802C 056 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106463 $220.55 000001080986-3562505210
2022 7 FD04 05 E121 C 9504802C 056 1/24/2022 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR012M1062202106463 $48.47 000001080986-3562505210
2022 7 FD04 05 E121 C 9504802C 056 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106463 $16.40 000001080986-3562505210
2022 7 FD04 05 E122 C 9504802C 056 1/24/2022 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR012M1062202106463 $555.52 000001080986-3562505210
2022 7 FD04 05 E122 C 9504802C 056 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106463 $185.20 000001080986-3562505210
2022 7 FD04 05 E123 C 9504802C 056 1/24/2022 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR012M1062202106463 $101.26 000001080986-3562505210
2022 7 FD04 05 E123 C 9504802C 056 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106463 $39.59 000001080986-3562505210
2022 7 FD04 05 E124 C 9504802C 056 1/24/2022 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR012M1062202106463 $0.30 000001080986-3562505210
2022 7 FD04 05 E124 C 9504802C 056 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106463 $0.11 000001080986-3562505210
2022 7 FD04 05 E111 C 9504802C 056 1/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR012M1062202106769 $523.69 10691570-3562505320
2022 7 FD04 05 E111 C 9504802C 056 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106769 $180.84 10691570-3562505320
2022 7 FD04 05 E121 C 9504802C 056 1/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR012M1062202106769 $40.07 10691570-3562505320
2022 7 FD04 05 E121 C 9504802C 056 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106769 $13.84 10691570-3562505320
2022 7 FD04 05 E122 C 9504802C 056 1/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR012M1062202106769 $439.73 10691570-3562505320
2022 7 FD04 05 E111 C 9504802C 056 1/10/2022 4010 CONSTRUCTION ENGINEERING CA-XR011M1062200705794 $290.94 10683638-3562505320
2022 7 FD04 05 E111 C 9504802C 056 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705794 $232.75 10683638-3562505320
2022 7 FD04 05 E121 C 9504802C 056 1/10/2022 4010 CONSTRUCTION ENGINEERING CA-XR011M1062200705794 $22.26 10683638-3562505320
2022 7 FD04 05 E121 C 9504802C 056 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705794 $17.80 10683638-3562505320
2022 7 FD04 05 E122 C 9504802C 056 1/10/2022 4010 CONSTRUCTION ENGINEERING CA-XR011M1062200705794 $244.30 10683638-3562505320
2022 7 FD04 05 E122 C 9504802C 056 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705794 $195.44 10683638-3562505320
2022 6 FD04 05 E111 C 9504802C 056 12/22/2021 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR122L1062135504522 $367.45 000001080986-3562505210
2022 6 FD04 05 E111 C 9504802C 056 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504522 $261.84 000001080986-3562505210
2022 6 FD04 05 E121 C 9504802C 056 12/22/2021 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR122L1062135504522 $25.74 000001080986-3562505210
2022 6 FD04 05 E121 C 9504802C 056 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504522 $18.83 000001080986-3562505210
2022 6 FD04 05 E122 C 9504802C 056 12/22/2021 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR122L1062135504522 $308.77 000001080986-3562505210
2022 6 FD04 05 E122 C 9504802C 056 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504522 $219.87 000001080986-3562505210
2022 6 FD04 05 E123 C 9504802C 056 12/22/2021 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR122L1062135504522 $96.89 000001080986-3562505210
2022 6 FD04 05 E123 C 9504802C 056 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504522 $48.40 000001080986-3562505210
2022 6 FD04 05 E124 C 9504802C 056 12/22/2021 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR122L1062135504522 $0.17 000001080986-3562505210
2022 6 FD04 05 E124 C 9504802C 056 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504522 $0.13 000001080986-3562505210