2024 |
10 |
FD52 |
00 |
E229 |
D |
9504801D |
056 |
4/26/2024 |
0010 |
ENV STUDIES-UST/HZM |
IET-XE13A162524116018010 |
|
|
$25.40 |
|
2024 |
10 |
FD52 |
05 |
E111 |
D |
9504801D |
056 |
4/26/2024 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR042O1062411502786 |
|
|
$298.60 |
000001091468-3562505200 |
2024 |
10 |
FD52 |
05 |
E111 |
D |
9504801D |
056 |
4/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042O1062411502786 |
|
|
$25.76 |
000001091468-3562505200 |
2024 |
10 |
FD52 |
05 |
E121 |
D |
9504801D |
056 |
4/26/2024 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR042O1062411502786 |
|
|
$20.85 |
000001091468-3562505200 |
2024 |
10 |
FD52 |
05 |
E121 |
D |
9504801D |
056 |
4/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042O1062411502786 |
|
|
$1.80 |
000001091468-3562505200 |
2024 |
10 |
FD52 |
05 |
E122 |
D |
9504801D |
056 |
4/26/2024 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR042O1062411502786 |
|
|
$197.64 |
000001091468-3562505200 |
2024 |
10 |
FD52 |
05 |
E122 |
D |
9504801D |
056 |
4/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042O1062411502786 |
|
|
$17.05 |
000001091468-3562505200 |
2024 |
10 |
FD52 |
05 |
E123 |
D |
9504801D |
056 |
4/26/2024 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR042O1062411502786 |
|
|
$74.57 |
000001091468-3562505200 |
2024 |
10 |
FD52 |
05 |
E123 |
D |
9504801D |
056 |
4/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042O1062411502786 |
|
|
$6.39 |
000001091468-3562505200 |
2024 |
10 |
FD52 |
05 |
E124 |
D |
9504801D |
056 |
4/26/2024 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR042O1062411502786 |
|
|
$0.10 |
000001091468-3562505200 |
2024 |
10 |
FD52 |
05 |
E124 |
D |
9504801D |
056 |
4/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042O1062411502786 |
|
|
$0.01 |
000001091468-3562505200 |
2024 |
10 |
FD52 |
00 |
E111 |
D |
9504801D |
056 |
4/26/2024 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR042O1062411502790 |
|
|
$281.92 |
000001091639-3562500061 |
2024 |
10 |
FD52 |
00 |
E111 |
D |
9504801D |
056 |
4/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042O1062411502790 |
|
|
$14.50 |
000001091639-3562500061 |
2024 |
10 |
FD52 |
00 |
E121 |
D |
9504801D |
056 |
4/26/2024 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR042O1062411502790 |
|
|
$21.57 |
000001091639-3562500061 |
2024 |
10 |
FD52 |
00 |
E121 |
D |
9504801D |
056 |
4/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042O1062411502790 |
|
|
$1.11 |
000001091639-3562500061 |
2024 |
10 |
FD52 |
00 |
E122 |
D |
9504801D |
056 |
4/26/2024 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR042O1062411502790 |
|
|
$186.55 |
000001091639-3562500061 |
2024 |
10 |
FD52 |
00 |
E122 |
D |
9504801D |
056 |
4/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042O1062411502790 |
|
|
$9.59 |
000001091639-3562500061 |
2024 |
10 |
FD52 |
00 |
E123 |
D |
9504801D |
056 |
4/26/2024 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR042O1062411502790 |
|
|
$7.87 |
000001091639-3562500061 |
2024 |
10 |
FD52 |
00 |
E123 |
D |
9504801D |
056 |
4/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042O1062411502790 |
|
|
$0.38 |
000001091639-3562500061 |
2024 |
10 |
FD52 |
00 |
E124 |
D |
9504801D |
056 |
4/26/2024 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR042O1062411502790 |
|
|
$0.08 |
000001091639-3562500061 |
2024 |
10 |
FD52 |
05 |
E111 |
D |
9504801D |
056 |
4/10/2024 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR041O1062410001669 |
|
|
$102.70 |
000001091468-3562505200 |
2024 |
10 |
FD52 |
05 |
E111 |
D |
9504801D |
056 |
4/10/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041O1062410001669 |
|
|
$34.08 |
000001091468-3562505200 |
2024 |
10 |
FD52 |
05 |
E121 |
D |
9504801D |
056 |
4/10/2024 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR041O1062410001669 |
|
|
$7.00 |
000001091468-3562505200 |
2024 |
10 |
FD52 |
05 |
E121 |
D |
9504801D |
056 |
4/10/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041O1062410001669 |
|
|
$2.32 |
000001091468-3562505200 |
2024 |
10 |
FD52 |
05 |
E122 |
D |
9504801D |
056 |
4/10/2024 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR041O1062410001669 |
|
|
$67.94 |
000001091468-3562505200 |
2024 |
10 |
FD52 |
05 |
E122 |
D |
9504801D |
056 |
4/10/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041O1062410001669 |
|
|
$22.56 |
000001091468-3562505200 |
2024 |
10 |
FD52 |
05 |
E123 |
D |
9504801D |
056 |
4/10/2024 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR041O1062410001669 |
|
|
$25.68 |
000001091468-3562505200 |
2024 |
10 |
FD52 |
05 |
E123 |
D |
9504801D |
056 |
4/10/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041O1062410001669 |
|
|
$8.45 |
000001091468-3562505200 |
2024 |
8 |
FD52 |
00 |
E122 |
D |
9504801D |
056 |
2/9/2024 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR021O1062403907664 |
|
|
$14.48 |
000001084052-3562500636 |
2024 |
8 |
FD52 |
00 |
E122 |
D |
9504801D |
056 |
2/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021O1062403907664 |
|
|
$2.90 |
000001084052-3562500636 |
2024 |
8 |
FD52 |
00 |
E123 |
D |
9504801D |
056 |
2/9/2024 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR021O1062403907664 |
|
|
$2.47 |
000001084052-3562500636 |
2024 |
8 |
FD52 |
00 |
E123 |
D |
9504801D |
056 |
2/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021O1062403907664 |
|
|
$0.49 |
000001084052-3562500636 |
2024 |
8 |
FD52 |
00 |
E111 |
D |
9504801D |
056 |
2/9/2024 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR021O1062403907664 |
|
|
$21.88 |
000001084052-3562500636 |
2024 |
8 |
FD52 |
00 |
E111 |
D |
9504801D |
056 |
2/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021O1062403907664 |
|
|
$4.37 |
000001084052-3562500636 |
2024 |
8 |
FD52 |
00 |
E121 |
D |
9504801D |
056 |
2/9/2024 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR021O1062403907664 |
|
|
$1.64 |
000001084052-3562500636 |
2024 |
8 |
FD52 |
00 |
E121 |
D |
9504801D |
056 |
2/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021O1062403907664 |
|
|
$0.32 |
000001084052-3562500636 |
2023 |
2 |
FD52 |
00 |
E111 |
D |
9504801D |
056 |
8/10/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR081M1062222110148 |
|
|
$22.52 |
000001084052-3562500636 |
2023 |
2 |
FD52 |
00 |
E111 |
D |
9504801D |
056 |
8/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081M1062222110148 |
|
|
$22.52 |
000001084052-3562500636 |
2023 |
2 |
FD52 |
00 |
E121 |
D |
9504801D |
056 |
8/10/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR081M1062222110148 |
|
|
$1.68 |
000001084052-3562500636 |
2023 |
2 |
FD52 |
00 |
E121 |
D |
9504801D |
056 |
8/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081M1062222110148 |
|
|
$1.68 |
000001084052-3562500636 |
2023 |
2 |
FD52 |
00 |
E122 |
D |
9504801D |
056 |
8/10/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR081M1062222110148 |
|
|
$17.51 |
000001084052-3562500636 |
2023 |
2 |
FD52 |
00 |
E122 |
D |
9504801D |
056 |
8/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081M1062222110148 |
|
|
$17.57 |
000001084052-3562500636 |
2023 |
2 |
FD52 |
00 |
E123 |
D |
9504801D |
056 |
8/10/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR081M1062222110148 |
|
|
$2.39 |
000001084052-3562500636 |
2023 |
2 |
FD52 |
00 |
E123 |
D |
9504801D |
056 |
8/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081M1062222110148 |
|
|
$2.32 |
000001084052-3562500636 |
2023 |
1 |
FD52 |
00 |
E111 |
D |
9504801D |
056 |
7/12/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR071M1062219207899 |
|
|
$236.48 |
000001083372-3562500061 |
2023 |
1 |
FD52 |
00 |
E121 |
D |
9504801D |
056 |
7/12/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR071M1062219207899 |
|
|
$16.40 |
000001083372-3562500061 |
2023 |
1 |
FD52 |
00 |
E122 |
D |
9504801D |
056 |
7/12/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR071M1062219207899 |
|
|
$198.56 |
000001083372-3562500061 |
2023 |
1 |
FD52 |
00 |
E123 |
D |
9504801D |
056 |
7/12/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR071M1062219207899 |
|
|
$56.14 |
000001083372-3562500061 |
2022 |
4 |
FD52 |
00 |
E122 |
D |
9504801D |
056 |
10/14/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR101L1062128110105 |
|
|
$3,318.79 |
000001072174-3562500610 |
2022 |
4 |
FD52 |
00 |
E122 |
D |
9504801D |
056 |
10/14/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101L1062128110105 |
|
|
$129.29 |
000001072174-3562500610 |
2022 |
4 |
FD52 |
00 |
E123 |
D |
9504801D |
056 |
10/14/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR101L1062128110105 |
|
|
$571.35 |
000001072174-3562500610 |
2022 |
4 |
FD52 |
00 |
E123 |
D |
9504801D |
056 |
10/14/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101L1062128110105 |
|
|
$30.52 |
000001072174-3562500610 |
2022 |
4 |
FD52 |
00 |
E111 |
D |
9504801D |
056 |
10/11/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR101L1062128110104 |
|
|
$3,952.35 |
000001072174-3562500610 |
2022 |
4 |
FD52 |
00 |
E111 |
D |
9504801D |
056 |
10/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101L1062128110104 |
|
|
$153.98 |
000001072174-3562500610 |
2022 |
4 |
FD52 |
00 |
E121 |
D |
9504801D |
056 |
10/11/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR101L1062128110104 |
|
|
$296.10 |
000001072174-3562500610 |
2022 |
4 |
FD52 |
00 |
E121 |
D |
9504801D |
056 |
10/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101L1062128110104 |
|
|
$11.43 |
000001072174-3562500610 |
2021 |
11 |
FD52 |
00 |
E111 |
D |
9504801D |
056 |
5/14/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051L1062112709758 |
|
|
$87.43 |
000001077677-3562500636 |
2021 |
11 |
FD52 |
00 |
E111 |
D |
9504801D |
056 |
5/14/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051L1062112709758 |
|
|
$46.41 |
000001077677-3562500636 |
2021 |
11 |
FD52 |
00 |
E121 |
D |
9504801D |
056 |
5/14/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051L1062112709758 |
|
|
$6.62 |
000001077677-3562500636 |
2021 |
11 |
FD52 |
00 |
E121 |
D |
9504801D |
056 |
5/14/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051L1062112709758 |
|
|
$3.50 |
000001077677-3562500636 |
2021 |
11 |
FD52 |
00 |
E122 |
D |
9504801D |
056 |
5/14/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051L1062112709758 |
|
|
$73.58 |
000001077677-3562500636 |
2021 |
11 |
FD52 |
00 |
E122 |
D |
9504801D |
056 |
5/14/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051L1062112709758 |
|
|
$39.18 |
000001077677-3562500636 |
2021 |
11 |
FD52 |
00 |
E123 |
D |
9504801D |
056 |
5/14/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051L1062112709758 |
|
|
$9.35 |
000001077677-3562500636 |
2021 |
11 |
FD52 |
00 |
E123 |
D |
9504801D |
056 |
5/14/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051L1062112709758 |
|
|
$4.89 |
000001077677-3562500636 |
2021 |
1 |
FD52 |
00 |
E111 |
D |
9504801D |
056 |
7/9/2020 |
1300 |
RDWAY PLANS REVIEW & CORRECTED |
CA-XR071K1062019009353 |
|
|
$705.78 |
000001074874-3562500638 |
2021 |
1 |
FD52 |
00 |
E111 |
D |
9504801D |
056 |
7/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071K1062019009353 |
|
|
$60.22 |
000001074874-3562500638 |
2021 |
1 |
FD52 |
00 |
E121 |
D |
9504801D |
056 |
7/9/2020 |
1300 |
RDWAY PLANS REVIEW & CORRECTED |
CA-XR071K1062019009353 |
|
|
$49.34 |
000001074874-3562500638 |
2021 |
1 |
FD52 |
00 |
E121 |
D |
9504801D |
056 |
7/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071K1062019009353 |
|
|
$4.22 |
000001074874-3562500638 |
2021 |
1 |
FD52 |
00 |
E122 |
D |
9504801D |
056 |
7/9/2020 |
1300 |
RDWAY PLANS REVIEW & CORRECTED |
CA-XR071K1062019009353 |
|
|
$588.85 |
000001074874-3562500638 |
2021 |
1 |
FD52 |
00 |
E122 |
D |
9504801D |
056 |
7/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071K1062019009353 |
|
|
$50.24 |
000001074874-3562500638 |
2021 |
1 |
FD52 |
00 |
E123 |
D |
9504801D |
056 |
7/9/2020 |
1300 |
RDWAY PLANS REVIEW & CORRECTED |
CA-XR071K1062019009353 |
|
|
$152.87 |
000001074874-3562500638 |
2021 |
1 |
FD52 |
00 |
E123 |
D |
9504801D |
056 |
7/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071K1062019009353 |
|
|
$12.92 |
000001074874-3562500638 |
2020 |
6 |
FD52 |
00 |
E111 |
D |
9504801D |
056 |
12/12/2019 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR121J1061934005901 |
|
|
$244.13 |
000001072174-3562500610 |
2020 |
6 |
FD52 |
00 |
E111 |
D |
9504801D |
056 |
12/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121J1061934005901 |
|
|
$104.43 |
000001072174-3562500610 |
2020 |
6 |
FD52 |
00 |
E121 |
D |
9504801D |
056 |
12/12/2019 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR121J1061934005901 |
|
|
$18.13 |
000001072174-3562500610 |
2020 |
6 |
FD52 |
00 |
E121 |
D |
9504801D |
056 |
12/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121J1061934005901 |
|
|
$7.76 |
000001072174-3562500610 |
2020 |
6 |
FD52 |
00 |
E122 |
D |
9504801D |
056 |
12/12/2019 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR121J1061934005901 |
|
|
$204.14 |
000001072174-3562500610 |
2020 |
6 |
FD52 |
00 |
E122 |
D |
9504801D |
056 |
12/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121J1061934005901 |
|
|
$87.12 |
000001072174-3562500610 |
2020 |
6 |
FD52 |
00 |
E123 |
D |
9504801D |
056 |
12/12/2019 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR121J1061934005901 |
|
|
$37.73 |
000001072174-3562500610 |
2020 |
6 |
FD52 |
00 |
E123 |
D |
9504801D |
056 |
12/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121J1061934005901 |
|
|
$15.81 |
000001072174-3562500610 |