The Commonwealth pays employees on a semi-monthly basis with a scheduled pay day on the 15th and 30th of each month. The two monthly pay periods are from the 1st to the 15th of the month and the 16th through the last day of the month. Pay check distribution is delayed by one pay period to allow for system processing. For example work performed during the 1st to the 15th day of the month is paid to the employee on the 30th of the month. Accordingly the cost accounting charges for labor costs posting in eMARS to operating accounts and highway projects are also delayed by approximately one pay period.
A good rule of measure is that the cost accounting charges for the pay period ending on the 15th of the month will post to eMARS by the 25th and those for the pay period ending on the last day of the month will post to eMARS by the 10th of the following month.

x close panel
Detailed Project Expenditure Report
Total E-MARS Expenditures for 9455501U = $754,266.04
Click here for Labor Costs Information
Year Month PBU Charge District Object Phase Program Code County Date ACT Activity Name Trans ID Reference # Vendor Name Expenditure Line Description
2024 10 FD52 00 E111 U 9455501U 110 4/26/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR042O1062411502731 $101.16 000001079919-3562500480
2024 10 FD52 00 E111 U 9455501U 110 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502731 $4.05 000001079919-3562500480
2024 10 FD52 00 E121 U 9455501U 110 4/26/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR042O1062411502731 $7.14 000001079919-3562500480
2024 10 FD52 00 E121 U 9455501U 110 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502731 $0.28 000001079919-3562500480
2024 10 FD52 00 E122 U 9455501U 110 4/26/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR042O1062411502731 $66.91 000001079919-3562500480
2024 10 FD52 00 E122 U 9455501U 110 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502731 $2.68 000001079919-3562500480
2024 10 FD52 00 E123 U 9455501U 110 4/26/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR042O1062411502731 $19.78 000001079919-3562500480
2024 10 FD52 00 E123 U 9455501U 110 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502731 $0.78 000001079919-3562500480
2024 10 FD52 00 E124 U 9455501U 110 4/26/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR042O1062411502731 $0.05 000001079919-3562500480
2024 10 FD52 03 E797 U 9455501U 110 4/25/2024 3550 RAILROAD CONTRACTS CR-2400045072 ($2,452.92) REFUND CHECK CSX CORPORATION
2024 10 FD52 00 E122 U 9455501U 110 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001618 $9.23 000001079919-3562500480
2024 10 FD52 00 E123 U 9455501U 110 4/10/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR041O1062410001618 $8.73 000001079919-3562500480
2024 10 FD52 00 E123 U 9455501U 110 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001618 $2.69 000001079919-3562500480
2024 10 FD52 00 E111 U 9455501U 110 4/10/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR041O1062410001617 $44.49 000001079919-3562500480
2024 10 FD52 00 E111 U 9455501U 110 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001617 $13.94 000001079919-3562500480
2024 10 FD52 00 E121 U 9455501U 110 4/10/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR041O1062410001617 $3.10 000001079919-3562500480
2024 10 FD52 00 E121 U 9455501U 110 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001617 $0.97 000001079919-3562500480
2024 10 FD52 00 E122 U 9455501U 110 4/10/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR041O1062410001617 $29.42 000001079919-3562500480
2024 9 FD52 03 E797 U 9455501U 110 3/21/2024 3550 RAILROAD CONTRACTS PRC-2400190716 DO2200023907 CSX TRANSPORTATION INC $8,885.51
2024 9 FD52 03 E122 U 9455501U 110 3/18/2024 3020 PREL ENGINEERING-UTILITIES CA-XR031O1062406810063 $246.10 000001078606-3562503208
2024 9 FD52 03 E123 U 9455501U 110 3/18/2024 3020 PREL ENGINEERING-UTILITIES CA-XR031O1062406810063 $71.00 000001078606-3562503208
2024 9 FD52 03 E111 U 9455501U 110 3/18/2024 3020 PREL ENGINEERING-UTILITIES CA-XR031O1062406810063 $371.92 000001078606-3562503208
2024 9 FD52 03 E121 U 9455501U 110 3/18/2024 3020 PREL ENGINEERING-UTILITIES CA-XR031O1062406810063 $25.69 000001078606-3562503208
2024 9 FD52 00 E111 U 9455501U 110 3/11/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR031O1062406810065 $192.74 000001079919-3562500480
2024 9 FD52 00 E111 U 9455501U 110 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810065 $36.78 000001079919-3562500480
2024 9 FD52 00 E121 U 9455501U 110 3/11/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR031O1062406810065 $13.44 000001079919-3562500480
2024 9 FD52 00 E121 U 9455501U 110 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810065 $2.56 000001079919-3562500480
2024 9 FD52 00 E122 U 9455501U 110 3/11/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR031O1062406810065 $127.58 000001079919-3562500480
2024 9 FD52 00 E122 U 9455501U 110 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810065 $24.34 000001079919-3562500480
2024 9 FD52 00 E123 U 9455501U 110 3/11/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR031O1062406810065 $37.79 000001079919-3562500480
2024 9 FD52 00 E123 U 9455501U 110 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810065 $7.11 000001079919-3562500480
2024 9 FD52 03 E797 U 9455501U 110 3/8/2024 3550 RAILROAD CONTRACTS PRC-2400179045 DO2200023907 CSX TRANSPORTATION INC $18,194.86
2024 8 FD52 03 E797 U 9455501U 110 2/27/2024 3550 RAILROAD CONTRACTS PRC-2400173686 DO2200023907 CSX TRANSPORTATION INC $1,158.52
2024 8 FD52 00 E111 U 9455501U 110 2/26/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR022O1062405408887 $226.76 000001079919-3562500480
2024 8 FD52 00 E111 U 9455501U 110 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408887 $1.13 000001079919-3562500480
2024 8 FD52 00 E121 U 9455501U 110 2/26/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR022O1062405408887 $16.93 000001079919-3562500480
2024 8 FD52 00 E121 U 9455501U 110 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408887 $0.09 000001079919-3562500480
2024 8 FD52 00 E122 U 9455501U 110 2/26/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR022O1062405408887 $149.94 000001079919-3562500480
2024 8 FD52 00 E122 U 9455501U 110 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408887 $0.75 000001079919-3562500480
2024 8 FD52 00 E123 U 9455501U 110 2/26/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR022O1062405408887 $24.05 000001079919-3562500480
2024 8 FD52 00 E123 U 9455501U 110 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408887 $0.12 000001079919-3562500480
2024 8 FD52 00 E124 U 9455501U 110 2/26/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR022O1062405408887 $0.05 000001079919-3562500480
2024 8 FD52 03 E111 U 9455501U 110 2/26/2024 3020 PREL ENGINEERING-UTILITIES CA-XR022O1062405408884 $338.11 000001078606-3562503208
2024 8 FD52 03 E121 U 9455501U 110 2/26/2024 3020 PREL ENGINEERING-UTILITIES CA-XR022O1062405408884 $23.36 000001078606-3562503208
2024 8 FD52 03 E122 U 9455501U 110 2/26/2024 3020 PREL ENGINEERING-UTILITIES CA-XR022O1062405408884 $223.73 000001078606-3562503208
2024 8 FD52 03 E123 U 9455501U 110 2/26/2024 3020 PREL ENGINEERING-UTILITIES CA-XR022O1062405408884 $64.54 000001078606-3562503208
2024 8 FD52 03 E124 U 9455501U 110 2/26/2024 3020 PREL ENGINEERING-UTILITIES CA-XR022O1062405408884 $0.09 000001078606-3562503208
2024 8 FD52 03 E797 U 9455501U 110 2/19/2024 3550 RAILROAD CONTRACTS PRC-2400163341 DO2200023907 CSX TRANSPORTATION INC $1,241.51
2024 7 FD52 03 E797 U 9455501U 110 1/24/2024 3550 RAILROAD CONTRACTS PRC-2400146859 DO2200023907 CSX TRANSPORTATION INC $1,786.22
2024 7 FD52 03 E111 U 9455501U 110 1/10/2024 3020 PREL ENGINEERING-UTILITIES CA-XR011O1062400505711 $371.92 000001078606-3562503208
2024 7 FD52 03 E111 U 9455501U 110 1/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505711 $371.92 000001078606-3562503208
2024 7 FD52 03 E121 U 9455501U 110 1/10/2024 3020 PREL ENGINEERING-UTILITIES CA-XR011O1062400505711 $25.69 000001078606-3562503208
2024 7 FD52 03 E121 U 9455501U 110 1/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505711 $25.69 000001078606-3562503208
2024 7 FD52 03 E122 U 9455501U 110 1/10/2024 3020 PREL ENGINEERING-UTILITIES CA-XR011O1062400505711 $246.11 000001078606-3562503208
2024 7 FD52 03 E122 U 9455501U 110 1/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505711 $246.10 000001078606-3562503208
2024 7 FD52 03 E123 U 9455501U 110 1/10/2024 3020 PREL ENGINEERING-UTILITIES CA-XR011O1062400505711 $71.50 000001078606-3562503208
2024 7 FD52 03 E123 U 9455501U 110 1/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505711 $70.50 000001078606-3562503208
2024 7 FD52 03 E797 U 9455501U 110 1/8/2024 3550 RAILROAD CONTRACTS PRC-2400134505 DO2200023907 CSX TRANSPORTATION INC $2,951.53
2024 7 FD52 00 E112 U 9455501U 110 1/8/2024 3030 INSPECTION&SUPER-RAILROAD CA-XR011O1062400505712 $148.14 000001078991-3562500480
2024 7 FD52 00 E112 U 9455501U 110 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505712 $63.49 000001078991-3562500480
2024 7 FD52 00 E121 U 9455501U 110 1/8/2024 3030 INSPECTION&SUPER-RAILROAD CA-XR011O1062400505712 $11.33 000001078991-3562500480
2024 7 FD52 00 E121 U 9455501U 110 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505712 $4.86 000001078991-3562500480
2024 6 FD52 03 E111 U 9455501U 110 12/22/2023 3020 PREL ENGINEERING-UTILITIES CA-XR122N1062335504596 $248.97 000001078606-3562503208
2024 6 FD52 03 E111 U 9455501U 110 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504596 $60.11 000001078606-3562503208
2024 6 FD52 03 E121 U 9455501U 110 12/22/2023 3020 PREL ENGINEERING-UTILITIES CA-XR122N1062335504596 $18.75 000001078606-3562503208
2024 6 FD52 03 E121 U 9455501U 110 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504596 $4.52 000001078606-3562503208
2024 6 FD52 03 E122 U 9455501U 110 12/22/2023 3020 PREL ENGINEERING-UTILITIES CA-XR122N1062335504596 $164.35 000001078606-3562503208
2024 6 FD52 03 E122 U 9455501U 110 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504596 $39.78 000001078606-3562503208
2024 6 FD52 03 E123 U 9455501U 110 12/22/2023 3020 PREL ENGINEERING-UTILITIES CA-XR122N1062335504596 $39.06 000001078606-3562503208
2024 6 FD52 03 E123 U 9455501U 110 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504596 $9.33 000001078606-3562503208
2024 6 FD52 03 E124 U 9455501U 110 12/22/2023 3020 PREL ENGINEERING-UTILITIES CA-XR122N1062335504596 $0.10 000001078606-3562503208
2024 6 FD52 03 E124 U 9455501U 110 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504596 $0.02 000001078606-3562503208
2024 6 FD52 00 E112 U 9455501U 110 12/22/2023 3030 INSPECTION&SUPER-RAILROAD CA-XR122N1062335504597 $138.26 000001078991-3562500480
2024 6 FD52 00 E112 U 9455501U 110 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504597 $103.49 000001078991-3562500480
2024 6 FD52 00 E121 U 9455501U 110 12/22/2023 3030 INSPECTION&SUPER-RAILROAD CA-XR122N1062335504597 $10.57 000001078991-3562500480
2024 6 FD52 00 E121 U 9455501U 110 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504597 $7.92 000001078991-3562500480
2024 6 FD52 00 E112 U 9455501U 110 12/11/2023 3030 INSPECTION&SUPER-RAILROAD CA-XR121N1062334203610 $148.14 000001078991-3562500480
2024 6 FD52 00 E121 U 9455501U 110 12/11/2023 3030 INSPECTION&SUPER-RAILROAD CA-XR121N1062334203610 $11.33 000001078991-3562500480
2024 5 FD52 03 E797 U 9455501U 110 11/30/2023 3550 RAILROAD CONTRACTS PRC-2400103942 DO2200023907 CSX TRANSPORTATION INC $25,993.66
2024 5 FD52 03 E797 U 9455501U 110 11/29/2023 3550 RAILROAD CONTRACTS PRC-2400103954 DO2200023907 CSX TRANSPORTATION INC $29,123.86
2024 5 FD52 00 E112 U 9455501U 110 11/22/2023 3030 INSPECTION&SUPER-RAILROAD CA-XR112N1062332502503 $296.28 000001078991-3562500480
2024 5 FD52 00 E112 U 9455501U 110 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502503 $19.75 000001078991-3562500480
2024 5 FD52 00 E121 U 9455501U 110 11/22/2023 3030 INSPECTION&SUPER-RAILROAD CA-XR112N1062332502503 $22.67 000001078991-3562500480
2024 5 FD52 00 E121 U 9455501U 110 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502503 $1.51 000001078991-3562500480
2024 5 FD52 00 E112 U 9455501U 110 11/9/2023 3030 INSPECTION&SUPER-RAILROAD CA-XR111N1062331201470 $296.28 000001078991-3562500480
2024 5 FD52 00 E121 U 9455501U 110 11/9/2023 3030 INSPECTION&SUPER-RAILROAD CA-XR111N1062331201470 $22.67 000001078991-3562500480
2024 4 FD52 00 E112 U 9455501U 110 10/9/2023 3030 INSPECTION&SUPER-RAILROAD CA-XR101N1062328009684 $296.28 000001078991-3562500480
2024 4 FD52 00 E121 U 9455501U 110 10/9/2023 3030 INSPECTION&SUPER-RAILROAD CA-XR101N1062328009684 $22.67 000001078991-3562500480
2024 3 FD52 00 E112 U 9455501U 110 9/29/2023 3030 INSPECTION&SUPER-RAILROAD CA-XR092N1062327208401 $128.39 000001078991-3562500480
2024 3 FD52 00 E121 U 9455501U 110 9/29/2023 3030 INSPECTION&SUPER-RAILROAD CA-XR092N1062327208401 $9.82 000001078991-3562500480
2024 3 FD52 00 E112 U 9455501U 110 9/28/2023 3030 INSPECTION&SUPER-RAILROAD CA-XR092N1062326507050 ($128.39) 000001078991-3562500480
2024 3 FD52 00 E121 U 9455501U 110 9/28/2023 3030 INSPECTION&SUPER-RAILROAD CA-XR092N1062326507050 ($9.82) 000001078991-3562500480
2024 3 FD52 00 E112 U 9455501U 110 9/25/2023 3030 INSPECTION&SUPER-RAILROAD CA-XR092N1062326507050 $128.39 000001078991-3562500480
2024 3 FD52 00 E121 U 9455501U 110 9/25/2023 3030 INSPECTION&SUPER-RAILROAD CA-XR092N1062326507050 $9.82 000001078991-3562500480
2024 3 FD52 00 E121 U 9455501U 110 9/11/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR091N1062325106084 $9.39 000001079919-3562500480
2024 3 FD52 00 E121 U 9455501U 110 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106084 $1.95 000001079919-3562500480
2024 3 FD52 00 E122 U 9455501U 110 9/11/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR091N1062325106084 $85.90 000001079919-3562500480
2024 3 FD52 00 E122 U 9455501U 110 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106084 $17.86 000001079919-3562500480
2024 3 FD52 00 E123 U 9455501U 110 9/11/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR091N1062325106084 $13.79 000001079919-3562500480
2024 3 FD52 00 E123 U 9455501U 110 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106084 $2.83 000001079919-3562500480
2024 3 FD52 00 E111 U 9455501U 110 9/11/2023 3030 INSPECTION&SUPER-RAILROAD CA-XR091N1062325106082 $287.77 000001078991-3562500480
2024 3 FD52 00 E112 U 9455501U 110 9/11/2023 3030 INSPECTION&SUPER-RAILROAD CA-XR091N1062325106082 $148.14 000001078991-3562500480
2024 3 FD52 00 E121 U 9455501U 110 9/11/2023 3030 INSPECTION&SUPER-RAILROAD CA-XR091N1062325106082 $32.91 000001078991-3562500480
2024 3 FD52 00 E122 U 9455501U 110 9/11/2023 3030 INSPECTION&SUPER-RAILROAD CA-XR091N1062325106082 $190.42 000001078991-3562500480
2024 3 FD52 00 E123 U 9455501U 110 9/11/2023 3030 INSPECTION&SUPER-RAILROAD CA-XR091N1062325106082 $35.84 000001078991-3562500480
2024 3 FD52 00 E111 U 9455501U 110 9/11/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR091N1062325106084 $129.82 000001079919-3562500480
2024 3 FD52 00 E111 U 9455501U 110 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106084 $27.00 000001079919-3562500480
2024 2 FD52 03 E797 U 9455501U 110 8/21/2023 3550 RAILROAD CONTRACTS PRC-2400033589 DO2200023907 CSX TRANSPORTATION INC $7,492.52
2024 2 FD52 03 E797 U 9455501U 110 8/18/2023 3550 RAILROAD CONTRACTS PRC-2400033603 DO2200023907 CSX TRANSPORTATION INC $11,977.49
2024 2 FD52 03 E797 U 9455501U 110 8/18/2023 3550 RAILROAD CONTRACTS PRC-2400033614 DO2200023907 CSX TRANSPORTATION INC $14,375.85
2024 2 FD52 03 E121 U 9455501U 110 8/15/2023 3020 PREL ENGINEERING-UTILITIES CA-XR081N1062322003848 $37.51 000001078606-3562503208
2024 2 FD52 03 E121 U 9455501U 110 8/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003848 $5.75 000001078606-3562503208
2024 2 FD52 03 E122 U 9455501U 110 8/15/2023 3020 PREL ENGINEERING-UTILITIES CA-XR081N1062322003848 $329.63 000001078606-3562503208
2024 2 FD52 03 E122 U 9455501U 110 8/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003848 $50.54 000001078606-3562503208
2024 2 FD52 03 E123 U 9455501U 110 8/15/2023 3020 PREL ENGINEERING-UTILITIES CA-XR081N1062322003848 $78.34 000001078606-3562503208
2024 2 FD52 03 E123 U 9455501U 110 8/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003848 $11.85 000001078606-3562503208
2024 2 FD52 03 E111 U 9455501U 110 8/15/2023 3020 PREL ENGINEERING-UTILITIES CA-XR081N1062322003848 $498.15 000001078606-3562503208
2024 2 FD52 03 E111 U 9455501U 110 8/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003848 $76.38 000001078606-3562503208
2023 12 FD52 00 E121 U 9455501U 110 6/26/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR062N1062317400424 $27.84 000001079919-3562500480
2023 12 FD52 00 E121 U 9455501U 110 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400424 $4.50 000001079919-3562500480
2023 12 FD52 00 E122 U 9455501U 110 6/26/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR062N1062317400424 $305.47 000001079919-3562500480
2023 12 FD52 00 E122 U 9455501U 110 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400424 $49.37 000001079919-3562500480
2023 12 FD52 00 E123 U 9455501U 110 6/26/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR062N1062317400424 $75.16 000001079919-3562500480
2023 12 FD52 00 E123 U 9455501U 110 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400424 $12.00 000001079919-3562500480
2023 12 FD52 03 E111 U 9455501U 110 6/26/2023 3020 PREL ENGINEERING-UTILITIES CA-XR062N1062317400419 $170.19 000001078606-3562503208
2023 12 FD52 03 E111 U 9455501U 110 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400419 $7.66 000001078606-3562503208
2023 12 FD52 03 E121 U 9455501U 110 6/26/2023 3020 PREL ENGINEERING-UTILITIES CA-XR062N1062317400419 $11.96 000001078606-3562503208
2023 12 FD52 03 E121 U 9455501U 110 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400419 $0.54 000001078606-3562503208
2023 12 FD52 03 E122 U 9455501U 110 6/26/2023 3020 PREL ENGINEERING-UTILITIES CA-XR062N1062317400419 $132.69 000001078606-3562503208
2023 12 FD52 03 E122 U 9455501U 110 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400419 $5.97 000001078606-3562503208
2023 12 FD52 03 E123 U 9455501U 110 6/26/2023 3020 PREL ENGINEERING-UTILITIES CA-XR062N1062317400419 $29.85 000001078606-3562503208
2023 12 FD52 00 E124 U 9455501U 110 6/26/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR062N1062317400424 $0.15 000001079919-3562500480
2023 12 FD52 03 E123 U 9455501U 110 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400419 $1.33 000001078606-3562503208
2023 12 FD52 03 E124 U 9455501U 110 6/26/2023 3020 PREL ENGINEERING-UTILITIES CA-XR062N1062317400419 $0.05 000001078606-3562503208
2023 12 FD52 00 E124 U 9455501U 110 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400424 $0.02 000001079919-3562500480
2023 12 FD52 00 E111 U 9455501U 110 6/26/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR062N1062317400423 $391.63 000001079919-3562500480
2023 12 FD52 00 E111 U 9455501U 110 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400423 $63.29 000001079919-3562500480
2023 12 FD52 03 E111 U 9455501U 110 6/8/2023 3020 PREL ENGINEERING-UTILITIES CA-XR061N1062315810126 $773.74 000001078606-3562503208
2023 12 FD52 03 E111 U 9455501U 110 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810126 $148.12 000001078606-3562503208
2023 12 FD52 03 E121 U 9455501U 110 6/8/2023 3020 PREL ENGINEERING-UTILITIES CA-XR061N1062315810126 $55.27 000001078606-3562503208
2023 12 FD52 03 E121 U 9455501U 110 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810126 $10.70 000001078606-3562503208
2023 12 FD52 03 E122 U 9455501U 110 6/8/2023 3020 PREL ENGINEERING-UTILITIES CA-XR061N1062315810126 $603.52 000001078606-3562503208
2023 12 FD52 03 E122 U 9455501U 110 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810126 $115.53 000001078606-3562503208
2023 12 FD52 03 E123 U 9455501U 110 6/8/2023 3020 PREL ENGINEERING-UTILITIES CA-XR061N1062315810126 $138.68 000001078606-3562503208
2023 12 FD52 03 E123 U 9455501U 110 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810126 $26.61 000001078606-3562503208
2023 11 FD52 03 E797 U 9455501U 110 5/30/2023 3550 RAILROAD CONTRACTS PRC-2300232672 DO2200023907 CSX TRANSPORTATION INC $18,368.67
2023 11 FD52 03 E111 U 9455501U 110 5/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR052N1062314309029 $318.97 000001078607-3562503208
2023 11 FD52 03 E121 U 9455501U 110 5/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR052N1062314309029 $22.41 000001078607-3562503208
2023 11 FD52 03 E122 U 9455501U 110 5/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR052N1062314309029 $248.80 000001078607-3562503208
2023 11 FD52 03 E123 U 9455501U 110 5/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR052N1062314309029 $55.94 000001078607-3562503208
2023 11 FD52 03 E124 U 9455501U 110 5/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR052N1062314309029 $0.09 000001078607-3562503208
2023 11 FD52 00 E111 U 9455501U 110 5/9/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR051N1062312808059 $213.76 000001079919-3562500480
2023 11 FD52 00 E121 U 9455501U 110 5/9/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR051N1062312808059 $15.31 000001079919-3562500480
2023 11 FD52 00 E122 U 9455501U 110 5/9/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR051N1062312808059 $166.73 000001079919-3562500480
2023 11 FD52 00 E123 U 9455501U 110 5/9/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR051N1062312808059 $26.41 000001079919-3562500480
2023 11 FD52 03 E795 U 9455501U 110 5/1/2023 3560 UTILITY CONTRACTS PRC-2300200764 SC2200001503 PENNYRILE RURAL ELECTRIC $279,780.67
2023 10 FD52 03 E797 U 9455501U 110 4/24/2023 3550 RAILROAD CONTRACTS PRC-2300184210 DO2200023907 CSX TRANSPORTATION INC $13,823.23
2023 10 FD52 00 E111 U 9455501U 110 4/14/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR041N1062309605761 $174.90 000001079919-3562500480
2023 10 FD52 00 E111 U 9455501U 110 4/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605761 $34.98 000001079919-3562500480
2023 10 FD52 00 E121 U 9455501U 110 4/14/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR041N1062309605761 $12.31 000001079919-3562500480
2023 10 FD52 00 E121 U 9455501U 110 4/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605761 $2.46 000001079919-3562500480
2023 10 FD52 00 E122 U 9455501U 110 4/14/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR041N1062309605761 $136.43 000001079919-3562500480
2023 10 FD52 00 E122 U 9455501U 110 4/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605761 $27.28 000001079919-3562500480
2023 10 FD52 00 E123 U 9455501U 110 4/14/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR041N1062309605761 $32.18 000001079919-3562500480
2023 10 FD52 00 E123 U 9455501U 110 4/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605761 $6.32 000001079919-3562500480
2023 10 FD52 03 E111 U 9455501U 110 4/14/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR041N1062309605757 $584.86 000001078607-3562503208
2023 10 FD52 03 E111 U 9455501U 110 4/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605757 $53.02 000001078607-3562503208
2023 10 FD52 03 E121 U 9455501U 110 4/14/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR041N1062309605757 $41.09 000001078607-3562503208
2023 10 FD52 03 E121 U 9455501U 110 4/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605757 $3.73 000001078607-3562503208
2023 10 FD52 03 E122 U 9455501U 110 4/14/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR041N1062309605757 $456.13 000001078607-3562503208
2023 10 FD52 03 E122 U 9455501U 110 4/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605757 $41.36 000001078607-3562503208
2023 10 FD52 03 E123 U 9455501U 110 4/14/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR041N1062309605757 $102.65 000001078607-3562503208
2023 10 FD52 03 E123 U 9455501U 110 4/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605757 $9.22 000001078607-3562503208
2023 10 FD52 03 E797 U 9455501U 110 4/10/2023 3550 RAILROAD CONTRACTS PRC-2300184196 DO2200023907 CSX TRANSPORTATION INC $24,743.04
2023 8 FD52 00 E111 U 9455501U 110 2/9/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR021N1062303901410 $151.58 000001079919-3562500480
2023 8 FD52 00 E111 U 9455501U 110 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901410 $40.81 000001079919-3562500480
2023 8 FD52 00 E121 U 9455501U 110 2/9/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR021N1062303901410 $10.67 000001079919-3562500480
2023 8 FD52 00 E121 U 9455501U 110 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901410 $2.87 000001079919-3562500480
2023 8 FD52 00 E122 U 9455501U 110 2/9/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR021N1062303901410 $118.23 000001079919-3562500480
2023 8 FD52 00 E122 U 9455501U 110 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901410 $31.83 000001079919-3562500480
2023 8 FD52 00 E123 U 9455501U 110 2/9/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR021N1062303901410 $27.90 000001079919-3562500480
2023 8 FD52 00 E123 U 9455501U 110 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901410 $7.38 000001079919-3562500480
2023 8 FD52 03 E797 U 9455501U 110 2/1/2023 3550 RAILROAD CONTRACTS PRC-2300140515 DO2200000802 CSX TRANSPORTATION INC $4,645.42
2023 8 FD52 03 E797 U 9455501U 110 2/1/2023 3550 RAILROAD CONTRACTS PRC-2300135865 DO2200023907 CSX TRANSPORTATION INC $2,234.83
2023 8 FD52 03 E797 U 9455501U 110 2/1/2023 3550 RAILROAD CONTRACTS PRC-2300140501 DO2200023907 CSX TRANSPORTATION INC $9,778.21
2023 6 FD52 00 E121 U 9455501U 110 12/12/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR121M1062234208205 ($0.60) 000001079919-3562500480
2023 5 FD52 03 E797 U 9455501U 110 11/8/2022 3550 RAILROAD CONTRACTS PRC-2300084132 DO2200000802 CSX TRANSPORTATION INC $1,003.40
2023 3 FD52 03 E111 U 9455501U 110 9/28/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR092M1062226602757 $525.11 000001078607-3562503208
2023 3 FD52 03 E111 U 9455501U 110 9/28/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602757 $52.51 000001078607-3562503208
2023 3 FD52 03 E121 U 9455501U 110 9/28/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR092M1062226602757 $37.88 000001078607-3562503208
2023 3 FD52 03 E121 U 9455501U 110 9/28/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602757 $3.78 000001078607-3562503208
2023 3 FD52 03 E122 U 9455501U 110 9/28/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR092M1062226602757 $409.59 000001078607-3562503208
2023 3 FD52 03 E122 U 9455501U 110 9/28/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602757 $40.96 000001078607-3562503208
2023 3 FD52 03 E123 U 9455501U 110 9/28/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR092M1062226602757 $87.37 000001078607-3562503208
2023 3 FD52 03 E123 U 9455501U 110 9/28/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602757 $8.63 000001078607-3562503208
2023 3 FD52 03 E124 U 9455501U 110 9/28/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR092M1062226602757 $0.18 000001078607-3562503208
2023 3 FD52 03 E124 U 9455501U 110 9/28/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602757 $0.02 000001078607-3562503208
2023 3 FD52 00 E111 U 9455501U 110 9/26/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR092M1062226602763 $194.33 000001079919-3562500480
2023 3 FD52 00 E111 U 9455501U 110 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602763 $58.29 000001079919-3562500480
2023 3 FD52 00 E121 U 9455501U 110 9/26/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR092M1062226602763 $14.29 000001079919-3562500480
2023 3 FD52 00 E121 U 9455501U 110 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602763 $4.29 000001079919-3562500480
2023 3 FD52 00 E122 U 9455501U 110 9/26/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR092M1062226602763 $151.58 000001079919-3562500480
2023 3 FD52 00 E122 U 9455501U 110 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602763 $45.47 000001079919-3562500480
2023 3 FD52 00 E123 U 9455501U 110 9/26/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR092M1062226602763 $19.22 000001079919-3562500480
2023 3 FD52 00 E123 U 9455501U 110 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602763 $5.67 000001079919-3562500480
2023 3 FD52 00 E124 U 9455501U 110 9/26/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR092M1062226602763 $0.05 000001079919-3562500480
2023 3 FD52 00 E124 U 9455501U 110 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602763 $0.02 000001079919-3562500480
2023 3 FD52 00 E111 U 9455501U 110 9/26/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR092M1062226602759 $116.71 000001078991-3562500480
2023 3 FD52 00 E111 U 9455501U 110 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602759 $11.49 000001078991-3562500480
2023 3 FD52 00 E121 U 9455501U 110 9/26/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR092M1062226602759 $8.20 000001078991-3562500480
2023 3 FD52 00 E121 U 9455501U 110 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602759 $0.80 000001078991-3562500480
2023 3 FD52 00 E122 U 9455501U 110 9/26/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR092M1062226602759 $91.00 000001078991-3562500480
2023 3 FD52 00 E122 U 9455501U 110 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602759 $8.96 000001078991-3562500480
2023 3 FD52 00 E123 U 9455501U 110 9/26/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR092M1062226602759 $24.35 000001078991-3562500480
2023 3 FD52 00 E123 U 9455501U 110 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602759 $2.38 000001078991-3562500480
2023 3 FD52 00 E124 U 9455501U 110 9/26/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR092M1062226602759 $0.04 000001078991-3562500480
2023 3 FD52 03 E795 U 9455501U 110 9/12/2022 3560 UTILITY CONTRACTS PRC-2300043800 SC2200001011 CITY OF GUTHRIE $4,840.45
2023 3 FD52 03 E111 U 9455501U 110 9/12/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR091M1062225101611 $1,169.56 000001078607-3562503208
2023 3 FD52 03 E121 U 9455501U 110 9/12/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR091M1062225101611 $82.18 000001078607-3562503208
2023 3 FD52 03 E122 U 9455501U 110 9/12/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR091M1062225101611 $912.26 000001078607-3562503208
2023 3 FD52 03 E123 U 9455501U 110 9/12/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR091M1062225101611 $188.35 000001078607-3562503208
2023 2 FD52 03 E795 U 9455501U 110 8/31/2022 3560 UTILITY CONTRACTS PRC-2300037777 SC2200000933 CITY OF GUTHRIE $172,704.29
2023 2 FD52 03 E795 U 9455501U 110 8/30/2022 3560 UTILITY CONTRACTS PRC-2300036714 SC2200000933 CITY OF GUTHRIE $7,004.50
2023 2 FD52 03 E111 U 9455501U 110 8/24/2022 3020 PREL ENGINEERING-UTILITIES CA-XR082M1062223500419 $637.94 000001078606-3562503208
2023 2 FD52 03 E121 U 9455501U 110 8/24/2022 3020 PREL ENGINEERING-UTILITIES CA-XR082M1062223500419 $44.83 000001078606-3562503208
2023 2 FD52 03 E122 U 9455501U 110 8/24/2022 3020 PREL ENGINEERING-UTILITIES CA-XR082M1062223500419 $497.59 000001078606-3562503208
2023 2 FD52 03 E123 U 9455501U 110 8/24/2022 3020 PREL ENGINEERING-UTILITIES CA-XR082M1062223500419 $102.74 000001078606-3562503208
2023 2 FD52 03 E124 U 9455501U 110 8/24/2022 3020 PREL ENGINEERING-UTILITIES CA-XR082M1062223500419 $0.18 000001078606-3562503208
2023 2 FD52 00 E111 U 9455501U 110 8/16/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR081M1062222110110 $296.02 000001078991-3562500480
2023 2 FD52 00 E111 U 9455501U 110 8/16/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110110 $49.76 000001078991-3562500480
2023 2 FD52 00 E121 U 9455501U 110 8/16/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR081M1062222110110 $20.32 000001078991-3562500480
2023 2 FD52 00 E121 U 9455501U 110 8/16/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110110 $3.41 000001078991-3562500480
2023 2 FD52 00 E122 U 9455501U 110 8/16/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR081M1062222110110 $231.00 000001078991-3562500480
2023 2 FD52 00 E122 U 9455501U 110 8/16/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110110 $38.82 000001078991-3562500480
2023 2 FD52 00 E123 U 9455501U 110 8/16/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR081M1062222110110 $61.85 000001078991-3562500480
2023 2 FD52 00 E123 U 9455501U 110 8/16/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110110 $10.29 000001078991-3562500480
2023 2 FD52 00 E122 U 9455501U 110 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110114 $6.26 000001079919-3562500480
2023 2 FD52 00 E123 U 9455501U 110 8/10/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR081M1062222110114 $18.45 000001079919-3562500480
2023 2 FD52 00 E123 U 9455501U 110 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110114 $0.78 000001079919-3562500480
2023 2 FD52 00 E111 U 9455501U 110 8/10/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR081M1062222110113 $186.97 000001079919-3562500480
2023 2 FD52 00 E111 U 9455501U 110 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110113 $8.02 000001079919-3562500480
2023 2 FD52 00 E121 U 9455501U 110 8/10/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR081M1062222110113 $13.45 000001079919-3562500480
2023 2 FD52 00 E121 U 9455501U 110 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110113 $0.58 000001079919-3562500480
2023 2 FD52 00 E122 U 9455501U 110 8/10/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR081M1062222110113 $145.90 000001079919-3562500480
2023 2 FD52 03 E797 U 9455501U 110 8/2/2022 3550 RAILROAD CONTRACTS PRC-2300019624 DO2200000802 CSX TRANSPORTATION INC $4,394.44
2023 1 FD52 03 E111 U 9455501U 110 7/12/2022 3020 PREL ENGINEERING-UTILITIES CA-XR071M1062219207865 $295.35 000001078606-3562503208
2023 1 FD52 03 E111 U 9455501U 110 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207865 $29.53 000001078606-3562503208
2023 1 FD52 03 E121 U 9455501U 110 7/12/2022 3020 PREL ENGINEERING-UTILITIES CA-XR071M1062219207865 $20.61 000001078606-3562503208
2023 1 FD52 03 E121 U 9455501U 110 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207865 $2.06 000001078606-3562503208
2023 1 FD52 03 E122 U 9455501U 110 7/12/2022 3020 PREL ENGINEERING-UTILITIES CA-XR071M1062219207865 $248.00 000001078606-3562503208
2023 1 FD52 03 E122 U 9455501U 110 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207865 $24.80 000001078606-3562503208
2023 1 FD52 03 E123 U 9455501U 110 7/12/2022 3020 PREL ENGINEERING-UTILITIES CA-XR071M1062219207865 $51.41 000001078606-3562503208
2023 1 FD52 03 E123 U 9455501U 110 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207865 $5.09 000001078606-3562503208
2023 1 FD52 03 E111 U 9455501U 110 7/12/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR071M1062219207865 $295.35 000001078607-3562503208
2023 1 FD52 03 E111 U 9455501U 110 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207865 $29.53 000001078607-3562503208
2023 1 FD52 03 E121 U 9455501U 110 7/12/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR071M1062219207865 $20.61 000001078607-3562503208
2023 1 FD52 03 E121 U 9455501U 110 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207865 $2.06 000001078607-3562503208
2023 1 FD52 03 E122 U 9455501U 110 7/12/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR071M1062219207865 $248.00 000001078607-3562503208
2023 1 FD52 03 E122 U 9455501U 110 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207865 $24.80 000001078607-3562503208
2023 1 FD52 03 E123 U 9455501U 110 7/12/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR071M1062219207865 $51.41 000001078607-3562503208
2023 1 FD52 03 E123 U 9455501U 110 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207865 $5.09 000001078607-3562503208
2023 1 FD52 00 E111 U 9455501U 110 7/12/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR071M1062219207867 $182.70 000001078991-3562500480
2023 1 FD52 00 E111 U 9455501U 110 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207867 $196.78 000001078991-3562500480
2023 1 FD52 00 E121 U 9455501U 110 7/12/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR071M1062219207867 $12.43 000001078991-3562500480
2023 1 FD52 00 E121 U 9455501U 110 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207867 $13.38 000001078991-3562500480
2023 1 FD52 00 E122 U 9455501U 110 7/12/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR071M1062219207867 $153.51 000001078991-3562500480
2023 1 FD52 00 E122 U 9455501U 110 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207867 $165.24 000001078991-3562500480
2023 1 FD52 00 E123 U 9455501U 110 7/12/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR071M1062219207867 $41.54 000001078991-3562500480
2023 1 FD52 00 E123 U 9455501U 110 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207867 $43.95 000001078991-3562500480
2023 1 FD52 00 E111 U 9455501U 110 7/12/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR071M1062219207871 $312.53 000001079919-3562500480
2023 1 FD52 00 E111 U 9455501U 110 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207871 $45.50 000001079919-3562500480
2023 1 FD52 00 E121 U 9455501U 110 7/12/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR071M1062219207871 $21.94 000001079919-3562500480
2023 1 FD52 00 E121 U 9455501U 110 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207871 $3.24 000001079919-3562500480
2023 1 FD52 00 E122 U 9455501U 110 7/12/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR071M1062219207871 $262.28 000001079919-3562500480
2023 1 FD52 00 E122 U 9455501U 110 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207871 $38.21 000001079919-3562500480
2023 1 FD52 00 E123 U 9455501U 110 7/12/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR071M1062219207871 $48.96 000001079919-3562500480
2023 1 FD52 00 E123 U 9455501U 110 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207871 $4.97 000001079919-3562500480
2022 12 FD52 03 E111 U 9455501U 110 6/27/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR062M1062217506754 $295.25 000001078607-3562503208
2022 12 FD52 03 E111 U 9455501U 110 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506754 $65.76 000001078607-3562503208
2022 12 FD52 03 E121 U 9455501U 110 6/27/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR062M1062217506754 $20.60 000001078607-3562503208
2022 12 FD52 03 E121 U 9455501U 110 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506754 $4.59 000001078607-3562503208
2022 12 FD52 03 E122 U 9455501U 110 6/27/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR062M1062217506754 $248.00 000001078607-3562503208
2022 12 FD52 03 E122 U 9455501U 110 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506754 $55.22 000001078607-3562503208
2022 12 FD52 03 E123 U 9455501U 110 6/27/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR062M1062217506754 $51.47 000001078607-3562503208
2022 12 FD52 03 E123 U 9455501U 110 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506754 $11.33 000001078607-3562503208
2022 12 FD52 03 E124 U 9455501U 110 6/27/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR062M1062217506754 $0.09 000001078607-3562503208
2022 12 FD52 03 E124 U 9455501U 110 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506754 $0.02 000001078607-3562503208
2022 12 FD52 03 E111 U 9455501U 110 6/13/2022 3020 PREL ENGINEERING-UTILITIES CA-XR061M1062215905711 $541.53 000001078606-3562503208
2022 12 FD52 03 E111 U 9455501U 110 6/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905711 $79.05 000001078606-3562503208
2022 12 FD52 03 E121 U 9455501U 110 6/13/2022 3020 PREL ENGINEERING-UTILITIES CA-XR061M1062215905711 $37.77 000001078606-3562503208
2022 12 FD52 03 E121 U 9455501U 110 6/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905711 $5.51 000001078606-3562503208
2022 12 FD52 03 E122 U 9455501U 110 6/13/2022 3020 PREL ENGINEERING-UTILITIES CA-XR061M1062215905711 $454.97 000001078606-3562503208
2022 12 FD52 03 E122 U 9455501U 110 6/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905711 $66.38 000001078606-3562503208
2022 12 FD52 03 E123 U 9455501U 110 6/13/2022 3020 PREL ENGINEERING-UTILITIES CA-XR061M1062215905711 $94.36 000001078606-3562503208
2022 12 FD52 03 E123 U 9455501U 110 6/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905711 $13.63 000001078606-3562503208
2022 12 FD52 00 E111 U 9455501U 110 6/13/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR061M1062215905717 $286.16 000001079919-3562500480
2022 12 FD52 00 E111 U 9455501U 110 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905718 $97.83 000001079919-3562500480
2022 12 FD52 00 E121 U 9455501U 110 6/9/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR061M1062215905718 $20.12 000001079919-3562500480
2022 12 FD52 00 E121 U 9455501U 110 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905718 $6.90 000001079919-3562500480
2022 12 FD52 00 E122 U 9455501U 110 6/9/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR061M1062215905718 $240.43 000001079919-3562500480
2022 12 FD52 00 E122 U 9455501U 110 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905718 $82.15 000001079919-3562500480
2022 12 FD52 00 E123 U 9455501U 110 6/9/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR061M1062215905718 $45.03 000001079919-3562500480
2022 12 FD52 00 E123 U 9455501U 110 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905718 $14.31 000001079919-3562500480
2022 11 FD52 03 E797 U 9455501U 110 5/24/2022 3550 RAILROAD CONTRACTS PRC-2200212335 DO2200000802 CSX TRANSPORTATION INC $1,241.04
2022 11 FD52 00 E111 U 9455501U 110 5/23/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR052M1062214004664 $274.30 000001078991-3562500480
2022 11 FD52 00 E111 U 9455501U 110 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004664 $5.48 000001078991-3562500480
2022 11 FD52 00 E121 U 9455501U 110 5/23/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR052M1062214004664 $19.14 000001078991-3562500480
2022 11 FD52 00 E121 U 9455501U 110 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004664 $0.38 000001078991-3562500480
2022 11 FD52 00 E122 U 9455501U 110 5/23/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR052M1062214004664 $230.26 000001078991-3562500480
2022 11 FD52 00 E122 U 9455501U 110 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004664 $4.60 000001078991-3562500480
2022 11 FD52 00 E123 U 9455501U 110 5/23/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR052M1062214004664 $61.77 000001078991-3562500480
2022 11 FD52 00 E123 U 9455501U 110 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004664 $1.22 000001078991-3562500480
2022 11 FD52 00 E124 U 9455501U 110 5/23/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR052M1062214004664 $0.10 000001078991-3562500480
2022 11 FD52 00 E111 U 9455501U 110 5/9/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR051M1062212603653 $123.71 000001079919-3562500480
2022 11 FD52 00 E121 U 9455501U 110 5/9/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR051M1062212603653 $9.06 000001079919-3562500480
2022 11 FD52 00 E122 U 9455501U 110 5/9/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR051M1062212603653 $103.88 000001079919-3562500480
2022 11 FD52 00 E123 U 9455501U 110 5/9/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR051M1062212603653 $13.17 000001079919-3562500480
2022 11 FD52 03 E111 U 9455501U 110 5/9/2022 3020 PREL ENGINEERING-UTILITIES CA-XR051M1062212603646 $912.00 000001078606-3562503208
2022 11 FD52 03 E111 U 9455501U 110 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603646 $324.88 000001078606-3562503208
2022 11 FD52 03 E121 U 9455501U 110 5/9/2022 3020 PREL ENGINEERING-UTILITIES CA-XR051M1062212603646 $66.58 000001078606-3562503208
2022 11 FD52 03 E121 U 9455501U 110 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603646 $22.67 000001078606-3562503208
2022 11 FD52 03 E122 U 9455501U 110 5/9/2022 3020 PREL ENGINEERING-UTILITIES CA-XR051M1062212603646 $765.80 000001078606-3562503208
2022 11 FD52 03 E122 U 9455501U 110 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603646 $272.80 000001078606-3562503208
2022 11 FD52 03 E123 U 9455501U 110 5/9/2022 3020 PREL ENGINEERING-UTILITIES CA-XR051M1062212603646 $175.51 000001078606-3562503208
2022 11 FD52 03 E123 U 9455501U 110 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603646 $55.99 000001078606-3562503208
2022 11 FD52 00 E111 U 9455501U 110 5/9/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR051M1062212603648 $274.22 000001078991-3562500480
2022 11 FD52 00 E121 U 9455501U 110 5/9/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR051M1062212603648 $19.14 000001078991-3562500480
2022 11 FD52 00 E122 U 9455501U 110 5/9/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR051M1062212603648 $230.26 000001078991-3562500480
2022 11 FD52 00 E123 U 9455501U 110 5/9/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR051M1062212603648 $61.76 000001078991-3562500480
2022 10 FD52 03 E123 U 9455501U 110 4/25/2022 3020 PREL ENGINEERING-UTILITIES CA-XR042M1062211202526 $154.17 000001078606-3562503208
2022 10 FD52 03 E123 U 9455501U 110 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202526 $7.26 000001078606-3562503208
2022 10 FD52 03 E124 U 9455501U 110 4/25/2022 3020 PREL ENGINEERING-UTILITIES CA-XR042M1062211202526 $0.27 000001078606-3562503208
2022 10 FD52 03 E124 U 9455501U 110 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202526 $0.01 000001078606-3562503208
2022 10 FD52 03 E111 U 9455501U 110 4/25/2022 3020 PREL ENGINEERING-UTILITIES CA-XR042M1062211202526 $886.03 000001078606-3562503208
2022 10 FD52 03 E111 U 9455501U 110 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202526 $42.14 000001078606-3562503208
2022 10 FD52 03 E121 U 9455501U 110 4/25/2022 3020 PREL ENGINEERING-UTILITIES CA-XR042M1062211202526 $61.82 000001078606-3562503208
2022 10 FD52 03 E121 U 9455501U 110 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202526 $2.94 000001078606-3562503208
2022 10 FD52 03 E122 U 9455501U 110 4/25/2022 3020 PREL ENGINEERING-UTILITIES CA-XR042M1062211202526 $744.00 000001078606-3562503208
2022 10 FD52 00 E111 U 9455501U 110 4/25/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR042M1062211202536 $112.46 000001079919-3562500480
2022 10 FD52 00 E111 U 9455501U 110 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202536 $112.46 000001079919-3562500480
2022 10 FD52 00 E121 U 9455501U 110 4/25/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR042M1062211202536 $8.24 000001079919-3562500480
2022 10 FD52 00 E121 U 9455501U 110 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202536 $8.23 000001079919-3562500480
2022 10 FD52 00 E122 U 9455501U 110 4/25/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR042M1062211202536 $94.43 000001079919-3562500480
2022 10 FD52 00 E122 U 9455501U 110 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202536 $94.43 000001079919-3562500480
2022 10 FD52 00 E123 U 9455501U 110 4/25/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR042M1062211202536 $12.13 000001079919-3562500480
2022 10 FD52 00 E123 U 9455501U 110 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202536 $11.82 000001079919-3562500480
2022 10 FD52 00 E124 U 9455501U 110 4/25/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR042M1062211202536 $0.03 000001079919-3562500480
2022 10 FD52 03 E122 U 9455501U 110 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202526 $35.38 000001078606-3562503208
2022 10 FD52 00 E124 U 9455501U 110 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202536 $0.03 000001079919-3562500480
2022 10 FD52 00 E123 U 9455501U 110 4/11/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR041M1062209801470 $103.37 000001078991-3562500480
2022 10 FD52 00 E123 U 9455501U 110 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801470 $51.04 000001078991-3562500480
2022 10 FD52 00 E111 U 9455501U 110 4/11/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR041M1062209801470 $457.03 000001078991-3562500480
2022 10 FD52 00 E111 U 9455501U 110 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801470 $228.51 000001078991-3562500480
2022 10 FD52 00 E121 U 9455501U 110 4/11/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR041M1062209801470 $31.88 000001078991-3562500480
2022 10 FD52 00 E111 U 9455501U 110 4/11/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR041M1062209801475 $356.38 000001079919-3562500480
2022 10 FD52 00 E121 U 9455501U 110 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801470 $15.94 000001078991-3562500480
2022 10 FD52 00 E111 U 9455501U 110 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801475 $27.56 000001079919-3562500480
2022 10 FD52 00 E121 U 9455501U 110 4/11/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR041M1062209801475 $25.68 000001079919-3562500480
2022 10 FD52 00 E121 U 9455501U 110 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801475 $1.94 000001079919-3562500480
2022 10 FD52 00 E122 U 9455501U 110 4/11/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR041M1062209801475 $299.29 000001079919-3562500480
2022 10 FD52 00 E122 U 9455501U 110 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801475 $23.14 000001079919-3562500480
2022 10 FD52 00 E123 U 9455501U 110 4/11/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR041M1062209801475 $58.52 000001079919-3562500480
2022 10 FD52 00 E123 U 9455501U 110 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801475 $6.65 000001079919-3562500480
2022 10 FD52 00 E122 U 9455501U 110 4/11/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR041M1062209801470 $383.77 000001078991-3562500480
2022 10 FD52 03 E111 U 9455501U 110 4/11/2022 3020 PREL ENGINEERING-UTILITIES CA-XR041M1062209801466 $270.73 000001078606-3562503208
2022 10 FD52 03 E111 U 9455501U 110 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801466 $24.55 000001078606-3562503208
2022 10 FD52 03 E121 U 9455501U 110 4/11/2022 3020 PREL ENGINEERING-UTILITIES CA-XR041M1062209801466 $18.89 000001078606-3562503208
2022 10 FD52 03 E121 U 9455501U 110 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801466 $1.71 000001078606-3562503208
2022 10 FD52 00 E122 U 9455501U 110 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801470 $191.88 000001078991-3562500480
2022 10 FD52 03 E122 U 9455501U 110 4/11/2022 3020 PREL ENGINEERING-UTILITIES CA-XR041M1062209801466 $227.33 000001078606-3562503208
2022 10 FD52 03 E122 U 9455501U 110 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801466 $20.62 000001078606-3562503208
2022 10 FD52 03 E123 U 9455501U 110 4/11/2022 3020 PREL ENGINEERING-UTILITIES CA-XR041M1062209801466 $47.12 000001078606-3562503208
2022 10 FD52 03 E123 U 9455501U 110 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801466 $4.23 000001078606-3562503208
2022 9 FD52 00 E111 U 9455501U 110 3/24/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR032M1062208200394 $98.99 000001079919-3562500480
2022 9 FD52 00 E111 U 9455501U 110 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200394 $1.98 000001079919-3562500480
2022 9 FD52 00 E121 U 9455501U 110 3/24/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR032M1062208200394 $6.92 000001079919-3562500480
2022 9 FD52 00 E121 U 9455501U 110 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200394 $0.13 000001079919-3562500480
2022 9 FD52 03 E111 U 9455501U 110 3/24/2022 3020 PREL ENGINEERING-UTILITIES CA-XR032M1062208200384 $590.69 000001078606-3562503208
2022 9 FD52 00 E122 U 9455501U 110 3/24/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR032M1062208200394 $83.12 000001079919-3562500480
2022 9 FD52 03 E121 U 9455501U 110 3/24/2022 3020 PREL ENGINEERING-UTILITIES CA-XR032M1062208200384 $41.21 000001078606-3562503208
2022 9 FD52 00 E122 U 9455501U 110 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200394 $1.66 000001079919-3562500480
2022 9 FD52 03 E122 U 9455501U 110 3/24/2022 3020 PREL ENGINEERING-UTILITIES CA-XR032M1062208200384 $496.00 000001078606-3562503208
2022 9 FD52 00 E123 U 9455501U 110 3/24/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR032M1062208200394 $26.21 000001079919-3562500480
2022 9 FD52 03 E123 U 9455501U 110 3/24/2022 3020 PREL ENGINEERING-UTILITIES CA-XR032M1062208200384 $102.74 000001078606-3562503208
2022 9 FD52 00 E123 U 9455501U 110 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200394 $0.52 000001079919-3562500480
2022 9 FD52 03 E124 U 9455501U 110 3/24/2022 3020 PREL ENGINEERING-UTILITIES CA-XR032M1062208200384 $0.18 000001078606-3562503208
2022 9 FD52 00 E124 U 9455501U 110 3/24/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR032M1062208200394 $0.04 000001079919-3562500480
2022 9 FD52 00 E111 U 9455501U 110 3/9/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR031M1062206709461 $357.37 000001079919-3562500480
2022 9 FD52 00 E121 U 9455501U 110 3/9/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR031M1062206709461 $26.17 000001079919-3562500480
2022 9 FD52 00 E122 U 9455501U 110 3/9/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR031M1062206709461 $300.08 000001079919-3562500480
2022 9 FD52 00 E123 U 9455501U 110 3/9/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR031M1062206709461 $38.04 000001079919-3562500480
2022 9 FD52 03 E111 U 9455501U 110 3/9/2022 3020 PREL ENGINEERING-UTILITIES CA-XR031M1062206709452 $721.85 000001078606-3562503208
2022 9 FD52 03 E111 U 9455501U 110 3/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709452 $90.49 000001078606-3562503208
2022 9 FD52 03 E121 U 9455501U 110 3/9/2022 3020 PREL ENGINEERING-UTILITIES CA-XR031M1062206709452 $50.37 000001078606-3562503208
2022 9 FD52 03 E121 U 9455501U 110 3/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709452 $6.32 000001078606-3562503208
2022 9 FD52 03 E122 U 9455501U 110 3/9/2022 3020 PREL ENGINEERING-UTILITIES CA-XR031M1062206709452 $606.22 000001078606-3562503208
2022 9 FD52 03 E122 U 9455501U 110 3/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709452 $75.98 000001078606-3562503208
2022 9 FD52 03 E123 U 9455501U 110 3/9/2022 3020 PREL ENGINEERING-UTILITIES CA-XR031M1062206709452 $125.70 000001078606-3562503208
2022 9 FD52 03 E123 U 9455501U 110 3/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709452 $15.60 000001078606-3562503208
2022 9 FD52 03 E797 U 9455501U 110 3/8/2022 3550 RAILROAD CONTRACTS PRC-2200153365 DO2200000802 CSX TRANSPORTATION INC $1,106.25
2022 8 FD52 03 E111 U 9455501U 110 2/25/2022 3020 PREL ENGINEERING-UTILITIES CA-XR022M1062205308410 $768.66 000001078606-3562503208
2022 8 FD52 03 E111 U 9455501U 110 2/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308410 $84.92 000001078606-3562503208
2022 8 FD52 03 E121 U 9455501U 110 2/25/2022 3020 PREL ENGINEERING-UTILITIES CA-XR022M1062205308410 $54.52 000001078606-3562503208
2022 8 FD52 03 E121 U 9455501U 110 2/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308410 $6.05 000001078606-3562503208
2022 8 FD52 03 E122 U 9455501U 110 2/25/2022 3020 PREL ENGINEERING-UTILITIES CA-XR022M1062205308410 $645.40 000001078606-3562503208
2022 8 FD52 03 E122 U 9455501U 110 2/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308410 $71.30 000001078606-3562503208
2022 8 FD52 03 E123 U 9455501U 110 2/25/2022 3020 PREL ENGINEERING-UTILITIES CA-XR022M1062205308410 $138.82 000001078606-3562503208
2022 8 FD52 03 E123 U 9455501U 110 2/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308410 $15.33 000001078606-3562503208
2022 8 FD52 03 E124 U 9455501U 110 2/25/2022 3020 PREL ENGINEERING-UTILITIES CA-XR022M1062205308410 $0.27 000001078606-3562503208
2022 8 FD52 03 E124 U 9455501U 110 2/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308410 $0.03 000001078606-3562503208
2022 8 FD52 03 E797 U 9455501U 110 2/21/2022 3550 RAILROAD CONTRACTS PRC-2200143941 DO2200000802 CSX TRANSPORTATION INC $571.42
2022 8 FD52 00 E111 U 9455501U 110 2/14/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR021M1062203907441 $467.44 000001079919-3562500480
2022 8 FD52 00 E111 U 9455501U 110 2/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907441 $136.83 000001079919-3562500480
2022 8 FD52 00 E121 U 9455501U 110 2/14/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR021M1062203907441 $33.27 000001079919-3562500480
2022 8 FD52 00 E121 U 9455501U 110 2/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907441 $9.75 000001079919-3562500480
2022 8 FD52 00 E122 U 9455501U 110 2/14/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR021M1062203907441 $392.35 000001079919-3562500480
2022 8 FD52 00 E122 U 9455501U 110 2/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907441 $114.90 000001079919-3562500480
2022 8 FD52 00 E123 U 9455501U 110 2/14/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR021M1062203907441 $81.36 000001079919-3562500480
2022 8 FD52 00 E123 U 9455501U 110 2/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907441 $22.83 000001079919-3562500480
2022 8 FD52 03 E111 U 9455501U 110 2/9/2022 3020 PREL ENGINEERING-UTILITIES CA-XR021M1062203907431 $295.35 000001078606-3562503208
2022 8 FD52 03 E111 U 9455501U 110 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907431 $29.53 000001078606-3562503208
2022 8 FD52 03 E121 U 9455501U 110 2/9/2022 3020 PREL ENGINEERING-UTILITIES CA-XR021M1062203907431 $20.61 000001078606-3562503208
2022 8 FD52 03 E121 U 9455501U 110 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907431 $2.06 000001078606-3562503208
2022 8 FD52 03 E122 U 9455501U 110 2/9/2022 3020 PREL ENGINEERING-UTILITIES CA-XR021M1062203907431 $248.00 000001078606-3562503208
2022 8 FD52 03 E122 U 9455501U 110 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907431 $24.80 000001078606-3562503208
2022 8 FD52 03 E123 U 9455501U 110 2/9/2022 3020 PREL ENGINEERING-UTILITIES CA-XR021M1062203907431 $51.41 000001078606-3562503208
2022 8 FD52 03 E123 U 9455501U 110 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907431 $5.09 000001078606-3562503208
2022 8 FD52 00 E111 U 9455501U 110 2/9/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR021M1062203907434 $249.29 000001078991-3562500480
2022 8 FD52 00 E111 U 9455501U 110 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907434 $24.93 000001078991-3562500480
2022 8 FD52 00 E121 U 9455501U 110 2/9/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR021M1062203907434 $17.40 000001078991-3562500480
2022 8 FD52 00 E121 U 9455501U 110 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907434 $1.74 000001078991-3562500480
2022 8 FD52 00 E122 U 9455501U 110 2/9/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR021M1062203907434 $209.33 000001078991-3562500480
2022 8 FD52 00 E122 U 9455501U 110 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907434 $20.93 000001078991-3562500480
2022 8 FD52 00 E123 U 9455501U 110 2/9/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR021M1062203907434 $56.19 000001078991-3562500480
2022 8 FD52 00 E123 U 9455501U 110 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907434 $5.57 000001078991-3562500480
2022 7 FD52 03 E111 U 9455501U 110 1/27/2022 3020 PREL ENGINEERING-UTILITIES CA-XR012M1062202106442 $1,624.40 000001078606-3562503208
2022 7 FD52 03 E121 U 9455501U 110 1/27/2022 3020 PREL ENGINEERING-UTILITIES CA-XR012M1062202106442 $113.34 000001078606-3562503208
2022 7 FD52 03 E122 U 9455501U 110 1/27/2022 3020 PREL ENGINEERING-UTILITIES CA-XR012M1062202106442 $1,364.01 000001078606-3562503208
2022 7 FD52 03 E123 U 9455501U 110 1/27/2022 3020 PREL ENGINEERING-UTILITIES CA-XR012M1062202106442 $282.52 000001078606-3562503208
2022 7 FD52 03 E124 U 9455501U 110 1/27/2022 3020 PREL ENGINEERING-UTILITIES CA-XR012M1062202106442 $0.50 000001078606-3562503208
2022 7 FD52 00 E111 U 9455501U 110 1/24/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR012M1062202106446 $274.22 000001078991-3562500480
2022 7 FD52 00 E121 U 9455501U 110 1/24/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR012M1062202106446 $19.14 000001078991-3562500480
2022 7 FD52 00 E122 U 9455501U 110 1/24/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR012M1062202106446 $230.26 000001078991-3562500480
2022 7 FD52 00 E123 U 9455501U 110 1/24/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR012M1062202106446 $61.77 000001078991-3562500480
2022 7 FD52 00 E124 U 9455501U 110 1/24/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR012M1062202106446 $0.10 000001078991-3562500480
2022 7 FD52 03 E111 U 9455501U 110 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705543 $1,210.35 000001078606-3562503208
2022 7 FD52 00 E111 U 9455501U 110 1/10/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR011M1062200705552 $423.59 000001079919-3562500480
2022 7 FD52 03 E121 U 9455501U 110 1/10/2022 3020 PREL ENGINEERING-UTILITIES CA-XR011M1062200705543 $75.55 000001078606-3562503208
2022 7 FD52 00 E111 U 9455501U 110 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705552 $255.61 000001079919-3562500480
2022 7 FD52 03 E121 U 9455501U 110 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705543 $84.45 000001078606-3562503208
2022 7 FD52 00 E121 U 9455501U 110 1/10/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR011M1062200705552 $30.51 000001079919-3562500480
2022 7 FD52 03 E122 U 9455501U 110 1/10/2022 3020 PREL ENGINEERING-UTILITIES CA-XR011M1062200705543 $909.34 000001078606-3562503208
2022 7 FD52 00 E121 U 9455501U 110 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705552 $18.30 000001079919-3562500480
2022 7 FD52 03 E122 U 9455501U 110 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705543 $1,016.33 000001078606-3562503208
2022 7 FD52 00 E122 U 9455501U 110 1/10/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR011M1062200705552 $355.70 000001079919-3562500480
2022 7 FD52 03 E123 U 9455501U 110 1/10/2022 3020 PREL ENGINEERING-UTILITIES CA-XR011M1062200705543 $190.25 000001078606-3562503208
2022 7 FD52 00 E122 U 9455501U 110 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705552 $214.63 000001079919-3562500480
2022 7 FD52 03 E123 U 9455501U 110 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705543 $208.61 000001078606-3562503208
2022 7 FD52 00 E123 U 9455501U 110 1/10/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR011M1062200705552 $70.14 000001079919-3562500480
2022 7 FD52 00 E123 U 9455501U 110 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705552 $46.00 000001079919-3562500480
2022 7 FD52 03 E111 U 9455501U 110 1/10/2022 3020 PREL ENGINEERING-UTILITIES CA-XR011M1062200705542 $1,082.93 000001078606-3562503208
2022 6 FD52 00 E111 U 9455501U 110 12/22/2021 3030 INSPECTION&SUPER-RAILROAD CA-XR122L1062135504490 $249.29 000001078991-3562500480
2022 6 FD52 00 E111 U 9455501U 110 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504490 $24.93 000001078991-3562500480
2022 6 FD52 03 E111 U 9455501U 110 12/22/2021 3020 PREL ENGINEERING-UTILITIES CA-XR122L1062135504485 $748.20 000001078606-3562503208
2022 6 FD52 00 E121 U 9455501U 110 12/22/2021 3030 INSPECTION&SUPER-RAILROAD CA-XR122L1062135504490 $17.61 000001078991-3562500480
2022 6 FD52 03 E111 U 9455501U 110 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504485 $255.57 000001078606-3562503208
2022 6 FD52 00 E121 U 9455501U 110 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504490 $1.76 000001078991-3562500480
2022 6 FD52 03 E121 U 9455501U 110 12/22/2021 3020 PREL ENGINEERING-UTILITIES CA-XR122L1062135504485 $52.29 000001078606-3562503208
2022 6 FD52 00 E122 U 9455501U 110 12/22/2021 3030 INSPECTION&SUPER-RAILROAD CA-XR122L1062135504490 $209.33 000001078991-3562500480
2022 6 FD52 03 E121 U 9455501U 110 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504485 $17.87 000001078606-3562503208
2022 6 FD52 00 E122 U 9455501U 110 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504490 $20.93 000001078991-3562500480
2022 6 FD52 03 E122 U 9455501U 110 12/22/2021 3020 PREL ENGINEERING-UTILITIES CA-XR122L1062135504485 $628.26 000001078606-3562503208
2022 6 FD52 00 E123 U 9455501U 110 12/22/2021 3030 INSPECTION&SUPER-RAILROAD CA-XR122L1062135504490 $53.49 000001078991-3562500480
2022 6 FD52 03 E122 U 9455501U 110 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504485 $214.60 000001078606-3562503208
2022 6 FD52 00 E123 U 9455501U 110 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504490 $5.30 000001078991-3562500480
2022 6 FD52 03 E123 U 9455501U 110 12/22/2021 3020 PREL ENGINEERING-UTILITIES CA-XR122L1062135504485 $127.39 000001078606-3562503208
2022 6 FD52 00 E124 U 9455501U 110 12/22/2021 3030 INSPECTION&SUPER-RAILROAD CA-XR122L1062135504490 $0.09 000001078991-3562500480
2022 6 FD52 03 E123 U 9455501U 110 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504485 $42.97 000001078606-3562503208
2022 6 FD52 00 E124 U 9455501U 110 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504490 $0.01 000001078991-3562500480
2022 6 FD52 03 E124 U 9455501U 110 12/22/2021 3020 PREL ENGINEERING-UTILITIES CA-XR122L1062135504485 $0.23 000001078606-3562503208
2022 6 FD52 03 E124 U 9455501U 110 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504485 $0.08 000001078606-3562503208
2022 6 FD52 00 E111 U 9455501U 110 12/22/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR122L1062135504499 $112.58 000001079919-3562500480
2022 6 FD52 00 E111 U 9455501U 110 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504499 $2.70 000001079919-3562500480
2022 6 FD52 00 E121 U 9455501U 110 12/22/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR122L1062135504499 $8.27 000001079919-3562500480
2022 6 FD52 00 E121 U 9455501U 110 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504499 $0.20 000001079919-3562500480
2022 6 FD52 00 E122 U 9455501U 110 12/22/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR122L1062135504499 $94.43 000001079919-3562500480
2022 6 FD52 00 E122 U 9455501U 110 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504499 $2.26 000001079919-3562500480
2022 6 FD52 00 E123 U 9455501U 110 12/22/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR122L1062135504499 $11.69 000001079919-3562500480
2022 6 FD52 00 E123 U 9455501U 110 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504499 $0.28 000001079919-3562500480
2022 6 FD52 00 E124 U 9455501U 110 12/22/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR122L1062135504499 $0.03 000001079919-3562500480
2022 6 FD52 03 E111 U 9455501U 110 12/8/2021 3020 PREL ENGINEERING-UTILITIES CA-XR121L1062134103553 $590.50 000001078606-3562503208
2022 6 FD52 03 E111 U 9455501U 110 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103553 $221.70 000001078606-3562503208
2022 6 FD52 03 E121 U 9455501U 110 12/8/2021 3020 PREL ENGINEERING-UTILITIES CA-XR121L1062134103553 $41.29 000001078606-3562503208
2022 6 FD52 03 E121 U 9455501U 110 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103553 $15.50 000001078606-3562503208
2022 6 FD52 03 E122 U 9455501U 110 12/8/2021 3020 PREL ENGINEERING-UTILITIES CA-XR121L1062134103553 $496.00 000001078606-3562503208
2022 6 FD52 03 E122 U 9455501U 110 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103553 $186.16 000001078606-3562503208
2022 6 FD52 03 E123 U 9455501U 110 12/8/2021 3020 PREL ENGINEERING-UTILITIES CA-XR121L1062134103553 $100.60 000001078606-3562503208
2022 6 FD52 03 E123 U 9455501U 110 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103553 $37.28 000001078606-3562503208
2022 5 FD52 03 E123 U 9455501U 110 11/23/2021 3020 PREL ENGINEERING-UTILITIES CA-XR112L1062132602518 $107.55 000001078606-3562503208
2022 5 FD52 03 E123 U 9455501U 110 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602518 $65.42 000001078606-3562503208
2022 5 FD52 03 E124 U 9455501U 110 11/23/2021 3020 PREL ENGINEERING-UTILITIES CA-XR112L1062132602518 $0.19 000001078606-3562503208
2022 5 FD52 03 E124 U 9455501U 110 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602518 $0.12 000001078606-3562503208
2022 5 FD52 03 E111 U 9455501U 110 11/23/2021 3020 PREL ENGINEERING-UTILITIES CA-XR112L1062132602518 $630.15 000001078606-3562503208
2022 5 FD52 03 E111 U 9455501U 110 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602518 $389.06 000001078606-3562503208
2022 5 FD52 03 E121 U 9455501U 110 11/23/2021 3020 PREL ENGINEERING-UTILITIES CA-XR112L1062132602518 $44.05 000001078606-3562503208
2022 5 FD52 03 E121 U 9455501U 110 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602518 $27.20 000001078606-3562503208
2022 5 FD52 03 E122 U 9455501U 110 11/23/2021 3020 PREL ENGINEERING-UTILITIES CA-XR112L1062132602518 $529.07 000001078606-3562503208
2022 5 FD52 03 E122 U 9455501U 110 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602518 $326.70 000001078606-3562503208
2022 5 FD52 03 E797 U 9455501U 110 11/10/2021 3550 RAILROAD CONTRACTS PRC-2200081935 DO2200000802 CSX TRANSPORTATION INC $1,013.57
2022 5 FD52 00 E111 U 9455501U 110 11/8/2021 3030 INSPECTION&SUPER-RAILROAD CA-XR111L1062130901517 $255.93 000001078991-3562500480
2022 5 FD52 00 E111 U 9455501U 110 11/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901517 $1.83 000001078991-3562500480
2022 5 FD52 00 E121 U 9455501U 110 11/8/2021 3030 INSPECTION&SUPER-RAILROAD CA-XR111L1062130901517 $17.62 000001078991-3562500480
2022 5 FD52 00 E121 U 9455501U 110 11/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901517 $0.12 000001078991-3562500480
2022 5 FD52 00 E122 U 9455501U 110 11/8/2021 3030 INSPECTION&SUPER-RAILROAD CA-XR111L1062130901517 $214.90 000001078991-3562500480
2022 5 FD52 00 E122 U 9455501U 110 11/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901517 $1.54 000001078991-3562500480
2022 5 FD52 00 E123 U 9455501U 110 11/8/2021 3030 INSPECTION&SUPER-RAILROAD CA-XR111L1062130901517 $54.87 000001078991-3562500480
2022 5 FD52 00 E123 U 9455501U 110 11/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901517 $0.39 000001078991-3562500480
2022 5 FD52 03 E111 U 9455501U 110 11/8/2021 3020 PREL ENGINEERING-UTILITIES CA-XR111L1062130901513 $1,624.40 000001078606-3562503208
2022 5 FD52 03 E111 U 9455501U 110 11/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901513 $180.63 000001078606-3562503208
2022 5 FD52 03 E121 U 9455501U 110 11/8/2021 3020 PREL ENGINEERING-UTILITIES CA-XR111L1062130901513 $113.55 000001078606-3562503208
2022 5 FD52 03 E121 U 9455501U 110 11/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901513 $12.62 000001078606-3562503208
2022 5 FD52 03 E122 U 9455501U 110 11/8/2021 3020 PREL ENGINEERING-UTILITIES CA-XR111L1062130901513 $1,364.01 000001078606-3562503208
2022 5 FD52 03 E122 U 9455501U 110 11/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901513 $151.67 000001078606-3562503208
2022 5 FD52 03 E123 U 9455501U 110 11/8/2021 3020 PREL ENGINEERING-UTILITIES CA-XR111L1062130901513 $275.97 000001078606-3562503208
2022 5 FD52 03 E123 U 9455501U 110 11/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901513 $30.37 000001078606-3562503208
2022 5 FD52 03 E111 U 9455501U 110 11/2/2021 3020 PREL ENGINEERING-UTILITIES JVC-2200000319 ($6,555.51) Correct funding to 80/20 split
2022 5 FD52 03 E121 U 9455501U 110 11/2/2021 3020 PREL ENGINEERING-UTILITIES JVC-2200000321 ($459.59) Correct funding to 80/20 split
2022 5 FD52 03 E122 U 9455501U 110 11/2/2021 3030 INSPECTION&SUPER-RAILROAD JVC-2200000323 ($209.33) Correct funding to 80/20 split
2022 5 FD52 03 E123 U 9455501U 110 11/2/2021 3040 INSPECTION&SUPER-UTILITIES JVC-2200000324 ($113.02) Correct funding to 80/20 split
2022 5 FD52 00 E111 U 9455501U 110 11/2/2021 3030 INSPECTION&SUPER-RAILROAD JVC-2200000319 $49.86 Correct funding to 80/20 split
2022 5 FD52 00 E122 U 9455501U 110 11/2/2021 3040 INSPECTION&SUPER-UTILITIES JVC-2200000323 $135.16 Correct funding to 80/20 split
2022 5 FD52 00 E124 U 9455501U 110 11/2/2021 3020 PREL ENGINEERING-UTILITIES JVC-2200000324 $0.25 Correct funding to 80/20 split
2022 5 FD52 03 E121 U 9455501U 110 11/2/2021 3030 INSPECTION&SUPER-RAILROAD JVC-2200000321 $3.53 Correct funding to 80/20 split
2022 5 FD52 00 E111 U 9455501U 110 11/2/2021 3040 INSPECTION&SUPER-UTILITIES JVC-2200000319 ($805.28) Correct funding to 80/20 split
2022 5 FD52 00 E123 U 9455501U 110 11/2/2021 3020 PREL ENGINEERING-UTILITIES JVC-2200000323 ($1,134.94) Correct funding to 80/20 split
2022 5 FD52 00 E124 U 9455501U 110 11/2/2021 3030 INSPECTION&SUPER-RAILROAD JVC-2200000324 ($0.09) Correct funding to 80/20 split
2022 5 FD52 03 E121 U 9455501U 110 11/2/2021 3040 INSPECTION&SUPER-UTILITIES JVC-2200000321 ($58.05) Correct funding to 80/20 split
2022 5 FD52 00 E111 U 9455501U 110 11/2/2021 3040 INSPECTION&SUPER-UTILITIES JVC-2200000319 $644.22 Correct funding to 80/20 split
2022 5 FD52 00 E123 U 9455501U 110 11/2/2021 3020 PREL ENGINEERING-UTILITIES JVC-2200000323 $907.95 Correct funding to 80/20 split
2022 5 FD52 00 E124 U 9455501U 110 11/2/2021 3030 INSPECTION&SUPER-RAILROAD JVC-2200000324 $0.07 Correct funding to 80/20 split
2022 5 FD52 03 E121 U 9455501U 110 11/2/2021 3040 INSPECTION&SUPER-UTILITIES JVC-2200000321 $46.44 Correct funding to 80/20 split
2022 5 FD52 00 E111 U 9455501U 110 11/2/2021 3040 INSPECTION&SUPER-UTILITIES JVC-2200000319 $161.06 Correct funding to 80/20 split
2022 5 FD52 00 E123 U 9455501U 110 11/2/2021 3020 PREL ENGINEERING-UTILITIES JVC-2200000323 $226.99 Correct funding to 80/20 split
2022 5 FD52 00 E124 U 9455501U 110 11/2/2021 3030 INSPECTION&SUPER-RAILROAD JVC-2200000324 $0.02 Correct funding to 80/20 split
2022 5 FD52 03 E121 U 9455501U 110 11/2/2021 3040 INSPECTION&SUPER-UTILITIES JVC-2200000321 $11.61 Correct funding to 80/20 split
2022 5 FD52 00 E123 U 9455501U 110 11/2/2021 3030 INSPECTION&SUPER-RAILROAD JVC-2200000323 ($53.49) Correct funding to 80/20 split
2022 5 FD52 00 E124 U 9455501U 110 11/2/2021 3040 INSPECTION&SUPER-UTILITIES JVC-2200000324 ($0.19) Correct funding to 80/20 split
2022 5 FD52 03 E122 U 9455501U 110 11/2/2021 3020 PREL ENGINEERING-UTILITIES JVC-2200000321 ($5,506.18) Correct funding to 80/20 split
2022 5 FD52 00 E123 U 9455501U 110 11/2/2021 3030 INSPECTION&SUPER-RAILROAD JVC-2200000323 $42.79 Correct funding to 80/20 split
2022 5 FD52 00 E124 U 9455501U 110 11/2/2021 3040 INSPECTION&SUPER-UTILITIES JVC-2200000324 $0.15 Correct funding to 80/20 split
2022 5 FD52 03 E122 U 9455501U 110 11/2/2021 3020 PREL ENGINEERING-UTILITIES JVC-2200000321 $4,404.94 Correct funding to 80/20 split
2022 5 FD52 00 E123 U 9455501U 110 11/2/2021 3030 INSPECTION&SUPER-RAILROAD JVC-2200000323 $10.70 Correct funding to 80/20 split
2022 5 FD52 00 E124 U 9455501U 110 11/2/2021 3040 INSPECTION&SUPER-UTILITIES JVC-2200000324 $0.04 Correct funding to 80/20 split
2022 5 FD52 03 E122 U 9455501U 110 11/2/2021 3020 PREL ENGINEERING-UTILITIES JVC-2200000321 $1,101.24 Correct funding to 80/20 split
2022 5 FD52 03 E111 U 9455501U 110 11/2/2021 3020 PREL ENGINEERING-UTILITIES JVC-2200000319 $5,244.40 Correct funding to 80/20 split
2022 5 FD52 03 E121 U 9455501U 110 11/2/2021 3020 PREL ENGINEERING-UTILITIES JVC-2200000321 $367.67 Correct funding to 80/20 split
2022 5 FD52 03 E122 U 9455501U 110 11/2/2021 3030 INSPECTION&SUPER-RAILROAD JVC-2200000323 $167.46 Correct funding to 80/20 split
2022 5 FD52 03 E123 U 9455501U 110 11/2/2021 3040 INSPECTION&SUPER-UTILITIES JVC-2200000324 $90.41 Correct funding to 80/20 split
2022 5 FD52 03 E111 U 9455501U 110 11/2/2021 3020 PREL ENGINEERING-UTILITIES JVC-2200000319 $1,311.11 Correct funding to 80/20 split
2022 5 FD52 03 E121 U 9455501U 110 11/2/2021 3020 PREL ENGINEERING-UTILITIES JVC-2200000321 $91.92 Correct funding to 80/20 split
2022 5 FD52 03 E122 U 9455501U 110 11/2/2021 3030 INSPECTION&SUPER-RAILROAD JVC-2200000323 $41.87 Correct funding to 80/20 split
2022 5 FD52 03 E123 U 9455501U 110 11/2/2021 3040 INSPECTION&SUPER-UTILITIES JVC-2200000324 $22.61 Correct funding to 80/20 split
2022 5 FD52 00 E111 U 9455501U 110 11/2/2021 3030 INSPECTION&SUPER-RAILROAD JVC-2200000319 ($249.29) Correct funding to 80/20 split
2022 5 FD52 00 E122 U 9455501U 110 11/2/2021 3040 INSPECTION&SUPER-UTILITIES JVC-2200000323 ($675.76) Correct funding to 80/20 split
2022 5 FD52 00 E124 U 9455501U 110 11/2/2021 3020 PREL ENGINEERING-UTILITIES JVC-2200000324 ($1.22) Correct funding to 80/20 split
2022 5 FD52 03 E121 U 9455501U 110 11/2/2021 3030 INSPECTION&SUPER-RAILROAD JVC-2200000321 ($17.61) Correct funding to 80/20 split
2022 5 FD52 00 E111 U 9455501U 110 11/2/2021 3030 INSPECTION&SUPER-RAILROAD JVC-2200000319 $199.43 Correct funding to 80/20 split
2022 5 FD52 00 E122 U 9455501U 110 11/2/2021 3040 INSPECTION&SUPER-UTILITIES JVC-2200000323 $540.60 Correct funding to 80/20 split
2022 5 FD52 00 E124 U 9455501U 110 11/2/2021 3020 PREL ENGINEERING-UTILITIES JVC-2200000324 $0.97 Correct funding to 80/20 split
2022 5 FD52 03 E121 U 9455501U 110 11/2/2021 3030 INSPECTION&SUPER-RAILROAD JVC-2200000321 $14.08 Correct funding to 80/20 split
2022 4 FD52 00 E111 U 9455501U 110 10/29/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR102L1062129500426 $423.00 000001079919-3562500480
2022 4 FD52 00 E111 U 9455501U 110 10/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500426 $25.60 000001079919-3562500480
2022 4 FD52 00 E121 U 9455501U 110 10/29/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR102L1062129500426 $30.44 000001079919-3562500480
2022 4 FD52 00 E121 U 9455501U 110 10/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500426 $1.87 000001079919-3562500480
2022 4 FD52 00 E122 U 9455501U 110 10/29/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR102L1062129500426 $355.10 000001079919-3562500480
2022 4 FD52 00 E122 U 9455501U 110 10/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500426 $21.49 000001079919-3562500480
2022 4 FD52 00 E123 U 9455501U 110 10/29/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR102L1062129500426 $73.28 000001079919-3562500480
2022 4 FD52 00 E123 U 9455501U 110 10/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500426 $3.09 000001079919-3562500480
2022 4 FD52 00 E124 U 9455501U 110 10/29/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR102L1062129500426 $0.14 000001079919-3562500480
2022 4 FD52 00 E124 U 9455501U 110 10/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500426 $0.01 000001079919-3562500480
2022 4 FD52 03 E111 U 9455501U 110 10/25/2021 3020 PREL ENGINEERING-UTILITIES CA-XR102L1062129500410 $1,614.54 000001078606-3562503208
2022 4 FD52 03 E111 U 9455501U 110 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500410 $261.48 000001078606-3562503208
2022 4 FD52 03 E121 U 9455501U 110 10/25/2021 3020 PREL ENGINEERING-UTILITIES CA-XR102L1062129500410 $112.85 000001078606-3562503208
2022 4 FD52 03 E121 U 9455501U 110 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500410 $18.28 000001078606-3562503208
2022 4 FD52 03 E122 U 9455501U 110 10/25/2021 3020 PREL ENGINEERING-UTILITIES CA-XR102L1062129500410 $1,355.74 000001078606-3562503208
2022 4 FD52 03 E122 U 9455501U 110 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500410 $219.57 000001078606-3562503208
2022 4 FD52 03 E123 U 9455501U 110 10/25/2021 3020 PREL ENGINEERING-UTILITIES CA-XR102L1062129500410 $274.44 000001078606-3562503208
2022 4 FD52 03 E123 U 9455501U 110 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500410 $43.97 000001078606-3562503208
2022 4 FD52 03 E124 U 9455501U 110 10/25/2021 3020 PREL ENGINEERING-UTILITIES CA-XR102L1062129500410 $0.50 000001078606-3562503208
2022 4 FD52 03 E124 U 9455501U 110 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500410 $0.08 000001078606-3562503208
2022 4 FD52 00 E111 U 9455501U 110 10/14/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR101L1062128110150 $202.40 000001079919-3562500480
2022 4 FD52 00 E111 U 9455501U 110 10/14/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110150 $13.04 000001079919-3562500480
2022 4 FD52 00 E121 U 9455501U 110 10/14/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR101L1062128110150 $14.39 000001079919-3562500480
2022 4 FD52 00 E121 U 9455501U 110 10/14/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110150 $0.93 000001079919-3562500480
2022 4 FD52 00 E122 U 9455501U 110 10/14/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR101L1062128110150 $169.57 000001079919-3562500480
2022 4 FD52 00 E122 U 9455501U 110 10/14/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110150 $10.95 000001079919-3562500480
2022 4 FD52 00 E123 U 9455501U 110 10/14/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR101L1062128110150 $21.00 000001079919-3562500480
2022 4 FD52 00 E123 U 9455501U 110 10/14/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110150 $1.34 000001079919-3562500480
2022 4 FD52 03 E111 U 9455501U 110 10/11/2021 3020 PREL ENGINEERING-UTILITIES CA-XR101L1062128110127 $1,623.91 000001078606-3562503208
2022 4 FD52 03 E111 U 9455501U 110 10/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110127 $169.72 000001078606-3562503208
2022 4 FD52 03 E121 U 9455501U 110 10/11/2021 3020 PREL ENGINEERING-UTILITIES CA-XR101L1062128110127 $114.20 000001078606-3562503208
2022 4 FD52 03 E121 U 9455501U 110 10/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110127 $11.87 000001078606-3562503208
2022 4 FD52 03 E122 U 9455501U 110 10/11/2021 3020 PREL ENGINEERING-UTILITIES CA-XR101L1062128110127 $1,363.60 000001078606-3562503208
2022 4 FD52 03 E122 U 9455501U 110 10/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110127 $142.51 000001078606-3562503208
2022 4 FD52 03 E123 U 9455501U 110 10/11/2021 3020 PREL ENGINEERING-UTILITIES CA-XR101L1062128110127 $285.95 000001078606-3562503208
2022 4 FD52 03 E123 U 9455501U 110 10/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110127 $28.54 000001078606-3562503208
2022 3 FD52 03 E111 U 9455501U 110 9/30/2021 3020 PREL ENGINEERING-UTILITIES CA-XR092L1062126709045 $1,122.15 000001078606-3562503208
2022 3 FD52 03 E111 U 9455501U 110 9/30/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709045 $172.87 000001078606-3562503208
2022 3 FD52 03 E121 U 9455501U 110 9/30/2021 3020 PREL ENGINEERING-UTILITIES CA-XR092L1062126709045 $78.46 000001078606-3562503208
2022 3 FD52 03 E121 U 9455501U 110 9/30/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709045 $12.08 000001078606-3562503208
2022 3 FD52 03 E122 U 9455501U 110 9/30/2021 3020 PREL ENGINEERING-UTILITIES CA-XR092L1062126709045 $942.40 000001078606-3562503208
2022 3 FD52 03 E122 U 9455501U 110 9/30/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709045 $145.16 000001078606-3562503208
2022 3 FD52 03 E123 U 9455501U 110 9/30/2021 3020 PREL ENGINEERING-UTILITIES CA-XR092L1062126709045 $190.75 000001078606-3562503208
2022 3 FD52 03 E123 U 9455501U 110 9/30/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709045 $29.07 000001078606-3562503208
2022 3 FD52 03 E124 U 9455501U 110 9/30/2021 3020 PREL ENGINEERING-UTILITIES CA-XR092L1062126709045 $0.35 000001078606-3562503208
2022 3 FD52 03 E124 U 9455501U 110 9/30/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709045 $0.06 000001078606-3562503208
2022 3 FD52 03 E111 U 9455501U 110 9/13/2021 3020 PREL ENGINEERING-UTILITIES CA-XR091L1062125207988 $541.46 000001078606-3562503208
2022 3 FD52 03 E121 U 9455501U 110 9/13/2021 3020 PREL ENGINEERING-UTILITIES CA-XR091L1062125207988 $37.84 000001078606-3562503208
2022 3 FD52 03 E122 U 9455501U 110 9/13/2021 3020 PREL ENGINEERING-UTILITIES CA-XR091L1062125207988 $454.68 000001078606-3562503208
2022 3 FD52 03 E123 U 9455501U 110 9/13/2021 3020 PREL ENGINEERING-UTILITIES CA-XR091L1062125207988 $91.91 000001078606-3562503208
2022 2 FD52 03 E111 U 9455501U 110 8/25/2021 3020 PREL ENGINEERING-UTILITIES CA-XR082L1062123606980 $324.88 000001078606-3562503208
2022 2 FD52 03 E121 U 9455501U 110 8/25/2021 3020 PREL ENGINEERING-UTILITIES CA-XR082L1062123606980 $22.70 000001078606-3562503208
2022 2 FD52 03 E122 U 9455501U 110 8/25/2021 3020 PREL ENGINEERING-UTILITIES CA-XR082L1062123606980 $272.80 000001078606-3562503208
2022 2 FD52 03 E123 U 9455501U 110 8/25/2021 3020 PREL ENGINEERING-UTILITIES CA-XR082L1062123606980 $55.14 000001078606-3562503208
2022 2 FD52 03 E124 U 9455501U 110 8/25/2021 3020 PREL ENGINEERING-UTILITIES CA-XR082L1062123606980 $0.10 000001078606-3562503208
2022 2 FD52 03 E111 U 9455501U 110 8/9/2021 3020 PREL ENGINEERING-UTILITIES CA-XR081L1062121805836 $147.19 000001078606-3562503208
2022 2 FD52 03 E111 U 9455501U 110 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805836 $4.12 000001078606-3562503208
2022 2 FD52 03 E121 U 9455501U 110 8/9/2021 3020 PREL ENGINEERING-UTILITIES CA-XR081L1062121805836 $10.97 000001078606-3562503208
2022 2 FD52 03 E121 U 9455501U 110 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805836 $0.31 000001078606-3562503208
2022 2 FD52 03 E122 U 9455501U 110 8/9/2021 3020 PREL ENGINEERING-UTILITIES CA-XR081L1062121805836 $123.59 000001078606-3562503208
2022 2 FD52 03 E122 U 9455501U 110 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805836 $3.46 000001078606-3562503208
2022 2 FD52 03 E123 U 9455501U 110 8/9/2021 3020 PREL ENGINEERING-UTILITIES CA-XR081L1062121805836 $35.06 000001078606-3562503208
2022 2 FD52 03 E123 U 9455501U 110 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805836 $0.97 000001078606-3562503208
2022 1 FD52 00 E111 U 9455501U 110 7/29/2021 3030 INSPECTION&SUPER-RAILROAD CA-XR072L1062120404730 $249.29 000001078991-3562500480
2022 1 FD52 00 E111 U 9455501U 110 7/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404730 $24.93 000001078991-3562500480
2022 1 FD52 00 E121 U 9455501U 110 7/29/2021 3030 INSPECTION&SUPER-RAILROAD CA-XR072L1062120404730 $17.61 000001078991-3562500480
2022 1 FD52 00 E121 U 9455501U 110 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404731 $1.76 000001078991-3562500480
2022 1 FD52 03 E122 U 9455501U 110 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404713 $620.00 000001078606-3562503208
2022 1 FD52 00 E122 U 9455501U 110 7/26/2021 3030 INSPECTION&SUPER-RAILROAD CA-XR072L1062120404731 $209.33 000001078991-3562500480
2022 1 FD52 03 E123 U 9455501U 110 7/26/2021 3020 PREL ENGINEERING-UTILITIES CA-XR072L1062120404713 $151.54 000001078606-3562503208
2022 1 FD52 00 E122 U 9455501U 110 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404731 $20.93 000001078991-3562500480
2022 1 FD52 03 E123 U 9455501U 110 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404713 $124.15 000001078606-3562503208
2022 1 FD52 00 E123 U 9455501U 110 7/26/2021 3030 INSPECTION&SUPER-RAILROAD CA-XR072L1062120404731 $53.49 000001078991-3562500480
2022 1 FD52 03 E124 U 9455501U 110 7/26/2021 3020 PREL ENGINEERING-UTILITIES CA-XR072L1062120404713 $0.27 000001078606-3562503208
2022 1 FD52 00 E123 U 9455501U 110 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404731 $5.30 000001078991-3562500480
2022 1 FD52 03 E124 U 9455501U 110 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404713 $0.23 000001078606-3562503208
2022 1 FD52 00 E124 U 9455501U 110 7/26/2021 3030 INSPECTION&SUPER-RAILROAD CA-XR072L1062120404731 $0.09 000001078991-3562500480
2022 1 FD52 00 E124 U 9455501U 110 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404731 $0.01 000001078991-3562500480
2022 1 FD52 00 E111 U 9455501U 110 7/26/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR072L1062120404731 $179.88 000001079003-3562500480
2022 1 FD52 00 E111 U 9455501U 110 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404731 $39.13 000001079003-3562500480
2022 1 FD52 00 E121 U 9455501U 110 7/26/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR072L1062120404731 $13.22 000001079003-3562500480
2022 1 FD52 00 E121 U 9455501U 110 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404731 $2.88 000001079003-3562500480
2022 1 FD52 00 E122 U 9455501U 110 7/26/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR072L1062120404731 $151.09 000001079003-3562500480
2022 1 FD52 00 E122 U 9455501U 110 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404731 $32.86 000001079003-3562500480
2022 1 FD52 00 E123 U 9455501U 110 7/26/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR072L1062120404731 $18.74 000001079003-3562500480
2022 1 FD52 00 E123 U 9455501U 110 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404731 $4.01 000001079003-3562500480
2022 1 FD52 03 E111 U 9455501U 110 7/26/2021 3020 PREL ENGINEERING-UTILITIES CA-XR072L1062120404712 $886.04 000001078606-3562503208
2022 1 FD52 00 E124 U 9455501U 110 7/26/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR072L1062120404731 $0.05 000001079003-3562500480
2022 1 FD52 03 E111 U 9455501U 110 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404712 $738.35 000001078606-3562503208
2022 1 FD52 00 E124 U 9455501U 110 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404731 $0.02 000001079003-3562500480
2022 1 FD52 03 E121 U 9455501U 110 7/26/2021 3020 PREL ENGINEERING-UTILITIES CA-XR072L1062120404712 $61.93 000001078606-3562503208
2022 1 FD52 03 E121 U 9455501U 110 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404712 $51.60 000001078606-3562503208
2022 1 FD52 03 E122 U 9455501U 110 7/26/2021 3020 PREL ENGINEERING-UTILITIES CA-XR072L1062120404712 $744.00 000001078606-3562503208
2022 1 FD52 03 E111 U 9455501U 110 7/12/2021 3020 PREL ENGINEERING-UTILITIES CA-XR071L1062119003576 $295.34 000001078606-3562503208
2022 1 FD52 03 E111 U 9455501U 110 7/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003576 $16.93 000001078606-3562503208
2022 1 FD52 03 E121 U 9455501U 110 7/12/2021 3020 PREL ENGINEERING-UTILITIES CA-XR071L1062119003576 $20.64 000001078606-3562503208
2022 1 FD52 03 E121 U 9455501U 110 7/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003576 $1.18 000001078606-3562503208
2022 1 FD52 03 E122 U 9455501U 110 7/12/2021 3020 PREL ENGINEERING-UTILITIES CA-XR071L1062119003576 $249.37 000001078606-3562503208
2022 1 FD52 03 E122 U 9455501U 110 7/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003576 $14.29 000001078606-3562503208
2022 1 FD52 03 E123 U 9455501U 110 7/12/2021 3020 PREL ENGINEERING-UTILITIES CA-XR071L1062119003576 $50.15 000001078606-3562503208
2022 1 FD52 03 E123 U 9455501U 110 7/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003576 $2.85 000001078606-3562503208