2023 |
7 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
1/24/2023 |
0093 |
ENV STUDIES-PERMITTING MITIGA |
CA-XR012N1062302300452 |
|
|
$284.12 |
000001086084-3562500061 |
2023 |
7 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
1/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012N1062302300452 |
|
|
$71.26 |
000001086084-3562500061 |
2023 |
7 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
1/24/2023 |
0093 |
ENV STUDIES-PERMITTING MITIGA |
CA-XR012N1062302300452 |
|
|
$21.44 |
000001086084-3562500061 |
2023 |
7 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
1/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012N1062302300452 |
|
|
$5.38 |
000001086084-3562500061 |
2023 |
7 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
1/24/2023 |
0093 |
ENV STUDIES-PERMITTING MITIGA |
CA-XR012N1062302300452 |
|
|
$221.76 |
000001086084-3562500061 |
2023 |
7 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
1/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012N1062302300452 |
|
|
$55.58 |
000001086084-3562500061 |
2023 |
7 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
1/24/2023 |
0093 |
ENV STUDIES-PERMITTING MITIGA |
CA-XR012N1062302300452 |
|
|
$38.62 |
000001086084-3562500061 |
2023 |
7 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
1/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012N1062302300452 |
|
|
$9.52 |
000001086084-3562500061 |
2023 |
7 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
1/24/2023 |
0093 |
ENV STUDIES-PERMITTING MITIGA |
CA-XR012N1062302300452 |
|
|
$0.10 |
000001086084-3562500061 |
2023 |
7 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
1/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012N1062302300452 |
|
|
$0.02 |
000001086084-3562500061 |
2023 |
4 |
FD04 |
03 |
E143 |
D |
9455501D |
110 |
10/31/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300078067 |
PON22000000520 |
HMB Engineers Inc |
$15,599.35 |
Todd County 3-80001 2019-04-2 |
2023 |
2 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
8/24/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR082M1062223500403 |
|
|
$0.18 |
000001068576-3562500061 |
2023 |
2 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
8/24/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR082M1062223500402 |
|
|
$409.09 |
000001068576-3562500061 |
2023 |
2 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
8/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500402 |
|
|
$4.91 |
000001068576-3562500061 |
2023 |
2 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
8/24/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR082M1062223500402 |
|
|
$28.53 |
000001068576-3562500061 |
2023 |
2 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
8/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500402 |
|
|
$0.34 |
000001068576-3562500061 |
2023 |
2 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
8/24/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR082M1062223500402 |
|
|
$319.09 |
000001068576-3562500061 |
2023 |
2 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
8/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500402 |
|
|
$3.83 |
000001068576-3562500061 |
2023 |
2 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
8/24/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR082M1062223500402 |
|
|
$112.30 |
000001068576-3562500061 |
2023 |
2 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
8/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500402 |
|
|
$1.34 |
000001068576-3562500061 |
2023 |
2 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
8/10/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR081M1062222110125 |
|
|
$94.51 |
000001082398-3562500636 |
2023 |
2 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
8/10/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR081M1062222110125 |
|
|
$6.56 |
000001082398-3562500636 |
2023 |
2 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
8/10/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR081M1062222110125 |
|
|
$73.72 |
000001082398-3562500636 |
2023 |
2 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
8/10/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR081M1062222110125 |
|
|
$16.47 |
000001082398-3562500636 |
2023 |
2 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
8/10/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR081M1062222110093 |
|
|
$2,025.01 |
000001068576-3562500061 |
2023 |
2 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
8/10/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR081M1062222110093 |
|
|
$141.18 |
000001068576-3562500061 |
2023 |
2 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
8/10/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR081M1062222110093 |
|
|
$1,579.51 |
000001068576-3562500061 |
2023 |
2 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
8/10/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR081M1062222110093 |
|
|
$555.85 |
000001068576-3562500061 |
2023 |
1 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308959 |
|
|
$48.99 |
000001065829-3562500632 |
2023 |
1 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
7/25/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR072M1062220309001 |
|
|
$67.01 |
000001082398-3562500636 |
2023 |
1 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220309001 |
|
|
$145.74 |
000001082398-3562500636 |
2023 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/25/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR072M1062220309001 |
|
|
$15.24 |
000001082398-3562500636 |
2023 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220309001 |
|
|
$32.30 |
000001082398-3562500636 |
2023 |
1 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
7/25/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR072M1062220309001 |
|
|
$0.02 |
000001082398-3562500636 |
2023 |
1 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220309001 |
|
|
$0.05 |
000001082398-3562500636 |
2023 |
1 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
7/25/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR072M1062220308959 |
|
|
$37.48 |
000001065829-3562500632 |
2023 |
1 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308959 |
|
|
$3.75 |
000001065829-3562500632 |
2023 |
1 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
7/25/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR072M1062220309001 |
|
|
$85.83 |
000001082398-3562500636 |
2023 |
1 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220309001 |
|
|
$186.86 |
000001082398-3562500636 |
2023 |
1 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
7/25/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR072M1062220309001 |
|
|
$5.99 |
000001082398-3562500636 |
2023 |
1 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220309001 |
|
|
$13.03 |
000001082398-3562500636 |
2023 |
1 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
7/25/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR072M1062220308958 |
|
|
$489.90 |
000001065829-3562500632 |
2023 |
1 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
7/13/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR071M1062219207884 |
|
|
$159.16 |
000001082398-3562500636 |
2023 |
1 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
7/13/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207884 |
|
|
$60.46 |
000001082398-3562500636 |
2023 |
1 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
7/13/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR071M1062219207884 |
|
|
$10.96 |
000001082398-3562500636 |
2023 |
1 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
7/13/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207884 |
|
|
$4.17 |
000001082398-3562500636 |
2023 |
1 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
7/13/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR071M1062219207884 |
|
|
$133.60 |
000001082398-3562500636 |
2023 |
1 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
7/13/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207884 |
|
|
$50.77 |
000001082398-3562500636 |
2023 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/13/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR071M1062219207884 |
|
|
$30.04 |
000001082398-3562500636 |
2023 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/13/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207884 |
|
|
$11.29 |
000001082398-3562500636 |
2023 |
1 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
7/12/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR071M1062219207850 |
|
|
$1,325.76 |
000001068576-3562500061 |
2023 |
1 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207850 |
|
|
$294.70 |
000001068576-3562500061 |
2023 |
1 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
7/12/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR071M1062219207850 |
|
|
$91.72 |
000001068576-3562500061 |
2023 |
1 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207850 |
|
|
$20.38 |
000001068576-3562500061 |
2023 |
1 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
7/12/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR071M1062219207850 |
|
|
$1,113.24 |
000001068576-3562500061 |
2023 |
1 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207850 |
|
|
$247.46 |
000001068576-3562500061 |
2023 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/12/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR071M1062219207850 |
|
|
$393.75 |
000001068576-3562500061 |
2023 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207850 |
|
|
$86.64 |
000001068576-3562500061 |
2022 |
12 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
6/27/2022 |
1060 |
RDWAY PLANS-FINAL-DRAINAGE SEC |
CA-XR062M1062217506734 |
|
|
$21.27 |
000001068804-3562500630 |
2022 |
12 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506734 |
|
|
$12.17 |
000001068804-3562500630 |
2022 |
12 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
6/27/2022 |
1060 |
RDWAY PLANS-FINAL-DRAINAGE SEC |
CA-XR062M1062217506734 |
|
|
$238.72 |
000001068804-3562500630 |
2022 |
12 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506734 |
|
|
$136.54 |
000001068804-3562500630 |
2022 |
12 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
6/27/2022 |
1060 |
RDWAY PLANS-FINAL-DRAINAGE SEC |
CA-XR062M1062217506734 |
|
|
$32.40 |
000001068804-3562500630 |
2022 |
12 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
6/27/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR062M1062217506733 |
|
|
$1,325.77 |
000001068576-3562500061 |
2022 |
12 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506733 |
|
|
$496.97 |
000001068576-3562500061 |
2022 |
12 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
6/27/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR062M1062217506733 |
|
|
$91.71 |
000001068576-3562500061 |
2022 |
12 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506733 |
|
|
$34.37 |
000001068576-3562500061 |
2022 |
12 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
6/27/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR062M1062217506733 |
|
|
$1,113.24 |
000001068576-3562500061 |
2022 |
12 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506733 |
|
|
$417.31 |
000001068576-3562500061 |
2022 |
12 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
6/27/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR062M1062217506733 |
|
|
$394.24 |
000001068576-3562500061 |
2022 |
12 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506733 |
|
|
$146.12 |
000001068576-3562500061 |
2022 |
12 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506734 |
|
|
$18.12 |
000001068804-3562500630 |
2022 |
12 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
6/27/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR062M1062217506733 |
|
|
$0.64 |
000001068576-3562500061 |
2022 |
12 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506733 |
|
|
$0.24 |
000001068576-3562500061 |
2022 |
12 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
6/27/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR062M1062217506777 |
|
|
$377.90 |
000001082398-3562500636 |
2022 |
12 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506777 |
|
|
$131.26 |
000001082398-3562500636 |
2022 |
12 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
6/27/2022 |
1060 |
RDWAY PLANS-FINAL-DRAINAGE SEC |
CA-XR062M1062217506734 |
|
|
$0.09 |
000001068804-3562500630 |
2022 |
12 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
6/27/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR062M1062217506777 |
|
|
$26.14 |
000001082398-3562500636 |
2022 |
12 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506777 |
|
|
$9.08 |
000001082398-3562500636 |
2022 |
12 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
6/27/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR062M1062217506777 |
|
|
$317.30 |
000001082398-3562500636 |
2022 |
12 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506777 |
|
|
$110.21 |
000001082398-3562500636 |
2022 |
12 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
6/27/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR062M1062217506777 |
|
|
$71.32 |
000001082398-3562500636 |
2022 |
12 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506777 |
|
|
$24.50 |
000001082398-3562500636 |
2022 |
12 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
6/27/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR062M1062217506777 |
|
|
$0.12 |
000001082398-3562500636 |
2022 |
12 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506777 |
|
|
$0.04 |
000001082398-3562500636 |
2022 |
12 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506734 |
|
|
$0.05 |
000001068804-3562500630 |
2022 |
12 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
6/27/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR062M1062217506733 |
|
|
$1,550.78 |
000001068747-3562503204 |
2022 |
12 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506733 |
|
|
$344.62 |
000001068747-3562503204 |
2022 |
12 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
6/27/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR062M1062217506733 |
|
|
$106.78 |
000001068747-3562503204 |
2022 |
12 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506733 |
|
|
$23.73 |
000001068747-3562503204 |
2022 |
12 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
6/27/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR062M1062217506733 |
|
|
$1,302.19 |
000001068747-3562503204 |
2022 |
12 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506733 |
|
|
$289.38 |
000001068747-3562503204 |
2022 |
12 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
6/27/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR062M1062217506733 |
|
|
$307.21 |
000001068747-3562503204 |
2022 |
12 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506733 |
|
|
$67.51 |
000001068747-3562503204 |
2022 |
12 |
FD04 |
03 |
E124 |
D |
9455501D |
110 |
6/27/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR062M1062217506733 |
|
|
$0.55 |
000001068747-3562503204 |
2022 |
12 |
FD04 |
03 |
E124 |
D |
9455501D |
110 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506733 |
|
|
$0.12 |
000001068747-3562503204 |
2022 |
12 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
6/27/2022 |
1060 |
RDWAY PLANS-FINAL-DRAINAGE SEC |
CA-XR062M1062217506733 |
|
|
$284.33 |
000001068804-3562500630 |
2022 |
12 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506733 |
|
|
$162.61 |
000001068804-3562500630 |
2022 |
12 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
6/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905691 |
|
|
$18.41 |
000001068576-3562500061 |
2022 |
12 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
6/9/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR061M1062215905691 |
|
|
$1,525.85 |
000001068576-3562500061 |
2022 |
12 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
6/9/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR061M1062215905691 |
|
|
$2,361.36 |
000001068747-3562503204 |
2022 |
12 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
6/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905691 |
|
|
$481.74 |
000001068747-3562503204 |
2022 |
12 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
6/9/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR061M1062215905691 |
|
|
$162.58 |
000001068747-3562503204 |
2022 |
12 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
6/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905691 |
|
|
$33.17 |
000001068747-3562503204 |
2022 |
12 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
6/9/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR061M1062215905691 |
|
|
$1,982.84 |
000001068747-3562503204 |
2022 |
12 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
6/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905691 |
|
|
$404.51 |
000001068747-3562503204 |
2022 |
12 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
6/9/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR061M1062215905691 |
|
|
$467.71 |
000001068747-3562503204 |
2022 |
12 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
6/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905691 |
|
|
$94.37 |
000001068747-3562503204 |
2022 |
12 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
6/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905691 |
|
|
$223.53 |
000001068576-3562500061 |
2022 |
12 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
6/9/2022 |
1060 |
RDWAY PLANS-FINAL-DRAINAGE SEC |
CA-XR061M1062215905691 |
|
|
$191.10 |
000001068804-3562500630 |
2022 |
12 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
6/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905691 |
|
|
$17.37 |
000001068804-3562500630 |
2022 |
12 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
6/9/2022 |
1060 |
RDWAY PLANS-FINAL-DRAINAGE SEC |
CA-XR061M1062215905691 |
|
|
$14.09 |
000001068804-3562500630 |
2022 |
12 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
6/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905691 |
|
|
$1.28 |
000001068804-3562500630 |
2022 |
12 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
6/9/2022 |
1060 |
RDWAY PLANS-FINAL-DRAINAGE SEC |
CA-XR061M1062215905691 |
|
|
$160.46 |
000001068804-3562500630 |
2022 |
12 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
6/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905691 |
|
|
$14.59 |
000001068804-3562500630 |
2022 |
12 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
6/9/2022 |
1060 |
RDWAY PLANS-FINAL-DRAINAGE SEC |
CA-XR061M1062215905691 |
|
|
$21.64 |
000001068804-3562500630 |
2022 |
12 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
6/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905691 |
|
|
$1.94 |
000001068804-3562500630 |
2022 |
12 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
6/9/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR061M1062215905691 |
|
|
$539.35 |
000001068576-3562500061 |
2022 |
12 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
6/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905691 |
|
|
$78.26 |
000001068576-3562500061 |
2022 |
12 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
6/9/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR061M1062215905733 |
|
|
$200.53 |
000001082398-3562500636 |
2022 |
12 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
6/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905733 |
|
|
$71.84 |
000001082398-3562500636 |
2022 |
12 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
6/9/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR061M1062215905733 |
|
|
$13.82 |
000001082398-3562500636 |
2022 |
12 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
6/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905733 |
|
|
$4.96 |
000001082398-3562500636 |
2022 |
12 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
6/9/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR061M1062215905733 |
|
|
$168.39 |
000001082398-3562500636 |
2022 |
12 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
6/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905733 |
|
|
$60.33 |
000001082398-3562500636 |
2022 |
12 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
6/9/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR061M1062215905733 |
|
|
$37.85 |
000001082398-3562500636 |
2022 |
12 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
6/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905733 |
|
|
$13.41 |
000001082398-3562500636 |
2022 |
12 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
6/9/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR061M1062215905690 |
|
|
$1,817.14 |
000001068576-3562500061 |
2022 |
12 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
6/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905690 |
|
|
$266.20 |
000001068576-3562500061 |
2022 |
12 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
6/9/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR061M1062215905690 |
|
|
$125.71 |
000001068576-3562500061 |
2022 |
11 |
FD04 |
00 |
E229 |
D |
9455501D |
110 |
5/26/2022 |
0092 |
ENV STUDIES-PERMITTING |
IET-XE13A162522145016020 |
|
|
$287.70 |
|
2022 |
11 |
FD04 |
03 |
E143 |
D |
9455501D |
110 |
5/26/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200215594 |
PON22000000520 |
HMB Engineers Inc |
$17,599.35 |
Todd County 3-80001 2019-04-2 |
2022 |
11 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
5/25/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR052M1062214004686 |
|
|
$109.41 |
000001082398-3562500636 |
2022 |
11 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
5/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004686 |
|
|
$15.75 |
000001082398-3562500636 |
2022 |
11 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
5/25/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR052M1062214004686 |
|
|
$7.56 |
000001082398-3562500636 |
2022 |
11 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
5/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004686 |
|
|
$1.10 |
000001082398-3562500636 |
2022 |
11 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
5/25/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR052M1062214004686 |
|
|
$91.85 |
000001082398-3562500636 |
2022 |
11 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
5/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004686 |
|
|
$13.23 |
000001082398-3562500636 |
2022 |
11 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
5/25/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR052M1062214004686 |
|
|
$20.61 |
000001082398-3562500636 |
2022 |
11 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
5/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004686 |
|
|
$2.93 |
000001082398-3562500636 |
2022 |
11 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
5/25/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR052M1062214004686 |
|
|
$0.03 |
000001082398-3562500636 |
2022 |
11 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004640 |
|
|
$63.77 |
000001069164-3562500610 |
2022 |
11 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
5/23/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR052M1062214004640 |
|
|
$72.25 |
000001069164-3562500610 |
2022 |
11 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004640 |
|
|
$4.69 |
000001069164-3562500610 |
2022 |
11 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
5/23/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR052M1062214004640 |
|
|
$819.42 |
000001069164-3562500610 |
2022 |
11 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004640 |
|
|
$53.55 |
000001069164-3562500610 |
2022 |
11 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
5/23/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR052M1062214004640 |
|
|
$163.41 |
000001069164-3562500610 |
2022 |
11 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
5/23/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR052M1062214004639 |
|
|
$1,041.67 |
000001068576-3562500061 |
2022 |
11 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
5/23/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR052M1062214004639 |
|
|
$72.06 |
000001068576-3562500061 |
2022 |
11 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004640 |
|
|
$10.19 |
000001069164-3562500610 |
2022 |
11 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
5/23/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR052M1062214004639 |
|
|
$874.69 |
000001068576-3562500061 |
2022 |
11 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
5/23/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR052M1062214004639 |
|
|
$308.80 |
000001068576-3562500061 |
2022 |
11 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
5/23/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR052M1062214004639 |
|
|
$0.50 |
000001068576-3562500061 |
2022 |
11 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
5/23/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR052M1062214004640 |
|
|
$0.43 |
000001069164-3562500610 |
2022 |
11 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
5/23/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR052M1062214004639 |
|
|
$2,699.57 |
000001068747-3562503204 |
2022 |
11 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004639 |
|
|
$36.48 |
000001068747-3562503204 |
2022 |
11 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004640 |
|
|
$0.03 |
000001069164-3562500610 |
2022 |
11 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
5/23/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR052M1062214004639 |
|
|
$185.06 |
000001068747-3562503204 |
2022 |
11 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004639 |
|
|
$2.50 |
000001068747-3562503204 |
2022 |
11 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
5/23/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR052M1062214004639 |
|
|
$2,266.83 |
000001068747-3562503204 |
2022 |
11 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004639 |
|
|
$30.63 |
000001068747-3562503204 |
2022 |
11 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
5/23/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR052M1062214004639 |
|
|
$554.65 |
000001068747-3562503204 |
2022 |
11 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004639 |
|
|
$7.43 |
000001068747-3562503204 |
2022 |
11 |
FD04 |
03 |
E124 |
D |
9455501D |
110 |
5/23/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR052M1062214004639 |
|
|
$0.99 |
000001068747-3562503204 |
2022 |
11 |
FD04 |
03 |
E124 |
D |
9455501D |
110 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004639 |
|
|
$0.01 |
000001068747-3562503204 |
2022 |
11 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
5/23/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR052M1062214004639 |
|
|
$975.96 |
000001069164-3562500610 |
2022 |
11 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
5/13/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603669 |
|
|
$1.30 |
000001082398-3562500636 |
2022 |
11 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
5/13/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR051M1062212603669 |
|
|
$131.30 |
000001082398-3562500636 |
2022 |
11 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
5/13/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603669 |
|
|
$7.00 |
000001082398-3562500636 |
2022 |
11 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
5/13/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR051M1062212603669 |
|
|
$9.08 |
000001082398-3562500636 |
2022 |
11 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
5/13/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603669 |
|
|
$0.50 |
000001082398-3562500636 |
2022 |
11 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
5/13/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR051M1062212603669 |
|
|
$110.22 |
000001082398-3562500636 |
2022 |
11 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
5/13/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603669 |
|
|
$5.88 |
000001082398-3562500636 |
2022 |
11 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
5/13/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR051M1062212603669 |
|
|
$24.72 |
000001082398-3562500636 |
2022 |
11 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
5/9/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR051M1062212603627 |
|
|
$1,267.70 |
000001068747-3562503204 |
2022 |
11 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
5/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603627 |
|
|
$1,468.35 |
000001068747-3562503204 |
2022 |
11 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
5/9/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR051M1062212603627 |
|
|
$86.90 |
000001068747-3562503204 |
2022 |
11 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
5/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603627 |
|
|
$100.66 |
000001068747-3562503204 |
2022 |
11 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
5/9/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR051M1062212603627 |
|
|
$1,064.49 |
000001068747-3562503204 |
2022 |
11 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
5/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603627 |
|
|
$1,232.97 |
000001068747-3562503204 |
2022 |
11 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
5/9/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR051M1062212603627 |
|
|
$263.17 |
000001068747-3562503204 |
2022 |
11 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
5/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603627 |
|
|
$298.91 |
000001068747-3562503204 |
2022 |
11 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
5/9/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR051M1062212603627 |
|
|
$1,564.48 |
000001069164-3562500610 |
2022 |
11 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
5/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603627 |
|
|
$428.48 |
000001069164-3562500610 |
2022 |
11 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
5/9/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR051M1062212603627 |
|
|
$116.87 |
000001069164-3562500610 |
2022 |
11 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
5/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603627 |
|
|
$31.77 |
000001069164-3562500610 |
2022 |
11 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
5/9/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR051M1062212603627 |
|
|
$1,313.86 |
000001069164-3562500610 |
2022 |
11 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
5/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603627 |
|
|
$359.79 |
000001069164-3562500610 |
2022 |
11 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
5/9/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR051M1062212603627 |
|
|
$305.51 |
000001069164-3562500610 |
2022 |
11 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
5/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603627 |
|
|
$85.92 |
000001069164-3562500610 |
2022 |
10 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
4/25/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR042M1062211202502 |
|
|
$2,611.68 |
000001068747-3562503204 |
2022 |
10 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202502 |
|
|
$124.37 |
000001068747-3562503204 |
2022 |
10 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
4/25/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR042M1062211202502 |
|
|
$179.03 |
000001068747-3562503204 |
2022 |
10 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202502 |
|
|
$8.53 |
000001068747-3562503204 |
2022 |
10 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
4/25/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR042M1062211202502 |
|
|
$2,193.03 |
000001068747-3562503204 |
2022 |
10 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202502 |
|
|
$104.43 |
000001068747-3562503204 |
2022 |
10 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
4/25/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR042M1062211202502 |
|
|
$536.76 |
000001068747-3562503204 |
2022 |
10 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202502 |
|
|
$25.32 |
000001068747-3562503204 |
2022 |
10 |
FD04 |
03 |
E124 |
D |
9455501D |
110 |
4/25/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR042M1062211202502 |
|
|
$0.95 |
000001068747-3562503204 |
2022 |
10 |
FD04 |
03 |
E124 |
D |
9455501D |
110 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202502 |
|
|
$0.05 |
000001068747-3562503204 |
2022 |
10 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
4/25/2022 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR042M1062211202502 |
|
|
$132.73 |
000001069105-3562500610 |
2022 |
10 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202502 |
|
|
$41.70 |
000001069105-3562500610 |
2022 |
10 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
4/25/2022 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR042M1062211202502 |
|
|
$9.56 |
000001069105-3562500610 |
2022 |
10 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202502 |
|
|
$3.01 |
000001069105-3562500610 |
2022 |
10 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
4/25/2022 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR042M1062211202502 |
|
|
$111.40 |
000001069105-3562500610 |
2022 |
10 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202502 |
|
|
$35.01 |
000001069105-3562500610 |
2022 |
10 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
4/25/2022 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR042M1062211202502 |
|
|
$23.91 |
000001069105-3562500610 |
2022 |
10 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202502 |
|
|
$7.43 |
000001069105-3562500610 |
2022 |
10 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
4/25/2022 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR042M1062211202502 |
|
|
$0.04 |
000001069105-3562500610 |
2022 |
10 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202502 |
|
|
$0.01 |
000001069105-3562500610 |
2022 |
10 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
4/25/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR042M1062211202502 |
|
|
$2,498.57 |
000001069164-3562500610 |
2022 |
10 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202502 |
|
|
$485.31 |
000001069164-3562500610 |
2022 |
10 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
4/25/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR042M1062211202502 |
|
|
$189.11 |
000001069164-3562500610 |
2022 |
10 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202502 |
|
|
$36.77 |
000001069164-3562500610 |
2022 |
10 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
4/25/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR042M1062211202502 |
|
|
$2,098.40 |
000001069164-3562500610 |
2022 |
10 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202502 |
|
|
$407.52 |
000001069164-3562500610 |
2022 |
10 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
4/25/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR042M1062211202502 |
|
|
$274.57 |
000001069164-3562500610 |
2022 |
10 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202502 |
|
|
$53.17 |
000001069164-3562500610 |
2022 |
10 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
4/25/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR042M1062211202502 |
|
|
$0.72 |
000001069164-3562500610 |
2022 |
10 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202502 |
|
|
$0.14 |
000001069164-3562500610 |
2022 |
10 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
4/25/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR042M1062211202501 |
|
|
$1,988.64 |
000001068576-3562500061 |
2022 |
10 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
4/25/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR042M1062211202563 |
|
|
$218.69 |
000001082398-3562500636 |
2022 |
10 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202501 |
|
|
$94.70 |
000001068576-3562500061 |
2022 |
10 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202563 |
|
|
$63.24 |
000001082398-3562500636 |
2022 |
10 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
4/25/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR042M1062211202501 |
|
|
$137.57 |
000001068576-3562500061 |
2022 |
10 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
4/25/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR042M1062211202563 |
|
|
$15.14 |
000001082398-3562500636 |
2022 |
10 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202501 |
|
|
$6.55 |
000001068576-3562500061 |
2022 |
10 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202563 |
|
|
$4.37 |
000001082398-3562500636 |
2022 |
10 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
4/25/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR042M1062211202501 |
|
|
$1,669.86 |
000001068576-3562500061 |
2022 |
10 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
4/25/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR042M1062211202563 |
|
|
$183.70 |
000001082398-3562500636 |
2022 |
10 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202501 |
|
|
$79.52 |
000001068576-3562500061 |
2022 |
10 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202563 |
|
|
$53.10 |
000001082398-3562500636 |
2022 |
10 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
4/25/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR042M1062211202501 |
|
|
$589.77 |
000001068576-3562500061 |
2022 |
10 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
4/25/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR042M1062211202563 |
|
|
$41.27 |
000001082398-3562500636 |
2022 |
10 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202501 |
|
|
$27.84 |
000001068576-3562500061 |
2022 |
10 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202563 |
|
|
$11.80 |
000001082398-3562500636 |
2022 |
10 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
4/25/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR042M1062211202501 |
|
|
$0.95 |
000001068576-3562500061 |
2022 |
10 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
4/25/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR042M1062211202563 |
|
|
$0.07 |
000001082398-3562500636 |
2022 |
10 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202501 |
|
|
$0.05 |
000001068576-3562500061 |
2022 |
10 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202563 |
|
|
$0.01 |
000001082398-3562500636 |
2022 |
10 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
4/11/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR041M1062209801447 |
|
|
$84.34 |
000001069164-3562500610 |
2022 |
10 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801447 |
|
|
$10.30 |
000001069164-3562500610 |
2022 |
10 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
4/11/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR041M1062209801447 |
|
|
$951.65 |
000001069164-3562500610 |
2022 |
10 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801447 |
|
|
$115.74 |
000001069164-3562500610 |
2022 |
10 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
4/11/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR041M1062209801447 |
|
|
$133.74 |
000001069164-3562500610 |
2022 |
10 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801447 |
|
|
$15.57 |
000001069164-3562500610 |
2022 |
10 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
4/11/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR041M1062209801446 |
|
|
$1,215.28 |
000001068576-3562500061 |
2022 |
10 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
4/11/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR041M1062209801446 |
|
|
$84.06 |
000001068576-3562500061 |
2022 |
10 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
4/11/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR041M1062209801446 |
|
|
$1,020.47 |
000001068576-3562500061 |
2022 |
10 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
4/11/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR041M1062209801446 |
|
|
$360.27 |
000001068576-3562500061 |
2022 |
10 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
4/11/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR041M1062209801446 |
|
|
$2,492.86 |
000001068747-3562503204 |
2022 |
10 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801446 |
|
|
$13.98 |
000001068747-3562503204 |
2022 |
10 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
4/11/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR041M1062209801446 |
|
|
$170.89 |
000001068747-3562503204 |
2022 |
10 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801446 |
|
|
$0.96 |
000001068747-3562503204 |
2022 |
10 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
4/11/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR041M1062209801446 |
|
|
$2,093.25 |
000001068747-3562503204 |
2022 |
10 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801446 |
|
|
$11.74 |
000001068747-3562503204 |
2022 |
10 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
4/11/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR041M1062209801446 |
|
|
$512.14 |
000001068747-3562503204 |
2022 |
10 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801446 |
|
|
$2.85 |
000001068747-3562503204 |
2022 |
10 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
4/11/2022 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR041M1062209801446 |
|
|
$1,302.99 |
000001069105-3562500610 |
2022 |
10 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
4/11/2022 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR041M1062209801446 |
|
|
$93.95 |
000001069105-3562500610 |
2022 |
10 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
4/11/2022 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR041M1062209801446 |
|
|
$1,094.12 |
000001069105-3562500610 |
2022 |
10 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
4/11/2022 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR041M1062209801446 |
|
|
$234.20 |
000001069105-3562500610 |
2022 |
10 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
4/11/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR041M1062209801446 |
|
|
$1,133.24 |
000001069164-3562500610 |
2022 |
10 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801446 |
|
|
$137.83 |
000001069164-3562500610 |
2022 |
9 |
FD04 |
00 |
E229 |
D |
9455501D |
110 |
3/28/2022 |
0092 |
ENV STUDIES-PERMITTING |
IET-XE13A162522084014940 |
|
|
$295.40 |
|
2022 |
9 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200416 |
|
|
$34.23 |
000001081835-3562500638 |
2022 |
9 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
3/24/2022 |
1300 |
RDWAY PLANS REVIEW & CORRECTED |
CA-XR032M1062208200416 |
|
|
$142.46 |
000001081835-3562500638 |
2022 |
9 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
3/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR032M1062208200383 |
|
|
$59.60 |
000001078527-3562500636 |
2022 |
9 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200383 |
|
|
$19.09 |
000001078527-3562500636 |
2022 |
9 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
3/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR032M1062208200383 |
|
|
$4.13 |
000001078527-3562500636 |
2022 |
9 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200383 |
|
|
$1.32 |
000001078527-3562500636 |
2022 |
9 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
3/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR032M1062208200383 |
|
|
$50.10 |
000001078527-3562500636 |
2022 |
9 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200383 |
|
|
$16.04 |
000001078527-3562500636 |
2022 |
9 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200416 |
|
|
$8.14 |
000001081835-3562500638 |
2022 |
9 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
3/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR032M1062208200383 |
|
|
$11.26 |
000001078527-3562500636 |
2022 |
9 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200383 |
|
|
$3.57 |
000001078527-3562500636 |
2022 |
9 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
3/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR032M1062208200383 |
|
|
$0.02 |
000001078527-3562500636 |
2022 |
9 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200383 |
|
|
$0.01 |
000001078527-3562500636 |
2022 |
9 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
3/24/2022 |
1300 |
RDWAY PLANS REVIEW & CORRECTED |
CA-XR032M1062208200416 |
|
|
$0.27 |
000001081835-3562500638 |
2022 |
9 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
3/24/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR032M1062208200360 |
|
|
$189.39 |
000001068576-3562500061 |
2022 |
9 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
3/24/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR032M1062208200360 |
|
|
$13.10 |
000001068576-3562500061 |
2022 |
9 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
3/24/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR032M1062208200360 |
|
|
$159.03 |
000001068576-3562500061 |
2022 |
9 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200416 |
|
|
$0.02 |
000001081835-3562500638 |
2022 |
9 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
3/24/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR032M1062208200360 |
|
|
$56.14 |
000001068576-3562500061 |
2022 |
9 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
3/24/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR032M1062208200360 |
|
|
$0.09 |
000001068576-3562500061 |
2022 |
9 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
3/24/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR032M1062208200360 |
|
|
$2,719.47 |
000001068747-3562503204 |
2022 |
9 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200360 |
|
|
$16.58 |
000001068747-3562503204 |
2022 |
9 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
3/24/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR032M1062208200360 |
|
|
$186.42 |
000001068747-3562503204 |
2022 |
9 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200360 |
|
|
$1.14 |
000001068747-3562503204 |
2022 |
9 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
3/24/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR032M1062208200360 |
|
|
$2,283.54 |
000001068747-3562503204 |
2022 |
9 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200360 |
|
|
$13.92 |
000001068747-3562503204 |
2022 |
9 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
3/24/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR032M1062208200360 |
|
|
$558.70 |
000001068747-3562503204 |
2022 |
9 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200360 |
|
|
$3.38 |
000001068747-3562503204 |
2022 |
9 |
FD04 |
03 |
E124 |
D |
9455501D |
110 |
3/24/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR032M1062208200360 |
|
|
$0.99 |
000001068747-3562503204 |
2022 |
9 |
FD04 |
03 |
E124 |
D |
9455501D |
110 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200360 |
|
|
$0.01 |
000001068747-3562503204 |
2022 |
9 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
3/24/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR032M1062208200360 |
|
|
$3,925.09 |
000001069164-3562500610 |
2022 |
9 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200360 |
|
|
$706.40 |
000001069164-3562500610 |
2022 |
9 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
3/24/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR032M1062208200360 |
|
|
$275.36 |
000001069164-3562500610 |
2022 |
9 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200360 |
|
|
$45.20 |
000001069164-3562500610 |
2022 |
9 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
3/24/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR032M1062208200360 |
|
|
$3,295.97 |
000001069164-3562500610 |
2022 |
9 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200360 |
|
|
$593.16 |
000001069164-3562500610 |
2022 |
9 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
3/24/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR032M1062208200360 |
|
|
$664.85 |
000001069164-3562500610 |
2022 |
9 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200360 |
|
|
$161.15 |
000001069164-3562500610 |
2022 |
9 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
3/24/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR032M1062208200360 |
|
|
$1.37 |
000001069164-3562500610 |
2022 |
9 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200360 |
|
|
$0.27 |
000001069164-3562500610 |
2022 |
9 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
3/24/2022 |
1300 |
RDWAY PLANS REVIEW & CORRECTED |
CA-XR032M1062208200415 |
|
|
$705.78 |
000001081835-3562500638 |
2022 |
9 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200415 |
|
|
$40.77 |
000001081835-3562500638 |
2022 |
9 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
3/24/2022 |
1300 |
RDWAY PLANS REVIEW & CORRECTED |
CA-XR032M1062208200415 |
|
|
$49.62 |
000001081835-3562500638 |
2022 |
9 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200415 |
|
|
$2.87 |
000001081835-3562500638 |
2022 |
9 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
3/24/2022 |
1300 |
RDWAY PLANS REVIEW & CORRECTED |
CA-XR032M1062208200415 |
|
|
$592.65 |
000001081835-3562500638 |
2022 |
9 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
3/10/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR031M1062206709435 |
|
|
$2,422.84 |
000001068747-3562503204 |
2022 |
9 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
3/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709435 |
|
|
$294.64 |
000001068747-3562503204 |
2022 |
9 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
3/10/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR031M1062206709435 |
|
|
$166.10 |
000001068747-3562503204 |
2022 |
9 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
3/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709435 |
|
|
$20.19 |
000001068747-3562503204 |
2022 |
9 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
3/10/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR031M1062206709435 |
|
|
$2,034.46 |
000001068747-3562503204 |
2022 |
9 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
3/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709435 |
|
|
$247.41 |
000001068747-3562503204 |
2022 |
9 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
3/10/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR031M1062206709435 |
|
|
$498.28 |
000001068747-3562503204 |
2022 |
9 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
3/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709435 |
|
|
$59.98 |
000001068747-3562503204 |
2022 |
9 |
FD04 |
03 |
E124 |
D |
9455501D |
110 |
3/10/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR031M1062206709435 |
|
|
($0.02) |
000001068747-3562503204 |
2022 |
9 |
FD04 |
03 |
E124 |
D |
9455501D |
110 |
3/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709435 |
|
|
$0.01 |
000001068747-3562503204 |
2022 |
9 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
3/10/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR031M1062206709435 |
|
|
$5,323.74 |
000001069164-3562500610 |
2022 |
9 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
3/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709435 |
|
|
$119.71 |
000001069164-3562500610 |
2022 |
9 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
3/10/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR031M1062206709435 |
|
|
$375.97 |
000001069164-3562500610 |
2022 |
9 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
3/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709435 |
|
|
$7.55 |
000001069164-3562500610 |
2022 |
9 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
3/10/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR031M1062206709435 |
|
|
$4,470.35 |
000001069164-3562500610 |
2022 |
9 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
3/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709435 |
|
|
$100.52 |
000001069164-3562500610 |
2022 |
9 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
3/10/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR031M1062206709435 |
|
|
$875.29 |
000001069164-3562500610 |
2022 |
9 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
3/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709435 |
|
|
$28.31 |
000001069164-3562500610 |
2022 |
8 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
2/23/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR022M1062205308384 |
|
|
$1,741.12 |
000001068747-3562503204 |
2022 |
8 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
2/23/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR022M1062205308384 |
|
|
$119.35 |
000001068747-3562503204 |
2022 |
8 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
2/23/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR022M1062205308384 |
|
|
$1,462.02 |
000001068747-3562503204 |
2022 |
8 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
2/23/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR022M1062205308384 |
|
|
$357.69 |
000001068747-3562503204 |
2022 |
8 |
FD04 |
03 |
E124 |
D |
9455501D |
110 |
2/23/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR022M1062205308384 |
|
|
$0.64 |
000001068747-3562503204 |
2022 |
8 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
2/23/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR022M1062205308384 |
|
|
$2,676.27 |
000001069164-3562500610 |
2022 |
8 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
2/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022M1062205308384 |
|
|
$10.99 |
000001069164-3562500610 |
2022 |
8 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
2/23/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR022M1062205308384 |
|
|
$179.83 |
000001069164-3562500610 |
2022 |
8 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
2/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022M1062205308384 |
|
|
$0.69 |
000001069164-3562500610 |
2022 |
8 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
2/23/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR022M1062205308384 |
|
|
$2,247.25 |
000001069164-3562500610 |
2022 |
8 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
2/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022M1062205308384 |
|
|
$9.23 |
000001069164-3562500610 |
2022 |
8 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
2/23/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR022M1062205308384 |
|
|
$530.64 |
000001069164-3562500610 |
2022 |
8 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
2/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022M1062205308384 |
|
|
$2.60 |
000001069164-3562500610 |
2022 |
8 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
2/23/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR022M1062205308384 |
|
|
$0.98 |
000001069164-3562500610 |
2022 |
8 |
FD04 |
03 |
E797 |
D |
9455501D |
110 |
2/21/2022 |
3550 |
RAILROAD CONTRACTS |
PRC-2200143941 |
DO2200000802 |
CSX TRANSPORTATION INC |
$567.98 |
|
2022 |
8 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
2/14/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR021M1062203907409 |
|
|
$288.58 |
000001069164-3562500610 |
2022 |
8 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
2/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021M1062203907409 |
|
|
$28.86 |
000001069164-3562500610 |
2022 |
8 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
2/14/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR021M1062203907409 |
|
|
$21.64 |
000001069164-3562500610 |
2022 |
8 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
2/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021M1062203907409 |
|
|
$2.16 |
000001069164-3562500610 |
2022 |
8 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
2/14/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR021M1062203907409 |
|
|
$242.33 |
000001069164-3562500610 |
2022 |
8 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
2/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021M1062203907409 |
|
|
$24.23 |
000001069164-3562500610 |
2022 |
8 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
2/14/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR021M1062203907409 |
|
|
$32.19 |
000001069164-3562500610 |
2022 |
8 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
2/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021M1062203907409 |
|
|
$3.17 |
000001069164-3562500610 |
2022 |
7 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
1/27/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR012M1062202106417 |
|
|
$1,053.55 |
000001069164-3562500610 |
2022 |
7 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
1/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106417 |
|
|
$62.64 |
000001069164-3562500610 |
2022 |
7 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
1/27/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR012M1062202106417 |
|
|
$79.25 |
000001069164-3562500610 |
2022 |
7 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
1/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106417 |
|
|
$4.70 |
000001069164-3562500610 |
2022 |
7 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
1/27/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR012M1062202106417 |
|
|
$884.66 |
000001069164-3562500610 |
2022 |
7 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
1/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106417 |
|
|
$52.60 |
000001069164-3562500610 |
2022 |
7 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
1/27/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR012M1062202106417 |
|
|
$116.20 |
000001069164-3562500610 |
2022 |
7 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
1/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106417 |
|
|
$6.88 |
000001069164-3562500610 |
2022 |
7 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
1/27/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR012M1062202106417 |
|
|
$0.31 |
000001069164-3562500610 |
2022 |
7 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
1/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106417 |
|
|
$0.02 |
000001069164-3562500610 |
2022 |
7 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
1/27/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR012M1062202106416 |
|
|
$2,671.43 |
000001068578-3562510360 |
2022 |
7 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
1/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106416 |
|
|
$521.51 |
000001068578-3562510360 |
2022 |
7 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
1/27/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR012M1062202106416 |
|
|
$184.26 |
000001068578-3562510360 |
2022 |
7 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
1/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106416 |
|
|
$35.97 |
000001068578-3562510360 |
2022 |
7 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
1/27/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR012M1062202106416 |
|
|
$2,243.19 |
000001068578-3562510360 |
2022 |
7 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
1/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106416 |
|
|
$437.92 |
000001068578-3562510360 |
2022 |
7 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
1/27/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR012M1062202106416 |
|
|
$517.56 |
000001068578-3562510360 |
2022 |
7 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
1/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106416 |
|
|
$100.05 |
000001068578-3562510360 |
2022 |
7 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
1/27/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR012M1062202106416 |
|
|
$0.84 |
000001068578-3562510360 |
2022 |
7 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
1/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106416 |
|
|
$0.16 |
000001068578-3562510360 |
2022 |
7 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
1/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012M1062202106441 |
|
|
$43.61 |
000001078527-3562500636 |
2022 |
7 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
1/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106441 |
|
|
$8.32 |
000001078527-3562500636 |
2022 |
7 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
1/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012M1062202106441 |
|
|
$3.02 |
000001078527-3562500636 |
2022 |
7 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
1/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106441 |
|
|
$0.58 |
000001078527-3562500636 |
2022 |
7 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
1/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012M1062202106441 |
|
|
$36.74 |
000001078527-3562500636 |
2022 |
7 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
1/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106441 |
|
|
$6.99 |
000001078527-3562500636 |
2022 |
7 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
1/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012M1062202106441 |
|
|
$8.25 |
000001078527-3562500636 |
2022 |
7 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
1/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106441 |
|
|
$1.55 |
000001078527-3562500636 |
2022 |
7 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
1/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012M1062202106441 |
|
|
$0.01 |
000001078527-3562500636 |
2022 |
7 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
1/14/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR011M1062200705524 |
|
|
$913.91 |
000001069164-3562500610 |
2022 |
7 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
1/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011M1062200705524 |
|
|
$783.22 |
000001069164-3562500610 |
2022 |
7 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
1/14/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR011M1062200705524 |
|
|
$68.78 |
000001069164-3562500610 |
2022 |
7 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
1/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011M1062200705524 |
|
|
$58.86 |
000001069164-3562500610 |
2022 |
7 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
1/14/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR011M1062200705524 |
|
|
$767.41 |
000001069164-3562500610 |
2022 |
7 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
1/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011M1062200705524 |
|
|
$657.67 |
000001069164-3562500610 |
2022 |
7 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
1/14/2022 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR011M1062200705524 |
|
|
$103.40 |
000001069164-3562500610 |
2022 |
7 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
1/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011M1062200705524 |
|
|
$86.14 |
000001069164-3562500610 |
2022 |
7 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
1/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011M1062200705542 |
|
|
$54.42 |
000001078527-3562500636 |
2022 |
7 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
1/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011M1062200705542 |
|
|
$99.54 |
000001078527-3562500636 |
2022 |
7 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
1/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011M1062200705542 |
|
|
$3.79 |
000001078527-3562500636 |
2022 |
7 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
1/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011M1062200705542 |
|
|
$6.88 |
000001078527-3562500636 |
2022 |
7 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
1/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011M1062200705542 |
|
|
$45.92 |
000001078527-3562500636 |
2022 |
7 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
1/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011M1062200705542 |
|
|
$83.59 |
000001078527-3562500636 |
2022 |
7 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
1/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011M1062200705542 |
|
|
$10.45 |
000001078527-3562500636 |
2022 |
7 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
1/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011M1062200705542 |
|
|
$18.57 |
000001078527-3562500636 |
2022 |
6 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
12/22/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR122L1062135504457 |
|
|
$2,839.58 |
000001069164-3562500610 |
2022 |
6 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504457 |
|
|
$462.43 |
000001069164-3562500610 |
2022 |
6 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
12/22/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR122L1062135504457 |
|
|
$215.01 |
000001069164-3562500610 |
2022 |
6 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504457 |
|
|
$35.09 |
000001069164-3562500610 |
2022 |
6 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
12/22/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR122L1062135504457 |
|
|
$2,384.47 |
000001069164-3562500610 |
2022 |
6 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504457 |
|
|
$388.31 |
000001069164-3562500610 |
2022 |
6 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
12/22/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR122L1062135504457 |
|
|
$328.99 |
000001069164-3562500610 |
2022 |
6 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504457 |
|
|
$45.84 |
000001069164-3562500610 |
2022 |
6 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
12/22/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR122L1062135504457 |
|
|
$0.92 |
000001069164-3562500610 |
2022 |
6 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504457 |
|
|
$0.13 |
000001069164-3562500610 |
2022 |
6 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
12/8/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR121L1062134103529 |
|
|
$2,770.42 |
000001069164-3562500610 |
2022 |
6 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
12/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103529 |
|
|
$1,752.63 |
000001069164-3562500610 |
2022 |
6 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
12/8/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR121L1062134103529 |
|
|
$208.50 |
000001069164-3562500610 |
2022 |
6 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
12/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103529 |
|
|
$132.09 |
000001069164-3562500610 |
2022 |
6 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
12/8/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR121L1062134103529 |
|
|
$2,326.30 |
000001069164-3562500610 |
2022 |
6 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
12/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103529 |
|
|
$1,471.68 |
000001069164-3562500610 |
2022 |
6 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
12/8/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR121L1062134103529 |
|
|
$385.66 |
000001069164-3562500610 |
2022 |
6 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
12/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103529 |
|
|
$235.41 |
000001069164-3562500610 |
2022 |
5 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
11/23/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR112L1062132602486 |
|
|
$284.29 |
000001069105-3562500610 |
2022 |
5 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
11/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602486 |
|
|
$28.43 |
000001069105-3562500610 |
2022 |
5 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
11/23/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR112L1062132602486 |
|
|
$20.38 |
000001069105-3562500610 |
2022 |
5 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
11/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602486 |
|
|
$2.04 |
000001069105-3562500610 |
2022 |
5 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
11/23/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR112L1062132602486 |
|
|
$238.72 |
000001069105-3562500610 |
2022 |
5 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
11/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602486 |
|
|
$23.87 |
000001069105-3562500610 |
2022 |
5 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
11/23/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR112L1062132602486 |
|
|
$48.69 |
000001069105-3562500610 |
2022 |
5 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
11/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602486 |
|
|
$4.82 |
000001069105-3562500610 |
2022 |
5 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
11/23/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR112L1062132602486 |
|
|
$0.09 |
000001069105-3562500610 |
2022 |
5 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
11/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602486 |
|
|
$0.01 |
000001069105-3562500610 |
2022 |
5 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
11/23/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR112L1062132602486 |
|
|
$3,417.44 |
000001069164-3562500610 |
2022 |
5 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
11/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602486 |
|
|
$548.69 |
000001069164-3562500610 |
2022 |
5 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
11/23/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR112L1062132602486 |
|
|
$256.11 |
000001069164-3562500610 |
2022 |
5 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
11/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602486 |
|
|
$40.93 |
000001069164-3562500610 |
2022 |
5 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
11/23/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR112L1062132602486 |
|
|
$2,869.62 |
000001069164-3562500610 |
2022 |
5 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
11/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602486 |
|
|
$460.73 |
000001069164-3562500610 |
2022 |
5 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
11/23/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR112L1062132602486 |
|
|
$556.70 |
000001069164-3562500610 |
2022 |
5 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
11/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602486 |
|
|
$99.04 |
000001069164-3562500610 |
2022 |
5 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
11/23/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR112L1062132602486 |
|
|
$1.38 |
000001069164-3562500610 |
2022 |
5 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
11/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602486 |
|
|
$0.23 |
000001069164-3562500610 |
2022 |
5 |
FD04 |
03 |
E797 |
D |
9455501D |
110 |
11/10/2021 |
3550 |
RAILROAD CONTRACTS |
PRC-2200081935 |
DO2200000802 |
CSX TRANSPORTATION INC |
$38.96 |
|
2022 |
5 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
11/8/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR111L1062130901488 |
|
|
$1,410.02 |
000001069164-3562500610 |
2022 |
5 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
11/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111L1062130901488 |
|
|
$247.49 |
000001069164-3562500610 |
2022 |
5 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
11/8/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR111L1062130901488 |
|
|
$106.01 |
000001069164-3562500610 |
2022 |
5 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
11/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111L1062130901488 |
|
|
$18.59 |
000001069164-3562500610 |
2022 |
5 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
11/8/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR111L1062130901488 |
|
|
$1,183.66 |
000001069164-3562500610 |
2022 |
5 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
11/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111L1062130901488 |
|
|
$207.81 |
000001069164-3562500610 |
2022 |
5 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
11/8/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR111L1062130901488 |
|
|
$175.83 |
000001069164-3562500610 |
2022 |
5 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
11/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111L1062130901488 |
|
|
$32.03 |
000001069164-3562500610 |
2022 |
4 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
10/25/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR102L1062129500409 |
|
|
$79.53 |
000001078527-3562500636 |
2022 |
4 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500409 |
|
|
$17.90 |
000001078527-3562500636 |
2022 |
4 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
10/25/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR102L1062129500409 |
|
|
$5.52 |
000001078527-3562500636 |
2022 |
4 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500409 |
|
|
$1.23 |
000001078527-3562500636 |
2022 |
4 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
10/25/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR102L1062129500409 |
|
|
$66.80 |
000001078527-3562500636 |
2022 |
4 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500409 |
|
|
$15.03 |
000001078527-3562500636 |
2022 |
4 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
10/25/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR102L1062129500409 |
|
|
$14.28 |
000001078527-3562500636 |
2022 |
4 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500409 |
|
|
$3.18 |
000001078527-3562500636 |
2022 |
4 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
10/25/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR102L1062129500409 |
|
|
$0.02 |
000001078527-3562500636 |
2022 |
4 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
10/11/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR101L1062128110126 |
|
|
$39.68 |
000001078527-3562500636 |
2022 |
4 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
10/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101L1062128110126 |
|
|
$1.59 |
000001078527-3562500636 |
2022 |
4 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
10/11/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR101L1062128110126 |
|
|
$2.75 |
000001078527-3562500636 |
2022 |
4 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
10/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101L1062128110126 |
|
|
$0.12 |
000001078527-3562500636 |
2022 |
4 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
10/11/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR101L1062128110126 |
|
|
$33.40 |
000001078527-3562500636 |
2022 |
4 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
10/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101L1062128110126 |
|
|
$1.34 |
000001078527-3562500636 |
2022 |
4 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
10/11/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR101L1062128110126 |
|
|
$7.12 |
000001078527-3562500636 |
2022 |
4 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
10/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101L1062128110126 |
|
|
$0.28 |
000001078527-3562500636 |
2022 |
3 |
FD04 |
03 |
E143 |
D |
9455501D |
110 |
9/28/2021 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200054153 |
PON22000000520 |
HMB Engineers Inc |
$37,116.45 |
Todd County 3-80001 2019-04-2 |
2022 |
3 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
9/13/2021 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR091L1062125208009 |
|
|
$36.45 |
000001079561-3562500636 |
2022 |
3 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
9/13/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091L1062125208009 |
|
|
$1.82 |
000001079561-3562500636 |
2022 |
3 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
9/13/2021 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR091L1062125208009 |
|
|
$2.52 |
000001079561-3562500636 |
2022 |
3 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
9/13/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091L1062125208009 |
|
|
$0.12 |
000001079561-3562500636 |
2022 |
3 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
9/13/2021 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR091L1062125208009 |
|
|
$30.62 |
000001079561-3562500636 |
2022 |
3 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
9/13/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091L1062125208009 |
|
|
$1.53 |
000001079561-3562500636 |
2022 |
3 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
9/13/2021 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR091L1062125208009 |
|
|
$6.54 |
000001079561-3562500636 |
2022 |
3 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
9/13/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091L1062125208009 |
|
|
$0.32 |
000001079561-3562500636 |
2022 |
3 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
9/13/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR091L1062125207959 |
|
|
$996.41 |
000001069164-3562500610 |
2022 |
3 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
9/13/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091L1062125207959 |
|
|
$8.47 |
000001069164-3562500610 |
2022 |
3 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
9/13/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR091L1062125207959 |
|
|
$75.12 |
000001069164-3562500610 |
2022 |
3 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
9/13/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091L1062125207959 |
|
|
$0.64 |
000001069164-3562500610 |
2022 |
3 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
9/13/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR091L1062125207959 |
|
|
$836.69 |
000001069164-3562500610 |
2022 |
3 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
9/13/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091L1062125207959 |
|
|
$7.11 |
000001069164-3562500610 |
2022 |
3 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
9/13/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR091L1062125207959 |
|
|
$108.31 |
000001069164-3562500610 |
2022 |
3 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
9/13/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091L1062125207959 |
|
|
$0.91 |
000001069164-3562500610 |
2022 |
2 |
FD04 |
03 |
E143 |
D |
9455501D |
110 |
8/30/2021 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200033817 |
PON22000000520 |
HMB Engineers Inc |
$21,954.24 |
Todd County 3-80001 2019-04-2 |
2022 |
2 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
8/27/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR082L1062123606946 |
|
|
$2,704.97 |
000001069164-3562500610 |
2022 |
2 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
8/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082L1062123606946 |
|
|
$128.22 |
000001069164-3562500610 |
2022 |
2 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
8/27/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR082L1062123606946 |
|
|
$205.02 |
000001069164-3562500610 |
2022 |
2 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
8/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082L1062123606946 |
|
|
$9.72 |
000001069164-3562500610 |
2022 |
2 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
8/25/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR082L1062123606947 |
|
|
$2,271.35 |
000001069164-3562500610 |
2022 |
2 |
FD04 |
03 |
E797 |
D |
9455501D |
110 |
8/25/2021 |
3550 |
RAILROAD CONTRACTS |
PRC-2200028765 |
DO2200000802 |
CSX TRANSPORTATION INC |
$1,047.50 |
|
2022 |
2 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
8/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082L1062123606947 |
|
|
$107.67 |
000001069164-3562500610 |
2022 |
2 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
8/25/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR082L1062123606947 |
|
|
$305.31 |
000001069164-3562500610 |
2022 |
2 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
8/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082L1062123606947 |
|
|
$13.82 |
000001069164-3562500610 |
2022 |
2 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
8/25/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR082L1062123606947 |
|
|
$0.87 |
000001069164-3562500610 |
2022 |
2 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
8/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082L1062123606947 |
|
|
$0.04 |
000001069164-3562500610 |
2022 |
2 |
FD04 |
03 |
E797 |
D |
9455501D |
110 |
8/24/2021 |
3550 |
RAILROAD CONTRACTS |
PRC-2200028761 |
DO2200000802 |
CSX TRANSPORTATION INC |
$3,345.56 |
|
2022 |
2 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
8/11/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR081L1062121805803 |
|
|
$926.70 |
000001069164-3562500610 |
2022 |
2 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
8/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081L1062121805803 |
|
|
$205.85 |
000001069164-3562500610 |
2022 |
2 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
8/11/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR081L1062121805803 |
|
|
$68.56 |
000001069164-3562500610 |
2022 |
2 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
8/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081L1062121805803 |
|
|
$15.22 |
000001069164-3562500610 |
2022 |
2 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
8/11/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR081L1062121805803 |
|
|
$778.14 |
000001069164-3562500610 |
2022 |
2 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
8/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081L1062121805803 |
|
|
$172.85 |
000001069164-3562500610 |
2022 |
2 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
8/11/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR081L1062121805803 |
|
|
$202.24 |
000001069164-3562500610 |
2022 |
2 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
8/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081L1062121805803 |
|
|
$44.29 |
000001069164-3562500610 |
2022 |
2 |
FD04 |
03 |
E143 |
D |
9455501D |
110 |
8/10/2021 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200015906 |
PON22000000520 |
HMB Engineers Inc |
$10,408.96 |
Todd County 3-80001 2019-04-2 |
2022 |
2 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
8/9/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081L1062121805835 |
|
|
$119.33 |
000001078527-3562500636 |
2022 |
2 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
8/9/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081L1062121805835 |
|
|
$25.45 |
000001078527-3562500636 |
2022 |
2 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
8/9/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081L1062121805835 |
|
|
$8.24 |
000001078527-3562500636 |
2022 |
2 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
8/9/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081L1062121805835 |
|
|
$1.75 |
000001078527-3562500636 |
2022 |
2 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
8/9/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081L1062121805835 |
|
|
$100.20 |
000001078527-3562500636 |
2022 |
2 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
8/9/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081L1062121805835 |
|
|
$21.37 |
000001078527-3562500636 |
2022 |
2 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
8/9/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081L1062121805835 |
|
|
$21.42 |
000001078527-3562500636 |
2022 |
2 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
8/9/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081L1062121805835 |
|
|
$4.52 |
000001078527-3562500636 |
2022 |
1 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
7/29/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR072L1062120404662 |
|
|
$4,375.83 |
000001069164-3562500610 |
2022 |
1 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
7/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072L1062120404662 |
|
|
$1,449.13 |
000001069164-3562500610 |
2022 |
1 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
7/29/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR072L1062120404662 |
|
|
$322.18 |
000001069164-3562500610 |
2022 |
1 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
7/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072L1062120404662 |
|
|
$104.65 |
000001069164-3562500610 |
2022 |
1 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
7/29/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR072L1062120404662 |
|
|
$3,674.79 |
000001069164-3562500610 |
2022 |
1 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
7/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072L1062120404662 |
|
|
$1,216.83 |
000001069164-3562500610 |
2022 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/29/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR072L1062120404662 |
|
|
$706.78 |
000001069164-3562500610 |
2022 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072L1062120404662 |
|
|
$235.53 |
000001069164-3562500610 |
2022 |
1 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
7/29/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR072L1062120404662 |
|
|
$1.68 |
000001069164-3562500610 |
2022 |
1 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
7/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072L1062120404662 |
|
|
$0.54 |
000001069164-3562500610 |
2022 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/14/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071L1062119003538 |
|
|
$404.21 |
000001069164-3562500610 |
2022 |
1 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
7/12/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR071L1062119003537 |
|
|
$7,139.66 |
000001069164-3562500610 |
2022 |
1 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
7/12/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071L1062119003537 |
|
|
$2,780.24 |
000001069164-3562500610 |
2022 |
1 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
7/12/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR071L1062119003537 |
|
|
$515.32 |
000001069164-3562500610 |
2022 |
1 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
7/12/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071L1062119003537 |
|
|
$201.00 |
000001069164-3562500610 |
2022 |
1 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
7/12/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR071L1062119003537 |
|
|
$6,028.02 |
000001069164-3562500610 |
2022 |
1 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
7/12/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071L1062119003537 |
|
|
$2,347.36 |
000001069164-3562500610 |
2022 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/12/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR071L1062119003537 |
|
|
$1,182.51 |
000001069164-3562500610 |
2022 |
1 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
7/8/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062L1062117302505 |
|
|
$159.10 |
000001078527-3562500636 |
2022 |
1 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
7/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062L1062117302505 |
|
|
$715.97 |
000001078527-3562500636 |
2022 |
1 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
7/8/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062L1062117302505 |
|
|
$11.04 |
000001078527-3562500636 |
2022 |
1 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
7/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062L1062117302505 |
|
|
$49.70 |
000001078527-3562500636 |
2022 |
1 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
7/8/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062L1062117302505 |
|
|
$134.33 |
000001078527-3562500636 |
2022 |
1 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
7/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062L1062117302505 |
|
|
$604.49 |
000001078527-3562500636 |
2022 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/8/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062L1062117302505 |
|
|
$29.62 |
000001078527-3562500636 |
2022 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062L1062117302505 |
|
|
$127.15 |
000001078527-3562500636 |
2022 |
1 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
7/8/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062L1062117302505 |
|
|
$0.05 |
000001078527-3562500636 |
2022 |
1 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
7/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062L1062117302505 |
|
|
$0.22 |
000001078527-3562500636 |
2022 |
1 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
7/1/2021 |
1060 |
RDWAY PLANS-FINAL-DRAINAGE SEC |
CA-XR062L1062117302451 |
|
|
$53.21 |
000001068804-3562500630 |
2022 |
1 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
7/1/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062L1062117302451 |
|
|
$8.62 |
000001068804-3562500630 |
2022 |
1 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
7/1/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR062L1062117302451 |
|
|
$8,526.29 |
000001069164-3562500610 |
2022 |
1 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
7/1/2021 |
1060 |
RDWAY PLANS-FINAL-DRAINAGE SEC |
CA-XR062L1062117302451 |
|
|
$611.90 |
000001068804-3562500630 |
2022 |
1 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
7/1/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062L1062117302451 |
|
|
$1,068.87 |
000001069164-3562500610 |
2022 |
1 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
7/1/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR062L1062117302451 |
|
|
$620.61 |
000001069164-3562500610 |
2022 |
1 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
7/1/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062L1062117302451 |
|
|
$76.09 |
000001069164-3562500610 |
2022 |
1 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
7/1/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR062L1062117302451 |
|
|
$7,198.75 |
000001069164-3562500610 |
2022 |
1 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
7/1/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062L1062117302451 |
|
|
$902.44 |
000001069164-3562500610 |
2022 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/1/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR062L1062117302451 |
|
|
$1,332.81 |
000001069164-3562500610 |
2022 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/1/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062L1062117302451 |
|
|
$182.79 |
000001069164-3562500610 |
2022 |
1 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
7/1/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR062L1062117302451 |
|
|
$3.20 |
000001069164-3562500610 |
2022 |
1 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
7/1/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062L1062117302451 |
|
|
$0.39 |
000001069164-3562500610 |
2022 |
1 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
7/1/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062L1062117302451 |
|
|
$99.10 |
000001068804-3562500630 |
2022 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/1/2021 |
1060 |
RDWAY PLANS-FINAL-DRAINAGE SEC |
CA-XR062L1062117302451 |
|
|
$95.99 |
000001068804-3562500630 |
2022 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/1/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062L1062117302451 |
|
|
$15.31 |
000001068804-3562500630 |
2022 |
1 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
7/1/2021 |
1060 |
RDWAY PLANS-FINAL-DRAINAGE SEC |
CA-XR062L1062117302451 |
|
|
$0.25 |
000001068804-3562500630 |
2022 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/1/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR061L1062116001450P |
|
|
$1,152.16 |
000001069164-3562500610 |
2022 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/1/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061L1062116001450P |
|
|
$151.21 |
000001069164-3562500610 |
2022 |
1 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
7/1/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062L1062117302451 |
|
|
$0.04 |
000001068804-3562500630 |
2022 |
1 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
7/1/2021 |
1060 |
RDWAY PLANS-FINAL-DRAINAGE SEC |
CA-XR062L1062117302450 |
|
|
$724.75 |
000001068804-3562500630 |
2022 |
1 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
7/1/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062L1062117302450 |
|
|
$117.38 |
000001068804-3562500630 |
2021 |
12 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
6/10/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR061L1062116001450 |
|
|
$8,025.78 |
000001069164-3562500610 |
2021 |
12 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
6/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061L1062116001450 |
|
|
$1,004.40 |
000001069164-3562500610 |
2021 |
12 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
6/10/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR061L1062116001450 |
|
|
$601.79 |
000001069164-3562500610 |
2021 |
12 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
6/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061L1062116001450 |
|
|
$75.18 |
000001069164-3562500610 |
2021 |
12 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
6/10/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR061L1062116001450 |
|
|
$6,776.05 |
000001069164-3562500610 |
2021 |
12 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
6/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061L1062116001450 |
|
|
$848.01 |
000001069164-3562500610 |
2021 |
11 |
FD04 |
03 |
E143 |
D |
9455501D |
110 |
5/27/2021 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2100197769 |
PON22000000520 |
HMB Engineers Inc |
$25,270.35 |
Todd County 3-80001 2019-04-2 |
2021 |
11 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
5/24/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR052L1062114100374 |
|
|
$4,197.00 |
000001069164-3562500610 |
2021 |
11 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
5/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052L1062114100374 |
|
|
$292.93 |
000001069164-3562500610 |
2021 |
11 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
5/24/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR052L1062114100374 |
|
|
$317.12 |
000001069164-3562500610 |
2021 |
11 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
5/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052L1062114100374 |
|
|
$22.13 |
000001069164-3562500610 |
2021 |
11 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
5/24/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR052L1062114100374 |
|
|
$3,543.52 |
000001069164-3562500610 |
2021 |
11 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
5/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052L1062114100374 |
|
|
$247.32 |
000001069164-3562500610 |
2021 |
11 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
5/24/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR052L1062114100374 |
|
|
$645.50 |
000001069164-3562500610 |
2021 |
11 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
5/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052L1062114100374 |
|
|
$37.28 |
000001069164-3562500610 |
2021 |
11 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
5/24/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR052L1062114100374 |
|
|
$1.75 |
000001069164-3562500610 |
2021 |
11 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
5/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052L1062114100374 |
|
|
$0.11 |
000001069164-3562500610 |
2021 |
11 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
5/10/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR051L1062112709723 |
|
|
$241.89 |
000001069164-3562500610 |
2021 |
11 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
5/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051L1062112709723 |
|
|
$10.20 |
000001069164-3562500610 |
2021 |
11 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
5/10/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR051L1062112709723 |
|
|
$2,717.57 |
000001069164-3562500610 |
2021 |
11 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
5/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051L1062112709723 |
|
|
$114.77 |
000001069164-3562500610 |
2021 |
11 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
5/10/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR051L1062112709723 |
|
|
$357.80 |
000001069164-3562500610 |
2021 |
11 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
5/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051L1062112709723 |
|
|
$14.99 |
000001069164-3562500610 |
2021 |
11 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
5/10/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR051L1062112709723 |
|
|
$3,218.70 |
000001069164-3562500610 |
2021 |
11 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
5/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051L1062112709723 |
|
|
$135.94 |
000001069164-3562500610 |
2021 |
11 |
FD04 |
00 |
E361 |
D |
9455501D |
110 |
5/5/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
TP-2100018292 |
|
|
$28.00 |
|
2021 |
9 |
FD04 |
00 |
E361 |
D |
9455501D |
110 |
3/31/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
JV2E-2100006122 |
|
|
$474.75 |
Correcting prog chrg from FG03 to FD04/945501D
IET67021*755
IET670021*623 |
2021 |
9 |
FD04 |
00 |
E361 |
D |
9455501D |
110 |
3/31/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
JV2E-2100006111 |
|
|
$330.06 |
Correcting prog chrg from FG03 to FD04/945501D
IET67021*798
IET67021*794 |
2021 |
9 |
FD04 |
00 |
E361 |
D |
9455501D |
110 |
3/31/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
JV2E-2100006112 |
|
|
$147.62 |
Correcting prog chrg from FG03 to FD04/9455501D
iet67021*731 |
2021 |
9 |
FD04 |
03 |
E143 |
D |
9455501D |
110 |
3/26/2021 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2100158495 |
PON22000004373 |
HDR ENGINEERING INC |
$45,690.78 |
Letter Agreement 1 |
2021 |
9 |
FD04 |
03 |
E143 |
D |
9455501D |
110 |
3/25/2021 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2100157565 |
PON22000000520 |
HMB Engineers Inc |
$19,177.50 |
Todd County 3-80001 2019-04-2 |
2021 |
9 |
FD04 |
00 |
E361 |
D |
9455501D |
110 |
3/22/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
JV2E-2100005893 |
|
|
$88.35 |
Correcting prog chrg from FG03 to FD04/9455501D
IET67021*835 |
2021 |
9 |
FD04 |
00 |
E361 |
D |
9455501D |
110 |
3/19/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
JV2E-2100005898 |
|
|
$87.97 |
Correct prog chrg from FG03 to FD04/9455501D
IET67021*665 |
2021 |
9 |
FD04 |
00 |
E361 |
D |
9455501D |
110 |
3/19/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
JV2E-2100005895 |
|
|
$353.40 |
Correcting prog chrg from FG03 to
FD04/945501D
IET67021*873
IET67021*836 |
2021 |
9 |
FD04 |
00 |
E361 |
D |
9455501D |
110 |
3/19/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
JV2E-2100005896 |
|
|
$561.30 |
Correcting prog chrg from FG03 to FD04/9455501D
IET67021*288
IET67021*747 |
2021 |
8 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
2/23/2021 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR022L1062105304390 |
|
|
$660.91 |
000001069107-3562500610 |
2021 |
8 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304390 |
|
|
$128.30 |
000001069107-3562500610 |
2021 |
8 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
2/23/2021 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR022L1062105304390 |
|
|
$50.05 |
000001069107-3562500610 |
2021 |
8 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304390 |
|
|
$9.71 |
000001069107-3562500610 |
2021 |
8 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
2/23/2021 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR022L1062105304390 |
|
|
$558.01 |
000001069107-3562500610 |
2021 |
8 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304390 |
|
|
$108.33 |
000001069107-3562500610 |
2021 |
8 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
2/23/2021 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR022L1062105304390 |
|
|
$89.38 |
000001069107-3562500610 |
2021 |
8 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304390 |
|
|
$17.11 |
000001069107-3562500610 |
2021 |
8 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
2/23/2021 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR022L1062105304390 |
|
|
$0.29 |
000001069107-3562500610 |
2021 |
8 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304390 |
|
|
$0.04 |
000001069107-3562500610 |
2021 |
7 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
1/25/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR012L1062102202346 |
|
|
$3,310.14 |
000001069105-3562500610 |
2021 |
7 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202346 |
|
|
$586.44 |
000001069105-3562500610 |
2021 |
7 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
1/25/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR012L1062102202346 |
|
|
$246.26 |
000001069105-3562500610 |
2021 |
7 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202346 |
|
|
$43.89 |
000001069105-3562500610 |
2021 |
7 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
1/25/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR012L1062102202346 |
|
|
$2,794.73 |
000001069105-3562500610 |
2021 |
7 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202346 |
|
|
$495.13 |
000001069105-3562500610 |
2021 |
7 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
1/25/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR012L1062102202346 |
|
|
$534.03 |
000001069105-3562500610 |
2021 |
7 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202346 |
|
|
$91.69 |
000001069105-3562500610 |
2021 |
7 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
1/25/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR012L1062102202346 |
|
|
$1.36 |
000001069105-3562500610 |
2021 |
7 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202346 |
|
|
$0.25 |
000001069105-3562500610 |
2021 |
7 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
1/25/2021 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR012L1062102202346 |
|
|
$630.65 |
000001069107-3562500610 |
2021 |
7 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202346 |
|
|
$192.00 |
000001069107-3562500610 |
2021 |
7 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
1/25/2021 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR012L1062102202346 |
|
|
$41.67 |
000001069107-3562500610 |
2021 |
7 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202346 |
|
|
$12.69 |
000001069107-3562500610 |
2021 |
7 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
1/25/2021 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR012L1062102202346 |
|
|
$532.53 |
000001069107-3562500610 |
2021 |
7 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202346 |
|
|
$162.11 |
000001069107-3562500610 |
2021 |
7 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
1/25/2021 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR012L1062102202346 |
|
|
$105.39 |
000001069107-3562500610 |
2021 |
7 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202346 |
|
|
$31.72 |
000001069107-3562500610 |
2021 |
7 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
1/25/2021 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR012L1062102202346 |
|
|
$0.18 |
000001069107-3562500610 |
2021 |
7 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202346 |
|
|
$0.05 |
000001069107-3562500610 |
2021 |
7 |
FD04 |
00 |
E361 |
D |
9455501D |
110 |
1/14/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
TP-2100010803 |
|
|
$278.00 |
|
2021 |
7 |
FD04 |
00 |
E229 |
D |
9455501D |
110 |
1/11/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
IET-XE13A162521010014650 |
|
|
$11,625.00 |
|
2021 |
7 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
1/11/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR011L1062100801434 |
|
|
$4,829.32 |
000001069105-3562500610 |
2021 |
7 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801434 |
|
|
$1,882.62 |
000001069105-3562500610 |
2021 |
7 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
1/11/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR011L1062100801434 |
|
|
$352.42 |
000001069105-3562500610 |
2021 |
7 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801434 |
|
|
$137.81 |
000001069105-3562500610 |
2021 |
7 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
1/11/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR011L1062100801434 |
|
|
$4,077.41 |
000001069105-3562500610 |
2021 |
7 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801434 |
|
|
$1,589.49 |
000001069105-3562500610 |
2021 |
7 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
1/11/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR011L1062100801434 |
|
|
$836.03 |
000001069105-3562500610 |
2021 |
7 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801434 |
|
|
$318.29 |
000001069105-3562500610 |
2021 |
7 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
1/11/2021 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR011L1062100801434 |
|
|
$725.10 |
000001069107-3562500610 |
2021 |
7 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801434 |
|
|
$278.70 |
000001069107-3562500610 |
2021 |
7 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
1/11/2021 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR011L1062100801434 |
|
|
$47.10 |
000001069107-3562500610 |
2021 |
7 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801434 |
|
|
$18.09 |
000001069107-3562500610 |
2021 |
7 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
1/11/2021 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR011L1062100801434 |
|
|
$612.26 |
000001069107-3562500610 |
2021 |
7 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801434 |
|
|
$235.31 |
000001069107-3562500610 |
2021 |
7 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
1/11/2021 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR011L1062100801434 |
|
|
$121.25 |
000001069107-3562500610 |
2021 |
7 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801434 |
|
|
$46.04 |
000001069107-3562500610 |
2021 |
6 |
FD04 |
00 |
E229 |
D |
9455501D |
110 |
12/28/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
IET-XE13A162520360018000 |
|
|
$11,625.00 |
|
2021 |
6 |
FD04 |
00 |
E361 |
D |
9455501D |
110 |
12/23/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
TP-2100011122 |
|
|
$208.00 |
|
2021 |
6 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
12/23/2020 |
1060 |
RDWAY PLANS-FINAL-DRAINAGE SEC |
CA-XR122K1062035700382 |
|
|
$181.26 |
000001068804-3562500630 |
2021 |
6 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700382 |
|
|
$23.72 |
000001068804-3562500630 |
2021 |
6 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
12/23/2020 |
1060 |
RDWAY PLANS-FINAL-DRAINAGE SEC |
CA-XR122K1062035700382 |
|
|
$13.29 |
000001068804-3562500630 |
2021 |
6 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700382 |
|
|
$1.74 |
000001068804-3562500630 |
2021 |
6 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
12/23/2020 |
1060 |
RDWAY PLANS-FINAL-DRAINAGE SEC |
CA-XR122K1062035700382 |
|
|
$153.04 |
000001068804-3562500630 |
2021 |
6 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
12/23/2020 |
1030 |
FIELD SURVEY |
CA-XR122K1062035700384 |
|
|
$548.32 |
000001070122-3562503204 |
2021 |
6 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700382 |
|
|
$20.03 |
000001068804-3562500630 |
2021 |
6 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700384 |
|
|
$22.52 |
000001070122-3562503204 |
2021 |
6 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
12/23/2020 |
1060 |
RDWAY PLANS-FINAL-DRAINAGE SEC |
CA-XR122K1062035700382 |
|
|
$25.00 |
000001068804-3562500630 |
2021 |
6 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
12/23/2020 |
1030 |
FIELD SURVEY |
CA-XR122K1062035700384 |
|
|
$38.90 |
000001070122-3562503204 |
2021 |
6 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700382 |
|
|
$3.22 |
000001068804-3562500630 |
2021 |
6 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700384 |
|
|
$1.55 |
000001070122-3562503204 |
2021 |
6 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
12/23/2020 |
1060 |
RDWAY PLANS-FINAL-DRAINAGE SEC |
CA-XR122K1062035700382 |
|
|
$0.07 |
000001068804-3562500630 |
2021 |
6 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
12/23/2020 |
1030 |
FIELD SURVEY |
CA-XR122K1062035700384 |
|
|
$462.93 |
000001070122-3562503204 |
2021 |
6 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700384 |
|
|
$19.01 |
000001070122-3562503204 |
2021 |
6 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
12/23/2020 |
1030 |
FIELD SURVEY |
CA-XR122K1062035700384 |
|
|
$130.31 |
000001070122-3562503204 |
2021 |
6 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700384 |
|
|
$5.14 |
000001070122-3562503204 |
2021 |
6 |
FD04 |
03 |
E124 |
D |
9455501D |
110 |
12/23/2020 |
1030 |
FIELD SURVEY |
CA-XR122K1062035700384 |
|
|
$0.27 |
000001070122-3562503204 |
2021 |
6 |
FD04 |
03 |
E124 |
D |
9455501D |
110 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700384 |
|
|
$0.01 |
000001070122-3562503204 |
2021 |
6 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
12/23/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR122K1062035700382 |
|
|
$16,466.31 |
000001069105-3562500610 |
2021 |
6 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700382 |
|
|
$1,658.10 |
000001069105-3562500610 |
2021 |
6 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
12/23/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR122K1062035700382 |
|
|
$1,203.83 |
000001069105-3562500610 |
2021 |
6 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700382 |
|
|
$120.55 |
000001069105-3562500610 |
2021 |
6 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
12/23/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR122K1062035700382 |
|
|
$13,902.44 |
000001069105-3562500610 |
2021 |
6 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700382 |
|
|
$1,399.93 |
000001069105-3562500610 |
2021 |
6 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
12/23/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR122K1062035700382 |
|
|
$2,884.82 |
000001069105-3562500610 |
2021 |
6 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700382 |
|
|
$294.39 |
000001069105-3562500610 |
2021 |
6 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
12/23/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR122K1062035700382 |
|
|
$7.19 |
000001069105-3562500610 |
2021 |
6 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700382 |
|
|
$0.73 |
000001069105-3562500610 |
2021 |
6 |
FD04 |
00 |
E361 |
D |
9455501D |
110 |
12/22/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
TP-2100011124 |
|
|
$218.00 |
|
2021 |
6 |
FD04 |
00 |
E361 |
D |
9455501D |
110 |
12/22/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
TP-2100010809 |
|
|
$278.00 |
|
2021 |
6 |
FD04 |
00 |
E229 |
D |
9455501D |
110 |
12/11/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
IET-XE13A162520345015780 |
|
|
$12,218.50 |
|
2021 |
6 |
FD04 |
00 |
E361 |
D |
9455501D |
110 |
12/10/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
TP-2100010369 |
|
|
$46.00 |
|
2021 |
6 |
FD04 |
00 |
E361 |
D |
9455501D |
110 |
12/10/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
TP-2100010385 |
|
|
$242.00 |
|
2021 |
6 |
FD04 |
00 |
E361 |
D |
9455501D |
110 |
12/10/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
TP-2100010416 |
|
|
$134.00 |
|
2021 |
6 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
12/9/2020 |
1030 |
FIELD SURVEY |
CA-XR121K1062034309702 |
|
|
$386.70 |
000001070122-3562503204 |
2021 |
6 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
12/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034309702 |
|
|
$110.68 |
000001070122-3562503204 |
2021 |
6 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
12/9/2020 |
1030 |
FIELD SURVEY |
CA-XR121K1062034309702 |
|
|
$27.05 |
000001070122-3562503204 |
2021 |
6 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
12/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034309702 |
|
|
$7.80 |
000001070122-3562503204 |
2021 |
6 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
12/9/2020 |
1030 |
FIELD SURVEY |
CA-XR121K1062034309702 |
|
|
$326.29 |
000001070122-3562503204 |
2021 |
6 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
12/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034309702 |
|
|
$93.45 |
000001070122-3562503204 |
2021 |
6 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
12/9/2020 |
1030 |
FIELD SURVEY |
CA-XR121K1062034309702 |
|
|
$91.33 |
000001070122-3562503204 |
2021 |
6 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
12/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034309702 |
|
|
$25.95 |
000001070122-3562503204 |
2021 |
6 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
12/9/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121K1062034309695 |
|
|
$511.66 |
000001065829-3562500632 |
2021 |
6 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
12/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034309695 |
|
|
$85.28 |
000001065829-3562500632 |
2021 |
6 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
12/9/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121K1062034309695 |
|
|
$39.14 |
000001065829-3562500632 |
2021 |
6 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
12/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034309695 |
|
|
$6.53 |
000001065829-3562500632 |
2021 |
6 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
12/9/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR121K1062034309700 |
|
|
$14,201.27 |
000001069105-3562500610 |
2021 |
6 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
12/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034309700 |
|
|
$9,800.82 |
000001069105-3562500610 |
2021 |
6 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
12/9/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR121K1062034309700 |
|
|
$1,036.09 |
000001069105-3562500610 |
2021 |
6 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
12/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034309700 |
|
|
$705.28 |
000001069105-3562500610 |
2021 |
6 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
12/9/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR121K1062034309700 |
|
|
$11,990.24 |
000001069105-3562500610 |
2021 |
6 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
12/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034309700 |
|
|
$8,274.84 |
000001069105-3562500610 |
2021 |
6 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
12/9/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR121K1062034309700 |
|
|
$2,475.41 |
000001069105-3562500610 |
2021 |
6 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
12/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034309700 |
|
|
$1,686.41 |
000001069105-3562500610 |
2021 |
5 |
FD04 |
00 |
E229 |
D |
9455501D |
110 |
11/30/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
IET-XE13A162520330015370 |
|
|
$2,240.00 |
|
2021 |
5 |
FD04 |
03 |
E143 |
D |
9455501D |
110 |
11/25/2020 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2100085475 |
PON22000000520 |
HMB Engineers Inc |
$31,363.20 |
Todd County 3-80001 2019-04-2 |
2021 |
5 |
FD04 |
00 |
E361 |
D |
9455501D |
110 |
11/25/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
TP-2100009508 |
|
|
$108.00 |
|
2021 |
5 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
11/23/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR112K1062032508760 |
|
|
$2,683.62 |
000001069105-3562500610 |
2021 |
5 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508760 |
|
|
$4,777.03 |
000001069105-3562500610 |
2021 |
5 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
11/23/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR112K1062032508760 |
|
|
$195.55 |
000001069105-3562500610 |
2021 |
5 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508760 |
|
|
$344.74 |
000001069105-3562500610 |
2021 |
5 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
11/23/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR112K1062032508760 |
|
|
$2,265.79 |
000001069105-3562500610 |
2021 |
5 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508760 |
|
|
$4,033.23 |
000001069105-3562500610 |
2021 |
5 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
11/23/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR112K1062032508760 |
|
|
$516.38 |
000001069105-3562500610 |
2021 |
5 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508760 |
|
|
$964.09 |
000001069105-3562500610 |
2021 |
5 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
11/23/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR112K1062032508760 |
|
|
$1.20 |
000001069105-3562500610 |
2021 |
5 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508760 |
|
|
$2.32 |
000001069105-3562500610 |
2021 |
5 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
11/23/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR112K1062032508797 |
|
|
$180.01 |
000001076099-3562500610 |
2021 |
5 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508797 |
|
|
$48.96 |
000001076099-3562500610 |
2021 |
5 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
11/23/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR112K1062032508797 |
|
|
$12.74 |
000001076099-3562500610 |
2021 |
5 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508797 |
|
|
$3.47 |
000001076099-3562500610 |
2021 |
5 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
11/23/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR112K1062032508797 |
|
|
$151.98 |
000001076099-3562500610 |
2021 |
5 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508797 |
|
|
$41.33 |
000001076099-3562500610 |
2021 |
5 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
11/23/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR112K1062032508797 |
|
|
$33.65 |
000001076099-3562500610 |
2021 |
5 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508797 |
|
|
$8.97 |
000001076099-3562500610 |
2021 |
5 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
11/23/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR112K1062032508797 |
|
|
$0.10 |
000001076099-3562500610 |
2021 |
5 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508797 |
|
|
$0.03 |
000001076099-3562500610 |
2021 |
5 |
FD04 |
00 |
E229 |
D |
9455501D |
110 |
11/12/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
IET-XE13A162520315021270 |
|
|
$5,045.00 |
|
2021 |
5 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
11/12/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR111K1062031107767 |
|
|
$5,220.37 |
000001069105-3562500610 |
2021 |
5 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
11/12/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111K1062031107767 |
|
|
$5,144.54 |
000001069105-3562500610 |
2021 |
5 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
11/12/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR111K1062031107767 |
|
|
$379.35 |
000001069105-3562500610 |
2021 |
5 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
11/12/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111K1062031107767 |
|
|
$369.36 |
000001069105-3562500610 |
2021 |
5 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
11/12/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR111K1062031107767 |
|
|
$4,407.50 |
000001069105-3562500610 |
2021 |
5 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
11/12/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111K1062031107767 |
|
|
$4,343.54 |
000001069105-3562500610 |
2021 |
5 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
11/12/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR111K1062031107767 |
|
|
$860.44 |
000001069105-3562500610 |
2021 |
5 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
11/12/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111K1062031107767 |
|
|
$925.90 |
000001069105-3562500610 |
2021 |
5 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
11/9/2020 |
1030 |
FIELD SURVEY |
CA-XR111K1062031107768 |
|
|
$1,708.59 |
000001070122-3562503204 |
2021 |
5 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
11/9/2020 |
1030 |
FIELD SURVEY |
CA-XR111K1062031107768 |
|
|
$119.79 |
000001070122-3562503204 |
2021 |
5 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
11/9/2020 |
1030 |
FIELD SURVEY |
CA-XR111K1062031107768 |
|
|
$1,442.56 |
000001070122-3562503204 |
2021 |
5 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
11/9/2020 |
1030 |
FIELD SURVEY |
CA-XR111K1062031107768 |
|
|
$403.51 |
000001070122-3562503204 |
2021 |
4 |
FD04 |
00 |
E361 |
D |
9455501D |
110 |
10/28/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
TP-2100007637 |
|
|
$98.00 |
|
2021 |
4 |
FD04 |
03 |
E143 |
D |
9455501D |
110 |
10/27/2020 |
0560 |
ENV STUDIES-ARCHAEOLOGY-CONS |
PRC-2100063998 |
PON21900002070 |
CULTURAL RESOURCE |
$4,035.45 |
Letter Agreement 93-CRS |
2021 |
4 |
FD04 |
03 |
E143 |
D |
9455501D |
110 |
10/27/2020 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2100067334 |
PON22000000520 |
HMB Engineers Inc |
$172,497.60 |
Todd County 3-80001 2019-04-2 |
2021 |
4 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
10/26/2020 |
1030 |
FIELD SURVEY |
CA-XR102K1062029706705 |
|
|
$161.54 |
000001070122-3562503204 |
2021 |
4 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
10/26/2020 |
1030 |
FIELD SURVEY |
CA-XR102K1062029706705 |
|
|
$11.70 |
000001070122-3562503204 |
2021 |
4 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
10/26/2020 |
1030 |
FIELD SURVEY |
CA-XR102K1062029706705 |
|
|
$136.39 |
000001070122-3562503204 |
2021 |
4 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
10/26/2020 |
1030 |
FIELD SURVEY |
CA-XR102K1062029706705 |
|
|
$39.18 |
000001070122-3562503204 |
2021 |
4 |
FD04 |
03 |
E124 |
D |
9455501D |
110 |
10/26/2020 |
1030 |
FIELD SURVEY |
CA-XR102K1062029706705 |
|
|
$0.09 |
000001070122-3562503204 |
2021 |
4 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
10/26/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR102K1062029706703 |
|
|
$3,589.05 |
000001069105-3562500610 |
2021 |
4 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
10/26/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102K1062029706703 |
|
|
$32.24 |
000001069105-3562500610 |
2021 |
4 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
10/26/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR102K1062029706703 |
|
|
$263.00 |
000001069105-3562500610 |
2021 |
4 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
10/26/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102K1062029706703 |
|
|
$2.24 |
000001069105-3562500610 |
2021 |
4 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
10/26/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR102K1062029706703 |
|
|
$3,029.96 |
000001069105-3562500610 |
2021 |
4 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
10/26/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102K1062029706703 |
|
|
$27.21 |
000001069105-3562500610 |
2021 |
4 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
10/26/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR102K1062029706703 |
|
|
$575.49 |
000001069105-3562500610 |
2021 |
4 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
10/26/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102K1062029706703 |
|
|
$4.75 |
000001069105-3562500610 |
2021 |
4 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
10/26/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR102K1062029706703 |
|
|
$1.39 |
000001069105-3562500610 |
2021 |
4 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
10/26/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102K1062029706703 |
|
|
$0.01 |
000001069105-3562500610 |
2021 |
4 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
10/12/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR101K1062028205685 |
|
|
$2,021.49 |
000001069105-3562500610 |
2021 |
4 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
10/12/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101K1062028205685 |
|
|
$155.34 |
000001069105-3562500610 |
2021 |
4 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
10/12/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR101K1062028205685 |
|
|
$148.51 |
000001069105-3562500610 |
2021 |
4 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
10/12/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101K1062028205685 |
|
|
$11.58 |
000001069105-3562500610 |
2021 |
4 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
10/12/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR101K1062028205685 |
|
|
$1,706.73 |
000001069105-3562500610 |
2021 |
4 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
10/12/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101K1062028205685 |
|
|
$131.16 |
000001069105-3562500610 |
2021 |
4 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
10/12/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR101K1062028205685 |
|
|
$316.82 |
000001069105-3562500610 |
2021 |
4 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
10/12/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101K1062028205685 |
|
|
$25.36 |
000001069105-3562500610 |
2021 |
1 |
FD04 |
03 |
E143 |
D |
9455501D |
110 |
7/20/2020 |
0560 |
ENV STUDIES-ARCHAEOLOGY-CONS |
PRC-2100009742 |
PON21900002070 |
CULTURAL RESOURCE |
$1,848.31 |
47 CRS |
2020 |
12 |
FD04 |
03 |
E143 |
D |
9455501D |
110 |
6/30/2020 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2000219536 |
PON22000000520 |
HMB Engineers Inc |
$11,107.76 |
Todd County 3-80001 2019-04-2 |
2020 |
11 |
FD04 |
03 |
E143 |
D |
9455501D |
110 |
5/28/2020 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2000200977 |
PON22000000520 |
HMB Engineers Inc |
$10,594.29 |
Todd County 3-80001 2019-04-2 |
2020 |
10 |
FD04 |
03 |
E143 |
D |
9455501D |
110 |
4/27/2020 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2000184471 |
PON22000000520 |
HMB Engineers Inc |
$15,134.70 |
Todd County 3-80001 2019-04-2 |
2020 |
9 |
FD04 |
03 |
E143 |
D |
9455501D |
110 |
3/25/2020 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2000163646 |
PON22000000520 |
HMB Engineers Inc |
$75,808.20 |
Todd County 3-80001 2019-04-2 |
2020 |
7 |
FD04 |
03 |
E143 |
D |
9455501D |
110 |
1/16/2020 |
0560 |
ENV STUDIES-ARCHAEOLOGY-CONS |
PRC-2000112214 |
PON21900002070 |
CULTURAL RESOURCE |
$7,393.22 |
47 CRS |
2020 |
7 |
FD04 |
03 |
E143 |
D |
9455501D |
110 |
1/15/2020 |
0570 |
ENV STUDIES-HIST/CULT-CONSULT |
PRC-2000119086 |
PON21900001906 |
H W Lochner Inc |
$9,246.00 |
28-EMM |
2020 |
6 |
FD04 |
03 |
E143 |
D |
9455501D |
110 |
12/6/2019 |
0510 |
ENV STUDIES-UST/HZM |
PRC-2000092204 |
PON21900002073 |
WOOD ENVIRONMENT & INFRASTRUCTURE SOLUTIONS INC |
$7,851.07 |
44-JWM |
2020 |
5 |
FD04 |
03 |
E143 |
D |
9455501D |
110 |
11/5/2019 |
0560 |
ENV STUDIES-ARCHAEOLOGY-CONS |
PRC-2000071811 |
PON21900002070 |
CULTURAL RESOURCE |
$9,241.53 |
47 CRS |
2020 |
4 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
10/31/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR102J1061929702530 |
|
|
$159.15 |
000001068830-3562500061 |
2020 |
4 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
10/31/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102J1061929702530 |
|
|
$46.07 |
000001068830-3562500061 |
2020 |
4 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
10/31/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR102J1061929702530 |
|
|
$12.01 |
000001068830-3562500061 |
2020 |
4 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
10/31/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102J1061929702530 |
|
|
$3.47 |
000001068830-3562500061 |
2020 |
4 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
10/31/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR102J1061929702530 |
|
|
$132.84 |
000001068830-3562500061 |
2020 |
4 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
10/31/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102J1061929702530 |
|
|
$38.43 |
000001068830-3562500061 |
2020 |
4 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
10/31/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR102J1061929702530 |
|
|
$30.60 |
000001068830-3562500061 |
2020 |
4 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
10/31/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102J1061929702530 |
|
|
$8.68 |
000001068830-3562500061 |
2020 |
4 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
10/31/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR102J1061929702530 |
|
|
$0.09 |
000001068830-3562500061 |
2020 |
4 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
10/31/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102J1061929702530 |
|
|
$0.03 |
000001068830-3562500061 |
2020 |
4 |
FD04 |
00 |
E229 |
D |
9455501D |
110 |
10/28/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
IET-XE13A162519298025000 |
|
|
$116.28 |
|
2020 |
4 |
FD04 |
03 |
E143 |
D |
9455501D |
110 |
10/18/2019 |
0570 |
ENV STUDIES-HIST/CULT-CONSULT |
PRC-2000068351 |
PON21900001906 |
H W Lochner Inc |
$9,011.00 |
28-EMM |
2020 |
4 |
FD04 |
03 |
E143 |
D |
9455501D |
110 |
10/18/2019 |
0510 |
ENV STUDIES-UST/HZM |
PRC-2000067321 |
PON21900002073 |
WOOD ENVIRONMENT & INFRASTRUCTURE SOLUTIONS INC |
$3,750.93 |
44-JWM |
2020 |
4 |
FD04 |
00 |
E229 |
D |
9455501D |
110 |
10/15/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
IET-XE13A162519283024100 |
|
|
$116.28 |
|
2020 |
4 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
10/15/2019 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR101J1061928101502 |
|
|
$12.06 |
000001071047-3562500061 |
2020 |
4 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
10/15/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101J1061928101502 |
|
|
$1.44 |
000001071047-3562500061 |
2020 |
4 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
10/15/2019 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR101J1061928101502 |
|
|
$14.41 |
000001071047-3562500061 |
2020 |
4 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
10/15/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101J1061928101502 |
|
|
$1.73 |
000001071047-3562500061 |
2020 |
4 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
10/15/2019 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR101J1061928101502 |
|
|
$1.11 |
000001071047-3562500061 |
2020 |
4 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
10/15/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101J1061928101502 |
|
|
$0.14 |
000001071047-3562500061 |
2020 |
4 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
10/9/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR101J1061928101482 |
|
|
$928.82 |
000001068830-3562500061 |
2020 |
4 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
10/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101J1061928101482 |
|
|
$506.96 |
000001068830-3562500061 |
2020 |
4 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
10/9/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR101J1061928101482 |
|
|
$68.77 |
000001068830-3562500061 |
2020 |
4 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
10/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101J1061928101482 |
|
|
$38.03 |
000001068830-3562500061 |
2020 |
4 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
10/9/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR101J1061928101482 |
|
|
$774.90 |
000001068830-3562500061 |
2020 |
4 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
10/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101J1061928101482 |
|
|
$422.95 |
000001068830-3562500061 |
2020 |
4 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
10/9/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR101J1061928101482 |
|
|
$157.13 |
000001068830-3562500061 |
2020 |
4 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
10/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101J1061928101482 |
|
|
$91.96 |
000001068830-3562500061 |
2020 |
3 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
9/25/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092J1061926700411 |
|
|
$273.70 |
000001067619-3562503204 |
2020 |
3 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
9/25/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092J1061926700411 |
|
|
$30.28 |
000001067619-3562503204 |
2020 |
3 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
9/25/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092J1061926700411 |
|
|
$19.90 |
000001067619-3562503204 |
2020 |
3 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
9/25/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092J1061926700411 |
|
|
$2.20 |
000001067619-3562503204 |
2020 |
3 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
9/25/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092J1061926700411 |
|
|
$228.27 |
000001067619-3562503204 |
2020 |
3 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
9/25/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092J1061926700411 |
|
|
$25.26 |
000001067619-3562503204 |
2020 |
3 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
9/25/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092J1061926700411 |
|
|
$33.56 |
000001067619-3562503204 |
2020 |
3 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
9/25/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092J1061926700411 |
|
|
$3.65 |
000001067619-3562503204 |
2020 |
3 |
FD04 |
03 |
E124 |
D |
9455501D |
110 |
9/25/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092J1061926700411 |
|
|
$0.10 |
000001067619-3562503204 |
2020 |
3 |
FD04 |
03 |
E124 |
D |
9455501D |
110 |
9/25/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092J1061926700411 |
|
|
$0.01 |
000001067619-3562503204 |
2020 |
3 |
FD04 |
00 |
E229 |
D |
9455501D |
110 |
9/24/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
IET-XE13A162519266032970 |
|
|
$209.30 |
|
2020 |
3 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
9/9/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091J1061924909298 |
|
|
$2,603.39 |
000001067619-3562503204 |
2020 |
3 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
9/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091J1061924909298 |
|
|
$132.66 |
000001067619-3562503204 |
2020 |
3 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
9/9/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091J1061924909298 |
|
|
$214.16 |
000001067619-3562503204 |
2020 |
3 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
9/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091J1061924909298 |
|
|
$10.84 |
000001067619-3562503204 |
2020 |
3 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
9/9/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091J1061924909298 |
|
|
$2,172.01 |
000001067619-3562503204 |
2020 |
3 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
9/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091J1061924909298 |
|
|
$110.68 |
000001067619-3562503204 |
2020 |
3 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
9/9/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091J1061924909298 |
|
|
($150.50) |
000001067619-3562503204 |
2020 |
3 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
9/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091J1061924909298 |
|
|
($7.05) |
000001067619-3562503204 |
2020 |
3 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
9/9/2019 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR091J1061924909301 |
|
|
$1.72 |
000001068747-3562503204 |
2020 |
3 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
9/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091J1061924909301 |
|
|
$0.13 |
000001068747-3562503204 |
2020 |
3 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
9/9/2019 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR091J1061924909301 |
|
|
($32.42) |
000001068747-3562503204 |
2020 |
3 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
9/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091J1061924909301 |
|
|
($2.59) |
000001068747-3562503204 |
2020 |
2 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
8/29/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082J1061923508105 |
|
|
$2,047.50 |
000001067619-3562503204 |
2020 |
2 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
8/29/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082J1061923508105 |
|
|
$25.18 |
000001067619-3562503204 |
2020 |
2 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
8/29/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082J1061923508105 |
|
|
$466.11 |
000001067619-3562503204 |
2020 |
2 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
8/29/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082J1061923508105 |
|
|
$5.68 |
000001067619-3562503204 |
2020 |
2 |
FD04 |
03 |
E124 |
D |
9455501D |
110 |
8/29/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082J1061923508105 |
|
|
$0.90 |
000001067619-3562503204 |
2020 |
2 |
FD04 |
03 |
E124 |
D |
9455501D |
110 |
8/29/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082J1061923508105 |
|
|
$0.01 |
000001067619-3562503204 |
2020 |
2 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
8/29/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082J1061923508105 |
|
|
$2,454.15 |
000001067619-3562503204 |
2020 |
2 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
8/29/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082J1061923508105 |
|
|
$30.18 |
000001067619-3562503204 |
2020 |
2 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
8/29/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082J1061923508105 |
|
|
$169.72 |
000001067619-3562503204 |
2020 |
2 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
8/29/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082J1061923508105 |
|
|
$2.09 |
000001067619-3562503204 |
2020 |
2 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
8/26/2019 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR082J1061923508108 |
|
|
$248.73 |
000001068747-3562503204 |
2020 |
2 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
8/26/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082J1061923508108 |
|
|
$2.99 |
000001068747-3562503204 |
2020 |
2 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
8/26/2019 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR082J1061923508108 |
|
|
$17.20 |
000001068747-3562503204 |
2020 |
2 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
8/26/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082J1061923508108 |
|
|
$0.21 |
000001068747-3562503204 |
2020 |
2 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
8/26/2019 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR082J1061923508108 |
|
|
$207.52 |
000001068747-3562503204 |
2020 |
2 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
8/26/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082J1061923508108 |
|
|
$2.49 |
000001068747-3562503204 |
2020 |
2 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
8/26/2019 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR082J1061923508108 |
|
|
$47.24 |
000001068747-3562503204 |
2020 |
2 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
8/26/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082J1061923508108 |
|
|
$0.56 |
000001068747-3562503204 |
2020 |
2 |
FD04 |
03 |
E124 |
D |
9455501D |
110 |
8/26/2019 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR082J1061923508108 |
|
|
$0.09 |
000001068747-3562503204 |
2020 |
2 |
FD04 |
00 |
E229 |
D |
9455501D |
110 |
8/22/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
IET-XE13A162519233039030 |
|
|
$209.30 |
|
2020 |
2 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
8/12/2019 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR081J1061922106938 |
|
|
$80.27 |
000001068578-3562500061 |
2020 |
2 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
8/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081J1061922106938 |
|
|
$2.75 |
000001068578-3562500061 |
2020 |
2 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
8/12/2019 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR081J1061922106939 |
|
|
$264.59 |
000001068747-3562503204 |
2020 |
2 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
8/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081J1061922106939 |
|
|
$139.00 |
000001068747-3562503204 |
2020 |
2 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
8/12/2019 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR081J1061922106939 |
|
|
$19.82 |
000001068747-3562503204 |
2020 |
2 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
8/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081J1061922106939 |
|
|
$10.41 |
000001068747-3562503204 |
2020 |
2 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
8/12/2019 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR081J1061922106939 |
|
|
$220.74 |
000001068747-3562503204 |
2020 |
2 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
8/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081J1061922106939 |
|
|
$115.97 |
000001068747-3562503204 |
2020 |
2 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
8/12/2019 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR081J1061922106939 |
|
|
$28.15 |
000001068747-3562503204 |
2020 |
2 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
8/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081J1061922106939 |
|
|
$14.45 |
000001068747-3562503204 |
2020 |
2 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
8/12/2019 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR081J1061922106938 |
|
|
$14.56 |
000001068578-3562500061 |
2020 |
2 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
8/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081J1061922106938 |
|
|
$0.49 |
000001068578-3562500061 |
2020 |
2 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
8/12/2019 |
1030 |
FIELD SURVEY |
CA-XR081J1061922106960 |
|
|
$252.99 |
000001070122-3562503204 |
2020 |
2 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
8/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081J1061922106960 |
|
|
$24.67 |
000001070122-3562503204 |
2020 |
2 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
8/12/2019 |
1030 |
FIELD SURVEY |
CA-XR081J1061922106960 |
|
|
$18.58 |
000001070122-3562503204 |
2020 |
2 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
8/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081J1061922106960 |
|
|
$1.82 |
000001070122-3562503204 |
2020 |
2 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
8/12/2019 |
1030 |
FIELD SURVEY |
CA-XR081J1061922106960 |
|
|
$210.60 |
000001070122-3562503204 |
2020 |
2 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
8/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081J1061922106960 |
|
|
$20.59 |
000001070122-3562503204 |
2020 |
2 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
8/12/2019 |
1030 |
FIELD SURVEY |
CA-XR081J1061922106960 |
|
|
$54.44 |
000001070122-3562503204 |
2020 |
2 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
8/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081J1061922106960 |
|
|
$5.07 |
000001070122-3562503204 |
2020 |
2 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
8/12/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081J1061922106935 |
|
|
$2,006.44 |
000001067619-3562503204 |
2020 |
2 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
8/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081J1061922106935 |
|
|
$57.15 |
000001067619-3562503204 |
2020 |
2 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
8/12/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081J1061922106935 |
|
|
$138.76 |
000001067619-3562503204 |
2020 |
2 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
8/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081J1061922106935 |
|
|
$3.96 |
000001067619-3562503204 |
2020 |
2 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
8/12/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081J1061922106935 |
|
|
$1,673.98 |
000001067619-3562503204 |
2020 |
2 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
8/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081J1061922106935 |
|
|
$47.68 |
000001067619-3562503204 |
2020 |
2 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
8/12/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081J1061922106935 |
|
|
$381.14 |
000001067619-3562503204 |
2020 |
2 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
8/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081J1061922106935 |
|
|
$10.75 |
000001067619-3562503204 |
2020 |
2 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
8/12/2019 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR081J1061922106937 |
|
|
$96.25 |
000001068578-3562500061 |
2020 |
2 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
8/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081J1061922106937 |
|
|
$3.30 |
000001068578-3562500061 |
2020 |
2 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
8/12/2019 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR081J1061922106937 |
|
|
$7.24 |
000001068578-3562500061 |
2020 |
2 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
8/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081J1061922106937 |
|
|
$0.25 |
000001068578-3562500061 |
2020 |
1 |
FD04 |
03 |
E143 |
D |
9455501D |
110 |
7/26/2019 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2000012314 |
PON21900003494 |
MUNICIPAL ENGINEERING CO |
$103,547.25 |
Todd County 3-80001 2019-04-2 |
2020 |
1 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
7/24/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072J1061920405834 |
|
|
$0.11 |
000001068830-3562500061 |
2020 |
1 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
7/24/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR072J1061920405817 |
|
|
$282.69 |
000001065829-3562500636 |
2020 |
1 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
7/24/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072J1061920405817 |
|
|
$119.52 |
000001065829-3562500636 |
2020 |
1 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
7/24/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR072J1061920405817 |
|
|
$20.09 |
000001065829-3562500636 |
2020 |
1 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
7/24/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072J1061920405817 |
|
|
$8.49 |
000001065829-3562500636 |
2020 |
1 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
7/24/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR072J1061920405817 |
|
|
$235.92 |
000001065829-3562500636 |
2020 |
1 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
7/24/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072J1061920405817 |
|
|
$99.71 |
000001065829-3562500636 |
2020 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/24/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR072J1061920405817 |
|
|
$33.49 |
000001065829-3562500636 |
2020 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/24/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072J1061920405817 |
|
|
$13.89 |
000001065829-3562500636 |
2020 |
1 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
7/24/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR072J1061920405817 |
|
|
$0.09 |
000001065829-3562500636 |
2020 |
1 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
7/24/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072J1061920405817 |
|
|
$0.04 |
000001065829-3562500636 |
2020 |
1 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
7/24/2019 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR072J1061920405833 |
|
|
$232.15 |
000001068747-3562503204 |
2020 |
1 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
7/24/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072J1061920405833 |
|
|
$35.49 |
000001068747-3562503204 |
2020 |
1 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
7/24/2019 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR072J1061920405833 |
|
|
$16.05 |
000001068747-3562503204 |
2020 |
1 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
7/24/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072J1061920405833 |
|
|
$2.46 |
000001068747-3562503204 |
2020 |
1 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
7/24/2019 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR072J1061920405833 |
|
|
$193.69 |
000001068747-3562503204 |
2020 |
1 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
7/24/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072J1061920405833 |
|
|
$29.61 |
000001068747-3562503204 |
2020 |
1 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
7/24/2019 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR072J1061920405833 |
|
|
$44.16 |
000001068747-3562503204 |
2020 |
1 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
7/24/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072J1061920405833 |
|
|
$6.67 |
000001068747-3562503204 |
2020 |
1 |
FD04 |
03 |
E124 |
D |
9455501D |
110 |
7/24/2019 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR072J1061920405833 |
|
|
$0.08 |
000001068747-3562503204 |
2020 |
1 |
FD04 |
03 |
E124 |
D |
9455501D |
110 |
7/24/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072J1061920405833 |
|
|
$0.01 |
000001068747-3562503204 |
2020 |
1 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
7/24/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR072J1061920405829 |
|
|
$1,409.48 |
000001067619-3562503204 |
2020 |
1 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
7/24/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072J1061920405829 |
|
|
$216.89 |
000001067619-3562503204 |
2020 |
1 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
7/24/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR072J1061920405829 |
|
|
$97.46 |
000001067619-3562503204 |
2020 |
1 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
7/24/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072J1061920405829 |
|
|
$15.00 |
000001067619-3562503204 |
2020 |
1 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
7/24/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR072J1061920405829 |
|
|
$1,175.93 |
000001067619-3562503204 |
2020 |
1 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
7/24/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072J1061920405829 |
|
|
$180.95 |
000001067619-3562503204 |
2020 |
1 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
7/24/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR072J1061920405829 |
|
|
$268.07 |
000001067619-3562503204 |
2020 |
1 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
7/24/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072J1061920405829 |
|
|
$40.78 |
000001067619-3562503204 |
2020 |
1 |
FD04 |
03 |
E124 |
D |
9455501D |
110 |
7/24/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR072J1061920405829 |
|
|
$0.52 |
000001067619-3562503204 |
2020 |
1 |
FD04 |
03 |
E124 |
D |
9455501D |
110 |
7/24/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072J1061920405829 |
|
|
$0.08 |
000001067619-3562503204 |
2020 |
1 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
7/24/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR072J1061920405833 |
|
|
$636.90 |
000001068830-3562500061 |
2020 |
1 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
7/24/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072J1061920405833 |
|
|
$197.01 |
000001068830-3562500061 |
2020 |
1 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
7/24/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR072J1061920405833 |
|
|
$48.03 |
000001068830-3562500061 |
2020 |
1 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
7/24/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072J1061920405833 |
|
|
$14.85 |
000001068830-3562500061 |
2020 |
1 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
7/24/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR072J1061920405833 |
|
|
$531.36 |
000001068830-3562500061 |
2020 |
1 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
7/24/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072J1061920405833 |
|
|
$164.36 |
000001068830-3562500061 |
2020 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/24/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR072J1061920405833 |
|
|
$122.43 |
000001068830-3562500061 |
2020 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/24/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072J1061920405833 |
|
|
$37.12 |
000001068830-3562500061 |
2020 |
1 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
7/24/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR072J1061920405833 |
|
|
$0.36 |
000001068830-3562500061 |
2020 |
1 |
FD04 |
00 |
E229 |
D |
9455501D |
110 |
7/16/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
IET-XE13A162519165033050 |
|
|
$152.00 |
|
2020 |
1 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
7/15/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071J1061919004779 |
|
|
$5.07 |
000001068578-3562500061 |
2020 |
1 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
7/15/2019 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR071J1061919004779 |
|
|
$10.85 |
000001068578-3562500061 |
2020 |
1 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
7/15/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071J1061919004779 |
|
|
$0.37 |
000001068578-3562500061 |
2020 |
1 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
7/15/2019 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR071J1061919004779 |
|
|
$121.78 |
000001068578-3562500061 |
2020 |
1 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
7/15/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071J1061919004779 |
|
|
$4.23 |
000001068578-3562500061 |
2020 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/15/2019 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR071J1061919004779 |
|
|
$31.46 |
000001068578-3562500061 |
2020 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/15/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071J1061919004779 |
|
|
$1.08 |
000001068578-3562500061 |
2020 |
1 |
FD04 |
00 |
E229 |
D |
9455501D |
110 |
7/12/2019 |
0010 |
ENV STUDIES-UST/HZM |
IET-XE13A162519191008090 |
|
|
$204.00 |
|
2020 |
1 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
7/10/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR071J1061919004777 |
|
|
$1,094.42 |
000001067619-3562503204 |
2020 |
1 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
7/10/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071J1061919004777 |
|
|
$37.58 |
000001067619-3562503204 |
2020 |
1 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
7/10/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR071J1061919004777 |
|
|
$75.68 |
000001067619-3562503204 |
2020 |
1 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
7/10/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071J1061919004777 |
|
|
$2.61 |
000001067619-3562503204 |
2020 |
1 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
7/10/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR071J1061919004777 |
|
|
$913.08 |
000001067619-3562503204 |
2020 |
1 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
7/10/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071J1061919004777 |
|
|
$31.35 |
000001067619-3562503204 |
2020 |
1 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
7/10/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR071J1061919004777 |
|
|
$207.90 |
000001067619-3562503204 |
2020 |
1 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
7/10/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071J1061919004777 |
|
|
$7.06 |
000001067619-3562503204 |
2020 |
1 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
7/10/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR071J1061919004767 |
|
|
$331.79 |
000001065829-3562500636 |
2020 |
1 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
7/10/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071J1061919004767 |
|
|
$82.95 |
000001065829-3562500636 |
2020 |
1 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
7/10/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR071J1061919004767 |
|
|
$23.57 |
000001065829-3562500636 |
2020 |
1 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
7/10/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071J1061919004767 |
|
|
$5.90 |
000001065829-3562500636 |
2020 |
1 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
7/10/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR071J1061919004767 |
|
|
$276.80 |
000001065829-3562500636 |
2020 |
1 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
7/10/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071J1061919004767 |
|
|
$69.21 |
000001065829-3562500636 |
2020 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/10/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR071J1061919004767 |
|
|
$39.20 |
000001065829-3562500636 |
2020 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/10/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071J1061919004767 |
|
|
$9.63 |
000001065829-3562500636 |
2020 |
1 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
7/10/2019 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR071J1061919004778 |
|
|
$146.14 |
000001068578-3562500061 |
2020 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/2/2019 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR061J1061915802563P |
|
|
$27.99 |
000001069105-3562500610 |
2020 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/2/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802563P |
|
|
$4.03 |
000001069105-3562500610 |
2020 |
1 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
7/2/2019 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR061J1061915802548P |
|
|
$43.37 |
000001068747-3562503204 |
2020 |
1 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
7/2/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802548P |
|
|
$6.29 |
000001068747-3562503204 |
2020 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/2/2019 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR061J1061915802563P |
|
|
$47.64 |
000001069107-3562500610 |
2020 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/1/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802564P |
|
|
$6.92 |
000001069107-3562500610 |
2020 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/1/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR061J1061915802527P |
|
|
$30.68 |
000001065829-3562500636 |
2020 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/1/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802527P |
|
|
$11.60 |
000001065829-3562500636 |
2020 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/1/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR061J1061915802552P |
|
|
$80.77 |
000001068830-3562500061 |
2020 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/1/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802552P |
|
|
$46.71 |
000001068830-3562500061 |
2020 |
1 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
7/1/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062J1061917103673 |
|
|
$2,188.84 |
000001067619-3562503204 |
2020 |
1 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
7/1/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062J1061917103673 |
|
|
$123.31 |
000001067619-3562503204 |
2020 |
1 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
7/1/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062J1061917103673 |
|
|
$151.38 |
000001067619-3562503204 |
2020 |
1 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
7/1/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062J1061917103673 |
|
|
$8.53 |
000001067619-3562503204 |
2020 |
1 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
7/1/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062J1061917103673 |
|
|
$1,826.14 |
000001067619-3562503204 |
2020 |
1 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
7/1/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062J1061917103673 |
|
|
$102.88 |
000001067619-3562503204 |
2020 |
1 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
7/1/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062J1061917103673 |
|
|
$415.90 |
000001067619-3562503204 |
2020 |
1 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
7/1/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062J1061917103673 |
|
|
$23.19 |
000001067619-3562503204 |
2020 |
1 |
FD04 |
03 |
E124 |
D |
9455501D |
110 |
7/1/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062J1061917103673 |
|
|
$0.79 |
000001067619-3562503204 |
2020 |
1 |
FD04 |
03 |
E124 |
D |
9455501D |
110 |
7/1/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062J1061917103673 |
|
|
$0.05 |
000001067619-3562503204 |
2020 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/1/2019 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR061J1061915802566P |
|
|
$9.34 |
000001069164-3562500610 |
2020 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/1/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802566P |
|
|
$2.08 |
000001069164-3562500610 |
2020 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/1/2019 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR061J1061915802543P |
|
|
$35.10 |
000001068578-3562500061 |
2020 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/1/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802543P |
|
|
$5.07 |
000001068578-3562500061 |
2020 |
1 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
7/1/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR061J1061915802539P |
|
|
$193.68 |
000001067619-3562503204 |
2020 |
1 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
7/1/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802539P |
|
|
$28.06 |
000001067619-3562503204 |
2020 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/1/2019 |
1060 |
RDWAY PLANS-FINAL-DRAINAGE SEC |
CA-XR061J1061915802550P |
|
|
$31.63 |
000001068804-3562500630 |
2020 |
1 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
7/1/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802550P |
|
|
$30.78 |
000001068804-3562500630 |
2019 |
12 |
FD04 |
03 |
E143 |
D |
9455501D |
110 |
6/17/2019 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-1900211303 |
PON21900003494 |
MUNICIPAL ENGINEERING CO |
$53,896.80 |
Todd County 3-80001 2019-04-2 |
2019 |
12 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
6/14/2019 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR061J1061915802566 |
|
|
$79.87 |
000001069164-3562500610 |
2019 |
12 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
6/14/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802566 |
|
|
$18.24 |
000001069164-3562500610 |
2019 |
12 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
6/14/2019 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR061J1061915802566 |
|
|
$6.01 |
000001069164-3562500610 |
2019 |
12 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
6/14/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802566 |
|
|
$1.37 |
000001069164-3562500610 |
2019 |
12 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
6/14/2019 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR061J1061915802566 |
|
|
$66.73 |
000001069164-3562500610 |
2019 |
12 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
6/14/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802566 |
|
|
$15.22 |
000001069164-3562500610 |
2019 |
12 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
6/14/2019 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR061J1061915802563 |
|
|
$297.45 |
000001069105-3562500610 |
2019 |
12 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
6/14/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802563 |
|
|
$43.62 |
000001069105-3562500610 |
2019 |
12 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
6/14/2019 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR061J1061915802563 |
|
|
$22.59 |
000001069105-3562500610 |
2019 |
12 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
6/14/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802563 |
|
|
$3.32 |
000001069105-3562500610 |
2019 |
12 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
6/14/2019 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR061J1061915802563 |
|
|
$248.10 |
000001069105-3562500610 |
2019 |
12 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
6/14/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802563 |
|
|
$36.39 |
000001069105-3562500610 |
2019 |
12 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
6/14/2019 |
1060 |
RDWAY PLANS-FINAL-DRAINAGE SEC |
CA-XR061J1061915802550 |
|
|
$226.57 |
000001068804-3562500630 |
2019 |
12 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
6/14/2019 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR061J1061915802548 |
|
|
$227.93 |
000001068747-3562503204 |
2019 |
12 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
6/14/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802550 |
|
|
$226.57 |
000001068804-3562500630 |
2019 |
12 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
6/14/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802548 |
|
|
$33.44 |
000001068747-3562503204 |
2019 |
12 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
6/14/2019 |
1060 |
RDWAY PLANS-FINAL-DRAINAGE SEC |
CA-XR061J1061915802550 |
|
|
$16.68 |
000001068804-3562500630 |
2019 |
12 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
6/14/2019 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR061J1061915802548 |
|
|
$15.77 |
000001068747-3562503204 |
2019 |
12 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
6/14/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802550 |
|
|
$16.68 |
000001068804-3562500630 |
2019 |
12 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
6/14/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802548 |
|
|
$2.32 |
000001068747-3562503204 |
2019 |
12 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
6/14/2019 |
1060 |
RDWAY PLANS-FINAL-DRAINAGE SEC |
CA-XR061J1061915802550 |
|
|
$189.03 |
000001068804-3562500630 |
2019 |
12 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
6/14/2019 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR061J1061915802563 |
|
|
$267.75 |
000001069107-3562500610 |
2019 |
12 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
6/14/2019 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR061J1061915802548 |
|
|
$190.22 |
000001068747-3562503204 |
2019 |
12 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
6/14/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802550 |
|
|
$189.03 |
000001068804-3562500630 |
2019 |
12 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
6/14/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802563 |
|
|
$39.25 |
000001069107-3562500610 |
2019 |
12 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
6/14/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802548 |
|
|
$27.90 |
000001068747-3562503204 |
2019 |
12 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
6/14/2019 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR061J1061915802563 |
|
|
$19.06 |
000001069107-3562500610 |
2019 |
12 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
6/14/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802563 |
|
|
$2.79 |
000001069107-3562500610 |
2019 |
12 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
6/14/2019 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR061J1061915802563 |
|
|
$223.28 |
000001069107-3562500610 |
2019 |
12 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
6/14/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802563 |
|
|
$32.74 |
000001069107-3562500610 |
2019 |
12 |
FD04 |
03 |
E143 |
D |
9455501D |
110 |
6/10/2019 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-1900207821 |
PON21900001777 |
WOOLPERT INC |
$120,132.82 |
Todd Co. |
2019 |
12 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
6/10/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR061J1061915802527 |
|
|
$259.21 |
000001065829-3562500636 |
2019 |
12 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
6/10/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802527 |
|
|
$99.89 |
000001065829-3562500636 |
2019 |
12 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
6/10/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR061J1061915802552 |
|
|
$418.45 |
000001068830-3562500061 |
2019 |
12 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
6/10/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR061J1061915802527 |
|
|
$18.41 |
000001065829-3562500636 |
2019 |
12 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
6/10/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802552 |
|
|
$247.92 |
000001068830-3562500061 |
2019 |
12 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
6/10/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802527 |
|
|
$7.09 |
000001065829-3562500636 |
2019 |
12 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
6/10/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR061J1061915802552 |
|
|
$31.55 |
000001068830-3562500061 |
2019 |
12 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
6/10/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR061J1061915802527 |
|
|
$216.26 |
000001065829-3562500636 |
2019 |
12 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
6/10/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802552 |
|
|
$18.69 |
000001068830-3562500061 |
2019 |
12 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
6/10/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802527 |
|
|
$83.35 |
000001065829-3562500636 |
2019 |
12 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
6/10/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR061J1061915802552 |
|
|
$349.07 |
000001068830-3562500061 |
2019 |
12 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
6/10/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802552 |
|
|
$206.84 |
000001068830-3562500061 |
2019 |
12 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
6/10/2019 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR061J1061915802543 |
|
|
$162.41 |
000001068578-3562500061 |
2019 |
12 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
6/10/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802543 |
|
|
$23.87 |
000001068578-3562500061 |
2019 |
12 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
6/10/2019 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR061J1061915802543 |
|
|
$12.04 |
000001068578-3562500061 |
2019 |
12 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
6/10/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802543 |
|
|
$1.78 |
000001068578-3562500061 |
2019 |
12 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
6/10/2019 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR061J1061915802543 |
|
|
$135.50 |
000001068578-3562500061 |
2019 |
12 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
6/10/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802543 |
|
|
$19.92 |
000001068578-3562500061 |
2019 |
12 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
6/10/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR061J1061915802539 |
|
|
$1,018.35 |
000001067619-3562503204 |
2019 |
12 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
6/10/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802539 |
|
|
$149.26 |
000001067619-3562503204 |
2019 |
12 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
6/10/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR061J1061915802539 |
|
|
$70.43 |
000001067619-3562503204 |
2019 |
12 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
6/10/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802539 |
|
|
$10.32 |
000001067619-3562503204 |
2019 |
12 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
6/10/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR061J1061915802539 |
|
|
$849.67 |
000001067619-3562503204 |
2019 |
12 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
6/10/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802539 |
|
|
$124.53 |
000001067619-3562503204 |
2019 |
11 |
FD04 |
00 |
E229 |
D |
9455501D |
110 |
5/29/2019 |
0092 |
ENV STUDIES-PERMITTING |
IET-XE13A162519145012450 |
|
|
$164.16 |
|
2019 |
11 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
5/23/2019 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR052J1061914201387 |
|
|
$189.33 |
000001068576-3562500061 |
2019 |
11 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
5/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052J1061914201387 |
|
|
$4.80 |
000001068576-3562500061 |
2019 |
11 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
5/23/2019 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR052J1061914201387 |
|
|
$14.40 |
000001068576-3562500061 |
2019 |
11 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
5/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052J1061914201387 |
|
|
$0.37 |
000001068576-3562500061 |
2019 |
11 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
5/23/2019 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR052J1061914201387 |
|
|
$158.01 |
000001068576-3562500061 |
2019 |
11 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
5/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052J1061914201387 |
|
|
$4.00 |
000001068576-3562500061 |
2019 |
11 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
5/23/2019 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR052J1061914201387 |
|
|
$30.31 |
000001068576-3562500061 |
2019 |
11 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
5/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052J1061914201387 |
|
|
$0.76 |
000001068576-3562500061 |
2019 |
11 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
5/23/2019 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR052J1061914201387 |
|
|
$0.09 |
000001068576-3562500061 |
2019 |
11 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
5/23/2019 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR052J1061914201387 |
|
|
$265.77 |
000001068578-3562500061 |
2019 |
11 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
5/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052J1061914201387 |
|
|
$26.58 |
000001068578-3562500061 |
2019 |
11 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
5/23/2019 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR052J1061914201387 |
|
|
$19.70 |
000001068578-3562500061 |
2019 |
11 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
5/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052J1061914201387 |
|
|
$1.97 |
000001068578-3562500061 |
2019 |
11 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
5/23/2019 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR052J1061914201387 |
|
|
$221.73 |
000001068578-3562500061 |
2019 |
11 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
5/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052J1061914201387 |
|
|
$22.18 |
000001068578-3562500061 |
2019 |
11 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
5/23/2019 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR052J1061914201387 |
|
|
$57.39 |
000001068578-3562500061 |
2019 |
11 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
5/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052J1061914201387 |
|
|
$5.64 |
000001068578-3562500061 |
2019 |
11 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
5/23/2019 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR052J1061914201387 |
|
|
$0.18 |
000001068578-3562500061 |
2019 |
11 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
5/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052J1061914201387 |
|
|
$0.02 |
000001068578-3562500061 |
2019 |
11 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
5/23/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052J1061914201376 |
|
|
$248.73 |
000001067619-3562503204 |
2019 |
11 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
5/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052J1061914201376 |
|
|
$37.15 |
000001067619-3562503204 |
2019 |
11 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
5/23/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052J1061914201376 |
|
|
$17.20 |
000001067619-3562503204 |
2019 |
11 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
5/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052J1061914201376 |
|
|
$2.57 |
000001067619-3562503204 |
2019 |
11 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
5/23/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052J1061914201376 |
|
|
$207.51 |
000001067619-3562503204 |
2019 |
11 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
5/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052J1061914201376 |
|
|
$31.00 |
000001067619-3562503204 |
2019 |
11 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
5/23/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052J1061914201376 |
|
|
$47.31 |
000001067619-3562503204 |
2019 |
11 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
5/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052J1061914201376 |
|
|
$6.98 |
000001067619-3562503204 |
2019 |
11 |
FD04 |
03 |
E124 |
D |
9455501D |
110 |
5/23/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052J1061914201376 |
|
|
$0.09 |
000001067619-3562503204 |
2019 |
11 |
FD04 |
03 |
E124 |
D |
9455501D |
110 |
5/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052J1061914201376 |
|
|
$0.01 |
000001067619-3562503204 |
2019 |
11 |
FD04 |
03 |
E143 |
D |
9455501D |
110 |
5/9/2019 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-1900185205 |
PON21900003494 |
MUNICIPAL ENGINEERING CO |
$53,896.80 |
Todd County 3-80001 2019-04-2 |
2019 |
10 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
4/29/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042J1061911410304 |
|
|
$248.63 |
000001067619-3562503204 |
2019 |
10 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
4/29/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042J1061911410304 |
|
|
$26.86 |
000001067619-3562503204 |
2019 |
10 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
4/29/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042J1061911410304 |
|
|
$17.20 |
000001067619-3562503204 |
2019 |
10 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
4/29/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042J1061911410304 |
|
|
$1.85 |
000001067619-3562503204 |
2019 |
10 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
4/29/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042J1061911410304 |
|
|
$207.27 |
000001067619-3562503204 |
2019 |
10 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
4/29/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042J1061911410304 |
|
|
$22.41 |
000001067619-3562503204 |
2019 |
10 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
4/29/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042J1061911410304 |
|
|
$47.23 |
000001067619-3562503204 |
2019 |
10 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
4/29/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042J1061911410304 |
|
|
$5.05 |
000001067619-3562503204 |
2019 |
10 |
FD04 |
03 |
E124 |
D |
9455501D |
110 |
4/29/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042J1061911410304 |
|
|
$0.10 |
000001067619-3562503204 |
2019 |
10 |
FD04 |
03 |
E124 |
D |
9455501D |
110 |
4/29/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042J1061911410304 |
|
|
$0.01 |
000001067619-3562503204 |
2019 |
10 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
4/25/2019 |
0410 |
TRANSPORTATION PLANNING |
CA-XR042J1061911410316 |
|
|
$914.06 |
000001067767-3562500064 |
2019 |
10 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
4/25/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042J1061911410316 |
|
|
$55.84 |
000001067767-3562500064 |
2019 |
10 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
4/25/2019 |
0410 |
TRANSPORTATION PLANNING |
CA-XR042J1061911410316 |
|
|
$63.45 |
000001067767-3562500064 |
2019 |
10 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
4/25/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042J1061911410316 |
|
|
$3.87 |
000001067767-3562500064 |
2019 |
10 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
4/25/2019 |
0410 |
TRANSPORTATION PLANNING |
CA-XR042J1061911410316 |
|
|
$762.60 |
000001067767-3562500064 |
2019 |
10 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
4/25/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042J1061911410316 |
|
|
$46.59 |
000001067767-3562500064 |
2019 |
10 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
4/25/2019 |
0410 |
TRANSPORTATION PLANNING |
CA-XR042J1061911410316 |
|
|
$190.41 |
000001067767-3562500064 |
2019 |
10 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
4/25/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042J1061911410316 |
|
|
$11.52 |
000001067767-3562500064 |
2019 |
10 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
4/25/2019 |
0410 |
TRANSPORTATION PLANNING |
CA-XR042J1061911410316 |
|
|
$0.33 |
000001067767-3562500064 |
2019 |
10 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
4/25/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042J1061911410316 |
|
|
$0.02 |
000001067767-3562500064 |
2019 |
10 |
FD04 |
03 |
E143 |
D |
9455501D |
110 |
4/9/2019 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-1900169661 |
PON21900003494 |
MUNICIPAL ENGINEERING CO |
$53,896.80 |
Todd County 3-80001 2019-04-2 |
2019 |
9 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
3/25/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR032J1061908107962 |
|
|
$263.84 |
000001065829-3562500636 |
2019 |
9 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
3/25/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032J1061908107962 |
|
|
$28.27 |
000001065829-3562500636 |
2019 |
9 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
3/25/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR032J1061908107962 |
|
|
$18.74 |
000001065829-3562500636 |
2019 |
9 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
3/25/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032J1061908107962 |
|
|
$2.02 |
000001065829-3562500636 |
2019 |
9 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
3/25/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR032J1061908107962 |
|
|
$219.91 |
000001065829-3562500636 |
2019 |
9 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
3/25/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032J1061908107962 |
|
|
$23.59 |
000001065829-3562500636 |
2019 |
9 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
3/25/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR032J1061908107962 |
|
|
$31.07 |
000001065829-3562500636 |
2019 |
9 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
3/25/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032J1061908107962 |
|
|
$3.28 |
000001065829-3562500636 |
2019 |
9 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
3/25/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR032J1061908107962 |
|
|
$0.09 |
000001065829-3562500636 |
2019 |
9 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
3/25/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032J1061908107962 |
|
|
$0.01 |
000001065829-3562500636 |
2019 |
9 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
3/14/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
JV2E-1900005485 |
|
|
$1,030.67 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR121I1061834100371 |
2019 |
9 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
3/14/2019 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
JV2E-1900005484 |
|
|
$207.57 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR121I1061834100372 |
2019 |
9 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
3/14/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-1900005485 |
|
|
$233.80 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR121I1061834100371 |
2019 |
9 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
3/14/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-1900005484 |
|
|
$47.03 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR121I1061834100372 |
2019 |
9 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
3/14/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
JV2E-1900005485 |
|
|
$235.12 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR121I1061834100371 |
2019 |
9 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
3/14/2019 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
JV2E-1900005484 |
|
|
$47.35 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR121I1061834100372 |
2019 |
9 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
3/14/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-1900005485 |
|
|
$52.70 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR121I1061834100371 |
2019 |
9 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
3/14/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-1900005484 |
|
|
$10.60 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR121I1061834100372 |
2019 |
9 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
3/14/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
JV2E-1900005485 |
|
|
$1,235.38 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR121I1061834100371 |
2019 |
9 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
3/14/2019 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
JV2E-1900005484 |
|
|
$248.73 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR121I1061834100372 |
2019 |
9 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
3/14/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-1900005484 |
|
|
$56.38 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR121I1061834100372 |
2019 |
9 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
3/14/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-1900005485 |
|
|
$280.24 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CAXR121I1061834100371 |
2019 |
9 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
3/14/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
JV2E-1900005485 |
|
|
$87.94 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR121I1061834100371 |
2019 |
9 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
3/14/2019 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
JV2E-1900005484 |
|
|
$17.71 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR121I1061834100372 |
2019 |
9 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
3/14/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-1900005485 |
|
|
$19.95 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR121I1061834100371 |
2019 |
9 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
3/14/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-1900005484 |
|
|
$4.02 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CAXR121I1061834100372 |
2019 |
9 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
3/13/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
JV2E-1900005481 |
|
|
$594.88 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR011J1061900902539 |
2019 |
9 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
3/13/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
JV2E-1900005432 |
|
|
$207.81 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR022J1061905305642 |
2019 |
9 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
3/13/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
JV2E-1900005483 |
|
|
$684.80 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR122I1061835401366 |
2019 |
9 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
3/13/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-1900005481 |
|
|
$827.58 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR011J1061900902539 |
2019 |
9 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
3/13/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-1900005432 |
|
|
$30.99 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR022J1061905305642 |
2019 |
9 |
FD04 |
03 |
E122 |
D |
9455501D |
110 |
3/13/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-1900005483 |
|
|
$293.40 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR122I1061835401366 |
2019 |
9 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
3/13/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
JV2E-1900005481 |
|
|
$137.27 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR011J1061900902539 |
2019 |
9 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
3/13/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
JV2E-1900005432 |
|
|
$47.38 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR022J1061905305642 |
2019 |
9 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
3/13/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
JV2E-1900005483 |
|
|
$156.53 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR122I1061835401366 |
2019 |
9 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
3/13/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-1900005481 |
|
|
$186.52 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR011J1061900902539 |
2019 |
9 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
3/13/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-1900005432 |
|
|
$6.98 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR022J1061905305642 |
2019 |
9 |
FD04 |
03 |
E123 |
D |
9455501D |
110 |
3/13/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-1900005483 |
|
|
$66.13 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR122I1061835401366 |
2019 |
9 |
FD04 |
03 |
E124 |
D |
9455501D |
110 |
3/13/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
JV2E-1900005432 |
|
|
$0.10 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR022J1061905305642 |
2019 |
9 |
FD04 |
03 |
E124 |
D |
9455501D |
110 |
3/13/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
JV2E-1900005483 |
|
|
$0.30 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR122I1061835401366 |
2019 |
9 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
3/13/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
JV2E-1900005481 |
|
|
$713.03 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR011J1061900902539 |
2019 |
9 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
3/13/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
JV2E-1900005432 |
|
|
$248.84 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR022J1061905305642 |
2019 |
9 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
3/13/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
JV2E-1900005483 |
|
|
$820.93 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR122I1061835401366 |
2019 |
9 |
FD04 |
03 |
E124 |
D |
9455501D |
110 |
3/13/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-1900005432 |
|
|
$0.01 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR022J1061905305642 |
2019 |
9 |
FD04 |
03 |
E124 |
D |
9455501D |
110 |
3/13/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-1900005483 |
|
|
$0.13 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR122I1061835401366 |
2019 |
9 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
3/13/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-1900005481 |
|
|
$991.94 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR011J1061900902539 |
2019 |
9 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
3/13/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-1900005432 |
|
|
$37.15 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR022J1061905305642 |
2019 |
9 |
FD04 |
03 |
E111 |
D |
9455501D |
110 |
3/13/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-1900005483 |
|
|
$351.67 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR122I1061835401366 |
2019 |
9 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
3/13/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
JV2E-1900005481 |
|
|
$49.31 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR011J1061900902539 |
2019 |
9 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
3/13/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
JV2E-1900005432 |
|
|
$17.20 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR022J1061905305642 |
2019 |
9 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
3/13/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
JV2E-1900005483 |
|
|
$58.42 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR122I1061835401366 |
2019 |
9 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
3/13/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-1900005481 |
|
|
$68.59 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR011J1061900902539 |
2019 |
9 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
3/13/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-1900005432 |
|
|
$2.57 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR022J1061905305642 |
2019 |
9 |
FD04 |
03 |
E121 |
D |
9455501D |
110 |
3/13/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-1900005483 |
|
|
$25.03 |
CORRECT COUNTY FROM 114 TO 110. CORRECT PROGRAM FROM 9491901D TO 9455501D
CA XR122I1061835401366 |
2019 |
9 |
FD04 |
03 |
E143 |
D |
9455501D |
110 |
3/6/2019 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-1900148689 |
PON21900003494 |
MUNICIPAL ENGINEERING CO |
$26,948.40 |
Todd County 3-80001 2019-04-2 |
2019 |
7 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
1/29/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012J1061902303419 |
|
|
$150.80 |
000001065829-3562500636 |
2019 |
7 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
1/29/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012J1061902303419 |
|
|
$77.67 |
000001065829-3562500636 |
2019 |
7 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
1/29/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012J1061902303419 |
|
|
$10.71 |
000001065829-3562500636 |
2019 |
7 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
1/29/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012J1061902303419 |
|
|
$5.52 |
000001065829-3562500636 |
2019 |
7 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
1/29/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012J1061902303419 |
|
|
$125.82 |
000001065829-3562500636 |
2019 |
7 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
1/29/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012J1061902303419 |
|
|
$64.79 |
000001065829-3562500636 |
2019 |
7 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
1/29/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012J1061902303419 |
|
|
$17.88 |
000001065829-3562500636 |
2019 |
7 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
1/29/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012J1061902303419 |
|
|
$9.03 |
000001065829-3562500636 |
2019 |
7 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
1/29/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012J1061902303419 |
|
|
$0.05 |
000001065829-3562500636 |
2019 |
7 |
FD04 |
00 |
E124 |
D |
9455501D |
110 |
1/29/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012J1061902303419 |
|
|
$0.03 |
000001065829-3562500636 |
2019 |
6 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
12/13/2018 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121I1061834100376 |
|
|
$20.53 |
000001065829-3562500636 |
2019 |
6 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
12/10/2018 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121I1061834100375 |
|
|
$207.31 |
000001065829-3562500636 |
2019 |
6 |
FD04 |
00 |
E111 |
D |
9455501D |
110 |
12/10/2018 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121I1061834100375 |
|
|
$176.83 |
000001065829-3562500636 |
2019 |
6 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
12/10/2018 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121I1061834100375 |
|
|
$14.86 |
000001065829-3562500636 |
2019 |
6 |
FD04 |
00 |
E121 |
D |
9455501D |
110 |
12/10/2018 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121I1061834100375 |
|
|
$12.68 |
000001065829-3562500636 |
2019 |
6 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
12/10/2018 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121I1061834100375 |
|
|
$172.69 |
000001065829-3562500636 |
2019 |
6 |
FD04 |
00 |
E122 |
D |
9455501D |
110 |
12/10/2018 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121I1061834100375 |
|
|
$147.52 |
000001065829-3562500636 |
2019 |
6 |
FD04 |
00 |
E123 |
D |
9455501D |
110 |
12/10/2018 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121I1061834100375 |
|
|
$24.68 |
000001065829-3562500636 |