The Commonwealth pays employees on a semi-monthly basis with a scheduled pay day on the 15th and 30th of each month. The two monthly pay periods are from the 1st to the 15th of the month and the 16th through the last day of the month. Pay check distribution is delayed by one pay period to allow for system processing. For example work performed during the 1st to the 15th day of the month is paid to the employee on the 30th of the month. Accordingly the cost accounting charges for labor costs posting in eMARS to operating accounts and highway projects are also delayed by approximately one pay period.
A good rule of measure is that the cost accounting charges for the pay period ending on the 15th of the month will post to eMARS by the 25th and those for the pay period ending on the last day of the month will post to eMARS by the 10th of the following month.

x close panel
Detailed Project Expenditure Report
Total E-MARS Expenditures for 9442101D = $1,348,292.48
Click here for Labor Costs Information
Year Month PBU Charge District Object Phase Program Code County Date ACT Activity Name Trans ID Reference # Vendor Name Expenditure Line Description
2024 10 FD52 06 E111 D 9442101D 059 4/30/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042O1062411502716 $954.68 000001066132-3562506200
2024 10 FD52 06 E111 D 9442101D 059 4/30/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502716 $109.46 000001066132-3562506200
2024 10 FD52 06 E121 D 9442101D 059 4/30/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042O1062411502716 $71.86 000001066132-3562506200
2024 10 FD52 06 E121 D 9442101D 059 4/30/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502716 $8.24 000001066132-3562506200
2024 10 FD52 06 E122 D 9442101D 059 4/30/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042O1062411502716 $631.64 000001066132-3562506200
2024 10 FD52 06 E122 D 9442101D 059 4/30/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502716 $72.43 000001066132-3562506200
2024 10 FD52 06 E123 D 9442101D 059 4/30/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042O1062411502716 $107.15 000001066132-3562506200
2024 10 FD52 06 E123 D 9442101D 059 4/30/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502716 $12.17 000001066132-3562506200
2024 10 FD52 06 E124 D 9442101D 059 4/30/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042O1062411502716 $0.18 000001066132-3562506200
2024 10 FD52 06 E124 D 9442101D 059 4/30/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502716 $0.02 000001066132-3562506200
2024 10 FD52 06 E229 D 9442101D 059 4/17/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF IET-XE13A162524101022900 $22.65
2024 10 FD52 06 E111 D 9442101D 059 4/10/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041O1062410001606 $2,100.07 000001066132-3562506200
2024 10 FD52 06 E111 D 9442101D 059 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001606 $142.10 000001066132-3562506200
2024 10 FD52 06 E121 D 9442101D 059 4/10/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041O1062410001606 $158.10 000001066132-3562506200
2024 10 FD52 06 E121 D 9442101D 059 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001606 $10.70 000001066132-3562506200
2024 10 FD52 06 E122 D 9442101D 059 4/10/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041O1062410001606 $1,389.62 000001066132-3562506200
2024 10 FD52 06 E122 D 9442101D 059 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001606 $94.03 000001066132-3562506200
2024 10 FD52 06 E123 D 9442101D 059 4/10/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041O1062410001606 $235.64 000001066132-3562506200
2024 10 FD52 06 E123 D 9442101D 059 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001606 $15.80 000001066132-3562506200
2024 9 FD52 06 E111 D 9442101D 059 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810054 $125.31 000001066132-3562506200
2024 9 FD52 06 E121 D 9442101D 059 3/11/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031O1062406810054 $226.60 000001066132-3562506200
2024 9 FD52 06 E121 D 9442101D 059 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810054 $9.44 000001066132-3562506200
2024 9 FD52 06 E122 D 9442101D 059 3/11/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031O1062406810054 $1,991.78 000001066132-3562506200
2024 9 FD52 06 E122 D 9442101D 059 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810054 $82.92 000001066132-3562506200
2024 9 FD52 06 E123 D 9442101D 059 3/11/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031O1062406810054 $337.67 000001066132-3562506200
2024 9 FD52 06 E123 D 9442101D 059 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810054 $13.93 000001066132-3562506200
2024 9 FD52 06 E111 D 9442101D 059 3/11/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031O1062406810053 $3,010.23 000001066132-3562506200
2024 8 FD52 06 E111 D 9442101D 059 2/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022O1062405408873 $2,386.43 000001066132-3562506200
2024 8 FD52 06 E111 D 9442101D 059 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408873 $29.27 000001066132-3562506200
2024 8 FD52 06 E121 D 9442101D 059 2/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022O1062405408873 $179.65 000001066132-3562506200
2024 8 FD52 06 E121 D 9442101D 059 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408873 $2.21 000001066132-3562506200
2024 8 FD52 06 E122 D 9442101D 059 2/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022O1062405408873 $1,579.11 000001066132-3562506200
2024 8 FD52 06 E122 D 9442101D 059 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408873 $19.37 000001066132-3562506200
2024 8 FD52 06 E123 D 9442101D 059 2/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022O1062405408873 $267.64 000001066132-3562506200
2024 8 FD52 06 E123 D 9442101D 059 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408873 $3.25 000001066132-3562506200
2024 8 FD52 06 E124 D 9442101D 059 2/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022O1062405408873 $0.45 000001066132-3562506200
2024 8 FD52 06 E124 D 9442101D 059 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408873 $0.01 000001066132-3562506200
2024 8 FD52 00 E121 D 9442101D 059 2/9/2024 1640 BRIDGE-REVIEW OF PLANS CA-XR021O1062403907715 $26.74 000001091002-3562500610
2024 8 FD52 00 E121 D 9442101D 059 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907715 $2.49 000001091002-3562500610
2024 8 FD52 06 E111 D 9442101D 059 2/9/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021O1062403907643 $1,312.76 000001066132-3562506200
2024 8 FD52 06 E111 D 9442101D 059 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907643 $14.58 000001066132-3562506200
2024 8 FD52 06 E121 D 9442101D 059 2/9/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021O1062403907643 $98.81 000001066132-3562506200
2024 8 FD52 06 E121 D 9442101D 059 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907643 $1.10 000001066132-3562506200
2024 8 FD52 06 E122 D 9442101D 059 2/9/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021O1062403907643 $868.51 000001066132-3562506200
2024 8 FD52 06 E122 D 9442101D 059 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907643 $9.65 000001066132-3562506200
2024 8 FD52 06 E123 D 9442101D 059 2/9/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021O1062403907643 $147.20 000001066132-3562506200
2024 8 FD52 06 E123 D 9442101D 059 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907643 $1.62 000001066132-3562506200
2024 8 FD52 00 E122 D 9442101D 059 2/9/2024 1640 BRIDGE-REVIEW OF PLANS CA-XR021O1062403907715 $251.57 000001091002-3562500610
2024 8 FD52 00 E122 D 9442101D 059 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907715 $23.48 000001091002-3562500610
2024 8 FD52 00 E123 D 9442101D 059 2/9/2024 1640 BRIDGE-REVIEW OF PLANS CA-XR021O1062403907715 $70.43 000001091002-3562500610
2024 8 FD52 00 E123 D 9442101D 059 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907715 $6.53 000001091002-3562500610
2024 8 FD52 00 E111 D 9442101D 059 2/9/2024 1640 BRIDGE-REVIEW OF PLANS CA-XR021O1062403907714 $380.27 000001091002-3562500610
2024 8 FD52 00 E111 D 9442101D 059 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907714 $35.48 000001091002-3562500610
2024 7 FD52 06 E122 D 9442101D 059 1/24/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012O1062402306559 $610.55 000001066132-3562506200
2024 7 FD52 06 E122 D 9442101D 059 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306559 $144.02 000001066132-3562506200
2024 7 FD52 06 E123 D 9442101D 059 1/24/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012O1062402306559 $103.65 000001066132-3562506200
2024 7 FD52 06 E123 D 9442101D 059 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306559 $24.19 000001066132-3562506200
2024 7 FD52 06 E124 D 9442101D 059 1/24/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012O1062402306559 $0.19 000001066132-3562506200
2024 7 FD52 06 E124 D 9442101D 059 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306559 $0.04 000001066132-3562506200
2024 7 FD52 06 E111 D 9442101D 059 1/24/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012O1062402306559 $922.76 000001066132-3562506200
2024 7 FD52 06 E111 D 9442101D 059 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306559 $217.64 000001066132-3562506200
2024 7 FD52 06 E121 D 9442101D 059 1/24/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012O1062402306559 $69.47 000001066132-3562506200
2024 7 FD52 06 E121 D 9442101D 059 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306559 $16.39 000001066132-3562506200
2024 7 FD52 06 E143 D 9442101D 059 1/4/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400131889 PON22000000178 GRESHAM SMITH $4,007.15 Kenton 5-450
2024 7 FD52 06 E143 D 9442101D 059 1/4/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400131889 PON22000000178 GRESHAM SMITH $531.81 Kenton 5-450
2024 6 FD52 06 E111 D 9442101D 059 12/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122N1062335504584 $1,082.51 000001066132-3562506208
2024 6 FD52 06 E111 D 9442101D 059 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504584 $123.70 000001066132-3562506200
2024 6 FD52 06 E121 D 9442101D 059 12/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122N1062335504584 $81.85 000001066132-3562506208
2024 6 FD52 06 E121 D 9442101D 059 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504584 $9.35 000001066132-3562506200
2024 6 FD52 06 E122 D 9442101D 059 12/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122N1062335504584 $716.24 000001066132-3562506200
2024 6 FD52 06 E122 D 9442101D 059 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504584 $81.86 000001066132-3562506208
2024 6 FD52 06 E123 D 9442101D 059 12/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122N1062335504584 $96.86 000001066132-3562506208
2024 6 FD52 06 E123 D 9442101D 059 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504584 $10.95 000001066132-3562506200
2024 6 FD52 06 E124 D 9442101D 059 12/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122N1062335504584 $0.23 000001066132-3562506208
2024 6 FD52 06 E124 D 9442101D 059 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504584 $0.02 000001066132-3562506200
2024 5 FD52 06 E111 D 9442101D 059 11/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111N1062331201458 $437.59 000001066132-3562506200
2024 5 FD52 06 E111 D 9442101D 059 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201458 $21.58 000001066132-3562506200
2024 5 FD52 06 E121 D 9442101D 059 11/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111N1062331201458 $33.03 000001066132-3562506200
2024 5 FD52 06 E121 D 9442101D 059 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201458 $1.63 000001066132-3562506200
2024 5 FD52 06 E122 D 9442101D 059 11/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111N1062331201458 $289.50 000001066132-3562506200
2024 5 FD52 06 E122 D 9442101D 059 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201458 $14.28 000001066132-3562506200
2024 5 FD52 06 E123 D 9442101D 059 11/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111N1062331201458 $42.56 000001066132-3562506200
2024 5 FD52 06 E123 D 9442101D 059 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201458 $2.08 000001066132-3562506200
2024 4 FD52 06 E143 D 9442101D 059 10/26/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400083604 PON22000000178 GRESHAM SMITH $377.11 Kenton 5-450
2024 4 FD52 06 E143 D 9442101D 059 10/26/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400083604 PON22000000178 GRESHAM SMITH $1,571.50 Kenton 5-450
2024 3 FD52 06 E143 D 9442101D 059 9/27/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400061843 PON22000000178 GRESHAM SMITH $21,603.04 Kenton 5-450
2024 3 FD52 06 E143 D 9442101D 059 9/27/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400061843 PON22000000178 GRESHAM SMITH $2,270.49 Kenton 5-450
2024 3 FD52 06 E111 D 9442101D 059 9/18/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091N1062325106070 $437.51 000001066132-3562506200
2024 3 FD52 06 E121 D 9442101D 059 9/18/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091N1062325106070 $33.03 000001066132-3562506200
2024 3 FD52 06 E122 D 9442101D 059 9/18/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091N1062325106070 $289.50 000001066132-3562506200
2024 3 FD52 06 E123 D 9442101D 059 9/18/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091N1062325106070 $42.54 000001066132-3562506200
2024 3 FD52 06 E143 D 9442101D 059 9/5/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400043923 PON22000000178 GRESHAM SMITH $17,607.35 Kenton 5-450
2024 2 FD52 06 E111 D 9442101D 059 8/15/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR081N1062322003840 $508.50 000001072538-3562506200
2024 2 FD52 06 E111 D 9442101D 059 8/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003840 $3.16 000001072538-3562506200
2024 2 FD52 06 E121 D 9442101D 059 8/15/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR081N1062322003840 $37.13 000001072538-3562506200
2024 2 FD52 06 E121 D 9442101D 059 8/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003840 $0.23 000001072538-3562506200
2024 2 FD52 06 E122 D 9442101D 059 8/15/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR081N1062322003840 $336.46 000001072538-3562506200
2024 2 FD52 06 E122 D 9442101D 059 8/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003840 $2.09 000001072538-3562506200
2024 2 FD52 06 E123 D 9442101D 059 8/15/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR081N1062322003840 $75.60 000001072538-3562506200
2024 2 FD52 06 E123 D 9442101D 059 8/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003840 $0.46 000001072538-3562506200
2024 2 FD52 06 E111 D 9442101D 059 8/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081N1062322003837 $477.29 000001066132-3562506200
2024 2 FD52 06 E121 D 9442101D 059 8/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081N1062322003837 $36.03 000001066132-3562506200
2024 2 FD52 06 E122 D 9442101D 059 8/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081N1062322003837 $315.82 000001066132-3562506200
2024 2 FD52 06 E123 D 9442101D 059 8/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081N1062322003837 $46.40 000001066132-3562506200
2024 2 FD52 06 E143 D 9442101D 059 8/2/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400021806 PON22000000178 GRESHAM SMITH $35,411.03 Kenton 5-450
2024 1 FD52 06 E143 D 9442101D 059 7/27/2023 1550 DESIGN CONTRACTS-CONSULTANT JVC-2400000071 GRESHAM SMITH ($17,804.78) Move expenditures from 10-1 to 25-1 per MOD 3, PRC 2400016833
2024 1 FD52 06 E143 D 9442101D 059 7/27/2023 1550 DESIGN CONTRACTS-CONSULTANT JVC-2400000071 GRESHAM SMITH $17,804.78 Move expenditures from 10-1 to 25-1 per MOD 3, PRC 2400016833
2024 1 FD52 06 E143 D 9442101D 059 7/27/2023 1550 DESIGN CONTRACTS-CONSULTANT JVC-2400000071 GRESHAM SMITH ($20,856.86) Move expenditures from 10-1 to 25-1 per MOD 3, PRC 2400016843
2024 1 FD52 06 E143 D 9442101D 059 7/27/2023 1550 DESIGN CONTRACTS-CONSULTANT JVC-2400000071 GRESHAM SMITH $20,856.86 Move expenditures from 10-1 to 25-1 per MOD 3, PRC 2400016843
2024 1 FD52 06 E143 D 9442101D 059 7/26/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400016833 PON22000000178 GRESHAM SMITH $17,804.78 Kenton 5-450
2024 1 FD52 06 E143 D 9442101D 059 7/26/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400016843 PON22000000178 GRESHAM SMITH $20,856.86 Kenton 5-450
2024 1 FD52 06 E143 D 9442101D 059 7/24/2023 1550 DESIGN CONTRACTS-CONSULTANT JVC-2400000069 GRESHAM SMITH ($750,000.00) Moving expenditures from 10-1 and 20-1 to 25-1 & 30-1 PRC 2000105813
2024 1 FD52 06 E143 D 9442101D 059 7/24/2023 1550 DESIGN CONTRACTS-CONSULTANT JVC-2400000069 GRESHAM SMITH $164,730.41 Moving expenditures from 10-1 and 20-1 to 25-1 & 30-1 PRC 2000105813
2024 1 FD52 06 E143 D 9442101D 059 7/24/2023 1550 DESIGN CONTRACTS-CONSULTANT JVC-2400000069 GRESHAM SMITH $750,000.00 Moving expenditures from 10-1 and 20-1 to 25-1 & 30-1 PRC 2000105813
2024 1 FD52 06 E143 D 9442101D 059 7/24/2023 1550 DESIGN CONTRACTS-CONSULTANT JVC-2400000069 GRESHAM SMITH ($270,081.52) Moving expenditures from 10-1 and 20-1 to 25-1 & 30-1 PRC 2000105813
2024 1 FD52 06 E143 D 9442101D 059 7/24/2023 1550 DESIGN CONTRACTS-CONSULTANT JVC-2400000069 GRESHAM SMITH $270,081.52 Moving expenditures from 10-1 and 20-1 to 25-1 & 30-1 PRC 2000105813
2024 1 FD52 06 E143 D 9442101D 059 7/24/2023 1550 DESIGN CONTRACTS-CONSULTANT JVC-2400000069 GRESHAM SMITH ($164,730.41) Moving expenditures from 10-1 and 20-1 to 25-1 & 30-1 PRC 2000105813
2023 12 FD52 06 E122 D 9442101D 059 6/26/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062N1062317400407 $266.05 000001066132-3562506200
2023 12 FD52 06 E122 D 9442101D 059 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400407 $7.66 000001066132-3562506200
2023 12 FD52 06 E123 D 9442101D 059 6/26/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062N1062317400407 $38.65 000001066132-3562506200
2023 12 FD52 06 E123 D 9442101D 059 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400407 $1.10 000001066132-3562506200
2023 12 FD52 06 E124 D 9442101D 059 6/26/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062N1062317400407 $0.09 000001066132-3562506200
2023 12 FD52 06 E111 D 9442101D 059 6/26/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062N1062317400406 $341.12 000001066132-3562506200
2023 12 FD52 06 E111 D 9442101D 059 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400406 $9.82 000001066132-3562506200
2023 12 FD52 06 E121 D 9442101D 059 6/26/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062N1062317400406 $25.70 000001066132-3562506200
2023 12 FD52 06 E121 D 9442101D 059 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400406 $0.74 000001066132-3562506200
2023 12 FD52 06 E111 D 9442101D 059 6/8/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061N1062315810114 $1,075.74 000001066132-3562506200
2023 12 FD52 06 E111 D 9442101D 059 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810114 $112.07 000001066132-3562506200
2023 12 FD52 06 E121 D 9442101D 059 6/8/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061N1062315810114 $81.03 000001066132-3562506200
2023 12 FD52 06 E121 D 9442101D 059 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810114 $8.44 000001066132-3562506200
2023 12 FD52 06 E122 D 9442101D 059 6/8/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061N1062315810114 $839.00 000001066132-3562506200
2023 12 FD52 06 E122 D 9442101D 059 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810114 $87.42 000001066132-3562506200
2023 12 FD52 06 E123 D 9442101D 059 6/8/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061N1062315810114 $122.07 000001066132-3562506200
2023 12 FD52 06 E123 D 9442101D 059 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810114 $12.58 000001066132-3562506200
2023 11 FD52 06 E111 D 9442101D 059 5/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052N1062314309015 $409.28 000001066132-3562506200
2023 11 FD52 06 E111 D 9442101D 059 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309015 $7.64 000001066132-3562506200
2023 11 FD52 06 E121 D 9442101D 059 5/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052N1062314309015 $30.83 000001066132-3562506200
2023 11 FD52 06 E121 D 9442101D 059 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309015 $0.58 000001066132-3562506200
2023 11 FD52 06 E122 D 9442101D 059 5/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052N1062314309015 $319.28 000001066132-3562506200
2023 11 FD52 06 E122 D 9442101D 059 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309015 $5.96 000001066132-3562506200
2023 11 FD52 06 E123 D 9442101D 059 5/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052N1062314309015 $46.41 000001066132-3562506200
2023 11 FD52 06 E123 D 9442101D 059 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309015 $0.86 000001066132-3562506200
2023 11 FD52 06 E124 D 9442101D 059 5/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052N1062314309015 $0.09 000001066132-3562506200
2023 10 FD52 06 E143 D 9442101D 059 4/27/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300205893 PON22000000178 GRESHAM SMITH $6,634.17 Kenton 5-450
2023 9 FD52 06 E143 D 9442101D 059 3/31/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300182519 PON22000000178 GRESHAM SMITH $17,748.62 Kenton 5-450
2023 9 FD52 06 E111 D 9442101D 059 3/13/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031N1062306703641 $2,782.12 000001066132-3562506208
2023 9 FD52 06 E111 D 9442101D 059 3/13/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703641 $132.39 000001066132-3562506208
2023 9 FD52 06 E121 D 9442101D 059 3/13/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031N1062306703641 $207.84 000001066132-3562506200
2023 9 FD52 06 E121 D 9442101D 059 3/13/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703641 $9.87 000001066132-3562506200
2023 9 FD52 06 E122 D 9442101D 059 3/13/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031N1062306703641 $2,170.16 000001066132-3562506208
2023 9 FD52 06 E122 D 9442101D 059 3/13/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703641 $103.27 000001066132-3562506208
2023 9 FD52 06 E123 D 9442101D 059 3/13/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031N1062306703641 $331.20 000001066132-3562506200
2023 9 FD52 06 E123 D 9442101D 059 3/13/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703641 $15.71 000001066132-3562506200
2023 9 FD52 00 E111 D 9442101D 059 3/9/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR031N1062306703688 $109.76 000001086741-3562500480
2023 9 FD52 00 E111 D 9442101D 059 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703688 $5.94 000001086741-3562500480
2023 9 FD52 00 E121 D 9442101D 059 3/9/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR031N1062306703688 $7.74 000001086741-3562500480
2023 9 FD52 00 E121 D 9442101D 059 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703688 $0.42 000001086741-3562500480
2023 9 FD52 00 E122 D 9442101D 059 3/9/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR031N1062306703688 $85.57 000001086741-3562500480
2023 9 FD52 00 E122 D 9442101D 059 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703688 $4.63 000001086741-3562500480
2023 9 FD52 00 E123 D 9442101D 059 3/9/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR031N1062306703688 $26.54 000001086741-3562500480
2023 9 FD52 00 E123 D 9442101D 059 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703688 $1.34 000001086741-3562500480
2023 8 FD52 06 E143 D 9442101D 059 2/27/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300160507 PON22000000178 GRESHAM SMITH $4,948.15 Kenton 5-450
2023 8 FD52 06 E111 D 9442101D 059 2/23/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR022N1062305302423 $496.36 000001072538-3562506200
2023 8 FD52 06 E111 D 9442101D 059 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302423 $21.84 000001072538-3562506200
2023 8 FD52 06 E121 D 9442101D 059 2/23/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR022N1062305302423 $36.31 000001072538-3562506200
2023 8 FD52 06 E121 D 9442101D 059 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302423 $1.60 000001072538-3562506200
2023 8 FD52 06 E122 D 9442101D 059 2/23/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR022N1062305302423 $387.07 000001072538-3562506200
2023 8 FD52 06 E122 D 9442101D 059 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302423 $17.04 000001072538-3562506200
2023 8 FD52 06 E123 D 9442101D 059 2/23/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR022N1062305302423 $78.24 000001072538-3562506200
2023 8 FD52 06 E123 D 9442101D 059 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302423 $3.40 000001072538-3562506200
2023 8 FD52 06 E124 D 9442101D 059 2/23/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR022N1062305302423 $0.18 000001072538-3562506200
2023 8 FD52 06 E124 D 9442101D 059 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302423 $0.01 000001072538-3562506200
2023 8 FD52 06 E111 D 9442101D 059 2/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901396 $265.96 000001072538-3562506200
2023 8 FD52 06 E121 D 9442101D 059 2/15/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR021N1062303901396 $16.56 000001072538-3562506200
2023 8 FD52 06 E121 D 9442101D 059 2/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901396 $19.36 000001072538-3562506200
2023 8 FD52 06 E122 D 9442101D 059 2/15/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR021N1062303901396 $177.16 000001072538-3562506200
2023 8 FD52 06 E122 D 9442101D 059 2/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901396 $207.46 000001072538-3562506200
2023 8 FD52 06 E123 D 9442101D 059 2/15/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR021N1062303901396 $36.27 000001072538-3562506200
2023 8 FD52 06 E123 D 9442101D 059 2/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901396 $41.42 000001072538-3562506200
2023 8 FD52 06 E111 D 9442101D 059 2/15/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021N1062303901391 $506.71 000001066132-3562506200
2023 8 FD52 06 E111 D 9442101D 059 2/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901391 $64.83 000001066132-3562506200
2023 8 FD52 06 E121 D 9442101D 059 2/15/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021N1062303901391 $37.41 000001066132-3562506200
2023 8 FD52 06 E121 D 9442101D 059 2/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901391 $4.78 000001066132-3562506200
2023 8 FD52 06 E122 D 9442101D 059 2/15/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021N1062303901391 $395.29 000001066132-3562506200
2023 8 FD52 06 E122 D 9442101D 059 2/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901391 $50.57 000001066132-3562506200
2023 8 FD52 06 E123 D 9442101D 059 2/15/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021N1062303901391 $74.73 000001066132-3562506200
2023 8 FD52 06 E123 D 9442101D 059 2/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901391 $9.75 000001066132-3562506200
2023 8 FD52 06 E111 D 9442101D 059 2/9/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR021N1062303901395 $227.35 000001072538-3562506200
2023 7 FD52 06 E111 D 9442101D 059 1/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012N1062302300390 $766.14 000001066132-3562506200
2023 7 FD52 06 E111 D 9442101D 059 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300390 $203.07 000001066132-3562506200
2023 7 FD52 06 E121 D 9442101D 059 1/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012N1062302300390 $55.85 000001066132-3562506200
2023 7 FD52 06 E121 D 9442101D 059 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300390 $14.39 000001066132-3562506200
2023 7 FD52 06 E122 D 9442101D 059 1/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012N1062302300390 $597.49 000001066132-3562506200
2023 7 FD52 06 E122 D 9442101D 059 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300390 $158.39 000001066132-3562506200
2023 7 FD52 06 E123 D 9442101D 059 1/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012N1062302300390 $128.57 000001066132-3562506200
2023 7 FD52 06 E123 D 9442101D 059 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300390 $42.45 000001066132-3562506200
2023 7 FD52 06 E124 D 9442101D 059 1/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012N1062302300390 $0.30 000001066132-3562506200
2023 7 FD52 06 E124 D 9442101D 059 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300390 $0.11 000001066132-3562506200
2023 7 FD52 06 E111 D 9442101D 059 1/3/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR122M1062235509127 $248.12 000001034498-3562506200
2023 7 FD52 06 E111 D 9442101D 059 1/3/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509127 $92.97 000001034498-3562506200
2023 7 FD52 06 E121 D 9442101D 059 1/3/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR122M1062235509127 $18.19 000001034498-3562506200
2023 7 FD52 06 E121 D 9442101D 059 1/3/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509127 $6.81 000001034498-3562506200
2023 7 FD52 06 E122 D 9442101D 059 1/3/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR122M1062235509127 $193.54 000001034498-3562506200
2023 7 FD52 06 E122 D 9442101D 059 1/3/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509127 $72.52 000001034498-3562506200
2023 7 FD52 06 E123 D 9442101D 059 1/3/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR122M1062235509127 $36.09 000001034498-3562506200
2023 7 FD52 06 E123 D 9442101D 059 1/3/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509127 $13.28 000001034498-3562506200
2023 7 FD52 06 E124 D 9442101D 059 1/3/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR122M1062235509127 $0.09 000001034498-3562506200
2023 7 FD52 06 E124 D 9442101D 059 1/3/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509127 $0.03 000001034498-3562506200
2023 6 FD52 06 E111 D 9442101D 059 12/22/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR122M1062235509140 $248.12 000001072538-3562506200
2023 6 FD52 06 E111 D 9442101D 059 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509140 $92.97 000001072538-3562506200
2023 6 FD52 06 E121 D 9442101D 059 12/22/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR122M1062235509140 $18.19 000001072538-3562506200
2023 6 FD52 06 E121 D 9442101D 059 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509140 $6.81 000001072538-3562506200
2023 6 FD52 06 E122 D 9442101D 059 12/22/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR122M1062235509140 $193.54 000001072538-3562506200
2023 6 FD52 06 E122 D 9442101D 059 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509140 $72.52 000001072538-3562506200
2023 6 FD52 06 E123 D 9442101D 059 12/22/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR122M1062235509140 $36.09 000001072538-3562506200
2023 6 FD52 06 E123 D 9442101D 059 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509140 $13.28 000001072538-3562506200
2023 6 FD52 06 E124 D 9442101D 059 12/22/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR122M1062235509140 $0.09 000001072538-3562506200
2023 6 FD52 06 E124 D 9442101D 059 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509140 $0.03 000001072538-3562506200
2023 6 FD52 06 E111 D 9442101D 059 12/22/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122M1062235509136 $847.78 000001066132-3562506200
2023 6 FD52 06 E111 D 9442101D 059 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509136 $54.82 000001066132-3562506200
2023 6 FD52 06 E121 D 9442101D 059 12/22/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122M1062235509136 $62.33 000001066132-3562506200
2023 6 FD52 06 E121 D 9442101D 059 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509136 $3.97 000001066132-3562506200
2023 6 FD52 06 E122 D 9442101D 059 12/22/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122M1062235509136 $661.22 000001066132-3562506200
2023 6 FD52 06 E122 D 9442101D 059 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509136 $42.76 000001066132-3562506200
2023 6 FD52 06 E123 D 9442101D 059 12/22/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122M1062235509136 $114.73 000001066132-3562506200
2023 6 FD52 06 E123 D 9442101D 059 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509136 $8.82 000001066132-3562506200
2023 6 FD52 06 E124 D 9442101D 059 12/22/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122M1062235509136 $0.28 000001066132-3562506200
2023 6 FD52 06 E124 D 9442101D 059 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509136 $0.03 000001066132-3562506200
2023 4 FD52 06 E143 D 9442101D 059 10/25/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300075307 PON22000000178 GRESHAM SMITH $610.00 Kenton 5-450
2023 4 FD52 06 E111 D 9442101D 059 10/10/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR101M1062228003917 $363.92 000001072538-3562506200
2023 4 FD52 06 E111 D 9442101D 059 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003917 $18.53 000001072538-3562506200
2023 4 FD52 06 E121 D 9442101D 059 10/10/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR101M1062228003917 $26.67 000001072538-3562506200
2023 4 FD52 06 E121 D 9442101D 059 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003917 $1.35 000001072538-3562506200
2023 4 FD52 06 E122 D 9442101D 059 10/10/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR101M1062228003917 $283.86 000001072538-3562506200
2023 4 FD52 06 E122 D 9442101D 059 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003917 $14.45 000001072538-3562506200
2023 4 FD52 06 E123 D 9442101D 059 10/10/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR101M1062228003917 $52.70 000001072538-3562506200
2023 4 FD52 06 E123 D 9442101D 059 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003917 $2.65 000001072538-3562506200
2023 3 FD52 06 E111 D 9442101D 059 9/27/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR092M1062226602744 $1,240.64 000001072538-3562506200
2023 3 FD52 06 E111 D 9442101D 059 9/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602744 $124.06 000001072538-3562506200
2023 3 FD52 06 E121 D 9442101D 059 9/27/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR092M1062226602744 $90.92 000001072538-3562506200
2023 3 FD52 06 E121 D 9442101D 059 9/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602744 $9.09 000001072538-3562506200
2023 3 FD52 06 E122 D 9442101D 059 9/27/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR092M1062226602744 $967.70 000001072538-3562506200
2023 3 FD52 06 E122 D 9442101D 059 9/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602744 $96.77 000001072538-3562506200
2023 3 FD52 06 E123 D 9442101D 059 9/27/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR092M1062226602744 $179.79 000001072538-3562506200
2023 3 FD52 06 E123 D 9442101D 059 9/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602744 $17.72 000001072538-3562506200
2023 3 FD52 06 E124 D 9442101D 059 9/27/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR092M1062226602744 $0.45 000001072538-3562506200
2023 3 FD52 06 E124 D 9442101D 059 9/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602744 $0.05 000001072538-3562506200
2023 3 FD52 06 E111 D 9442101D 059 9/15/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR091M1062225101599 $1,137.25 000001072538-3562506200
2023 3 FD52 06 E121 D 9442101D 059 9/15/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR091M1062225101599 $83.35 000001072538-3562506200
2023 3 FD52 06 E122 D 9442101D 059 9/15/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR091M1062225101599 $887.05 000001072538-3562506200
2023 3 FD52 06 E123 D 9442101D 059 9/15/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR091M1062225101599 $164.59 000001072538-3562506200
2023 2 FD52 06 E121 D 9442101D 059 8/16/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR081M1062222110096 $63.01 000001072538-3562506200
2023 2 FD52 06 E121 D 9442101D 059 8/16/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110096 $0.05 000001072538-3562506200
2023 2 FD52 06 E122 D 9442101D 059 8/16/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR081M1062222110096 $670.23 000001072538-3562506200
2023 2 FD52 06 E122 D 9442101D 059 8/16/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110096 $0.48 000001072538-3562506200
2023 2 FD52 06 E123 D 9442101D 059 8/16/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR081M1062222110096 $127.93 000001072538-3562506200
2023 2 FD52 06 E123 D 9442101D 059 8/16/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110096 $0.14 000001072538-3562506200
2023 2 FD52 06 E111 D 9442101D 059 8/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081M1062222110092 $450.37 000001066132-3562506200
2023 2 FD52 06 E111 D 9442101D 059 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110092 $6.00 000001066132-3562506200
2023 2 FD52 06 E121 D 9442101D 059 8/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081M1062222110092 $33.61 000001066132-3562506200
2023 2 FD52 06 E121 D 9442101D 059 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110092 $0.44 000001066132-3562506200
2023 2 FD52 06 E122 D 9442101D 059 8/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081M1062222110092 $351.21 000001066132-3562506200
2023 2 FD52 06 E122 D 9442101D 059 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110092 $4.68 000001066132-3562506200
2023 2 FD52 06 E123 D 9442101D 059 8/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081M1062222110092 $46.88 000001066132-3562506200
2023 2 FD52 06 E123 D 9442101D 059 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110092 $0.62 000001066132-3562506200
2023 2 FD52 06 E111 D 9442101D 059 8/10/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR081M1062222110095 $859.29 000001072538-3562506200
2023 2 FD52 06 E111 D 9442101D 059 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110095 $0.61 000001072538-3562506200
2023 1 FD52 06 E143 D 9442101D 059 7/26/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300014306 PON22000000178 GRESHAM SMITH $10,292.00 Kenton 5-450
2023 1 FD52 06 E143 D 9442101D 059 7/26/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300014306 PON22000000178 GRESHAM SMITH $17,028.68 Kenton 5-450
2023 1 FD52 06 E111 D 9442101D 059 7/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072M1062220308959 $1,200.59 000001066132-3562506200
2023 1 FD52 06 E111 D 9442101D 059 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308959 $165.92 000001066132-3562506200
2023 1 FD52 06 E121 D 9442101D 059 7/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072M1062220308959 $89.64 000001066132-3562506200
2023 1 FD52 06 E121 D 9442101D 059 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308959 $12.39 000001066132-3562506200
2023 1 FD52 06 E122 D 9442101D 059 7/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072M1062220308959 $936.56 000001066132-3562506200
2023 1 FD52 06 E122 D 9442101D 059 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308959 $129.41 000001066132-3562506200
2023 1 FD52 06 E123 D 9442101D 059 7/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072M1062220308959 $125.18 000001066132-3562506200
2023 1 FD52 06 E123 D 9442101D 059 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308959 $17.08 000001066132-3562506200
2023 1 FD52 06 E124 D 9442101D 059 7/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072M1062220308959 $0.27 000001066132-3562506200
2023 1 FD52 06 E124 D 9442101D 059 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308959 $0.04 000001066132-3562506200
2022 12 FD52 06 E111 D 9442101D 059 6/27/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR062M1062217506736 $229.75 000001072538-3562506200
2022 12 FD52 06 E111 D 9442101D 059 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506736 $78.43 000001072538-3562506200
2022 12 FD52 06 E121 D 9442101D 059 6/27/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR062M1062217506736 $16.78 000001072538-3562506200
2022 12 FD52 06 E121 D 9442101D 059 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506736 $5.72 000001072538-3562506200
2022 12 FD52 06 E122 D 9442101D 059 6/27/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR062M1062217506736 $192.92 000001072538-3562506200
2022 12 FD52 06 E122 D 9442101D 059 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506736 $65.85 000001072538-3562506200
2022 12 FD52 06 E123 D 9442101D 059 6/27/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR062M1062217506736 $36.07 000001072538-3562506200
2022 12 FD52 06 E123 D 9442101D 059 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506736 $12.10 000001072538-3562506200
2022 12 FD52 06 E124 D 9442101D 059 6/27/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR062M1062217506736 $0.09 000001072538-3562506200
2022 12 FD52 06 E124 D 9442101D 059 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506736 $0.03 000001072538-3562506200
2022 10 FD52 06 E143 D 9442101D 059 4/27/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200194434 PON22000000178 GRESHAM SMITH $7,243.04 Kenton 5-450
2022 9 FD52 06 E143 D 9442101D 059 3/23/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200171077 PON22000000178 GRESHAM SMITH $4,303.21 Kenton 5-450
2022 8 FD52 06 E143 D 9442101D 059 2/24/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200150792 PON22000000178 GRESHAM SMITH $13,614.31 Kenton 5-450
2022 8 FD52 06 E143 D 9442101D 059 2/24/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200150792 PON22000000178 GRESHAM SMITH $3,200.00 Kenton 5-450
2022 8 FD52 06 E121 D 9442101D 059 2/14/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021M1062203907407 ($1.19) 000001066132-3562506208
2022 8 FD52 06 E123 D 9442101D 059 2/14/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021M1062203907407 $22.26 000001066132-3562506208
2022 7 FD52 06 E111 D 9442101D 059 1/27/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR012M1062202106421 $552.27 000001072538-3562506200
2022 7 FD52 00 E111 D 9442101D 059 1/27/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012M1062202106416 $273.18 000001068449-3562500636
2022 7 FD52 06 E121 D 9442101D 059 1/27/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR012M1062202106421 $40.44 000001072538-3562506200
2022 7 FD52 00 E111 D 9442101D 059 1/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106416 $13.47 000001068449-3562500636
2022 7 FD52 06 E122 D 9442101D 059 1/27/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR012M1062202106421 $463.75 000001072538-3562506200
2022 7 FD52 00 E121 D 9442101D 059 1/27/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012M1062202106416 $19.37 000001068449-3562500636
2022 7 FD52 06 E123 D 9442101D 059 1/27/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR012M1062202106421 $90.78 000001072538-3562506200
2022 7 FD52 00 E121 D 9442101D 059 1/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106416 $0.95 000001068449-3562500636
2022 7 FD52 06 E124 D 9442101D 059 1/27/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR012M1062202106421 $0.23 000001072538-3562506200
2022 7 FD52 00 E122 D 9442101D 059 1/27/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012M1062202106416 $229.35 000001068449-3562500636
2022 7 FD52 00 E122 D 9442101D 059 1/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106416 $11.31 000001068449-3562500636
2022 7 FD52 00 E123 D 9442101D 059 1/27/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012M1062202106416 $61.78 000001068449-3562500636
2022 7 FD52 00 E123 D 9442101D 059 1/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106416 $3.02 000001068449-3562500636
2022 7 FD52 00 E124 D 9442101D 059 1/27/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012M1062202106416 $0.10 000001068449-3562500636
2022 7 FD52 00 E111 D 9442101D 059 1/24/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR012M1062202106415 $470.76 000001066655-3562500061
2022 7 FD52 00 E111 D 9442101D 059 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106415 $60.26 000001066655-3562500061
2022 7 FD52 00 E121 D 9442101D 059 1/24/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR012M1062202106415 $33.41 000001066655-3562500061
2022 7 FD52 00 E121 D 9442101D 059 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106415 $4.28 000001066655-3562500061
2022 7 FD52 00 E122 D 9442101D 059 1/24/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR012M1062202106415 $395.33 000001066655-3562500061
2022 7 FD52 00 E122 D 9442101D 059 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106415 $50.60 000001066655-3562500061
2022 7 FD52 00 E123 D 9442101D 059 1/24/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR012M1062202106415 $112.55 000001066655-3562500061
2022 7 FD52 00 E123 D 9442101D 059 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106415 $14.26 000001066655-3562500061
2022 7 FD52 00 E124 D 9442101D 059 1/24/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR012M1062202106415 $0.20 000001066655-3562500061
2022 7 FD52 00 E124 D 9442101D 059 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106415 $0.02 000001066655-3562500061
2022 7 FD52 06 E111 D 9442101D 059 1/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012M1062202106414 $1,627.32 000001066132-3562506208
2022 7 FD52 06 E111 D 9442101D 059 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106414 $93.37 000001066132-3562506204
2022 7 FD52 06 E121 D 9442101D 059 1/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012M1062202106414 $120.64 000001066132-3562506204
2022 7 FD52 06 E121 D 9442101D 059 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106414 $6.74 000001066132-3562506200
2022 7 FD52 06 E122 D 9442101D 059 1/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012M1062202106414 $1,366.68 000001066132-3562506204
2022 7 FD52 06 E122 D 9442101D 059 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106414 $78.39 000001066132-3562506200
2022 7 FD52 06 E123 D 9442101D 059 1/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012M1062202106414 $205.39 000001066132-3562506200
2022 7 FD52 06 E123 D 9442101D 059 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106414 $16.14 000001066132-3562506208
2022 7 FD52 06 E124 D 9442101D 059 1/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012M1062202106414 $0.56 000001066132-3562506200
2022 7 FD52 06 E124 D 9442101D 059 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106414 $0.04 000001066132-3562506208
2022 7 FD52 06 E143 D 9442101D 059 1/21/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200124938 PON22000000178 GRESHAM SMITH $11,380.44 Kenton 5-450
2022 7 FD52 06 E143 D 9442101D 059 1/21/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200124938 PON22000000178 GRESHAM SMITH $1,600.00 Kenton 5-450
2022 7 FD52 06 E143 D 9442101D 059 1/11/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200113098 PON22000000178 GRESHAM SMITH $16,173.87 Kenton 5-450
2022 7 FD52 06 E143 D 9442101D 059 1/11/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200113098 PON22000000178 GRESHAM SMITH $7,050.13 Kenton 5-450
2022 6 FD52 06 E111 D 9442101D 059 12/22/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122L1062135504454 $511.71 000001066132-3562506200
2022 6 FD52 06 E111 D 9442101D 059 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504454 $68.38 000001066132-3562506200
2022 6 FD52 06 E121 D 9442101D 059 12/22/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122L1062135504454 $38.29 000001066132-3562506200
2022 6 FD52 06 E121 D 9442101D 059 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504454 $4.94 000001066132-3562506200
2022 6 FD52 06 E122 D 9442101D 059 12/22/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122L1062135504454 $429.85 000001066132-3562506200
2022 6 FD52 06 E122 D 9442101D 059 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504454 $57.41 000001066132-3562506200
2022 6 FD52 06 E123 D 9442101D 059 12/22/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122L1062135504454 $73.17 000001066132-3562506200
2022 6 FD52 06 E123 D 9442101D 059 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504454 $15.02 000001066132-3562506200
2022 6 FD52 06 E124 D 9442101D 059 12/22/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122L1062135504454 $0.18 000001066132-3562506200
2022 6 FD52 06 E124 D 9442101D 059 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504454 $0.04 000001066132-3562506200
2022 6 FD52 06 E143 D 9442101D 059 12/2/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200091410 PON22000000178 GRESHAM SMITH $13,370.33 Kenton 5-450
2022 6 FD52 06 E143 D 9442101D 059 12/2/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200091410 PON22000000178 GRESHAM SMITH $980.00 Kenton 5-450
2022 5 FD52 06 E123 D 9442101D 059 11/29/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112L1062132602484 $64.77 000001066132-3562506200
2022 5 FD52 06 E123 D 9442101D 059 11/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602484 $13.46 000001066132-3562506200
2022 5 FD52 06 E124 D 9442101D 059 11/29/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112L1062132602484 $0.16 000001066132-3562506200
2022 5 FD52 06 E124 D 9442101D 059 11/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602484 $0.04 000001066132-3562506200
2022 5 FD52 00 E111 D 9442101D 059 11/23/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112L1062132602486 $99.29 000001068449-3562500636
2022 5 FD52 00 E111 D 9442101D 059 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602486 $37.41 000001068449-3562500636
2022 5 FD52 00 E121 D 9442101D 059 11/23/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112L1062132602486 $7.07 000001068449-3562500636
2022 5 FD52 00 E121 D 9442101D 059 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602486 $2.67 000001068449-3562500636
2022 5 FD52 00 E122 D 9442101D 059 11/23/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112L1062132602486 $83.40 000001068449-3562500636
2022 5 FD52 00 E122 D 9442101D 059 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602486 $31.41 000001068449-3562500636
2022 5 FD52 00 E123 D 9442101D 059 11/23/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112L1062132602486 $21.44 000001068449-3562500636
2022 5 FD52 00 E123 D 9442101D 059 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602486 $7.98 000001068449-3562500636
2022 5 FD52 00 E124 D 9442101D 059 11/23/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112L1062132602486 $0.04 000001068449-3562500636
2022 5 FD52 00 E124 D 9442101D 059 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602486 $0.01 000001068449-3562500636
2022 5 FD52 06 E111 D 9442101D 059 11/23/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR112L1062132602491 $382.99 000001072538-3562506200
2022 5 FD52 06 E111 D 9442101D 059 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602491 $166.33 000001072538-3562506200
2022 5 FD52 06 E121 D 9442101D 059 11/23/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR112L1062132602491 $27.96 000001072538-3562506200
2022 5 FD52 06 E121 D 9442101D 059 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602491 $12.15 000001072538-3562506200
2022 5 FD52 06 E122 D 9442101D 059 11/23/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR112L1062132602491 $321.53 000001072538-3562506200
2022 5 FD52 06 E111 D 9442101D 059 11/23/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112L1062132602483 $476.24 000001066132-3562506200
2022 5 FD52 06 E122 D 9442101D 059 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602491 $139.68 000001072538-3562506200
2022 5 FD52 06 E111 D 9442101D 059 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602483 $79.74 000001066132-3562506200
2022 5 FD52 06 E123 D 9442101D 059 11/23/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR112L1062132602491 $58.75 000001072538-3562506200
2022 5 FD52 06 E121 D 9442101D 059 11/23/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112L1062132602483 $35.74 000001066132-3562506200
2022 5 FD52 06 E123 D 9442101D 059 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602491 $25.05 000001072538-3562506200
2022 5 FD52 06 E121 D 9442101D 059 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602483 $5.89 000001066132-3562506200
2022 5 FD52 06 E124 D 9442101D 059 11/23/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR112L1062132602491 $0.15 000001072538-3562506200
2022 5 FD52 06 E122 D 9442101D 059 11/23/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112L1062132602483 $400.09 000001066132-3562506200
2022 5 FD52 06 E124 D 9442101D 059 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602491 $0.07 000001072538-3562506200
2022 5 FD52 06 E122 D 9442101D 059 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602483 $66.96 000001066132-3562506200
2022 5 FD52 06 E111 D 9442101D 059 11/12/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111L1062130901486 $1,418.48 000001066132-3562506204
2022 5 FD52 06 E111 D 9442101D 059 11/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901486 $51.95 000001066132-3562506200
2022 5 FD52 06 E121 D 9442101D 059 11/12/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111L1062130901486 $105.50 000001066132-3562506204
2022 5 FD52 06 E121 D 9442101D 059 11/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901486 $3.69 000001066132-3562506204
2022 5 FD52 06 E122 D 9442101D 059 11/12/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111L1062130901486 $1,190.74 000001066132-3562506200
2022 5 FD52 06 E122 D 9442101D 059 11/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901486 $43.62 000001066132-3562506204
2022 5 FD52 06 E123 D 9442101D 059 11/12/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111L1062130901486 $206.18 000001066132-3562506206
2022 5 FD52 06 E123 D 9442101D 059 11/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901486 $11.40 000001066132-3562506204
2022 5 FD52 00 E111 D 9442101D 059 11/8/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111L1062130901488 $273.14 000001068449-3562500636
2022 5 FD52 00 E111 D 9442101D 059 11/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901488 $11.29 000001068449-3562500636
2022 5 FD52 00 E121 D 9442101D 059 11/8/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111L1062130901488 $18.95 000001068449-3562500636
2022 5 FD52 00 E121 D 9442101D 059 11/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901488 $0.78 000001068449-3562500636
2022 5 FD52 00 E122 D 9442101D 059 11/8/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111L1062130901488 $229.36 000001068449-3562500636
2022 5 FD52 00 E122 D 9442101D 059 11/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901488 $9.48 000001068449-3562500636
2022 5 FD52 00 E123 D 9442101D 059 11/8/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111L1062130901488 $58.81 000001068449-3562500636
2022 5 FD52 00 E123 D 9442101D 059 11/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901488 $2.41 000001068449-3562500636
2022 4 FD52 06 E111 D 9442101D 059 10/29/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102L1062129500377 $511.98 000001066132-3562506200
2022 4 FD52 06 E111 D 9442101D 059 10/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500377 $219.43 000001066132-3562506200
2022 4 FD52 06 E121 D 9442101D 059 10/29/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102L1062129500377 $38.28 000001066132-3562506200
2022 4 FD52 06 E121 D 9442101D 059 10/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500377 $16.55 000001066132-3562506200
2022 4 FD52 06 E122 D 9442101D 059 10/29/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102L1062129500377 $429.86 000001066132-3562506200
2022 4 FD52 06 E122 D 9442101D 059 10/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500377 $184.26 000001066132-3562506200
2022 4 FD52 06 E123 D 9442101D 059 10/29/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102L1062129500377 $73.28 000001066132-3562506200
2022 4 FD52 06 E123 D 9442101D 059 10/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500377 $26.20 000001066132-3562506200
2022 4 FD52 06 E124 D 9442101D 059 10/29/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102L1062129500377 $0.18 000001066132-3562506200
2022 4 FD52 06 E124 D 9442101D 059 10/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500377 $0.06 000001066132-3562506200
2022 4 FD52 00 E111 D 9442101D 059 10/25/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR102L1062129500391 $910.06 000001075794-3562500061
2022 4 FD52 00 E111 D 9442101D 059 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500391 $28.51 000001075794-3562500061
2022 4 FD52 00 E121 D 9442101D 059 10/25/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR102L1062129500391 $67.73 000001075794-3562500061
2022 4 FD52 00 E121 D 9442101D 059 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500391 $2.12 000001075794-3562500061
2022 4 FD52 00 E122 D 9442101D 059 10/25/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR102L1062129500391 $764.13 000001075794-3562500061
2022 4 FD52 00 E122 D 9442101D 059 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500391 $23.94 000001075794-3562500061
2022 4 FD52 00 E123 D 9442101D 059 10/25/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR102L1062129500391 $125.52 000001075794-3562500061
2022 4 FD52 00 E123 D 9442101D 059 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500391 $3.87 000001075794-3562500061
2022 4 FD52 00 E124 D 9442101D 059 10/25/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR102L1062129500391 $0.36 000001075794-3562500061
2022 4 FD52 00 E124 D 9442101D 059 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500391 $0.01 000001075794-3562500061
2022 4 FD52 06 E143 D 9442101D 059 10/22/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200069247 PON22000000178 GRESHAM SMITH $10,359.70 Kenton 5-450
2022 4 FD52 06 E121 D 9442101D 059 10/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110100 ($0.20) 000001066132-3562506200
2022 4 FD52 06 E122 D 9442101D 059 10/11/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101L1062128110100 $954.47 000001066132-3562506200
2022 4 FD52 06 E122 D 9442101D 059 10/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110100 ($2.52) 000001066132-3562506200
2022 4 FD52 06 E123 D 9442101D 059 10/11/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101L1062128110100 $124.63 000001066132-3562506200
2022 4 FD52 06 E123 D 9442101D 059 10/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110100 ($0.69) 000001066132-3562506200
2022 4 FD52 06 E124 D 9442101D 059 10/11/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101L1062128110100 ($0.01) 000001066132-3562506200
2022 4 FD52 06 E111 D 9442101D 059 10/11/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101L1062128110099 $1,136.97 000001066132-3562506200
2022 4 FD52 06 E111 D 9442101D 059 10/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110099 ($3.01) 000001066132-3562506200
2022 4 FD52 06 E121 D 9442101D 059 10/11/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101L1062128110099 $86.19 000001066132-3562506200
2022 3 FD52 00 E111 D 9442101D 059 9/27/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR092L1062126709022 $455.00 000001075794-3562500061
2022 3 FD52 00 E111 D 9442101D 059 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709022 $45.50 000001075794-3562500061
2022 3 FD52 00 E121 D 9442101D 059 9/27/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR092L1062126709022 $33.86 000001075794-3562500061
2022 3 FD52 00 E121 D 9442101D 059 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709022 $3.38 000001075794-3562500061
2022 3 FD52 00 E122 D 9442101D 059 9/27/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR092L1062126709022 $382.07 000001075794-3562500061
2022 3 FD52 00 E122 D 9442101D 059 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709022 $38.21 000001075794-3562500061
2022 3 FD52 00 E123 D 9442101D 059 9/27/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR092L1062126709022 $62.82 000001075794-3562500061
2022 3 FD52 00 E123 D 9442101D 059 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709022 $6.18 000001075794-3562500061
2022 3 FD52 00 E124 D 9442101D 059 9/27/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR092L1062126709022 $0.18 000001075794-3562500061
2022 3 FD52 00 E124 D 9442101D 059 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709022 $0.02 000001075794-3562500061
2022 3 FD52 06 E111 D 9442101D 059 9/27/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092L1062126709007 $1,648.95 000001066132-3562506200
2022 3 FD52 06 E111 D 9442101D 059 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709007 $204.41 000001066132-3562506200
2022 3 FD52 06 E121 D 9442101D 059 9/27/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092L1062126709007 $124.46 000001066132-3562506200
2022 3 FD52 06 E121 D 9442101D 059 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709007 $15.28 000001066132-3562506200
2022 3 FD52 06 E122 D 9442101D 059 9/27/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092L1062126709007 $1,384.63 000001066132-3562506200
2022 3 FD52 06 E122 D 9442101D 059 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709007 $171.63 000001066132-3562506200
2022 3 FD52 06 E123 D 9442101D 059 9/27/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092L1062126709007 $198.07 000001066132-3562506200
2022 3 FD52 06 E123 D 9442101D 059 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709007 $28.72 000001066132-3562506200
2022 3 FD52 06 E124 D 9442101D 059 9/27/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092L1062126709007 $0.46 000001066132-3562506200
2022 3 FD52 06 E124 D 9442101D 059 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709007 $0.07 000001066132-3562506200
2022 3 FD52 06 E143 D 9442101D 059 9/23/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200050430 PON22000000178 GRESHAM SMITH $32,398.04 Kenton 5-450
2022 3 FD52 06 E111 D 9442101D 059 9/13/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091L1062125207956 $1,245.27 000001066132-3562506200
2022 3 FD52 06 E111 D 9442101D 059 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207956 $65.78 000001066132-3562506200
2022 3 FD52 06 E121 D 9442101D 059 9/13/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091L1062125207956 $93.30 000001066132-3562506200
2022 3 FD52 06 E121 D 9442101D 059 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207956 $4.64 000001066132-3562506200
2022 3 FD52 06 E122 D 9442101D 059 9/13/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091L1062125207956 $1,045.69 000001066132-3562506200
2022 3 FD52 06 E122 D 9442101D 059 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207956 $55.24 000001066132-3562506200
2022 3 FD52 06 E123 D 9442101D 059 9/13/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091L1062125207956 $162.49 000001066132-3562506200
2022 3 FD52 06 E123 D 9442101D 059 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207956 $15.29 000001066132-3562506200
2022 2 FD52 06 E143 D 9442101D 059 8/27/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200031912 PON22000000178 GRESHAM SMITH $36,018.77 Kenton 5-450
2022 2 FD52 06 E143 D 9442101D 059 8/27/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200031912 PON22000000178 GRESHAM SMITH $500.00 Kenton 5-450
2022 2 FD52 06 E111 D 9442101D 059 8/9/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081L1062121805800 $758.03 000001066132-3562506200
2022 2 FD52 06 E111 D 9442101D 059 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805800 $28.80 000001066132-3562506200
2022 2 FD52 06 E121 D 9442101D 059 8/9/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081L1062121805800 $57.46 000001066132-3562506200
2022 2 FD52 06 E121 D 9442101D 059 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805800 $2.18 000001066132-3562506200
2022 2 FD52 06 E122 D 9442101D 059 8/9/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081L1062121805800 $636.51 000001066132-3562506200
2022 2 FD52 06 E122 D 9442101D 059 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805800 $24.18 000001066132-3562506200
2022 2 FD52 06 E123 D 9442101D 059 8/9/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081L1062121805800 $83.19 000001066132-3562506200
2022 2 FD52 06 E123 D 9442101D 059 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805800 $3.12 000001066132-3562506200
2022 1 FD52 06 E143 D 9442101D 059 7/22/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200011747 PON22000000178 GRESHAM SMITH $21,165.19 Kenton 5-450
2022 1 FD52 06 E143 D 9442101D 059 7/22/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200011747 PON22000000178 GRESHAM SMITH $18,223.25 Kenton 5-450
2022 1 FD52 06 E143 D 9442101D 059 7/20/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200011255 PON22000000178 GRESHAM SMITH $29,244.59 Kenton 5-450
2022 1 FD52 06 E121 D 9442101D 059 7/14/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR071L1062119003541 ($1.46) 000001072538-3562506200
2022 1 FD52 06 E121 D 9442101D 059 7/12/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071L1062119003535 ($1.46) 000001066132-3562506200
2022 1 FD52 06 E123 D 9442101D 059 7/1/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061L1062116001447P $146.07 000001066132-3562506200
2022 1 FD52 06 E123 D 9442101D 059 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061L1062116001447P $14.40 000001066132-3562506200
2021 12 FD52 06 E111 D 9442101D 059 6/10/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061L1062116001447 $1,023.80 000001066132-3562506200
2021 12 FD52 06 E111 D 9442101D 059 6/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061L1062116001447 $102.38 000001066132-3562506200
2021 12 FD52 06 E121 D 9442101D 059 6/10/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061L1062116001447 $76.19 000001066132-3562506200
2021 12 FD52 06 E121 D 9442101D 059 6/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061L1062116001447 $7.62 000001066132-3562506200
2021 12 FD52 06 E122 D 9442101D 059 6/10/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061L1062116001447 $864.39 000001066132-3562506200
2021 12 FD52 06 E122 D 9442101D 059 6/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061L1062116001447 $86.44 000001066132-3562506200
2021 11 FD52 06 E143 D 9442101D 059 5/19/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100191909 PON22000000178 GRESHAM SMITH $23,013.98 Kenton 5-450
2021 11 FD52 06 E143 D 9442101D 059 5/19/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100191909 PON22000000178 GRESHAM SMITH $14,143.50 Kenton 5-450
2021 11 FD52 00 E111 D 9442101D 059 5/10/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR051L1062112709738 $227.56 000001075794-3562500061
2021 11 FD52 00 E111 D 9442101D 059 5/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709738 $34.88 000001075794-3562500061
2021 11 FD52 00 E121 D 9442101D 059 5/10/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR051L1062112709738 $16.70 000001075794-3562500061
2021 11 FD52 00 E121 D 9442101D 059 5/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709738 $2.55 000001075794-3562500061
2021 11 FD52 00 E122 D 9442101D 059 5/10/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR051L1062112709738 $192.32 000001075794-3562500061
2021 11 FD52 00 E122 D 9442101D 059 5/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709738 $29.45 000001075794-3562500061
2021 11 FD52 00 E123 D 9442101D 059 5/10/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR051L1062112709738 $31.48 000001075794-3562500061
2021 11 FD52 00 E123 D 9442101D 059 5/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709738 $4.74 000001075794-3562500061
2021 11 FD52 06 E111 D 9442101D 059 5/10/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR051L1062112709727 $511.83 000001072538-3562506200
2021 11 FD52 06 E111 D 9442101D 059 5/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709727 $34.55 000001072538-3562506200
2021 11 FD52 06 E121 D 9442101D 059 5/10/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR051L1062112709727 $38.10 000001072538-3562506200
2021 11 FD52 06 E121 D 9442101D 059 5/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709727 $2.43 000001072538-3562506200
2021 11 FD52 06 E122 D 9442101D 059 5/10/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR051L1062112709727 $432.20 000001072538-3562506200
2021 11 FD52 06 E122 D 9442101D 059 5/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709727 $29.17 000001072538-3562506200
2021 11 FD52 06 E123 D 9442101D 059 5/10/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR051L1062112709727 $73.06 000001072538-3562506200
2021 11 FD52 06 E123 D 9442101D 059 5/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709727 $8.04 000001072538-3562506200
2021 10 FD52 06 E143 D 9442101D 059 4/26/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100174568 PON22000000178 GRESHAM SMITH $31,170.00 Kenton 5-450
2021 10 FD52 00 E121 D 9442101D 059 4/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308658 $2.01 000001075794-3562500061
2021 10 FD52 00 E122 D 9442101D 059 4/26/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR042L1062111308658 $480.20 000001075794-3562500061
2021 10 FD52 00 E122 D 9442101D 059 4/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308658 $22.80 000001075794-3562500061
2021 10 FD52 00 E123 D 9442101D 059 4/26/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR042L1062111308658 $78.46 000001075794-3562500061
2021 10 FD52 00 E123 D 9442101D 059 4/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308658 $3.67 000001075794-3562500061
2021 10 FD52 00 E124 D 9442101D 059 4/26/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR042L1062111308658 $0.23 000001075794-3562500061
2021 10 FD52 00 E124 D 9442101D 059 4/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308658 $0.01 000001075794-3562500061
2021 10 FD52 00 E111 D 9442101D 059 4/26/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR042L1062111308658 $568.80 000001075794-3562500061
2021 10 FD52 00 E111 D 9442101D 059 4/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308658 $27.00 000001075794-3562500061
2021 10 FD52 00 E121 D 9442101D 059 4/26/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR042L1062111308658 $42.33 000001075794-3562500061
2021 10 FD52 06 E123 D 9442101D 059 4/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041L1062109907624 $1.82 000001072538-3562506200
2021 10 FD52 06 E229 D 9442101D 059 4/12/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF IET-XE13A162521100007340 $2.28
2021 10 FD52 00 E123 D 9442101D 059 4/12/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR041L1062109907637 $57.53 000001075794-3562500061
2021 10 FD52 00 E123 D 9442101D 059 4/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041L1062109907637 $1.96 000001075794-3562500061
2021 10 FD52 00 E111 D 9442101D 059 4/12/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR041L1062109907637 $417.00 000001075794-3562500061
2021 10 FD52 00 E111 D 9442101D 059 4/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041L1062109907637 $14.46 000001075794-3562500061
2021 10 FD52 00 E121 D 9442101D 059 4/12/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR041L1062109907637 $30.61 000001075794-3562500061
2021 10 FD52 00 E121 D 9442101D 059 4/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041L1062109907637 $1.06 000001075794-3562500061
2021 10 FD52 06 E111 D 9442101D 059 4/12/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041L1062109907615 $469.00 000001066132-3562506200
2021 10 FD52 06 E111 D 9442101D 059 4/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041L1062109907615 $49.96 000001066132-3562506200
2021 10 FD52 06 E121 D 9442101D 059 4/12/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041L1062109907615 $34.92 000001066132-3562506200
2021 10 FD52 06 E121 D 9442101D 059 4/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041L1062109907615 $3.73 000001066132-3562506200
2021 10 FD52 06 E122 D 9442101D 059 4/12/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041L1062109907615 $396.18 000001066132-3562506200
2021 10 FD52 00 E122 D 9442101D 059 4/12/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR041L1062109907637 $352.15 000001075794-3562500061
2021 10 FD52 06 E122 D 9442101D 059 4/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041L1062109907615 $42.18 000001066132-3562506200
2021 10 FD52 06 E123 D 9442101D 059 4/12/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041L1062109907615 $66.95 000001066132-3562506200
2021 10 FD52 06 E123 D 9442101D 059 4/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041L1062109907615 $6.79 000001066132-3562506200
2021 10 FD52 00 E122 D 9442101D 059 4/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041L1062109907637 $12.21 000001075794-3562500061
2021 10 FD52 06 E111 D 9442101D 059 4/12/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR041L1062109907623 $421.24 000001072538-3562506200
2021 10 FD52 06 E111 D 9442101D 059 4/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041L1062109907623 $12.08 000001072538-3562506200
2021 10 FD52 06 E121 D 9442101D 059 4/12/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR041L1062109907623 $28.34 000001072538-3562506200
2021 10 FD52 06 E121 D 9442101D 059 4/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041L1062109907623 $0.81 000001072538-3562506200
2021 10 FD52 06 E122 D 9442101D 059 4/12/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR041L1062109907623 $355.62 000001072538-3562506200
2021 10 FD52 06 E122 D 9442101D 059 4/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041L1062109907623 $10.20 000001072538-3562506200
2021 10 FD52 06 E123 D 9442101D 059 4/12/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR041L1062109907623 $64.27 000001072538-3562506200
2021 9 FD52 06 E111 D 9442101D 059 3/24/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032L1062108206539 $511.88 000001066132-3562506200
2021 9 FD52 06 E111 D 9442101D 059 3/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032L1062108206539 $16.30 000001066132-3562506200
2021 9 FD52 06 E121 D 9442101D 059 3/24/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032L1062108206539 $38.28 000001066132-3562506200
2021 9 FD52 06 E121 D 9442101D 059 3/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032L1062108206539 $1.17 000001066132-3562506200
2021 9 FD52 06 E122 D 9442101D 059 3/24/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032L1062108206539 $432.21 000001066132-3562506200
2021 9 FD52 06 E122 D 9442101D 059 3/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032L1062108206539 $13.77 000001066132-3562506200
2021 9 FD52 06 E123 D 9442101D 059 3/24/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032L1062108206539 $73.00 000001066132-3562506200
2021 9 FD52 06 E123 D 9442101D 059 3/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032L1062108206539 $3.79 000001066132-3562506200
2021 9 FD52 06 E124 D 9442101D 059 3/24/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032L1062108206539 $0.18 000001066132-3562506200
2021 9 FD52 06 E124 D 9442101D 059 3/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032L1062108206539 $0.01 000001066132-3562506200
2021 9 FD52 06 E143 D 9442101D 059 3/17/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100151896 PON22000000178 GRESHAM SMITH $35,714.32 Kenton 5-450
2021 9 FD52 06 E121 D 9442101D 059 3/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031L1062106805509 $5.12 000001066132-3562506200
2021 9 FD52 06 E143 D 9442101D 059 3/10/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100145406 PON22000000178 GRESHAM SMITH $21,511.23 Kenton 5-450
2021 9 FD52 06 E122 D 9442101D 059 3/10/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031L1062106805509 $1,316.33 000001066132-3562506200
2021 9 FD52 06 E122 D 9442101D 059 3/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031L1062106805509 $59.96 000001066132-3562506200
2021 9 FD52 06 E123 D 9442101D 059 3/10/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031L1062106805509 $229.02 000001066132-3562506200
2021 9 FD52 06 E123 D 9442101D 059 3/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031L1062106805509 $13.91 000001066132-3562506200
2021 9 FD52 06 E111 D 9442101D 059 3/10/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR031L1062106805515 $433.25 000001072538-3562506200
2021 9 FD52 06 E111 D 9442101D 059 3/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031L1062106805515 $19.92 000001072538-3562506200
2021 9 FD52 06 E121 D 9442101D 059 3/10/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR031L1062106805515 $31.43 000001072538-3562506200
2021 9 FD52 06 E121 D 9442101D 059 3/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031L1062106805515 $1.56 000001072538-3562506200
2021 9 FD52 06 E122 D 9442101D 059 3/10/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR031L1062106805515 $365.76 000001072538-3562506200
2021 9 FD52 06 E111 D 9442101D 059 3/10/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031L1062106805508 $1,559.12 000001066132-3562506200
2021 9 FD52 06 E122 D 9442101D 059 3/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031L1062106805515 $16.82 000001072538-3562506200
2021 9 FD52 06 E111 D 9442101D 059 3/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031L1062106805508 $71.02 000001066132-3562506200
2021 9 FD52 06 E123 D 9442101D 059 3/10/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR031L1062106805515 $79.97 000001072538-3562506200
2021 9 FD52 06 E121 D 9442101D 059 3/10/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031L1062106805508 $115.46 000001066132-3562506200
2021 9 FD52 06 E123 D 9442101D 059 3/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031L1062106805515 $4.63 000001072538-3562506200
2021 8 FD52 06 E111 D 9442101D 059 2/23/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022L1062105304386 $973.33 000001066132-3562506200
2021 8 FD52 06 E111 D 9442101D 059 2/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304386 $128.00 000001066132-3562506200
2021 8 FD52 00 E111 D 9442101D 059 2/23/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR022L1062105304417 $682.50 000001075794-3562500061
2021 8 FD52 06 E121 D 9442101D 059 2/23/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022L1062105304386 $72.72 000001066132-3562506200
2021 8 FD52 00 E111 D 9442101D 059 2/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304417 $104.96 000001075794-3562500061
2021 8 FD52 06 E121 D 9442101D 059 2/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304386 $9.58 000001066132-3562506200
2021 8 FD52 00 E121 D 9442101D 059 2/23/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR022L1062105304417 $50.80 000001075794-3562500061
2021 8 FD52 06 E122 D 9442101D 059 2/23/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022L1062105304386 $821.73 000001066132-3562506200
2021 8 FD52 00 E121 D 9442101D 059 2/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304417 $7.81 000001075794-3562500061
2021 8 FD52 06 E122 D 9442101D 059 2/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304386 $108.08 000001066132-3562506200
2021 8 FD52 00 E122 D 9442101D 059 2/23/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR022L1062105304417 $576.24 000001075794-3562500061
2021 8 FD52 06 E123 D 9442101D 059 2/23/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022L1062105304386 $140.56 000001066132-3562506200
2021 8 FD52 00 E122 D 9442101D 059 2/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304417 $88.62 000001075794-3562500061
2021 8 FD52 06 E123 D 9442101D 059 2/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304386 $17.67 000001066132-3562506200
2021 8 FD52 00 E123 D 9442101D 059 2/23/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR022L1062105304417 $94.31 000001075794-3562500061
2021 8 FD52 06 E124 D 9442101D 059 2/23/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022L1062105304386 $0.35 000001066132-3562506200
2021 8 FD52 00 E123 D 9442101D 059 2/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304417 $14.26 000001075794-3562500061
2021 8 FD52 06 E124 D 9442101D 059 2/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304386 $0.04 000001066132-3562506200
2021 8 FD52 00 E124 D 9442101D 059 2/23/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR022L1062105304417 $0.27 000001075794-3562500061
2021 8 FD52 00 E124 D 9442101D 059 2/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304417 $0.05 000001075794-3562500061
2021 8 FD52 06 E111 D 9442101D 059 2/8/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021L1062103603365 $533.75 000001066132-3562506200
2021 8 FD52 06 E111 D 9442101D 059 2/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021L1062103603365 $108.33 000001066132-3562506200
2021 8 FD52 06 E121 D 9442101D 059 2/8/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021L1062103603365 $39.84 000001066132-3562506200
2021 8 FD52 06 E121 D 9442101D 059 2/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021L1062103603365 $7.93 000001066132-3562506200
2021 8 FD52 06 E122 D 9442101D 059 2/8/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021L1062103603365 $450.74 000001066132-3562506200
2021 8 FD52 06 E122 D 9442101D 059 2/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021L1062103603365 $91.46 000001066132-3562506200
2021 8 FD52 06 E123 D 9442101D 059 2/8/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021L1062103603365 $73.60 000001066132-3562506200
2021 8 FD52 06 E123 D 9442101D 059 2/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021L1062103603365 $18.57 000001066132-3562506200
2021 7 FD52 06 E111 D 9442101D 059 1/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012L1062102202341 $1,023.79 000001066132-3562506200
2021 7 FD52 06 E111 D 9442101D 059 1/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012L1062102202341 $134.98 000001066132-3562506200
2021 7 FD52 06 E121 D 9442101D 059 1/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012L1062102202341 $76.56 000001066132-3562506200
2021 7 FD52 06 E121 D 9442101D 059 1/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012L1062102202341 $9.99 000001066132-3562506200
2021 7 FD52 06 E122 D 9442101D 059 1/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012L1062102202341 $864.39 000001066132-3562506200
2021 7 FD52 06 E122 D 9442101D 059 1/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012L1062102202341 $113.96 000001066132-3562506200
2021 7 FD52 06 E123 D 9442101D 059 1/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012L1062102202341 $146.18 000001066132-3562506200
2021 7 FD52 06 E123 D 9442101D 059 1/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012L1062102202341 $21.98 000001066132-3562506200
2021 7 FD52 06 E124 D 9442101D 059 1/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012L1062102202341 $0.36 000001066132-3562506200
2021 7 FD52 06 E124 D 9442101D 059 1/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012L1062102202341 $0.06 000001066132-3562506200
2021 7 FD52 06 E143 D 9442101D 059 1/20/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100115339 PON22000000178 GRESHAM SMITH $41,996.75 Kenton 5-450
2021 7 FD52 06 E143 D 9442101D 059 1/20/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100115339 PON22000000178 GRESHAM SMITH $24,164.53 Kenton 5-450
2021 7 FD52 06 E111 D 9442101D 059 1/11/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR011L1062100801441 $210.55 000001072538-3562506200
2021 7 FD52 06 E111 D 9442101D 059 1/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011L1062100801441 $116.25 000001072538-3562506200
2021 7 FD52 06 E121 D 9442101D 059 1/11/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR011L1062100801441 $14.98 000001072538-3562506200
2021 7 FD52 06 E121 D 9442101D 059 1/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011L1062100801441 $8.27 000001072538-3562506200
2021 7 FD52 06 E122 D 9442101D 059 1/11/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR011L1062100801441 $177.81 000001072538-3562506200
2021 7 FD52 06 E122 D 9442101D 059 1/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011L1062100801441 $98.15 000001072538-3562506200
2021 7 FD52 06 E123 D 9442101D 059 1/11/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR011L1062100801441 $32.36 000001072538-3562506200
2021 7 FD52 06 E123 D 9442101D 059 1/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011L1062100801441 $17.50 000001072538-3562506200
2021 6 FD52 06 E111 D 9442101D 059 12/23/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR122K1062035700390 $229.67 000001072538-3562506200
2021 6 FD52 06 E111 D 9442101D 059 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700390 $51.16 000001072538-3562506200
2021 6 FD52 06 E121 D 9442101D 059 12/23/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR122K1062035700390 $16.79 000001072538-3562506200
2021 6 FD52 06 E121 D 9442101D 059 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700390 $3.74 000001072538-3562506200
2021 6 FD52 06 E122 D 9442101D 059 12/23/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR122K1062035700390 $193.36 000001072538-3562506200
2021 6 FD52 06 E122 D 9442101D 059 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700390 $43.20 000001072538-3562506200
2021 6 FD52 06 E123 D 9442101D 059 12/23/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR122K1062035700390 $34.01 000001072538-3562506200
2021 6 FD52 06 E123 D 9442101D 059 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700390 $7.48 000001072538-3562506200
2021 6 FD52 06 E124 D 9442101D 059 12/23/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR122K1062035700390 $0.10 000001072538-3562506200
2021 6 FD52 06 E124 D 9442101D 059 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700390 $0.02 000001072538-3562506200
2021 6 FD52 06 E111 D 9442101D 059 12/23/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122K1062035700378 $360.30 000001066132-3562506200
2021 6 FD52 06 E111 D 9442101D 059 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700378 $8.59 000001066132-3562506200
2021 6 FD52 06 E121 D 9442101D 059 12/23/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122K1062035700378 $26.78 000001066132-3562506200
2021 6 FD52 06 E121 D 9442101D 059 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700378 $0.64 000001066132-3562506200
2021 6 FD52 06 E122 D 9442101D 059 12/23/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122K1062035700378 $304.17 000001066132-3562506200
2021 6 FD52 06 E122 D 9442101D 059 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700378 $7.25 000001066132-3562506200
2021 6 FD52 06 E123 D 9442101D 059 12/23/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122K1062035700378 $54.70 000001066132-3562506200
2021 6 FD52 06 E123 D 9442101D 059 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700378 $0.90 000001066132-3562506200
2021 6 FD52 06 E124 D 9442101D 059 12/23/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122K1062035700378 $0.17 000001066132-3562506200
2021 6 FD52 06 E143 D 9442101D 059 12/18/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100099425 PON22000000178 GRESHAM SMITH $64,902.34 Kenton 5-450
2021 6 FD52 06 E143 D 9442101D 059 12/18/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100099425 PON22000000178 GRESHAM SMITH $6,138.34 Kenton 5-450
2021 6 FD52 06 E111 D 9442101D 059 12/14/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121K1062034309696 $511.63 000001066132-3562506200
2021 6 FD52 06 E111 D 9442101D 059 12/14/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309696 $148.51 000001066132-3562506200
2021 6 FD52 06 E121 D 9442101D 059 12/14/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121K1062034309696 $38.03 000001066132-3562506200
2021 6 FD52 06 E121 D 9442101D 059 12/14/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309696 $10.99 000001066132-3562506200
2021 6 FD52 06 E122 D 9442101D 059 12/14/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121K1062034309696 $430.85 000001066132-3562506200
2021 6 FD52 06 E122 D 9442101D 059 12/14/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309696 $125.39 000001066132-3562506200
2021 6 FD52 06 E123 D 9442101D 059 12/14/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121K1062034309696 $70.93 000001066132-3562506200
2021 6 FD52 06 E123 D 9442101D 059 12/14/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309696 $21.65 000001066132-3562506200
2021 6 FD52 06 E143 D 9442101D 059 12/4/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100065119 PON22000000178 GRESHAM SMITH $39,569.87 Kenton 5-450
2021 6 FD52 06 E143 D 9442101D 059 12/4/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100083551 PON22000000178 GRESHAM SMITH $32,579.33 Kenton 5-450
2021 6 FD52 06 E143 D 9442101D 059 12/4/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100065119 PON22000000178 GRESHAM SMITH $7,050.50 Kenton 5-450
2021 6 FD52 06 E143 D 9442101D 059 12/4/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100083551 PON22000000178 GRESHAM SMITH $3,250.00 Kenton 5-450
2021 6 FD52 06 E143 D 9442101D 059 12/4/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100065119 PON22000000178 GRESHAM SMITH $4,540.98 Kenton 5-450
2021 6 FD52 06 E143 D 9442101D 059 12/4/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100065119 PON22000000178 GRESHAM SMITH $1,565.00 Kenton 5-450
2021 5 FD52 06 E111 D 9442101D 059 11/23/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112K1062032508755 $562.82 000001066132-3562506200
2021 5 FD52 06 E111 D 9442101D 059 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508755 $154.20 000001066132-3562506200
2021 5 FD52 06 E121 D 9442101D 059 11/23/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112K1062032508755 $42.01 000001066132-3562506200
2021 5 FD52 06 E121 D 9442101D 059 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508755 $11.47 000001066132-3562506200
2021 5 FD52 06 E122 D 9442101D 059 11/23/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112K1062032508755 $474.00 000001066132-3562506200
2021 5 FD52 06 E122 D 9442101D 059 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508755 $130.19 000001066132-3562506200
2021 5 FD52 06 E123 D 9442101D 059 11/23/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112K1062032508755 $77.97 000001066132-3562506200
2021 5 FD52 06 E123 D 9442101D 059 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508755 $22.23 000001066132-3562506200
2021 5 FD52 06 E124 D 9442101D 059 11/23/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112K1062032508755 $0.16 000001066132-3562506200
2021 5 FD52 06 E124 D 9442101D 059 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508755 $0.07 000001066132-3562506200
2021 5 FD52 00 E111 D 9442101D 059 11/23/2020 0070 ENV STUDIES-HIST/CULTURAL CA-XR112K1062032508791 $500.56 000001075794-3562500061
2021 5 FD52 00 E111 D 9442101D 059 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508791 $125.13 000001075794-3562500061
2021 5 FD52 00 E121 D 9442101D 059 11/23/2020 0070 ENV STUDIES-HIST/CULTURAL CA-XR112K1062032508791 $36.94 000001075794-3562500061
2021 5 FD52 00 E121 D 9442101D 059 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508791 $9.24 000001075794-3562500061
2021 5 FD52 00 E122 D 9442101D 059 11/23/2020 0070 ENV STUDIES-HIST/CULTURAL CA-XR112K1062032508791 $422.57 000001075794-3562500061
2021 5 FD52 00 E122 D 9442101D 059 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508791 $105.65 000001075794-3562500061
2021 5 FD52 00 E123 D 9442101D 059 11/23/2020 0070 ENV STUDIES-HIST/CULTURAL CA-XR112K1062032508791 $67.27 000001075794-3562500061
2021 5 FD52 00 E123 D 9442101D 059 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508791 $16.50 000001075794-3562500061
2021 5 FD52 00 E124 D 9442101D 059 11/23/2020 0070 ENV STUDIES-HIST/CULTURAL CA-XR112K1062032508791 $0.20 000001075794-3562500061
2021 5 FD52 00 E124 D 9442101D 059 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508791 $0.05 000001075794-3562500061
2021 5 FD52 06 E111 D 9442101D 059 11/9/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR111K1062031107774 $459.49 000001072538-3562506200
2021 5 FD52 06 E111 D 9442101D 059 11/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111K1062031107774 $45.95 000001072538-3562506200
2021 5 FD52 06 E121 D 9442101D 059 11/9/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR111K1062031107774 $32.47 000001072538-3562506200
2021 5 FD52 06 E121 D 9442101D 059 11/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111K1062031107774 $3.25 000001072538-3562506200
2021 5 FD52 06 E122 D 9442101D 059 11/9/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR111K1062031107774 $387.95 000001072538-3562506200
2021 5 FD52 06 E122 D 9442101D 059 11/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111K1062031107774 $38.80 000001072538-3562506200
2021 5 FD52 06 E123 D 9442101D 059 11/9/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR111K1062031107774 $68.17 000001072538-3562506200
2021 5 FD52 06 E123 D 9442101D 059 11/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111K1062031107774 $6.71 000001072538-3562506200
2021 5 FD52 06 E111 D 9442101D 059 11/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111K1062031107763 $1,520.52 000001066132-3562506200
2021 5 FD52 06 E111 D 9442101D 059 11/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111K1062031107763 $5.96 000001066132-3562506204
2021 5 FD52 06 E121 D 9442101D 059 11/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111K1062031107763 $113.56 000001066132-3562506204
2021 5 FD52 06 E121 D 9442101D 059 11/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111K1062031107763 $0.45 000001066132-3562506204
2021 5 FD52 06 E122 D 9442101D 059 11/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111K1062031107763 $1,283.94 000001066132-3562506204
2021 5 FD52 06 E122 D 9442101D 059 11/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111K1062031107763 $5.03 000001066132-3562506204
2021 5 FD52 06 E123 D 9442101D 059 11/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111K1062031107763 $202.69 000001066132-3562506200
2021 5 FD52 06 E123 D 9442101D 059 11/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111K1062031107763 $0.72 000001066132-3562506204
2021 4 FD52 00 E111 D 9442101D 059 10/29/2020 0070 ENV STUDIES-HIST/CULTURAL CA-XR102K1062029706736 $227.50 000001075794-3562500061
2021 4 FD52 00 E124 D 9442101D 059 10/29/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102K1062029706736 $0.02 000001075794-3562500061
2021 4 FD52 00 E111 D 9442101D 059 10/29/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102K1062029706736 $50.36 000001075794-3562500061
2021 4 FD52 00 E121 D 9442101D 059 10/29/2020 0070 ENV STUDIES-HIST/CULTURAL CA-XR102K1062029706736 $16.79 000001075794-3562500061
2021 4 FD52 00 E121 D 9442101D 059 10/29/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102K1062029706736 $3.72 000001075794-3562500061
2021 4 FD52 00 E122 D 9442101D 059 10/29/2020 0070 ENV STUDIES-HIST/CULTURAL CA-XR102K1062029706736 $192.08 000001075794-3562500061
2021 4 FD52 00 E122 D 9442101D 059 10/29/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102K1062029706736 $42.52 000001075794-3562500061
2021 4 FD52 00 E123 D 9442101D 059 10/29/2020 0070 ENV STUDIES-HIST/CULTURAL CA-XR102K1062029706736 $30.56 000001075794-3562500061
2021 4 FD52 00 E123 D 9442101D 059 10/29/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102K1062029706736 $6.64 000001075794-3562500061
2021 4 FD52 00 E124 D 9442101D 059 10/29/2020 0070 ENV STUDIES-HIST/CULTURAL CA-XR102K1062029706736 $0.09 000001075794-3562500061
2021 4 FD52 06 E111 D 9442101D 059 10/26/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR102K1062029706712 $330.96 000001072538-3562506200
2021 4 FD52 06 E111 D 9442101D 059 10/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102K1062029706712 $38.41 000001072538-3562506200
2021 4 FD52 06 E121 D 9442101D 059 10/26/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR102K1062029706712 $24.40 000001072538-3562506200
2021 4 FD52 06 E121 D 9442101D 059 10/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102K1062029706712 $2.86 000001072538-3562506200
2021 4 FD52 06 E122 D 9442101D 059 10/26/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR102K1062029706712 $279.31 000001072538-3562506200
2021 4 FD52 06 E122 D 9442101D 059 10/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102K1062029706712 $32.42 000001072538-3562506200
2021 4 FD52 06 E123 D 9442101D 059 10/26/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR102K1062029706712 $44.86 000001072538-3562506200
2021 4 FD52 06 E123 D 9442101D 059 10/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102K1062029706712 $4.46 000001072538-3562506200
2021 4 FD52 06 E124 D 9442101D 059 10/26/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR102K1062029706712 $0.11 000001072538-3562506200
2021 4 FD52 06 E111 D 9442101D 059 10/26/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102K1062029706698 $524.44 000001066132-3562506200
2021 4 FD52 06 E111 D 9442101D 059 10/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102K1062029706698 $141.88 000001066132-3562506200
2021 4 FD52 06 E121 D 9442101D 059 10/26/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102K1062029706698 $39.40 000001066132-3562506200
2021 4 FD52 06 E121 D 9442101D 059 10/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102K1062029706698 $10.67 000001066132-3562506200
2021 4 FD52 06 E122 D 9442101D 059 10/26/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102K1062029706698 $443.05 000001066132-3562506200
2021 4 FD52 06 E122 D 9442101D 059 10/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102K1062029706698 $119.79 000001066132-3562506200
2021 4 FD52 06 E123 D 9442101D 059 10/26/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102K1062029706698 $61.54 000001066132-3562506200
2021 4 FD52 06 E123 D 9442101D 059 10/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102K1062029706698 $15.90 000001066132-3562506200
2021 4 FD52 06 E124 D 9442101D 059 10/26/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102K1062029706698 $0.16 000001066132-3562506200
2021 4 FD52 06 E124 D 9442101D 059 10/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102K1062029706698 $0.04 000001066132-3562506200
2021 4 FD52 06 E111 D 9442101D 059 10/12/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101K1062028205681 $1,023.88 000001066132-3562506200
2021 4 FD52 06 E111 D 9442101D 059 10/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101K1062028205681 $119.77 000001066132-3562506200
2021 4 FD52 06 E121 D 9442101D 059 10/12/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101K1062028205681 $76.06 000001066132-3562506200
2021 4 FD52 06 E121 D 9442101D 059 10/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101K1062028205681 $9.03 000001066132-3562506200
2021 4 FD52 06 E122 D 9442101D 059 10/12/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101K1062028205681 $864.76 000001066132-3562506200
2021 4 FD52 06 E122 D 9442101D 059 10/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101K1062028205681 $101.12 000001066132-3562506200
2021 4 FD52 06 E123 D 9442101D 059 10/12/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101K1062028205681 $141.91 000001066132-3562506200
2021 4 FD52 06 E123 D 9442101D 059 10/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101K1062028205681 $12.62 000001066132-3562506200
2021 4 FD52 06 E143 D 9442101D 059 10/2/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100052409 PON22000000178 GRESHAM SMITH $8,615.50 Kenton 5-450
2021 4 FD52 06 E143 D 9442101D 059 10/2/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100052409 PON22000000178 GRESHAM SMITH $16,745.26 Kenton 5-450
2021 3 FD52 06 E111 D 9442101D 059 9/29/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR092K1062026704610 $229.75 000001072538-3562506200
2021 3 FD52 06 E111 D 9442101D 059 9/29/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704610 $22.97 000001072538-3562506200
2021 3 FD52 06 E121 D 9442101D 059 9/29/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR092K1062026704610 $16.79 000001072538-3562506200
2021 3 FD52 06 E121 D 9442101D 059 9/29/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704610 $1.68 000001072538-3562506200
2021 3 FD52 06 E122 D 9442101D 059 9/29/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR092K1062026704610 $193.98 000001072538-3562506200
2021 3 FD52 06 E122 D 9442101D 059 9/29/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704610 $19.39 000001072538-3562506200
2021 3 FD52 06 E123 D 9442101D 059 9/29/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR092K1062026704610 $34.09 000001072538-3562506200
2021 3 FD52 06 E123 D 9442101D 059 9/29/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704610 $3.36 000001072538-3562506200
2021 3 FD52 06 E124 D 9442101D 059 9/29/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR092K1062026704610 $0.09 000001072538-3562506200
2021 3 FD52 06 E124 D 9442101D 059 9/29/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704610 $0.01 000001072538-3562506200
2021 3 FD52 06 E111 D 9442101D 059 9/24/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092K1062026704592 $379.02 000001066132-3562506200
2021 3 FD52 06 E111 D 9442101D 059 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704592 $37.90 000001066132-3562506200
2021 3 FD52 06 E121 D 9442101D 059 9/24/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092K1062026704592 $28.57 000001066132-3562506200
2021 3 FD52 06 E121 D 9442101D 059 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704592 $2.85 000001066132-3562506200
2021 3 FD52 06 E122 D 9442101D 059 9/24/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092K1062026704592 $320.01 000001066132-3562506200
2021 3 FD52 06 E122 D 9442101D 059 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704592 $32.00 000001066132-3562506200
2021 3 FD52 06 E123 D 9442101D 059 9/24/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092K1062026704592 $40.43 000001066132-3562506200
2021 3 FD52 06 E123 D 9442101D 059 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704592 $3.99 000001066132-3562506200
2021 3 FD52 06 E124 D 9442101D 059 9/24/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092K1062026704592 $0.09 000001066132-3562506200
2021 3 FD52 06 E124 D 9442101D 059 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704592 $0.01 000001066132-3562506200
2021 2 FD52 06 E143 D 9442101D 059 8/28/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100031360 PON22000000178 GRESHAM SMITH $9,547.56 Kenton 5-450
2021 1 FD52 06 E143 D 9442101D 059 7/24/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100011105 PON22000000178 GRESHAM SMITH $15,758.64 Kenton 5-450
2021 1 FD52 06 E143 D 9442101D 059 7/24/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100012876 PON22000000178 GRESHAM SMITH $29,174.95 Kenton 5-450
2021 1 FD52 06 E143 D 9442101D 059 7/24/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100012876 PON22000000178 GRESHAM SMITH $1,050.00 Kenton 5-450
2020 11 FD52 06 E143 D 9442101D 059 5/22/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000197454 PON22000000178 GRESHAM SMITH $24,174.68 Kenton 6-450
2020 11 FD52 06 E143 D 9442101D 059 5/22/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000197454 PON22000000178 GRESHAM SMITH $4,540.98 Kenton 5-450
2020 11 FD52 06 E143 D 9442101D 059 5/22/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000197454 PON22000000178 GRESHAM SMITH $2,300.00 Kenton 5-450
2020 11 FD52 06 E111 D 9442101D 059 5/11/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051K1062012905490 $499.82 000001066132-3562506200
2020 11 FD52 06 E121 D 9442101D 059 5/11/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051K1062012905490 $37.10 000001066132-3562506200
2020 11 FD52 06 E122 D 9442101D 059 5/11/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051K1062012905490 $417.00 000001066132-3562506200
2020 11 FD52 06 E123 D 9442101D 059 5/11/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051K1062012905490 $70.84 000001066132-3562506200
2020 10 FD52 06 E143 D 9442101D 059 4/24/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000182124 PON22000000178 GRESHAM SMITH $22,697.94 Kenton 5-450
2020 10 FD52 06 E143 D 9442101D 059 4/24/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000182124 PON22000000178 GRESHAM SMITH $6,811.48 DBE-Contractor
2020 10 FD52 06 E122 D 9442101D 059 4/14/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041K1062009903462 $289.86 000001066132-3562506200
2020 10 FD52 06 E123 D 9442101D 059 4/14/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041K1062009903462 $37.01 000001066132-3562506200
2020 10 FD52 06 E111 D 9442101D 059 4/14/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041K1062009903462 $347.43 000001066132-3562506200
2020 10 FD52 06 E121 D 9442101D 059 4/14/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041K1062009903462 $26.18 000001066132-3562506200
2020 9 FD52 06 E143 D 9442101D 059 3/17/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000159148 PON22000000178 GRESHAM SMITH $21,503.75 Kenton 5-450
2020 9 FD52 06 E143 D 9442101D 059 3/17/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000159148 PON22000000178 GRESHAM SMITH $8,496.25 Kenton 5-450
2020 8 FD52 06 E143 D 9442101D 059 2/19/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000141946 PON22000000178 GRESHAM SMITH $18,824.18 Kenton 5-450
2020 8 FD52 06 E143 D 9442101D 059 2/19/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000141946 PON22000000178 GRESHAM SMITH $24,240.69 Kenton 5-450
2020 8 FD52 06 E143 D 9442101D 059 2/19/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000141946 PON22000000178 GRESHAM SMITH $21,151.50 Kenton 5-450
2020 8 FD52 06 E111 D 9442101D 059 2/10/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR021K1062003809900 $210.53 000001072538-3562506200
2020 8 FD52 06 E111 D 9442101D 059 2/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021K1062003809900 $32.58 000001072538-3562506200
2020 8 FD52 06 E121 D 9442101D 059 2/10/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR021K1062003809900 $14.88 000001072538-3562506200
2020 8 FD52 06 E121 D 9442101D 059 2/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021K1062003809900 $2.31 000001072538-3562506200
2020 8 FD52 06 E122 D 9442101D 059 2/10/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR021K1062003809900 $175.70 000001072538-3562506200
2020 8 FD52 06 E122 D 9442101D 059 2/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021K1062003809900 $27.18 000001072538-3562506200
2020 8 FD52 06 E123 D 9442101D 059 2/10/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR021K1062003809900 $31.27 000001072538-3562506200
2020 8 FD52 06 E123 D 9442101D 059 2/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021K1062003809900 $4.76 000001072538-3562506200
2020 7 FD52 06 E143 D 9442101D 059 1/17/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000122124 PON22000000178 GRESHAM SMITH $18,094.42 Kenton 5-450
2020 6 FD52 06 E143 D 9442101D 059 12/30/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000105813 PON22000000178 GRESHAM SMITH $21,273.66 Kenton 5-450
2020 6 FD52 06 E143 D 9442101D 059 12/30/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000105813 PON22000000178 GRESHAM SMITH $13,038.00 Kenton 5-450
2020 6 FD52 06 E143 D 9442101D 059 12/30/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000105813 PON22000000178 GRESHAM SMITH $105,757.50 Kenton 5-450
2020 6 FD52 06 E111 D 9442101D 059 12/23/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122J1061935406852 $997.14 000001066132-3562506200
2020 6 FD52 06 E111 D 9442101D 059 12/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122J1061935406852 $206.01 000001066132-3562506202
2020 6 FD52 06 E121 D 9442101D 059 12/23/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122J1061935406852 $74.26 000001066132-3562506200
2020 6 FD52 06 E121 D 9442101D 059 12/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122J1061935406852 $15.25 000001066132-3562506202
2020 6 FD52 06 E122 D 9442101D 059 12/23/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122J1061935406852 $831.77 000001066132-3562506202
2020 6 FD52 06 E122 D 9442101D 059 12/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122J1061935406852 $171.88 000001066132-3562506200
2020 6 FD52 06 E123 D 9442101D 059 12/23/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122J1061935406852 $123.38 000001066132-3562506200
2020 6 FD52 06 E123 D 9442101D 059 12/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122J1061935406852 $26.50 000001066132-3562506200
2020 6 FD52 06 E124 D 9442101D 059 12/23/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122J1061935406852 $0.34 000001066132-3562506202
2020 6 FD52 06 E124 D 9442101D 059 12/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122J1061935406852 $0.07 000001066132-3562506200
2020 5 FD52 06 E143 D 9442101D 059 11/19/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000088407 PON22000000178 GRESHAM SMITH $4,872.21 Kenton 5-450
2020 5 FD52 06 E143 D 9442101D 059 11/19/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000088407 PON22000000178 GRESHAM SMITH $35,794.48 Kenton 5-450
2020 5 FD52 06 E111 D 9442101D 059 11/12/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111J1061931103644 $200.57 000001066132-3562506200
2020 5 FD52 06 E111 D 9442101D 059 11/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111J1061931103644 $42.52 000001066132-3562506200
2020 5 FD52 06 E121 D 9442101D 059 11/12/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111J1061931103644 $14.63 000001066132-3562506200
2020 5 FD52 06 E121 D 9442101D 059 11/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111J1061931103644 $3.10 000001066132-3562506200
2020 5 FD52 06 E122 D 9442101D 059 11/12/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111J1061931103644 $167.34 000001066132-3562506200
2020 5 FD52 06 E122 D 9442101D 059 11/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111J1061931103644 $35.47 000001066132-3562506200
2020 5 FD52 06 E123 D 9442101D 059 11/12/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111J1061931103644 $31.29 000001066132-3562506200
2020 5 FD52 06 E123 D 9442101D 059 11/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111J1061931103644 $6.53 000001066132-3562506200
2020 5 FD52 06 E143 D 9442101D 059 11/7/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000079502 PON22000000178 GRESHAM SMITH $2,556.25 Kenton 5-450
2020 5 FD52 06 E143 D 9442101D 059 11/7/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000079502 PON22000000178 GRESHAM SMITH $12,549.90 Kenton 5-450
2020 4 FD52 06 E123 D 9442101D 059 10/28/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102J1061929702521 $34.06 000001066132-3562506200
2020 4 FD52 06 E123 D 9442101D 059 10/28/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102J1061929702521 $1.39 000001066132-3562506200
2020 4 FD52 06 E124 D 9442101D 059 10/28/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102J1061929702521 $0.09 000001066132-3562506200
2020 4 FD52 06 E111 D 9442101D 059 10/28/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102J1061929702520 $218.71 000001066132-3562506200
2020 4 FD52 06 E111 D 9442101D 059 10/28/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102J1061929702520 $9.05 000001066132-3562506200
2020 4 FD52 06 E121 D 9442101D 059 10/28/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102J1061929702520 $15.97 000001066132-3562506200
2020 4 FD52 06 E121 D 9442101D 059 10/28/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102J1061929702520 $0.67 000001066132-3562506200
2020 4 FD52 06 E122 D 9442101D 059 10/28/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102J1061929702520 $182.55 000001066132-3562506200
2020 4 FD52 06 E122 D 9442101D 059 10/28/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102J1061929702520 $7.55 000001066132-3562506200
2020 3 FD52 06 E143 D 9442101D 059 9/30/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000056711 PON22000000178 GRESHAM SMITH $4,086.89 Kenton 5-450
2020 2 FD52 06 E229 D 9442101D 059 8/30/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF IET-XE13A162519241009740 $57.76
2020 2 FD52 06 E111 D 9442101D 059 8/26/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082J1061923508095 $379.02 000001066132-3562506200
2020 2 FD52 06 E121 D 9442101D 059 8/26/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082J1061923508095 $28.71 000001066132-3562506200
2020 2 FD52 06 E122 D 9442101D 059 8/26/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082J1061923508095 $316.22 000001066132-3562506200
2020 2 FD52 06 E123 D 9442101D 059 8/26/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082J1061923508095 $40.38 000001066132-3562506200
2020 2 FD52 06 E124 D 9442101D 059 8/26/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082J1061923508095 $0.09 000001066132-3562506200
2020 1 FD52 06 E111 D 9442101D 059 7/24/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072J1061920405819 $379.23 000001066132-3562506200
2020 1 FD52 06 E111 D 9442101D 059 7/24/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072J1061920405819 $216.29 000001066132-3562506200
2020 1 FD52 06 E121 D 9442101D 059 7/24/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072J1061920405819 $28.71 000001066132-3562506200
2020 1 FD52 06 E121 D 9442101D 059 7/24/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072J1061920405819 $16.39 000001066132-3562506200
2020 1 FD52 06 E122 D 9442101D 059 7/24/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072J1061920405819 $316.22 000001066132-3562506200
2020 1 FD52 06 E122 D 9442101D 059 7/24/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072J1061920405819 $180.45 000001066132-3562506200
2020 1 FD52 06 E123 D 9442101D 059 7/24/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072J1061920405819 $40.65 000001066132-3562506200
2020 1 FD52 06 E123 D 9442101D 059 7/24/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072J1061920405819 $22.78 000001066132-3562506200
2020 1 FD52 06 E124 D 9442101D 059 7/24/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072J1061920405819 $0.09 000001066132-3562506200
2020 1 FD52 06 E124 D 9442101D 059 7/24/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072J1061920405819 $0.05 000001066132-3562506200
2019 11 FD52 00 E111 D 9442101D 059 5/14/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051J1061912800455 $344.85 000001068449-3562500636
2019 11 FD52 00 E111 D 9442101D 059 5/14/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051J1061912800455 $16.56 000001068449-3562500636
2019 11 FD52 00 E121 D 9442101D 059 5/14/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051J1061912800455 $25.14 000001068449-3562500636
2019 11 FD52 00 E121 D 9442101D 059 5/14/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051J1061912800455 $1.21 000001068449-3562500636
2019 11 FD52 00 E122 D 9442101D 059 5/14/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051J1061912800455 $286.63 000001068449-3562500636
2019 11 FD52 00 E122 D 9442101D 059 5/14/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051J1061912800455 $13.82 000001068449-3562500636
2019 11 FD52 00 E123 D 9442101D 059 5/14/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051J1061912800455 $51.73 000001068449-3562500636
2019 11 FD52 00 E123 D 9442101D 059 5/14/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051J1061912800455 $2.47 000001068449-3562500636
2019 11 FD52 00 E111 D 9442101D 059 5/9/2019 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR051J1061912800405 $199.72 000001066655-3562500061
2019 11 FD52 00 E111 D 9442101D 059 5/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051J1061912800405 $63.91 000001066655-3562500061
2019 11 FD52 00 E121 D 9442101D 059 5/9/2019 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR051J1061912800405 $13.99 000001066655-3562500061
2019 11 FD52 00 E121 D 9442101D 059 5/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051J1061912800405 $4.48 000001066655-3562500061
2019 11 FD52 00 E122 D 9442101D 059 5/9/2019 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR051J1061912800405 $166.63 000001066655-3562500061
2019 11 FD52 00 E122 D 9442101D 059 5/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051J1061912800405 $53.31 000001066655-3562500061
2019 11 FD52 00 E123 D 9442101D 059 5/9/2019 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR051J1061912800405 $46.88 000001066655-3562500061
2019 11 FD52 00 E123 D 9442101D 059 5/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051J1061912800405 $14.83 000001066655-3562500061
2019 11 FD52 00 E229 D 9442101D 059 5/3/2019 0091 ENV STUDIES-ENV PROJ MGR (EPM) IET-XE13A162519123060890 $93.50
2019 10 FD52 06 E111 D 9442101D 059 4/12/2019 7010 OVERHEAD EXCEPT MAIN AND EQUIP CA-XR041J1061909909170 $89.88 000001067091-3562500019
2019 10 FD52 06 E111 D 9442101D 059 4/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041J1061909909170 $7.79 000001067091-3562500019
2019 10 FD52 06 E121 D 9442101D 059 4/12/2019 7010 OVERHEAD EXCEPT MAIN AND EQUIP CA-XR041J1061909909170 $6.75 000001067091-3562500019
2019 10 FD52 06 E121 D 9442101D 059 4/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041J1061909909170 $0.58 000001067091-3562500019
2019 10 FD52 06 E122 D 9442101D 059 4/12/2019 7010 OVERHEAD EXCEPT MAIN AND EQUIP CA-XR041J1061909909170 $74.99 000001067091-3562500019
2019 10 FD52 06 E122 D 9442101D 059 4/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041J1061909909170 $6.50 000001067091-3562500019
2019 10 FD52 06 E123 D 9442101D 059 4/12/2019 7010 OVERHEAD EXCEPT MAIN AND EQUIP CA-XR041J1061909909170 $13.17 000001067091-3562500019
2019 10 FD52 06 E123 D 9442101D 059 4/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041J1061909909170 $1.12 000001067091-3562500019
2019 9 FD52 00 E111 D 9442101D 059 3/14/2019 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR031J1061906706893 $139.50 000001066655-3562500061
2019 9 FD52 00 E111 D 9442101D 059 3/14/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031J1061906706893 $11.16 000001066655-3562500061
2019 9 FD52 00 E121 D 9442101D 059 3/14/2019 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR031J1061906706893 $9.77 000001066655-3562500061
2019 9 FD52 00 E121 D 9442101D 059 3/14/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031J1061906706893 $0.79 000001066655-3562500061
2019 9 FD52 00 E122 D 9442101D 059 3/14/2019 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR031J1061906706893 $116.38 000001066655-3562500061
2019 9 FD52 00 E122 D 9442101D 059 3/14/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031J1061906706893 $9.31 000001066655-3562500061
2019 9 FD52 00 E123 D 9442101D 059 3/14/2019 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR031J1061906706893 $32.68 000001066655-3562500061
2019 9 FD52 00 E123 D 9442101D 059 3/14/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031J1061906706893 $2.59 000001066655-3562500061
2019 8 FD52 06 E111 D 9442101D 059 2/25/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022J1061905305648 $307.71 000001066132-3562506204
2019 8 FD52 06 E121 D 9442101D 059 2/25/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022J1061905305648 $23.10 000001066132-3562506204
2019 8 FD52 06 E122 D 9442101D 059 2/25/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022J1061905305648 $256.72 000001066132-3562506204
2019 8 FD52 06 E123 D 9442101D 059 2/25/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022J1061905305648 $39.18 000001066132-3562506204
2019 8 FD52 06 E124 D 9442101D 059 2/25/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022J1061905305648 $0.09 000001066132-3562506204