2024 |
1 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
7/24/2023 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
JVC-2400000060 |
|
|
($615,457.30) |
Move $615,457.30 of expenditures from 10-1 to 15-1 |
2024 |
1 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
7/24/2023 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
JVC-2400000060 |
|
|
$615,457.30 |
Move $615,457.30 of expenditures from 10-1 to 15-1 |
2023 |
12 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
6/26/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062N1062317400407 |
|
|
$1,709.16 |
000001066290-3562506208 |
2023 |
12 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
6/26/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062N1062317400407 |
|
|
$518.12 |
000001066290-3562506200 |
2023 |
12 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
6/26/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062N1062317400407 |
|
|
$128.23 |
000001066290-3562506200 |
2023 |
12 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
6/26/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062N1062317400407 |
|
|
$39.54 |
000001066290-3562506208 |
2023 |
12 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
6/26/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062N1062317400407 |
|
|
$1,333.16 |
000001066290-3562506208 |
2023 |
12 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
6/26/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062N1062317400407 |
|
|
$404.14 |
000001066290-3562506200 |
2023 |
12 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
6/26/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062N1062317400407 |
|
|
$151.72 |
000001066290-3562506200 |
2023 |
12 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
6/26/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062N1062317400407 |
|
|
$22.33 |
000001066290-3562506208 |
2023 |
12 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
6/26/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062N1062317400407 |
|
|
$0.59 |
000001066290-3562506200 |
2023 |
12 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
6/26/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062N1062317400407 |
|
|
$0.22 |
000001066290-3562506200 |
2023 |
12 |
FD52 |
06 |
E143 |
D |
9441501D |
059 |
6/12/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300240475 |
PON21900003654 |
LESLIE M HANEY & ALBERT W GROSS PTR |
$65,521.35 |
Kenton County 6-449.00 |
2023 |
12 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
6/8/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR061N1062315810114 |
|
|
$760.56 |
000001066290-3562506208 |
2023 |
12 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
6/8/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061N1062315810114 |
|
|
$95.26 |
000001066290-3562506200 |
2023 |
12 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
6/8/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR061N1062315810114 |
|
|
$57.15 |
000001066290-3562506200 |
2023 |
12 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
6/8/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061N1062315810114 |
|
|
$7.15 |
000001066290-3562506200 |
2023 |
12 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
6/8/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR061N1062315810114 |
|
|
$593.13 |
000001066290-3562506208 |
2023 |
12 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
6/8/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061N1062315810114 |
|
|
$74.30 |
000001066290-3562506208 |
2023 |
12 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
6/8/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR061N1062315810114 |
|
|
$106.85 |
000001066290-3562506208 |
2023 |
12 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
6/8/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061N1062315810114 |
|
|
$13.61 |
000001066290-3562506200 |
2023 |
12 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
6/8/2023 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR061N1062315810114 |
|
|
$1,076.47 |
000001066296-3562506200 |
2023 |
12 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
6/8/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061N1062315810114 |
|
|
$190.15 |
000001066296-3562506200 |
2023 |
12 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
6/8/2023 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR061N1062315810114 |
|
|
$78.38 |
000001066296-3562506200 |
2023 |
12 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
6/8/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061N1062315810114 |
|
|
$13.85 |
000001066296-3562506200 |
2023 |
12 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
6/8/2023 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR061N1062315810114 |
|
|
$839.74 |
000001066296-3562506200 |
2023 |
12 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
6/8/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061N1062315810114 |
|
|
$148.32 |
000001066296-3562506200 |
2023 |
12 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
6/8/2023 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR061N1062315810114 |
|
|
$170.01 |
000001066296-3562506200 |
2023 |
12 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
6/8/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061N1062315810114 |
|
|
$29.60 |
000001066296-3562506200 |
2023 |
11 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
5/24/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052N1062314309016 |
|
|
$818.62 |
000001066290-3562506200 |
2023 |
11 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
5/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052N1062314309016 |
|
|
$15.28 |
000001066290-3562506200 |
2023 |
11 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
5/24/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052N1062314309016 |
|
|
$61.67 |
000001066290-3562506200 |
2023 |
11 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
5/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052N1062314309016 |
|
|
$1.15 |
000001066290-3562506200 |
2023 |
11 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
5/24/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052N1062314309016 |
|
|
$638.57 |
000001066290-3562506200 |
2023 |
11 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
5/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052N1062314309016 |
|
|
$11.92 |
000001066290-3562506200 |
2023 |
11 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
5/24/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052N1062314309016 |
|
|
$92.82 |
000001066290-3562506200 |
2023 |
11 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
5/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052N1062314309016 |
|
|
$1.71 |
000001066290-3562506200 |
2023 |
11 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
5/24/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052N1062314309016 |
|
|
$0.18 |
000001066290-3562506200 |
2023 |
9 |
FD52 |
06 |
E143 |
D |
9441501D |
059 |
3/1/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300161994 |
PON21900004138 |
AECOM TECHNICAL SERVICES, INC. |
$3,161.77 |
Letter Agreement 1 |
2023 |
8 |
FD52 |
06 |
E143 |
D |
9441501D |
059 |
2/17/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300148366 |
PON21900003654 |
LESLIE M HANEY & ALBERT W GROSS PTR |
$29,120.60 |
Kenton County 6-449.00 |
2023 |
6 |
FD52 |
06 |
E143 |
D |
9441501D |
059 |
12/22/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300113432 |
PON21900004138 |
AECOM TECHNICAL SERVICES, INC. |
$10,612.60 |
Letter Agreement 1 |
2023 |
6 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
12/22/2022 |
4260 |
SIGNAL PLANS-TRAF |
CA-XR122M1062235509143 |
|
|
$232.84 |
000001075860-3562500463 |
2023 |
6 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
12/22/2022 |
4260 |
SIGNAL PLANS-TRAF |
CA-XR122M1062235509143 |
|
|
$17.35 |
000001075860-3562500463 |
2023 |
6 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
12/22/2022 |
4260 |
SIGNAL PLANS-TRAF |
CA-XR122M1062235509143 |
|
|
$181.61 |
000001075860-3562500463 |
2023 |
6 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
12/22/2022 |
4260 |
SIGNAL PLANS-TRAF |
CA-XR122M1062235509143 |
|
|
$27.56 |
000001075860-3562500463 |
2023 |
6 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
12/22/2022 |
4260 |
SIGNAL PLANS-TRAF |
CA-XR122M1062235509143 |
|
|
$0.06 |
000001075860-3562500463 |
2023 |
6 |
FD52 |
06 |
E143 |
D |
9441501D |
059 |
12/6/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300096737 |
PON21900004138 |
AECOM TECHNICAL SERVICES, INC. |
$2,867.45 |
Letter Agreement 1 |
2023 |
5 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
11/7/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111M1062230806133 |
|
|
$409.33 |
000001066290-3562506200 |
2023 |
5 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
11/7/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111M1062230806133 |
|
|
$30.56 |
000001066290-3562506200 |
2023 |
5 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
11/7/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111M1062230806133 |
|
|
$319.29 |
000001066290-3562506200 |
2023 |
5 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
11/7/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111M1062230806133 |
|
|
$42.61 |
000001066290-3562506200 |
2023 |
4 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
10/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101M1062228003921 |
|
|
$0.46 |
000001075860-3562500463 |
2023 |
4 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
10/10/2022 |
4260 |
SIGNAL PLANS-TRAF |
CA-XR101M1062228003921 |
|
|
$2.60 |
000001075860-3562500463 |
2023 |
4 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
10/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101M1062228003921 |
|
|
$0.04 |
000001075860-3562500463 |
2023 |
4 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
10/10/2022 |
4260 |
SIGNAL PLANS-TRAF |
CA-XR101M1062228003921 |
|
|
$27.25 |
000001075860-3562500463 |
2023 |
4 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
10/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101M1062228003921 |
|
|
$0.36 |
000001075860-3562500463 |
2023 |
4 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
10/10/2022 |
4260 |
SIGNAL PLANS-TRAF |
CA-XR101M1062228003921 |
|
|
$4.14 |
000001075860-3562500463 |
2023 |
4 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
10/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101M1062228003921 |
|
|
$0.05 |
000001075860-3562500463 |
2023 |
4 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
10/10/2022 |
4260 |
SIGNAL PLANS-TRAF |
CA-XR101M1062228003920 |
|
|
$34.93 |
000001075860-3562500463 |
2023 |
3 |
FD52 |
06 |
E143 |
D |
9441501D |
059 |
9/30/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300058027 |
PON21900004138 |
AECOM TECHNICAL SERVICES, INC. |
$9,386.34 |
Letter Agreement 1 |
2023 |
2 |
FD52 |
06 |
E143 |
D |
9441501D |
059 |
8/25/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300034883 |
PON21900004138 |
AECOM TECHNICAL SERVICES, INC. |
$12,601.93 |
Letter Agreement 1 |
2023 |
2 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
8/24/2022 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR082M1062223500401 |
|
|
$61.81 |
000001066296-3562506208 |
2023 |
2 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
8/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500401 |
|
|
$1.24 |
000001066296-3562506208 |
2023 |
2 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
8/24/2022 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR082M1062223500401 |
|
|
$4.73 |
000001066296-3562506208 |
2023 |
2 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
8/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500401 |
|
|
$0.10 |
000001066296-3562506208 |
2023 |
2 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
8/24/2022 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR082M1062223500401 |
|
|
$48.18 |
000001066296-3562506208 |
2023 |
2 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
8/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500401 |
|
|
$0.97 |
000001066296-3562506208 |
2023 |
2 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
8/24/2022 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR082M1062223500401 |
|
|
$2.25 |
000001066296-3562506208 |
2023 |
2 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
8/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500401 |
|
|
$0.04 |
000001066296-3562506208 |
2023 |
2 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
8/24/2022 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR082M1062223500401 |
|
|
$0.02 |
000001066296-3562506208 |
2023 |
2 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
8/16/2022 |
4260 |
SIGNAL PLANS-TRAF |
CA-XR081M1062222110100 |
|
|
$127.98 |
000001075860-3562500463 |
2023 |
2 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
8/16/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081M1062222110100 |
|
|
$9.73 |
000001075860-3562500463 |
2023 |
2 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
8/16/2022 |
4260 |
SIGNAL PLANS-TRAF |
CA-XR081M1062222110100 |
|
|
$9.54 |
000001075860-3562500463 |
2023 |
2 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
8/16/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081M1062222110100 |
|
|
$0.73 |
000001075860-3562500463 |
2023 |
2 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
8/16/2022 |
4260 |
SIGNAL PLANS-TRAF |
CA-XR081M1062222110100 |
|
|
$99.89 |
000001075860-3562500463 |
2023 |
2 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
8/16/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081M1062222110100 |
|
|
$7.59 |
000001075860-3562500463 |
2023 |
2 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
8/16/2022 |
4260 |
SIGNAL PLANS-TRAF |
CA-XR081M1062222110100 |
|
|
$15.17 |
000001075860-3562500463 |
2023 |
2 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
8/16/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081M1062222110100 |
|
|
$1.14 |
000001075860-3562500463 |
2023 |
2 |
FD52 |
00 |
E111 |
D |
9441501D |
059 |
8/16/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR081M1062222110142 |
|
|
$157.37 |
000001083932-3562500636 |
2023 |
2 |
FD52 |
00 |
E111 |
D |
9441501D |
059 |
8/16/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081M1062222110142 |
|
|
$40.90 |
000001083932-3562500636 |
2023 |
2 |
FD52 |
00 |
E121 |
D |
9441501D |
059 |
8/16/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR081M1062222110142 |
|
|
$10.96 |
000001083932-3562500636 |
2023 |
2 |
FD52 |
00 |
E121 |
D |
9441501D |
059 |
8/16/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081M1062222110142 |
|
|
$2.85 |
000001083932-3562500636 |
2023 |
2 |
FD52 |
00 |
E122 |
D |
9441501D |
059 |
8/16/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR081M1062222110142 |
|
|
$122.71 |
000001083932-3562500636 |
2023 |
2 |
FD52 |
00 |
E122 |
D |
9441501D |
059 |
8/16/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081M1062222110142 |
|
|
$31.91 |
000001083932-3562500636 |
2023 |
2 |
FD52 |
00 |
E123 |
D |
9441501D |
059 |
8/16/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR081M1062222110142 |
|
|
$33.01 |
000001083932-3562500636 |
2023 |
2 |
FD52 |
00 |
E123 |
D |
9441501D |
059 |
8/16/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081M1062222110142 |
|
|
$8.49 |
000001083932-3562500636 |
2023 |
2 |
FD52 |
06 |
E143 |
D |
9441501D |
059 |
8/11/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300025199 |
PON21900003654 |
LESLIE M HANEY & ALBERT W GROSS PTR |
$31,536.40 |
Kenton County 6-449.00 |
2023 |
2 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
8/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081M1062222110092 |
|
|
$1,851.07 |
000001066290-3562506200 |
2023 |
2 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
8/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081M1062222110092 |
|
|
$27.64 |
000001066290-3562506200 |
2023 |
2 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
8/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081M1062222110092 |
|
|
$134.56 |
000001066290-3562506208 |
2023 |
2 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
8/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081M1062222110092 |
|
|
$2.10 |
000001066290-3562506200 |
2023 |
2 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
8/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081M1062222110092 |
|
|
$1,443.69 |
000001066290-3562506208 |
2023 |
2 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
8/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081M1062222110092 |
|
|
$21.56 |
000001066290-3562506208 |
2023 |
2 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
8/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081M1062222110092 |
|
|
$253.30 |
000001066290-3562506200 |
2023 |
2 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
8/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081M1062222110092 |
|
|
$1.78 |
000001066290-3562506200 |
2023 |
1 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
7/25/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR072M1062220308959 |
|
|
$300.05 |
000001066290-3562506200 |
2023 |
1 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308959 |
|
|
$41.48 |
000001066290-3562506200 |
2023 |
1 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
7/25/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR072M1062220308959 |
|
|
$22.41 |
000001066290-3562506200 |
2023 |
1 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308959 |
|
|
$3.10 |
000001066290-3562506200 |
2023 |
1 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
7/25/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR072M1062220308959 |
|
|
$234.14 |
000001066290-3562506200 |
2023 |
1 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308959 |
|
|
$32.36 |
000001066290-3562506200 |
2023 |
1 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
7/25/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR072M1062220308959 |
|
|
$31.30 |
000001066290-3562506200 |
2023 |
1 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308959 |
|
|
$4.27 |
000001066290-3562506200 |
2023 |
1 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
7/25/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR072M1062220308959 |
|
|
$0.07 |
000001066290-3562506200 |
2023 |
1 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308959 |
|
|
$0.01 |
000001066290-3562506200 |
2022 |
12 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506732 |
|
|
$70.46 |
000001066296-3562506200 |
2022 |
12 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
6/27/2022 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR062M1062217506732 |
|
|
$42.83 |
000001066296-3562506200 |
2022 |
12 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506732 |
|
|
$9.32 |
000001066296-3562506200 |
2022 |
12 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
6/27/2022 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR062M1062217506732 |
|
|
$0.09 |
000001066296-3562506200 |
2022 |
12 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506732 |
|
|
$0.02 |
000001066296-3562506200 |
2022 |
12 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
6/27/2022 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR062M1062217506731 |
|
|
$379.34 |
000001066296-3562506200 |
2022 |
12 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506731 |
|
|
$83.90 |
000001066296-3562506200 |
2022 |
12 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
6/27/2022 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR062M1062217506731 |
|
|
$28.24 |
000001066296-3562506200 |
2022 |
12 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506731 |
|
|
$6.24 |
000001066296-3562506200 |
2022 |
12 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
6/27/2022 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR062M1062217506731 |
|
|
$319.08 |
000001066296-3562506200 |
2022 |
11 |
FD52 |
06 |
E143 |
D |
9441501D |
059 |
5/5/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200200735 |
PON21900004138 |
AECOM TECHNICAL SERVICES, INC. |
$2,348.52 |
Letter Agreement 1 |
2022 |
10 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
4/25/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042M1062211202500 |
|
|
$758.03 |
000001066290-3562506200 |
2022 |
10 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202500 |
|
|
$35.88 |
000001066290-3562506200 |
2022 |
10 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
4/25/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042M1062211202500 |
|
|
$56.47 |
000001066290-3562506200 |
2022 |
10 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202500 |
|
|
$2.68 |
000001066290-3562506200 |
2022 |
10 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
4/25/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042M1062211202500 |
|
|
$636.52 |
000001066290-3562506200 |
2022 |
10 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202500 |
|
|
$30.13 |
000001066290-3562506200 |
2022 |
10 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
4/25/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042M1062211202500 |
|
|
$85.26 |
000001066290-3562506200 |
2022 |
10 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202500 |
|
|
$3.99 |
000001066290-3562506200 |
2022 |
10 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
4/25/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042M1062211202500 |
|
|
$0.18 |
000001066290-3562506200 |
2022 |
10 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202500 |
|
|
$0.01 |
000001066290-3562506200 |
2022 |
10 |
FD52 |
06 |
E143 |
D |
9441501D |
059 |
4/12/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200183224 |
PON21900004138 |
AECOM TECHNICAL SERVICES, INC. |
$2,289.79 |
Letter Agreement 1 |
2022 |
9 |
FD52 |
06 |
E143 |
D |
9441501D |
059 |
3/15/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200164627 |
PON21900003654 |
LESLIE M HANEY & ALBERT W GROSS PTR |
$31,536.40 |
Kenton County 6-449.00 |
2022 |
8 |
FD52 |
00 |
E111 |
D |
9441501D |
059 |
2/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022M1062205308384 |
|
|
$148.98 |
000001068448-3562500636 |
2022 |
8 |
FD52 |
00 |
E111 |
D |
9441501D |
059 |
2/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022M1062205308384 |
|
|
$14.90 |
000001068448-3562500636 |
2022 |
8 |
FD52 |
00 |
E121 |
D |
9441501D |
059 |
2/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022M1062205308384 |
|
|
$10.56 |
000001068448-3562500636 |
2022 |
8 |
FD52 |
00 |
E121 |
D |
9441501D |
059 |
2/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022M1062205308384 |
|
|
$1.06 |
000001068448-3562500636 |
2022 |
8 |
FD52 |
00 |
E122 |
D |
9441501D |
059 |
2/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022M1062205308384 |
|
|
$125.10 |
000001068448-3562500636 |
2022 |
8 |
FD52 |
00 |
E122 |
D |
9441501D |
059 |
2/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022M1062205308384 |
|
|
$12.51 |
000001068448-3562500636 |
2022 |
8 |
FD52 |
00 |
E123 |
D |
9441501D |
059 |
2/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022M1062205308384 |
|
|
$33.73 |
000001068448-3562500636 |
2022 |
8 |
FD52 |
00 |
E123 |
D |
9441501D |
059 |
2/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022M1062205308384 |
|
|
$3.34 |
000001068448-3562500636 |
2022 |
8 |
FD52 |
00 |
E124 |
D |
9441501D |
059 |
2/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022M1062205308384 |
|
|
$0.06 |
000001068448-3562500636 |
2022 |
8 |
FD52 |
00 |
E124 |
D |
9441501D |
059 |
2/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022M1062205308384 |
|
|
$0.01 |
000001068448-3562500636 |
2022 |
8 |
FD52 |
06 |
E143 |
D |
9441501D |
059 |
2/18/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200146060 |
PON21900004138 |
AECOM TECHNICAL SERVICES, INC. |
$4,813.92 |
Letter Agreement 1 |
2022 |
8 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
2/14/2022 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR021M1062203907407 |
|
|
$511.90 |
000001066296-3562506200 |
2022 |
8 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
2/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021M1062203907407 |
|
|
$72.45 |
000001066296-3562506200 |
2022 |
8 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
2/14/2022 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR021M1062203907407 |
|
|
$37.51 |
000001066296-3562506200 |
2022 |
8 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
2/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021M1062203907407 |
|
|
$5.24 |
000001066296-3562506200 |
2022 |
8 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
2/14/2022 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR021M1062203907407 |
|
|
$429.91 |
000001066296-3562506200 |
2022 |
8 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
2/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021M1062203907407 |
|
|
$60.83 |
000001066296-3562506200 |
2022 |
8 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
2/14/2022 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR021M1062203907407 |
|
|
$74.98 |
000001066296-3562506200 |
2022 |
8 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
2/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021M1062203907407 |
|
|
$12.44 |
000001066296-3562506200 |
2022 |
8 |
FD52 |
06 |
E143 |
D |
9441501D |
059 |
2/8/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200138818 |
PON21900003654 |
LESLIE M HANEY & ALBERT W GROSS PTR |
$47,304.60 |
Kenton County 6-449.00 |
2022 |
7 |
FD52 |
06 |
E143 |
D |
9441501D |
059 |
1/27/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200131423 |
PON21900004138 |
AECOM TECHNICAL SERVICES, INC. |
$7,716.32 |
Letter Agreement 1 |
2022 |
6 |
FD52 |
06 |
E143 |
D |
9441501D |
059 |
12/16/2021 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200102700 |
PON21900003654 |
LESLIE M HANEY & ALBERT W GROSS PTR |
$31,536.40 |
Kenton County 6-449.00 |
2022 |
5 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
11/29/2021 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR112L1062132602484 |
|
|
$229.83 |
000001066296-3562506200 |
2022 |
5 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
11/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602484 |
|
|
$99.86 |
000001066296-3562506200 |
2022 |
5 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
11/29/2021 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR112L1062132602484 |
|
|
$16.78 |
000001066296-3562506200 |
2022 |
5 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
11/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602484 |
|
|
$7.31 |
000001066296-3562506200 |
2022 |
5 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
11/29/2021 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR112L1062132602484 |
|
|
$193.17 |
000001066296-3562506200 |
2022 |
5 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
11/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602484 |
|
|
$83.86 |
000001066296-3562506200 |
2022 |
5 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
11/29/2021 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR112L1062132602484 |
|
|
$35.27 |
000001066296-3562506200 |
2022 |
5 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
11/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602484 |
|
|
$15.03 |
000001066296-3562506200 |
2022 |
5 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
11/29/2021 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR112L1062132602484 |
|
|
$0.09 |
000001066296-3562506200 |
2022 |
5 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
11/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602484 |
|
|
$0.04 |
000001066296-3562506200 |
2022 |
5 |
FD52 |
06 |
E143 |
D |
9441501D |
059 |
11/9/2021 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200082451 |
PON21900003654 |
LESLIE M HANEY & ALBERT W GROSS PTR |
$25,040.60 |
Kenton County 6-449.00 |
2022 |
5 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
11/8/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111L1062130901487 |
|
|
$416.91 |
000001066290-3562506200 |
2022 |
5 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
11/8/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111L1062130901487 |
|
|
$31.60 |
000001066290-3562506200 |
2022 |
5 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
11/8/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111L1062130901487 |
|
|
$350.09 |
000001066290-3562506200 |
2022 |
5 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
11/8/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111L1062130901487 |
|
|
$45.74 |
000001066290-3562506200 |
2022 |
4 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
10/25/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR102L1062129500378 |
|
|
$494.27 |
000001066290-3562506200 |
2022 |
4 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500378 |
|
|
$216.95 |
000001066290-3562506200 |
2022 |
4 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
10/25/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR102L1062129500378 |
|
|
$37.01 |
000001066290-3562506200 |
2022 |
4 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500378 |
|
|
$16.38 |
000001066290-3562506200 |
2022 |
4 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
10/25/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR102L1062129500378 |
|
|
$414.97 |
000001066290-3562506200 |
2022 |
4 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500378 |
|
|
$182.18 |
000001066290-3562506200 |
2022 |
4 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
10/25/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR102L1062129500378 |
|
|
$69.07 |
000001066290-3562506200 |
2022 |
4 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500378 |
|
|
$25.62 |
000001066290-3562506200 |
2022 |
4 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
10/25/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR102L1062129500378 |
|
|
$0.17 |
000001066290-3562506200 |
2022 |
4 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500378 |
|
|
$0.06 |
000001066290-3562506200 |
2022 |
4 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
10/25/2021 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR102L1062129500378 |
|
|
$229.75 |
000001066296-3562506200 |
2022 |
4 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500378 |
|
|
$22.97 |
000001066296-3562506200 |
2022 |
4 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
10/25/2021 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR102L1062129500378 |
|
|
$22.71 |
000001066296-3562506200 |
2022 |
4 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500378 |
|
|
$2.54 |
000001066296-3562506200 |
2022 |
4 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
10/25/2021 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR102L1062129500378 |
|
|
$192.92 |
000001066296-3562506200 |
2022 |
4 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500378 |
|
|
$19.29 |
000001066296-3562506200 |
2022 |
4 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
10/25/2021 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR102L1062129500378 |
|
|
$35.09 |
000001066296-3562506200 |
2022 |
4 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500378 |
|
|
$3.46 |
000001066296-3562506200 |
2022 |
4 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
10/25/2021 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR102L1062129500378 |
|
|
$0.09 |
000001066296-3562506200 |
2022 |
4 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500378 |
|
|
$0.01 |
000001066296-3562506200 |
2022 |
4 |
FD52 |
06 |
E143 |
D |
9441501D |
059 |
10/22/2021 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200070223 |
PON21900003654 |
LESLIE M HANEY & ALBERT W GROSS PTR |
$21,635.60 |
Kenton County 6-449.00 |
2022 |
4 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
10/11/2021 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR101L1062128110100 |
|
|
$229.76 |
000001066296-3562506200 |
2022 |
4 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
10/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101L1062128110100 |
|
|
$131.10 |
000001066296-3562506200 |
2022 |
4 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
10/11/2021 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR101L1062128110100 |
|
|
$16.64 |
000001066296-3562506200 |
2022 |
4 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
10/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101L1062128110100 |
|
|
$9.50 |
000001066296-3562506200 |
2022 |
4 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
10/11/2021 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR101L1062128110100 |
|
|
$192.92 |
000001066296-3562506200 |
2022 |
4 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
10/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101L1062128110100 |
|
|
$110.08 |
000001066296-3562506200 |
2022 |
4 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
10/11/2021 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR101L1062128110100 |
|
|
$35.31 |
000001066296-3562506200 |
2022 |
4 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
10/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101L1062128110100 |
|
|
$19.74 |
000001066296-3562506200 |
2022 |
3 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
9/27/2021 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR092L1062126709008 |
|
|
$229.75 |
000001066296-3562506200 |
2022 |
3 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
9/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092L1062126709008 |
|
|
$92.82 |
000001066296-3562506200 |
2022 |
3 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
9/27/2021 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR092L1062126709008 |
|
|
$16.78 |
000001066296-3562506200 |
2022 |
3 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
9/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092L1062126709008 |
|
|
$6.78 |
000001066296-3562506200 |
2022 |
3 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
9/27/2021 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR092L1062126709008 |
|
|
$192.93 |
000001066296-3562506200 |
2022 |
3 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
9/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092L1062126709008 |
|
|
$77.93 |
000001066296-3562506200 |
2022 |
3 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
9/27/2021 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR092L1062126709008 |
|
|
$35.21 |
000001066296-3562506200 |
2022 |
3 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
9/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092L1062126709008 |
|
|
$13.98 |
000001066296-3562506200 |
2022 |
3 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
9/27/2021 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR092L1062126709008 |
|
|
$0.10 |
000001066296-3562506200 |
2022 |
3 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
9/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092L1062126709008 |
|
|
$0.03 |
000001066296-3562506200 |
2022 |
1 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
7/26/2021 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR072L1062120404659 |
|
|
($5.93) |
000001066296-3562506200 |
2022 |
1 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
7/26/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072L1062120404659 |
|
|
($0.86) |
000001066296-3562506200 |
2022 |
1 |
FD52 |
06 |
E143 |
D |
9441501D |
059 |
7/22/2021 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200011669 |
PON21900003654 |
LESLIE M HANEY & ALBERT W GROSS PTR |
$6,359.70 |
Kenton County 6-449.00 |
2022 |
1 |
FD52 |
06 |
E143 |
D |
9441501D |
059 |
7/22/2021 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200011669 |
PON21900003654 |
LESLIE M HANEY & ALBERT W GROSS PTR |
$9,408.50 |
Kenton County 6-449.00 |
2022 |
1 |
FD52 |
06 |
E143 |
D |
9441501D |
059 |
7/20/2021 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200011065 |
PON21900003654 |
LESLIE M HANEY & ALBERT W GROSS PTR |
$8,611.70 |
Kenton County 6-449.00 |
2022 |
1 |
FD52 |
06 |
E143 |
D |
9441501D |
059 |
7/20/2021 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200011065 |
PON21900003654 |
LESLIE M HANEY & ALBERT W GROSS PTR |
$9,408.50 |
Kenton County 6-449.00 |
2022 |
1 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
7/12/2021 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR071L1062119003535 |
|
|
$1,148.73 |
000001066296-3562506200 |
2022 |
1 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
7/12/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071L1062119003535 |
|
|
$167.56 |
000001066296-3562506200 |
2022 |
1 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
7/12/2021 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR071L1062119003535 |
|
|
$83.22 |
000001066296-3562506200 |
2022 |
1 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
7/12/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071L1062119003535 |
|
|
$12.14 |
000001066296-3562506200 |
2022 |
1 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
7/12/2021 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR071L1062119003535 |
|
|
$969.87 |
000001066296-3562506200 |
2022 |
1 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
7/12/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071L1062119003535 |
|
|
$141.47 |
000001066296-3562506200 |
2022 |
1 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
7/12/2021 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR071L1062119003535 |
|
|
$175.57 |
000001066296-3562506200 |
2022 |
1 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
7/12/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071L1062119003535 |
|
|
$25.22 |
000001066296-3562506200 |
2021 |
11 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
5/27/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052L1062114100371 |
|
|
$0.31 |
000001066290-3562506200 |
2021 |
11 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
5/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052L1062114100371 |
|
|
($3.54) |
000001066290-3562506200 |
2021 |
11 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
5/27/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052L1062114100371 |
|
|
($0.01) |
000001066290-3562506200 |
2021 |
11 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
5/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052L1062114100371 |
|
|
($0.26) |
000001066290-3562506200 |
2021 |
11 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
5/27/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052L1062114100371 |
|
|
$1.27 |
000001066290-3562506200 |
2021 |
11 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
5/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052L1062114100371 |
|
|
($2.99) |
000001066290-3562506200 |
2021 |
11 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
5/27/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052L1062114100371 |
|
|
$0.20 |
000001066290-3562506200 |
2021 |
11 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
5/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052L1062114100371 |
|
|
($0.39) |
000001066290-3562506200 |
2021 |
11 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
5/27/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052L1062114100371 |
|
|
$0.01 |
000001066290-3562506200 |
2021 |
11 |
FD52 |
06 |
E143 |
D |
9441501D |
059 |
5/12/2021 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2100186416 |
PON21900003654 |
LESLIE M HANEY & ALBERT W GROSS PTR |
$22,127.90 |
Kenton County 6-449.00 |
2021 |
11 |
FD52 |
06 |
E143 |
D |
9441501D |
059 |
5/12/2021 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2100186416 |
PON21900003654 |
LESLIE M HANEY & ALBERT W GROSS PTR |
$9,408.50 |
Kenton County 6-449.00 |
2021 |
10 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
4/26/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042L1062111308631 |
|
|
$511.80 |
000001066290-3562506200 |
2021 |
10 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
4/26/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042L1062111308631 |
|
|
$70.89 |
000001066290-3562506200 |
2021 |
10 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
4/26/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042L1062111308631 |
|
|
$38.28 |
000001066290-3562506200 |
2021 |
10 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
4/26/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042L1062111308631 |
|
|
$5.29 |
000001066290-3562506200 |
2021 |
10 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
4/26/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042L1062111308631 |
|
|
$431.79 |
000001066290-3562506200 |
2021 |
10 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
4/26/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042L1062111308631 |
|
|
$59.85 |
000001066290-3562506200 |
2021 |
10 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
4/26/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042L1062111308631 |
|
|
$73.09 |
000001066290-3562506200 |
2021 |
10 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
4/26/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042L1062111308631 |
|
|
$10.16 |
000001066290-3562506200 |
2021 |
10 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
4/26/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042L1062111308631 |
|
|
$0.26 |
000001066290-3562506200 |
2021 |
10 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
4/12/2021 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR041L1062109907616 |
|
|
$469.00 |
000001066296-3562506200 |
2021 |
10 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
4/12/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041L1062109907616 |
|
|
$49.96 |
000001066296-3562506200 |
2021 |
10 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
4/12/2021 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR041L1062109907616 |
|
|
$34.92 |
000001066296-3562506200 |
2021 |
10 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
4/12/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041L1062109907616 |
|
|
$3.73 |
000001066296-3562506200 |
2021 |
10 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
4/12/2021 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR041L1062109907616 |
|
|
$396.18 |
000001066296-3562506200 |
2021 |
10 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
4/12/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041L1062109907616 |
|
|
$42.18 |
000001066296-3562506200 |
2021 |
10 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
4/12/2021 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR041L1062109907616 |
|
|
$66.95 |
000001066296-3562506200 |
2021 |
10 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
4/12/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041L1062109907616 |
|
|
$6.79 |
000001066296-3562506200 |
2021 |
10 |
FD52 |
00 |
E111 |
D |
9441501D |
059 |
4/12/2021 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR041L1062109907621 |
|
|
$125.03 |
000001071596-3562500061 |
2021 |
10 |
FD52 |
00 |
E111 |
D |
9441501D |
059 |
4/12/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041L1062109907621 |
|
|
$4.45 |
000001071596-3562500061 |
2021 |
10 |
FD52 |
00 |
E121 |
D |
9441501D |
059 |
4/12/2021 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR041L1062109907621 |
|
|
$9.18 |
000001071596-3562500061 |
2021 |
10 |
FD52 |
00 |
E121 |
D |
9441501D |
059 |
4/12/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041L1062109907621 |
|
|
$0.32 |
000001071596-3562500061 |
2021 |
10 |
FD52 |
00 |
E122 |
D |
9441501D |
059 |
4/12/2021 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR041L1062109907621 |
|
|
$105.65 |
000001071596-3562500061 |
2021 |
10 |
FD52 |
00 |
E122 |
D |
9441501D |
059 |
4/12/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041L1062109907621 |
|
|
$3.76 |
000001071596-3562500061 |
2021 |
10 |
FD52 |
00 |
E123 |
D |
9441501D |
059 |
4/12/2021 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR041L1062109907621 |
|
|
$17.26 |
000001071596-3562500061 |
2021 |
10 |
FD52 |
00 |
E123 |
D |
9441501D |
059 |
4/12/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041L1062109907621 |
|
|
$0.60 |
000001071596-3562500061 |
2021 |
9 |
FD52 |
06 |
E143 |
D |
9441501D |
059 |
3/16/2021 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2100150523 |
PON21900003654 |
LESLIE M HANEY & ALBERT W GROSS PTR |
$24,010.65 |
Kenton County 6-449.00 |
2021 |
9 |
FD52 |
06 |
E143 |
D |
9441501D |
059 |
3/16/2021 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2100150523 |
PON21900003654 |
LESLIE M HANEY & ALBERT W GROSS PTR |
$9,408.50 |
Kenton County 6-449.00 |
2021 |
9 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
3/10/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031L1062106805509 |
|
|
$996.28 |
000001066290-3562506200 |
2021 |
9 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
3/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805509 |
|
|
$44.05 |
000001066290-3562506200 |
2021 |
9 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
3/10/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031L1062106805509 |
|
|
$74.65 |
000001066290-3562506200 |
2021 |
9 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
3/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805509 |
|
|
$3.21 |
000001066290-3562506200 |
2021 |
9 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
3/10/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031L1062106805509 |
|
|
$841.35 |
000001066290-3562506200 |
2021 |
9 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
3/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805509 |
|
|
$37.19 |
000001066290-3562506200 |
2021 |
9 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
3/10/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031L1062106805509 |
|
|
$129.99 |
000001066290-3562506200 |
2021 |
9 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
3/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805509 |
|
|
$7.87 |
000001066290-3562506200 |
2021 |
7 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
1/25/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012L1062102202342 |
|
|
$777.68 |
000001066290-3562506200 |
2021 |
7 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202342 |
|
|
$126.50 |
000001066290-3562506200 |
2021 |
7 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
1/25/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012L1062102202342 |
|
|
$57.38 |
000001066290-3562506200 |
2021 |
7 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202342 |
|
|
$9.23 |
000001066290-3562506200 |
2021 |
7 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
1/25/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012L1062102202342 |
|
|
$656.60 |
000001066290-3562506200 |
2021 |
7 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202342 |
|
|
$106.80 |
000001066290-3562506200 |
2021 |
7 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
1/25/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012L1062102202342 |
|
|
$136.04 |
000001066290-3562506200 |
2021 |
7 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202342 |
|
|
$24.71 |
000001066290-3562506200 |
2021 |
7 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
1/25/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012L1062102202342 |
|
|
$0.36 |
000001066290-3562506200 |
2021 |
7 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202342 |
|
|
$0.07 |
000001066290-3562506200 |
2021 |
6 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
12/23/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR122K1062035700379 |
|
|
$229.66 |
000001066296-3562506200 |
2021 |
6 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700379 |
|
|
$51.16 |
000001066296-3562506200 |
2021 |
6 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
12/23/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR122K1062035700379 |
|
|
$16.79 |
000001066296-3562506200 |
2021 |
6 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700379 |
|
|
$3.74 |
000001066296-3562506200 |
2021 |
6 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
12/23/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR122K1062035700379 |
|
|
$193.98 |
000001066296-3562506200 |
2021 |
6 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700379 |
|
|
$43.20 |
000001066296-3562506200 |
2021 |
6 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
12/23/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR122K1062035700379 |
|
|
$34.14 |
000001066296-3562506200 |
2021 |
6 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700379 |
|
|
$7.48 |
000001066296-3562506200 |
2021 |
6 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
12/23/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR122K1062035700379 |
|
|
$0.09 |
000001066296-3562506200 |
2021 |
6 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700379 |
|
|
$0.02 |
000001066296-3562506200 |
2021 |
6 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
12/9/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR121K1062034309697 |
|
|
$193.98 |
000001066296-3562506200 |
2021 |
6 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
12/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034309697 |
|
|
$43.20 |
000001066296-3562506200 |
2021 |
6 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
12/9/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR121K1062034309697 |
|
|
$34.14 |
000001066296-3562506200 |
2021 |
6 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
12/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034309697 |
|
|
$7.48 |
000001066296-3562506200 |
2021 |
6 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
12/9/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR121K1062034309697 |
|
|
$229.75 |
000001066296-3562506200 |
2021 |
6 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
12/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034309697 |
|
|
$51.16 |
000001066296-3562506200 |
2021 |
6 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
12/9/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR121K1062034309697 |
|
|
$16.24 |
000001066296-3562506200 |
2021 |
6 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
12/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034309697 |
|
|
$3.62 |
000001066296-3562506200 |
2021 |
5 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
11/23/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR112K1062032508756 |
|
|
$18.47 |
000001066296-3562506200 |
2021 |
5 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508756 |
|
|
$4.63 |
000001066296-3562506200 |
2021 |
5 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
11/23/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR112K1062032508756 |
|
|
$213.37 |
000001066296-3562506200 |
2021 |
5 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508756 |
|
|
$53.49 |
000001066296-3562506200 |
2021 |
5 |
FD52 |
00 |
E111 |
D |
9441501D |
059 |
11/23/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112K1062032508759 |
|
|
$645.37 |
000001068448-3562500636 |
2021 |
5 |
FD52 |
00 |
E111 |
D |
9441501D |
059 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508759 |
|
|
$161.38 |
000001068448-3562500636 |
2021 |
5 |
FD52 |
00 |
E121 |
D |
9441501D |
059 |
11/23/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112K1062032508759 |
|
|
$48.80 |
000001068448-3562500636 |
2021 |
5 |
FD52 |
00 |
E121 |
D |
9441501D |
059 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508759 |
|
|
$12.20 |
000001068448-3562500636 |
2021 |
5 |
FD52 |
00 |
E122 |
D |
9441501D |
059 |
11/23/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112K1062032508759 |
|
|
$545.01 |
000001068448-3562500636 |
2021 |
5 |
FD52 |
00 |
E122 |
D |
9441501D |
059 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508759 |
|
|
$136.25 |
000001068448-3562500636 |
2021 |
5 |
FD52 |
00 |
E123 |
D |
9441501D |
059 |
11/23/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112K1062032508759 |
|
|
$65.33 |
000001068448-3562500636 |
2021 |
5 |
FD52 |
00 |
E123 |
D |
9441501D |
059 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508759 |
|
|
$16.10 |
000001068448-3562500636 |
2021 |
5 |
FD52 |
00 |
E124 |
D |
9441501D |
059 |
11/23/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112K1062032508759 |
|
|
$0.15 |
000001068448-3562500636 |
2021 |
5 |
FD52 |
00 |
E124 |
D |
9441501D |
059 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508759 |
|
|
$0.04 |
000001068448-3562500636 |
2021 |
5 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
11/23/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR112K1062032508756 |
|
|
$37.57 |
000001066296-3562506200 |
2021 |
5 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508756 |
|
|
$9.26 |
000001066296-3562506200 |
2021 |
5 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
11/23/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR112K1062032508756 |
|
|
$0.10 |
000001066296-3562506200 |
2021 |
5 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
11/23/2020 |
4260 |
SIGNAL PLANS-TRAF |
CA-XR112K1062032508792 |
|
|
$237.16 |
000001075860-3562500463 |
2021 |
5 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508792 |
|
|
$59.29 |
000001075860-3562500463 |
2021 |
5 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508756 |
|
|
$0.03 |
000001066296-3562506200 |
2021 |
5 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
11/23/2020 |
4260 |
SIGNAL PLANS-TRAF |
CA-XR112K1062032508792 |
|
|
$17.93 |
000001075860-3562500463 |
2021 |
5 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508792 |
|
|
$4.48 |
000001075860-3562500463 |
2021 |
5 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
11/23/2020 |
4260 |
SIGNAL PLANS-TRAF |
CA-XR112K1062032508792 |
|
|
$200.23 |
000001075860-3562500463 |
2021 |
5 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508792 |
|
|
$50.06 |
000001075860-3562500463 |
2021 |
5 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
11/23/2020 |
4260 |
SIGNAL PLANS-TRAF |
CA-XR112K1062032508792 |
|
|
$25.04 |
000001075860-3562500463 |
2021 |
5 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508792 |
|
|
$6.16 |
000001075860-3562500463 |
2021 |
5 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
11/23/2020 |
4260 |
SIGNAL PLANS-TRAF |
CA-XR112K1062032508792 |
|
|
$0.07 |
000001075860-3562500463 |
2021 |
5 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508792 |
|
|
$0.02 |
000001075860-3562500463 |
2021 |
5 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
11/23/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR112K1062032508755 |
|
|
$252.64 |
000001066296-3562506200 |
2021 |
5 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508755 |
|
|
$63.35 |
000001066296-3562506200 |
2021 |
5 |
FD52 |
00 |
E111 |
D |
9441501D |
059 |
11/12/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111K1062031107767 |
|
|
$373.44 |
000001068448-3562500636 |
2021 |
5 |
FD52 |
00 |
E111 |
D |
9441501D |
059 |
11/12/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111K1062031107767 |
|
|
$37.34 |
000001068448-3562500636 |
2021 |
5 |
FD52 |
00 |
E121 |
D |
9441501D |
059 |
11/12/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111K1062031107767 |
|
|
$28.00 |
000001068448-3562500636 |
2021 |
5 |
FD52 |
00 |
E121 |
D |
9441501D |
059 |
11/12/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111K1062031107767 |
|
|
$2.80 |
000001068448-3562500636 |
2021 |
5 |
FD52 |
00 |
E122 |
D |
9441501D |
059 |
11/12/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111K1062031107767 |
|
|
$315.30 |
000001068448-3562500636 |
2021 |
5 |
FD52 |
00 |
E122 |
D |
9441501D |
059 |
11/12/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111K1062031107767 |
|
|
$31.53 |
000001068448-3562500636 |
2021 |
5 |
FD52 |
00 |
E123 |
D |
9441501D |
059 |
11/12/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111K1062031107767 |
|
|
$37.73 |
000001068448-3562500636 |
2021 |
5 |
FD52 |
00 |
E123 |
D |
9441501D |
059 |
11/12/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111K1062031107767 |
|
|
$3.73 |
000001068448-3562500636 |
2021 |
5 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
11/12/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR111K1062031107764 |
|
|
$229.75 |
000001066296-3562506200 |
2021 |
5 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
11/12/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111K1062031107764 |
|
|
$22.97 |
000001066296-3562506200 |
2021 |
5 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
11/12/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR111K1062031107764 |
|
|
$16.24 |
000001066296-3562506200 |
2021 |
5 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
11/12/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111K1062031107764 |
|
|
$1.63 |
000001066296-3562506200 |
2021 |
5 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
11/12/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR111K1062031107764 |
|
|
$193.98 |
000001066296-3562506200 |
2021 |
5 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
11/12/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111K1062031107764 |
|
|
$19.39 |
000001066296-3562506200 |
2021 |
5 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
11/12/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR111K1062031107764 |
|
|
$34.09 |
000001066296-3562506200 |
2021 |
5 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
11/12/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111K1062031107764 |
|
|
$3.36 |
000001066296-3562506200 |
2021 |
5 |
FD52 |
00 |
E111 |
D |
9441501D |
059 |
11/9/2020 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR111K1062031107771 |
|
|
$227.38 |
000001071596-3562500061 |
2021 |
5 |
FD52 |
00 |
E111 |
D |
9441501D |
059 |
11/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111K1062031107771 |
|
|
$29.73 |
000001071596-3562500061 |
2021 |
5 |
FD52 |
00 |
E121 |
D |
9441501D |
059 |
11/9/2020 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR111K1062031107771 |
|
|
$16.57 |
000001071596-3562500061 |
2021 |
5 |
FD52 |
00 |
E121 |
D |
9441501D |
059 |
11/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111K1062031107771 |
|
|
$2.17 |
000001071596-3562500061 |
2021 |
5 |
FD52 |
00 |
E122 |
D |
9441501D |
059 |
11/9/2020 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR111K1062031107771 |
|
|
$191.57 |
000001071596-3562500061 |
2021 |
5 |
FD52 |
00 |
E122 |
D |
9441501D |
059 |
11/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111K1062031107771 |
|
|
$25.10 |
000001071596-3562500061 |
2021 |
5 |
FD52 |
00 |
E123 |
D |
9441501D |
059 |
11/9/2020 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR111K1062031107771 |
|
|
$30.44 |
000001071596-3562500061 |
2021 |
5 |
FD52 |
00 |
E123 |
D |
9441501D |
059 |
11/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111K1062031107771 |
|
|
$3.92 |
000001071596-3562500061 |
2021 |
4 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
10/26/2020 |
4260 |
SIGNAL PLANS-TRAF |
CA-XR102K1062029706739 |
|
|
$3.26 |
000001075860-3562500463 |
2021 |
4 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
10/26/2020 |
4260 |
SIGNAL PLANS-TRAF |
CA-XR102K1062029706739 |
|
|
$36.40 |
000001075860-3562500463 |
2021 |
4 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
10/26/2020 |
4260 |
SIGNAL PLANS-TRAF |
CA-XR102K1062029706739 |
|
|
$4.54 |
000001075860-3562500463 |
2021 |
4 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
10/26/2020 |
4260 |
SIGNAL PLANS-TRAF |
CA-XR102K1062029706739 |
|
|
$0.01 |
000001075860-3562500463 |
2021 |
4 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
10/26/2020 |
4260 |
SIGNAL PLANS-TRAF |
CA-XR102K1062029706738 |
|
|
$43.12 |
000001075860-3562500463 |
2021 |
4 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
10/12/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR101K1062028205682 |
|
|
$196.14 |
000001066290-3562506200 |
2021 |
4 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
10/12/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101K1062028205682 |
|
|
$10.11 |
000001066290-3562506200 |
2021 |
4 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
10/12/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR101K1062028205682 |
|
|
$14.22 |
000001066290-3562506200 |
2021 |
4 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
10/12/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101K1062028205682 |
|
|
$0.76 |
000001066290-3562506200 |
2021 |
4 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
10/12/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR101K1062028205682 |
|
|
$165.54 |
000001066290-3562506200 |
2021 |
4 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
10/12/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101K1062028205682 |
|
|
$8.54 |
000001066290-3562506200 |
2021 |
4 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
10/12/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR101K1062028205682 |
|
|
$37.20 |
000001066290-3562506200 |
2021 |
4 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
10/12/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101K1062028205682 |
|
|
$1.06 |
000001066290-3562506200 |
2021 |
3 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
9/10/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR091K1062025303606 |
|
|
$168.48 |
000001066296-3562506200 |
2021 |
3 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
9/10/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091K1062025303606 |
|
|
$170.62 |
000001066296-3562506200 |
2021 |
3 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
9/10/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR091K1062025303606 |
|
|
$11.91 |
000001066296-3562506200 |
2021 |
3 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
9/10/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091K1062025303606 |
|
|
$12.05 |
000001066296-3562506200 |
2021 |
3 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
9/10/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR091K1062025303606 |
|
|
$142.25 |
000001066296-3562506200 |
2021 |
3 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
9/10/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091K1062025303606 |
|
|
$144.05 |
000001066296-3562506200 |
2021 |
3 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
9/10/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR091K1062025303606 |
|
|
$25.30 |
000001066296-3562506200 |
2021 |
3 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
9/10/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091K1062025303606 |
|
|
$24.93 |
000001066296-3562506200 |
2021 |
2 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
8/13/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR081K1062022001433 |
|
|
$210.66 |
000001066296-3562506200 |
2021 |
2 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
8/13/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081K1062022001433 |
|
|
$19.10 |
000001066296-3562506200 |
2021 |
2 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
8/13/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR081K1062022001433 |
|
|
$14.88 |
000001066296-3562506200 |
2021 |
2 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
8/13/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081K1062022001433 |
|
|
$1.35 |
000001066296-3562506200 |
2021 |
2 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
8/13/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR081K1062022001433 |
|
|
$177.81 |
000001066296-3562506200 |
2021 |
2 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
8/13/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081K1062022001433 |
|
|
$16.13 |
000001066296-3562506200 |
2021 |
2 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
8/13/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR081K1062022001433 |
|
|
$31.24 |
000001066296-3562506200 |
2021 |
2 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
8/13/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081K1062022001433 |
|
|
$2.79 |
000001066296-3562506200 |
2021 |
1 |
FD52 |
06 |
E143 |
D |
9441501D |
059 |
7/24/2020 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2100011469 |
PON21900003654 |
LESLIE M HANEY & ALBERT W GROSS PTR |
$6,756.00 |
Kenton County 6-449.00 |
2021 |
1 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
7/2/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR062K1062017108294 |
|
|
$459.48 |
000001066296-3562506200 |
2021 |
1 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
7/2/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062K1062017108294 |
|
|
$151.94 |
000001066296-3562506200 |
2021 |
1 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
7/2/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR062K1062017108294 |
|
|
$33.59 |
000001066296-3562506200 |
2021 |
1 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
7/2/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062K1062017108294 |
|
|
$11.11 |
000001066296-3562506200 |
2021 |
1 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
7/2/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR062K1062017108294 |
|
|
$383.35 |
000001066296-3562506200 |
2021 |
1 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
7/2/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062K1062017108294 |
|
|
$126.76 |
000001066296-3562506200 |
2021 |
1 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
7/2/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR062K1062017108294 |
|
|
$68.38 |
000001066296-3562506200 |
2021 |
1 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
7/2/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062K1062017108294 |
|
|
$22.20 |
000001066296-3562506200 |
2021 |
1 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
7/2/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR062K1062017108294 |
|
|
$0.18 |
000001066296-3562506200 |
2021 |
1 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
7/2/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062K1062017108294 |
|
|
$0.06 |
000001066296-3562506200 |
2021 |
1 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
7/1/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR061K1062016107382P |
|
|
($34.03) |
000001066296-3562506200 |
2020 |
12 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
6/10/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR061K1062016107382 |
|
|
($229.75) |
000001066296-3562506200 |
2020 |
12 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
6/10/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR061K1062016107382 |
|
|
($16.79) |
000001066296-3562506200 |
2020 |
12 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
6/10/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR061K1062016107382 |
|
|
($191.68) |
000001066296-3562506200 |
2020 |
12 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
6/10/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR061K1062016107382 |
|
|
($0.09) |
000001066296-3562506200 |
2020 |
11 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
5/26/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR052K1062014306395 |
|
|
$229.75 |
000001066296-3562506200 |
2020 |
11 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
5/26/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR052K1062014306395 |
|
|
$16.79 |
000001066296-3562506200 |
2020 |
11 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
5/26/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR052K1062014306395 |
|
|
$191.68 |
000001066296-3562506200 |
2020 |
11 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
5/26/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR052K1062014306395 |
|
|
$34.03 |
000001066296-3562506200 |
2020 |
11 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
5/26/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR052K1062014306395 |
|
|
$0.09 |
000001066296-3562506200 |
2020 |
10 |
FD52 |
06 |
E143 |
D |
9441501D |
059 |
4/10/2020 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2000172301 |
PON21900003654 |
LESLIE M HANEY & ALBERT W GROSS PTR |
$16,169.75 |
Kenton County 6-449.00 |
2020 |
9 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
3/12/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031K1062006601521 |
|
|
$809.03 |
000001066290-3562500022 |
2020 |
9 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
3/12/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031K1062006601521 |
|
|
$49.01 |
000001066290-3562500022 |
2020 |
9 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
3/12/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031K1062006601521 |
|
|
$61.31 |
000001066290-3562506200 |
2020 |
9 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
3/12/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031K1062006601521 |
|
|
$3.70 |
000001066290-3562500022 |
2020 |
9 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
3/12/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031K1062006601521 |
|
|
$674.81 |
000001066290-3562506200 |
2020 |
9 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
3/12/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031K1062006601521 |
|
|
$40.88 |
000001066290-3562500022 |
2020 |
9 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
3/12/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031K1062006601521 |
|
|
$69.37 |
000001066290-3562500022 |
2020 |
9 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
3/12/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031K1062006601521 |
|
|
$5.12 |
000001066290-3562500022 |
2020 |
9 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
3/12/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR031K1062006601521 |
|
|
$84.24 |
000001066296-3562506200 |
2020 |
9 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
3/12/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031K1062006601521 |
|
|
$4.04 |
000001066296-3562506200 |
2020 |
9 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
3/12/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR031K1062006601521 |
|
|
$5.95 |
000001066296-3562506200 |
2020 |
9 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
3/12/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031K1062006601521 |
|
|
$0.28 |
000001066296-3562506200 |
2020 |
9 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
3/12/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR031K1062006601521 |
|
|
$70.28 |
000001066296-3562506200 |
2020 |
9 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
3/12/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031K1062006601521 |
|
|
$3.37 |
000001066296-3562506200 |
2020 |
9 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
3/12/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR031K1062006601521 |
|
|
$12.49 |
000001066296-3562506200 |
2020 |
9 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
3/12/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031K1062006601521 |
|
|
$0.59 |
000001066296-3562506200 |
2020 |
9 |
FD52 |
06 |
E143 |
D |
9441501D |
059 |
3/11/2020 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2000154172 |
PON21900003654 |
LESLIE M HANEY & ALBERT W GROSS PTR |
$18,052.50 |
Kenton County 6-449.00 |
2020 |
8 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
2/10/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR021K1062003809874 |
|
|
$31.27 |
000001066296-3562506200 |
2020 |
8 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
2/10/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021K1062003809874 |
|
|
$4.76 |
000001066296-3562506200 |
2020 |
8 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
2/10/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR021K1062003809874 |
|
|
$210.53 |
000001066296-3562506200 |
2020 |
8 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
2/10/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021K1062003809874 |
|
|
$32.58 |
000001066296-3562506200 |
2020 |
8 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
2/10/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR021K1062003809874 |
|
|
$14.88 |
000001066296-3562506200 |
2020 |
8 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
2/10/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021K1062003809874 |
|
|
$2.31 |
000001066296-3562506200 |
2020 |
8 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
2/10/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR021K1062003809874 |
|
|
$175.70 |
000001066296-3562506200 |
2020 |
8 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
2/10/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021K1062003809874 |
|
|
$27.18 |
000001066296-3562506200 |
2020 |
7 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
1/27/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR012K1062002308827 |
|
|
$229.79 |
000001066296-3562506200 |
2020 |
7 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
1/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012K1062002308827 |
|
|
$90.06 |
000001066296-3562506200 |
2020 |
7 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
1/27/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR012K1062002308827 |
|
|
$16.79 |
000001066296-3562506200 |
2020 |
7 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
1/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012K1062002308827 |
|
|
$6.58 |
000001066296-3562506200 |
2020 |
7 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
1/27/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR012K1062002308827 |
|
|
$191.90 |
000001066296-3562506200 |
2020 |
7 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
1/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012K1062002308827 |
|
|
$75.14 |
000001066296-3562506200 |
2020 |
7 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
1/27/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR012K1062002308827 |
|
|
$34.25 |
000001066296-3562506200 |
2020 |
7 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
1/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012K1062002308827 |
|
|
$13.16 |
000001066296-3562506200 |
2020 |
7 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
1/27/2020 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR012K1062002308827 |
|
|
$0.13 |
000001066296-3562506200 |
2020 |
7 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
1/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012K1062002308827 |
|
|
$0.03 |
000001066296-3562506200 |
2020 |
6 |
FD52 |
06 |
E143 |
D |
9441501D |
059 |
12/5/2019 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2000097797 |
PON21900003654 |
LESLIE M HANEY & ALBERT W GROSS PTR |
$15,062.00 |
Kenton County 6-449.00 |
2020 |
5 |
FD52 |
00 |
E111 |
D |
9441501D |
059 |
11/14/2019 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR111J1061931103675 |
|
|
$26.48 |
000001071596-3562500061 |
2020 |
5 |
FD52 |
00 |
E111 |
D |
9441501D |
059 |
11/14/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111J1061931103675 |
|
|
$2.12 |
000001071596-3562500061 |
2020 |
5 |
FD52 |
00 |
E121 |
D |
9441501D |
059 |
11/14/2019 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR111J1061931103675 |
|
|
$1.96 |
000001071596-3562500061 |
2020 |
5 |
FD52 |
00 |
E121 |
D |
9441501D |
059 |
11/14/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111J1061931103675 |
|
|
$0.16 |
000001071596-3562500061 |
2020 |
5 |
FD52 |
00 |
E122 |
D |
9441501D |
059 |
11/14/2019 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR111J1061931103675 |
|
|
$22.09 |
000001071596-3562500061 |
2020 |
5 |
FD52 |
00 |
E122 |
D |
9441501D |
059 |
11/14/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111J1061931103675 |
|
|
$1.77 |
000001071596-3562500061 |
2020 |
5 |
FD52 |
00 |
E123 |
D |
9441501D |
059 |
11/14/2019 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR111J1061931103675 |
|
|
$3.65 |
000001071596-3562500061 |
2020 |
5 |
FD52 |
00 |
E123 |
D |
9441501D |
059 |
11/14/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111J1061931103675 |
|
|
$0.29 |
000001071596-3562500061 |
2020 |
3 |
FD52 |
00 |
E111 |
D |
9441501D |
059 |
9/9/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091J1061924909299 |
|
|
$400.11 |
000001068448-3562500636 |
2020 |
3 |
FD52 |
00 |
E111 |
D |
9441501D |
059 |
9/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091J1061924909299 |
|
|
$58.15 |
000001068448-3562500636 |
2020 |
3 |
FD52 |
00 |
E121 |
D |
9441501D |
059 |
9/9/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091J1061924909299 |
|
|
$30.22 |
000001068448-3562500636 |
2020 |
3 |
FD52 |
00 |
E121 |
D |
9441501D |
059 |
9/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091J1061924909299 |
|
|
$4.40 |
000001068448-3562500636 |
2020 |
3 |
FD52 |
00 |
E122 |
D |
9441501D |
059 |
9/9/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091J1061924909299 |
|
|
$333.81 |
000001068448-3562500636 |
2020 |
3 |
FD52 |
00 |
E122 |
D |
9441501D |
059 |
9/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091J1061924909299 |
|
|
$48.51 |
000001068448-3562500636 |
2020 |
3 |
FD52 |
00 |
E123 |
D |
9441501D |
059 |
9/9/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091J1061924909299 |
|
|
$40.45 |
000001068448-3562500636 |
2020 |
3 |
FD52 |
00 |
E123 |
D |
9441501D |
059 |
9/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091J1061924909299 |
|
|
$5.80 |
000001068448-3562500636 |
2020 |
3 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
9/9/2019 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR091J1061924909292 |
|
|
$218.81 |
000001066296-3562506200 |
2020 |
3 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
9/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091J1061924909292 |
|
|
$60.98 |
000001066296-3562506200 |
2020 |
3 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
9/9/2019 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR091J1061924909292 |
|
|
$15.97 |
000001066296-3562506200 |
2020 |
3 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
9/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091J1061924909292 |
|
|
$4.44 |
000001066296-3562506200 |
2020 |
3 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
9/9/2019 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR091J1061924909292 |
|
|
$182.55 |
000001066296-3562506200 |
2020 |
3 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
9/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091J1061924909292 |
|
|
$50.88 |
000001066296-3562506200 |
2020 |
3 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
9/9/2019 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR091J1061924909292 |
|
|
$34.17 |
000001066296-3562506200 |
2020 |
3 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
9/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091J1061924909292 |
|
|
$9.36 |
000001066296-3562506200 |
2020 |
2 |
FD52 |
06 |
E143 |
D |
9441501D |
059 |
8/19/2019 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2000029341 |
PON21900003654 |
LESLIE M HANEY & ALBERT W GROSS PTR |
$28,241.25 |
Kenton County 6-449.00 |
2020 |
1 |
FD52 |
06 |
E143 |
D |
9441501D |
059 |
7/24/2019 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2000009927 |
PON21900003654 |
LESLIE M HANEY & ALBERT W GROSS PTR |
$28,241.25 |
Kenton County 6-449.00 |
2020 |
1 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
7/15/2019 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR071J1061919004770 |
|
|
$240.75 |
000001066296-3562506200 |
2020 |
1 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
7/15/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071J1061919004770 |
|
|
$109.75 |
000001066296-3562506200 |
2020 |
1 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
7/15/2019 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR071J1061919004770 |
|
|
$17.57 |
000001066296-3562506200 |
2020 |
1 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
7/15/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071J1061919004770 |
|
|
$8.00 |
000001066296-3562506200 |
2020 |
1 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
7/15/2019 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR071J1061919004770 |
|
|
$200.81 |
000001066296-3562506200 |
2020 |
1 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
7/15/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071J1061919004770 |
|
|
$91.56 |
000001066296-3562506200 |
2020 |
1 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
7/15/2019 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR071J1061919004770 |
|
|
$37.67 |
000001066296-3562506200 |
2020 |
1 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
7/15/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071J1061919004770 |
|
|
$16.84 |
000001066296-3562506200 |
2020 |
1 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
7/1/2019 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR061J1061915802530P |
|
|
$27.16 |
000001066296-3562506200 |
2020 |
1 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
7/1/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802530P |
|
|
$8.89 |
000001066296-3562506200 |
2020 |
1 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
7/1/2019 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR062J1061917103662 |
|
|
$240.73 |
000001066296-3562506200 |
2020 |
1 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
7/1/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062J1061917103662 |
|
|
$50.38 |
000001066296-3562506200 |
2020 |
1 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
7/1/2019 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR062J1061917103662 |
|
|
$17.57 |
000001066296-3562506200 |
2020 |
1 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
7/1/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062J1061917103662 |
|
|
$3.67 |
000001066296-3562506200 |
2020 |
1 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
7/1/2019 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR062J1061917103662 |
|
|
$200.81 |
000001066296-3562506200 |
2020 |
1 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
7/1/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062J1061917103662 |
|
|
$42.03 |
000001066296-3562506200 |
2020 |
1 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
7/1/2019 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR062J1061917103662 |
|
|
$37.54 |
000001066296-3562506200 |
2020 |
1 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
7/1/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062J1061917103662 |
|
|
$7.73 |
000001066296-3562506200 |
2020 |
1 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
7/1/2019 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR062J1061917103662 |
|
|
$0.10 |
000001066296-3562506200 |
2020 |
1 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
7/1/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062J1061917103662 |
|
|
$0.02 |
000001066296-3562506200 |
2019 |
12 |
FD52 |
06 |
E143 |
D |
9441501D |
059 |
6/10/2019 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-1900207405 |
PON21900003654 |
LESLIE M HANEY & ALBERT W GROSS PTR |
$47,068.75 |
Kenton County 6-449.00 |
2019 |
12 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
6/10/2019 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR061J1061915802530 |
|
|
$173.90 |
000001066296-3562506200 |
2019 |
12 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
6/10/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802530 |
|
|
$58.03 |
000001066296-3562506200 |
2019 |
12 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
6/10/2019 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR061J1061915802530 |
|
|
$12.68 |
000001066296-3562506200 |
2019 |
12 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
6/10/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802530 |
|
|
$4.24 |
000001066296-3562506200 |
2019 |
12 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
6/10/2019 |
1220 |
ENV IMPACT STATEMENT-GENERAL |
CA-XR061J1061915802530 |
|
|
$145.03 |
000001066296-3562506200 |
2019 |
12 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
6/10/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802530 |
|
|
$48.42 |
000001066296-3562506200 |
2019 |
11 |
FD52 |
00 |
E111 |
D |
9441501D |
059 |
5/23/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052J1061914201382 |
|
|
$344.97 |
000001068448-3562500636 |
2019 |
11 |
FD52 |
00 |
E111 |
D |
9441501D |
059 |
5/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052J1061914201382 |
|
|
$34.50 |
000001068448-3562500636 |
2019 |
11 |
FD52 |
00 |
E121 |
D |
9441501D |
059 |
5/23/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052J1061914201382 |
|
|
$25.14 |
000001068448-3562500636 |
2019 |
11 |
FD52 |
00 |
E121 |
D |
9441501D |
059 |
5/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052J1061914201382 |
|
|
$2.52 |
000001068448-3562500636 |
2019 |
11 |
FD52 |
00 |
E122 |
D |
9441501D |
059 |
5/23/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052J1061914201382 |
|
|
$287.81 |
000001068448-3562500636 |
2019 |
11 |
FD52 |
00 |
E122 |
D |
9441501D |
059 |
5/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052J1061914201382 |
|
|
$28.78 |
000001068448-3562500636 |
2019 |
11 |
FD52 |
00 |
E123 |
D |
9441501D |
059 |
5/23/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052J1061914201382 |
|
|
$51.95 |
000001068448-3562500636 |
2019 |
11 |
FD52 |
00 |
E123 |
D |
9441501D |
059 |
5/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052J1061914201382 |
|
|
$5.14 |
000001068448-3562500636 |
2019 |
11 |
FD52 |
00 |
E124 |
D |
9441501D |
059 |
5/23/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052J1061914201382 |
|
|
$0.09 |
000001068448-3562500636 |
2019 |
11 |
FD52 |
00 |
E124 |
D |
9441501D |
059 |
5/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052J1061914201382 |
|
|
$0.01 |
000001068448-3562500636 |
2019 |
11 |
FD52 |
00 |
E121 |
D |
9441501D |
059 |
5/14/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051J1061912800455 |
|
|
$1.21 |
000001068448-3562500636 |
2019 |
11 |
FD52 |
00 |
E122 |
D |
9441501D |
059 |
5/14/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051J1061912800455 |
|
|
$287.81 |
000001068448-3562500636 |
2019 |
11 |
FD52 |
00 |
E122 |
D |
9441501D |
059 |
5/14/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051J1061912800455 |
|
|
$13.82 |
000001068448-3562500636 |
2019 |
11 |
FD52 |
00 |
E123 |
D |
9441501D |
059 |
5/14/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051J1061912800455 |
|
|
$51.92 |
000001068448-3562500636 |
2019 |
11 |
FD52 |
00 |
E123 |
D |
9441501D |
059 |
5/14/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051J1061912800455 |
|
|
$2.47 |
000001068448-3562500636 |
2019 |
11 |
FD52 |
00 |
E111 |
D |
9441501D |
059 |
5/14/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051J1061912800455 |
|
|
$344.85 |
000001068448-3562500636 |
2019 |
11 |
FD52 |
00 |
E111 |
D |
9441501D |
059 |
5/14/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051J1061912800455 |
|
|
$16.56 |
000001068448-3562500636 |
2019 |
11 |
FD52 |
00 |
E121 |
D |
9441501D |
059 |
5/14/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051J1061912800455 |
|
|
$25.14 |
000001068448-3562500636 |
2019 |
11 |
FD52 |
06 |
E143 |
D |
9441501D |
059 |
5/10/2019 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-1900186892 |
PON21900003654 |
LESLIE M HANEY & ALBERT W GROSS PTR |
$19,130.75 |
Kenton County 6-449.00 |
2019 |
11 |
FD52 |
06 |
E143 |
D |
9441501D |
059 |
5/10/2019 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-1900186892 |
PON21900003654 |
LESLIE M HANEY & ALBERT W GROSS PTR |
$9,110.50 |
Kenton County 6-449.00 |
2019 |
11 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
5/9/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051J1061912800402 |
|
|
$378.95 |
000001066290-3562506200 |
2019 |
11 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
5/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051J1061912800402 |
|
|
$18.19 |
000001066290-3562506200 |
2019 |
11 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
5/9/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051J1061912800402 |
|
|
$28.70 |
000001066290-3562506200 |
2019 |
11 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
5/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051J1061912800402 |
|
|
$1.38 |
000001066290-3562506200 |
2019 |
11 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
5/9/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051J1061912800402 |
|
|
$316.21 |
000001066290-3562506200 |
2019 |
11 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
5/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051J1061912800402 |
|
|
$15.18 |
000001066290-3562506200 |
2019 |
11 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
5/9/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051J1061912800402 |
|
|
$40.40 |
000001066290-3562506200 |
2019 |
11 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
5/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051J1061912800402 |
|
|
$1.92 |
000001066290-3562506200 |
2019 |
10 |
FD52 |
06 |
E143 |
D |
9441501D |
059 |
4/22/2019 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-1900174413 |
PON21900003654 |
LESLIE M HANEY & ALBERT W GROSS PTR |
$9,717.00 |
Kenton County 6-449.00 |
2019 |
10 |
FD52 |
06 |
E143 |
D |
9441501D |
059 |
4/22/2019 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-1900174413 |
PON21900003654 |
LESLIE M HANEY & ALBERT W GROSS PTR |
$9,110.50 |
Kenton County 6-449.00 |
2019 |
8 |
FD52 |
06 |
E121 |
D |
9441501D |
059 |
2/25/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022J1061905305653 |
|
|
$23.10 |
000001066290-3562506204 |
2019 |
8 |
FD52 |
06 |
E122 |
D |
9441501D |
059 |
2/25/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022J1061905305653 |
|
|
$256.73 |
000001066290-3562506204 |
2019 |
8 |
FD52 |
06 |
E123 |
D |
9441501D |
059 |
2/25/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022J1061905305653 |
|
|
$39.18 |
000001066290-3562506204 |
2019 |
8 |
FD52 |
06 |
E124 |
D |
9441501D |
059 |
2/25/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022J1061905305653 |
|
|
$0.09 |
000001066290-3562506204 |
2019 |
8 |
FD52 |
06 |
E111 |
D |
9441501D |
059 |
2/25/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022J1061905305652 |
|
|
$307.71 |
000001066290-3562506204 |