The Commonwealth pays employees on a semi-monthly basis with a scheduled pay day on the 15th and 30th of each month. The two monthly pay periods are from the 1st to the 15th of the month and the 16th through the last day of the month. Pay check distribution is delayed by one pay period to allow for system processing. For example work performed during the 1st to the 15th day of the month is paid to the employee on the 30th of the month. Accordingly the cost accounting charges for labor costs posting in eMARS to operating accounts and highway projects are also delayed by approximately one pay period.
A good rule of measure is that the cost accounting charges for the pay period ending on the 15th of the month will post to eMARS by the 25th and those for the pay period ending on the last day of the month will post to eMARS by the 10th of the following month.

x close panel
Detailed Project Expenditure Report
Total E-MARS Expenditures for 9441501D = $697,715.66
Click here for Labor Costs Information
Year Month PBU Charge District Object Phase Program Code County Date ACT Activity Name Trans ID Reference # Vendor Name Expenditure Line Description
2024 1 FD52 06 E111 D 9441501D 059 7/24/2023 1220 ENV IMPACT STATEMENT-GENERAL JVC-2400000060 ($615,457.30) Move $615,457.30 of expenditures from 10-1 to 15-1
2024 1 FD52 06 E111 D 9441501D 059 7/24/2023 1220 ENV IMPACT STATEMENT-GENERAL JVC-2400000060 $615,457.30 Move $615,457.30 of expenditures from 10-1 to 15-1
2023 12 FD52 06 E111 D 9441501D 059 6/26/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062N1062317400407 $1,709.16 000001066290-3562506208
2023 12 FD52 06 E111 D 9441501D 059 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400407 $518.12 000001066290-3562506200
2023 12 FD52 06 E121 D 9441501D 059 6/26/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062N1062317400407 $128.23 000001066290-3562506200
2023 12 FD52 06 E121 D 9441501D 059 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400407 $39.54 000001066290-3562506208
2023 12 FD52 06 E122 D 9441501D 059 6/26/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062N1062317400407 $1,333.16 000001066290-3562506208
2023 12 FD52 06 E122 D 9441501D 059 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400407 $404.14 000001066290-3562506200
2023 12 FD52 06 E123 D 9441501D 059 6/26/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062N1062317400407 $151.72 000001066290-3562506200
2023 12 FD52 06 E123 D 9441501D 059 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400407 $22.33 000001066290-3562506208
2023 12 FD52 06 E124 D 9441501D 059 6/26/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062N1062317400407 $0.59 000001066290-3562506200
2023 12 FD52 06 E124 D 9441501D 059 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400407 $0.22 000001066290-3562506200
2023 12 FD52 06 E143 D 9441501D 059 6/12/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300240475 PON21900003654 LESLIE M HANEY & ALBERT W GROSS PTR $65,521.35 Kenton County 6-449.00
2023 12 FD52 06 E111 D 9441501D 059 6/8/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061N1062315810114 $760.56 000001066290-3562506208
2023 12 FD52 06 E111 D 9441501D 059 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810114 $95.26 000001066290-3562506200
2023 12 FD52 06 E121 D 9441501D 059 6/8/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061N1062315810114 $57.15 000001066290-3562506200
2023 12 FD52 06 E121 D 9441501D 059 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810114 $7.15 000001066290-3562506200
2023 12 FD52 06 E122 D 9441501D 059 6/8/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061N1062315810114 $593.13 000001066290-3562506208
2023 12 FD52 06 E122 D 9441501D 059 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810114 $74.30 000001066290-3562506208
2023 12 FD52 06 E123 D 9441501D 059 6/8/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061N1062315810114 $106.85 000001066290-3562506208
2023 12 FD52 06 E123 D 9441501D 059 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810114 $13.61 000001066290-3562506200
2023 12 FD52 06 E111 D 9441501D 059 6/8/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR061N1062315810114 $1,076.47 000001066296-3562506200
2023 12 FD52 06 E111 D 9441501D 059 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810114 $190.15 000001066296-3562506200
2023 12 FD52 06 E121 D 9441501D 059 6/8/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR061N1062315810114 $78.38 000001066296-3562506200
2023 12 FD52 06 E121 D 9441501D 059 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810114 $13.85 000001066296-3562506200
2023 12 FD52 06 E122 D 9441501D 059 6/8/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR061N1062315810114 $839.74 000001066296-3562506200
2023 12 FD52 06 E122 D 9441501D 059 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810114 $148.32 000001066296-3562506200
2023 12 FD52 06 E123 D 9441501D 059 6/8/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR061N1062315810114 $170.01 000001066296-3562506200
2023 12 FD52 06 E123 D 9441501D 059 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810114 $29.60 000001066296-3562506200
2023 11 FD52 06 E111 D 9441501D 059 5/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052N1062314309016 $818.62 000001066290-3562506200
2023 11 FD52 06 E111 D 9441501D 059 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309016 $15.28 000001066290-3562506200
2023 11 FD52 06 E121 D 9441501D 059 5/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052N1062314309016 $61.67 000001066290-3562506200
2023 11 FD52 06 E121 D 9441501D 059 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309016 $1.15 000001066290-3562506200
2023 11 FD52 06 E122 D 9441501D 059 5/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052N1062314309016 $638.57 000001066290-3562506200
2023 11 FD52 06 E122 D 9441501D 059 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309016 $11.92 000001066290-3562506200
2023 11 FD52 06 E123 D 9441501D 059 5/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052N1062314309016 $92.82 000001066290-3562506200
2023 11 FD52 06 E123 D 9441501D 059 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309016 $1.71 000001066290-3562506200
2023 11 FD52 06 E124 D 9441501D 059 5/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052N1062314309016 $0.18 000001066290-3562506200
2023 9 FD52 06 E143 D 9441501D 059 3/1/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300161994 PON21900004138 AECOM TECHNICAL SERVICES, INC. $3,161.77 Letter Agreement 1
2023 8 FD52 06 E143 D 9441501D 059 2/17/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300148366 PON21900003654 LESLIE M HANEY & ALBERT W GROSS PTR $29,120.60 Kenton County 6-449.00
2023 6 FD52 06 E143 D 9441501D 059 12/22/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300113432 PON21900004138 AECOM TECHNICAL SERVICES, INC. $10,612.60 Letter Agreement 1
2023 6 FD52 06 E111 D 9441501D 059 12/22/2022 4260 SIGNAL PLANS-TRAF CA-XR122M1062235509143 $232.84 000001075860-3562500463
2023 6 FD52 06 E121 D 9441501D 059 12/22/2022 4260 SIGNAL PLANS-TRAF CA-XR122M1062235509143 $17.35 000001075860-3562500463
2023 6 FD52 06 E122 D 9441501D 059 12/22/2022 4260 SIGNAL PLANS-TRAF CA-XR122M1062235509143 $181.61 000001075860-3562500463
2023 6 FD52 06 E123 D 9441501D 059 12/22/2022 4260 SIGNAL PLANS-TRAF CA-XR122M1062235509143 $27.56 000001075860-3562500463
2023 6 FD52 06 E124 D 9441501D 059 12/22/2022 4260 SIGNAL PLANS-TRAF CA-XR122M1062235509143 $0.06 000001075860-3562500463
2023 6 FD52 06 E143 D 9441501D 059 12/6/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300096737 PON21900004138 AECOM TECHNICAL SERVICES, INC. $2,867.45 Letter Agreement 1
2023 5 FD52 06 E111 D 9441501D 059 11/7/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111M1062230806133 $409.33 000001066290-3562506200
2023 5 FD52 06 E121 D 9441501D 059 11/7/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111M1062230806133 $30.56 000001066290-3562506200
2023 5 FD52 06 E122 D 9441501D 059 11/7/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111M1062230806133 $319.29 000001066290-3562506200
2023 5 FD52 06 E123 D 9441501D 059 11/7/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111M1062230806133 $42.61 000001066290-3562506200
2023 4 FD52 06 E111 D 9441501D 059 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003921 $0.46 000001075860-3562500463
2023 4 FD52 06 E121 D 9441501D 059 10/10/2022 4260 SIGNAL PLANS-TRAF CA-XR101M1062228003921 $2.60 000001075860-3562500463
2023 4 FD52 06 E121 D 9441501D 059 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003921 $0.04 000001075860-3562500463
2023 4 FD52 06 E122 D 9441501D 059 10/10/2022 4260 SIGNAL PLANS-TRAF CA-XR101M1062228003921 $27.25 000001075860-3562500463
2023 4 FD52 06 E122 D 9441501D 059 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003921 $0.36 000001075860-3562500463
2023 4 FD52 06 E123 D 9441501D 059 10/10/2022 4260 SIGNAL PLANS-TRAF CA-XR101M1062228003921 $4.14 000001075860-3562500463
2023 4 FD52 06 E123 D 9441501D 059 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003921 $0.05 000001075860-3562500463
2023 4 FD52 06 E111 D 9441501D 059 10/10/2022 4260 SIGNAL PLANS-TRAF CA-XR101M1062228003920 $34.93 000001075860-3562500463
2023 3 FD52 06 E143 D 9441501D 059 9/30/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300058027 PON21900004138 AECOM TECHNICAL SERVICES, INC. $9,386.34 Letter Agreement 1
2023 2 FD52 06 E143 D 9441501D 059 8/25/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300034883 PON21900004138 AECOM TECHNICAL SERVICES, INC. $12,601.93 Letter Agreement 1
2023 2 FD52 06 E111 D 9441501D 059 8/24/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR082M1062223500401 $61.81 000001066296-3562506208
2023 2 FD52 06 E111 D 9441501D 059 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500401 $1.24 000001066296-3562506208
2023 2 FD52 06 E121 D 9441501D 059 8/24/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR082M1062223500401 $4.73 000001066296-3562506208
2023 2 FD52 06 E121 D 9441501D 059 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500401 $0.10 000001066296-3562506208
2023 2 FD52 06 E122 D 9441501D 059 8/24/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR082M1062223500401 $48.18 000001066296-3562506208
2023 2 FD52 06 E122 D 9441501D 059 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500401 $0.97 000001066296-3562506208
2023 2 FD52 06 E123 D 9441501D 059 8/24/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR082M1062223500401 $2.25 000001066296-3562506208
2023 2 FD52 06 E123 D 9441501D 059 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500401 $0.04 000001066296-3562506208
2023 2 FD52 06 E124 D 9441501D 059 8/24/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR082M1062223500401 $0.02 000001066296-3562506208
2023 2 FD52 06 E111 D 9441501D 059 8/16/2022 4260 SIGNAL PLANS-TRAF CA-XR081M1062222110100 $127.98 000001075860-3562500463
2023 2 FD52 06 E111 D 9441501D 059 8/16/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110100 $9.73 000001075860-3562500463
2023 2 FD52 06 E121 D 9441501D 059 8/16/2022 4260 SIGNAL PLANS-TRAF CA-XR081M1062222110100 $9.54 000001075860-3562500463
2023 2 FD52 06 E121 D 9441501D 059 8/16/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110100 $0.73 000001075860-3562500463
2023 2 FD52 06 E122 D 9441501D 059 8/16/2022 4260 SIGNAL PLANS-TRAF CA-XR081M1062222110100 $99.89 000001075860-3562500463
2023 2 FD52 06 E122 D 9441501D 059 8/16/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110100 $7.59 000001075860-3562500463
2023 2 FD52 06 E123 D 9441501D 059 8/16/2022 4260 SIGNAL PLANS-TRAF CA-XR081M1062222110100 $15.17 000001075860-3562500463
2023 2 FD52 06 E123 D 9441501D 059 8/16/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110100 $1.14 000001075860-3562500463
2023 2 FD52 00 E111 D 9441501D 059 8/16/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR081M1062222110142 $157.37 000001083932-3562500636
2023 2 FD52 00 E111 D 9441501D 059 8/16/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110142 $40.90 000001083932-3562500636
2023 2 FD52 00 E121 D 9441501D 059 8/16/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR081M1062222110142 $10.96 000001083932-3562500636
2023 2 FD52 00 E121 D 9441501D 059 8/16/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110142 $2.85 000001083932-3562500636
2023 2 FD52 00 E122 D 9441501D 059 8/16/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR081M1062222110142 $122.71 000001083932-3562500636
2023 2 FD52 00 E122 D 9441501D 059 8/16/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110142 $31.91 000001083932-3562500636
2023 2 FD52 00 E123 D 9441501D 059 8/16/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR081M1062222110142 $33.01 000001083932-3562500636
2023 2 FD52 00 E123 D 9441501D 059 8/16/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110142 $8.49 000001083932-3562500636
2023 2 FD52 06 E143 D 9441501D 059 8/11/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300025199 PON21900003654 LESLIE M HANEY & ALBERT W GROSS PTR $31,536.40 Kenton County 6-449.00
2023 2 FD52 06 E111 D 9441501D 059 8/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081M1062222110092 $1,851.07 000001066290-3562506200
2023 2 FD52 06 E111 D 9441501D 059 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110092 $27.64 000001066290-3562506200
2023 2 FD52 06 E121 D 9441501D 059 8/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081M1062222110092 $134.56 000001066290-3562506208
2023 2 FD52 06 E121 D 9441501D 059 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110092 $2.10 000001066290-3562506200
2023 2 FD52 06 E122 D 9441501D 059 8/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081M1062222110092 $1,443.69 000001066290-3562506208
2023 2 FD52 06 E122 D 9441501D 059 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110092 $21.56 000001066290-3562506208
2023 2 FD52 06 E123 D 9441501D 059 8/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081M1062222110092 $253.30 000001066290-3562506200
2023 2 FD52 06 E123 D 9441501D 059 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110092 $1.78 000001066290-3562506200
2023 1 FD52 06 E111 D 9441501D 059 7/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072M1062220308959 $300.05 000001066290-3562506200
2023 1 FD52 06 E111 D 9441501D 059 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308959 $41.48 000001066290-3562506200
2023 1 FD52 06 E121 D 9441501D 059 7/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072M1062220308959 $22.41 000001066290-3562506200
2023 1 FD52 06 E121 D 9441501D 059 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308959 $3.10 000001066290-3562506200
2023 1 FD52 06 E122 D 9441501D 059 7/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072M1062220308959 $234.14 000001066290-3562506200
2023 1 FD52 06 E122 D 9441501D 059 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308959 $32.36 000001066290-3562506200
2023 1 FD52 06 E123 D 9441501D 059 7/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072M1062220308959 $31.30 000001066290-3562506200
2023 1 FD52 06 E123 D 9441501D 059 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308959 $4.27 000001066290-3562506200
2023 1 FD52 06 E124 D 9441501D 059 7/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072M1062220308959 $0.07 000001066290-3562506200
2023 1 FD52 06 E124 D 9441501D 059 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308959 $0.01 000001066290-3562506200
2022 12 FD52 06 E122 D 9441501D 059 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506732 $70.46 000001066296-3562506200
2022 12 FD52 06 E123 D 9441501D 059 6/27/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR062M1062217506732 $42.83 000001066296-3562506200
2022 12 FD52 06 E123 D 9441501D 059 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506732 $9.32 000001066296-3562506200
2022 12 FD52 06 E124 D 9441501D 059 6/27/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR062M1062217506732 $0.09 000001066296-3562506200
2022 12 FD52 06 E124 D 9441501D 059 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506732 $0.02 000001066296-3562506200
2022 12 FD52 06 E111 D 9441501D 059 6/27/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR062M1062217506731 $379.34 000001066296-3562506200
2022 12 FD52 06 E111 D 9441501D 059 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506731 $83.90 000001066296-3562506200
2022 12 FD52 06 E121 D 9441501D 059 6/27/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR062M1062217506731 $28.24 000001066296-3562506200
2022 12 FD52 06 E121 D 9441501D 059 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506731 $6.24 000001066296-3562506200
2022 12 FD52 06 E122 D 9441501D 059 6/27/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR062M1062217506731 $319.08 000001066296-3562506200
2022 11 FD52 06 E143 D 9441501D 059 5/5/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200200735 PON21900004138 AECOM TECHNICAL SERVICES, INC. $2,348.52 Letter Agreement 1
2022 10 FD52 06 E111 D 9441501D 059 4/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042M1062211202500 $758.03 000001066290-3562506200
2022 10 FD52 06 E111 D 9441501D 059 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202500 $35.88 000001066290-3562506200
2022 10 FD52 06 E121 D 9441501D 059 4/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042M1062211202500 $56.47 000001066290-3562506200
2022 10 FD52 06 E121 D 9441501D 059 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202500 $2.68 000001066290-3562506200
2022 10 FD52 06 E122 D 9441501D 059 4/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042M1062211202500 $636.52 000001066290-3562506200
2022 10 FD52 06 E122 D 9441501D 059 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202500 $30.13 000001066290-3562506200
2022 10 FD52 06 E123 D 9441501D 059 4/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042M1062211202500 $85.26 000001066290-3562506200
2022 10 FD52 06 E123 D 9441501D 059 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202500 $3.99 000001066290-3562506200
2022 10 FD52 06 E124 D 9441501D 059 4/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042M1062211202500 $0.18 000001066290-3562506200
2022 10 FD52 06 E124 D 9441501D 059 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202500 $0.01 000001066290-3562506200
2022 10 FD52 06 E143 D 9441501D 059 4/12/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200183224 PON21900004138 AECOM TECHNICAL SERVICES, INC. $2,289.79 Letter Agreement 1
2022 9 FD52 06 E143 D 9441501D 059 3/15/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200164627 PON21900003654 LESLIE M HANEY & ALBERT W GROSS PTR $31,536.40 Kenton County 6-449.00
2022 8 FD52 00 E111 D 9441501D 059 2/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022M1062205308384 $148.98 000001068448-3562500636
2022 8 FD52 00 E111 D 9441501D 059 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308384 $14.90 000001068448-3562500636
2022 8 FD52 00 E121 D 9441501D 059 2/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022M1062205308384 $10.56 000001068448-3562500636
2022 8 FD52 00 E121 D 9441501D 059 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308384 $1.06 000001068448-3562500636
2022 8 FD52 00 E122 D 9441501D 059 2/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022M1062205308384 $125.10 000001068448-3562500636
2022 8 FD52 00 E122 D 9441501D 059 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308384 $12.51 000001068448-3562500636
2022 8 FD52 00 E123 D 9441501D 059 2/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022M1062205308384 $33.73 000001068448-3562500636
2022 8 FD52 00 E123 D 9441501D 059 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308384 $3.34 000001068448-3562500636
2022 8 FD52 00 E124 D 9441501D 059 2/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022M1062205308384 $0.06 000001068448-3562500636
2022 8 FD52 00 E124 D 9441501D 059 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308384 $0.01 000001068448-3562500636
2022 8 FD52 06 E143 D 9441501D 059 2/18/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200146060 PON21900004138 AECOM TECHNICAL SERVICES, INC. $4,813.92 Letter Agreement 1
2022 8 FD52 06 E111 D 9441501D 059 2/14/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR021M1062203907407 $511.90 000001066296-3562506200
2022 8 FD52 06 E111 D 9441501D 059 2/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907407 $72.45 000001066296-3562506200
2022 8 FD52 06 E121 D 9441501D 059 2/14/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR021M1062203907407 $37.51 000001066296-3562506200
2022 8 FD52 06 E121 D 9441501D 059 2/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907407 $5.24 000001066296-3562506200
2022 8 FD52 06 E122 D 9441501D 059 2/14/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR021M1062203907407 $429.91 000001066296-3562506200
2022 8 FD52 06 E122 D 9441501D 059 2/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907407 $60.83 000001066296-3562506200
2022 8 FD52 06 E123 D 9441501D 059 2/14/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR021M1062203907407 $74.98 000001066296-3562506200
2022 8 FD52 06 E123 D 9441501D 059 2/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907407 $12.44 000001066296-3562506200
2022 8 FD52 06 E143 D 9441501D 059 2/8/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200138818 PON21900003654 LESLIE M HANEY & ALBERT W GROSS PTR $47,304.60 Kenton County 6-449.00
2022 7 FD52 06 E143 D 9441501D 059 1/27/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200131423 PON21900004138 AECOM TECHNICAL SERVICES, INC. $7,716.32 Letter Agreement 1
2022 6 FD52 06 E143 D 9441501D 059 12/16/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200102700 PON21900003654 LESLIE M HANEY & ALBERT W GROSS PTR $31,536.40 Kenton County 6-449.00
2022 5 FD52 06 E111 D 9441501D 059 11/29/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR112L1062132602484 $229.83 000001066296-3562506200
2022 5 FD52 06 E111 D 9441501D 059 11/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602484 $99.86 000001066296-3562506200
2022 5 FD52 06 E121 D 9441501D 059 11/29/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR112L1062132602484 $16.78 000001066296-3562506200
2022 5 FD52 06 E121 D 9441501D 059 11/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602484 $7.31 000001066296-3562506200
2022 5 FD52 06 E122 D 9441501D 059 11/29/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR112L1062132602484 $193.17 000001066296-3562506200
2022 5 FD52 06 E122 D 9441501D 059 11/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602484 $83.86 000001066296-3562506200
2022 5 FD52 06 E123 D 9441501D 059 11/29/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR112L1062132602484 $35.27 000001066296-3562506200
2022 5 FD52 06 E123 D 9441501D 059 11/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602484 $15.03 000001066296-3562506200
2022 5 FD52 06 E124 D 9441501D 059 11/29/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR112L1062132602484 $0.09 000001066296-3562506200
2022 5 FD52 06 E124 D 9441501D 059 11/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602484 $0.04 000001066296-3562506200
2022 5 FD52 06 E143 D 9441501D 059 11/9/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200082451 PON21900003654 LESLIE M HANEY & ALBERT W GROSS PTR $25,040.60 Kenton County 6-449.00
2022 5 FD52 06 E111 D 9441501D 059 11/8/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111L1062130901487 $416.91 000001066290-3562506200
2022 5 FD52 06 E121 D 9441501D 059 11/8/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111L1062130901487 $31.60 000001066290-3562506200
2022 5 FD52 06 E122 D 9441501D 059 11/8/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111L1062130901487 $350.09 000001066290-3562506200
2022 5 FD52 06 E123 D 9441501D 059 11/8/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111L1062130901487 $45.74 000001066290-3562506200
2022 4 FD52 06 E111 D 9441501D 059 10/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102L1062129500378 $494.27 000001066290-3562506200
2022 4 FD52 06 E111 D 9441501D 059 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500378 $216.95 000001066290-3562506200
2022 4 FD52 06 E121 D 9441501D 059 10/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102L1062129500378 $37.01 000001066290-3562506200
2022 4 FD52 06 E121 D 9441501D 059 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500378 $16.38 000001066290-3562506200
2022 4 FD52 06 E122 D 9441501D 059 10/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102L1062129500378 $414.97 000001066290-3562506200
2022 4 FD52 06 E122 D 9441501D 059 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500378 $182.18 000001066290-3562506200
2022 4 FD52 06 E123 D 9441501D 059 10/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102L1062129500378 $69.07 000001066290-3562506200
2022 4 FD52 06 E123 D 9441501D 059 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500378 $25.62 000001066290-3562506200
2022 4 FD52 06 E124 D 9441501D 059 10/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102L1062129500378 $0.17 000001066290-3562506200
2022 4 FD52 06 E124 D 9441501D 059 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500378 $0.06 000001066290-3562506200
2022 4 FD52 06 E111 D 9441501D 059 10/25/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR102L1062129500378 $229.75 000001066296-3562506200
2022 4 FD52 06 E111 D 9441501D 059 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500378 $22.97 000001066296-3562506200
2022 4 FD52 06 E121 D 9441501D 059 10/25/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR102L1062129500378 $22.71 000001066296-3562506200
2022 4 FD52 06 E121 D 9441501D 059 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500378 $2.54 000001066296-3562506200
2022 4 FD52 06 E122 D 9441501D 059 10/25/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR102L1062129500378 $192.92 000001066296-3562506200
2022 4 FD52 06 E122 D 9441501D 059 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500378 $19.29 000001066296-3562506200
2022 4 FD52 06 E123 D 9441501D 059 10/25/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR102L1062129500378 $35.09 000001066296-3562506200
2022 4 FD52 06 E123 D 9441501D 059 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500378 $3.46 000001066296-3562506200
2022 4 FD52 06 E124 D 9441501D 059 10/25/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR102L1062129500378 $0.09 000001066296-3562506200
2022 4 FD52 06 E124 D 9441501D 059 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500378 $0.01 000001066296-3562506200
2022 4 FD52 06 E143 D 9441501D 059 10/22/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200070223 PON21900003654 LESLIE M HANEY & ALBERT W GROSS PTR $21,635.60 Kenton County 6-449.00
2022 4 FD52 06 E111 D 9441501D 059 10/11/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR101L1062128110100 $229.76 000001066296-3562506200
2022 4 FD52 06 E111 D 9441501D 059 10/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110100 $131.10 000001066296-3562506200
2022 4 FD52 06 E121 D 9441501D 059 10/11/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR101L1062128110100 $16.64 000001066296-3562506200
2022 4 FD52 06 E121 D 9441501D 059 10/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110100 $9.50 000001066296-3562506200
2022 4 FD52 06 E122 D 9441501D 059 10/11/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR101L1062128110100 $192.92 000001066296-3562506200
2022 4 FD52 06 E122 D 9441501D 059 10/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110100 $110.08 000001066296-3562506200
2022 4 FD52 06 E123 D 9441501D 059 10/11/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR101L1062128110100 $35.31 000001066296-3562506200
2022 4 FD52 06 E123 D 9441501D 059 10/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110100 $19.74 000001066296-3562506200
2022 3 FD52 06 E111 D 9441501D 059 9/27/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR092L1062126709008 $229.75 000001066296-3562506200
2022 3 FD52 06 E111 D 9441501D 059 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709008 $92.82 000001066296-3562506200
2022 3 FD52 06 E121 D 9441501D 059 9/27/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR092L1062126709008 $16.78 000001066296-3562506200
2022 3 FD52 06 E121 D 9441501D 059 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709008 $6.78 000001066296-3562506200
2022 3 FD52 06 E122 D 9441501D 059 9/27/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR092L1062126709008 $192.93 000001066296-3562506200
2022 3 FD52 06 E122 D 9441501D 059 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709008 $77.93 000001066296-3562506200
2022 3 FD52 06 E123 D 9441501D 059 9/27/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR092L1062126709008 $35.21 000001066296-3562506200
2022 3 FD52 06 E123 D 9441501D 059 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709008 $13.98 000001066296-3562506200
2022 3 FD52 06 E124 D 9441501D 059 9/27/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR092L1062126709008 $0.10 000001066296-3562506200
2022 3 FD52 06 E124 D 9441501D 059 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709008 $0.03 000001066296-3562506200
2022 1 FD52 06 E121 D 9441501D 059 7/26/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR072L1062120404659 ($5.93) 000001066296-3562506200
2022 1 FD52 06 E121 D 9441501D 059 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404659 ($0.86) 000001066296-3562506200
2022 1 FD52 06 E143 D 9441501D 059 7/22/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200011669 PON21900003654 LESLIE M HANEY & ALBERT W GROSS PTR $6,359.70 Kenton County 6-449.00
2022 1 FD52 06 E143 D 9441501D 059 7/22/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200011669 PON21900003654 LESLIE M HANEY & ALBERT W GROSS PTR $9,408.50 Kenton County 6-449.00
2022 1 FD52 06 E143 D 9441501D 059 7/20/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200011065 PON21900003654 LESLIE M HANEY & ALBERT W GROSS PTR $8,611.70 Kenton County 6-449.00
2022 1 FD52 06 E143 D 9441501D 059 7/20/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200011065 PON21900003654 LESLIE M HANEY & ALBERT W GROSS PTR $9,408.50 Kenton County 6-449.00
2022 1 FD52 06 E111 D 9441501D 059 7/12/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR071L1062119003535 $1,148.73 000001066296-3562506200
2022 1 FD52 06 E111 D 9441501D 059 7/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003535 $167.56 000001066296-3562506200
2022 1 FD52 06 E121 D 9441501D 059 7/12/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR071L1062119003535 $83.22 000001066296-3562506200
2022 1 FD52 06 E121 D 9441501D 059 7/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003535 $12.14 000001066296-3562506200
2022 1 FD52 06 E122 D 9441501D 059 7/12/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR071L1062119003535 $969.87 000001066296-3562506200
2022 1 FD52 06 E122 D 9441501D 059 7/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003535 $141.47 000001066296-3562506200
2022 1 FD52 06 E123 D 9441501D 059 7/12/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR071L1062119003535 $175.57 000001066296-3562506200
2022 1 FD52 06 E123 D 9441501D 059 7/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003535 $25.22 000001066296-3562506200
2021 11 FD52 06 E111 D 9441501D 059 5/27/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052L1062114100371 $0.31 000001066290-3562506200
2021 11 FD52 06 E111 D 9441501D 059 5/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052L1062114100371 ($3.54) 000001066290-3562506200
2021 11 FD52 06 E121 D 9441501D 059 5/27/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052L1062114100371 ($0.01) 000001066290-3562506200
2021 11 FD52 06 E121 D 9441501D 059 5/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052L1062114100371 ($0.26) 000001066290-3562506200
2021 11 FD52 06 E122 D 9441501D 059 5/27/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052L1062114100371 $1.27 000001066290-3562506200
2021 11 FD52 06 E122 D 9441501D 059 5/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052L1062114100371 ($2.99) 000001066290-3562506200
2021 11 FD52 06 E123 D 9441501D 059 5/27/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052L1062114100371 $0.20 000001066290-3562506200
2021 11 FD52 06 E123 D 9441501D 059 5/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052L1062114100371 ($0.39) 000001066290-3562506200
2021 11 FD52 06 E124 D 9441501D 059 5/27/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052L1062114100371 $0.01 000001066290-3562506200
2021 11 FD52 06 E143 D 9441501D 059 5/12/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100186416 PON21900003654 LESLIE M HANEY & ALBERT W GROSS PTR $22,127.90 Kenton County 6-449.00
2021 11 FD52 06 E143 D 9441501D 059 5/12/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100186416 PON21900003654 LESLIE M HANEY & ALBERT W GROSS PTR $9,408.50 Kenton County 6-449.00
2021 10 FD52 06 E111 D 9441501D 059 4/26/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042L1062111308631 $511.80 000001066290-3562506200
2021 10 FD52 06 E111 D 9441501D 059 4/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308631 $70.89 000001066290-3562506200
2021 10 FD52 06 E121 D 9441501D 059 4/26/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042L1062111308631 $38.28 000001066290-3562506200
2021 10 FD52 06 E121 D 9441501D 059 4/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308631 $5.29 000001066290-3562506200
2021 10 FD52 06 E122 D 9441501D 059 4/26/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042L1062111308631 $431.79 000001066290-3562506200
2021 10 FD52 06 E122 D 9441501D 059 4/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308631 $59.85 000001066290-3562506200
2021 10 FD52 06 E123 D 9441501D 059 4/26/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042L1062111308631 $73.09 000001066290-3562506200
2021 10 FD52 06 E123 D 9441501D 059 4/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308631 $10.16 000001066290-3562506200
2021 10 FD52 06 E124 D 9441501D 059 4/26/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042L1062111308631 $0.26 000001066290-3562506200
2021 10 FD52 06 E111 D 9441501D 059 4/12/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR041L1062109907616 $469.00 000001066296-3562506200
2021 10 FD52 06 E111 D 9441501D 059 4/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041L1062109907616 $49.96 000001066296-3562506200
2021 10 FD52 06 E121 D 9441501D 059 4/12/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR041L1062109907616 $34.92 000001066296-3562506200
2021 10 FD52 06 E121 D 9441501D 059 4/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041L1062109907616 $3.73 000001066296-3562506200
2021 10 FD52 06 E122 D 9441501D 059 4/12/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR041L1062109907616 $396.18 000001066296-3562506200
2021 10 FD52 06 E122 D 9441501D 059 4/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041L1062109907616 $42.18 000001066296-3562506200
2021 10 FD52 06 E123 D 9441501D 059 4/12/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR041L1062109907616 $66.95 000001066296-3562506200
2021 10 FD52 06 E123 D 9441501D 059 4/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041L1062109907616 $6.79 000001066296-3562506200
2021 10 FD52 00 E111 D 9441501D 059 4/12/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR041L1062109907621 $125.03 000001071596-3562500061
2021 10 FD52 00 E111 D 9441501D 059 4/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041L1062109907621 $4.45 000001071596-3562500061
2021 10 FD52 00 E121 D 9441501D 059 4/12/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR041L1062109907621 $9.18 000001071596-3562500061
2021 10 FD52 00 E121 D 9441501D 059 4/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041L1062109907621 $0.32 000001071596-3562500061
2021 10 FD52 00 E122 D 9441501D 059 4/12/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR041L1062109907621 $105.65 000001071596-3562500061
2021 10 FD52 00 E122 D 9441501D 059 4/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041L1062109907621 $3.76 000001071596-3562500061
2021 10 FD52 00 E123 D 9441501D 059 4/12/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR041L1062109907621 $17.26 000001071596-3562500061
2021 10 FD52 00 E123 D 9441501D 059 4/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041L1062109907621 $0.60 000001071596-3562500061
2021 9 FD52 06 E143 D 9441501D 059 3/16/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100150523 PON21900003654 LESLIE M HANEY & ALBERT W GROSS PTR $24,010.65 Kenton County 6-449.00
2021 9 FD52 06 E143 D 9441501D 059 3/16/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100150523 PON21900003654 LESLIE M HANEY & ALBERT W GROSS PTR $9,408.50 Kenton County 6-449.00
2021 9 FD52 06 E111 D 9441501D 059 3/10/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031L1062106805509 $996.28 000001066290-3562506200
2021 9 FD52 06 E111 D 9441501D 059 3/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031L1062106805509 $44.05 000001066290-3562506200
2021 9 FD52 06 E121 D 9441501D 059 3/10/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031L1062106805509 $74.65 000001066290-3562506200
2021 9 FD52 06 E121 D 9441501D 059 3/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031L1062106805509 $3.21 000001066290-3562506200
2021 9 FD52 06 E122 D 9441501D 059 3/10/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031L1062106805509 $841.35 000001066290-3562506200
2021 9 FD52 06 E122 D 9441501D 059 3/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031L1062106805509 $37.19 000001066290-3562506200
2021 9 FD52 06 E123 D 9441501D 059 3/10/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031L1062106805509 $129.99 000001066290-3562506200
2021 9 FD52 06 E123 D 9441501D 059 3/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031L1062106805509 $7.87 000001066290-3562506200
2021 7 FD52 06 E111 D 9441501D 059 1/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012L1062102202342 $777.68 000001066290-3562506200
2021 7 FD52 06 E111 D 9441501D 059 1/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012L1062102202342 $126.50 000001066290-3562506200
2021 7 FD52 06 E121 D 9441501D 059 1/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012L1062102202342 $57.38 000001066290-3562506200
2021 7 FD52 06 E121 D 9441501D 059 1/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012L1062102202342 $9.23 000001066290-3562506200
2021 7 FD52 06 E122 D 9441501D 059 1/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012L1062102202342 $656.60 000001066290-3562506200
2021 7 FD52 06 E122 D 9441501D 059 1/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012L1062102202342 $106.80 000001066290-3562506200
2021 7 FD52 06 E123 D 9441501D 059 1/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012L1062102202342 $136.04 000001066290-3562506200
2021 7 FD52 06 E123 D 9441501D 059 1/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012L1062102202342 $24.71 000001066290-3562506200
2021 7 FD52 06 E124 D 9441501D 059 1/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012L1062102202342 $0.36 000001066290-3562506200
2021 7 FD52 06 E124 D 9441501D 059 1/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012L1062102202342 $0.07 000001066290-3562506200
2021 6 FD52 06 E111 D 9441501D 059 12/23/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR122K1062035700379 $229.66 000001066296-3562506200
2021 6 FD52 06 E111 D 9441501D 059 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700379 $51.16 000001066296-3562506200
2021 6 FD52 06 E121 D 9441501D 059 12/23/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR122K1062035700379 $16.79 000001066296-3562506200
2021 6 FD52 06 E121 D 9441501D 059 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700379 $3.74 000001066296-3562506200
2021 6 FD52 06 E122 D 9441501D 059 12/23/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR122K1062035700379 $193.98 000001066296-3562506200
2021 6 FD52 06 E122 D 9441501D 059 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700379 $43.20 000001066296-3562506200
2021 6 FD52 06 E123 D 9441501D 059 12/23/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR122K1062035700379 $34.14 000001066296-3562506200
2021 6 FD52 06 E123 D 9441501D 059 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700379 $7.48 000001066296-3562506200
2021 6 FD52 06 E124 D 9441501D 059 12/23/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR122K1062035700379 $0.09 000001066296-3562506200
2021 6 FD52 06 E124 D 9441501D 059 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700379 $0.02 000001066296-3562506200
2021 6 FD52 06 E122 D 9441501D 059 12/9/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR121K1062034309697 $193.98 000001066296-3562506200
2021 6 FD52 06 E122 D 9441501D 059 12/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309697 $43.20 000001066296-3562506200
2021 6 FD52 06 E123 D 9441501D 059 12/9/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR121K1062034309697 $34.14 000001066296-3562506200
2021 6 FD52 06 E123 D 9441501D 059 12/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309697 $7.48 000001066296-3562506200
2021 6 FD52 06 E111 D 9441501D 059 12/9/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR121K1062034309697 $229.75 000001066296-3562506200
2021 6 FD52 06 E111 D 9441501D 059 12/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309697 $51.16 000001066296-3562506200
2021 6 FD52 06 E121 D 9441501D 059 12/9/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR121K1062034309697 $16.24 000001066296-3562506200
2021 6 FD52 06 E121 D 9441501D 059 12/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309697 $3.62 000001066296-3562506200
2021 5 FD52 06 E121 D 9441501D 059 11/23/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR112K1062032508756 $18.47 000001066296-3562506200
2021 5 FD52 06 E121 D 9441501D 059 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508756 $4.63 000001066296-3562506200
2021 5 FD52 06 E122 D 9441501D 059 11/23/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR112K1062032508756 $213.37 000001066296-3562506200
2021 5 FD52 06 E122 D 9441501D 059 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508756 $53.49 000001066296-3562506200
2021 5 FD52 00 E111 D 9441501D 059 11/23/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112K1062032508759 $645.37 000001068448-3562500636
2021 5 FD52 00 E111 D 9441501D 059 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508759 $161.38 000001068448-3562500636
2021 5 FD52 00 E121 D 9441501D 059 11/23/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112K1062032508759 $48.80 000001068448-3562500636
2021 5 FD52 00 E121 D 9441501D 059 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508759 $12.20 000001068448-3562500636
2021 5 FD52 00 E122 D 9441501D 059 11/23/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112K1062032508759 $545.01 000001068448-3562500636
2021 5 FD52 00 E122 D 9441501D 059 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508759 $136.25 000001068448-3562500636
2021 5 FD52 00 E123 D 9441501D 059 11/23/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112K1062032508759 $65.33 000001068448-3562500636
2021 5 FD52 00 E123 D 9441501D 059 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508759 $16.10 000001068448-3562500636
2021 5 FD52 00 E124 D 9441501D 059 11/23/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112K1062032508759 $0.15 000001068448-3562500636
2021 5 FD52 00 E124 D 9441501D 059 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508759 $0.04 000001068448-3562500636
2021 5 FD52 06 E123 D 9441501D 059 11/23/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR112K1062032508756 $37.57 000001066296-3562506200
2021 5 FD52 06 E123 D 9441501D 059 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508756 $9.26 000001066296-3562506200
2021 5 FD52 06 E124 D 9441501D 059 11/23/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR112K1062032508756 $0.10 000001066296-3562506200
2021 5 FD52 06 E111 D 9441501D 059 11/23/2020 4260 SIGNAL PLANS-TRAF CA-XR112K1062032508792 $237.16 000001075860-3562500463
2021 5 FD52 06 E111 D 9441501D 059 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508792 $59.29 000001075860-3562500463
2021 5 FD52 06 E124 D 9441501D 059 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508756 $0.03 000001066296-3562506200
2021 5 FD52 06 E121 D 9441501D 059 11/23/2020 4260 SIGNAL PLANS-TRAF CA-XR112K1062032508792 $17.93 000001075860-3562500463
2021 5 FD52 06 E121 D 9441501D 059 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508792 $4.48 000001075860-3562500463
2021 5 FD52 06 E122 D 9441501D 059 11/23/2020 4260 SIGNAL PLANS-TRAF CA-XR112K1062032508792 $200.23 000001075860-3562500463
2021 5 FD52 06 E122 D 9441501D 059 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508792 $50.06 000001075860-3562500463
2021 5 FD52 06 E123 D 9441501D 059 11/23/2020 4260 SIGNAL PLANS-TRAF CA-XR112K1062032508792 $25.04 000001075860-3562500463
2021 5 FD52 06 E123 D 9441501D 059 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508792 $6.16 000001075860-3562500463
2021 5 FD52 06 E124 D 9441501D 059 11/23/2020 4260 SIGNAL PLANS-TRAF CA-XR112K1062032508792 $0.07 000001075860-3562500463
2021 5 FD52 06 E124 D 9441501D 059 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508792 $0.02 000001075860-3562500463
2021 5 FD52 06 E111 D 9441501D 059 11/23/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR112K1062032508755 $252.64 000001066296-3562506200
2021 5 FD52 06 E111 D 9441501D 059 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508755 $63.35 000001066296-3562506200
2021 5 FD52 00 E111 D 9441501D 059 11/12/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111K1062031107767 $373.44 000001068448-3562500636
2021 5 FD52 00 E111 D 9441501D 059 11/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111K1062031107767 $37.34 000001068448-3562500636
2021 5 FD52 00 E121 D 9441501D 059 11/12/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111K1062031107767 $28.00 000001068448-3562500636
2021 5 FD52 00 E121 D 9441501D 059 11/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111K1062031107767 $2.80 000001068448-3562500636
2021 5 FD52 00 E122 D 9441501D 059 11/12/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111K1062031107767 $315.30 000001068448-3562500636
2021 5 FD52 00 E122 D 9441501D 059 11/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111K1062031107767 $31.53 000001068448-3562500636
2021 5 FD52 00 E123 D 9441501D 059 11/12/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111K1062031107767 $37.73 000001068448-3562500636
2021 5 FD52 00 E123 D 9441501D 059 11/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111K1062031107767 $3.73 000001068448-3562500636
2021 5 FD52 06 E111 D 9441501D 059 11/12/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR111K1062031107764 $229.75 000001066296-3562506200
2021 5 FD52 06 E111 D 9441501D 059 11/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111K1062031107764 $22.97 000001066296-3562506200
2021 5 FD52 06 E121 D 9441501D 059 11/12/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR111K1062031107764 $16.24 000001066296-3562506200
2021 5 FD52 06 E121 D 9441501D 059 11/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111K1062031107764 $1.63 000001066296-3562506200
2021 5 FD52 06 E122 D 9441501D 059 11/12/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR111K1062031107764 $193.98 000001066296-3562506200
2021 5 FD52 06 E122 D 9441501D 059 11/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111K1062031107764 $19.39 000001066296-3562506200
2021 5 FD52 06 E123 D 9441501D 059 11/12/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR111K1062031107764 $34.09 000001066296-3562506200
2021 5 FD52 06 E123 D 9441501D 059 11/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111K1062031107764 $3.36 000001066296-3562506200
2021 5 FD52 00 E111 D 9441501D 059 11/9/2020 0070 ENV STUDIES-HIST/CULTURAL CA-XR111K1062031107771 $227.38 000001071596-3562500061
2021 5 FD52 00 E111 D 9441501D 059 11/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111K1062031107771 $29.73 000001071596-3562500061
2021 5 FD52 00 E121 D 9441501D 059 11/9/2020 0070 ENV STUDIES-HIST/CULTURAL CA-XR111K1062031107771 $16.57 000001071596-3562500061
2021 5 FD52 00 E121 D 9441501D 059 11/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111K1062031107771 $2.17 000001071596-3562500061
2021 5 FD52 00 E122 D 9441501D 059 11/9/2020 0070 ENV STUDIES-HIST/CULTURAL CA-XR111K1062031107771 $191.57 000001071596-3562500061
2021 5 FD52 00 E122 D 9441501D 059 11/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111K1062031107771 $25.10 000001071596-3562500061
2021 5 FD52 00 E123 D 9441501D 059 11/9/2020 0070 ENV STUDIES-HIST/CULTURAL CA-XR111K1062031107771 $30.44 000001071596-3562500061
2021 5 FD52 00 E123 D 9441501D 059 11/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111K1062031107771 $3.92 000001071596-3562500061
2021 4 FD52 06 E121 D 9441501D 059 10/26/2020 4260 SIGNAL PLANS-TRAF CA-XR102K1062029706739 $3.26 000001075860-3562500463
2021 4 FD52 06 E122 D 9441501D 059 10/26/2020 4260 SIGNAL PLANS-TRAF CA-XR102K1062029706739 $36.40 000001075860-3562500463
2021 4 FD52 06 E123 D 9441501D 059 10/26/2020 4260 SIGNAL PLANS-TRAF CA-XR102K1062029706739 $4.54 000001075860-3562500463
2021 4 FD52 06 E124 D 9441501D 059 10/26/2020 4260 SIGNAL PLANS-TRAF CA-XR102K1062029706739 $0.01 000001075860-3562500463
2021 4 FD52 06 E111 D 9441501D 059 10/26/2020 4260 SIGNAL PLANS-TRAF CA-XR102K1062029706738 $43.12 000001075860-3562500463
2021 4 FD52 06 E111 D 9441501D 059 10/12/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101K1062028205682 $196.14 000001066290-3562506200
2021 4 FD52 06 E111 D 9441501D 059 10/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101K1062028205682 $10.11 000001066290-3562506200
2021 4 FD52 06 E121 D 9441501D 059 10/12/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101K1062028205682 $14.22 000001066290-3562506200
2021 4 FD52 06 E121 D 9441501D 059 10/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101K1062028205682 $0.76 000001066290-3562506200
2021 4 FD52 06 E122 D 9441501D 059 10/12/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101K1062028205682 $165.54 000001066290-3562506200
2021 4 FD52 06 E122 D 9441501D 059 10/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101K1062028205682 $8.54 000001066290-3562506200
2021 4 FD52 06 E123 D 9441501D 059 10/12/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101K1062028205682 $37.20 000001066290-3562506200
2021 4 FD52 06 E123 D 9441501D 059 10/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101K1062028205682 $1.06 000001066290-3562506200
2021 3 FD52 06 E111 D 9441501D 059 9/10/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR091K1062025303606 $168.48 000001066296-3562506200
2021 3 FD52 06 E111 D 9441501D 059 9/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091K1062025303606 $170.62 000001066296-3562506200
2021 3 FD52 06 E121 D 9441501D 059 9/10/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR091K1062025303606 $11.91 000001066296-3562506200
2021 3 FD52 06 E121 D 9441501D 059 9/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091K1062025303606 $12.05 000001066296-3562506200
2021 3 FD52 06 E122 D 9441501D 059 9/10/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR091K1062025303606 $142.25 000001066296-3562506200
2021 3 FD52 06 E122 D 9441501D 059 9/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091K1062025303606 $144.05 000001066296-3562506200
2021 3 FD52 06 E123 D 9441501D 059 9/10/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR091K1062025303606 $25.30 000001066296-3562506200
2021 3 FD52 06 E123 D 9441501D 059 9/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091K1062025303606 $24.93 000001066296-3562506200
2021 2 FD52 06 E111 D 9441501D 059 8/13/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR081K1062022001433 $210.66 000001066296-3562506200
2021 2 FD52 06 E111 D 9441501D 059 8/13/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081K1062022001433 $19.10 000001066296-3562506200
2021 2 FD52 06 E121 D 9441501D 059 8/13/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR081K1062022001433 $14.88 000001066296-3562506200
2021 2 FD52 06 E121 D 9441501D 059 8/13/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081K1062022001433 $1.35 000001066296-3562506200
2021 2 FD52 06 E122 D 9441501D 059 8/13/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR081K1062022001433 $177.81 000001066296-3562506200
2021 2 FD52 06 E122 D 9441501D 059 8/13/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081K1062022001433 $16.13 000001066296-3562506200
2021 2 FD52 06 E123 D 9441501D 059 8/13/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR081K1062022001433 $31.24 000001066296-3562506200
2021 2 FD52 06 E123 D 9441501D 059 8/13/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081K1062022001433 $2.79 000001066296-3562506200
2021 1 FD52 06 E143 D 9441501D 059 7/24/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100011469 PON21900003654 LESLIE M HANEY & ALBERT W GROSS PTR $6,756.00 Kenton County 6-449.00
2021 1 FD52 06 E111 D 9441501D 059 7/2/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR062K1062017108294 $459.48 000001066296-3562506200
2021 1 FD52 06 E111 D 9441501D 059 7/2/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108294 $151.94 000001066296-3562506200
2021 1 FD52 06 E121 D 9441501D 059 7/2/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR062K1062017108294 $33.59 000001066296-3562506200
2021 1 FD52 06 E121 D 9441501D 059 7/2/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108294 $11.11 000001066296-3562506200
2021 1 FD52 06 E122 D 9441501D 059 7/2/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR062K1062017108294 $383.35 000001066296-3562506200
2021 1 FD52 06 E122 D 9441501D 059 7/2/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108294 $126.76 000001066296-3562506200
2021 1 FD52 06 E123 D 9441501D 059 7/2/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR062K1062017108294 $68.38 000001066296-3562506200
2021 1 FD52 06 E123 D 9441501D 059 7/2/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108294 $22.20 000001066296-3562506200
2021 1 FD52 06 E124 D 9441501D 059 7/2/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR062K1062017108294 $0.18 000001066296-3562506200
2021 1 FD52 06 E124 D 9441501D 059 7/2/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108294 $0.06 000001066296-3562506200
2021 1 FD52 06 E123 D 9441501D 059 7/1/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR061K1062016107382P ($34.03) 000001066296-3562506200
2020 12 FD52 06 E111 D 9441501D 059 6/10/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR061K1062016107382 ($229.75) 000001066296-3562506200
2020 12 FD52 06 E121 D 9441501D 059 6/10/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR061K1062016107382 ($16.79) 000001066296-3562506200
2020 12 FD52 06 E122 D 9441501D 059 6/10/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR061K1062016107382 ($191.68) 000001066296-3562506200
2020 12 FD52 06 E124 D 9441501D 059 6/10/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR061K1062016107382 ($0.09) 000001066296-3562506200
2020 11 FD52 06 E111 D 9441501D 059 5/26/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR052K1062014306395 $229.75 000001066296-3562506200
2020 11 FD52 06 E121 D 9441501D 059 5/26/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR052K1062014306395 $16.79 000001066296-3562506200
2020 11 FD52 06 E122 D 9441501D 059 5/26/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR052K1062014306395 $191.68 000001066296-3562506200
2020 11 FD52 06 E123 D 9441501D 059 5/26/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR052K1062014306395 $34.03 000001066296-3562506200
2020 11 FD52 06 E124 D 9441501D 059 5/26/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR052K1062014306395 $0.09 000001066296-3562506200
2020 10 FD52 06 E143 D 9441501D 059 4/10/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000172301 PON21900003654 LESLIE M HANEY & ALBERT W GROSS PTR $16,169.75 Kenton County 6-449.00
2020 9 FD52 06 E111 D 9441501D 059 3/12/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031K1062006601521 $809.03 000001066290-3562500022
2020 9 FD52 06 E111 D 9441501D 059 3/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031K1062006601521 $49.01 000001066290-3562500022
2020 9 FD52 06 E121 D 9441501D 059 3/12/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031K1062006601521 $61.31 000001066290-3562506200
2020 9 FD52 06 E121 D 9441501D 059 3/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031K1062006601521 $3.70 000001066290-3562500022
2020 9 FD52 06 E122 D 9441501D 059 3/12/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031K1062006601521 $674.81 000001066290-3562506200
2020 9 FD52 06 E122 D 9441501D 059 3/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031K1062006601521 $40.88 000001066290-3562500022
2020 9 FD52 06 E123 D 9441501D 059 3/12/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031K1062006601521 $69.37 000001066290-3562500022
2020 9 FD52 06 E123 D 9441501D 059 3/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031K1062006601521 $5.12 000001066290-3562500022
2020 9 FD52 06 E111 D 9441501D 059 3/12/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR031K1062006601521 $84.24 000001066296-3562506200
2020 9 FD52 06 E111 D 9441501D 059 3/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031K1062006601521 $4.04 000001066296-3562506200
2020 9 FD52 06 E121 D 9441501D 059 3/12/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR031K1062006601521 $5.95 000001066296-3562506200
2020 9 FD52 06 E121 D 9441501D 059 3/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031K1062006601521 $0.28 000001066296-3562506200
2020 9 FD52 06 E122 D 9441501D 059 3/12/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR031K1062006601521 $70.28 000001066296-3562506200
2020 9 FD52 06 E122 D 9441501D 059 3/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031K1062006601521 $3.37 000001066296-3562506200
2020 9 FD52 06 E123 D 9441501D 059 3/12/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR031K1062006601521 $12.49 000001066296-3562506200
2020 9 FD52 06 E123 D 9441501D 059 3/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031K1062006601521 $0.59 000001066296-3562506200
2020 9 FD52 06 E143 D 9441501D 059 3/11/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000154172 PON21900003654 LESLIE M HANEY & ALBERT W GROSS PTR $18,052.50 Kenton County 6-449.00
2020 8 FD52 06 E123 D 9441501D 059 2/10/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR021K1062003809874 $31.27 000001066296-3562506200
2020 8 FD52 06 E123 D 9441501D 059 2/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021K1062003809874 $4.76 000001066296-3562506200
2020 8 FD52 06 E111 D 9441501D 059 2/10/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR021K1062003809874 $210.53 000001066296-3562506200
2020 8 FD52 06 E111 D 9441501D 059 2/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021K1062003809874 $32.58 000001066296-3562506200
2020 8 FD52 06 E121 D 9441501D 059 2/10/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR021K1062003809874 $14.88 000001066296-3562506200
2020 8 FD52 06 E121 D 9441501D 059 2/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021K1062003809874 $2.31 000001066296-3562506200
2020 8 FD52 06 E122 D 9441501D 059 2/10/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR021K1062003809874 $175.70 000001066296-3562506200
2020 8 FD52 06 E122 D 9441501D 059 2/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021K1062003809874 $27.18 000001066296-3562506200
2020 7 FD52 06 E111 D 9441501D 059 1/27/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR012K1062002308827 $229.79 000001066296-3562506200
2020 7 FD52 06 E111 D 9441501D 059 1/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012K1062002308827 $90.06 000001066296-3562506200
2020 7 FD52 06 E121 D 9441501D 059 1/27/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR012K1062002308827 $16.79 000001066296-3562506200
2020 7 FD52 06 E121 D 9441501D 059 1/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012K1062002308827 $6.58 000001066296-3562506200
2020 7 FD52 06 E122 D 9441501D 059 1/27/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR012K1062002308827 $191.90 000001066296-3562506200
2020 7 FD52 06 E122 D 9441501D 059 1/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012K1062002308827 $75.14 000001066296-3562506200
2020 7 FD52 06 E123 D 9441501D 059 1/27/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR012K1062002308827 $34.25 000001066296-3562506200
2020 7 FD52 06 E123 D 9441501D 059 1/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012K1062002308827 $13.16 000001066296-3562506200
2020 7 FD52 06 E124 D 9441501D 059 1/27/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR012K1062002308827 $0.13 000001066296-3562506200
2020 7 FD52 06 E124 D 9441501D 059 1/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012K1062002308827 $0.03 000001066296-3562506200
2020 6 FD52 06 E143 D 9441501D 059 12/5/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000097797 PON21900003654 LESLIE M HANEY & ALBERT W GROSS PTR $15,062.00 Kenton County 6-449.00
2020 5 FD52 00 E111 D 9441501D 059 11/14/2019 0070 ENV STUDIES-HIST/CULTURAL CA-XR111J1061931103675 $26.48 000001071596-3562500061
2020 5 FD52 00 E111 D 9441501D 059 11/14/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111J1061931103675 $2.12 000001071596-3562500061
2020 5 FD52 00 E121 D 9441501D 059 11/14/2019 0070 ENV STUDIES-HIST/CULTURAL CA-XR111J1061931103675 $1.96 000001071596-3562500061
2020 5 FD52 00 E121 D 9441501D 059 11/14/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111J1061931103675 $0.16 000001071596-3562500061
2020 5 FD52 00 E122 D 9441501D 059 11/14/2019 0070 ENV STUDIES-HIST/CULTURAL CA-XR111J1061931103675 $22.09 000001071596-3562500061
2020 5 FD52 00 E122 D 9441501D 059 11/14/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111J1061931103675 $1.77 000001071596-3562500061
2020 5 FD52 00 E123 D 9441501D 059 11/14/2019 0070 ENV STUDIES-HIST/CULTURAL CA-XR111J1061931103675 $3.65 000001071596-3562500061
2020 5 FD52 00 E123 D 9441501D 059 11/14/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111J1061931103675 $0.29 000001071596-3562500061
2020 3 FD52 00 E111 D 9441501D 059 9/9/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091J1061924909299 $400.11 000001068448-3562500636
2020 3 FD52 00 E111 D 9441501D 059 9/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909299 $58.15 000001068448-3562500636
2020 3 FD52 00 E121 D 9441501D 059 9/9/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091J1061924909299 $30.22 000001068448-3562500636
2020 3 FD52 00 E121 D 9441501D 059 9/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909299 $4.40 000001068448-3562500636
2020 3 FD52 00 E122 D 9441501D 059 9/9/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091J1061924909299 $333.81 000001068448-3562500636
2020 3 FD52 00 E122 D 9441501D 059 9/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909299 $48.51 000001068448-3562500636
2020 3 FD52 00 E123 D 9441501D 059 9/9/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091J1061924909299 $40.45 000001068448-3562500636
2020 3 FD52 00 E123 D 9441501D 059 9/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909299 $5.80 000001068448-3562500636
2020 3 FD52 06 E111 D 9441501D 059 9/9/2019 1220 ENV IMPACT STATEMENT-GENERAL CA-XR091J1061924909292 $218.81 000001066296-3562506200
2020 3 FD52 06 E111 D 9441501D 059 9/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909292 $60.98 000001066296-3562506200
2020 3 FD52 06 E121 D 9441501D 059 9/9/2019 1220 ENV IMPACT STATEMENT-GENERAL CA-XR091J1061924909292 $15.97 000001066296-3562506200
2020 3 FD52 06 E121 D 9441501D 059 9/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909292 $4.44 000001066296-3562506200
2020 3 FD52 06 E122 D 9441501D 059 9/9/2019 1220 ENV IMPACT STATEMENT-GENERAL CA-XR091J1061924909292 $182.55 000001066296-3562506200
2020 3 FD52 06 E122 D 9441501D 059 9/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909292 $50.88 000001066296-3562506200
2020 3 FD52 06 E123 D 9441501D 059 9/9/2019 1220 ENV IMPACT STATEMENT-GENERAL CA-XR091J1061924909292 $34.17 000001066296-3562506200
2020 3 FD52 06 E123 D 9441501D 059 9/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909292 $9.36 000001066296-3562506200
2020 2 FD52 06 E143 D 9441501D 059 8/19/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000029341 PON21900003654 LESLIE M HANEY & ALBERT W GROSS PTR $28,241.25 Kenton County 6-449.00
2020 1 FD52 06 E143 D 9441501D 059 7/24/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000009927 PON21900003654 LESLIE M HANEY & ALBERT W GROSS PTR $28,241.25 Kenton County 6-449.00
2020 1 FD52 06 E111 D 9441501D 059 7/15/2019 1220 ENV IMPACT STATEMENT-GENERAL CA-XR071J1061919004770 $240.75 000001066296-3562506200
2020 1 FD52 06 E111 D 9441501D 059 7/15/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071J1061919004770 $109.75 000001066296-3562506200
2020 1 FD52 06 E121 D 9441501D 059 7/15/2019 1220 ENV IMPACT STATEMENT-GENERAL CA-XR071J1061919004770 $17.57 000001066296-3562506200
2020 1 FD52 06 E121 D 9441501D 059 7/15/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071J1061919004770 $8.00 000001066296-3562506200
2020 1 FD52 06 E122 D 9441501D 059 7/15/2019 1220 ENV IMPACT STATEMENT-GENERAL CA-XR071J1061919004770 $200.81 000001066296-3562506200
2020 1 FD52 06 E122 D 9441501D 059 7/15/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071J1061919004770 $91.56 000001066296-3562506200
2020 1 FD52 06 E123 D 9441501D 059 7/15/2019 1220 ENV IMPACT STATEMENT-GENERAL CA-XR071J1061919004770 $37.67 000001066296-3562506200
2020 1 FD52 06 E123 D 9441501D 059 7/15/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071J1061919004770 $16.84 000001066296-3562506200
2020 1 FD52 06 E123 D 9441501D 059 7/1/2019 1220 ENV IMPACT STATEMENT-GENERAL CA-XR061J1061915802530P $27.16 000001066296-3562506200
2020 1 FD52 06 E123 D 9441501D 059 7/1/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061J1061915802530P $8.89 000001066296-3562506200
2020 1 FD52 06 E111 D 9441501D 059 7/1/2019 1220 ENV IMPACT STATEMENT-GENERAL CA-XR062J1061917103662 $240.73 000001066296-3562506200
2020 1 FD52 06 E111 D 9441501D 059 7/1/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062J1061917103662 $50.38 000001066296-3562506200
2020 1 FD52 06 E121 D 9441501D 059 7/1/2019 1220 ENV IMPACT STATEMENT-GENERAL CA-XR062J1061917103662 $17.57 000001066296-3562506200
2020 1 FD52 06 E121 D 9441501D 059 7/1/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062J1061917103662 $3.67 000001066296-3562506200
2020 1 FD52 06 E122 D 9441501D 059 7/1/2019 1220 ENV IMPACT STATEMENT-GENERAL CA-XR062J1061917103662 $200.81 000001066296-3562506200
2020 1 FD52 06 E122 D 9441501D 059 7/1/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062J1061917103662 $42.03 000001066296-3562506200
2020 1 FD52 06 E123 D 9441501D 059 7/1/2019 1220 ENV IMPACT STATEMENT-GENERAL CA-XR062J1061917103662 $37.54 000001066296-3562506200
2020 1 FD52 06 E123 D 9441501D 059 7/1/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062J1061917103662 $7.73 000001066296-3562506200
2020 1 FD52 06 E124 D 9441501D 059 7/1/2019 1220 ENV IMPACT STATEMENT-GENERAL CA-XR062J1061917103662 $0.10 000001066296-3562506200
2020 1 FD52 06 E124 D 9441501D 059 7/1/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062J1061917103662 $0.02 000001066296-3562506200
2019 12 FD52 06 E143 D 9441501D 059 6/10/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-1900207405 PON21900003654 LESLIE M HANEY & ALBERT W GROSS PTR $47,068.75 Kenton County 6-449.00
2019 12 FD52 06 E111 D 9441501D 059 6/10/2019 1220 ENV IMPACT STATEMENT-GENERAL CA-XR061J1061915802530 $173.90 000001066296-3562506200
2019 12 FD52 06 E111 D 9441501D 059 6/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061J1061915802530 $58.03 000001066296-3562506200
2019 12 FD52 06 E121 D 9441501D 059 6/10/2019 1220 ENV IMPACT STATEMENT-GENERAL CA-XR061J1061915802530 $12.68 000001066296-3562506200
2019 12 FD52 06 E121 D 9441501D 059 6/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061J1061915802530 $4.24 000001066296-3562506200
2019 12 FD52 06 E122 D 9441501D 059 6/10/2019 1220 ENV IMPACT STATEMENT-GENERAL CA-XR061J1061915802530 $145.03 000001066296-3562506200
2019 12 FD52 06 E122 D 9441501D 059 6/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061J1061915802530 $48.42 000001066296-3562506200
2019 11 FD52 00 E111 D 9441501D 059 5/23/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052J1061914201382 $344.97 000001068448-3562500636
2019 11 FD52 00 E111 D 9441501D 059 5/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201382 $34.50 000001068448-3562500636
2019 11 FD52 00 E121 D 9441501D 059 5/23/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052J1061914201382 $25.14 000001068448-3562500636
2019 11 FD52 00 E121 D 9441501D 059 5/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201382 $2.52 000001068448-3562500636
2019 11 FD52 00 E122 D 9441501D 059 5/23/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052J1061914201382 $287.81 000001068448-3562500636
2019 11 FD52 00 E122 D 9441501D 059 5/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201382 $28.78 000001068448-3562500636
2019 11 FD52 00 E123 D 9441501D 059 5/23/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052J1061914201382 $51.95 000001068448-3562500636
2019 11 FD52 00 E123 D 9441501D 059 5/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201382 $5.14 000001068448-3562500636
2019 11 FD52 00 E124 D 9441501D 059 5/23/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052J1061914201382 $0.09 000001068448-3562500636
2019 11 FD52 00 E124 D 9441501D 059 5/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201382 $0.01 000001068448-3562500636
2019 11 FD52 00 E121 D 9441501D 059 5/14/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051J1061912800455 $1.21 000001068448-3562500636
2019 11 FD52 00 E122 D 9441501D 059 5/14/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051J1061912800455 $287.81 000001068448-3562500636
2019 11 FD52 00 E122 D 9441501D 059 5/14/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051J1061912800455 $13.82 000001068448-3562500636
2019 11 FD52 00 E123 D 9441501D 059 5/14/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051J1061912800455 $51.92 000001068448-3562500636
2019 11 FD52 00 E123 D 9441501D 059 5/14/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051J1061912800455 $2.47 000001068448-3562500636
2019 11 FD52 00 E111 D 9441501D 059 5/14/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051J1061912800455 $344.85 000001068448-3562500636
2019 11 FD52 00 E111 D 9441501D 059 5/14/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051J1061912800455 $16.56 000001068448-3562500636
2019 11 FD52 00 E121 D 9441501D 059 5/14/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051J1061912800455 $25.14 000001068448-3562500636
2019 11 FD52 06 E143 D 9441501D 059 5/10/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-1900186892 PON21900003654 LESLIE M HANEY & ALBERT W GROSS PTR $19,130.75 Kenton County 6-449.00
2019 11 FD52 06 E143 D 9441501D 059 5/10/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-1900186892 PON21900003654 LESLIE M HANEY & ALBERT W GROSS PTR $9,110.50 Kenton County 6-449.00
2019 11 FD52 06 E111 D 9441501D 059 5/9/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051J1061912800402 $378.95 000001066290-3562506200
2019 11 FD52 06 E111 D 9441501D 059 5/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051J1061912800402 $18.19 000001066290-3562506200
2019 11 FD52 06 E121 D 9441501D 059 5/9/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051J1061912800402 $28.70 000001066290-3562506200
2019 11 FD52 06 E121 D 9441501D 059 5/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051J1061912800402 $1.38 000001066290-3562506200
2019 11 FD52 06 E122 D 9441501D 059 5/9/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051J1061912800402 $316.21 000001066290-3562506200
2019 11 FD52 06 E122 D 9441501D 059 5/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051J1061912800402 $15.18 000001066290-3562506200
2019 11 FD52 06 E123 D 9441501D 059 5/9/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051J1061912800402 $40.40 000001066290-3562506200
2019 11 FD52 06 E123 D 9441501D 059 5/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051J1061912800402 $1.92 000001066290-3562506200
2019 10 FD52 06 E143 D 9441501D 059 4/22/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-1900174413 PON21900003654 LESLIE M HANEY & ALBERT W GROSS PTR $9,717.00 Kenton County 6-449.00
2019 10 FD52 06 E143 D 9441501D 059 4/22/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-1900174413 PON21900003654 LESLIE M HANEY & ALBERT W GROSS PTR $9,110.50 Kenton County 6-449.00
2019 8 FD52 06 E121 D 9441501D 059 2/25/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022J1061905305653 $23.10 000001066290-3562506204
2019 8 FD52 06 E122 D 9441501D 059 2/25/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022J1061905305653 $256.73 000001066290-3562506204
2019 8 FD52 06 E123 D 9441501D 059 2/25/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022J1061905305653 $39.18 000001066290-3562506204
2019 8 FD52 06 E124 D 9441501D 059 2/25/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022J1061905305653 $0.09 000001066290-3562506204
2019 8 FD52 06 E111 D 9441501D 059 2/25/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022J1061905305652 $307.71 000001066290-3562506204