The Commonwealth pays employees on a semi-monthly basis with a scheduled pay day on the 15th and 30th of each month. The two monthly pay periods are from the 1st to the 15th of the month and the 16th through the last day of the month. Pay check distribution is delayed by one pay period to allow for system processing. For example work performed during the 1st to the 15th day of the month is paid to the employee on the 30th of the month. Accordingly the cost accounting charges for labor costs posting in eMARS to operating accounts and highway projects are also delayed by approximately one pay period.
A good rule of measure is that the cost accounting charges for the pay period ending on the 15th of the month will post to eMARS by the 25th and those for the pay period ending on the last day of the month will post to eMARS by the 10th of the following month.

x close panel
Detailed Project Expenditure Report
Total E-MARS Expenditures for 9441101D = $2,899,675.42
Click here for Labor Costs Information
Year Month PBU Charge District Object Phase Program Code County Date ACT Activity Name Trans ID Reference # Vendor Name Expenditure Line Description
2024 10 FD52 06 E121 D 9441101D 008 4/26/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR042O1062411502718 $125.19 000001068497-3562506200
2024 10 FD52 06 E121 D 9441101D 008 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502718 $12.52 000001068497-3562506200
2024 10 FD52 06 E122 D 9441101D 008 4/26/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR042O1062411502718 $1,128.68 000001068497-3562506200
2024 10 FD52 06 E122 D 9441101D 008 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502718 $112.87 000001068497-3562506200
2024 10 FD52 00 E111 D 9441101D 008 4/26/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR042O1062411502728 $1,562.68 000001078812-3562500061
2024 10 FD52 06 E123 D 9441101D 008 4/26/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR042O1062411502718 $270.81 000001068497-3562506200
2024 10 FD52 00 E111 D 9441101D 008 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502728 $90.29 000001078812-3562500061
2024 10 FD52 00 E121 D 9441101D 008 4/26/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR042O1062411502728 $116.76 000001078812-3562500061
2024 10 FD52 00 E121 D 9441101D 008 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502728 $6.75 000001078812-3562500061
2024 10 FD52 00 E122 D 9441101D 008 4/26/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR042O1062411502728 $1,034.02 000001078812-3562500061
2024 10 FD52 00 E122 D 9441101D 008 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502728 $59.74 000001078812-3562500061
2024 10 FD52 00 E123 D 9441101D 008 4/26/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR042O1062411502728 $242.20 000001078812-3562500061
2024 10 FD52 00 E123 D 9441101D 008 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502728 $13.82 000001078812-3562500061
2024 10 FD52 00 E124 D 9441101D 008 4/26/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR042O1062411502728 $0.55 000001078812-3562500061
2024 10 FD52 00 E124 D 9441101D 008 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502728 $0.03 000001078812-3562500061
2024 10 FD52 06 E123 D 9441101D 008 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502718 $26.78 000001068497-3562506200
2024 10 FD52 06 E124 D 9441101D 008 4/26/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR042O1062411502718 $0.55 000001068497-3562506200
2024 10 FD52 00 E111 D 9441101D 008 4/26/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR042O1062411502719 $582.48 000001072234-3562500061
2024 10 FD52 00 E111 D 9441101D 008 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502719 $89.60 000001072234-3562500061
2024 10 FD52 00 E121 D 9441101D 008 4/26/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR042O1062411502719 $42.28 000001072234-3562500061
2024 10 FD52 00 E121 D 9441101D 008 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502719 $6.50 000001072234-3562500061
2024 10 FD52 00 E122 D 9441101D 008 4/26/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR042O1062411502719 $385.51 000001072234-3562500061
2024 10 FD52 00 E122 D 9441101D 008 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502719 $59.29 000001072234-3562500061
2024 10 FD52 00 E123 D 9441101D 008 4/26/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR042O1062411502719 $135.21 000001072234-3562500061
2024 10 FD52 00 E123 D 9441101D 008 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502719 $20.64 000001072234-3562500061
2024 10 FD52 06 E124 D 9441101D 008 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502718 $0.05 000001068497-3562506200
2024 10 FD52 00 E124 D 9441101D 008 4/26/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR042O1062411502719 $0.18 000001072234-3562500061
2024 10 FD52 00 E124 D 9441101D 008 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502719 $0.03 000001072234-3562500061
2024 10 FD52 06 E111 D 9441101D 008 4/26/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR042O1062411502717 $1,705.73 000001068497-3562506200
2024 10 FD52 06 E111 D 9441101D 008 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502717 $170.57 000001068497-3562506200
2024 10 FD52 06 E143 D 9441101D 059 4/25/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400219982 PON21900003425 BURGESS AND NIPLE INC $35,955.79 Boone- Kenton Counties 6-79.00
2024 10 FD52 06 E111 D 9441101D 008 4/10/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR041O1062410001607 $312.58 000001068497-3562506200
2024 10 FD52 06 E111 D 9441101D 008 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001607 $102.57 000001068497-3562506200
2024 10 FD52 06 E121 D 9441101D 008 4/10/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR041O1062410001607 $22.85 000001068497-3562506200
2024 10 FD52 06 E121 D 9441101D 008 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001607 $7.49 000001068497-3562506200
2024 10 FD52 00 E111 D 9441101D 008 4/10/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR041O1062410001616 $572.87 000001078812-3562500061
2024 10 FD52 06 E122 D 9441101D 008 4/10/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR041O1062410001607 $206.62 000001068497-3562506200
2024 10 FD52 00 E111 D 9441101D 008 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001616 $80.60 000001078812-3562500061
2024 10 FD52 06 E122 D 9441101D 008 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001607 $67.88 000001068497-3562506200
2024 10 FD52 00 E121 D 9441101D 008 4/10/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR041O1062410001616 $42.27 000001078812-3562500061
2024 10 FD52 06 E123 D 9441101D 008 4/10/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR041O1062410001607 $49.71 000001068497-3562506200
2024 10 FD52 00 E121 D 9441101D 008 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001616 $5.95 000001078812-3562500061
2024 10 FD52 06 E123 D 9441101D 008 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001607 $16.09 000001068497-3562506200
2024 10 FD52 00 E122 D 9441101D 008 4/10/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR041O1062410001616 $379.14 000001078812-3562500061
2024 10 FD52 00 E122 D 9441101D 008 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001616 $53.34 000001078812-3562500061
2024 10 FD52 00 E123 D 9441101D 008 4/10/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR041O1062410001616 $88.89 000001078812-3562500061
2024 10 FD52 00 E123 D 9441101D 008 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001616 $12.34 000001078812-3562500061
2024 9 FD52 06 E143 D 9441101D 059 3/21/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400191400 PON21900003425 BURGESS AND NIPLE INC $65,792.46 Boone- Kenton Counties 6-79.00
2024 9 FD52 00 E111 D 9441101D 008 3/18/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR031O1062406810063 $286.43 000001078812-3562500061
2024 9 FD52 00 E111 D 9441101D 008 3/18/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810063 $14.13 000001078812-3562500061
2024 9 FD52 00 E121 D 9441101D 008 3/18/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR031O1062406810063 $21.14 000001078812-3562500061
2024 9 FD52 00 E121 D 9441101D 008 3/18/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810063 $1.04 000001078812-3562500061
2024 9 FD52 00 E122 D 9441101D 008 3/18/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR031O1062406810063 $189.57 000001078812-3562500061
2024 9 FD52 00 E122 D 9441101D 008 3/18/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810063 $9.35 000001078812-3562500061
2024 9 FD52 00 E123 D 9441101D 008 3/18/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR031O1062406810063 $44.40 000001078812-3562500061
2024 9 FD52 00 E123 D 9441101D 008 3/18/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810063 $2.16 000001078812-3562500061
2024 8 FD52 00 E122 D 9441101D 008 2/26/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR022O1062405408876 $398.80 000001072234-3562500061
2024 8 FD52 00 E122 D 9441101D 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408876 $36.96 000001072234-3562500061
2024 8 FD52 00 E123 D 9441101D 008 2/26/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR022O1062405408876 $139.82 000001072234-3562500061
2024 8 FD52 00 E123 D 9441101D 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408876 $12.86 000001072234-3562500061
2024 8 FD52 00 E124 D 9441101D 008 2/26/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR022O1062405408876 $0.18 000001072234-3562500061
2024 8 FD52 00 E124 D 9441101D 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408876 $0.02 000001072234-3562500061
2024 8 FD52 00 E111 D 9441101D 008 2/26/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR022O1062405408876 $602.69 000001072234-3562500061
2024 8 FD52 00 E111 D 9441101D 008 2/26/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR022O1062405408885 $902.96 000001078812-3562500061
2024 8 FD52 00 E111 D 9441101D 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408885 $45.84 000001078812-3562500061
2024 8 FD52 00 E111 D 9441101D 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408876 $55.85 000001072234-3562500061
2024 8 FD52 00 E121 D 9441101D 008 2/26/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR022O1062405408885 $67.47 000001078812-3562500061
2024 8 FD52 00 E121 D 9441101D 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408885 $3.43 000001078812-3562500061
2024 8 FD52 00 E122 D 9441101D 008 2/26/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR022O1062405408885 $597.44 000001078812-3562500061
2024 8 FD52 00 E122 D 9441101D 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408885 $30.33 000001078812-3562500061
2024 8 FD52 00 E123 D 9441101D 008 2/26/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR022O1062405408885 $139.93 000001078812-3562500061
2024 8 FD52 00 E123 D 9441101D 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408885 $7.02 000001078812-3562500061
2024 8 FD52 00 E124 D 9441101D 008 2/26/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR022O1062405408885 $0.32 000001078812-3562500061
2024 8 FD52 00 E124 D 9441101D 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408885 $0.02 000001078812-3562500061
2024 8 FD52 00 E121 D 9441101D 008 2/26/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR022O1062405408876 $43.74 000001072234-3562500061
2024 8 FD52 00 E121 D 9441101D 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408876 $4.06 000001072234-3562500061
2024 8 FD52 00 E111 D 9441101D 008 2/16/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR021O1062403907646 $128.90 000001072234-3562500061
2024 8 FD52 00 E111 D 9441101D 008 2/16/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907646 $12.52 000001072234-3562500061
2024 8 FD52 00 E121 D 9441101D 008 2/16/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR021O1062403907646 $9.16 000001072234-3562500061
2024 8 FD52 00 E121 D 9441101D 008 2/16/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907646 $0.89 000001072234-3562500061
2024 8 FD52 00 E122 D 9441101D 008 2/16/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR021O1062403907646 $85.30 000001072234-3562500061
2024 8 FD52 00 E122 D 9441101D 008 2/16/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907646 $8.28 000001072234-3562500061
2024 8 FD52 00 E123 D 9441101D 008 2/16/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR021O1062403907646 $29.91 000001072234-3562500061
2024 8 FD52 00 E123 D 9441101D 008 2/16/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907646 $2.88 000001072234-3562500061
2024 8 FD52 06 E121 D 9441101D 008 2/16/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR021O1062403907644 ($0.25) 000001068497-3562506200
2024 8 FD52 06 E121 D 9441101D 008 2/16/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907644 ($0.11) 000001068497-3562506200
2024 8 FD52 06 E143 D 9441101D 059 2/12/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400161287 PON21900003425 BURGESS AND NIPLE INC $38,444.04 Boone- Kenton Counties 6-79.00
2024 8 FD52 06 E143 D 9441101D 059 2/12/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400161287 PON21900003425 BURGESS AND NIPLE INC $7,237.13 Boone- Kenton Counties 6-79.00
2024 8 FD52 00 E111 D 9441101D 008 2/9/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR021O1062403907654 $716.22 000001078812-3562500061
2024 8 FD52 00 E121 D 9441101D 008 2/9/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR021O1062403907654 $52.86 000001078812-3562500061
2024 8 FD52 06 E111 D 9441101D 008 2/9/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021O1062403907642 $437.74 000001065717-3562506200
2024 8 FD52 00 E122 D 9441101D 008 2/9/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR021O1062403907654 $473.93 000001078812-3562500061
2024 8 FD52 06 E111 D 9441101D 008 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907642 $4.67 000001065717-3562506200
2024 8 FD52 00 E123 D 9441101D 008 2/9/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR021O1062403907654 $110.94 000001078812-3562500061
2024 8 FD52 06 E121 D 9441101D 008 2/9/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021O1062403907642 $32.93 000001065717-3562506200
2024 8 FD52 06 E121 D 9441101D 008 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907642 $0.35 000001065717-3562506200
2024 8 FD52 06 E122 D 9441101D 008 2/9/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021O1062403907642 $289.50 000001065717-3562506200
2024 8 FD52 06 E122 D 9441101D 008 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907642 $3.09 000001065717-3562506200
2024 8 FD52 06 E123 D 9441101D 008 2/9/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021O1062403907642 $49.07 000001065717-3562506200
2024 8 FD52 06 E123 D 9441101D 008 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907642 $0.52 000001065717-3562506200
2024 7 FD52 06 E111 D 9441101D 008 1/31/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306560 $130.77 000001068497-3562506200
2024 7 FD52 06 E121 D 9441101D 008 1/31/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR012O1062402306560 $21.11 000001068497-3562506200
2024 7 FD52 06 E121 D 9441101D 008 1/31/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306560 $9.71 000001068497-3562506200
2024 7 FD52 06 E122 D 9441101D 008 1/31/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR012O1062402306560 $188.11 000001068497-3562506200
2024 7 FD52 06 E122 D 9441101D 008 1/31/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306560 $86.53 000001068497-3562506200
2024 7 FD52 06 E123 D 9441101D 008 1/31/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR012O1062402306560 $45.31 000001068497-3562506200
2024 7 FD52 06 E123 D 9441101D 008 1/31/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306560 $20.53 000001068497-3562506200
2024 7 FD52 06 E124 D 9441101D 008 1/31/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR012O1062402306560 $0.09 000001068497-3562506200
2024 7 FD52 06 E124 D 9441101D 008 1/31/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306560 $0.04 000001068497-3562506200
2024 7 FD52 06 E111 D 9441101D 008 1/31/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR012O1062402306560 $284.29 000001068497-3562506200
2024 7 FD52 06 E111 D 9441101D 008 1/30/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012O1062402306558 $477.29 000001065717-3562506200
2024 7 FD52 06 E111 D 9441101D 008 1/30/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306558 $112.64 000001065717-3562506200
2024 7 FD52 06 E121 D 9441101D 008 1/30/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012O1062402306558 $35.93 000001065717-3562506200
2024 7 FD52 06 E121 D 9441101D 008 1/30/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306558 $8.47 000001065717-3562506200
2024 7 FD52 06 E122 D 9441101D 008 1/30/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012O1062402306558 $315.82 000001065717-3562506200
2024 7 FD52 06 E122 D 9441101D 008 1/30/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306558 $74.54 000001065717-3562506200
2024 7 FD52 06 E123 D 9441101D 008 1/30/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012O1062402306558 $53.63 000001065717-3562506200
2024 7 FD52 06 E123 D 9441101D 008 1/30/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306558 $12.53 000001065717-3562506200
2024 7 FD52 06 E124 D 9441101D 008 1/30/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012O1062402306558 $0.09 000001065717-3562506200
2024 7 FD52 06 E124 D 9441101D 008 1/30/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306558 $0.02 000001065717-3562506200
2024 7 FD52 06 E143 D 9441101D 059 1/4/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400131824 PON21900003425 BURGESS AND NIPLE INC $50,775.46 Boone- Kenton Counties 6-79.00
2024 7 FD52 06 E143 D 9441101D 059 1/4/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400131824 PON21900003425 BURGESS AND NIPLE INC $1,351.26 Boone- Kenton Counties 6-79.00
2024 7 FD52 06 E111 D 9441101D 008 1/4/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR122N1062335504585 $284.30 000001068497-3562506200
2024 7 FD52 06 E111 D 9441101D 008 1/4/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504585 $48.51 000001068497-3562506200
2024 7 FD52 06 E121 D 9441101D 008 1/4/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR122N1062335504585 $20.93 000001068497-3562506200
2024 7 FD52 06 E121 D 9441101D 008 1/4/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504585 $3.56 000001068497-3562506200
2024 7 FD52 06 E122 D 9441101D 008 1/4/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR122N1062335504585 $188.11 000001068497-3562506200
2024 7 FD52 06 E122 D 9441101D 008 1/4/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504585 $32.10 000001068497-3562506200
2024 7 FD52 06 E123 D 9441101D 008 1/4/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR122N1062335504585 $39.18 000001068497-3562506200
2024 7 FD52 06 E123 D 9441101D 008 1/4/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504585 $6.59 000001068497-3562506200
2024 7 FD52 06 E124 D 9441101D 008 1/4/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR122N1062335504585 $0.09 000001068497-3562506200
2024 7 FD52 06 E124 D 9441101D 008 1/4/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504585 $0.02 000001068497-3562506200
2024 6 FD52 06 E111 D 9441101D 008 12/14/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR121N1062334203601 $568.57 000001068497-3562506200
2024 6 FD52 06 E111 D 9441101D 008 12/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203601 $276.70 000001068497-3562506200
2024 6 FD52 06 E121 D 9441101D 008 12/14/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR121N1062334203601 $41.67 000001068497-3562506200
2024 6 FD52 06 E121 D 9441101D 008 12/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203601 $20.28 000001068497-3562506200
2024 6 FD52 06 E122 D 9441101D 008 12/14/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR121N1062334203601 $376.22 000001068497-3562506200
2024 6 FD52 06 E122 D 9441101D 008 12/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203601 $183.09 000001068497-3562506200
2024 6 FD52 06 E123 D 9441101D 008 12/14/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR121N1062334203601 $78.65 000001068497-3562506200
2024 6 FD52 06 E123 D 9441101D 008 12/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203601 $37.60 000001068497-3562506200
2024 6 FD52 00 E229 D 9441101D 008 12/13/2023 0010 ENV STUDIES-UST/HZM IET-XE13A162523344015370 $64.40
2024 6 FD52 00 E111 D 9441101D 008 12/11/2023 0010 ENV STUDIES-UST/HZM CA-XR121N1062334203610 $604.24 000001078906-3562500061
2024 6 FD52 00 E111 D 9441101D 008 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203610 $206.20 000001078906-3562500061
2024 6 FD52 00 E121 D 9441101D 008 12/11/2023 0010 ENV STUDIES-UST/HZM CA-XR121N1062334203610 $45.91 000001078906-3562500061
2024 6 FD52 00 E121 D 9441101D 008 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203610 $15.67 000001078906-3562500061
2024 6 FD52 00 E122 D 9441101D 008 12/11/2023 0010 ENV STUDIES-UST/HZM CA-XR121N1062334203610 $400.00 000001078906-3562500061
2024 6 FD52 00 E122 D 9441101D 008 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203610 $136.44 000001078906-3562500061
2024 6 FD52 00 E123 D 9441101D 008 12/11/2023 0010 ENV STUDIES-UST/HZM CA-XR121N1062334203610 $17.16 000001078906-3562500061
2024 6 FD52 00 E123 D 9441101D 008 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203610 $5.43 000001078906-3562500061
2024 5 FD52 06 E143 D 9441101D 059 11/30/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400108378 PON21900003425 BURGESS AND NIPLE INC $34,212.94 Boone- Kenton Counties 6-79.00
2024 5 FD52 06 E143 D 9441101D 059 11/30/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400108378 PON21900003425 BURGESS AND NIPLE INC $19,085.92 Boone- Kenton Counties 6-79.00
2024 5 FD52 06 E122 D 9441101D 008 11/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112N1062332502489 $316.70 000001065717-3562506200
2024 5 FD52 06 E122 D 9441101D 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502489 $65.69 000001065717-3562506200
2024 5 FD52 06 E123 D 9441101D 008 11/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112N1062332502489 $46.64 000001065717-3562506200
2024 5 FD52 06 E123 D 9441101D 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502489 $9.55 000001065717-3562506200
2024 5 FD52 06 E124 D 9441101D 008 11/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112N1062332502489 $0.12 000001065717-3562506200
2024 5 FD52 06 E124 D 9441101D 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502489 $0.02 000001065717-3562506200
2024 5 FD52 00 E111 D 9441101D 008 11/22/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR112N1062332502492 $160.81 000001072234-3562500061
2024 5 FD52 00 E111 D 9441101D 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502492 $89.59 000001072234-3562500061
2024 5 FD52 00 E121 D 9441101D 008 11/22/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR112N1062332502492 $11.66 000001072234-3562500061
2024 5 FD52 00 E121 D 9441101D 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502492 $6.51 000001072234-3562500061
2024 5 FD52 00 E122 D 9441101D 008 11/22/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR112N1062332502492 $106.35 000001072234-3562500061
2024 5 FD52 00 E122 D 9441101D 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502492 $59.28 000001072234-3562500061
2024 5 FD52 00 E123 D 9441101D 008 11/22/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR112N1062332502492 $31.14 000001072234-3562500061
2024 5 FD52 00 E123 D 9441101D 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502492 $17.15 000001072234-3562500061
2024 5 FD52 00 E124 D 9441101D 008 11/22/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR112N1062332502492 $0.05 000001072234-3562500061
2024 5 FD52 00 E124 D 9441101D 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502492 $0.02 000001072234-3562500061
2024 5 FD52 06 E111 D 9441101D 008 11/22/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR112N1062332502490 $1,375.09 000001068497-3562506200
2024 5 FD52 06 E111 D 9441101D 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502490 $344.62 000001068497-3562506200
2024 5 FD52 06 E111 D 9441101D 008 11/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112N1062332502489 $477.47 000001065717-3562506200
2024 5 FD52 06 E121 D 9441101D 008 11/22/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR112N1062332502490 $101.89 000001068497-3562506200
2024 5 FD52 06 E121 D 9441101D 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502490 $25.57 000001068497-3562506200
2024 5 FD52 06 E122 D 9441101D 008 11/22/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR112N1062332502490 $909.54 000001068497-3562506200
2024 5 FD52 06 E122 D 9441101D 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502490 $228.05 000001068497-3562506200
2024 5 FD52 06 E123 D 9441101D 008 11/22/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR112N1062332502490 $165.40 000001068497-3562506200
2024 5 FD52 06 E123 D 9441101D 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502490 $39.52 000001068497-3562506200
2024 5 FD52 06 E124 D 9441101D 008 11/22/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR112N1062332502490 $0.46 000001068497-3562506200
2024 5 FD52 06 E124 D 9441101D 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502490 $0.11 000001068497-3562506200
2024 5 FD52 06 E111 D 9441101D 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502489 $99.27 000001065717-3562506200
2024 5 FD52 00 E111 D 9441101D 008 11/22/2023 0010 ENV STUDIES-UST/HZM CA-XR112N1062332502502 $302.06 000001078906-3562500061
2024 5 FD52 00 E111 D 9441101D 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502502 $113.58 000001078906-3562500061
2024 5 FD52 00 E121 D 9441101D 008 11/22/2023 0010 ENV STUDIES-UST/HZM CA-XR112N1062332502502 $23.11 000001078906-3562500061
2024 5 FD52 00 E121 D 9441101D 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502502 $8.70 000001078906-3562500061
2024 5 FD52 00 E122 D 9441101D 008 11/22/2023 0010 ENV STUDIES-UST/HZM CA-XR112N1062332502502 $199.87 000001078906-3562500061
2024 5 FD52 00 E122 D 9441101D 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502502 $75.15 000001078906-3562500061
2024 5 FD52 00 E123 D 9441101D 008 11/22/2023 0010 ENV STUDIES-UST/HZM CA-XR112N1062332502502 $8.58 000001078906-3562500061
2024 5 FD52 00 E123 D 9441101D 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502502 $3.00 000001078906-3562500061
2024 5 FD52 00 E124 D 9441101D 008 11/22/2023 0010 ENV STUDIES-UST/HZM CA-XR112N1062332502502 $0.07 000001078906-3562500061
2024 5 FD52 00 E124 D 9441101D 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502502 $0.04 000001078906-3562500061
2024 5 FD52 06 E121 D 9441101D 008 11/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112N1062332502489 $36.03 000001065717-3562506200
2024 5 FD52 06 E121 D 9441101D 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502489 $7.49 000001065717-3562506200
2024 5 FD52 06 E111 D 9441101D 008 11/15/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR111N1062331201460 $2,832.26 000001068497-3562506208
2024 5 FD52 06 E111 D 9441101D 008 11/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201460 $431.76 000001068497-3562506200
2024 5 FD52 06 E121 D 9441101D 008 11/15/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR111N1062331201460 $207.52 000001068497-3562506200
2024 5 FD52 06 E121 D 9441101D 008 11/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201460 $31.62 000001068497-3562506200
2024 5 FD52 06 E122 D 9441101D 008 11/15/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR111N1062331201460 $1,874.12 000001068497-3562506200
2024 5 FD52 06 E122 D 9441101D 008 11/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201460 $285.69 000001068497-3562506208
2024 5 FD52 06 E123 D 9441101D 008 11/15/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR111N1062331201460 $390.26 000001068497-3562506208
2024 5 FD52 06 E123 D 9441101D 008 11/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201460 $58.60 000001068497-3562506200
2024 5 FD52 06 E111 D 9441101D 008 11/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111N1062331201458 $503.29 000001065717-3562506204
2024 5 FD52 06 E111 D 9441101D 008 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201458 $23.33 000001065717-3562506204
2024 5 FD52 06 E121 D 9441101D 008 11/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111N1062331201458 $37.62 000001065717-3562506200
2024 5 FD52 06 E121 D 9441101D 008 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201458 $1.75 000001065717-3562506200
2024 5 FD52 06 E122 D 9441101D 008 11/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111N1062331201458 $332.93 000001065717-3562506200
2024 5 FD52 06 E122 D 9441101D 008 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201458 $15.44 000001065717-3562506204
2024 5 FD52 06 E123 D 9441101D 008 11/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111N1062331201458 $50.82 000001065717-3562506204
2024 5 FD52 06 E123 D 9441101D 008 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201458 $2.30 000001065717-3562506200
2024 5 FD52 00 E111 D 9441101D 008 11/9/2023 0010 ENV STUDIES-UST/HZM CA-XR111N1062331201469 $350.72 000001078906-3562500061
2024 5 FD52 00 E121 D 9441101D 008 11/9/2023 0010 ENV STUDIES-UST/HZM CA-XR111N1062331201469 $25.58 000001078906-3562500061
2024 5 FD52 00 E122 D 9441101D 008 11/9/2023 0010 ENV STUDIES-UST/HZM CA-XR111N1062331201469 $232.07 000001078906-3562500061
2024 5 FD52 00 E123 D 9441101D 008 11/9/2023 0010 ENV STUDIES-UST/HZM CA-XR111N1062331201469 $50.17 000001078906-3562500061
2024 5 FD52 00 E111 D 9441101D 008 11/6/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR102N1062329600397 $110.49 000001072234-3562500061
2024 5 FD52 00 E111 D 9441101D 008 11/6/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102N1062329600397 $27.84 000001072234-3562500061
2024 5 FD52 00 E121 D 9441101D 008 11/6/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR102N1062329600397 $8.02 000001072234-3562500061
2024 5 FD52 00 E121 D 9441101D 008 11/6/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102N1062329600397 $2.03 000001072234-3562500061
2024 5 FD52 00 E122 D 9441101D 008 11/6/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR102N1062329600397 $73.13 000001072234-3562500061
2024 5 FD52 00 E122 D 9441101D 008 11/6/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102N1062329600397 $18.42 000001072234-3562500061
2024 5 FD52 00 E123 D 9441101D 008 11/6/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR102N1062329600397 $21.37 000001072234-3562500061
2024 5 FD52 00 E123 D 9441101D 008 11/6/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102N1062329600397 $5.33 000001072234-3562500061
2024 5 FD52 00 E124 D 9441101D 008 11/6/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR102N1062329600397 $0.03 000001072234-3562500061
2024 5 FD52 00 E124 D 9441101D 008 11/6/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102N1062329600397 $0.01 000001072234-3562500061
2024 4 FD52 06 E111 D 9441101D 008 10/30/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR102N1062329600395 $2,418.33 000001068497-3562506200
2024 4 FD52 06 E111 D 9441101D 008 10/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102N1062329600395 $66.30 000001068497-3562506200
2024 4 FD52 06 E121 D 9441101D 008 10/30/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR102N1062329600395 $177.97 000001068497-3562506200
2024 4 FD52 06 E121 D 9441101D 008 10/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102N1062329600395 $4.87 000001068497-3562506200
2024 4 FD52 06 E122 D 9441101D 008 10/30/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR102N1062329600395 $1,600.21 000001068497-3562506200
2024 4 FD52 06 E122 D 9441101D 008 10/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102N1062329600395 $43.87 000001068497-3562506200
2024 4 FD52 06 E123 D 9441101D 008 10/30/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR102N1062329600395 $332.72 000001068497-3562506200
2024 4 FD52 06 E123 D 9441101D 008 10/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102N1062329600395 $9.01 000001068497-3562506200
2024 4 FD52 06 E124 D 9441101D 008 10/30/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR102N1062329600395 $0.77 000001068497-3562506200
2024 4 FD52 06 E124 D 9441101D 008 10/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102N1062329600395 $0.02 000001068497-3562506200
2024 4 FD52 06 E111 D 9441101D 008 10/13/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101N1062328009674 $980.03 000001065717-3562506200
2024 4 FD52 06 E111 D 9441101D 008 10/13/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009674 $20.30 000001065717-3562506200
2024 4 FD52 06 E121 D 9441101D 008 10/13/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101N1062328009674 $74.00 000001065717-3562506200
2024 4 FD52 06 E121 D 9441101D 008 10/13/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009674 $1.53 000001065717-3562506200
2024 4 FD52 06 E122 D 9441101D 008 10/13/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101N1062328009674 $648.49 000001065717-3562506200
2024 4 FD52 06 E122 D 9441101D 008 10/13/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009674 $13.43 000001065717-3562506200
2024 4 FD52 06 E123 D 9441101D 008 10/13/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101N1062328009674 $95.30 000001065717-3562506200
2024 4 FD52 06 E123 D 9441101D 008 10/13/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009674 $1.95 000001065717-3562506200
2024 4 FD52 06 E111 D 9441101D 008 10/9/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR101N1062328009675 $525.02 000001068497-3562506200
2024 4 FD52 06 E111 D 9441101D 008 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009675 $10.50 000001068497-3562506200
2024 4 FD52 06 E121 D 9441101D 008 10/9/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR101N1062328009675 $39.64 000001068497-3562506200
2024 4 FD52 06 E121 D 9441101D 008 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009675 $0.79 000001068497-3562506200
2024 4 FD52 06 E122 D 9441101D 008 10/9/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR101N1062328009675 $347.41 000001068497-3562506200
2024 4 FD52 06 E122 D 9441101D 008 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009675 $6.95 000001068497-3562506200
2024 4 FD52 06 E123 D 9441101D 008 10/9/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR101N1062328009675 $51.05 000001068497-3562506200
2024 4 FD52 06 E123 D 9441101D 008 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009675 $1.01 000001068497-3562506200
2024 3 FD52 06 E111 D 9441101D 008 9/5/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR082N1062323504917 $263.01 000001068497-3562506200
2024 3 FD52 06 E121 D 9441101D 008 9/5/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR082N1062323504917 $19.30 000001068497-3562506200
2024 3 FD52 06 E122 D 9441101D 008 9/5/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR082N1062323504917 $174.03 000001068497-3562506200
2024 3 FD52 06 E123 D 9441101D 008 9/5/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR082N1062323504917 $39.10 000001068497-3562506200
2024 3 FD52 06 E124 D 9441101D 008 9/5/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR082N1062323504917 $0.09 000001068497-3562506200
2024 2 FD52 06 E143 D 9441101D 059 8/21/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400031875 PON21900003425 BURGESS AND NIPLE INC $141,535.54 Boone- Kenton Counties 6-79.00
2024 2 FD52 06 E111 D 9441101D 008 8/9/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR081N1062322003838 $789.03 000001068497-3562506200
2024 2 FD52 06 E111 D 9441101D 008 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003838 $4.91 000001068497-3562506200
2024 2 FD52 06 E121 D 9441101D 008 8/9/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR081N1062322003838 $57.61 000001068497-3562506200
2024 2 FD52 06 E121 D 9441101D 008 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003838 $0.36 000001068497-3562506200
2024 2 FD52 06 E122 D 9441101D 008 8/9/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR081N1062322003838 $522.11 000001068497-3562506200
2024 2 FD52 06 E122 D 9441101D 008 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003838 $3.25 000001068497-3562506200
2024 2 FD52 06 E123 D 9441101D 008 8/9/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR081N1062322003838 $117.31 000001068497-3562506200
2024 2 FD52 06 E123 D 9441101D 008 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003838 $0.72 000001068497-3562506200
2024 2 FD52 00 E111 D 9441101D 008 8/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081N1062322003838 $132.60 000001068681-3562500636
2024 2 FD52 00 E111 D 9441101D 008 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003838 $16.35 000001068681-3562500636
2024 2 FD52 00 E121 D 9441101D 008 8/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081N1062322003838 $9.40 000001068681-3562500636
2024 2 FD52 00 E121 D 9441101D 008 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003838 $1.16 000001068681-3562500636
2024 2 FD52 00 E122 D 9441101D 008 8/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081N1062322003838 $87.74 000001068681-3562500636
2024 2 FD52 00 E122 D 9441101D 008 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003838 $10.82 000001068681-3562500636
2024 2 FD52 00 E123 D 9441101D 008 8/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081N1062322003838 $25.58 000001068681-3562500636
2024 2 FD52 00 E123 D 9441101D 008 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003838 $3.13 000001068681-3562500636
2024 1 FD52 06 E111 D 9441101D 008 7/24/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR072N1062320202653 $868.14 000001068497-3562506200
2024 1 FD52 06 E111 D 9441101D 008 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202653 $216.80 000001068497-3562506200
2024 1 FD52 06 E121 D 9441101D 008 7/24/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR072N1062320202653 $63.67 000001068497-3562506200
2024 1 FD52 06 E121 D 9441101D 008 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202653 $15.90 000001068497-3562506200
2024 1 FD52 06 E122 D 9441101D 008 7/24/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR072N1062320202653 $574.32 000001068497-3562506200
2024 1 FD52 06 E122 D 9441101D 008 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202653 $143.46 000001068497-3562506200
2024 1 FD52 06 E123 D 9441101D 008 7/24/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR072N1062320202653 $129.41 000001068497-3562506200
2024 1 FD52 06 E123 D 9441101D 008 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202653 $31.84 000001068497-3562506200
2024 1 FD52 06 E124 D 9441101D 008 7/24/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR072N1062320202653 $0.30 000001068497-3562506200
2024 1 FD52 06 E124 D 9441101D 008 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202653 $0.08 000001068497-3562506200
2024 1 FD52 00 E122 D 9441101D 008 7/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101529 $13.60 000001072234-3562500061
2024 1 FD52 00 E123 D 9441101D 008 7/14/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR071N1062319101529 $23.28 000001072234-3562500061
2024 1 FD52 00 E123 D 9441101D 008 7/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101529 $3.54 000001072234-3562500061
2024 1 FD52 00 E111 D 9441101D 008 7/14/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR071N1062319101528 $113.72 000001072234-3562500061
2024 1 FD52 00 E111 D 9441101D 008 7/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101528 $17.44 000001072234-3562500061
2024 1 FD52 00 E121 D 9441101D 008 7/14/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR071N1062319101528 $8.04 000001072234-3562500061
2024 1 FD52 00 E121 D 9441101D 008 7/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101528 $1.23 000001072234-3562500061
2024 1 FD52 00 E122 D 9441101D 008 7/14/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR071N1062319101528 $88.70 000001072234-3562500061
2023 12 FD52 00 E111 D 9441101D 008 6/26/2023 0010 ENV STUDIES-UST/HZM CA-XR062N1062317400421 $208.97 000001078906-3562500061
2023 12 FD52 00 E121 D 9441101D 008 6/26/2023 0010 ENV STUDIES-UST/HZM CA-XR062N1062317400421 $15.53 000001078906-3562500061
2023 12 FD52 00 E122 D 9441101D 008 6/26/2023 0010 ENV STUDIES-UST/HZM CA-XR062N1062317400421 $163.00 000001078906-3562500061
2023 12 FD52 00 E123 D 9441101D 008 6/26/2023 0010 ENV STUDIES-UST/HZM CA-XR062N1062317400421 $31.68 000001078906-3562500061
2023 12 FD52 00 E124 D 9441101D 008 6/26/2023 0010 ENV STUDIES-UST/HZM CA-XR062N1062317400421 $0.07 000001078906-3562500061
2023 12 FD52 06 E111 D 9441101D 008 6/15/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR061N1062315810115 $682.23 000001068497-3562506200
2023 12 FD52 06 E111 D 9441101D 008 6/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810115 $120.70 000001068497-3562506200
2023 12 FD52 06 E121 D 9441101D 008 6/15/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR061N1062315810115 $49.68 000001068497-3562506200
2023 12 FD52 06 E121 D 9441101D 008 6/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810115 $8.78 000001068497-3562506200
2023 12 FD52 06 E122 D 9441101D 008 6/15/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR061N1062315810115 $532.23 000001068497-3562506200
2023 12 FD52 06 E122 D 9441101D 008 6/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810115 $94.16 000001068497-3562506200
2023 12 FD52 06 E123 D 9441101D 008 6/15/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR061N1062315810115 $107.75 000001068497-3562506200
2023 12 FD52 06 E123 D 9441101D 008 6/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810115 $18.80 000001068497-3562506200
2023 11 FD52 06 E123 D 9441101D 008 5/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309017 $206.05 000001068497-3562506200
2023 11 FD52 06 E124 D 9441101D 008 5/30/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR052N1062314309017 $0.18 000001068497-3562506200
2023 11 FD52 06 E124 D 9441101D 008 5/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309017 $0.48 000001068497-3562506200
2023 11 FD52 06 E111 D 9441101D 008 5/30/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR052N1062314309017 $496.26 000001068497-3562506200
2023 11 FD52 06 E111 D 9441101D 008 5/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309017 $1,323.33 000001068497-3562506200
2023 11 FD52 06 E121 D 9441101D 008 5/30/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR052N1062314309017 $36.31 000001068497-3562506200
2023 11 FD52 06 E121 D 9441101D 008 5/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309017 $96.84 000001068497-3562506200
2023 11 FD52 06 E122 D 9441101D 008 5/30/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR052N1062314309017 $387.07 000001068497-3562506200
2023 11 FD52 06 E122 D 9441101D 008 5/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309017 $1,032.20 000001068497-3562506200
2023 11 FD52 06 E123 D 9441101D 008 5/30/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR052N1062314309017 $80.67 000001068497-3562506200
2023 11 FD52 00 E111 D 9441101D 008 5/24/2023 0010 ENV STUDIES-UST/HZM CA-XR052N1062314309030 $531.79 000001078906-3562500061
2023 11 FD52 00 E111 D 9441101D 008 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309030 $132.98 000001078906-3562500061
2023 11 FD52 00 E121 D 9441101D 008 5/24/2023 0010 ENV STUDIES-UST/HZM CA-XR052N1062314309030 $39.55 000001078906-3562500061
2023 11 FD52 00 E121 D 9441101D 008 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309030 $9.88 000001078906-3562500061
2023 11 FD52 00 E122 D 9441101D 008 5/24/2023 0010 ENV STUDIES-UST/HZM CA-XR052N1062314309030 $414.90 000001078906-3562500061
2023 11 FD52 00 E122 D 9441101D 008 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309030 $103.72 000001078906-3562500061
2023 11 FD52 00 E123 D 9441101D 008 5/24/2023 0010 ENV STUDIES-UST/HZM CA-XR052N1062314309030 $80.86 000001078906-3562500061
2023 11 FD52 00 E123 D 9441101D 008 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309030 $19.95 000001078906-3562500061
2023 11 FD52 00 E124 D 9441101D 008 5/24/2023 0010 ENV STUDIES-UST/HZM CA-XR052N1062314309030 $0.17 000001078906-3562500061
2023 11 FD52 00 E124 D 9441101D 008 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309030 $0.04 000001078906-3562500061
2023 11 FD52 06 E111 D 9441101D 008 5/15/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR051N1062312808046 $1,091.76 000001068497-3562506200
2023 11 FD52 06 E121 D 9441101D 008 5/15/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR051N1062312808046 $79.49 000001068497-3562506200
2023 11 FD52 06 E122 D 9441101D 008 5/15/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR051N1062312808046 $851.57 000001068497-3562506200
2023 11 FD52 06 E123 D 9441101D 008 5/15/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR051N1062312808046 $172.04 000001068497-3562506200
2023 11 FD52 00 E111 D 9441101D 008 5/9/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR051N1062312808047 $208.48 000001072234-3562500061
2023 11 FD52 00 E121 D 9441101D 008 5/9/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR051N1062312808047 $14.74 000001072234-3562500061
2023 11 FD52 00 E122 D 9441101D 008 5/9/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR051N1062312808047 $162.62 000001072234-3562500061
2023 11 FD52 00 E123 D 9441101D 008 5/9/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR051N1062312808047 $42.64 000001072234-3562500061
2023 11 FD52 00 E111 D 9441101D 008 5/9/2023 0010 ENV STUDIES-UST/HZM CA-XR051N1062312808057 $543.32 000001078906-3562500061
2023 11 FD52 00 E121 D 9441101D 008 5/9/2023 0010 ENV STUDIES-UST/HZM CA-XR051N1062312808057 $39.52 000001078906-3562500061
2023 11 FD52 00 E122 D 9441101D 008 5/9/2023 0010 ENV STUDIES-UST/HZM CA-XR051N1062312808057 $423.79 000001078906-3562500061
2023 11 FD52 00 E123 D 9441101D 008 5/9/2023 0010 ENV STUDIES-UST/HZM CA-XR051N1062312808057 $82.37 000001078906-3562500061
2023 10 FD52 06 E111 D 9441101D 008 4/28/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR042N1062311106909 $955.37 000001068497-3562506200
2023 10 FD52 06 E111 D 9441101D 008 4/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106909 $50.22 000001068497-3562506200
2023 10 FD52 06 E121 D 9441101D 008 4/28/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR042N1062311106909 $69.90 000001068497-3562506200
2023 10 FD52 06 E121 D 9441101D 008 4/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106909 $3.68 000001068497-3562506200
2023 10 FD52 06 E122 D 9441101D 008 4/28/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR042N1062311106909 $745.12 000001068497-3562506200
2023 10 FD52 06 E122 D 9441101D 008 4/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106909 $39.17 000001068497-3562506200
2023 10 FD52 06 E123 D 9441101D 008 4/28/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR042N1062311106909 $150.63 000001068497-3562506200
2023 10 FD52 06 E123 D 9441101D 008 4/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106909 $7.82 000001068497-3562506200
2023 10 FD52 06 E124 D 9441101D 008 4/28/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR042N1062311106909 $0.35 000001068497-3562506200
2023 10 FD52 06 E124 D 9441101D 008 4/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106909 $0.02 000001068497-3562506200
2023 10 FD52 06 E143 D 9441101D 059 4/26/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300205419 PON21900003425 BURGESS AND NIPLE INC $136,284.70 Boone- Kenton Counties 6-79.00
2023 10 FD52 06 E143 D 9441101D 059 4/26/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300205419 PON21900003425 BURGESS AND NIPLE INC $17,600.00 Boone- Kenton Counties 6-79.00
2023 10 FD52 00 E111 D 9441101D 008 4/24/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR042N1062311106911 $208.59 000001072234-3562500061
2023 10 FD52 00 E111 D 9441101D 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106911 $46.69 000001072234-3562500061
2023 10 FD52 00 E121 D 9441101D 008 4/24/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR042N1062311106911 $15.08 000001072234-3562500061
2023 10 FD52 00 E121 D 9441101D 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106911 $3.38 000001072234-3562500061
2023 10 FD52 00 E122 D 9441101D 008 4/24/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR042N1062311106911 $162.62 000001072234-3562500061
2023 10 FD52 00 E122 D 9441101D 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106911 $36.43 000001072234-3562500061
2023 10 FD52 00 E123 D 9441101D 008 4/24/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR042N1062311106911 $42.72 000001072234-3562500061
2023 10 FD52 00 E123 D 9441101D 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106911 $9.47 000001072234-3562500061
2023 10 FD52 00 E124 D 9441101D 008 4/24/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR042N1062311106911 $0.07 000001072234-3562500061
2023 10 FD52 00 E124 D 9441101D 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106911 $0.01 000001072234-3562500061
2023 10 FD52 00 E111 D 9441101D 008 4/14/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR041N1062309605757 $147.56 000001078532-3562500636
2023 10 FD52 00 E111 D 9441101D 008 4/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605757 $38.02 000001078532-3562500636
2023 10 FD52 00 E121 D 9441101D 008 4/14/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR041N1062309605757 $10.25 000001078532-3562500636
2023 10 FD52 00 E121 D 9441101D 008 4/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605757 $2.65 000001078532-3562500636
2023 10 FD52 00 E122 D 9441101D 008 4/14/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR041N1062309605757 $115.04 000001078532-3562500636
2023 10 FD52 00 E122 D 9441101D 008 4/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605757 $29.65 000001078532-3562500636
2023 10 FD52 00 E123 D 9441101D 008 4/14/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR041N1062309605757 $35.20 000001078532-3562500636
2023 10 FD52 00 E123 D 9441101D 008 4/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605757 $8.99 000001078532-3562500636
2023 9 FD52 00 E111 D 9441101D 008 3/9/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR031N1062306703653 $900.91 000001078812-3562500061
2023 9 FD52 00 E121 D 9441101D 008 3/9/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR031N1062306703653 $66.33 000001078812-3562500061
2023 9 FD52 00 E122 D 9441101D 008 3/9/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR031N1062306703653 $702.71 000001078812-3562500061
2023 9 FD52 00 E123 D 9441101D 008 3/9/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR031N1062306703653 $128.29 000001078812-3562500061
2023 9 FD52 00 E111 D 9441101D 008 3/1/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR022N1062305302435 $245.70 000001078812-3562500061
2023 9 FD52 00 E111 D 9441101D 008 3/1/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302435 $41.93 000001078812-3562500061
2023 9 FD52 00 E121 D 9441101D 008 3/1/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR022N1062305302435 $18.34 000001078812-3562500061
2023 9 FD52 00 E121 D 9441101D 008 3/1/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302435 $3.13 000001078812-3562500061
2023 9 FD52 00 E122 D 9441101D 008 3/1/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR022N1062305302435 $191.64 000001078812-3562500061
2023 9 FD52 00 E122 D 9441101D 008 3/1/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302435 $32.71 000001078812-3562500061
2023 9 FD52 00 E123 D 9441101D 008 3/1/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR022N1062305302435 $35.07 000001078812-3562500061
2023 9 FD52 00 E123 D 9441101D 008 3/1/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302435 $5.89 000001078812-3562500061
2023 9 FD52 00 E124 D 9441101D 008 3/1/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR022N1062305302435 $0.09 000001078812-3562500061
2023 9 FD52 00 E124 D 9441101D 008 3/1/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302435 $0.02 000001078812-3562500061
2023 8 FD52 06 E111 D 9441101D 008 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302419 $1,415.65 000001065717-3562500022
2023 8 FD52 06 E111 D 9441101D 008 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302419 $22.98 000001065717-3562500022
2023 8 FD52 06 E121 D 9441101D 008 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302419 $106.57 000001065717-3562506200
2023 8 FD52 06 E121 D 9441101D 008 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302419 $1.73 000001065717-3562500022
2023 8 FD52 06 E122 D 9441101D 008 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302419 $1,104.21 000001065717-3562500022
2023 8 FD52 06 E122 D 9441101D 008 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302419 $17.92 000001065717-3562500022
2023 8 FD52 06 E123 D 9441101D 008 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302419 $157.91 000001065717-3562506200
2023 8 FD52 06 E123 D 9441101D 008 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302419 $2.26 000001065717-3562500022
2023 8 FD52 06 E124 D 9441101D 008 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302419 $0.31 000001065717-3562506200
2023 8 FD52 06 E124 D 9441101D 008 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302419 $0.01 000001065717-3562500022
2023 8 FD52 06 E111 D 9441101D 008 2/15/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021N1062303901391 $275.16 000001065717-3562506200
2023 8 FD52 06 E111 D 9441101D 008 2/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901391 $33.53 000001065717-3562506200
2023 8 FD52 06 E121 D 9441101D 008 2/15/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021N1062303901391 $20.73 000001065717-3562506200
2023 8 FD52 06 E121 D 9441101D 008 2/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901391 $2.52 000001065717-3562506200
2023 8 FD52 06 E122 D 9441101D 008 2/15/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021N1062303901391 $214.61 000001065717-3562506200
2023 8 FD52 06 E122 D 9441101D 008 2/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901391 $26.16 000001065717-3562506200
2023 8 FD52 06 E123 D 9441101D 008 2/15/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021N1062303901391 $31.22 000001065717-3562506200
2023 8 FD52 06 E123 D 9441101D 008 2/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901391 $3.76 000001065717-3562506200
2023 8 FD52 06 E143 D 9441101D 059 2/10/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300148006 PON21900003425 BURGESS AND NIPLE INC $58,526.66 Boone- Kenton Counties 6-79.00
2023 8 FD52 06 E143 D 9441101D 059 2/10/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300148006 PON21900003425 BURGESS AND NIPLE INC $7,331.00 Boone- Kenton Counties 6-79.00
2023 7 FD52 06 E143 D 9441101D 059 1/13/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300125237 PON21900003425 BURGESS AND NIPLE INC $60,922.40 Boone- Kenton Counties 6-79.00
2023 7 FD52 06 E143 D 9441101D 059 1/13/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300125237 PON21900003425 BURGESS AND NIPLE INC $15,000.00 Boone- Kenton Counties 6-79.00
2023 6 FD52 06 E121 D 9441101D 008 12/22/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122M1062235509136 $10.09 000001065717-3562506200
2023 6 FD52 06 E121 D 9441101D 008 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509136 $1.23 000001065717-3562506200
2023 6 FD52 06 E122 D 9441101D 008 12/22/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122M1062235509136 $111.95 000001065717-3562506200
2023 6 FD52 06 E122 D 9441101D 008 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509136 $13.74 000001065717-3562506200
2023 6 FD52 06 E123 D 9441101D 008 12/22/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122M1062235509136 $32.20 000001065717-3562506200
2023 6 FD52 06 E123 D 9441101D 008 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509136 $3.89 000001065717-3562506200
2023 6 FD52 06 E124 D 9441101D 008 12/22/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122M1062235509136 $0.09 000001065717-3562506200
2023 6 FD52 06 E124 D 9441101D 008 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509136 $0.01 000001065717-3562506200
2023 6 FD52 06 E111 D 9441101D 008 12/22/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122M1062235509135 $143.51 000001065717-3562506200
2023 6 FD52 06 E111 D 9441101D 008 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509135 $17.61 000001065717-3562506200
2023 6 FD52 06 E111 D 9441101D 008 12/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121M1062234208188 $514.50 000001065717-3562506200
2023 6 FD52 06 E111 D 9441101D 008 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208188 $161.37 000001065717-3562506200
2023 6 FD52 06 E121 D 9441101D 008 12/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121M1062234208188 $37.83 000001065717-3562506200
2023 6 FD52 06 E121 D 9441101D 008 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208188 $11.65 000001065717-3562506200
2023 6 FD52 06 E122 D 9441101D 008 12/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121M1062234208188 $400.94 000001065717-3562506200
2023 6 FD52 06 E122 D 9441101D 008 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208188 $125.87 000001065717-3562506200
2023 6 FD52 06 E123 D 9441101D 008 12/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121M1062234208188 $66.43 000001065717-3562506200
2023 6 FD52 06 E123 D 9441101D 008 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208188 $24.87 000001065717-3562506200
2023 6 FD52 06 E143 D 9441101D 059 12/5/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300100452 PON21900003425 BURGESS AND NIPLE INC $87,182.54 Boone- Kenton Counties 6-79.00
2023 6 FD52 06 E143 D 9441101D 059 12/5/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300100452 PON21900003425 BURGESS AND NIPLE INC $11,190.00 Boone- Kenton Counties 6-79.00
2023 5 FD52 06 E111 D 9441101D 008 11/29/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR112M1062232607123 $1,108.30 000001068497-3562506200
2023 5 FD52 06 E111 D 9441101D 008 11/29/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607123 $524.37 000001068497-3562506200
2023 5 FD52 06 E121 D 9441101D 008 11/29/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR112M1062232607123 $81.23 000001068497-3562506200
2023 5 FD52 06 E121 D 9441101D 008 11/29/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607123 $38.43 000001068497-3562506200
2023 5 FD52 06 E122 D 9441101D 008 11/29/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR112M1062232607123 $864.47 000001068497-3562506200
2023 5 FD52 06 E122 D 9441101D 008 11/29/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607123 $409.00 000001068497-3562506200
2023 5 FD52 06 E123 D 9441101D 008 11/29/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR112M1062232607123 $161.38 000001068497-3562506200
2023 5 FD52 06 E123 D 9441101D 008 11/29/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607123 $74.91 000001068497-3562506200
2023 5 FD52 06 E124 D 9441101D 008 11/29/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR112M1062232607123 $0.41 000001068497-3562506200
2023 5 FD52 06 E124 D 9441101D 008 11/29/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607123 $0.19 000001068497-3562506200
2023 5 FD52 06 E111 D 9441101D 008 11/14/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR111M1062230806134 $248.13 000001068497-3562506200
2023 5 FD52 06 E111 D 9441101D 008 11/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806134 $40.03 000001068497-3562506200
2023 5 FD52 06 E121 D 9441101D 008 11/14/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR111M1062230806134 $18.19 000001068497-3562506200
2023 5 FD52 06 E121 D 9441101D 008 11/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806134 $2.94 000001068497-3562506200
2023 5 FD52 06 E122 D 9441101D 008 11/14/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR111M1062230806134 $193.54 000001068497-3562506200
2023 5 FD52 06 E122 D 9441101D 008 11/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806134 $31.22 000001068497-3562506200
2023 5 FD52 06 E123 D 9441101D 008 11/14/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR111M1062230806134 $35.99 000001068497-3562506200
2023 5 FD52 06 E123 D 9441101D 008 11/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806134 $5.72 000001068497-3562506200
2023 5 FD52 06 E143 D 9441101D 059 11/2/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300080348 PON21900003425 BURGESS AND NIPLE INC $70,733.01 Boone- Kenton Counties 6-79.00
2023 5 FD52 06 E143 D 9441101D 059 11/2/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300080348 PON21900003425 BURGESS AND NIPLE INC $6,740.88 Boone- Kenton Counties 6-79.00
2023 4 FD52 06 E111 D 9441101D 008 10/31/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR102M1062229405024 $273.06 000001068497-3562506200
2023 4 FD52 06 E111 D 9441101D 008 10/31/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405024 $30.21 000001068497-3562506200
2023 4 FD52 06 E121 D 9441101D 008 10/31/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR102M1062229405024 $20.00 000001068497-3562506200
2023 4 FD52 06 E121 D 9441101D 008 10/31/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405024 $2.21 000001068497-3562506200
2023 4 FD52 06 E122 D 9441101D 008 10/31/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR102M1062229405024 $212.89 000001068497-3562506200
2023 4 FD52 06 E122 D 9441101D 008 10/31/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405024 $23.56 000001068497-3562506200
2023 4 FD52 06 E123 D 9441101D 008 10/31/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR102M1062229405024 $39.56 000001068497-3562506200
2023 4 FD52 06 E123 D 9441101D 008 10/31/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405024 $4.32 000001068497-3562506200
2023 4 FD52 06 E124 D 9441101D 008 10/31/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR102M1062229405024 $0.10 000001068497-3562506200
2023 4 FD52 06 E124 D 9441101D 008 10/31/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405024 $0.01 000001068497-3562506200
2023 4 FD52 06 E143 D 9441101D 059 10/17/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300068674 PON21900003425 BURGESS AND NIPLE INC $62,262.96 Boone- Kenton Counties 6-79.00
2023 4 FD52 06 E143 D 9441101D 059 10/17/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300068674 PON21900003425 BURGESS AND NIPLE INC $18,930.80 Boone- Kenton Counties 6-79.00
2023 4 FD52 06 E111 D 9441101D 008 10/10/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR101M1062228003915 $744.38 000001068497-3562506200
2023 4 FD52 06 E111 D 9441101D 008 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003915 $38.04 000001068497-3562506200
2023 4 FD52 06 E121 D 9441101D 008 10/10/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR101M1062228003915 $54.56 000001068497-3562506200
2023 4 FD52 06 E121 D 9441101D 008 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003915 $2.79 000001068497-3562506200
2023 4 FD52 06 E122 D 9441101D 008 10/10/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR101M1062228003915 $580.63 000001068497-3562506200
2023 4 FD52 06 E122 D 9441101D 008 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003915 $29.67 000001068497-3562506200
2023 4 FD52 06 E123 D 9441101D 008 10/10/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR101M1062228003915 $107.82 000001068497-3562506200
2023 4 FD52 06 E123 D 9441101D 008 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003915 $5.43 000001068497-3562506200
2023 3 FD52 00 E111 D 9441101D 008 9/26/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092M1062226602741 $71.69 000001068681-3562500636
2023 3 FD52 00 E111 D 9441101D 008 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602741 $35.40 000001068681-3562500636
2023 3 FD52 00 E121 D 9441101D 008 9/26/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092M1062226602741 $5.10 000001068681-3562500636
2023 3 FD52 00 E121 D 9441101D 008 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602741 $2.51 000001068681-3562500636
2023 3 FD52 00 E122 D 9441101D 008 9/26/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092M1062226602741 $55.78 000001068681-3562500636
2023 3 FD52 00 E122 D 9441101D 008 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602741 $27.62 000001068681-3562500636
2023 3 FD52 00 E123 D 9441101D 008 9/26/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092M1062226602741 $15.04 000001068681-3562500636
2023 3 FD52 00 E123 D 9441101D 008 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602741 $7.34 000001068681-3562500636
2023 3 FD52 00 E124 D 9441101D 008 9/26/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092M1062226602741 $0.02 000001068681-3562500636
2023 3 FD52 00 E124 D 9441101D 008 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602741 $0.01 000001068681-3562500636
2023 3 FD52 06 E143 D 9441101D 059 9/13/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300044446 PON21900003425 BURGESS AND NIPLE INC $29,589.95 Boone- Kenton Counties 6-79.00
2023 3 FD52 06 E111 D 9441101D 008 9/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091M1062225101596 $44.59 000001065717-3562506208
2023 3 FD52 06 E121 D 9441101D 008 9/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091M1062225101596 $3.01 000001065717-3562506208
2023 3 FD52 06 E122 D 9441101D 008 9/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091M1062225101596 $34.78 000001065717-3562506208
2023 3 FD52 06 E123 D 9441101D 008 9/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091M1062225101596 $10.29 000001065717-3562506208
2023 3 FD52 06 E111 D 9441101D 008 9/12/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR091M1062225101597 $454.90 000001068497-3562506200
2023 3 FD52 06 E121 D 9441101D 008 9/12/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR091M1062225101597 $33.34 000001068497-3562506200
2023 3 FD52 06 E122 D 9441101D 008 9/12/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR091M1062225101597 $354.82 000001068497-3562506200
2023 3 FD52 06 E123 D 9441101D 008 9/12/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR091M1062225101597 $65.84 000001068497-3562506200
2023 3 FD52 00 E111 D 9441101D 008 9/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091M1062225101597 $131.01 000001068681-3562500636
2023 3 FD52 00 E111 D 9441101D 008 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101597 $13.77 000001068681-3562500636
2023 3 FD52 00 E121 D 9441101D 008 9/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091M1062225101597 $9.13 000001068681-3562500636
2023 3 FD52 00 E121 D 9441101D 008 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101597 $0.95 000001068681-3562500636
2023 3 FD52 00 E122 D 9441101D 008 9/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091M1062225101597 $101.50 000001068681-3562500636
2023 3 FD52 00 E122 D 9441101D 008 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101597 $10.74 000001068681-3562500636
2023 3 FD52 00 E123 D 9441101D 008 9/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091M1062225101597 $27.24 000001068681-3562500636
2023 3 FD52 00 E123 D 9441101D 008 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101597 $2.86 000001068681-3562500636
2023 2 FD52 00 E111 D 9441101D 008 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500432 $242.04 000001081305-3562500061
2023 2 FD52 00 E121 D 9441101D 008 8/24/2022 0060 ENV STUDIES-ARCHAEOLOGY CA-XR082M1062223500432 $82.08 000001081305-3562500061
2023 2 FD52 00 E121 D 9441101D 008 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500432 $18.25 000001081305-3562500061
2023 2 FD52 00 E122 D 9441101D 008 8/24/2022 0060 ENV STUDIES-ARCHAEOLOGY CA-XR082M1062223500432 $849.12 000001081305-3562500061
2023 2 FD52 00 E122 D 9441101D 008 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500432 $188.79 000001081305-3562500061
2023 2 FD52 00 E123 D 9441101D 008 8/24/2022 0060 ENV STUDIES-ARCHAEOLOGY CA-XR082M1062223500432 $144.06 000001081305-3562500061
2023 2 FD52 00 E123 D 9441101D 008 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500432 $31.52 000001081305-3562500061
2023 2 FD52 00 E124 D 9441101D 008 8/24/2022 0060 ENV STUDIES-ARCHAEOLOGY CA-XR082M1062223500432 $0.37 000001081305-3562500061
2023 2 FD52 00 E124 D 9441101D 008 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500432 $0.08 000001081305-3562500061
2023 2 FD52 06 E111 D 9441101D 008 8/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082M1062223500400 $92.69 000001065717-3562506208
2023 2 FD52 06 E111 D 9441101D 008 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500400 $1.85 000001065717-3562506208
2023 2 FD52 06 E121 D 9441101D 008 8/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082M1062223500400 $7.09 000001065717-3562506208
2023 2 FD52 06 E121 D 9441101D 008 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500400 $0.14 000001065717-3562506208
2023 2 FD52 06 E122 D 9441101D 008 8/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082M1062223500400 $72.51 000001065717-3562506208
2023 2 FD52 06 E122 D 9441101D 008 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500400 $1.44 000001065717-3562506208
2023 2 FD52 06 E123 D 9441101D 008 8/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082M1062223500400 $3.41 000001065717-3562506208
2023 2 FD52 06 E123 D 9441101D 008 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500400 $0.06 000001065717-3562506208
2023 2 FD52 06 E124 D 9441101D 008 8/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082M1062223500400 $0.05 000001065717-3562506208
2023 2 FD52 00 E111 D 9441101D 008 8/24/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR082M1062223500420 $450.45 000001078812-3562500061
2023 2 FD52 00 E111 D 9441101D 008 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500420 $63.88 000001078812-3562500061
2023 2 FD52 00 E121 D 9441101D 008 8/24/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR082M1062223500420 $33.61 000001078812-3562500061
2023 2 FD52 00 E121 D 9441101D 008 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500420 $4.76 000001078812-3562500061
2023 2 FD52 00 E122 D 9441101D 008 8/24/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR082M1062223500420 $351.36 000001078812-3562500061
2023 2 FD52 00 E122 D 9441101D 008 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500420 $49.83 000001078812-3562500061
2023 2 FD52 00 E123 D 9441101D 008 8/24/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR082M1062223500420 $59.05 000001078812-3562500061
2023 2 FD52 00 E123 D 9441101D 008 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500420 $8.23 000001078812-3562500061
2023 2 FD52 00 E124 D 9441101D 008 8/24/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR082M1062223500420 $0.17 000001078812-3562500061
2023 2 FD52 00 E124 D 9441101D 008 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500420 $0.02 000001078812-3562500061
2023 2 FD52 06 E111 D 9441101D 008 8/24/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR082M1062223500402 $843.71 000001068497-3562506200
2023 2 FD52 06 E111 D 9441101D 008 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500402 $410.24 000001068497-3562506200
2023 2 FD52 06 E121 D 9441101D 008 8/24/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR082M1062223500402 $61.83 000001068497-3562506200
2023 2 FD52 06 E121 D 9441101D 008 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500402 $30.07 000001068497-3562506200
2023 2 FD52 06 E122 D 9441101D 008 8/24/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR082M1062223500402 $658.03 000001068497-3562506200
2023 2 FD52 06 E122 D 9441101D 008 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500402 $319.99 000001068497-3562506200
2023 2 FD52 06 E123 D 9441101D 008 8/24/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR082M1062223500402 $122.86 000001068497-3562506200
2023 2 FD52 06 E123 D 9441101D 008 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500402 $58.60 000001068497-3562506200
2023 2 FD52 06 E124 D 9441101D 008 8/24/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR082M1062223500402 $0.31 000001068497-3562506200
2023 2 FD52 00 E111 D 9441101D 008 8/24/2022 0060 ENV STUDIES-ARCHAEOLOGY CA-XR082M1062223500432 $1,088.62 000001081305-3562500061
2023 2 FD52 06 E124 D 9441101D 008 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500402 $0.15 000001068497-3562506200
2023 2 FD52 06 E143 D 9441101D 059 8/2/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300016893 PON21900003425 BURGESS AND NIPLE INC $116,253.62 Boone- Kenton Counties 6-79.00
2023 2 FD52 06 E143 D 9441101D 059 8/2/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300016893 PON21900003425 BURGESS AND NIPLE INC $3,545.20 Boone- Kenton Counties 6-79.00
2022 12 FD52 00 E111 D 9441101D 008 6/27/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR062M1062217506736 $28.53 000001072234-3562500061
2022 12 FD52 00 E111 D 9441101D 008 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506736 $0.28 000001072234-3562500061
2022 12 FD52 00 E121 D 9441101D 008 6/27/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR062M1062217506736 $2.02 000001072234-3562500061
2022 12 FD52 00 E121 D 9441101D 008 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506736 $0.02 000001072234-3562500061
2022 12 FD52 00 E122 D 9441101D 008 6/27/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR062M1062217506736 $23.96 000001072234-3562500061
2022 12 FD52 00 E122 D 9441101D 008 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506736 $0.24 000001072234-3562500061
2022 12 FD52 00 E123 D 9441101D 008 6/27/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR062M1062217506736 $6.81 000001072234-3562500061
2022 12 FD52 00 E123 D 9441101D 008 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506736 $0.07 000001072234-3562500061
2022 12 FD52 00 E124 D 9441101D 008 6/27/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR062M1062217506736 $0.01 000001072234-3562500061
2022 12 FD52 06 E111 D 9441101D 008 6/27/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR062M1062217506733 $459.48 000001068497-3562506200
2022 12 FD52 06 E111 D 9441101D 008 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506733 $156.84 000001068497-3562506200
2022 12 FD52 06 E121 D 9441101D 008 6/27/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR062M1062217506733 $33.55 000001068497-3562506200
2022 12 FD52 06 E121 D 9441101D 008 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506733 $11.46 000001068497-3562506200
2022 12 FD52 06 E122 D 9441101D 008 6/27/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR062M1062217506733 $385.83 000001068497-3562506200
2022 12 FD52 06 E122 D 9441101D 008 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506733 $131.70 000001068497-3562506200
2022 12 FD52 06 E123 D 9441101D 008 6/27/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR062M1062217506733 $72.13 000001068497-3562506200
2022 12 FD52 06 E123 D 9441101D 008 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506733 $24.20 000001068497-3562506200
2022 12 FD52 06 E124 D 9441101D 008 6/27/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR062M1062217506733 $0.18 000001068497-3562506200
2022 12 FD52 06 E124 D 9441101D 008 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506733 $0.06 000001068497-3562506200
2022 12 FD52 00 E111 D 9441101D 008 6/27/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062M1062217506733 $198.75 000001068681-3562500636
2022 12 FD52 00 E111 D 9441101D 008 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506733 $25.82 000001068681-3562500636
2022 12 FD52 06 E111 D 9441101D 008 6/27/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062M1062217506730 $225.22 000001065717-3562506208
2022 12 FD52 00 E121 D 9441101D 008 6/27/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062M1062217506733 $14.09 000001068681-3562500636
2022 12 FD52 06 E121 D 9441101D 008 6/27/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062M1062217506730 $15.28 000001065717-3562506208
2022 12 FD52 00 E121 D 9441101D 008 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506733 $1.84 000001068681-3562500636
2022 12 FD52 06 E122 D 9441101D 008 6/27/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062M1062217506730 $189.12 000001065717-3562506208
2022 12 FD52 00 E122 D 9441101D 008 6/27/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062M1062217506733 $167.35 000001068681-3562500636
2022 12 FD52 06 E123 D 9441101D 008 6/27/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062M1062217506730 $56.14 000001065717-3562506208
2022 12 FD52 00 E122 D 9441101D 008 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506733 $21.68 000001068681-3562500636
2022 12 FD52 06 E124 D 9441101D 008 6/27/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062M1062217506730 $0.09 000001065717-3562506208
2022 12 FD52 00 E123 D 9441101D 008 6/27/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062M1062217506733 $45.14 000001068681-3562500636
2022 12 FD52 00 E123 D 9441101D 008 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506733 $5.79 000001068681-3562500636
2022 12 FD52 00 E124 D 9441101D 008 6/27/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062M1062217506733 $0.09 000001068681-3562500636
2022 12 FD52 00 E124 D 9441101D 008 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506733 $0.01 000001068681-3562500636
2022 12 FD52 06 E111 D 9441101D 008 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905689 $101.36 000001065717-3562506208
2022 12 FD52 00 E111 D 9441101D 008 6/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061M1062215905691 $379.40 000001068681-3562500636
2022 12 FD52 00 E111 D 9441101D 008 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905691 $141.73 000001068681-3562500636
2022 12 FD52 00 E121 D 9441101D 008 6/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061M1062215905691 $26.22 000001068681-3562500636
2022 12 FD52 00 E121 D 9441101D 008 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905691 $9.79 000001068681-3562500636
2022 12 FD52 00 E122 D 9441101D 008 6/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061M1062215905691 $318.54 000001068681-3562500636
2022 12 FD52 00 E122 D 9441101D 008 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905691 $119.00 000001068681-3562500636
2022 12 FD52 06 E121 D 9441101D 008 6/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061M1062215905689 $36.15 000001065717-3562506204
2022 12 FD52 00 E123 D 9441101D 008 6/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061M1062215905691 $86.04 000001068681-3562500636
2022 12 FD52 00 E123 D 9441101D 008 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905691 $31.78 000001068681-3562500636
2022 12 FD52 06 E121 D 9441101D 008 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905689 $7.34 000001065717-3562500022
2022 12 FD52 06 E122 D 9441101D 008 6/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061M1062215905689 $425.33 000001065717-3562500022
2022 12 FD52 06 E122 D 9441101D 008 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905689 $85.09 000001065717-3562506208
2022 12 FD52 06 E123 D 9441101D 008 6/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061M1062215905689 $93.40 000001065717-3562500022
2022 12 FD52 06 E123 D 9441101D 008 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905689 $16.75 000001065717-3562500022
2022 12 FD52 06 E111 D 9441101D 008 6/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061M1062215905688 $506.64 000001065717-3562506204
2022 12 FD52 06 E143 D 9441101D 059 6/3/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200221819 PON21900003425 BURGESS AND NIPLE INC $90,349.28 Boone- Kenton Counties 6-79.00
2022 12 FD52 06 E143 D 9441101D 059 6/3/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200221819 PON21900003425 BURGESS AND NIPLE INC $22,168.60 Boone- Kenton Counties 6-79.00
2022 10 FD52 06 E143 D 9441101D 059 4/27/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200194389 PON21900003425 BURGESS AND NIPLE INC $187,110.55 Boone- Kenton Counties 6-79.00
2022 10 FD52 06 E143 D 9441101D 059 4/27/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200194389 PON21900003425 BURGESS AND NIPLE INC $63,447.90 Boone- Kenton Counties 6-79.00
2022 10 FD52 00 E111 D 9441101D 008 4/11/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR041M1062209801468 $208.54 000001078812-3562500061
2022 10 FD52 00 E121 D 9441101D 008 4/11/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR041M1062209801468 $15.52 000001078812-3562500061
2022 10 FD52 00 E122 D 9441101D 008 4/11/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR041M1062209801468 $175.11 000001078812-3562500061
2022 10 FD52 00 E123 D 9441101D 008 4/11/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR041M1062209801468 $29.45 000001078812-3562500061
2022 9 FD52 06 E143 D 9441101D 059 3/15/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200164681 PON21900003425 BURGESS AND NIPLE INC $185,303.13 Boone- Kenton Counties 6-79.00
2022 9 FD52 00 E111 D 9441101D 008 3/9/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR031M1062206709454 $278.05 000001078812-3562500061
2022 9 FD52 00 E121 D 9441101D 008 3/9/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR031M1062206709454 $20.70 000001078812-3562500061
2022 9 FD52 00 E122 D 9441101D 008 3/9/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR031M1062206709454 $233.49 000001078812-3562500061
2022 9 FD52 00 E123 D 9441101D 008 3/9/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR031M1062206709454 $39.28 000001078812-3562500061
2022 8 FD52 00 E111 D 9441101D 008 2/23/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR022M1062205308413 $561.12 000001078812-3562500061
2022 8 FD52 00 E111 D 9441101D 008 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308413 $95.55 000001078812-3562500061
2022 8 FD52 00 E121 D 9441101D 008 2/23/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR022M1062205308413 $41.79 000001078812-3562500061
2022 8 FD52 00 E121 D 9441101D 008 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308413 $7.12 000001078812-3562500061
2022 8 FD52 00 E122 D 9441101D 008 2/23/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR022M1062205308413 $471.22 000001078812-3562500061
2022 8 FD52 00 E122 D 9441101D 008 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308413 $80.23 000001078812-3562500061
2022 8 FD52 00 E123 D 9441101D 008 2/23/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR022M1062205308413 $79.47 000001078812-3562500061
2022 8 FD52 00 E123 D 9441101D 008 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308413 $13.30 000001078812-3562500061
2022 8 FD52 00 E124 D 9441101D 008 2/23/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR022M1062205308413 $0.22 000001078812-3562500061
2022 8 FD52 00 E124 D 9441101D 008 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308413 $0.04 000001078812-3562500061
2022 8 FD52 00 E111 D 9441101D 008 2/14/2022 0060 ENV STUDIES-ARCHAEOLOGY CA-XR021M1062203907456 $503.99 000001081305-3562500061
2022 8 FD52 00 E111 D 9441101D 008 2/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907456 $81.65 000001081305-3562500061
2022 8 FD52 00 E121 D 9441101D 008 2/14/2022 0060 ENV STUDIES-ARCHAEOLOGY CA-XR021M1062203907456 $37.95 000001081305-3562500061
2022 8 FD52 00 E121 D 9441101D 008 2/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907456 $6.15 000001081305-3562500061
2022 8 FD52 00 E122 D 9441101D 008 2/14/2022 0060 ENV STUDIES-ARCHAEOLOGY CA-XR021M1062203907456 $423.20 000001081305-3562500061
2022 8 FD52 00 E122 D 9441101D 008 2/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907456 $68.56 000001081305-3562500061
2022 8 FD52 00 E123 D 9441101D 008 2/14/2022 0060 ENV STUDIES-ARCHAEOLOGY CA-XR021M1062203907456 $71.95 000001081305-3562500061
2022 8 FD52 00 E123 D 9441101D 008 2/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907456 $11.49 000001081305-3562500061
2022 8 FD52 00 E111 D 9441101D 008 2/9/2022 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR021M1062203907465 $141.77 000001081427-3562500610
2022 8 FD52 00 E111 D 9441101D 008 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907465 $41.02 000001081427-3562500610
2022 8 FD52 00 E121 D 9441101D 008 2/9/2022 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR021M1062203907465 $10.24 000001081427-3562500610
2022 8 FD52 00 E121 D 9441101D 008 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907465 $2.97 000001081427-3562500610
2022 8 FD52 00 E122 D 9441101D 008 2/9/2022 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR021M1062203907465 $119.09 000001081427-3562500610
2022 8 FD52 00 E122 D 9441101D 008 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907465 $34.44 000001081427-3562500610
2022 8 FD52 00 E123 D 9441101D 008 2/9/2022 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR021M1062203907465 $27.97 000001081427-3562500610
2022 8 FD52 00 E111 D 9441101D 008 2/9/2022 0010 ENV STUDIES-UST/HZM CA-XR021M1062203907434 $323.05 000001078906-3562500061
2022 8 FD52 00 E123 D 9441101D 008 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907465 $7.94 000001081427-3562500610
2022 8 FD52 00 E111 D 9441101D 008 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907434 $71.96 000001078906-3562500061
2022 8 FD52 00 E111 D 9441101D 008 2/9/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR021M1062203907433 $227.49 000001078812-3562500061
2022 8 FD52 00 E121 D 9441101D 008 2/9/2022 0010 ENV STUDIES-UST/HZM CA-XR021M1062203907434 $21.95 000001078906-3562500061
2022 8 FD52 00 E111 D 9441101D 008 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907433 $50.36 000001078812-3562500061
2022 8 FD52 00 E121 D 9441101D 008 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907434 $4.88 000001078906-3562500061
2022 8 FD52 00 E121 D 9441101D 008 2/9/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR021M1062203907433 $16.94 000001078812-3562500061
2022 8 FD52 00 E122 D 9441101D 008 2/9/2022 0010 ENV STUDIES-UST/HZM CA-XR021M1062203907434 $271.36 000001078906-3562500061
2022 8 FD52 00 E121 D 9441101D 008 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907433 $3.76 000001078812-3562500061
2022 8 FD52 00 E122 D 9441101D 008 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907434 $60.42 000001078906-3562500061
2022 8 FD52 00 E122 D 9441101D 008 2/9/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR021M1062203907433 $191.03 000001078812-3562500061
2022 8 FD52 00 E123 D 9441101D 008 2/9/2022 0010 ENV STUDIES-UST/HZM CA-XR021M1062203907434 $112.50 000001078906-3562500061
2022 8 FD52 00 E122 D 9441101D 008 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907433 $42.28 000001078812-3562500061
2022 8 FD52 00 E123 D 9441101D 008 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907434 $24.80 000001078906-3562500061
2022 8 FD52 00 E123 D 9441101D 008 2/9/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR021M1062203907433 $32.24 000001078812-3562500061
2022 8 FD52 00 E123 D 9441101D 008 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907433 $7.02 000001078812-3562500061
2022 7 FD52 06 E143 D 9441101D 059 1/27/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200131937 PON21900003425 BURGESS AND NIPLE INC $190,611.87 Boone- Kenton Counties 6-79.00
2022 7 FD52 06 E143 D 9441101D 059 1/27/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200131937 PON21900003425 BURGESS AND NIPLE INC $51,546.10 Boone- Kenton Counties 6-79.00
2022 7 FD52 00 E111 D 9441101D 008 1/27/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR012M1062202106444 $500.50 000001078812-3562500061
2022 7 FD52 00 E111 D 9441101D 008 1/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106444 $49.38 000001078812-3562500061
2022 7 FD52 00 E121 D 9441101D 008 1/27/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR012M1062202106444 $37.27 000001078812-3562500061
2022 7 FD52 00 E121 D 9441101D 008 1/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106444 $3.68 000001078812-3562500061
2022 7 FD52 00 E122 D 9441101D 008 1/27/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR012M1062202106444 $420.27 000001078812-3562500061
2022 7 FD52 00 E122 D 9441101D 008 1/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106444 $41.46 000001078812-3562500061
2022 7 FD52 00 E123 D 9441101D 008 1/27/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR012M1062202106444 $70.80 000001078812-3562500061
2022 7 FD52 00 E123 D 9441101D 008 1/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106444 $6.88 000001078812-3562500061
2022 7 FD52 00 E124 D 9441101D 008 1/27/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR012M1062202106444 $0.20 000001078812-3562500061
2022 7 FD52 00 E124 D 9441101D 008 1/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106444 $0.02 000001078812-3562500061
2022 7 FD52 06 E143 D 9441101D 059 1/13/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200116909 PON21900003425 BURGESS AND NIPLE INC $87,860.31 Boone- Kenton Counties 6-79.00
2022 7 FD52 00 E121 D 9441101D 008 1/10/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR011M1062200705527 $0.18 000001072234-3562502306
2022 7 FD52 00 E123 D 9441101D 008 1/10/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR011M1062200705527 $2.34 000001072234-3562502306
2022 7 FD52 00 E123 D 9441101D 008 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705527 $0.02 000001072234-3562502306
2022 7 FD52 00 E124 D 9441101D 008 1/10/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR011M1062200705527 $0.01 000001072234-3562502306
2022 7 FD52 00 E111 D 9441101D 008 1/10/2022 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR011M1062200705530 $146.99 000001074821-3562500610
2022 7 FD52 00 E111 D 9441101D 008 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705530 $117.60 000001074821-3562500610
2022 7 FD52 00 E121 D 9441101D 008 1/10/2022 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR011M1062200705530 $10.08 000001074821-3562500610
2022 7 FD52 00 E121 D 9441101D 008 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705530 $8.06 000001074821-3562500610
2022 7 FD52 00 E122 D 9441101D 008 1/10/2022 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR011M1062200705530 $123.43 000001074821-3562500610
2022 7 FD52 00 E122 D 9441101D 008 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705530 $98.75 000001074821-3562500610
2022 7 FD52 00 E123 D 9441101D 008 1/10/2022 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR011M1062200705530 $25.90 000001074821-3562500610
2022 7 FD52 00 E123 D 9441101D 008 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705530 $20.41 000001074821-3562500610
2022 6 FD52 00 E111 D 9441101D 008 12/22/2021 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR122L1062135504459 $976.74 000001072234-3562502306
2022 6 FD52 00 E111 D 9441101D 008 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504459 $5.46 000001072234-3562502306
2022 6 FD52 00 E121 D 9441101D 008 12/22/2021 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR122L1062135504459 $73.58 000001072234-3562502306
2022 6 FD52 00 E121 D 9441101D 008 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504459 $0.41 000001072234-3562502306
2022 6 FD52 00 E122 D 9441101D 008 12/22/2021 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR122L1062135504459 $820.17 000001072234-3562502306
2022 6 FD52 00 E122 D 9441101D 008 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504459 $4.59 000001072234-3562502306
2022 6 FD52 00 E123 D 9441101D 008 12/22/2021 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR122L1062135504459 $149.69 000001072234-3562502306
2022 6 FD52 00 E123 D 9441101D 008 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504459 $0.82 000001072234-3562502306
2022 6 FD52 00 E124 D 9441101D 008 12/22/2021 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR122L1062135504459 $0.44 000001072234-3562502306
2022 6 FD52 06 E111 D 9441101D 008 12/8/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR121L1062134103529 $689.32 000001068497-3562506200
2022 6 FD52 06 E111 D 9441101D 008 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103529 $153.16 000001068497-3562506200
2022 6 FD52 06 E121 D 9441101D 008 12/8/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR121L1062134103529 $49.92 000001068497-3562506200
2022 6 FD52 06 E121 D 9441101D 008 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103529 $11.09 000001068497-3562506200
2022 6 FD52 06 E122 D 9441101D 008 12/8/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR121L1062134103529 $578.76 000001068497-3562506200
2022 6 FD52 06 E122 D 9441101D 008 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103529 $128.61 000001068497-3562506200
2022 6 FD52 06 E123 D 9441101D 008 12/8/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR121L1062134103529 $105.45 000001068497-3562506200
2022 6 FD52 06 E123 D 9441101D 008 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103529 $23.05 000001068497-3562506200
2022 6 FD52 00 E111 D 9441101D 008 12/8/2021 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR121L1062134103532 $342.44 000001072234-3562500061
2022 6 FD52 00 E111 D 9441101D 008 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103532 $128.40 000001072234-3562500061
2022 6 FD52 00 E121 D 9441101D 008 12/8/2021 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR121L1062134103532 $23.85 000001072234-3562500061
2022 6 FD52 00 E121 D 9441101D 008 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103532 $8.95 000001072234-3562500061
2022 6 FD52 00 E122 D 9441101D 008 12/8/2021 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR121L1062134103532 $287.51 000001072234-3562500061
2022 6 FD52 00 E122 D 9441101D 008 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103532 $107.82 000001072234-3562500061
2022 6 FD52 00 E123 D 9441101D 008 12/8/2021 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR121L1062134103532 $78.10 000001072234-3562500061
2022 6 FD52 00 E123 D 9441101D 008 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103532 $28.91 000001072234-3562500061
2022 5 FD52 06 E143 D 9441101D 059 11/30/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200089383 PON21900003425 BURGESS AND NIPLE INC $89,853.56 Boone- Kenton Counties 6-79.00
2022 5 FD52 06 E143 D 9441101D 059 11/30/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200089383 PON21900003425 BURGESS AND NIPLE INC $39,001.60 Boone- Kenton Counties 6-79.00
2022 5 FD52 00 E111 D 9441101D 004 11/29/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR112L1062132602539 $227.50 000001080310-3562500061
2022 5 FD52 00 E111 D 9441101D 004 11/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602539 $22.75 000001080310-3562500061
2022 5 FD52 00 E121 D 9441101D 004 11/29/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR112L1062132602539 $16.93 000001080310-3562500061
2022 5 FD52 00 E121 D 9441101D 004 11/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602539 $1.69 000001080310-3562500061
2022 5 FD52 00 E122 D 9441101D 004 11/29/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR112L1062132602539 $191.03 000001080310-3562500061
2022 5 FD52 00 E122 D 9441101D 004 11/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602539 $19.10 000001080310-3562500061
2022 5 FD52 00 E123 D 9441101D 004 11/23/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR112L1062132602540 $31.41 000001080310-3562500061
2022 5 FD52 00 E123 D 9441101D 004 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602540 $3.09 000001080310-3562500061
2022 5 FD52 00 E124 D 9441101D 004 11/23/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR112L1062132602540 $0.09 000001080310-3562500061
2022 5 FD52 00 E124 D 9441101D 004 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602540 $0.01 000001080310-3562500061
2022 5 FD52 00 E111 D 9441101D 008 11/8/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR111L1062130901515 $433.77 000001078812-3562500061
2022 5 FD52 00 E111 D 9441101D 008 11/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901515 $108.45 000001078812-3562500061
2022 5 FD52 00 E121 D 9441101D 008 11/8/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR111L1062130901515 $31.84 000001078812-3562500061
2022 5 FD52 00 E121 D 9441101D 008 11/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901515 $7.96 000001078812-3562500061
2022 5 FD52 00 E122 D 9441101D 008 11/8/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR111L1062130901515 $364.24 000001078812-3562500061
2022 5 FD52 00 E122 D 9441101D 008 11/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901515 $91.06 000001078812-3562500061
2022 5 FD52 00 E123 D 9441101D 008 11/8/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR111L1062130901515 $60.03 000001078812-3562500061
2022 5 FD52 00 E123 D 9441101D 008 11/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901515 $14.74 000001078812-3562500061
2022 5 FD52 06 E143 D 9441101D 059 11/2/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200075118 PON21900003425 BURGESS AND NIPLE INC $94,082.72 Boone- Kenton Counties 6-79.00
2022 4 FD52 00 E111 D 9441101D 008 10/25/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR102L1062129500413 $682.55 000001078812-3562500061
2022 4 FD52 00 E111 D 9441101D 008 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500413 $21.23 000001078812-3562500061
2022 4 FD52 00 E121 D 9441101D 008 10/25/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR102L1062129500413 $50.80 000001078812-3562500061
2022 4 FD52 00 E121 D 9441101D 008 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500413 $1.58 000001078812-3562500061
2022 4 FD52 00 E122 D 9441101D 008 10/25/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR102L1062129500413 $573.10 000001078812-3562500061
2022 4 FD52 00 E122 D 9441101D 008 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500413 $17.83 000001078812-3562500061
2022 4 FD52 00 E123 D 9441101D 008 10/25/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR102L1062129500413 $94.14 000001078812-3562500061
2022 4 FD52 00 E123 D 9441101D 008 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500413 $2.88 000001078812-3562500061
2022 4 FD52 00 E124 D 9441101D 008 10/25/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR102L1062129500413 $0.27 000001078812-3562500061
2022 4 FD52 00 E124 D 9441101D 008 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500413 $0.01 000001078812-3562500061
2022 3 FD52 06 E143 D 9441101D 059 9/23/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200051415 PON21900003425 BURGESS AND NIPLE INC $55,172.49 Boone- Kenton Counties 6-79.00
2022 3 FD52 06 E143 D 9441101D 059 9/23/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200051415 PON21900003425 BURGESS AND NIPLE INC $1,764.18 Boone- Kenton Counties 6-79.00
2022 3 FD52 00 E111 D 9441101D 008 9/13/2021 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR091L1062125207994 $2,187.51 000001079071-3562500061
2022 3 FD52 00 E121 D 9441101D 008 9/13/2021 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR091L1062125207994 $163.29 000001079071-3562500061
2022 3 FD52 00 E122 D 9441101D 008 9/13/2021 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR091L1062125207994 $1,836.85 000001079071-3562500061
2022 3 FD52 00 E123 D 9441101D 008 9/13/2021 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR091L1062125207994 $345.02 000001079071-3562500061
2022 3 FD52 06 E111 D 9441101D 008 9/13/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091L1062125207955 $715.69 000001065717-3562506208
2022 3 FD52 06 E111 D 9441101D 008 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207955 $64.96 000001065717-3562506208
2022 3 FD52 06 E121 D 9441101D 008 9/13/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091L1062125207955 $51.49 000001065717-3562506208
2022 3 FD52 06 E121 D 9441101D 008 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207955 $4.68 000001065717-3562506208
2022 3 FD52 06 E122 D 9441101D 008 9/13/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091L1062125207955 $600.96 000001065717-3562506208
2022 3 FD52 06 E122 D 9441101D 008 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207955 $54.55 000001065717-3562506208
2022 3 FD52 06 E123 D 9441101D 008 9/13/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091L1062125207955 $111.50 000001065717-3562506208
2022 3 FD52 06 E123 D 9441101D 008 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207955 $9.97 000001065717-3562506208
2022 2 FD52 00 E111 D 9441101D 008 8/25/2021 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR082L1062123606987 $1,750.01 000001079071-3562500061
2022 2 FD52 00 E121 D 9441101D 008 8/25/2021 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR082L1062123606987 $132.27 000001079071-3562500061
2022 2 FD52 00 E122 D 9441101D 008 8/25/2021 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR082L1062123606987 $1,469.48 000001079071-3562500061
2022 2 FD52 00 E123 D 9441101D 008 8/25/2021 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR082L1062123606987 $276.02 000001079071-3562500061
2022 2 FD52 00 E124 D 9441101D 008 8/25/2021 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR082L1062123606987 $0.80 000001079071-3562500061
2022 2 FD52 00 E229 D 9441101D 008 8/12/2021 0050 ENV STUDIES-TERRESTRIAL ECOL IET-XE13A162521223016610 $69.96
2022 2 FD52 06 E111 D 9441101D 008 8/11/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR081L1062121805802 $229.75 000001068497-3562506200
2022 2 FD52 06 E111 D 9441101D 008 8/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805802 $35.23 000001068497-3562506200
2022 2 FD52 06 E121 D 9441101D 008 8/11/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR081L1062121805802 $16.64 000001068497-3562506200
2022 2 FD52 06 E121 D 9441101D 008 8/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805802 $2.55 000001068497-3562506200
2022 2 FD52 06 E122 D 9441101D 008 8/11/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR081L1062121805802 $192.92 000001068497-3562506200
2022 2 FD52 06 E122 D 9441101D 008 8/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805802 $29.58 000001068497-3562506200
2022 2 FD52 06 E123 D 9441101D 008 8/11/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR081L1062121805802 $35.11 000001068497-3562506200
2022 2 FD52 06 E123 D 9441101D 008 8/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805802 $5.30 000001068497-3562506200
2022 2 FD52 00 E111 D 9441101D 008 8/11/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081L1062121805802 $110.36 000001068681-3562500636
2022 2 FD52 00 E121 D 9441101D 008 8/11/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081L1062121805802 $7.61 000001068681-3562500636
2022 2 FD52 00 E122 D 9441101D 008 8/11/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081L1062121805802 $92.68 000001068681-3562500636
2022 2 FD52 00 E123 D 9441101D 008 8/11/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081L1062121805802 $24.95 000001068681-3562500636
2022 2 FD52 00 E111 D 9441101D 008 8/9/2021 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR081L1062121805847 $984.85 000001079071-3562500061
2022 2 FD52 00 E111 D 9441101D 008 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805847 $55.55 000001079071-3562500061
2022 2 FD52 00 E121 D 9441101D 008 8/9/2021 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR081L1062121805847 $73.86 000001079071-3562500061
2022 2 FD52 00 E121 D 9441101D 008 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805847 $4.25 000001079071-3562500061
2022 2 FD52 00 E122 D 9441101D 008 8/9/2021 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR081L1062121805847 $826.98 000001079071-3562500061
2022 2 FD52 00 E122 D 9441101D 008 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805847 $46.65 000001079071-3562500061
2022 2 FD52 00 E123 D 9441101D 008 8/9/2021 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR081L1062121805847 $134.01 000001079071-3562500061
2022 2 FD52 00 E123 D 9441101D 008 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805847 $2.34 000001079071-3562500061
2022 2 FD52 00 E111 D 9441101D 008 8/9/2021 0010 ENV STUDIES-UST/HZM CA-XR081L1062121805841 $323.15 000001078906-3562500061
2022 2 FD52 00 E121 D 9441101D 008 8/9/2021 0010 ENV STUDIES-UST/HZM CA-XR081L1062121805841 $20.36 000001078906-3562500061
2022 2 FD52 00 E122 D 9441101D 008 8/9/2021 0010 ENV STUDIES-UST/HZM CA-XR081L1062121805841 $271.35 000001078906-3562500061
2022 2 FD52 00 E123 D 9441101D 008 8/9/2021 0010 ENV STUDIES-UST/HZM CA-XR081L1062121805841 $99.62 000001078906-3562500061
2022 2 FD52 00 E111 D 9441101D 008 8/9/2021 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR081L1062121805806 $213.95 000001072234-3562500061
2022 2 FD52 00 E111 D 9441101D 008 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805806 $53.65 000001072234-3562500061
2022 2 FD52 00 E121 D 9441101D 008 8/9/2021 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR081L1062121805806 $14.71 000001072234-3562500061
2022 2 FD52 00 E121 D 9441101D 008 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805806 $3.67 000001072234-3562500061
2022 2 FD52 00 E122 D 9441101D 008 8/9/2021 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR081L1062121805806 $179.69 000001072234-3562500061
2022 2 FD52 00 E122 D 9441101D 008 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805806 $45.06 000001072234-3562500061
2022 2 FD52 00 E123 D 9441101D 008 8/9/2021 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR081L1062121805806 $53.56 000001072234-3562500061
2022 2 FD52 00 E123 D 9441101D 008 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805806 $13.28 000001072234-3562500061
2022 2 FD52 06 E111 D 9441101D 008 8/9/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081L1062121805799 $360.26 000001065717-3562506200
2022 2 FD52 06 E111 D 9441101D 008 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805799 $25.95 000001065717-3562506200
2022 2 FD52 06 E121 D 9441101D 008 8/9/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081L1062121805799 $26.61 000001065717-3562506200
2022 2 FD52 06 E121 D 9441101D 008 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805799 $1.87 000001065717-3562506200
2022 2 FD52 06 E122 D 9441101D 008 8/9/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081L1062121805799 $302.54 000001065717-3562506200
2022 2 FD52 06 E122 D 9441101D 008 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805799 $21.79 000001065717-3562506200
2022 2 FD52 06 E123 D 9441101D 008 8/9/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081L1062121805799 $56.38 000001065717-3562506200
2022 2 FD52 06 E123 D 9441101D 008 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805799 $4.97 000001065717-3562506200
2022 1 FD52 00 E111 D 9441101D 008 7/26/2021 0010 ENV STUDIES-UST/HZM CA-XR072L1062120404724 $161.58 000001078906-3562500061
2022 1 FD52 00 E111 D 9441101D 008 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404724 $16.16 000001078906-3562500061
2022 1 FD52 00 E121 D 9441101D 008 7/26/2021 0010 ENV STUDIES-UST/HZM CA-XR072L1062120404724 $10.76 000001078906-3562500061
2022 1 FD52 00 E121 D 9441101D 008 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404724 $1.07 000001078906-3562500061
2022 1 FD52 00 E122 D 9441101D 008 7/26/2021 0010 ENV STUDIES-UST/HZM CA-XR072L1062120404724 $135.68 000001078906-3562500061
2022 1 FD52 00 E122 D 9441101D 008 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404724 $13.57 000001078906-3562500061
2022 1 FD52 00 E123 D 9441101D 008 7/26/2021 0010 ENV STUDIES-UST/HZM CA-XR072L1062120404724 $49.86 000001078906-3562500061
2022 1 FD52 00 E123 D 9441101D 008 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404724 $4.94 000001078906-3562500061
2022 1 FD52 00 E124 D 9441101D 008 7/26/2021 0010 ENV STUDIES-UST/HZM CA-XR072L1062120404724 $0.09 000001078906-3562500061
2022 1 FD52 00 E124 D 9441101D 008 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404724 $0.01 000001078906-3562500061
2022 1 FD52 00 E111 D 9441101D 008 7/26/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR072L1062120404720 $227.50 000001078812-3562500061
2022 1 FD52 00 E111 D 9441101D 008 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404720 $189.59 000001078812-3562500061
2022 1 FD52 00 E121 D 9441101D 008 7/26/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR072L1062120404720 $16.93 000001078812-3562500061
2022 1 FD52 00 E121 D 9441101D 008 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404720 $14.11 000001078812-3562500061
2022 1 FD52 00 E122 D 9441101D 008 7/26/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR072L1062120404720 $191.03 000001078812-3562500061
2022 1 FD52 00 E122 D 9441101D 008 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404720 $159.20 000001078812-3562500061
2022 1 FD52 00 E123 D 9441101D 008 7/26/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR072L1062120404720 $31.75 000001078812-3562500061
2022 1 FD52 00 E123 D 9441101D 008 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404720 $25.75 000001078812-3562500061
2022 1 FD52 00 E124 D 9441101D 008 7/26/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR072L1062120404720 $0.09 000001078812-3562500061
2022 1 FD52 00 E124 D 9441101D 008 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404720 $0.08 000001078812-3562500061
2022 1 FD52 00 E111 D 9441101D 008 7/8/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR062L1062117302506 $126.12 000001078532-3562500636
2022 1 FD52 00 E111 D 9441101D 008 7/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302506 $9.46 000001078532-3562500636
2022 1 FD52 00 E121 D 9441101D 008 7/8/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR062L1062117302506 $8.95 000001078532-3562500636
2022 1 FD52 00 E121 D 9441101D 008 7/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302506 $0.67 000001078532-3562500636
2022 1 FD52 00 E122 D 9441101D 008 7/8/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR062L1062117302506 $106.48 000001078532-3562500636
2022 1 FD52 00 E122 D 9441101D 008 7/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302506 $7.99 000001078532-3562500636
2022 1 FD52 00 E123 D 9441101D 008 7/8/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR062L1062117302506 $28.53 000001078532-3562500636
2022 1 FD52 00 E123 D 9441101D 008 7/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302506 $2.12 000001078532-3562500636
2022 1 FD52 00 E124 D 9441101D 008 7/8/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR062L1062117302506 $0.05 000001078532-3562500636
2022 1 FD52 06 E111 D 9441101D 008 7/1/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062L1062117302447 $1,473.70 000001065717-3562506200
2022 1 FD52 06 E111 D 9441101D 008 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302447 $26.40 000001065717-3562506200
2022 1 FD52 06 E121 D 9441101D 008 7/1/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062L1062117302447 $110.38 000001065717-3562506200
2022 1 FD52 06 E121 D 9441101D 008 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302447 $1.90 000001065717-3562506200
2022 1 FD52 06 E122 D 9441101D 008 7/1/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062L1062117302447 $1,244.24 000001065717-3562506200
2022 1 FD52 06 E122 D 9441101D 008 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302447 $22.29 000001065717-3562506200
2022 1 FD52 06 E123 D 9441101D 008 7/1/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062L1062117302447 $204.30 000001065717-3562506200
2022 1 FD52 06 E123 D 9441101D 008 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302447 $6.14 000001065717-3562506200
2022 1 FD52 06 E124 D 9441101D 008 7/1/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062L1062117302447 $0.50 000001065717-3562506200
2022 1 FD52 06 E124 D 9441101D 008 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302447 $0.02 000001065717-3562506200
2021 11 FD52 06 E111 D 9441101D 008 5/24/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052L1062114100369 $563.10 000001065717-3562506200
2021 11 FD52 06 E111 D 9441101D 008 5/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052L1062114100369 $0.97 000001065717-3562506200
2021 11 FD52 06 E121 D 9441101D 008 5/24/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052L1062114100369 $42.10 000001065717-3562506200
2021 11 FD52 06 E121 D 9441101D 008 5/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052L1062114100369 $0.07 000001065717-3562506200
2021 11 FD52 06 E122 D 9441101D 008 5/24/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052L1062114100369 $475.42 000001065717-3562506200
2021 11 FD52 06 E122 D 9441101D 008 5/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052L1062114100369 $0.82 000001065717-3562506200
2021 11 FD52 06 E123 D 9441101D 008 5/24/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052L1062114100369 $80.24 000001065717-3562506200
2021 11 FD52 06 E123 D 9441101D 008 5/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052L1062114100369 $0.23 000001065717-3562506200
2021 11 FD52 06 E124 D 9441101D 008 5/24/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052L1062114100369 $0.20 000001065717-3562506200
2021 9 FD52 06 E111 D 9441101D 008 3/24/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032L1062108206538 $511.88 000001065717-3562506200
2021 9 FD52 06 E111 D 9441101D 008 3/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032L1062108206538 $16.30 000001065717-3562506200
2021 9 FD52 06 E121 D 9441101D 008 3/24/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032L1062108206538 $38.28 000001065717-3562506200
2021 9 FD52 06 E121 D 9441101D 008 3/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032L1062108206538 $1.17 000001065717-3562506200
2021 9 FD52 06 E122 D 9441101D 008 3/24/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032L1062108206538 $432.21 000001065717-3562506200
2021 9 FD52 06 E122 D 9441101D 008 3/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032L1062108206538 $13.77 000001065717-3562506200
2021 9 FD52 06 E123 D 9441101D 008 3/24/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032L1062108206538 $73.00 000001065717-3562506200
2021 9 FD52 06 E123 D 9441101D 008 3/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032L1062108206538 $3.79 000001065717-3562506200
2021 9 FD52 06 E124 D 9441101D 008 3/24/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032L1062108206538 $0.18 000001065717-3562506200
2021 9 FD52 06 E124 D 9441101D 008 3/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032L1062108206538 $0.01 000001065717-3562506200
2021 7 FD52 06 E143 D 9441101D 059 1/19/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100115229 PON21900003425 BURGESS AND NIPLE INC $26,332.59 Boone- Kenton Counties 6-79.00
2021 7 FD52 06 E143 D 9441101D 059 1/19/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100115229 PON21900003425 BURGESS AND NIPLE INC $2,815.25 Boone- Kenton Counties 6-79.00
2021 7 FD52 06 E111 D 9441101D 008 1/11/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011L1062100801430 $543.81 000001065717-3562506200
2021 7 FD52 06 E111 D 9441101D 008 1/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011L1062100801430 $672.51 000001065717-3562506200
2021 7 FD52 06 E121 D 9441101D 008 1/11/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011L1062100801430 $40.92 000001065717-3562506200
2021 7 FD52 06 E121 D 9441101D 008 1/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011L1062100801430 $50.80 000001065717-3562500022
2021 7 FD52 06 E122 D 9441101D 008 1/11/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011L1062100801430 $459.13 000001065717-3562500022
2021 7 FD52 06 E122 D 9441101D 008 1/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011L1062100801430 $567.81 000001065717-3562500022
2021 7 FD52 06 E123 D 9441101D 008 1/11/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011L1062100801430 $65.36 000001065717-3562500022
2021 7 FD52 06 E123 D 9441101D 008 1/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011L1062100801430 $74.21 000001065717-3562500022
2021 6 FD52 06 E111 D 9441101D 008 12/29/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122K1062035700377 $347.47 000001065717-3562500022
2021 6 FD52 06 E111 D 9441101D 008 12/29/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700377 $4.34 000001065717-3562500022
2021 6 FD52 06 E121 D 9441101D 008 12/29/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122K1062035700377 $26.39 000001065717-3562500022
2021 6 FD52 06 E121 D 9441101D 008 12/29/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700377 $0.33 000001065717-3562500022
2021 6 FD52 06 E122 D 9441101D 008 12/29/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122K1062035700377 $293.37 000001065717-3562500022
2021 6 FD52 06 E122 D 9441101D 008 12/29/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700377 $3.66 000001065717-3562500022
2021 6 FD52 06 E123 D 9441101D 008 12/29/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122K1062035700377 $32.50 000001065717-3562500022
2021 6 FD52 06 E123 D 9441101D 008 12/29/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700377 $0.40 000001065717-3562500022
2021 6 FD52 06 E124 D 9441101D 008 12/29/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122K1062035700377 $0.10 000001065717-3562500022
2021 6 FD52 06 E111 D 9441101D 008 12/23/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR122K1062035700381 $229.67 000001068497-3562506200
2021 6 FD52 06 E111 D 9441101D 008 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700381 $51.16 000001068497-3562506200
2021 6 FD52 06 E121 D 9441101D 008 12/23/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR122K1062035700381 $16.79 000001068497-3562506200
2021 6 FD52 06 E121 D 9441101D 008 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700381 $3.74 000001068497-3562506200
2021 6 FD52 06 E122 D 9441101D 008 12/23/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR122K1062035700381 $193.98 000001068497-3562506200
2021 6 FD52 06 E122 D 9441101D 008 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700381 $43.20 000001068497-3562506200
2021 6 FD52 06 E123 D 9441101D 008 12/23/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR122K1062035700381 $34.14 000001068497-3562506200
2021 6 FD52 06 E123 D 9441101D 008 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700381 $7.48 000001068497-3562506200
2021 6 FD52 06 E124 D 9441101D 008 12/23/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR122K1062035700381 $0.09 000001068497-3562506200
2021 6 FD52 06 E124 D 9441101D 008 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700381 $0.02 000001068497-3562506200
2021 4 FD52 06 E111 D 9441101D 008 10/12/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101K1062028205680 $379.10 000001065717-3562506200
2021 4 FD52 06 E111 D 9441101D 008 10/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101K1062028205680 $59.63 000001065717-3562506200
2021 4 FD52 06 E121 D 9441101D 008 10/12/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101K1062028205680 $28.56 000001065717-3562506200
2021 4 FD52 06 E121 D 9441101D 008 10/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101K1062028205680 $4.49 000001065717-3562506200
2021 4 FD52 06 E122 D 9441101D 008 10/12/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101K1062028205680 $320.01 000001065717-3562506200
2021 4 FD52 06 E122 D 9441101D 008 10/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101K1062028205680 $50.35 000001065717-3562506200
2021 4 FD52 06 E123 D 9441101D 008 10/12/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101K1062028205680 $40.45 000001065717-3562506200
2021 4 FD52 06 E123 D 9441101D 008 10/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101K1062028205680 $6.28 000001065717-3562506200
2021 2 FD52 06 E111 D 9441101D 008 8/10/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081K1062022001432 $805.61 000001065717-3562506200
2021 2 FD52 06 E111 D 9441101D 008 8/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081K1062022001432 $0.59 000001065717-3562506206
2021 2 FD52 06 E121 D 9441101D 008 8/10/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081K1062022001432 $60.20 000001065717-3562506206
2021 2 FD52 06 E121 D 9441101D 008 8/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081K1062022001432 $0.04 000001065717-3562506206
2021 2 FD52 06 E122 D 9441101D 008 8/10/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081K1062022001432 $680.15 000001065717-3562506200
2021 2 FD52 06 E122 D 9441101D 008 8/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081K1062022001432 $0.50 000001065717-3562506206
2021 2 FD52 06 E123 D 9441101D 008 8/10/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081K1062022001432 $101.95 000001065717-3562506200
2021 2 FD52 06 E123 D 9441101D 008 8/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081K1062022001432 $0.15 000001065717-3562506206
2021 1 FD52 06 E111 D 9441101D 008 7/27/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072K1062020600336 $922.32 000001065717-3562506200
2021 1 FD52 06 E123 D 9441101D 008 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600343 $12.63 000001068497-3562506200
2021 1 FD52 06 E124 D 9441101D 008 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600336 $0.08 000001065717-3562506200
2021 1 FD52 06 E111 D 9441101D 008 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600336 $290.34 000001065717-3562506206
2021 1 FD52 06 E124 D 9441101D 008 7/27/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR072K1062020600343 $0.09 000001068497-3562506200
2021 1 FD52 06 E121 D 9441101D 008 7/27/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072K1062020600336 $69.15 000001065717-3562500022
2021 1 FD52 06 E124 D 9441101D 008 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600343 $0.03 000001068497-3562506200
2021 1 FD52 06 E121 D 9441101D 008 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600336 $21.80 000001065717-3562506200
2021 1 FD52 06 E122 D 9441101D 008 7/27/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072K1062020600336 $779.03 000001065717-3562500022
2021 1 FD52 06 E122 D 9441101D 008 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600336 $245.13 000001065717-3562500022
2021 1 FD52 06 E123 D 9441101D 008 7/27/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072K1062020600336 $115.77 000001065717-3562506206
2021 1 FD52 06 E123 D 9441101D 008 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600336 $34.01 000001065717-3562500022
2021 1 FD52 06 E124 D 9441101D 008 7/27/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072K1062020600336 $0.31 000001065717-3562506200
2021 1 FD52 06 E111 D 9441101D 008 7/27/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR072K1062020600342 $229.55 000001068497-3562506200
2021 1 FD52 06 E111 D 9441101D 008 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600342 $86.38 000001068497-3562506200
2021 1 FD52 06 E121 D 9441101D 008 7/27/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR072K1062020600342 $16.79 000001068497-3562506200
2021 1 FD52 06 E121 D 9441101D 008 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600342 $6.32 000001068497-3562506200
2021 1 FD52 06 E122 D 9441101D 008 7/27/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR072K1062020600342 $193.98 000001068497-3562506200
2021 1 FD52 06 E122 D 9441101D 008 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600342 $72.94 000001068497-3562506200
2021 1 FD52 06 E123 D 9441101D 008 7/27/2020 1220 ENV IMPACT STATEMENT-GENERAL CA-XR072K1062020600342 $34.22 000001068497-3562506200
2021 1 FD52 00 E111 D 9441101D 008 7/2/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR062K1062017108341 $469.95 000001074821-3562500610
2021 1 FD52 00 E111 D 9441101D 008 7/2/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108341 $64.85 000001074821-3562500610
2021 1 FD52 00 E121 D 9441101D 008 7/2/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR062K1062017108341 $34.76 000001074821-3562500610
2021 1 FD52 00 E121 D 9441101D 008 7/2/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108341 $4.80 000001074821-3562500610
2021 1 FD52 00 E122 D 9441101D 008 7/2/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR062K1062017108341 $392.08 000001074821-3562500610
2021 1 FD52 00 E122 D 9441101D 008 7/2/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108341 $54.11 000001074821-3562500610
2021 1 FD52 00 E123 D 9441101D 008 7/2/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR062K1062017108341 $78.49 000001074821-3562500610
2021 1 FD52 00 E123 D 9441101D 008 7/2/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108341 $10.69 000001074821-3562500610
2021 1 FD52 00 E124 D 9441101D 008 7/2/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR062K1062017108341 $0.18 000001074821-3562500610
2021 1 FD52 00 E124 D 9441101D 008 7/2/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108341 $0.03 000001074821-3562500610
2020 12 FD52 06 E143 D 9441101D 059 6/12/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000208725 PON21900003425 BURGESS AND NIPLE INC $23,172.79 Boone- Kenton Counties 6-79.00
2020 12 FD52 06 E143 D 9441101D 059 6/12/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000208725 PON21900003425 BURGESS AND NIPLE INC $7,450.00 DBE Contractor
2020 10 FD52 06 E143 D 9441101D 059 4/24/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000182109 PON21900003425 BURGESS AND NIPLE INC $14,284.36 Boone- Kenton Counties 6-79.00
2020 10 FD52 06 E143 D 9441101D 059 4/24/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000182109 PON21900003425 BURGESS AND NIPLE INC $3,200.00 DBE-Contractor
2020 7 FD52 06 E143 D 9441101D 059 1/23/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000122135 PON21900003425 BURGESS AND NIPLE INC $50,769.03 Boone- Kenton Counties 6-79.00
2020 7 FD52 06 E143 D 9441101D 059 1/23/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000122135 PON21900003425 BURGESS AND NIPLE INC $6,333.50 Boone- Kenton Counties 6-79.00
2020 7 FD52 06 E143 D 9441101D 059 1/23/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000122135 PON21900003425 BURGESS AND NIPLE INC $2,400.00 Boone- Kenton Counties 6-79.00
2020 7 FD52 00 E229 D 9441101D 008 1/13/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF IET-XE13A162520010013940 $55.86
2020 7 FD52 00 E111 D 9441101D 008 1/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011K1062000807914 $537.93 000001068681-3562500636
2020 7 FD52 00 E111 D 9441101D 008 1/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011K1062000807914 $753.10 000001068681-3562500636
2020 7 FD52 00 E121 D 9441101D 008 1/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011K1062000807914 $40.32 000001068681-3562500636
2020 7 FD52 00 E121 D 9441101D 008 1/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011K1062000807914 $56.47 000001068681-3562500636
2020 7 FD52 00 E122 D 9441101D 008 1/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011K1062000807914 $448.80 000001068681-3562500636
2020 7 FD52 00 E122 D 9441101D 008 1/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011K1062000807914 $628.31 000001068681-3562500636
2020 7 FD52 00 E123 D 9441101D 008 1/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011K1062000807914 $55.15 000001068681-3562500636
2020 7 FD52 00 E123 D 9441101D 008 1/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011K1062000807914 $75.14 000001068681-3562500636
2020 7 FD52 00 E111 D 9441101D 008 1/9/2020 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR011K1062000807929 $156.99 000001072234-3562500061
2020 7 FD52 00 E111 D 9441101D 008 1/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011K1062000807929 $191.72 000001072234-3562500061
2020 7 FD52 00 E121 D 9441101D 008 1/9/2020 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR011K1062000807929 $10.82 000001072234-3562500061
2020 7 FD52 00 E121 D 9441101D 008 1/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011K1062000807929 $13.22 000001072234-3562500061
2020 7 FD52 00 E122 D 9441101D 008 1/9/2020 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR011K1062000807929 $131.15 000001072234-3562500061
2020 7 FD52 00 E122 D 9441101D 008 1/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011K1062000807929 $159.96 000001072234-3562500061
2020 7 FD52 00 E123 D 9441101D 008 1/9/2020 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR011K1062000807929 $38.52 000001072234-3562500061
2020 7 FD52 00 E123 D 9441101D 008 1/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011K1062000807929 $46.09 000001072234-3562500061
2020 7 FD52 06 E111 D 9441101D 008 1/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011K1062000807907 $347.55 000001065717-3562506200
2020 7 FD52 06 E111 D 9441101D 008 1/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011K1062000807907 $527.17 000001065717-3562506200
2020 7 FD52 06 E121 D 9441101D 008 1/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011K1062000807907 $26.18 000001065717-3562506200
2020 7 FD52 06 E121 D 9441101D 008 1/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011K1062000807907 $39.71 000001065717-3562506200
2020 7 FD52 06 E122 D 9441101D 008 1/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011K1062000807907 $289.86 000001065717-3562506200
2020 7 FD52 06 E122 D 9441101D 008 1/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011K1062000807907 $439.82 000001065717-3562506200
2020 7 FD52 06 E123 D 9441101D 008 1/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011K1062000807907 $37.66 000001065717-3562506200
2020 7 FD52 06 E123 D 9441101D 008 1/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011K1062000807907 $55.53 000001065717-3562506200
2020 6 FD52 06 E143 D 9441101D 059 12/30/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000104181 PON21900003425 BURGESS AND NIPLE INC $71,240.23 Boone- Kenton Counties 6-79.00
2020 4 FD52 06 E143 D 9441101D 059 10/25/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000073764 PON21900003425 BURGESS AND NIPLE INC $50,621.90 Boone- Kenton Counties 6-79.00
2020 4 FD52 06 E143 D 9441101D 059 10/25/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000073764 PON21900003425 BURGESS AND NIPLE INC $9,528.75 Boone- Kenton Counties 6-79.00
2020 2 FD52 06 E143 D 9441101D 059 8/19/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000029288 PON21900003425 BURGESS AND NIPLE INC $35,266.68 Boone- Kenton Counties 6-79.00
2020 2 FD52 06 E143 D 9441101D 059 8/19/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000029288 PON21900003425 BURGESS AND NIPLE INC $15,990.22 Boone- Kenton Counties 6-79.00
2019 12 FD52 06 E143 D 9441101D 059 6/3/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-1900199308 PON21900003425 BURGESS AND NIPLE INC $9,471.60 Boone- Kenton Counties 6-79.00
2019 12 FD52 06 E143 D 9441101D 059 6/3/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-1900199308 PON21900003425 BURGESS AND NIPLE INC $36,983.90 Boone- Kenton Counties 6-79.00
2019 11 FD52 00 E229 D 9441101D 008 5/29/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF IET-XE13A162519145009230 $74.50
2019 11 FD52 00 E111 D 9441101D 008 5/29/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052J1061914201394 $344.97 000001068681-3562500636
2019 11 FD52 00 E111 D 9441101D 008 5/29/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201394 $34.50 000001068681-3562500636
2019 11 FD52 00 E121 D 9441101D 008 5/29/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052J1061914201394 $25.14 000001068681-3562500636
2019 11 FD52 00 E121 D 9441101D 008 5/29/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201394 $2.52 000001068681-3562500636
2019 11 FD52 00 E122 D 9441101D 008 5/29/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052J1061914201394 $287.81 000001068681-3562500636
2019 11 FD52 00 E122 D 9441101D 008 5/29/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201394 $28.78 000001068681-3562500636
2019 11 FD52 00 E123 D 9441101D 008 5/29/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052J1061914201394 $51.95 000001068681-3562500636
2019 11 FD52 00 E123 D 9441101D 008 5/29/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201394 $5.14 000001068681-3562500636
2019 11 FD52 00 E124 D 9441101D 008 5/29/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052J1061914201394 $0.09 000001068681-3562500636
2019 11 FD52 00 E124 D 9441101D 008 5/29/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201394 $0.01 000001068681-3562500636
2019 11 FD52 06 E111 D 9441101D 008 5/23/2019 1220 ENV IMPACT STATEMENT-GENERAL CA-XR052J1061914201384 $587.41 000001068497-3562506200
2019 11 FD52 06 E111 D 9441101D 008 5/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201384 $14.73 000001068497-3562506200
2019 11 FD52 06 E121 D 9441101D 008 5/23/2019 1220 ENV IMPACT STATEMENT-GENERAL CA-XR052J1061914201384 $43.89 000001068497-3562506200
2019 11 FD52 06 E121 D 9441101D 008 5/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201384 $1.08 000001068497-3562506200
2019 11 FD52 06 E122 D 9441101D 008 5/23/2019 1220 ENV IMPACT STATEMENT-GENERAL CA-XR052J1061914201384 $490.08 000001068497-3562506200
2019 11 FD52 06 E122 D 9441101D 008 5/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201384 $12.29 000001068497-3562506200
2019 11 FD52 06 E123 D 9441101D 008 5/23/2019 1220 ENV IMPACT STATEMENT-GENERAL CA-XR052J1061914201384 $74.45 000001068497-3562506200
2019 11 FD52 06 E123 D 9441101D 008 5/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201384 $2.38 000001068497-3562506200
2019 11 FD52 06 E124 D 9441101D 008 5/23/2019 1220 ENV IMPACT STATEMENT-GENERAL CA-XR052J1061914201384 $0.18 000001068497-3562506200
2019 11 FD52 06 E143 D 9441101D 059 5/2/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-1900181285 PON21900003425 BURGESS AND NIPLE INC $50,375.72 Boone- Kenton Counties 6-79.00
2019 11 FD52 06 E143 D 9441101D 059 5/2/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-1900181285 PON21900003425 BURGESS AND NIPLE INC $19,546.50 Boone- Kenton Counties 6-79.00
2019 10 FD52 06 E143 D 9441101D 059 4/3/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-1900162120 PON21900003425 BURGESS AND NIPLE INC $47,835.16 Boone- Kenton Counties 6-79.00
2019 9 FD52 06 E111 D 9441101D 008 3/11/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031J1061906706877 $463.24 000001065717-3562506200
2019 9 FD52 06 E121 D 9441101D 008 3/11/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031J1061906706877 $35.09 000001065717-3562506200
2019 9 FD52 06 E122 D 9441101D 008 3/11/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031J1061906706877 $386.48 000001065717-3562506200
2019 9 FD52 06 E123 D 9441101D 008 3/11/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031J1061906706877 $49.35 000001065717-3562506200
2019 8 FD52 06 E143 D 9441101D 059 2/21/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-1900141433 PON21900003425 BURGESS AND NIPLE INC $16,194.18 Boone- Kenton Counties 6-79.00
2019 8 FD52 06 E111 D 9441101D 008 2/11/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021J1061903904513 $347.50 000001065717-3562506200
2019 8 FD52 06 E111 D 9441101D 008 2/11/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021J1061903904513 $38.45 000001065717-3562506200
2019 8 FD52 06 E121 D 9441101D 008 2/11/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021J1061903904513 $26.32 000001065717-3562506200
2019 8 FD52 06 E121 D 9441101D 008 2/11/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021J1061903904513 $2.91 000001065717-3562506200
2019 8 FD52 06 E122 D 9441101D 008 2/11/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021J1061903904513 $290.23 000001065717-3562506200
2019 8 FD52 06 E122 D 9441101D 008 2/11/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021J1061903904513 $32.08 000001065717-3562506200
2019 8 FD52 06 E123 D 9441101D 008 2/11/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021J1061903904513 $37.11 000001065717-3562506200
2019 8 FD52 06 E123 D 9441101D 008 2/11/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021J1061903904513 $4.05 000001065717-3562506200