2024 |
10 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
4/10/2024 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR041O1062410001611 |
|
|
$28.37 |
000001075887-3562500636 |
2024 |
10 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
4/10/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041O1062410001611 |
|
|
$5.53 |
000001075887-3562500636 |
2024 |
10 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
4/10/2024 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR041O1062410001611 |
|
|
$263.05 |
000001075887-3562500636 |
2024 |
10 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
4/10/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041O1062410001611 |
|
|
$51.29 |
000001075887-3562500636 |
2024 |
10 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
4/10/2024 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR041O1062410001611 |
|
|
$82.08 |
000001075887-3562500636 |
2024 |
10 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
4/10/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041O1062410001611 |
|
|
$15.88 |
000001075887-3562500636 |
2024 |
10 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
4/10/2024 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR041O1062410001611 |
|
|
$397.54 |
000001075887-3562500636 |
2024 |
10 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
4/10/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041O1062410001611 |
|
|
$77.52 |
000001075887-3562500636 |
2024 |
9 |
FD52 |
09 |
E143 |
D |
9440501D |
045 |
3/18/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400187778 |
PON21900003413 |
GRW ENGINEERS INC |
$19,506.52 |
Greenup County 9-397.0 |
2024 |
9 |
FD52 |
09 |
E143 |
D |
9440501D |
045 |
3/18/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400187798 |
PON21900003413 |
GRW ENGINEERS INC |
$19,506.52 |
Greenup County 9-397.0 |
2024 |
9 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
3/11/2024 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR031O1062406810058 |
|
|
$770.24 |
000001075887-3562500636 |
2024 |
9 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
3/11/2024 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR031O1062406810058 |
|
|
$54.95 |
000001075887-3562500636 |
2024 |
9 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
3/11/2024 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR031O1062406810058 |
|
|
$509.67 |
000001075887-3562500636 |
2024 |
9 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
3/11/2024 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR031O1062406810058 |
|
|
$158.83 |
000001075887-3562500636 |
2024 |
6 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
12/14/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121N1062334203601 |
|
|
$434.49 |
000001070711-3562500636 |
2024 |
6 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
12/14/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121N1062334203601 |
|
|
$188.83 |
000001070711-3562500636 |
2024 |
6 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
12/14/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121N1062334203601 |
|
|
$31.23 |
000001070711-3562500636 |
2024 |
6 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
12/14/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121N1062334203601 |
|
|
$13.59 |
000001070711-3562500636 |
2024 |
6 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
12/14/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121N1062334203601 |
|
|
$287.46 |
000001070711-3562500636 |
2024 |
6 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
12/14/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121N1062334203601 |
|
|
$124.95 |
000001070711-3562500636 |
2024 |
6 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
12/14/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121N1062334203601 |
|
|
$64.10 |
000001070711-3562500636 |
2024 |
6 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
12/14/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121N1062334203601 |
|
|
$27.57 |
000001070711-3562500636 |
2024 |
3 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
9/11/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091N1062325106072 |
|
|
$398.22 |
000001070711-3562500636 |
2024 |
3 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
9/11/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091N1062325106072 |
|
|
$28.64 |
000001070711-3562500636 |
2024 |
3 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
9/11/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091N1062325106072 |
|
|
$263.50 |
000001070711-3562500636 |
2024 |
3 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
9/11/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091N1062325106072 |
|
|
$58.56 |
000001070711-3562500636 |
2023 |
12 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
6/26/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062N1062317400409 |
|
|
$0.10 |
000001070711-3562500636 |
2023 |
12 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
6/26/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062N1062317400409 |
|
|
$372.57 |
000001070711-3562500636 |
2023 |
12 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
6/26/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062N1062317400409 |
|
|
$27.12 |
000001070711-3562500636 |
2023 |
12 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
6/26/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062N1062317400409 |
|
|
$290.58 |
000001070711-3562500636 |
2023 |
12 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
6/26/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062N1062317400409 |
|
|
$63.91 |
000001070711-3562500636 |
2023 |
11 |
FD52 |
09 |
E143 |
D |
9440501D |
045 |
5/19/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300222093 |
PON21900003413 |
GRW ENGINEERS INC |
$50,153.46 |
Greenup County 9-397.0 |
2023 |
11 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
5/15/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051N1062312808046 |
|
|
$409.83 |
000001070711-3562500636 |
2023 |
11 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
5/15/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051N1062312808046 |
|
|
$29.16 |
000001070711-3562500636 |
2023 |
11 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
5/15/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051N1062312808046 |
|
|
$319.65 |
000001070711-3562500636 |
2023 |
11 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
5/15/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051N1062312808046 |
|
|
$70.29 |
000001070711-3562500636 |
2023 |
9 |
FD52 |
00 |
E111 |
D |
9440501D |
121 |
3/15/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR031N1062306703687 |
|
|
$342.27 |
000001086707-3562500610 |
2023 |
9 |
FD52 |
00 |
E121 |
D |
9440501D |
121 |
3/15/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR031N1062306703687 |
|
|
$24.41 |
000001086707-3562500610 |
2023 |
9 |
FD52 |
00 |
E122 |
D |
9440501D |
121 |
3/15/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR031N1062306703687 |
|
|
$266.96 |
000001086707-3562500610 |
2023 |
9 |
FD52 |
00 |
E123 |
D |
9440501D |
121 |
3/15/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR031N1062306703687 |
|
|
$57.27 |
000001086707-3562500610 |
2023 |
8 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
2/23/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022N1062305302422 |
|
|
$372.57 |
000001070711-3562500636 |
2023 |
8 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
2/23/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022N1062305302422 |
|
|
$27.12 |
000001070711-3562500636 |
2023 |
8 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
2/23/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022N1062305302422 |
|
|
$290.61 |
000001070711-3562500636 |
2023 |
8 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
2/23/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022N1062305302422 |
|
|
$63.89 |
000001070711-3562500636 |
2023 |
8 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
2/23/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022N1062305302422 |
|
|
$0.09 |
000001070711-3562500636 |
2023 |
6 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
12/12/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121M1062234208190 |
|
|
$372.52 |
000001070711-3562500636 |
2023 |
6 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
12/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121M1062234208190 |
|
|
$157.47 |
000001070711-3562500636 |
2023 |
6 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
12/12/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121M1062234208190 |
|
|
$26.54 |
000001070711-3562500636 |
2023 |
6 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
12/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121M1062234208190 |
|
|
$11.21 |
000001070711-3562500636 |
2023 |
6 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
12/12/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121M1062234208190 |
|
|
$290.21 |
000001070711-3562500636 |
2023 |
6 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
12/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121M1062234208190 |
|
|
$122.83 |
000001070711-3562500636 |
2023 |
6 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
12/12/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121M1062234208190 |
|
|
$56.33 |
000001070711-3562500636 |
2023 |
6 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
12/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121M1062234208190 |
|
|
$23.53 |
000001070711-3562500636 |
2023 |
5 |
FD52 |
09 |
E143 |
D |
9440501D |
045 |
11/18/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300091022 |
PON21900003413 |
GRW ENGINEERS INC |
$29,259.78 |
Greenup County 9-397.0 |
2023 |
4 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
10/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR102M1062229405025 |
|
|
$409.83 |
000001070711-3562500636 |
2023 |
4 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
10/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102M1062229405025 |
|
|
$521.31 |
000001070711-3562500636 |
2023 |
4 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
10/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR102M1062229405025 |
|
|
$29.82 |
000001070711-3562500636 |
2023 |
4 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
10/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102M1062229405025 |
|
|
$37.94 |
000001070711-3562500636 |
2023 |
4 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
10/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR102M1062229405025 |
|
|
$319.67 |
000001070711-3562500636 |
2023 |
4 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
10/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102M1062229405025 |
|
|
$406.62 |
000001070711-3562500636 |
2023 |
4 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
10/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR102M1062229405025 |
|
|
$62.41 |
000001070711-3562500636 |
2023 |
4 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
10/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102M1062229405025 |
|
|
$77.91 |
000001070711-3562500636 |
2023 |
4 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
10/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR102M1062229405025 |
|
|
$0.10 |
000001070711-3562500636 |
2023 |
4 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
10/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102M1062229405025 |
|
|
$0.12 |
000001070711-3562500636 |
2023 |
2 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
8/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082M1062223500403 |
|
|
$372.72 |
000001070711-3562500636 |
2023 |
2 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
8/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500403 |
|
|
$13.91 |
000001070711-3562500636 |
2023 |
2 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
8/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082M1062223500403 |
|
|
$27.11 |
000001070711-3562500636 |
2023 |
2 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
8/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500403 |
|
|
$1.01 |
000001070711-3562500636 |
2023 |
2 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
8/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082M1062223500403 |
|
|
$290.61 |
000001070711-3562500636 |
2023 |
2 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
8/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500403 |
|
|
$10.85 |
000001070711-3562500636 |
2023 |
2 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
8/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082M1062223500403 |
|
|
$56.16 |
000001070711-3562500636 |
2023 |
2 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
8/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500403 |
|
|
$2.08 |
000001070711-3562500636 |
2023 |
2 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
8/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082M1062223500403 |
|
|
$0.09 |
000001070711-3562500636 |
2023 |
1 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
7/28/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR072M1062220308962 |
|
|
$372.91 |
000001070711-3562500636 |
2023 |
1 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
7/28/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308962 |
|
|
$82.46 |
000001070711-3562500636 |
2023 |
1 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
7/28/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR072M1062220308962 |
|
|
$27.12 |
000001070711-3562500636 |
2023 |
1 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
7/28/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308962 |
|
|
$6.00 |
000001070711-3562500636 |
2023 |
1 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
7/28/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR072M1062220308962 |
|
|
$292.92 |
000001070711-3562500636 |
2023 |
1 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
7/28/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308962 |
|
|
$64.32 |
000001070711-3562500636 |
2023 |
1 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
7/28/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR072M1062220308962 |
|
|
$56.73 |
000001070711-3562500636 |
2023 |
1 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
7/28/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308962 |
|
|
$12.32 |
000001070711-3562500636 |
2023 |
1 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
7/28/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR072M1062220308962 |
|
|
$0.10 |
000001070711-3562500636 |
2023 |
1 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
7/28/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308962 |
|
|
$0.02 |
000001070711-3562500636 |
2023 |
1 |
FD52 |
00 |
E111 |
D |
9440501D |
010 |
7/12/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR071M1062219207852 |
|
|
$344.98 |
000001072341-3562500636 |
2023 |
1 |
FD52 |
00 |
E121 |
D |
9440501D |
010 |
7/12/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR071M1062219207852 |
|
|
$24.42 |
000001072341-3562500636 |
2023 |
1 |
FD52 |
00 |
E122 |
D |
9440501D |
010 |
7/12/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR071M1062219207852 |
|
|
$289.68 |
000001072341-3562500636 |
2023 |
1 |
FD52 |
00 |
E123 |
D |
9440501D |
010 |
7/12/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR071M1062219207852 |
|
|
$56.14 |
000001072341-3562500636 |
2022 |
11 |
FD52 |
09 |
E111 |
D |
9440501D |
022 |
5/13/2022 |
1030 |
FIELD SURVEY |
CA-XR051M1062212603672 |
|
|
$827.01 |
000001082503-3562509204 |
2022 |
11 |
FD52 |
09 |
E111 |
D |
9440501D |
022 |
5/13/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603672 |
|
|
$52.42 |
000001082503-3562509204 |
2022 |
11 |
FD52 |
09 |
E115 |
D |
9440501D |
022 |
5/13/2022 |
1030 |
FIELD SURVEY |
CA-XR051M1062212603672 |
|
|
$65.19 |
000001082503-3562509204 |
2022 |
11 |
FD52 |
09 |
E121 |
D |
9440501D |
022 |
5/13/2022 |
1030 |
FIELD SURVEY |
CA-XR051M1062212603672 |
|
|
$66.75 |
000001082503-3562509204 |
2022 |
11 |
FD52 |
09 |
E121 |
D |
9440501D |
022 |
5/13/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603672 |
|
|
$3.96 |
000001082503-3562509204 |
2022 |
11 |
FD52 |
09 |
E122 |
D |
9440501D |
022 |
5/13/2022 |
1030 |
FIELD SURVEY |
CA-XR051M1062212603672 |
|
|
$749.18 |
000001082503-3562509204 |
2022 |
11 |
FD52 |
09 |
E122 |
D |
9440501D |
022 |
5/13/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603672 |
|
|
$44.02 |
000001082503-3562509204 |
2022 |
11 |
FD52 |
09 |
E123 |
D |
9440501D |
022 |
5/13/2022 |
1030 |
FIELD SURVEY |
CA-XR051M1062212603672 |
|
|
$161.76 |
000001082503-3562509204 |
2022 |
11 |
FD52 |
09 |
E123 |
D |
9440501D |
022 |
5/13/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603672 |
|
|
$7.76 |
000001082503-3562509204 |
2022 |
11 |
FD52 |
09 |
E229 |
D |
9440501D |
022 |
5/12/2022 |
1030 |
FIELD SURVEY |
IET-XE13A162522130001130 |
|
|
$155.10 |
|
2022 |
11 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
5/9/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051M1062212603628 |
|
|
$379.32 |
000001070711-3562500636 |
2022 |
11 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
5/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603628 |
|
|
$18.72 |
000001070711-3562500636 |
2022 |
11 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
5/9/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051M1062212603628 |
|
|
$27.50 |
000001070711-3562500636 |
2022 |
11 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
5/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603628 |
|
|
$1.36 |
000001070711-3562500636 |
2022 |
11 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
5/9/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051M1062212603628 |
|
|
$318.64 |
000001070711-3562500636 |
2022 |
11 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
5/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603628 |
|
|
$15.72 |
000001070711-3562500636 |
2022 |
11 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
5/9/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051M1062212603628 |
|
|
$61.78 |
000001070711-3562500636 |
2022 |
11 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
5/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603628 |
|
|
$3.02 |
000001070711-3562500636 |
2022 |
10 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
4/11/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR041M1062209801447 |
|
|
$316.31 |
000001070711-3562500636 |
2022 |
10 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801447 |
|
|
$30.77 |
000001070711-3562500636 |
2022 |
10 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
4/11/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR041M1062209801447 |
|
|
$22.93 |
000001070711-3562500636 |
2022 |
10 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801447 |
|
|
$2.22 |
000001070711-3562500636 |
2022 |
10 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
4/11/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR041M1062209801447 |
|
|
$265.54 |
000001070711-3562500636 |
2022 |
10 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801447 |
|
|
$25.84 |
000001070711-3562500636 |
2022 |
10 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
4/11/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR041M1062209801447 |
|
|
$51.51 |
000001070711-3562500636 |
2022 |
10 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801447 |
|
|
$4.96 |
000001070711-3562500636 |
2022 |
9 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
3/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709436 |
|
|
$10.86 |
000001070711-3562500636 |
2022 |
9 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
3/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031M1062206709436 |
|
|
$68.64 |
000001070711-3562500636 |
2022 |
9 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
3/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709436 |
|
|
$2.09 |
000001070711-3562500636 |
2022 |
9 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
3/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031M1062206709435 |
|
|
$421.57 |
000001070711-3562500636 |
2022 |
9 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
3/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709435 |
|
|
$12.93 |
000001070711-3562500636 |
2022 |
9 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
3/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031M1062206709435 |
|
|
$30.55 |
000001070711-3562500636 |
2022 |
9 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
3/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709435 |
|
|
$0.94 |
000001070711-3562500636 |
2022 |
9 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
3/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031M1062206709435 |
|
|
$354.05 |
000001070711-3562500636 |
2022 |
8 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
2/14/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR021M1062203907409 |
|
|
$117.64 |
000001069551-3562500610 |
2022 |
8 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
2/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021M1062203907409 |
|
|
$57.73 |
000001069551-3562500610 |
2022 |
8 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
2/14/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR021M1062203907409 |
|
|
$8.07 |
000001069551-3562500610 |
2022 |
8 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
2/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021M1062203907409 |
|
|
$3.96 |
000001069551-3562500610 |
2022 |
8 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
2/14/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR021M1062203907409 |
|
|
$98.74 |
000001069551-3562500610 |
2022 |
8 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
2/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021M1062203907409 |
|
|
$48.47 |
000001069551-3562500610 |
2022 |
8 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
2/14/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR021M1062203907409 |
|
|
$20.67 |
000001069551-3562500610 |
2022 |
8 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
2/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021M1062203907409 |
|
|
$10.03 |
000001069551-3562500610 |
2022 |
7 |
FD52 |
09 |
E111 |
D |
9440501D |
045 |
1/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011M1062200705525 |
|
|
$392.35 |
000001070031-3562509204 |
2022 |
7 |
FD52 |
09 |
E111 |
D |
9440501D |
045 |
1/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011M1062200705525 |
|
|
$196.17 |
000001070031-3562509204 |
2022 |
7 |
FD52 |
09 |
E121 |
D |
9440501D |
045 |
1/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011M1062200705525 |
|
|
$28.29 |
000001070031-3562509204 |
2022 |
7 |
FD52 |
09 |
E121 |
D |
9440501D |
045 |
1/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011M1062200705525 |
|
|
$14.14 |
000001070031-3562509204 |
2022 |
7 |
FD52 |
09 |
E122 |
D |
9440501D |
045 |
1/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011M1062200705525 |
|
|
$329.45 |
000001070031-3562509204 |
2022 |
7 |
FD52 |
09 |
E122 |
D |
9440501D |
045 |
1/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011M1062200705525 |
|
|
$164.72 |
000001070031-3562509204 |
2022 |
7 |
FD52 |
09 |
E123 |
D |
9440501D |
045 |
1/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011M1062200705525 |
|
|
$59.35 |
000001070031-3562509204 |
2022 |
7 |
FD52 |
09 |
E123 |
D |
9440501D |
045 |
1/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011M1062200705525 |
|
|
$29.03 |
000001070031-3562509204 |
2022 |
6 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
12/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103531 |
|
|
$108.92 |
000001070711-3562500636 |
2022 |
6 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
12/10/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121L1062134103531 |
|
|
$53.62 |
000001070711-3562500636 |
2022 |
6 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
12/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103531 |
|
|
$19.92 |
000001070711-3562500636 |
2022 |
6 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
12/8/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121L1062134103530 |
|
|
$344.63 |
000001070711-3562500636 |
2022 |
6 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
12/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103530 |
|
|
$129.71 |
000001070711-3562500636 |
2022 |
6 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
12/8/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121L1062134103530 |
|
|
$24.49 |
000001070711-3562500636 |
2022 |
6 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
12/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103530 |
|
|
$9.20 |
000001070711-3562500636 |
2022 |
6 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
12/8/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121L1062134103530 |
|
|
$289.67 |
000001070711-3562500636 |
2022 |
5 |
FD52 |
09 |
E111 |
D |
9440501D |
045 |
11/23/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112L1062132602487 |
|
|
$599.11 |
000001070031-3562509204 |
2022 |
5 |
FD52 |
09 |
E111 |
D |
9440501D |
045 |
11/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602487 |
|
|
$149.81 |
000001070031-3562509204 |
2022 |
5 |
FD52 |
09 |
E121 |
D |
9440501D |
045 |
11/23/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112L1062132602487 |
|
|
$43.87 |
000001070031-3562509204 |
2022 |
5 |
FD52 |
09 |
E121 |
D |
9440501D |
045 |
11/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602487 |
|
|
$10.97 |
000001070031-3562509204 |
2022 |
5 |
FD52 |
09 |
E122 |
D |
9440501D |
045 |
11/23/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112L1062132602487 |
|
|
$502.90 |
000001070031-3562509204 |
2022 |
5 |
FD52 |
09 |
E122 |
D |
9440501D |
045 |
11/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602487 |
|
|
$125.80 |
000001070031-3562509204 |
2022 |
5 |
FD52 |
09 |
E123 |
D |
9440501D |
045 |
11/23/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112L1062132602487 |
|
|
$88.09 |
000001070031-3562509204 |
2022 |
5 |
FD52 |
09 |
E123 |
D |
9440501D |
045 |
11/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602487 |
|
|
$21.63 |
000001070031-3562509204 |
2022 |
5 |
FD52 |
09 |
E124 |
D |
9440501D |
045 |
11/23/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112L1062132602487 |
|
|
$0.26 |
000001070031-3562509204 |
2022 |
5 |
FD52 |
09 |
E124 |
D |
9440501D |
045 |
11/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602487 |
|
|
$0.06 |
000001070031-3562509204 |
2022 |
5 |
FD52 |
09 |
E143 |
D |
9440501D |
010 |
11/19/2021 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200088854 |
PON21900003413 |
GRW ENGINEERS INC |
$21,139.51 |
Boyd County 9-397.0 |
2022 |
5 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
11/8/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111L1062130901490 |
|
|
$379.51 |
000001070711-3562500636 |
2022 |
5 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
11/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111L1062130901490 |
|
|
$21.25 |
000001070711-3562500636 |
2022 |
5 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
11/8/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111L1062130901490 |
|
|
$26.93 |
000001070711-3562500636 |
2022 |
5 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
11/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111L1062130901490 |
|
|
$1.51 |
000001070711-3562500636 |
2022 |
5 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
11/8/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111L1062130901490 |
|
|
$318.64 |
000001070711-3562500636 |
2022 |
5 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
11/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111L1062130901490 |
|
|
$17.84 |
000001070711-3562500636 |
2022 |
5 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
11/8/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111L1062130901490 |
|
|
$58.82 |
000001070711-3562500636 |
2022 |
5 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
11/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111L1062130901490 |
|
|
$3.26 |
000001070711-3562500636 |
2022 |
5 |
FD52 |
09 |
E111 |
D |
9440501D |
045 |
11/8/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111L1062130901489 |
|
|
$235.41 |
000001070031-3562509204 |
2022 |
5 |
FD52 |
09 |
E111 |
D |
9440501D |
045 |
11/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111L1062130901489 |
|
|
$34.21 |
000001070031-3562509204 |
2022 |
5 |
FD52 |
09 |
E121 |
D |
9440501D |
045 |
11/8/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111L1062130901489 |
|
|
$17.24 |
000001070031-3562509204 |
2022 |
5 |
FD52 |
09 |
E121 |
D |
9440501D |
045 |
11/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111L1062130901489 |
|
|
$2.50 |
000001070031-3562509204 |
2022 |
5 |
FD52 |
09 |
E122 |
D |
9440501D |
045 |
11/8/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111L1062130901489 |
|
|
$197.67 |
000001070031-3562509204 |
2022 |
5 |
FD52 |
09 |
E122 |
D |
9440501D |
045 |
11/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111L1062130901489 |
|
|
$28.73 |
000001070031-3562509204 |
2022 |
5 |
FD52 |
09 |
E123 |
D |
9440501D |
045 |
11/8/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111L1062130901489 |
|
|
$34.57 |
000001070031-3562509204 |
2022 |
5 |
FD52 |
09 |
E123 |
D |
9440501D |
045 |
11/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111L1062130901489 |
|
|
$4.94 |
000001070031-3562509204 |
2022 |
4 |
FD52 |
09 |
E111 |
D |
9440501D |
045 |
10/29/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR102L1062129500381 |
|
|
$427.89 |
000001070031-3562509204 |
2022 |
4 |
FD52 |
09 |
E111 |
D |
9440501D |
045 |
10/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500381 |
|
|
$73.04 |
000001070031-3562509204 |
2022 |
4 |
FD52 |
09 |
E121 |
D |
9440501D |
045 |
10/29/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR102L1062129500381 |
|
|
$31.34 |
000001070031-3562509204 |
2022 |
4 |
FD52 |
09 |
E121 |
D |
9440501D |
045 |
10/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500381 |
|
|
$5.35 |
000001070031-3562509204 |
2022 |
4 |
FD52 |
09 |
E122 |
D |
9440501D |
045 |
10/29/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR102L1062129500381 |
|
|
$359.40 |
000001070031-3562509204 |
2022 |
4 |
FD52 |
09 |
E122 |
D |
9440501D |
045 |
10/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500381 |
|
|
$61.33 |
000001070031-3562509204 |
2022 |
4 |
FD52 |
09 |
E123 |
D |
9440501D |
045 |
10/29/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR102L1062129500381 |
|
|
$62.89 |
000001070031-3562509204 |
2022 |
4 |
FD52 |
09 |
E123 |
D |
9440501D |
045 |
10/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500381 |
|
|
$10.54 |
000001070031-3562509204 |
2022 |
4 |
FD52 |
09 |
E124 |
D |
9440501D |
045 |
10/29/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR102L1062129500381 |
|
|
$0.18 |
000001070031-3562509204 |
2022 |
4 |
FD52 |
09 |
E124 |
D |
9440501D |
045 |
10/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500381 |
|
|
$0.03 |
000001070031-3562509204 |
2022 |
4 |
FD52 |
09 |
E111 |
D |
9440501D |
045 |
10/14/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR101L1062128110102 |
|
|
$428.01 |
000001070031-3562509204 |
2022 |
4 |
FD52 |
09 |
E111 |
D |
9440501D |
045 |
10/14/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101L1062128110102 |
|
|
$55.64 |
000001070031-3562509204 |
2022 |
4 |
FD52 |
09 |
E121 |
D |
9440501D |
045 |
10/14/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR101L1062128110102 |
|
|
$31.33 |
000001070031-3562509204 |
2022 |
4 |
FD52 |
09 |
E121 |
D |
9440501D |
045 |
10/14/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101L1062128110102 |
|
|
$4.07 |
000001070031-3562509204 |
2022 |
4 |
FD52 |
09 |
E122 |
D |
9440501D |
045 |
10/14/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR101L1062128110102 |
|
|
$359.40 |
000001070031-3562509204 |
2022 |
4 |
FD52 |
09 |
E122 |
D |
9440501D |
045 |
10/14/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101L1062128110102 |
|
|
$46.72 |
000001070031-3562509204 |
2022 |
4 |
FD52 |
09 |
E123 |
D |
9440501D |
045 |
10/14/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR101L1062128110102 |
|
|
$62.85 |
000001070031-3562509204 |
2022 |
4 |
FD52 |
09 |
E123 |
D |
9440501D |
045 |
10/14/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101L1062128110102 |
|
|
$8.03 |
000001070031-3562509204 |
2022 |
4 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
10/11/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR101L1062128110103 |
|
|
$289.68 |
000001070711-3562500636 |
2022 |
4 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
10/11/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR101L1062128110103 |
|
|
$53.44 |
000001070711-3562500636 |
2022 |
4 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
10/11/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR101L1062128110103 |
|
|
$344.98 |
000001070711-3562500636 |
2022 |
4 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
10/11/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR101L1062128110103 |
|
|
$24.49 |
000001070711-3562500636 |
2022 |
3 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
9/27/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR092L1062126709017 |
|
|
$324.15 |
000001073961-3562500610 |
2022 |
3 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
9/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092L1062126709017 |
|
|
$108.64 |
000001073961-3562500610 |
2022 |
3 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
9/27/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR092L1062126709017 |
|
|
$22.24 |
000001073961-3562500610 |
2022 |
3 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
9/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092L1062126709017 |
|
|
$7.49 |
000001073961-3562500610 |
2022 |
3 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
9/27/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR092L1062126709017 |
|
|
$273.45 |
000001073961-3562500610 |
2022 |
3 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
9/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092L1062126709017 |
|
|
$91.23 |
000001073961-3562500610 |
2022 |
3 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
9/27/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR092L1062126709017 |
|
|
$58.58 |
000001073961-3562500610 |
2022 |
3 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
9/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092L1062126709017 |
|
|
$19.48 |
000001073961-3562500610 |
2022 |
3 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
9/27/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR092L1062126709017 |
|
|
$0.10 |
000001073961-3562500610 |
2022 |
3 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
9/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092L1062126709017 |
|
|
$0.05 |
000001073961-3562500610 |
2022 |
3 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
9/13/2021 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR091L1062125207960 |
|
|
$561.33 |
000001069551-3562500610 |
2022 |
3 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
9/13/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091L1062125207960 |
|
|
$17.11 |
000001069551-3562500610 |
2022 |
3 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
9/13/2021 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR091L1062125207960 |
|
|
$118.04 |
000001069551-3562500610 |
2022 |
3 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
9/13/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091L1062125207960 |
|
|
$3.37 |
000001069551-3562500610 |
2022 |
3 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
9/13/2021 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR091L1062125207960 |
|
|
$668.50 |
000001069551-3562500610 |
2022 |
3 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
9/13/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091L1062125207960 |
|
|
$20.38 |
000001069551-3562500610 |
2022 |
3 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
9/13/2021 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR091L1062125207960 |
|
|
$44.49 |
000001069551-3562500610 |
2022 |
3 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
9/13/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091L1062125207960 |
|
|
$1.32 |
000001069551-3562500610 |
2022 |
2 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
8/25/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082L1062123606948 |
|
|
$379.47 |
000001070711-3562500636 |
2022 |
2 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
8/25/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082L1062123606948 |
|
|
$27.58 |
000001070711-3562500636 |
2022 |
2 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
8/25/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082L1062123606948 |
|
|
$318.64 |
000001070711-3562500636 |
2022 |
2 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
8/25/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082L1062123606948 |
|
|
$58.79 |
000001070711-3562500636 |
2022 |
2 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
8/25/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082L1062123606948 |
|
|
$0.10 |
000001070711-3562500636 |
2022 |
2 |
FD52 |
00 |
E111 |
D |
9440501D |
010 |
8/9/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR081L1062121805843 |
|
|
$469.86 |
000001078987-3562500610 |
2022 |
2 |
FD52 |
00 |
E111 |
D |
9440501D |
010 |
8/9/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081L1062121805843 |
|
|
$487.50 |
000001078987-3562500610 |
2022 |
2 |
FD52 |
00 |
E121 |
D |
9440501D |
010 |
8/9/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR081L1062121805843 |
|
|
$35.04 |
000001078987-3562500610 |
2022 |
2 |
FD52 |
00 |
E121 |
D |
9440501D |
010 |
8/9/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081L1062121805843 |
|
|
$36.35 |
000001078987-3562500610 |
2022 |
2 |
FD52 |
00 |
E122 |
D |
9440501D |
010 |
8/9/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR081L1062121805843 |
|
|
$394.62 |
000001078987-3562500610 |
2022 |
2 |
FD52 |
00 |
E122 |
D |
9440501D |
010 |
8/9/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081L1062121805843 |
|
|
$409.35 |
000001078987-3562500610 |
2022 |
2 |
FD52 |
00 |
E123 |
D |
9440501D |
010 |
8/9/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR081L1062121805843 |
|
|
$74.16 |
000001078987-3562500610 |
2022 |
2 |
FD52 |
00 |
E123 |
D |
9440501D |
010 |
8/9/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081L1062121805843 |
|
|
$74.97 |
000001078987-3562500610 |
2022 |
1 |
FD52 |
00 |
E111 |
D |
9440501D |
121 |
7/29/2021 |
0060 |
ENV STUDIES-ARCHAEOLOGY |
CA-XR072L1062120404662 |
|
|
$5.05 |
000001068639-3562500061 |
2022 |
1 |
FD52 |
00 |
E111 |
D |
9440501D |
121 |
7/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072L1062120404662 |
|
|
$1.30 |
000001068639-3562500061 |
2022 |
1 |
FD52 |
00 |
E121 |
D |
9440501D |
121 |
7/29/2021 |
0060 |
ENV STUDIES-ARCHAEOLOGY |
CA-XR072L1062120404662 |
|
|
$0.39 |
000001068639-3562500061 |
2022 |
1 |
FD52 |
00 |
E121 |
D |
9440501D |
121 |
7/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072L1062120404662 |
|
|
$0.10 |
000001068639-3562500061 |
2022 |
1 |
FD52 |
00 |
E122 |
D |
9440501D |
121 |
7/29/2021 |
0060 |
ENV STUDIES-ARCHAEOLOGY |
CA-XR072L1062120404662 |
|
|
$4.24 |
000001068639-3562500061 |
2022 |
1 |
FD52 |
00 |
E122 |
D |
9440501D |
121 |
7/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072L1062120404662 |
|
|
$1.07 |
000001068639-3562500061 |
2022 |
1 |
FD52 |
00 |
E123 |
D |
9440501D |
121 |
7/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072L1062120404662 |
|
|
($0.01) |
000001068639-3562500061 |
2022 |
1 |
FD52 |
00 |
E111 |
D |
9440501D |
010 |
7/29/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR072L1062120404730 |
|
|
$852.86 |
000001078987-3562500610 |
2022 |
1 |
FD52 |
00 |
E111 |
D |
9440501D |
010 |
7/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072L1062120404730 |
|
|
$85.29 |
000001078987-3562500610 |
2022 |
1 |
FD52 |
00 |
E121 |
D |
9440501D |
010 |
7/29/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR072L1062120404730 |
|
|
$61.14 |
000001078987-3562500610 |
2022 |
1 |
FD52 |
00 |
E121 |
D |
9440501D |
010 |
7/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072L1062120404730 |
|
|
$6.12 |
000001078987-3562500610 |
2022 |
1 |
FD52 |
00 |
E122 |
D |
9440501D |
010 |
7/29/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR072L1062120404730 |
|
|
$716.13 |
000001078987-3562500610 |
2022 |
1 |
FD52 |
00 |
E122 |
D |
9440501D |
010 |
7/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072L1062120404730 |
|
|
$71.62 |
000001078987-3562500610 |
2022 |
1 |
FD52 |
00 |
E123 |
D |
9440501D |
010 |
7/29/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR072L1062120404730 |
|
|
$146.07 |
000001078987-3562500610 |
2022 |
1 |
FD52 |
00 |
E123 |
D |
9440501D |
010 |
7/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072L1062120404730 |
|
|
$14.45 |
000001078987-3562500610 |
2022 |
1 |
FD52 |
00 |
E124 |
D |
9440501D |
010 |
7/29/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR072L1062120404730 |
|
|
$0.27 |
000001078987-3562500610 |
2022 |
1 |
FD52 |
00 |
E124 |
D |
9440501D |
010 |
7/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072L1062120404730 |
|
|
$0.03 |
000001078987-3562500610 |
2022 |
1 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
7/26/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR072L1062120404664 |
|
|
$344.97 |
000001070711-3562500636 |
2022 |
1 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
7/26/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072L1062120404664 |
|
|
$287.49 |
000001070711-3562500636 |
2022 |
1 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
7/26/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR072L1062120404664 |
|
|
$25.07 |
000001070711-3562500636 |
2022 |
1 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
7/26/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072L1062120404664 |
|
|
$20.90 |
000001070711-3562500636 |
2022 |
1 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
7/26/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR072L1062120404664 |
|
|
$289.68 |
000001070711-3562500636 |
2022 |
1 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
7/26/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072L1062120404664 |
|
|
$241.40 |
000001070711-3562500636 |
2022 |
1 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
7/26/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR072L1062120404664 |
|
|
$53.83 |
000001070711-3562500636 |
2022 |
1 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
7/26/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072L1062120404664 |
|
|
$44.15 |
000001070711-3562500636 |
2022 |
1 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
7/26/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR072L1062120404664 |
|
|
$0.09 |
000001070711-3562500636 |
2022 |
1 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
7/26/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072L1062120404664 |
|
|
$0.08 |
000001070711-3562500636 |
2022 |
1 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
7/1/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR061L1062116001452P |
|
|
$54.26 |
000001070711-3562500636 |
2022 |
1 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
7/1/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061L1062116001452P |
|
|
$92.82 |
000001070711-3562500636 |
2021 |
12 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
6/10/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR061L1062116001452 |
|
|
$344.29 |
000001070711-3562500636 |
2021 |
12 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
6/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061L1062116001452 |
|
|
$604.39 |
000001070711-3562500636 |
2021 |
12 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
6/10/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR061L1062116001452 |
|
|
$24.48 |
000001070711-3562500636 |
2021 |
12 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
6/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061L1062116001452 |
|
|
$42.88 |
000001070711-3562500636 |
2021 |
12 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
6/10/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR061L1062116001452 |
|
|
$291.26 |
000001070711-3562500636 |
2021 |
12 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
6/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061L1062116001452 |
|
|
$510.29 |
000001070711-3562500636 |
2021 |
11 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
5/10/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051L1062112709724 |
|
|
$344.98 |
000001070711-3562500636 |
2021 |
11 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
5/10/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051L1062112709724 |
|
|
$24.49 |
000001070711-3562500636 |
2021 |
11 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
5/10/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051L1062112709724 |
|
|
$291.26 |
000001070711-3562500636 |
2021 |
11 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
5/10/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051L1062112709724 |
|
|
$53.44 |
000001070711-3562500636 |
2021 |
10 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
4/26/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042L1062111308637 |
|
|
$344.51 |
000001070711-3562500636 |
2021 |
10 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
4/26/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042L1062111308637 |
|
|
$34.96 |
000001070711-3562500636 |
2021 |
10 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
4/26/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042L1062111308637 |
|
|
$25.07 |
000001070711-3562500636 |
2021 |
10 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
4/26/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042L1062111308637 |
|
|
$2.54 |
000001070711-3562500636 |
2021 |
10 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
4/26/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042L1062111308637 |
|
|
$291.26 |
000001070711-3562500636 |
2021 |
10 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
4/26/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042L1062111308637 |
|
|
$29.52 |
000001070711-3562500636 |
2021 |
10 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
4/26/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042L1062111308637 |
|
|
$53.49 |
000001070711-3562500636 |
2021 |
10 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
4/26/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042L1062111308637 |
|
|
$5.36 |
000001070711-3562500636 |
2021 |
10 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
4/26/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042L1062111308637 |
|
|
$0.09 |
000001070711-3562500636 |
2021 |
10 |
FD52 |
09 |
E143 |
D |
9440501D |
010 |
4/12/2021 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2100166858 |
PON21900003413 |
GRW ENGINEERS INC |
$5,413.52 |
Boyd County 9-397.0 |
2021 |
10 |
FD52 |
09 |
E143 |
D |
9440501D |
022 |
4/12/2021 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2100166858 |
PON21900003413 |
GRW ENGINEERS INC |
$5,413.50 |
Carter County 9-397.0 |
2021 |
10 |
FD52 |
09 |
E143 |
D |
9440501D |
045 |
4/12/2021 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2100166858 |
PON21900003413 |
GRW ENGINEERS INC |
$5,413.52 |
Greenup County 9-397.0 |
2021 |
7 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
1/25/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012L1062102202349 |
|
|
$344.97 |
000001070711-3562500636 |
2021 |
7 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202349 |
|
|
$34.50 |
000001070711-3562500636 |
2021 |
7 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
1/25/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012L1062102202349 |
|
|
$25.07 |
000001070711-3562500636 |
2021 |
7 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202349 |
|
|
$2.51 |
000001070711-3562500636 |
2021 |
7 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
1/25/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012L1062102202349 |
|
|
$291.25 |
000001070711-3562500636 |
2021 |
7 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202349 |
|
|
$29.13 |
000001070711-3562500636 |
2021 |
7 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
1/25/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012L1062102202349 |
|
|
$53.48 |
000001070711-3562500636 |
2021 |
7 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202349 |
|
|
$5.30 |
000001070711-3562500636 |
2021 |
7 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
1/25/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012L1062102202349 |
|
|
$0.09 |
000001070711-3562500636 |
2021 |
7 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202349 |
|
|
$0.01 |
000001070711-3562500636 |
2021 |
6 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
12/23/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR122K1062035700385 |
|
|
$345.06 |
000001070711-3562500636 |
2021 |
6 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700385 |
|
|
$15.18 |
000001070711-3562500636 |
2021 |
6 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
12/23/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR122K1062035700385 |
|
|
$25.11 |
000001070711-3562500636 |
2021 |
6 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700385 |
|
|
$1.11 |
000001070711-3562500636 |
2021 |
6 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
12/23/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR122K1062035700385 |
|
|
$291.27 |
000001070711-3562500636 |
2021 |
6 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700385 |
|
|
$12.82 |
000001070711-3562500636 |
2021 |
6 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
12/23/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR122K1062035700385 |
|
|
$51.92 |
000001070711-3562500636 |
2021 |
6 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700385 |
|
|
$2.26 |
000001070711-3562500636 |
2021 |
6 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
12/23/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR122K1062035700385 |
|
|
$0.09 |
000001070711-3562500636 |
2021 |
6 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
12/9/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR121K1062034309712 |
|
|
$398.62 |
000001073961-3562500610 |
2021 |
6 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
12/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034309712 |
|
|
$121.78 |
000001073961-3562500610 |
2021 |
6 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
12/9/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR121K1062034309712 |
|
|
$28.99 |
000001073961-3562500610 |
2021 |
6 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
12/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034309712 |
|
|
$8.88 |
000001073961-3562500610 |
2021 |
6 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
12/9/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR121K1062034309712 |
|
|
$336.56 |
000001073961-3562500610 |
2021 |
6 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
12/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034309712 |
|
|
$102.82 |
000001073961-3562500610 |
2021 |
6 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
12/9/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR121K1062034309712 |
|
|
$66.29 |
000001073961-3562500610 |
2021 |
6 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
12/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034309712 |
|
|
$19.68 |
000001073961-3562500610 |
2021 |
5 |
FD52 |
00 |
E111 |
D |
9440501D |
067 |
11/23/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR112K1062032508796 |
|
|
$492.58 |
000001076083-3562500610 |
2021 |
5 |
FD52 |
00 |
E111 |
D |
9440501D |
067 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508796 |
|
|
$127.35 |
000001076083-3562500610 |
2021 |
5 |
FD52 |
00 |
E121 |
D |
9440501D |
067 |
11/23/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR112K1062032508796 |
|
|
$35.18 |
000001076083-3562500610 |
2021 |
5 |
FD52 |
00 |
E121 |
D |
9440501D |
067 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508796 |
|
|
$9.10 |
000001076083-3562500610 |
2021 |
5 |
FD52 |
00 |
E122 |
D |
9440501D |
067 |
11/23/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR112K1062032508796 |
|
|
$416.04 |
000001076083-3562500610 |
2021 |
5 |
FD52 |
00 |
E122 |
D |
9440501D |
067 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508796 |
|
|
$107.51 |
000001076083-3562500610 |
2021 |
5 |
FD52 |
00 |
E123 |
D |
9440501D |
067 |
11/23/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR112K1062032508796 |
|
|
$85.78 |
000001076083-3562500610 |
2021 |
5 |
FD52 |
00 |
E123 |
D |
9440501D |
067 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508796 |
|
|
$21.87 |
000001076083-3562500610 |
2021 |
5 |
FD52 |
00 |
E124 |
D |
9440501D |
067 |
11/23/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR112K1062032508796 |
|
|
$0.20 |
000001076083-3562500610 |
2021 |
5 |
FD52 |
00 |
E124 |
D |
9440501D |
067 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508796 |
|
|
$0.06 |
000001076083-3562500610 |
2021 |
5 |
FD52 |
00 |
E111 |
D |
9440501D |
067 |
11/12/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR111K1062031107800 |
|
|
$1,337.26 |
000001076083-3562500610 |
2021 |
5 |
FD52 |
00 |
E111 |
D |
9440501D |
067 |
11/12/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111K1062031107800 |
|
|
$82.89 |
000001076083-3562500610 |
2021 |
5 |
FD52 |
00 |
E121 |
D |
9440501D |
067 |
11/12/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR111K1062031107800 |
|
|
$93.63 |
000001076083-3562500610 |
2021 |
5 |
FD52 |
00 |
E121 |
D |
9440501D |
067 |
11/12/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111K1062031107800 |
|
|
$5.60 |
000001076083-3562500610 |
2021 |
5 |
FD52 |
00 |
E122 |
D |
9440501D |
067 |
11/12/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR111K1062031107800 |
|
|
$1,129.01 |
000001076083-3562500610 |
2021 |
5 |
FD52 |
00 |
E122 |
D |
9440501D |
067 |
11/12/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111K1062031107800 |
|
|
$69.98 |
000001076083-3562500610 |
2021 |
5 |
FD52 |
00 |
E123 |
D |
9440501D |
067 |
11/12/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR111K1062031107800 |
|
|
$224.20 |
000001076083-3562500610 |
2021 |
5 |
FD52 |
00 |
E123 |
D |
9440501D |
067 |
11/12/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111K1062031107800 |
|
|
$13.46 |
000001076083-3562500610 |
2021 |
4 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
10/26/2020 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR102K1062029706741 |
|
|
$52.09 |
000001075887-3562500636 |
2021 |
4 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
10/26/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102K1062029706741 |
|
|
$21.06 |
000001075887-3562500636 |
2021 |
4 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
10/26/2020 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR102K1062029706741 |
|
|
$0.09 |
000001075887-3562500636 |
2021 |
4 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
10/26/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102K1062029706741 |
|
|
$0.03 |
000001075887-3562500636 |
2021 |
4 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
10/26/2020 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR102K1062029706740 |
|
|
$345.09 |
000001075887-3562500636 |
2021 |
4 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
10/26/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102K1062029706740 |
|
|
$141.21 |
000001075887-3562500636 |
2021 |
4 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
10/26/2020 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR102K1062029706740 |
|
|
$25.11 |
000001075887-3562500636 |
2021 |
4 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
10/26/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102K1062029706740 |
|
|
$10.28 |
000001075887-3562500636 |
2021 |
4 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
10/26/2020 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR102K1062029706740 |
|
|
$291.26 |
000001075887-3562500636 |
2021 |
4 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
10/26/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102K1062029706740 |
|
|
$119.23 |
000001075887-3562500636 |
2021 |
4 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
10/12/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR101K1062028205688 |
|
|
$344.97 |
000001070711-3562500636 |
2021 |
4 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
10/12/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR101K1062028205688 |
|
|
$24.55 |
000001070711-3562500636 |
2021 |
4 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
10/12/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR101K1062028205688 |
|
|
$291.26 |
000001070711-3562500636 |
2021 |
4 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
10/12/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR101K1062028205688 |
|
|
$51.90 |
000001070711-3562500636 |
2021 |
3 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
9/15/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091K1062025303611 |
|
|
$252.93 |
000001070711-3562500636 |
2021 |
3 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
9/15/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091K1062025303611 |
|
|
$8.74 |
000001070711-3562500636 |
2021 |
3 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
9/15/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091K1062025303611 |
|
|
$18.00 |
000001070711-3562500636 |
2021 |
3 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
9/15/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091K1062025303611 |
|
|
$0.62 |
000001070711-3562500636 |
2021 |
3 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
9/15/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091K1062025303611 |
|
|
$213.59 |
000001070711-3562500636 |
2021 |
3 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
9/15/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091K1062025303611 |
|
|
$7.38 |
000001070711-3562500636 |
2021 |
3 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
9/15/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091K1062025303611 |
|
|
$38.07 |
000001070711-3562500636 |
2021 |
3 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
9/15/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091K1062025303611 |
|
|
$1.30 |
000001070711-3562500636 |
2021 |
2 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
8/24/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR082K1062023402528 |
|
|
$1,363.99 |
000001069551-3562500610 |
2021 |
2 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
8/24/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082K1062023402528 |
|
|
$24.47 |
000001069551-3562500610 |
2021 |
2 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
8/24/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR082K1062023402528 |
|
|
$101.87 |
000001069551-3562500610 |
2021 |
2 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
8/24/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082K1062023402528 |
|
|
$1.81 |
000001069551-3562500610 |
2021 |
2 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
8/24/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR082K1062023402528 |
|
|
$1,151.61 |
000001069551-3562500610 |
2021 |
2 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
8/24/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082K1062023402528 |
|
|
$20.66 |
000001069551-3562500610 |
2021 |
2 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
8/24/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR082K1062023402528 |
|
|
$225.07 |
000001069551-3562500610 |
2021 |
2 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
8/24/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082K1062023402528 |
|
|
$4.03 |
000001069551-3562500610 |
2021 |
2 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
8/24/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR082K1062023402528 |
|
|
$0.64 |
000001069551-3562500610 |
2021 |
2 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
8/24/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082K1062023402528 |
|
|
$0.01 |
000001069551-3562500610 |
2021 |
2 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
8/10/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR081K1062022001438 |
|
|
$383.96 |
000001069551-3562500610 |
2021 |
2 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
8/10/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081K1062022001438 |
|
|
$12.32 |
000001069551-3562500610 |
2021 |
2 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
8/10/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR081K1062022001438 |
|
|
$27.13 |
000001069551-3562500610 |
2021 |
2 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
8/10/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081K1062022001438 |
|
|
$0.90 |
000001069551-3562500610 |
2021 |
2 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
8/10/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR081K1062022001438 |
|
|
$324.13 |
000001069551-3562500610 |
2021 |
2 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
8/10/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081K1062022001438 |
|
|
$10.40 |
000001069551-3562500610 |
2021 |
2 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
8/10/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR081K1062022001438 |
|
|
$59.73 |
000001069551-3562500610 |
2021 |
2 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
8/10/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081K1062022001438 |
|
|
$1.85 |
000001069551-3562500610 |
2021 |
1 |
FD52 |
00 |
E229 |
D |
9440501D |
022 |
7/28/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
IET-XE13A162520207003770 |
|
|
$140.00 |
|
2021 |
1 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
7/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072K1062020600345 |
|
|
$235.70 |
000001069551-3562500610 |
2021 |
1 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
7/27/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR072K1062020600345 |
|
|
$92.07 |
000001069551-3562500610 |
2021 |
1 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
7/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072K1062020600345 |
|
|
$17.32 |
000001069551-3562500610 |
2021 |
1 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
7/27/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR072K1062020600345 |
|
|
$1,062.06 |
000001069551-3562500610 |
2021 |
1 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
7/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072K1062020600345 |
|
|
$199.00 |
000001069551-3562500610 |
2021 |
1 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
7/27/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR072K1062020600345 |
|
|
$182.62 |
000001069551-3562500610 |
2021 |
1 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
7/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072K1062020600345 |
|
|
$35.86 |
000001069551-3562500610 |
2021 |
1 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
7/27/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR072K1062020600367 |
|
|
$320.72 |
000001073961-3562500610 |
2021 |
1 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
7/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072K1062020600367 |
|
|
$39.34 |
000001073961-3562500610 |
2021 |
1 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
7/27/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR072K1062020600367 |
|
|
$21.95 |
000001073961-3562500610 |
2021 |
1 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
7/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072K1062020600367 |
|
|
$2.70 |
000001073961-3562500610 |
2021 |
1 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
7/27/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR072K1062020600345 |
|
|
$0.41 |
000001069551-3562500610 |
2021 |
1 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
7/27/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR072K1062020600367 |
|
|
$270.78 |
000001073961-3562500610 |
2021 |
1 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
7/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072K1062020600367 |
|
|
$33.21 |
000001073961-3562500610 |
2021 |
1 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
7/27/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR072K1062020600367 |
|
|
$51.96 |
000001073961-3562500610 |
2021 |
1 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
7/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072K1062020600367 |
|
|
$6.31 |
000001073961-3562500610 |
2021 |
1 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
7/27/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR072K1062020600367 |
|
|
$0.09 |
000001073961-3562500610 |
2021 |
1 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
7/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072K1062020600367 |
|
|
$0.01 |
000001073961-3562500610 |
2021 |
1 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
7/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072K1062020600345 |
|
|
$0.09 |
000001069551-3562500610 |
2021 |
1 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
7/27/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR072K1062020600344 |
|
|
$1,257.93 |
000001069551-3562500610 |
2021 |
1 |
FD52 |
09 |
E111 |
D |
9440501D |
045 |
7/9/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR071K1062019009322 |
|
|
$1,070.03 |
000001070031-3562509204 |
2021 |
1 |
FD52 |
09 |
E121 |
D |
9440501D |
045 |
7/9/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR071K1062019009322 |
|
|
$78.36 |
000001070031-3562509204 |
2021 |
1 |
FD52 |
09 |
E122 |
D |
9440501D |
045 |
7/9/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR071K1062019009322 |
|
|
$892.73 |
000001070031-3562509204 |
2021 |
1 |
FD52 |
09 |
E123 |
D |
9440501D |
045 |
7/9/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR071K1062019009322 |
|
|
$152.32 |
000001070031-3562509204 |
2021 |
1 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
7/9/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR071K1062019009321 |
|
|
$1,243.18 |
000001069551-3562500610 |
2021 |
1 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
7/9/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR071K1062019009339 |
|
|
$1,421.43 |
000001073961-3562500610 |
2021 |
1 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
7/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071K1062019009321 |
|
|
$119.92 |
000001069551-3562500610 |
2021 |
1 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
7/9/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR071K1062019009339 |
|
|
$101.18 |
000001073961-3562500610 |
2021 |
1 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
7/9/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR071K1062019009321 |
|
|
$88.11 |
000001069551-3562500610 |
2021 |
1 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
7/9/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR071K1062019009339 |
|
|
$1,185.90 |
000001073961-3562500610 |
2021 |
1 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
7/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071K1062019009321 |
|
|
$8.53 |
000001069551-3562500610 |
2021 |
1 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
7/9/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR071K1062019009339 |
|
|
$236.18 |
000001073961-3562500610 |
2021 |
1 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
7/9/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR071K1062019009321 |
|
|
$1,036.77 |
000001069551-3562500610 |
2021 |
1 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
7/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071K1062019009321 |
|
|
$100.04 |
000001069551-3562500610 |
2021 |
1 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
7/9/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR071K1062019009321 |
|
|
$183.08 |
000001069551-3562500610 |
2021 |
1 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
7/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071K1062019009321 |
|
|
$17.87 |
000001069551-3562500610 |
2021 |
1 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
7/8/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062K1062017108306 |
|
|
$344.97 |
000001070711-3562500636 |
2021 |
1 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
7/8/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062K1062017108306 |
|
|
$34.50 |
000001070711-3562500636 |
2021 |
1 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
7/8/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062K1062017108306 |
|
|
$25.10 |
000001070711-3562500636 |
2021 |
1 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
7/8/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062K1062017108306 |
|
|
$2.51 |
000001070711-3562500636 |
2021 |
1 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
7/8/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062K1062017108306 |
|
|
$287.81 |
000001070711-3562500636 |
2021 |
1 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
7/8/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062K1062017108306 |
|
|
$28.78 |
000001070711-3562500636 |
2021 |
1 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
7/8/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062K1062017108306 |
|
|
$51.95 |
000001070711-3562500636 |
2021 |
1 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
7/8/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062K1062017108306 |
|
|
$5.14 |
000001070711-3562500636 |
2021 |
1 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
7/8/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062K1062017108306 |
|
|
$0.09 |
000001070711-3562500636 |
2021 |
1 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
7/8/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062K1062017108306 |
|
|
$0.01 |
000001070711-3562500636 |
2021 |
1 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
7/6/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR061K1062016107410P |
|
|
$52.01 |
000001073961-3562500610 |
2021 |
1 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
7/6/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061K1062016107410P |
|
|
$5.69 |
000001073961-3562500610 |
2021 |
1 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
7/1/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR061K1062016107389P |
|
|
$86.50 |
000001069551-3562500610 |
2021 |
1 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
7/1/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061K1062016107389P |
|
|
$14.52 |
000001069551-3562500610 |
2020 |
12 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
6/12/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR061K1062016107410 |
|
|
$312.82 |
000001073961-3562500610 |
2020 |
12 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
6/12/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061K1062016107410 |
|
|
$34.61 |
000001073961-3562500610 |
2020 |
12 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
6/12/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR061K1062016107410 |
|
|
$22.26 |
000001073961-3562500610 |
2020 |
12 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
6/12/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061K1062016107410 |
|
|
$2.47 |
000001073961-3562500610 |
2020 |
12 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
6/12/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR061K1062016107410 |
|
|
$260.90 |
000001073961-3562500610 |
2020 |
12 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
6/12/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061K1062016107410 |
|
|
$28.88 |
000001073961-3562500610 |
2020 |
12 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
6/10/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR061K1062016107389 |
|
|
$782.91 |
000001069551-3562500610 |
2020 |
12 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
6/10/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061K1062016107389 |
|
|
$138.65 |
000001069551-3562500610 |
2020 |
12 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
6/10/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR061K1062016107389 |
|
|
$56.90 |
000001069551-3562500610 |
2020 |
12 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
6/10/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061K1062016107389 |
|
|
$10.14 |
000001069551-3562500610 |
2020 |
12 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
6/10/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR061K1062016107389 |
|
|
$653.18 |
000001069551-3562500610 |
2020 |
12 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
6/10/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061K1062016107389 |
|
|
$115.68 |
000001069551-3562500610 |
2020 |
11 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
5/26/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR052K1062014306403 |
|
|
$2,124.54 |
000001069551-3562500610 |
2020 |
11 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
5/26/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052K1062014306403 |
|
|
$14.82 |
000001069551-3562500610 |
2020 |
11 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
5/26/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR052K1062014306403 |
|
|
$152.38 |
000001069551-3562500610 |
2020 |
11 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
5/26/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052K1062014306403 |
|
|
$1.11 |
000001069551-3562500610 |
2020 |
11 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
5/26/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR052K1062014306403 |
|
|
$1,772.46 |
000001069551-3562500610 |
2020 |
11 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
5/26/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052K1062014306403 |
|
|
$12.37 |
000001069551-3562500610 |
2020 |
11 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
5/26/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR052K1062014306403 |
|
|
$364.45 |
000001069551-3562500610 |
2020 |
11 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
5/26/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052K1062014306403 |
|
|
$2.22 |
000001069551-3562500610 |
2020 |
11 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
5/26/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR052K1062014306403 |
|
|
$0.66 |
000001069551-3562500610 |
2020 |
11 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
5/26/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052K1062014306403 |
|
|
$0.01 |
000001069551-3562500610 |
2020 |
11 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
5/26/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052K1062014306406 |
|
|
$345.06 |
000001070711-3562500636 |
2020 |
11 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
5/26/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052K1062014306406 |
|
|
$15.18 |
000001070711-3562500636 |
2020 |
11 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
5/26/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052K1062014306406 |
|
|
$25.11 |
000001070711-3562500636 |
2020 |
11 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
5/26/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052K1062014306406 |
|
|
$1.11 |
000001070711-3562500636 |
2020 |
11 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
5/26/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052K1062014306406 |
|
|
$287.82 |
000001070711-3562500636 |
2020 |
11 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
5/26/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052K1062014306406 |
|
|
$12.66 |
000001070711-3562500636 |
2020 |
11 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
5/26/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052K1062014306406 |
|
|
$51.92 |
000001070711-3562500636 |
2020 |
11 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
5/26/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052K1062014306406 |
|
|
$2.26 |
000001070711-3562500636 |
2020 |
11 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
5/26/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052K1062014306406 |
|
|
$0.09 |
000001070711-3562500636 |
2020 |
11 |
FD52 |
09 |
E143 |
D |
9440501D |
010 |
5/11/2020 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2000191483 |
PON21900003413 |
GRW ENGINEERS INC |
$20,957.92 |
Boyd County 9-397.0 |
2020 |
11 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
5/11/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR051K1062012905496 |
|
|
$583.91 |
000001069551-3562500610 |
2020 |
11 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
5/11/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR051K1062012905496 |
|
|
$42.10 |
000001069551-3562500610 |
2020 |
11 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
5/11/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR051K1062012905496 |
|
|
$487.16 |
000001069551-3562500610 |
2020 |
11 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
5/11/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR051K1062012905496 |
|
|
$103.80 |
000001069551-3562500610 |
2020 |
10 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
4/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042K1062011504460 |
|
|
$43.94 |
000001069551-3562500610 |
2020 |
10 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
4/27/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR042K1062011504460 |
|
|
$0.76 |
000001069551-3562500610 |
2020 |
10 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
4/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042K1062011504460 |
|
|
$0.09 |
000001069551-3562500610 |
2020 |
10 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
4/27/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042K1062011504464 |
|
|
$344.88 |
000001070711-3562500636 |
2020 |
10 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
4/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042K1062011504464 |
|
|
$16.56 |
000001070711-3562500636 |
2020 |
10 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
4/27/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042K1062011504464 |
|
|
$25.11 |
000001070711-3562500636 |
2020 |
10 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
4/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042K1062011504464 |
|
|
$1.21 |
000001070711-3562500636 |
2020 |
10 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
4/27/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042K1062011504464 |
|
|
$287.81 |
000001070711-3562500636 |
2020 |
10 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
4/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042K1062011504464 |
|
|
$13.82 |
000001070711-3562500636 |
2020 |
10 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
4/27/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042K1062011504464 |
|
|
$51.92 |
000001070711-3562500636 |
2020 |
10 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
4/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042K1062011504464 |
|
|
$2.47 |
000001070711-3562500636 |
2020 |
10 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
4/27/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042K1062011504464 |
|
|
$0.09 |
000001070711-3562500636 |
2020 |
10 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
4/27/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR042K1062011504503 |
|
|
$995.00 |
000001073961-3562500610 |
2020 |
10 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
4/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042K1062011504503 |
|
|
$47.38 |
000001073961-3562500610 |
2020 |
10 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
4/27/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR042K1062011504503 |
|
|
$71.39 |
000001073961-3562500610 |
2020 |
10 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
4/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042K1062011504503 |
|
|
$3.40 |
000001073961-3562500610 |
2020 |
10 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
4/27/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR042K1062011504503 |
|
|
$830.13 |
000001073961-3562500610 |
2020 |
10 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
4/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042K1062011504503 |
|
|
$39.53 |
000001073961-3562500610 |
2020 |
10 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
4/27/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR042K1062011504503 |
|
|
$165.40 |
000001073961-3562500610 |
2020 |
10 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
4/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042K1062011504503 |
|
|
$7.80 |
000001073961-3562500610 |
2020 |
10 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
4/27/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR042K1062011504503 |
|
|
$0.32 |
000001073961-3562500610 |
2020 |
10 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
4/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042K1062011504503 |
|
|
$0.02 |
000001073961-3562500610 |
2020 |
10 |
FD52 |
09 |
E111 |
D |
9440501D |
010 |
4/27/2020 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR042K1062011504467 |
|
|
$1,405.20 |
000001071374-3562509200 |
2020 |
10 |
FD52 |
09 |
E111 |
D |
9440501D |
010 |
4/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042K1062011504467 |
|
|
$67.08 |
000001071374-3562509200 |
2020 |
10 |
FD52 |
09 |
E121 |
D |
9440501D |
010 |
4/27/2020 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR042K1062011504467 |
|
|
$105.24 |
000001071374-3562509200 |
2020 |
10 |
FD52 |
09 |
E121 |
D |
9440501D |
010 |
4/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042K1062011504467 |
|
|
$5.02 |
000001071374-3562509200 |
2020 |
10 |
FD52 |
09 |
E122 |
D |
9440501D |
010 |
4/27/2020 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR042K1062011504467 |
|
|
$1,172.41 |
000001071374-3562509200 |
2020 |
10 |
FD52 |
09 |
E122 |
D |
9440501D |
010 |
4/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042K1062011504467 |
|
|
$55.97 |
000001071374-3562509200 |
2020 |
10 |
FD52 |
09 |
E123 |
D |
9440501D |
010 |
4/27/2020 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR042K1062011504467 |
|
|
$196.02 |
000001071374-3562509200 |
2020 |
10 |
FD52 |
09 |
E123 |
D |
9440501D |
010 |
4/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042K1062011504467 |
|
|
$9.24 |
000001071374-3562509200 |
2020 |
10 |
FD52 |
09 |
E124 |
D |
9440501D |
010 |
4/27/2020 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR042K1062011504467 |
|
|
$0.45 |
000001071374-3562509200 |
2020 |
10 |
FD52 |
09 |
E124 |
D |
9440501D |
010 |
4/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042K1062011504467 |
|
|
$0.02 |
000001071374-3562509200 |
2020 |
10 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
4/27/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR042K1062011504459 |
|
|
$2,307.98 |
000001069551-3562500610 |
2020 |
10 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
4/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042K1062011504459 |
|
|
$273.24 |
000001069551-3562500610 |
2020 |
10 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
4/27/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR042K1062011504459 |
|
|
$167.13 |
000001069551-3562500610 |
2020 |
10 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
4/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042K1062011504459 |
|
|
$19.65 |
000001069551-3562500610 |
2020 |
10 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
4/27/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR042K1062011504459 |
|
|
$1,925.48 |
000001069551-3562500610 |
2020 |
10 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
4/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042K1062011504459 |
|
|
$227.97 |
000001069551-3562500610 |
2020 |
10 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
4/27/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR042K1062011504459 |
|
|
$364.18 |
000001069551-3562500610 |
2020 |
10 |
FD52 |
09 |
E111 |
D |
9440501D |
010 |
4/14/2020 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR041K1062009903475 |
|
|
$1,030.52 |
000001071374-3562509200 |
2020 |
10 |
FD52 |
09 |
E121 |
D |
9440501D |
010 |
4/14/2020 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR041K1062009903475 |
|
|
$76.12 |
000001071374-3562509200 |
2020 |
10 |
FD52 |
09 |
E122 |
D |
9440501D |
010 |
4/14/2020 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR041K1062009903475 |
|
|
$859.77 |
000001071374-3562509200 |
2020 |
10 |
FD52 |
09 |
E123 |
D |
9440501D |
010 |
4/14/2020 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR041K1062009903475 |
|
|
$143.66 |
000001071374-3562509200 |
2020 |
10 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
4/9/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR041K1062009903470 |
|
|
$3,094.57 |
000001069551-3562500610 |
2020 |
10 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
4/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041K1062009903470 |
|
|
$160.42 |
000001069551-3562500610 |
2020 |
10 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
4/9/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR041K1062009903470 |
|
|
$219.06 |
000001069551-3562500610 |
2020 |
10 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
4/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041K1062009903470 |
|
|
$10.95 |
000001069551-3562500610 |
2020 |
10 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
4/9/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR041K1062009903470 |
|
|
$2,581.84 |
000001069551-3562500610 |
2020 |
10 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
4/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041K1062009903470 |
|
|
$133.84 |
000001069551-3562500610 |
2020 |
10 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
4/9/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR041K1062009903470 |
|
|
$520.18 |
000001069551-3562500610 |
2020 |
10 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
4/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041K1062009903470 |
|
|
$25.85 |
000001069551-3562500610 |
2020 |
10 |
FD52 |
09 |
E143 |
D |
9440501D |
045 |
4/8/2020 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2000172745 |
PON21900003413 |
GRW ENGINEERS INC |
$140,484.54 |
Greenup County 9-397.0 |
2020 |
9 |
FD52 |
09 |
E143 |
D |
9440501D |
010 |
3/25/2020 |
0530 |
ENV STUDIES-NOISE QUAL-CONSULT |
PRC-2000163028 |
PON21900001906 |
H W Lochner Inc |
$7,324.00 |
36-CJC |
2020 |
9 |
FD52 |
09 |
E143 |
D |
9440501D |
045 |
3/13/2020 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2000157294 |
PON21900003413 |
GRW ENGINEERS INC |
$31,299.97 |
Greenup County 9-397.0 |
2020 |
9 |
FD52 |
09 |
E111 |
D |
9440501D |
010 |
3/9/2020 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR031K1062006601535 |
|
|
$226.72 |
000001071374-3562509200 |
2020 |
9 |
FD52 |
09 |
E111 |
D |
9440501D |
010 |
3/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031K1062006601535 |
|
|
$11.95 |
000001071374-3562509200 |
2020 |
9 |
FD52 |
09 |
E121 |
D |
9440501D |
010 |
3/9/2020 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR031K1062006601535 |
|
|
$16.74 |
000001071374-3562509200 |
2020 |
9 |
FD52 |
09 |
E121 |
D |
9440501D |
010 |
3/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031K1062006601535 |
|
|
$0.89 |
000001071374-3562509200 |
2020 |
9 |
FD52 |
09 |
E122 |
D |
9440501D |
010 |
3/9/2020 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR031K1062006601535 |
|
|
$189.14 |
000001071374-3562509200 |
2020 |
9 |
FD52 |
09 |
E122 |
D |
9440501D |
010 |
3/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031K1062006601535 |
|
|
$9.97 |
000001071374-3562509200 |
2020 |
9 |
FD52 |
09 |
E123 |
D |
9440501D |
010 |
3/9/2020 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR031K1062006601535 |
|
|
$31.62 |
000001071374-3562509200 |
2020 |
9 |
FD52 |
09 |
E123 |
D |
9440501D |
010 |
3/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031K1062006601535 |
|
|
$1.64 |
000001071374-3562509200 |
2020 |
9 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
3/9/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031K1062006601532 |
|
|
$202.44 |
000001070711-3562500636 |
2020 |
9 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
3/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031K1062006601532 |
|
|
$116.88 |
000001070711-3562500636 |
2020 |
9 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
3/9/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031K1062006601532 |
|
|
$14.40 |
000001070711-3562500636 |
2020 |
9 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
3/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031K1062006601532 |
|
|
$8.32 |
000001070711-3562500636 |
2020 |
9 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
3/9/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031K1062006601532 |
|
|
$168.85 |
000001070711-3562500636 |
2020 |
9 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
3/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031K1062006601532 |
|
|
$97.52 |
000001070711-3562500636 |
2020 |
9 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
3/9/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031K1062006601532 |
|
|
$30.61 |
000001070711-3562500636 |
2020 |
9 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
3/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031K1062006601532 |
|
|
$17.43 |
000001070711-3562500636 |
2020 |
9 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
3/9/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR031K1062006601528 |
|
|
$1,227.25 |
000001069551-3562500610 |
2020 |
9 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
3/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031K1062006601528 |
|
|
$35.02 |
000001069551-3562500610 |
2020 |
9 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
3/9/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR031K1062006601528 |
|
|
$87.02 |
000001069551-3562500610 |
2020 |
9 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
3/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031K1062006601528 |
|
|
$2.46 |
000001069551-3562500610 |
2020 |
9 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
3/9/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR031K1062006601528 |
|
|
$1,023.71 |
000001069551-3562500610 |
2020 |
9 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
3/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031K1062006601528 |
|
|
$29.22 |
000001069551-3562500610 |
2020 |
9 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
3/9/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR031K1062006601528 |
|
|
$213.11 |
000001069551-3562500610 |
2020 |
9 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
3/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031K1062006601528 |
|
|
$5.97 |
000001069551-3562500610 |
2020 |
9 |
FD52 |
09 |
E143 |
D |
9440501D |
010 |
3/3/2020 |
0530 |
ENV STUDIES-NOISE QUAL-CONSULT |
PRC-2000147564 |
PON21900001906 |
H W Lochner Inc |
$18,701.00 |
36-CJC |
2020 |
8 |
FD52 |
09 |
E143 |
D |
9440501D |
022 |
2/26/2020 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
JVC-2000000443 |
PON21900003413 |
GRW ENGINEERS INC |
($3,211.95) |
Move suspended fund from allowed priority to suspended |
2020 |
8 |
FD52 |
09 |
E143 |
D |
9440501D |
022 |
2/26/2020 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
JVC-2000000443 |
PON21900003413 |
GRW ENGINEERS INC |
$3,211.95 |
Move suspended fund from allowed priority to suspended |
2020 |
8 |
FD52 |
00 |
E111 |
D |
9440501D |
010 |
2/24/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
JVC-2000000432 |
|
|
$316.31 |
Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15 |
2020 |
8 |
FD52 |
00 |
E121 |
D |
9440501D |
010 |
2/24/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
JVC-2000000432 |
|
|
($22.50) |
Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15 |
2020 |
8 |
FD52 |
00 |
E121 |
D |
9440501D |
010 |
2/24/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
JVC-2000000432 |
|
|
$22.50 |
Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15 |
2020 |
8 |
FD52 |
00 |
E122 |
D |
9440501D |
010 |
2/24/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
JVC-2000000432 |
|
|
($263.83) |
Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15 |
2020 |
8 |
FD52 |
00 |
E122 |
D |
9440501D |
010 |
2/24/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
JVC-2000000432 |
|
|
$263.83 |
Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15 |
2020 |
8 |
FD52 |
00 |
E123 |
D |
9440501D |
010 |
2/24/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
JVC-2000000432 |
|
|
($47.61) |
Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15 |
2020 |
8 |
FD52 |
00 |
E123 |
D |
9440501D |
010 |
2/24/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
JVC-2000000432 |
|
|
$47.61 |
Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15 |
2020 |
8 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
2/24/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
JVC-2000000432 |
|
|
($2,311.83) |
Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15 |
2020 |
8 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
2/24/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
JVC-2000000432 |
|
|
$2,311.83 |
Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15 |
2020 |
8 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
2/24/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
JVC-2000000432 |
|
|
($167.68) |
Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15 |
2020 |
8 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
2/24/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
JVC-2000000432 |
|
|
$167.68 |
Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15 |
2020 |
8 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
2/24/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
JVC-2000000432 |
|
|
($1,928.44) |
Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15 |
2020 |
8 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
2/24/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
JVC-2000000432 |
|
|
$1,928.44 |
Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15 |
2020 |
8 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
2/24/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
JVC-2000000432 |
|
|
($357.98) |
Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15 |
2020 |
8 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
2/24/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
JVC-2000000432 |
|
|
$357.98 |
Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15 |
2020 |
8 |
FD52 |
09 |
E143 |
D |
9440501D |
010 |
2/24/2020 |
0530 |
ENV STUDIES-NOISE QUAL-CONSULT |
JVC-2000000432 |
PON21900001906 |
H W Lochner Inc |
($6,435.00) |
Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15 |
2020 |
8 |
FD52 |
09 |
E143 |
D |
9440501D |
010 |
2/24/2020 |
0530 |
ENV STUDIES-NOISE QUAL-CONSULT |
JVC-2000000432 |
PON21900001906 |
H W Lochner Inc |
$6,435.00 |
Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15 |
2020 |
8 |
FD52 |
09 |
E143 |
D |
9440501D |
010 |
2/24/2020 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
JVC-2000000432 |
PON21900003413 |
GRW ENGINEERS INC |
($24,360.81) |
Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15 |
2020 |
8 |
FD52 |
00 |
E111 |
D |
9440501D |
121 |
2/24/2020 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR022K1062005200424 |
|
|
$527.69 |
000001068562-3562500061 |
2020 |
8 |
FD52 |
00 |
E111 |
D |
9440501D |
121 |
2/24/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022K1062005200424 |
|
|
$172.84 |
000001068562-3562500061 |
2020 |
8 |
FD52 |
09 |
E143 |
D |
9440501D |
010 |
2/24/2020 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
JVC-2000000432 |
PON21900003413 |
GRW ENGINEERS INC |
$24,360.81 |
Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15 |
2020 |
8 |
FD52 |
00 |
E121 |
D |
9440501D |
121 |
2/24/2020 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR022K1062005200424 |
|
|
$39.70 |
000001068562-3562500061 |
2020 |
8 |
FD52 |
00 |
E121 |
D |
9440501D |
121 |
2/24/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022K1062005200424 |
|
|
$13.00 |
000001068562-3562500061 |
2020 |
8 |
FD52 |
00 |
E122 |
D |
9440501D |
121 |
2/24/2020 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR022K1062005200424 |
|
|
$440.31 |
000001068562-3562500061 |
2020 |
8 |
FD52 |
00 |
E122 |
D |
9440501D |
121 |
2/24/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022K1062005200424 |
|
|
$144.20 |
000001068562-3562500061 |
2020 |
8 |
FD52 |
00 |
E123 |
D |
9440501D |
121 |
2/24/2020 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR022K1062005200424 |
|
|
$80.23 |
000001068562-3562500061 |
2020 |
8 |
FD52 |
00 |
E123 |
D |
9440501D |
121 |
2/24/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022K1062005200424 |
|
|
$25.80 |
000001068562-3562500061 |
2020 |
8 |
FD52 |
00 |
E124 |
D |
9440501D |
121 |
2/24/2020 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR022K1062005200424 |
|
|
$0.21 |
000001068562-3562500061 |
2020 |
8 |
FD52 |
00 |
E124 |
D |
9440501D |
121 |
2/24/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022K1062005200424 |
|
|
$0.07 |
000001068562-3562500061 |
2020 |
8 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
2/24/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR022K1062005200428 |
|
|
$1,020.73 |
000001069551-3562500610 |
2020 |
8 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
2/24/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR022K1062005200428 |
|
|
$73.91 |
000001069551-3562500610 |
2020 |
8 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
2/24/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR022K1062005200428 |
|
|
$851.59 |
000001069551-3562500610 |
2020 |
8 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
2/24/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR022K1062005200428 |
|
|
$157.28 |
000001069551-3562500610 |
2020 |
8 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
2/24/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR022K1062005200428 |
|
|
$0.30 |
000001069551-3562500610 |
2020 |
8 |
FD52 |
00 |
E111 |
D |
9440501D |
010 |
2/24/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
JVC-2000000432 |
|
|
($316.31) |
Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15 |
2020 |
8 |
FD52 |
09 |
E143 |
D |
9440501D |
010 |
2/20/2020 |
0530 |
ENV STUDIES-NOISE QUAL-CONSULT |
PRC-2000133189 |
PON21900001906 |
H W Lochner Inc |
$6,435.00 |
36-CJC |
2020 |
8 |
FD52 |
09 |
E143 |
D |
9440501D |
010 |
2/18/2020 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2000140388 |
PON21900003413 |
GRW ENGINEERS INC |
$24,360.81 |
Boyd County 9-397.0 |
2020 |
8 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
2/10/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR021K1062003809882 |
|
|
$357.98 |
000001069551-3562500610 |
2020 |
8 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
2/10/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021K1062003809882 |
|
|
$54.62 |
000001069551-3562500610 |
2020 |
8 |
FD52 |
00 |
E111 |
D |
9440501D |
010 |
2/10/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR021K1062003809896 |
|
|
$316.31 |
000001072341-3562500636 |
2020 |
8 |
FD52 |
00 |
E111 |
D |
9440501D |
010 |
2/10/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021K1062003809896 |
|
|
$28.67 |
000001072341-3562500636 |
2020 |
8 |
FD52 |
00 |
E121 |
D |
9440501D |
010 |
2/10/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR021K1062003809896 |
|
|
$22.50 |
000001072341-3562500636 |
2020 |
8 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
2/10/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR021K1062003809882 |
|
|
$2,311.83 |
000001069551-3562500610 |
2020 |
8 |
FD52 |
00 |
E121 |
D |
9440501D |
010 |
2/10/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021K1062003809896 |
|
|
$2.04 |
000001072341-3562500636 |
2020 |
8 |
FD52 |
00 |
E122 |
D |
9440501D |
010 |
2/10/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR021K1062003809896 |
|
|
$263.83 |
000001072341-3562500636 |
2020 |
8 |
FD52 |
00 |
E122 |
D |
9440501D |
010 |
2/10/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021K1062003809896 |
|
|
$23.92 |
000001072341-3562500636 |
2020 |
8 |
FD52 |
00 |
E123 |
D |
9440501D |
010 |
2/10/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR021K1062003809896 |
|
|
$47.61 |
000001072341-3562500636 |
2020 |
8 |
FD52 |
00 |
E123 |
D |
9440501D |
010 |
2/10/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021K1062003809896 |
|
|
$4.27 |
000001072341-3562500636 |
2020 |
8 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
2/10/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021K1062003809882 |
|
|
$362.67 |
000001069551-3562500610 |
2020 |
8 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
2/10/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR021K1062003809882 |
|
|
$167.68 |
000001069551-3562500610 |
2020 |
8 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
2/10/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021K1062003809882 |
|
|
$26.33 |
000001069551-3562500610 |
2020 |
8 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
2/10/2020 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR021K1062003809882 |
|
|
$1,928.44 |
000001069551-3562500610 |
2020 |
8 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
2/10/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021K1062003809882 |
|
|
$302.58 |
000001069551-3562500610 |
2020 |
7 |
FD52 |
00 |
E121 |
D |
9440501D |
121 |
1/30/2020 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR012K1062002308833 |
|
|
($1.02) |
000001068439-3562500061 |
2020 |
7 |
FD52 |
00 |
E121 |
D |
9440501D |
121 |
1/30/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012K1062002308833 |
|
|
($0.38) |
000001068439-3562500061 |
2020 |
7 |
FD52 |
00 |
E123 |
D |
9440501D |
121 |
1/30/2020 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR012K1062002308833 |
|
|
$19.65 |
000001068439-3562500061 |
2020 |
7 |
FD52 |
00 |
E123 |
D |
9440501D |
121 |
1/30/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012K1062002308833 |
|
|
$7.15 |
000001068439-3562500061 |
2020 |
7 |
FD52 |
09 |
E111 |
D |
9440501D |
010 |
1/27/2020 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR012K1062002308846 |
|
|
$1,405.13 |
000001071374-3562509200 |
2020 |
7 |
FD52 |
09 |
E111 |
D |
9440501D |
010 |
1/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012K1062002308846 |
|
|
$543.36 |
000001071374-3562509200 |
2020 |
7 |
FD52 |
09 |
E121 |
D |
9440501D |
010 |
1/27/2020 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR012K1062002308846 |
|
|
$105.24 |
000001071374-3562509200 |
2020 |
7 |
FD52 |
09 |
E121 |
D |
9440501D |
010 |
1/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012K1062002308846 |
|
|
$40.70 |
000001071374-3562509200 |
2020 |
7 |
FD52 |
09 |
E122 |
D |
9440501D |
010 |
1/27/2020 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR012K1062002308846 |
|
|
$1,172.41 |
000001071374-3562509200 |
2020 |
7 |
FD52 |
09 |
E122 |
D |
9440501D |
010 |
1/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012K1062002308846 |
|
|
$453.32 |
000001071374-3562509200 |
2020 |
7 |
FD52 |
09 |
E123 |
D |
9440501D |
010 |
1/27/2020 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR012K1062002308846 |
|
|
$196.80 |
000001071374-3562509200 |
2020 |
7 |
FD52 |
09 |
E123 |
D |
9440501D |
010 |
1/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012K1062002308846 |
|
|
$74.86 |
000001071374-3562509200 |
2020 |
7 |
FD52 |
09 |
E124 |
D |
9440501D |
010 |
1/27/2020 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR012K1062002308846 |
|
|
$0.45 |
000001071374-3562509200 |
2020 |
7 |
FD52 |
09 |
E124 |
D |
9440501D |
010 |
1/27/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012K1062002308846 |
|
|
$0.17 |
000001071374-3562509200 |
2020 |
7 |
FD52 |
09 |
E143 |
D |
9440501D |
010 |
1/16/2020 |
0530 |
ENV STUDIES-NOISE QUAL-CONSULT |
PRC-2000112384 |
PON21900001906 |
H W Lochner Inc |
$11,700.00 |
36-CJC |
2020 |
7 |
FD52 |
09 |
E143 |
D |
9440501D |
022 |
1/14/2020 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2000117852 |
PON21900003413 |
GRW ENGINEERS INC |
$41,915.84 |
Carter County 9-397.0 |
2020 |
7 |
FD52 |
00 |
E111 |
D |
9440501D |
010 |
1/9/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011K1062000807934 |
|
|
$315.80 |
000001072341-3562500636 |
2020 |
7 |
FD52 |
00 |
E111 |
D |
9440501D |
010 |
1/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011K1062000807934 |
|
|
$632.88 |
000001072341-3562500636 |
2020 |
7 |
FD52 |
00 |
E121 |
D |
9440501D |
010 |
1/9/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011K1062000807934 |
|
|
$22.51 |
000001072341-3562500636 |
2020 |
7 |
FD52 |
00 |
E121 |
D |
9440501D |
010 |
1/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011K1062000807934 |
|
|
$45.04 |
000001072341-3562500636 |
2020 |
7 |
FD52 |
00 |
E122 |
D |
9440501D |
010 |
1/9/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011K1062000807934 |
|
|
$263.83 |
000001072341-3562500636 |
2020 |
7 |
FD52 |
00 |
E122 |
D |
9440501D |
010 |
1/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011K1062000807934 |
|
|
$528.02 |
000001072341-3562500636 |
2020 |
7 |
FD52 |
00 |
E123 |
D |
9440501D |
010 |
1/9/2020 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011K1062000807934 |
|
|
$48.42 |
000001072341-3562500636 |
2020 |
7 |
FD52 |
00 |
E123 |
D |
9440501D |
010 |
1/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011K1062000807934 |
|
|
$94.36 |
000001072341-3562500636 |
2020 |
7 |
FD52 |
00 |
E111 |
D |
9440501D |
121 |
1/9/2020 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR011K1062000807913 |
|
|
$173.53 |
000001068439-3562500061 |
2020 |
7 |
FD52 |
00 |
E111 |
D |
9440501D |
121 |
1/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011K1062000807913 |
|
|
$63.20 |
000001068439-3562500061 |
2020 |
7 |
FD52 |
00 |
E121 |
D |
9440501D |
121 |
1/9/2020 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR011K1062000807913 |
|
|
$13.12 |
000001068439-3562500061 |
2020 |
7 |
FD52 |
00 |
E121 |
D |
9440501D |
121 |
1/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011K1062000807913 |
|
|
$4.78 |
000001068439-3562500061 |
2020 |
7 |
FD52 |
00 |
E122 |
D |
9440501D |
121 |
1/9/2020 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR011K1062000807913 |
|
|
$144.84 |
000001068439-3562500061 |
2020 |
7 |
FD52 |
00 |
E122 |
D |
9440501D |
121 |
1/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011K1062000807913 |
|
|
$52.73 |
000001068439-3562500061 |
2020 |
7 |
FD52 |
00 |
E123 |
D |
9440501D |
121 |
1/9/2020 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR011K1062000807913 |
|
|
$28.08 |
000001068439-3562500061 |
2020 |
7 |
FD52 |
00 |
E123 |
D |
9440501D |
121 |
1/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011K1062000807913 |
|
|
$10.01 |
000001068439-3562500061 |
2020 |
6 |
FD52 |
00 |
E229 |
D |
9440501D |
121 |
12/26/2019 |
0092 |
ENV STUDIES-PERMITTING |
IET-XE13A162519359012150 |
|
|
$198.80 |
|
2020 |
6 |
FD52 |
09 |
E111 |
D |
9440501D |
010 |
12/23/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR122J1061935406877 |
|
|
$205.95 |
000001071374-3562509200 |
2020 |
6 |
FD52 |
09 |
E124 |
D |
9440501D |
010 |
12/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122J1061935406877 |
|
|
$0.02 |
000001071374-3562509200 |
2020 |
6 |
FD52 |
09 |
E111 |
D |
9440501D |
010 |
12/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122J1061935406877 |
|
|
$40.39 |
000001071374-3562509200 |
2020 |
6 |
FD52 |
09 |
E121 |
D |
9440501D |
010 |
12/23/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR122J1061935406877 |
|
|
$15.45 |
000001071374-3562509200 |
2020 |
6 |
FD52 |
09 |
E121 |
D |
9440501D |
010 |
12/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122J1061935406877 |
|
|
$3.02 |
000001071374-3562509200 |
2020 |
6 |
FD52 |
09 |
E122 |
D |
9440501D |
010 |
12/23/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR122J1061935406877 |
|
|
$171.27 |
000001071374-3562509200 |
2020 |
6 |
FD52 |
09 |
E122 |
D |
9440501D |
010 |
12/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122J1061935406877 |
|
|
$33.69 |
000001071374-3562509200 |
2020 |
6 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
12/23/2019 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR122J1061935406866 |
|
|
$587.97 |
000001069551-3562500610 |
2020 |
6 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
12/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122J1061935406866 |
|
|
$146.76 |
000001069551-3562500610 |
2020 |
6 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
12/23/2019 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR122J1061935406866 |
|
|
$42.16 |
000001069551-3562500610 |
2020 |
6 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
12/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122J1061935406866 |
|
|
$10.52 |
000001069551-3562500610 |
2020 |
6 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
12/23/2019 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR122J1061935406866 |
|
|
$490.54 |
000001069551-3562500610 |
2020 |
6 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
12/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122J1061935406866 |
|
|
$122.44 |
000001069551-3562500610 |
2020 |
6 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
12/23/2019 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR122J1061935406866 |
|
|
$95.36 |
000001069551-3562500610 |
2020 |
6 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
12/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122J1061935406866 |
|
|
$23.54 |
000001069551-3562500610 |
2020 |
6 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
12/23/2019 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR122J1061935406866 |
|
|
$0.17 |
000001069551-3562500610 |
2020 |
6 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
12/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122J1061935406866 |
|
|
$0.04 |
000001069551-3562500610 |
2020 |
6 |
FD52 |
09 |
E123 |
D |
9440501D |
010 |
12/23/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR122J1061935406877 |
|
|
$28.68 |
000001071374-3562509200 |
2020 |
6 |
FD52 |
09 |
E123 |
D |
9440501D |
010 |
12/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122J1061935406877 |
|
|
$5.57 |
000001071374-3562509200 |
2020 |
6 |
FD52 |
00 |
E111 |
D |
9440501D |
121 |
12/23/2019 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR122J1061935406860 |
|
|
$416.67 |
000001068439-3562500061 |
2020 |
6 |
FD52 |
00 |
E111 |
D |
9440501D |
121 |
12/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122J1061935406860 |
|
|
$416.67 |
000001068439-3562500061 |
2020 |
6 |
FD52 |
00 |
E121 |
D |
9440501D |
121 |
12/23/2019 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR122J1061935406860 |
|
|
$31.67 |
000001068439-3562500061 |
2020 |
6 |
FD52 |
00 |
E121 |
D |
9440501D |
121 |
12/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122J1061935406860 |
|
|
$31.67 |
000001068439-3562500061 |
2020 |
6 |
FD52 |
00 |
E122 |
D |
9440501D |
121 |
12/23/2019 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR122J1061935406860 |
|
|
$347.62 |
000001068439-3562500061 |
2020 |
6 |
FD52 |
00 |
E122 |
D |
9440501D |
121 |
12/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122J1061935406860 |
|
|
$347.62 |
000001068439-3562500061 |
2020 |
6 |
FD52 |
00 |
E123 |
D |
9440501D |
121 |
12/23/2019 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR122J1061935406860 |
|
|
$67.69 |
000001068439-3562500061 |
2020 |
6 |
FD52 |
00 |
E123 |
D |
9440501D |
121 |
12/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122J1061935406860 |
|
|
$65.65 |
000001068439-3562500061 |
2020 |
6 |
FD52 |
00 |
E124 |
D |
9440501D |
121 |
12/23/2019 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR122J1061935406860 |
|
|
$0.20 |
000001068439-3562500061 |
2020 |
6 |
FD52 |
09 |
E124 |
D |
9440501D |
010 |
12/23/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR122J1061935406877 |
|
|
$0.05 |
000001071374-3562509200 |
2020 |
6 |
FD52 |
00 |
E124 |
D |
9440501D |
121 |
12/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122J1061935406860 |
|
|
$0.20 |
000001068439-3562500061 |
2020 |
6 |
FD52 |
09 |
E143 |
D |
9440501D |
045 |
12/13/2019 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2000103860 |
PON21900003413 |
GRW ENGINEERS INC |
$151,435.00 |
Greenup County 9-397.0 |
2020 |
6 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
12/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121J1061934005879 |
|
|
$71.97 |
000001069551-3562500610 |
2020 |
6 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
12/9/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121J1061934005884 |
|
|
$379.47 |
000001070711-3562500636 |
2020 |
6 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
12/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121J1061934005884 |
|
|
$379.48 |
000001070711-3562500636 |
2020 |
6 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
12/9/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121J1061934005884 |
|
|
$27.67 |
000001070711-3562500636 |
2020 |
6 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
12/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121J1061934005884 |
|
|
$27.67 |
000001070711-3562500636 |
2020 |
6 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
12/9/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121J1061934005884 |
|
|
$316.60 |
000001070711-3562500636 |
2020 |
6 |
FD52 |
00 |
E111 |
D |
9440501D |
009 |
12/9/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR121J1061934005875 |
|
|
$1,307.76 |
000001068700-3562500061 |
2020 |
6 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
12/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121J1061934005884 |
|
|
$316.60 |
000001070711-3562500636 |
2020 |
6 |
FD52 |
00 |
E111 |
D |
9440501D |
009 |
12/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121J1061934005875 |
|
|
$443.70 |
000001068700-3562500061 |
2020 |
6 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
12/9/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121J1061934005884 |
|
|
$57.60 |
000001070711-3562500636 |
2020 |
6 |
FD52 |
09 |
E111 |
D |
9440501D |
010 |
12/9/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR121J1061934005887 |
|
|
$927.47 |
000001071374-3562509200 |
2020 |
6 |
FD52 |
00 |
E121 |
D |
9440501D |
009 |
12/9/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR121J1061934005875 |
|
|
$88.14 |
000001068700-3562500061 |
2020 |
6 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
12/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121J1061934005884 |
|
|
$56.58 |
000001070711-3562500636 |
2020 |
6 |
FD52 |
09 |
E111 |
D |
9440501D |
010 |
12/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121J1061934005887 |
|
|
$397.37 |
000001071374-3562509200 |
2020 |
6 |
FD52 |
00 |
E121 |
D |
9440501D |
009 |
12/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121J1061934005875 |
|
|
$29.90 |
000001068700-3562500061 |
2020 |
6 |
FD52 |
09 |
E121 |
D |
9440501D |
010 |
12/9/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR121J1061934005887 |
|
|
$69.50 |
000001071374-3562509200 |
2020 |
6 |
FD52 |
00 |
E122 |
D |
9440501D |
009 |
12/9/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR121J1061934005875 |
|
|
$1,091.06 |
000001068700-3562500061 |
2020 |
6 |
FD52 |
09 |
E121 |
D |
9440501D |
010 |
12/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121J1061934005887 |
|
|
$29.78 |
000001071374-3562509200 |
2020 |
6 |
FD52 |
00 |
E122 |
D |
9440501D |
009 |
12/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121J1061934005875 |
|
|
$370.18 |
000001068700-3562500061 |
2020 |
6 |
FD52 |
09 |
E122 |
D |
9440501D |
010 |
12/9/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR121J1061934005887 |
|
|
$773.79 |
000001071374-3562509200 |
2020 |
6 |
FD52 |
00 |
E123 |
D |
9440501D |
009 |
12/9/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR121J1061934005875 |
|
|
$70.41 |
000001068700-3562500061 |
2020 |
6 |
FD52 |
09 |
E122 |
D |
9440501D |
010 |
12/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121J1061934005887 |
|
|
$331.52 |
000001071374-3562509200 |
2020 |
6 |
FD52 |
00 |
E123 |
D |
9440501D |
009 |
12/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121J1061934005875 |
|
|
$22.17 |
000001068700-3562500061 |
2020 |
6 |
FD52 |
09 |
E123 |
D |
9440501D |
010 |
12/9/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR121J1061934005887 |
|
|
$129.96 |
000001071374-3562509200 |
2020 |
6 |
FD52 |
09 |
E123 |
D |
9440501D |
010 |
12/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121J1061934005887 |
|
|
$54.75 |
000001071374-3562509200 |
2020 |
6 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
12/9/2019 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR121J1061934005879 |
|
|
$1,046.49 |
000001069551-3562500610 |
2020 |
6 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
12/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121J1061934005879 |
|
|
$448.74 |
000001069551-3562500610 |
2020 |
6 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
12/9/2019 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR121J1061934005879 |
|
|
$75.06 |
000001069551-3562500610 |
2020 |
6 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
12/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121J1061934005879 |
|
|
$32.18 |
000001069551-3562500610 |
2020 |
6 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
12/9/2019 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR121J1061934005879 |
|
|
$873.17 |
000001069551-3562500610 |
2020 |
6 |
FD52 |
00 |
E111 |
D |
9440501D |
121 |
12/9/2019 |
0060 |
ENV STUDIES-ARCHAEOLOGY |
CA-XR121J1061934005874 |
|
|
$235.50 |
000001068639-3562500061 |
2020 |
6 |
FD52 |
00 |
E111 |
D |
9440501D |
121 |
12/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121J1061934005874 |
|
|
$64.97 |
000001068639-3562500061 |
2020 |
6 |
FD52 |
00 |
E121 |
D |
9440501D |
121 |
12/9/2019 |
0060 |
ENV STUDIES-ARCHAEOLOGY |
CA-XR121J1061934005874 |
|
|
$17.71 |
000001068639-3562500061 |
2020 |
6 |
FD52 |
00 |
E121 |
D |
9440501D |
121 |
12/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121J1061934005874 |
|
|
$4.88 |
000001068639-3562500061 |
2020 |
6 |
FD52 |
00 |
E122 |
D |
9440501D |
121 |
12/9/2019 |
0060 |
ENV STUDIES-ARCHAEOLOGY |
CA-XR121J1061934005874 |
|
|
$196.39 |
000001068639-3562500061 |
2020 |
6 |
FD52 |
00 |
E122 |
D |
9440501D |
121 |
12/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121J1061934005874 |
|
|
$54.21 |
000001068639-3562500061 |
2020 |
6 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
12/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121J1061934005879 |
|
|
$374.38 |
000001069551-3562500610 |
2020 |
6 |
FD52 |
00 |
E123 |
D |
9440501D |
121 |
12/9/2019 |
0060 |
ENV STUDIES-ARCHAEOLOGY |
CA-XR121J1061934005874 |
|
|
$37.58 |
000001068639-3562500061 |
2020 |
6 |
FD52 |
00 |
E123 |
D |
9440501D |
121 |
12/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121J1061934005874 |
|
|
$10.20 |
000001068639-3562500061 |
2020 |
6 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
12/9/2019 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR121J1061934005879 |
|
|
$170.01 |
000001069551-3562500610 |
2020 |
5 |
FD52 |
00 |
E229 |
D |
9440501D |
121 |
11/26/2019 |
0060 |
ENV STUDIES-ARCHAEOLOGY |
IET-XE13A162519329005220 |
|
|
$299.64 |
|
2020 |
5 |
FD52 |
00 |
E229 |
D |
9440501D |
009 |
11/26/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
IET-XE13A162519329020930 |
|
|
$152.46 |
|
2020 |
5 |
FD52 |
00 |
E123 |
D |
9440501D |
121 |
11/22/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112J1061932504751 |
|
|
$56.08 |
000001068820-3562500061 |
2020 |
5 |
FD52 |
00 |
E124 |
D |
9440501D |
121 |
11/22/2019 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR112J1061932504751 |
|
|
$0.18 |
000001068820-3562500061 |
2020 |
5 |
FD52 |
00 |
E124 |
D |
9440501D |
121 |
11/22/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112J1061932504751 |
|
|
$0.11 |
000001068820-3562500061 |
2020 |
5 |
FD52 |
00 |
E111 |
D |
9440501D |
121 |
11/22/2019 |
0060 |
ENV STUDIES-ARCHAEOLOGY |
CA-XR112J1061932504750 |
|
|
$428.00 |
000001068639-3562500061 |
2020 |
5 |
FD52 |
00 |
E111 |
D |
9440501D |
121 |
11/22/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112J1061932504750 |
|
|
$107.00 |
000001068639-3562500061 |
2020 |
5 |
FD52 |
00 |
E121 |
D |
9440501D |
121 |
11/22/2019 |
0060 |
ENV STUDIES-ARCHAEOLOGY |
CA-XR112J1061932504750 |
|
|
$32.18 |
000001068639-3562500061 |
2020 |
5 |
FD52 |
00 |
E121 |
D |
9440501D |
121 |
11/22/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112J1061932504750 |
|
|
$8.05 |
000001068639-3562500061 |
2020 |
5 |
FD52 |
00 |
E122 |
D |
9440501D |
121 |
11/22/2019 |
0060 |
ENV STUDIES-ARCHAEOLOGY |
CA-XR112J1061932504750 |
|
|
$357.07 |
000001068639-3562500061 |
2020 |
5 |
FD52 |
00 |
E122 |
D |
9440501D |
121 |
11/22/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112J1061932504750 |
|
|
$89.27 |
000001068639-3562500061 |
2020 |
5 |
FD52 |
00 |
E123 |
D |
9440501D |
121 |
11/22/2019 |
0060 |
ENV STUDIES-ARCHAEOLOGY |
CA-XR112J1061932504750 |
|
|
$68.31 |
000001068639-3562500061 |
2020 |
5 |
FD52 |
00 |
E123 |
D |
9440501D |
121 |
11/22/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112J1061932504750 |
|
|
$16.78 |
000001068639-3562500061 |
2020 |
5 |
FD52 |
00 |
E124 |
D |
9440501D |
121 |
11/22/2019 |
0060 |
ENV STUDIES-ARCHAEOLOGY |
CA-XR112J1061932504750 |
|
|
$0.19 |
000001068639-3562500061 |
2020 |
5 |
FD52 |
00 |
E124 |
D |
9440501D |
121 |
11/22/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112J1061932504750 |
|
|
$0.04 |
000001068639-3562500061 |
2020 |
5 |
FD52 |
00 |
E111 |
D |
9440501D |
009 |
11/22/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR112J1061932504750 |
|
|
$1,178.26 |
000001068700-3562500061 |
2020 |
5 |
FD52 |
00 |
E111 |
D |
9440501D |
009 |
11/22/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112J1061932504750 |
|
|
$573.20 |
000001068700-3562500061 |
2020 |
5 |
FD52 |
00 |
E121 |
D |
9440501D |
009 |
11/22/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR112J1061932504750 |
|
|
$79.42 |
000001068700-3562500061 |
2020 |
5 |
FD52 |
00 |
E121 |
D |
9440501D |
009 |
11/22/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112J1061932504750 |
|
|
$38.63 |
000001068700-3562500061 |
2020 |
5 |
FD52 |
00 |
E122 |
D |
9440501D |
009 |
11/22/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR112J1061932504750 |
|
|
$983.02 |
000001068700-3562500061 |
2020 |
5 |
FD52 |
00 |
E122 |
D |
9440501D |
009 |
11/22/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112J1061932504750 |
|
|
$478.22 |
000001068700-3562500061 |
2020 |
5 |
FD52 |
00 |
E123 |
D |
9440501D |
009 |
11/22/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR112J1061932504750 |
|
|
$63.95 |
000001068700-3562500061 |
2020 |
5 |
FD52 |
00 |
E123 |
D |
9440501D |
009 |
11/22/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112J1061932504750 |
|
|
$28.63 |
000001068700-3562500061 |
2020 |
5 |
FD52 |
00 |
E124 |
D |
9440501D |
009 |
11/22/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR112J1061932504750 |
|
|
$0.67 |
000001068700-3562500061 |
2020 |
5 |
FD52 |
00 |
E124 |
D |
9440501D |
009 |
11/22/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112J1061932504750 |
|
|
$0.33 |
000001068700-3562500061 |
2020 |
5 |
FD52 |
09 |
E111 |
D |
9440501D |
010 |
11/22/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR112J1061932504769 |
|
|
$935.67 |
000001071374-3562509200 |
2020 |
5 |
FD52 |
09 |
E111 |
D |
9440501D |
010 |
11/22/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112J1061932504769 |
|
|
$224.93 |
000001071374-3562509200 |
2020 |
5 |
FD52 |
09 |
E121 |
D |
9440501D |
010 |
11/22/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR112J1061932504769 |
|
|
$69.97 |
000001071374-3562509200 |
2020 |
5 |
FD52 |
09 |
E121 |
D |
9440501D |
010 |
11/22/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112J1061932504769 |
|
|
$16.82 |
000001071374-3562509200 |
2020 |
5 |
FD52 |
09 |
E122 |
D |
9440501D |
010 |
11/22/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR112J1061932504769 |
|
|
$780.70 |
000001071374-3562509200 |
2020 |
5 |
FD52 |
09 |
E122 |
D |
9440501D |
010 |
11/22/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112J1061932504769 |
|
|
$187.66 |
000001071374-3562509200 |
2020 |
5 |
FD52 |
09 |
E123 |
D |
9440501D |
010 |
11/22/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR112J1061932504769 |
|
|
$144.07 |
000001071374-3562509200 |
2020 |
5 |
FD52 |
09 |
E123 |
D |
9440501D |
010 |
11/22/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112J1061932504769 |
|
|
$34.12 |
000001071374-3562509200 |
2020 |
5 |
FD52 |
09 |
E124 |
D |
9440501D |
010 |
11/22/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR112J1061932504769 |
|
|
$0.33 |
000001071374-3562509200 |
2020 |
5 |
FD52 |
09 |
E124 |
D |
9440501D |
010 |
11/22/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112J1061932504769 |
|
|
$0.08 |
000001071374-3562509200 |
2020 |
5 |
FD52 |
00 |
E111 |
D |
9440501D |
121 |
11/22/2019 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR112J1061932504750 |
|
|
$433.05 |
000001068820-3562500061 |
2020 |
5 |
FD52 |
00 |
E111 |
D |
9440501D |
121 |
11/22/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112J1061932504750 |
|
|
$282.23 |
000001068820-3562500061 |
2020 |
5 |
FD52 |
00 |
E121 |
D |
9440501D |
121 |
11/22/2019 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR112J1061932504750 |
|
|
$30.64 |
000001068820-3562500061 |
2020 |
5 |
FD52 |
00 |
E121 |
D |
9440501D |
121 |
11/22/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112J1061932504750 |
|
|
$19.96 |
000001068820-3562500061 |
2020 |
5 |
FD52 |
00 |
E122 |
D |
9440501D |
121 |
11/22/2019 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR112J1061932504750 |
|
|
$361.54 |
000001068820-3562500061 |
2020 |
5 |
FD52 |
00 |
E122 |
D |
9440501D |
121 |
11/22/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112J1061932504750 |
|
|
$235.45 |
000001068820-3562500061 |
2020 |
5 |
FD52 |
00 |
E123 |
D |
9440501D |
121 |
11/22/2019 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR112J1061932504750 |
|
|
$87.02 |
000001068820-3562500061 |
2020 |
5 |
FD52 |
00 |
E229 |
D |
9440501D |
022 |
11/12/2019 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
IET-XE13A162519314005960 |
|
|
$300.00 |
|
2020 |
5 |
FD52 |
00 |
E229 |
D |
9440501D |
009 |
11/12/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
IET-XE13A162519314024870 |
|
|
$172.30 |
|
2020 |
5 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
11/12/2019 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR111J1061931103656 |
|
|
$2,965.34 |
000001069551-3562500610 |
2020 |
5 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
11/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111J1061931103656 |
|
|
$402.25 |
000001069551-3562500610 |
2020 |
5 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
11/12/2019 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR111J1061931103656 |
|
|
$214.64 |
000001069551-3562500610 |
2020 |
5 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
11/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111J1061931103656 |
|
|
$29.36 |
000001069551-3562500610 |
2020 |
5 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
11/12/2019 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR111J1061931103656 |
|
|
$2,473.98 |
000001069551-3562500610 |
2020 |
5 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
11/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111J1061931103656 |
|
|
$335.61 |
000001069551-3562500610 |
2020 |
5 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
11/12/2019 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR111J1061931103656 |
|
|
$520.25 |
000001069551-3562500610 |
2020 |
5 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
11/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111J1061931103656 |
|
|
$71.48 |
000001069551-3562500610 |
2020 |
5 |
FD52 |
00 |
E111 |
D |
9440501D |
009 |
11/12/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR111J1061931103651 |
|
|
$308.82 |
000001068700-3562500061 |
2020 |
5 |
FD52 |
00 |
E111 |
D |
9440501D |
009 |
11/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111J1061931103651 |
|
|
$14.26 |
000001068700-3562500061 |
2020 |
5 |
FD52 |
00 |
E121 |
D |
9440501D |
009 |
11/12/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR111J1061931103651 |
|
|
$22.29 |
000001068700-3562500061 |
2020 |
5 |
FD52 |
00 |
E121 |
D |
9440501D |
009 |
11/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111J1061931103651 |
|
|
$1.07 |
000001068700-3562500061 |
2020 |
5 |
FD52 |
00 |
E122 |
D |
9440501D |
009 |
11/12/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR111J1061931103651 |
|
|
$257.66 |
000001068700-3562500061 |
2020 |
5 |
FD52 |
00 |
E122 |
D |
9440501D |
009 |
11/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111J1061931103651 |
|
|
$11.90 |
000001068700-3562500061 |
2020 |
5 |
FD52 |
00 |
E123 |
D |
9440501D |
009 |
11/12/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR111J1061931103651 |
|
|
$15.45 |
000001068700-3562500061 |
2020 |
5 |
FD52 |
00 |
E123 |
D |
9440501D |
009 |
11/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111J1061931103651 |
|
|
$0.66 |
000001068700-3562500061 |
2020 |
5 |
FD52 |
09 |
E143 |
D |
9440501D |
010 |
11/8/2019 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2000081087 |
PON21900003413 |
GRW ENGINEERS INC |
$41,915.84 |
Boyd County 9-397.0 |
2020 |
4 |
FD52 |
00 |
E229 |
D |
9440501D |
121 |
10/28/2019 |
0092 |
ENV STUDIES-PERMITTING |
IET-XE13A162519298015220 |
|
|
$66.88 |
|
2020 |
4 |
FD52 |
09 |
E111 |
D |
9440501D |
010 |
10/28/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR102J1061929702561 |
|
|
$510.54 |
000001071374-3562509200 |
2020 |
4 |
FD52 |
09 |
E111 |
D |
9440501D |
010 |
10/28/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102J1061929702561 |
|
|
$32.66 |
000001071374-3562509200 |
2020 |
4 |
FD52 |
09 |
E121 |
D |
9440501D |
010 |
10/28/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR102J1061929702561 |
|
|
$38.16 |
000001071374-3562509200 |
2020 |
4 |
FD52 |
09 |
E121 |
D |
9440501D |
010 |
10/28/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102J1061929702561 |
|
|
$2.44 |
000001071374-3562509200 |
2020 |
4 |
FD52 |
09 |
E122 |
D |
9440501D |
010 |
10/28/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR102J1061929702561 |
|
|
$425.84 |
000001071374-3562509200 |
2020 |
4 |
FD52 |
09 |
E122 |
D |
9440501D |
010 |
10/28/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102J1061929702561 |
|
|
$27.24 |
000001071374-3562509200 |
2020 |
4 |
FD52 |
09 |
E123 |
D |
9440501D |
010 |
10/28/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR102J1061929702561 |
|
|
$78.42 |
000001071374-3562509200 |
2020 |
4 |
FD52 |
09 |
E123 |
D |
9440501D |
010 |
10/28/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102J1061929702561 |
|
|
$4.96 |
000001071374-3562509200 |
2020 |
4 |
FD52 |
09 |
E124 |
D |
9440501D |
010 |
10/28/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR102J1061929702561 |
|
|
$0.18 |
000001071374-3562509200 |
2020 |
4 |
FD52 |
09 |
E124 |
D |
9440501D |
010 |
10/28/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102J1061929702561 |
|
|
$0.02 |
000001071374-3562509200 |
2020 |
4 |
FD52 |
00 |
E111 |
D |
9440501D |
121 |
10/28/2019 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR102J1061929702528 |
|
|
$189.40 |
000001068439-3562500061 |
2020 |
4 |
FD52 |
00 |
E111 |
D |
9440501D |
121 |
10/28/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102J1061929702528 |
|
|
$41.16 |
000001068439-3562500061 |
2020 |
4 |
FD52 |
00 |
E121 |
D |
9440501D |
121 |
10/28/2019 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR102J1061929702528 |
|
|
$14.40 |
000001068439-3562500061 |
2020 |
4 |
FD52 |
00 |
E121 |
D |
9440501D |
121 |
10/28/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102J1061929702528 |
|
|
$3.12 |
000001068439-3562500061 |
2020 |
4 |
FD52 |
00 |
E122 |
D |
9440501D |
121 |
10/28/2019 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR102J1061929702528 |
|
|
$158.01 |
000001068439-3562500061 |
2020 |
4 |
FD52 |
00 |
E122 |
D |
9440501D |
121 |
10/28/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102J1061929702528 |
|
|
$34.34 |
000001068439-3562500061 |
2020 |
4 |
FD52 |
00 |
E123 |
D |
9440501D |
121 |
10/28/2019 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR102J1061929702528 |
|
|
$30.40 |
000001068439-3562500061 |
2020 |
4 |
FD52 |
00 |
E123 |
D |
9440501D |
121 |
10/28/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102J1061929702528 |
|
|
$6.48 |
000001068439-3562500061 |
2020 |
4 |
FD52 |
00 |
E124 |
D |
9440501D |
121 |
10/28/2019 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR102J1061929702528 |
|
|
$0.09 |
000001068439-3562500061 |
2020 |
4 |
FD52 |
00 |
E124 |
D |
9440501D |
121 |
10/28/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102J1061929702528 |
|
|
$0.02 |
000001068439-3562500061 |
2020 |
4 |
FD52 |
00 |
E229 |
D |
9440501D |
121 |
10/15/2019 |
0092 |
ENV STUDIES-PERMITTING |
IET-XE13A162519283014870 |
|
|
$66.88 |
|
2020 |
4 |
FD52 |
00 |
E111 |
D |
9440501D |
121 |
10/9/2019 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR101J1061928101480 |
|
|
$189.35 |
000001068439-3562500061 |
2020 |
4 |
FD52 |
00 |
E111 |
D |
9440501D |
121 |
10/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101J1061928101480 |
|
|
$4.80 |
000001068439-3562500061 |
2020 |
4 |
FD52 |
09 |
E111 |
D |
9440501D |
022 |
10/9/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR101J1061928101488 |
|
|
$255.25 |
000001069765-3562509200 |
2020 |
4 |
FD52 |
00 |
E121 |
D |
9440501D |
121 |
10/9/2019 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR101J1061928101480 |
|
|
$14.40 |
000001068439-3562500061 |
2020 |
4 |
FD52 |
09 |
E111 |
D |
9440501D |
022 |
10/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101J1061928101488 |
|
|
$21.78 |
000001069765-3562509200 |
2020 |
4 |
FD52 |
00 |
E121 |
D |
9440501D |
121 |
10/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101J1061928101480 |
|
|
$0.37 |
000001068439-3562500061 |
2020 |
4 |
FD52 |
09 |
E121 |
D |
9440501D |
022 |
10/9/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR101J1061928101488 |
|
|
$19.09 |
000001069765-3562509200 |
2020 |
4 |
FD52 |
00 |
E122 |
D |
9440501D |
121 |
10/9/2019 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR101J1061928101480 |
|
|
$158.01 |
000001068439-3562500061 |
2020 |
4 |
FD52 |
09 |
E121 |
D |
9440501D |
022 |
10/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101J1061928101488 |
|
|
$1.62 |
000001069765-3562509200 |
2020 |
4 |
FD52 |
00 |
E122 |
D |
9440501D |
121 |
10/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101J1061928101480 |
|
|
$4.00 |
000001068439-3562500061 |
2020 |
4 |
FD52 |
09 |
E122 |
D |
9440501D |
022 |
10/9/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR101J1061928101488 |
|
|
$213.16 |
000001069765-3562509200 |
2020 |
4 |
FD52 |
00 |
E123 |
D |
9440501D |
121 |
10/9/2019 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR101J1061928101480 |
|
|
$30.31 |
000001068439-3562500061 |
2020 |
4 |
FD52 |
09 |
E122 |
D |
9440501D |
022 |
10/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101J1061928101488 |
|
|
$18.18 |
000001069765-3562509200 |
2020 |
4 |
FD52 |
00 |
E123 |
D |
9440501D |
121 |
10/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101J1061928101480 |
|
|
$0.76 |
000001068439-3562500061 |
2020 |
4 |
FD52 |
09 |
E123 |
D |
9440501D |
022 |
10/9/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR101J1061928101488 |
|
|
$39.31 |
000001069765-3562509200 |
2020 |
4 |
FD52 |
09 |
E123 |
D |
9440501D |
022 |
10/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101J1061928101488 |
|
|
$3.30 |
000001069765-3562509200 |
2020 |
4 |
FD52 |
09 |
E143 |
D |
9440501D |
045 |
10/8/2019 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2000061997 |
PON21900003413 |
GRW ENGINEERS INC |
$36,113.81 |
Greenup County 9-397.0 |
2020 |
3 |
FD52 |
00 |
E121 |
D |
9440501D |
121 |
9/25/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092J1061926700413 |
|
|
$27.72 |
000001068439-3562500061 |
2020 |
3 |
FD52 |
00 |
E122 |
D |
9440501D |
121 |
9/25/2019 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR092J1061926700413 |
|
|
$1,216.69 |
000001068439-3562500061 |
2020 |
3 |
FD52 |
00 |
E122 |
D |
9440501D |
121 |
9/25/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092J1061926700413 |
|
|
$304.06 |
000001068439-3562500061 |
2020 |
3 |
FD52 |
00 |
E123 |
D |
9440501D |
121 |
9/25/2019 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR092J1061926700413 |
|
|
$234.26 |
000001068439-3562500061 |
2020 |
3 |
FD52 |
00 |
E111 |
D |
9440501D |
121 |
9/25/2019 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR092J1061926700413 |
|
|
$243.61 |
000001068562-3562500061 |
2020 |
3 |
FD52 |
00 |
E111 |
D |
9440501D |
121 |
9/25/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092J1061926700413 |
|
|
$27.09 |
000001068562-3562500061 |
2020 |
3 |
FD52 |
00 |
E121 |
D |
9440501D |
121 |
9/25/2019 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR092J1061926700413 |
|
|
$18.06 |
000001068562-3562500061 |
2020 |
3 |
FD52 |
00 |
E123 |
D |
9440501D |
121 |
9/25/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092J1061926700413 |
|
|
$57.42 |
000001068439-3562500061 |
2020 |
3 |
FD52 |
00 |
E121 |
D |
9440501D |
121 |
9/25/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092J1061926700413 |
|
|
$2.01 |
000001068562-3562500061 |
2020 |
3 |
FD52 |
00 |
E122 |
D |
9440501D |
121 |
9/25/2019 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR092J1061926700413 |
|
|
$203.25 |
000001068562-3562500061 |
2020 |
3 |
FD52 |
00 |
E122 |
D |
9440501D |
121 |
9/25/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092J1061926700413 |
|
|
$22.60 |
000001068562-3562500061 |
2020 |
3 |
FD52 |
00 |
E123 |
D |
9440501D |
121 |
9/25/2019 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR092J1061926700413 |
|
|
$52.61 |
000001068562-3562500061 |
2020 |
3 |
FD52 |
00 |
E123 |
D |
9440501D |
121 |
9/25/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092J1061926700413 |
|
|
$5.75 |
000001068562-3562500061 |
2020 |
3 |
FD52 |
00 |
E124 |
D |
9440501D |
121 |
9/25/2019 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR092J1061926700413 |
|
|
$0.17 |
000001068562-3562500061 |
2020 |
3 |
FD52 |
00 |
E124 |
D |
9440501D |
121 |
9/25/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092J1061926700413 |
|
|
$0.02 |
000001068562-3562500061 |
2020 |
3 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
9/25/2019 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR092J1061926700420 |
|
|
$1,202.19 |
000001069551-3562500610 |
2020 |
3 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
9/25/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092J1061926700420 |
|
|
$283.02 |
000001069551-3562500610 |
2020 |
3 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
9/25/2019 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR092J1061926700420 |
|
|
$88.05 |
000001069551-3562500610 |
2020 |
3 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
9/25/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092J1061926700420 |
|
|
$20.72 |
000001069551-3562500610 |
2020 |
3 |
FD52 |
00 |
E124 |
D |
9440501D |
121 |
9/25/2019 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR092J1061926700413 |
|
|
$0.70 |
000001068439-3562500061 |
2020 |
3 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
9/25/2019 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR092J1061926700420 |
|
|
$1,003.25 |
000001069551-3562500610 |
2020 |
3 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
9/25/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092J1061926700420 |
|
|
$236.14 |
000001069551-3562500610 |
2020 |
3 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
9/25/2019 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR092J1061926700420 |
|
|
$211.47 |
000001069551-3562500610 |
2020 |
3 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
9/25/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092J1061926700420 |
|
|
$50.54 |
000001069551-3562500610 |
2020 |
3 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
9/25/2019 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR092J1061926700420 |
|
|
$0.45 |
000001069551-3562500610 |
2020 |
3 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
9/25/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092J1061926700420 |
|
|
$0.12 |
000001069551-3562500610 |
2020 |
3 |
FD52 |
09 |
E111 |
D |
9440501D |
022 |
9/25/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR092J1061926700423 |
|
|
$280.72 |
000001069765-3562509200 |
2020 |
3 |
FD52 |
00 |
E124 |
D |
9440501D |
121 |
9/25/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092J1061926700413 |
|
|
$0.18 |
000001068439-3562500061 |
2020 |
3 |
FD52 |
09 |
E111 |
D |
9440501D |
022 |
9/25/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092J1061926700423 |
|
|
$56.15 |
000001069765-3562509200 |
2020 |
3 |
FD52 |
09 |
E121 |
D |
9440501D |
022 |
9/25/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR092J1061926700423 |
|
|
$20.99 |
000001069765-3562509200 |
2020 |
3 |
FD52 |
09 |
E121 |
D |
9440501D |
022 |
9/25/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092J1061926700423 |
|
|
$4.20 |
000001069765-3562509200 |
2020 |
3 |
FD52 |
09 |
E122 |
D |
9440501D |
022 |
9/25/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR092J1061926700423 |
|
|
$234.21 |
000001069765-3562509200 |
2020 |
3 |
FD52 |
09 |
E122 |
D |
9440501D |
022 |
9/25/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092J1061926700423 |
|
|
$46.85 |
000001069765-3562509200 |
2020 |
3 |
FD52 |
09 |
E123 |
D |
9440501D |
022 |
9/25/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR092J1061926700423 |
|
|
$43.20 |
000001069765-3562509200 |
2020 |
3 |
FD52 |
09 |
E123 |
D |
9440501D |
022 |
9/25/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092J1061926700423 |
|
|
$8.52 |
000001069765-3562509200 |
2020 |
3 |
FD52 |
09 |
E124 |
D |
9440501D |
022 |
9/25/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR092J1061926700423 |
|
|
$0.10 |
000001069765-3562509200 |
2020 |
3 |
FD52 |
09 |
E124 |
D |
9440501D |
022 |
9/25/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092J1061926700423 |
|
|
$0.02 |
000001069765-3562509200 |
2020 |
3 |
FD52 |
00 |
E111 |
D |
9440501D |
121 |
9/25/2019 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR092J1061926700412 |
|
|
$1,458.35 |
000001068439-3562500061 |
2020 |
3 |
FD52 |
00 |
E111 |
D |
9440501D |
121 |
9/25/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092J1061926700412 |
|
|
$364.44 |
000001068439-3562500061 |
2020 |
3 |
FD52 |
00 |
E121 |
D |
9440501D |
121 |
9/25/2019 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR092J1061926700412 |
|
|
$110.86 |
000001068439-3562500061 |
2020 |
3 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
9/12/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091J1061924909328 |
|
|
$344.97 |
000001070711-3562500636 |
2020 |
3 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
9/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091J1061924909328 |
|
|
$34.50 |
000001070711-3562500636 |
2020 |
3 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
9/12/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091J1061924909328 |
|
|
$25.14 |
000001070711-3562500636 |
2020 |
3 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
9/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091J1061924909328 |
|
|
$2.52 |
000001070711-3562500636 |
2020 |
3 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
9/12/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091J1061924909328 |
|
|
$287.81 |
000001070711-3562500636 |
2020 |
3 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
9/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091J1061924909328 |
|
|
$28.78 |
000001070711-3562500636 |
2020 |
3 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
9/12/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091J1061924909328 |
|
|
$51.95 |
000001070711-3562500636 |
2020 |
3 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
9/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091J1061924909328 |
|
|
$5.14 |
000001070711-3562500636 |
2020 |
3 |
FD52 |
09 |
E143 |
D |
9440501D |
045 |
9/11/2019 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2000044600 |
PON21900003413 |
GRW ENGINEERS INC |
$54,322.38 |
Greenup County 9-397.0 |
2020 |
3 |
FD52 |
09 |
E111 |
D |
9440501D |
045 |
9/9/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091J1061924909311 |
|
|
$1,046.08 |
000001070031-3562509208 |
2020 |
3 |
FD52 |
09 |
E111 |
D |
9440501D |
045 |
9/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091J1061924909311 |
|
|
$318.68 |
000001070031-3562509208 |
2020 |
3 |
FD52 |
09 |
E121 |
D |
9440501D |
045 |
9/9/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091J1061924909311 |
|
|
$75.49 |
000001070031-3562509208 |
2020 |
3 |
FD52 |
09 |
E121 |
D |
9440501D |
045 |
9/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091J1061924909311 |
|
|
$22.99 |
000001070031-3562509208 |
2020 |
3 |
FD52 |
09 |
E122 |
D |
9440501D |
045 |
9/9/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091J1061924909311 |
|
|
$872.82 |
000001070031-3562509208 |
2020 |
3 |
FD52 |
09 |
E122 |
D |
9440501D |
045 |
9/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091J1061924909311 |
|
|
$265.88 |
000001070031-3562509208 |
2020 |
3 |
FD52 |
09 |
E111 |
D |
9440501D |
022 |
9/9/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR091J1061924909309 |
|
|
$255.21 |
000001069765-3562509200 |
2020 |
3 |
FD52 |
09 |
E123 |
D |
9440501D |
045 |
9/9/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091J1061924909311 |
|
|
$144.57 |
000001070031-3562509208 |
2020 |
3 |
FD52 |
09 |
E121 |
D |
9440501D |
022 |
9/9/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR091J1061924909309 |
|
|
$19.09 |
000001069765-3562509200 |
2020 |
3 |
FD52 |
09 |
E123 |
D |
9440501D |
045 |
9/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091J1061924909311 |
|
|
$43.32 |
000001070031-3562509208 |
2020 |
3 |
FD52 |
09 |
E122 |
D |
9440501D |
022 |
9/9/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR091J1061924909309 |
|
|
$212.92 |
000001069765-3562509200 |
2020 |
3 |
FD52 |
09 |
E123 |
D |
9440501D |
022 |
9/9/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR091J1061924909309 |
|
|
$39.18 |
000001069765-3562509200 |
2020 |
3 |
FD52 |
00 |
E111 |
D |
9440501D |
121 |
9/9/2019 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR091J1061924909299 |
|
|
$568.19 |
000001068439-3562500061 |
2020 |
3 |
FD52 |
00 |
E111 |
D |
9440501D |
121 |
9/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091J1061924909299 |
|
|
$7.07 |
000001068439-3562500061 |
2020 |
3 |
FD52 |
00 |
E121 |
D |
9440501D |
121 |
9/9/2019 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR091J1061924909299 |
|
|
$43.18 |
000001068439-3562500061 |
2020 |
3 |
FD52 |
00 |
E121 |
D |
9440501D |
121 |
9/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091J1061924909299 |
|
|
$0.54 |
000001068439-3562500061 |
2020 |
3 |
FD52 |
00 |
E122 |
D |
9440501D |
121 |
9/9/2019 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR091J1061924909299 |
|
|
$474.04 |
000001068439-3562500061 |
2020 |
3 |
FD52 |
00 |
E122 |
D |
9440501D |
121 |
9/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091J1061924909299 |
|
|
$5.90 |
000001068439-3562500061 |
2020 |
3 |
FD52 |
00 |
E123 |
D |
9440501D |
121 |
9/9/2019 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR091J1061924909299 |
|
|
$90.94 |
000001068439-3562500061 |
2020 |
3 |
FD52 |
00 |
E123 |
D |
9440501D |
121 |
9/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091J1061924909299 |
|
|
$1.11 |
000001068439-3562500061 |
2020 |
3 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
9/9/2019 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR091J1061924909306 |
|
|
$1,645.19 |
000001069551-3562500610 |
2020 |
3 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
9/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091J1061924909306 |
|
|
$100.76 |
000001069551-3562500610 |
2020 |
3 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
9/9/2019 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR091J1061924909306 |
|
|
$121.10 |
000001069551-3562500610 |
2020 |
3 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
9/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091J1061924909306 |
|
|
$7.57 |
000001069551-3562500610 |
2020 |
3 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
9/9/2019 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR091J1061924909306 |
|
|
$1,372.52 |
000001069551-3562500610 |
2020 |
3 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
9/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091J1061924909306 |
|
|
$84.07 |
000001069551-3562500610 |
2020 |
3 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
9/9/2019 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR091J1061924909306 |
|
|
$223.05 |
000001069551-3562500610 |
2020 |
3 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
9/9/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091J1061924909306 |
|
|
$11.64 |
000001069551-3562500610 |
2020 |
2 |
FD52 |
09 |
E229 |
D |
9440501D |
045 |
8/30/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
IET-XE13A162519241005660 |
|
|
$75.50 |
|
2020 |
2 |
FD52 |
09 |
E111 |
D |
9440501D |
045 |
8/26/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082J1061923508124 |
|
|
$268.25 |
000001070031-3562509208 |
2020 |
2 |
FD52 |
09 |
E111 |
D |
9440501D |
045 |
8/26/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082J1061923508124 |
|
|
$132.33 |
000001070031-3562509208 |
2020 |
2 |
FD52 |
09 |
E121 |
D |
9440501D |
045 |
8/26/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082J1061923508124 |
|
|
$19.36 |
000001070031-3562509208 |
2020 |
2 |
FD52 |
09 |
E121 |
D |
9440501D |
045 |
8/26/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082J1061923508124 |
|
|
$9.55 |
000001070031-3562509208 |
2020 |
2 |
FD52 |
09 |
E122 |
D |
9440501D |
045 |
8/26/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082J1061923508124 |
|
|
$223.80 |
000001070031-3562509208 |
2020 |
2 |
FD52 |
09 |
E122 |
D |
9440501D |
045 |
8/26/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082J1061923508124 |
|
|
$110.40 |
000001070031-3562509208 |
2020 |
2 |
FD52 |
09 |
E123 |
D |
9440501D |
045 |
8/26/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082J1061923508124 |
|
|
$37.16 |
000001070031-3562509208 |
2020 |
2 |
FD52 |
09 |
E123 |
D |
9440501D |
045 |
8/26/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082J1061923508124 |
|
|
$17.99 |
000001070031-3562509208 |
2020 |
2 |
FD52 |
09 |
E124 |
D |
9440501D |
045 |
8/26/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082J1061923508124 |
|
|
$0.09 |
000001070031-3562509208 |
2020 |
2 |
FD52 |
09 |
E124 |
D |
9440501D |
045 |
8/26/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082J1061923508124 |
|
|
$0.04 |
000001070031-3562509208 |
2020 |
2 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
8/26/2019 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR082J1061923508117 |
|
|
$417.44 |
000001069551-3562500610 |
2020 |
2 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
8/26/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082J1061923508117 |
|
|
$10.18 |
000001069551-3562500610 |
2020 |
2 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
8/26/2019 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR082J1061923508117 |
|
|
$29.84 |
000001069551-3562500610 |
2020 |
2 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
8/26/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082J1061923508117 |
|
|
$0.72 |
000001069551-3562500610 |
2020 |
2 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
8/26/2019 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR082J1061923508117 |
|
|
$348.26 |
000001069551-3562500610 |
2020 |
2 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
8/26/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082J1061923508117 |
|
|
$8.50 |
000001069551-3562500610 |
2020 |
2 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
8/26/2019 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR082J1061923508117 |
|
|
$70.95 |
000001069551-3562500610 |
2020 |
2 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
8/26/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082J1061923508117 |
|
|
$1.71 |
000001069551-3562500610 |
2020 |
2 |
FD52 |
00 |
E124 |
D |
9440501D |
022 |
8/26/2019 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR082J1061923508117 |
|
|
$0.12 |
000001069551-3562500610 |
2020 |
2 |
FD52 |
09 |
E143 |
D |
9440501D |
010 |
8/13/2019 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2000022762 |
PON21900003413 |
GRW ENGINEERS INC |
$75,315.09 |
Boyd County 9-397.0 |
2020 |
2 |
FD52 |
09 |
E111 |
D |
9440501D |
045 |
8/12/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081J1061922106954 |
|
|
$737.69 |
000001070031-3562509208 |
2020 |
2 |
FD52 |
09 |
E111 |
D |
9440501D |
045 |
8/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081J1061922106954 |
|
|
$526.88 |
000001070031-3562509208 |
2020 |
2 |
FD52 |
09 |
E121 |
D |
9440501D |
045 |
8/12/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081J1061922106954 |
|
|
$53.23 |
000001070031-3562509208 |
2020 |
2 |
FD52 |
09 |
E121 |
D |
9440501D |
045 |
8/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081J1061922106954 |
|
|
$38.02 |
000001070031-3562509208 |
2020 |
2 |
FD52 |
09 |
E122 |
D |
9440501D |
045 |
8/12/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081J1061922106954 |
|
|
$615.44 |
000001070031-3562509208 |
2020 |
2 |
FD52 |
09 |
E122 |
D |
9440501D |
045 |
8/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081J1061922106954 |
|
|
$439.57 |
000001070031-3562509208 |
2020 |
2 |
FD52 |
09 |
E123 |
D |
9440501D |
045 |
8/12/2019 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081J1061922106954 |
|
|
$102.46 |
000001070031-3562509208 |
2020 |
2 |
FD52 |
09 |
E123 |
D |
9440501D |
045 |
8/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081J1061922106954 |
|
|
$71.62 |
000001070031-3562509208 |
2020 |
2 |
FD52 |
09 |
E111 |
D |
9440501D |
022 |
8/12/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR081J1061922106949 |
|
|
$655.02 |
000001069765-3562509200 |
2020 |
2 |
FD52 |
09 |
E111 |
D |
9440501D |
022 |
8/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081J1061922106949 |
|
|
$18.72 |
000001069765-3562509200 |
2020 |
2 |
FD52 |
09 |
E121 |
D |
9440501D |
022 |
8/12/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR081J1061922106949 |
|
|
$48.97 |
000001069765-3562509200 |
2020 |
2 |
FD52 |
09 |
E121 |
D |
9440501D |
022 |
8/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081J1061922106949 |
|
|
$1.40 |
000001069765-3562509200 |
2020 |
2 |
FD52 |
09 |
E122 |
D |
9440501D |
022 |
8/12/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR081J1061922106949 |
|
|
$546.49 |
000001069765-3562509200 |
2020 |
2 |
FD52 |
09 |
E122 |
D |
9440501D |
022 |
8/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081J1061922106949 |
|
|
$15.62 |
000001069765-3562509200 |
2020 |
2 |
FD52 |
09 |
E123 |
D |
9440501D |
022 |
8/12/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR081J1061922106949 |
|
|
$100.60 |
000001069765-3562509200 |
2020 |
2 |
FD52 |
09 |
E123 |
D |
9440501D |
022 |
8/12/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081J1061922106949 |
|
|
$2.84 |
000001069765-3562509200 |
2020 |
1 |
FD52 |
09 |
E123 |
D |
9440501D |
022 |
7/29/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072J1061920405854 |
|
|
$9.09 |
000001069765-3562509200 |
2020 |
1 |
FD52 |
09 |
E124 |
D |
9440501D |
022 |
7/29/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR072J1061920405854 |
|
|
$0.09 |
000001069765-3562509200 |
2020 |
1 |
FD52 |
09 |
E124 |
D |
9440501D |
022 |
7/29/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072J1061920405854 |
|
|
$0.02 |
000001069765-3562509200 |
2020 |
1 |
FD52 |
09 |
E111 |
D |
9440501D |
022 |
7/29/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR072J1061920405854 |
|
|
$255.27 |
000001069765-3562509200 |
2020 |
1 |
FD52 |
09 |
E111 |
D |
9440501D |
022 |
7/29/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072J1061920405854 |
|
|
$59.88 |
000001069765-3562509200 |
2020 |
1 |
FD52 |
09 |
E121 |
D |
9440501D |
022 |
7/29/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR072J1061920405854 |
|
|
$19.09 |
000001069765-3562509200 |
2020 |
1 |
FD52 |
09 |
E121 |
D |
9440501D |
022 |
7/29/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072J1061920405854 |
|
|
$4.48 |
000001069765-3562509200 |
2020 |
1 |
FD52 |
09 |
E122 |
D |
9440501D |
022 |
7/29/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR072J1061920405854 |
|
|
$212.91 |
000001069765-3562509200 |
2020 |
1 |
FD52 |
09 |
E122 |
D |
9440501D |
022 |
7/29/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072J1061920405854 |
|
|
$49.95 |
000001069765-3562509200 |
2020 |
1 |
FD52 |
09 |
E123 |
D |
9440501D |
022 |
7/29/2019 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR072J1061920405854 |
|
|
$39.29 |
000001069765-3562509200 |
2020 |
1 |
FD52 |
09 |
E143 |
D |
9440501D |
010 |
7/22/2019 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2000011005 |
PON21900003413 |
GRW ENGINEERS INC |
$48,766.30 |
Boyd County 9-397.0 |
2020 |
1 |
FD52 |
00 |
E229 |
D |
9440501D |
121 |
7/16/2019 |
0060 |
ENV STUDIES-ARCHAEOLOGY |
IET-XE13A162519165007870 |
|
|
$74.50 |
|
2020 |
1 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
7/10/2019 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR071J1061919004794 |
|
|
$1,079.43 |
000001069551-3562500610 |
2020 |
1 |
FD52 |
00 |
E111 |
D |
9440501D |
022 |
7/10/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071J1061919004794 |
|
|
$30.52 |
000001069551-3562500610 |
2020 |
1 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
7/10/2019 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR071J1061919004794 |
|
|
$76.89 |
000001069551-3562500610 |
2020 |
1 |
FD52 |
00 |
E121 |
D |
9440501D |
022 |
7/10/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071J1061919004794 |
|
|
$2.17 |
000001069551-3562500610 |
2020 |
1 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
7/10/2019 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR071J1061919004794 |
|
|
$900.60 |
000001069551-3562500610 |
2020 |
1 |
FD52 |
00 |
E122 |
D |
9440501D |
022 |
7/10/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071J1061919004794 |
|
|
$25.45 |
000001069551-3562500610 |
2020 |
1 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
7/10/2019 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR071J1061919004794 |
|
|
$197.96 |
000001069551-3562500610 |
2020 |
1 |
FD52 |
00 |
E123 |
D |
9440501D |
022 |
7/10/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071J1061919004794 |
|
|
$5.73 |
000001069551-3562500610 |
2020 |
1 |
FD52 |
00 |
E123 |
D |
9440501D |
121 |
7/1/2019 |
0060 |
ENV STUDIES-ARCHAEOLOGY |
CA-XR061J1061915802545P |
|
|
$46.36 |
000001068639-3562500061 |
2020 |
1 |
FD52 |
00 |
E123 |
D |
9440501D |
121 |
7/1/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802545P |
|
|
$43.66 |
000001068639-3562500061 |
2020 |
1 |
FD52 |
00 |
E123 |
D |
9440501D |
121 |
7/1/2019 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR061J1061915802551P |
|
|
$80.26 |
000001068820-3562500061 |
2020 |
1 |
FD52 |
00 |
E123 |
D |
9440501D |
121 |
7/1/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802551P |
|
|
$26.47 |
000001068820-3562500061 |
2020 |
1 |
FD52 |
00 |
E123 |
D |
9440501D |
009 |
7/1/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR061J1061915802546P |
|
|
$7.84 |
000001068700-3562500061 |
2020 |
1 |
FD52 |
00 |
E123 |
D |
9440501D |
009 |
7/1/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802546P |
|
|
$2.15 |
000001068700-3562500061 |
2019 |
12 |
FD52 |
09 |
E143 |
D |
9440501D |
010 |
6/18/2019 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-1900213415 |
PON21900003413 |
GRW ENGINEERS INC |
$52,145.35 |
Boyd County 9-397.0 |
2019 |
12 |
FD52 |
00 |
E111 |
D |
9440501D |
121 |
6/14/2019 |
0060 |
ENV STUDIES-ARCHAEOLOGY |
CA-XR061J1061915802545 |
|
|
$276.09 |
000001068639-3562500061 |
2019 |
12 |
FD52 |
00 |
E111 |
D |
9440501D |
121 |
6/14/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802545 |
|
|
$267.06 |
000001068639-3562500061 |
2019 |
12 |
FD52 |
00 |
E121 |
D |
9440501D |
121 |
6/14/2019 |
0060 |
ENV STUDIES-ARCHAEOLOGY |
CA-XR061J1061915802545 |
|
|
$20.74 |
000001068639-3562500061 |
2019 |
12 |
FD52 |
00 |
E121 |
D |
9440501D |
121 |
6/14/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802545 |
|
|
$20.07 |
000001068639-3562500061 |
2019 |
12 |
FD52 |
00 |
E122 |
D |
9440501D |
121 |
6/14/2019 |
0060 |
ENV STUDIES-ARCHAEOLOGY |
CA-XR061J1061915802545 |
|
|
$230.33 |
000001068639-3562500061 |
2019 |
12 |
FD52 |
00 |
E122 |
D |
9440501D |
121 |
6/14/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802545 |
|
|
$222.81 |
000001068639-3562500061 |
2019 |
12 |
FD52 |
00 |
E111 |
D |
9440501D |
121 |
6/14/2019 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR061J1061915802551 |
|
|
$350.67 |
000001068820-3562500061 |
2019 |
12 |
FD52 |
00 |
E111 |
D |
9440501D |
121 |
6/14/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802551 |
|
|
$122.63 |
000001068820-3562500061 |
2019 |
12 |
FD52 |
00 |
E121 |
D |
9440501D |
121 |
6/14/2019 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR061J1061915802551 |
|
|
$24.51 |
000001068820-3562500061 |
2019 |
12 |
FD52 |
00 |
E121 |
D |
9440501D |
121 |
6/14/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802551 |
|
|
$8.62 |
000001068820-3562500061 |
2019 |
12 |
FD52 |
00 |
E122 |
D |
9440501D |
121 |
6/14/2019 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR061J1061915802551 |
|
|
$292.54 |
000001068820-3562500061 |
2019 |
12 |
FD52 |
00 |
E122 |
D |
9440501D |
121 |
6/14/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802551 |
|
|
$102.33 |
000001068820-3562500061 |
2019 |
12 |
FD52 |
00 |
E111 |
D |
9440501D |
009 |
6/10/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR061J1061915802546 |
|
|
$146.03 |
000001068700-3562500061 |
2019 |
12 |
FD52 |
00 |
E111 |
D |
9440501D |
009 |
6/10/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802546 |
|
|
$43.01 |
000001068700-3562500061 |
2019 |
12 |
FD52 |
00 |
E121 |
D |
9440501D |
009 |
6/10/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR061J1061915802546 |
|
|
$9.83 |
000001068700-3562500061 |
2019 |
12 |
FD52 |
00 |
E121 |
D |
9440501D |
009 |
6/10/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802546 |
|
|
$2.90 |
000001068700-3562500061 |
2019 |
12 |
FD52 |
00 |
E122 |
D |
9440501D |
009 |
6/10/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR061J1061915802546 |
|
|
$121.77 |
000001068700-3562500061 |
2019 |
12 |
FD52 |
00 |
E122 |
D |
9440501D |
009 |
6/10/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061J1061915802546 |
|
|
$35.88 |
000001068700-3562500061 |
2019 |
11 |
FD52 |
00 |
E229 |
D |
9440501D |
121 |
5/29/2019 |
0092 |
ENV STUDIES-PERMITTING |
IET-XE13A162519145009040 |
|
|
$196.00 |
|
2019 |
11 |
FD52 |
00 |
E229 |
D |
9440501D |
009 |
5/29/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
IET-XE13A162519145014610 |
|
|
$154.50 |
|
2019 |
11 |
FD52 |
00 |
E122 |
D |
9440501D |
009 |
5/23/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR052J1061914201396 |
|
|
$265.68 |
000001068700-3562500061 |
2019 |
11 |
FD52 |
00 |
E122 |
D |
9440501D |
009 |
5/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052J1061914201396 |
|
|
$82.19 |
000001068700-3562500061 |
2019 |
11 |
FD52 |
00 |
E111 |
D |
9440501D |
121 |
5/23/2019 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR052J1061914201382 |
|
|
$568.12 |
000001068439-3562500061 |
2019 |
11 |
FD52 |
00 |
E111 |
D |
9440501D |
121 |
5/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052J1061914201382 |
|
|
$14.14 |
000001068439-3562500061 |
2019 |
11 |
FD52 |
00 |
E121 |
D |
9440501D |
121 |
5/23/2019 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR052J1061914201382 |
|
|
$43.20 |
000001068439-3562500061 |
2019 |
11 |
FD52 |
00 |
E123 |
D |
9440501D |
009 |
5/23/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR052J1061914201396 |
|
|
$17.12 |
000001068700-3562500061 |
2019 |
11 |
FD52 |
00 |
E121 |
D |
9440501D |
121 |
5/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052J1061914201382 |
|
|
$1.07 |
000001068439-3562500061 |
2019 |
11 |
FD52 |
00 |
E122 |
D |
9440501D |
121 |
5/23/2019 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR052J1061914201382 |
|
|
$474.03 |
000001068439-3562500061 |
2019 |
11 |
FD52 |
00 |
E122 |
D |
9440501D |
121 |
5/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052J1061914201382 |
|
|
$11.80 |
000001068439-3562500061 |
2019 |
11 |
FD52 |
00 |
E123 |
D |
9440501D |
121 |
5/23/2019 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR052J1061914201382 |
|
|
$90.96 |
000001068439-3562500061 |
2019 |
11 |
FD52 |
00 |
E123 |
D |
9440501D |
121 |
5/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052J1061914201382 |
|
|
$2.23 |
000001068439-3562500061 |
2019 |
11 |
FD52 |
00 |
E124 |
D |
9440501D |
121 |
5/23/2019 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR052J1061914201382 |
|
|
$0.27 |
000001068439-3562500061 |
2019 |
11 |
FD52 |
00 |
E124 |
D |
9440501D |
121 |
5/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052J1061914201382 |
|
|
$0.01 |
000001068439-3562500061 |
2019 |
11 |
FD52 |
00 |
E123 |
D |
9440501D |
009 |
5/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052J1061914201396 |
|
|
$4.92 |
000001068700-3562500061 |
2019 |
11 |
FD52 |
00 |
E124 |
D |
9440501D |
009 |
5/23/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR052J1061914201396 |
|
|
$0.18 |
000001068700-3562500061 |
2019 |
11 |
FD52 |
00 |
E124 |
D |
9440501D |
009 |
5/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052J1061914201396 |
|
|
$0.06 |
000001068700-3562500061 |
2019 |
11 |
FD52 |
00 |
E111 |
D |
9440501D |
121 |
5/23/2019 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR052J1061914201386 |
|
|
$203.75 |
000001068562-3562500061 |
2019 |
11 |
FD52 |
00 |
E111 |
D |
9440501D |
121 |
5/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052J1061914201386 |
|
|
$20.37 |
000001068562-3562500061 |
2019 |
11 |
FD52 |
00 |
E121 |
D |
9440501D |
121 |
5/23/2019 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR052J1061914201386 |
|
|
$15.11 |
000001068562-3562500061 |
2019 |
11 |
FD52 |
00 |
E121 |
D |
9440501D |
121 |
5/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052J1061914201386 |
|
|
$1.51 |
000001068562-3562500061 |
2019 |
11 |
FD52 |
00 |
E122 |
D |
9440501D |
121 |
5/23/2019 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR052J1061914201386 |
|
|
$169.99 |
000001068562-3562500061 |
2019 |
11 |
FD52 |
00 |
E122 |
D |
9440501D |
121 |
5/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052J1061914201386 |
|
|
$16.99 |
000001068562-3562500061 |
2019 |
11 |
FD52 |
00 |
E123 |
D |
9440501D |
121 |
5/23/2019 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR052J1061914201386 |
|
|
$43.99 |
000001068562-3562500061 |
2019 |
11 |
FD52 |
00 |
E123 |
D |
9440501D |
121 |
5/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052J1061914201386 |
|
|
$4.32 |
000001068562-3562500061 |
2019 |
11 |
FD52 |
00 |
E124 |
D |
9440501D |
121 |
5/23/2019 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR052J1061914201386 |
|
|
$0.14 |
000001068562-3562500061 |
2019 |
11 |
FD52 |
00 |
E124 |
D |
9440501D |
121 |
5/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052J1061914201386 |
|
|
$0.01 |
000001068562-3562500061 |
2019 |
11 |
FD52 |
00 |
E111 |
D |
9440501D |
009 |
5/23/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR052J1061914201395 |
|
|
$318.45 |
000001068700-3562500061 |
2019 |
11 |
FD52 |
00 |
E111 |
D |
9440501D |
009 |
5/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052J1061914201395 |
|
|
$98.51 |
000001068700-3562500061 |
2019 |
11 |
FD52 |
00 |
E121 |
D |
9440501D |
009 |
5/23/2019 |
0050 |
ENV STUDIES-TERRESTRIAL ECOL |
CA-XR052J1061914201395 |
|
|
$21.46 |
000001068700-3562500061 |
2019 |
11 |
FD52 |
00 |
E121 |
D |
9440501D |
009 |
5/23/2019 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052J1061914201395 |
|
|
$6.64 |
000001068700-3562500061 |
2019 |
11 |
FD52 |
09 |
E143 |
D |
9440501D |
010 |
5/15/2019 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-1900190806 |
PON21900003413 |
GRW ENGINEERS INC |
$121,289.39 |
Boyd County 9-397.0 |
2019 |
10 |
FD52 |
09 |
E143 |
D |
9440501D |
022 |
4/10/2019 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-1900170987 |
PON21900003413 |
GRW ENGINEERS INC |
$97,532.60 |
Carter County 9-397.0 |
2019 |
9 |
FD52 |
09 |
E143 |
D |
9440501D |
022 |
3/13/2019 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-1900153093 |
PON21900003413 |
GRW ENGINEERS INC |
$83,879.70 |
Carter County 9-397.0 |
2019 |
8 |
FD52 |
09 |
E143 |
D |
9440501D |
022 |
2/14/2019 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-1900136441 |
PON21900003413 |
GRW ENGINEERS INC |
$102,675.94 |
Carter County 9-397.0 |