The Commonwealth pays employees on a semi-monthly basis with a scheduled pay day on the 15th and 30th of each month. The two monthly pay periods are from the 1st to the 15th of the month and the 16th through the last day of the month. Pay check distribution is delayed by one pay period to allow for system processing. For example work performed during the 1st to the 15th day of the month is paid to the employee on the 30th of the month. Accordingly the cost accounting charges for labor costs posting in eMARS to operating accounts and highway projects are also delayed by approximately one pay period.
A good rule of measure is that the cost accounting charges for the pay period ending on the 15th of the month will post to eMARS by the 25th and those for the pay period ending on the last day of the month will post to eMARS by the 10th of the following month.

x close panel
Detailed Project Expenditure Report
Total E-MARS Expenditures for 9440501D = $1,505,668.28
Click here for Labor Costs Information
Year Month PBU Charge District Object Phase Program Code County Date ACT Activity Name Trans ID Reference # Vendor Name Expenditure Line Description
2024 10 FD52 00 E121 D 9440501D 022 4/10/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR041O1062410001611 $28.37 000001075887-3562500636
2024 10 FD52 00 E121 D 9440501D 022 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001611 $5.53 000001075887-3562500636
2024 10 FD52 00 E122 D 9440501D 022 4/10/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR041O1062410001611 $263.05 000001075887-3562500636
2024 10 FD52 00 E122 D 9440501D 022 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001611 $51.29 000001075887-3562500636
2024 10 FD52 00 E123 D 9440501D 022 4/10/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR041O1062410001611 $82.08 000001075887-3562500636
2024 10 FD52 00 E123 D 9440501D 022 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001611 $15.88 000001075887-3562500636
2024 10 FD52 00 E111 D 9440501D 022 4/10/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR041O1062410001611 $397.54 000001075887-3562500636
2024 10 FD52 00 E111 D 9440501D 022 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001611 $77.52 000001075887-3562500636
2024 9 FD52 09 E143 D 9440501D 045 3/18/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400187778 PON21900003413 GRW ENGINEERS INC $19,506.52 Greenup County 9-397.0
2024 9 FD52 09 E143 D 9440501D 045 3/18/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400187798 PON21900003413 GRW ENGINEERS INC $19,506.52 Greenup County 9-397.0
2024 9 FD52 00 E111 D 9440501D 022 3/11/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR031O1062406810058 $770.24 000001075887-3562500636
2024 9 FD52 00 E121 D 9440501D 022 3/11/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR031O1062406810058 $54.95 000001075887-3562500636
2024 9 FD52 00 E122 D 9440501D 022 3/11/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR031O1062406810058 $509.67 000001075887-3562500636
2024 9 FD52 00 E123 D 9440501D 022 3/11/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR031O1062406810058 $158.83 000001075887-3562500636
2024 6 FD52 00 E111 D 9440501D 022 12/14/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121N1062334203601 $434.49 000001070711-3562500636
2024 6 FD52 00 E111 D 9440501D 022 12/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203601 $188.83 000001070711-3562500636
2024 6 FD52 00 E121 D 9440501D 022 12/14/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121N1062334203601 $31.23 000001070711-3562500636
2024 6 FD52 00 E121 D 9440501D 022 12/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203601 $13.59 000001070711-3562500636
2024 6 FD52 00 E122 D 9440501D 022 12/14/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121N1062334203601 $287.46 000001070711-3562500636
2024 6 FD52 00 E122 D 9440501D 022 12/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203601 $124.95 000001070711-3562500636
2024 6 FD52 00 E123 D 9440501D 022 12/14/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121N1062334203601 $64.10 000001070711-3562500636
2024 6 FD52 00 E123 D 9440501D 022 12/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203601 $27.57 000001070711-3562500636
2024 3 FD52 00 E111 D 9440501D 022 9/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091N1062325106072 $398.22 000001070711-3562500636
2024 3 FD52 00 E121 D 9440501D 022 9/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091N1062325106072 $28.64 000001070711-3562500636
2024 3 FD52 00 E122 D 9440501D 022 9/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091N1062325106072 $263.50 000001070711-3562500636
2024 3 FD52 00 E123 D 9440501D 022 9/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091N1062325106072 $58.56 000001070711-3562500636
2023 12 FD52 00 E124 D 9440501D 022 6/26/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062N1062317400409 $0.10 000001070711-3562500636
2023 12 FD52 00 E111 D 9440501D 022 6/26/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062N1062317400409 $372.57 000001070711-3562500636
2023 12 FD52 00 E121 D 9440501D 022 6/26/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062N1062317400409 $27.12 000001070711-3562500636
2023 12 FD52 00 E122 D 9440501D 022 6/26/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062N1062317400409 $290.58 000001070711-3562500636
2023 12 FD52 00 E123 D 9440501D 022 6/26/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062N1062317400409 $63.91 000001070711-3562500636
2023 11 FD52 09 E143 D 9440501D 045 5/19/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300222093 PON21900003413 GRW ENGINEERS INC $50,153.46 Greenup County 9-397.0
2023 11 FD52 00 E111 D 9440501D 022 5/15/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051N1062312808046 $409.83 000001070711-3562500636
2023 11 FD52 00 E121 D 9440501D 022 5/15/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051N1062312808046 $29.16 000001070711-3562500636
2023 11 FD52 00 E122 D 9440501D 022 5/15/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051N1062312808046 $319.65 000001070711-3562500636
2023 11 FD52 00 E123 D 9440501D 022 5/15/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051N1062312808046 $70.29 000001070711-3562500636
2023 9 FD52 00 E111 D 9440501D 121 3/15/2023 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR031N1062306703687 $342.27 000001086707-3562500610
2023 9 FD52 00 E121 D 9440501D 121 3/15/2023 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR031N1062306703687 $24.41 000001086707-3562500610
2023 9 FD52 00 E122 D 9440501D 121 3/15/2023 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR031N1062306703687 $266.96 000001086707-3562500610
2023 9 FD52 00 E123 D 9440501D 121 3/15/2023 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR031N1062306703687 $57.27 000001086707-3562500610
2023 8 FD52 00 E111 D 9440501D 022 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302422 $372.57 000001070711-3562500636
2023 8 FD52 00 E121 D 9440501D 022 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302422 $27.12 000001070711-3562500636
2023 8 FD52 00 E122 D 9440501D 022 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302422 $290.61 000001070711-3562500636
2023 8 FD52 00 E123 D 9440501D 022 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302422 $63.89 000001070711-3562500636
2023 8 FD52 00 E124 D 9440501D 022 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302422 $0.09 000001070711-3562500636
2023 6 FD52 00 E111 D 9440501D 022 12/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121M1062234208190 $372.52 000001070711-3562500636
2023 6 FD52 00 E111 D 9440501D 022 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208190 $157.47 000001070711-3562500636
2023 6 FD52 00 E121 D 9440501D 022 12/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121M1062234208190 $26.54 000001070711-3562500636
2023 6 FD52 00 E121 D 9440501D 022 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208190 $11.21 000001070711-3562500636
2023 6 FD52 00 E122 D 9440501D 022 12/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121M1062234208190 $290.21 000001070711-3562500636
2023 6 FD52 00 E122 D 9440501D 022 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208190 $122.83 000001070711-3562500636
2023 6 FD52 00 E123 D 9440501D 022 12/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121M1062234208190 $56.33 000001070711-3562500636
2023 6 FD52 00 E123 D 9440501D 022 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208190 $23.53 000001070711-3562500636
2023 5 FD52 09 E143 D 9440501D 045 11/18/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300091022 PON21900003413 GRW ENGINEERS INC $29,259.78 Greenup County 9-397.0
2023 4 FD52 00 E111 D 9440501D 022 10/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102M1062229405025 $409.83 000001070711-3562500636
2023 4 FD52 00 E111 D 9440501D 022 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405025 $521.31 000001070711-3562500636
2023 4 FD52 00 E121 D 9440501D 022 10/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102M1062229405025 $29.82 000001070711-3562500636
2023 4 FD52 00 E121 D 9440501D 022 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405025 $37.94 000001070711-3562500636
2023 4 FD52 00 E122 D 9440501D 022 10/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102M1062229405025 $319.67 000001070711-3562500636
2023 4 FD52 00 E122 D 9440501D 022 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405025 $406.62 000001070711-3562500636
2023 4 FD52 00 E123 D 9440501D 022 10/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102M1062229405025 $62.41 000001070711-3562500636
2023 4 FD52 00 E123 D 9440501D 022 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405025 $77.91 000001070711-3562500636
2023 4 FD52 00 E124 D 9440501D 022 10/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102M1062229405025 $0.10 000001070711-3562500636
2023 4 FD52 00 E124 D 9440501D 022 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405025 $0.12 000001070711-3562500636
2023 2 FD52 00 E111 D 9440501D 022 8/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082M1062223500403 $372.72 000001070711-3562500636
2023 2 FD52 00 E111 D 9440501D 022 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500403 $13.91 000001070711-3562500636
2023 2 FD52 00 E121 D 9440501D 022 8/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082M1062223500403 $27.11 000001070711-3562500636
2023 2 FD52 00 E121 D 9440501D 022 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500403 $1.01 000001070711-3562500636
2023 2 FD52 00 E122 D 9440501D 022 8/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082M1062223500403 $290.61 000001070711-3562500636
2023 2 FD52 00 E122 D 9440501D 022 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500403 $10.85 000001070711-3562500636
2023 2 FD52 00 E123 D 9440501D 022 8/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082M1062223500403 $56.16 000001070711-3562500636
2023 2 FD52 00 E123 D 9440501D 022 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500403 $2.08 000001070711-3562500636
2023 2 FD52 00 E124 D 9440501D 022 8/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082M1062223500403 $0.09 000001070711-3562500636
2023 1 FD52 00 E111 D 9440501D 022 7/28/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072M1062220308962 $372.91 000001070711-3562500636
2023 1 FD52 00 E111 D 9440501D 022 7/28/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308962 $82.46 000001070711-3562500636
2023 1 FD52 00 E121 D 9440501D 022 7/28/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072M1062220308962 $27.12 000001070711-3562500636
2023 1 FD52 00 E121 D 9440501D 022 7/28/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308962 $6.00 000001070711-3562500636
2023 1 FD52 00 E122 D 9440501D 022 7/28/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072M1062220308962 $292.92 000001070711-3562500636
2023 1 FD52 00 E122 D 9440501D 022 7/28/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308962 $64.32 000001070711-3562500636
2023 1 FD52 00 E123 D 9440501D 022 7/28/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072M1062220308962 $56.73 000001070711-3562500636
2023 1 FD52 00 E123 D 9440501D 022 7/28/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308962 $12.32 000001070711-3562500636
2023 1 FD52 00 E124 D 9440501D 022 7/28/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072M1062220308962 $0.10 000001070711-3562500636
2023 1 FD52 00 E124 D 9440501D 022 7/28/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308962 $0.02 000001070711-3562500636
2023 1 FD52 00 E111 D 9440501D 010 7/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071M1062219207852 $344.98 000001072341-3562500636
2023 1 FD52 00 E121 D 9440501D 010 7/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071M1062219207852 $24.42 000001072341-3562500636
2023 1 FD52 00 E122 D 9440501D 010 7/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071M1062219207852 $289.68 000001072341-3562500636
2023 1 FD52 00 E123 D 9440501D 010 7/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071M1062219207852 $56.14 000001072341-3562500636
2022 11 FD52 09 E111 D 9440501D 022 5/13/2022 1030 FIELD SURVEY CA-XR051M1062212603672 $827.01 000001082503-3562509204
2022 11 FD52 09 E111 D 9440501D 022 5/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603672 $52.42 000001082503-3562509204
2022 11 FD52 09 E115 D 9440501D 022 5/13/2022 1030 FIELD SURVEY CA-XR051M1062212603672 $65.19 000001082503-3562509204
2022 11 FD52 09 E121 D 9440501D 022 5/13/2022 1030 FIELD SURVEY CA-XR051M1062212603672 $66.75 000001082503-3562509204
2022 11 FD52 09 E121 D 9440501D 022 5/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603672 $3.96 000001082503-3562509204
2022 11 FD52 09 E122 D 9440501D 022 5/13/2022 1030 FIELD SURVEY CA-XR051M1062212603672 $749.18 000001082503-3562509204
2022 11 FD52 09 E122 D 9440501D 022 5/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603672 $44.02 000001082503-3562509204
2022 11 FD52 09 E123 D 9440501D 022 5/13/2022 1030 FIELD SURVEY CA-XR051M1062212603672 $161.76 000001082503-3562509204
2022 11 FD52 09 E123 D 9440501D 022 5/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603672 $7.76 000001082503-3562509204
2022 11 FD52 09 E229 D 9440501D 022 5/12/2022 1030 FIELD SURVEY IET-XE13A162522130001130 $155.10
2022 11 FD52 00 E111 D 9440501D 022 5/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051M1062212603628 $379.32 000001070711-3562500636
2022 11 FD52 00 E111 D 9440501D 022 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603628 $18.72 000001070711-3562500636
2022 11 FD52 00 E121 D 9440501D 022 5/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051M1062212603628 $27.50 000001070711-3562500636
2022 11 FD52 00 E121 D 9440501D 022 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603628 $1.36 000001070711-3562500636
2022 11 FD52 00 E122 D 9440501D 022 5/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051M1062212603628 $318.64 000001070711-3562500636
2022 11 FD52 00 E122 D 9440501D 022 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603628 $15.72 000001070711-3562500636
2022 11 FD52 00 E123 D 9440501D 022 5/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051M1062212603628 $61.78 000001070711-3562500636
2022 11 FD52 00 E123 D 9440501D 022 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603628 $3.02 000001070711-3562500636
2022 10 FD52 00 E111 D 9440501D 022 4/11/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041M1062209801447 $316.31 000001070711-3562500636
2022 10 FD52 00 E111 D 9440501D 022 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801447 $30.77 000001070711-3562500636
2022 10 FD52 00 E121 D 9440501D 022 4/11/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041M1062209801447 $22.93 000001070711-3562500636
2022 10 FD52 00 E121 D 9440501D 022 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801447 $2.22 000001070711-3562500636
2022 10 FD52 00 E122 D 9440501D 022 4/11/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041M1062209801447 $265.54 000001070711-3562500636
2022 10 FD52 00 E122 D 9440501D 022 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801447 $25.84 000001070711-3562500636
2022 10 FD52 00 E123 D 9440501D 022 4/11/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041M1062209801447 $51.51 000001070711-3562500636
2022 10 FD52 00 E123 D 9440501D 022 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801447 $4.96 000001070711-3562500636
2022 9 FD52 00 E122 D 9440501D 022 3/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709436 $10.86 000001070711-3562500636
2022 9 FD52 00 E123 D 9440501D 022 3/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031M1062206709436 $68.64 000001070711-3562500636
2022 9 FD52 00 E123 D 9440501D 022 3/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709436 $2.09 000001070711-3562500636
2022 9 FD52 00 E111 D 9440501D 022 3/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031M1062206709435 $421.57 000001070711-3562500636
2022 9 FD52 00 E111 D 9440501D 022 3/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709435 $12.93 000001070711-3562500636
2022 9 FD52 00 E121 D 9440501D 022 3/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031M1062206709435 $30.55 000001070711-3562500636
2022 9 FD52 00 E121 D 9440501D 022 3/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709435 $0.94 000001070711-3562500636
2022 9 FD52 00 E122 D 9440501D 022 3/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031M1062206709435 $354.05 000001070711-3562500636
2022 8 FD52 00 E111 D 9440501D 022 2/14/2022 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR021M1062203907409 $117.64 000001069551-3562500610
2022 8 FD52 00 E111 D 9440501D 022 2/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907409 $57.73 000001069551-3562500610
2022 8 FD52 00 E121 D 9440501D 022 2/14/2022 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR021M1062203907409 $8.07 000001069551-3562500610
2022 8 FD52 00 E121 D 9440501D 022 2/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907409 $3.96 000001069551-3562500610
2022 8 FD52 00 E122 D 9440501D 022 2/14/2022 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR021M1062203907409 $98.74 000001069551-3562500610
2022 8 FD52 00 E122 D 9440501D 022 2/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907409 $48.47 000001069551-3562500610
2022 8 FD52 00 E123 D 9440501D 022 2/14/2022 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR021M1062203907409 $20.67 000001069551-3562500610
2022 8 FD52 00 E123 D 9440501D 022 2/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907409 $10.03 000001069551-3562500610
2022 7 FD52 09 E111 D 9440501D 045 1/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011M1062200705525 $392.35 000001070031-3562509204
2022 7 FD52 09 E111 D 9440501D 045 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705525 $196.17 000001070031-3562509204
2022 7 FD52 09 E121 D 9440501D 045 1/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011M1062200705525 $28.29 000001070031-3562509204
2022 7 FD52 09 E121 D 9440501D 045 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705525 $14.14 000001070031-3562509204
2022 7 FD52 09 E122 D 9440501D 045 1/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011M1062200705525 $329.45 000001070031-3562509204
2022 7 FD52 09 E122 D 9440501D 045 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705525 $164.72 000001070031-3562509204
2022 7 FD52 09 E123 D 9440501D 045 1/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011M1062200705525 $59.35 000001070031-3562509204
2022 7 FD52 09 E123 D 9440501D 045 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705525 $29.03 000001070031-3562509204
2022 6 FD52 00 E122 D 9440501D 022 12/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103531 $108.92 000001070711-3562500636
2022 6 FD52 00 E123 D 9440501D 022 12/10/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121L1062134103531 $53.62 000001070711-3562500636
2022 6 FD52 00 E123 D 9440501D 022 12/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103531 $19.92 000001070711-3562500636
2022 6 FD52 00 E111 D 9440501D 022 12/8/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121L1062134103530 $344.63 000001070711-3562500636
2022 6 FD52 00 E111 D 9440501D 022 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103530 $129.71 000001070711-3562500636
2022 6 FD52 00 E121 D 9440501D 022 12/8/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121L1062134103530 $24.49 000001070711-3562500636
2022 6 FD52 00 E121 D 9440501D 022 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103530 $9.20 000001070711-3562500636
2022 6 FD52 00 E122 D 9440501D 022 12/8/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121L1062134103530 $289.67 000001070711-3562500636
2022 5 FD52 09 E111 D 9440501D 045 11/23/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112L1062132602487 $599.11 000001070031-3562509204
2022 5 FD52 09 E111 D 9440501D 045 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602487 $149.81 000001070031-3562509204
2022 5 FD52 09 E121 D 9440501D 045 11/23/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112L1062132602487 $43.87 000001070031-3562509204
2022 5 FD52 09 E121 D 9440501D 045 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602487 $10.97 000001070031-3562509204
2022 5 FD52 09 E122 D 9440501D 045 11/23/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112L1062132602487 $502.90 000001070031-3562509204
2022 5 FD52 09 E122 D 9440501D 045 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602487 $125.80 000001070031-3562509204
2022 5 FD52 09 E123 D 9440501D 045 11/23/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112L1062132602487 $88.09 000001070031-3562509204
2022 5 FD52 09 E123 D 9440501D 045 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602487 $21.63 000001070031-3562509204
2022 5 FD52 09 E124 D 9440501D 045 11/23/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112L1062132602487 $0.26 000001070031-3562509204
2022 5 FD52 09 E124 D 9440501D 045 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602487 $0.06 000001070031-3562509204
2022 5 FD52 09 E143 D 9440501D 010 11/19/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200088854 PON21900003413 GRW ENGINEERS INC $21,139.51 Boyd County 9-397.0
2022 5 FD52 00 E111 D 9440501D 022 11/8/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111L1062130901490 $379.51 000001070711-3562500636
2022 5 FD52 00 E111 D 9440501D 022 11/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901490 $21.25 000001070711-3562500636
2022 5 FD52 00 E121 D 9440501D 022 11/8/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111L1062130901490 $26.93 000001070711-3562500636
2022 5 FD52 00 E121 D 9440501D 022 11/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901490 $1.51 000001070711-3562500636
2022 5 FD52 00 E122 D 9440501D 022 11/8/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111L1062130901490 $318.64 000001070711-3562500636
2022 5 FD52 00 E122 D 9440501D 022 11/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901490 $17.84 000001070711-3562500636
2022 5 FD52 00 E123 D 9440501D 022 11/8/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111L1062130901490 $58.82 000001070711-3562500636
2022 5 FD52 00 E123 D 9440501D 022 11/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901490 $3.26 000001070711-3562500636
2022 5 FD52 09 E111 D 9440501D 045 11/8/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111L1062130901489 $235.41 000001070031-3562509204
2022 5 FD52 09 E111 D 9440501D 045 11/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901489 $34.21 000001070031-3562509204
2022 5 FD52 09 E121 D 9440501D 045 11/8/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111L1062130901489 $17.24 000001070031-3562509204
2022 5 FD52 09 E121 D 9440501D 045 11/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901489 $2.50 000001070031-3562509204
2022 5 FD52 09 E122 D 9440501D 045 11/8/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111L1062130901489 $197.67 000001070031-3562509204
2022 5 FD52 09 E122 D 9440501D 045 11/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901489 $28.73 000001070031-3562509204
2022 5 FD52 09 E123 D 9440501D 045 11/8/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111L1062130901489 $34.57 000001070031-3562509204
2022 5 FD52 09 E123 D 9440501D 045 11/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901489 $4.94 000001070031-3562509204
2022 4 FD52 09 E111 D 9440501D 045 10/29/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102L1062129500381 $427.89 000001070031-3562509204
2022 4 FD52 09 E111 D 9440501D 045 10/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500381 $73.04 000001070031-3562509204
2022 4 FD52 09 E121 D 9440501D 045 10/29/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102L1062129500381 $31.34 000001070031-3562509204
2022 4 FD52 09 E121 D 9440501D 045 10/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500381 $5.35 000001070031-3562509204
2022 4 FD52 09 E122 D 9440501D 045 10/29/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102L1062129500381 $359.40 000001070031-3562509204
2022 4 FD52 09 E122 D 9440501D 045 10/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500381 $61.33 000001070031-3562509204
2022 4 FD52 09 E123 D 9440501D 045 10/29/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102L1062129500381 $62.89 000001070031-3562509204
2022 4 FD52 09 E123 D 9440501D 045 10/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500381 $10.54 000001070031-3562509204
2022 4 FD52 09 E124 D 9440501D 045 10/29/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102L1062129500381 $0.18 000001070031-3562509204
2022 4 FD52 09 E124 D 9440501D 045 10/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500381 $0.03 000001070031-3562509204
2022 4 FD52 09 E111 D 9440501D 045 10/14/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101L1062128110102 $428.01 000001070031-3562509204
2022 4 FD52 09 E111 D 9440501D 045 10/14/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110102 $55.64 000001070031-3562509204
2022 4 FD52 09 E121 D 9440501D 045 10/14/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101L1062128110102 $31.33 000001070031-3562509204
2022 4 FD52 09 E121 D 9440501D 045 10/14/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110102 $4.07 000001070031-3562509204
2022 4 FD52 09 E122 D 9440501D 045 10/14/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101L1062128110102 $359.40 000001070031-3562509204
2022 4 FD52 09 E122 D 9440501D 045 10/14/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110102 $46.72 000001070031-3562509204
2022 4 FD52 09 E123 D 9440501D 045 10/14/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101L1062128110102 $62.85 000001070031-3562509204
2022 4 FD52 09 E123 D 9440501D 045 10/14/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110102 $8.03 000001070031-3562509204
2022 4 FD52 00 E122 D 9440501D 022 10/11/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101L1062128110103 $289.68 000001070711-3562500636
2022 4 FD52 00 E123 D 9440501D 022 10/11/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101L1062128110103 $53.44 000001070711-3562500636
2022 4 FD52 00 E111 D 9440501D 022 10/11/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101L1062128110103 $344.98 000001070711-3562500636
2022 4 FD52 00 E121 D 9440501D 022 10/11/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101L1062128110103 $24.49 000001070711-3562500636
2022 3 FD52 00 E111 D 9440501D 022 9/27/2021 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR092L1062126709017 $324.15 000001073961-3562500610
2022 3 FD52 00 E111 D 9440501D 022 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709017 $108.64 000001073961-3562500610
2022 3 FD52 00 E121 D 9440501D 022 9/27/2021 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR092L1062126709017 $22.24 000001073961-3562500610
2022 3 FD52 00 E121 D 9440501D 022 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709017 $7.49 000001073961-3562500610
2022 3 FD52 00 E122 D 9440501D 022 9/27/2021 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR092L1062126709017 $273.45 000001073961-3562500610
2022 3 FD52 00 E122 D 9440501D 022 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709017 $91.23 000001073961-3562500610
2022 3 FD52 00 E123 D 9440501D 022 9/27/2021 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR092L1062126709017 $58.58 000001073961-3562500610
2022 3 FD52 00 E123 D 9440501D 022 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709017 $19.48 000001073961-3562500610
2022 3 FD52 00 E124 D 9440501D 022 9/27/2021 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR092L1062126709017 $0.10 000001073961-3562500610
2022 3 FD52 00 E124 D 9440501D 022 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709017 $0.05 000001073961-3562500610
2022 3 FD52 00 E122 D 9440501D 022 9/13/2021 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR091L1062125207960 $561.33 000001069551-3562500610
2022 3 FD52 00 E122 D 9440501D 022 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207960 $17.11 000001069551-3562500610
2022 3 FD52 00 E123 D 9440501D 022 9/13/2021 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR091L1062125207960 $118.04 000001069551-3562500610
2022 3 FD52 00 E123 D 9440501D 022 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207960 $3.37 000001069551-3562500610
2022 3 FD52 00 E111 D 9440501D 022 9/13/2021 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR091L1062125207960 $668.50 000001069551-3562500610
2022 3 FD52 00 E111 D 9440501D 022 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207960 $20.38 000001069551-3562500610
2022 3 FD52 00 E121 D 9440501D 022 9/13/2021 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR091L1062125207960 $44.49 000001069551-3562500610
2022 3 FD52 00 E121 D 9440501D 022 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207960 $1.32 000001069551-3562500610
2022 2 FD52 00 E111 D 9440501D 022 8/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082L1062123606948 $379.47 000001070711-3562500636
2022 2 FD52 00 E121 D 9440501D 022 8/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082L1062123606948 $27.58 000001070711-3562500636
2022 2 FD52 00 E122 D 9440501D 022 8/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082L1062123606948 $318.64 000001070711-3562500636
2022 2 FD52 00 E123 D 9440501D 022 8/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082L1062123606948 $58.79 000001070711-3562500636
2022 2 FD52 00 E124 D 9440501D 022 8/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082L1062123606948 $0.10 000001070711-3562500636
2022 2 FD52 00 E111 D 9440501D 010 8/9/2021 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR081L1062121805843 $469.86 000001078987-3562500610
2022 2 FD52 00 E111 D 9440501D 010 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805843 $487.50 000001078987-3562500610
2022 2 FD52 00 E121 D 9440501D 010 8/9/2021 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR081L1062121805843 $35.04 000001078987-3562500610
2022 2 FD52 00 E121 D 9440501D 010 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805843 $36.35 000001078987-3562500610
2022 2 FD52 00 E122 D 9440501D 010 8/9/2021 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR081L1062121805843 $394.62 000001078987-3562500610
2022 2 FD52 00 E122 D 9440501D 010 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805843 $409.35 000001078987-3562500610
2022 2 FD52 00 E123 D 9440501D 010 8/9/2021 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR081L1062121805843 $74.16 000001078987-3562500610
2022 2 FD52 00 E123 D 9440501D 010 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805843 $74.97 000001078987-3562500610
2022 1 FD52 00 E111 D 9440501D 121 7/29/2021 0060 ENV STUDIES-ARCHAEOLOGY CA-XR072L1062120404662 $5.05 000001068639-3562500061
2022 1 FD52 00 E111 D 9440501D 121 7/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404662 $1.30 000001068639-3562500061
2022 1 FD52 00 E121 D 9440501D 121 7/29/2021 0060 ENV STUDIES-ARCHAEOLOGY CA-XR072L1062120404662 $0.39 000001068639-3562500061
2022 1 FD52 00 E121 D 9440501D 121 7/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404662 $0.10 000001068639-3562500061
2022 1 FD52 00 E122 D 9440501D 121 7/29/2021 0060 ENV STUDIES-ARCHAEOLOGY CA-XR072L1062120404662 $4.24 000001068639-3562500061
2022 1 FD52 00 E122 D 9440501D 121 7/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404662 $1.07 000001068639-3562500061
2022 1 FD52 00 E123 D 9440501D 121 7/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404662 ($0.01) 000001068639-3562500061
2022 1 FD52 00 E111 D 9440501D 010 7/29/2021 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR072L1062120404730 $852.86 000001078987-3562500610
2022 1 FD52 00 E111 D 9440501D 010 7/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404730 $85.29 000001078987-3562500610
2022 1 FD52 00 E121 D 9440501D 010 7/29/2021 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR072L1062120404730 $61.14 000001078987-3562500610
2022 1 FD52 00 E121 D 9440501D 010 7/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404730 $6.12 000001078987-3562500610
2022 1 FD52 00 E122 D 9440501D 010 7/29/2021 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR072L1062120404730 $716.13 000001078987-3562500610
2022 1 FD52 00 E122 D 9440501D 010 7/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404730 $71.62 000001078987-3562500610
2022 1 FD52 00 E123 D 9440501D 010 7/29/2021 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR072L1062120404730 $146.07 000001078987-3562500610
2022 1 FD52 00 E123 D 9440501D 010 7/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404730 $14.45 000001078987-3562500610
2022 1 FD52 00 E124 D 9440501D 010 7/29/2021 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR072L1062120404730 $0.27 000001078987-3562500610
2022 1 FD52 00 E124 D 9440501D 010 7/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404730 $0.03 000001078987-3562500610
2022 1 FD52 00 E111 D 9440501D 022 7/26/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072L1062120404664 $344.97 000001070711-3562500636
2022 1 FD52 00 E111 D 9440501D 022 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404664 $287.49 000001070711-3562500636
2022 1 FD52 00 E121 D 9440501D 022 7/26/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072L1062120404664 $25.07 000001070711-3562500636
2022 1 FD52 00 E121 D 9440501D 022 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404664 $20.90 000001070711-3562500636
2022 1 FD52 00 E122 D 9440501D 022 7/26/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072L1062120404664 $289.68 000001070711-3562500636
2022 1 FD52 00 E122 D 9440501D 022 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404664 $241.40 000001070711-3562500636
2022 1 FD52 00 E123 D 9440501D 022 7/26/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072L1062120404664 $53.83 000001070711-3562500636
2022 1 FD52 00 E123 D 9440501D 022 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404664 $44.15 000001070711-3562500636
2022 1 FD52 00 E124 D 9440501D 022 7/26/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072L1062120404664 $0.09 000001070711-3562500636
2022 1 FD52 00 E124 D 9440501D 022 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404664 $0.08 000001070711-3562500636
2022 1 FD52 00 E123 D 9440501D 022 7/1/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061L1062116001452P $54.26 000001070711-3562500636
2022 1 FD52 00 E123 D 9440501D 022 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061L1062116001452P $92.82 000001070711-3562500636
2021 12 FD52 00 E111 D 9440501D 022 6/10/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061L1062116001452 $344.29 000001070711-3562500636
2021 12 FD52 00 E111 D 9440501D 022 6/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061L1062116001452 $604.39 000001070711-3562500636
2021 12 FD52 00 E121 D 9440501D 022 6/10/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061L1062116001452 $24.48 000001070711-3562500636
2021 12 FD52 00 E121 D 9440501D 022 6/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061L1062116001452 $42.88 000001070711-3562500636
2021 12 FD52 00 E122 D 9440501D 022 6/10/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061L1062116001452 $291.26 000001070711-3562500636
2021 12 FD52 00 E122 D 9440501D 022 6/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061L1062116001452 $510.29 000001070711-3562500636
2021 11 FD52 00 E111 D 9440501D 022 5/10/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051L1062112709724 $344.98 000001070711-3562500636
2021 11 FD52 00 E121 D 9440501D 022 5/10/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051L1062112709724 $24.49 000001070711-3562500636
2021 11 FD52 00 E122 D 9440501D 022 5/10/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051L1062112709724 $291.26 000001070711-3562500636
2021 11 FD52 00 E123 D 9440501D 022 5/10/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051L1062112709724 $53.44 000001070711-3562500636
2021 10 FD52 00 E111 D 9440501D 022 4/26/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042L1062111308637 $344.51 000001070711-3562500636
2021 10 FD52 00 E111 D 9440501D 022 4/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308637 $34.96 000001070711-3562500636
2021 10 FD52 00 E121 D 9440501D 022 4/26/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042L1062111308637 $25.07 000001070711-3562500636
2021 10 FD52 00 E121 D 9440501D 022 4/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308637 $2.54 000001070711-3562500636
2021 10 FD52 00 E122 D 9440501D 022 4/26/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042L1062111308637 $291.26 000001070711-3562500636
2021 10 FD52 00 E122 D 9440501D 022 4/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308637 $29.52 000001070711-3562500636
2021 10 FD52 00 E123 D 9440501D 022 4/26/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042L1062111308637 $53.49 000001070711-3562500636
2021 10 FD52 00 E123 D 9440501D 022 4/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308637 $5.36 000001070711-3562500636
2021 10 FD52 00 E124 D 9440501D 022 4/26/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042L1062111308637 $0.09 000001070711-3562500636
2021 10 FD52 09 E143 D 9440501D 010 4/12/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100166858 PON21900003413 GRW ENGINEERS INC $5,413.52 Boyd County 9-397.0
2021 10 FD52 09 E143 D 9440501D 022 4/12/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100166858 PON21900003413 GRW ENGINEERS INC $5,413.50 Carter County 9-397.0
2021 10 FD52 09 E143 D 9440501D 045 4/12/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100166858 PON21900003413 GRW ENGINEERS INC $5,413.52 Greenup County 9-397.0
2021 7 FD52 00 E111 D 9440501D 022 1/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012L1062102202349 $344.97 000001070711-3562500636
2021 7 FD52 00 E111 D 9440501D 022 1/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012L1062102202349 $34.50 000001070711-3562500636
2021 7 FD52 00 E121 D 9440501D 022 1/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012L1062102202349 $25.07 000001070711-3562500636
2021 7 FD52 00 E121 D 9440501D 022 1/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012L1062102202349 $2.51 000001070711-3562500636
2021 7 FD52 00 E122 D 9440501D 022 1/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012L1062102202349 $291.25 000001070711-3562500636
2021 7 FD52 00 E122 D 9440501D 022 1/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012L1062102202349 $29.13 000001070711-3562500636
2021 7 FD52 00 E123 D 9440501D 022 1/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012L1062102202349 $53.48 000001070711-3562500636
2021 7 FD52 00 E123 D 9440501D 022 1/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012L1062102202349 $5.30 000001070711-3562500636
2021 7 FD52 00 E124 D 9440501D 022 1/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012L1062102202349 $0.09 000001070711-3562500636
2021 7 FD52 00 E124 D 9440501D 022 1/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012L1062102202349 $0.01 000001070711-3562500636
2021 6 FD52 00 E111 D 9440501D 022 12/23/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122K1062035700385 $345.06 000001070711-3562500636
2021 6 FD52 00 E111 D 9440501D 022 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700385 $15.18 000001070711-3562500636
2021 6 FD52 00 E121 D 9440501D 022 12/23/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122K1062035700385 $25.11 000001070711-3562500636
2021 6 FD52 00 E121 D 9440501D 022 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700385 $1.11 000001070711-3562500636
2021 6 FD52 00 E122 D 9440501D 022 12/23/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122K1062035700385 $291.27 000001070711-3562500636
2021 6 FD52 00 E122 D 9440501D 022 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700385 $12.82 000001070711-3562500636
2021 6 FD52 00 E123 D 9440501D 022 12/23/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122K1062035700385 $51.92 000001070711-3562500636
2021 6 FD52 00 E123 D 9440501D 022 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700385 $2.26 000001070711-3562500636
2021 6 FD52 00 E124 D 9440501D 022 12/23/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122K1062035700385 $0.09 000001070711-3562500636
2021 6 FD52 00 E111 D 9440501D 022 12/9/2020 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR121K1062034309712 $398.62 000001073961-3562500610
2021 6 FD52 00 E111 D 9440501D 022 12/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309712 $121.78 000001073961-3562500610
2021 6 FD52 00 E121 D 9440501D 022 12/9/2020 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR121K1062034309712 $28.99 000001073961-3562500610
2021 6 FD52 00 E121 D 9440501D 022 12/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309712 $8.88 000001073961-3562500610
2021 6 FD52 00 E122 D 9440501D 022 12/9/2020 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR121K1062034309712 $336.56 000001073961-3562500610
2021 6 FD52 00 E122 D 9440501D 022 12/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309712 $102.82 000001073961-3562500610
2021 6 FD52 00 E123 D 9440501D 022 12/9/2020 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR121K1062034309712 $66.29 000001073961-3562500610
2021 6 FD52 00 E123 D 9440501D 022 12/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309712 $19.68 000001073961-3562500610
2021 5 FD52 00 E111 D 9440501D 067 11/23/2020 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR112K1062032508796 $492.58 000001076083-3562500610
2021 5 FD52 00 E111 D 9440501D 067 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508796 $127.35 000001076083-3562500610
2021 5 FD52 00 E121 D 9440501D 067 11/23/2020 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR112K1062032508796 $35.18 000001076083-3562500610
2021 5 FD52 00 E121 D 9440501D 067 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508796 $9.10 000001076083-3562500610
2021 5 FD52 00 E122 D 9440501D 067 11/23/2020 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR112K1062032508796 $416.04 000001076083-3562500610
2021 5 FD52 00 E122 D 9440501D 067 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508796 $107.51 000001076083-3562500610
2021 5 FD52 00 E123 D 9440501D 067 11/23/2020 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR112K1062032508796 $85.78 000001076083-3562500610
2021 5 FD52 00 E123 D 9440501D 067 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508796 $21.87 000001076083-3562500610
2021 5 FD52 00 E124 D 9440501D 067 11/23/2020 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR112K1062032508796 $0.20 000001076083-3562500610
2021 5 FD52 00 E124 D 9440501D 067 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508796 $0.06 000001076083-3562500610
2021 5 FD52 00 E111 D 9440501D 067 11/12/2020 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR111K1062031107800 $1,337.26 000001076083-3562500610
2021 5 FD52 00 E111 D 9440501D 067 11/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111K1062031107800 $82.89 000001076083-3562500610
2021 5 FD52 00 E121 D 9440501D 067 11/12/2020 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR111K1062031107800 $93.63 000001076083-3562500610
2021 5 FD52 00 E121 D 9440501D 067 11/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111K1062031107800 $5.60 000001076083-3562500610
2021 5 FD52 00 E122 D 9440501D 067 11/12/2020 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR111K1062031107800 $1,129.01 000001076083-3562500610
2021 5 FD52 00 E122 D 9440501D 067 11/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111K1062031107800 $69.98 000001076083-3562500610
2021 5 FD52 00 E123 D 9440501D 067 11/12/2020 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR111K1062031107800 $224.20 000001076083-3562500610
2021 5 FD52 00 E123 D 9440501D 067 11/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111K1062031107800 $13.46 000001076083-3562500610
2021 4 FD52 00 E123 D 9440501D 022 10/26/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR102K1062029706741 $52.09 000001075887-3562500636
2021 4 FD52 00 E123 D 9440501D 022 10/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102K1062029706741 $21.06 000001075887-3562500636
2021 4 FD52 00 E124 D 9440501D 022 10/26/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR102K1062029706741 $0.09 000001075887-3562500636
2021 4 FD52 00 E124 D 9440501D 022 10/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102K1062029706741 $0.03 000001075887-3562500636
2021 4 FD52 00 E111 D 9440501D 022 10/26/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR102K1062029706740 $345.09 000001075887-3562500636
2021 4 FD52 00 E111 D 9440501D 022 10/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102K1062029706740 $141.21 000001075887-3562500636
2021 4 FD52 00 E121 D 9440501D 022 10/26/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR102K1062029706740 $25.11 000001075887-3562500636
2021 4 FD52 00 E121 D 9440501D 022 10/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102K1062029706740 $10.28 000001075887-3562500636
2021 4 FD52 00 E122 D 9440501D 022 10/26/2020 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR102K1062029706740 $291.26 000001075887-3562500636
2021 4 FD52 00 E122 D 9440501D 022 10/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102K1062029706740 $119.23 000001075887-3562500636
2021 4 FD52 00 E111 D 9440501D 022 10/12/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101K1062028205688 $344.97 000001070711-3562500636
2021 4 FD52 00 E121 D 9440501D 022 10/12/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101K1062028205688 $24.55 000001070711-3562500636
2021 4 FD52 00 E122 D 9440501D 022 10/12/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101K1062028205688 $291.26 000001070711-3562500636
2021 4 FD52 00 E123 D 9440501D 022 10/12/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101K1062028205688 $51.90 000001070711-3562500636
2021 3 FD52 00 E111 D 9440501D 022 9/15/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091K1062025303611 $252.93 000001070711-3562500636
2021 3 FD52 00 E111 D 9440501D 022 9/15/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091K1062025303611 $8.74 000001070711-3562500636
2021 3 FD52 00 E121 D 9440501D 022 9/15/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091K1062025303611 $18.00 000001070711-3562500636
2021 3 FD52 00 E121 D 9440501D 022 9/15/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091K1062025303611 $0.62 000001070711-3562500636
2021 3 FD52 00 E122 D 9440501D 022 9/15/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091K1062025303611 $213.59 000001070711-3562500636
2021 3 FD52 00 E122 D 9440501D 022 9/15/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091K1062025303611 $7.38 000001070711-3562500636
2021 3 FD52 00 E123 D 9440501D 022 9/15/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091K1062025303611 $38.07 000001070711-3562500636
2021 3 FD52 00 E123 D 9440501D 022 9/15/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091K1062025303611 $1.30 000001070711-3562500636
2021 2 FD52 00 E111 D 9440501D 022 8/24/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR082K1062023402528 $1,363.99 000001069551-3562500610
2021 2 FD52 00 E111 D 9440501D 022 8/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082K1062023402528 $24.47 000001069551-3562500610
2021 2 FD52 00 E121 D 9440501D 022 8/24/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR082K1062023402528 $101.87 000001069551-3562500610
2021 2 FD52 00 E121 D 9440501D 022 8/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082K1062023402528 $1.81 000001069551-3562500610
2021 2 FD52 00 E122 D 9440501D 022 8/24/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR082K1062023402528 $1,151.61 000001069551-3562500610
2021 2 FD52 00 E122 D 9440501D 022 8/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082K1062023402528 $20.66 000001069551-3562500610
2021 2 FD52 00 E123 D 9440501D 022 8/24/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR082K1062023402528 $225.07 000001069551-3562500610
2021 2 FD52 00 E123 D 9440501D 022 8/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082K1062023402528 $4.03 000001069551-3562500610
2021 2 FD52 00 E124 D 9440501D 022 8/24/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR082K1062023402528 $0.64 000001069551-3562500610
2021 2 FD52 00 E124 D 9440501D 022 8/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082K1062023402528 $0.01 000001069551-3562500610
2021 2 FD52 00 E111 D 9440501D 022 8/10/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR081K1062022001438 $383.96 000001069551-3562500610
2021 2 FD52 00 E111 D 9440501D 022 8/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081K1062022001438 $12.32 000001069551-3562500610
2021 2 FD52 00 E121 D 9440501D 022 8/10/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR081K1062022001438 $27.13 000001069551-3562500610
2021 2 FD52 00 E121 D 9440501D 022 8/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081K1062022001438 $0.90 000001069551-3562500610
2021 2 FD52 00 E122 D 9440501D 022 8/10/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR081K1062022001438 $324.13 000001069551-3562500610
2021 2 FD52 00 E122 D 9440501D 022 8/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081K1062022001438 $10.40 000001069551-3562500610
2021 2 FD52 00 E123 D 9440501D 022 8/10/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR081K1062022001438 $59.73 000001069551-3562500610
2021 2 FD52 00 E123 D 9440501D 022 8/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081K1062022001438 $1.85 000001069551-3562500610
2021 1 FD52 00 E229 D 9440501D 022 7/28/2020 5011 GEOTECH INVEST ROADWAY (DESIGN IET-XE13A162520207003770 $140.00
2021 1 FD52 00 E111 D 9440501D 022 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600345 $235.70 000001069551-3562500610
2021 1 FD52 00 E121 D 9440501D 022 7/27/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR072K1062020600345 $92.07 000001069551-3562500610
2021 1 FD52 00 E121 D 9440501D 022 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600345 $17.32 000001069551-3562500610
2021 1 FD52 00 E122 D 9440501D 022 7/27/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR072K1062020600345 $1,062.06 000001069551-3562500610
2021 1 FD52 00 E122 D 9440501D 022 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600345 $199.00 000001069551-3562500610
2021 1 FD52 00 E123 D 9440501D 022 7/27/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR072K1062020600345 $182.62 000001069551-3562500610
2021 1 FD52 00 E123 D 9440501D 022 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600345 $35.86 000001069551-3562500610
2021 1 FD52 00 E111 D 9440501D 022 7/27/2020 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR072K1062020600367 $320.72 000001073961-3562500610
2021 1 FD52 00 E111 D 9440501D 022 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600367 $39.34 000001073961-3562500610
2021 1 FD52 00 E121 D 9440501D 022 7/27/2020 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR072K1062020600367 $21.95 000001073961-3562500610
2021 1 FD52 00 E121 D 9440501D 022 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600367 $2.70 000001073961-3562500610
2021 1 FD52 00 E124 D 9440501D 022 7/27/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR072K1062020600345 $0.41 000001069551-3562500610
2021 1 FD52 00 E122 D 9440501D 022 7/27/2020 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR072K1062020600367 $270.78 000001073961-3562500610
2021 1 FD52 00 E122 D 9440501D 022 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600367 $33.21 000001073961-3562500610
2021 1 FD52 00 E123 D 9440501D 022 7/27/2020 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR072K1062020600367 $51.96 000001073961-3562500610
2021 1 FD52 00 E123 D 9440501D 022 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600367 $6.31 000001073961-3562500610
2021 1 FD52 00 E124 D 9440501D 022 7/27/2020 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR072K1062020600367 $0.09 000001073961-3562500610
2021 1 FD52 00 E124 D 9440501D 022 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600367 $0.01 000001073961-3562500610
2021 1 FD52 00 E124 D 9440501D 022 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600345 $0.09 000001069551-3562500610
2021 1 FD52 00 E111 D 9440501D 022 7/27/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR072K1062020600344 $1,257.93 000001069551-3562500610
2021 1 FD52 09 E111 D 9440501D 045 7/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071K1062019009322 $1,070.03 000001070031-3562509204
2021 1 FD52 09 E121 D 9440501D 045 7/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071K1062019009322 $78.36 000001070031-3562509204
2021 1 FD52 09 E122 D 9440501D 045 7/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071K1062019009322 $892.73 000001070031-3562509204
2021 1 FD52 09 E123 D 9440501D 045 7/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071K1062019009322 $152.32 000001070031-3562509204
2021 1 FD52 00 E111 D 9440501D 022 7/9/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR071K1062019009321 $1,243.18 000001069551-3562500610
2021 1 FD52 00 E111 D 9440501D 022 7/9/2020 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR071K1062019009339 $1,421.43 000001073961-3562500610
2021 1 FD52 00 E111 D 9440501D 022 7/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071K1062019009321 $119.92 000001069551-3562500610
2021 1 FD52 00 E121 D 9440501D 022 7/9/2020 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR071K1062019009339 $101.18 000001073961-3562500610
2021 1 FD52 00 E121 D 9440501D 022 7/9/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR071K1062019009321 $88.11 000001069551-3562500610
2021 1 FD52 00 E122 D 9440501D 022 7/9/2020 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR071K1062019009339 $1,185.90 000001073961-3562500610
2021 1 FD52 00 E121 D 9440501D 022 7/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071K1062019009321 $8.53 000001069551-3562500610
2021 1 FD52 00 E123 D 9440501D 022 7/9/2020 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR071K1062019009339 $236.18 000001073961-3562500610
2021 1 FD52 00 E122 D 9440501D 022 7/9/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR071K1062019009321 $1,036.77 000001069551-3562500610
2021 1 FD52 00 E122 D 9440501D 022 7/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071K1062019009321 $100.04 000001069551-3562500610
2021 1 FD52 00 E123 D 9440501D 022 7/9/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR071K1062019009321 $183.08 000001069551-3562500610
2021 1 FD52 00 E123 D 9440501D 022 7/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071K1062019009321 $17.87 000001069551-3562500610
2021 1 FD52 00 E111 D 9440501D 022 7/8/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062K1062017108306 $344.97 000001070711-3562500636
2021 1 FD52 00 E111 D 9440501D 022 7/8/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108306 $34.50 000001070711-3562500636
2021 1 FD52 00 E121 D 9440501D 022 7/8/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062K1062017108306 $25.10 000001070711-3562500636
2021 1 FD52 00 E121 D 9440501D 022 7/8/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108306 $2.51 000001070711-3562500636
2021 1 FD52 00 E122 D 9440501D 022 7/8/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062K1062017108306 $287.81 000001070711-3562500636
2021 1 FD52 00 E122 D 9440501D 022 7/8/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108306 $28.78 000001070711-3562500636
2021 1 FD52 00 E123 D 9440501D 022 7/8/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062K1062017108306 $51.95 000001070711-3562500636
2021 1 FD52 00 E123 D 9440501D 022 7/8/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108306 $5.14 000001070711-3562500636
2021 1 FD52 00 E124 D 9440501D 022 7/8/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062K1062017108306 $0.09 000001070711-3562500636
2021 1 FD52 00 E124 D 9440501D 022 7/8/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108306 $0.01 000001070711-3562500636
2021 1 FD52 00 E123 D 9440501D 022 7/6/2020 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR061K1062016107410P $52.01 000001073961-3562500610
2021 1 FD52 00 E123 D 9440501D 022 7/6/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061K1062016107410P $5.69 000001073961-3562500610
2021 1 FD52 00 E123 D 9440501D 022 7/1/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR061K1062016107389P $86.50 000001069551-3562500610
2021 1 FD52 00 E123 D 9440501D 022 7/1/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061K1062016107389P $14.52 000001069551-3562500610
2020 12 FD52 00 E111 D 9440501D 022 6/12/2020 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR061K1062016107410 $312.82 000001073961-3562500610
2020 12 FD52 00 E111 D 9440501D 022 6/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061K1062016107410 $34.61 000001073961-3562500610
2020 12 FD52 00 E121 D 9440501D 022 6/12/2020 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR061K1062016107410 $22.26 000001073961-3562500610
2020 12 FD52 00 E121 D 9440501D 022 6/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061K1062016107410 $2.47 000001073961-3562500610
2020 12 FD52 00 E122 D 9440501D 022 6/12/2020 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR061K1062016107410 $260.90 000001073961-3562500610
2020 12 FD52 00 E122 D 9440501D 022 6/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061K1062016107410 $28.88 000001073961-3562500610
2020 12 FD52 00 E111 D 9440501D 022 6/10/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR061K1062016107389 $782.91 000001069551-3562500610
2020 12 FD52 00 E111 D 9440501D 022 6/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061K1062016107389 $138.65 000001069551-3562500610
2020 12 FD52 00 E121 D 9440501D 022 6/10/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR061K1062016107389 $56.90 000001069551-3562500610
2020 12 FD52 00 E121 D 9440501D 022 6/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061K1062016107389 $10.14 000001069551-3562500610
2020 12 FD52 00 E122 D 9440501D 022 6/10/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR061K1062016107389 $653.18 000001069551-3562500610
2020 12 FD52 00 E122 D 9440501D 022 6/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061K1062016107389 $115.68 000001069551-3562500610
2020 11 FD52 00 E111 D 9440501D 022 5/26/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR052K1062014306403 $2,124.54 000001069551-3562500610
2020 11 FD52 00 E111 D 9440501D 022 5/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052K1062014306403 $14.82 000001069551-3562500610
2020 11 FD52 00 E121 D 9440501D 022 5/26/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR052K1062014306403 $152.38 000001069551-3562500610
2020 11 FD52 00 E121 D 9440501D 022 5/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052K1062014306403 $1.11 000001069551-3562500610
2020 11 FD52 00 E122 D 9440501D 022 5/26/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR052K1062014306403 $1,772.46 000001069551-3562500610
2020 11 FD52 00 E122 D 9440501D 022 5/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052K1062014306403 $12.37 000001069551-3562500610
2020 11 FD52 00 E123 D 9440501D 022 5/26/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR052K1062014306403 $364.45 000001069551-3562500610
2020 11 FD52 00 E123 D 9440501D 022 5/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052K1062014306403 $2.22 000001069551-3562500610
2020 11 FD52 00 E124 D 9440501D 022 5/26/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR052K1062014306403 $0.66 000001069551-3562500610
2020 11 FD52 00 E124 D 9440501D 022 5/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052K1062014306403 $0.01 000001069551-3562500610
2020 11 FD52 00 E111 D 9440501D 022 5/26/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052K1062014306406 $345.06 000001070711-3562500636
2020 11 FD52 00 E111 D 9440501D 022 5/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052K1062014306406 $15.18 000001070711-3562500636
2020 11 FD52 00 E121 D 9440501D 022 5/26/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052K1062014306406 $25.11 000001070711-3562500636
2020 11 FD52 00 E121 D 9440501D 022 5/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052K1062014306406 $1.11 000001070711-3562500636
2020 11 FD52 00 E122 D 9440501D 022 5/26/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052K1062014306406 $287.82 000001070711-3562500636
2020 11 FD52 00 E122 D 9440501D 022 5/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052K1062014306406 $12.66 000001070711-3562500636
2020 11 FD52 00 E123 D 9440501D 022 5/26/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052K1062014306406 $51.92 000001070711-3562500636
2020 11 FD52 00 E123 D 9440501D 022 5/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052K1062014306406 $2.26 000001070711-3562500636
2020 11 FD52 00 E124 D 9440501D 022 5/26/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052K1062014306406 $0.09 000001070711-3562500636
2020 11 FD52 09 E143 D 9440501D 010 5/11/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000191483 PON21900003413 GRW ENGINEERS INC $20,957.92 Boyd County 9-397.0
2020 11 FD52 00 E111 D 9440501D 022 5/11/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR051K1062012905496 $583.91 000001069551-3562500610
2020 11 FD52 00 E121 D 9440501D 022 5/11/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR051K1062012905496 $42.10 000001069551-3562500610
2020 11 FD52 00 E122 D 9440501D 022 5/11/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR051K1062012905496 $487.16 000001069551-3562500610
2020 11 FD52 00 E123 D 9440501D 022 5/11/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR051K1062012905496 $103.80 000001069551-3562500610
2020 10 FD52 00 E123 D 9440501D 022 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504460 $43.94 000001069551-3562500610
2020 10 FD52 00 E124 D 9440501D 022 4/27/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR042K1062011504460 $0.76 000001069551-3562500610
2020 10 FD52 00 E124 D 9440501D 022 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504460 $0.09 000001069551-3562500610
2020 10 FD52 00 E111 D 9440501D 022 4/27/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042K1062011504464 $344.88 000001070711-3562500636
2020 10 FD52 00 E111 D 9440501D 022 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504464 $16.56 000001070711-3562500636
2020 10 FD52 00 E121 D 9440501D 022 4/27/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042K1062011504464 $25.11 000001070711-3562500636
2020 10 FD52 00 E121 D 9440501D 022 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504464 $1.21 000001070711-3562500636
2020 10 FD52 00 E122 D 9440501D 022 4/27/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042K1062011504464 $287.81 000001070711-3562500636
2020 10 FD52 00 E122 D 9440501D 022 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504464 $13.82 000001070711-3562500636
2020 10 FD52 00 E123 D 9440501D 022 4/27/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042K1062011504464 $51.92 000001070711-3562500636
2020 10 FD52 00 E123 D 9440501D 022 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504464 $2.47 000001070711-3562500636
2020 10 FD52 00 E124 D 9440501D 022 4/27/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042K1062011504464 $0.09 000001070711-3562500636
2020 10 FD52 00 E111 D 9440501D 022 4/27/2020 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR042K1062011504503 $995.00 000001073961-3562500610
2020 10 FD52 00 E111 D 9440501D 022 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504503 $47.38 000001073961-3562500610
2020 10 FD52 00 E121 D 9440501D 022 4/27/2020 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR042K1062011504503 $71.39 000001073961-3562500610
2020 10 FD52 00 E121 D 9440501D 022 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504503 $3.40 000001073961-3562500610
2020 10 FD52 00 E122 D 9440501D 022 4/27/2020 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR042K1062011504503 $830.13 000001073961-3562500610
2020 10 FD52 00 E122 D 9440501D 022 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504503 $39.53 000001073961-3562500610
2020 10 FD52 00 E123 D 9440501D 022 4/27/2020 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR042K1062011504503 $165.40 000001073961-3562500610
2020 10 FD52 00 E123 D 9440501D 022 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504503 $7.80 000001073961-3562500610
2020 10 FD52 00 E124 D 9440501D 022 4/27/2020 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR042K1062011504503 $0.32 000001073961-3562500610
2020 10 FD52 00 E124 D 9440501D 022 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504503 $0.02 000001073961-3562500610
2020 10 FD52 09 E111 D 9440501D 010 4/27/2020 0640 ENV STUDIES-GEN-CONSULT CA-XR042K1062011504467 $1,405.20 000001071374-3562509200
2020 10 FD52 09 E111 D 9440501D 010 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504467 $67.08 000001071374-3562509200
2020 10 FD52 09 E121 D 9440501D 010 4/27/2020 0640 ENV STUDIES-GEN-CONSULT CA-XR042K1062011504467 $105.24 000001071374-3562509200
2020 10 FD52 09 E121 D 9440501D 010 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504467 $5.02 000001071374-3562509200
2020 10 FD52 09 E122 D 9440501D 010 4/27/2020 0640 ENV STUDIES-GEN-CONSULT CA-XR042K1062011504467 $1,172.41 000001071374-3562509200
2020 10 FD52 09 E122 D 9440501D 010 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504467 $55.97 000001071374-3562509200
2020 10 FD52 09 E123 D 9440501D 010 4/27/2020 0640 ENV STUDIES-GEN-CONSULT CA-XR042K1062011504467 $196.02 000001071374-3562509200
2020 10 FD52 09 E123 D 9440501D 010 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504467 $9.24 000001071374-3562509200
2020 10 FD52 09 E124 D 9440501D 010 4/27/2020 0640 ENV STUDIES-GEN-CONSULT CA-XR042K1062011504467 $0.45 000001071374-3562509200
2020 10 FD52 09 E124 D 9440501D 010 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504467 $0.02 000001071374-3562509200
2020 10 FD52 00 E111 D 9440501D 022 4/27/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR042K1062011504459 $2,307.98 000001069551-3562500610
2020 10 FD52 00 E111 D 9440501D 022 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504459 $273.24 000001069551-3562500610
2020 10 FD52 00 E121 D 9440501D 022 4/27/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR042K1062011504459 $167.13 000001069551-3562500610
2020 10 FD52 00 E121 D 9440501D 022 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504459 $19.65 000001069551-3562500610
2020 10 FD52 00 E122 D 9440501D 022 4/27/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR042K1062011504459 $1,925.48 000001069551-3562500610
2020 10 FD52 00 E122 D 9440501D 022 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504459 $227.97 000001069551-3562500610
2020 10 FD52 00 E123 D 9440501D 022 4/27/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR042K1062011504459 $364.18 000001069551-3562500610
2020 10 FD52 09 E111 D 9440501D 010 4/14/2020 0640 ENV STUDIES-GEN-CONSULT CA-XR041K1062009903475 $1,030.52 000001071374-3562509200
2020 10 FD52 09 E121 D 9440501D 010 4/14/2020 0640 ENV STUDIES-GEN-CONSULT CA-XR041K1062009903475 $76.12 000001071374-3562509200
2020 10 FD52 09 E122 D 9440501D 010 4/14/2020 0640 ENV STUDIES-GEN-CONSULT CA-XR041K1062009903475 $859.77 000001071374-3562509200
2020 10 FD52 09 E123 D 9440501D 010 4/14/2020 0640 ENV STUDIES-GEN-CONSULT CA-XR041K1062009903475 $143.66 000001071374-3562509200
2020 10 FD52 00 E111 D 9440501D 022 4/9/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR041K1062009903470 $3,094.57 000001069551-3562500610
2020 10 FD52 00 E111 D 9440501D 022 4/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041K1062009903470 $160.42 000001069551-3562500610
2020 10 FD52 00 E121 D 9440501D 022 4/9/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR041K1062009903470 $219.06 000001069551-3562500610
2020 10 FD52 00 E121 D 9440501D 022 4/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041K1062009903470 $10.95 000001069551-3562500610
2020 10 FD52 00 E122 D 9440501D 022 4/9/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR041K1062009903470 $2,581.84 000001069551-3562500610
2020 10 FD52 00 E122 D 9440501D 022 4/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041K1062009903470 $133.84 000001069551-3562500610
2020 10 FD52 00 E123 D 9440501D 022 4/9/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR041K1062009903470 $520.18 000001069551-3562500610
2020 10 FD52 00 E123 D 9440501D 022 4/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041K1062009903470 $25.85 000001069551-3562500610
2020 10 FD52 09 E143 D 9440501D 045 4/8/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000172745 PON21900003413 GRW ENGINEERS INC $140,484.54 Greenup County 9-397.0
2020 9 FD52 09 E143 D 9440501D 010 3/25/2020 0530 ENV STUDIES-NOISE QUAL-CONSULT PRC-2000163028 PON21900001906 H W Lochner Inc $7,324.00 36-CJC
2020 9 FD52 09 E143 D 9440501D 045 3/13/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000157294 PON21900003413 GRW ENGINEERS INC $31,299.97 Greenup County 9-397.0
2020 9 FD52 09 E111 D 9440501D 010 3/9/2020 0640 ENV STUDIES-GEN-CONSULT CA-XR031K1062006601535 $226.72 000001071374-3562509200
2020 9 FD52 09 E111 D 9440501D 010 3/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031K1062006601535 $11.95 000001071374-3562509200
2020 9 FD52 09 E121 D 9440501D 010 3/9/2020 0640 ENV STUDIES-GEN-CONSULT CA-XR031K1062006601535 $16.74 000001071374-3562509200
2020 9 FD52 09 E121 D 9440501D 010 3/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031K1062006601535 $0.89 000001071374-3562509200
2020 9 FD52 09 E122 D 9440501D 010 3/9/2020 0640 ENV STUDIES-GEN-CONSULT CA-XR031K1062006601535 $189.14 000001071374-3562509200
2020 9 FD52 09 E122 D 9440501D 010 3/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031K1062006601535 $9.97 000001071374-3562509200
2020 9 FD52 09 E123 D 9440501D 010 3/9/2020 0640 ENV STUDIES-GEN-CONSULT CA-XR031K1062006601535 $31.62 000001071374-3562509200
2020 9 FD52 09 E123 D 9440501D 010 3/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031K1062006601535 $1.64 000001071374-3562509200
2020 9 FD52 00 E111 D 9440501D 022 3/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031K1062006601532 $202.44 000001070711-3562500636
2020 9 FD52 00 E111 D 9440501D 022 3/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031K1062006601532 $116.88 000001070711-3562500636
2020 9 FD52 00 E121 D 9440501D 022 3/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031K1062006601532 $14.40 000001070711-3562500636
2020 9 FD52 00 E121 D 9440501D 022 3/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031K1062006601532 $8.32 000001070711-3562500636
2020 9 FD52 00 E122 D 9440501D 022 3/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031K1062006601532 $168.85 000001070711-3562500636
2020 9 FD52 00 E122 D 9440501D 022 3/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031K1062006601532 $97.52 000001070711-3562500636
2020 9 FD52 00 E123 D 9440501D 022 3/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031K1062006601532 $30.61 000001070711-3562500636
2020 9 FD52 00 E123 D 9440501D 022 3/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031K1062006601532 $17.43 000001070711-3562500636
2020 9 FD52 00 E111 D 9440501D 022 3/9/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR031K1062006601528 $1,227.25 000001069551-3562500610
2020 9 FD52 00 E111 D 9440501D 022 3/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031K1062006601528 $35.02 000001069551-3562500610
2020 9 FD52 00 E121 D 9440501D 022 3/9/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR031K1062006601528 $87.02 000001069551-3562500610
2020 9 FD52 00 E121 D 9440501D 022 3/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031K1062006601528 $2.46 000001069551-3562500610
2020 9 FD52 00 E122 D 9440501D 022 3/9/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR031K1062006601528 $1,023.71 000001069551-3562500610
2020 9 FD52 00 E122 D 9440501D 022 3/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031K1062006601528 $29.22 000001069551-3562500610
2020 9 FD52 00 E123 D 9440501D 022 3/9/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR031K1062006601528 $213.11 000001069551-3562500610
2020 9 FD52 00 E123 D 9440501D 022 3/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031K1062006601528 $5.97 000001069551-3562500610
2020 9 FD52 09 E143 D 9440501D 010 3/3/2020 0530 ENV STUDIES-NOISE QUAL-CONSULT PRC-2000147564 PON21900001906 H W Lochner Inc $18,701.00 36-CJC
2020 8 FD52 09 E143 D 9440501D 022 2/26/2020 1550 DESIGN CONTRACTS-CONSULTANT JVC-2000000443 PON21900003413 GRW ENGINEERS INC ($3,211.95) Move suspended fund from allowed priority to suspended
2020 8 FD52 09 E143 D 9440501D 022 2/26/2020 1550 DESIGN CONTRACTS-CONSULTANT JVC-2000000443 PON21900003413 GRW ENGINEERS INC $3,211.95 Move suspended fund from allowed priority to suspended
2020 8 FD52 00 E111 D 9440501D 010 2/24/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF JVC-2000000432 $316.31 Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15
2020 8 FD52 00 E121 D 9440501D 010 2/24/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF JVC-2000000432 ($22.50) Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15
2020 8 FD52 00 E121 D 9440501D 010 2/24/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF JVC-2000000432 $22.50 Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15
2020 8 FD52 00 E122 D 9440501D 010 2/24/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF JVC-2000000432 ($263.83) Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15
2020 8 FD52 00 E122 D 9440501D 010 2/24/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF JVC-2000000432 $263.83 Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15
2020 8 FD52 00 E123 D 9440501D 010 2/24/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF JVC-2000000432 ($47.61) Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15
2020 8 FD52 00 E123 D 9440501D 010 2/24/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF JVC-2000000432 $47.61 Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15
2020 8 FD52 00 E111 D 9440501D 022 2/24/2020 5011 GEOTECH INVEST ROADWAY (DESIGN JVC-2000000432 ($2,311.83) Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15
2020 8 FD52 00 E111 D 9440501D 022 2/24/2020 5011 GEOTECH INVEST ROADWAY (DESIGN JVC-2000000432 $2,311.83 Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15
2020 8 FD52 00 E121 D 9440501D 022 2/24/2020 5011 GEOTECH INVEST ROADWAY (DESIGN JVC-2000000432 ($167.68) Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15
2020 8 FD52 00 E121 D 9440501D 022 2/24/2020 5011 GEOTECH INVEST ROADWAY (DESIGN JVC-2000000432 $167.68 Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15
2020 8 FD52 00 E122 D 9440501D 022 2/24/2020 5011 GEOTECH INVEST ROADWAY (DESIGN JVC-2000000432 ($1,928.44) Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15
2020 8 FD52 00 E122 D 9440501D 022 2/24/2020 5011 GEOTECH INVEST ROADWAY (DESIGN JVC-2000000432 $1,928.44 Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15
2020 8 FD52 00 E123 D 9440501D 022 2/24/2020 5011 GEOTECH INVEST ROADWAY (DESIGN JVC-2000000432 ($357.98) Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15
2020 8 FD52 00 E123 D 9440501D 022 2/24/2020 5011 GEOTECH INVEST ROADWAY (DESIGN JVC-2000000432 $357.98 Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15
2020 8 FD52 09 E143 D 9440501D 010 2/24/2020 0530 ENV STUDIES-NOISE QUAL-CONSULT JVC-2000000432 PON21900001906 H W Lochner Inc ($6,435.00) Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15
2020 8 FD52 09 E143 D 9440501D 010 2/24/2020 0530 ENV STUDIES-NOISE QUAL-CONSULT JVC-2000000432 PON21900001906 H W Lochner Inc $6,435.00 Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15
2020 8 FD52 09 E143 D 9440501D 010 2/24/2020 1550 DESIGN CONTRACTS-CONSULTANT JVC-2000000432 PON21900003413 GRW ENGINEERS INC ($24,360.81) Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15
2020 8 FD52 00 E111 D 9440501D 121 2/24/2020 0010 ENV STUDIES-UST/HZM CA-XR022K1062005200424 $527.69 000001068562-3562500061
2020 8 FD52 00 E111 D 9440501D 121 2/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022K1062005200424 $172.84 000001068562-3562500061
2020 8 FD52 09 E143 D 9440501D 010 2/24/2020 1550 DESIGN CONTRACTS-CONSULTANT JVC-2000000432 PON21900003413 GRW ENGINEERS INC $24,360.81 Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15
2020 8 FD52 00 E121 D 9440501D 121 2/24/2020 0010 ENV STUDIES-UST/HZM CA-XR022K1062005200424 $39.70 000001068562-3562500061
2020 8 FD52 00 E121 D 9440501D 121 2/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022K1062005200424 $13.00 000001068562-3562500061
2020 8 FD52 00 E122 D 9440501D 121 2/24/2020 0010 ENV STUDIES-UST/HZM CA-XR022K1062005200424 $440.31 000001068562-3562500061
2020 8 FD52 00 E122 D 9440501D 121 2/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022K1062005200424 $144.20 000001068562-3562500061
2020 8 FD52 00 E123 D 9440501D 121 2/24/2020 0010 ENV STUDIES-UST/HZM CA-XR022K1062005200424 $80.23 000001068562-3562500061
2020 8 FD52 00 E123 D 9440501D 121 2/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022K1062005200424 $25.80 000001068562-3562500061
2020 8 FD52 00 E124 D 9440501D 121 2/24/2020 0010 ENV STUDIES-UST/HZM CA-XR022K1062005200424 $0.21 000001068562-3562500061
2020 8 FD52 00 E124 D 9440501D 121 2/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022K1062005200424 $0.07 000001068562-3562500061
2020 8 FD52 00 E111 D 9440501D 022 2/24/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR022K1062005200428 $1,020.73 000001069551-3562500610
2020 8 FD52 00 E121 D 9440501D 022 2/24/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR022K1062005200428 $73.91 000001069551-3562500610
2020 8 FD52 00 E122 D 9440501D 022 2/24/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR022K1062005200428 $851.59 000001069551-3562500610
2020 8 FD52 00 E123 D 9440501D 022 2/24/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR022K1062005200428 $157.28 000001069551-3562500610
2020 8 FD52 00 E124 D 9440501D 022 2/24/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR022K1062005200428 $0.30 000001069551-3562500610
2020 8 FD52 00 E111 D 9440501D 010 2/24/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF JVC-2000000432 ($316.31) Move expenditures with 9440501D due to funding requests from line 10 to suspended line 15
2020 8 FD52 09 E143 D 9440501D 010 2/20/2020 0530 ENV STUDIES-NOISE QUAL-CONSULT PRC-2000133189 PON21900001906 H W Lochner Inc $6,435.00 36-CJC
2020 8 FD52 09 E143 D 9440501D 010 2/18/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000140388 PON21900003413 GRW ENGINEERS INC $24,360.81 Boyd County 9-397.0
2020 8 FD52 00 E123 D 9440501D 022 2/10/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR021K1062003809882 $357.98 000001069551-3562500610
2020 8 FD52 00 E123 D 9440501D 022 2/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021K1062003809882 $54.62 000001069551-3562500610
2020 8 FD52 00 E111 D 9440501D 010 2/10/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021K1062003809896 $316.31 000001072341-3562500636
2020 8 FD52 00 E111 D 9440501D 010 2/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021K1062003809896 $28.67 000001072341-3562500636
2020 8 FD52 00 E121 D 9440501D 010 2/10/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021K1062003809896 $22.50 000001072341-3562500636
2020 8 FD52 00 E111 D 9440501D 022 2/10/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR021K1062003809882 $2,311.83 000001069551-3562500610
2020 8 FD52 00 E121 D 9440501D 010 2/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021K1062003809896 $2.04 000001072341-3562500636
2020 8 FD52 00 E122 D 9440501D 010 2/10/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021K1062003809896 $263.83 000001072341-3562500636
2020 8 FD52 00 E122 D 9440501D 010 2/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021K1062003809896 $23.92 000001072341-3562500636
2020 8 FD52 00 E123 D 9440501D 010 2/10/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021K1062003809896 $47.61 000001072341-3562500636
2020 8 FD52 00 E123 D 9440501D 010 2/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021K1062003809896 $4.27 000001072341-3562500636
2020 8 FD52 00 E111 D 9440501D 022 2/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021K1062003809882 $362.67 000001069551-3562500610
2020 8 FD52 00 E121 D 9440501D 022 2/10/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR021K1062003809882 $167.68 000001069551-3562500610
2020 8 FD52 00 E121 D 9440501D 022 2/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021K1062003809882 $26.33 000001069551-3562500610
2020 8 FD52 00 E122 D 9440501D 022 2/10/2020 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR021K1062003809882 $1,928.44 000001069551-3562500610
2020 8 FD52 00 E122 D 9440501D 022 2/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021K1062003809882 $302.58 000001069551-3562500610
2020 7 FD52 00 E121 D 9440501D 121 1/30/2020 0092 ENV STUDIES-PERMITTING CA-XR012K1062002308833 ($1.02) 000001068439-3562500061
2020 7 FD52 00 E121 D 9440501D 121 1/30/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012K1062002308833 ($0.38) 000001068439-3562500061
2020 7 FD52 00 E123 D 9440501D 121 1/30/2020 0092 ENV STUDIES-PERMITTING CA-XR012K1062002308833 $19.65 000001068439-3562500061
2020 7 FD52 00 E123 D 9440501D 121 1/30/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012K1062002308833 $7.15 000001068439-3562500061
2020 7 FD52 09 E111 D 9440501D 010 1/27/2020 0640 ENV STUDIES-GEN-CONSULT CA-XR012K1062002308846 $1,405.13 000001071374-3562509200
2020 7 FD52 09 E111 D 9440501D 010 1/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012K1062002308846 $543.36 000001071374-3562509200
2020 7 FD52 09 E121 D 9440501D 010 1/27/2020 0640 ENV STUDIES-GEN-CONSULT CA-XR012K1062002308846 $105.24 000001071374-3562509200
2020 7 FD52 09 E121 D 9440501D 010 1/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012K1062002308846 $40.70 000001071374-3562509200
2020 7 FD52 09 E122 D 9440501D 010 1/27/2020 0640 ENV STUDIES-GEN-CONSULT CA-XR012K1062002308846 $1,172.41 000001071374-3562509200
2020 7 FD52 09 E122 D 9440501D 010 1/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012K1062002308846 $453.32 000001071374-3562509200
2020 7 FD52 09 E123 D 9440501D 010 1/27/2020 0640 ENV STUDIES-GEN-CONSULT CA-XR012K1062002308846 $196.80 000001071374-3562509200
2020 7 FD52 09 E123 D 9440501D 010 1/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012K1062002308846 $74.86 000001071374-3562509200
2020 7 FD52 09 E124 D 9440501D 010 1/27/2020 0640 ENV STUDIES-GEN-CONSULT CA-XR012K1062002308846 $0.45 000001071374-3562509200
2020 7 FD52 09 E124 D 9440501D 010 1/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012K1062002308846 $0.17 000001071374-3562509200
2020 7 FD52 09 E143 D 9440501D 010 1/16/2020 0530 ENV STUDIES-NOISE QUAL-CONSULT PRC-2000112384 PON21900001906 H W Lochner Inc $11,700.00 36-CJC
2020 7 FD52 09 E143 D 9440501D 022 1/14/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000117852 PON21900003413 GRW ENGINEERS INC $41,915.84 Carter County 9-397.0
2020 7 FD52 00 E111 D 9440501D 010 1/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011K1062000807934 $315.80 000001072341-3562500636
2020 7 FD52 00 E111 D 9440501D 010 1/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011K1062000807934 $632.88 000001072341-3562500636
2020 7 FD52 00 E121 D 9440501D 010 1/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011K1062000807934 $22.51 000001072341-3562500636
2020 7 FD52 00 E121 D 9440501D 010 1/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011K1062000807934 $45.04 000001072341-3562500636
2020 7 FD52 00 E122 D 9440501D 010 1/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011K1062000807934 $263.83 000001072341-3562500636
2020 7 FD52 00 E122 D 9440501D 010 1/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011K1062000807934 $528.02 000001072341-3562500636
2020 7 FD52 00 E123 D 9440501D 010 1/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011K1062000807934 $48.42 000001072341-3562500636
2020 7 FD52 00 E123 D 9440501D 010 1/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011K1062000807934 $94.36 000001072341-3562500636
2020 7 FD52 00 E111 D 9440501D 121 1/9/2020 0092 ENV STUDIES-PERMITTING CA-XR011K1062000807913 $173.53 000001068439-3562500061
2020 7 FD52 00 E111 D 9440501D 121 1/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011K1062000807913 $63.20 000001068439-3562500061
2020 7 FD52 00 E121 D 9440501D 121 1/9/2020 0092 ENV STUDIES-PERMITTING CA-XR011K1062000807913 $13.12 000001068439-3562500061
2020 7 FD52 00 E121 D 9440501D 121 1/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011K1062000807913 $4.78 000001068439-3562500061
2020 7 FD52 00 E122 D 9440501D 121 1/9/2020 0092 ENV STUDIES-PERMITTING CA-XR011K1062000807913 $144.84 000001068439-3562500061
2020 7 FD52 00 E122 D 9440501D 121 1/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011K1062000807913 $52.73 000001068439-3562500061
2020 7 FD52 00 E123 D 9440501D 121 1/9/2020 0092 ENV STUDIES-PERMITTING CA-XR011K1062000807913 $28.08 000001068439-3562500061
2020 7 FD52 00 E123 D 9440501D 121 1/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011K1062000807913 $10.01 000001068439-3562500061
2020 6 FD52 00 E229 D 9440501D 121 12/26/2019 0092 ENV STUDIES-PERMITTING IET-XE13A162519359012150 $198.80
2020 6 FD52 09 E111 D 9440501D 010 12/23/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR122J1061935406877 $205.95 000001071374-3562509200
2020 6 FD52 09 E124 D 9440501D 010 12/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122J1061935406877 $0.02 000001071374-3562509200
2020 6 FD52 09 E111 D 9440501D 010 12/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122J1061935406877 $40.39 000001071374-3562509200
2020 6 FD52 09 E121 D 9440501D 010 12/23/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR122J1061935406877 $15.45 000001071374-3562509200
2020 6 FD52 09 E121 D 9440501D 010 12/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122J1061935406877 $3.02 000001071374-3562509200
2020 6 FD52 09 E122 D 9440501D 010 12/23/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR122J1061935406877 $171.27 000001071374-3562509200
2020 6 FD52 09 E122 D 9440501D 010 12/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122J1061935406877 $33.69 000001071374-3562509200
2020 6 FD52 00 E111 D 9440501D 022 12/23/2019 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR122J1061935406866 $587.97 000001069551-3562500610
2020 6 FD52 00 E111 D 9440501D 022 12/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122J1061935406866 $146.76 000001069551-3562500610
2020 6 FD52 00 E121 D 9440501D 022 12/23/2019 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR122J1061935406866 $42.16 000001069551-3562500610
2020 6 FD52 00 E121 D 9440501D 022 12/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122J1061935406866 $10.52 000001069551-3562500610
2020 6 FD52 00 E122 D 9440501D 022 12/23/2019 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR122J1061935406866 $490.54 000001069551-3562500610
2020 6 FD52 00 E122 D 9440501D 022 12/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122J1061935406866 $122.44 000001069551-3562500610
2020 6 FD52 00 E123 D 9440501D 022 12/23/2019 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR122J1061935406866 $95.36 000001069551-3562500610
2020 6 FD52 00 E123 D 9440501D 022 12/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122J1061935406866 $23.54 000001069551-3562500610
2020 6 FD52 00 E124 D 9440501D 022 12/23/2019 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR122J1061935406866 $0.17 000001069551-3562500610
2020 6 FD52 00 E124 D 9440501D 022 12/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122J1061935406866 $0.04 000001069551-3562500610
2020 6 FD52 09 E123 D 9440501D 010 12/23/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR122J1061935406877 $28.68 000001071374-3562509200
2020 6 FD52 09 E123 D 9440501D 010 12/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122J1061935406877 $5.57 000001071374-3562509200
2020 6 FD52 00 E111 D 9440501D 121 12/23/2019 0092 ENV STUDIES-PERMITTING CA-XR122J1061935406860 $416.67 000001068439-3562500061
2020 6 FD52 00 E111 D 9440501D 121 12/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122J1061935406860 $416.67 000001068439-3562500061
2020 6 FD52 00 E121 D 9440501D 121 12/23/2019 0092 ENV STUDIES-PERMITTING CA-XR122J1061935406860 $31.67 000001068439-3562500061
2020 6 FD52 00 E121 D 9440501D 121 12/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122J1061935406860 $31.67 000001068439-3562500061
2020 6 FD52 00 E122 D 9440501D 121 12/23/2019 0092 ENV STUDIES-PERMITTING CA-XR122J1061935406860 $347.62 000001068439-3562500061
2020 6 FD52 00 E122 D 9440501D 121 12/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122J1061935406860 $347.62 000001068439-3562500061
2020 6 FD52 00 E123 D 9440501D 121 12/23/2019 0092 ENV STUDIES-PERMITTING CA-XR122J1061935406860 $67.69 000001068439-3562500061
2020 6 FD52 00 E123 D 9440501D 121 12/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122J1061935406860 $65.65 000001068439-3562500061
2020 6 FD52 00 E124 D 9440501D 121 12/23/2019 0092 ENV STUDIES-PERMITTING CA-XR122J1061935406860 $0.20 000001068439-3562500061
2020 6 FD52 09 E124 D 9440501D 010 12/23/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR122J1061935406877 $0.05 000001071374-3562509200
2020 6 FD52 00 E124 D 9440501D 121 12/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122J1061935406860 $0.20 000001068439-3562500061
2020 6 FD52 09 E143 D 9440501D 045 12/13/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000103860 PON21900003413 GRW ENGINEERS INC $151,435.00 Greenup County 9-397.0
2020 6 FD52 00 E123 D 9440501D 022 12/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121J1061934005879 $71.97 000001069551-3562500610
2020 6 FD52 00 E111 D 9440501D 022 12/9/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121J1061934005884 $379.47 000001070711-3562500636
2020 6 FD52 00 E111 D 9440501D 022 12/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121J1061934005884 $379.48 000001070711-3562500636
2020 6 FD52 00 E121 D 9440501D 022 12/9/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121J1061934005884 $27.67 000001070711-3562500636
2020 6 FD52 00 E121 D 9440501D 022 12/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121J1061934005884 $27.67 000001070711-3562500636
2020 6 FD52 00 E122 D 9440501D 022 12/9/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121J1061934005884 $316.60 000001070711-3562500636
2020 6 FD52 00 E111 D 9440501D 009 12/9/2019 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR121J1061934005875 $1,307.76 000001068700-3562500061
2020 6 FD52 00 E122 D 9440501D 022 12/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121J1061934005884 $316.60 000001070711-3562500636
2020 6 FD52 00 E111 D 9440501D 009 12/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121J1061934005875 $443.70 000001068700-3562500061
2020 6 FD52 00 E123 D 9440501D 022 12/9/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121J1061934005884 $57.60 000001070711-3562500636
2020 6 FD52 09 E111 D 9440501D 010 12/9/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR121J1061934005887 $927.47 000001071374-3562509200
2020 6 FD52 00 E121 D 9440501D 009 12/9/2019 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR121J1061934005875 $88.14 000001068700-3562500061
2020 6 FD52 00 E123 D 9440501D 022 12/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121J1061934005884 $56.58 000001070711-3562500636
2020 6 FD52 09 E111 D 9440501D 010 12/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121J1061934005887 $397.37 000001071374-3562509200
2020 6 FD52 00 E121 D 9440501D 009 12/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121J1061934005875 $29.90 000001068700-3562500061
2020 6 FD52 09 E121 D 9440501D 010 12/9/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR121J1061934005887 $69.50 000001071374-3562509200
2020 6 FD52 00 E122 D 9440501D 009 12/9/2019 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR121J1061934005875 $1,091.06 000001068700-3562500061
2020 6 FD52 09 E121 D 9440501D 010 12/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121J1061934005887 $29.78 000001071374-3562509200
2020 6 FD52 00 E122 D 9440501D 009 12/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121J1061934005875 $370.18 000001068700-3562500061
2020 6 FD52 09 E122 D 9440501D 010 12/9/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR121J1061934005887 $773.79 000001071374-3562509200
2020 6 FD52 00 E123 D 9440501D 009 12/9/2019 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR121J1061934005875 $70.41 000001068700-3562500061
2020 6 FD52 09 E122 D 9440501D 010 12/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121J1061934005887 $331.52 000001071374-3562509200
2020 6 FD52 00 E123 D 9440501D 009 12/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121J1061934005875 $22.17 000001068700-3562500061
2020 6 FD52 09 E123 D 9440501D 010 12/9/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR121J1061934005887 $129.96 000001071374-3562509200
2020 6 FD52 09 E123 D 9440501D 010 12/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121J1061934005887 $54.75 000001071374-3562509200
2020 6 FD52 00 E111 D 9440501D 022 12/9/2019 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR121J1061934005879 $1,046.49 000001069551-3562500610
2020 6 FD52 00 E111 D 9440501D 022 12/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121J1061934005879 $448.74 000001069551-3562500610
2020 6 FD52 00 E121 D 9440501D 022 12/9/2019 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR121J1061934005879 $75.06 000001069551-3562500610
2020 6 FD52 00 E121 D 9440501D 022 12/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121J1061934005879 $32.18 000001069551-3562500610
2020 6 FD52 00 E122 D 9440501D 022 12/9/2019 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR121J1061934005879 $873.17 000001069551-3562500610
2020 6 FD52 00 E111 D 9440501D 121 12/9/2019 0060 ENV STUDIES-ARCHAEOLOGY CA-XR121J1061934005874 $235.50 000001068639-3562500061
2020 6 FD52 00 E111 D 9440501D 121 12/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121J1061934005874 $64.97 000001068639-3562500061
2020 6 FD52 00 E121 D 9440501D 121 12/9/2019 0060 ENV STUDIES-ARCHAEOLOGY CA-XR121J1061934005874 $17.71 000001068639-3562500061
2020 6 FD52 00 E121 D 9440501D 121 12/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121J1061934005874 $4.88 000001068639-3562500061
2020 6 FD52 00 E122 D 9440501D 121 12/9/2019 0060 ENV STUDIES-ARCHAEOLOGY CA-XR121J1061934005874 $196.39 000001068639-3562500061
2020 6 FD52 00 E122 D 9440501D 121 12/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121J1061934005874 $54.21 000001068639-3562500061
2020 6 FD52 00 E122 D 9440501D 022 12/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121J1061934005879 $374.38 000001069551-3562500610
2020 6 FD52 00 E123 D 9440501D 121 12/9/2019 0060 ENV STUDIES-ARCHAEOLOGY CA-XR121J1061934005874 $37.58 000001068639-3562500061
2020 6 FD52 00 E123 D 9440501D 121 12/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121J1061934005874 $10.20 000001068639-3562500061
2020 6 FD52 00 E123 D 9440501D 022 12/9/2019 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR121J1061934005879 $170.01 000001069551-3562500610
2020 5 FD52 00 E229 D 9440501D 121 11/26/2019 0060 ENV STUDIES-ARCHAEOLOGY IET-XE13A162519329005220 $299.64
2020 5 FD52 00 E229 D 9440501D 009 11/26/2019 0050 ENV STUDIES-TERRESTRIAL ECOL IET-XE13A162519329020930 $152.46
2020 5 FD52 00 E123 D 9440501D 121 11/22/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112J1061932504751 $56.08 000001068820-3562500061
2020 5 FD52 00 E124 D 9440501D 121 11/22/2019 0070 ENV STUDIES-HIST/CULTURAL CA-XR112J1061932504751 $0.18 000001068820-3562500061
2020 5 FD52 00 E124 D 9440501D 121 11/22/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112J1061932504751 $0.11 000001068820-3562500061
2020 5 FD52 00 E111 D 9440501D 121 11/22/2019 0060 ENV STUDIES-ARCHAEOLOGY CA-XR112J1061932504750 $428.00 000001068639-3562500061
2020 5 FD52 00 E111 D 9440501D 121 11/22/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112J1061932504750 $107.00 000001068639-3562500061
2020 5 FD52 00 E121 D 9440501D 121 11/22/2019 0060 ENV STUDIES-ARCHAEOLOGY CA-XR112J1061932504750 $32.18 000001068639-3562500061
2020 5 FD52 00 E121 D 9440501D 121 11/22/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112J1061932504750 $8.05 000001068639-3562500061
2020 5 FD52 00 E122 D 9440501D 121 11/22/2019 0060 ENV STUDIES-ARCHAEOLOGY CA-XR112J1061932504750 $357.07 000001068639-3562500061
2020 5 FD52 00 E122 D 9440501D 121 11/22/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112J1061932504750 $89.27 000001068639-3562500061
2020 5 FD52 00 E123 D 9440501D 121 11/22/2019 0060 ENV STUDIES-ARCHAEOLOGY CA-XR112J1061932504750 $68.31 000001068639-3562500061
2020 5 FD52 00 E123 D 9440501D 121 11/22/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112J1061932504750 $16.78 000001068639-3562500061
2020 5 FD52 00 E124 D 9440501D 121 11/22/2019 0060 ENV STUDIES-ARCHAEOLOGY CA-XR112J1061932504750 $0.19 000001068639-3562500061
2020 5 FD52 00 E124 D 9440501D 121 11/22/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112J1061932504750 $0.04 000001068639-3562500061
2020 5 FD52 00 E111 D 9440501D 009 11/22/2019 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR112J1061932504750 $1,178.26 000001068700-3562500061
2020 5 FD52 00 E111 D 9440501D 009 11/22/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112J1061932504750 $573.20 000001068700-3562500061
2020 5 FD52 00 E121 D 9440501D 009 11/22/2019 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR112J1061932504750 $79.42 000001068700-3562500061
2020 5 FD52 00 E121 D 9440501D 009 11/22/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112J1061932504750 $38.63 000001068700-3562500061
2020 5 FD52 00 E122 D 9440501D 009 11/22/2019 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR112J1061932504750 $983.02 000001068700-3562500061
2020 5 FD52 00 E122 D 9440501D 009 11/22/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112J1061932504750 $478.22 000001068700-3562500061
2020 5 FD52 00 E123 D 9440501D 009 11/22/2019 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR112J1061932504750 $63.95 000001068700-3562500061
2020 5 FD52 00 E123 D 9440501D 009 11/22/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112J1061932504750 $28.63 000001068700-3562500061
2020 5 FD52 00 E124 D 9440501D 009 11/22/2019 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR112J1061932504750 $0.67 000001068700-3562500061
2020 5 FD52 00 E124 D 9440501D 009 11/22/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112J1061932504750 $0.33 000001068700-3562500061
2020 5 FD52 09 E111 D 9440501D 010 11/22/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR112J1061932504769 $935.67 000001071374-3562509200
2020 5 FD52 09 E111 D 9440501D 010 11/22/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112J1061932504769 $224.93 000001071374-3562509200
2020 5 FD52 09 E121 D 9440501D 010 11/22/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR112J1061932504769 $69.97 000001071374-3562509200
2020 5 FD52 09 E121 D 9440501D 010 11/22/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112J1061932504769 $16.82 000001071374-3562509200
2020 5 FD52 09 E122 D 9440501D 010 11/22/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR112J1061932504769 $780.70 000001071374-3562509200
2020 5 FD52 09 E122 D 9440501D 010 11/22/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112J1061932504769 $187.66 000001071374-3562509200
2020 5 FD52 09 E123 D 9440501D 010 11/22/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR112J1061932504769 $144.07 000001071374-3562509200
2020 5 FD52 09 E123 D 9440501D 010 11/22/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112J1061932504769 $34.12 000001071374-3562509200
2020 5 FD52 09 E124 D 9440501D 010 11/22/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR112J1061932504769 $0.33 000001071374-3562509200
2020 5 FD52 09 E124 D 9440501D 010 11/22/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112J1061932504769 $0.08 000001071374-3562509200
2020 5 FD52 00 E111 D 9440501D 121 11/22/2019 0070 ENV STUDIES-HIST/CULTURAL CA-XR112J1061932504750 $433.05 000001068820-3562500061
2020 5 FD52 00 E111 D 9440501D 121 11/22/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112J1061932504750 $282.23 000001068820-3562500061
2020 5 FD52 00 E121 D 9440501D 121 11/22/2019 0070 ENV STUDIES-HIST/CULTURAL CA-XR112J1061932504750 $30.64 000001068820-3562500061
2020 5 FD52 00 E121 D 9440501D 121 11/22/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112J1061932504750 $19.96 000001068820-3562500061
2020 5 FD52 00 E122 D 9440501D 121 11/22/2019 0070 ENV STUDIES-HIST/CULTURAL CA-XR112J1061932504750 $361.54 000001068820-3562500061
2020 5 FD52 00 E122 D 9440501D 121 11/22/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112J1061932504750 $235.45 000001068820-3562500061
2020 5 FD52 00 E123 D 9440501D 121 11/22/2019 0070 ENV STUDIES-HIST/CULTURAL CA-XR112J1061932504750 $87.02 000001068820-3562500061
2020 5 FD52 00 E229 D 9440501D 022 11/12/2019 5011 GEOTECH INVEST ROADWAY (DESIGN IET-XE13A162519314005960 $300.00
2020 5 FD52 00 E229 D 9440501D 009 11/12/2019 0050 ENV STUDIES-TERRESTRIAL ECOL IET-XE13A162519314024870 $172.30
2020 5 FD52 00 E111 D 9440501D 022 11/12/2019 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR111J1061931103656 $2,965.34 000001069551-3562500610
2020 5 FD52 00 E111 D 9440501D 022 11/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111J1061931103656 $402.25 000001069551-3562500610
2020 5 FD52 00 E121 D 9440501D 022 11/12/2019 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR111J1061931103656 $214.64 000001069551-3562500610
2020 5 FD52 00 E121 D 9440501D 022 11/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111J1061931103656 $29.36 000001069551-3562500610
2020 5 FD52 00 E122 D 9440501D 022 11/12/2019 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR111J1061931103656 $2,473.98 000001069551-3562500610
2020 5 FD52 00 E122 D 9440501D 022 11/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111J1061931103656 $335.61 000001069551-3562500610
2020 5 FD52 00 E123 D 9440501D 022 11/12/2019 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR111J1061931103656 $520.25 000001069551-3562500610
2020 5 FD52 00 E123 D 9440501D 022 11/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111J1061931103656 $71.48 000001069551-3562500610
2020 5 FD52 00 E111 D 9440501D 009 11/12/2019 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR111J1061931103651 $308.82 000001068700-3562500061
2020 5 FD52 00 E111 D 9440501D 009 11/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111J1061931103651 $14.26 000001068700-3562500061
2020 5 FD52 00 E121 D 9440501D 009 11/12/2019 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR111J1061931103651 $22.29 000001068700-3562500061
2020 5 FD52 00 E121 D 9440501D 009 11/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111J1061931103651 $1.07 000001068700-3562500061
2020 5 FD52 00 E122 D 9440501D 009 11/12/2019 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR111J1061931103651 $257.66 000001068700-3562500061
2020 5 FD52 00 E122 D 9440501D 009 11/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111J1061931103651 $11.90 000001068700-3562500061
2020 5 FD52 00 E123 D 9440501D 009 11/12/2019 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR111J1061931103651 $15.45 000001068700-3562500061
2020 5 FD52 00 E123 D 9440501D 009 11/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111J1061931103651 $0.66 000001068700-3562500061
2020 5 FD52 09 E143 D 9440501D 010 11/8/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000081087 PON21900003413 GRW ENGINEERS INC $41,915.84 Boyd County 9-397.0
2020 4 FD52 00 E229 D 9440501D 121 10/28/2019 0092 ENV STUDIES-PERMITTING IET-XE13A162519298015220 $66.88
2020 4 FD52 09 E111 D 9440501D 010 10/28/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR102J1061929702561 $510.54 000001071374-3562509200
2020 4 FD52 09 E111 D 9440501D 010 10/28/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102J1061929702561 $32.66 000001071374-3562509200
2020 4 FD52 09 E121 D 9440501D 010 10/28/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR102J1061929702561 $38.16 000001071374-3562509200
2020 4 FD52 09 E121 D 9440501D 010 10/28/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102J1061929702561 $2.44 000001071374-3562509200
2020 4 FD52 09 E122 D 9440501D 010 10/28/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR102J1061929702561 $425.84 000001071374-3562509200
2020 4 FD52 09 E122 D 9440501D 010 10/28/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102J1061929702561 $27.24 000001071374-3562509200
2020 4 FD52 09 E123 D 9440501D 010 10/28/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR102J1061929702561 $78.42 000001071374-3562509200
2020 4 FD52 09 E123 D 9440501D 010 10/28/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102J1061929702561 $4.96 000001071374-3562509200
2020 4 FD52 09 E124 D 9440501D 010 10/28/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR102J1061929702561 $0.18 000001071374-3562509200
2020 4 FD52 09 E124 D 9440501D 010 10/28/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102J1061929702561 $0.02 000001071374-3562509200
2020 4 FD52 00 E111 D 9440501D 121 10/28/2019 0092 ENV STUDIES-PERMITTING CA-XR102J1061929702528 $189.40 000001068439-3562500061
2020 4 FD52 00 E111 D 9440501D 121 10/28/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102J1061929702528 $41.16 000001068439-3562500061
2020 4 FD52 00 E121 D 9440501D 121 10/28/2019 0092 ENV STUDIES-PERMITTING CA-XR102J1061929702528 $14.40 000001068439-3562500061
2020 4 FD52 00 E121 D 9440501D 121 10/28/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102J1061929702528 $3.12 000001068439-3562500061
2020 4 FD52 00 E122 D 9440501D 121 10/28/2019 0092 ENV STUDIES-PERMITTING CA-XR102J1061929702528 $158.01 000001068439-3562500061
2020 4 FD52 00 E122 D 9440501D 121 10/28/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102J1061929702528 $34.34 000001068439-3562500061
2020 4 FD52 00 E123 D 9440501D 121 10/28/2019 0092 ENV STUDIES-PERMITTING CA-XR102J1061929702528 $30.40 000001068439-3562500061
2020 4 FD52 00 E123 D 9440501D 121 10/28/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102J1061929702528 $6.48 000001068439-3562500061
2020 4 FD52 00 E124 D 9440501D 121 10/28/2019 0092 ENV STUDIES-PERMITTING CA-XR102J1061929702528 $0.09 000001068439-3562500061
2020 4 FD52 00 E124 D 9440501D 121 10/28/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102J1061929702528 $0.02 000001068439-3562500061
2020 4 FD52 00 E229 D 9440501D 121 10/15/2019 0092 ENV STUDIES-PERMITTING IET-XE13A162519283014870 $66.88
2020 4 FD52 00 E111 D 9440501D 121 10/9/2019 0092 ENV STUDIES-PERMITTING CA-XR101J1061928101480 $189.35 000001068439-3562500061
2020 4 FD52 00 E111 D 9440501D 121 10/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101J1061928101480 $4.80 000001068439-3562500061
2020 4 FD52 09 E111 D 9440501D 022 10/9/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR101J1061928101488 $255.25 000001069765-3562509200
2020 4 FD52 00 E121 D 9440501D 121 10/9/2019 0092 ENV STUDIES-PERMITTING CA-XR101J1061928101480 $14.40 000001068439-3562500061
2020 4 FD52 09 E111 D 9440501D 022 10/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101J1061928101488 $21.78 000001069765-3562509200
2020 4 FD52 00 E121 D 9440501D 121 10/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101J1061928101480 $0.37 000001068439-3562500061
2020 4 FD52 09 E121 D 9440501D 022 10/9/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR101J1061928101488 $19.09 000001069765-3562509200
2020 4 FD52 00 E122 D 9440501D 121 10/9/2019 0092 ENV STUDIES-PERMITTING CA-XR101J1061928101480 $158.01 000001068439-3562500061
2020 4 FD52 09 E121 D 9440501D 022 10/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101J1061928101488 $1.62 000001069765-3562509200
2020 4 FD52 00 E122 D 9440501D 121 10/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101J1061928101480 $4.00 000001068439-3562500061
2020 4 FD52 09 E122 D 9440501D 022 10/9/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR101J1061928101488 $213.16 000001069765-3562509200
2020 4 FD52 00 E123 D 9440501D 121 10/9/2019 0092 ENV STUDIES-PERMITTING CA-XR101J1061928101480 $30.31 000001068439-3562500061
2020 4 FD52 09 E122 D 9440501D 022 10/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101J1061928101488 $18.18 000001069765-3562509200
2020 4 FD52 00 E123 D 9440501D 121 10/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101J1061928101480 $0.76 000001068439-3562500061
2020 4 FD52 09 E123 D 9440501D 022 10/9/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR101J1061928101488 $39.31 000001069765-3562509200
2020 4 FD52 09 E123 D 9440501D 022 10/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101J1061928101488 $3.30 000001069765-3562509200
2020 4 FD52 09 E143 D 9440501D 045 10/8/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000061997 PON21900003413 GRW ENGINEERS INC $36,113.81 Greenup County 9-397.0
2020 3 FD52 00 E121 D 9440501D 121 9/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092J1061926700413 $27.72 000001068439-3562500061
2020 3 FD52 00 E122 D 9440501D 121 9/25/2019 0092 ENV STUDIES-PERMITTING CA-XR092J1061926700413 $1,216.69 000001068439-3562500061
2020 3 FD52 00 E122 D 9440501D 121 9/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092J1061926700413 $304.06 000001068439-3562500061
2020 3 FD52 00 E123 D 9440501D 121 9/25/2019 0092 ENV STUDIES-PERMITTING CA-XR092J1061926700413 $234.26 000001068439-3562500061
2020 3 FD52 00 E111 D 9440501D 121 9/25/2019 0010 ENV STUDIES-UST/HZM CA-XR092J1061926700413 $243.61 000001068562-3562500061
2020 3 FD52 00 E111 D 9440501D 121 9/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092J1061926700413 $27.09 000001068562-3562500061
2020 3 FD52 00 E121 D 9440501D 121 9/25/2019 0010 ENV STUDIES-UST/HZM CA-XR092J1061926700413 $18.06 000001068562-3562500061
2020 3 FD52 00 E123 D 9440501D 121 9/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092J1061926700413 $57.42 000001068439-3562500061
2020 3 FD52 00 E121 D 9440501D 121 9/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092J1061926700413 $2.01 000001068562-3562500061
2020 3 FD52 00 E122 D 9440501D 121 9/25/2019 0010 ENV STUDIES-UST/HZM CA-XR092J1061926700413 $203.25 000001068562-3562500061
2020 3 FD52 00 E122 D 9440501D 121 9/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092J1061926700413 $22.60 000001068562-3562500061
2020 3 FD52 00 E123 D 9440501D 121 9/25/2019 0010 ENV STUDIES-UST/HZM CA-XR092J1061926700413 $52.61 000001068562-3562500061
2020 3 FD52 00 E123 D 9440501D 121 9/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092J1061926700413 $5.75 000001068562-3562500061
2020 3 FD52 00 E124 D 9440501D 121 9/25/2019 0010 ENV STUDIES-UST/HZM CA-XR092J1061926700413 $0.17 000001068562-3562500061
2020 3 FD52 00 E124 D 9440501D 121 9/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092J1061926700413 $0.02 000001068562-3562500061
2020 3 FD52 00 E111 D 9440501D 022 9/25/2019 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR092J1061926700420 $1,202.19 000001069551-3562500610
2020 3 FD52 00 E111 D 9440501D 022 9/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092J1061926700420 $283.02 000001069551-3562500610
2020 3 FD52 00 E121 D 9440501D 022 9/25/2019 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR092J1061926700420 $88.05 000001069551-3562500610
2020 3 FD52 00 E121 D 9440501D 022 9/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092J1061926700420 $20.72 000001069551-3562500610
2020 3 FD52 00 E124 D 9440501D 121 9/25/2019 0092 ENV STUDIES-PERMITTING CA-XR092J1061926700413 $0.70 000001068439-3562500061
2020 3 FD52 00 E122 D 9440501D 022 9/25/2019 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR092J1061926700420 $1,003.25 000001069551-3562500610
2020 3 FD52 00 E122 D 9440501D 022 9/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092J1061926700420 $236.14 000001069551-3562500610
2020 3 FD52 00 E123 D 9440501D 022 9/25/2019 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR092J1061926700420 $211.47 000001069551-3562500610
2020 3 FD52 00 E123 D 9440501D 022 9/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092J1061926700420 $50.54 000001069551-3562500610
2020 3 FD52 00 E124 D 9440501D 022 9/25/2019 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR092J1061926700420 $0.45 000001069551-3562500610
2020 3 FD52 00 E124 D 9440501D 022 9/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092J1061926700420 $0.12 000001069551-3562500610
2020 3 FD52 09 E111 D 9440501D 022 9/25/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR092J1061926700423 $280.72 000001069765-3562509200
2020 3 FD52 00 E124 D 9440501D 121 9/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092J1061926700413 $0.18 000001068439-3562500061
2020 3 FD52 09 E111 D 9440501D 022 9/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092J1061926700423 $56.15 000001069765-3562509200
2020 3 FD52 09 E121 D 9440501D 022 9/25/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR092J1061926700423 $20.99 000001069765-3562509200
2020 3 FD52 09 E121 D 9440501D 022 9/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092J1061926700423 $4.20 000001069765-3562509200
2020 3 FD52 09 E122 D 9440501D 022 9/25/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR092J1061926700423 $234.21 000001069765-3562509200
2020 3 FD52 09 E122 D 9440501D 022 9/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092J1061926700423 $46.85 000001069765-3562509200
2020 3 FD52 09 E123 D 9440501D 022 9/25/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR092J1061926700423 $43.20 000001069765-3562509200
2020 3 FD52 09 E123 D 9440501D 022 9/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092J1061926700423 $8.52 000001069765-3562509200
2020 3 FD52 09 E124 D 9440501D 022 9/25/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR092J1061926700423 $0.10 000001069765-3562509200
2020 3 FD52 09 E124 D 9440501D 022 9/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092J1061926700423 $0.02 000001069765-3562509200
2020 3 FD52 00 E111 D 9440501D 121 9/25/2019 0092 ENV STUDIES-PERMITTING CA-XR092J1061926700412 $1,458.35 000001068439-3562500061
2020 3 FD52 00 E111 D 9440501D 121 9/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092J1061926700412 $364.44 000001068439-3562500061
2020 3 FD52 00 E121 D 9440501D 121 9/25/2019 0092 ENV STUDIES-PERMITTING CA-XR092J1061926700412 $110.86 000001068439-3562500061
2020 3 FD52 00 E111 D 9440501D 022 9/12/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091J1061924909328 $344.97 000001070711-3562500636
2020 3 FD52 00 E111 D 9440501D 022 9/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909328 $34.50 000001070711-3562500636
2020 3 FD52 00 E121 D 9440501D 022 9/12/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091J1061924909328 $25.14 000001070711-3562500636
2020 3 FD52 00 E121 D 9440501D 022 9/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909328 $2.52 000001070711-3562500636
2020 3 FD52 00 E122 D 9440501D 022 9/12/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091J1061924909328 $287.81 000001070711-3562500636
2020 3 FD52 00 E122 D 9440501D 022 9/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909328 $28.78 000001070711-3562500636
2020 3 FD52 00 E123 D 9440501D 022 9/12/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091J1061924909328 $51.95 000001070711-3562500636
2020 3 FD52 00 E123 D 9440501D 022 9/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909328 $5.14 000001070711-3562500636
2020 3 FD52 09 E143 D 9440501D 045 9/11/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000044600 PON21900003413 GRW ENGINEERS INC $54,322.38 Greenup County 9-397.0
2020 3 FD52 09 E111 D 9440501D 045 9/9/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091J1061924909311 $1,046.08 000001070031-3562509208
2020 3 FD52 09 E111 D 9440501D 045 9/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909311 $318.68 000001070031-3562509208
2020 3 FD52 09 E121 D 9440501D 045 9/9/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091J1061924909311 $75.49 000001070031-3562509208
2020 3 FD52 09 E121 D 9440501D 045 9/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909311 $22.99 000001070031-3562509208
2020 3 FD52 09 E122 D 9440501D 045 9/9/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091J1061924909311 $872.82 000001070031-3562509208
2020 3 FD52 09 E122 D 9440501D 045 9/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909311 $265.88 000001070031-3562509208
2020 3 FD52 09 E111 D 9440501D 022 9/9/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR091J1061924909309 $255.21 000001069765-3562509200
2020 3 FD52 09 E123 D 9440501D 045 9/9/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091J1061924909311 $144.57 000001070031-3562509208
2020 3 FD52 09 E121 D 9440501D 022 9/9/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR091J1061924909309 $19.09 000001069765-3562509200
2020 3 FD52 09 E123 D 9440501D 045 9/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909311 $43.32 000001070031-3562509208
2020 3 FD52 09 E122 D 9440501D 022 9/9/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR091J1061924909309 $212.92 000001069765-3562509200
2020 3 FD52 09 E123 D 9440501D 022 9/9/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR091J1061924909309 $39.18 000001069765-3562509200
2020 3 FD52 00 E111 D 9440501D 121 9/9/2019 0092 ENV STUDIES-PERMITTING CA-XR091J1061924909299 $568.19 000001068439-3562500061
2020 3 FD52 00 E111 D 9440501D 121 9/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909299 $7.07 000001068439-3562500061
2020 3 FD52 00 E121 D 9440501D 121 9/9/2019 0092 ENV STUDIES-PERMITTING CA-XR091J1061924909299 $43.18 000001068439-3562500061
2020 3 FD52 00 E121 D 9440501D 121 9/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909299 $0.54 000001068439-3562500061
2020 3 FD52 00 E122 D 9440501D 121 9/9/2019 0092 ENV STUDIES-PERMITTING CA-XR091J1061924909299 $474.04 000001068439-3562500061
2020 3 FD52 00 E122 D 9440501D 121 9/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909299 $5.90 000001068439-3562500061
2020 3 FD52 00 E123 D 9440501D 121 9/9/2019 0092 ENV STUDIES-PERMITTING CA-XR091J1061924909299 $90.94 000001068439-3562500061
2020 3 FD52 00 E123 D 9440501D 121 9/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909299 $1.11 000001068439-3562500061
2020 3 FD52 00 E111 D 9440501D 022 9/9/2019 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR091J1061924909306 $1,645.19 000001069551-3562500610
2020 3 FD52 00 E111 D 9440501D 022 9/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909306 $100.76 000001069551-3562500610
2020 3 FD52 00 E121 D 9440501D 022 9/9/2019 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR091J1061924909306 $121.10 000001069551-3562500610
2020 3 FD52 00 E121 D 9440501D 022 9/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909306 $7.57 000001069551-3562500610
2020 3 FD52 00 E122 D 9440501D 022 9/9/2019 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR091J1061924909306 $1,372.52 000001069551-3562500610
2020 3 FD52 00 E122 D 9440501D 022 9/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909306 $84.07 000001069551-3562500610
2020 3 FD52 00 E123 D 9440501D 022 9/9/2019 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR091J1061924909306 $223.05 000001069551-3562500610
2020 3 FD52 00 E123 D 9440501D 022 9/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909306 $11.64 000001069551-3562500610
2020 2 FD52 09 E229 D 9440501D 045 8/30/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF IET-XE13A162519241005660 $75.50
2020 2 FD52 09 E111 D 9440501D 045 8/26/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082J1061923508124 $268.25 000001070031-3562509208
2020 2 FD52 09 E111 D 9440501D 045 8/26/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082J1061923508124 $132.33 000001070031-3562509208
2020 2 FD52 09 E121 D 9440501D 045 8/26/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082J1061923508124 $19.36 000001070031-3562509208
2020 2 FD52 09 E121 D 9440501D 045 8/26/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082J1061923508124 $9.55 000001070031-3562509208
2020 2 FD52 09 E122 D 9440501D 045 8/26/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082J1061923508124 $223.80 000001070031-3562509208
2020 2 FD52 09 E122 D 9440501D 045 8/26/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082J1061923508124 $110.40 000001070031-3562509208
2020 2 FD52 09 E123 D 9440501D 045 8/26/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082J1061923508124 $37.16 000001070031-3562509208
2020 2 FD52 09 E123 D 9440501D 045 8/26/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082J1061923508124 $17.99 000001070031-3562509208
2020 2 FD52 09 E124 D 9440501D 045 8/26/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082J1061923508124 $0.09 000001070031-3562509208
2020 2 FD52 09 E124 D 9440501D 045 8/26/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082J1061923508124 $0.04 000001070031-3562509208
2020 2 FD52 00 E111 D 9440501D 022 8/26/2019 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR082J1061923508117 $417.44 000001069551-3562500610
2020 2 FD52 00 E111 D 9440501D 022 8/26/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082J1061923508117 $10.18 000001069551-3562500610
2020 2 FD52 00 E121 D 9440501D 022 8/26/2019 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR082J1061923508117 $29.84 000001069551-3562500610
2020 2 FD52 00 E121 D 9440501D 022 8/26/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082J1061923508117 $0.72 000001069551-3562500610
2020 2 FD52 00 E122 D 9440501D 022 8/26/2019 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR082J1061923508117 $348.26 000001069551-3562500610
2020 2 FD52 00 E122 D 9440501D 022 8/26/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082J1061923508117 $8.50 000001069551-3562500610
2020 2 FD52 00 E123 D 9440501D 022 8/26/2019 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR082J1061923508117 $70.95 000001069551-3562500610
2020 2 FD52 00 E123 D 9440501D 022 8/26/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082J1061923508117 $1.71 000001069551-3562500610
2020 2 FD52 00 E124 D 9440501D 022 8/26/2019 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR082J1061923508117 $0.12 000001069551-3562500610
2020 2 FD52 09 E143 D 9440501D 010 8/13/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000022762 PON21900003413 GRW ENGINEERS INC $75,315.09 Boyd County 9-397.0
2020 2 FD52 09 E111 D 9440501D 045 8/12/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081J1061922106954 $737.69 000001070031-3562509208
2020 2 FD52 09 E111 D 9440501D 045 8/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081J1061922106954 $526.88 000001070031-3562509208
2020 2 FD52 09 E121 D 9440501D 045 8/12/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081J1061922106954 $53.23 000001070031-3562509208
2020 2 FD52 09 E121 D 9440501D 045 8/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081J1061922106954 $38.02 000001070031-3562509208
2020 2 FD52 09 E122 D 9440501D 045 8/12/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081J1061922106954 $615.44 000001070031-3562509208
2020 2 FD52 09 E122 D 9440501D 045 8/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081J1061922106954 $439.57 000001070031-3562509208
2020 2 FD52 09 E123 D 9440501D 045 8/12/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081J1061922106954 $102.46 000001070031-3562509208
2020 2 FD52 09 E123 D 9440501D 045 8/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081J1061922106954 $71.62 000001070031-3562509208
2020 2 FD52 09 E111 D 9440501D 022 8/12/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR081J1061922106949 $655.02 000001069765-3562509200
2020 2 FD52 09 E111 D 9440501D 022 8/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081J1061922106949 $18.72 000001069765-3562509200
2020 2 FD52 09 E121 D 9440501D 022 8/12/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR081J1061922106949 $48.97 000001069765-3562509200
2020 2 FD52 09 E121 D 9440501D 022 8/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081J1061922106949 $1.40 000001069765-3562509200
2020 2 FD52 09 E122 D 9440501D 022 8/12/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR081J1061922106949 $546.49 000001069765-3562509200
2020 2 FD52 09 E122 D 9440501D 022 8/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081J1061922106949 $15.62 000001069765-3562509200
2020 2 FD52 09 E123 D 9440501D 022 8/12/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR081J1061922106949 $100.60 000001069765-3562509200
2020 2 FD52 09 E123 D 9440501D 022 8/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081J1061922106949 $2.84 000001069765-3562509200
2020 1 FD52 09 E123 D 9440501D 022 7/29/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072J1061920405854 $9.09 000001069765-3562509200
2020 1 FD52 09 E124 D 9440501D 022 7/29/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR072J1061920405854 $0.09 000001069765-3562509200
2020 1 FD52 09 E124 D 9440501D 022 7/29/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072J1061920405854 $0.02 000001069765-3562509200
2020 1 FD52 09 E111 D 9440501D 022 7/29/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR072J1061920405854 $255.27 000001069765-3562509200
2020 1 FD52 09 E111 D 9440501D 022 7/29/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072J1061920405854 $59.88 000001069765-3562509200
2020 1 FD52 09 E121 D 9440501D 022 7/29/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR072J1061920405854 $19.09 000001069765-3562509200
2020 1 FD52 09 E121 D 9440501D 022 7/29/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072J1061920405854 $4.48 000001069765-3562509200
2020 1 FD52 09 E122 D 9440501D 022 7/29/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR072J1061920405854 $212.91 000001069765-3562509200
2020 1 FD52 09 E122 D 9440501D 022 7/29/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072J1061920405854 $49.95 000001069765-3562509200
2020 1 FD52 09 E123 D 9440501D 022 7/29/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR072J1061920405854 $39.29 000001069765-3562509200
2020 1 FD52 09 E143 D 9440501D 010 7/22/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000011005 PON21900003413 GRW ENGINEERS INC $48,766.30 Boyd County 9-397.0
2020 1 FD52 00 E229 D 9440501D 121 7/16/2019 0060 ENV STUDIES-ARCHAEOLOGY IET-XE13A162519165007870 $74.50
2020 1 FD52 00 E111 D 9440501D 022 7/10/2019 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR071J1061919004794 $1,079.43 000001069551-3562500610
2020 1 FD52 00 E111 D 9440501D 022 7/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071J1061919004794 $30.52 000001069551-3562500610
2020 1 FD52 00 E121 D 9440501D 022 7/10/2019 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR071J1061919004794 $76.89 000001069551-3562500610
2020 1 FD52 00 E121 D 9440501D 022 7/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071J1061919004794 $2.17 000001069551-3562500610
2020 1 FD52 00 E122 D 9440501D 022 7/10/2019 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR071J1061919004794 $900.60 000001069551-3562500610
2020 1 FD52 00 E122 D 9440501D 022 7/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071J1061919004794 $25.45 000001069551-3562500610
2020 1 FD52 00 E123 D 9440501D 022 7/10/2019 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR071J1061919004794 $197.96 000001069551-3562500610
2020 1 FD52 00 E123 D 9440501D 022 7/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071J1061919004794 $5.73 000001069551-3562500610
2020 1 FD52 00 E123 D 9440501D 121 7/1/2019 0060 ENV STUDIES-ARCHAEOLOGY CA-XR061J1061915802545P $46.36 000001068639-3562500061
2020 1 FD52 00 E123 D 9440501D 121 7/1/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061J1061915802545P $43.66 000001068639-3562500061
2020 1 FD52 00 E123 D 9440501D 121 7/1/2019 0070 ENV STUDIES-HIST/CULTURAL CA-XR061J1061915802551P $80.26 000001068820-3562500061
2020 1 FD52 00 E123 D 9440501D 121 7/1/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061J1061915802551P $26.47 000001068820-3562500061
2020 1 FD52 00 E123 D 9440501D 009 7/1/2019 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR061J1061915802546P $7.84 000001068700-3562500061
2020 1 FD52 00 E123 D 9440501D 009 7/1/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061J1061915802546P $2.15 000001068700-3562500061
2019 12 FD52 09 E143 D 9440501D 010 6/18/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-1900213415 PON21900003413 GRW ENGINEERS INC $52,145.35 Boyd County 9-397.0
2019 12 FD52 00 E111 D 9440501D 121 6/14/2019 0060 ENV STUDIES-ARCHAEOLOGY CA-XR061J1061915802545 $276.09 000001068639-3562500061
2019 12 FD52 00 E111 D 9440501D 121 6/14/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061J1061915802545 $267.06 000001068639-3562500061
2019 12 FD52 00 E121 D 9440501D 121 6/14/2019 0060 ENV STUDIES-ARCHAEOLOGY CA-XR061J1061915802545 $20.74 000001068639-3562500061
2019 12 FD52 00 E121 D 9440501D 121 6/14/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061J1061915802545 $20.07 000001068639-3562500061
2019 12 FD52 00 E122 D 9440501D 121 6/14/2019 0060 ENV STUDIES-ARCHAEOLOGY CA-XR061J1061915802545 $230.33 000001068639-3562500061
2019 12 FD52 00 E122 D 9440501D 121 6/14/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061J1061915802545 $222.81 000001068639-3562500061
2019 12 FD52 00 E111 D 9440501D 121 6/14/2019 0070 ENV STUDIES-HIST/CULTURAL CA-XR061J1061915802551 $350.67 000001068820-3562500061
2019 12 FD52 00 E111 D 9440501D 121 6/14/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061J1061915802551 $122.63 000001068820-3562500061
2019 12 FD52 00 E121 D 9440501D 121 6/14/2019 0070 ENV STUDIES-HIST/CULTURAL CA-XR061J1061915802551 $24.51 000001068820-3562500061
2019 12 FD52 00 E121 D 9440501D 121 6/14/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061J1061915802551 $8.62 000001068820-3562500061
2019 12 FD52 00 E122 D 9440501D 121 6/14/2019 0070 ENV STUDIES-HIST/CULTURAL CA-XR061J1061915802551 $292.54 000001068820-3562500061
2019 12 FD52 00 E122 D 9440501D 121 6/14/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061J1061915802551 $102.33 000001068820-3562500061
2019 12 FD52 00 E111 D 9440501D 009 6/10/2019 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR061J1061915802546 $146.03 000001068700-3562500061
2019 12 FD52 00 E111 D 9440501D 009 6/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061J1061915802546 $43.01 000001068700-3562500061
2019 12 FD52 00 E121 D 9440501D 009 6/10/2019 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR061J1061915802546 $9.83 000001068700-3562500061
2019 12 FD52 00 E121 D 9440501D 009 6/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061J1061915802546 $2.90 000001068700-3562500061
2019 12 FD52 00 E122 D 9440501D 009 6/10/2019 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR061J1061915802546 $121.77 000001068700-3562500061
2019 12 FD52 00 E122 D 9440501D 009 6/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061J1061915802546 $35.88 000001068700-3562500061
2019 11 FD52 00 E229 D 9440501D 121 5/29/2019 0092 ENV STUDIES-PERMITTING IET-XE13A162519145009040 $196.00
2019 11 FD52 00 E229 D 9440501D 009 5/29/2019 0050 ENV STUDIES-TERRESTRIAL ECOL IET-XE13A162519145014610 $154.50
2019 11 FD52 00 E122 D 9440501D 009 5/23/2019 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR052J1061914201396 $265.68 000001068700-3562500061
2019 11 FD52 00 E122 D 9440501D 009 5/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201396 $82.19 000001068700-3562500061
2019 11 FD52 00 E111 D 9440501D 121 5/23/2019 0092 ENV STUDIES-PERMITTING CA-XR052J1061914201382 $568.12 000001068439-3562500061
2019 11 FD52 00 E111 D 9440501D 121 5/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201382 $14.14 000001068439-3562500061
2019 11 FD52 00 E121 D 9440501D 121 5/23/2019 0092 ENV STUDIES-PERMITTING CA-XR052J1061914201382 $43.20 000001068439-3562500061
2019 11 FD52 00 E123 D 9440501D 009 5/23/2019 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR052J1061914201396 $17.12 000001068700-3562500061
2019 11 FD52 00 E121 D 9440501D 121 5/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201382 $1.07 000001068439-3562500061
2019 11 FD52 00 E122 D 9440501D 121 5/23/2019 0092 ENV STUDIES-PERMITTING CA-XR052J1061914201382 $474.03 000001068439-3562500061
2019 11 FD52 00 E122 D 9440501D 121 5/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201382 $11.80 000001068439-3562500061
2019 11 FD52 00 E123 D 9440501D 121 5/23/2019 0092 ENV STUDIES-PERMITTING CA-XR052J1061914201382 $90.96 000001068439-3562500061
2019 11 FD52 00 E123 D 9440501D 121 5/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201382 $2.23 000001068439-3562500061
2019 11 FD52 00 E124 D 9440501D 121 5/23/2019 0092 ENV STUDIES-PERMITTING CA-XR052J1061914201382 $0.27 000001068439-3562500061
2019 11 FD52 00 E124 D 9440501D 121 5/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201382 $0.01 000001068439-3562500061
2019 11 FD52 00 E123 D 9440501D 009 5/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201396 $4.92 000001068700-3562500061
2019 11 FD52 00 E124 D 9440501D 009 5/23/2019 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR052J1061914201396 $0.18 000001068700-3562500061
2019 11 FD52 00 E124 D 9440501D 009 5/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201396 $0.06 000001068700-3562500061
2019 11 FD52 00 E111 D 9440501D 121 5/23/2019 0010 ENV STUDIES-UST/HZM CA-XR052J1061914201386 $203.75 000001068562-3562500061
2019 11 FD52 00 E111 D 9440501D 121 5/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201386 $20.37 000001068562-3562500061
2019 11 FD52 00 E121 D 9440501D 121 5/23/2019 0010 ENV STUDIES-UST/HZM CA-XR052J1061914201386 $15.11 000001068562-3562500061
2019 11 FD52 00 E121 D 9440501D 121 5/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201386 $1.51 000001068562-3562500061
2019 11 FD52 00 E122 D 9440501D 121 5/23/2019 0010 ENV STUDIES-UST/HZM CA-XR052J1061914201386 $169.99 000001068562-3562500061
2019 11 FD52 00 E122 D 9440501D 121 5/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201386 $16.99 000001068562-3562500061
2019 11 FD52 00 E123 D 9440501D 121 5/23/2019 0010 ENV STUDIES-UST/HZM CA-XR052J1061914201386 $43.99 000001068562-3562500061
2019 11 FD52 00 E123 D 9440501D 121 5/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201386 $4.32 000001068562-3562500061
2019 11 FD52 00 E124 D 9440501D 121 5/23/2019 0010 ENV STUDIES-UST/HZM CA-XR052J1061914201386 $0.14 000001068562-3562500061
2019 11 FD52 00 E124 D 9440501D 121 5/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201386 $0.01 000001068562-3562500061
2019 11 FD52 00 E111 D 9440501D 009 5/23/2019 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR052J1061914201395 $318.45 000001068700-3562500061
2019 11 FD52 00 E111 D 9440501D 009 5/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201395 $98.51 000001068700-3562500061
2019 11 FD52 00 E121 D 9440501D 009 5/23/2019 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR052J1061914201395 $21.46 000001068700-3562500061
2019 11 FD52 00 E121 D 9440501D 009 5/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201395 $6.64 000001068700-3562500061
2019 11 FD52 09 E143 D 9440501D 010 5/15/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-1900190806 PON21900003413 GRW ENGINEERS INC $121,289.39 Boyd County 9-397.0
2019 10 FD52 09 E143 D 9440501D 022 4/10/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-1900170987 PON21900003413 GRW ENGINEERS INC $97,532.60 Carter County 9-397.0
2019 9 FD52 09 E143 D 9440501D 022 3/13/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-1900153093 PON21900003413 GRW ENGINEERS INC $83,879.70 Carter County 9-397.0
2019 8 FD52 09 E143 D 9440501D 022 2/14/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-1900136441 PON21900003413 GRW ENGINEERS INC $102,675.94 Carter County 9-397.0