The Commonwealth pays employees on a semi-monthly basis with a scheduled pay day on the 15th and 30th of each month. The two monthly pay periods are from the 1st to the 15th of the month and the 16th through the last day of the month. Pay check distribution is delayed by one pay period to allow for system processing. For example work performed during the 1st to the 15th day of the month is paid to the employee on the 30th of the month. Accordingly the cost accounting charges for labor costs posting in eMARS to operating accounts and highway projects are also delayed by approximately one pay period.
A good rule of measure is that the cost accounting charges for the pay period ending on the 15th of the month will post to eMARS by the 25th and those for the pay period ending on the last day of the month will post to eMARS by the 10th of the following month.

x close panel
Detailed Project Expenditure Report
Total E-MARS Expenditures for 8930701C = $16,749,443.21
Click here for Labor Costs Information
Year Month PBU Charge District Object Phase Program Code County Date ACT Activity Name Trans ID Reference # Vendor Name Expenditure Line Description
2024 10 FD52 05 E797 C 8930701C 093 4/24/2024 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P039K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $183,620.92
2024 10 FD52 05 E797 C 8930701C 093 4/10/2024 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P038K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $96,695.70
2024 10 FD52 05 E797 C 8930701C 093 4/9/2024 4010 CONSTRUCTION ENGINEERING PRC-2400187403 PON22400001007 QK4 INC $89,613.00 SW Highway & Bridge Construction Inspection R2
2024 9 FD52 05 E797 C 8930701C 093 3/27/2024 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P037K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $35,937.00
2024 9 FD52 05 E229 C 8930701C 093 3/27/2024 4010 CONSTRUCTION ENGINEERING IET-XE13A162524085011410 $325.81
2024 9 FD52 05 E797 C 8930701C 093 3/13/2024 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P036K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $366,334.88
2024 8 FD52 05 E797 C 8930701C 093 2/29/2024 4010 CONSTRUCTION ENGINEERING PRC-2400175430 PON22400001007 QK4 INC $33,945.00 SW Highway & Bridge Construction Inspection R2
2024 8 FD52 05 E111 C 8930701C 056 2/29/2024 4010 CONSTRUCTION ENGINEERING CA-XR022O1062405408985 $2,739.82 11079519-3562505380
2024 8 FD52 05 E115 C 8930701C 056 2/29/2024 4010 CONSTRUCTION ENGINEERING CA-XR022O1062405408985 $151.75 11079519-3562505380
2024 8 FD52 05 E121 C 8930701C 056 2/29/2024 4010 CONSTRUCTION ENGINEERING CA-XR022O1062405408985 $196.23 11079519-3562505380
2024 8 FD52 05 E122 C 8930701C 056 2/29/2024 4010 CONSTRUCTION ENGINEERING CA-XR022O1062405408985 $1,913.35 11079519-3562505380
2024 8 FD52 05 E797 C 8930701C 093 2/28/2024 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P035K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $119,760.91
2024 8 FD52 05 E797 C 8930701C 093 2/14/2024 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P034K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $121,215.98
2024 7 FD52 05 E797 C 8930701C 093 1/18/2024 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P033K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $132,120.05
2024 7 FD52 05 E797 C 8930701C 093 1/9/2024 4010 CONSTRUCTION ENGINEERING PRC-2400134383 PON22200004162 QK4 INC $22,911.50 SW HWY & Bridge Construction Inspection Region 1
2024 7 FD52 05 E797 C 8930701C 093 1/4/2024 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P032K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $896,540.01
2024 6 FD52 05 E111 C 8930701C 093 12/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR122N1062335504623 $296.14 000001086365-3562500680
2024 6 FD52 05 E111 C 8930701C 093 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504623 $65.50 000001086365-3562500680
2024 6 FD52 05 E121 C 8930701C 093 12/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR122N1062335504623 $22.45 000001086365-3562500680
2024 6 FD52 05 E121 C 8930701C 093 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504623 $4.96 000001086365-3562500680
2024 6 FD52 05 E122 C 8930701C 093 12/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR122N1062335504623 $195.79 000001086365-3562500680
2024 6 FD52 05 E122 C 8930701C 093 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504623 $43.34 000001086365-3562500680
2024 6 FD52 05 E123 C 8930701C 093 12/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR122N1062335504623 $35.10 000001086365-3562500680
2024 6 FD52 05 E123 C 8930701C 093 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504623 $7.64 000001086365-3562500680
2024 6 FD52 05 E124 C 8930701C 093 12/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR122N1062335504623 $0.09 000001086365-3562500680
2024 6 FD52 05 E124 C 8930701C 093 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504623 $0.02 000001086365-3562500680
2024 6 FD52 05 E797 C 8930701C 093 12/20/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P031K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $240,463.87
2024 6 FD52 05 E229 C 8930701C 093 12/13/2023 4010 CONSTRUCTION ENGINEERING IET-XE13A162523344012750 $15.34
2024 6 FD52 05 E111 C 8930701C 093 12/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR121N1062334203631 $382.22 000001086365-3562500680
2024 6 FD52 05 E111 C 8930701C 093 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203631 $191.11 000001086365-3562500680
2024 6 FD52 05 E121 C 8930701C 093 12/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR121N1062334203631 $26.44 000001086365-3562500680
2024 6 FD52 05 E121 C 8930701C 093 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203631 $13.23 000001086365-3562500680
2024 6 FD52 05 E122 C 8930701C 093 12/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR121N1062334203631 $252.91 000001086365-3562500680
2024 6 FD52 05 E122 C 8930701C 093 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203631 $126.46 000001086365-3562500680
2024 6 FD52 05 E123 C 8930701C 093 12/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR121N1062334203631 $64.13 000001086365-3562500680
2024 6 FD52 05 E123 C 8930701C 093 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203631 $31.72 000001086365-3562500680
2024 6 FD52 05 E797 C 8930701C 093 12/6/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P030K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $387,608.53
2024 5 FD52 05 E797 C 8930701C 093 11/22/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P029K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $259,272.04
2024 5 FD52 05 E111 C 8930701C 093 11/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR112N1062332502819 $166.88 11038836-3562505360
2024 5 FD52 05 E111 C 8930701C 093 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502819 $58.23 11038836-3562505360
2024 5 FD52 05 E121 C 8930701C 093 11/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR112N1062332502819 $12.04 11038836-3562505360
2024 5 FD52 05 E121 C 8930701C 093 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502819 $4.19 11038836-3562505360
2024 5 FD52 05 E111 C 8930701C 093 11/22/2023 5242 CONCRETE TESTING UNIT CA-XR112N1062332502570 $15.09 000001090072-3562505210
2024 5 FD52 05 E122 C 8930701C 093 11/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR112N1062332502819 $109.93 11038836-3562505360
2024 5 FD52 05 E111 C 8930701C 093 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502570 $5.43 000001090072-3562505210
2024 5 FD52 05 E122 C 8930701C 093 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502819 $38.53 11038836-3562505360
2024 5 FD52 05 E121 C 8930701C 093 11/22/2023 5242 CONCRETE TESTING UNIT CA-XR112N1062332502570 $1.06 000001090072-3562505210
2024 5 FD52 05 E123 C 8930701C 093 11/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR112N1062332502819 $29.71 11038836-3562505360
2024 5 FD52 05 E121 C 8930701C 093 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502570 $0.36 000001090072-3562505210
2024 5 FD52 05 E123 C 8930701C 093 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502819 $10.33 11038836-3562505360
2024 5 FD52 05 E122 C 8930701C 093 11/22/2023 5242 CONCRETE TESTING UNIT CA-XR112N1062332502570 $9.99 000001090072-3562505210
2024 5 FD52 05 E124 C 8930701C 093 11/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR112N1062332502819 $0.04 11038836-3562505360
2024 5 FD52 05 E122 C 8930701C 093 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502570 $3.60 000001090072-3562505210
2024 5 FD52 05 E124 C 8930701C 093 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502819 $0.02 11038836-3562505360
2024 5 FD52 05 E123 C 8930701C 093 11/22/2023 5242 CONCRETE TESTING UNIT CA-XR112N1062332502570 $4.27 000001090072-3562505210
2024 5 FD52 05 E123 C 8930701C 093 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502570 $1.53 000001090072-3562505210
2024 5 FD52 05 E124 C 8930701C 093 11/22/2023 5242 CONCRETE TESTING UNIT CA-XR112N1062332502570 $0.01 000001090072-3562505210
2024 5 FD52 00 E229 C 8930701C 093 11/14/2023 5142 CORING-CONCRETE STRUCTURES IET-XE13A162523314015220 $180.00
2024 5 FD52 00 E111 C 8930701C 093 11/9/2023 5142 CORING-CONCRETE STRUCTURES CA-XR111N1062331201529 $246.51 000001089982-3562500640
2024 5 FD52 00 E111 C 8930701C 093 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201529 $17.75 000001089982-3562500640
2024 5 FD52 00 E121 C 8930701C 093 11/9/2023 5142 CORING-CONCRETE STRUCTURES CA-XR111N1062331201529 $18.24 000001089982-3562500640
2024 5 FD52 00 E121 C 8930701C 093 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201529 $1.31 000001089982-3562500640
2024 5 FD52 00 E122 C 8930701C 093 11/9/2023 5142 CORING-CONCRETE STRUCTURES CA-XR111N1062331201529 $162.94 000001089982-3562500640
2024 5 FD52 00 E122 C 8930701C 093 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201529 $11.75 000001089982-3562500640
2024 5 FD52 00 E123 C 8930701C 093 11/9/2023 5142 CORING-CONCRETE STRUCTURES CA-XR111N1062331201529 $41.26 000001089982-3562500640
2024 5 FD52 00 E123 C 8930701C 093 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201529 $2.94 000001089982-3562500640
2024 5 FD52 05 E797 C 8930701C 093 11/9/2023 4010 CONSTRUCTION ENGINEERING PRC-2400093407 PON22200004162 QK4 INC $22,134.00 SW HWY & Bridge Construction Inspection Region 1
2024 5 FD52 05 E111 C 8930701C 093 11/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR111N1062331201490 $621.73 000001086365-3562500680
2024 5 FD52 05 E111 C 8930701C 093 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201490 $56.36 000001086365-3562500680
2024 5 FD52 05 E121 C 8930701C 093 11/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR111N1062331201490 $44.68 000001086365-3562500680
2024 5 FD52 05 E121 C 8930701C 093 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201490 $4.05 000001086365-3562500680
2024 5 FD52 05 E122 C 8930701C 093 11/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR111N1062331201490 $411.31 000001086365-3562500680
2024 5 FD52 05 E122 C 8930701C 093 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201490 $37.29 000001086365-3562500680
2024 5 FD52 05 E123 C 8930701C 093 11/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR111N1062331201490 $90.71 000001086365-3562500680
2024 5 FD52 05 E123 C 8930701C 093 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201490 $8.14 000001086365-3562500680
2024 5 FD52 05 E797 C 8930701C 093 11/8/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P028K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $297,279.10
2024 5 FD52 05 E797 C 8930701C 093 11/8/2023 4010 CONSTRUCTION ENGINEERING PRC-2400090795 PON22200004162 QK4 INC $23,473.50 SW HWY & Bridge Construction Inspection Region 1
2024 4 FD52 00 E229 C 8930701C 093 10/27/2023 5341 GEOTECHNICAL INVEST (CONST) IET-XE13A162523298018150 $196.39
2024 4 FD52 05 E797 C 8930701C 093 10/25/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P027K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $862,448.59
2024 4 FD52 05 E797 C 8930701C 093 10/11/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P026K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $118,710.37
2024 4 FD52 05 E229 C 8930701C 093 10/11/2023 4010 CONSTRUCTION ENGINEERING IET-XE13A162523283013100 $2.20
2024 4 FD52 05 E111 C 8930701C 093 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328010165 $34.66 11018757-3562505360
2024 4 FD52 05 E111 C 8930701C 093 10/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR101N1062328009705 $325.48 000001086365-3562500680
2024 4 FD52 05 E121 C 8930701C 093 10/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR101N1062328009705 $24.53 000001086365-3562500680
2024 4 FD52 05 E121 C 8930701C 093 10/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR101N1062328010165 $5.52 11018757-3562505360
2024 4 FD52 05 E122 C 8930701C 093 10/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR101N1062328009705 $215.37 000001086365-3562500680
2024 4 FD52 05 E123 C 8930701C 093 10/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR101N1062328009705 $38.49 000001086365-3562500680
2024 4 FD52 05 E121 C 8930701C 093 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328010165 $2.43 11018757-3562505360
2024 4 FD52 05 E122 C 8930701C 093 10/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR101N1062328010165 $52.50 11018757-3562505360
2024 4 FD52 05 E122 C 8930701C 093 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328010165 $22.93 11018757-3562505360
2024 4 FD52 05 E123 C 8930701C 093 10/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR101N1062328010165 $14.18 11018757-3562505360
2024 4 FD52 05 E123 C 8930701C 093 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328010165 $6.14 11018757-3562505360
2024 4 FD52 05 E111 C 8930701C 093 10/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR101N1062328010164 $78.86 11018757-3562505360
2024 4 FD52 05 E797 C 8930701C 093 10/5/2023 4010 CONSTRUCTION ENGINEERING PRC-2400068236 PON22200004162 QK4 INC $17,475.00 SW HWY & Bridge Construction Inspection Region 1
2024 3 FD52 05 E111 C 8930701C 093 9/29/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR092N1062327208431 $109.59 000001087144-3562505210
2024 3 FD52 05 E111 C 8930701C 093 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208431 $40.56 000001087144-3562505210
2024 3 FD52 05 E121 C 8930701C 093 9/29/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR092N1062327208431 $7.97 000001087144-3562505210
2024 3 FD52 05 E121 C 8930701C 093 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208431 $2.97 000001087144-3562505210
2024 3 FD52 05 E122 C 8930701C 093 9/29/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR092N1062327208431 $72.50 000001087144-3562505210
2024 3 FD52 05 E122 C 8930701C 093 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208431 $26.85 000001087144-3562505210
2024 3 FD52 05 E123 C 8930701C 093 9/29/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR092N1062327208431 $13.80 000001087144-3562505210
2024 3 FD52 05 E123 C 8930701C 093 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208431 $5.01 000001087144-3562505210
2024 3 FD52 05 E124 C 8930701C 093 9/29/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR092N1062327208431 $0.05 000001087144-3562505210
2024 3 FD52 05 E111 C 8930701C 093 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208719 $54.89 11003912-3562505360
2024 3 FD52 05 E111 C 8930701C 093 9/29/2023 4010 CONSTRUCTION ENGINEERING CA-XR092N1062327208719 $143.01 11003912-3562505360
2024 3 FD52 05 E121 C 8930701C 093 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208719 $3.96 11003912-3562505360
2024 3 FD52 05 E121 C 8930701C 093 9/29/2023 4010 CONSTRUCTION ENGINEERING CA-XR092N1062327208719 $10.32 11003912-3562505360
2024 3 FD52 05 E122 C 8930701C 093 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208719 $36.32 11003912-3562505360
2024 3 FD52 05 E122 C 8930701C 093 9/29/2023 4010 CONSTRUCTION ENGINEERING CA-XR092N1062327208719 $94.76 11003912-3562505360
2024 3 FD52 05 E123 C 8930701C 093 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208719 $9.72 11003912-3562505360
2024 3 FD52 05 E123 C 8930701C 093 9/29/2023 4010 CONSTRUCTION ENGINEERING CA-XR092N1062327208719 $25.63 11003912-3562505360
2024 3 FD52 05 E124 C 8930701C 093 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208719 $0.01 11003912-3562505360
2024 3 FD52 05 E124 C 8930701C 093 9/29/2023 4010 CONSTRUCTION ENGINEERING CA-XR092N1062327208719 $0.04 11003912-3562505360
2024 3 FD52 05 E115 C 8930701C 093 9/29/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR092N1062327208429 $188.12 000001086740-3562505210
2024 3 FD52 05 E121 C 8930701C 093 9/29/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR092N1062327208429 $14.21 000001086740-3562505210
2024 3 FD52 05 E122 C 8930701C 093 9/29/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR092N1062327208429 $124.32 000001086740-3562505210
2024 3 FD52 05 E111 C 8930701C 093 9/28/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR092N1062326507080 ($109.59) 000001087144-3562505210
2024 3 FD52 05 E111 C 8930701C 093 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507080 ($40.56) 000001087144-3562505210
2024 3 FD52 05 E121 C 8930701C 093 9/28/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR092N1062326507080 ($7.97) 000001087144-3562505210
2024 3 FD52 05 E121 C 8930701C 093 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507080 ($2.97) 000001087144-3562505210
2024 3 FD52 05 E122 C 8930701C 093 9/28/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR092N1062326507080 ($72.50) 000001087144-3562505210
2024 3 FD52 05 E122 C 8930701C 093 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507080 ($26.85) 000001087144-3562505210
2024 3 FD52 05 E123 C 8930701C 093 9/28/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR092N1062326507080 ($13.80) 000001087144-3562505210
2024 3 FD52 05 E123 C 8930701C 093 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507080 ($5.01) 000001087144-3562505210
2024 3 FD52 05 E124 C 8930701C 093 9/28/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR092N1062326507080 ($0.05) 000001087144-3562505210
2024 3 FD52 05 E115 C 8930701C 093 9/28/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR092N1062326507078 ($188.12) 000001086740-3562505210
2024 3 FD52 05 E121 C 8930701C 093 9/28/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR092N1062326507078 ($14.21) 000001086740-3562505210
2024 3 FD52 05 E122 C 8930701C 093 9/28/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR092N1062326507078 ($124.32) 000001086740-3562505210
2024 3 FD52 05 E797 C 8930701C 093 9/27/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P025K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $99,435.72
2024 3 FD52 05 E111 C 8930701C 093 9/25/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR092N1062326507080 $109.59 000001087144-3562505210
2024 3 FD52 05 E111 C 8930701C 093 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507080 $40.56 000001087144-3562505210
2024 3 FD52 05 E121 C 8930701C 093 9/25/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR092N1062326507080 $7.97 000001087144-3562505210
2024 3 FD52 05 E121 C 8930701C 093 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507080 $2.97 000001087144-3562505210
2024 3 FD52 05 E122 C 8930701C 093 9/25/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR092N1062326507080 $72.50 000001087144-3562505210
2024 3 FD52 05 E122 C 8930701C 093 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507080 $26.85 000001087144-3562505210
2024 3 FD52 05 E123 C 8930701C 093 9/25/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR092N1062326507080 $13.80 000001087144-3562505210
2024 3 FD52 05 E123 C 8930701C 093 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507080 $5.01 000001087144-3562505210
2024 3 FD52 05 E124 C 8930701C 093 9/25/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR092N1062326507080 $0.05 000001087144-3562505210
2024 3 FD52 05 E115 C 8930701C 093 9/25/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR092N1062326507078 $188.12 000001086740-3562505210
2024 3 FD52 05 E121 C 8930701C 093 9/25/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR092N1062326507078 $14.21 000001086740-3562505210
2024 3 FD52 05 E122 C 8930701C 093 9/25/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR092N1062326507078 $124.32 000001086740-3562505210
2024 3 FD52 05 E111 C 8930701C 093 9/18/2023 5203 TESTING OF ASPHALT MIXTURES CA-XR091N1062325106110 $567.43 000001087288-3562505210
2024 3 FD52 05 E111 C 8930701C 093 9/18/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106110 $218.08 000001087288-3562505210
2024 3 FD52 05 E121 C 8930701C 093 9/18/2023 5203 TESTING OF ASPHALT MIXTURES CA-XR091N1062325106110 $42.44 000001087288-3562505210
2024 3 FD52 05 E121 C 8930701C 093 9/18/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106110 $16.31 000001087288-3562505210
2024 3 FD52 05 E122 C 8930701C 093 9/18/2023 5203 TESTING OF ASPHALT MIXTURES CA-XR091N1062325106110 $375.41 000001087288-3562505210
2024 3 FD52 05 E122 C 8930701C 093 9/18/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106110 $144.31 000001087288-3562505210
2024 3 FD52 05 E123 C 8930701C 093 9/18/2023 5203 TESTING OF ASPHALT MIXTURES CA-XR091N1062325106110 $88.12 000001087288-3562505210
2024 3 FD52 05 E123 C 8930701C 093 9/18/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106110 $33.25 000001087288-3562505210
2024 3 FD52 05 E797 C 8930701C 093 9/14/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P024K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $320,884.07
2024 3 FD52 05 E229 C 8930701C 093 9/13/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF IET-XE13A162523253009050 $18.70
2024 3 FD52 05 E229 C 8930701C 093 9/13/2023 4010 CONSTRUCTION ENGINEERING IET-XE13A162523253013030 $61.66
2024 3 FD52 05 E797 C 8930701C 093 9/13/2023 4010 CONSTRUCTION ENGINEERING PRC-2400049184 PON22200004162 QK4 INC $18,636.50 SW HWY & Bridge Construction Inspection Region 1
2024 3 FD52 05 E111 C 8930701C 093 9/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR091N1062325106106 $350.37 000001086365-3562500680
2024 3 FD52 05 E121 C 8930701C 093 9/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR091N1062325106106 $24.23 000001086365-3562500680
2024 3 FD52 05 E122 C 8930701C 093 9/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR091N1062325106106 $231.82 000001086365-3562500680
2024 3 FD52 05 E123 C 8930701C 093 9/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR091N1062325106106 $58.56 000001086365-3562500680
2024 3 FD52 05 E111 C 8930701C 093 9/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR091N1062325106167 $590.70 10987558-3562505360
2024 3 FD52 05 E111 C 8930701C 093 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106167 $97.58 10987558-3562505360
2024 3 FD52 05 E121 C 8930701C 093 9/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR091N1062325106167 $41.40 10987558-3562505360
2024 3 FD52 05 E121 C 8930701C 093 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106167 $6.84 10987558-3562505360
2024 3 FD52 05 E122 C 8930701C 093 9/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR091N1062325106167 $390.87 10987558-3562505360
2024 3 FD52 05 E122 C 8930701C 093 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106167 $64.58 10987558-3562505360
2024 3 FD52 05 E111 C 8930701C 093 9/11/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR091N1062325106109 $1,269.00 000001087144-3562505210
2024 3 FD52 05 E123 C 8930701C 093 9/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR091N1062325106167 $105.55 10987558-3562505360
2024 3 FD52 05 E111 C 8930701C 093 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106109 $170.78 000001087144-3562505210
2024 3 FD52 05 E123 C 8930701C 093 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106167 $17.30 10987558-3562505360
2024 3 FD52 05 E121 C 8930701C 093 9/11/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR091N1062325106109 $89.88 000001087144-3562505210
2024 3 FD52 05 E121 C 8930701C 093 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106109 $12.18 000001087144-3562505210
2024 3 FD52 05 E122 C 8930701C 093 9/11/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR091N1062325106109 $839.70 000001087144-3562505210
2024 3 FD52 05 E122 C 8930701C 093 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106109 $113.01 000001087144-3562505210
2024 3 FD52 05 E123 C 8930701C 093 9/11/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR091N1062325106109 $234.99 000001087144-3562505210
2024 3 FD52 05 E123 C 8930701C 093 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106109 $21.09 000001087144-3562505210
2024 2 FD52 05 E797 C 8930701C 093 8/30/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P023K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $461,954.31
2024 2 FD52 05 E111 C 8930701C 093 8/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR082N1062323505142 $704.07 10987558-3562505360
2024 2 FD52 05 E111 C 8930701C 093 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323505142 $140.81 10987558-3562505360
2024 2 FD52 05 E121 C 8930701C 093 8/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR082N1062323505142 $50.74 10987558-3562505360
2024 2 FD52 05 E121 C 8930701C 093 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323505142 $10.14 10987558-3562505360
2024 2 FD52 05 E122 C 8930701C 093 8/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR082N1062323505142 $465.88 10987558-3562505360
2024 2 FD52 05 E122 C 8930701C 093 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323505142 $93.17 10987558-3562505360
2024 2 FD52 05 E123 C 8930701C 093 8/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR082N1062323505142 $125.83 10987558-3562505360
2024 2 FD52 05 E123 C 8930701C 093 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323505142 $24.96 10987558-3562505360
2024 2 FD52 05 E124 C 8930701C 093 8/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR082N1062323505142 $0.18 10987558-3562505360
2024 2 FD52 05 E124 C 8930701C 093 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323505142 $0.04 10987558-3562505360
2024 2 FD52 05 E797 C 8930701C 093 8/17/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P022K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $653,399.99
2024 2 FD52 05 E797 C 8930701C 093 8/14/2023 4010 CONSTRUCTION ENGINEERING PRC-2400022933 PON22200004162 QK4 INC $17,426.50 SW HWY & Bridge Construction Inspection Region 1
2024 2 FD52 05 E229 C 8930701C 093 8/11/2023 4010 CONSTRUCTION ENGINEERING IET-XE13A162523222013300 $2.68
2024 2 FD52 05 E122 C 8930701C 093 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003921 $52.43 10973433-3562505360
2024 2 FD52 05 E123 C 8930701C 093 8/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR081N1062322003921 $57.50 10973433-3562505360
2024 2 FD52 05 E123 C 8930701C 093 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003921 $14.04 10973433-3562505360
2024 2 FD52 05 E111 C 8930701C 093 8/9/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR081N1062322003873 $934.67 000001086740-3562505210
2024 2 FD52 05 E111 C 8930701C 093 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003873 ($217.78) 000001086740-3562505210
2024 2 FD52 05 E121 C 8930701C 093 8/9/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR081N1062322003873 $69.52 000001086740-3562505210
2024 2 FD52 05 E121 C 8930701C 093 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003873 ($16.30) 000001086740-3562505210
2024 2 FD52 05 E122 C 8930701C 093 8/9/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR081N1062322003873 $652.51 000001086740-3562505210
2024 2 FD52 05 E122 C 8930701C 093 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003873 ($178.07) 000001086740-3562505210
2024 2 FD52 05 E123 C 8930701C 093 8/9/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR081N1062322003873 $137.52 000001086740-3562505210
2024 2 FD52 05 E123 C 8930701C 093 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003873 ($36.80) 000001086740-3562505210
2024 2 FD52 05 E111 C 8930701C 093 8/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR081N1062322003920 $322.12 10973433-3562505360
2024 2 FD52 05 E111 C 8930701C 093 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003920 $79.24 10973433-3562505360
2024 2 FD52 05 E121 C 8930701C 093 8/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR081N1062322003920 $22.58 10973433-3562505360
2024 2 FD52 05 E121 C 8930701C 093 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003920 $5.55 10973433-3562505360
2024 2 FD52 05 E122 C 8930701C 093 8/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR081N1062322003920 $212.89 10973433-3562505360
2024 2 FD52 05 E237 C 8930701C 056 8/4/2023 4010 CONSTRUCTION ENGINEERING PRC-2400021826 DO2400000594 HUMBOLDT MFG CO $4,200.00 CYLINDER MOLDS
2024 2 FD52 05 E797 C 8930701C 093 8/2/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P021K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $66,013.60
2024 1 FD52 05 E229 C 8930701C 093 7/26/2023 4010 CONSTRUCTION ENGINEERING IET-XE13A162523206010790 $133.82
2024 1 FD52 01 E121 C 8930701C 093 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202725 $42.17 000001088391-3562505210
2024 1 FD52 05 E111 C 8930701C 093 7/24/2023 5203 TESTING OF ASPHALT MIXTURES CA-XR072N1062320202703 $498.15 000001087288-3562505210
2024 1 FD52 05 E111 C 8930701C 093 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202703 $231.47 000001087288-3562505210
2024 1 FD52 05 E111 C 8930701C 093 7/24/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR072N1062320202698 $2,336.22 000001086740-3562505210
2024 1 FD52 05 E121 C 8930701C 093 7/24/2023 5203 TESTING OF ASPHALT MIXTURES CA-XR072N1062320202703 $37.70 000001087288-3562505210
2024 1 FD52 05 E111 C 8930701C 093 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202698 $359.50 000001086740-3562505210
2024 1 FD52 05 E121 C 8930701C 093 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202703 $17.52 000001087288-3562505210
2024 1 FD52 01 E122 C 8930701C 093 7/24/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR072N1062320202725 $796.59 000001088391-3562505210
2024 1 FD52 05 E121 C 8930701C 093 7/24/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR072N1062320202698 $175.90 000001086740-3562505210
2024 1 FD52 05 E122 C 8930701C 093 7/24/2023 5203 TESTING OF ASPHALT MIXTURES CA-XR072N1062320202703 $329.64 000001087288-3562505210
2024 1 FD52 05 E121 C 8930701C 093 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202698 $27.02 000001086740-3562505210
2024 1 FD52 05 E122 C 8930701C 093 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202703 $153.15 000001087288-3562505210
2024 1 FD52 05 E122 C 8930701C 093 7/24/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR072N1062320202698 $1,545.88 000001086740-3562505210
2024 1 FD52 05 E123 C 8930701C 093 7/24/2023 5203 TESTING OF ASPHALT MIXTURES CA-XR072N1062320202703 $77.44 000001087288-3562505210
2024 1 FD52 05 E122 C 8930701C 093 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202698 $237.88 000001086740-3562505210
2024 1 FD52 05 E123 C 8930701C 093 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202703 $35.29 000001087288-3562505210
2024 1 FD52 05 E123 C 8930701C 093 7/24/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR072N1062320202698 $366.49 000001086740-3562505210
2024 1 FD52 05 E124 C 8930701C 093 7/24/2023 5203 TESTING OF ASPHALT MIXTURES CA-XR072N1062320202703 $0.21 000001087288-3562505210
2024 1 FD52 05 E123 C 8930701C 093 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202698 $54.89 000001086740-3562505210
2024 1 FD52 05 E124 C 8930701C 093 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202703 $0.09 000001087288-3562505210
2024 1 FD52 05 E124 C 8930701C 093 7/24/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR072N1062320202698 $0.95 000001086740-3562505210
2024 1 FD52 05 E124 C 8930701C 093 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202698 $0.15 000001086740-3562505210
2024 1 FD52 01 E122 C 8930701C 093 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202725 $368.74 000001088391-3562505210
2024 1 FD52 05 E111 C 8930701C 093 7/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR072N1062320203028 $249.53 10973433-3562505360
2024 1 FD52 05 E111 C 8930701C 093 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320203028 $146.49 10973433-3562505360
2024 1 FD52 01 E123 C 8930701C 093 7/24/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR072N1062320202725 $187.17 000001088391-3562505210
2024 1 FD52 05 E121 C 8930701C 093 7/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR072N1062320203028 $17.97 10973433-3562505360
2024 1 FD52 05 E121 C 8930701C 093 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320203028 $10.55 10973433-3562505360
2024 1 FD52 05 E122 C 8930701C 093 7/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR072N1062320203028 $165.37 10973433-3562505360
2024 1 FD52 05 E122 C 8930701C 093 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320203028 $96.93 10973433-3562505360
2024 1 FD52 05 E123 C 8930701C 093 7/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR072N1062320203028 $44.78 10973433-3562505360
2024 1 FD52 05 E123 C 8930701C 093 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320203028 $25.95 10973433-3562505360
2024 1 FD52 05 E124 C 8930701C 093 7/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR072N1062320203028 $0.05 10973433-3562505360
2024 1 FD52 05 E124 C 8930701C 093 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320203028 $0.04 10973433-3562505360
2024 1 FD52 01 E123 C 8930701C 093 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202725 $84.98 000001088391-3562505210
2024 1 FD52 01 E124 C 8930701C 093 7/24/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR072N1062320202725 $0.48 000001088391-3562505210
2024 1 FD52 01 E124 C 8930701C 093 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202725 $0.22 000001088391-3562505210
2024 1 FD52 01 E111 C 8930701C 093 7/24/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR072N1062320202724 $1,203.87 000001088391-3562505210
2024 1 FD52 01 E111 C 8930701C 093 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202724 $557.25 000001088391-3562505210
2024 1 FD52 01 E121 C 8930701C 093 7/24/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR072N1062320202724 $91.11 000001088391-3562505210
2024 1 FD52 05 E797 C 8930701C 093 7/19/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P020K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $459,404.44
2024 1 FD52 05 E111 C 8930701C 093 7/11/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR071N1062319101562 $235.05 000001086740-3562505210
2024 1 FD52 05 E111 C 8930701C 093 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101562 $17.54 000001086740-3562505210
2024 1 FD52 05 E121 C 8930701C 093 7/11/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR071N1062319101562 $17.47 000001086740-3562505210
2024 1 FD52 05 E121 C 8930701C 093 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101562 $1.31 000001086740-3562505210
2024 1 FD52 05 E122 C 8930701C 093 7/11/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR071N1062319101562 $183.29 000001086740-3562505210
2024 1 FD52 05 E122 C 8930701C 093 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101562 $13.68 000001086740-3562505210
2024 1 FD52 05 E123 C 8930701C 093 7/11/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR071N1062319101562 $35.03 000001086740-3562505210
2024 1 FD52 05 E123 C 8930701C 093 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101562 $2.57 000001086740-3562505210
2024 1 FD52 05 E111 C 8930701C 093 7/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR071N1062319101643 $743.01 10957973-3562505360
2024 1 FD52 05 E111 C 8930701C 093 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101643 $520.56 10957973-3562505360
2024 1 FD52 05 E121 C 8930701C 093 7/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR071N1062319101643 $51.78 10957973-3562505360
2024 1 FD52 05 E121 C 8930701C 093 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101643 $36.28 10957973-3562505360
2024 1 FD52 05 E122 C 8930701C 093 7/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR071N1062319101643 $579.55 10957973-3562505360
2024 1 FD52 05 E122 C 8930701C 093 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101643 $406.03 10957973-3562505360
2024 1 FD52 05 E123 C 8930701C 093 7/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR071N1062319101643 $141.28 10957973-3562505360
2024 1 FD52 05 E123 C 8930701C 093 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101643 $97.77 10957973-3562505360
2024 1 FD52 05 E111 C 8930701C 093 7/11/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR071N1062319101564 $120.66 000001087144-3562505210
2024 1 FD52 05 E111 C 8930701C 093 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101564 $23.44 000001087144-3562505210
2024 1 FD52 05 E121 C 8930701C 093 7/11/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR071N1062319101564 $8.56 000001087144-3562505210
2024 1 FD52 05 E121 C 8930701C 093 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101564 $1.67 000001087144-3562505210
2024 1 FD52 05 E122 C 8930701C 093 7/11/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR071N1062319101564 $94.34 000001087144-3562505210
2024 1 FD52 05 E122 C 8930701C 093 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101564 $18.29 000001087144-3562505210
2024 1 FD52 05 E123 C 8930701C 093 7/11/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR071N1062319101564 $16.10 000001087144-3562505210
2024 1 FD52 05 E123 C 8930701C 093 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101564 $3.07 000001087144-3562505210
2024 1 FD52 05 E797 C 8930701C 093 7/6/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P019K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $63,785.89
2023 12 FD52 00 E123 C 8930701C 093 6/26/2023 5213 ASPHALT MIX DESIGN CA-XR062N1062317400480 $38.08 000001088015-3562500640
2023 12 FD52 05 E122 C 8930701C 093 6/26/2023 4010 CONSTRUCTION ENGINEERING CA-XR062N1062317400454 $156.00 000001086365-3562500620
2023 12 FD52 00 E124 C 8930701C 093 6/26/2023 5213 ASPHALT MIX DESIGN CA-XR062N1062317400480 $0.09 000001088015-3562500640
2023 12 FD52 05 E122 C 8930701C 093 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400454 $21.63 000001086365-3562500620
2023 12 FD52 05 E123 C 8930701C 093 6/26/2023 4010 CONSTRUCTION ENGINEERING CA-XR062N1062317400454 $34.37 000001086365-3562500620
2023 12 FD52 05 E111 C 8930701C 093 6/26/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR062N1062317400457 $427.23 000001086740-3562505210
2023 12 FD52 05 E111 C 8930701C 093 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400457 $69.21 000001086740-3562505210
2023 12 FD52 05 E121 C 8930701C 093 6/26/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR062N1062317400457 $32.32 000001086740-3562505210
2023 12 FD52 05 E123 C 8930701C 093 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400454 $4.69 000001086365-3562500620
2023 12 FD52 05 E121 C 8930701C 093 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400457 $5.23 000001086740-3562505210
2023 12 FD52 05 E122 C 8930701C 093 6/26/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR062N1062317400457 $333.24 000001086740-3562505210
2023 12 FD52 05 E122 C 8930701C 093 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400457 $53.98 000001086740-3562505210
2023 12 FD52 05 E123 C 8930701C 093 6/26/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR062N1062317400457 $70.13 000001086740-3562505210
2023 12 FD52 05 E123 C 8930701C 093 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400457 $11.19 000001086740-3562505210
2023 12 FD52 05 E124 C 8930701C 093 6/26/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR062N1062317400457 $0.18 000001086740-3562505210
2023 12 FD52 05 E124 C 8930701C 093 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400457 $0.03 000001086740-3562505210
2023 12 FD52 05 E124 C 8930701C 093 6/26/2023 4010 CONSTRUCTION ENGINEERING CA-XR062N1062317400454 $0.09 000001086365-3562500620
2023 12 FD52 05 E124 C 8930701C 093 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400454 $0.01 000001086365-3562500620
2023 12 FD52 05 E111 C 8930701C 093 6/26/2023 4010 CONSTRUCTION ENGINEERING CA-XR062N1062317400806 $1,340.62 10957973-3562505360
2023 12 FD52 05 E111 C 8930701C 093 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400806 $129.36 10957973-3562505360
2023 12 FD52 05 E121 C 8930701C 093 6/26/2023 4010 CONSTRUCTION ENGINEERING CA-XR062N1062317400806 $95.61 10957973-3562505360
2023 12 FD52 05 E121 C 8930701C 093 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400806 $9.23 10957973-3562505360
2023 12 FD52 05 E122 C 8930701C 093 6/26/2023 4010 CONSTRUCTION ENGINEERING CA-XR062N1062317400806 $1,045.43 10957973-3562505360
2023 12 FD52 05 E122 C 8930701C 093 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400806 $100.90 10957973-3562505360
2023 12 FD52 05 E123 C 8930701C 093 6/26/2023 4010 CONSTRUCTION ENGINEERING CA-XR062N1062317400806 $279.11 10957973-3562505360
2023 12 FD52 05 E123 C 8930701C 093 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400806 $26.72 10957973-3562505360
2023 12 FD52 05 E124 C 8930701C 093 6/26/2023 4010 CONSTRUCTION ENGINEERING CA-XR062N1062317400806 $0.39 10957973-3562505360
2023 12 FD52 05 E124 C 8930701C 093 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400806 $0.04 10957973-3562505360
2023 12 FD52 05 E111 C 8930701C 093 6/26/2023 4010 CONSTRUCTION ENGINEERING CA-XR062N1062317400453 $199.95 000001086365-3562500620
2023 12 FD52 00 E111 C 8930701C 093 6/26/2023 5213 ASPHALT MIX DESIGN CA-XR062N1062317400479 $234.98 000001088015-3562500640
2023 12 FD52 05 E111 C 8930701C 093 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400453 $27.73 000001086365-3562500620
2023 12 FD52 00 E121 C 8930701C 093 6/26/2023 5213 ASPHALT MIX DESIGN CA-XR062N1062317400479 $17.15 000001088015-3562500640
2023 12 FD52 05 E121 C 8930701C 093 6/26/2023 4010 CONSTRUCTION ENGINEERING CA-XR062N1062317400453 $14.99 000001086365-3562500620
2023 12 FD52 00 E122 C 8930701C 093 6/26/2023 5213 ASPHALT MIX DESIGN CA-XR062N1062317400479 $183.28 000001088015-3562500640
2023 12 FD52 05 E121 C 8930701C 093 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400453 $2.08 000001086365-3562500620
2023 12 FD52 05 E797 C 8930701C 093 6/21/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P018K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $816,933.44
2023 12 FD52 05 E797 C 8930701C 093 6/19/2023 4010 CONSTRUCTION ENGINEERING PRC-2300247559 PON22200004162 QK4 INC $18,156.00 SW HWY & Bridge Construction Inspection Region 1
2023 12 FD52 05 E797 C 8930701C 093 6/12/2023 4010 CONSTRUCTION ENGINEERING PRC-2300236173 PON22200004162 QK4 INC $25,632.00 SW HWY & Bridge Construction Inspection Region 1
2023 12 FD52 05 E123 C 8930701C 093 6/8/2023 4010 CONSTRUCTION ENGINEERING CA-XR061N1062315810192 $144.77 10937204-3562505360
2023 12 FD52 05 E123 C 8930701C 093 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810192 $40.94 10937204-3562505360
2023 12 FD52 05 E111 C 8930701C 093 6/8/2023 4010 CONSTRUCTION ENGINEERING CA-XR061N1062315810192 $694.31 10937204-3562505360
2023 12 FD52 05 E111 C 8930701C 093 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810192 $198.14 10937204-3562505360
2023 12 FD52 05 E111 C 8930701C 093 6/8/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR061N1062315810160 $378.57 000001086740-3562505210
2023 12 FD52 05 E111 C 8930701C 093 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810160 $1,971.18 000001086740-3562505210
2023 12 FD52 05 E121 C 8930701C 093 6/8/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR061N1062315810160 $28.28 000001086740-3562505210
2023 12 FD52 05 E121 C 8930701C 093 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810160 $147.26 000001086740-3562505210
2023 12 FD52 05 E122 C 8930701C 093 6/8/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR061N1062315810160 $295.29 000001086740-3562505210
2023 12 FD52 05 E122 C 8930701C 093 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810160 $1,537.52 000001086740-3562505210
2023 12 FD52 05 E123 C 8930701C 093 6/8/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR061N1062315810160 $66.28 000001086740-3562505210
2023 12 FD52 05 E123 C 8930701C 093 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810160 $318.60 000001086740-3562505210
2023 12 FD52 05 E121 C 8930701C 093 6/8/2023 4010 CONSTRUCTION ENGINEERING CA-XR061N1062315810192 $47.91 10937204-3562505360
2023 12 FD52 05 E121 C 8930701C 093 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810192 $13.69 10937204-3562505360
2023 12 FD52 05 E122 C 8930701C 093 6/8/2023 4010 CONSTRUCTION ENGINEERING CA-XR061N1062315810192 $541.50 10937204-3562505360
2023 12 FD52 05 E122 C 8930701C 093 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810192 $154.56 10937204-3562505360
2023 12 FD52 05 E797 C 8930701C 093 6/7/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P017K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $494,138.05
2023 11 FD52 05 E797 C 8930701C 093 5/24/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P016K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $295,914.14
2023 11 FD52 05 E111 C 8930701C 093 5/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR052N1062314309143 $2,183.35 10937204-3562505360
2023 11 FD52 05 E111 C 8930701C 093 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309143 $595.16 10937204-3562505360
2023 11 FD52 05 E121 C 8930701C 093 5/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR052N1062314309143 $162.67 10937204-3562505360
2023 11 FD52 05 E121 C 8930701C 093 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309143 $44.48 10937204-3562505360
2023 11 FD52 05 E122 C 8930701C 093 5/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR052N1062314309143 $1,702.91 10937204-3562505360
2023 11 FD52 05 E122 C 8930701C 093 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309143 $464.22 10937204-3562505360
2023 11 FD52 05 E123 C 8930701C 093 5/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR052N1062314309143 $174.94 10937204-3562505360
2023 11 FD52 05 E123 C 8930701C 093 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309143 $41.69 10937204-3562505360
2023 11 FD52 05 E124 C 8930701C 093 5/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR052N1062314309143 $0.25 10937204-3562505360
2023 11 FD52 05 E124 C 8930701C 093 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309143 $0.06 10937204-3562505360
2023 11 FD52 05 E111 C 8930701C 093 5/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR052N1062314309064 $327.80 000001086365-3562500680
2023 11 FD52 05 E121 C 8930701C 093 5/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR052N1062314309064 $22.86 000001086365-3562500680
2023 11 FD52 05 E122 C 8930701C 093 5/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR052N1062314309064 $255.72 000001086365-3562500680
2023 11 FD52 05 E123 C 8930701C 093 5/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR052N1062314309064 $63.91 000001086365-3562500680
2023 11 FD52 05 E124 C 8930701C 093 5/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR052N1062314309064 $0.10 000001086365-3562500680
2023 11 FD52 05 E111 C 8930701C 093 5/24/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR052N1062314309068 $234.98 000001086740-3562505210
2023 11 FD52 05 E111 C 8930701C 093 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309068 $23.50 000001086740-3562505210
2023 11 FD52 05 E121 C 8930701C 093 5/24/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR052N1062314309068 $17.45 000001086740-3562505210
2023 11 FD52 05 E121 C 8930701C 093 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309068 $1.74 000001086740-3562505210
2023 11 FD52 05 E122 C 8930701C 093 5/24/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR052N1062314309068 $183.27 000001086740-3562505210
2023 11 FD52 05 E122 C 8930701C 093 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309068 $18.33 000001086740-3562505210
2023 11 FD52 05 E123 C 8930701C 093 5/24/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR052N1062314309068 $35.03 000001086740-3562505210
2023 11 FD52 05 E123 C 8930701C 093 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309068 $3.45 000001086740-3562505210
2023 11 FD52 05 E124 C 8930701C 093 5/24/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR052N1062314309068 $0.09 000001086740-3562505210
2023 11 FD52 05 E124 C 8930701C 093 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309068 $0.01 000001086740-3562505210
2023 11 FD52 05 E237 C 8930701C 093 5/17/2023 4010 CONSTRUCTION ENGINEERING PRC-2300222100 DO2300024911 HUMBOLDT MFG CO $1,680.00
2023 11 FD52 05 E229 C 8930701C 093 5/15/2023 4010 CONSTRUCTION ENGINEERING IET-XE13A162523130021990 $205.60
2023 11 FD52 05 E797 C 8930701C 093 5/10/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P015K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $240,259.39
2023 11 FD52 05 E111 C 8930701C 093 5/9/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR051N1062312808088 $1,137.21 000001086740-3562505210
2023 11 FD52 05 E111 C 8930701C 093 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808088 $206.09 000001086740-3562505210
2023 11 FD52 05 E121 C 8930701C 093 5/9/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR051N1062312808088 $84.24 000001086740-3562505210
2023 11 FD52 05 E121 C 8930701C 093 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808088 $15.26 000001086740-3562505210
2023 11 FD52 05 E122 C 8930701C 093 5/9/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR051N1062312808088 $887.08 000001086740-3562505210
2023 11 FD52 05 E122 C 8930701C 093 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808088 $160.75 000001086740-3562505210
2023 11 FD52 05 E123 C 8930701C 093 5/9/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR051N1062312808088 $169.75 000001086740-3562505210
2023 11 FD52 05 E111 C 8930701C 093 5/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR051N1062312808111 $2,129.35 10923330-3562505360
2023 11 FD52 05 E123 C 8930701C 093 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808088 $30.28 000001086740-3562505210
2023 11 FD52 05 E111 C 8930701C 093 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808111 $412.34 10923330-3562505360
2023 11 FD52 05 E121 C 8930701C 093 5/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR051N1062312808111 $149.99 10923330-3562505360
2023 11 FD52 05 E121 C 8930701C 093 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808111 $28.52 10923330-3562505360
2023 11 FD52 05 E111 C 8930701C 093 5/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR051N1062312808085 $360.51 000001086365-3562500680
2023 11 FD52 05 E122 C 8930701C 093 5/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR051N1062312808111 $1,660.90 10923330-3562505360
2023 11 FD52 05 E111 C 8930701C 093 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808085 $12.50 000001086365-3562500680
2023 11 FD52 05 E122 C 8930701C 093 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808111 $321.62 10923330-3562505360
2023 11 FD52 05 E121 C 8930701C 093 5/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR051N1062312808085 $24.50 000001086365-3562500680
2023 11 FD52 05 E123 C 8930701C 093 5/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR051N1062312808111 $359.04 10923330-3562505360
2023 11 FD52 05 E121 C 8930701C 093 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808085 $0.85 000001086365-3562500680
2023 11 FD52 05 E123 C 8930701C 093 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808111 $83.45 10923330-3562505360
2023 11 FD52 05 E122 C 8930701C 093 5/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR051N1062312808085 $281.25 000001086365-3562500680
2023 11 FD52 05 E122 C 8930701C 093 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808085 $9.75 000001086365-3562500680
2023 11 FD52 05 E123 C 8930701C 093 5/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR051N1062312808085 $70.30 000001086365-3562500680
2023 11 FD52 05 E123 C 8930701C 093 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808085 $2.42 000001086365-3562500680
2023 10 FD52 05 E797 C 8930701C 093 4/26/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P014K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $638,378.60
2023 10 FD52 05 E797 C 8930701C 093 4/25/2023 4010 CONSTRUCTION ENGINEERING PRC-2300201362 PON22200004162 QK4 INC $18,397.50 SW HWY & Bridge Construction Inspection Region 1
2023 10 FD52 05 E111 C 8930701C 093 4/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR042N1062311107089 $2,341.62 10923330-3562505360
2023 10 FD52 05 E111 C 8930701C 093 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311107089 $1,035.71 10923330-3562505360
2023 10 FD52 05 E121 C 8930701C 093 4/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR042N1062311107089 $167.01 10923330-3562505360
2023 10 FD52 05 E111 C 8930701C 093 4/24/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR042N1062311106971 $944.66 000001087144-3562505210
2023 10 FD52 05 E121 C 8930701C 093 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311107089 $73.85 10923330-3562505360
2023 10 FD52 05 E111 C 8930701C 093 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106971 $487.03 000001087144-3562505210
2023 10 FD52 05 E122 C 8930701C 093 4/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR042N1062311107089 $1,826.47 10923330-3562505360
2023 10 FD52 05 E121 C 8930701C 093 4/24/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR042N1062311106971 $66.17 000001087144-3562505210
2023 10 FD52 05 E122 C 8930701C 093 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311107089 $807.85 10923330-3562505360
2023 10 FD52 05 E121 C 8930701C 093 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106971 $33.43 000001087144-3562505210
2023 10 FD52 05 E123 C 8930701C 093 4/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR042N1062311107089 $488.85 10923330-3562505360
2023 10 FD52 05 E122 C 8930701C 093 4/24/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR042N1062311106971 $736.85 000001087144-3562505210
2023 10 FD52 05 E123 C 8930701C 093 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311107089 $213.96 10923330-3562505360
2023 10 FD52 05 E122 C 8930701C 093 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106971 $379.88 000001087144-3562505210
2023 10 FD52 05 E124 C 8930701C 093 4/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR042N1062311107089 $0.70 10923330-3562505360
2023 10 FD52 05 E123 C 8930701C 093 4/24/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR042N1062311106971 $262.45 000001087144-3562505210
2023 10 FD52 05 E124 C 8930701C 093 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311107089 $0.30 10923330-3562505360
2023 10 FD52 05 E123 C 8930701C 093 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106971 $174.44 000001087144-3562505210
2023 10 FD52 05 E124 C 8930701C 093 4/24/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR042N1062311106971 $0.43 000001087144-3562505210
2023 10 FD52 05 E124 C 8930701C 093 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106971 $0.26 000001087144-3562505210
2023 10 FD52 05 E111 C 8930701C 093 4/24/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR042N1062311106965 $1,303.52 000001086740-3562505210
2023 10 FD52 05 E111 C 8930701C 093 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106965 $483.78 000001086740-3562505210
2023 10 FD52 05 E121 C 8930701C 093 4/24/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR042N1062311106965 $98.02 000001086740-3562505210
2023 10 FD52 05 E121 C 8930701C 093 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106965 $35.97 000001086740-3562505210
2023 10 FD52 05 E122 C 8930701C 093 4/24/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR042N1062311106965 $1,016.34 000001086740-3562505210
2023 10 FD52 05 E122 C 8930701C 093 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106965 $377.34 000001086740-3562505210
2023 10 FD52 05 E123 C 8930701C 093 4/24/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR042N1062311106965 $252.75 000001086740-3562505210
2023 10 FD52 05 E123 C 8930701C 093 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106965 $74.09 000001086740-3562505210
2023 10 FD52 05 E124 C 8930701C 093 4/24/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR042N1062311106965 $0.66 000001086740-3562505210
2023 10 FD52 05 E124 C 8930701C 093 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106965 $0.19 000001086740-3562505210
2023 10 FD52 05 E111 C 8930701C 093 4/24/2023 5203 TESTING OF ASPHALT MIXTURES CA-XR042N1062311106980 $258.30 000001087288-3562505210
2023 10 FD52 05 E111 C 8930701C 093 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106980 $214.71 000001087288-3562505210
2023 10 FD52 05 E121 C 8930701C 093 4/24/2023 5203 TESTING OF ASPHALT MIXTURES CA-XR042N1062311106980 $19.19 000001087288-3562505210
2023 10 FD52 05 E121 C 8930701C 093 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106980 $15.93 000001087288-3562505210
2023 10 FD52 05 E122 C 8930701C 093 4/24/2023 5203 TESTING OF ASPHALT MIXTURES CA-XR042N1062311106980 $201.61 000001087288-3562505210
2023 10 FD52 05 E122 C 8930701C 093 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106980 $167.47 000001087288-3562505210
2023 10 FD52 05 E123 C 8930701C 093 4/24/2023 5203 TESTING OF ASPHALT MIXTURES CA-XR042N1062311106980 $38.91 000001087288-3562505210
2023 10 FD52 05 E123 C 8930701C 093 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106980 $31.54 000001087288-3562505210
2023 10 FD52 05 E124 C 8930701C 093 4/24/2023 5203 TESTING OF ASPHALT MIXTURES CA-XR042N1062311106980 $0.10 000001087288-3562505210
2023 10 FD52 05 E124 C 8930701C 093 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106980 $0.08 000001087288-3562505210
2023 10 FD52 05 E229 C 8930701C 093 4/14/2023 4010 CONSTRUCTION ENGINEERING IET-XE13A162523100012920 $164.62
2023 10 FD52 05 E111 C 8930701C 093 4/14/2023 4010 CONSTRUCTION ENGINEERING CA-XR041N1062309605905 $2,467.32 10907944-3562505360
2023 10 FD52 05 E111 C 8930701C 093 4/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605905 $282.57 10907944-3562505360
2023 10 FD52 05 E121 C 8930701C 093 4/14/2023 4010 CONSTRUCTION ENGINEERING CA-XR041N1062309605905 $170.27 10907944-3562505360
2023 10 FD52 05 E121 C 8930701C 093 4/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605905 $19.50 10907944-3562505360
2023 10 FD52 05 E122 C 8930701C 093 4/14/2023 4010 CONSTRUCTION ENGINEERING CA-XR041N1062309605905 $1,924.52 10907944-3562505360
2023 10 FD52 05 E122 C 8930701C 093 4/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605905 $220.41 10907944-3562505360
2023 10 FD52 05 E123 C 8930701C 093 4/14/2023 4010 CONSTRUCTION ENGINEERING CA-XR041N1062309605905 $513.87 10907944-3562505360
2023 10 FD52 05 E123 C 8930701C 093 4/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605905 $58.38 10907944-3562505360
2023 10 FD52 05 E797 C 8930701C 093 4/12/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P013K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $1,804,771.04
2023 10 FD52 05 E123 C 8930701C 093 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605791 $7.29 000001086365-3562500680
2023 10 FD52 05 E111 C 8930701C 093 4/10/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR041N1062309605794 $1,646.98 000001086740-3562505210
2023 10 FD52 05 E111 C 8930701C 093 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605794 $40.21 000001086740-3562505210
2023 10 FD52 05 E115 C 8930701C 093 4/10/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR041N1062309605794 $59.65 000001086740-3562505210
2023 10 FD52 05 E121 C 8930701C 093 4/10/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR041N1062309605794 $127.16 000001086740-3562505210
2023 10 FD52 05 E121 C 8930701C 093 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605794 $2.99 000001086740-3562505210
2023 10 FD52 05 E122 C 8930701C 093 4/10/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR041N1062309605794 $1,331.18 000001086740-3562505210
2023 10 FD52 05 E122 C 8930701C 093 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605794 $31.36 000001086740-3562505210
2023 10 FD52 05 E123 C 8930701C 093 4/10/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR041N1062309605794 $288.07 000001086740-3562505210
2023 10 FD52 05 E123 C 8930701C 093 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605794 $5.91 000001086740-3562505210
2023 10 FD52 05 E111 C 8930701C 093 4/10/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR041N1062309605805 $521.23 000001087144-3562505210
2023 10 FD52 05 E111 C 8930701C 093 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605805 $194.92 000001087144-3562505210
2023 10 FD52 05 E121 C 8930701C 093 4/10/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR041N1062309605805 $37.02 000001087144-3562505210
2023 10 FD52 05 E121 C 8930701C 093 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605805 $13.84 000001087144-3562505210
2023 10 FD52 05 E122 C 8930701C 093 4/10/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR041N1062309605805 $406.56 000001087144-3562505210
2023 10 FD52 05 E122 C 8930701C 093 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605805 $152.03 000001087144-3562505210
2023 10 FD52 05 E123 C 8930701C 093 4/10/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR041N1062309605805 $69.53 000001087144-3562505210
2023 10 FD52 05 E111 C 8930701C 093 4/10/2023 4010 CONSTRUCTION ENGINEERING CA-XR041N1062309605790 $300.39 000001086365-3562500680
2023 10 FD52 05 E123 C 8930701C 093 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605805 $25.52 000001087144-3562505210
2023 10 FD52 05 E111 C 8930701C 093 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605790 $37.66 000001086365-3562500680
2023 10 FD52 05 E121 C 8930701C 093 4/10/2023 4010 CONSTRUCTION ENGINEERING CA-XR041N1062309605790 $20.42 000001086365-3562500680
2023 10 FD52 05 E121 C 8930701C 093 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605790 $2.55 000001086365-3562500680
2023 10 FD52 05 E122 C 8930701C 093 4/10/2023 4010 CONSTRUCTION ENGINEERING CA-XR041N1062309605790 $234.38 000001086365-3562500680
2023 10 FD52 05 E122 C 8930701C 093 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605790 $29.37 000001086365-3562500680
2023 10 FD52 05 E123 C 8930701C 093 4/10/2023 4010 CONSTRUCTION ENGINEERING CA-XR041N1062309605790 $58.62 000001086365-3562500680
2023 9 FD52 05 E797 C 8930701C 093 3/29/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P012K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $321,479.90
2023 9 FD52 05 E797 C 8930701C 093 3/28/2023 4010 CONSTRUCTION ENGINEERING PRC-2300171871 PON22200004162 QK4 INC $17,978.00 SW HWY & Bridge Construction Inspection Region 1
2023 9 FD52 05 E122 C 8930701C 093 3/27/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR032N1062308304675 $935.01 000001086740-3562505210
2023 9 FD52 05 E122 C 8930701C 093 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304675 $43.74 000001086740-3562505210
2023 9 FD52 05 E123 C 8930701C 093 3/27/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR032N1062308304675 $175.06 000001086740-3562505210
2023 9 FD52 05 E123 C 8930701C 093 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304675 $8.24 000001086740-3562505210
2023 9 FD52 05 E111 C 8930701C 093 3/27/2023 4010 CONSTRUCTION ENGINEERING CA-XR032N1062308304816 $1,872.89 10907944-3562505360
2023 9 FD52 05 E124 C 8930701C 093 3/27/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR032N1062308304675 $0.45 000001086740-3562505210
2023 9 FD52 05 E111 C 8930701C 093 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304816 $441.71 10907944-3562505360
2023 9 FD52 05 E121 C 8930701C 093 3/27/2023 4010 CONSTRUCTION ENGINEERING CA-XR032N1062308304816 $133.57 10907944-3562505360
2023 9 FD52 05 E121 C 8930701C 093 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304816 $31.51 10907944-3562505360
2023 9 FD52 05 E122 C 8930701C 093 3/27/2023 4010 CONSTRUCTION ENGINEERING CA-XR032N1062308304816 $1,460.85 10907944-3562505360
2023 9 FD52 05 E122 C 8930701C 093 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304816 $344.53 10907944-3562505360
2023 9 FD52 05 E123 C 8930701C 093 3/27/2023 4010 CONSTRUCTION ENGINEERING CA-XR032N1062308304816 $390.41 10907944-3562505360
2023 9 FD52 05 E123 C 8930701C 093 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304816 $91.25 10907944-3562505360
2023 9 FD52 05 E124 C 8930701C 093 3/27/2023 4010 CONSTRUCTION ENGINEERING CA-XR032N1062308304816 $0.55 10907944-3562505360
2023 9 FD52 05 E124 C 8930701C 093 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304816 $0.13 10907944-3562505360
2023 9 FD52 05 E124 C 8930701C 093 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304675 $0.02 000001086740-3562505210
2023 9 FD52 05 E111 C 8930701C 093 3/27/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR032N1062308304674 $1,174.82 000001086740-3562505210
2023 9 FD52 05 E111 C 8930701C 093 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304674 $56.08 000001086740-3562505210
2023 9 FD52 05 E115 C 8930701C 093 3/27/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR032N1062308304674 $23.86 000001086740-3562505210
2023 9 FD52 05 E121 C 8930701C 093 3/27/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR032N1062308304674 $89.06 000001086740-3562505210
2023 9 FD52 05 E121 C 8930701C 093 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304674 $4.17 000001086740-3562505210
2023 9 FD52 05 E229 C 8930701C 093 3/17/2023 4010 CONSTRUCTION ENGINEERING IET-XE13A162523069016360 $169.20
2023 9 FD52 05 E797 C 8930701C 093 3/15/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P011K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $540,567.28
2023 9 FD52 05 E111 C 8930701C 093 3/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR031N1062306703719 $3,064.61 10894093-3562505360
2023 9 FD52 05 E111 C 8930701C 093 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703719 $312.72 10894093-3562505360
2023 9 FD52 05 E121 C 8930701C 093 3/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR031N1062306703719 $211.49 10894093-3562505360
2023 9 FD52 05 E121 C 8930701C 093 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703719 $21.58 10894093-3562505360
2023 9 FD52 05 E122 C 8930701C 093 3/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR031N1062306703719 $2,390.40 10894093-3562505360
2023 9 FD52 05 E122 C 8930701C 093 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703719 $243.92 10894093-3562505360
2023 9 FD52 05 E123 C 8930701C 093 3/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR031N1062306703719 $638.20 10894093-3562505360
2023 9 FD52 05 E123 C 8930701C 093 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703719 $64.61 10894093-3562505360
2023 9 FD52 05 E111 C 8930701C 093 3/9/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR031N1062306703688 $1,282.86 000001086740-3562505210
2023 9 FD52 05 E111 C 8930701C 093 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703688 $39.06 000001086740-3562505210
2023 9 FD52 05 E121 C 8930701C 093 3/9/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR031N1062306703688 $95.28 000001086740-3562505210
2023 9 FD52 05 E121 C 8930701C 093 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703688 $2.90 000001086740-3562505210
2023 9 FD52 05 E122 C 8930701C 093 3/9/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR031N1062306703688 $1,000.58 000001086740-3562505210
2023 9 FD52 05 E122 C 8930701C 093 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703688 $30.47 000001086740-3562505210
2023 9 FD52 05 E123 C 8930701C 093 3/9/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR031N1062306703688 $191.09 000001086740-3562505210
2023 9 FD52 05 E123 C 8930701C 093 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703688 $5.74 000001086740-3562505210
2023 9 FD52 05 E797 C 8930701C 093 3/1/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P010K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $635,342.57
2023 8 FD52 05 E111 C 8930701C 093 2/23/2023 4010 CONSTRUCTION ENGINEERING CA-XR022N1062305302798 $460.55 10894093-3562505360
2023 8 FD52 05 E111 C 8930701C 093 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302798 $1,621.12 10894093-3562505360
2023 8 FD52 05 E121 C 8930701C 093 2/23/2023 4010 CONSTRUCTION ENGINEERING CA-XR022N1062305302798 $34.65 10894093-3562505360
2023 8 FD52 05 E121 C 8930701C 093 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302798 $121.97 10894093-3562505360
2023 8 FD52 05 E122 C 8930701C 093 2/23/2023 4010 CONSTRUCTION ENGINEERING CA-XR022N1062305302798 $359.23 10894093-3562505360
2023 8 FD52 05 E122 C 8930701C 093 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302798 $1,264.47 10894093-3562505360
2023 8 FD52 05 E123 C 8930701C 093 2/23/2023 4010 CONSTRUCTION ENGINEERING CA-XR022N1062305302798 $54.93 10894093-3562505360
2023 8 FD52 05 E123 C 8930701C 093 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302798 $182.29 10894093-3562505360
2023 8 FD52 05 E124 C 8930701C 093 2/23/2023 4010 CONSTRUCTION ENGINEERING CA-XR022N1062305302798 $0.14 10894093-3562505360
2023 8 FD52 05 E124 C 8930701C 093 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302798 $0.48 10894093-3562505360
2023 8 FD52 05 E797 C 8930701C 093 2/20/2023 4010 CONSTRUCTION ENGINEERING PRC-2300151544 PON22200004162 QK4 INC $15,397.00 SW HWY & Bridge Construction Inspection Region 1
2023 8 FD52 05 E797 C 8930701C 093 2/15/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P009K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $29,277.00
2023 8 FD52 05 E229 C 8930701C 093 2/14/2023 4010 CONSTRUCTION ENGINEERING IET-XE13A162523041019080 $64.66
2023 8 FD52 05 E111 C 8930701C 093 2/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR021N1062303901459 $110.05 000001086365-3562500620
2023 8 FD52 05 E111 C 8930701C 093 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901459 $10.02 000001086365-3562500620
2023 8 FD52 05 E121 C 8930701C 093 2/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR021N1062303901459 $8.09 000001086365-3562500620
2023 8 FD52 05 E121 C 8930701C 093 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901459 $0.74 000001086365-3562500620
2023 8 FD52 05 E122 C 8930701C 093 2/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR021N1062303901459 $85.80 000001086365-3562500620
2023 8 FD52 05 E122 C 8930701C 093 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901459 $7.82 000001086365-3562500620
2023 8 FD52 05 E123 C 8930701C 093 2/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR021N1062303901459 $18.89 000001086365-3562500620
2023 8 FD52 05 E123 C 8930701C 093 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901459 $1.70 000001086365-3562500620
2023 8 FD52 05 E111 C 8930701C 093 2/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR021N1062303901476 $2,167.11 10876470-3562505360
2023 8 FD52 05 E111 C 8930701C 093 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901476 $639.07 10876470-3562505360
2023 8 FD52 05 E121 C 8930701C 093 2/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR021N1062303901476 $161.65 10876470-3562505360
2023 8 FD52 05 E121 C 8930701C 093 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901476 $47.67 10876470-3562505360
2023 8 FD52 05 E122 C 8930701C 093 2/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR021N1062303901476 $1,690.36 10876470-3562505360
2023 8 FD52 05 E122 C 8930701C 093 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901476 $498.48 10876470-3562505360
2023 8 FD52 05 E123 C 8930701C 093 2/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR021N1062303901476 $247.93 10876470-3562505360
2023 8 FD52 05 E123 C 8930701C 093 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901476 $71.86 10876470-3562505360
2023 8 FD52 05 E797 C 8930701C 093 2/2/2023 4010 CONSTRUCTION ENGINEERING PRC-2300134090 PON22200004162 QK4 INC $16,376.00 SW HWY & Bridge Construction Inspection Region 1
2023 8 FD52 05 E797 C 8930701C 093 2/1/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P008K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $184,432.28
2023 7 FD52 05 E111 C 8930701C 093 1/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR012N1062302300547 $2,623.06 10876470-3562505360
2023 7 FD52 05 E111 C 8930701C 093 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300547 $754.27 10876470-3562505360
2023 7 FD52 05 E121 C 8930701C 093 1/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR012N1062302300547 $197.34 10876470-3562505360
2023 7 FD52 05 E121 C 8930701C 093 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300547 $56.74 10876470-3562505360
2023 7 FD52 05 E122 C 8930701C 093 1/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR012N1062302300547 $2,045.99 10876470-3562505360
2023 7 FD52 05 E122 C 8930701C 093 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300547 $588.33 10876470-3562505360
2023 7 FD52 05 E123 C 8930701C 093 1/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR012N1062302300547 $300.06 10876470-3562505360
2023 7 FD52 05 E123 C 8930701C 093 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300547 $84.82 10876470-3562505360
2023 7 FD52 05 E124 C 8930701C 093 1/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR012N1062302300547 $0.78 10876470-3562505360
2023 7 FD52 05 E124 C 8930701C 093 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300547 $0.22 10876470-3562505360
2023 7 FD52 05 E797 C 8930701C 093 1/24/2023 4010 CONSTRUCTION ENGINEERING PRC-2300125497 PON22200004162 QK4 INC $15,931.00 SW HWY & Bridge Construction Inspection Region 1
2023 7 FD52 05 E797 C 8930701C 093 1/19/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P007K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $1,624,289.26
2023 7 FD52 05 E111 C 8930701C 093 1/12/2023 4010 CONSTRUCTION ENGINEERING CA-XR011N1062300610298 $847.98 10861859-3562505360
2023 7 FD52 05 E229 C 8930701C 093 1/11/2023 4010 CONSTRUCTION ENGINEERING IET-XE13A162523010011970 $126.04
2023 7 FD52 05 E111 C 8930701C 093 1/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011N1062300610299 $2,368.52 10861859-3562505360
2023 7 FD52 05 E121 C 8930701C 093 1/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR011N1062300610299 $63.17 10861859-3562505360
2023 7 FD52 05 E121 C 8930701C 093 1/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011N1062300610299 $176.45 10861859-3562505360
2023 7 FD52 05 E122 C 8930701C 093 1/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR011N1062300610299 $661.43 10861859-3562505360
2023 7 FD52 05 E122 C 8930701C 093 1/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011N1062300610299 $1,847.44 10861859-3562505360
2023 7 FD52 05 E123 C 8930701C 093 1/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR011N1062300610299 $105.22 10861859-3562505360
2023 7 FD52 05 E123 C 8930701C 093 1/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011N1062300610299 $279.66 10861859-3562505360
2023 7 FD52 05 E143 C 8930701C 093 1/6/2023 0550 ENV STUDIES-TERRES ECOL-CONSUL PRC-2300118144 PON22200002823 KENTUCKY NATURAL LANDS TRUST $54,200.00 Reestablish Contract with Ky Natural Land Trust
2023 7 FD52 05 E797 C 8930701C 093 1/5/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P006K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $24,108.00
2023 6 FD52 05 E111 C 8930701C 093 12/22/2022 4010 CONSTRUCTION ENGINEERING CA-XR122M1062235509356 $2,115.10 10861859-3562505360
2023 6 FD52 05 E111 C 8930701C 093 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509356 $1,101.40 10861859-3562505360
2023 6 FD52 05 E121 C 8930701C 093 12/22/2022 4010 CONSTRUCTION ENGINEERING CA-XR122M1062235509356 $158.37 10861859-3562505360
2023 6 FD52 05 E121 C 8930701C 093 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509356 $82.47 10861859-3562505360
2023 6 FD52 05 E122 C 8930701C 093 12/22/2022 4010 CONSTRUCTION ENGINEERING CA-XR122M1062235509356 $1,649.78 10861859-3562505360
2023 6 FD52 05 E122 C 8930701C 093 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509356 $859.09 10861859-3562505360
2023 6 FD52 05 E123 C 8930701C 093 12/22/2022 4010 CONSTRUCTION ENGINEERING CA-XR122M1062235509356 $234.21 10861859-3562505360
2023 6 FD52 05 E123 C 8930701C 093 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509356 $119.31 10861859-3562505360
2023 6 FD52 05 E124 C 8930701C 093 12/22/2022 4010 CONSTRUCTION ENGINEERING CA-XR122M1062235509356 $0.66 10861859-3562505360
2023 6 FD52 05 E124 C 8930701C 093 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509356 $0.34 10861859-3562505360
2023 6 FD52 05 E797 C 8930701C 093 12/21/2022 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P005K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $583,881.50
2023 6 FD52 05 E797 C 8930701C 093 12/13/2022 4010 CONSTRUCTION ENGINEERING PRC-2300106474 PON22200004162 QK4 INC $8,099.00 SW HWY & Bridge Construction Inspection Region 1
2023 6 FD52 05 E143 C 8930701C 056 12/8/2022 0094 ENV STUDIES-PERMIT IN-LIEU FEE PRCI-2300000382 SC2200001490 KY DEPT OF FISH & WILDLIFE RESOURCES $1,133,384.00 Re-establish Contract with KDFWR
2023 6 FD52 05 E797 C 8930701C 093 12/7/2022 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P004K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $75,361.00
2023 5 FD52 05 E797 C 8930701C 093 11/23/2022 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P003K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $4,931.04
2023 5 FD52 05 E797 C 8930701C 093 11/9/2022 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P002K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $10,650.00
2023 5 FD52 05 E797 C 8930701C 093 11/4/2022 4010 CONSTRUCTION ENGINEERING PRC-2300076891 PON22200004162 QK4 INC $133.50 SW HWY & Bridge Construction Inspection Region 1
2023 4 FD52 05 E797 C 8930701C 093 10/28/2022 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221338P001K CTXCONST0922213380001K LOUISVILLE PAVING COMPANY INC $462,119.19