The Commonwealth pays employees on a semi-monthly basis with a scheduled pay day on the 15th and 30th of each month. The two monthly pay periods are from the 1st to the 15th of the month and the 16th through the last day of the month. Pay check distribution is delayed by one pay period to allow for system processing. For example work performed during the 1st to the 15th day of the month is paid to the employee on the 30th of the month. Accordingly the cost accounting charges for labor costs posting in eMARS to operating accounts and highway projects are also delayed by approximately one pay period.
A good rule of measure is that the cost accounting charges for the pay period ending on the 15th of the month will post to eMARS by the 25th and those for the pay period ending on the last day of the month will post to eMARS by the 10th of the following month.

x close panel
Detailed Project Expenditure Report
Total E-MARS Expenditures for 8768802U = $333,554.02
Click here for Labor Costs Information
Year Month PBU Charge District Object Phase Program Code County Date ACT Activity Name Trans ID Reference # Vendor Name Expenditure Line Description
2024 11 FD52 07 E111 U 8768802U 009 5/9/2024 3020 PREL ENGINEERING-UTILITIES CA-XR051O1062412903874 $1,106.43 000001083217-3562507208
2024 11 FD52 07 E111 U 8768802U 009 5/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051O1062412903874 $60.05 000001083217-3562507208
2024 11 FD52 07 E121 U 8768802U 009 5/9/2024 3020 PREL ENGINEERING-UTILITIES CA-XR051O1062412903874 $82.01 000001083217-3562507208
2024 11 FD52 07 E121 U 8768802U 009 5/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051O1062412903874 $4.45 000001083217-3562507208
2024 11 FD52 07 E122 U 8768802U 009 5/9/2024 3020 PREL ENGINEERING-UTILITIES CA-XR051O1062412903874 $732.13 000001083217-3562507208
2024 11 FD52 07 E122 U 8768802U 009 5/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051O1062412903874 $39.74 000001083217-3562507208
2024 11 FD52 07 E123 U 8768802U 009 5/9/2024 3020 PREL ENGINEERING-UTILITIES CA-XR051O1062412903874 $173.57 000001083217-3562507208
2024 11 FD52 07 E123 U 8768802U 009 5/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051O1062412903874 $9.31 000001083217-3562507208
2024 10 FD52 07 E111 U 8768802U 009 4/26/2024 3020 PREL ENGINEERING-UTILITIES CA-XR042O1062411502738 $1,381.00 000001083217-3562507208
2024 10 FD52 07 E111 U 8768802U 009 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502738 $16.81 000001083217-3562507208
2024 10 FD52 07 E121 U 8768802U 009 4/26/2024 3020 PREL ENGINEERING-UTILITIES CA-XR042O1062411502738 $103.14 000001083217-3562507208
2024 10 FD52 07 E121 U 8768802U 009 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502738 $1.26 000001083217-3562507208
2024 10 FD52 07 E122 U 8768802U 009 4/26/2024 3020 PREL ENGINEERING-UTILITIES CA-XR042O1062411502738 $913.75 000001083217-3562507208
2024 10 FD52 07 E122 U 8768802U 009 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502738 $11.12 000001083217-3562507208
2024 10 FD52 07 E123 U 8768802U 009 4/26/2024 3020 PREL ENGINEERING-UTILITIES CA-XR042O1062411502738 $216.53 000001083217-3562507208
2024 10 FD52 07 E123 U 8768802U 009 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502738 $2.61 000001083217-3562507208
2024 10 FD52 07 E124 U 8768802U 009 4/26/2024 3020 PREL ENGINEERING-UTILITIES CA-XR042O1062411502738 $0.49 000001083217-3562507208
2024 10 FD52 07 E124 U 8768802U 009 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502738 $0.01 000001083217-3562507208
2024 10 FD52 07 E111 U 8768802U 009 4/10/2024 3020 PREL ENGINEERING-UTILITIES CA-XR041O1062410001624 $1,009.52 000001083217-3562507208
2024 10 FD52 07 E111 U 8768802U 009 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001624 $116.24 000001083217-3562507208
2024 10 FD52 07 E121 U 8768802U 009 4/10/2024 3020 PREL ENGINEERING-UTILITIES CA-XR041O1062410001624 $74.82 000001083217-3562507208
2024 10 FD52 07 E121 U 8768802U 009 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001624 $8.61 000001083217-3562507208
2024 10 FD52 07 E122 U 8768802U 009 4/10/2024 3020 PREL ENGINEERING-UTILITIES CA-XR041O1062410001624 $668.00 000001083217-3562507208
2024 10 FD52 07 E122 U 8768802U 009 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001624 $76.92 000001083217-3562507208
2024 10 FD52 07 E123 U 8768802U 009 4/10/2024 3020 PREL ENGINEERING-UTILITIES CA-XR041O1062410001624 $158.48 000001083217-3562507208
2024 10 FD52 07 E123 U 8768802U 009 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001624 $18.01 000001083217-3562507208
2024 9 FD52 07 E111 U 8768802U 009 3/11/2024 3020 PREL ENGINEERING-UTILITIES CA-XR031O1062406810071 $94.35 000001083217-3562507208
2024 9 FD52 07 E111 U 8768802U 009 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810071 $12.08 000001083217-3562507208
2024 9 FD52 07 E121 U 8768802U 009 3/11/2024 3020 PREL ENGINEERING-UTILITIES CA-XR031O1062406810071 $7.00 000001083217-3562507208
2024 9 FD52 07 E121 U 8768802U 009 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810071 $0.90 000001083217-3562507208
2024 9 FD52 07 E122 U 8768802U 009 3/11/2024 3020 PREL ENGINEERING-UTILITIES CA-XR031O1062406810071 $62.43 000001083217-3562507208
2024 9 FD52 07 E122 U 8768802U 009 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810071 $7.99 000001083217-3562507208
2024 9 FD52 07 E123 U 8768802U 009 3/11/2024 3020 PREL ENGINEERING-UTILITIES CA-XR031O1062406810071 $14.81 000001083217-3562507208
2024 9 FD52 07 E123 U 8768802U 009 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810071 $1.87 000001083217-3562507208
2024 9 FD52 00 E111 U 8768802U 009 3/11/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR031O1062406810070 $140.57 000001082453-3562500480
2024 9 FD52 00 E111 U 8768802U 009 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810070 $4.87 000001082453-3562500480
2024 9 FD52 00 E121 U 8768802U 009 3/11/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR031O1062406810070 $10.00 000001082453-3562500480
2024 9 FD52 00 E121 U 8768802U 009 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810070 $0.35 000001082453-3562500480
2024 9 FD52 00 E122 U 8768802U 009 3/11/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR031O1062406810070 $93.06 000001082453-3562500480
2024 9 FD52 00 E122 U 8768802U 009 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810070 $3.22 000001082453-3562500480
2024 9 FD52 00 E123 U 8768802U 009 3/11/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR031O1062406810070 $42.24 000001082453-3562500480
2024 9 FD52 00 E123 U 8768802U 009 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810070 $1.45 000001082453-3562500480
2024 8 FD52 07 E111 U 8768802U 009 2/29/2024 3020 PREL ENGINEERING-UTILITIES CA-XR022O1062405408894 $643.35 000001083217-3562507208
2024 8 FD52 07 E111 U 8768802U 009 2/29/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408894 $24.36 000001083217-3562507208
2024 8 FD52 07 E121 U 8768802U 009 2/29/2024 3020 PREL ENGINEERING-UTILITIES CA-XR022O1062405408894 $48.05 000001083217-3562507208
2024 8 FD52 07 E121 U 8768802U 009 2/29/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408894 $1.81 000001083217-3562507208
2024 8 FD52 07 E122 U 8768802U 009 2/29/2024 3020 PREL ENGINEERING-UTILITIES CA-XR022O1062405408894 $425.66 000001083217-3562507208
2024 8 FD52 07 E122 U 8768802U 009 2/29/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408894 $16.12 000001083217-3562507208
2024 8 FD52 07 E123 U 8768802U 009 2/29/2024 3020 PREL ENGINEERING-UTILITIES CA-XR022O1062405408894 $100.89 000001083217-3562507208
2024 8 FD52 07 E123 U 8768802U 009 2/29/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408894 $3.78 000001083217-3562507208
2024 8 FD52 07 E124 U 8768802U 009 2/29/2024 3020 PREL ENGINEERING-UTILITIES CA-XR022O1062405408894 $0.23 000001083217-3562507208
2024 8 FD52 07 E124 U 8768802U 009 2/29/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408894 $0.01 000001083217-3562507208
2024 8 FD52 07 E111 U 8768802U 009 2/9/2024 3020 PREL ENGINEERING-UTILITIES CA-XR021O1062403907662 $919.89 000001083217-3562507208
2024 8 FD52 07 E111 U 8768802U 009 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907662 $42.77 000001083217-3562507208
2024 8 FD52 07 E121 U 8768802U 009 2/9/2024 3020 PREL ENGINEERING-UTILITIES CA-XR021O1062403907662 $68.18 000001083217-3562507208
2024 8 FD52 07 E121 U 8768802U 009 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907662 $3.17 000001083217-3562507208
2024 8 FD52 07 E122 U 8768802U 009 2/9/2024 3020 PREL ENGINEERING-UTILITIES CA-XR021O1062403907662 $608.69 000001083217-3562507208
2024 8 FD52 07 E122 U 8768802U 009 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907662 $28.30 000001083217-3562507208
2024 8 FD52 07 E123 U 8768802U 009 2/9/2024 3020 PREL ENGINEERING-UTILITIES CA-XR021O1062403907662 $144.29 000001083217-3562507208
2024 8 FD52 07 E123 U 8768802U 009 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907662 $6.63 000001083217-3562507208
2024 7 FD52 07 E111 U 8768802U 009 1/24/2024 3020 PREL ENGINEERING-UTILITIES CA-XR012O1062402306585 $737.62 000001083217-3562507208
2024 7 FD52 07 E111 U 8768802U 009 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306585 $177.38 000001083217-3562507208
2024 7 FD52 07 E121 U 8768802U 009 1/24/2024 3020 PREL ENGINEERING-UTILITIES CA-XR012O1062402306585 $55.11 000001083217-3562507208
2024 7 FD52 07 E121 U 8768802U 009 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306585 $13.25 000001083217-3562507208
2024 7 FD52 07 E122 U 8768802U 009 1/24/2024 3020 PREL ENGINEERING-UTILITIES CA-XR012O1062402306585 $488.09 000001083217-3562507208
2024 7 FD52 07 E122 U 8768802U 009 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306585 $117.37 000001083217-3562507208
2024 7 FD52 07 E123 U 8768802U 009 1/24/2024 3020 PREL ENGINEERING-UTILITIES CA-XR012O1062402306585 $115.97 000001083217-3562507208
2024 7 FD52 07 E123 U 8768802U 009 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306585 $27.49 000001083217-3562507208
2024 7 FD52 07 E124 U 8768802U 009 1/24/2024 3020 PREL ENGINEERING-UTILITIES CA-XR012O1062402306585 $0.26 000001083217-3562507208
2024 7 FD52 07 E124 U 8768802U 009 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306585 $0.06 000001083217-3562507208
2024 7 FD52 07 E111 U 8768802U 009 1/11/2024 3020 PREL ENGINEERING-UTILITIES CA-XR122N1062335504608 $1,320.99 000001083217-3562507208
2024 7 FD52 07 E111 U 8768802U 009 1/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504608 $395.23 000001083217-3562507208
2024 7 FD52 07 E121 U 8768802U 009 1/11/2024 3020 PREL ENGINEERING-UTILITIES CA-XR122N1062335504608 $99.37 000001083217-3562507208
2024 7 FD52 07 E121 U 8768802U 009 1/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504608 $29.74 000001083217-3562507208
2024 7 FD52 07 E122 U 8768802U 009 1/11/2024 3020 PREL ENGINEERING-UTILITIES CA-XR122N1062335504608 $874.02 000001083217-3562507208
2024 7 FD52 07 E122 U 8768802U 009 1/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504608 $261.52 000001083217-3562507208
2024 7 FD52 07 E123 U 8768802U 009 1/11/2024 3020 PREL ENGINEERING-UTILITIES CA-XR122N1062335504608 $180.32 000001083217-3562507208
2024 7 FD52 07 E123 U 8768802U 009 1/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504608 $53.03 000001083217-3562507208
2024 7 FD52 07 E124 U 8768802U 009 1/11/2024 3020 PREL ENGINEERING-UTILITIES CA-XR122N1062335504608 $0.47 000001083217-3562507208
2024 7 FD52 07 E124 U 8768802U 009 1/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504608 $0.14 000001083217-3562507208
2024 7 FD52 07 E111 U 8768802U 009 1/10/2024 3020 PREL ENGINEERING-UTILITIES CA-XR011O1062400505719 $283.05 000001083217-3562507208
2024 7 FD52 07 E111 U 8768802U 009 1/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505719 $150.20 000001083217-3562507208
2024 7 FD52 07 E121 U 8768802U 009 1/10/2024 3020 PREL ENGINEERING-UTILITIES CA-XR011O1062400505719 $20.98 000001083217-3562507208
2024 7 FD52 07 E121 U 8768802U 009 1/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505719 $11.13 000001083217-3562507208
2024 7 FD52 07 E122 U 8768802U 009 1/10/2024 3020 PREL ENGINEERING-UTILITIES CA-XR011O1062400505719 $187.29 000001083217-3562507208
2024 7 FD52 07 E122 U 8768802U 009 1/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505719 $99.38 000001083217-3562507208
2024 7 FD52 07 E123 U 8768802U 009 1/10/2024 3020 PREL ENGINEERING-UTILITIES CA-XR011O1062400505719 $44.64 000001083217-3562507208
2024 7 FD52 07 E123 U 8768802U 009 1/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505719 $23.28 000001083217-3562507208
2024 6 FD52 07 E111 U 8768802U 009 12/14/2023 3020 PREL ENGINEERING-UTILITIES CA-XR121N1062334203619 $1,029.19 000001083217-3562507208
2024 6 FD52 07 E111 U 8768802U 009 12/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203619 $247.71 000001083217-3562507208
2024 6 FD52 07 E121 U 8768802U 009 12/14/2023 3020 PREL ENGINEERING-UTILITIES CA-XR121N1062334203619 $76.66 000001083217-3562507208
2024 6 FD52 07 E121 U 8768802U 009 12/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203619 $18.45 000001083217-3562507208
2024 6 FD52 07 E122 U 8768802U 009 12/14/2023 3020 PREL ENGINEERING-UTILITIES CA-XR121N1062334203619 $681.06 000001083217-3562507208
2024 6 FD52 07 E122 U 8768802U 009 12/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203619 $163.91 000001083217-3562507208
2024 6 FD52 07 E123 U 8768802U 009 12/14/2023 3020 PREL ENGINEERING-UTILITIES CA-XR121N1062334203619 $140.40 000001083217-3562507208
2024 6 FD52 07 E123 U 8768802U 009 12/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203619 $33.24 000001083217-3562507208
2024 6 FD52 00 E111 U 8768802U 009 12/14/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR121N1062334203617 $85.21 000001082453-3562500480
2024 6 FD52 00 E111 U 8768802U 009 12/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203617 $52.17 000001082453-3562500480
2024 6 FD52 00 E121 U 8768802U 009 12/14/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR121N1062334203617 $6.06 000001082453-3562500480
2024 6 FD52 00 E121 U 8768802U 009 12/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203617 $3.71 000001082453-3562500480
2024 6 FD52 00 E122 U 8768802U 009 12/14/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR121N1062334203617 $56.40 000001082453-3562500480
2024 6 FD52 00 E122 U 8768802U 009 12/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203617 $34.52 000001082453-3562500480
2024 6 FD52 00 E123 U 8768802U 009 12/14/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR121N1062334203617 $21.39 000001082453-3562500480
2024 6 FD52 00 E123 U 8768802U 009 12/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203617 $12.94 000001082453-3562500480
2024 5 FD52 07 E111 U 8768802U 009 11/22/2023 3020 PREL ENGINEERING-UTILITIES CA-XR112N1062332502512 $892.15 000001083217-3562507208
2024 5 FD52 07 E111 U 8768802U 009 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502512 $206.20 000001083217-3562507208
2024 5 FD52 07 E121 U 8768802U 009 11/22/2023 3020 PREL ENGINEERING-UTILITIES CA-XR112N1062332502512 $67.12 000001083217-3562507208
2024 5 FD52 07 E121 U 8768802U 009 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502512 $15.51 000001083217-3562507208
2024 5 FD52 07 E122 U 8768802U 009 11/22/2023 3020 PREL ENGINEERING-UTILITIES CA-XR112N1062332502512 $590.25 000001083217-3562507208
2024 5 FD52 07 E122 U 8768802U 009 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502512 $136.44 000001083217-3562507208
2024 5 FD52 07 E123 U 8768802U 009 11/22/2023 3020 PREL ENGINEERING-UTILITIES CA-XR112N1062332502512 $121.67 000001083217-3562507208
2024 5 FD52 07 E123 U 8768802U 009 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502512 $27.68 000001083217-3562507208
2024 5 FD52 07 E124 U 8768802U 009 11/22/2023 3020 PREL ENGINEERING-UTILITIES CA-XR112N1062332502512 $0.32 000001083217-3562507208
2024 5 FD52 07 E124 U 8768802U 009 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502512 $0.08 000001083217-3562507208
2024 5 FD52 07 E111 U 8768802U 009 11/9/2023 3020 PREL ENGINEERING-UTILITIES CA-XR111N1062331201478 $707.61 000001083217-3562507208
2024 5 FD52 07 E111 U 8768802U 009 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201478 $119.51 000001083217-3562507208
2024 5 FD52 07 E121 U 8768802U 009 11/9/2023 3020 PREL ENGINEERING-UTILITIES CA-XR111N1062331201478 $52.70 000001083217-3562507208
2024 5 FD52 07 E121 U 8768802U 009 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201478 $8.90 000001083217-3562507208
2024 5 FD52 07 E122 U 8768802U 009 11/9/2023 3020 PREL ENGINEERING-UTILITIES CA-XR111N1062331201478 $468.22 000001083217-3562507208
2024 5 FD52 07 E122 U 8768802U 009 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201478 $79.08 000001083217-3562507208
2024 5 FD52 07 E123 U 8768802U 009 11/9/2023 3020 PREL ENGINEERING-UTILITIES CA-XR111N1062331201478 $96.43 000001083217-3562507208
2024 5 FD52 07 E123 U 8768802U 009 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201478 $16.04 000001083217-3562507208
2024 4 FD52 07 E111 U 8768802U 009 10/13/2023 3020 PREL ENGINEERING-UTILITIES CA-XR101N1062328009692 $2,103.96 000001083217-3562507208
2024 4 FD52 07 E121 U 8768802U 009 10/13/2023 3020 PREL ENGINEERING-UTILITIES CA-XR101N1062328009692 $156.71 000001083217-3562507208
2024 4 FD52 07 E122 U 8768802U 009 10/13/2023 3020 PREL ENGINEERING-UTILITIES CA-XR101N1062328009692 $1,392.19 000001083217-3562507208
2024 4 FD52 07 E123 U 8768802U 009 10/13/2023 3020 PREL ENGINEERING-UTILITIES CA-XR101N1062328009692 $286.09 000001083217-3562507208
2024 3 FD52 07 E111 U 8768802U 009 9/29/2023 3020 PREL ENGINEERING-UTILITIES CA-XR092N1062327208411 $729.05 000001083217-3562507208
2024 3 FD52 07 E111 U 8768802U 009 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208411 $73.08 000001083217-3562507208
2024 3 FD52 07 E121 U 8768802U 009 9/29/2023 3020 PREL ENGINEERING-UTILITIES CA-XR092N1062327208411 $54.85 000001083217-3562507208
2024 3 FD52 07 E121 U 8768802U 009 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208411 $5.50 000001083217-3562507208
2024 3 FD52 07 E122 U 8768802U 009 9/29/2023 3020 PREL ENGINEERING-UTILITIES CA-XR092N1062327208411 $482.41 000001083217-3562507208
2024 3 FD52 07 E122 U 8768802U 009 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208411 $48.36 000001083217-3562507208
2024 3 FD52 07 E123 U 8768802U 009 9/29/2023 3020 PREL ENGINEERING-UTILITIES CA-XR092N1062327208411 $99.26 000001083217-3562507208
2024 3 FD52 07 E123 U 8768802U 009 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208411 $9.81 000001083217-3562507208
2024 3 FD52 07 E124 U 8768802U 009 9/29/2023 3020 PREL ENGINEERING-UTILITIES CA-XR092N1062327208411 $0.26 000001083217-3562507208
2024 3 FD52 07 E124 U 8768802U 009 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208411 $0.03 000001083217-3562507208
2024 3 FD52 07 E111 U 8768802U 009 9/28/2023 3020 PREL ENGINEERING-UTILITIES CA-XR092N1062326507060 ($729.05) 000001083217-3562507208
2024 3 FD52 07 E111 U 8768802U 009 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507060 ($73.08) 000001083217-3562507208
2024 3 FD52 07 E121 U 8768802U 009 9/28/2023 3020 PREL ENGINEERING-UTILITIES CA-XR092N1062326507060 ($54.85) 000001083217-3562507208
2024 3 FD52 07 E121 U 8768802U 009 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507060 ($5.50) 000001083217-3562507208
2024 3 FD52 07 E122 U 8768802U 009 9/28/2023 3020 PREL ENGINEERING-UTILITIES CA-XR092N1062326507060 ($482.41) 000001083217-3562507208
2024 3 FD52 07 E122 U 8768802U 009 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507060 ($48.36) 000001083217-3562507208
2024 3 FD52 07 E123 U 8768802U 009 9/28/2023 3020 PREL ENGINEERING-UTILITIES CA-XR092N1062326507060 ($99.26) 000001083217-3562507208
2024 3 FD52 07 E123 U 8768802U 009 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507060 ($9.81) 000001083217-3562507208
2024 3 FD52 07 E124 U 8768802U 009 9/28/2023 3020 PREL ENGINEERING-UTILITIES CA-XR092N1062326507060 ($0.26) 000001083217-3562507208
2024 3 FD52 07 E124 U 8768802U 009 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507060 ($0.03) 000001083217-3562507208
2024 3 FD52 07 E111 U 8768802U 009 9/25/2023 3020 PREL ENGINEERING-UTILITIES CA-XR092N1062326507060 $729.05 000001083217-3562507208
2024 3 FD52 07 E111 U 8768802U 009 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507060 $73.08 000001083217-3562507208
2024 3 FD52 07 E121 U 8768802U 009 9/25/2023 3020 PREL ENGINEERING-UTILITIES CA-XR092N1062326507060 $54.85 000001083217-3562507208
2024 3 FD52 07 E121 U 8768802U 009 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507060 $5.50 000001083217-3562507208
2024 3 FD52 07 E122 U 8768802U 009 9/25/2023 3020 PREL ENGINEERING-UTILITIES CA-XR092N1062326507060 $482.41 000001083217-3562507208
2024 3 FD52 07 E122 U 8768802U 009 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507060 $48.36 000001083217-3562507208
2024 3 FD52 07 E123 U 8768802U 009 9/25/2023 3020 PREL ENGINEERING-UTILITIES CA-XR092N1062326507060 $99.26 000001083217-3562507208
2024 3 FD52 07 E123 U 8768802U 009 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507060 $9.81 000001083217-3562507208
2024 3 FD52 07 E124 U 8768802U 009 9/25/2023 3020 PREL ENGINEERING-UTILITIES CA-XR092N1062326507060 $0.26 000001083217-3562507208
2024 3 FD52 07 E124 U 8768802U 009 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507060 $0.03 000001083217-3562507208
2024 3 FD52 07 E111 U 8768802U 009 9/11/2023 3020 PREL ENGINEERING-UTILITIES CA-XR091N1062325106092 $1,651.07 000001083217-3562507208
2024 3 FD52 07 E111 U 8768802U 009 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106092 $56.92 000001083217-3562507208
2024 3 FD52 07 E121 U 8768802U 009 9/11/2023 3020 PREL ENGINEERING-UTILITIES CA-XR091N1062325106092 $122.96 000001083217-3562507208
2024 3 FD52 07 E121 U 8768802U 009 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106092 $4.24 000001083217-3562507208
2024 3 FD52 07 E122 U 8768802U 009 9/11/2023 3020 PREL ENGINEERING-UTILITIES CA-XR091N1062325106092 $1,092.53 000001083217-3562507208
2024 3 FD52 07 E122 U 8768802U 009 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106092 $37.66 000001083217-3562507208
2024 3 FD52 07 E123 U 8768802U 009 9/11/2023 3020 PREL ENGINEERING-UTILITIES CA-XR091N1062325106092 $224.62 000001083217-3562507208
2024 3 FD52 07 E123 U 8768802U 009 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106092 $7.64 000001083217-3562507208
2024 2 FD52 07 E111 U 8768802U 009 8/24/2023 3020 PREL ENGINEERING-UTILITIES CA-XR082N1062323504939 $1,226.52 000001083217-3562507208
2024 2 FD52 07 E111 U 8768802U 009 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504939 $178.75 000001083217-3562507208
2024 2 FD52 07 E121 U 8768802U 009 8/24/2023 3020 PREL ENGINEERING-UTILITIES CA-XR082N1062323504939 $92.28 000001083217-3562507208
2024 2 FD52 07 E121 U 8768802U 009 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504939 $13.45 000001083217-3562507208
2024 2 FD52 07 E122 U 8768802U 009 8/24/2023 3020 PREL ENGINEERING-UTILITIES CA-XR082N1062323504939 $811.59 000001083217-3562507208
2024 2 FD52 07 E122 U 8768802U 009 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504939 $118.28 000001083217-3562507208
2024 2 FD52 07 E123 U 8768802U 009 8/24/2023 3020 PREL ENGINEERING-UTILITIES CA-XR082N1062323504939 $167.10 000001083217-3562507208
2024 2 FD52 07 E123 U 8768802U 009 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504939 $23.98 000001083217-3562507208
2024 2 FD52 07 E124 U 8768802U 009 8/24/2023 3020 PREL ENGINEERING-UTILITIES CA-XR082N1062323504939 $0.43 000001083217-3562507208
2024 2 FD52 07 E124 U 8768802U 009 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504939 $0.06 000001083217-3562507208
2024 2 FD52 07 E111 U 8768802U 009 8/9/2023 3020 PREL ENGINEERING-UTILITIES CA-XR081N1062322003858 $1,097.93 000001083217-3562507208
2024 2 FD52 07 E111 U 8768802U 009 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003858 $41.51 000001083217-3562507208
2024 2 FD52 07 E121 U 8768802U 009 8/9/2023 3020 PREL ENGINEERING-UTILITIES CA-XR081N1062322003858 $81.77 000001083217-3562507208
2024 2 FD52 07 E121 U 8768802U 009 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003858 $3.10 000001083217-3562507208
2024 2 FD52 07 E122 U 8768802U 009 8/9/2023 3020 PREL ENGINEERING-UTILITIES CA-XR081N1062322003858 $726.46 000001083217-3562507208
2024 2 FD52 07 E122 U 8768802U 009 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003858 $27.47 000001083217-3562507208
2024 2 FD52 07 E123 U 8768802U 009 8/9/2023 3020 PREL ENGINEERING-UTILITIES CA-XR081N1062322003858 $149.36 000001083217-3562507208
2024 2 FD52 07 E123 U 8768802U 009 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003858 $5.57 000001083217-3562507208
2024 1 FD52 07 E121 U 8768802U 009 7/24/2023 3020 PREL ENGINEERING-UTILITIES CA-XR072N1062320202678 $129.57 000001083217-3562507208
2024 1 FD52 07 E121 U 8768802U 009 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202678 $32.02 000001083217-3562507208
2024 1 FD52 07 E122 U 8768802U 009 7/24/2023 3020 PREL ENGINEERING-UTILITIES CA-XR072N1062320202678 $1,145.72 000001083217-3562507208
2024 1 FD52 07 E122 U 8768802U 009 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202678 $284.53 000001083217-3562507208
2024 1 FD52 07 E123 U 8768802U 009 7/24/2023 3020 PREL ENGINEERING-UTILITIES CA-XR072N1062320202678 $240.92 000001083217-3562507208
2024 1 FD52 07 E123 U 8768802U 009 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202678 $59.90 000001083217-3562507208
2024 1 FD52 07 E124 U 8768802U 009 7/24/2023 3020 PREL ENGINEERING-UTILITIES CA-XR072N1062320202678 $0.61 000001083217-3562507208
2024 1 FD52 07 E124 U 8768802U 009 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202678 $0.16 000001083217-3562507208
2024 1 FD52 07 E111 U 8768802U 009 7/24/2023 3020 PREL ENGINEERING-UTILITIES CA-XR072N1062320202678 $1,731.67 000001083217-3562507208
2024 1 FD52 07 E111 U 8768802U 009 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202678 $429.99 000001083217-3562507208
2024 1 FD52 07 E111 U 8768802U 009 7/11/2023 3020 PREL ENGINEERING-UTILITIES CA-XR071N1062319101546 $1,610.29 000001083217-3562507208
2024 1 FD52 07 E111 U 8768802U 009 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101546 $137.56 000001083217-3562507208
2024 1 FD52 07 E121 U 8768802U 009 7/11/2023 3020 PREL ENGINEERING-UTILITIES CA-XR071N1062319101546 $119.74 000001083217-3562507208
2024 1 FD52 07 E121 U 8768802U 009 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101546 $10.23 000001083217-3562507208
2024 1 FD52 07 E122 U 8768802U 009 7/11/2023 3020 PREL ENGINEERING-UTILITIES CA-XR071N1062319101546 $1,255.97 000001083217-3562507208
2024 1 FD52 07 E122 U 8768802U 009 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101546 $107.30 000001083217-3562507208
2024 1 FD52 07 E123 U 8768802U 009 7/11/2023 3020 PREL ENGINEERING-UTILITIES CA-XR071N1062319101546 $232.36 000001083217-3562507208
2024 1 FD52 07 E123 U 8768802U 009 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101546 $19.57 000001083217-3562507208
2024 1 FD52 00 E111 U 8768802U 009 7/11/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR071N1062319101544 $80.43 000001082453-3562500480
2024 1 FD52 00 E111 U 8768802U 009 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101544 $5.15 000001082453-3562500480
2024 1 FD52 00 E121 U 8768802U 009 7/11/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR071N1062319101544 $5.69 000001082453-3562500480
2024 1 FD52 00 E121 U 8768802U 009 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101544 $0.37 000001082453-3562500480
2024 1 FD52 00 E122 U 8768802U 009 7/11/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR071N1062319101544 $62.72 000001082453-3562500480
2024 1 FD52 00 E122 U 8768802U 009 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101544 $4.02 000001082453-3562500480
2024 1 FD52 00 E123 U 8768802U 009 7/11/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR071N1062319101544 $21.30 000001082453-3562500480
2024 1 FD52 00 E123 U 8768802U 009 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101544 $1.35 000001082453-3562500480
2023 12 FD52 00 E111 U 8768802U 009 6/26/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR062N1062317400431 $128.61 000001082453-3562500480
2023 12 FD52 00 E111 U 8768802U 009 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400431 $6.76 000001082453-3562500480
2023 12 FD52 00 E121 U 8768802U 009 6/26/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR062N1062317400431 $9.11 000001082453-3562500480
2023 12 FD52 00 E121 U 8768802U 009 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400431 $0.47 000001082453-3562500480
2023 12 FD52 00 E122 U 8768802U 009 6/26/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR062N1062317400431 $100.36 000001082453-3562500480
2023 12 FD52 00 E122 U 8768802U 009 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400431 $5.28 000001082453-3562500480
2023 12 FD52 00 E123 U 8768802U 009 6/26/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR062N1062317400431 $34.09 000001082453-3562500480
2023 12 FD52 00 E123 U 8768802U 009 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400431 $1.78 000001082453-3562500480
2023 12 FD52 00 E124 U 8768802U 009 6/26/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR062N1062317400431 $0.05 000001082453-3562500480
2023 12 FD52 07 E111 U 8768802U 009 6/26/2023 3020 PREL ENGINEERING-UTILITIES CA-XR062N1062317400433 $2,508.39 000001083217-3562507208
2023 12 FD52 07 E111 U 8768802U 009 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400433 $161.83 000001083217-3562507208
2023 12 FD52 07 E121 U 8768802U 009 6/26/2023 3020 PREL ENGINEERING-UTILITIES CA-XR062N1062317400433 $188.53 000001083217-3562507208
2023 12 FD52 07 E121 U 8768802U 009 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400433 $12.17 000001083217-3562507208
2023 12 FD52 07 E122 U 8768802U 009 6/26/2023 3020 PREL ENGINEERING-UTILITIES CA-XR062N1062317400433 $1,956.54 000001083217-3562507208
2023 12 FD52 07 E122 U 8768802U 009 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400433 $126.23 000001083217-3562507208
2023 12 FD52 07 E123 U 8768802U 009 6/26/2023 3020 PREL ENGINEERING-UTILITIES CA-XR062N1062317400433 $361.86 000001083217-3562507208
2023 12 FD52 07 E123 U 8768802U 009 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400433 $23.02 000001083217-3562507208
2023 12 FD52 07 E124 U 8768802U 009 6/26/2023 3020 PREL ENGINEERING-UTILITIES CA-XR062N1062317400433 $0.94 000001083217-3562507208
2023 12 FD52 07 E124 U 8768802U 009 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400433 $0.06 000001083217-3562507208
2023 12 FD52 00 E121 U 8768802U 009 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810137 $1.84 000001082453-3562500480
2023 12 FD52 00 E122 U 8768802U 009 6/8/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR061N1062315810137 $46.00 000001082453-3562500480
2023 12 FD52 00 E122 U 8768802U 009 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810137 $20.24 000001082453-3562500480
2023 12 FD52 00 E123 U 8768802U 009 6/8/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR061N1062315810137 $15.67 000001082453-3562500480
2023 12 FD52 00 E123 U 8768802U 009 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810137 $6.82 000001082453-3562500480
2023 12 FD52 07 E111 U 8768802U 009 6/8/2023 3020 PREL ENGINEERING-UTILITIES CA-XR061N1062315810139 $1,439.80 000001083217-3562507208
2023 12 FD52 07 E111 U 8768802U 009 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810139 $390.50 000001083217-3562507208
2023 12 FD52 07 E121 U 8768802U 009 6/8/2023 3020 PREL ENGINEERING-UTILITIES CA-XR061N1062315810139 $104.66 000001083217-3562507208
2023 12 FD52 07 E121 U 8768802U 009 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810139 $28.03 000001083217-3562507208
2023 12 FD52 07 E122 U 8768802U 009 6/8/2023 3020 PREL ENGINEERING-UTILITIES CA-XR061N1062315810139 $1,123.16 000001083217-3562507208
2023 12 FD52 07 E122 U 8768802U 009 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810139 $304.59 000001083217-3562507208
2023 12 FD52 07 E123 U 8768802U 009 6/8/2023 3020 PREL ENGINEERING-UTILITIES CA-XR061N1062315810139 $223.75 000001083217-3562507208
2023 12 FD52 07 E123 U 8768802U 009 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810139 $61.95 000001083217-3562507208
2023 12 FD52 00 E111 U 8768802U 009 6/8/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR061N1062315810137 $58.96 000001082453-3562500480
2023 12 FD52 00 E111 U 8768802U 009 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810137 $25.95 000001082453-3562500480
2023 12 FD52 00 E121 U 8768802U 009 6/8/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR061N1062315810137 $4.17 000001082453-3562500480
2023 11 FD52 07 E111 U 8768802U 009 5/24/2023 3020 PREL ENGINEERING-UTILITIES CA-XR052N1062314309043 $364.17 000001083217-3562507208
2023 11 FD52 07 E111 U 8768802U 009 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309043 $3.24 000001083217-3562507208
2023 11 FD52 07 E121 U 8768802U 009 5/24/2023 3020 PREL ENGINEERING-UTILITIES CA-XR052N1062314309043 $27.37 000001083217-3562507208
2023 11 FD52 07 E121 U 8768802U 009 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309043 $0.25 000001083217-3562507208
2023 11 FD52 07 E122 U 8768802U 009 5/24/2023 3020 PREL ENGINEERING-UTILITIES CA-XR052N1062314309043 $284.01 000001083217-3562507208
2023 11 FD52 07 E122 U 8768802U 009 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309043 $2.53 000001083217-3562507208
2023 11 FD52 07 E123 U 8768802U 009 5/24/2023 3020 PREL ENGINEERING-UTILITIES CA-XR052N1062314309043 $52.49 000001083217-3562507208
2023 11 FD52 07 E123 U 8768802U 009 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309043 $0.46 000001083217-3562507208
2023 11 FD52 07 E124 U 8768802U 009 5/24/2023 3020 PREL ENGINEERING-UTILITIES CA-XR052N1062314309043 $0.14 000001083217-3562507208
2023 11 FD52 00 E111 U 8768802U 009 5/16/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR051N1062312808065 $114.95 000001082453-3562500480
2023 11 FD52 00 E111 U 8768802U 009 5/16/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808065 $3.89 000001082453-3562500480
2023 11 FD52 00 E121 U 8768802U 009 5/16/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR051N1062312808065 $8.13 000001082453-3562500480
2023 11 FD52 00 E121 U 8768802U 009 5/16/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808065 $0.27 000001082453-3562500480
2023 11 FD52 00 E122 U 8768802U 009 5/16/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR051N1062312808065 $89.69 000001082453-3562500480
2023 11 FD52 00 E122 U 8768802U 009 5/16/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808065 $3.03 000001082453-3562500480
2023 11 FD52 00 E123 U 8768802U 009 5/16/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR051N1062312808065 $30.46 000001082453-3562500480
2023 11 FD52 00 E123 U 8768802U 009 5/16/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808065 $1.02 000001082453-3562500480
2023 11 FD52 07 E111 U 8768802U 009 5/9/2023 3020 PREL ENGINEERING-UTILITIES CA-XR051N1062312808068 $469.52 000001083217-3562507208
2023 11 FD52 07 E111 U 8768802U 009 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808068 $35.60 000001083217-3562507208
2023 11 FD52 07 E121 U 8768802U 009 5/9/2023 3020 PREL ENGINEERING-UTILITIES CA-XR051N1062312808068 $32.99 000001083217-3562507208
2023 11 FD52 07 E121 U 8768802U 009 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808068 $2.56 000001083217-3562507208
2023 11 FD52 07 E122 U 8768802U 009 5/9/2023 3020 PREL ENGINEERING-UTILITIES CA-XR051N1062312808068 $366.27 000001083217-3562507208
2023 11 FD52 07 E122 U 8768802U 009 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808068 $27.77 000001083217-3562507208
2023 11 FD52 07 E123 U 8768802U 009 5/9/2023 3020 PREL ENGINEERING-UTILITIES CA-XR051N1062312808068 $80.09 000001083217-3562507208
2023 11 FD52 07 E123 U 8768802U 009 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808068 $5.67 000001083217-3562507208
2023 10 FD52 07 E111 U 8768802U 009 4/10/2023 3020 PREL ENGINEERING-UTILITIES CA-XR041N1062309605771 $321.71 000001083217-3562507208
2023 10 FD52 07 E111 U 8768802U 009 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605771 $30.26 000001083217-3562507208
2023 10 FD52 07 E121 U 8768802U 009 4/10/2023 3020 PREL ENGINEERING-UTILITIES CA-XR041N1062309605771 $23.13 000001083217-3562507208
2023 10 FD52 07 E121 U 8768802U 009 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605771 $2.25 000001083217-3562507208
2023 10 FD52 07 E122 U 8768802U 009 4/10/2023 3020 PREL ENGINEERING-UTILITIES CA-XR041N1062309605771 $250.97 000001083217-3562507208
2023 10 FD52 07 E122 U 8768802U 009 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605771 $23.60 000001083217-3562507208
2023 10 FD52 07 E123 U 8768802U 009 4/10/2023 3020 PREL ENGINEERING-UTILITIES CA-XR041N1062309605771 $51.57 000001083217-3562507208
2023 10 FD52 07 E123 U 8768802U 009 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605771 $4.30 000001083217-3562507208
2023 9 FD52 07 E111 U 8768802U 009 3/27/2023 3020 PREL ENGINEERING-UTILITIES CA-XR032N1062308304648 $1,316.79 000001083217-3562507208
2023 9 FD52 07 E111 U 8768802U 009 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304648 $128.15 000001083217-3562507208
2023 9 FD52 07 E121 U 8768802U 009 3/27/2023 3020 PREL ENGINEERING-UTILITIES CA-XR032N1062308304648 $96.71 000001083217-3562507208
2023 9 FD52 07 E121 U 8768802U 009 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304648 $9.18 000001083217-3562507208
2023 9 FD52 07 E122 U 8768802U 009 3/27/2023 3020 PREL ENGINEERING-UTILITIES CA-XR032N1062308304648 $1,026.62 000001083217-3562507208
2023 9 FD52 07 E122 U 8768802U 009 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304648 $99.96 000001083217-3562507208
2023 9 FD52 07 E123 U 8768802U 009 3/27/2023 3020 PREL ENGINEERING-UTILITIES CA-XR032N1062308304648 $172.88 000001083217-3562507208
2023 9 FD52 07 E123 U 8768802U 009 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304648 $21.69 000001083217-3562507208
2023 9 FD52 07 E124 U 8768802U 009 3/27/2023 3020 PREL ENGINEERING-UTILITIES CA-XR032N1062308304648 $0.49 000001083217-3562507208
2023 9 FD52 07 E124 U 8768802U 009 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304648 $0.05 000001083217-3562507208
2023 9 FD52 00 E111 U 8768802U 009 3/14/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR031N1062306703661 $294.85 000001082453-3562500480
2023 9 FD52 00 E111 U 8768802U 009 3/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703661 $11.40 000001082453-3562500480
2023 9 FD52 00 E121 U 8768802U 009 3/14/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR031N1062306703661 $20.86 000001082453-3562500480
2023 9 FD52 00 E121 U 8768802U 009 3/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703661 $0.80 000001082453-3562500480
2023 9 FD52 00 E122 U 8768802U 009 3/14/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR031N1062306703661 $229.98 000001082453-3562500480
2023 9 FD52 00 E122 U 8768802U 009 3/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703661 $8.89 000001082453-3562500480
2023 9 FD52 00 E123 U 8768802U 009 3/14/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR031N1062306703661 $78.11 000001082453-3562500480
2023 9 FD52 00 E123 U 8768802U 009 3/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703661 $3.00 000001082453-3562500480
2023 9 FD52 07 E121 U 8768802U 009 3/9/2023 3020 PREL ENGINEERING-UTILITIES CA-XR031N1062306703663 $35.06 000001083217-3562507208
2023 9 FD52 07 E121 U 8768802U 009 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703663 $4.39 000001083217-3562507208
2023 9 FD52 07 E122 U 8768802U 009 3/9/2023 3020 PREL ENGINEERING-UTILITIES CA-XR031N1062306703663 $412.79 000001083217-3562507208
2023 9 FD52 07 E122 U 8768802U 009 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703663 $51.74 000001083217-3562507208
2023 9 FD52 07 E123 U 8768802U 009 3/9/2023 3020 PREL ENGINEERING-UTILITIES CA-XR031N1062306703663 $103.84 000001083217-3562507208
2023 9 FD52 07 E123 U 8768802U 009 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703663 $12.86 000001083217-3562507208
2023 9 FD52 07 E111 U 8768802U 009 3/9/2023 3020 PREL ENGINEERING-UTILITIES CA-XR031N1062306703663 $529.22 000001083217-3562507208
2023 9 FD52 07 E111 U 8768802U 009 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703663 $66.33 000001083217-3562507208
2023 9 FD52 07 E111 U 8768802U 009 3/1/2023 3020 PREL ENGINEERING-UTILITIES CA-XR022N1062305302452 $216.50 000001083217-3562507208
2023 9 FD52 07 E121 U 8768802U 009 3/1/2023 3020 PREL ENGINEERING-UTILITIES CA-XR022N1062305302452 $14.95 000001083217-3562507208
2023 9 FD52 07 E122 U 8768802U 009 3/1/2023 3020 PREL ENGINEERING-UTILITIES CA-XR022N1062305302452 $168.88 000001083217-3562507208
2023 9 FD52 07 E123 U 8768802U 009 3/1/2023 3020 PREL ENGINEERING-UTILITIES CA-XR022N1062305302452 $42.44 000001083217-3562507208
2023 9 FD52 07 E124 U 8768802U 009 3/1/2023 3020 PREL ENGINEERING-UTILITIES CA-XR022N1062305302452 $0.10 000001083217-3562507208
2023 8 FD52 00 E122 U 8768802U 009 2/15/2023 3040 INSPECTION&SUPER-UTILITIES JV2E-2300005312 $121.58 Move CA XR021N1062303901399 from 8768801U, contract only, to 02U, state forces
2023 8 FD52 00 E122 U 8768802U 009 2/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2300005312 $29.17 Move CA XR021N1062303901399 from 8768801U, contract only, to 02U, state forces
2023 8 FD52 00 E123 U 8768802U 009 2/15/2023 3040 INSPECTION&SUPER-UTILITIES JV2E-2300005312 $19.31 Move CA XR021N1062303901399 from 8768801U, contract only, to 02U, state forces
2023 8 FD52 00 E123 U 8768802U 009 2/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2300005312 $4.57 Move CA XR021N1062303901399 from 8768801U, contract only, to 02U, state forces
2023 8 FD52 00 E111 U 8768802U 009 2/15/2023 3040 INSPECTION&SUPER-UTILITIES JV2E-2300005312 $155.93 Move CA XR021N1062303901399 from 8768801U, contract only, to 02U, state forces
2023 8 FD52 00 E111 U 8768802U 009 2/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2300005312 $37.40 Move CA XR021N1062303901399 from 8768801U, contract only, to 02U, state forces
2023 8 FD52 00 E121 U 8768802U 009 2/15/2023 3040 INSPECTION&SUPER-UTILITIES JV2E-2300005312 $11.17 Move CA XR021N1062303901399 from 8768801U, contract only, to 02U, state forces
2023 8 FD52 00 E121 U 8768802U 009 2/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2300005312 $2.68 Move CA XR021N1062303901399 from 8768801U, contract only, to 02U, state forces
2023 8 FD52 00 E122 U 8768802U 009 2/9/2023 3040 INSPECTION&SUPER-UTILITIES JV2E-2300005107 $466.65 Move various CA's from 8768801U, contract only, to 8768802U, state forces. See attachment details.
2023 8 FD52 00 E122 U 8768802U 009 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2300005107 $133.62 Move various CA's from 8768801U, contract only, to 8768802U, state forces. See attachment details.
2023 8 FD52 00 E123 U 8768802U 009 2/9/2023 3040 INSPECTION&SUPER-UTILITIES JV2E-2300005107 $28.37 Move various CA's from 8768801U, contract only, to 8768802U, state forces. See attachment details.
2023 8 FD52 00 E123 U 8768802U 009 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2300005107 $14.94 Move various CA's from 8768801U, contract only, to 8768802U, state forces. See attachment details.
2023 8 FD52 00 E124 U 8768802U 009 2/9/2023 3040 INSPECTION&SUPER-UTILITIES JV2E-2300005107 $0.15 Move various CA's from 8768801U, contract only, to 8768802U, state forces. See attachment details.
2023 8 FD52 00 E111 U 8768802U 009 2/9/2023 3040 INSPECTION&SUPER-UTILITIES JV2E-2300005107 $597.86 Move various CA's from 8768801U, contract only, to 8768802U, state forces. See attachment details.
2023 8 FD52 00 E124 U 8768802U 009 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2300005107 $0.04 Move various CA's from 8768801U, contract only, to 8768802U, state forces. See attachment details.
2023 8 FD52 07 E111 U 8768802U 009 2/9/2023 3020 PREL ENGINEERING-UTILITIES CA-XR021N1062303901423 $99.23 000001083217-3562507208
2023 8 FD52 07 E111 U 8768802U 009 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901423 $9.00 000001083217-3562507208
2023 8 FD52 07 E121 U 8768802U 009 2/9/2023 3020 PREL ENGINEERING-UTILITIES CA-XR021N1062303901423 $6.58 000001083217-3562507208
2023 8 FD52 07 E121 U 8768802U 009 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901423 $0.59 000001083217-3562507208
2023 8 FD52 07 E122 U 8768802U 009 2/9/2023 3020 PREL ENGINEERING-UTILITIES CA-XR021N1062303901423 $77.40 000001083217-3562507208
2023 8 FD52 00 E111 U 8768802U 009 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2300005107 $171.34 Move various CA's from 8768801U, contract only, to 8768802U, state forces. See attachment details.
2023 8 FD52 07 E122 U 8768802U 009 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901423 $7.02 000001083217-3562507208
2023 8 FD52 07 E123 U 8768802U 009 2/9/2023 3020 PREL ENGINEERING-UTILITIES CA-XR021N1062303901423 $19.46 000001083217-3562507208
2023 8 FD52 07 E123 U 8768802U 009 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901423 $1.74 000001083217-3562507208
2023 8 FD52 00 E121 U 8768802U 009 2/9/2023 3040 INSPECTION&SUPER-UTILITIES JV2E-2300005107 $44.29 Move various CA's from 8768801U, contract only, to 8768802U, state forces. See attachment details.
2023 8 FD52 00 E121 U 8768802U 009 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2300005107 $12.54 Move various CA's from 8768801U, contract only, to 8768802U, state forces. See attachment details.
2023 7 FD52 07 E111 U 8768802U 009 1/27/2023 3020 PREL ENGINEERING-UTILITIES CA-XR012N1062302300423 $357.16 000001083217-3562507208
2023 7 FD52 07 E111 U 8768802U 009 1/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300423 $39.69 000001083217-3562507208
2023 7 FD52 07 E121 U 8768802U 009 1/27/2023 3020 PREL ENGINEERING-UTILITIES CA-XR012N1062302300423 $24.68 000001083217-3562507208
2023 7 FD52 07 E121 U 8768802U 009 1/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300423 $2.74 000001083217-3562507208
2023 7 FD52 07 E122 U 8768802U 009 1/27/2023 3020 PREL ENGINEERING-UTILITIES CA-XR012N1062302300423 $278.63 000001083217-3562507208
2023 7 FD52 07 E122 U 8768802U 009 1/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300423 $30.96 000001083217-3562507208
2023 7 FD52 07 E123 U 8768802U 009 1/27/2023 3020 PREL ENGINEERING-UTILITIES CA-XR012N1062302300423 $70.09 000001083217-3562507208
2023 7 FD52 07 E123 U 8768802U 009 1/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300423 $7.69 000001083217-3562507208
2023 7 FD52 07 E124 U 8768802U 009 1/27/2023 3020 PREL ENGINEERING-UTILITIES CA-XR012N1062302300423 $0.15 000001083217-3562507208
2023 7 FD52 07 E124 U 8768802U 009 1/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300423 $0.02 000001083217-3562507208
2023 7 FD52 07 E111 U 8768802U 009 1/12/2023 3020 PREL ENGINEERING-UTILITIES CA-XR011N1062300610255 $108.11 000001083217-3562507208
2023 7 FD52 07 E111 U 8768802U 009 1/12/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011N1062300610255 $104.49 000001083217-3562507208
2023 7 FD52 07 E121 U 8768802U 009 1/12/2023 3020 PREL ENGINEERING-UTILITIES CA-XR011N1062300610255 $7.17 000001083217-3562507208
2023 7 FD52 07 E121 U 8768802U 009 1/12/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011N1062300610255 $6.94 000001083217-3562507208
2023 7 FD52 07 E122 U 8768802U 009 1/12/2023 3020 PREL ENGINEERING-UTILITIES CA-XR011N1062300610255 $83.99 000001083217-3562507208
2023 7 FD52 07 E122 U 8768802U 009 1/12/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011N1062300610255 $81.51 000001083217-3562507208
2023 7 FD52 07 E123 U 8768802U 009 1/12/2023 3020 PREL ENGINEERING-UTILITIES CA-XR011N1062300610255 $21.35 000001083217-3562507208
2023 7 FD52 07 E123 U 8768802U 009 1/12/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011N1062300610255 $20.26 000001083217-3562507208
2023 7 FD52 07 E111 U 8768802U 009 1/3/2023 3020 PREL ENGINEERING-UTILITIES CA-XR122M1062235509170 $796.01 000001083217-3562507208
2023 7 FD52 07 E121 U 8768802U 009 1/3/2023 3020 PREL ENGINEERING-UTILITIES CA-XR122M1062235509170 $55.84 000001083217-3562507208
2023 7 FD52 07 E122 U 8768802U 009 1/3/2023 3020 PREL ENGINEERING-UTILITIES CA-XR122M1062235509170 $620.89 000001083217-3562507208
2023 7 FD52 07 E123 U 8768802U 009 1/3/2023 3020 PREL ENGINEERING-UTILITIES CA-XR122M1062235509170 $121.10 000001083217-3562507208
2023 7 FD52 07 E124 U 8768802U 009 1/3/2023 3020 PREL ENGINEERING-UTILITIES CA-XR122M1062235509170 $0.32 000001083217-3562507208
2023 6 FD52 07 E111 U 8768802U 009 12/14/2022 3020 PREL ENGINEERING-UTILITIES CA-XR121M1062234208216 $1,976.76 000001083217-3562507208
2023 6 FD52 07 E111 U 8768802U 009 12/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208216 $514.87 000001083217-3562507208
2023 6 FD52 07 E121 U 8768802U 009 12/14/2022 3020 PREL ENGINEERING-UTILITIES CA-XR121M1062234208216 $139.23 000001083217-3562507208
2023 6 FD52 07 E121 U 8768802U 009 12/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208216 $35.91 000001083217-3562507208
2023 6 FD52 07 E122 U 8768802U 009 12/14/2022 3020 PREL ENGINEERING-UTILITIES CA-XR121M1062234208216 $1,542.11 000001083217-3562507208
2023 6 FD52 07 E122 U 8768802U 009 12/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208216 $401.59 000001083217-3562507208
2023 6 FD52 07 E123 U 8768802U 009 12/14/2022 3020 PREL ENGINEERING-UTILITIES CA-XR121M1062234208216 $264.35 000001083217-3562507208
2023 6 FD52 07 E123 U 8768802U 009 12/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208216 $72.75 000001083217-3562507208
2023 6 FD52 00 E111 U 8768802U 009 12/14/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR121M1062234208213 $434.29 000001082453-3562500480
2023 6 FD52 00 E111 U 8768802U 009 12/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208213 $134.13 000001082453-3562500480
2023 6 FD52 00 E121 U 8768802U 009 12/14/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR121M1062234208213 $30.72 000001082453-3562500480
2023 6 FD52 00 E121 U 8768802U 009 12/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208213 $9.49 000001082453-3562500480
2023 6 FD52 00 E122 U 8768802U 009 12/14/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR121M1062234208213 $338.69 000001082453-3562500480
2023 6 FD52 00 E122 U 8768802U 009 12/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208213 $104.63 000001082453-3562500480
2023 6 FD52 00 E123 U 8768802U 009 12/14/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR121M1062234208213 $101.32 000001082453-3562500480
2023 6 FD52 00 E123 U 8768802U 009 12/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208213 $30.96 000001082453-3562500480
2023 5 FD52 00 E111 U 8768802U 009 11/23/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR112M1062232607156 $160.80 000001082453-3562500480
2023 5 FD52 00 E111 U 8768802U 009 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607156 $34.09 000001082453-3562500480
2023 5 FD52 00 E121 U 8768802U 009 11/23/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR112M1062232607156 $11.38 000001082453-3562500480
2023 5 FD52 00 E121 U 8768802U 009 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607156 $2.41 000001082453-3562500480
2023 5 FD52 00 E122 U 8768802U 009 11/23/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR112M1062232607156 $125.44 000001082453-3562500480
2023 5 FD52 00 E122 U 8768802U 009 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607156 $26.60 000001082453-3562500480
2023 5 FD52 00 E123 U 8768802U 009 11/23/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR112M1062232607156 $37.50 000001082453-3562500480
2023 5 FD52 00 E123 U 8768802U 009 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607156 $7.86 000001082453-3562500480
2023 5 FD52 00 E124 U 8768802U 009 11/23/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR112M1062232607156 $0.06 000001082453-3562500480
2023 5 FD52 00 E124 U 8768802U 009 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607156 $0.01 000001082453-3562500480
2023 5 FD52 07 E111 U 8768802U 009 11/23/2022 3020 PREL ENGINEERING-UTILITIES CA-XR112M1062232607161 $108.30 000001083217-3562507208
2023 5 FD52 07 E111 U 8768802U 009 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607161 $57.73 000001083217-3562507208
2023 5 FD52 07 E121 U 8768802U 009 11/23/2022 3020 PREL ENGINEERING-UTILITIES CA-XR112M1062232607161 $7.44 000001083217-3562507208
2023 5 FD52 07 E121 U 8768802U 009 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607161 $3.99 000001083217-3562507208
2023 5 FD52 07 E122 U 8768802U 009 11/23/2022 3020 PREL ENGINEERING-UTILITIES CA-XR112M1062232607161 $84.67 000001083217-3562507208
2023 5 FD52 07 E122 U 8768802U 009 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607161 $45.03 000001083217-3562507208
2023 5 FD52 07 E123 U 8768802U 009 11/23/2022 3020 PREL ENGINEERING-UTILITIES CA-XR112M1062232607161 $19.60 000001083217-3562507208
2023 5 FD52 07 E123 U 8768802U 009 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607161 $10.27 000001083217-3562507208
2023 5 FD52 07 E124 U 8768802U 009 11/23/2022 3020 PREL ENGINEERING-UTILITIES CA-XR112M1062232607161 $0.02 000001083217-3562507208
2023 5 FD52 07 E124 U 8768802U 009 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607161 $0.03 000001083217-3562507208
2023 5 FD52 07 E111 U 8768802U 009 11/7/2022 3020 PREL ENGINEERING-UTILITIES CA-XR111M1062230806163 $242.84 000001083217-3562507208
2023 5 FD52 07 E111 U 8768802U 009 11/7/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806163 $58.26 000001083217-3562507208
2023 5 FD52 07 E121 U 8768802U 009 11/7/2022 3020 PREL ENGINEERING-UTILITIES CA-XR111M1062230806163 $18.17 000001083217-3562507208
2023 5 FD52 07 E121 U 8768802U 009 11/7/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806163 $4.37 000001083217-3562507208
2023 5 FD52 07 E122 U 8768802U 009 11/7/2022 3020 PREL ENGINEERING-UTILITIES CA-XR111M1062230806163 $189.34 000001083217-3562507208
2023 5 FD52 07 E122 U 8768802U 009 11/7/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806163 $45.44 000001083217-3562507208
2023 5 FD52 07 E123 U 8768802U 009 11/7/2022 3020 PREL ENGINEERING-UTILITIES CA-XR111M1062230806163 $32.25 000001083217-3562507208
2023 5 FD52 07 E123 U 8768802U 009 11/7/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806163 $7.60 000001083217-3562507208
2023 4 FD52 07 E111 U 8768802U 009 10/24/2022 3020 PREL ENGINEERING-UTILITIES CA-XR102M1062229405058 $476.29 000001083217-3562507208
2023 4 FD52 07 E111 U 8768802U 009 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405058 $124.15 000001083217-3562507208
2023 4 FD52 07 E121 U 8768802U 009 10/24/2022 3020 PREL ENGINEERING-UTILITIES CA-XR102M1062229405058 $32.74 000001083217-3562507208
2023 4 FD52 07 E121 U 8768802U 009 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405058 $8.53 000001083217-3562507208
2023 4 FD52 07 E122 U 8768802U 009 10/24/2022 3020 PREL ENGINEERING-UTILITIES CA-XR102M1062229405058 $371.51 000001083217-3562507208
2023 4 FD52 07 E122 U 8768802U 009 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405058 $96.84 000001083217-3562507208
2023 4 FD52 07 E123 U 8768802U 009 10/24/2022 3020 PREL ENGINEERING-UTILITIES CA-XR102M1062229405058 $85.99 000001083217-3562507208
2023 4 FD52 07 E123 U 8768802U 009 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405058 $22.08 000001083217-3562507208
2023 4 FD52 07 E124 U 8768802U 009 10/24/2022 3020 PREL ENGINEERING-UTILITIES CA-XR102M1062229405058 $0.20 000001083217-3562507208
2023 4 FD52 07 E124 U 8768802U 009 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405058 $0.06 000001083217-3562507208
2023 4 FD52 07 E111 U 8768802U 009 10/10/2022 3020 PREL ENGINEERING-UTILITIES CA-XR101M1062228003946 $619.38 000001083217-3562507208
2023 4 FD52 07 E121 U 8768802U 009 10/10/2022 3020 PREL ENGINEERING-UTILITIES CA-XR101M1062228003946 $41.72 000001083217-3562507208
2023 4 FD52 07 E122 U 8768802U 009 10/10/2022 3020 PREL ENGINEERING-UTILITIES CA-XR101M1062228003946 $483.12 000001083217-3562507208
2023 4 FD52 07 E123 U 8768802U 009 10/10/2022 3020 PREL ENGINEERING-UTILITIES CA-XR101M1062228003946 $99.65 000001083217-3562507208
2023 3 FD52 07 E111 U 8768802U 009 9/26/2022 3020 PREL ENGINEERING-UTILITIES CA-XR092M1062226602780 $1,000.05 000001083217-3562507208
2023 3 FD52 07 E111 U 8768802U 009 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602780 $166.29 000001083217-3562507208
2023 3 FD52 07 E121 U 8768802U 009 9/26/2022 3020 PREL ENGINEERING-UTILITIES CA-XR092M1062226602780 $72.46 000001083217-3562507208
2023 3 FD52 07 E121 U 8768802U 009 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602780 $11.91 000001083217-3562507208
2023 3 FD52 07 E122 U 8768802U 009 9/26/2022 3020 PREL ENGINEERING-UTILITIES CA-XR092M1062226602780 $779.40 000001083217-3562507208
2023 3 FD52 07 E122 U 8768802U 009 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602780 $129.70 000001083217-3562507208
2023 3 FD52 07 E123 U 8768802U 009 9/26/2022 3020 PREL ENGINEERING-UTILITIES CA-XR092M1062226602780 $138.08 000001083217-3562507208
2023 3 FD52 07 E123 U 8768802U 009 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602780 $24.72 000001083217-3562507208
2023 3 FD52 07 E124 U 8768802U 009 9/26/2022 3020 PREL ENGINEERING-UTILITIES CA-XR092M1062226602780 $0.42 000001083217-3562507208
2023 3 FD52 07 E124 U 8768802U 009 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602780 $0.06 000001083217-3562507208
2023 3 FD52 07 E111 U 8768802U 009 9/12/2022 3020 PREL ENGINEERING-UTILITIES CA-XR091M1062225101632 $1,071.07 000001083217-3562507208
2023 3 FD52 07 E111 U 8768802U 009 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101632 $16.91 000001083217-3562507208
2023 3 FD52 07 E121 U 8768802U 009 9/12/2022 3020 PREL ENGINEERING-UTILITIES CA-XR091M1062225101632 $72.31 000001083217-3562507208
2023 3 FD52 07 E121 U 8768802U 009 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101632 $1.27 000001083217-3562507208
2023 3 FD52 07 E122 U 8768802U 009 9/12/2022 3020 PREL ENGINEERING-UTILITIES CA-XR091M1062225101632 $835.43 000001083217-3562507208
2023 3 FD52 07 E122 U 8768802U 009 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101632 $13.19 000001083217-3562507208
2023 3 FD52 07 E123 U 8768802U 009 9/12/2022 3020 PREL ENGINEERING-UTILITIES CA-XR091M1062225101632 $184.32 000001083217-3562507208
2023 3 FD52 07 E123 U 8768802U 009 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101632 $2.21 000001083217-3562507208
2023 2 FD52 07 E111 U 8768802U 009 8/24/2022 3020 PREL ENGINEERING-UTILITIES CA-XR082M1062223500444 $1,039.88 000001083217-3562507208
2023 2 FD52 07 E111 U 8768802U 009 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500444 $161.63 000001083217-3562507208
2023 2 FD52 07 E121 U 8768802U 009 8/24/2022 3020 PREL ENGINEERING-UTILITIES CA-XR082M1062223500444 $73.56 000001083217-3562507208
2023 2 FD52 07 E121 U 8768802U 009 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500444 $11.23 000001083217-3562507208
2023 2 FD52 07 E122 U 8768802U 009 8/24/2022 3020 PREL ENGINEERING-UTILITIES CA-XR082M1062223500444 $810.86 000001083217-3562507208
2023 2 FD52 07 E122 U 8768802U 009 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500444 $126.07 000001083217-3562507208
2023 2 FD52 07 E123 U 8768802U 009 8/24/2022 3020 PREL ENGINEERING-UTILITIES CA-XR082M1062223500444 $171.27 000001083217-3562507208
2023 2 FD52 07 E123 U 8768802U 009 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500444 $27.87 000001083217-3562507208
2023 2 FD52 07 E124 U 8768802U 009 8/24/2022 3020 PREL ENGINEERING-UTILITIES CA-XR082M1062223500444 $0.41 000001083217-3562507208
2023 2 FD52 07 E124 U 8768802U 009 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500444 $0.07 000001083217-3562507208
2023 2 FD52 00 E111 U 8768802U 009 8/24/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR082M1062223500438 $274.16 000001082453-3562500480
2023 2 FD52 00 E111 U 8768802U 009 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500438 $24.06 000001082453-3562500480
2023 2 FD52 00 E121 U 8768802U 009 8/24/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR082M1062223500438 $19.40 000001082453-3562500480
2023 2 FD52 00 E121 U 8768802U 009 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500438 $1.71 000001082453-3562500480
2023 2 FD52 00 E122 U 8768802U 009 8/24/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR082M1062223500438 $213.88 000001082453-3562500480
2023 2 FD52 00 E122 U 8768802U 009 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500438 $18.77 000001082453-3562500480
2023 2 FD52 00 E123 U 8768802U 009 8/24/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR082M1062223500438 $63.86 000001082453-3562500480
2023 2 FD52 00 E123 U 8768802U 009 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500438 $5.55 000001082453-3562500480
2023 2 FD52 07 E111 U 8768802U 009 8/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2300001384 $71.16 Moving payroll charges from 8768801U t o8768802U
2023 2 FD52 07 E111 U 8768802U 009 8/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2300001389 $24.06 Moving payroll charges from 8768801U t o8768802U
2023 2 FD52 07 E121 U 8768802U 009 8/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2300001384 $5.05 Moving payroll charges from 8768801U t o8768802U
2023 2 FD52 07 E121 U 8768802U 009 8/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2300001389 $1.71 Moving payroll charges from 8768801U t o8768802U
2023 2 FD52 07 E122 U 8768802U 009 8/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2300001384 $59.74 Moving payroll charges from 8768801U t o8768802U
2023 2 FD52 07 E122 U 8768802U 009 8/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2300001389 $18.77 Moving payroll charges from 8768801U t o8768802U
2023 2 FD52 07 E123 U 8768802U 009 8/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2300001384 $10.46 Moving payroll charges from 8768801U t o8768802U
2023 2 FD52 07 E123 U 8768802U 009 8/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2300001389 $5.55 Moving payroll charges from 8768801U t o8768802U
2023 2 FD52 07 E111 U 8768802U 009 8/22/2022 3040 INSPECTION&SUPER-UTILITIES JV2E-2300001384 $580.67 Moving payroll charges from 8768801U t o8768802U
2023 2 FD52 07 E111 U 8768802U 009 8/22/2022 3040 INSPECTION&SUPER-UTILITIES JV2E-2300001389 $274.16 Moving payroll charges from 8768801U t o8768802U
2023 2 FD52 07 E121 U 8768802U 009 8/22/2022 3040 INSPECTION&SUPER-UTILITIES JV2E-2300001384 $40.82 Moving payroll charges from 8768801U t o8768802U
2023 2 FD52 07 E121 U 8768802U 009 8/22/2022 3040 INSPECTION&SUPER-UTILITIES JV2E-2300001389 $19.40 Moving payroll charges from 8768801U t o8768802U
2023 2 FD52 07 E122 U 8768802U 009 8/22/2022 3040 INSPECTION&SUPER-UTILITIES JV2E-2300001384 $487.48 Moving payroll charges from 8768801U t o8768802U
2023 2 FD52 07 E122 U 8768802U 009 8/22/2022 3040 INSPECTION&SUPER-UTILITIES JV2E-2300001389 $213.88 Moving payroll charges from 8768801U t o8768802U
2023 2 FD52 07 E123 U 8768802U 009 8/22/2022 3040 INSPECTION&SUPER-UTILITIES JV2E-2300001384 $113.17 Moving payroll charges from 8768801U t o8768802U
2023 2 FD52 07 E123 U 8768802U 009 8/22/2022 3040 INSPECTION&SUPER-UTILITIES JV2E-2300001389 $63.86 Moving payroll charges from 8768801U t o8768802U
2023 2 FD52 07 E111 U 8768802U 009 8/10/2022 3020 PREL ENGINEERING-UTILITIES CA-XR081M1062222110130 $530.42 000001083217-3562507208
2023 2 FD52 07 E111 U 8768802U 009 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110130 $455.21 000001083217-3562507208
2023 2 FD52 07 E121 U 8768802U 009 8/10/2022 3020 PREL ENGINEERING-UTILITIES CA-XR081M1062222110130 $36.20 000001083217-3562507208
2023 2 FD52 07 E121 U 8768802U 009 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110130 $30.08 000001083217-3562507208
2023 2 FD52 07 E122 U 8768802U 009 8/10/2022 3020 PREL ENGINEERING-UTILITIES CA-XR081M1062222110130 $413.73 000001083217-3562507208
2023 2 FD52 07 E122 U 8768802U 009 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110130 $355.06 000001083217-3562507208
2023 2 FD52 07 E123 U 8768802U 009 8/10/2022 3020 PREL ENGINEERING-UTILITIES CA-XR081M1062222110130 $90.08 000001083217-3562507208
2023 2 FD52 07 E123 U 8768802U 009 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110130 $80.87 000001083217-3562507208
2023 1 FD52 07 E121 U 8768802U 009 7/25/2022 3020 PREL ENGINEERING-UTILITIES CA-XR072M1062220309010 $14.88 000001083217-3562507208
2023 1 FD52 07 E121 U 8768802U 009 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220309010 $22.32 000001083217-3562507208
2023 1 FD52 07 E122 U 8768802U 009 7/25/2022 3020 PREL ENGINEERING-UTILITIES CA-XR072M1062220309010 $168.87 000001083217-3562507208
2023 1 FD52 07 E122 U 8768802U 009 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220309010 $253.29 000001083217-3562507208
2023 1 FD52 07 E123 U 8768802U 009 7/25/2022 3020 PREL ENGINEERING-UTILITIES CA-XR072M1062220309010 $39.66 000001083217-3562507208
2023 1 FD52 07 E123 U 8768802U 009 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220309010 $57.75 000001083217-3562507208
2023 1 FD52 07 E124 U 8768802U 009 7/25/2022 3020 PREL ENGINEERING-UTILITIES CA-XR072M1062220309010 $0.09 000001083217-3562507208
2023 1 FD52 07 E124 U 8768802U 009 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220309010 $0.14 000001083217-3562507208
2023 1 FD52 07 E111 U 8768802U 009 7/25/2022 3020 PREL ENGINEERING-UTILITIES CA-XR072M1062220309009 $216.50 000001083217-3562507208
2023 1 FD52 07 E111 U 8768802U 009 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220309009 $324.74 000001083217-3562507208
2023 1 FD52 07 E111 U 8768802U 009 7/12/2022 3020 PREL ENGINEERING-UTILITIES CA-XR071M1062219207893 $481.10 000001083217-3562507208
2023 1 FD52 07 E111 U 8768802U 009 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207893 $345.86 000001083217-3562507208
2023 1 FD52 07 E121 U 8768802U 009 7/12/2022 3020 PREL ENGINEERING-UTILITIES CA-XR071M1062219207893 $31.38 000001083217-3562507208
2023 1 FD52 07 E121 U 8768802U 009 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207893 $22.56 000001083217-3562507208
2023 1 FD52 07 E122 U 8768802U 009 7/12/2022 3020 PREL ENGINEERING-UTILITIES CA-XR071M1062219207893 $403.98 000001083217-3562507208
2023 1 FD52 07 E122 U 8768802U 009 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207893 $290.42 000001083217-3562507208
2023 1 FD52 07 E123 U 8768802U 009 7/12/2022 3020 PREL ENGINEERING-UTILITIES CA-XR071M1062219207893 $94.31 000001083217-3562507208
2023 1 FD52 07 E123 U 8768802U 009 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207893 $66.43 000001083217-3562507208
2022 12 FD52 00 E111 U 8768802U 009 6/27/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR062M1062217506778 $148.91 000001082453-3562500480
2022 12 FD52 00 E111 U 8768802U 009 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506778 $78.62 000001082453-3562500480
2022 12 FD52 00 E121 U 8768802U 009 6/27/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR062M1062217506778 $10.46 000001082453-3562500480
2022 12 FD52 00 E121 U 8768802U 009 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506778 $5.52 000001082453-3562500480
2022 12 FD52 00 E122 U 8768802U 009 6/27/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR062M1062217506778 $125.04 000001082453-3562500480
2022 12 FD52 00 E122 U 8768802U 009 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506778 $66.01 000001082453-3562500480
2022 12 FD52 00 E123 U 8768802U 009 6/27/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR062M1062217506778 $37.59 000001082453-3562500480
2022 12 FD52 00 E123 U 8768802U 009 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506778 $19.60 000001082453-3562500480
2022 12 FD52 00 E124 U 8768802U 009 6/27/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR062M1062217506778 $0.06 000001082453-3562500480
2022 12 FD52 00 E124 U 8768802U 009 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506778 $0.04 000001082453-3562500480
2022 12 FD52 07 E111 U 8768802U 009 6/27/2022 3020 PREL ENGINEERING-UTILITIES CA-XR062M1062217506793 $926.31 000001083217-3562507208
2022 12 FD52 07 E111 U 8768802U 009 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506793 $22.48 000001083217-3562507208
2022 12 FD52 07 E121 U 8768802U 009 6/27/2022 3020 PREL ENGINEERING-UTILITIES CA-XR062M1062217506793 $64.59 000001083217-3562507208
2022 12 FD52 07 E121 U 8768802U 009 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506793 $1.68 000001083217-3562507208
2022 12 FD52 07 E122 U 8768802U 009 6/27/2022 3020 PREL ENGINEERING-UTILITIES CA-XR062M1062217506793 $777.88 000001083217-3562507208
2022 12 FD52 07 E122 U 8768802U 009 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506793 $18.88 000001083217-3562507208
2022 12 FD52 07 E123 U 8768802U 009 6/27/2022 3020 PREL ENGINEERING-UTILITIES CA-XR062M1062217506793 $168.56 000001083217-3562507208
2022 12 FD52 07 E123 U 8768802U 009 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506793 $3.17 000001083217-3562507208
2022 12 FD52 07 E124 U 8768802U 009 6/27/2022 3020 PREL ENGINEERING-UTILITIES CA-XR062M1062217506793 $0.41 000001083217-3562507208
2022 12 FD52 07 E124 U 8768802U 009 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506793 $0.01 000001083217-3562507208
2022 12 FD52 07 E121 U 8768802U 009 6/13/2022 3020 PREL ENGINEERING-UTILITIES JV2E-2200008256 $407.84 Move various CA's from 8768801U to 8768802U. See attachment.
2022 12 FD52 00 E121 U 8768802U 009 6/13/2022 3040 INSPECTION&SUPER-UTILITIES JV2E-2200008256 $48.80 Move various CA's from 8768801U to 8768802U. See attachment.
2022 12 FD52 07 E121 U 8768802U 009 6/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2200008256 $69.41 Move various CA's from 8768801U to 8768802U. See attachment.
2022 12 FD52 00 E121 U 8768802U 009 6/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2200008256 $4.32 Move various CA's from 8768801U to 8768802U. See attachment.
2022 12 FD52 07 E122 U 8768802U 009 6/13/2022 3020 PREL ENGINEERING-UTILITIES JV2E-2200008256 $5,025.22 Move various CA's from 8768801U to 8768802U. See attachment.
2022 12 FD52 07 E111 U 8768802U 009 6/13/2022 3020 PREL ENGINEERING-UTILITIES JV2E-2200008256 $5,983.86 Move various CA's from 8768801U to 8768802U. See attachment.
2022 12 FD52 00 E122 U 8768802U 009 6/13/2022 3040 INSPECTION&SUPER-UTILITIES JV2E-2200008256 $578.79 Move various CA's from 8768801U to 8768802U. See attachment.
2022 12 FD52 07 E122 U 8768802U 009 6/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2200008256 $859.44 Move various CA's from 8768801U to 8768802U. See attachment.
2022 12 FD52 00 E122 U 8768802U 009 6/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2200008256 $52.02 Move various CA's from 8768801U to 8768802U. See attachment.
2022 12 FD52 07 E123 U 8768802U 009 6/13/2022 3020 PREL ENGINEERING-UTILITIES JV2E-2200008256 $1,206.28 Move various CA's from 8768801U to 8768802U. See attachment.
2022 12 FD52 00 E123 U 8768802U 009 6/13/2022 3040 INSPECTION&SUPER-UTILITIES JV2E-2200008256 $154.11 Move various CA's from 8768801U to 8768802U. See attachment.
2022 12 FD52 07 E123 U 8768802U 009 6/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2200008256 $196.52 Move various CA's from 8768801U to 8768802U. See attachment.
2022 12 FD52 00 E123 U 8768802U 009 6/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2200008256 $16.26 Move various CA's from 8768801U to 8768802U. See attachment.
2022 12 FD52 07 E124 U 8768802U 009 6/13/2022 3020 PREL ENGINEERING-UTILITIES JV2E-2200008256 $1.39 Move various CA's from 8768801U to 8768802U. See attachment.
2022 12 FD52 00 E124 U 8768802U 009 6/13/2022 3040 INSPECTION&SUPER-UTILITIES JV2E-2200008256 $0.18 Move various CA's from 8768801U to 8768802U. See attachment.
2022 12 FD52 07 E124 U 8768802U 009 6/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2200008256 $0.22 Move various CA's from 8768801U to 8768802U. See attachment.
2022 12 FD52 00 E111 U 8768802U 009 6/13/2022 3040 INSPECTION&SUPER-UTILITIES JV2E-2200008256 $689.15 Move various CA's from 8768801U to 8768802U. See attachment.
2022 12 FD52 07 E111 U 8768802U 009 6/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2200008256 $1,023.52 Move various CA's from 8768801U to 8768802U. See attachment.
2022 12 FD52 00 E111 U 8768802U 009 6/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2200008256 $61.95 Move various CA's from 8768801U to 8768802U. See attachment.
2022 11 FD52 00 E121 U 8768802U 009 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603671 $0.78 000001082453-3562500480
2022 11 FD52 00 E122 U 8768802U 009 5/9/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR051M1062212603671 $143.68 000001082453-3562500480
2022 11 FD52 00 E122 U 8768802U 009 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603671 $9.40 000001082453-3562500480
2022 11 FD52 00 E123 U 8768802U 009 5/9/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR051M1062212603671 $45.32 000001082453-3562500480
2022 11 FD52 00 E123 U 8768802U 009 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603671 $2.94 000001082453-3562500480
2022 11 FD52 00 E111 U 8768802U 009 5/9/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR051M1062212603670 $171.04 000001082453-3562500480
2022 11 FD52 00 E111 U 8768802U 009 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603670 $11.20 000001082453-3562500480
2022 11 FD52 00 E121 U 8768802U 009 5/9/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR051M1062212603670 $11.97 000001082453-3562500480
2022 10 FD52 00 E111 U 8768802U 009 4/25/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR042M1062211202566 $226.21 000001082453-3562500480
2022 10 FD52 00 E111 U 8768802U 009 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202566 $29.41 000001082453-3562500480
2022 10 FD52 00 E121 U 8768802U 009 4/25/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR042M1062211202566 $15.83 000001082453-3562500480
2022 10 FD52 00 E121 U 8768802U 009 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202566 $2.06 000001082453-3562500480
2022 10 FD52 00 E122 U 8768802U 009 4/25/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR042M1062211202566 $189.99 000001082453-3562500480
2022 10 FD52 00 E122 U 8768802U 009 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202566 $24.69 000001082453-3562500480
2022 10 FD52 00 E123 U 8768802U 009 4/25/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR042M1062211202566 $59.95 000001082453-3562500480
2022 10 FD52 00 E123 U 8768802U 009 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202566 $7.72 000001082453-3562500480
2022 10 FD52 00 E124 U 8768802U 009 4/25/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR042M1062211202566 $0.10 000001082453-3562500480
2022 10 FD52 00 E124 U 8768802U 009 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202566 $0.01 000001082453-3562500480
2022 8 FD52 07 E111 U 8768802U 009 2/21/2022 1440 RIGHT OF WAY STAKING JV2E-2200005416 $882.54 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 07 E121 U 8768802U 009 2/21/2022 1440 RIGHT OF WAY STAKING JV2E-2200005416 $66.17 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 07 E122 U 8768802U 009 2/21/2022 1440 RIGHT OF WAY STAKING JV2E-2200005416 $741.01 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 07 E123 U 8768802U 009 2/21/2022 1440 RIGHT OF WAY STAKING JV2E-2200005416 $135.54 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 07 E124 U 8768802U 009 2/21/2022 1440 RIGHT OF WAY STAKING JV2E-2200005416 $0.40 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 07 E111 U 8768802U 009 2/21/2022 1030 FIELD SURVEY JV2E-2200005416 $270.42 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 07 E111 U 8768802U 009 2/21/2022 3020 PREL ENGINEERING-UTILITIES JV2E-2200005416 $15,550.75 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 07 E121 U 8768802U 009 2/21/2022 3020 PREL ENGINEERING-UTILITIES JV2E-2200005416 $1,106.40 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 07 E122 U 8768802U 009 2/21/2022 3020 PREL ENGINEERING-UTILITIES JV2E-2200005416 $13,072.97 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 07 E123 U 8768802U 009 2/21/2022 3020 PREL ENGINEERING-UTILITIES JV2E-2200005416 $2,861.58 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 07 E124 U 8768802U 009 2/21/2022 3020 PREL ENGINEERING-UTILITIES JV2E-2200005416 $3.99 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 07 E111 U 8768802U 009 2/21/2022 3040 INSPECTION&SUPER-UTILITIES JV2E-2200005416 $61,578.38 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 07 E121 U 8768802U 009 2/21/2022 3040 INSPECTION&SUPER-UTILITIES JV2E-2200005416 $4,604.27 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 07 E122 U 8768802U 009 2/21/2022 3040 INSPECTION&SUPER-UTILITIES JV2E-2200005416 $51,947.99 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 07 E123 U 8768802U 009 2/21/2022 3040 INSPECTION&SUPER-UTILITIES JV2E-2200005416 $9,662.98 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 07 E124 U 8768802U 009 2/21/2022 3040 INSPECTION&SUPER-UTILITIES JV2E-2200005416 $12.51 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 07 E121 U 8768802U 009 2/21/2022 1030 FIELD SURVEY JV2E-2200005416 $19.06 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 00 E111 U 8768802U 009 2/21/2022 3040 INSPECTION&SUPER-UTILITIES JV2E-2200005416 $8,008.48 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 00 E121 U 8768802U 009 2/21/2022 3040 INSPECTION&SUPER-UTILITIES JV2E-2200005416 $564.59 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 00 E122 U 8768802U 009 2/21/2022 3040 INSPECTION&SUPER-UTILITIES JV2E-2200005416 $6,737.71 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 00 E123 U 8768802U 009 2/21/2022 3040 INSPECTION&SUPER-UTILITIES JV2E-2200005416 $1,525.60 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 00 E124 U 8768802U 009 2/21/2022 3040 INSPECTION&SUPER-UTILITIES JV2E-2200005416 $1.44 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 07 E111 U 8768802U 121 2/21/2022 3560 UTILITY CONTRACTS JV2E-2200005416 $416.92 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 07 E121 U 8768802U 121 2/21/2022 3560 UTILITY CONTRACTS JV2E-2200005416 $31.11 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 07 E122 U 8768802U 121 2/21/2022 3560 UTILITY CONTRACTS JV2E-2200005416 $350.09 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 07 E123 U 8768802U 121 2/21/2022 3560 UTILITY CONTRACTS JV2E-2200005416 $62.97 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 07 E111 U 8768802U 009 2/21/2022 3560 UTILITY CONTRACTS JV2E-2200005416 $2,946.83 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 07 E122 U 8768802U 009 2/21/2022 1030 FIELD SURVEY JV2E-2200005416 $228.12 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 07 E121 U 8768802U 009 2/21/2022 3560 UTILITY CONTRACTS JV2E-2200005416 $219.91 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 07 E122 U 8768802U 009 2/21/2022 3560 UTILITY CONTRACTS JV2E-2200005416 $2,474.39 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 07 E123 U 8768802U 009 2/21/2022 3560 UTILITY CONTRACTS JV2E-2200005416 $444.71 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 07 E124 U 8768802U 009 2/21/2022 3560 UTILITY CONTRACTS JV2E-2200005416 $1.04 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 07 E111 U 8768802U 121 2/21/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2200005416 $100.27 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 07 E121 U 8768802U 121 2/21/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2200005416 $7.56 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 07 E122 U 8768802U 121 2/21/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2200005416 $84.20 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 07 E123 U 8768802U 121 2/21/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2200005416 $16.03 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 07 E111 U 8768802U 009 2/21/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2200005416 $14,519.89 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 07 E121 U 8768802U 009 2/21/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2200005416 $1,078.89 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 07 E123 U 8768802U 009 2/21/2022 1030 FIELD SURVEY JV2E-2200005416 $49.37 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 07 E122 U 8768802U 009 2/21/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2200005416 $12,234.20 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 07 E123 U 8768802U 009 2/21/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2200005416 $2,360.46 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 07 E124 U 8768802U 009 2/21/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2200005416 $2.77 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 00 E111 U 8768802U 009 2/21/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2200005416 $1,322.98 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 00 E121 U 8768802U 009 2/21/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2200005416 $93.72 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 00 E122 U 8768802U 009 2/21/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2200005416 $1,112.88 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 00 E123 U 8768802U 009 2/21/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2200005416 $199.93 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.
2022 8 FD52 00 E124 U 8768802U 009 2/21/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS JV2E-2200005416 $0.17 To move various CA's from 8768801U to State Force Costs 02U. See attached document for details.