The Commonwealth pays employees on a semi-monthly basis with a scheduled pay day on the 15th and 30th of each month. The two monthly pay periods are from the 1st to the 15th of the month and the 16th through the last day of the month. Pay check distribution is delayed by one pay period to allow for system processing. For example work performed during the 1st to the 15th day of the month is paid to the employee on the 30th of the month. Accordingly the cost accounting charges for labor costs posting in eMARS to operating accounts and highway projects are also delayed by approximately one pay period.
A good rule of measure is that the cost accounting charges for the pay period ending on the 15th of the month will post to eMARS by the 25th and those for the pay period ending on the last day of the month will post to eMARS by the 10th of the following month.

x close panel
Detailed Project Expenditure Report
Total E-MARS Expenditures for 8768802D = $711,196.81
Click here for Labor Costs Information
Year Month PBU Charge District Object Phase Program Code County Date ACT Activity Name Trans ID Reference # Vendor Name Expenditure Line Description
2023 10 FD04 07 E111 D 8768802D 007 4/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR042N1062311106964 $267.02 000001086639-3562507208
2023 10 FD04 07 E111 D 8768802D 007 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106964 $114.64 000001086639-3562507208
2023 10 FD04 07 E121 D 8768802D 007 4/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR042N1062311106964 $20.07 000001086639-3562507208
2023 10 FD04 07 E121 D 8768802D 007 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106964 $8.61 000001086639-3562507208
2023 10 FD04 07 E122 D 8768802D 007 4/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR042N1062311106964 $208.25 000001086639-3562507208
2023 10 FD04 07 E122 D 8768802D 007 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106964 $89.42 000001086639-3562507208
2023 10 FD04 07 E123 D 8768802D 007 4/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR042N1062311106964 $38.69 000001086639-3562507208
2023 10 FD04 07 E123 D 8768802D 007 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106964 $16.31 000001086639-3562507208
2023 10 FD04 07 E124 D 8768802D 007 4/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR042N1062311106964 $0.11 000001086639-3562507208
2023 10 FD04 07 E124 D 8768802D 007 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106964 $0.05 000001086639-3562507208
2023 9 FD04 07 E111 D 8768802D 121 3/27/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR032N1062308304685 $134.09 000001086969-3562500636
2023 9 FD04 07 E111 D 8768802D 121 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304685 $18.59 000001086969-3562500636
2023 9 FD04 07 E121 D 8768802D 121 3/27/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR032N1062308304685 $9.56 000001086969-3562500636
2023 9 FD04 07 E121 D 8768802D 121 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304685 $1.32 000001086969-3562500636
2023 9 FD04 07 E122 D 8768802D 121 3/27/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR032N1062308304685 $104.59 000001086969-3562500636
2023 9 FD04 07 E122 D 8768802D 121 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304685 $14.50 000001086969-3562500636
2023 9 FD04 07 E123 D 8768802D 121 3/27/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR032N1062308304685 $31.98 000001086969-3562500636
2023 9 FD04 07 E123 D 8768802D 121 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304685 $4.40 000001086969-3562500636
2023 9 FD04 07 E124 D 8768802D 121 3/27/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR032N1062308304685 $0.05 000001086969-3562500636
2023 9 FD04 07 E124 D 8768802D 121 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304685 $0.01 000001086969-3562500636
2023 9 FD04 07 E111 D 8768802D 105 3/27/2023 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR032N1062308304631 $1,901.16 000001078196-3562507204
2023 9 FD04 07 E111 D 8768802D 105 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304631 $347.48 000001078196-3562507204
2023 9 FD04 07 E121 D 8768802D 105 3/27/2023 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR032N1062308304631 $133.09 000001078196-3562507204
2023 9 FD04 07 E121 D 8768802D 105 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304631 $24.33 000001078196-3562507204
2023 9 FD04 07 E122 D 8768802D 105 3/27/2023 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR032N1062308304631 $1,482.90 000001078196-3562507204
2023 9 FD04 07 E122 D 8768802D 105 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304631 $271.04 000001078196-3562507204
2023 9 FD04 07 E123 D 8768802D 105 3/27/2023 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR032N1062308304631 $569.39 000001078196-3562507204
2023 9 FD04 07 E123 D 8768802D 105 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304631 $103.18 000001078196-3562507204
2023 9 FD04 07 E124 D 8768802D 105 3/27/2023 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR032N1062308304631 $0.81 000001078196-3562507204
2023 9 FD04 07 E124 D 8768802D 105 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304631 $0.14 000001078196-3562507204
2023 9 FD04 07 E111 D 8768802D 007 3/9/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR031N1062306703684 $214.82 000001086639-3562507208
2023 9 FD04 07 E111 D 8768802D 007 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703684 $11.94 000001086639-3562507208
2023 9 FD04 07 E121 D 8768802D 007 3/9/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR031N1062306703684 $16.44 000001086639-3562507208
2023 9 FD04 07 E121 D 8768802D 007 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703684 $0.91 000001086639-3562507208
2023 9 FD04 07 E111 D 8768802D 105 3/9/2023 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR031N1062306703651 $911.62 000001078196-3562507204
2023 9 FD04 07 E122 D 8768802D 007 3/9/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR031N1062306703684 $167.61 000001086639-3562507208
2023 9 FD04 07 E111 D 8768802D 105 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703651 $64.84 000001078196-3562507204
2023 9 FD04 07 E122 D 8768802D 007 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703684 $9.31 000001086639-3562507208
2023 9 FD04 07 E121 D 8768802D 105 3/9/2023 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR031N1062306703651 $64.19 000001078196-3562507204
2023 9 FD04 07 E123 D 8768802D 007 3/9/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR031N1062306703684 $0.36 000001086639-3562507208
2023 9 FD04 07 E121 D 8768802D 105 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703651 $4.59 000001078196-3562507204
2023 9 FD04 07 E122 D 8768802D 105 3/9/2023 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR031N1062306703651 $711.16 000001078196-3562507204
2023 9 FD04 07 E122 D 8768802D 105 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703651 $50.58 000001078196-3562507204
2023 9 FD04 07 E123 D 8768802D 105 3/9/2023 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR031N1062306703651 $234.39 000001078196-3562507204
2023 9 FD04 07 E123 D 8768802D 105 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703651 $14.47 000001078196-3562507204
2023 9 FD04 00 E111 D 8768802D 105 3/9/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR031N1062306703682 $819.40 000001086582-3562500636
2023 9 FD04 00 E121 D 8768802D 105 3/9/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR031N1062306703682 $57.35 000001086582-3562500636
2023 9 FD04 00 E122 D 8768802D 105 3/9/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR031N1062306703682 $639.13 000001086582-3562500636
2023 9 FD04 00 E123 D 8768802D 105 3/9/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR031N1062306703682 $195.23 000001086582-3562500636
2023 8 FD04 00 E111 D 8768802D 105 2/23/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR022N1062305302486 $107.39 000001086582-3562500636
2023 8 FD04 00 E111 D 8768802D 105 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302486 $23.60 000001086582-3562500636
2023 8 FD04 00 E121 D 8768802D 105 2/23/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR022N1062305302486 $7.65 000001086582-3562500636
2023 8 FD04 00 E121 D 8768802D 105 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302486 $1.68 000001086582-3562500636
2023 8 FD04 00 E122 D 8768802D 105 2/23/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR022N1062305302486 $84.24 000001086582-3562500636
2023 8 FD04 00 E122 D 8768802D 105 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302486 $18.41 000001086582-3562500636
2023 8 FD04 00 E123 D 8768802D 105 2/23/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR022N1062305302486 $25.78 000001086582-3562500636
2023 8 FD04 00 E123 D 8768802D 105 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302486 $5.58 000001086582-3562500636
2023 8 FD04 00 E124 D 8768802D 105 2/23/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR022N1062305302486 $0.07 000001086582-3562500636
2023 3 FD04 00 E111 D 8768802D 105 9/15/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091M1062225101595 $81.97 000001064456-3562500636
2023 3 FD04 00 E111 D 8768802D 105 9/15/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101595 $4.26 000001064456-3562500636
2023 3 FD04 00 E121 D 8768802D 105 9/15/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091M1062225101595 $5.74 000001064456-3562500636
2023 3 FD04 00 E121 D 8768802D 105 9/15/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101595 $0.30 000001064456-3562500636
2023 3 FD04 00 E122 D 8768802D 105 9/15/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091M1062225101595 $63.91 000001064456-3562500636
2023 3 FD04 00 E122 D 8768802D 105 9/15/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101595 $3.32 000001064456-3562500636
2023 3 FD04 00 E123 D 8768802D 105 9/15/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091M1062225101595 $17.16 000001064456-3562500636
2023 3 FD04 00 E123 D 8768802D 105 9/15/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101595 $0.88 000001064456-3562500636
2023 2 FD04 00 E111 D 8768802D 105 8/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082M1062223500399 $89.39 000001064456-3562500636
2023 2 FD04 00 E121 D 8768802D 105 8/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082M1062223500399 $6.38 000001064456-3562500636
2023 2 FD04 00 E122 D 8768802D 105 8/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082M1062223500399 $69.72 000001064456-3562500636
2023 2 FD04 00 E123 D 8768802D 105 8/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082M1062223500399 $18.71 000001064456-3562500636
2023 2 FD04 00 E124 D 8768802D 105 8/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082M1062223500399 $0.03 000001064456-3562500636
2023 2 FD04 00 E111 D 8768802D 105 8/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081M1062222110090 $177.03 000001064456-3562500636
2023 2 FD04 00 E111 D 8768802D 105 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110090 $2.36 000001064456-3562500636
2023 2 FD04 00 E121 D 8768802D 105 8/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081M1062222110090 $12.39 000001064456-3562500636
2023 2 FD04 00 E121 D 8768802D 105 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110090 $0.16 000001064456-3562500636
2023 2 FD04 00 E122 D 8768802D 105 8/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081M1062222110090 $138.05 000001064456-3562500636
2023 2 FD04 00 E122 D 8768802D 105 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110090 $1.84 000001064456-3562500636
2023 2 FD04 00 E123 D 8768802D 105 8/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081M1062222110090 $37.06 000001064456-3562500636
2023 2 FD04 00 E123 D 8768802D 105 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110090 $0.49 000001064456-3562500636
2022 12 FD04 00 E111 D 8768802D 105 6/27/2022 0071 ENV STUDIES-HISTORIC MITIGA CA-XR062M1062217506794 $325.00 000001083229-3562500061
2022 12 FD04 00 E111 D 8768802D 105 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506794 $99.09 000001083229-3562500061
2022 12 FD04 00 E121 D 8768802D 105 6/27/2022 0071 ENV STUDIES-HISTORIC MITIGA CA-XR062M1062217506794 $22.22 000001083229-3562500061
2022 12 FD04 00 E121 D 8768802D 105 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506794 $6.77 000001083229-3562500061
2022 12 FD04 00 E122 D 8768802D 105 6/27/2022 0071 ENV STUDIES-HISTORIC MITIGA CA-XR062M1062217506794 $272.90 000001083229-3562500061
2022 12 FD04 00 E122 D 8768802D 105 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506794 $83.20 000001083229-3562500061
2022 12 FD04 00 E123 D 8768802D 105 6/27/2022 0071 ENV STUDIES-HISTORIC MITIGA CA-XR062M1062217506794 $76.86 000001083229-3562500061
2022 12 FD04 00 E123 D 8768802D 105 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506794 $23.15 000001083229-3562500061
2022 12 FD04 00 E124 D 8768802D 105 6/27/2022 0071 ENV STUDIES-HISTORIC MITIGA CA-XR062M1062217506794 $0.14 000001083229-3562500061
2022 12 FD04 00 E124 D 8768802D 105 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506794 $0.04 000001083229-3562500061
2022 11 FD04 00 E229 D 8768802D 105 5/26/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF IET-XE13A162522145016090 $23.94
2022 11 FD04 00 E111 D 8768802D 105 5/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052M1062214004636 $182.10 000001064456-3562500636
2022 11 FD04 00 E111 D 8768802D 105 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004636 $80.48 000001064456-3562500636
2022 11 FD04 00 E121 D 8768802D 105 5/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052M1062214004636 $12.91 000001064456-3562500636
2022 11 FD04 00 E121 D 8768802D 105 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004636 $5.71 000001064456-3562500636
2022 11 FD04 00 E122 D 8768802D 105 5/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052M1062214004636 $152.90 000001064456-3562500636
2022 11 FD04 00 E122 D 8768802D 105 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004636 $67.58 000001064456-3562500636
2022 11 FD04 00 E123 D 8768802D 105 5/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052M1062214004636 $41.32 000001064456-3562500636
2022 11 FD04 00 E123 D 8768802D 105 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004636 $18.05 000001064456-3562500636
2022 11 FD04 00 E124 D 8768802D 105 5/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052M1062214004636 $0.07 000001064456-3562500636
2022 11 FD04 00 E124 D 8768802D 105 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004636 $0.03 000001064456-3562500636
2022 11 FD04 00 E111 D 8768802D 105 5/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051M1062212603624 $145.67 000001064456-3562500636
2022 11 FD04 00 E111 D 8768802D 105 5/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603624 $9.11 000001064456-3562500636
2022 11 FD04 00 E121 D 8768802D 105 5/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051M1062212603624 $10.33 000001064456-3562500636
2022 11 FD04 00 E121 D 8768802D 105 5/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603624 $0.64 000001064456-3562500636
2022 11 FD04 00 E122 D 8768802D 105 5/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051M1062212603624 $122.32 000001064456-3562500636
2022 11 FD04 00 E122 D 8768802D 105 5/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603624 $7.65 000001064456-3562500636
2022 11 FD04 00 E123 D 8768802D 105 5/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051M1062212603624 $32.96 000001064456-3562500636
2022 11 FD04 00 E123 D 8768802D 105 5/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603624 $2.04 000001064456-3562500636
2022 1 FD04 00 E111 D 8768802D 105 7/29/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072L1062120404656 $829.71 000001064456-3562500632
2022 1 FD04 00 E111 D 8768802D 105 7/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404656 $59.26 000001064456-3562500632
2022 1 FD04 00 E121 D 8768802D 105 7/29/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072L1062120404656 $63.47 000001064456-3562500632
2022 1 FD04 00 E121 D 8768802D 105 7/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404656 $4.53 000001064456-3562500632
2022 1 FD04 00 E111 D 8768802D 105 7/12/2021 0010 ENV STUDIES-UST/HZM CA-XR071L1062119003582 $161.58 000001078723-3562500061
2022 1 FD04 00 E111 D 8768802D 105 7/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003582 $134.65 000001078723-3562500061
2022 1 FD04 00 E121 D 8768802D 105 7/12/2021 0010 ENV STUDIES-UST/HZM CA-XR071L1062119003582 $10.18 000001078723-3562500061
2022 1 FD04 00 E121 D 8768802D 105 7/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003582 $8.48 000001078723-3562500061
2022 1 FD04 00 E122 D 8768802D 105 7/12/2021 0010 ENV STUDIES-UST/HZM CA-XR071L1062119003582 $136.42 000001078723-3562500061
2022 1 FD04 00 E122 D 8768802D 105 7/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003582 $113.68 000001078723-3562500061
2022 1 FD04 00 E123 D 8768802D 105 7/12/2021 0010 ENV STUDIES-UST/HZM CA-XR071L1062119003582 $50.20 000001078723-3562500061
2022 1 FD04 00 E123 D 8768802D 105 7/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003582 $41.12 000001078723-3562500061
2022 1 FD04 07 E123 D 8768802D 105 7/2/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR061L1062116001493P $175.99 000001078196-3562507204
2022 1 FD04 07 E123 D 8768802D 105 7/2/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061L1062116001493P $22.24 000001078196-3562507204
2022 1 FD04 00 E111 D 8768802D 009 7/1/2021 1620 BRIDGE DESIGN & PLANS CA-XR062L1062117302485 $304.25 000001077583-3562500610
2022 1 FD04 00 E111 D 8768802D 009 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302485 $32.43 000001077583-3562500610
2022 1 FD04 00 E121 D 8768802D 009 7/1/2021 1620 BRIDGE DESIGN & PLANS CA-XR062L1062117302485 $23.03 000001077583-3562500610
2022 1 FD04 00 E121 D 8768802D 009 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302485 $2.45 000001077583-3562500610
2022 1 FD04 00 E122 D 8768802D 009 7/1/2021 1620 BRIDGE DESIGN & PLANS CA-XR062L1062117302485 $257.03 000001077583-3562500610
2022 1 FD04 00 E122 D 8768802D 009 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302485 $27.38 000001077583-3562500610
2022 1 FD04 00 E123 D 8768802D 009 7/1/2021 1620 BRIDGE DESIGN & PLANS CA-XR062L1062117302485 $33.51 000001077583-3562500610
2022 1 FD04 00 E123 D 8768802D 009 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302485 $3.55 000001077583-3562500610
2022 1 FD04 00 E124 D 8768802D 009 7/1/2021 1620 BRIDGE DESIGN & PLANS CA-XR062L1062117302485 $0.10 000001077583-3562500610
2022 1 FD04 00 E124 D 8768802D 009 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302485 $0.01 000001077583-3562500610
2021 12 FD04 07 E111 D 8768802D 105 6/14/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR061L1062116001493 $972.90 000001078196-3562507204
2021 12 FD04 07 E111 D 8768802D 105 6/14/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061L1062116001493 $124.63 000001078196-3562507204
2021 12 FD04 07 E121 D 8768802D 105 6/14/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR061L1062116001493 $69.36 000001078196-3562507204
2021 12 FD04 07 E121 D 8768802D 105 6/14/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061L1062116001493 $8.97 000001078196-3562507204
2021 12 FD04 07 E122 D 8768802D 105 6/14/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR061L1062116001493 $821.41 000001078196-3562507204
2021 12 FD04 07 E122 D 8768802D 105 6/14/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061L1062116001493 $105.23 000001078196-3562507204
2021 11 FD04 00 E111 D 8768802D 009 5/10/2021 1620 BRIDGE DESIGN & PLANS CA-XR051L1062112709754 $1,703.22 000001077583-3562500610
2021 11 FD04 00 E111 D 8768802D 009 5/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709754 $42.59 000001077583-3562500610
2021 11 FD04 00 E121 D 8768802D 009 5/10/2021 1620 BRIDGE DESIGN & PLANS CA-XR051L1062112709754 $128.24 000001077583-3562500610
2021 11 FD04 00 E121 D 8768802D 009 5/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709754 $3.20 000001077583-3562500610
2021 11 FD04 00 E122 D 8768802D 009 5/10/2021 1620 BRIDGE DESIGN & PLANS CA-XR051L1062112709754 $1,438.01 000001077583-3562500610
2021 11 FD04 00 E122 D 8768802D 009 5/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709754 $35.96 000001077583-3562500610
2021 11 FD04 00 E123 D 8768802D 009 5/10/2021 1620 BRIDGE DESIGN & PLANS CA-XR051L1062112709754 $208.74 000001077583-3562500610
2021 11 FD04 00 E123 D 8768802D 009 5/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709754 $5.07 000001077583-3562500610
2021 10 FD04 00 E122 D 8768802D 009 4/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308689 $785.08 000001077583-3562500610
2021 10 FD04 00 E123 D 8768802D 009 4/26/2021 1620 BRIDGE DESIGN & PLANS CA-XR042L1062111308689 $755.00 000001077583-3562500610
2021 10 FD04 00 E123 D 8768802D 009 4/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308689 $106.93 000001077583-3562500610
2021 10 FD04 00 E124 D 8768802D 009 4/26/2021 1620 BRIDGE DESIGN & PLANS CA-XR042L1062111308689 $2.18 000001077583-3562500610
2021 10 FD04 00 E124 D 8768802D 009 4/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308689 $0.32 000001077583-3562500610
2021 10 FD04 00 E111 D 8768802D 009 4/26/2021 1620 BRIDGE DESIGN & PLANS CA-XR042L1062111308689 $6,191.57 000001077583-3562500610
2021 10 FD04 00 E111 D 8768802D 009 4/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308689 $929.87 000001077583-3562500610
2021 10 FD04 00 E121 D 8768802D 009 4/26/2021 1620 BRIDGE DESIGN & PLANS CA-XR042L1062111308689 $468.75 000001077583-3562500610
2021 10 FD04 00 E121 D 8768802D 009 4/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308689 $70.31 000001077583-3562500610
2021 10 FD04 00 E122 D 8768802D 009 4/26/2021 1620 BRIDGE DESIGN & PLANS CA-XR042L1062111308689 $5,227.54 000001077583-3562500610
2021 4 FD04 07 E143 D 8768802D 105 10/7/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100054881 PON21700002782 LESLIE M HANEY & ALBERT W GROSS PTR $31,215.35 LA # 6
2020 4 FD04 07 E143 D 8768802D 105 10/7/2019 0640 ENV STUDIES-GEN-CONSULT PRC-2000042864 PON21900001905 QK4 INC $4,500.00 Letter Agreement 9-TEF
2020 4 FD04 07 E143 D 8768802D 105 10/7/2019 0640 ENV STUDIES-GEN-CONSULT PRC-2000046620 PON21900001905 QK4 INC $1,701.23 Letter Agreement 9-TEF
2020 3 FD04 00 E111 D 8768802D 105 9/12/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091J1061924909285 $42.92 000001064456-3562500636
2020 3 FD04 00 E111 D 8768802D 105 9/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909285 $4.29 000001064456-3562500636
2020 3 FD04 00 E121 D 8768802D 105 9/12/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091J1061924909285 $3.26 000001064456-3562500636
2020 3 FD04 00 E121 D 8768802D 105 9/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909285 $0.32 000001064456-3562500636
2020 3 FD04 00 E122 D 8768802D 105 9/12/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091J1061924909285 $35.81 000001064456-3562500636
2020 3 FD04 00 E122 D 8768802D 105 9/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909285 $3.58 000001064456-3562500636
2020 3 FD04 00 E123 D 8768802D 105 9/12/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091J1061924909285 $4.07 000001064456-3562500636
2020 3 FD04 00 E123 D 8768802D 105 9/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909285 $0.40 000001064456-3562500636
2020 3 FD04 07 E111 D 8768802D 009 9/9/2019 1440 RIGHT OF WAY STAKING CA-XR091J1061924909323 $307.53 000001070616-3562507204
2020 3 FD04 07 E111 D 8768802D 009 9/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909323 $88.78 000001070616-3562507204
2020 3 FD04 07 E121 D 8768802D 009 9/9/2019 1440 RIGHT OF WAY STAKING CA-XR091J1061924909323 $22.27 000001070616-3562507204
2020 3 FD04 07 E121 D 8768802D 009 9/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909323 $6.43 000001070616-3562507204
2020 3 FD04 07 E122 D 8768802D 009 9/9/2019 1440 RIGHT OF WAY STAKING CA-XR091J1061924909323 $256.57 000001070616-3562507204
2020 3 FD04 07 E122 D 8768802D 009 9/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909323 $74.07 000001070616-3562507204
2020 3 FD04 07 E123 D 8768802D 009 9/9/2019 1440 RIGHT OF WAY STAKING CA-XR091J1061924909323 $56.83 000001070616-3562507204
2020 3 FD04 07 E123 D 8768802D 009 9/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909323 $16.14 000001070616-3562507204
2020 2 FD04 07 E229 D 8768802D 009 8/30/2019 1030 FIELD SURVEY IET-XE13A162519241013300 $28.00
2020 2 FD04 00 E111 D 8768802D 105 8/26/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082J1061923508087 $42.92 000001064456-3562500636
2020 2 FD04 00 E111 D 8768802D 105 8/26/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082J1061923508087 $12.02 000001064456-3562500636
2020 2 FD04 00 E121 D 8768802D 105 8/26/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082J1061923508087 $3.26 000001064456-3562500636
2020 2 FD04 00 E121 D 8768802D 105 8/26/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082J1061923508087 $0.91 000001064456-3562500636
2020 2 FD04 00 E122 D 8768802D 105 8/26/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082J1061923508087 $35.81 000001064456-3562500636
2020 2 FD04 00 E122 D 8768802D 105 8/26/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082J1061923508087 $10.03 000001064456-3562500636
2020 2 FD04 00 E123 D 8768802D 105 8/26/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082J1061923508087 $4.08 000001064456-3562500636
2020 2 FD04 00 E123 D 8768802D 105 8/26/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082J1061923508087 $1.12 000001064456-3562500636
2020 2 FD04 00 E124 D 8768802D 105 8/26/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082J1061923508087 $0.01 000001064456-3562500636
2020 2 FD04 07 E111 D 8768802D 009 8/26/2019 1030 FIELD SURVEY CA-XR082J1061923508127 $162.83 000001070229-3562507204
2020 2 FD04 07 E111 D 8768802D 009 8/26/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082J1061923508127 $8.37 000001070229-3562507204
2020 2 FD04 07 E121 D 8768802D 009 8/26/2019 1030 FIELD SURVEY CA-XR082J1061923508127 $11.32 000001070229-3562507204
2020 2 FD04 07 E121 D 8768802D 009 8/26/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082J1061923508127 $0.58 000001070229-3562507204
2020 2 FD04 07 E122 D 8768802D 009 8/26/2019 1030 FIELD SURVEY CA-XR082J1061923508127 $135.80 000001070229-3562507204
2020 2 FD04 07 E122 D 8768802D 009 8/26/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082J1061923508127 $6.98 000001070229-3562507204
2020 2 FD04 07 E123 D 8768802D 009 8/26/2019 1030 FIELD SURVEY CA-XR082J1061923508127 $34.50 000001070229-3562507204
2020 2 FD04 07 E123 D 8768802D 009 8/26/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082J1061923508127 $1.75 000001070229-3562507204
2020 2 FD04 07 E124 D 8768802D 009 8/26/2019 1030 FIELD SURVEY CA-XR082J1061923508127 $0.08 000001070229-3562507204
2020 2 FD04 07 E229 D 8768802D 009 8/22/2019 1030 FIELD SURVEY IET-XE13A162519233034050 $29.12
2020 2 FD04 07 E111 D 8768802D 009 8/12/2019 1030 FIELD SURVEY CA-XR081J1061922106966 $639.58 000001070229-3562507204
2020 2 FD04 07 E111 D 8768802D 009 8/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081J1061922106966 $79.50 000001070229-3562507204
2020 2 FD04 07 E121 D 8768802D 009 8/12/2019 1030 FIELD SURVEY CA-XR081J1061922106966 $44.52 000001070229-3562507204
2020 2 FD04 07 E121 D 8768802D 009 8/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081J1061922106966 $5.56 000001070229-3562507204
2020 2 FD04 07 E122 D 8768802D 009 8/12/2019 1030 FIELD SURVEY CA-XR081J1061922106966 $533.75 000001070229-3562507204
2020 2 FD04 07 E122 D 8768802D 009 8/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081J1061922106966 $66.33 000001070229-3562507204
2020 2 FD04 07 E123 D 8768802D 009 8/12/2019 1030 FIELD SURVEY CA-XR081J1061922106966 $135.66 000001070229-3562507204
2020 2 FD04 07 E123 D 8768802D 009 8/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081J1061922106966 $16.26 000001070229-3562507204
2020 2 FD04 07 E111 D 8768802D 105 8/12/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR081J1061922106920 $187.68 000001064423-3562507200
2020 2 FD04 07 E121 D 8768802D 105 8/12/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR081J1061922106920 $13.22 000001064423-3562507200
2020 2 FD04 07 E122 D 8768802D 105 8/12/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR081J1061922106920 $156.58 000001064423-3562507200
2020 2 FD04 07 E123 D 8768802D 105 8/12/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR081J1061922106920 $47.59 000001064423-3562507200
2020 1 FD04 07 E111 D 8768802D 105 7/15/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR071J1061919004762 $225.12 000001064423-3562507200
2020 1 FD04 07 E111 D 8768802D 105 7/15/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071J1061919004762 $31.84 000001064423-3562507200
2020 1 FD04 07 E121 D 8768802D 105 7/15/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR071J1061919004762 $15.86 000001064423-3562507200
2020 1 FD04 07 E121 D 8768802D 105 7/15/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071J1061919004762 $2.23 000001064423-3562507200
2020 1 FD04 07 E122 D 8768802D 105 7/10/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR071J1061919004763 $187.89 000001064423-3562507200
2020 1 FD04 00 E111 D 8768802D 105 7/10/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071J1061919004763 $47.21 000001064456-3562500636
2020 1 FD04 00 E111 D 8768802D 105 7/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071J1061919004763 $7.55 000001064456-3562500636
2020 1 FD04 00 E121 D 8768802D 105 7/10/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071J1061919004763 $3.59 000001064456-3562500636
2020 1 FD04 00 E121 D 8768802D 105 7/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071J1061919004763 $0.57 000001064456-3562500636
2020 1 FD04 00 E122 D 8768802D 105 7/10/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071J1061919004763 $39.39 000001064456-3562500636
2020 1 FD04 07 E122 D 8768802D 105 7/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071J1061919004763 $26.56 000001064423-3562507200
2020 1 FD04 00 E122 D 8768802D 105 7/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071J1061919004763 $6.30 000001064456-3562500636
2020 1 FD04 00 E123 D 8768802D 105 7/10/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071J1061919004763 $4.48 000001064456-3562500636
2020 1 FD04 00 E123 D 8768802D 105 7/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071J1061919004763 $0.70 000001064456-3562500636
2020 1 FD04 07 E123 D 8768802D 105 7/10/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR071J1061919004763 $57.16 000001064423-3562507200
2020 1 FD04 07 E123 D 8768802D 105 7/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071J1061919004763 $8.00 000001064423-3562507200
2020 1 FD04 00 E122 D 8768802D 105 7/1/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062J1061917103652 $118.16 000001064456-3562500636
2020 1 FD04 00 E122 D 8768802D 105 7/1/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062J1061917103652 $2.75 000001064456-3562500636
2020 1 FD04 00 E123 D 8768802D 105 7/1/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062J1061917103652 $13.41 000001064456-3562500636
2020 1 FD04 00 E123 D 8768802D 105 7/1/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062J1061917103652 $0.31 000001064456-3562500636
2020 1 FD04 00 E124 D 8768802D 105 7/1/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062J1061917103652 $0.04 000001064456-3562500636
2020 1 FD04 00 E111 D 8768802D 105 7/1/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062J1061917103652 $141.63 000001064456-3562500636
2020 1 FD04 00 E111 D 8768802D 105 7/1/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062J1061917103652 $3.30 000001064456-3562500636
2020 1 FD04 00 E121 D 8768802D 105 7/1/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062J1061917103652 $10.76 000001064456-3562500636
2020 1 FD04 00 E121 D 8768802D 105 7/1/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062J1061917103652 $0.25 000001064456-3562500636
2019 11 FD04 07 E143 D 8768802D 105 5/24/2019 0640 ENV STUDIES-GEN-CONSULT PRC-1900196655 PON21900001905 QK4 INC $12,910.72 Letter Agreement 9-TEF
2019 11 FD04 07 E143 D 8768802D 105 5/8/2019 0640 ENV STUDIES-GEN-CONSULT PRC-1900178899 PON21900001905 QK4 INC $18,341.00 Letter Agreement 9-TEF
2019 10 FD04 07 E111 D 8768802D 105 4/25/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR042J1061911410236 $194.99 000001064423-3562507200
2019 10 FD04 07 E121 D 8768802D 105 4/25/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR042J1061911410236 $13.67 000001064423-3562507200
2019 10 FD04 07 E122 D 8768802D 105 4/25/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR042J1061911410236 $162.67 000001064423-3562507200
2019 10 FD04 07 E123 D 8768802D 105 4/25/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR042J1061911410236 $51.89 000001064423-3562507200
2019 10 FD04 07 E124 D 8768802D 105 4/25/2019 0640 ENV STUDIES-GEN-CONSULT CA-XR042J1061911410236 $0.10 000001064423-3562507200
2019 10 FD04 07 E143 D 8768802D 105 4/8/2019 0640 ENV STUDIES-GEN-CONSULT PRC-1900160608 PON21900001905 QK4 INC $18,506.12 Letter Agreement 9-TEF
2019 8 FD04 07 E143 D 8768802D 105 2/28/2019 0640 ENV STUDIES-GEN-CONSULT JV2E-1900005164 $13,887.93 Move to 8768802D PRC 1900087182
2019 8 FD04 07 E143 D 8768802D 105 2/28/2019 0640 ENV STUDIES-GEN-CONSULT JV2E-1900005164 $4,068.96 Move to 8768802D PRC 1900122604
2019 8 FD04 07 E143 D 8768802D 105 2/26/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-1900143234 PON21700002782 LESLIE M HANEY & ALBERT W GROSS PTR $31,215.35 LA # 6
2019 7 FD04 07 E143 D 8768802D 105 1/10/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-1900113168 PON21700002782 LESLIE M HANEY & ALBERT W GROSS PTR $218,507.45 LA # 6
2019 6 FD04 07 E143 D 8768802D 105 12/18/2018 1550 DESIGN CONTRACTS-CONSULTANT PRC-1900099325 PON21700002782 LESLIE M HANEY & ALBERT W GROSS PTR $312,153.50 LA # 6
2019 5 FD04 00 E111 D 8768802D 105 11/13/2018 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR111I1061831308359 $209.49 000001064264-3562500061
2019 5 FD04 00 E111 D 8768802D 105 11/13/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111I1061831308359 $9.78 000001064264-3562500061
2019 5 FD04 00 E121 D 8768802D 105 11/13/2018 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR111I1061831308359 $14.92 000001064264-3562500061
2019 5 FD04 00 E121 D 8768802D 105 11/13/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111I1061831308359 $0.69 000001064264-3562500061
2019 5 FD04 00 E122 D 8768802D 105 11/13/2018 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR111I1061831308359 $174.80 000001064264-3562500061
2019 5 FD04 00 E122 D 8768802D 105 11/13/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111I1061831308359 $8.16 000001064264-3562500061
2019 5 FD04 00 E123 D 8768802D 105 11/13/2018 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR111I1061831308359 $47.59 000001064264-3562500061
2019 5 FD04 00 E123 D 8768802D 105 11/13/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111I1061831308359 $2.20 000001064264-3562500061
2019 4 FD04 00 E111 D 8768802D 105 10/25/2018 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102I1061829707227 $296.52 000001064456-3562500636
2019 4 FD04 00 E111 D 8768802D 105 10/25/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102I1061829707227 $65.91 000001064456-3562500636
2019 4 FD04 00 E121 D 8768802D 105 10/25/2018 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102I1061829707227 $22.36 000001064456-3562500636
2019 4 FD04 00 E121 D 8768802D 105 10/25/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102I1061829707227 $4.97 000001064456-3562500636
2019 4 FD04 00 E122 D 8768802D 105 10/25/2018 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102I1061829707227 $247.45 000001064456-3562500636
2019 4 FD04 00 E122 D 8768802D 105 10/25/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102I1061829707227 $54.99 000001064456-3562500636
2019 4 FD04 00 E123 D 8768802D 105 10/25/2018 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102I1061829707227 $40.97 000001064456-3562500636
2019 4 FD04 00 E123 D 8768802D 105 10/25/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102I1061829707227 $8.95 000001064456-3562500636
2019 4 FD04 00 E124 D 8768802D 105 10/25/2018 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102I1061829707227 $0.11 000001064456-3562500636
2019 4 FD04 00 E124 D 8768802D 105 10/25/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102I1061829707227 $0.02 000001064456-3562500636
2019 4 FD04 00 E229 D 8768802D 105 10/15/2018 1040 ROADWAY PLANS-PRELIMINARY-OFF IET-XE13A162518288011320 $35.28
2019 4 FD04 00 E111 D 8768802D 105 10/10/2018 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101I1061828206203 $181.14 000001064456-3562500636
2019 4 FD04 00 E111 D 8768802D 105 10/10/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101I1061828206203 $20.30 000001064456-3562500636
2019 4 FD04 00 E121 D 8768802D 105 10/10/2018 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101I1061828206203 $13.66 000001064456-3562500636
2019 4 FD04 00 E121 D 8768802D 105 10/10/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101I1061828206203 $1.53 000001064456-3562500636
2019 4 FD04 00 E122 D 8768802D 105 10/10/2018 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101I1061828206203 $151.23 000001064456-3562500636
2019 4 FD04 00 E122 D 8768802D 105 10/10/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101I1061828206203 $16.94 000001064456-3562500636
2019 4 FD04 00 E123 D 8768802D 105 10/10/2018 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101I1061828206203 $25.00 000001064456-3562500636
2019 4 FD04 00 E123 D 8768802D 105 10/10/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101I1061828206203 $2.76 000001064456-3562500636
2019 3 FD04 00 E229 D 8768802D 105 9/12/2018 1040 ROADWAY PLANS-PRELIMINARY-OFF IET-XE13A162518253007940 $34.65
2019 3 FD04 00 E111 D 8768802D 105 9/10/2018 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091I1061825003871 $332.31 000001064456-3562500636
2019 3 FD04 00 E111 D 8768802D 105 9/10/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091I1061825003871 $61.33 000001064456-3562500636
2019 3 FD04 00 E121 D 8768802D 105 9/10/2018 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091I1061825003871 $25.05 000001064456-3562500636
2019 3 FD04 00 E121 D 8768802D 105 9/10/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091I1061825003871 $4.62 000001064456-3562500636
2019 3 FD04 00 E122 D 8768802D 105 9/10/2018 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091I1061825003871 $277.24 000001064456-3562500636
2019 3 FD04 00 E122 D 8768802D 105 9/10/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091I1061825003871 $51.17 000001064456-3562500636
2019 3 FD04 00 E123 D 8768802D 105 9/10/2018 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091I1061825003871 $45.88 000001064456-3562500636
2019 3 FD04 00 E123 D 8768802D 105 9/10/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091I1061825003871 $8.33 000001064456-3562500636
2019 3 FD04 07 E111 D 8768802D 105 9/10/2018 0640 ENV STUDIES-GEN-CONSULT CA-XR091I1061825003869 $340.46 000001064423-3562507200
2019 3 FD04 07 E121 D 8768802D 105 9/10/2018 0640 ENV STUDIES-GEN-CONSULT CA-XR091I1061825003869 $23.83 000001064423-3562507200
2019 3 FD04 07 E122 D 8768802D 105 9/10/2018 0640 ENV STUDIES-GEN-CONSULT CA-XR091I1061825003869 $284.04 000001064423-3562507200
2019 3 FD04 07 E123 D 8768802D 105 9/10/2018 0640 ENV STUDIES-GEN-CONSULT CA-XR091I1061825003869 $95.15 000001064423-3562507200
2019 2 FD04 00 E111 D 8768802D 105 8/27/2018 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR082I1061823502654 $228.64 000001064264-3562500061
2019 2 FD04 00 E111 D 8768802D 105 8/27/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082I1061823502654 $31.39 000001064264-3562500061
2019 2 FD04 00 E121 D 8768802D 105 8/27/2018 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR082I1061823502654 $16.27 000001064264-3562500061
2019 2 FD04 00 E121 D 8768802D 105 8/27/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082I1061823502654 $2.23 000001064264-3562500061
2019 2 FD04 00 E122 D 8768802D 105 8/27/2018 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR082I1061823502654 $190.94 000001064264-3562500061
2019 2 FD04 00 E122 D 8768802D 105 8/27/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082I1061823502654 $26.19 000001064264-3562500061
2019 2 FD04 00 E123 D 8768802D 105 8/27/2018 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR082I1061823502654 $52.04 000001064264-3562500061
2019 2 FD04 00 E123 D 8768802D 105 8/27/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082I1061823502654 $7.06 000001064264-3562500061
2019 2 FD04 00 E124 D 8768802D 105 8/27/2018 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR082I1061823502654 $0.10 000001064264-3562500061
2019 2 FD04 00 E124 D 8768802D 105 8/27/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082I1061823502654 $0.01 000001064264-3562500061