The Commonwealth pays employees on a semi-monthly basis with a scheduled pay day on the 15th and 30th of each month. The two monthly pay periods are from the 1st to the 15th of the month and the 16th through the last day of the month. Pay check distribution is delayed by one pay period to allow for system processing. For example work performed during the 1st to the 15th day of the month is paid to the employee on the 30th of the month. Accordingly the cost accounting charges for labor costs posting in eMARS to operating accounts and highway projects are also delayed by approximately one pay period.
A good rule of measure is that the cost accounting charges for the pay period ending on the 15th of the month will post to eMARS by the 25th and those for the pay period ending on the last day of the month will post to eMARS by the 10th of the following month.

x close panel
Detailed Project Expenditure Report
Total E-MARS Expenditures for 8022202U = $104,942.99
Click here for Labor Costs Information
Year Month PBU Charge District Object Phase Program Code County Date ACT Activity Name Trans ID Reference # Vendor Name Expenditure Line Description
2024 10 FD52 00 E111 U 8022202U 008 4/10/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR041O1062410001606 $389.59 000001066600-3562500480
2024 10 FD52 00 E111 U 8022202U 008 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001606 $54.90 000001066600-3562500480
2024 10 FD52 00 E121 U 8022202U 008 4/10/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR041O1062410001606 $28.41 000001066600-3562500480
2024 10 FD52 00 E121 U 8022202U 008 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001606 $3.99 000001066600-3562500480
2024 10 FD52 00 E122 U 8022202U 008 4/10/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR041O1062410001606 $257.99 000001066600-3562500480
2024 10 FD52 00 E122 U 8022202U 008 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001606 $36.32 000001066600-3562500480
2024 10 FD52 00 E123 U 8022202U 008 4/10/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR041O1062410001606 $68.77 000001066600-3562500480
2024 10 FD52 00 E123 U 8022202U 008 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001606 $10.12 000001066600-3562500480
2024 10 FD52 06 E111 U 8022202U 008 4/10/2024 3020 PREL ENGINEERING-UTILITIES CA-XR041O1062410001605 $301.70 000001065883-3562506208
2024 10 FD52 06 E111 U 8022202U 008 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001605 $23.30 000001065883-3562506208
2024 10 FD52 06 E121 U 8022202U 008 4/10/2024 3020 PREL ENGINEERING-UTILITIES CA-XR041O1062410001605 $23.05 000001065883-3562506208
2024 10 FD52 06 E121 U 8022202U 008 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001605 $1.78 000001065883-3562506208
2024 10 FD52 06 E122 U 8022202U 008 4/10/2024 3020 PREL ENGINEERING-UTILITIES CA-XR041O1062410001605 $199.42 000001065883-3562506208
2024 10 FD52 06 E122 U 8022202U 008 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001605 $15.41 000001065883-3562506208
2024 10 FD52 06 E123 U 8022202U 008 4/10/2024 3020 PREL ENGINEERING-UTILITIES CA-XR041O1062410001605 $9.30 000001065883-3562506208
2024 10 FD52 06 E123 U 8022202U 008 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001605 $0.68 000001065883-3562506208
2024 9 FD52 00 E111 U 8022202U 008 3/11/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR031O1062406810054 $140.56 000001066600-3562500480
2024 9 FD52 00 E111 U 8022202U 008 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810054 $4.87 000001066600-3562500480
2024 9 FD52 00 E121 U 8022202U 008 3/11/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR031O1062406810054 $10.00 000001066600-3562500480
2024 9 FD52 00 E121 U 8022202U 008 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810054 $0.35 000001066600-3562500480
2024 9 FD52 00 E122 U 8022202U 008 3/11/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR031O1062406810054 $93.06 000001066600-3562500480
2024 9 FD52 00 E122 U 8022202U 008 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810054 $3.22 000001066600-3562500480
2024 9 FD52 00 E123 U 8022202U 008 3/11/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR031O1062406810054 $42.24 000001066600-3562500480
2024 9 FD52 00 E123 U 8022202U 008 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810054 $1.45 000001066600-3562500480
2024 8 FD52 00 E111 U 8022202U 008 2/26/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR022O1062405408874 $127.83 000001066600-3562500480
2024 8 FD52 00 E111 U 8022202U 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408874 $11.93 000001066600-3562500480
2024 8 FD52 00 E121 U 8022202U 008 2/26/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR022O1062405408874 $9.09 000001066600-3562500480
2024 8 FD52 06 E111 U 8022202U 008 2/26/2024 3020 PREL ENGINEERING-UTILITIES CA-XR022O1062405408873 $273.91 000001065883-3562506208
2024 8 FD52 00 E121 U 8022202U 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408874 $0.85 000001066600-3562500480
2024 8 FD52 06 E111 U 8022202U 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408873 $72.33 000001065883-3562506208
2024 8 FD52 00 E122 U 8022202U 008 2/26/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR022O1062405408874 $84.61 000001066600-3562500480
2024 8 FD52 06 E121 U 8022202U 008 2/26/2024 3020 PREL ENGINEERING-UTILITIES CA-XR022O1062405408873 $20.96 000001065883-3562506208
2024 8 FD52 00 E122 U 8022202U 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408874 $7.89 000001066600-3562500480
2024 8 FD52 06 E121 U 8022202U 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408873 $5.54 000001065883-3562506208
2024 8 FD52 00 E123 U 8022202U 008 2/26/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR022O1062405408874 $38.41 000001066600-3562500480
2024 8 FD52 06 E122 U 8022202U 008 2/26/2024 3020 PREL ENGINEERING-UTILITIES CA-XR022O1062405408873 $181.29 000001065883-3562506208
2024 8 FD52 00 E123 U 8022202U 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408874 $3.56 000001066600-3562500480
2024 8 FD52 06 E122 U 8022202U 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408873 $47.86 000001065883-3562506208
2024 8 FD52 00 E124 U 8022202U 008 2/26/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR022O1062405408874 $0.05 000001066600-3562500480
2024 8 FD52 06 E123 U 8022202U 008 2/26/2024 3020 PREL ENGINEERING-UTILITIES CA-XR022O1062405408873 $8.54 000001065883-3562506208
2024 8 FD52 06 E123 U 8022202U 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408873 $2.10 000001065883-3562506208
2024 8 FD52 06 E124 U 8022202U 008 2/26/2024 3020 PREL ENGINEERING-UTILITIES CA-XR022O1062405408873 $0.09 000001065883-3562506208
2024 8 FD52 06 E124 U 8022202U 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408873 $0.02 000001065883-3562506208
2024 8 FD52 06 E111 U 8022202U 008 2/9/2024 3020 PREL ENGINEERING-UTILITIES CA-XR021O1062403907642 $251.13 000001065883-3562506208
2024 8 FD52 06 E111 U 8022202U 008 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907642 $32.15 000001065883-3562506208
2024 8 FD52 06 E121 U 8022202U 008 2/9/2024 3020 PREL ENGINEERING-UTILITIES CA-XR021O1062403907642 $19.21 000001065883-3562506208
2024 8 FD52 06 E121 U 8022202U 008 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907642 $2.46 000001065883-3562506208
2024 8 FD52 06 E122 U 8022202U 008 2/9/2024 3020 PREL ENGINEERING-UTILITIES CA-XR021O1062403907642 $166.18 000001065883-3562506208
2024 8 FD52 06 E122 U 8022202U 008 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907642 $21.27 000001065883-3562506208
2024 8 FD52 06 E123 U 8022202U 008 2/9/2024 3020 PREL ENGINEERING-UTILITIES CA-XR021O1062403907642 $7.77 000001065883-3562506208
2024 8 FD52 06 E123 U 8022202U 008 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907642 $0.93 000001065883-3562506208
2024 7 FD52 00 E111 U 8022202U 008 1/4/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR122N1062335504585 $51.01 000001066600-3562500480
2024 7 FD52 00 E111 U 8022202U 008 1/4/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504585 $15.68 000001066600-3562500480
2024 7 FD52 00 E121 U 8022202U 008 1/4/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR122N1062335504585 $3.63 000001066600-3562500480
2024 7 FD52 00 E121 U 8022202U 008 1/4/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504585 $1.11 000001066600-3562500480
2024 7 FD52 00 E122 U 8022202U 008 1/4/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR122N1062335504585 $33.84 000001066600-3562500480
2024 7 FD52 00 E122 U 8022202U 008 1/4/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504585 $10.37 000001066600-3562500480
2024 7 FD52 00 E123 U 8022202U 008 1/4/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR122N1062335504585 $12.81 000001066600-3562500480
2024 7 FD52 00 E123 U 8022202U 008 1/4/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504585 $3.88 000001066600-3562500480
2024 7 FD52 00 E124 U 8022202U 008 1/4/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR122N1062335504585 $0.02 000001066600-3562500480
2024 5 FD52 06 E111 U 8022202U 008 11/9/2023 3020 PREL ENGINEERING-UTILITIES CA-XR111N1062331201458 $319.06 000001065883-3562506208
2024 5 FD52 06 E111 U 8022202U 008 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201458 $63.82 000001065883-3562506208
2024 5 FD52 06 E121 U 8022202U 008 11/9/2023 3020 PREL ENGINEERING-UTILITIES CA-XR111N1062331201458 $22.78 000001065883-3562506208
2024 5 FD52 06 E121 U 8022202U 008 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201458 $4.55 000001065883-3562506208
2024 5 FD52 06 E122 U 8022202U 008 11/9/2023 3020 PREL ENGINEERING-UTILITIES CA-XR111N1062331201458 $211.13 000001065883-3562506208
2024 5 FD52 06 E122 U 8022202U 008 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201458 $42.23 000001065883-3562506208
2024 5 FD52 06 E123 U 8022202U 008 11/9/2023 3020 PREL ENGINEERING-UTILITIES CA-XR111N1062331201458 $41.35 000001065883-3562506208
2024 5 FD52 06 E123 U 8022202U 008 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201458 $8.17 000001065883-3562506208
2024 4 FD52 00 E111 U 8022202U 008 10/30/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR102N1062329600394 $93.78 000001066600-3562500480
2024 4 FD52 00 E111 U 8022202U 008 10/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102N1062329600394 $22.88 000001066600-3562500480
2024 4 FD52 00 E121 U 8022202U 008 10/30/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR102N1062329600394 $6.66 000001066600-3562500480
2024 4 FD52 00 E121 U 8022202U 008 10/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102N1062329600394 $1.62 000001066600-3562500480
2024 4 FD52 00 E122 U 8022202U 008 10/30/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR102N1062329600394 $62.04 000001066600-3562500480
2024 4 FD52 00 E122 U 8022202U 008 10/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102N1062329600394 $15.15 000001066600-3562500480
2024 4 FD52 00 E123 U 8022202U 008 10/30/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR102N1062329600394 $23.47 000001066600-3562500480
2024 4 FD52 00 E123 U 8022202U 008 10/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102N1062329600394 $5.67 000001066600-3562500480
2024 4 FD52 00 E124 U 8022202U 008 10/30/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR102N1062329600394 $0.03 000001066600-3562500480
2024 4 FD52 00 E124 U 8022202U 008 10/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102N1062329600394 $0.01 000001066600-3562500480
2024 2 FD52 06 E111 U 8022202U 008 8/9/2023 3020 PREL ENGINEERING-UTILITIES CA-XR081N1062322003837 $127.85 000001065883-3562506208
2024 2 FD52 06 E121 U 8022202U 008 8/9/2023 3020 PREL ENGINEERING-UTILITIES CA-XR081N1062322003837 $9.63 000001065883-3562506208
2024 2 FD52 06 E122 U 8022202U 008 8/9/2023 3020 PREL ENGINEERING-UTILITIES CA-XR081N1062322003837 $84.60 000001065883-3562506208
2024 2 FD52 06 E123 U 8022202U 008 8/9/2023 3020 PREL ENGINEERING-UTILITIES CA-XR081N1062322003837 $16.33 000001065883-3562506208
2024 1 FD52 00 E111 U 8022202U 008 7/11/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR071N1062319101527 $80.42 000001066600-3562500480
2024 1 FD52 00 E111 U 8022202U 008 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101527 $5.15 000001066600-3562500480
2024 1 FD52 00 E121 U 8022202U 008 7/11/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR071N1062319101527 $5.69 000001066600-3562500480
2024 1 FD52 00 E121 U 8022202U 008 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101527 $0.37 000001066600-3562500480
2024 1 FD52 00 E122 U 8022202U 008 7/11/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR071N1062319101527 $62.72 000001066600-3562500480
2024 1 FD52 00 E122 U 8022202U 008 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101527 $4.02 000001066600-3562500480
2024 1 FD52 00 E123 U 8022202U 008 7/11/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR071N1062319101527 $21.30 000001066600-3562500480
2024 1 FD52 00 E123 U 8022202U 008 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101527 $1.35 000001066600-3562500480
2023 12 FD52 06 E111 U 8022202U 008 6/26/2023 3020 PREL ENGINEERING-UTILITIES CA-XR062N1062317400406 $852.86 000001065883-3562506208
2023 12 FD52 06 E111 U 8022202U 008 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400406 $34.87 000001065883-3562506208
2023 12 FD52 06 E121 U 8022202U 008 6/26/2023 3020 PREL ENGINEERING-UTILITIES CA-XR062N1062317400406 $61.33 000001065883-3562506208
2023 12 FD52 06 E121 U 8022202U 008 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400406 $2.51 000001065883-3562506208
2023 12 FD52 06 E122 U 8022202U 008 6/26/2023 3020 PREL ENGINEERING-UTILITIES CA-XR062N1062317400406 $665.23 000001065883-3562506208
2023 12 FD52 06 E122 U 8022202U 008 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400406 $27.20 000001065883-3562506208
2023 12 FD52 06 E123 U 8022202U 008 6/26/2023 3020 PREL ENGINEERING-UTILITIES CA-XR062N1062317400406 $135.12 000001065883-3562506208
2023 12 FD52 06 E123 U 8022202U 008 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400406 $5.47 000001065883-3562506208
2023 12 FD52 06 E124 U 8022202U 008 6/26/2023 3020 PREL ENGINEERING-UTILITIES CA-XR062N1062317400406 $0.27 000001065883-3562506208
2023 12 FD52 06 E124 U 8022202U 008 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400406 $0.01 000001065883-3562506208
2023 11 FD52 00 E111 U 8022202U 008 5/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR052N1062314309016 $95.37 000001066600-3562500480
2023 11 FD52 00 E111 U 8022202U 008 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309016 $3.05 000001066600-3562500480
2023 11 FD52 00 E121 U 8022202U 008 5/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR052N1062314309016 $6.81 000001066600-3562500480
2023 11 FD52 00 E121 U 8022202U 008 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309016 $0.21 000001066600-3562500480
2023 11 FD52 06 E111 U 8022202U 008 5/24/2023 3020 PREL ENGINEERING-UTILITIES CA-XR052N1062314309015 $445.26 000001065883-3562506208
2023 11 FD52 00 E122 U 8022202U 008 5/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR052N1062314309016 $74.41 000001066600-3562500480
2023 11 FD52 06 E111 U 8022202U 008 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309015 $11.74 000001065883-3562506208
2023 11 FD52 00 E122 U 8022202U 008 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309016 $2.38 000001066600-3562500480
2023 11 FD52 06 E121 U 8022202U 008 5/24/2023 3020 PREL ENGINEERING-UTILITIES CA-XR052N1062314309015 $34.06 000001065883-3562506200
2023 11 FD52 00 E123 U 8022202U 008 5/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR052N1062314309016 $17.50 000001066600-3562500480
2023 11 FD52 06 E121 U 8022202U 008 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309015 $0.90 000001065883-3562506208
2023 11 FD52 00 E123 U 8022202U 008 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309016 $0.55 000001066600-3562500480
2023 11 FD52 06 E122 U 8022202U 008 5/24/2023 3020 PREL ENGINEERING-UTILITIES CA-XR052N1062314309015 $347.30 000001065883-3562506208
2023 11 FD52 00 E124 U 8022202U 008 5/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR052N1062314309016 $0.05 000001066600-3562500480
2023 11 FD52 06 E122 U 8022202U 008 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309015 $9.16 000001065883-3562506208
2023 11 FD52 06 E123 U 8022202U 008 5/24/2023 3020 PREL ENGINEERING-UTILITIES CA-XR052N1062314309015 $16.85 000001065883-3562506208
2023 11 FD52 06 E123 U 8022202U 008 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309015 $0.40 000001065883-3562506208
2023 11 FD52 06 E124 U 8022202U 008 5/24/2023 3020 PREL ENGINEERING-UTILITIES CA-XR052N1062314309015 $0.19 000001065883-3562506200
2023 11 FD52 06 E111 U 8022202U 008 5/9/2023 3020 PREL ENGINEERING-UTILITIES CA-XR051N1062312808045 $3,453.85 000001065883-3562506208
2023 11 FD52 06 E111 U 8022202U 008 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808045 $310.13 000001065883-3562506208
2023 11 FD52 06 E121 U 8022202U 008 5/9/2023 3020 PREL ENGINEERING-UTILITIES CA-XR051N1062312808045 $253.16 000001065883-3562506208
2023 11 FD52 06 E121 U 8022202U 008 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808045 $23.50 000001065883-3562506208
2023 11 FD52 06 E122 U 8022202U 008 5/9/2023 3020 PREL ENGINEERING-UTILITIES CA-XR051N1062312808045 $2,694.01 000001065883-3562506208
2023 11 FD52 06 E122 U 8022202U 008 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808045 $241.90 000001065883-3562506208
2023 11 FD52 06 E123 U 8022202U 008 5/9/2023 3020 PREL ENGINEERING-UTILITIES CA-XR051N1062312808045 $342.36 000001065883-3562506208
2023 11 FD52 06 E123 U 8022202U 008 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808045 $15.09 000001065883-3562506208
2023 11 FD52 00 E111 U 8022202U 008 5/9/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR051N1062312808045 $213.76 000001066600-3562500480
2023 11 FD52 00 E121 U 8022202U 008 5/9/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR051N1062312808045 $15.31 000001066600-3562500480
2023 11 FD52 00 E122 U 8022202U 008 5/9/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR051N1062312808045 $166.73 000001066600-3562500480
2023 11 FD52 00 E123 U 8022202U 008 5/9/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR051N1062312808045 $26.41 000001066600-3562500480
2023 10 FD52 06 E123 U 8022202U 008 4/24/2023 3020 PREL ENGINEERING-UTILITIES CA-XR042N1062311106908 $49.71 000001065883-3562506208
2023 10 FD52 06 E123 U 8022202U 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106908 $20.47 000001065883-3562506208
2023 10 FD52 06 E124 U 8022202U 008 4/24/2023 3020 PREL ENGINEERING-UTILITIES CA-XR042N1062311106908 $0.20 000001065883-3562506208
2023 10 FD52 06 E124 U 8022202U 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106908 $0.14 000001065883-3562506208
2023 10 FD52 06 E111 U 8022202U 008 4/24/2023 3020 PREL ENGINEERING-UTILITIES CA-XR042N1062311106907 $505.06 000001065883-3562506208
2023 10 FD52 06 E111 U 8022202U 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106907 $390.84 000001065883-3562506208
2023 10 FD52 06 E121 U 8022202U 008 4/24/2023 3020 PREL ENGINEERING-UTILITIES CA-XR042N1062311106907 $37.49 000001065883-3562506208
2023 10 FD52 06 E121 U 8022202U 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106907 $29.64 000001065883-3562506208
2023 10 FD52 06 E122 U 8022202U 008 4/24/2023 3020 PREL ENGINEERING-UTILITIES CA-XR042N1062311106907 $394.23 000001065883-3562506208
2023 10 FD52 06 E122 U 8022202U 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106907 $304.86 000001065883-3562506208
2023 9 FD52 00 E111 U 8022202U 008 3/27/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR032N1062308304620 $218.62 000001066600-3562500480
2023 9 FD52 00 E111 U 8022202U 008 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304620 $21.86 000001066600-3562500480
2023 9 FD52 00 E121 U 8022202U 008 3/27/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR032N1062308304620 $16.09 000001066600-3562500480
2023 9 FD52 00 E121 U 8022202U 008 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304620 $1.60 000001066600-3562500480
2023 9 FD52 00 E122 U 8022202U 008 3/27/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR032N1062308304620 $170.52 000001066600-3562500480
2023 9 FD52 00 E122 U 8022202U 008 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304620 $17.05 000001066600-3562500480
2023 9 FD52 00 E123 U 8022202U 008 3/27/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR032N1062308304620 $27.04 000001066600-3562500480
2023 9 FD52 00 E123 U 8022202U 008 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304620 $2.67 000001066600-3562500480
2023 9 FD52 00 E124 U 8022202U 008 3/27/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR032N1062308304620 $0.05 000001066600-3562500480
2023 9 FD52 00 E124 U 8022202U 008 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304620 $0.01 000001066600-3562500480
2023 8 FD52 00 E111 U 8022202U 008 2/15/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR021N1062303901392 $88.60 000001066600-3562500480
2023 8 FD52 00 E111 U 8022202U 008 2/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901392 $14.74 000001066600-3562500480
2023 8 FD52 00 E121 U 8022202U 008 2/15/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR021N1062303901392 $6.26 000001066600-3562500480
2023 8 FD52 00 E121 U 8022202U 008 2/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901392 $1.04 000001066600-3562500480
2023 8 FD52 00 E122 U 8022202U 008 2/15/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR021N1062303901392 $68.99 000001066600-3562500480
2023 8 FD52 00 E122 U 8022202U 008 2/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901392 $11.50 000001066600-3562500480
2023 8 FD52 00 E123 U 8022202U 008 2/15/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR021N1062303901392 $23.46 000001066600-3562500480
2023 8 FD52 00 E123 U 8022202U 008 2/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901392 $3.88 000001066600-3562500480
2023 6 FD52 00 E121 U 8022202U 008 12/12/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR121M1062234208188 ($0.43) 000001066600-3562500480
2023 5 FD52 00 E111 U 8022202U 008 11/7/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR111M1062230806133 $80.32 000001066600-3562500480
2023 5 FD52 00 E111 U 8022202U 008 11/7/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806133 $13.83 000001066600-3562500480
2023 5 FD52 00 E121 U 8022202U 008 11/7/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR111M1062230806133 $5.69 000001066600-3562500480
2023 5 FD52 00 E121 U 8022202U 008 11/7/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806133 $0.98 000001066600-3562500480
2023 5 FD52 00 E122 U 8022202U 008 11/7/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR111M1062230806133 $62.72 000001066600-3562500480
2023 5 FD52 00 E122 U 8022202U 008 11/7/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806133 $10.79 000001066600-3562500480
2023 5 FD52 00 E123 U 8022202U 008 11/7/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR111M1062230806133 $18.74 000001066600-3562500480
2023 5 FD52 00 E123 U 8022202U 008 11/7/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806133 $3.20 000001066600-3562500480
2023 4 FD52 06 E121 U 8022202U 008 10/31/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405023 $2.02 000001065883-3562506208
2023 4 FD52 06 E122 U 8022202U 008 10/31/2022 3020 PREL ENGINEERING-UTILITIES CA-XR102M1062229405023 $208.70 000001065883-3562506208
2023 4 FD52 06 E122 U 8022202U 008 10/31/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405023 $23.10 000001065883-3562506208
2023 4 FD52 06 E123 U 8022202U 008 10/31/2022 3020 PREL ENGINEERING-UTILITIES CA-XR102M1062229405023 $61.82 000001065883-3562506208
2023 4 FD52 06 E123 U 8022202U 008 10/31/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405023 $6.78 000001065883-3562506208
2023 4 FD52 06 E124 U 8022202U 008 10/31/2022 3020 PREL ENGINEERING-UTILITIES CA-XR102M1062229405023 $0.10 000001065883-3562506208
2023 4 FD52 06 E124 U 8022202U 008 10/31/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405023 $0.01 000001065883-3562506208
2023 4 FD52 00 E111 U 8022202U 008 10/31/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR102M1062229405023 $70.76 000001066600-3562500480
2023 4 FD52 00 E111 U 8022202U 008 10/31/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405023 $10.26 000001066600-3562500480
2023 4 FD52 00 E121 U 8022202U 008 10/31/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR102M1062229405023 $5.01 000001066600-3562500480
2023 4 FD52 00 E121 U 8022202U 008 10/31/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405023 $0.72 000001066600-3562500480
2023 4 FD52 00 E122 U 8022202U 008 10/31/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR102M1062229405023 $55.19 000001066600-3562500480
2023 4 FD52 00 E122 U 8022202U 008 10/31/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405023 $8.01 000001066600-3562500480
2023 4 FD52 00 E123 U 8022202U 008 10/31/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR102M1062229405023 $16.49 000001066600-3562500480
2023 4 FD52 00 E123 U 8022202U 008 10/31/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405023 $2.36 000001066600-3562500480
2023 4 FD52 00 E124 U 8022202U 008 10/31/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR102M1062229405023 $0.03 000001066600-3562500480
2023 4 FD52 06 E111 U 8022202U 008 10/31/2022 3020 PREL ENGINEERING-UTILITIES CA-XR102M1062229405022 $267.56 000001065883-3562506208
2023 4 FD52 06 E111 U 8022202U 008 10/31/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405022 $29.61 000001065883-3562506208
2023 4 FD52 06 E121 U 8022202U 008 10/31/2022 3020 PREL ENGINEERING-UTILITIES CA-XR102M1062229405022 $18.32 000001065883-3562506208
2023 2 FD52 06 E111 U 8022202U 008 8/16/2022 3020 PREL ENGINEERING-UTILITIES CA-XR081M1062222110091 $135.97 000001065883-3562506208
2023 2 FD52 06 E111 U 8022202U 008 8/16/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110091 $11.22 000001065883-3562506208
2023 2 FD52 06 E121 U 8022202U 008 8/16/2022 3020 PREL ENGINEERING-UTILITIES CA-XR081M1062222110091 $10.40 000001065883-3562506208
2023 2 FD52 06 E121 U 8022202U 008 8/16/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110091 $0.85 000001065883-3562506208
2023 2 FD52 06 E122 U 8022202U 008 8/16/2022 3020 PREL ENGINEERING-UTILITIES CA-XR081M1062222110091 $106.00 000001065883-3562506208
2023 2 FD52 06 E122 U 8022202U 008 8/16/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110091 $8.75 000001065883-3562506208
2023 2 FD52 06 E123 U 8022202U 008 8/16/2022 3020 PREL ENGINEERING-UTILITIES CA-XR081M1062222110091 $4.96 000001065883-3562506208
2023 2 FD52 06 E123 U 8022202U 008 8/16/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110091 $0.38 000001065883-3562506208
2023 1 FD52 00 E111 U 8022202U 008 7/12/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR071M1062219207849 $44.61 000001066600-3562500480
2023 1 FD52 00 E111 U 8022202U 008 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207849 $3.57 000001066600-3562500480
2023 1 FD52 00 E121 U 8022202U 008 7/12/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR071M1062219207849 $3.13 000001066600-3562500480
2023 1 FD52 00 E121 U 8022202U 008 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207849 $0.25 000001066600-3562500480
2023 1 FD52 00 E122 U 8022202U 008 7/12/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR071M1062219207849 $37.51 000001066600-3562500480
2023 1 FD52 00 E122 U 8022202U 008 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207849 $3.00 000001066600-3562500480
2023 1 FD52 00 E123 U 8022202U 008 7/12/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR071M1062219207849 $11.24 000001066600-3562500480
2023 1 FD52 00 E123 U 8022202U 008 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207849 $0.89 000001066600-3562500480
2023 1 FD52 06 E111 U 8022202U 008 7/12/2022 3020 PREL ENGINEERING-UTILITIES CA-XR071M1062219207848 $285.98 000001065883-3562506208
2023 1 FD52 06 E111 U 8022202U 008 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207848 $12.59 000001065883-3562506208
2023 1 FD52 06 E121 U 8022202U 008 7/12/2022 3020 PREL ENGINEERING-UTILITIES CA-XR071M1062219207848 $21.88 000001065883-3562506208
2023 1 FD52 06 E121 U 8022202U 008 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207848 $0.96 000001065883-3562506208
2023 1 FD52 06 E122 U 8022202U 008 7/12/2022 3020 PREL ENGINEERING-UTILITIES CA-XR071M1062219207848 $240.15 000001065883-3562506208
2023 1 FD52 06 E122 U 8022202U 008 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207848 $10.57 000001065883-3562506208
2023 1 FD52 06 E123 U 8022202U 008 7/12/2022 3020 PREL ENGINEERING-UTILITIES CA-XR071M1062219207848 $11.26 000001065883-3562506208
2023 1 FD52 06 E123 U 8022202U 008 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207848 $0.46 000001065883-3562506208
2022 11 FD52 00 E111 U 8022202U 008 5/9/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR051M1062212603626 $247.42 000001066600-3562500480
2022 11 FD52 00 E121 U 8022202U 008 5/9/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR051M1062212603626 $18.12 000001066600-3562500480
2022 11 FD52 00 E122 U 8022202U 008 5/9/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR051M1062212603626 $207.75 000001066600-3562500480
2022 11 FD52 00 E123 U 8022202U 008 5/9/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR051M1062212603626 $26.33 000001066600-3562500480
2022 11 FD52 06 E111 U 8022202U 008 5/9/2022 3020 PREL ENGINEERING-UTILITIES CA-XR051M1062212603625 $235.94 000001065883-3562506208
2022 11 FD52 06 E111 U 8022202U 008 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603625 $41.53 000001065883-3562506208
2022 11 FD52 06 E121 U 8022202U 008 5/9/2022 3020 PREL ENGINEERING-UTILITIES CA-XR051M1062212603625 $18.05 000001065883-3562506208
2022 11 FD52 06 E121 U 8022202U 008 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603625 $3.17 000001065883-3562506208
2022 11 FD52 06 E122 U 8022202U 008 5/9/2022 3020 PREL ENGINEERING-UTILITIES CA-XR051M1062212603625 $198.10 000001065883-3562506208
2022 11 FD52 06 E122 U 8022202U 008 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603625 $34.87 000001065883-3562506208
2022 11 FD52 06 E123 U 8022202U 008 5/9/2022 3020 PREL ENGINEERING-UTILITIES CA-XR051M1062212603625 $9.35 000001065883-3562506208
2022 11 FD52 06 E123 U 8022202U 008 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603625 $1.54 000001065883-3562506208
2022 10 FD52 06 E111 U 8022202U 008 4/11/2022 3020 PREL ENGINEERING-UTILITIES CA-XR041M1062209801445 $393.27 000001065883-3562506208
2022 10 FD52 06 E111 U 8022202U 008 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801445 $31.98 000001065883-3562506208
2022 10 FD52 06 E121 U 8022202U 008 4/11/2022 3020 PREL ENGINEERING-UTILITIES CA-XR041M1062209801445 $30.08 000001065883-3562506208
2022 10 FD52 06 E121 U 8022202U 008 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801445 $2.44 000001065883-3562506208
2022 10 FD52 06 E122 U 8022202U 008 4/11/2022 3020 PREL ENGINEERING-UTILITIES CA-XR041M1062209801445 $330.20 000001065883-3562506208
2022 10 FD52 06 E122 U 8022202U 008 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801445 $26.85 000001065883-3562506208
2022 10 FD52 06 E123 U 8022202U 008 4/11/2022 3020 PREL ENGINEERING-UTILITIES CA-XR041M1062209801445 $15.50 000001065883-3562506208
2022 10 FD52 06 E123 U 8022202U 008 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801445 $1.19 000001065883-3562506208
2022 9 FD52 06 E111 U 8022202U 008 3/9/2022 3020 PREL ENGINEERING-UTILITIES CA-XR031M1062206709433 $262.16 000001065883-3562506208
2022 9 FD52 06 E111 U 8022202U 008 3/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709433 $5.94 000001065883-3562506208
2022 9 FD52 06 E121 U 8022202U 008 3/9/2022 3020 PREL ENGINEERING-UTILITIES CA-XR031M1062206709433 $20.05 000001065883-3562506208
2022 9 FD52 06 E121 U 8022202U 008 3/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709433 $0.46 000001065883-3562506208
2022 9 FD52 06 E122 U 8022202U 008 3/9/2022 3020 PREL ENGINEERING-UTILITIES CA-XR031M1062206709433 $220.14 000001065883-3562506208
2022 9 FD52 06 E122 U 8022202U 008 3/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709433 $4.99 000001065883-3562506208
2022 9 FD52 06 E123 U 8022202U 008 3/9/2022 3020 PREL ENGINEERING-UTILITIES CA-XR031M1062206709433 $10.30 000001065883-3562506208
2022 9 FD52 06 E123 U 8022202U 008 3/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709433 $0.22 000001065883-3562506208
2022 8 FD52 06 E111 U 8022202U 008 2/14/2022 3020 PREL ENGINEERING-UTILITIES CA-XR021M1062203907406 $889.94 000001065883-3562506208
2022 8 FD52 06 E111 U 8022202U 008 2/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907406 $125.62 000001065883-3562506208
2022 8 FD52 06 E121 U 8022202U 008 2/14/2022 3020 PREL ENGINEERING-UTILITIES CA-XR021M1062203907406 $62.25 000001065883-3562506208
2022 8 FD52 06 E121 U 8022202U 008 2/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907406 $9.01 000001065883-3562506208
2022 8 FD52 06 E122 U 8022202U 008 2/14/2022 3020 PREL ENGINEERING-UTILITIES CA-XR021M1062203907406 $747.45 000001065883-3562506208
2022 8 FD52 06 E122 U 8022202U 008 2/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907406 $105.48 000001065883-3562506208
2022 8 FD52 06 E123 U 8022202U 008 2/14/2022 3020 PREL ENGINEERING-UTILITIES CA-XR021M1062203907406 $177.12 000001065883-3562506208
2022 8 FD52 06 E123 U 8022202U 008 2/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907406 $18.86 000001065883-3562506208
2022 3 FD52 00 E111 U 8022202U 008 9/13/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR091L1062125207957 $288.55 000001066600-3562500480
2022 3 FD52 00 E111 U 8022202U 008 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207957 $20.62 000001066600-3562500480
2022 3 FD52 00 E121 U 8022202U 008 9/13/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR091L1062125207957 $20.52 000001066600-3562500480
2022 3 FD52 00 E121 U 8022202U 008 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207957 $1.46 000001066600-3562500480
2022 3 FD52 00 E122 U 8022202U 008 9/13/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR091L1062125207957 $242.37 000001066600-3562500480
2022 3 FD52 00 E122 U 8022202U 008 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207957 $17.31 000001066600-3562500480
2022 3 FD52 00 E123 U 8022202U 008 9/13/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR091L1062125207957 $30.01 000001066600-3562500480
2022 3 FD52 00 E123 U 8022202U 008 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207957 $2.12 000001066600-3562500480
2022 2 FD52 06 E111 U 8022202U 008 8/9/2021 3020 PREL ENGINEERING-UTILITIES CA-XR081L1062121805800 $214.43 000001065883-3562506208
2022 2 FD52 06 E111 U 8022202U 008 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805800 $28.03 000001065883-3562506208
2022 2 FD52 06 E121 U 8022202U 008 8/9/2021 3020 PREL ENGINEERING-UTILITIES CA-XR081L1062121805800 $16.11 000001065883-3562506208
2022 2 FD52 06 E121 U 8022202U 008 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805800 $2.11 000001065883-3562506208
2022 2 FD52 06 E122 U 8022202U 008 8/9/2021 3020 PREL ENGINEERING-UTILITIES CA-XR081L1062121805800 $180.11 000001065883-3562506208
2022 2 FD52 06 E122 U 8022202U 008 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805800 $23.54 000001065883-3562506208
2022 2 FD52 06 E123 U 8022202U 008 8/9/2021 3020 PREL ENGINEERING-UTILITIES CA-XR081L1062121805800 $8.47 000001065883-3562506208
2022 2 FD52 06 E123 U 8022202U 008 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805800 $1.04 000001065883-3562506208
2021 11 FD52 00 E111 U 8022202U 008 5/24/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR052L1062114100372 $32.37 000001066600-3562500480
2021 11 FD52 00 E121 U 8022202U 008 5/24/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR052L1062114100372 $2.48 000001066600-3562500480
2021 11 FD52 00 E122 U 8022202U 008 5/24/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR052L1062114100372 $27.33 000001066600-3562500480
2021 10 FD52 06 E111 U 8022202U 008 4/26/2021 3020 PREL ENGINEERING-UTILITIES CA-XR042L1062111308630 $800.78 000001065883-3562506208
2021 10 FD52 06 E111 U 8022202U 008 4/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308630 $612.59 000001065883-3562506208
2021 10 FD52 06 E121 U 8022202U 008 4/26/2021 3020 PREL ENGINEERING-UTILITIES CA-XR042L1062111308630 $60.17 000001065883-3562506208
2021 10 FD52 06 E121 U 8022202U 008 4/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308630 $46.03 000001065883-3562506208
2021 10 FD52 06 E122 U 8022202U 008 4/26/2021 3020 PREL ENGINEERING-UTILITIES CA-XR042L1062111308630 $676.09 000001065883-3562506208
2021 10 FD52 06 E122 U 8022202U 008 4/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308630 $517.21 000001065883-3562506208
2021 10 FD52 06 E123 U 8022202U 008 4/26/2021 3020 PREL ENGINEERING-UTILITIES CA-XR042L1062111308630 $32.75 000001065883-3562506208
2021 10 FD52 06 E123 U 8022202U 008 4/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308630 $22.72 000001065883-3562506208
2021 10 FD52 06 E124 U 8022202U 008 4/26/2021 3020 PREL ENGINEERING-UTILITIES CA-XR042L1062111308630 $0.34 000001065883-3562506208
2021 10 FD52 06 E124 U 8022202U 008 4/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308630 $0.26 000001065883-3562506208
2021 10 FD52 00 E111 U 8022202U 008 4/26/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR042L1062111308632 $177.49 000001066600-3562500480
2021 10 FD52 00 E111 U 8022202U 008 4/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308632 $38.14 000001066600-3562500480
2021 10 FD52 00 E121 U 8022202U 008 4/26/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR042L1062111308632 $12.40 000001066600-3562500480
2021 10 FD52 00 E121 U 8022202U 008 4/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308632 $2.71 000001066600-3562500480
2021 10 FD52 00 E122 U 8022202U 008 4/26/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR042L1062111308632 $149.78 000001066600-3562500480
2021 10 FD52 00 E122 U 8022202U 008 4/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308632 $32.21 000001066600-3562500480
2021 10 FD52 00 E123 U 8022202U 008 4/26/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR042L1062111308632 $33.18 000001066600-3562500480
2021 10 FD52 00 E123 U 8022202U 008 4/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308632 $5.65 000001066600-3562500480
2021 10 FD52 00 E124 U 8022202U 008 4/26/2021 3040 INSPECTION&SUPER-UTILITIES CA-XR042L1062111308632 $0.10 000001066600-3562500480
2021 6 FD52 06 E111 U 8022202U 008 12/23/2020 3020 PREL ENGINEERING-UTILITIES CA-XR122K1062035700378 $615.07 000001065883-3562506208
2021 6 FD52 06 E111 U 8022202U 008 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700378 $120.12 000001065883-3562506208
2021 6 FD52 06 E121 U 8022202U 008 12/23/2020 3020 PREL ENGINEERING-UTILITIES CA-XR122K1062035700378 $47.04 000001065883-3562506208
2021 6 FD52 06 E121 U 8022202U 008 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700378 $9.19 000001065883-3562506208
2021 6 FD52 06 E122 U 8022202U 008 12/23/2020 3020 PREL ENGINEERING-UTILITIES CA-XR122K1062035700378 $519.15 000001065883-3562506208
2021 6 FD52 06 E122 U 8022202U 008 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700378 $101.42 000001065883-3562506208
2021 6 FD52 06 E123 U 8022202U 008 12/23/2020 3020 PREL ENGINEERING-UTILITIES CA-XR122K1062035700378 $24.38 000001065883-3562506208
2021 6 FD52 06 E123 U 8022202U 008 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700378 $4.46 000001065883-3562506208
2021 6 FD52 06 E124 U 8022202U 008 12/23/2020 3020 PREL ENGINEERING-UTILITIES CA-XR122K1062035700378 $0.26 000001065883-3562506208
2021 6 FD52 06 E124 U 8022202U 008 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700378 $0.05 000001065883-3562506208
2021 6 FD52 06 E111 U 8022202U 008 12/9/2020 3020 PREL ENGINEERING-UTILITIES CA-XR121K1062034309695 $771.88 000001065883-3562506208
2021 6 FD52 06 E111 U 8022202U 008 12/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309695 $263.97 000001065883-3562506208
2021 6 FD52 06 E121 U 8022202U 008 12/9/2020 3020 PREL ENGINEERING-UTILITIES CA-XR121K1062034309695 $59.07 000001065883-3562506208
2021 6 FD52 06 E121 U 8022202U 008 12/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309695 $20.19 000001065883-3562506208
2021 6 FD52 06 E122 U 8022202U 008 12/9/2020 3020 PREL ENGINEERING-UTILITIES CA-XR121K1062034309695 $651.95 000001065883-3562506208
2021 6 FD52 06 E122 U 8022202U 008 12/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309695 $222.87 000001065883-3562506208
2021 6 FD52 06 E123 U 8022202U 008 12/9/2020 3020 PREL ENGINEERING-UTILITIES CA-XR121K1062034309695 $30.87 000001065883-3562506208
2021 6 FD52 06 E123 U 8022202U 008 12/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309695 $9.79 000001065883-3562506208
2021 5 FD52 06 E111 U 8022202U 008 11/23/2020 3020 PREL ENGINEERING-UTILITIES CA-XR112K1062032508754 $1,494.30 000001065883-3562506208
2021 5 FD52 06 E111 U 8022202U 008 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508754 $543.29 000001065883-3562506208
2021 5 FD52 06 E121 U 8022202U 008 11/23/2020 3020 PREL ENGINEERING-UTILITIES CA-XR112K1062032508754 $114.32 000001065883-3562506208
2021 5 FD52 06 E121 U 8022202U 008 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508754 $41.57 000001065883-3562506208
2021 5 FD52 06 E122 U 8022202U 008 11/23/2020 3020 PREL ENGINEERING-UTILITIES CA-XR112K1062032508754 $1,261.65 000001065883-3562506208
2021 5 FD52 06 E122 U 8022202U 008 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508754 $458.70 000001065883-3562506208
2021 5 FD52 06 E123 U 8022202U 008 11/23/2020 3020 PREL ENGINEERING-UTILITIES CA-XR112K1062032508754 $59.81 000001065883-3562506208
2021 5 FD52 06 E123 U 8022202U 008 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508754 $20.15 000001065883-3562506208
2021 5 FD52 06 E124 U 8022202U 008 11/23/2020 3020 PREL ENGINEERING-UTILITIES CA-XR112K1062032508754 $0.63 000001065883-3562506208
2021 5 FD52 06 E124 U 8022202U 008 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508754 $0.23 000001065883-3562506208
2021 4 FD52 06 E111 U 8022202U 008 10/26/2020 3020 PREL ENGINEERING-UTILITIES CA-XR102K1062029706697 $214.49 000001065883-3562506208
2021 4 FD52 06 E111 U 8022202U 008 10/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102K1062029706697 $143.00 000001065883-3562506208
2021 4 FD52 06 E121 U 8022202U 008 10/26/2020 3020 PREL ENGINEERING-UTILITIES CA-XR102K1062029706697 $16.41 000001065883-3562506208
2021 4 FD52 06 E121 U 8022202U 008 10/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102K1062029706697 $10.94 000001065883-3562506208
2021 4 FD52 06 E122 U 8022202U 008 10/26/2020 3020 PREL ENGINEERING-UTILITIES CA-XR102K1062029706697 $181.09 000001065883-3562506208
2021 4 FD52 06 E122 U 8022202U 008 10/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102K1062029706697 $120.73 000001065883-3562506208
2021 4 FD52 06 E123 U 8022202U 008 10/26/2020 3020 PREL ENGINEERING-UTILITIES CA-XR102K1062029706697 $8.72 000001065883-3562506208
2021 4 FD52 06 E123 U 8022202U 008 10/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102K1062029706697 $5.30 000001065883-3562506208
2021 4 FD52 06 E124 U 8022202U 008 10/26/2020 3020 PREL ENGINEERING-UTILITIES CA-XR102K1062029706697 $0.09 000001065883-3562506208
2021 4 FD52 06 E124 U 8022202U 008 10/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102K1062029706697 $0.06 000001065883-3562506208
2021 4 FD52 06 E111 U 8022202U 008 10/12/2020 3020 PREL ENGINEERING-UTILITIES CA-XR101K1062028205680 $586.21 000001065883-3562506208
2021 4 FD52 06 E111 U 8022202U 008 10/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101K1062028205680 $14.59 000001065883-3562506208
2021 4 FD52 06 E121 U 8022202U 008 10/12/2020 3020 PREL ENGINEERING-UTILITIES CA-XR101K1062028205680 $44.85 000001065883-3562506208
2021 4 FD52 06 E121 U 8022202U 008 10/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101K1062028205680 $1.11 000001065883-3562506208
2021 4 FD52 06 E122 U 8022202U 008 10/12/2020 3020 PREL ENGINEERING-UTILITIES CA-XR101K1062028205680 $495.00 000001065883-3562506208
2021 4 FD52 06 E122 U 8022202U 008 10/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101K1062028205680 $12.32 000001065883-3562506208
2021 4 FD52 06 E123 U 8022202U 008 10/12/2020 3020 PREL ENGINEERING-UTILITIES CA-XR101K1062028205680 $23.03 000001065883-3562506208
2021 4 FD52 06 E123 U 8022202U 008 10/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101K1062028205680 $0.54 000001065883-3562506208
2021 3 FD52 06 E111 U 8022202U 008 9/24/2020 3020 PREL ENGINEERING-UTILITIES CA-XR092K1062026704591 $300.24 000001065883-3562506208
2021 3 FD52 06 E111 U 8022202U 008 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704591 $51.19 000001065883-3562506208
2021 3 FD52 06 E121 U 8022202U 008 9/24/2020 3020 PREL ENGINEERING-UTILITIES CA-XR092K1062026704591 $22.98 000001065883-3562506208
2021 3 FD52 06 E121 U 8022202U 008 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704591 $3.92 000001065883-3562506208
2021 3 FD52 06 E122 U 8022202U 008 9/24/2020 3020 PREL ENGINEERING-UTILITIES CA-XR092K1062026704591 $253.54 000001065883-3562506208
2021 3 FD52 06 E122 U 8022202U 008 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704591 $43.22 000001065883-3562506208
2021 3 FD52 06 E123 U 8022202U 008 9/24/2020 3020 PREL ENGINEERING-UTILITIES CA-XR092K1062026704591 $11.90 000001065883-3562506208
2021 3 FD52 06 E123 U 8022202U 008 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704591 $1.90 000001065883-3562506208
2021 3 FD52 06 E124 U 8022202U 008 9/24/2020 3020 PREL ENGINEERING-UTILITIES CA-XR092K1062026704591 $0.13 000001065883-3562506208
2021 3 FD52 06 E124 U 8022202U 008 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704591 $0.02 000001065883-3562506208
2021 3 FD52 00 E111 U 8022202U 008 9/10/2020 3040 INSPECTION&SUPER-UTILITIES CA-XR091K1062025303606 $157.51 000001066600-3562500480
2021 3 FD52 00 E111 U 8022202U 008 9/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091K1062025303606 $22.94 000001066600-3562500480
2021 3 FD52 00 E121 U 8022202U 008 9/10/2020 3040 INSPECTION&SUPER-UTILITIES CA-XR091K1062025303606 $11.19 000001066600-3562500480
2021 3 FD52 00 E121 U 8022202U 008 9/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091K1062025303606 $1.63 000001066600-3562500480
2021 3 FD52 00 E122 U 8022202U 008 9/10/2020 3040 INSPECTION&SUPER-UTILITIES CA-XR091K1062025303606 $132.93 000001066600-3562500480
2021 3 FD52 00 E122 U 8022202U 008 9/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091K1062025303606 $19.37 000001066600-3562500480
2021 3 FD52 00 E123 U 8022202U 008 9/10/2020 3040 INSPECTION&SUPER-UTILITIES CA-XR091K1062025303606 $15.92 000001066600-3562500480
2021 3 FD52 00 E123 U 8022202U 008 9/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091K1062025303606 $2.28 000001066600-3562500480
2021 3 FD52 06 E111 U 8022202U 008 9/10/2020 3020 PREL ENGINEERING-UTILITIES CA-XR091K1062025303604 $1,141.03 000001065883-3562506208
2021 3 FD52 06 E111 U 8022202U 008 9/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091K1062025303604 $67.49 000001065883-3562506208
2021 3 FD52 06 E121 U 8022202U 008 9/10/2020 3020 PREL ENGINEERING-UTILITIES CA-XR091K1062025303604 $86.15 000001065883-3562506208
2021 3 FD52 06 E121 U 8022202U 008 9/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091K1062025303604 $5.16 000001065883-3562506208
2021 3 FD52 06 E122 U 8022202U 008 9/10/2020 3020 PREL ENGINEERING-UTILITIES CA-XR091K1062025303604 $963.42 000001065883-3562506200
2021 3 FD52 06 E122 U 8022202U 008 9/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091K1062025303604 $56.98 000001065883-3562506208
2021 3 FD52 06 E123 U 8022202U 008 9/10/2020 3020 PREL ENGINEERING-UTILITIES CA-XR091K1062025303604 $95.67 000001065883-3562506208
2021 3 FD52 06 E123 U 8022202U 008 9/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091K1062025303604 $2.50 000001065883-3562506208
2021 2 FD52 06 E111 U 8022202U 008 8/24/2020 3020 PREL ENGINEERING-UTILITIES CA-XR082K1062023402522 $2,767.27 000001065883-3562506200
2021 2 FD52 06 E111 U 8022202U 008 8/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082K1062023402522 $113.93 000001065883-3562506200
2021 2 FD52 06 E121 U 8022202U 008 8/24/2020 3020 PREL ENGINEERING-UTILITIES CA-XR082K1062023402522 $207.69 000001065883-3562506200
2021 2 FD52 06 E121 U 8022202U 008 8/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082K1062023402522 $8.22 000001065883-3562506200
2021 2 FD52 06 E122 U 8022202U 008 8/24/2020 3020 PREL ENGINEERING-UTILITIES CA-XR082K1062023402522 $2,336.39 000001065883-3562506200
2021 2 FD52 06 E122 U 8022202U 008 8/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082K1062023402522 $96.19 000001065883-3562506200
2021 2 FD52 06 E123 U 8022202U 008 8/24/2020 3020 PREL ENGINEERING-UTILITIES CA-XR082K1062023402522 $333.98 000001065883-3562506200
2021 2 FD52 06 E123 U 8022202U 008 8/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082K1062023402522 $28.29 000001065883-3562506200
2021 2 FD52 06 E124 U 8022202U 008 8/24/2020 3020 PREL ENGINEERING-UTILITIES CA-XR082K1062023402522 $0.79 000001065883-3562506200
2021 2 FD52 06 E124 U 8022202U 008 8/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082K1062023402522 $0.09 000001065883-3562506200
2021 2 FD52 06 E111 U 8022202U 008 8/10/2020 3020 PREL ENGINEERING-UTILITIES CA-XR081K1062022001432 $160.43 000001065883-3562506208
2021 2 FD52 06 E121 U 8022202U 008 8/10/2020 3020 PREL ENGINEERING-UTILITIES CA-XR081K1062022001432 $11.99 000001065883-3562506208
2021 2 FD52 06 E122 U 8022202U 008 8/10/2020 3020 PREL ENGINEERING-UTILITIES CA-XR081K1062022001432 $135.45 000001065883-3562506208
2021 2 FD52 06 E123 U 8022202U 008 8/10/2020 3020 PREL ENGINEERING-UTILITIES CA-XR081K1062022001432 $27.92 000001065883-3562506208
2021 1 FD52 06 E111 U 8022202U 059 7/27/2020 4260 SIGNAL PLANS-TRAF CA-XR072K1062020600351 $64.62 000001071381-3562500463
2021 1 FD52 06 E111 U 8022202U 059 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600351 $15.09 000001071381-3562500463
2021 1 FD52 06 E121 U 8022202U 059 7/27/2020 4260 SIGNAL PLANS-TRAF CA-XR072K1062020600351 $4.89 000001071381-3562500463
2021 1 FD52 06 E121 U 8022202U 059 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600351 $1.15 000001071381-3562500463
2021 1 FD52 06 E122 U 8022202U 059 7/27/2020 4260 SIGNAL PLANS-TRAF CA-XR072K1062020600351 $54.61 000001071381-3562500463
2021 1 FD52 06 E122 U 8022202U 059 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600351 $12.74 000001071381-3562500463
2021 1 FD52 06 E123 U 8022202U 059 7/27/2020 4260 SIGNAL PLANS-TRAF CA-XR072K1062020600351 $6.82 000001071381-3562500463
2021 1 FD52 06 E123 U 8022202U 059 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600351 $1.57 000001071381-3562500463
2021 1 FD52 06 E124 U 8022202U 059 7/27/2020 4260 SIGNAL PLANS-TRAF CA-XR072K1062020600351 $0.02 000001071381-3562500463
2021 1 FD52 06 E111 U 8022202U 008 7/27/2020 3020 PREL ENGINEERING-UTILITIES CA-XR072K1062020600336 $1,068.36 000001065883-3562506208
2021 1 FD52 06 E111 U 8022202U 008 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600336 $151.89 000001065883-3562506208
2021 1 FD52 06 E121 U 8022202U 008 7/27/2020 3020 PREL ENGINEERING-UTILITIES CA-XR072K1062020600336 $81.20 000001065883-3562506208
2021 1 FD52 06 E121 U 8022202U 008 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600336 $11.57 000001065883-3562506208
2021 1 FD52 06 E122 U 8022202U 008 7/27/2020 3020 PREL ENGINEERING-UTILITIES CA-XR072K1062020600336 $901.86 000001065883-3562506208
2021 1 FD52 06 E122 U 8022202U 008 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600336 $128.25 000001065883-3562506208
2021 1 FD52 06 E123 U 8022202U 008 7/27/2020 3020 PREL ENGINEERING-UTILITIES CA-XR072K1062020600336 $113.04 000001065883-3562506208
2021 1 FD52 06 E123 U 8022202U 008 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600336 $14.82 000001065883-3562506208
2021 1 FD52 06 E124 U 8022202U 008 7/27/2020 3020 PREL ENGINEERING-UTILITIES CA-XR072K1062020600336 $0.51 000001065883-3562506208
2021 1 FD52 06 E124 U 8022202U 008 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600336 $0.07 000001065883-3562506208
2021 1 FD52 06 E111 U 8022202U 008 7/9/2020 3020 PREL ENGINEERING-UTILITIES CA-XR071K1062019009314 $719.05 000001065883-3562506208
2021 1 FD52 06 E111 U 8022202U 008 7/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071K1062019009314 $33.55 000001065883-3562506208
2021 1 FD52 06 E121 U 8022202U 008 7/9/2020 3020 PREL ENGINEERING-UTILITIES CA-XR071K1062019009314 $53.19 000001065883-3562506208
2021 1 FD52 06 E121 U 8022202U 008 7/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071K1062019009314 $2.53 000001065883-3562506208
2021 1 FD52 06 E122 U 8022202U 008 7/9/2020 3020 PREL ENGINEERING-UTILITIES CA-XR071K1062019009314 $599.91 000001065883-3562506208
2021 1 FD52 06 E122 U 8022202U 008 7/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071K1062019009314 $27.99 000001065883-3562506208
2021 1 FD52 06 E123 U 8022202U 008 7/9/2020 3020 PREL ENGINEERING-UTILITIES CA-XR071K1062019009314 $54.30 000001065883-3562506208
2021 1 FD52 06 E123 U 8022202U 008 7/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071K1062019009314 $1.73 000001065883-3562506208
2021 1 FD52 06 E111 U 8022202U 008 7/8/2020 3020 PREL ENGINEERING-UTILITIES CA-XR062K1062017108293 $686.39 000001065883-3562506208
2021 1 FD52 06 E111 U 8022202U 008 7/8/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108293 $73.78 000001065883-3562506208
2021 1 FD52 06 E121 U 8022202U 008 7/8/2020 3020 PREL ENGINEERING-UTILITIES CA-XR062K1062017108293 $52.50 000001065883-3562506208
2021 1 FD52 06 E121 U 8022202U 008 7/8/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108293 $5.64 000001065883-3562506208
2021 1 FD52 06 E122 U 8022202U 008 7/8/2020 3020 PREL ENGINEERING-UTILITIES CA-XR062K1062017108293 $572.64 000001065883-3562506208
2021 1 FD52 06 E122 U 8022202U 008 7/8/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108293 $61.56 000001065883-3562506208
2021 1 FD52 06 E123 U 8022202U 008 7/8/2020 3020 PREL ENGINEERING-UTILITIES CA-XR062K1062017108293 $27.09 000001065883-3562506208
2021 1 FD52 06 E123 U 8022202U 008 7/8/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108293 $2.74 000001065883-3562506208
2021 1 FD52 06 E124 U 8022202U 008 7/8/2020 3020 PREL ENGINEERING-UTILITIES CA-XR062K1062017108293 $0.29 000001065883-3562506208
2021 1 FD52 06 E124 U 8022202U 008 7/8/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108293 $0.04 000001065883-3562506208
2021 1 FD52 06 E123 U 8022202U 008 7/6/2020 3020 PREL ENGINEERING-UTILITIES CA-XR061K1062016107381P $14.99 000001065883-3562506208
2021 1 FD52 06 E123 U 8022202U 008 7/6/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061K1062016107381P $3.06 000001065883-3562506208
2020 12 FD52 06 E229 U 8022202U 008 6/15/2020 3020 PREL ENGINEERING-UTILITIES IET-XE13C162520041017470 ($7.60)
2020 12 FD52 06 E111 U 8022202U 008 6/10/2020 3020 PREL ENGINEERING-UTILITIES CA-XR061K1062016107381 $359.53 000001065883-3562506208
2020 12 FD52 06 E111 U 8022202U 008 6/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061K1062016107381 $78.79 000001065883-3562506208
2020 12 FD52 06 E121 U 8022202U 008 6/10/2020 3020 PREL ENGINEERING-UTILITIES CA-XR061K1062016107381 $27.50 000001065883-3562506208
2020 12 FD52 06 E121 U 8022202U 008 6/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061K1062016107381 $6.02 000001065883-3562506208
2020 12 FD52 06 E122 U 8022202U 008 6/10/2020 3020 PREL ENGINEERING-UTILITIES CA-XR061K1062016107381 $299.96 000001065883-3562506208
2020 12 FD52 06 E122 U 8022202U 008 6/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061K1062016107381 $65.73 000001065883-3562506208
2020 11 FD52 06 E111 U 8022202U 008 5/26/2020 3020 PREL ENGINEERING-UTILITIES CA-XR052K1062014306394 $108.95 000001065883-3562506208
2020 11 FD52 06 E121 U 8022202U 008 5/26/2020 3020 PREL ENGINEERING-UTILITIES CA-XR052K1062014306394 $8.33 000001065883-3562506208
2020 11 FD52 06 E122 U 8022202U 008 5/26/2020 3020 PREL ENGINEERING-UTILITIES CA-XR052K1062014306394 $90.90 000001065883-3562506208
2020 11 FD52 06 E123 U 8022202U 008 5/26/2020 3020 PREL ENGINEERING-UTILITIES CA-XR052K1062014306394 $4.49 000001065883-3562506208
2020 11 FD52 06 E124 U 8022202U 008 5/26/2020 3020 PREL ENGINEERING-UTILITIES CA-XR052K1062014306394 $0.05 000001065883-3562506208
2020 11 FD52 06 E111 U 8022202U 008 5/11/2020 3020 PREL ENGINEERING-UTILITIES CA-XR051K1062012905489 $618.39 000001065883-3562506208
2020 11 FD52 06 E121 U 8022202U 008 5/11/2020 3020 PREL ENGINEERING-UTILITIES CA-XR051K1062012905489 $46.23 000001065883-3562506208
2020 11 FD52 06 E122 U 8022202U 008 5/11/2020 3020 PREL ENGINEERING-UTILITIES CA-XR051K1062012905489 $515.92 000001065883-3562506208
2020 11 FD52 06 E123 U 8022202U 008 5/11/2020 3020 PREL ENGINEERING-UTILITIES CA-XR051K1062012905489 $107.64 000001065883-3562506208
2020 10 FD52 06 E111 U 8022202U 008 4/27/2020 3020 PREL ENGINEERING-UTILITIES CA-XR042K1062011504447 $350.03 000001065883-3562506208
2020 10 FD52 06 E111 U 8022202U 008 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504447 $16.57 000001065883-3562506208
2020 10 FD52 06 E121 U 8022202U 008 4/27/2020 3020 PREL ENGINEERING-UTILITIES CA-XR042K1062011504447 $26.42 000001065883-3562506208
2020 10 FD52 06 E121 U 8022202U 008 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504447 $1.25 000001065883-3562506208
2020 10 FD52 06 E122 U 8022202U 008 4/27/2020 3020 PREL ENGINEERING-UTILITIES CA-XR042K1062011504447 $292.03 000001065883-3562506208
2020 10 FD52 06 E122 U 8022202U 008 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504447 $13.82 000001065883-3562506208
2020 10 FD52 06 E123 U 8022202U 008 4/27/2020 3020 PREL ENGINEERING-UTILITIES CA-XR042K1062011504447 $60.97 000001065883-3562506208
2020 10 FD52 06 E123 U 8022202U 008 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504447 $2.84 000001065883-3562506208
2020 10 FD52 06 E124 U 8022202U 008 4/27/2020 3020 PREL ENGINEERING-UTILITIES CA-XR042K1062011504447 $0.18 000001065883-3562506208
2020 10 FD52 06 E124 U 8022202U 008 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504447 $0.01 000001065883-3562506208
2020 10 FD52 06 E111 U 8022202U 008 4/9/2020 3020 PREL ENGINEERING-UTILITIES CA-XR041K1062009903461 $381.19 000001065883-3562506208
2020 10 FD52 06 E111 U 8022202U 008 4/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041K1062009903461 $23.00 000001065883-3562506208
2020 10 FD52 06 E121 U 8022202U 008 4/9/2020 3020 PREL ENGINEERING-UTILITIES CA-XR041K1062009903461 $28.20 000001065883-3562506202
2020 10 FD52 06 E121 U 8022202U 008 4/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041K1062009903461 $1.73 000001065883-3562506202
2020 10 FD52 06 E122 U 8022202U 008 4/9/2020 3020 PREL ENGINEERING-UTILITIES CA-XR041K1062009903461 $318.04 000001065883-3562506208
2020 10 FD52 06 E122 U 8022202U 008 4/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041K1062009903461 $19.19 000001065883-3562506208
2020 10 FD52 06 E123 U 8022202U 008 4/9/2020 3020 PREL ENGINEERING-UTILITIES CA-XR041K1062009903461 $31.94 000001065883-3562506202
2020 10 FD52 06 E123 U 8022202U 008 4/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041K1062009903461 $1.36 000001065883-3562506208
2020 9 FD52 06 E111 U 8022202U 008 3/25/2020 3020 PREL ENGINEERING-UTILITIES CA-XR032K1062008402477 $449.41 000001065883-3562506208
2020 9 FD52 06 E111 U 8022202U 008 3/25/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032K1062008402477 $53.63 000001065883-3562506208
2020 9 FD52 06 E121 U 8022202U 008 3/25/2020 3020 PREL ENGINEERING-UTILITIES CA-XR032K1062008402477 $34.38 000001065883-3562506208
2020 9 FD52 06 E121 U 8022202U 008 3/25/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032K1062008402477 $4.11 000001065883-3562506208
2020 9 FD52 06 E122 U 8022202U 008 3/25/2020 3020 PREL ENGINEERING-UTILITIES CA-XR032K1062008402477 $374.94 000001065883-3562506208
2020 9 FD52 06 E122 U 8022202U 008 3/25/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032K1062008402477 $44.74 000001065883-3562506208
2020 9 FD52 06 E123 U 8022202U 008 3/25/2020 3020 PREL ENGINEERING-UTILITIES CA-XR032K1062008402477 $18.64 000001065883-3562506208
2020 9 FD52 06 E123 U 8022202U 008 3/25/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032K1062008402477 $2.09 000001065883-3562506208
2020 9 FD52 06 E124 U 8022202U 008 3/25/2020 3020 PREL ENGINEERING-UTILITIES CA-XR032K1062008402477 $0.20 000001065883-3562506208
2020 9 FD52 06 E124 U 8022202U 008 3/25/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032K1062008402477 $0.02 000001065883-3562506208
2020 9 FD52 06 E229 U 8022202U 008 3/11/2020 3020 PREL ENGINEERING-UTILITIES IET-XE13A162520070013930 $10.64
2020 9 FD52 06 E111 U 8022202U 008 3/9/2020 3020 PREL ENGINEERING-UTILITIES CA-XR031K1062006601519 $1,352.58 000001065883-3562506204
2020 9 FD52 06 E111 U 8022202U 008 3/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031K1062006601519 $125.54 000001065883-3562506204
2020 9 FD52 06 E121 U 8022202U 008 3/9/2020 3020 PREL ENGINEERING-UTILITIES CA-XR031K1062006601519 $101.74 000001065883-3562506204
2020 9 FD52 06 E121 U 8022202U 008 3/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031K1062006601519 $9.13 000001065883-3562506204
2020 9 FD52 06 E122 U 8022202U 008 3/9/2020 3020 PREL ENGINEERING-UTILITIES CA-XR031K1062006601519 $1,128.45 000001065883-3562506204
2020 9 FD52 06 E122 U 8022202U 008 3/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031K1062006601519 $104.74 000001065883-3562506204
2020 9 FD52 06 E123 U 8022202U 008 3/9/2020 3020 PREL ENGINEERING-UTILITIES CA-XR031K1062006601519 $123.51 000001065883-3562506208
2020 9 FD52 06 E123 U 8022202U 008 3/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031K1062006601519 $23.57 000001065883-3562506204
2020 8 FD52 06 E229 U 8022202U 008 2/11/2020 3020 PREL ENGINEERING-UTILITIES IET-XE13A162520041017470 $7.60
2020 8 FD52 06 E111 U 8022202U 008 2/10/2020 3020 PREL ENGINEERING-UTILITIES CA-XR021K1062003809871 $445.68 000001065883-3562506204
2020 8 FD52 06 E111 U 8022202U 008 2/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021K1062003809871 $104.46 000001065883-3562506204
2020 8 FD52 06 E121 U 8022202U 008 2/10/2020 3020 PREL ENGINEERING-UTILITIES CA-XR021K1062003809871 $33.10 000001065883-3562506208
2020 8 FD52 06 E121 U 8022202U 008 2/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021K1062003809871 $7.66 000001065883-3562506208
2020 8 FD52 06 E122 U 8022202U 008 2/10/2020 3020 PREL ENGINEERING-UTILITIES CA-XR021K1062003809871 $371.80 000001065883-3562506204
2020 8 FD52 06 E122 U 8022202U 008 2/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021K1062003809871 $87.15 000001065883-3562506204
2020 8 FD52 06 E123 U 8022202U 008 2/10/2020 3020 PREL ENGINEERING-UTILITIES CA-XR021K1062003809871 $57.03 000001065883-3562506208
2020 8 FD52 06 E123 U 8022202U 008 2/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021K1062003809871 $17.09 000001065883-3562506204
2020 7 FD52 06 E121 U 8022202U 008 1/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012K1062002308825 $7.99 000001065883-3562506208
2020 7 FD52 06 E229 U 8022202U 008 1/27/2020 3020 PREL ENGINEERING-UTILITIES IET-XE13A162520025015150 $7.60
2020 7 FD52 06 E122 U 8022202U 008 1/27/2020 3020 PREL ENGINEERING-UTILITIES CA-XR012K1062002308825 $683.35 000001065883-3562506208
2020 7 FD52 06 E122 U 8022202U 008 1/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012K1062002308825 $88.53 000001065883-3562506204
2020 7 FD52 06 E123 U 8022202U 008 1/27/2020 3020 PREL ENGINEERING-UTILITIES CA-XR012K1062002308825 $64.65 000001065883-3562506204
2020 7 FD52 06 E123 U 8022202U 008 1/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012K1062002308825 $10.81 000001065883-3562506204
2020 7 FD52 06 E124 U 8022202U 008 1/27/2020 3020 PREL ENGINEERING-UTILITIES CA-XR012K1062002308825 $0.36 000001065883-3562506208
2020 7 FD52 06 E124 U 8022202U 008 1/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012K1062002308825 $0.05 000001065883-3562506204
2020 7 FD52 06 E111 U 8022202U 008 1/27/2020 3020 PREL ENGINEERING-UTILITIES CA-XR012K1062002308824 $819.08 000001065883-3562506208
2020 7 FD52 06 E111 U 8022202U 008 1/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012K1062002308824 $106.11 000001065883-3562506204
2020 7 FD52 06 E121 U 8022202U 008 1/27/2020 3020 PREL ENGINEERING-UTILITIES CA-XR012K1062002308824 $62.07 000001065883-3562506208
2020 7 FD52 06 E123 U 8022202U 008 1/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011K1062000807908 $10.41 000001065883-3562506208
2020 7 FD52 06 E111 U 8022202U 008 1/9/2020 3020 PREL ENGINEERING-UTILITIES CA-XR011K1062000807908 $374.50 000001065883-3562506208
2020 7 FD52 06 E111 U 8022202U 008 1/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011K1062000807908 $267.40 000001065883-3562506208
2020 7 FD52 06 E121 U 8022202U 008 1/9/2020 3020 PREL ENGINEERING-UTILITIES CA-XR011K1062000807908 $28.65 000001065883-3562506208
2020 7 FD52 06 E121 U 8022202U 008 1/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011K1062000807908 $20.44 000001065883-3562506208
2020 7 FD52 06 E122 U 8022202U 008 1/9/2020 3020 PREL ENGINEERING-UTILITIES CA-XR011K1062000807908 $312.43 000001065883-3562506208
2020 7 FD52 06 E122 U 8022202U 008 1/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011K1062000807908 $223.10 000001065883-3562506208
2020 7 FD52 06 E123 U 8022202U 008 1/9/2020 3020 PREL ENGINEERING-UTILITIES CA-XR011K1062000807908 $16.04 000001065883-3562506208
2020 6 FD52 06 E111 U 8022202U 008 12/23/2019 3020 PREL ENGINEERING-UTILITIES CA-XR122J1061935406850 $224.56 000001065883-3562506208
2020 6 FD52 06 E111 U 8022202U 008 12/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122J1061935406850 $112.66 000001065883-3562506208
2020 6 FD52 06 E121 U 8022202U 008 12/23/2019 3020 PREL ENGINEERING-UTILITIES CA-XR122J1061935406850 $17.19 000001065883-3562506208
2020 6 FD52 06 E121 U 8022202U 008 12/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122J1061935406850 $8.63 000001065883-3562506208
2020 6 FD52 06 E122 U 8022202U 008 12/23/2019 3020 PREL ENGINEERING-UTILITIES CA-XR122J1061935406850 $187.47 000001065883-3562506208
2020 6 FD52 06 E122 U 8022202U 008 12/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122J1061935406850 $93.99 000001065883-3562506208
2020 6 FD52 06 E123 U 8022202U 008 12/23/2019 3020 PREL ENGINEERING-UTILITIES CA-XR122J1061935406850 $9.51 000001065883-3562506208
2020 6 FD52 06 E123 U 8022202U 008 12/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122J1061935406850 $4.38 000001065883-3562506208
2020 6 FD52 06 E124 U 8022202U 008 12/23/2019 3020 PREL ENGINEERING-UTILITIES CA-XR122J1061935406850 $0.10 000001065883-3562506208
2020 6 FD52 06 E124 U 8022202U 008 12/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122J1061935406850 $0.06 000001065883-3562506208
2020 6 FD52 06 E111 U 8022202U 008 12/9/2019 3020 PREL ENGINEERING-UTILITIES CA-XR121J1061934005867 $399.36 000001065883-3562506208
2020 6 FD52 06 E111 U 8022202U 008 12/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121J1061934005867 $108.43 000001065883-3562506208
2020 6 FD52 06 E121 U 8022202U 008 12/9/2019 3020 PREL ENGINEERING-UTILITIES CA-XR121J1061934005867 $30.56 000001065883-3562506208
2020 6 FD52 06 E121 U 8022202U 008 12/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121J1061934005867 $8.29 000001065883-3562506208
2020 6 FD52 06 E122 U 8022202U 008 12/9/2019 3020 PREL ENGINEERING-UTILITIES CA-XR121J1061934005867 $333.28 000001065883-3562506208
2020 6 FD52 06 E122 U 8022202U 008 12/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121J1061934005867 $90.46 000001065883-3562506208
2020 6 FD52 06 E123 U 8022202U 008 12/9/2019 3020 PREL ENGINEERING-UTILITIES CA-XR121J1061934005867 $17.54 000001065883-3562506208
2020 6 FD52 06 E123 U 8022202U 008 12/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121J1061934005867 $4.43 000001065883-3562506208
2020 5 FD52 06 E229 U 8022202U 008 11/26/2019 3020 PREL ENGINEERING-UTILITIES IET-XE13A162519329018380 $12.16
2020 5 FD52 06 E111 U 8022202U 008 11/22/2019 3020 PREL ENGINEERING-UTILITIES CA-XR112J1061932504740 $389.05 000001065883-3562506208
2020 5 FD52 06 E111 U 8022202U 008 11/22/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112J1061932504740 $112.57 000001065883-3562506208
2020 5 FD52 06 E121 U 8022202U 008 11/22/2019 3020 PREL ENGINEERING-UTILITIES CA-XR112J1061932504740 $29.77 000001065883-3562506208
2020 5 FD52 06 E121 U 8022202U 008 11/22/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112J1061932504740 $8.61 000001065883-3562506208
2020 5 FD52 06 E122 U 8022202U 008 11/22/2019 3020 PREL ENGINEERING-UTILITIES CA-XR112J1061932504740 $324.63 000001065883-3562506208
2020 5 FD52 06 E122 U 8022202U 008 11/22/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112J1061932504740 $93.92 000001065883-3562506208
2020 5 FD52 06 E123 U 8022202U 008 11/22/2019 3020 PREL ENGINEERING-UTILITIES CA-XR112J1061932504740 $17.10 000001065883-3562506208
2020 5 FD52 06 E123 U 8022202U 008 11/22/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112J1061932504740 $4.61 000001065883-3562506208
2020 5 FD52 06 E124 U 8022202U 008 11/22/2019 3020 PREL ENGINEERING-UTILITIES CA-XR112J1061932504740 $0.18 000001065883-3562506208
2020 5 FD52 06 E124 U 8022202U 008 11/22/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112J1061932504740 $0.05 000001065883-3562506208
2020 5 FD52 06 E111 U 8022202U 008 11/12/2019 3020 PREL ENGINEERING-UTILITIES CA-XR111J1061931103643 $428.02 000001065883-3562506208
2020 5 FD52 06 E111 U 8022202U 008 11/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111J1061931103643 $320.05 000001065883-3562506208
2020 5 FD52 06 E121 U 8022202U 008 11/12/2019 3020 PREL ENGINEERING-UTILITIES CA-XR111J1061931103643 $32.75 000001065883-3562506208
2020 5 FD52 06 E121 U 8022202U 008 11/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111J1061931103643 $24.48 000001065883-3562506208
2020 5 FD52 06 E122 U 8022202U 008 11/12/2019 3020 PREL ENGINEERING-UTILITIES CA-XR111J1061931103643 $357.09 000001065883-3562506208
2020 5 FD52 06 E122 U 8022202U 008 11/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111J1061931103643 $267.01 000001065883-3562506208
2020 5 FD52 06 E123 U 8022202U 008 11/12/2019 3020 PREL ENGINEERING-UTILITIES CA-XR111J1061931103643 $19.28 000001065883-3562506208
2020 5 FD52 06 E123 U 8022202U 008 11/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111J1061931103643 $13.08 000001065883-3562506208
2020 4 FD52 06 E121 U 8022202U 059 10/28/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102J1061929702562 $3.41 000001071381-3562500463
2020 4 FD52 06 E229 U 8022202U 008 10/28/2019 3020 PREL ENGINEERING-UTILITIES IET-XE13A162519298005680 $13.00
2020 4 FD52 06 E122 U 8022202U 059 10/28/2019 4260 SIGNAL PLANS-TRAF CA-XR102J1061929702562 $255.46 000001071381-3562500463
2020 4 FD52 06 E122 U 8022202U 059 10/28/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102J1061929702562 $37.88 000001071381-3562500463
2020 4 FD52 06 E123 U 8022202U 059 10/28/2019 4260 SIGNAL PLANS-TRAF CA-XR102J1061929702562 $31.61 000001071381-3562500463
2020 4 FD52 06 E123 U 8022202U 059 10/28/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102J1061929702562 $4.67 000001071381-3562500463
2020 4 FD52 06 E124 U 8022202U 059 10/28/2019 4260 SIGNAL PLANS-TRAF CA-XR102J1061929702562 $0.10 000001071381-3562500463
2020 4 FD52 06 E124 U 8022202U 059 10/28/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102J1061929702562 $0.01 000001071381-3562500463
2020 4 FD52 06 E111 U 8022202U 008 10/28/2019 3020 PREL ENGINEERING-UTILITIES CA-XR102J1061929702519 $557.80 000001065883-3562506208
2020 4 FD52 06 E111 U 8022202U 008 10/28/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102J1061929702519 $169.65 000001065883-3562506208
2020 4 FD52 06 E121 U 8022202U 008 10/28/2019 3020 PREL ENGINEERING-UTILITIES CA-XR102J1061929702519 $42.67 000001065883-3562506208
2020 4 FD52 06 E121 U 8022202U 008 10/28/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102J1061929702519 $12.98 000001065883-3562506208
2020 4 FD52 06 E122 U 8022202U 008 10/28/2019 3020 PREL ENGINEERING-UTILITIES CA-XR102J1061929702519 $465.30 000001065883-3562506208
2020 4 FD52 06 E122 U 8022202U 008 10/28/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102J1061929702519 $141.54 000001065883-3562506208
2020 4 FD52 06 E123 U 8022202U 008 10/28/2019 3020 PREL ENGINEERING-UTILITIES CA-XR102J1061929702519 $24.53 000001065883-3562506208
2020 4 FD52 06 E123 U 8022202U 008 10/28/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102J1061929702519 $6.94 000001065883-3562506208
2020 4 FD52 06 E124 U 8022202U 008 10/28/2019 3020 PREL ENGINEERING-UTILITIES CA-XR102J1061929702519 $0.26 000001065883-3562506208
2020 4 FD52 06 E124 U 8022202U 008 10/28/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102J1061929702519 $0.08 000001065883-3562506208
2020 4 FD52 06 E111 U 8022202U 059 10/28/2019 4260 SIGNAL PLANS-TRAF CA-XR102J1061929702561 $306.16 000001071381-3562500463
2020 4 FD52 06 E111 U 8022202U 059 10/28/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102J1061929702561 $45.41 000001071381-3562500463
2020 4 FD52 06 E121 U 8022202U 059 10/28/2019 4260 SIGNAL PLANS-TRAF CA-XR102J1061929702561 $23.07 000001071381-3562500463
2020 4 FD52 06 E229 U 8022202U 008 10/15/2019 3020 PREL ENGINEERING-UTILITIES IET-XE13A162519283005770 $13.00
2020 4 FD52 06 E111 U 8022202U 008 10/9/2019 3020 PREL ENGINEERING-UTILITIES CA-XR101J1061928101472 $544.79 000001065883-3562506208
2020 4 FD52 06 E111 U 8022202U 008 10/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101J1061928101472 $74.97 000001065883-3562506208
2020 4 FD52 06 E121 U 8022202U 008 10/9/2019 3020 PREL ENGINEERING-UTILITIES CA-XR101J1061928101472 $41.68 000001065883-3562506208
2020 4 FD52 06 E121 U 8022202U 008 10/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101J1061928101472 $5.74 000001065883-3562506208
2020 4 FD52 06 E122 U 8022202U 008 10/9/2019 3020 PREL ENGINEERING-UTILITIES CA-XR101J1061928101472 $454.48 000001065883-3562506208
2020 4 FD52 06 E122 U 8022202U 008 10/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101J1061928101472 $62.55 000001065883-3562506208
2020 4 FD52 06 E123 U 8022202U 008 10/9/2019 3020 PREL ENGINEERING-UTILITIES CA-XR101J1061928101472 $23.74 000001065883-3562506208
2020 4 FD52 06 E123 U 8022202U 008 10/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101J1061928101472 $3.06 000001065883-3562506208
2020 3 FD52 06 E111 U 8022202U 008 9/9/2019 3020 PREL ENGINEERING-UTILITIES CA-XR091J1061924909289 $136.24 000001065883-3562506208
2020 3 FD52 06 E111 U 8022202U 008 9/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909289 $21.53 000001065883-3562506208
2020 3 FD52 06 E121 U 8022202U 008 9/9/2019 3020 PREL ENGINEERING-UTILITIES CA-XR091J1061924909289 $10.42 000001065883-3562506208
2020 3 FD52 06 E121 U 8022202U 008 9/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909289 $1.64 000001065883-3562506208
2020 3 FD52 06 E122 U 8022202U 008 9/9/2019 3020 PREL ENGINEERING-UTILITIES CA-XR091J1061924909289 $113.83 000001065883-3562506208
2020 3 FD52 06 E122 U 8022202U 008 9/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909289 $17.96 000001065883-3562506208
2020 3 FD52 06 E123 U 8022202U 008 9/9/2019 3020 PREL ENGINEERING-UTILITIES CA-XR091J1061924909289 $5.97 000001065883-3562506208
2020 3 FD52 06 E123 U 8022202U 008 9/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909289 $0.88 000001065883-3562506208
2020 2 FD52 06 E229 U 8022202U 008 8/30/2019 3020 PREL ENGINEERING-UTILITIES IET-XE13A162519241003800 $16.50
2020 2 FD52 06 E111 U 8022202U 008 8/26/2019 3020 PREL ENGINEERING-UTILITIES CA-XR082J1061923508093 $693.81 000001065883-3562506208
2020 2 FD52 06 E111 U 8022202U 008 8/26/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082J1061923508093 $28.53 000001065883-3562506208
2020 2 FD52 06 E121 U 8022202U 008 8/26/2019 3020 PREL ENGINEERING-UTILITIES CA-XR082J1061923508093 $53.08 000001065883-3562506208
2020 2 FD52 06 E121 U 8022202U 008 8/26/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082J1061923508093 $2.18 000001065883-3562506208
2020 2 FD52 06 E122 U 8022202U 008 8/26/2019 3020 PREL ENGINEERING-UTILITIES CA-XR082J1061923508093 $578.91 000001065883-3562506208
2020 2 FD52 06 E122 U 8022202U 008 8/26/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082J1061923508093 $23.80 000001065883-3562506208
2020 2 FD52 06 E123 U 8022202U 008 8/26/2019 3020 PREL ENGINEERING-UTILITIES CA-XR082J1061923508093 $30.08 000001065883-3562506208
2020 2 FD52 06 E123 U 8022202U 008 8/26/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082J1061923508093 $1.17 000001065883-3562506208
2020 2 FD52 06 E124 U 8022202U 008 8/26/2019 3020 PREL ENGINEERING-UTILITIES CA-XR082J1061923508093 $0.32 000001065883-3562506208
2020 2 FD52 06 E124 U 8022202U 008 8/26/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082J1061923508093 $0.01 000001065883-3562506208
2020 2 FD52 06 E229 U 8022202U 008 8/22/2019 3020 PREL ENGINEERING-UTILITIES IET-XE13A162519233009600 $9.00
2020 2 FD52 06 E111 U 8022202U 008 8/12/2019 3020 PREL ENGINEERING-UTILITIES CA-XR081J1061922106926 $534.85 000001065883-3562506208
2020 2 FD52 06 E111 U 8022202U 008 8/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081J1061922106926 $102.96 000001065883-3562506208
2020 2 FD52 06 E121 U 8022202U 008 8/12/2019 3020 PREL ENGINEERING-UTILITIES CA-XR081J1061922106926 $40.93 000001065883-3562506208
2020 2 FD52 06 E121 U 8022202U 008 8/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081J1061922106926 $7.87 000001065883-3562506208
2020 2 FD52 06 E122 U 8022202U 008 8/12/2019 3020 PREL ENGINEERING-UTILITIES CA-XR081J1061922106926 $445.96 000001065883-3562506208
2020 2 FD52 06 E122 U 8022202U 008 8/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081J1061922106926 $85.90 000001065883-3562506208
2020 2 FD52 06 E123 U 8022202U 008 8/12/2019 3020 PREL ENGINEERING-UTILITIES CA-XR081J1061922106926 $23.38 000001065883-3562506208
2020 2 FD52 06 E123 U 8022202U 008 8/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081J1061922106926 $4.21 000001065883-3562506208
2020 1 FD52 06 E111 U 8022202U 008 7/24/2019 3020 PREL ENGINEERING-UTILITIES CA-XR072J1061920405817 $502.34 000001065883-3562506208
2020 1 FD52 06 E111 U 8022202U 008 7/24/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072J1061920405817 $406.04 000001065883-3562506208
2020 1 FD52 06 E121 U 8022202U 008 7/24/2019 3020 PREL ENGINEERING-UTILITIES CA-XR072J1061920405817 $37.66 000001065883-3562506208
2020 1 FD52 06 E121 U 8022202U 008 7/24/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072J1061920405817 $30.71 000001065883-3562506208
2020 1 FD52 06 E122 U 8022202U 008 7/24/2019 3020 PREL ENGINEERING-UTILITIES CA-XR072J1061920405817 $419.08 000001065883-3562506208
2020 1 FD52 06 E122 U 8022202U 008 7/24/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072J1061920405817 $338.78 000001065883-3562506208
2020 1 FD52 06 E123 U 8022202U 008 7/24/2019 3020 PREL ENGINEERING-UTILITIES CA-XR072J1061920405817 $44.30 000001065883-3562506208
2020 1 FD52 06 E123 U 8022202U 008 7/24/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072J1061920405817 $26.04 000001065883-3562506208
2020 1 FD52 06 E124 U 8022202U 008 7/24/2019 3020 PREL ENGINEERING-UTILITIES CA-XR072J1061920405817 $0.24 000001065883-3562506208
2020 1 FD52 06 E124 U 8022202U 008 7/24/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072J1061920405817 $0.18 000001065883-3562506208
2020 1 FD52 06 E111 U 8022202U 008 7/10/2019 3020 PREL ENGINEERING-UTILITIES CA-XR071J1061919004767 $699.15 000001065883-3562506208
2020 1 FD52 06 E111 U 8022202U 008 7/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071J1061919004767 $55.36 000001065883-3562506208
2020 1 FD52 06 E121 U 8022202U 008 7/10/2019 3020 PREL ENGINEERING-UTILITIES CA-XR071J1061919004767 $53.48 000001065883-3562506208
2020 1 FD52 06 E121 U 8022202U 008 7/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071J1061919004767 $4.23 000001065883-3562506208
2020 1 FD52 06 E122 U 8022202U 008 7/10/2019 3020 PREL ENGINEERING-UTILITIES CA-XR071J1061919004767 $583.24 000001065883-3562506208
2020 1 FD52 06 E122 U 8022202U 008 7/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071J1061919004767 $46.19 000001065883-3562506208
2020 1 FD52 06 E123 U 8022202U 008 7/10/2019 3020 PREL ENGINEERING-UTILITIES CA-XR071J1061919004767 $30.37 000001065883-3562506208
2020 1 FD52 06 E123 U 8022202U 008 7/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071J1061919004767 $2.26 000001065883-3562506208
2020 1 FD52 06 E123 U 8022202U 008 7/1/2019 3020 PREL ENGINEERING-UTILITIES CA-XR061J1061915802527P $26.45 000001065883-3562506208
2020 1 FD52 06 E123 U 8022202U 008 7/1/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061J1061915802527P $26.05 000001065883-3562506208
2020 1 FD52 06 E111 U 8022202U 008 7/1/2019 3020 PREL ENGINEERING-UTILITIES CA-XR062J1061917103659 $856.02 000001065883-3562506208
2020 1 FD52 06 E111 U 8022202U 008 7/1/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062J1061917103659 $116.70 000001065883-3562506208
2020 1 FD52 06 E121 U 8022202U 008 7/1/2019 3020 PREL ENGINEERING-UTILITIES CA-XR062J1061917103659 $65.48 000001065883-3562506208
2020 1 FD52 06 E121 U 8022202U 008 7/1/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062J1061917103659 $8.93 000001065883-3562506208
2020 1 FD52 06 E122 U 8022202U 008 7/1/2019 3020 PREL ENGINEERING-UTILITIES CA-XR062J1061917103659 $714.18 000001065883-3562506208
2020 1 FD52 06 E122 U 8022202U 008 7/1/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062J1061917103659 $97.36 000001065883-3562506208
2020 1 FD52 06 E123 U 8022202U 008 7/1/2019 3020 PREL ENGINEERING-UTILITIES CA-XR062J1061917103659 $37.31 000001065883-3562506208
2020 1 FD52 06 E123 U 8022202U 008 7/1/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062J1061917103659 $4.77 000001065883-3562506208
2020 1 FD52 06 E124 U 8022202U 008 7/1/2019 3020 PREL ENGINEERING-UTILITIES CA-XR062J1061917103659 $0.40 000001065883-3562506208
2020 1 FD52 06 E124 U 8022202U 008 7/1/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062J1061917103659 $0.05 000001065883-3562506208
2019 12 FD52 06 E229 U 8022202U 008 6/26/2019 3020 PREL ENGINEERING-UTILITIES IET-XE13A162519177010060 $11.00
2019 12 FD52 06 E229 U 8022202U 008 6/26/2019 3020 PREL ENGINEERING-UTILITIES IET-XE13A162519177026570 $6.84
2019 12 FD52 06 E111 U 8022202U 008 6/10/2019 3020 PREL ENGINEERING-UTILITIES CA-XR061J1061915802527 $576.62 000001065883-3562506208
2019 12 FD52 06 E111 U 8022202U 008 6/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061J1061915802527 $637.03 000001065883-3562506208
2019 12 FD52 06 E121 U 8022202U 008 6/10/2019 3020 PREL ENGINEERING-UTILITIES CA-XR061J1061915802527 $44.11 000001065883-3562506208
2019 12 FD52 06 E121 U 8022202U 008 6/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061J1061915802527 $48.75 000001065883-3562506208
2019 12 FD52 06 E122 U 8022202U 008 6/10/2019 3020 PREL ENGINEERING-UTILITIES CA-XR061J1061915802527 $481.08 000001065883-3562506208
2019 12 FD52 06 E122 U 8022202U 008 6/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061J1061915802527 $531.47 000001065883-3562506208
2019 11 FD52 06 E111 U 8022202U 008 5/23/2019 3020 PREL ENGINEERING-UTILITIES CA-XR052J1061914201360 $583.70 000001065883-3562506208
2019 11 FD52 06 E111 U 8022202U 008 5/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201360 $82.75 000001065883-3562506208
2019 11 FD52 06 E121 U 8022202U 008 5/23/2019 3020 PREL ENGINEERING-UTILITIES CA-XR052J1061914201360 $44.64 000001065883-3562506208
2019 11 FD52 06 E121 U 8022202U 008 5/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201360 $6.33 000001065883-3562506208
2019 11 FD52 06 E122 U 8022202U 008 5/23/2019 3020 PREL ENGINEERING-UTILITIES CA-XR052J1061914201360 $486.94 000001065883-3562506208
2019 11 FD52 06 E122 U 8022202U 008 5/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201360 $69.03 000001065883-3562506208
2019 11 FD52 06 E123 U 8022202U 008 5/23/2019 3020 PREL ENGINEERING-UTILITIES CA-XR052J1061914201360 $25.44 000001065883-3562506208
2019 11 FD52 06 E123 U 8022202U 008 5/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201360 $3.38 000001065883-3562506208
2019 11 FD52 06 E124 U 8022202U 008 5/23/2019 3020 PREL ENGINEERING-UTILITIES CA-XR052J1061914201360 $0.27 000001065883-3562506208
2019 11 FD52 06 E124 U 8022202U 008 5/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201360 $0.03 000001065883-3562506208
2019 11 FD52 06 E229 U 8022202U 008 5/17/2019 3020 PREL ENGINEERING-UTILITIES IET-XE13A162519136006400 $17.50
2019 11 FD52 06 E111 U 8022202U 008 5/9/2019 3020 PREL ENGINEERING-UTILITIES CA-XR051J1061912800398 $907.90 000001065883-3562506208
2019 11 FD52 06 E111 U 8022202U 008 5/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051J1061912800398 $77.82 000001065883-3562506208
2019 11 FD52 06 E121 U 8022202U 008 5/9/2019 3020 PREL ENGINEERING-UTILITIES CA-XR051J1061912800398 $69.45 000001065883-3562506208
2019 11 FD52 06 E121 U 8022202U 008 5/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051J1061912800398 $5.95 000001065883-3562506208
2019 11 FD52 06 E122 U 8022202U 008 5/9/2019 3020 PREL ENGINEERING-UTILITIES CA-XR051J1061912800398 $757.46 000001065883-3562506208
2019 11 FD52 06 E122 U 8022202U 008 5/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051J1061912800398 $64.92 000001065883-3562506208
2019 11 FD52 06 E123 U 8022202U 008 5/9/2019 3020 PREL ENGINEERING-UTILITIES CA-XR051J1061912800398 $39.46 000001065883-3562506208
2019 11 FD52 06 E123 U 8022202U 008 5/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051J1061912800398 $3.18 000001065883-3562506208
2019 11 FD52 00 E111 U 8022202U 008 5/9/2019 3030 INSPECTION&SUPER-RAILROAD CA-XR051J1061912800460 $158.70 000001068544-3562500480
2019 11 FD52 00 E111 U 8022202U 008 5/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051J1061912800460 $7.62 000001068544-3562500480
2019 11 FD52 00 E121 U 8022202U 008 5/9/2019 3030 INSPECTION&SUPER-RAILROAD CA-XR051J1061912800460 $12.14 000001068544-3562500480
2019 11 FD52 00 E121 U 8022202U 008 5/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051J1061912800460 $0.58 000001068544-3562500480
2019 11 FD52 00 E122 U 8022202U 008 5/9/2019 3030 INSPECTION&SUPER-RAILROAD CA-XR051J1061912800460 $132.40 000001068544-3562500480
2019 11 FD52 00 E122 U 8022202U 008 5/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051J1061912800460 $6.36 000001068544-3562500480
2019 11 FD52 00 E123 U 8022202U 008 5/9/2019 3030 INSPECTION&SUPER-RAILROAD CA-XR051J1061912800460 $8.43 000001068544-3562500480
2019 11 FD52 00 E123 U 8022202U 008 5/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051J1061912800460 $0.38 000001068544-3562500480
2019 11 FD52 06 E229 U 8022202U 008 5/3/2019 3020 PREL ENGINEERING-UTILITIES IET-XE13A162519123015400 $26.50
2019 11 FD52 06 E229 U 8022202U 008 5/3/2019 3020 PREL ENGINEERING-UTILITIES IET-XE13A162519123037390 $12.16
2019 11 FD52 06 E229 U 8022202U 008 5/3/2019 3020 PREL ENGINEERING-UTILITIES IET-XE13A162519123052090 $9.88
2019 10 FD52 06 E111 U 8022202U 008 4/25/2019 3020 PREL ENGINEERING-UTILITIES CA-XR042J1061911410245 $505.83 000001065883-3562506208
2019 10 FD52 06 E111 U 8022202U 008 4/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042J1061911410245 $487.67 000001065883-3562506208
2019 10 FD52 06 E121 U 8022202U 008 4/25/2019 3020 PREL ENGINEERING-UTILITIES CA-XR042J1061911410245 $38.69 000001065883-3562506208
2019 10 FD52 06 E121 U 8022202U 008 4/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042J1061911410245 $37.31 000001065883-3562506208
2019 10 FD52 06 E122 U 8022202U 008 4/25/2019 3020 PREL ENGINEERING-UTILITIES CA-XR042J1061911410245 $422.02 000001065883-3562506208
2019 10 FD52 06 E122 U 8022202U 008 4/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042J1061911410245 $406.86 000001065883-3562506208
2019 10 FD52 06 E123 U 8022202U 008 4/25/2019 3020 PREL ENGINEERING-UTILITIES CA-XR042J1061911410245 $23.05 000001065883-3562506208
2019 10 FD52 06 E123 U 8022202U 008 4/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042J1061911410245 $19.93 000001065883-3562506208
2019 10 FD52 06 E124 U 8022202U 008 4/25/2019 3020 PREL ENGINEERING-UTILITIES CA-XR042J1061911410245 $0.24 000001065883-3562506208
2019 10 FD52 06 E124 U 8022202U 008 4/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042J1061911410245 $0.23 000001065883-3562506208
2019 10 FD52 06 E111 U 8022202U 008 4/10/2019 3020 PREL ENGINEERING-UTILITIES CA-XR041J1061909909150 $1,030.89 000001065883-3562506208
2019 10 FD52 06 E111 U 8022202U 008 4/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041J1061909909150 $6.96 000001065883-3562506208
2019 10 FD52 06 E121 U 8022202U 008 4/10/2019 3020 PREL ENGINEERING-UTILITIES CA-XR041J1061909909150 $78.86 000001065883-3562506208
2019 10 FD52 06 E121 U 8022202U 008 4/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041J1061909909150 $0.53 000001065883-3562506208
2019 10 FD52 06 E122 U 8022202U 008 4/10/2019 3020 PREL ENGINEERING-UTILITIES CA-XR041J1061909909150 $860.06 000001065883-3562506208
2019 10 FD52 06 E122 U 8022202U 008 4/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041J1061909909150 $5.81 000001065883-3562506208
2019 10 FD52 06 E123 U 8022202U 008 4/10/2019 3020 PREL ENGINEERING-UTILITIES CA-XR041J1061909909150 $45.69 000001065883-3562506208
2019 10 FD52 06 E123 U 8022202U 008 4/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041J1061909909150 $0.29 000001065883-3562506208
2019 9 FD52 00 E111 U 8022202U 008 3/25/2019 3040 INSPECTION&SUPER-UTILITIES CA-XR032J1061908107973 $151.09 000001066600-3562500480
2019 9 FD52 00 E111 U 8022202U 008 3/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032J1061908107973 $19.75 000001066600-3562500480
2019 9 FD52 00 E121 U 8022202U 008 3/25/2019 3040 INSPECTION&SUPER-UTILITIES CA-XR032J1061908107973 $11.56 000001066600-3562500480
2019 9 FD52 00 E121 U 8022202U 008 3/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032J1061908107973 $1.51 000001066600-3562500480
2019 9 FD52 00 E122 U 8022202U 008 3/25/2019 3040 INSPECTION&SUPER-UTILITIES CA-XR032J1061908107973 $126.10 000001066600-3562500480
2019 9 FD52 00 E122 U 8022202U 008 3/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032J1061908107973 $16.48 000001066600-3562500480
2019 9 FD52 00 E123 U 8022202U 008 3/25/2019 3040 INSPECTION&SUPER-UTILITIES CA-XR032J1061908107973 $8.47 000001066600-3562500480
2019 9 FD52 00 E123 U 8022202U 008 3/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032J1061908107973 $1.04 000001066600-3562500480
2019 9 FD52 00 E124 U 8022202U 008 3/25/2019 3040 INSPECTION&SUPER-UTILITIES CA-XR032J1061908107973 $0.09 000001066600-3562500480
2019 9 FD52 00 E124 U 8022202U 008 3/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032J1061908107973 $0.01 000001066600-3562500480
2019 9 FD52 06 E111 U 8022202U 008 3/25/2019 3020 PREL ENGINEERING-UTILITIES CA-XR032J1061908107962 $1,174.98 000001065883-3562506208
2019 9 FD52 06 E111 U 8022202U 008 3/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032J1061908107962 $46.91 000001065883-3562506208
2019 9 FD52 06 E115 U 8022202U 008 3/25/2019 3020 PREL ENGINEERING-UTILITIES CA-XR032J1061908107962 $38.58 000001065883-3562506208
2019 9 FD52 06 E121 U 8022202U 008 3/25/2019 3020 PREL ENGINEERING-UTILITIES CA-XR032J1061908107962 $92.67 000001065883-3562506208
2019 9 FD52 06 E121 U 8022202U 008 3/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032J1061908107962 $3.56 000001065883-3562506208
2019 9 FD52 06 E122 U 8022202U 008 3/25/2019 3020 PREL ENGINEERING-UTILITIES CA-XR032J1061908107962 $1,012.53 000001065883-3562506208
2019 9 FD52 06 E122 U 8022202U 008 3/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032J1061908107962 $39.13 000001065883-3562506208
2019 9 FD52 06 E123 U 8022202U 008 3/25/2019 3020 PREL ENGINEERING-UTILITIES CA-XR032J1061908107962 $72.64 000001065883-3562506208
2019 9 FD52 06 E123 U 8022202U 008 3/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032J1061908107962 $4.65 000001065883-3562506208
2019 9 FD52 06 E124 U 8022202U 008 3/25/2019 3020 PREL ENGINEERING-UTILITIES CA-XR032J1061908107962 $0.54 000001065883-3562506208
2019 9 FD52 06 E124 U 8022202U 008 3/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032J1061908107962 $0.02 000001065883-3562506208
2019 9 FD52 06 E111 U 8022202U 008 3/11/2019 3020 PREL ENGINEERING-UTILITIES CA-XR031J1061906706879 $1,393.08 000001065883-3562506208
2019 9 FD52 06 E121 U 8022202U 008 3/11/2019 3020 PREL ENGINEERING-UTILITIES CA-XR031J1061906706879 $106.57 000001065883-3562506208
2019 9 FD52 06 E122 U 8022202U 008 3/11/2019 3020 PREL ENGINEERING-UTILITIES CA-XR031J1061906706879 $1,162.25 000001065883-3562506208
2019 9 FD52 06 E123 U 8022202U 008 3/11/2019 3020 PREL ENGINEERING-UTILITIES CA-XR031J1061906706879 $61.72 000001065883-3562506208
2019 9 FD52 00 E111 U 8022202U 008 3/11/2019 3040 INSPECTION&SUPER-UTILITIES CA-XR031J1061906706890 $270.93 000001066600-3562500480
2019 9 FD52 00 E111 U 8022202U 008 3/11/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031J1061906706890 $36.45 000001066600-3562500480
2019 9 FD52 00 E121 U 8022202U 008 3/11/2019 3040 INSPECTION&SUPER-UTILITIES CA-XR031J1061906706890 $20.73 000001066600-3562500480
2019 9 FD52 00 E121 U 8022202U 008 3/11/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031J1061906706890 $2.79 000001066600-3562500480
2019 9 FD52 00 E122 U 8022202U 008 3/11/2019 3040 INSPECTION&SUPER-UTILITIES CA-XR031J1061906706890 $226.04 000001066600-3562500480
2019 9 FD52 00 E122 U 8022202U 008 3/11/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031J1061906706890 $30.41 000001066600-3562500480
2019 9 FD52 00 E123 U 8022202U 008 3/11/2019 3040 INSPECTION&SUPER-UTILITIES CA-XR031J1061906706890 $15.20 000001066600-3562500480
2019 9 FD52 00 E123 U 8022202U 008 3/11/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031J1061906706890 $1.92 000001066600-3562500480
2019 8 FD52 00 E111 U 8022202U 008 2/27/2019 3040 INSPECTION&SUPER-UTILITIES CA-XR022J1061905305670 $338.17 000001066600-3562500480
2019 8 FD52 00 E111 U 8022202U 008 2/27/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022J1061905305670 $16.32 000001066600-3562500480
2019 8 FD52 00 E121 U 8022202U 008 2/27/2019 3040 INSPECTION&SUPER-UTILITIES CA-XR022J1061905305670 $24.50 000001066600-3562500480
2019 8 FD52 00 E121 U 8022202U 008 2/27/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022J1061905305670 $1.14 000001066600-3562500480
2019 8 FD52 00 E122 U 8022202U 008 2/27/2019 3040 INSPECTION&SUPER-UTILITIES CA-XR022J1061905305670 $281.89 000001066600-3562500480
2019 8 FD52 00 E122 U 8022202U 008 2/27/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022J1061905305670 $13.62 000001066600-3562500480
2019 8 FD52 00 E123 U 8022202U 008 2/27/2019 3040 INSPECTION&SUPER-UTILITIES CA-XR022J1061905305670 $60.78 000001066600-3562500480
2019 8 FD52 00 E123 U 8022202U 008 2/27/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022J1061905305670 $4.31 000001066600-3562500480
2019 8 FD52 00 E124 U 8022202U 008 2/27/2019 3040 INSPECTION&SUPER-UTILITIES CA-XR022J1061905305670 $0.29 000001066600-3562500480
2019 8 FD52 00 E124 U 8022202U 008 2/27/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022J1061905305670 $0.01 000001066600-3562500480
2019 8 FD52 06 E111 U 8022202U 008 2/27/2019 3020 PREL ENGINEERING-UTILITIES CA-XR022J1061905305644 $880.17 000001065883-3562506208
2019 8 FD52 06 E111 U 8022202U 008 2/27/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022J1061905305644 $191.74 000001065883-3562506208
2019 8 FD52 06 E115 U 8022202U 008 2/27/2019 3020 PREL ENGINEERING-UTILITIES CA-XR022J1061905305644 $86.80 000001065883-3562506208
2019 8 FD52 06 E121 U 8022202U 008 2/27/2019 3020 PREL ENGINEERING-UTILITIES CA-XR022J1061905305644 $73.97 000001065883-3562506208
2019 8 FD52 06 E121 U 8022202U 008 2/27/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022J1061905305644 $14.67 000001065883-3562506208
2019 8 FD52 06 E122 U 8022202U 008 2/27/2019 3020 PREL ENGINEERING-UTILITIES CA-XR022J1061905305644 $806.73 000001065883-3562506208
2019 8 FD52 06 E122 U 8022202U 008 2/27/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022J1061905305644 $159.97 000001065883-3562506208
2019 8 FD52 06 E123 U 8022202U 008 2/27/2019 3020 PREL ENGINEERING-UTILITIES CA-XR022J1061905305644 $39.47 000001065883-3562506208
2019 8 FD52 06 E123 U 8022202U 008 2/27/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022J1061905305644 $8.03 000001065883-3562506208
2019 8 FD52 06 E124 U 8022202U 008 2/27/2019 3020 PREL ENGINEERING-UTILITIES CA-XR022J1061905305644 $0.42 000001065883-3562506208
2019 8 FD52 06 E124 U 8022202U 008 2/27/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022J1061905305644 $0.10 000001065883-3562506208
2019 8 FD52 06 E111 U 8022202U 008 2/11/2019 3020 PREL ENGINEERING-UTILITIES CA-XR021J1061903904515 $534.01 000001065883-3562506208
2019 8 FD52 06 E111 U 8022202U 008 2/11/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021J1061903904515 $90.09 000001065883-3562506208
2019 8 FD52 06 E121 U 8022202U 008 2/11/2019 3020 PREL ENGINEERING-UTILITIES CA-XR021J1061903904515 $40.85 000001065883-3562506208
2019 8 FD52 06 E121 U 8022202U 008 2/11/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021J1061903904515 $6.88 000001065883-3562506208
2019 8 FD52 06 E122 U 8022202U 008 2/11/2019 3020 PREL ENGINEERING-UTILITIES CA-XR021J1061903904515 $445.53 000001065883-3562506208
2019 8 FD52 06 E122 U 8022202U 008 2/11/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021J1061903904515 $75.16 000001065883-3562506208
2019 8 FD52 06 E123 U 8022202U 008 2/11/2019 3020 PREL ENGINEERING-UTILITIES CA-XR021J1061903904515 $23.88 000001065883-3562506208
2019 8 FD52 06 E123 U 8022202U 008 2/11/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021J1061903904515 $3.77 000001065883-3562506208
2019 7 FD52 06 E111 U 8022202U 008 1/24/2019 3020 PREL ENGINEERING-UTILITIES CA-XR012J1061902303420 $569.89 000001065883-3562506208
2019 7 FD52 06 E111 U 8022202U 008 1/24/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012J1061902303420 $131.97 000001065883-3562506208
2019 7 FD52 06 E121 U 8022202U 008 1/24/2019 3020 PREL ENGINEERING-UTILITIES CA-XR012J1061902303420 $43.59 000001065883-3562506208
2019 7 FD52 06 E121 U 8022202U 008 1/24/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012J1061902303420 $10.11 000001065883-3562506208
2019 7 FD52 06 E122 U 8022202U 008 1/24/2019 3020 PREL ENGINEERING-UTILITIES CA-XR012J1061902303420 $475.44 000001065883-3562506208
2019 7 FD52 06 E122 U 8022202U 008 1/24/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012J1061902303420 $110.10 000001065883-3562506208
2019 7 FD52 06 E123 U 8022202U 008 1/24/2019 3020 PREL ENGINEERING-UTILITIES CA-XR012J1061902303420 $25.58 000001065883-3562506208
2019 7 FD52 06 E123 U 8022202U 008 1/24/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012J1061902303420 $5.52 000001065883-3562506208
2019 7 FD52 06 E124 U 8022202U 008 1/24/2019 3020 PREL ENGINEERING-UTILITIES CA-XR012J1061902303420 $0.28 000001065883-3562506208
2019 7 FD52 06 E124 U 8022202U 008 1/24/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012J1061902303420 $0.06 000001065883-3562506208
2019 6 FD52 06 E111 U 8022202U 008 12/26/2018 3020 PREL ENGINEERING-UTILITIES CA-XR122I1061835401370 $835.85 000001065883-3562506208
2019 6 FD52 06 E115 U 8022202U 008 12/26/2018 3020 PREL ENGINEERING-UTILITIES CA-XR122I1061835401370 $38.58 000001065883-3562506208
2019 6 FD52 06 E121 U 8022202U 008 12/26/2018 3020 PREL ENGINEERING-UTILITIES CA-XR122I1061835401370 $66.89 000001065883-3562506208
2019 6 FD52 06 E122 U 8022202U 008 12/26/2018 3020 PREL ENGINEERING-UTILITIES CA-XR122I1061835401370 $729.54 000001065883-3562506208
2019 6 FD52 06 E123 U 8022202U 008 12/26/2018 3020 PREL ENGINEERING-UTILITIES CA-XR122I1061835401370 $37.03 000001065883-3562506208
2019 6 FD52 06 E124 U 8022202U 008 12/26/2018 3020 PREL ENGINEERING-UTILITIES CA-XR122I1061835401370 $0.40 000001065883-3562506208