2025 |
11 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
5/23/2025 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR052P1062514202142 |
|
|
$373.48 |
11339235-3562506340 |
2025 |
11 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
5/23/2025 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR052P1062514202142 |
|
|
$28.39 |
11339235-3562506340 |
2025 |
11 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
5/23/2025 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR052P1062514202142 |
|
|
$182.07 |
11339235-3562506340 |
2025 |
11 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
5/23/2025 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR052P1062514202142 |
|
|
$40.35 |
11339235-3562506340 |
2025 |
11 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
5/23/2025 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR052P1062514202142 |
|
|
$0.10 |
11339235-3562506340 |
2025 |
11 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
5/23/2025 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2500248314 |
PON22000001344 |
HDR ENGINEERING INC |
$21,151.93 |
Item N. 6-14 |
2025 |
11 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
5/19/2025 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2500243208 |
PON22000001344 |
HDR ENGINEERING INC |
$12,402.62 |
Item N. 6-14 |
2025 |
11 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
5/8/2025 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR051P1062512700863 |
|
|
$747.19 |
11330076-3562506340 |
2025 |
11 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
5/8/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051P1062512700863 |
|
|
$219.60 |
11330076-3562506340 |
2025 |
11 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
5/8/2025 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR051P1062512700863 |
|
|
$56.37 |
11330076-3562506340 |
2025 |
11 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
5/8/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051P1062512700863 |
|
|
$16.57 |
11330076-3562506340 |
2025 |
11 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
5/8/2025 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR051P1062512700863 |
|
|
$364.14 |
11330076-3562506340 |
2025 |
11 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
5/8/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051P1062512700863 |
|
|
$107.05 |
11330076-3562506340 |
2025 |
11 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
5/8/2025 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR051P1062512700863 |
|
|
$80.95 |
11330076-3562506340 |
2025 |
11 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
5/8/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051P1062512700863 |
|
|
$23.45 |
11330076-3562506340 |
2025 |
10 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
4/11/2025 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162525100004340 |
|
|
$4.65 |
|
2025 |
10 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
4/9/2025 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR041P1062509808673 |
|
|
$80.70 |
11311562-3562506340 |
2025 |
10 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
4/9/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041P1062509808673 |
|
|
$1.97 |
11311562-3562506340 |
2025 |
10 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
4/9/2025 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR041P1062509808315 |
|
|
$368.74 |
000001086565-3562506210 |
2025 |
10 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
4/9/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041P1062509808315 |
|
|
$36.87 |
000001086565-3562506210 |
2025 |
10 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
4/9/2025 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR041P1062509808315 |
|
|
$27.73 |
000001086565-3562506210 |
2025 |
10 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
4/9/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041P1062509808315 |
|
|
$2.78 |
000001086565-3562506210 |
2025 |
10 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
4/9/2025 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR041P1062509808315 |
|
|
$179.76 |
000001086565-3562506210 |
2025 |
10 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
4/9/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041P1062509808315 |
|
|
$17.97 |
000001086565-3562506210 |
2025 |
10 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
4/9/2025 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR041P1062509808315 |
|
|
$51.98 |
000001086565-3562506210 |
2025 |
10 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
4/9/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041P1062509808315 |
|
|
$5.15 |
000001086565-3562506210 |
2025 |
10 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
4/9/2025 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR041P1062509808673 |
|
|
$746.95 |
11311562-3562506340 |
2025 |
10 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
4/9/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041P1062509808673 |
|
|
$18.43 |
11311562-3562506340 |
2025 |
10 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
4/9/2025 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR041P1062509808673 |
|
|
$56.38 |
11311562-3562506340 |
2025 |
10 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
4/9/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041P1062509808673 |
|
|
$1.39 |
11311562-3562506340 |
2025 |
10 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
4/9/2025 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR041P1062509808673 |
|
|
$364.14 |
11311562-3562506340 |
2025 |
10 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
4/9/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041P1062509808673 |
|
|
$8.98 |
11311562-3562506340 |
2025 |
10 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
4/3/2025 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2500210555 |
PON22000001344 |
HDR ENGINEERING INC |
$12,354.18 |
Item N. 6-14 |
2025 |
10 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
4/3/2025 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2500210752 |
PON22000001344 |
HDR ENGINEERING INC |
$12,268.25 |
Item N. 6-14 |
2025 |
9 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
3/24/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032P1062508007613 |
|
|
$16.29 |
11304228-3562506340 |
2025 |
9 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
3/24/2025 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR032P1062508007613 |
|
|
$56.25 |
11304228-3562506340 |
2025 |
9 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
3/24/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032P1062508007613 |
|
|
$3.57 |
11304228-3562506340 |
2025 |
9 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
3/24/2025 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR032P1062508007613 |
|
|
$0.13 |
11304228-3562506340 |
2025 |
9 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
3/24/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032P1062508007613 |
|
|
$0.01 |
11304228-3562506340 |
2025 |
9 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
3/24/2025 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR032P1062508007612 |
|
|
$520.29 |
11304228-3562506340 |
2025 |
9 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
3/24/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032P1062508007612 |
|
|
$33.41 |
11304228-3562506340 |
2025 |
9 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
3/24/2025 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR032P1062508007612 |
|
|
$39.55 |
11304228-3562506340 |
2025 |
9 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
3/24/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032P1062508007612 |
|
|
$2.54 |
11304228-3562506340 |
2025 |
9 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
3/24/2025 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR032P1062508007612 |
|
|
$253.68 |
11304228-3562506340 |
2025 |
9 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
3/12/2025 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162525071005470 |
|
|
$4.65 |
|
2025 |
9 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
3/10/2025 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR031P1062506606365 |
|
|
$638.28 |
11294926-3562506340 |
2025 |
9 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
3/10/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031P1062506606365 |
|
|
$25.27 |
11294926-3562506340 |
2025 |
9 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
3/10/2025 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR031P1062506606365 |
|
|
$48.15 |
11294926-3562506340 |
2025 |
9 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
3/10/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031P1062506606365 |
|
|
$1.90 |
11294926-3562506340 |
2025 |
9 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
3/10/2025 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR031P1062506606365 |
|
|
$311.16 |
11294926-3562506340 |
2025 |
9 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
3/10/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031P1062506606365 |
|
|
$12.32 |
11294926-3562506340 |
2025 |
9 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
3/10/2025 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR031P1062506606365 |
|
|
$86.26 |
11294926-3562506340 |
2025 |
9 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
3/10/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031P1062506606365 |
|
|
$4.59 |
11294926-3562506340 |
2025 |
8 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
2/13/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021P1062503803680 |
|
|
$4.71 |
000001086565-3562506210 |
2025 |
8 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
2/13/2025 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR021P1062503803679 |
|
|
$270.63 |
000001086565-3562506210 |
2025 |
8 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
2/13/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021P1062503803679 |
|
|
$33.80 |
000001086565-3562506210 |
2025 |
8 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
2/13/2025 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR021P1062503803679 |
|
|
$20.33 |
000001086565-3562506210 |
2025 |
8 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
2/13/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021P1062503803679 |
|
|
$2.54 |
000001086565-3562506210 |
2025 |
8 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
2/13/2025 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR021P1062503803679 |
|
|
$131.82 |
000001086565-3562506210 |
2025 |
8 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
2/13/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021P1062503803679 |
|
|
$16.48 |
000001086565-3562506210 |
2025 |
8 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
2/13/2025 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR021P1062503803679 |
|
|
$38.12 |
000001086565-3562506210 |
2025 |
8 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
2/10/2025 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR021P1062503804208 |
|
|
$342.35 |
11281010-3562506340 |
2025 |
8 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
2/10/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021P1062503804208 |
|
|
$91.29 |
11281010-3562506340 |
2025 |
8 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
2/10/2025 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR021P1062503804208 |
|
|
$25.84 |
11281010-3562506340 |
2025 |
8 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
2/10/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021P1062503804208 |
|
|
$6.90 |
11281010-3562506340 |
2025 |
8 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
2/10/2025 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR021P1062503804208 |
|
|
$166.90 |
11281010-3562506340 |
2025 |
8 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
2/10/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021P1062503804208 |
|
|
$44.51 |
11281010-3562506340 |
2025 |
8 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
2/10/2025 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR021P1062503804208 |
|
|
$37.10 |
11281010-3562506340 |
2025 |
8 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
2/10/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021P1062503804208 |
|
|
$9.75 |
11281010-3562506340 |
2025 |
7 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
1/29/2025 |
4580 |
CONSTRUCTION CONTRACTS |
JV2E-2500005374 |
|
|
($585,607.18) |
Move funds from 8022202C to 01C to correct contract cost XCONST092199002P006K |
2025 |
7 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
1/29/2025 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2500159254 |
PON22000001344 |
HDR ENGINEERING INC |
$13,329.17 |
Item N. 6-14 |
2025 |
7 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
1/29/2025 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2500159298 |
PON22000001344 |
HDR ENGINEERING INC |
$12,561.00 |
Item N. 6-14 |
2025 |
7 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
1/29/2025 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR012P1062502302481 |
|
|
$295.29 |
000001086565-3562506210 |
2025 |
7 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
1/29/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012P1062502302481 |
|
|
$120.95 |
000001086565-3562506210 |
2025 |
7 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
1/29/2025 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR012P1062502302481 |
|
|
$21.62 |
000001086565-3562506210 |
2025 |
7 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
1/29/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012P1062502302481 |
|
|
$8.90 |
000001086565-3562506210 |
2025 |
7 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
1/29/2025 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR012P1062502302481 |
|
|
$145.01 |
000001086565-3562506210 |
2025 |
7 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
1/29/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012P1062502302481 |
|
|
$58.97 |
000001086565-3562506210 |
2025 |
7 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
1/29/2025 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR012P1062502302481 |
|
|
$42.08 |
000001086565-3562506210 |
2025 |
7 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
1/29/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012P1062502302481 |
|
|
$16.87 |
000001086565-3562506210 |
2025 |
7 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
1/29/2025 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR012P1062502302481 |
|
|
$0.13 |
000001086565-3562506210 |
2025 |
7 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
1/29/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012P1062502302481 |
|
|
$0.03 |
000001086565-3562506210 |
2025 |
7 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
1/28/2025 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
IET-XE13A162525028007300 |
|
|
$23.40 |
|
2025 |
7 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
1/9/2025 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR011P1062500801501 |
|
|
$1,181.61 |
000001086565-3562506210 |
2025 |
7 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
1/9/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011P1062500801501 |
|
|
$1,106.95 |
000001086565-3562506210 |
2025 |
7 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
1/9/2025 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR011P1062500801501 |
|
|
$87.58 |
000001086565-3562506210 |
2025 |
7 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
1/9/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011P1062500801501 |
|
|
$82.72 |
000001086565-3562506210 |
2025 |
7 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
1/9/2025 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR011P1062500801501 |
|
|
$576.04 |
000001086565-3562506210 |
2025 |
7 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
1/9/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011P1062500801501 |
|
|
$539.63 |
000001086565-3562506210 |
2025 |
7 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
1/9/2025 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR011P1062500801501 |
|
|
$205.12 |
000001086565-3562506210 |
2025 |
7 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
1/9/2025 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011P1062500801501 |
|
|
$169.60 |
000001086565-3562506210 |
2025 |
6 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
12/23/2024 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR122O1062435500424 |
|
|
$405.61 |
000001086565-3562506210 |
2025 |
6 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
12/23/2024 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR122O1062435500424 |
|
|
$30.50 |
000001086565-3562506210 |
2025 |
6 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
12/23/2024 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR122O1062435500424 |
|
|
$197.74 |
000001086565-3562506210 |
2025 |
6 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
12/23/2024 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR122O1062435500424 |
|
|
$57.12 |
000001086565-3562506210 |
2025 |
6 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
12/23/2024 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR122O1062435500424 |
|
|
$0.10 |
000001086565-3562506210 |
2025 |
5 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
11/26/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2500112284 |
PON22000001344 |
HDR ENGINEERING INC |
$9,114.50 |
Item N. 6-14 |
2025 |
5 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
11/26/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2500112304 |
PON22000001344 |
HDR ENGINEERING INC |
$12,502.73 |
Item N. 6-14 |
2025 |
4 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
10/16/2024 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162524284003300 |
|
|
$19.50 |
|
2025 |
4 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
10/9/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR101O1062428205485 |
|
|
$373.48 |
11210253-3562506340 |
2025 |
4 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
10/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101O1062428205485 |
|
|
$448.17 |
11210253-3562506340 |
2025 |
4 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
10/9/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR101O1062428205485 |
|
|
$28.19 |
11210253-3562506340 |
2025 |
4 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
10/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101O1062428205485 |
|
|
$33.82 |
11210253-3562506340 |
2025 |
4 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
10/9/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR101O1062428205485 |
|
|
$182.08 |
11210253-3562506340 |
2025 |
4 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
10/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101O1062428205485 |
|
|
$218.48 |
11210253-3562506340 |
2025 |
4 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
10/9/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR101O1062428205485 |
|
|
$40.90 |
11210253-3562506340 |
2025 |
4 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
10/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101O1062428205485 |
|
|
$47.85 |
11210253-3562506340 |
2025 |
3 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
9/18/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2500059475 |
PON22000001344 |
HDR ENGINEERING INC |
$19,667.50 |
Item N. 6-14 |
2025 |
3 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
9/11/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2500053405 |
PON22000001344 |
HDR ENGINEERING INC |
$303.87 |
Item N. 6-14 |
2025 |
3 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
9/11/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2500053405 |
PON22000001344 |
HDR ENGINEERING INC |
$104,380.00 |
Item N. 6-14 |
2025 |
3 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
9/11/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2500053405 |
PON22000001344 |
HDR ENGINEERING INC |
$2,548.00 |
Item N. 6-14 |
2025 |
3 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
9/11/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2500053405 |
PON22000001344 |
HDR ENGINEERING INC |
$1,501.50 |
Item N. 6-14 |
2025 |
3 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
9/11/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2500053405 |
PON22000001344 |
HDR ENGINEERING INC |
$157.68 |
Item N. 6-14 |
2025 |
2 |
FD52 |
06 |
E389 |
C |
8022202C |
008 |
8/30/2024 |
4010 |
CONSTRUCTION ENGINEERING |
PRC-2500044374 |
PON22100001940 |
MICHAEL BAKER INTERNATIONAL INC |
$12,740.00 |
Electrical Construction Inspection Services |
2025 |
2 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
8/28/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR082O1062423602055 |
|
|
$746.76 |
11187267-3562506340 |
2025 |
2 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
8/28/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082O1062423602055 |
|
|
$123.99 |
11187267-3562506340 |
2025 |
2 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
8/28/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR082O1062423602055 |
|
|
$56.77 |
11187267-3562506340 |
2025 |
2 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
8/28/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082O1062423602055 |
|
|
$9.43 |
11187267-3562506340 |
2025 |
2 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
8/28/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR082O1062423602055 |
|
|
$364.14 |
11187267-3562506340 |
2025 |
2 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
8/28/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082O1062423602055 |
|
|
$60.45 |
11187267-3562506340 |
2025 |
2 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
8/28/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR082O1062423602055 |
|
|
$80.83 |
11187267-3562506340 |
2025 |
2 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
8/28/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082O1062423602055 |
|
|
$13.24 |
11187267-3562506340 |
2025 |
2 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
8/28/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR082O1062423602055 |
|
|
$0.18 |
11187267-3562506340 |
2025 |
2 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
8/28/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082O1062423602055 |
|
|
$0.03 |
11187267-3562506340 |
2025 |
2 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
8/27/2024 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162524238003330 |
|
|
$19.50 |
|
2025 |
2 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
8/12/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR081O1062422200729 |
|
|
$342.29 |
11178528-3562506340 |
2025 |
2 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
8/12/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081O1062422200729 |
|
|
$15.98 |
11178528-3562506340 |
2025 |
2 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
8/12/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR081O1062422200729 |
|
|
$25.84 |
11178528-3562506340 |
2025 |
2 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
8/12/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081O1062422200729 |
|
|
$1.21 |
11178528-3562506340 |
2025 |
2 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
8/12/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR081O1062422200729 |
|
|
$166.89 |
11178528-3562506340 |
2025 |
2 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
8/12/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081O1062422200729 |
|
|
$7.79 |
11178528-3562506340 |
2025 |
2 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
8/12/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR081O1062422200729 |
|
|
$36.99 |
11178528-3562506340 |
2025 |
2 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
8/12/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081O1062422200729 |
|
|
$1.71 |
11178528-3562506340 |
2025 |
2 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
8/1/2024 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR072O1062420509751 |
|
|
$368.74 |
000001086565-3562506210 |
2025 |
2 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
8/1/2024 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR072O1062420509751 |
|
|
$27.74 |
000001086565-3562506210 |
2025 |
2 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
8/1/2024 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR072O1062420509751 |
|
|
$179.76 |
000001086565-3562506210 |
2025 |
2 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
8/1/2024 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR072O1062420509751 |
|
|
$53.18 |
000001086565-3562506210 |
2025 |
2 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
8/1/2024 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR072O1062420509751 |
|
|
$0.10 |
000001086565-3562506210 |
2025 |
1 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
7/11/2024 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR071O1062419208640 |
|
|
$1,335.53 |
000001086565-3562506210 |
2025 |
1 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
7/11/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071O1062419208640 |
|
|
$161.82 |
000001086565-3562506210 |
2025 |
1 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
7/11/2024 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR071O1062419208640 |
|
|
$95.96 |
000001086565-3562506210 |
2025 |
1 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
7/11/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071O1062419208640 |
|
|
$11.68 |
000001086565-3562506210 |
2025 |
1 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
7/11/2024 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR071O1062419208640 |
|
|
$883.74 |
000001086565-3562506210 |
2025 |
1 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
7/11/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071O1062419208640 |
|
|
$107.07 |
000001086565-3562506210 |
2025 |
1 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
7/11/2024 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR071O1062419208640 |
|
|
$283.42 |
000001086565-3562506210 |
2025 |
1 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
7/11/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071O1062419208640 |
|
|
$33.20 |
000001086565-3562506210 |
2024 |
12 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
6/25/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR062O1062417607960 |
|
|
$797.72 |
11157167-3562506340 |
2024 |
12 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
6/25/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062O1062417607960 |
|
|
$216.45 |
11157167-3562506340 |
2024 |
12 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
6/25/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR062O1062417607960 |
|
|
$60.62 |
11157167-3562506340 |
2024 |
12 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
6/25/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062O1062417607960 |
|
|
$16.45 |
11157167-3562506340 |
2024 |
12 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
6/25/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR062O1062417607960 |
|
|
$527.85 |
11157167-3562506340 |
2024 |
12 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
6/25/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062O1062417607960 |
|
|
$143.22 |
11157167-3562506340 |
2024 |
12 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
6/25/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR062O1062417607960 |
|
|
$89.03 |
11157167-3562506340 |
2024 |
12 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
6/25/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062O1062417607960 |
|
|
$23.80 |
11157167-3562506340 |
2024 |
12 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
6/25/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR062O1062417607960 |
|
|
$0.20 |
11157167-3562506340 |
2024 |
12 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
6/25/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062O1062417607960 |
|
|
$0.05 |
11157167-3562506340 |
2024 |
12 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
6/14/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400259767 |
PON22000001344 |
HDR ENGINEERING INC |
$271.20 |
Item N. 6-14 |
2024 |
12 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
6/14/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400259947 |
PON22000001344 |
HDR ENGINEERING INC |
$1,565.05 |
Item N. 6-14 |
2024 |
12 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
6/14/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400259767 |
PON22000001344 |
HDR ENGINEERING INC |
$4,470.85 |
Item N. 6-14 |
2024 |
12 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
6/14/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400259767 |
PON22000001344 |
HDR ENGINEERING INC |
$1,141.11 |
Item N. 6-14 |
2024 |
12 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
6/14/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400259767 |
PON22000001344 |
HDR ENGINEERING INC |
$1,036.18 |
Item N. 6-14 |
2024 |
12 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
6/14/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400259767 |
PON22000001344 |
HDR ENGINEERING INC |
$1,102.43 |
Item N. 6-14 |
2024 |
12 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
6/14/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400259767 |
PON22000001344 |
HDR ENGINEERING INC |
$119,072.50 |
Item N. 6-14 |
2024 |
12 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
6/14/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400259947 |
PON22000001344 |
HDR ENGINEERING INC |
$70,284.00 |
Item N. 6-14 |
2024 |
12 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
6/14/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400259767 |
PON22000001344 |
HDR ENGINEERING INC |
$4,424.75 |
Item N. 6-14 |
2024 |
12 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
6/14/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400259947 |
PON22000001344 |
HDR ENGINEERING INC |
$728.00 |
Item N. 6-14 |
2024 |
12 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
6/14/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400259947 |
PON22000001344 |
HDR ENGINEERING INC |
$5,824.00 |
Item N. 6-14 |
2024 |
12 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
6/14/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400259767 |
PON22000001344 |
HDR ENGINEERING INC |
$280.50 |
Item N. 6-14 |
2024 |
12 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
6/14/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400259947 |
PON22000001344 |
HDR ENGINEERING INC |
$1,234.93 |
Item N. 6-14 |
2024 |
12 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
6/10/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR061O1062415906764 |
|
|
$332.38 |
11149353-3562506340 |
2024 |
12 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
6/10/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061O1062415906764 |
|
|
$138.71 |
11149353-3562506340 |
2024 |
12 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
6/10/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR061O1062415906764 |
|
|
$25.07 |
11149353-3562506340 |
2024 |
12 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
6/10/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061O1062415906764 |
|
|
$10.46 |
11149353-3562506340 |
2024 |
12 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
6/10/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR061O1062415906764 |
|
|
$219.94 |
11149353-3562506340 |
2024 |
12 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
6/10/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061O1062415906764 |
|
|
$91.78 |
11149353-3562506340 |
2024 |
12 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
6/10/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR061O1062415906764 |
|
|
$37.15 |
11149353-3562506340 |
2024 |
12 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
6/10/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061O1062415906764 |
|
|
$15.26 |
11149353-3562506340 |
2024 |
11 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
5/23/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR052O1062414305605 |
|
|
$362.60 |
11141544-3562506340 |
2024 |
11 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
5/23/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052O1062414305605 |
|
|
$36.26 |
11141544-3562506340 |
2024 |
11 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
5/23/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR052O1062414305605 |
|
|
$27.55 |
11141544-3562506340 |
2024 |
11 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
5/23/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052O1062414305605 |
|
|
$2.75 |
11141544-3562506340 |
2024 |
11 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
5/23/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR052O1062414305605 |
|
|
$239.95 |
11141544-3562506340 |
2024 |
11 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
5/23/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052O1062414305605 |
|
|
$23.99 |
11141544-3562506340 |
2024 |
11 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
5/23/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR052O1062414305605 |
|
|
$40.37 |
11141544-3562506340 |
2024 |
11 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
5/23/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052O1062414305605 |
|
|
$3.99 |
11141544-3562506340 |
2024 |
11 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
5/23/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR052O1062414305605 |
|
|
$0.09 |
11141544-3562506340 |
2024 |
11 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
5/23/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052O1062414305605 |
|
|
$0.01 |
11141544-3562506340 |
2024 |
11 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
5/13/2024 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162524131005990 |
|
|
$52.65 |
|
2024 |
11 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
5/9/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR051O1062412904363 |
|
|
$362.70 |
11132333-3562506340 |
2024 |
11 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
5/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051O1062412904363 |
|
|
$4.35 |
11132333-3562506340 |
2024 |
11 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
5/9/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR051O1062412904363 |
|
|
$27.36 |
11132333-3562506340 |
2024 |
11 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
5/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051O1062412904363 |
|
|
$0.33 |
11132333-3562506340 |
2024 |
11 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
5/9/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR051O1062412904363 |
|
|
$239.93 |
11132333-3562506340 |
2024 |
11 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
5/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051O1062412904363 |
|
|
$2.88 |
11132333-3562506340 |
2024 |
11 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
5/9/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR051O1062412904363 |
|
|
$40.35 |
11132333-3562506340 |
2024 |
11 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
5/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051O1062412904363 |
|
|
$0.48 |
11132333-3562506340 |
2024 |
11 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
5/9/2024 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR051O1062412903866 |
|
|
$540.62 |
000001079228-3562506210 |
2024 |
11 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
5/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051O1062412903866 |
|
|
$69.15 |
000001079228-3562506210 |
2024 |
11 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
5/9/2024 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR051O1062412903866 |
|
|
$39.16 |
000001079228-3562506210 |
2024 |
11 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
5/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051O1062412903866 |
|
|
$4.99 |
000001079228-3562506210 |
2024 |
11 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
5/9/2024 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR051O1062412903866 |
|
|
$357.76 |
000001079228-3562506210 |
2024 |
11 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
5/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051O1062412903866 |
|
|
$45.76 |
000001079228-3562506210 |
2024 |
11 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
5/9/2024 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR051O1062412903866 |
|
|
$108.34 |
000001079228-3562506210 |
2024 |
11 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
5/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051O1062412903866 |
|
|
$14.04 |
000001079228-3562506210 |
2024 |
10 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
4/26/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR042O1062411503277 |
|
|
$239.91 |
11122000-3562506340 |
2024 |
10 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
4/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042O1062411503277 |
|
|
$6.08 |
11122000-3562506340 |
2024 |
10 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
4/26/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR042O1062411503277 |
|
|
$40.35 |
11122000-3562506340 |
2024 |
10 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
4/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042O1062411503277 |
|
|
$1.01 |
11122000-3562506340 |
2024 |
10 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
4/26/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR042O1062411503277 |
|
|
$0.11 |
11122000-3562506340 |
2024 |
10 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
4/26/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR042O1062411503276 |
|
|
$362.60 |
11122000-3562506340 |
2024 |
10 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
4/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042O1062411503276 |
|
|
$9.19 |
11122000-3562506340 |
2024 |
10 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
4/26/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR042O1062411503276 |
|
|
$27.55 |
11122000-3562506340 |
2024 |
10 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
4/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042O1062411503276 |
|
|
$0.70 |
11122000-3562506340 |
2024 |
10 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
4/25/2024 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P097K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$167,819.29 |
|
2024 |
10 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
4/10/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR041O1062410002008 |
|
|
$398.95 |
11111737-3562506340 |
2024 |
10 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
4/10/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041O1062410002008 |
|
|
$39.36 |
11111737-3562506340 |
2024 |
10 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
4/10/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR041O1062410002008 |
|
|
$30.09 |
11111737-3562506340 |
2024 |
10 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
4/10/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041O1062410002008 |
|
|
$2.96 |
11111737-3562506340 |
2024 |
10 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
4/10/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR041O1062410002008 |
|
|
$263.92 |
11111737-3562506340 |
2024 |
10 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
4/10/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041O1062410002008 |
|
|
$26.04 |
11111737-3562506340 |
2024 |
10 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
4/10/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR041O1062410002008 |
|
|
$44.43 |
11111737-3562506340 |
2024 |
10 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
4/10/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041O1062410002008 |
|
|
$4.33 |
11111737-3562506340 |
2024 |
9 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
3/25/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR032O1062408200692 |
|
|
$410.94 |
11101122-3562506340 |
2024 |
9 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
3/25/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032O1062408200692 |
|
|
$114.58 |
11101122-3562506340 |
2024 |
9 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
3/25/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR032O1062408200692 |
|
|
$31.23 |
11101122-3562506340 |
2024 |
9 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
3/25/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032O1062408200692 |
|
|
$8.71 |
11101122-3562506340 |
2024 |
9 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
3/25/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR032O1062408200692 |
|
|
$271.92 |
11101122-3562506340 |
2024 |
9 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
3/25/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032O1062408200692 |
|
|
$75.82 |
11101122-3562506340 |
2024 |
9 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
3/25/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR032O1062408200692 |
|
|
$45.86 |
11101122-3562506340 |
2024 |
9 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
3/25/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032O1062408200692 |
|
|
$12.60 |
11101122-3562506340 |
2024 |
9 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
3/25/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR032O1062408200692 |
|
|
$0.10 |
11101122-3562506340 |
2024 |
9 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
3/25/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032O1062408200692 |
|
|
$0.03 |
11101122-3562506340 |
2024 |
9 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
3/11/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR031O1062406810366 |
|
|
$1,196.57 |
11093431-3562506340 |
2024 |
9 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
3/11/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031O1062406810366 |
|
|
$24.46 |
11093431-3562506340 |
2024 |
9 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
3/11/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR031O1062406810366 |
|
|
$90.27 |
11093431-3562506340 |
2024 |
9 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
3/11/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031O1062406810366 |
|
|
$1.85 |
11093431-3562506340 |
2024 |
9 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
3/11/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR031O1062406810366 |
|
|
$791.77 |
11093431-3562506340 |
2024 |
9 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
3/11/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031O1062406810366 |
|
|
$16.19 |
11093431-3562506340 |
2024 |
9 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
3/11/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR031O1062406810366 |
|
|
$133.15 |
11093431-3562506340 |
2024 |
9 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
3/11/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031O1062406810366 |
|
|
$2.69 |
11093431-3562506340 |
2024 |
8 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
2/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022O1062405409172 |
|
|
$144.55 |
11084976-3562506340 |
2024 |
8 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
2/26/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR022O1062405409172 |
|
|
$676.85 |
11084976-3562506340 |
2024 |
8 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
2/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022O1062405409172 |
|
|
$10.98 |
11084976-3562506340 |
2024 |
8 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
2/26/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR022O1062405409172 |
|
|
$51.43 |
11084976-3562506340 |
2024 |
8 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
2/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022O1062405409172 |
|
|
$95.65 |
11084976-3562506340 |
2024 |
8 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
2/26/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR022O1062405409172 |
|
|
$447.87 |
11084976-3562506340 |
2024 |
8 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
2/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022O1062405409172 |
|
|
$15.90 |
11084976-3562506340 |
2024 |
8 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
2/26/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR022O1062405409172 |
|
|
$75.49 |
11084976-3562506340 |
2024 |
8 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
2/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022O1062405409172 |
|
|
$0.04 |
11084976-3562506340 |
2024 |
8 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
2/26/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR022O1062405409172 |
|
|
$0.17 |
11084976-3562506340 |
2024 |
8 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
2/14/2024 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P096K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$22,648.10 |
|
2024 |
8 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
2/9/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR021O1062403908045 |
|
|
$1,750.54 |
11076248-3562506340 |
2024 |
8 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
2/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021O1062403908045 |
|
|
$39.89 |
11076248-3562506340 |
2024 |
8 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
2/9/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR021O1062403908045 |
|
|
$132.06 |
11076248-3562506340 |
2024 |
8 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
2/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021O1062403908045 |
|
|
$3.01 |
11076248-3562506340 |
2024 |
8 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
2/9/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR021O1062403908045 |
|
|
$1,158.33 |
11076248-3562506340 |
2024 |
8 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
2/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021O1062403908045 |
|
|
$26.40 |
11076248-3562506340 |
2024 |
8 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
2/9/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR021O1062403908045 |
|
|
$194.81 |
11076248-3562506340 |
2024 |
8 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
2/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021O1062403908045 |
|
|
$4.39 |
11076248-3562506340 |
2024 |
8 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
2/5/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR012O1062402306818 |
|
|
$725.20 |
11065080-3562506340 |
2024 |
8 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
2/5/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306818 |
|
|
$239.80 |
11065080-3562506340 |
2024 |
8 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
2/5/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR012O1062402306818 |
|
|
$55.11 |
11065080-3562506340 |
2024 |
8 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
2/5/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306818 |
|
|
$18.23 |
11065080-3562506340 |
2024 |
8 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
2/5/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR012O1062402306818 |
|
|
$479.86 |
11065080-3562506340 |
2024 |
8 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
2/5/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306818 |
|
|
$158.68 |
11065080-3562506340 |
2024 |
8 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
2/5/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR012O1062402306818 |
|
|
$80.98 |
11065080-3562506340 |
2024 |
8 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
2/5/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306818 |
|
|
$26.37 |
11065080-3562506340 |
2024 |
8 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
2/5/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR012O1062402306818 |
|
|
$0.18 |
11065080-3562506340 |
2024 |
8 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
2/5/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306818 |
|
|
$0.06 |
11065080-3562506340 |
2024 |
7 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
1/31/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400139054 |
PON22000001344 |
HDR ENGINEERING INC |
$1,390.60 |
Item N. 6-14 |
2024 |
7 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
1/31/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400139054 |
PON22000001344 |
HDR ENGINEERING INC |
$1,386.35 |
Item N. 6-14 |
2024 |
7 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
1/31/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400139054 |
PON22000001344 |
HDR ENGINEERING INC |
$540.02 |
Item N. 6-14 |
2024 |
7 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
1/31/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400139054 |
PON22000001344 |
HDR ENGINEERING INC |
$17,698.50 |
Item N. 6-14 |
2024 |
7 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
1/31/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400152797 |
PON22000001344 |
HDR ENGINEERING INC |
$31,376.50 |
Item N. 6-14 |
2024 |
7 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
1/31/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400139054 |
PON22000001344 |
HDR ENGINEERING INC |
$654.50 |
Item N. 6-14 |
2024 |
7 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
1/31/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400152797 |
PON22000001344 |
HDR ENGINEERING INC |
$838.20 |
Item N. 6-14 |
2024 |
7 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
1/31/2024 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR012O1062402306599 |
|
|
$357.93 |
000001086565-3562506210 |
2024 |
7 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
1/31/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306599 |
|
|
$79.71 |
000001086565-3562506210 |
2024 |
7 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
1/31/2024 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR012O1062402306599 |
|
|
$26.91 |
000001086565-3562506210 |
2024 |
7 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
1/31/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306599 |
|
|
$6.00 |
000001086565-3562506210 |
2024 |
7 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
1/31/2024 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR012O1062402306599 |
|
|
$236.89 |
000001086565-3562506210 |
2024 |
7 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
1/31/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306599 |
|
|
$52.74 |
000001086565-3562506210 |
2024 |
7 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
1/31/2024 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR012O1062402306599 |
|
|
$52.04 |
000001086565-3562506210 |
2024 |
7 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
1/31/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306599 |
|
|
$11.46 |
000001086565-3562506210 |
2024 |
7 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
1/31/2024 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR012O1062402306599 |
|
|
$0.09 |
000001086565-3562506210 |
2024 |
7 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
1/31/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306599 |
|
|
$0.02 |
000001086565-3562506210 |
2024 |
7 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
1/31/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400139054 |
PON22000001344 |
HDR ENGINEERING INC |
$2,594.75 |
Item N. 6-14 |
2024 |
7 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
1/18/2024 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P094K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$731,202.64 |
|
2024 |
7 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
1/11/2024 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162524010004160 |
|
|
$5.85 |
|
2024 |
7 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
1/8/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011O1062400505940 |
|
|
$507.34 |
11060226-3562506340 |
2024 |
7 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
1/8/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR011O1062400505940 |
|
|
$398.76 |
11060226-3562506340 |
2024 |
7 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
1/8/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011O1062400505940 |
|
|
$38.29 |
11060226-3562506340 |
2024 |
7 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
1/8/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR011O1062400505940 |
|
|
$30.09 |
11060226-3562506340 |
2024 |
7 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
1/8/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011O1062400505940 |
|
|
$335.71 |
11060226-3562506340 |
2024 |
7 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
1/8/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR011O1062400505940 |
|
|
$263.93 |
11060226-3562506340 |
2024 |
7 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
1/8/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011O1062400505940 |
|
|
$55.80 |
11060226-3562506340 |
2024 |
7 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
1/8/2024 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR011O1062400505940 |
|
|
$45.03 |
11060226-3562506340 |
2024 |
7 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
1/4/2024 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P093K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$42,482.15 |
|
2024 |
6 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
12/27/2023 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162523359002670 |
|
|
$101.30 |
|
2024 |
6 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
12/22/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR122N1062335505013 |
|
|
$1,571.27 |
11054118-3562506340 |
2024 |
6 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
12/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122N1062335505013 |
|
|
$502.80 |
11054118-3562506340 |
2024 |
6 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
12/22/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR122N1062335505013 |
|
|
$119.40 |
11054118-3562506340 |
2024 |
6 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
12/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122N1062335505013 |
|
|
$38.21 |
11054118-3562506340 |
2024 |
6 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
12/22/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR122N1062335505013 |
|
|
$1,039.70 |
11054118-3562506340 |
2024 |
6 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
12/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122N1062335505013 |
|
|
$332.70 |
11054118-3562506340 |
2024 |
6 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
12/22/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR122N1062335505013 |
|
|
$152.26 |
11054118-3562506340 |
2024 |
6 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
12/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122N1062335505013 |
|
|
$47.87 |
11054118-3562506340 |
2024 |
6 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
12/22/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR122N1062335505013 |
|
|
$0.39 |
11054118-3562506340 |
2024 |
6 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
12/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122N1062335505013 |
|
|
$0.13 |
11054118-3562506340 |
2024 |
6 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
12/11/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR121N1062334203846 |
|
|
$725.44 |
11045314-3562506340 |
2024 |
6 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
12/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121N1062334203846 |
|
|
$984.34 |
11045314-3562506340 |
2024 |
6 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
12/11/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR121N1062334203846 |
|
|
$54.71 |
11045314-3562506340 |
2024 |
6 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
12/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121N1062334203846 |
|
|
$74.26 |
11045314-3562506340 |
2024 |
6 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
12/11/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR121N1062334203846 |
|
|
$479.86 |
11045314-3562506340 |
2024 |
6 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
12/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121N1062334203846 |
|
|
$651.33 |
11045314-3562506340 |
2024 |
6 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
12/11/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR121N1062334203846 |
|
|
$71.24 |
11045314-3562506340 |
2024 |
6 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
12/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121N1062334203846 |
|
|
$93.73 |
11045314-3562506340 |
2024 |
6 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
12/11/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR121N1062334203602 |
|
|
$0.04 |
000001071505-3562506200 |
2024 |
6 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
12/6/2023 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P092K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$5,494.40 |
|
2024 |
5 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
11/29/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR112N1062332502491 |
|
|
$216.20 |
000001071505-3562506200 |
2024 |
5 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
11/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112N1062332502491 |
|
|
$34.87 |
000001071505-3562506200 |
2024 |
5 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
11/29/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR112N1062332502491 |
|
|
$16.35 |
000001071505-3562506200 |
2024 |
5 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
11/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112N1062332502491 |
|
|
$2.64 |
000001071505-3562506200 |
2024 |
5 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
11/29/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR112N1062332502491 |
|
|
$143.03 |
000001071505-3562506200 |
2024 |
5 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
11/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112N1062332502491 |
|
|
$23.08 |
000001071505-3562506200 |
2024 |
5 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
11/29/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR112N1062332502491 |
|
|
$35.07 |
000001071505-3562506200 |
2024 |
5 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
11/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112N1062332502491 |
|
|
$5.57 |
000001071505-3562506200 |
2024 |
5 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
11/29/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR112N1062332502491 |
|
|
$0.09 |
000001071505-3562506200 |
2024 |
5 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
11/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112N1062332502491 |
|
|
$0.02 |
000001071505-3562506200 |
2024 |
5 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
11/27/2023 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162523329003740 |
|
|
$19.50 |
|
2024 |
5 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
11/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112N1062332502829 |
|
|
$0.03 |
11038961-3562506340 |
2024 |
5 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
11/22/2023 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P091K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$22,654.96 |
|
2024 |
5 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
11/22/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR112N1062332502829 |
|
|
$0.18 |
11038961-3562506340 |
2024 |
5 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
11/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112N1062332502828 |
|
|
$117.48 |
11038961-3562506340 |
2024 |
5 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
11/22/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR112N1062332502828 |
|
|
$725.28 |
11038961-3562506340 |
2024 |
5 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
11/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112N1062332502828 |
|
|
$8.92 |
11038961-3562506340 |
2024 |
5 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
11/22/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR112N1062332502828 |
|
|
$55.11 |
11038961-3562506340 |
2024 |
5 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
11/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112N1062332502828 |
|
|
$77.74 |
11038961-3562506340 |
2024 |
5 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
11/22/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR112N1062332502828 |
|
|
$479.86 |
11038961-3562506340 |
2024 |
5 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
11/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112N1062332502828 |
|
|
$11.18 |
11038961-3562506340 |
2024 |
5 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
11/22/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR112N1062332502828 |
|
|
$70.13 |
11038961-3562506340 |
2024 |
5 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
11/21/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400100821 |
PON22000001344 |
HDR ENGINEERING INC |
$49,614.50 |
Item N. 6-14 |
2024 |
5 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
11/21/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400100821 |
PON22000001344 |
HDR ENGINEERING INC |
$813.60 |
Item N. 6-14 |
2024 |
5 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
11/14/2023 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162523314004870 |
|
|
$62.40 |
|
2024 |
5 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
11/14/2023 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162523314010650 |
|
|
$165.00 |
|
2024 |
5 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
11/9/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR111N1062331201487 |
|
|
$184.17 |
000001085758-3562500424 |
2024 |
5 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
11/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201487 |
|
|
$16.74 |
000001085758-3562500424 |
2024 |
5 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
11/9/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR111N1062331201487 |
|
|
$12.62 |
000001085758-3562500424 |
2024 |
5 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
11/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201487 |
|
|
$1.15 |
000001085758-3562500424 |
2024 |
5 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
11/9/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR111N1062331201487 |
|
|
$121.86 |
000001085758-3562500424 |
2024 |
5 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
11/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201487 |
|
|
$11.08 |
000001085758-3562500424 |
2024 |
5 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
11/9/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR111N1062331201487 |
|
|
$42.97 |
000001085758-3562500424 |
2024 |
5 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
11/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201487 |
|
|
$3.88 |
000001085758-3562500424 |
2024 |
5 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
11/9/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR111N1062331201737 |
|
|
$997.15 |
11030433-3562506340 |
2024 |
5 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
11/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201737 |
|
|
$199.43 |
11030433-3562506340 |
2024 |
5 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
11/9/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR111N1062331201737 |
|
|
$75.23 |
11030433-3562506340 |
2024 |
5 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
11/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201737 |
|
|
$15.04 |
11030433-3562506340 |
2024 |
5 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
11/9/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR111N1062331201737 |
|
|
$659.81 |
11030433-3562506340 |
2024 |
5 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
11/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201737 |
|
|
$131.96 |
11030433-3562506340 |
2024 |
5 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
11/9/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR111N1062331201737 |
|
|
$96.48 |
11030433-3562506340 |
2024 |
5 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
11/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201737 |
|
|
$18.99 |
11030433-3562506340 |
2024 |
5 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
11/9/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR111N1062331201491 |
|
|
$1,961.79 |
000001086565-3562506210 |
2024 |
5 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
11/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201491 |
|
|
$367.97 |
000001086565-3562506210 |
2024 |
5 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
11/9/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR111N1062331201491 |
|
|
$136.26 |
000001086565-3562506210 |
2024 |
5 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
11/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201491 |
|
|
$25.06 |
000001086565-3562506210 |
2024 |
5 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
11/9/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR111N1062331201491 |
|
|
$1,298.11 |
000001086565-3562506210 |
2024 |
5 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
11/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201491 |
|
|
$243.48 |
000001086565-3562506210 |
2024 |
5 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
11/9/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR111N1062331201491 |
|
|
$397.64 |
000001086565-3562506210 |
2024 |
5 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
11/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201491 |
|
|
$81.23 |
000001086565-3562506210 |
2024 |
5 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
11/8/2023 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P090K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$5,215.50 |
|
2024 |
5 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
11/7/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400085657 |
PON22000001344 |
HDR ENGINEERING INC |
$821.02 |
Item N. 6-14 |
2024 |
5 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
11/7/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400085657 |
PON22000001344 |
HDR ENGINEERING INC |
$52,558.00 |
Item N. 6-14 |
2024 |
5 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
11/7/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400085657 |
PON22000001344 |
HDR ENGINEERING INC |
$1,102.00 |
Item N. 6-14 |
2024 |
5 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
11/7/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400085657 |
PON22000001344 |
HDR ENGINEERING INC |
$1,056.60 |
Item N. 6-14 |
2024 |
4 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
10/30/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR102N1062329600408 |
|
|
$628.19 |
000001079537-3562506210 |
2024 |
4 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
10/30/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102N1062329600408 |
|
|
$91.02 |
000001079537-3562506210 |
2024 |
4 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
10/30/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR102N1062329600408 |
|
|
$140.23 |
000001079537-3562506210 |
2024 |
4 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
10/30/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102N1062329600408 |
|
|
$20.06 |
000001079537-3562506210 |
2024 |
4 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
10/30/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR102N1062329600408 |
|
|
$0.30 |
000001079537-3562506210 |
2024 |
4 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
10/30/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102N1062329600408 |
|
|
$0.04 |
000001079537-3562506210 |
2024 |
4 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
10/27/2023 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P089K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$189,841.07 |
|
2024 |
4 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
10/27/2023 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162523298002640 |
|
|
$152.10 |
|
2024 |
4 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
10/24/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR102N1062329600844 |
|
|
$1,595.43 |
11025193-3562506340 |
2024 |
4 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
10/24/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR102N1062329600844 |
|
|
$121.22 |
11025193-3562506340 |
2024 |
4 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
10/24/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR102N1062329600430 |
|
|
$2,460.07 |
000001086565-3562506210 |
2024 |
4 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
10/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102N1062329600430 |
|
|
$901.32 |
000001086565-3562506210 |
2024 |
4 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
10/24/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR102N1062329600430 |
|
|
$177.71 |
000001086565-3562506210 |
2024 |
4 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
10/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102N1062329600430 |
|
|
$63.58 |
000001086565-3562506210 |
2024 |
4 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
10/24/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR102N1062329600430 |
|
|
$1,627.77 |
000001086565-3562506210 |
2024 |
4 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
10/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102N1062329600430 |
|
|
$596.41 |
000001086565-3562506210 |
2024 |
4 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
10/24/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR102N1062329600430 |
|
|
$478.14 |
000001086565-3562506210 |
2024 |
4 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
10/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102N1062329600430 |
|
|
$208.54 |
000001086565-3562506210 |
2024 |
4 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
10/24/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR102N1062329600430 |
|
|
$0.77 |
000001086565-3562506210 |
2024 |
4 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
10/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102N1062329600430 |
|
|
$0.31 |
000001086565-3562506210 |
2024 |
4 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
10/24/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR102N1062329600844 |
|
|
$1,055.70 |
11025193-3562506340 |
2024 |
4 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
10/24/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR102N1062329600844 |
|
|
$153.95 |
11025193-3562506340 |
2024 |
4 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
10/24/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR102N1062329600844 |
|
|
$0.40 |
11025193-3562506340 |
2024 |
4 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
10/24/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR102N1062329600407 |
|
|
$949.27 |
000001079537-3562506210 |
2024 |
4 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
10/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102N1062329600407 |
|
|
$137.55 |
000001079537-3562506210 |
2024 |
4 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
10/24/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR102N1062329600407 |
|
|
$69.71 |
000001079537-3562506210 |
2024 |
4 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
10/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102N1062329600407 |
|
|
$10.10 |
000001079537-3562506210 |
2024 |
4 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
10/11/2023 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162523283002730 |
|
|
$19.50 |
|
2024 |
4 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
10/9/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR101N1062328010093 |
|
|
$153.96 |
11016949-3562506340 |
2024 |
4 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
10/9/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR101N1062328009685 |
|
|
$4,790.64 |
000001079537-3562506210 |
2024 |
4 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
10/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101N1062328009685 |
|
|
$275.44 |
000001079537-3562506210 |
2024 |
4 |
FD52 |
06 |
E115 |
C |
8022202C |
008 |
10/9/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR101N1062328009685 |
|
|
$75.87 |
000001079537-3562506210 |
2024 |
4 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
10/9/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR101N1062328009685 |
|
|
$343.28 |
000001079537-3562506210 |
2024 |
4 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
10/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101N1062328009685 |
|
|
$19.04 |
000001079537-3562506210 |
2024 |
4 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
10/9/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR101N1062328009685 |
|
|
$3,220.14 |
000001079537-3562506210 |
2024 |
4 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
10/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101N1062328009685 |
|
|
$182.26 |
000001079537-3562506210 |
2024 |
4 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
10/9/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR101N1062328009685 |
|
|
$772.75 |
000001079537-3562506210 |
2024 |
4 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
10/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101N1062328009685 |
|
|
$47.05 |
000001079537-3562506210 |
2024 |
4 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
10/9/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR101N1062328009685 |
|
|
$0.06 |
000001079228-3562506210 |
2024 |
4 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
10/9/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR101N1062328010093 |
|
|
$1,595.43 |
11016949-3562506340 |
2024 |
4 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
10/9/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR101N1062328009685 |
|
|
$0.01 |
000001079228-3562506210 |
2024 |
4 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
10/9/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR101N1062328010093 |
|
|
$121.01 |
11016949-3562506340 |
2024 |
4 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
10/9/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR101N1062328009705 |
|
|
$2,473.88 |
000001086565-3562506210 |
2024 |
4 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
10/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101N1062328009705 |
|
|
$910.72 |
000001086565-3562506210 |
2024 |
4 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
10/9/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR101N1062328009705 |
|
|
$174.32 |
000001086565-3562506210 |
2024 |
4 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
10/9/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR101N1062328010093 |
|
|
$653.54 |
11016949-3562506340 |
2024 |
4 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
10/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101N1062328009705 |
|
|
$61.13 |
000001086565-3562506210 |
2024 |
4 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
10/9/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR101N1062328009705 |
|
|
$1,637.02 |
000001086565-3562506210 |
2024 |
4 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
10/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101N1062328009705 |
|
|
$602.61 |
000001086565-3562506210 |
2024 |
4 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
10/9/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR101N1062328009705 |
|
|
$478.06 |
000001086565-3562506210 |
2024 |
4 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
10/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101N1062328009705 |
|
|
$229.96 |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
9/29/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR092N1062327208428 |
|
|
$1,852.19 |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208428 |
|
|
$757.39 |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
9/29/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR092N1062327208428 |
|
|
$133.73 |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208428 |
|
|
$53.64 |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
9/29/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR092N1062327208428 |
|
|
$1,225.77 |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208428 |
|
|
$501.16 |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
9/29/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR092N1062327208428 |
|
|
$354.29 |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208428 |
|
|
$167.93 |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
9/29/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR092N1062327208428 |
|
|
$0.63 |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208428 |
|
|
$0.26 |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
9/29/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR092N1062327208402 |
|
|
$4,044.88 |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208402 |
|
|
$1,195.90 |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E115 |
C |
8022202C |
008 |
9/29/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR092N1062327208402 |
|
|
$101.16 |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
9/29/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR092N1062327208402 |
|
|
$301.77 |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208402 |
|
|
$85.64 |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
9/29/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR092N1062327208402 |
|
|
$2,743.51 |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208402 |
|
|
$791.32 |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
9/29/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR092N1062327208402 |
|
|
$662.64 |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208402 |
|
|
$216.29 |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
9/29/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR092N1062327208402 |
|
|
$1.36 |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208402 |
|
|
$0.42 |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
9/29/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR092N1062327208401 |
|
|
$536.62 |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208401 |
|
|
$93.53 |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
9/29/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR092N1062327209090 |
|
|
$1,450.39 |
11009759-3562506340 |
2024 |
3 |
FD52 |
06 |
E115 |
C |
8022202C |
008 |
9/29/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR092N1062327208401 |
|
|
$328.78 |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327209090 |
|
|
$145.04 |
11009759-3562506340 |
2024 |
3 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
9/29/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR092N1062327208401 |
|
|
$64.01 |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
9/29/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR092N1062327209090 |
|
|
$110.21 |
11009759-3562506340 |
2024 |
3 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208401 |
|
|
$6.74 |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327209090 |
|
|
$11.02 |
11009759-3562506340 |
2024 |
3 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
9/29/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR092N1062327208401 |
|
|
$572.72 |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
9/29/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR092N1062327209090 |
|
|
$959.72 |
11009759-3562506340 |
2024 |
3 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208401 |
|
|
$61.89 |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327209090 |
|
|
$95.97 |
11009759-3562506340 |
2024 |
3 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
9/29/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR092N1062327208401 |
|
|
$87.61 |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
9/29/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR092N1062327209090 |
|
|
$140.14 |
11009759-3562506340 |
2024 |
3 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208401 |
|
|
$15.79 |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
9/29/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR092N1062327208560 |
|
|
$664.76 |
11000790-3562506340 |
2024 |
3 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327209090 |
|
|
$13.81 |
11009759-3562506340 |
2024 |
3 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
9/29/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR092N1062327208401 |
|
|
$0.18 |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
9/29/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR092N1062327208560 |
|
|
$50.16 |
11000790-3562506340 |
2024 |
3 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
9/29/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR092N1062327209090 |
|
|
$0.36 |
11009759-3562506340 |
2024 |
3 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208401 |
|
|
$0.03 |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
9/29/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR092N1062327208560 |
|
|
$439.87 |
11000790-3562506340 |
2024 |
3 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327209090 |
|
|
$0.04 |
11009759-3562506340 |
2024 |
3 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
9/29/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR092N1062327208560 |
|
|
$64.15 |
11000790-3562506340 |
2024 |
3 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
9/28/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR092N1062326507077 |
|
|
($1,852.19) |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
9/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507077 |
|
|
($757.39) |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
9/28/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR092N1062326507077 |
|
|
($133.73) |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
9/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507077 |
|
|
($53.64) |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
9/28/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR092N1062326507077 |
|
|
($1,225.77) |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
9/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507077 |
|
|
($501.16) |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
9/28/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR092N1062326507077 |
|
|
($354.29) |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
9/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507077 |
|
|
($167.93) |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
9/28/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR092N1062326507077 |
|
|
($0.63) |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
9/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507077 |
|
|
($0.26) |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
9/28/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR092N1062326507051 |
|
|
($4,044.88) |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
9/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507051 |
|
|
($1,195.90) |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E115 |
C |
8022202C |
008 |
9/28/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR092N1062326507051 |
|
|
($101.16) |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
9/28/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR092N1062326507051 |
|
|
($301.77) |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
9/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507051 |
|
|
($85.64) |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
9/28/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR092N1062326507051 |
|
|
($2,743.51) |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
9/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507051 |
|
|
($791.32) |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
9/28/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR092N1062326507051 |
|
|
($662.64) |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
9/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507051 |
|
|
($216.29) |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
9/28/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR092N1062326507051 |
|
|
($1.36) |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
9/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507051 |
|
|
($0.42) |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
9/28/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR092N1062326507050 |
|
|
($536.62) |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
9/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507050 |
|
|
($93.53) |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E115 |
C |
8022202C |
008 |
9/28/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR092N1062326507050 |
|
|
($328.78) |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
9/28/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR092N1062326507050 |
|
|
($64.01) |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
9/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507050 |
|
|
($6.74) |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
9/28/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR092N1062326507050 |
|
|
($572.72) |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
9/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507050 |
|
|
($61.89) |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
9/28/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR092N1062326507050 |
|
|
($87.61) |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
9/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507050 |
|
|
($15.79) |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
9/28/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR092N1062326507050 |
|
|
($0.18) |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
9/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507050 |
|
|
($0.03) |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
9/27/2023 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P088K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$829,873.58 |
|
2024 |
3 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
9/25/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR092N1062326507077 |
|
|
$1,852.19 |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
9/25/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507077 |
|
|
$757.39 |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
9/25/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR092N1062326507077 |
|
|
$133.73 |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
9/25/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507077 |
|
|
$53.64 |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
9/25/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR092N1062326507077 |
|
|
$1,225.77 |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
9/25/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507077 |
|
|
$501.16 |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
9/25/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR092N1062326507077 |
|
|
$354.29 |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
9/25/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507077 |
|
|
$167.93 |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
9/25/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR092N1062326507077 |
|
|
$0.63 |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
9/25/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507077 |
|
|
$0.26 |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
9/25/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR092N1062326507051 |
|
|
$4,044.88 |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
9/25/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507051 |
|
|
$1,195.90 |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E115 |
C |
8022202C |
008 |
9/25/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR092N1062326507051 |
|
|
$101.16 |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
9/25/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR092N1062326507051 |
|
|
$301.77 |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
9/25/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507051 |
|
|
$85.64 |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
9/25/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR092N1062326507051 |
|
|
$2,743.51 |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
9/25/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507051 |
|
|
$791.32 |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
9/25/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR092N1062326507051 |
|
|
$662.64 |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
9/25/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507051 |
|
|
$216.29 |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
9/25/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR092N1062326507051 |
|
|
$1.36 |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
9/25/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507051 |
|
|
$0.42 |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
9/25/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR092N1062326507050 |
|
|
$536.62 |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
9/25/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507050 |
|
|
$93.53 |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E115 |
C |
8022202C |
008 |
9/25/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR092N1062326507050 |
|
|
$328.78 |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
9/25/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR092N1062326507050 |
|
|
$64.01 |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
9/25/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507050 |
|
|
$6.74 |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
9/25/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR092N1062326507050 |
|
|
$572.72 |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
9/25/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507050 |
|
|
$61.89 |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
9/25/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR092N1062326507050 |
|
|
$87.61 |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
9/25/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507050 |
|
|
$15.79 |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
9/25/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR092N1062326507050 |
|
|
$0.18 |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
9/25/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507050 |
|
|
$0.03 |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
9/13/2023 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P087K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$162,127.16 |
|
2024 |
3 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
9/13/2023 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162523253003370 |
|
|
$50.70 |
|
2024 |
3 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
9/13/2023 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162523253014060 |
|
|
$10.53 |
|
2024 |
3 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
9/11/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR091N1062325106107 |
|
|
$299.81 |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
9/11/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400048055 |
PON22000001344 |
HDR ENGINEERING INC |
$835.90 |
Item N. 6-14 |
2024 |
3 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
9/11/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR091N1062325106083 |
|
|
$1,839.73 |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
9/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091N1062325106083 |
|
|
$214.05 |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
9/11/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR091N1062325106083 |
|
|
$132.32 |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
9/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091N1062325106083 |
|
|
$14.91 |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
9/11/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR091N1062325106083 |
|
|
$1,217.29 |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
9/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091N1062325106083 |
|
|
$141.64 |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
9/11/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR091N1062325106083 |
|
|
$275.00 |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
9/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091N1062325106107 |
|
|
$28.86 |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
9/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091N1062325106083 |
|
|
$35.48 |
000001079537-3562506210 |
2024 |
3 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
9/11/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400048055 |
PON22000001344 |
HDR ENGINEERING INC |
$48,606.00 |
Item N. 6-14 |
2024 |
3 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
9/11/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400048055 |
PON22000001344 |
HDR ENGINEERING INC |
$1,439.25 |
Item N. 6-14 |
2024 |
3 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
9/11/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400048055 |
PON22000001344 |
HDR ENGINEERING INC |
$14,730.25 |
Item N. 6-14 |
2024 |
3 |
FD52 |
06 |
E115 |
C |
8022202C |
008 |
9/11/2023 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
CA-XR091N1062325106082 |
|
|
$101.17 |
000001079227-3562506210 |
2024 |
3 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
9/11/2023 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
CA-XR091N1062325106082 |
|
|
$7.60 |
000001079227-3562506210 |
2024 |
3 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
9/11/2023 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
CA-XR091N1062325106082 |
|
|
$66.95 |
000001079227-3562506210 |
2024 |
3 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
9/11/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR091N1062325106082 |
|
|
$820.27 |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
9/11/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR091N1062325106072 |
|
|
$639.38 |
000001071505-3562506200 |
2024 |
3 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
9/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091N1062325106082 |
|
|
$113.59 |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
9/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091N1062325106072 |
|
|
$1,065.47 |
000001071505-3562506200 |
2024 |
3 |
FD52 |
06 |
E115 |
C |
8022202C |
008 |
9/11/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR091N1062325106082 |
|
|
$809.31 |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
9/11/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR091N1062325106072 |
|
|
$48.91 |
000001071505-3562506200 |
2024 |
3 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
9/11/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR091N1062325106082 |
|
|
$116.97 |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
9/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091N1062325106072 |
|
|
$81.51 |
000001071505-3562506200 |
2024 |
3 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
9/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091N1062325106082 |
|
|
$7.95 |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
9/11/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR091N1062325106072 |
|
|
$423.08 |
000001071505-3562506200 |
2024 |
3 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
9/11/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR091N1062325106082 |
|
|
$1,078.23 |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
9/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091N1062325106072 |
|
|
$705.02 |
000001071505-3562506200 |
2024 |
3 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
9/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091N1062325106082 |
|
|
$75.16 |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
9/11/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR091N1062325106082 |
|
|
$119.25 |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
9/11/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400048055 |
PON22000001344 |
HDR ENGINEERING INC |
$2,681.40 |
Item N. 6-14 |
2024 |
3 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
9/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091N1062325106082 |
|
|
$18.55 |
000001079228-3562506210 |
2024 |
3 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
9/11/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR091N1062325106106 |
|
|
$1,469.84 |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
9/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091N1062325106106 |
|
|
$165.34 |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
9/11/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR091N1062325106106 |
|
|
$105.02 |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
9/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091N1062325106106 |
|
|
$11.61 |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
9/11/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR091N1062325106106 |
|
|
$972.53 |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
9/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091N1062325106106 |
|
|
$109.41 |
000001086565-3562506210 |
2024 |
3 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
9/5/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR082N1062323504917 |
|
|
$2,092.52 |
000001071505-3562506200 |
2024 |
3 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
9/5/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082N1062323504917 |
|
|
$464.82 |
000001071505-3562506200 |
2024 |
3 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
9/5/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR082N1062323504917 |
|
|
$157.69 |
000001071505-3562506200 |
2024 |
3 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
9/5/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082N1062323504917 |
|
|
$35.03 |
000001071505-3562506200 |
2024 |
3 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
9/5/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR082N1062323504917 |
|
|
$1,384.63 |
000001071505-3562506200 |
2024 |
3 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
9/5/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082N1062323504917 |
|
|
$307.57 |
000001071505-3562506200 |
2024 |
3 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
9/5/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR082N1062323504917 |
|
|
$225.62 |
000001071505-3562506200 |
2024 |
3 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
9/5/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082N1062323504917 |
|
|
$49.49 |
000001071505-3562506200 |
2024 |
3 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
9/5/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR082N1062323504917 |
|
|
$0.45 |
000001071505-3562506200 |
2024 |
3 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
9/5/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082N1062323504917 |
|
|
$0.10 |
000001071505-3562506200 |
2024 |
2 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
8/30/2023 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P086K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$1,264,708.25 |
|
2024 |
2 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
8/29/2023 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162523237016390 |
|
|
$67.86 |
|
2024 |
2 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
8/24/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR082N1062323504930 |
|
|
$1,399.91 |
000001079537-3562506210 |
2024 |
2 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
8/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082N1062323504930 |
|
|
$7.64 |
000001079537-3562506210 |
2024 |
2 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
8/24/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR082N1062323504930 |
|
|
$102.32 |
000001079537-3562506210 |
2024 |
2 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
8/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082N1062323504930 |
|
|
$0.54 |
000001079537-3562506210 |
2024 |
2 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
8/24/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR082N1062323504930 |
|
|
$926.90 |
000001079537-3562506210 |
2024 |
2 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
8/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082N1062323504930 |
|
|
$5.05 |
000001079537-3562506210 |
2024 |
2 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
8/24/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR082N1062323504930 |
|
|
$212.32 |
000001079537-3562506210 |
2024 |
2 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
8/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082N1062323504930 |
|
|
$1.29 |
000001079537-3562506210 |
2024 |
2 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
8/24/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR082N1062323504930 |
|
|
$0.48 |
000001079537-3562506210 |
2024 |
2 |
FD52 |
06 |
E115 |
C |
8022202C |
008 |
8/24/2023 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
CA-XR082N1062323504929 |
|
|
$75.87 |
000001079227-3562506210 |
2024 |
2 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
8/24/2023 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
CA-XR082N1062323504929 |
|
|
$5.70 |
000001079227-3562506210 |
2024 |
2 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
8/24/2023 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
CA-XR082N1062323504929 |
|
|
$50.20 |
000001079227-3562506210 |
2024 |
2 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
8/24/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR082N1062323504929 |
|
|
$1,245.49 |
000001079228-3562506210 |
2024 |
2 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
8/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082N1062323504929 |
|
|
$7.64 |
000001079228-3562506210 |
2024 |
2 |
FD52 |
06 |
E115 |
C |
8022202C |
008 |
8/24/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR082N1062323504929 |
|
|
$1,163.39 |
000001079228-3562506210 |
2024 |
2 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
8/24/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR082N1062323504929 |
|
|
$176.43 |
000001079228-3562506210 |
2024 |
2 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
8/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082N1062323504929 |
|
|
$0.54 |
000001079228-3562506210 |
2024 |
2 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
8/24/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR082N1062323504929 |
|
|
$1,593.89 |
000001079228-3562506210 |
2024 |
2 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
8/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082N1062323504929 |
|
|
$5.05 |
000001079228-3562506210 |
2024 |
2 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
8/24/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR082N1062323504929 |
|
|
$241.39 |
000001079228-3562506210 |
2024 |
2 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
8/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082N1062323504929 |
|
|
$1.29 |
000001079228-3562506210 |
2024 |
2 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
8/24/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR082N1062323504929 |
|
|
$0.45 |
000001079228-3562506210 |
2024 |
2 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
8/24/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR082N1062323504956 |
|
|
$498.14 |
000001086565-3562506210 |
2024 |
2 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
8/24/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR082N1062323504956 |
|
|
$35.74 |
000001086565-3562506210 |
2024 |
2 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
8/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082N1062323504956 |
|
|
$0.01 |
000001086565-3562506210 |
2024 |
2 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
8/24/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR082N1062323504956 |
|
|
$329.62 |
000001086565-3562506210 |
2024 |
2 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
8/24/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR082N1062323504956 |
|
|
$127.78 |
000001086565-3562506210 |
2024 |
2 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
8/24/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR082N1062323504956 |
|
|
$0.18 |
000001086565-3562506210 |
2024 |
2 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
8/11/2023 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162523222015080 |
|
|
$268.71 |
|
2024 |
2 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
8/9/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR081N1062322003872 |
|
|
$249.07 |
000001086565-3562506210 |
2024 |
2 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
8/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081N1062322003872 |
|
|
$24.91 |
000001086565-3562506210 |
2024 |
2 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
8/9/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR081N1062322003872 |
|
|
$16.71 |
000001086565-3562506210 |
2024 |
2 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
8/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081N1062322003872 |
|
|
$1.67 |
000001086565-3562506210 |
2024 |
2 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
8/9/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR081N1062322003872 |
|
|
$164.81 |
000001086565-3562506210 |
2024 |
2 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
8/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081N1062322003872 |
|
|
$16.48 |
000001086565-3562506210 |
2024 |
2 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
8/9/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR081N1062322003872 |
|
|
$63.94 |
000001086565-3562506210 |
2024 |
2 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
8/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081N1062322003872 |
|
|
$6.34 |
000001086565-3562506210 |
2024 |
2 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
8/9/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR081N1062322003839 |
|
|
$3,292.25 |
000001071505-3562506200 |
2024 |
2 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
8/9/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR081N1062322003839 |
|
|
$248.12 |
000001071505-3562506200 |
2024 |
2 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
8/9/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR081N1062322003839 |
|
|
$2,178.48 |
000001071505-3562506200 |
2024 |
2 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
8/9/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR081N1062322003839 |
|
|
$354.18 |
000001071505-3562506200 |
2024 |
2 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
8/9/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR081N1062322003849 |
|
|
$249.07 |
000001079228-3562506210 |
2024 |
2 |
FD52 |
06 |
E115 |
C |
8022202C |
008 |
8/9/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR081N1062322003849 |
|
|
$227.62 |
000001079228-3562506210 |
2024 |
2 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
8/9/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR081N1062322003849 |
|
|
$34.11 |
000001079228-3562506210 |
2024 |
2 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
8/9/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR081N1062322003849 |
|
|
$315.43 |
000001079228-3562506210 |
2024 |
2 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
8/9/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR081N1062322003849 |
|
|
$45.02 |
000001079228-3562506210 |
2024 |
2 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
8/2/2023 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P085K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$171,184.52 |
|
2024 |
1 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
7/31/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400016195 |
PON22000001344 |
HDR ENGINEERING INC |
$1,010.43 |
Item N. 6-14 |
2024 |
1 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
7/31/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400016195 |
PON22000001344 |
HDR ENGINEERING INC |
$36,554.00 |
Item N. 6-14 |
2024 |
1 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
7/31/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400016195 |
PON22000001344 |
HDR ENGINEERING INC |
$915.00 |
Item N. 6-14 |
2024 |
1 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
7/31/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400016195 |
PON22000001344 |
HDR ENGINEERING INC |
$1,119.90 |
Item N. 6-14 |
2024 |
1 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
7/28/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR072N1062320202654 |
|
|
$1,749.36 |
000001071505-3562506200 |
2024 |
1 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
7/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072N1062320202654 |
|
|
$194.58 |
000001071505-3562506200 |
2024 |
1 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
7/28/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR072N1062320202654 |
|
|
$131.84 |
000001071505-3562506200 |
2024 |
1 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
7/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072N1062320202654 |
|
|
$14.66 |
000001071505-3562506200 |
2024 |
1 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
7/28/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR072N1062320202654 |
|
|
$1,157.55 |
000001071505-3562506200 |
2024 |
1 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
7/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072N1062320202654 |
|
|
$128.75 |
000001071505-3562506200 |
2024 |
1 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
7/28/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR072N1062320202654 |
|
|
$188.40 |
000001071505-3562506200 |
2024 |
1 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
7/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072N1062320202654 |
|
|
$20.72 |
000001071505-3562506200 |
2024 |
1 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
7/28/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR072N1062320202654 |
|
|
$0.38 |
000001071505-3562506200 |
2024 |
1 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
7/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072N1062320202654 |
|
|
$0.04 |
000001071505-3562506200 |
2024 |
1 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
7/26/2023 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162523206009960 |
|
|
$38.22 |
|
2024 |
1 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
7/24/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR072N1062320202667 |
|
|
$1,333.47 |
000001079228-3562506210 |
2024 |
1 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
7/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072N1062320202667 |
|
|
$0.19 |
000001079228-3562506210 |
2024 |
1 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
7/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072N1062320202667 |
|
|
$517.28 |
000001079228-3562506210 |
2024 |
1 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
7/24/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR072N1062320202667 |
|
|
$95.73 |
000001079228-3562506210 |
2024 |
1 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
7/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072N1062320202667 |
|
|
$37.84 |
000001079228-3562506210 |
2024 |
1 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
7/24/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR072N1062320202667 |
|
|
$882.29 |
000001079228-3562506210 |
2024 |
1 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
7/24/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR072N1062320202696 |
|
|
$2,585.78 |
000001086565-3562506210 |
2024 |
1 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
7/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072N1062320202696 |
|
|
$774.20 |
000001086565-3562506210 |
2024 |
1 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
7/24/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR072N1062320202696 |
|
|
$184.87 |
000001086565-3562506210 |
2024 |
1 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
7/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072N1062320202696 |
|
|
$56.94 |
000001086565-3562506210 |
2024 |
1 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
7/24/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR072N1062320202696 |
|
|
$1,710.92 |
000001086565-3562506210 |
2024 |
1 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
7/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072N1062320202696 |
|
|
$512.30 |
000001086565-3562506210 |
2024 |
1 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
7/24/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR072N1062320202696 |
|
|
$571.68 |
000001086565-3562506210 |
2024 |
1 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
7/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072N1062320202696 |
|
|
$149.97 |
000001086565-3562506210 |
2024 |
1 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
7/24/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR072N1062320202696 |
|
|
$0.90 |
000001086565-3562506210 |
2024 |
1 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
7/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072N1062320202667 |
|
|
$342.28 |
000001079228-3562506210 |
2024 |
1 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
7/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072N1062320202696 |
|
|
$0.28 |
000001086565-3562506210 |
2024 |
1 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
7/24/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR072N1062320202667 |
|
|
$254.55 |
000001079228-3562506210 |
2024 |
1 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
7/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072N1062320202667 |
|
|
$92.61 |
000001079228-3562506210 |
2024 |
1 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
7/24/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR072N1062320202667 |
|
|
$1,369.91 |
000001079537-3562506210 |
2024 |
1 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
7/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072N1062320202667 |
|
|
$292.98 |
000001079537-3562506210 |
2024 |
1 |
FD52 |
06 |
E115 |
C |
8022202C |
008 |
7/24/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR072N1062320202667 |
|
|
$276.53 |
000001079537-3562506210 |
2024 |
1 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
7/24/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR072N1062320202667 |
|
|
$118.60 |
000001079537-3562506210 |
2024 |
1 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
7/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072N1062320202667 |
|
|
$20.94 |
000001079537-3562506210 |
2024 |
1 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
7/24/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR072N1062320202667 |
|
|
$1,117.67 |
000001079537-3562506210 |
2024 |
1 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
7/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072N1062320202667 |
|
|
$193.86 |
000001079537-3562506210 |
2024 |
1 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
7/24/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR072N1062320202667 |
|
|
$239.60 |
000001079537-3562506210 |
2024 |
1 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
7/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072N1062320202667 |
|
|
$50.08 |
000001079537-3562506210 |
2024 |
1 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
7/24/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR072N1062320202667 |
|
|
$0.49 |
000001079228-3562506210 |
2024 |
1 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
7/24/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR072N1062320202667 |
|
|
$0.50 |
000001079537-3562506210 |
2024 |
1 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
7/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072N1062320202667 |
|
|
$0.10 |
000001079537-3562506210 |
2024 |
1 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
7/19/2023 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P084K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$334,504.91 |
|
2024 |
1 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
7/14/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR071N1062319101528 |
|
|
$1,184.45 |
000001071505-3562506200 |
2024 |
1 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
7/14/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071N1062319101528 |
|
|
$987.04 |
000001071505-3562506200 |
2024 |
1 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
7/14/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR071N1062319101528 |
|
|
$89.18 |
000001071505-3562506200 |
2024 |
1 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
7/14/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071N1062319101528 |
|
|
$74.32 |
000001071505-3562506200 |
2024 |
1 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
7/14/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR071N1062319101528 |
|
|
$923.87 |
000001071505-3562506200 |
2024 |
1 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
7/14/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071N1062319101528 |
|
|
$769.89 |
000001071505-3562506200 |
2024 |
1 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
7/14/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR071N1062319101528 |
|
|
$136.22 |
000001071505-3562506200 |
2024 |
1 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
7/14/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071N1062319101528 |
|
|
$111.40 |
000001071505-3562506200 |
2024 |
1 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
7/12/2023 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162523191021070 |
|
|
$38.22 |
|
2024 |
1 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
7/11/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR071N1062319101538 |
|
|
$469.95 |
000001079228-3562506210 |
2024 |
1 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
7/11/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR071N1062319101538 |
|
|
$32.01 |
000001079228-3562506210 |
2024 |
1 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
7/11/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR071N1062319101538 |
|
|
$366.56 |
000001079228-3562506210 |
2024 |
1 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
7/11/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR071N1062319101538 |
|
|
$90.05 |
000001079228-3562506210 |
2024 |
1 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
7/11/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR071N1062319101560 |
|
|
$203.65 |
000001086565-3562506210 |
2024 |
1 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
7/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071N1062319101560 |
|
|
$375.65 |
000001086565-3562506210 |
2024 |
1 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
7/11/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR071N1062319101560 |
|
|
$13.55 |
000001086565-3562506210 |
2024 |
1 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
7/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071N1062319101560 |
|
|
$24.99 |
000001086565-3562506210 |
2024 |
1 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
7/11/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR071N1062319101560 |
|
|
$158.84 |
000001086565-3562506210 |
2024 |
1 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
7/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071N1062319101560 |
|
|
$293.00 |
000001086565-3562506210 |
2024 |
1 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
7/11/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR071N1062319101560 |
|
|
$56.10 |
000001086565-3562506210 |
2024 |
1 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
7/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071N1062319101560 |
|
|
$101.40 |
000001086565-3562506210 |
2024 |
1 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
7/11/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR071N1062319101538 |
|
|
$469.95 |
000001079537-3562506210 |
2024 |
1 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
7/11/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR071N1062319101538 |
|
|
$32.33 |
000001079537-3562506210 |
2024 |
1 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
7/11/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR071N1062319101538 |
|
|
$366.56 |
000001079537-3562506210 |
2024 |
1 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
7/11/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR071N1062319101538 |
|
|
$84.86 |
000001079537-3562506210 |
2024 |
1 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
7/6/2023 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P083K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$289,236.49 |
|
2023 |
12 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
6/26/2023 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162523176019930 |
|
|
$38.22 |
|
2023 |
12 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
6/26/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR062N1062317400409 |
|
|
$1,737.19 |
000001071505-3562506200 |
2023 |
12 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
6/26/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062N1062317400409 |
|
|
$54.22 |
000001071505-3562506200 |
2023 |
12 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
6/26/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR062N1062317400409 |
|
|
$130.80 |
000001071505-3562506200 |
2023 |
12 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
6/26/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062N1062317400409 |
|
|
$4.08 |
000001071505-3562506200 |
2023 |
12 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
6/26/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR062N1062317400409 |
|
|
$1,355.01 |
000001071505-3562506200 |
2023 |
12 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
6/26/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062N1062317400409 |
|
|
$42.29 |
000001071505-3562506200 |
2023 |
12 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
6/26/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR062N1062317400409 |
|
|
$198.16 |
000001071505-3562506200 |
2023 |
12 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
6/26/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062N1062317400409 |
|
|
$6.12 |
000001071505-3562506200 |
2023 |
12 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
6/26/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR062N1062317400409 |
|
|
$0.40 |
000001071505-3562506200 |
2023 |
12 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
6/26/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR062N1062317400422 |
|
|
$234.94 |
000001079537-3562506210 |
2023 |
12 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
6/26/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062N1062317400409 |
|
|
$0.01 |
000001071505-3562506200 |
2023 |
12 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
6/26/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062N1062317400422 |
|
|
$5.95 |
000001079537-3562506210 |
2023 |
12 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
6/26/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR062N1062317400422 |
|
|
$16.67 |
000001079537-3562506210 |
2023 |
12 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
6/26/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062N1062317400422 |
|
|
$0.42 |
000001079537-3562506210 |
2023 |
12 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
6/26/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR062N1062317400422 |
|
|
$183.07 |
000001079537-3562506210 |
2023 |
12 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
6/26/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062N1062317400422 |
|
|
$4.64 |
000001079537-3562506210 |
2023 |
12 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
6/26/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR062N1062317400422 |
|
|
$44.93 |
000001079537-3562506210 |
2023 |
12 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
6/26/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062N1062317400422 |
|
|
$1.13 |
000001079537-3562506210 |
2023 |
12 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
6/26/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR062N1062317400422 |
|
|
$0.12 |
000001079537-3562506210 |
2023 |
12 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
6/23/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300252639 |
PON22000001344 |
HDR ENGINEERING INC |
$821.02 |
Item N. 6-14 |
2023 |
12 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
6/23/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300252639 |
PON22000001344 |
HDR ENGINEERING INC |
$39,970.50 |
Item N. 6-14 |
2023 |
12 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
6/23/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300252639 |
PON22000001344 |
HDR ENGINEERING INC |
$2,092.75 |
Item N. 6-14 |
2023 |
12 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
6/23/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300252639 |
PON22000001344 |
HDR ENGINEERING INC |
$1,539.00 |
Item N. 6-14 |
2023 |
12 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
6/22/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300230176 |
PON22000001344 |
HDR ENGINEERING INC |
$1,453.02 |
Item N. 6-14 |
2023 |
12 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
6/22/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300230176 |
PON22000001344 |
HDR ENGINEERING INC |
$50,389.50 |
Item N. 6-14 |
2023 |
12 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
6/22/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300230176 |
PON22000001344 |
HDR ENGINEERING INC |
$1,476.00 |
Item N. 6-14 |
2023 |
12 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
6/22/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300230176 |
PON22000001344 |
HDR ENGINEERING INC |
$1,953.54 |
Item N. 6-14 |
2023 |
12 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
6/13/2023 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A262523161001380 |
|
|
$38.22 |
|
2023 |
12 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
6/8/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR061N1062315810128 |
|
|
$215.42 |
000001079228-3562506210 |
2023 |
12 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
6/8/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061N1062315810128 |
|
|
$31.59 |
000001079228-3562506210 |
2023 |
12 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
6/8/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR061N1062315810128 |
|
|
$15.19 |
000001079228-3562506210 |
2023 |
12 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
6/8/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061N1062315810128 |
|
|
$2.23 |
000001079228-3562506210 |
2023 |
12 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
6/8/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR061N1062315810128 |
|
|
$168.26 |
000001079228-3562506210 |
2023 |
12 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
6/8/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061N1062315810128 |
|
|
$24.64 |
000001079228-3562506210 |
2023 |
12 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
6/8/2023 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR061N1062315810128 |
|
|
$41.40 |
000001079228-3562506210 |
2023 |
12 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
6/8/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061N1062315810128 |
|
|
$5.99 |
000001079228-3562506210 |
2023 |
12 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
6/8/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR061N1062315810116 |
|
|
$1,278.76 |
000001071505-3562506200 |
2023 |
12 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
6/8/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061N1062315810116 |
|
|
$377.36 |
000001071505-3562506200 |
2023 |
12 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
6/8/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR061N1062315810116 |
|
|
$96.28 |
000001071505-3562506200 |
2023 |
12 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
6/8/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061N1062315810116 |
|
|
$28.41 |
000001071505-3562506200 |
2023 |
12 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
6/8/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR061N1062315810116 |
|
|
$997.43 |
000001071505-3562506200 |
2023 |
12 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
6/8/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061N1062315810116 |
|
|
$294.35 |
000001071505-3562506200 |
2023 |
12 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
6/8/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR061N1062315810116 |
|
|
$146.26 |
000001071505-3562506200 |
2023 |
12 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
6/8/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061N1062315810116 |
|
|
$42.59 |
000001071505-3562506200 |
2023 |
12 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
6/7/2023 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P082K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$288,693.39 |
|
2023 |
11 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
5/30/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR052N1062314309066 |
|
|
$307.13 |
000001086565-3562506210 |
2023 |
11 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
5/30/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052N1062314309066 |
|
|
$3.68 |
000001086565-3562506210 |
2023 |
11 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
5/30/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR052N1062314309066 |
|
|
$23.01 |
000001086565-3562506210 |
2023 |
11 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
5/30/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052N1062314309066 |
|
|
$0.27 |
000001086565-3562506210 |
2023 |
11 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
5/30/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR052N1062314309066 |
|
|
$239.48 |
000001086565-3562506210 |
2023 |
11 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
5/30/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052N1062314309066 |
|
|
$2.87 |
000001086565-3562506210 |
2023 |
11 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
5/30/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR052N1062314309066 |
|
|
$45.03 |
000001086565-3562506210 |
2023 |
11 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
5/30/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052N1062314309066 |
|
|
$0.53 |
000001086565-3562506210 |
2023 |
11 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
5/30/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR052N1062314309066 |
|
|
$0.09 |
000001086565-3562506210 |
2023 |
11 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
5/30/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR052N1062314309017 |
|
|
$1,947.76 |
000001071505-3562506200 |
2023 |
11 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
5/30/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR052N1062314309017 |
|
|
$146.66 |
000001071505-3562506200 |
2023 |
11 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
5/30/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR052N1062314309017 |
|
|
$1,519.25 |
000001071505-3562506200 |
2023 |
11 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
5/30/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR052N1062314309017 |
|
|
$222.11 |
000001071505-3562506200 |
2023 |
11 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
5/30/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR052N1062314309017 |
|
|
$0.45 |
000001071505-3562506200 |
2023 |
11 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
5/26/2023 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162523145014140 |
|
|
$38.22 |
|
2023 |
11 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
5/24/2023 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P081K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$121,351.34 |
|
2023 |
11 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
5/24/2023 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
CA-XR052N1062314309031 |
|
|
$234.98 |
000001079227-3562506210 |
2023 |
11 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
5/24/2023 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
CA-XR052N1062314309031 |
|
|
$16.93 |
000001079227-3562506210 |
2023 |
11 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
5/24/2023 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
CA-XR052N1062314309031 |
|
|
$183.28 |
000001079227-3562506210 |
2023 |
11 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
5/24/2023 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
CA-XR052N1062314309031 |
|
|
$45.02 |
000001079227-3562506210 |
2023 |
11 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
5/24/2023 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
CA-XR052N1062314309031 |
|
|
$0.09 |
000001079227-3562506210 |
2023 |
11 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
5/15/2023 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162523130020570 |
|
|
$38.22 |
|
2023 |
11 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
5/15/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR051N1062312808046 |
|
|
$1,273.94 |
000001071505-3562506200 |
2023 |
11 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
5/15/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR051N1062312808046 |
|
|
$95.92 |
000001071505-3562506200 |
2023 |
11 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
5/15/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR051N1062312808046 |
|
|
$993.67 |
000001071505-3562506200 |
2023 |
11 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
5/15/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR051N1062312808046 |
|
|
$145.27 |
000001071505-3562506200 |
2023 |
11 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
5/10/2023 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P080K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$108,088.87 |
|
2023 |
11 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
5/9/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR051N1062312808086 |
|
|
$258.47 |
000001086565-3562506210 |
2023 |
11 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
5/9/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR051N1062312808086 |
|
|
$17.60 |
000001086565-3562506210 |
2023 |
11 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
5/9/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR051N1062312808086 |
|
|
$201.61 |
000001086565-3562506210 |
2023 |
11 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
5/9/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR051N1062312808086 |
|
|
$49.52 |
000001086565-3562506210 |
2023 |
10 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
4/27/2023 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162523115013510 |
|
|
$38.22 |
|
2023 |
10 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
4/26/2023 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P079K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$76,583.56 |
|
2023 |
10 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
4/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042N1062311106925 |
|
|
$10.48 |
000001079537-3562506210 |
2023 |
10 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
4/24/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR042N1062311106963 |
|
|
$258.60 |
000001086565-3562506210 |
2023 |
10 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
4/24/2023 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
CA-XR042N1062311106924 |
|
|
$517.17 |
000001079227-3562506210 |
2023 |
10 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
4/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042N1062311106963 |
|
|
$13.44 |
000001086565-3562506210 |
2023 |
10 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
4/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042N1062311106924 |
|
|
$26.88 |
000001079227-3562506210 |
2023 |
10 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
4/24/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR042N1062311106963 |
|
|
$18.35 |
000001086565-3562506210 |
2023 |
10 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
4/24/2023 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
CA-XR042N1062311106924 |
|
|
$37.60 |
000001079227-3562506210 |
2023 |
10 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
4/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042N1062311106963 |
|
|
$0.95 |
000001086565-3562506210 |
2023 |
10 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
4/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042N1062311106924 |
|
|
$1.95 |
000001079227-3562506210 |
2023 |
10 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
4/24/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR042N1062311106963 |
|
|
$201.61 |
000001086565-3562506210 |
2023 |
10 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
4/24/2023 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
CA-XR042N1062311106924 |
|
|
$403.21 |
000001079227-3562506210 |
2023 |
10 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
4/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042N1062311106963 |
|
|
$10.48 |
000001086565-3562506210 |
2023 |
10 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
4/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042N1062311106924 |
|
|
$20.96 |
000001079227-3562506210 |
2023 |
10 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
4/24/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR042N1062311106963 |
|
|
$49.55 |
000001086565-3562506210 |
2023 |
10 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
4/24/2023 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
CA-XR042N1062311106924 |
|
|
$99.10 |
000001079227-3562506210 |
2023 |
10 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
4/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042N1062311106963 |
|
|
$2.55 |
000001086565-3562506210 |
2023 |
10 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
4/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042N1062311106924 |
|
|
$5.10 |
000001079227-3562506210 |
2023 |
10 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
4/24/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR042N1062311106963 |
|
|
$0.10 |
000001086565-3562506210 |
2023 |
10 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
4/24/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR042N1062311106925 |
|
|
$49.55 |
000001079537-3562506210 |
2023 |
10 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
4/24/2023 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
CA-XR042N1062311106924 |
|
|
$0.20 |
000001079227-3562506210 |
2023 |
10 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
4/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042N1062311106963 |
|
|
$0.01 |
000001086565-3562506210 |
2023 |
10 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
4/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042N1062311106924 |
|
|
$0.02 |
000001079227-3562506210 |
2023 |
10 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
4/24/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR042N1062311106910 |
|
|
$2,765.03 |
000001071505-3562506200 |
2023 |
10 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
4/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042N1062311106910 |
|
|
$488.15 |
000001071505-3562506200 |
2023 |
10 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
4/24/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR042N1062311106910 |
|
|
$208.19 |
000001071505-3562506200 |
2023 |
10 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
4/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042N1062311106910 |
|
|
$36.75 |
000001071505-3562506200 |
2023 |
10 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
4/24/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR042N1062311106910 |
|
|
$2,156.72 |
000001071505-3562506200 |
2023 |
10 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
4/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042N1062311106910 |
|
|
$380.75 |
000001071505-3562506200 |
2023 |
10 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
4/24/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR042N1062311106910 |
|
|
$315.88 |
000001071505-3562506200 |
2023 |
10 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
4/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042N1062311106925 |
|
|
$2.55 |
000001079537-3562506210 |
2023 |
10 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
4/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042N1062311106910 |
|
|
$55.09 |
000001071505-3562506200 |
2023 |
10 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
4/24/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR042N1062311106910 |
|
|
$0.64 |
000001071505-3562506200 |
2023 |
10 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
4/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042N1062311106910 |
|
|
$0.11 |
000001071505-3562506200 |
2023 |
10 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
4/24/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR042N1062311106925 |
|
|
$0.10 |
000001079537-3562506210 |
2023 |
10 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
4/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042N1062311106925 |
|
|
$0.01 |
000001079537-3562506210 |
2023 |
10 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
4/24/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR042N1062311106924 |
|
|
$258.56 |
000001079537-3562506210 |
2023 |
10 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
4/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042N1062311106924 |
|
|
$13.44 |
000001079537-3562506210 |
2023 |
10 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
4/24/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR042N1062311106924 |
|
|
$19.25 |
000001079537-3562506210 |
2023 |
10 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
4/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042N1062311106924 |
|
|
$1.00 |
000001079537-3562506210 |
2023 |
10 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
4/24/2023 |
5242 |
CONCRETE TESTING UNIT |
CA-XR042N1062311106924 |
|
|
$201.60 |
000001079537-3562506210 |
2023 |
10 |
FD52 |
06 |
E143 |
C |
8022202C |
035 |
4/20/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
JV2E-2300007077 |
|
|
$50,771.50 |
Move expenditures from 8022201C to 8022202C See attached |
2023 |
10 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
4/20/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300200358 |
PON22000001344 |
HDR ENGINEERING INC |
$608.40 |
Item N. 6-14 |
2023 |
10 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
4/20/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300200358 |
PON22000001344 |
HDR ENGINEERING INC |
$1,479.05 |
Item N. 6-14 |
2023 |
10 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
4/20/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
JV2E-2300007077 |
|
|
$54,116.00 |
Move expenditures from 8022201C to 8022202C See attached |
2023 |
10 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
4/20/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300200358 |
PON22000001344 |
HDR ENGINEERING INC |
$1,084.89 |
Item N. 6-14 |
2023 |
10 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
4/20/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300200358 |
PON22000001344 |
HDR ENGINEERING INC |
$103,064.50 |
Item N. 6-14 |
2023 |
10 |
FD52 |
06 |
E143 |
C |
8022202C |
035 |
4/20/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
JV2E-2300007077 |
|
|
$330,369.51 |
Move expenditures from 8022201C to 8022202C See attached |
2023 |
10 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
4/20/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300200358 |
PON22000001344 |
HDR ENGINEERING INC |
$9,327.00 |
Item N. 6-14 |
2023 |
10 |
FD52 |
09 |
E143 |
C |
8022202C |
035 |
4/20/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
JV2E-2300007077 |
|
|
$64,178.77 |
Move expenditures from 8022201C to 8022202C See attached |
2023 |
10 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
4/20/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
JV2E-2300007077 |
|
|
$1,338,618.50 |
Move expenditures from 8022201C to 8022202C See attached |
2023 |
10 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
4/20/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300200358 |
PON22000001344 |
HDR ENGINEERING INC |
$1,095.30 |
Item N. 6-14 |
2023 |
10 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
4/14/2023 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162523100012480 |
|
|
$38.22 |
|
2023 |
10 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
4/12/2023 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P078K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$25,858.11 |
|
2023 |
10 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
4/10/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR041N1062309605748 |
|
|
$434.30 |
000001071505-3562506200 |
2023 |
10 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
4/10/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041N1062309605748 |
|
|
$86.86 |
000001071505-3562506200 |
2023 |
10 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
4/10/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR041N1062309605748 |
|
|
$32.70 |
000001071505-3562506200 |
2023 |
10 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
4/10/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041N1062309605748 |
|
|
$6.54 |
000001071505-3562506200 |
2023 |
10 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
4/10/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR041N1062309605748 |
|
|
$338.75 |
000001071505-3562506200 |
2023 |
10 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
4/10/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041N1062309605748 |
|
|
$67.75 |
000001071505-3562506200 |
2023 |
10 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
4/10/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR041N1062309605748 |
|
|
$49.63 |
000001071505-3562506200 |
2023 |
10 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
4/10/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041N1062309605748 |
|
|
$9.80 |
000001071505-3562506200 |
2023 |
10 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
4/10/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR041N1062309605792 |
|
|
$281.45 |
000001086565-3562506210 |
2023 |
10 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
4/10/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR041N1062309605792 |
|
|
$21.10 |
000001086565-3562506210 |
2023 |
10 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
4/10/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR041N1062309605792 |
|
|
$219.53 |
000001086565-3562506210 |
2023 |
10 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
4/10/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR041N1062309605792 |
|
|
$41.27 |
000001086565-3562506210 |
2023 |
9 |
FD52 |
06 |
E389 |
C |
8022202C |
008 |
3/31/2023 |
4010 |
CONSTRUCTION ENGINEERING |
PRC-2300154814 |
PON22100001940 |
MICHAEL BAKER INTERNATIONAL INC |
$9,243.67 |
Electrical Construction Inspection Services |
2023 |
9 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
3/29/2023 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P077K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$7,675.69 |
|
2023 |
9 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
3/29/2023 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162523084014800 |
|
|
$38.22 |
|
2023 |
9 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
3/27/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR032N1062308304622 |
|
|
$2,474.00 |
000001071505-3562506200 |
2023 |
9 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
3/27/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032N1062308304622 |
|
|
$284.27 |
000001071505-3562506200 |
2023 |
9 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
3/27/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR032N1062308304622 |
|
|
$186.29 |
000001071505-3562506200 |
2023 |
9 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
3/27/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032N1062308304622 |
|
|
$21.41 |
000001071505-3562506200 |
2023 |
9 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
3/27/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR032N1062308304622 |
|
|
$1,929.86 |
000001071505-3562506200 |
2023 |
9 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
3/27/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032N1062308304622 |
|
|
$221.73 |
000001071505-3562506200 |
2023 |
9 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
3/27/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR032N1062308304622 |
|
|
$282.47 |
000001071505-3562506200 |
2023 |
9 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
3/27/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032N1062308304622 |
|
|
$32.08 |
000001071505-3562506200 |
2023 |
9 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
3/27/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR032N1062308304622 |
|
|
$0.57 |
000001071505-3562506200 |
2023 |
9 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
3/27/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032N1062308304622 |
|
|
$0.07 |
000001071505-3562506200 |
2023 |
9 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
3/17/2023 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162523069015170 |
|
|
$38.22 |
|
2023 |
9 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
3/15/2023 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P076K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$15,898.92 |
|
2023 |
9 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
3/13/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300168977 |
PON22000001344 |
HDR ENGINEERING INC |
$2,289.91 |
Item N. 6-14 |
2023 |
9 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
3/13/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300168977 |
PON22000001344 |
HDR ENGINEERING INC |
$46,596.50 |
Item N. 6-14 |
2023 |
9 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
3/13/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300168977 |
PON22000001344 |
HDR ENGINEERING INC |
$607.75 |
Item N. 6-14 |
2023 |
9 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
3/13/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300168977 |
PON22000001344 |
HDR ENGINEERING INC |
$1,083.49 |
Item N. 6-14 |
2023 |
9 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
3/9/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR031N1062306703643 |
|
|
$3,699.58 |
000001071505-3562506200 |
2023 |
9 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
3/9/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR031N1062306703643 |
|
|
$278.56 |
000001071505-3562506200 |
2023 |
9 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
3/9/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR031N1062306703643 |
|
|
$2,885.67 |
000001071505-3562506200 |
2023 |
9 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
3/9/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR031N1062306703643 |
|
|
$421.87 |
000001071505-3562506200 |
2023 |
9 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
3/1/2023 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P075K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$5,970.49 |
|
2023 |
9 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
3/1/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR022N1062305302484 |
|
|
$234.98 |
000001086565-3562506210 |
2023 |
9 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
3/1/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR022N1062305302484 |
|
|
$16.67 |
000001086565-3562506210 |
2023 |
9 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
3/1/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR022N1062305302484 |
|
|
$183.28 |
000001086565-3562506210 |
2023 |
9 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
3/1/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR022N1062305302484 |
|
|
$45.02 |
000001086565-3562506210 |
2023 |
9 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
3/1/2023 |
5330 |
PROJ DOCUMENTN&MATRLS CERTIF |
CA-XR022N1062305302484 |
|
|
$0.09 |
000001086565-3562506210 |
2023 |
8 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
2/27/2023 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162523056011780 |
|
|
$38.22 |
|
2023 |
8 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
2/23/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR022N1062305302422 |
|
|
$3,658.63 |
000001071505-3562506200 |
2023 |
8 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
2/23/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR022N1062305302422 |
|
|
$275.47 |
000001071505-3562506200 |
2023 |
8 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
2/23/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR022N1062305302422 |
|
|
$2,853.73 |
000001071505-3562506200 |
2023 |
8 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
2/23/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR022N1062305302422 |
|
|
$417.21 |
000001071505-3562506200 |
2023 |
8 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
2/23/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR022N1062305302422 |
|
|
$0.84 |
000001071505-3562506200 |
2023 |
8 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
2/15/2023 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P074K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$50,184.81 |
|
2023 |
8 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
2/14/2023 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162523041019120 |
|
|
$38.22 |
|
2023 |
8 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
2/9/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR021N1062303901394 |
|
|
$1,254.64 |
000001071505-3562506200 |
2023 |
8 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
2/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021N1062303901394 |
|
|
$231.15 |
000001071505-3562506200 |
2023 |
8 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
2/9/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR021N1062303901394 |
|
|
$94.47 |
000001071505-3562506200 |
2023 |
8 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
2/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021N1062303901394 |
|
|
$17.41 |
000001071505-3562506200 |
2023 |
8 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
2/9/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR021N1062303901394 |
|
|
$978.62 |
000001071505-3562506200 |
2023 |
8 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
2/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021N1062303901394 |
|
|
$180.29 |
000001071505-3562506200 |
2023 |
8 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
2/9/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR021N1062303901394 |
|
|
$143.34 |
000001071505-3562506200 |
2023 |
8 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
2/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021N1062303901394 |
|
|
$26.09 |
000001071505-3562506200 |
2023 |
8 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
2/2/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300134102 |
PON22000001344 |
HDR ENGINEERING INC |
$1,809.34 |
Item N. 6-14 |
2023 |
8 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
2/2/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300134102 |
PON22000001344 |
HDR ENGINEERING INC |
$59,235.00 |
Item N. 6-14 |
2023 |
8 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
2/2/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300134102 |
PON22000001344 |
HDR ENGINEERING INC |
$2,436.50 |
Item N. 6-14 |
2023 |
8 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
2/2/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300134102 |
PON22000001344 |
HDR ENGINEERING INC |
$797.40 |
Item N. 6-14 |
2023 |
8 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
2/1/2023 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P073K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$286,250.50 |
|
2023 |
7 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
1/26/2023 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162523025014110 |
|
|
$38.22 |
|
2023 |
7 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
1/24/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300124441 |
PON22000001344 |
HDR ENGINEERING INC |
$1,026.76 |
Item N. 6-14 |
2023 |
7 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
1/24/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300124441 |
PON22000001344 |
HDR ENGINEERING INC |
$61,353.00 |
Item N. 6-14 |
2023 |
7 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
1/24/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300124441 |
PON22000001344 |
HDR ENGINEERING INC |
$794.75 |
Item N. 6-14 |
2023 |
7 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
1/24/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR012N1062302300392 |
|
|
$2,634.55 |
000001071505-3562506200 |
2023 |
7 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
1/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012N1062302300392 |
|
|
$293.01 |
000001071505-3562506200 |
2023 |
7 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
1/24/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR012N1062302300392 |
|
|
$198.38 |
000001071505-3562506200 |
2023 |
7 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
1/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012N1062302300392 |
|
|
$22.06 |
000001071505-3562506200 |
2023 |
7 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
1/24/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR012N1062302300392 |
|
|
$2,055.09 |
000001071505-3562506200 |
2023 |
7 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
1/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012N1062302300392 |
|
|
$228.55 |
000001071505-3562506200 |
2023 |
7 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
1/24/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR012N1062302300392 |
|
|
$300.79 |
000001071505-3562506200 |
2023 |
7 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
1/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012N1062302300392 |
|
|
$33.07 |
000001071505-3562506200 |
2023 |
7 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
1/24/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR012N1062302300392 |
|
|
$0.61 |
000001071505-3562506200 |
2023 |
7 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
1/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012N1062302300392 |
|
|
$0.07 |
000001071505-3562506200 |
2023 |
7 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
1/24/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300124441 |
PON22000001344 |
HDR ENGINEERING INC |
$2,714.10 |
Item N. 6-14 |
2023 |
7 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
1/12/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR011N1062300610233 |
|
|
$1,526.63 |
000001071505-3562506200 |
2023 |
7 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
1/11/2023 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162523010012530 |
|
|
$38.22 |
|
2023 |
7 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
1/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011N1062300610234 |
|
|
$2,289.40 |
000001071505-3562506200 |
2023 |
7 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
1/9/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR011N1062300610234 |
|
|
$114.94 |
000001071505-3562506200 |
2023 |
7 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
1/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011N1062300610234 |
|
|
$172.38 |
000001071505-3562506200 |
2023 |
7 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
1/9/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR011N1062300610234 |
|
|
$1,190.79 |
000001071505-3562506200 |
2023 |
7 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
1/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011N1062300610234 |
|
|
$1,785.73 |
000001071505-3562506200 |
2023 |
7 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
1/9/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR011N1062300610234 |
|
|
$176.78 |
000001071505-3562506200 |
2023 |
7 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
1/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011N1062300610234 |
|
|
$258.37 |
000001071505-3562506200 |
2023 |
7 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
1/3/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR122M1062235509139 |
|
|
$281.42 |
000001071505-3562506200 |
2023 |
7 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
1/3/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122M1062235509139 |
|
|
$1.70 |
000001071505-3562506200 |
2023 |
7 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
1/3/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR122M1062235509139 |
|
|
$2,915.33 |
000001071505-3562506200 |
2023 |
7 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
1/3/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122M1062235509139 |
|
|
$17.66 |
000001071505-3562506200 |
2023 |
7 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
1/3/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR122M1062235509139 |
|
|
$391.41 |
000001071505-3562506200 |
2023 |
7 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
1/3/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122M1062235509139 |
|
|
$2.34 |
000001071505-3562506200 |
2023 |
7 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
1/3/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR122M1062235509139 |
|
|
$0.86 |
000001071505-3562506200 |
2023 |
7 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
1/3/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122M1062235509139 |
|
|
$0.01 |
000001071505-3562506200 |
2023 |
7 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
1/3/2023 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR122M1062235509139 |
|
|
$3,737.59 |
000001071505-3562506200 |
2023 |
7 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
1/3/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122M1062235509139 |
|
|
$22.64 |
000001071505-3562506200 |
2023 |
6 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
12/27/2022 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162522359012650 |
|
|
$38.22 |
|
2023 |
6 |
FD52 |
06 |
E389 |
C |
8022202C |
008 |
12/27/2022 |
4260 |
SIGNAL PLANS-TRAF |
IET-XM005162522359002510 |
|
|
$14,800.00 |
|
2023 |
6 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
12/23/2022 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P072K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$70,708.19 |
|
2023 |
6 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
12/23/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300112616 |
PON22000001344 |
HDR ENGINEERING INC |
$1,665.28 |
Item N. 6-14 |
2023 |
6 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
12/23/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300112616 |
PON22000001344 |
HDR ENGINEERING INC |
$60,619.00 |
Item N. 6-14 |
2023 |
6 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
12/23/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300112616 |
PON22000001344 |
HDR ENGINEERING INC |
$2,077.50 |
Item N. 6-14 |
2023 |
6 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
12/23/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300112616 |
PON22000001344 |
HDR ENGINEERING INC |
$1,410.70 |
Item N. 6-14 |
2023 |
6 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
12/20/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300107564 |
PON22000001344 |
HDR ENGINEERING INC |
$1,702.11 |
Item N. 6-14 |
2023 |
6 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
12/20/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300107564 |
PON22000001344 |
HDR ENGINEERING INC |
$55,421.00 |
Item N. 6-14 |
2023 |
6 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
12/20/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300107564 |
PON22000001344 |
HDR ENGINEERING INC |
$2,101.25 |
Item N. 6-14 |
2023 |
6 |
FD52 |
06 |
E143 |
C |
8022202C |
008 |
12/20/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300107564 |
PON22000001344 |
HDR ENGINEERING INC |
$1,641.60 |
Item N. 6-14 |
2023 |
6 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
12/13/2022 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162522344007070 |
|
|
$120.00 |
|
2023 |
6 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
12/13/2022 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162522344013300 |
|
|
$38.22 |
|
2023 |
6 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
12/12/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR121M1062234208241 |
|
|
$137.85 |
000001085758-3562500424 |
2023 |
6 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
12/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121M1062234208241 |
|
|
$66.86 |
000001085758-3562500424 |
2023 |
6 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
12/12/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR121M1062234208241 |
|
|
$9.25 |
000001085758-3562500424 |
2023 |
6 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
12/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121M1062234208241 |
|
|
$4.48 |
000001085758-3562500424 |
2023 |
6 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
12/12/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR121M1062234208241 |
|
|
$107.52 |
000001085758-3562500424 |
2023 |
6 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
12/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121M1062234208241 |
|
|
$52.15 |
000001085758-3562500424 |
2023 |
6 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
12/12/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR121M1062234208241 |
|
|
$28.13 |
000001085758-3562500424 |
2023 |
6 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
12/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121M1062234208241 |
|
|
$13.46 |
000001085758-3562500424 |
2023 |
6 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
12/12/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR121M1062234208190 |
|
|
$1,895.12 |
000001071505-3562506200 |
2023 |
6 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
12/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121M1062234208190 |
|
|
$421.14 |
000001071505-3562506200 |
2023 |
6 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
12/12/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR121M1062234208190 |
|
|
$142.69 |
000001071505-3562506200 |
2023 |
6 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
12/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121M1062234208190 |
|
|
$31.71 |
000001071505-3562506200 |
2023 |
6 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
12/12/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR121M1062234208190 |
|
|
$1,478.19 |
000001071505-3562506200 |
2023 |
6 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
12/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121M1062234208190 |
|
|
$328.49 |
000001071505-3562506200 |
2023 |
6 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
12/12/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR121M1062234208190 |
|
|
$198.95 |
000001071505-3562506200 |
2023 |
6 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
12/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121M1062234208190 |
|
|
$43.60 |
000001071505-3562506200 |
2023 |
6 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
12/7/2022 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P071K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$123,875.64 |
|
2023 |
6 |
FD52 |
06 |
E387 |
C |
8022202C |
008 |
12/1/2022 |
T410 |
TRAF SIGNAL MAINT |
PRC-2300090977 |
DO2300002809 |
ITS PLUS INC |
$7,980.00 |
|
2023 |
5 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
11/30/2022 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162522329010690 |
|
|
$38.22 |
|
2023 |
5 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
11/23/2022 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P070K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$171,686.45 |
|
2023 |
5 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
11/23/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR112M1062232607124 |
|
|
$1,868.80 |
000001071505-3562506200 |
2023 |
5 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
11/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112M1062232607124 |
|
|
$302.69 |
000001071505-3562506200 |
2023 |
5 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
11/23/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR112M1062232607124 |
|
|
$140.71 |
000001071505-3562506200 |
2023 |
5 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
11/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112M1062232607124 |
|
|
$22.79 |
000001071505-3562506200 |
2023 |
5 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
11/23/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR112M1062232607124 |
|
|
$1,457.66 |
000001071505-3562506200 |
2023 |
5 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
11/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112M1062232607124 |
|
|
$236.10 |
000001071505-3562506200 |
2023 |
5 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
11/23/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR112M1062232607124 |
|
|
$196.04 |
000001071505-3562506200 |
2023 |
5 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
11/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112M1062232607124 |
|
|
$31.34 |
000001071505-3562506200 |
2023 |
5 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
11/23/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR112M1062232607124 |
|
|
$0.43 |
000001071505-3562506200 |
2023 |
5 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
11/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112M1062232607124 |
|
|
$0.07 |
000001071505-3562506200 |
2023 |
5 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
11/14/2022 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162522314018270 |
|
|
$38.22 |
|
2023 |
5 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
11/10/2022 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P069K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$175,343.80 |
|
2023 |
5 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
11/7/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR111M1062230806136 |
|
|
$2,316.25 |
000001071505-3562506200 |
2023 |
5 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
11/7/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR111M1062230806136 |
|
|
$174.40 |
000001071505-3562506200 |
2023 |
5 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
11/7/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR111M1062230806136 |
|
|
$1,806.67 |
000001071505-3562506200 |
2023 |
5 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
11/7/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR111M1062230806136 |
|
|
$242.54 |
000001071505-3562506200 |
2023 |
4 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
10/27/2022 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P068K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$448,898.06 |
|
2023 |
4 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
10/27/2022 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162522298017750 |
|
|
$38.22 |
|
2023 |
4 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
10/24/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR102M1062229405025 |
|
|
$2,055.68 |
000001071505-3562506200 |
2023 |
4 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
10/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102M1062229405025 |
|
|
$334.70 |
000001071505-3562506200 |
2023 |
4 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
10/24/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR102M1062229405025 |
|
|
$154.78 |
000001071505-3562506200 |
2023 |
4 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
10/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102M1062229405025 |
|
|
$25.20 |
000001071505-3562506200 |
2023 |
4 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
10/24/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR102M1062229405025 |
|
|
$1,603.41 |
000001071505-3562506200 |
2023 |
4 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
10/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102M1062229405025 |
|
|
$261.07 |
000001071505-3562506200 |
2023 |
4 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
10/24/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR102M1062229405025 |
|
|
$215.66 |
000001071505-3562506200 |
2023 |
4 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
10/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102M1062229405025 |
|
|
$34.65 |
000001071505-3562506200 |
2023 |
4 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
10/24/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR102M1062229405025 |
|
|
$0.47 |
000001071505-3562506200 |
2023 |
4 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
10/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102M1062229405025 |
|
|
$0.08 |
000001071505-3562506200 |
2023 |
4 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
10/17/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR101M1062228003916 |
|
|
$1,895.12 |
000001071505-3562506200 |
2023 |
4 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
10/17/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101M1062228003916 |
|
|
$421.14 |
000001071505-3562506200 |
2023 |
4 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
10/17/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR101M1062228003916 |
|
|
$142.69 |
000001071505-3562506200 |
2023 |
4 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
10/17/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101M1062228003916 |
|
|
$31.71 |
000001071505-3562506200 |
2023 |
4 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
10/17/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR101M1062228003916 |
|
|
$1,478.19 |
000001071505-3562506200 |
2023 |
4 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
10/17/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101M1062228003916 |
|
|
$328.49 |
000001071505-3562506200 |
2023 |
4 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
10/17/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR101M1062228003916 |
|
|
$198.95 |
000001071505-3562506200 |
2023 |
4 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
10/17/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101M1062228003916 |
|
|
$43.60 |
000001071505-3562506200 |
2023 |
4 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
10/12/2022 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P067K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$602,728.73 |
|
2023 |
4 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
10/12/2022 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162522283015950 |
|
|
$38.22 |
|
2023 |
3 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
9/29/2022 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P066K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$410,010.90 |
|
2023 |
3 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
9/29/2022 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162522268014480 |
|
|
$38.22 |
|
2023 |
3 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
9/26/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR092M1062226602742 |
|
|
$1,368.69 |
000001071505-3562506200 |
2023 |
3 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
9/26/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092M1062226602742 |
|
|
$381.66 |
000001071505-3562506200 |
2023 |
3 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
9/26/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR092M1062226602742 |
|
|
$103.05 |
000001071505-3562506200 |
2023 |
3 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
9/26/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092M1062226602742 |
|
|
$28.74 |
000001071505-3562506200 |
2023 |
3 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
9/26/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR092M1062226602742 |
|
|
$1,067.58 |
000001071505-3562506200 |
2023 |
3 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
9/26/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092M1062226602742 |
|
|
$297.69 |
000001071505-3562506200 |
2023 |
3 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
9/26/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR092M1062226602742 |
|
|
$143.77 |
000001071505-3562506200 |
2023 |
3 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
9/26/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092M1062226602742 |
|
|
$39.52 |
000001071505-3562506200 |
2023 |
3 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
9/26/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR092M1062226602742 |
|
|
$0.32 |
000001071505-3562506200 |
2023 |
3 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
9/26/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092M1062226602742 |
|
|
$0.09 |
000001071505-3562506200 |
2023 |
3 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
9/14/2022 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P065K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$479,344.54 |
|
2023 |
3 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
9/14/2022 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162522253014540 |
|
|
$38.22 |
|
2023 |
3 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
9/12/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR091M1062225101598 |
|
|
$2,243.87 |
000001071505-3562506200 |
2023 |
3 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
9/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091M1062225101598 |
|
|
$38.12 |
000001071505-3562506200 |
2023 |
3 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
9/12/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR091M1062225101598 |
|
|
$168.95 |
000001071505-3562506200 |
2023 |
3 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
9/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091M1062225101598 |
|
|
$2.87 |
000001071505-3562506200 |
2023 |
3 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
9/12/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR091M1062225101598 |
|
|
$1,750.22 |
000001071505-3562506200 |
2023 |
3 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
9/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091M1062225101598 |
|
|
$29.73 |
000001071505-3562506200 |
2023 |
3 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
9/12/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR091M1062225101598 |
|
|
$235.00 |
000001071505-3562506200 |
2023 |
3 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
9/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091M1062225101598 |
|
|
$3.95 |
000001071505-3562506200 |
2023 |
2 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
8/31/2022 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P064K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$390,404.22 |
|
2023 |
2 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
8/29/2022 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162522237012820 |
|
|
$38.22 |
|
2023 |
2 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
8/29/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR082M1062223500404 |
|
|
$1,954.06 |
000001071505-3562506200 |
2023 |
2 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
8/29/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500404 |
|
|
$195.41 |
000001071505-3562506200 |
2023 |
2 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
8/29/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR082M1062223500404 |
|
|
$146.94 |
000001071505-3562506200 |
2023 |
2 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
8/29/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500404 |
|
|
$14.70 |
000001071505-3562506200 |
2023 |
2 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
8/29/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR082M1062223500404 |
|
|
$1,524.17 |
000001071505-3562506200 |
2023 |
2 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
8/29/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500404 |
|
|
$152.42 |
000001071505-3562506200 |
2023 |
2 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
8/29/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR082M1062223500404 |
|
|
$220.74 |
000001071505-3562506200 |
2023 |
2 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
8/29/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500404 |
|
|
$21.80 |
000001071505-3562506200 |
2023 |
2 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
8/29/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR082M1062223500404 |
|
|
$0.49 |
000001071505-3562506200 |
2023 |
2 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
8/29/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500404 |
|
|
$0.05 |
000001071505-3562506200 |
2023 |
2 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
8/17/2022 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P063K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$153,751.20 |
|
2023 |
2 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
8/16/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR081M1062222110094 |
|
|
$806.05 |
000001071505-3562506200 |
2023 |
2 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
8/16/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081M1062222110094 |
|
|
$806.05 |
000001071505-3562506200 |
2023 |
2 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
8/16/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR081M1062222110094 |
|
|
$60.62 |
000001071505-3562506200 |
2023 |
2 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
8/16/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081M1062222110094 |
|
|
$60.62 |
000001071505-3562506200 |
2023 |
2 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
8/16/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR081M1062222110094 |
|
|
$628.72 |
000001071505-3562506200 |
2023 |
2 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
8/16/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081M1062222110094 |
|
|
$628.72 |
000001071505-3562506200 |
2023 |
2 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
8/16/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR081M1062222110094 |
|
|
$91.98 |
000001071505-3562506200 |
2023 |
2 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
8/16/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081M1062222110094 |
|
|
$89.93 |
000001071505-3562506200 |
2023 |
2 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
8/12/2022 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162522222014590 |
|
|
$74.88 |
|
2023 |
2 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
8/3/2022 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P062K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$260,532.01 |
|
2023 |
1 |
FD52 |
00 |
E123 |
C |
8022202C |
008 |
7/28/2022 |
5213 |
ASPHALT MIX DESIGN |
CA-XR072M1062220308966 |
|
|
$32.24 |
000001074201-3562500640 |
2023 |
1 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
7/28/2022 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162522206011630 |
|
|
$74.88 |
|
2023 |
1 |
FD52 |
06 |
E115 |
C |
8022202C |
008 |
7/28/2022 |
5172 |
INDEP ASSURANCE SAMPLING & TES |
CA-XR072M1062220309002 |
|
|
$21.49 |
000001082496-3562506210 |
2023 |
1 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
7/28/2022 |
5172 |
INDEP ASSURANCE SAMPLING & TES |
CA-XR072M1062220309002 |
|
|
$1.48 |
000001082496-3562506210 |
2023 |
1 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
7/28/2022 |
5172 |
INDEP ASSURANCE SAMPLING & TES |
CA-XR072M1062220309002 |
|
|
$18.05 |
000001082496-3562506210 |
2023 |
1 |
FD52 |
00 |
E123 |
C |
8022202C |
008 |
7/28/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308966 |
|
|
$7.02 |
000001074201-3562500640 |
2023 |
1 |
FD52 |
00 |
E124 |
C |
8022202C |
008 |
7/28/2022 |
5213 |
ASPHALT MIX DESIGN |
CA-XR072M1062220308966 |
|
|
$0.09 |
000001074201-3562500640 |
2023 |
1 |
FD52 |
00 |
E124 |
C |
8022202C |
008 |
7/28/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308966 |
|
|
$0.02 |
000001074201-3562500640 |
2023 |
1 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
7/28/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR072M1062220308983 |
|
|
$409.94 |
000001079228-3562506210 |
2023 |
1 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
7/28/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308983 |
|
|
$261.17 |
000001079228-3562506210 |
2023 |
1 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
7/28/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR072M1062220308983 |
|
|
$29.18 |
000001079228-3562506210 |
2023 |
1 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
7/28/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308983 |
|
|
$19.22 |
000001079228-3562506210 |
2023 |
1 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
7/28/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR072M1062220308983 |
|
|
$319.75 |
000001079228-3562506210 |
2023 |
1 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
7/28/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308983 |
|
|
$203.70 |
000001079228-3562506210 |
2023 |
1 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
7/28/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR072M1062220308983 |
|
|
$98.09 |
000001079228-3562506210 |
2023 |
1 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
7/28/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308983 |
|
|
$54.63 |
000001079228-3562506210 |
2023 |
1 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
7/28/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR072M1062220308983 |
|
|
$0.18 |
000001079228-3562506210 |
2023 |
1 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
7/28/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308983 |
|
|
$0.12 |
000001079228-3562506210 |
2023 |
1 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
7/28/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR072M1062220308962 |
|
|
$1,831.93 |
000001071505-3562506200 |
2023 |
1 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
7/28/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308962 |
|
|
$183.20 |
000001071505-3562506200 |
2023 |
1 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
7/28/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR072M1062220308962 |
|
|
$137.76 |
000001071505-3562506200 |
2023 |
1 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
7/28/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308962 |
|
|
$13.77 |
000001071505-3562506200 |
2023 |
1 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
7/28/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR072M1062220308962 |
|
|
$1,428.90 |
000001071505-3562506200 |
2023 |
1 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
7/28/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308962 |
|
|
$142.90 |
000001071505-3562506200 |
2023 |
1 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
7/28/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR072M1062220308962 |
|
|
$206.95 |
000001071505-3562506200 |
2023 |
1 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
7/28/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308962 |
|
|
$20.44 |
000001071505-3562506200 |
2023 |
1 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
7/28/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR072M1062220308962 |
|
|
$0.45 |
000001071505-3562506200 |
2023 |
1 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
7/28/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308962 |
|
|
$0.05 |
000001071505-3562506200 |
2023 |
1 |
FD52 |
00 |
E111 |
C |
8022202C |
008 |
7/25/2022 |
5213 |
ASPHALT MIX DESIGN |
CA-XR072M1062220308965 |
|
|
$307.30 |
000001074201-3562500640 |
2023 |
1 |
FD52 |
00 |
E111 |
C |
8022202C |
008 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308965 |
|
|
$67.96 |
000001074201-3562500640 |
2023 |
1 |
FD52 |
00 |
E121 |
C |
8022202C |
008 |
7/25/2022 |
5213 |
ASPHALT MIX DESIGN |
CA-XR072M1062220308965 |
|
|
$23.30 |
000001074201-3562500640 |
2023 |
1 |
FD52 |
00 |
E121 |
C |
8022202C |
008 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308965 |
|
|
$5.16 |
000001074201-3562500640 |
2023 |
1 |
FD52 |
00 |
E122 |
C |
8022202C |
008 |
7/25/2022 |
5213 |
ASPHALT MIX DESIGN |
CA-XR072M1062220308965 |
|
|
$239.48 |
000001074201-3562500640 |
2023 |
1 |
FD52 |
00 |
E122 |
C |
8022202C |
008 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308965 |
|
|
$53.00 |
000001074201-3562500640 |
2023 |
1 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
7/20/2022 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P061K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$331,784.56 |
|
2023 |
1 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
7/13/2022 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162522191008260 |
|
|
$74.88 |
|
2023 |
1 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
7/12/2022 |
5242 |
CONCRETE TESTING UNIT |
CA-XR071M1062219207870 |
|
|
$121.98 |
000001079537-3562506210 |
2023 |
1 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207869 |
|
|
$1.69 |
000001079228-3562506210 |
2023 |
1 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207870 |
|
|
$19.89 |
000001079537-3562506210 |
2023 |
1 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
7/12/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR071M1062219207869 |
|
|
$203.92 |
000001079228-3562506210 |
2023 |
1 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207869 |
|
|
$8.97 |
000001079228-3562506210 |
2023 |
1 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
7/12/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR071M1062219207869 |
|
|
$13.86 |
000001079228-3562506210 |
2023 |
1 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
7/12/2022 |
5172 |
INDEP ASSURANCE SAMPLING & TES |
CA-XR071M1062219207885 |
|
|
$467.96 |
000001082496-3562506210 |
2023 |
1 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207885 |
|
|
$216.44 |
000001082496-3562506210 |
2023 |
1 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
7/12/2022 |
5172 |
INDEP ASSURANCE SAMPLING & TES |
CA-XR071M1062219207885 |
|
|
$34.27 |
000001082496-3562506210 |
2023 |
1 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207885 |
|
|
$15.57 |
000001082496-3562506210 |
2023 |
1 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
7/12/2022 |
5172 |
INDEP ASSURANCE SAMPLING & TES |
CA-XR071M1062219207885 |
|
|
$393.03 |
000001082496-3562506210 |
2023 |
1 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
7/12/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR071M1062219207851 |
|
|
$1,922.40 |
000001071505-3562506200 |
2023 |
1 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207885 |
|
|
$181.74 |
000001082496-3562506210 |
2023 |
1 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207851 |
|
|
$60.16 |
000001071505-3562506200 |
2023 |
1 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
7/12/2022 |
5172 |
INDEP ASSURANCE SAMPLING & TES |
CA-XR071M1062219207885 |
|
|
$80.80 |
000001082496-3562506210 |
2023 |
1 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
7/12/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR071M1062219207851 |
|
|
$144.36 |
000001071505-3562506200 |
2023 |
1 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207885 |
|
|
$41.18 |
000001082496-3562506210 |
2023 |
1 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207851 |
|
|
$4.52 |
000001071505-3562506200 |
2023 |
1 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
7/12/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR071M1062219207851 |
|
|
$1,614.24 |
000001071505-3562506200 |
2023 |
1 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207869 |
|
|
$0.61 |
000001079228-3562506210 |
2023 |
1 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207851 |
|
|
$50.52 |
000001071505-3562506200 |
2023 |
1 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
7/12/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR071M1062219207851 |
|
|
$234.36 |
000001071505-3562506200 |
2023 |
1 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207851 |
|
|
$7.25 |
000001071505-3562506200 |
2023 |
1 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
7/12/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR071M1062219207869 |
|
|
$171.20 |
000001079228-3562506210 |
2023 |
1 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207869 |
|
|
$7.53 |
000001079228-3562506210 |
2023 |
1 |
FD52 |
00 |
E111 |
C |
8022202C |
008 |
7/12/2022 |
5213 |
ASPHALT MIX DESIGN |
CA-XR071M1062219207853 |
|
|
$284.14 |
000001074201-3562500640 |
2023 |
1 |
FD52 |
00 |
E111 |
C |
8022202C |
008 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207853 |
|
|
$1.90 |
000001074201-3562500640 |
2023 |
1 |
FD52 |
00 |
E121 |
C |
8022202C |
008 |
7/12/2022 |
5213 |
ASPHALT MIX DESIGN |
CA-XR071M1062219207853 |
|
|
$21.56 |
000001074201-3562500640 |
2023 |
1 |
FD52 |
00 |
E121 |
C |
8022202C |
008 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207853 |
|
|
$0.15 |
000001074201-3562500640 |
2023 |
1 |
FD52 |
00 |
E122 |
C |
8022202C |
008 |
7/12/2022 |
5213 |
ASPHALT MIX DESIGN |
CA-XR071M1062219207853 |
|
|
$238.72 |
000001074201-3562500640 |
2023 |
1 |
FD52 |
00 |
E122 |
C |
8022202C |
008 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207853 |
|
|
$1.60 |
000001074201-3562500640 |
2023 |
1 |
FD52 |
00 |
E123 |
C |
8022202C |
008 |
7/12/2022 |
5213 |
ASPHALT MIX DESIGN |
CA-XR071M1062219207853 |
|
|
$32.14 |
000001074201-3562500640 |
2023 |
1 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
7/12/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR071M1062219207869 |
|
|
$38.98 |
000001079228-3562506210 |
2023 |
1 |
FD52 |
00 |
E123 |
C |
8022202C |
008 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207853 |
|
|
$0.21 |
000001074201-3562500640 |
2023 |
1 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
7/12/2022 |
5242 |
CONCRETE TESTING UNIT |
CA-XR071M1062219207869 |
|
|
$673.40 |
000001079537-3562506210 |
2023 |
1 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207869 |
|
|
$113.54 |
000001079537-3562506210 |
2023 |
1 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
7/12/2022 |
5242 |
CONCRETE TESTING UNIT |
CA-XR071M1062219207869 |
|
|
$48.97 |
000001079537-3562506210 |
2023 |
1 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207869 |
|
|
$8.44 |
000001079537-3562506210 |
2023 |
1 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
7/12/2022 |
5242 |
CONCRETE TESTING UNIT |
CA-XR071M1062219207869 |
|
|
$565.79 |
000001079537-3562506210 |
2023 |
1 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207869 |
|
|
$95.33 |
000001079537-3562506210 |
2023 |
1 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
7/7/2022 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P060K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$551,359.87 |
|
2022 |
12 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
6/27/2022 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162522176037500 |
|
|
$178.22 |
|
2022 |
12 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
6/27/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR062M1062217506735 |
|
|
$1,945.02 |
000001071505-3562506200 |
2022 |
12 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
6/27/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR062M1062217506735 |
|
|
$146.06 |
000001071505-3562506200 |
2022 |
12 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
6/27/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR062M1062217506735 |
|
|
$1,633.24 |
000001071505-3562506200 |
2022 |
12 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
6/27/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR062M1062217506735 |
|
|
$237.03 |
000001071505-3562506200 |
2022 |
12 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
6/27/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR062M1062217506735 |
|
|
$0.52 |
000001071505-3562506200 |
2022 |
12 |
FD52 |
00 |
E111 |
C |
8022202C |
008 |
6/27/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR062M1062217506749 |
|
|
$1,089.71 |
000001077922-3562500640 |
2022 |
12 |
FD52 |
00 |
E111 |
C |
8022202C |
008 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506749 |
|
|
$152.62 |
000001077922-3562500640 |
2022 |
12 |
FD52 |
00 |
E115 |
C |
8022202C |
008 |
6/27/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR062M1062217506749 |
|
|
$20.19 |
000001077922-3562500640 |
2022 |
12 |
FD52 |
00 |
E121 |
C |
8022202C |
008 |
6/27/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR062M1062217506749 |
|
|
$83.28 |
000001077922-3562500640 |
2022 |
12 |
FD52 |
00 |
E121 |
C |
8022202C |
008 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506749 |
|
|
$11.45 |
000001077922-3562500640 |
2022 |
12 |
FD52 |
00 |
E122 |
C |
8022202C |
008 |
6/27/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR062M1062217506749 |
|
|
$932.01 |
000001077922-3562500640 |
2022 |
12 |
FD52 |
00 |
E122 |
C |
8022202C |
008 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506749 |
|
|
$128.15 |
000001077922-3562500640 |
2022 |
12 |
FD52 |
00 |
E123 |
C |
8022202C |
008 |
6/27/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR062M1062217506749 |
|
|
$177.44 |
000001077922-3562500640 |
2022 |
12 |
FD52 |
00 |
E123 |
C |
8022202C |
008 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506749 |
|
|
$27.03 |
000001077922-3562500640 |
2022 |
12 |
FD52 |
00 |
E124 |
C |
8022202C |
008 |
6/27/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR062M1062217506749 |
|
|
$0.45 |
000001077922-3562500640 |
2022 |
12 |
FD52 |
00 |
E124 |
C |
8022202C |
008 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506749 |
|
|
$0.07 |
000001077922-3562500640 |
2022 |
12 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
6/27/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR062M1062217506759 |
|
|
$211.55 |
000001079228-3562506210 |
2022 |
12 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506759 |
|
|
$1.41 |
000001079228-3562506210 |
2022 |
12 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
6/27/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR062M1062217506759 |
|
|
$14.91 |
000001079228-3562506210 |
2022 |
12 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506759 |
|
|
$0.10 |
000001079228-3562506210 |
2022 |
12 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
6/27/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR062M1062217506759 |
|
|
$177.70 |
000001079228-3562506210 |
2022 |
12 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506759 |
|
|
$1.18 |
000001079228-3562506210 |
2022 |
12 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
6/27/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR062M1062217506759 |
|
|
$41.35 |
000001079228-3562506210 |
2022 |
12 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506759 |
|
|
$0.27 |
000001079228-3562506210 |
2022 |
12 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
6/27/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR062M1062217506759 |
|
|
$0.09 |
000001079228-3562506210 |
2022 |
12 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
6/24/2022 |
4010 |
CONSTRUCTION ENGINEERING |
PRC-2200235846 |
PON21900002383 |
HRV CONFORMANCE VERIFICATION |
$143.50 |
Structural Steel Shop Inspection |
2022 |
12 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
6/22/2022 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P059K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$417,121.67 |
|
2022 |
12 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
6/13/2022 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162522161018780 |
|
|
$115.24 |
|
2022 |
12 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
6/9/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR061M1062215905692 |
|
|
$1,762.20 |
000001071505-3562506200 |
2022 |
12 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
6/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905692 |
|
|
$258.32 |
000001071505-3562506200 |
2022 |
12 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
6/9/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR061M1062215905692 |
|
|
$132.33 |
000001071505-3562506200 |
2022 |
12 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
6/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905692 |
|
|
$19.41 |
000001071505-3562506200 |
2022 |
12 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
6/9/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR061M1062215905692 |
|
|
$1,479.70 |
000001071505-3562506200 |
2022 |
12 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
6/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905692 |
|
|
$216.92 |
000001071505-3562506200 |
2022 |
12 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
6/9/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR061M1062215905692 |
|
|
$215.10 |
000001071505-3562506200 |
2022 |
12 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
6/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905692 |
|
|
$31.13 |
000001071505-3562506200 |
2022 |
12 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
6/9/2022 |
5242 |
CONCRETE TESTING UNIT |
CA-XR061M1062215905715 |
|
|
$1,073.19 |
000001079537-3562506210 |
2022 |
12 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
6/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905715 |
|
|
$549.12 |
000001079537-3562506210 |
2022 |
12 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
6/9/2022 |
5242 |
CONCRETE TESTING UNIT |
CA-XR061M1062215905715 |
|
|
$74.52 |
000001079537-3562506210 |
2022 |
12 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
6/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905715 |
|
|
$37.49 |
000001079537-3562506210 |
2022 |
12 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
6/9/2022 |
5242 |
CONCRETE TESTING UNIT |
CA-XR061M1062215905715 |
|
|
$901.10 |
000001079537-3562506210 |
2022 |
12 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
6/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905715 |
|
|
$461.10 |
000001079537-3562506210 |
2022 |
12 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
6/9/2022 |
5242 |
CONCRETE TESTING UNIT |
CA-XR061M1062215905715 |
|
|
$217.74 |
000001079537-3562506210 |
2022 |
12 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
6/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905715 |
|
|
$105.35 |
000001079537-3562506210 |
2022 |
12 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
6/8/2022 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P058K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$352,758.02 |
|
2022 |
11 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
5/26/2022 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P057K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$315,448.72 |
|
2022 |
11 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
5/26/2022 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162522145012250 |
|
|
$54.94 |
|
2022 |
11 |
FD52 |
06 |
E115 |
C |
8022202C |
008 |
5/23/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR052M1062214004666 |
|
|
$276.11 |
000001079228-3562506210 |
2022 |
11 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
5/23/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR052M1062214004666 |
|
|
$118.49 |
000001079228-3562506210 |
2022 |
11 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004666 |
|
|
$3.67 |
000001079228-3562506210 |
2022 |
11 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
5/23/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR052M1062214004666 |
|
|
$1,373.56 |
000001079228-3562506210 |
2022 |
11 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004666 |
|
|
$43.24 |
000001079228-3562506210 |
2022 |
11 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
5/23/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR052M1062214004666 |
|
|
$281.50 |
000001079228-3562506210 |
2022 |
11 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004666 |
|
|
$9.15 |
000001079228-3562506210 |
2022 |
11 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
5/23/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR052M1062214004666 |
|
|
$0.64 |
000001079228-3562506210 |
2022 |
11 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004666 |
|
|
$0.02 |
000001079228-3562506210 |
2022 |
11 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
5/23/2022 |
5242 |
CONCRETE TESTING UNIT |
CA-XR052M1062214004667 |
|
|
$224.24 |
000001079537-3562506210 |
2022 |
11 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004667 |
|
|
$38.57 |
000001079537-3562506210 |
2022 |
11 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
5/23/2022 |
5242 |
CONCRETE TESTING UNIT |
CA-XR052M1062214004667 |
|
|
$15.80 |
000001079537-3562506210 |
2022 |
11 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004667 |
|
|
$2.71 |
000001079537-3562506210 |
2022 |
11 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
5/23/2022 |
5242 |
CONCRETE TESTING UNIT |
CA-XR052M1062214004667 |
|
|
$188.06 |
000001079537-3562506210 |
2022 |
11 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004667 |
|
|
$32.39 |
000001079537-3562506210 |
2022 |
11 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
5/23/2022 |
5242 |
CONCRETE TESTING UNIT |
CA-XR052M1062214004667 |
|
|
$42.83 |
000001079537-3562506210 |
2022 |
11 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004667 |
|
|
$7.29 |
000001079537-3562506210 |
2022 |
11 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
5/23/2022 |
5242 |
CONCRETE TESTING UNIT |
CA-XR052M1062214004667 |
|
|
$0.09 |
000001079537-3562506210 |
2022 |
11 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004667 |
|
|
$0.02 |
000001079537-3562506210 |
2022 |
11 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
5/23/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR052M1062214004641 |
|
|
$1,741.47 |
000001071505-3562506200 |
2022 |
11 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004641 |
|
|
$60.20 |
000001071505-3562506200 |
2022 |
11 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
5/23/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR052M1062214004641 |
|
|
$130.78 |
000001071505-3562506200 |
2022 |
11 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004641 |
|
|
$4.52 |
000001071505-3562506200 |
2022 |
11 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
5/23/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR052M1062214004641 |
|
|
$1,462.32 |
000001071505-3562506200 |
2022 |
11 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004641 |
|
|
$50.55 |
000001071505-3562506200 |
2022 |
11 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
5/23/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR052M1062214004641 |
|
|
$212.31 |
000001071505-3562506200 |
2022 |
11 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004641 |
|
|
$7.25 |
000001071505-3562506200 |
2022 |
11 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
5/23/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR052M1062214004641 |
|
|
$0.47 |
000001071505-3562506200 |
2022 |
11 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004641 |
|
|
$0.02 |
000001071505-3562506200 |
2022 |
11 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
5/23/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR052M1062214004666 |
|
|
$1,358.84 |
000001079228-3562506210 |
2022 |
11 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004666 |
|
|
$51.49 |
000001079228-3562506210 |
2022 |
11 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
5/13/2022 |
5172 |
INDEP ASSURANCE SAMPLING & TES |
CA-XR051M1062212603672 |
|
|
$514.86 |
000001082496-3562506210 |
2022 |
11 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
5/13/2022 |
5172 |
INDEP ASSURANCE SAMPLING & TES |
CA-XR051M1062212603672 |
|
|
$37.90 |
000001082496-3562506210 |
2022 |
11 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
5/13/2022 |
5172 |
INDEP ASSURANCE SAMPLING & TES |
CA-XR051M1062212603672 |
|
|
$432.33 |
000001082496-3562506210 |
2022 |
11 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
5/13/2022 |
5172 |
INDEP ASSURANCE SAMPLING & TES |
CA-XR051M1062212603672 |
|
|
$88.34 |
000001082496-3562506210 |
2022 |
11 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
5/12/2022 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162522130014340 |
|
|
$40.20 |
|
2022 |
11 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
5/11/2022 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P056K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$367,027.64 |
|
2022 |
11 |
FD52 |
00 |
E111 |
C |
8022202C |
008 |
5/11/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR051M1062212603641 |
|
|
$224.21 |
000001077922-3562500640 |
2022 |
11 |
FD52 |
00 |
E111 |
C |
8022202C |
008 |
5/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603641 |
|
|
$6.28 |
000001077922-3562500640 |
2022 |
11 |
FD52 |
00 |
E121 |
C |
8022202C |
008 |
5/11/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR051M1062212603641 |
|
|
$17.04 |
000001077922-3562500640 |
2022 |
11 |
FD52 |
00 |
E121 |
C |
8022202C |
008 |
5/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603641 |
|
|
$0.48 |
000001077922-3562500640 |
2022 |
11 |
FD52 |
00 |
E122 |
C |
8022202C |
008 |
5/11/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR051M1062212603641 |
|
|
$188.31 |
000001077922-3562500640 |
2022 |
11 |
FD52 |
00 |
E122 |
C |
8022202C |
008 |
5/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603641 |
|
|
$5.27 |
000001077922-3562500640 |
2022 |
11 |
FD52 |
00 |
E123 |
C |
8022202C |
008 |
5/11/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR051M1062212603641 |
|
|
$41.26 |
000001077922-3562500640 |
2022 |
11 |
FD52 |
00 |
E123 |
C |
8022202C |
008 |
5/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603641 |
|
|
$1.14 |
000001077922-3562500640 |
2022 |
11 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
5/9/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR051M1062212603629 |
|
|
$1,990.25 |
000001071505-3562506200 |
2022 |
11 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
5/9/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR051M1062212603629 |
|
|
$149.46 |
000001071505-3562506200 |
2022 |
11 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
5/9/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR051M1062212603629 |
|
|
$1,671.21 |
000001071505-3562506200 |
2022 |
11 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
5/9/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR051M1062212603629 |
|
|
$242.54 |
000001071505-3562506200 |
2022 |
11 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
5/9/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR051M1062212603650 |
|
|
$1,282.73 |
000001079228-3562506210 |
2022 |
11 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
5/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603650 |
|
|
$577.54 |
000001079228-3562506210 |
2022 |
11 |
FD52 |
06 |
E115 |
C |
8022202C |
008 |
5/9/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR051M1062212603650 |
|
|
$142.49 |
000001079228-3562506210 |
2022 |
11 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
5/9/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR051M1062212603650 |
|
|
$99.34 |
000001079228-3562506210 |
2022 |
11 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
5/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603650 |
|
|
$39.04 |
000001079228-3562506210 |
2022 |
11 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
5/9/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR051M1062212603650 |
|
|
$1,196.80 |
000001079228-3562506210 |
2022 |
11 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
5/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603650 |
|
|
$484.95 |
000001079228-3562506210 |
2022 |
11 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
5/9/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR051M1062212603650 |
|
|
$336.77 |
000001079228-3562506210 |
2022 |
11 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
5/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603650 |
|
|
$164.80 |
000001079228-3562506210 |
2022 |
10 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
4/27/2022 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P055K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$189,978.90 |
|
2022 |
10 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
4/25/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR042M1062211202504 |
|
|
$1,526.76 |
000001071505-3562506200 |
2022 |
10 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202504 |
|
|
$0.06 |
000001071505-3562506200 |
2022 |
10 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202504 |
|
|
$241.10 |
000001071505-3562506200 |
2022 |
10 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
4/25/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR042M1062211202504 |
|
|
$114.64 |
000001071505-3562506200 |
2022 |
10 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202504 |
|
|
$18.11 |
000001071505-3562506200 |
2022 |
10 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
4/25/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR042M1062211202504 |
|
|
$1,281.90 |
000001071505-3562506200 |
2022 |
10 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202504 |
|
|
$202.45 |
000001071505-3562506200 |
2022 |
10 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
4/25/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR042M1062211202504 |
|
|
$186.38 |
000001071505-3562506200 |
2022 |
10 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202504 |
|
|
$29.05 |
000001071505-3562506200 |
2022 |
10 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
4/25/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR042M1062211202531 |
|
|
$378.01 |
000001079228-3562506210 |
2022 |
10 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202531 |
|
|
$38.24 |
000001079228-3562506210 |
2022 |
10 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
4/25/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR042M1062211202531 |
|
|
$26.48 |
000001079228-3562506210 |
2022 |
10 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202531 |
|
|
$2.71 |
000001079228-3562506210 |
2022 |
10 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
4/25/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR042M1062211202504 |
|
|
$0.41 |
000001071505-3562506200 |
2022 |
10 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
4/25/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR042M1062211202531 |
|
|
$317.41 |
000001079228-3562506210 |
2022 |
10 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202531 |
|
|
$32.12 |
000001079228-3562506210 |
2022 |
10 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
4/25/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR042M1062211202531 |
|
|
$95.21 |
000001079228-3562506210 |
2022 |
10 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202531 |
|
|
$8.73 |
000001079228-3562506210 |
2022 |
10 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
4/25/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR042M1062211202531 |
|
|
$0.18 |
000001079228-3562506210 |
2022 |
10 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202531 |
|
|
$0.01 |
000001079228-3562506210 |
2022 |
10 |
FD52 |
00 |
E229 |
C |
8022202C |
008 |
4/13/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
IET-XE13A162522100018390 |
|
|
$61.50 |
|
2022 |
10 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
4/13/2022 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P054K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$152,368.88 |
|
2022 |
10 |
FD52 |
00 |
E123 |
C |
8022202C |
008 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801462 |
|
|
$1.36 |
000001077922-3562500640 |
2022 |
10 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
4/11/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR041M1062209801448 |
|
|
$663.42 |
000001071505-3562506200 |
2022 |
10 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801448 |
|
|
$1,326.84 |
000001071505-3562506200 |
2022 |
10 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
4/11/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR041M1062209801448 |
|
|
$49.82 |
000001071505-3562506200 |
2022 |
10 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801448 |
|
|
$99.64 |
000001071505-3562506200 |
2022 |
10 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
4/11/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR041M1062209801448 |
|
|
$557.06 |
000001071505-3562506200 |
2022 |
10 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801448 |
|
|
$1,114.15 |
000001071505-3562506200 |
2022 |
10 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
4/11/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR041M1062209801448 |
|
|
$82.66 |
000001071505-3562506200 |
2022 |
10 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801448 |
|
|
$159.88 |
000001071505-3562506200 |
2022 |
10 |
FD52 |
00 |
E111 |
C |
8022202C |
008 |
4/11/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR041M1062209801462 |
|
|
$186.91 |
000001077922-3562500640 |
2022 |
10 |
FD52 |
00 |
E111 |
C |
8022202C |
008 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801462 |
|
|
$7.47 |
000001077922-3562500640 |
2022 |
10 |
FD52 |
00 |
E121 |
C |
8022202C |
008 |
4/11/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR041M1062209801462 |
|
|
$14.19 |
000001077922-3562500640 |
2022 |
10 |
FD52 |
00 |
E121 |
C |
8022202C |
008 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801462 |
|
|
$0.57 |
000001077922-3562500640 |
2022 |
10 |
FD52 |
00 |
E122 |
C |
8022202C |
008 |
4/11/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR041M1062209801462 |
|
|
$156.92 |
000001077922-3562500640 |
2022 |
10 |
FD52 |
00 |
E122 |
C |
8022202C |
008 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801462 |
|
|
$6.27 |
000001077922-3562500640 |
2022 |
10 |
FD52 |
00 |
E123 |
C |
8022202C |
008 |
4/11/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR041M1062209801462 |
|
|
$34.39 |
000001077922-3562500640 |
2022 |
9 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
3/30/2022 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P053K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$87,967.42 |
|
2022 |
9 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
3/28/2022 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162522084012370 |
|
|
$25.46 |
|
2022 |
9 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
3/24/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR032M1062208200362 |
|
|
$1,899.79 |
000001071505-3562506200 |
2022 |
9 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
3/24/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR032M1062208200362 |
|
|
$142.66 |
000001071505-3562506200 |
2022 |
9 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
3/24/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR032M1062208200362 |
|
|
$1,595.26 |
000001071505-3562506200 |
2022 |
9 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
3/24/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR032M1062208200362 |
|
|
$231.52 |
000001071505-3562506200 |
2022 |
9 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
3/24/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR032M1062208200362 |
|
|
$0.51 |
000001071505-3562506200 |
2022 |
9 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
3/16/2022 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P052K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$46,946.43 |
|
2022 |
9 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
3/10/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR031M1062206709436 |
|
|
$1,934.97 |
000001071505-3562506200 |
2022 |
9 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
3/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709436 |
|
|
$74.63 |
000001071505-3562506200 |
2022 |
9 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
3/10/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR031M1062206709436 |
|
|
$145.30 |
000001071505-3562506200 |
2022 |
9 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
3/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709436 |
|
|
$5.60 |
000001071505-3562506200 |
2022 |
9 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
3/10/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR031M1062206709436 |
|
|
$1,624.79 |
000001071505-3562506200 |
2022 |
9 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
3/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709436 |
|
|
$62.67 |
000001071505-3562506200 |
2022 |
9 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
3/10/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR031M1062206709436 |
|
|
$235.92 |
000001071505-3562506200 |
2022 |
9 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
3/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709436 |
|
|
$8.99 |
000001071505-3562506200 |
2022 |
9 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
3/10/2022 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
CA-XR031M1062206709456 |
|
|
$572.06 |
000001079227-3562506210 |
2022 |
9 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
3/10/2022 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
CA-XR031M1062206709456 |
|
|
$42.10 |
000001079227-3562506210 |
2022 |
9 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
3/10/2022 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
CA-XR031M1062206709456 |
|
|
$480.36 |
000001079227-3562506210 |
2022 |
9 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
3/10/2022 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
CA-XR031M1062206709456 |
|
|
$98.15 |
000001079227-3562506210 |
2022 |
9 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
3/3/2022 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P051K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$56,866.31 |
|
2022 |
8 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
2/23/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR022M1062205308386 |
|
|
$1,831.93 |
000001071505-3562506200 |
2022 |
8 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
2/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022M1062205308386 |
|
|
$183.19 |
000001071505-3562506200 |
2022 |
8 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
2/23/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR022M1062205308386 |
|
|
$137.56 |
000001071505-3562506200 |
2022 |
8 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
2/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022M1062205308386 |
|
|
$13.76 |
000001071505-3562506200 |
2022 |
8 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
2/23/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR022M1062205308386 |
|
|
$1,538.29 |
000001071505-3562506200 |
2022 |
8 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
2/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022M1062205308386 |
|
|
$153.82 |
000001071505-3562506200 |
2022 |
8 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
2/23/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR022M1062205308386 |
|
|
$223.51 |
000001071505-3562506200 |
2022 |
8 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
2/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022M1062205308386 |
|
|
$22.07 |
000001071505-3562506200 |
2022 |
8 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
2/23/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR022M1062205308386 |
|
|
$0.49 |
000001071505-3562506200 |
2022 |
8 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
2/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022M1062205308386 |
|
|
$0.05 |
000001071505-3562506200 |
2022 |
8 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
2/18/2022 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P050K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$64,612.41 |
|
2022 |
8 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
2/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021M1062203907411 |
|
|
$17.44 |
000001071505-3562506200 |
2022 |
8 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
2/9/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR021M1062203907410 |
|
|
$1,447.46 |
000001071505-3562506200 |
2022 |
8 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
2/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021M1062203907410 |
|
|
$144.75 |
000001071505-3562506200 |
2022 |
8 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
2/9/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR021M1062203907410 |
|
|
$108.69 |
000001071505-3562506200 |
2022 |
8 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
2/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021M1062203907410 |
|
|
$10.87 |
000001071505-3562506200 |
2022 |
8 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
2/9/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR021M1062203907410 |
|
|
$1,215.43 |
000001071505-3562506200 |
2022 |
8 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
2/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021M1062203907410 |
|
|
$121.55 |
000001071505-3562506200 |
2022 |
8 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
2/9/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR021M1062203907410 |
|
|
$176.60 |
000001071505-3562506200 |
2022 |
8 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
2/2/2022 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P049K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$55,930.20 |
|
2022 |
7 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
1/24/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR012M1062202106419 |
|
|
$1,940.49 |
000001071505-3562506200 |
2022 |
7 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
1/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106419 |
|
|
$53.24 |
000001071505-3562506200 |
2022 |
7 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
1/24/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR012M1062202106419 |
|
|
$145.72 |
000001071505-3562506200 |
2022 |
7 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
1/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106419 |
|
|
$4.00 |
000001071505-3562506200 |
2022 |
7 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
1/24/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR012M1062202106419 |
|
|
$1,629.44 |
000001071505-3562506200 |
2022 |
7 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
1/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106419 |
|
|
$44.71 |
000001071505-3562506200 |
2022 |
7 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
1/24/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR012M1062202106419 |
|
|
$236.54 |
000001071505-3562506200 |
2022 |
7 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
1/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106419 |
|
|
$6.42 |
000001071505-3562506200 |
2022 |
7 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
1/24/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR012M1062202106419 |
|
|
$0.53 |
000001071505-3562506200 |
2022 |
7 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
1/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106419 |
|
|
$0.01 |
000001071505-3562506200 |
2022 |
7 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
1/24/2022 |
5242 |
CONCRETE TESTING UNIT |
CA-XR012M1062202106450 |
|
|
$1,089.43 |
000001079537-3562506210 |
2022 |
7 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
1/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106450 |
|
|
$112.14 |
000001079537-3562506210 |
2022 |
7 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
1/24/2022 |
5242 |
CONCRETE TESTING UNIT |
CA-XR012M1062202106450 |
|
|
$74.91 |
000001079537-3562506210 |
2022 |
7 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
1/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106450 |
|
|
$7.90 |
000001079537-3562506210 |
2022 |
7 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
1/24/2022 |
5242 |
CONCRETE TESTING UNIT |
CA-XR012M1062202106450 |
|
|
$914.87 |
000001079537-3562506210 |
2022 |
7 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
1/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106450 |
|
|
$94.16 |
000001079537-3562506210 |
2022 |
7 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
1/24/2022 |
5242 |
CONCRETE TESTING UNIT |
CA-XR012M1062202106450 |
|
|
$271.26 |
000001079537-3562506210 |
2022 |
7 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
1/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106450 |
|
|
$21.18 |
000001079537-3562506210 |
2022 |
7 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
1/24/2022 |
5242 |
CONCRETE TESTING UNIT |
CA-XR012M1062202106450 |
|
|
$0.50 |
000001079537-3562506210 |
2022 |
7 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
1/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106450 |
|
|
$0.05 |
000001079537-3562506210 |
2022 |
7 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
1/21/2022 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P048K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$344,843.89 |
|
2022 |
7 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
1/11/2022 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162522010011500 |
|
|
$53.60 |
|
2022 |
7 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
1/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011M1062200705549 |
|
|
$70.58 |
000001079537-3562506210 |
2022 |
7 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
1/10/2022 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
CA-XR011M1062200705547 |
|
|
$178.05 |
000001079227-3562506210 |
2022 |
7 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
1/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011M1062200705547 |
|
|
$178.05 |
000001079227-3562506210 |
2022 |
7 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
1/10/2022 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
CA-XR011M1062200705547 |
|
|
$12.03 |
000001079227-3562506210 |
2022 |
7 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
1/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011M1062200705547 |
|
|
$12.03 |
000001079227-3562506210 |
2022 |
7 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
1/10/2022 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
CA-XR011M1062200705547 |
|
|
$149.51 |
000001079227-3562506210 |
2022 |
7 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
1/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011M1062200705547 |
|
|
$149.51 |
000001079227-3562506210 |
2022 |
7 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
1/10/2022 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
CA-XR011M1062200705547 |
|
|
$51.89 |
000001079227-3562506210 |
2022 |
7 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
1/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011M1062200705547 |
|
|
$51.04 |
000001079227-3562506210 |
2022 |
7 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
1/10/2022 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR011M1062200705547 |
|
|
$0.05 |
000001079228-3562506210 |
2022 |
7 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
1/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011M1062200705547 |
|
|
$0.01 |
000001079228-3562506210 |
2022 |
7 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
1/10/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR011M1062200705525 |
|
|
$1,528.36 |
000001071505-3562506200 |
2022 |
7 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
1/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011M1062200705525 |
|
|
$1,510.52 |
000001071505-3562506200 |
2022 |
7 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
1/10/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR011M1062200705525 |
|
|
$115.18 |
000001071505-3562506200 |
2022 |
7 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
1/10/2022 |
5242 |
CONCRETE TESTING UNIT |
CA-XR011M1062200705548 |
|
|
$747.57 |
000001079537-3562506210 |
2022 |
7 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
1/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011M1062200705525 |
|
|
$113.63 |
000001071505-3562506200 |
2022 |
7 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
1/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011M1062200705548 |
|
|
$373.78 |
000001079537-3562506210 |
2022 |
7 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
1/10/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR011M1062200705525 |
|
|
$1,283.35 |
000001071505-3562506200 |
2022 |
7 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
1/10/2022 |
5242 |
CONCRETE TESTING UNIT |
CA-XR011M1062200705548 |
|
|
$52.67 |
000001079537-3562506210 |
2022 |
7 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
1/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011M1062200705525 |
|
|
$1,268.39 |
000001071505-3562506200 |
2022 |
7 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
1/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011M1062200705548 |
|
|
$26.33 |
000001079537-3562506210 |
2022 |
7 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
1/10/2022 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR011M1062200705525 |
|
|
$212.84 |
000001071505-3562506200 |
2022 |
7 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
1/10/2022 |
5242 |
CONCRETE TESTING UNIT |
CA-XR011M1062200705548 |
|
|
$627.74 |
000001079537-3562506210 |
2022 |
7 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
1/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011M1062200705525 |
|
|
$193.82 |
000001071505-3562506200 |
2022 |
7 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
1/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011M1062200705548 |
|
|
$313.86 |
000001079537-3562506210 |
2022 |
7 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
1/10/2022 |
5242 |
CONCRETE TESTING UNIT |
CA-XR011M1062200705548 |
|
|
$143.71 |
000001079537-3562506210 |
2022 |
6 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
12/27/2021 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162521359015620 |
|
|
$53.60 |
|
2022 |
6 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
12/22/2021 |
5242 |
CONCRETE TESTING UNIT |
CA-XR122L1062135504495 |
|
|
$1,227.79 |
000001079537-3562506210 |
2022 |
6 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504495 |
|
|
$165.65 |
000001079537-3562506210 |
2022 |
6 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
12/22/2021 |
5242 |
CONCRETE TESTING UNIT |
CA-XR122L1062135504495 |
|
|
$89.98 |
000001079537-3562506210 |
2022 |
6 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504495 |
|
|
$12.29 |
000001079537-3562506210 |
2022 |
6 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
12/22/2021 |
5242 |
CONCRETE TESTING UNIT |
CA-XR122L1062135504495 |
|
|
$1,031.03 |
000001079537-3562506210 |
2022 |
6 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504495 |
|
|
$139.10 |
000001079537-3562506210 |
2022 |
6 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
12/22/2021 |
5242 |
CONCRETE TESTING UNIT |
CA-XR122L1062135504495 |
|
|
$201.13 |
000001079537-3562506210 |
2022 |
6 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504495 |
|
|
$26.86 |
000001079537-3562506210 |
2022 |
6 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
12/22/2021 |
5242 |
CONCRETE TESTING UNIT |
CA-XR122L1062135504495 |
|
|
$0.48 |
000001079537-3562506210 |
2022 |
6 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504495 |
|
|
$0.07 |
000001079537-3562506210 |
2022 |
6 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
12/22/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR122L1062135504458 |
|
|
$2,643.94 |
000001071505-3562506200 |
2022 |
6 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504458 |
|
|
$403.93 |
000001071505-3562506200 |
2022 |
6 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
12/22/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR122L1062135504458 |
|
|
$199.21 |
000001071505-3562506200 |
2022 |
6 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504458 |
|
|
$30.71 |
000001071505-3562506200 |
2022 |
6 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
12/22/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR122L1062135504458 |
|
|
$2,220.10 |
000001071505-3562506200 |
2022 |
6 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504458 |
|
|
$339.18 |
000001071505-3562506200 |
2022 |
6 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
12/22/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR122L1062135504458 |
|
|
$337.45 |
000001071505-3562506200 |
2022 |
6 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504458 |
|
|
$60.79 |
000001071505-3562506200 |
2022 |
6 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
12/22/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR122L1062135504458 |
|
|
$0.82 |
000001071505-3562506200 |
2022 |
6 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504458 |
|
|
$0.18 |
000001071505-3562506200 |
2022 |
6 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
12/22/2021 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR122L1062135504492 |
|
|
$370.67 |
000001079228-3562506210 |
2022 |
6 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504492 |
|
|
$37.07 |
000001079228-3562506210 |
2022 |
6 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
12/22/2021 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR122L1062135504492 |
|
|
$27.42 |
000001079228-3562506210 |
2022 |
6 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504492 |
|
|
$2.74 |
000001079228-3562506210 |
2022 |
6 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
12/22/2021 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR122L1062135504492 |
|
|
$311.25 |
000001079228-3562506210 |
2022 |
6 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504492 |
|
|
$31.13 |
000001079228-3562506210 |
2022 |
6 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
12/22/2021 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR122L1062135504492 |
|
|
$80.78 |
000001079228-3562506210 |
2022 |
6 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504492 |
|
|
$7.98 |
000001079228-3562506210 |
2022 |
6 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
12/22/2021 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR122L1062135504492 |
|
|
$0.18 |
000001079228-3562506210 |
2022 |
6 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504492 |
|
|
$0.02 |
000001079228-3562506210 |
2022 |
6 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
12/15/2021 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P047K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$295,920.65 |
|
2022 |
6 |
FD52 |
06 |
E389 |
C |
8022202C |
008 |
12/13/2021 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XM005162521344002000 |
|
|
$457.32 |
|
2022 |
6 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
12/10/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR121L1062134103531 |
|
|
$2,373.28 |
000001071505-3562506200 |
2022 |
6 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
12/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103531 |
|
|
$708.12 |
000001071505-3562506200 |
2022 |
6 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
12/10/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR121L1062134103531 |
|
|
$178.67 |
000001071505-3562506200 |
2022 |
6 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
12/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103531 |
|
|
$53.29 |
000001071505-3562506200 |
2022 |
6 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
12/10/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR121L1062134103531 |
|
|
$1,992.84 |
000001071505-3562506200 |
2022 |
6 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
12/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103531 |
|
|
$594.61 |
000001071505-3562506200 |
2022 |
6 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
12/10/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR121L1062134103531 |
|
|
$312.41 |
000001071505-3562506200 |
2022 |
6 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
12/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103531 |
|
|
$89.52 |
000001071505-3562506200 |
2022 |
6 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
12/10/2021 |
5242 |
CONCRETE TESTING UNIT |
CA-XR121L1062134103561 |
|
|
$568.51 |
000001079537-3562506210 |
2022 |
6 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
12/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103561 |
|
|
$126.22 |
000001079537-3562506210 |
2022 |
6 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
12/10/2021 |
5242 |
CONCRETE TESTING UNIT |
CA-XR121L1062134103561 |
|
|
$42.56 |
000001079537-3562506210 |
2022 |
6 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
12/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103561 |
|
|
$9.45 |
000001079537-3562506210 |
2022 |
6 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
12/10/2021 |
5242 |
CONCRETE TESTING UNIT |
CA-XR121L1062134103561 |
|
|
$477.43 |
000001079537-3562506210 |
2022 |
6 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
12/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103561 |
|
|
$105.99 |
000001079537-3562506210 |
2022 |
6 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
12/10/2021 |
5242 |
CONCRETE TESTING UNIT |
CA-XR121L1062134103561 |
|
|
$80.89 |
000001079537-3562506210 |
2022 |
6 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
12/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103561 |
|
|
$17.71 |
000001079537-3562506210 |
2022 |
6 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
12/8/2021 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
CA-XR121L1062134103559 |
|
|
$377.81 |
000001079227-3562506210 |
2022 |
6 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
12/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103559 |
|
|
$314.85 |
000001079227-3562506210 |
2022 |
6 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
12/8/2021 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
CA-XR121L1062134103559 |
|
|
$26.15 |
000001079227-3562506210 |
2022 |
6 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
12/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103559 |
|
|
$21.78 |
000001079227-3562506210 |
2022 |
6 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
12/8/2021 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
CA-XR121L1062134103559 |
|
|
$317.22 |
000001079227-3562506210 |
2022 |
6 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
12/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103559 |
|
|
$264.38 |
000001079227-3562506210 |
2022 |
6 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
12/8/2021 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
CA-XR121L1062134103559 |
|
|
$85.59 |
000001079227-3562506210 |
2022 |
6 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
12/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103559 |
|
|
$69.90 |
000001079227-3562506210 |
2022 |
6 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
12/3/2021 |
4010 |
CONSTRUCTION ENGINEERING |
PRC-2200092678 |
PON21900002383 |
HRV CONFORMANCE VERIFICATION |
$5,740.00 |
Structural Steel Shop Inspection |
2022 |
6 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
12/1/2021 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P046K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$207,908.74 |
|
2022 |
5 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
11/30/2021 |
4010 |
CONSTRUCTION ENGINEERING |
PRC-2200083263 |
PON21900002383 |
HRV CONFORMANCE VERIFICATION |
$12,484.50 |
Structural Steel Shop Inspection |
2022 |
5 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
11/29/2021 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162521329011410 |
|
|
$36.85 |
|
2022 |
5 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
11/26/2021 |
4010 |
CONSTRUCTION ENGINEERING |
PRC-2200051501 |
PON21900002383 |
HRV CONFORMANCE VERIFICATION |
$13,776.00 |
Structural Steel Shop Inspection |
2022 |
5 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
11/23/2021 |
5242 |
CONCRETE TESTING UNIT |
CA-XR112L1062132602528 |
|
|
$2,117.50 |
000001079537-3562506210 |
2022 |
5 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
11/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602528 |
|
|
$1,087.52 |
000001079537-3562506210 |
2022 |
5 |
FD52 |
06 |
E115 |
C |
8022202C |
008 |
11/23/2021 |
5242 |
CONCRETE TESTING UNIT |
CA-XR112L1062132602528 |
|
|
$18.82 |
000001079537-3562506210 |
2022 |
5 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
11/23/2021 |
5242 |
CONCRETE TESTING UNIT |
CA-XR112L1062132602528 |
|
|
$153.00 |
000001079537-3562506210 |
2022 |
5 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
11/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602528 |
|
|
$76.66 |
000001079537-3562506210 |
2022 |
5 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
11/23/2021 |
5242 |
CONCRETE TESTING UNIT |
CA-XR112L1062132602528 |
|
|
$1,794.28 |
000001079537-3562506210 |
2022 |
5 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
11/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602528 |
|
|
$913.20 |
000001079537-3562506210 |
2022 |
5 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
11/23/2021 |
5242 |
CONCRETE TESTING UNIT |
CA-XR112L1062132602528 |
|
|
$460.87 |
000001079537-3562506210 |
2022 |
5 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
11/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602528 |
|
|
$235.68 |
000001079537-3562506210 |
2022 |
5 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
11/23/2021 |
5242 |
CONCRETE TESTING UNIT |
CA-XR112L1062132602528 |
|
|
$0.99 |
000001079537-3562506210 |
2022 |
5 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
11/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602528 |
|
|
$0.50 |
000001079537-3562506210 |
2022 |
5 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
11/23/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR112L1062132602489 |
|
|
$2,481.49 |
000001071505-3562506200 |
2022 |
5 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
11/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602489 |
|
|
$432.01 |
000001071505-3562506200 |
2022 |
5 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
11/23/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR112L1062132602489 |
|
|
$187.10 |
000001071505-3562506200 |
2022 |
5 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
11/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602489 |
|
|
$32.69 |
000001071505-3562506200 |
2022 |
5 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
11/23/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR112L1062132602489 |
|
|
$2,083.72 |
000001071505-3562506200 |
2022 |
5 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
11/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602489 |
|
|
$362.76 |
000001071505-3562506200 |
2022 |
5 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
11/23/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR112L1062132602489 |
|
|
$321.74 |
000001071505-3562506200 |
2022 |
5 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
11/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602489 |
|
|
$59.36 |
000001071505-3562506200 |
2022 |
5 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
11/23/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR112L1062132602489 |
|
|
$0.80 |
000001071505-3562506200 |
2022 |
5 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
11/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602489 |
|
|
$0.16 |
000001071505-3562506200 |
2022 |
5 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
11/17/2021 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P045K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$123,595.08 |
|
2022 |
5 |
FD52 |
06 |
E229 |
C |
8022202C |
008 |
11/12/2021 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162521314014010 |
|
|
$90.45 |
|
2022 |
5 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
11/8/2021 |
5242 |
CONCRETE TESTING UNIT |
CA-XR111L1062130901521 |
|
|
$428.07 |
000001079537-3562506210 |
2022 |
5 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
11/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111L1062130901521 |
|
|
$591.13 |
000001079537-3562506210 |
2022 |
5 |
FD52 |
06 |
E115 |
C |
8022202C |
008 |
11/8/2021 |
5242 |
CONCRETE TESTING UNIT |
CA-XR111L1062130901521 |
|
|
$37.64 |
000001079537-3562506210 |
2022 |
5 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
11/8/2021 |
5242 |
CONCRETE TESTING UNIT |
CA-XR111L1062130901521 |
|
|
$33.24 |
000001079537-3562506210 |
2022 |
5 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
11/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111L1062130901521 |
|
|
$40.44 |
000001079537-3562506210 |
2022 |
5 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
11/8/2021 |
5242 |
CONCRETE TESTING UNIT |
CA-XR111L1062130901521 |
|
|
$391.12 |
000001079537-3562506210 |
2022 |
5 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
11/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111L1062130901521 |
|
|
$496.38 |
000001079537-3562506210 |
2022 |
5 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
11/8/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR111L1062130901491 |
|
|
$3,014.00 |
000001071505-3562506200 |
2022 |
5 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
11/8/2021 |
5242 |
CONCRETE TESTING UNIT |
CA-XR111L1062130901521 |
|
|
$87.57 |
000001079537-3562506210 |
2022 |
5 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
11/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111L1062130901491 |
|
|
$53.74 |
000001071505-3562506200 |
2022 |
5 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
11/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111L1062130901521 |
|
|
$110.48 |
000001079537-3562506210 |
2022 |
5 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
11/8/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR111L1062130901491 |
|
|
$226.89 |
000001071505-3562506200 |
2022 |
5 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
11/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111L1062130901491 |
|
|
$4.04 |
000001071505-3562506200 |
2022 |
5 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
11/8/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR111L1062130901491 |
|
|
$2,530.85 |
000001071505-3562506200 |
2022 |
5 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
11/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111L1062130901491 |
|
|
$45.13 |
000001071505-3562506200 |
2022 |
5 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
11/8/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR111L1062130901491 |
|
|
$393.99 |
000001071505-3562506200 |
2022 |
5 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
11/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111L1062130901491 |
|
|
$6.32 |
000001071505-3562506200 |
2022 |
5 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
11/3/2021 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P044K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$350,683.52 |
|
2022 |
4 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
10/25/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR102L1062129500382 |
|
|
$2,038.89 |
000001071505-3562506200 |
2022 |
4 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500382 |
|
|
$999.99 |
000001071505-3562506200 |
2022 |
4 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
10/25/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR102L1062129500382 |
|
|
$154.03 |
000001071505-3562506200 |
2022 |
4 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500382 |
|
|
$75.20 |
000001071505-3562506200 |
2022 |
4 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
10/25/2021 |
5242 |
CONCRETE TESTING UNIT |
CA-XR102L1062129500420 |
|
|
$1,876.24 |
000001079537-3562506210 |
2022 |
4 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
10/25/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR102L1062129500382 |
|
|
$1,712.06 |
000001071505-3562506200 |
2022 |
4 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500420 |
|
|
$793.85 |
000001079537-3562506210 |
2022 |
4 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500382 |
|
|
$839.69 |
000001071505-3562506200 |
2022 |
4 |
FD52 |
06 |
E115 |
C |
8022202C |
008 |
10/25/2021 |
5242 |
CONCRETE TESTING UNIT |
CA-XR102L1062129500420 |
|
|
$95.90 |
000001079537-3562506210 |
2022 |
4 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
10/25/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR102L1062129500382 |
|
|
$276.17 |
000001071505-3562506200 |
2022 |
4 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
10/25/2021 |
5242 |
CONCRETE TESTING UNIT |
CA-XR102L1062129500420 |
|
|
$139.69 |
000001079537-3562506210 |
2022 |
4 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500382 |
|
|
$120.70 |
000001071505-3562506200 |
2022 |
4 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500420 |
|
|
$55.97 |
000001079537-3562506210 |
2022 |
4 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
10/25/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR102L1062129500382 |
|
|
$0.73 |
000001071505-3562506200 |
2022 |
4 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
10/25/2021 |
5242 |
CONCRETE TESTING UNIT |
CA-XR102L1062129500420 |
|
|
$1,656.15 |
000001079537-3562506210 |
2022 |
4 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500382 |
|
|
$0.28 |
000001071505-3562506200 |
2022 |
4 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500420 |
|
|
$666.61 |
000001079537-3562506210 |
2022 |
4 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
10/25/2021 |
5242 |
CONCRETE TESTING UNIT |
CA-XR102L1062129500420 |
|
|
$427.03 |
000001079537-3562506210 |
2022 |
4 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500420 |
|
|
$147.07 |
000001079537-3562506210 |
2022 |
4 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
10/25/2021 |
5242 |
CONCRETE TESTING UNIT |
CA-XR102L1062129500420 |
|
|
$0.88 |
000001079537-3562506210 |
2022 |
4 |
FD52 |
06 |
E124 |
C |
8022202C |
008 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500420 |
|
|
$0.35 |
000001079537-3562506210 |
2022 |
4 |
FD52 |
06 |
E797 |
C |
8022202C |
008 |
10/20/2021 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092199002P043K |
CTXCONST0921990020001K |
JOHN R JURGENSEN CO |
$526,334.37 |
|
2022 |
4 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
10/11/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR101L1062128110104 |
|
|
$376.91 |
000001071505-3562506200 |
2022 |
4 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
10/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101L1062128110135 |
|
|
$0.03 |
000001079227-3562506210 |
2022 |
4 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
10/11/2021 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
CA-XR101L1062128110135 |
|
|
($0.19) |
000001079227-3562506210 |
2022 |
4 |
FD52 |
06 |
E122 |
C |
8022202C |
008 |
10/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101L1062128110135 |
|
|
($0.01) |
000001079227-3562506210 |
2022 |
4 |
FD52 |
06 |
E123 |
C |
8022202C |
008 |
10/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101L1062128110104 |
|
|
$27.21 |
000001071505-3562506200 |
2022 |
4 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
10/11/2021 |
5242 |
CONCRETE TESTING UNIT |
CA-XR101L1062128110137 |
|
|
$387.46 |
000001079537-3562506210 |
2022 |
4 |
FD52 |
06 |
E111 |
C |
8022202C |
008 |
10/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101L1062128110137 |
|
|
$187.29 |
000001079537-3562506210 |
2022 |
4 |
FD52 |
06 |
E115 |
C |
8022202C |
008 |
10/11/2021 |
5242 |
CONCRETE TESTING UNIT |
CA-XR101L1062128110137 |
|
|
$223.68 |
000001079537-3562506210 |
2022 |
4 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
10/11/2021 |
5242 |
CONCRETE TESTING UNIT |
CA-XR101L1062128110137 |
|
|
$44.22 |
000001079537-3562506210 |
2022 |
4 |
FD52 |
06 |
E121 |
C |
8022202C |
008 |
10/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101L1062128110137 |
|
|
$12.71 |
000001079537-3562506210 |