The Commonwealth pays employees on a semi-monthly basis with a scheduled pay day on the 15th and 30th of each month. The two monthly pay periods are from the 1st to the 15th of the month and the 16th through the last day of the month. Pay check distribution is delayed by one pay period to allow for system processing. For example work performed during the 1st to the 15th day of the month is paid to the employee on the 30th of the month. Accordingly the cost accounting charges for labor costs posting in eMARS to operating accounts and highway projects are also delayed by approximately one pay period.
A good rule of measure is that the cost accounting charges for the pay period ending on the 15th of the month will post to eMARS by the 25th and those for the pay period ending on the last day of the month will post to eMARS by the 10th of the following month.

x close panel
Detailed Project Expenditure Report
Total E-MARS Expenditures for 7614002U = $622,852.68
Click here for Labor Costs Information
Year Month PBU Charge District Object Phase Program Code County Date ACT Activity Name Trans ID Reference # Vendor Name Expenditure Line Description
2024 10 FD52 05 E111 U 7614002U 106 4/30/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR042O1062411502746 $143.29 000001085746-3562505208
2024 10 FD52 05 E111 U 7614002U 106 4/30/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502746 $10.98 000001085746-3562505208
2024 10 FD52 05 E121 U 7614002U 106 4/30/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR042O1062411502746 $10.88 000001085746-3562505208
2024 10 FD52 05 E121 U 7614002U 106 4/30/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502746 $0.83 000001085746-3562505208
2024 10 FD52 05 E122 U 7614002U 106 4/30/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR042O1062411502746 $94.76 000001085746-3562505208
2024 10 FD52 05 E122 U 7614002U 106 4/30/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502746 $7.26 000001085746-3562505208
2024 10 FD52 05 E123 U 7614002U 106 4/30/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR042O1062411502746 $16.15 000001085746-3562505208
2024 10 FD52 05 E123 U 7614002U 106 4/30/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502746 $1.22 000001085746-3562505208
2024 10 FD52 05 E124 U 7614002U 106 4/30/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR042O1062411502746 $0.04 000001085746-3562505208
2024 9 FD52 00 E123 U 7614002U 106 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810095 $2.69 000001088937-3562500061
2024 9 FD52 00 E111 U 7614002U 106 3/11/2024 0010 ENV STUDIES-UST/HZM CA-XR031O1062406810095 $287.96 000001088937-3562500061
2024 9 FD52 00 E111 U 7614002U 106 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810095 $16.39 000001088937-3562500061
2024 9 FD52 05 E111 U 7614002U 106 3/11/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR031O1062406810079 $183.63 000001085746-3562505208
2024 9 FD52 05 E111 U 7614002U 106 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810079 $5.25 000001085746-3562505208
2024 9 FD52 00 E121 U 7614002U 106 3/11/2024 0010 ENV STUDIES-UST/HZM CA-XR031O1062406810095 $21.00 000001088937-3562500061
2024 9 FD52 05 E121 U 7614002U 106 3/11/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR031O1062406810079 $13.88 000001085746-3562505208
2024 9 FD52 05 E121 U 7614002U 106 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810079 $0.40 000001085746-3562505208
2024 9 FD52 05 E122 U 7614002U 106 3/11/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR031O1062406810079 $121.60 000001085746-3562505208
2024 9 FD52 05 E122 U 7614002U 106 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810079 $3.47 000001085746-3562505208
2024 9 FD52 05 E123 U 7614002U 106 3/11/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR031O1062406810079 $20.71 000001085746-3562505208
2024 9 FD52 05 E123 U 7614002U 106 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810079 $0.58 000001085746-3562505208
2024 9 FD52 00 E121 U 7614002U 106 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810095 $1.20 000001088937-3562500061
2024 9 FD52 00 E122 U 7614002U 106 3/11/2024 0010 ENV STUDIES-UST/HZM CA-XR031O1062406810095 $190.54 000001088937-3562500061
2024 9 FD52 00 E122 U 7614002U 106 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810095 $10.85 000001088937-3562500061
2024 9 FD52 00 E123 U 7614002U 106 3/11/2024 0010 ENV STUDIES-UST/HZM CA-XR031O1062406810095 $47.80 000001088937-3562500061
2024 8 FD52 00 E111 U 7614002U 106 2/26/2024 0010 ENV STUDIES-UST/HZM CA-XR022O1062405408923 $1,087.40 000001088937-3562500061
2024 8 FD52 00 E121 U 7614002U 106 2/26/2024 0010 ENV STUDIES-UST/HZM CA-XR022O1062405408923 $80.97 000001088937-3562500061
2024 8 FD52 00 E122 U 7614002U 106 2/26/2024 0010 ENV STUDIES-UST/HZM CA-XR022O1062405408923 $719.53 000001088937-3562500061
2024 8 FD52 00 E123 U 7614002U 106 2/26/2024 0010 ENV STUDIES-UST/HZM CA-XR022O1062405408923 $180.40 000001088937-3562500061
2024 8 FD52 00 E124 U 7614002U 106 2/26/2024 0010 ENV STUDIES-UST/HZM CA-XR022O1062405408923 $0.33 000001088937-3562500061
2024 8 FD52 05 E111 U 7614002U 106 2/26/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR022O1062405408903 $143.16 000001085746-3562505208
2024 8 FD52 05 E111 U 7614002U 106 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408903 $5.25 000001085746-3562505208
2024 8 FD52 05 E121 U 7614002U 106 2/26/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR022O1062405408903 $10.88 000001085746-3562505208
2024 8 FD52 05 E121 U 7614002U 106 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408903 $0.40 000001085746-3562505208
2024 8 FD52 05 E122 U 7614002U 106 2/26/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR022O1062405408903 $94.76 000001085746-3562505208
2024 8 FD52 05 E122 U 7614002U 106 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408903 $3.47 000001085746-3562505208
2024 8 FD52 05 E123 U 7614002U 106 2/26/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR022O1062405408903 $16.14 000001085746-3562505208
2024 8 FD52 05 E123 U 7614002U 106 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408903 $0.58 000001085746-3562505208
2024 8 FD52 05 E124 U 7614002U 106 2/26/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR022O1062405408903 $0.04 000001085746-3562505208
2024 8 FD52 05 E191 U 7614002U 106 2/20/2024 3040 INSPECTION&SUPER-UTILITIES PRC-2400164908 Eight Eleven Group, LLC $154.67
2024 8 FD52 00 E111 U 7614002U 106 2/9/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR021O1062403907659 $479.77 000001081377-3562500480
2024 8 FD52 00 E111 U 7614002U 106 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907659 $30.35 000001081377-3562500480
2024 8 FD52 00 E121 U 7614002U 106 2/9/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR021O1062403907659 $34.40 000001081377-3562500480
2024 8 FD52 00 E121 U 7614002U 106 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907659 $2.15 000001081377-3562500480
2024 8 FD52 00 E122 U 7614002U 106 2/9/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR021O1062403907659 $317.47 000001081377-3562500480
2024 8 FD52 00 E122 U 7614002U 106 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907659 $20.09 000001081377-3562500480
2024 8 FD52 00 E123 U 7614002U 106 2/9/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR021O1062403907659 $90.72 000001081377-3562500480
2024 8 FD52 00 E123 U 7614002U 106 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907659 $7.25 000001081377-3562500480
2024 8 FD52 00 E111 U 7614002U 106 2/9/2024 0010 ENV STUDIES-UST/HZM CA-XR021O1062403907687 $276.88 000001088937-3562500061
2024 8 FD52 00 E111 U 7614002U 106 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907687 $21.41 000001088937-3562500061
2024 8 FD52 00 E121 U 7614002U 106 2/9/2024 0010 ENV STUDIES-UST/HZM CA-XR021O1062403907687 $20.20 000001088937-3562500061
2024 8 FD52 00 E121 U 7614002U 106 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907687 $1.57 000001088937-3562500061
2024 8 FD52 00 E122 U 7614002U 106 2/9/2024 0010 ENV STUDIES-UST/HZM CA-XR021O1062403907687 $183.21 000001088937-3562500061
2024 8 FD52 00 E122 U 7614002U 106 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907687 $14.17 000001088937-3562500061
2024 8 FD52 00 E123 U 7614002U 106 2/9/2024 0010 ENV STUDIES-UST/HZM CA-XR021O1062403907687 $45.97 000001088937-3562500061
2024 8 FD52 00 E123 U 7614002U 106 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907687 $3.52 000001088937-3562500061
2024 7 FD52 05 E795 U 7614002U 106 1/30/2024 3560 UTILITY CONTRACTS PRC-2400151266 SC2300001345 Shelbyville Municipal Water & Sewer Commission $27,300.00
2024 7 FD52 05 E795 U 7614002U 106 1/30/2024 3560 UTILITY CONTRACTS PRC-2400151276 SC2400000340 Shelbyville Municipal Water & Sewer Commission $352,344.00
2024 7 FD52 05 E111 U 7614002U 106 1/24/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR012O1062402306594 $214.73 000001085746-3562505208
2024 7 FD52 05 E111 U 7614002U 106 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306594 $47.73 000001085746-3562505208
2024 7 FD52 05 E121 U 7614002U 106 1/24/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR012O1062402306594 $16.32 000001085746-3562505208
2024 7 FD52 05 E121 U 7614002U 106 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306594 $3.63 000001085746-3562505208
2024 7 FD52 05 E122 U 7614002U 106 1/24/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR012O1062402306594 $142.13 000001085746-3562505208
2024 7 FD52 05 E122 U 7614002U 106 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306594 $31.58 000001085746-3562505208
2024 7 FD52 05 E123 U 7614002U 106 1/24/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR012O1062402306594 $24.27 000001085746-3562505208
2024 7 FD52 05 E123 U 7614002U 106 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306594 $5.32 000001085746-3562505208
2024 7 FD52 05 E124 U 7614002U 106 1/24/2024 3040 INSPECTION&SUPER-UTILITIES CA-XR012O1062402306594 $0.05 000001085746-3562505208
2024 7 FD52 05 E124 U 7614002U 106 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306594 $0.01 000001085746-3562505208
2024 7 FD52 00 E111 U 7614002U 056 1/24/2024 0010 ENV STUDIES-UST/HZM CA-XR012O1062402306635 $281.92 000001090597-3562500061
2024 7 FD52 00 E111 U 7614002U 056 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306635 $62.83 000001090597-3562500061
2024 7 FD52 00 E121 U 7614002U 056 1/24/2024 0010 ENV STUDIES-UST/HZM CA-XR012O1062402306635 $20.99 000001090597-3562500061
2024 7 FD52 00 E121 U 7614002U 056 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306635 $4.68 000001090597-3562500061
2024 7 FD52 00 E122 U 7614002U 056 1/24/2024 0010 ENV STUDIES-UST/HZM CA-XR012O1062402306635 $186.55 000001090597-3562500061
2024 7 FD52 00 E122 U 7614002U 056 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306635 $41.57 000001090597-3562500061
2024 7 FD52 00 E123 U 7614002U 056 1/24/2024 0010 ENV STUDIES-UST/HZM CA-XR012O1062402306635 $46.87 000001090597-3562500061
2024 7 FD52 00 E123 U 7614002U 056 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306635 $10.33 000001090597-3562500061
2024 7 FD52 00 E124 U 7614002U 056 1/24/2024 0010 ENV STUDIES-UST/HZM CA-XR012O1062402306635 $0.08 000001090597-3562500061
2024 7 FD52 00 E124 U 7614002U 056 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306635 $0.02 000001090597-3562500061
2024 7 FD52 00 E121 U 7614002U 106 1/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505739 $33.54 000001088937-3562500061
2024 7 FD52 00 E122 U 7614002U 106 1/10/2024 0010 ENV STUDIES-UST/HZM CA-XR011O1062400505739 $556.97 000001088937-3562500061
2024 7 FD52 00 E122 U 7614002U 106 1/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505739 $304.28 000001088937-3562500061
2024 7 FD52 00 E123 U 7614002U 106 1/10/2024 0010 ENV STUDIES-UST/HZM CA-XR011O1062400505739 $140.35 000001088937-3562500061
2024 7 FD52 00 E123 U 7614002U 106 1/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505739 $75.58 000001088937-3562500061
2024 7 FD52 00 E111 U 7614002U 106 1/10/2024 0010 ENV STUDIES-UST/HZM CA-XR011O1062400505739 $841.84 000001088937-3562500061
2024 7 FD52 00 E111 U 7614002U 106 1/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505739 $459.85 000001088937-3562500061
2024 7 FD52 00 E121 U 7614002U 106 1/10/2024 0010 ENV STUDIES-UST/HZM CA-XR011O1062400505739 $61.40 000001088937-3562500061
2024 7 FD52 05 E795 U 7614002U 106 1/9/2024 3560 UTILITY CONTRACTS PRC-2400133431 SC2300001345 Shelbyville Municipal Water & Sewer Commission $14,700.00
2024 7 FD52 00 E111 U 7614002U 106 1/3/2024 0010 ENV STUDIES-UST/HZM CA-XR121N1062334203646 $140.96 000001088937-3562500061
2024 7 FD52 00 E111 U 7614002U 106 1/3/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203646 $40.67 000001088937-3562500061
2024 7 FD52 00 E121 U 7614002U 106 1/3/2024 0010 ENV STUDIES-UST/HZM CA-XR121N1062334203646 $10.28 000001088937-3562500061
2024 7 FD52 00 E121 U 7614002U 106 1/3/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203646 $2.97 000001088937-3562500061
2024 7 FD52 00 E122 U 7614002U 106 1/3/2024 0010 ENV STUDIES-UST/HZM CA-XR121N1062334203646 $93.27 000001088937-3562500061
2024 7 FD52 00 E122 U 7614002U 106 1/3/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203646 $26.91 000001088937-3562500061
2024 7 FD52 00 E123 U 7614002U 106 1/3/2024 0010 ENV STUDIES-UST/HZM CA-XR121N1062334203646 $20.23 000001088937-3562500061
2024 7 FD52 00 E123 U 7614002U 106 1/3/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203646 $5.75 000001088937-3562500061
2024 6 FD52 05 E795 U 7614002U 106 12/15/2023 3560 UTILITY CONTRACTS PRC-2400119674 SC2400000340 Shelbyville Municipal Water & Sewer Commission $147,546.00
2024 5 FD52 05 E795 U 7614002U 106 11/30/2023 3560 UTILITY CONTRACTS PRC-2400106544 SC2300001345 Shelbyville Municipal Water & Sewer Commission $10,710.36
2024 5 FD52 00 E111 U 7614002U 106 11/22/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR112N1062332502507 $127.74 000001081377-3562500480
2024 5 FD52 00 E111 U 7614002U 106 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502507 $35.79 000001081377-3562500480
2024 5 FD52 00 E121 U 7614002U 106 11/22/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR112N1062332502507 $9.08 000001081377-3562500480
2024 5 FD52 00 E121 U 7614002U 106 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502507 $2.53 000001081377-3562500480
2024 5 FD52 00 E122 U 7614002U 106 11/22/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR112N1062332502507 $84.60 000001081377-3562500480
2024 5 FD52 00 E122 U 7614002U 106 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502507 $23.69 000001081377-3562500480
2024 5 FD52 00 E123 U 7614002U 106 11/22/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR112N1062332502507 $32.01 000001081377-3562500480
2024 5 FD52 00 E123 U 7614002U 106 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502507 $8.87 000001081377-3562500480
2024 5 FD52 00 E124 U 7614002U 106 11/22/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR112N1062332502507 $0.05 000001081377-3562500480
2024 5 FD52 00 E124 U 7614002U 106 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502507 $0.01 000001081377-3562500480
2024 3 FD52 00 E122 U 7614002U 106 9/18/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106128 $45.93 000001088937-3562500061
2024 3 FD52 00 E123 U 7614002U 106 9/18/2023 0010 ENV STUDIES-UST/HZM CA-XR091N1062325106128 $71.39 000001088937-3562500061
2024 3 FD52 00 E123 U 7614002U 106 9/18/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106128 $9.82 000001088937-3562500061
2024 3 FD52 00 E111 U 7614002U 106 9/18/2023 0010 ENV STUDIES-UST/HZM CA-XR091N1062325106128 $498.31 000001088937-3562500061
2024 3 FD52 00 E111 U 7614002U 106 9/18/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106128 $69.41 000001088937-3562500061
2024 3 FD52 00 E121 U 7614002U 106 9/18/2023 0010 ENV STUDIES-UST/HZM CA-XR091N1062325106128 $36.35 000001088937-3562500061
2024 3 FD52 00 E121 U 7614002U 106 9/18/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106128 $5.06 000001088937-3562500061
2024 3 FD52 00 E122 U 7614002U 106 9/18/2023 0010 ENV STUDIES-UST/HZM CA-XR091N1062325106128 $329.79 000001088937-3562500061
2024 2 FD52 00 E111 U 7614002U 106 8/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR082N1062323504934 $202.09 000001081377-3562500480
2024 2 FD52 00 E111 U 7614002U 106 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504934 $31.28 000001081377-3562500480
2024 2 FD52 00 E121 U 7614002U 106 8/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR082N1062323504934 $14.49 000001081377-3562500480
2024 2 FD52 00 E121 U 7614002U 106 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504934 $2.25 000001081377-3562500480
2024 2 FD52 00 E122 U 7614002U 106 8/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR082N1062323504934 $133.83 000001081377-3562500480
2024 2 FD52 00 E122 U 7614002U 106 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504934 $20.69 000001081377-3562500480
2024 2 FD52 00 E123 U 7614002U 106 8/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR082N1062323504934 $35.06 000001081377-3562500480
2024 2 FD52 00 E123 U 7614002U 106 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504934 $5.34 000001081377-3562500480
2024 2 FD52 00 E124 U 7614002U 106 8/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR082N1062323504934 $0.09 000001081377-3562500480
2024 2 FD52 00 E124 U 7614002U 106 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504934 $0.01 000001081377-3562500480
2024 2 FD52 05 E795 U 7614002U 106 8/23/2023 3560 UTILITY CONTRACTS PRC-2400036250 SC2300001345 Shelbyville Municipal Water & Sewer Commission $45,500.00
2024 2 FD52 00 E111 U 7614002U 106 8/9/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR081N1062322003853 $297.78 000001081377-3562500480
2024 2 FD52 00 E111 U 7614002U 106 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003853 $64.83 000001081377-3562500480
2024 2 FD52 00 E121 U 7614002U 106 8/9/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR081N1062322003853 $21.39 000001081377-3562500480
2024 2 FD52 00 E121 U 7614002U 106 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003853 $4.68 000001081377-3562500480
2024 2 FD52 00 E122 U 7614002U 106 8/9/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR081N1062322003853 $197.05 000001081377-3562500480
2024 2 FD52 00 E122 U 7614002U 106 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003853 $42.89 000001081377-3562500480
2024 2 FD52 00 E123 U 7614002U 106 8/9/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR081N1062322003853 $50.03 000001081377-3562500480
2024 2 FD52 00 E123 U 7614002U 106 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003853 $7.97 000001081377-3562500480
2024 1 FD52 05 E111 U 7614002U 106 7/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR072N1062320202690 $131.26 000001085746-3562505208
2024 1 FD52 05 E111 U 7614002U 106 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202690 $35.70 000001085746-3562505208
2024 1 FD52 05 E121 U 7614002U 106 7/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR072N1062320202690 $9.97 000001085746-3562505208
2024 1 FD52 05 E121 U 7614002U 106 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202690 $2.70 000001085746-3562505208
2024 1 FD52 05 E122 U 7614002U 106 7/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR072N1062320202690 $86.86 000001085746-3562505208
2024 1 FD52 05 E122 U 7614002U 106 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202690 $23.63 000001085746-3562505208
2024 1 FD52 05 E123 U 7614002U 106 7/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR072N1062320202690 $12.88 000001085746-3562505208
2024 1 FD52 05 E123 U 7614002U 106 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202690 $3.44 000001085746-3562505208
2024 1 FD52 05 E124 U 7614002U 106 7/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR072N1062320202690 $0.03 000001085746-3562505208
2024 1 FD52 00 E111 U 7614002U 106 7/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR072N1062320202671 $121.90 000001081377-3562500480
2024 1 FD52 00 E111 U 7614002U 106 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202671 $31.13 000001081377-3562500480
2024 1 FD52 00 E121 U 7614002U 106 7/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR072N1062320202671 $8.66 000001081377-3562500480
2024 1 FD52 00 E121 U 7614002U 106 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202671 $2.22 000001081377-3562500480
2024 1 FD52 00 E122 U 7614002U 106 7/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR072N1062320202671 $80.66 000001081377-3562500480
2024 1 FD52 00 E122 U 7614002U 106 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202671 $20.60 000001081377-3562500480
2024 1 FD52 00 E123 U 7614002U 106 7/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR072N1062320202671 $30.52 000001081377-3562500480
2024 1 FD52 00 E123 U 7614002U 106 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202671 $7.73 000001081377-3562500480
2024 1 FD52 00 E124 U 7614002U 106 7/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR072N1062320202671 $0.04 000001081377-3562500480
2024 1 FD52 00 E124 U 7614002U 106 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202671 $0.02 000001081377-3562500480
2023 12 FD52 00 E111 U 7614002U 106 6/28/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR062N1062317400427 $120.57 000001081377-3562500480
2023 12 FD52 00 E111 U 7614002U 106 6/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400427 $6.44 000001081377-3562500480
2023 12 FD52 00 E121 U 7614002U 106 6/28/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR062N1062317400427 $8.54 000001081377-3562500480
2023 12 FD52 00 E121 U 7614002U 106 6/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400427 $0.46 000001081377-3562500480
2023 12 FD52 00 E122 U 7614002U 106 6/28/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR062N1062317400427 $94.08 000001081377-3562500480
2023 12 FD52 00 E122 U 7614002U 106 6/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400427 $5.03 000001081377-3562500480
2023 12 FD52 00 E123 U 7614002U 106 6/28/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR062N1062317400427 $31.96 000001081377-3562500480
2023 12 FD52 00 E123 U 7614002U 106 6/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400427 $1.69 000001081377-3562500480
2023 12 FD52 00 E124 U 7614002U 106 6/28/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR062N1062317400427 $0.05 000001081377-3562500480
2023 11 FD52 05 E111 U 7614002U 106 5/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR052N1062314309059 $266.14 000001085746-3562505208
2023 11 FD52 05 E111 U 7614002U 106 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309059 $3.28 000001085746-3562505208
2023 11 FD52 05 E121 U 7614002U 106 5/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR052N1062314309059 $20.20 000001085746-3562505208
2023 11 FD52 05 E121 U 7614002U 106 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309059 $0.25 000001085746-3562505208
2023 11 FD52 05 E122 U 7614002U 106 5/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR052N1062314309059 $207.56 000001085746-3562505208
2023 11 FD52 05 E122 U 7614002U 106 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309059 $2.56 000001085746-3562505208
2023 11 FD52 05 E123 U 7614002U 106 5/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR052N1062314309059 $30.33 000001085746-3562505208
2023 11 FD52 05 E123 U 7614002U 106 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309059 $0.37 000001085746-3562505208
2023 11 FD52 05 E124 U 7614002U 106 5/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR052N1062314309059 $0.08 000001085746-3562505208
2023 11 FD52 00 E111 U 7614002U 106 5/15/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR051N1062312808062 $104.94 000001081377-3562500480
2023 11 FD52 00 E111 U 7614002U 106 5/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808062 $7.00 000001081377-3562500480
2023 11 FD52 00 E121 U 7614002U 106 5/15/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR051N1062312808062 $7.39 000001081377-3562500480
2023 11 FD52 00 E121 U 7614002U 106 5/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808062 $0.49 000001081377-3562500480
2023 11 FD52 00 E122 U 7614002U 106 5/15/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR051N1062312808062 $81.85 000001081377-3562500480
2023 11 FD52 00 E122 U 7614002U 106 5/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808062 $5.46 000001081377-3562500480
2023 11 FD52 00 E123 U 7614002U 106 5/15/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR051N1062312808062 $19.26 000001081377-3562500480
2023 11 FD52 00 E123 U 7614002U 106 5/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808062 $1.27 000001081377-3562500480
2023 10 FD52 00 E111 U 7614002U 106 4/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR042N1062311106930 $656.93 000001081377-3562500480
2023 10 FD52 00 E111 U 7614002U 106 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106930 $148.41 000001081377-3562500480
2023 10 FD52 00 E121 U 7614002U 106 4/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR042N1062311106930 $46.81 000001081377-3562500480
2023 10 FD52 00 E121 U 7614002U 106 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106930 $10.57 000001081377-3562500480
2023 10 FD52 00 E122 U 7614002U 106 4/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR042N1062311106930 $512.44 000001081377-3562500480
2023 10 FD52 00 E122 U 7614002U 106 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106930 $115.75 000001081377-3562500480
2023 10 FD52 00 E123 U 7614002U 106 4/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR042N1062311106930 $128.76 000001081377-3562500480
2023 10 FD52 00 E123 U 7614002U 106 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106930 $27.56 000001081377-3562500480
2023 10 FD52 00 E124 U 7614002U 106 4/24/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR042N1062311106930 $0.31 000001081377-3562500480
2023 10 FD52 00 E124 U 7614002U 106 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106930 $0.07 000001081377-3562500480
2023 10 FD52 00 E121 U 7614002U 106 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605765 $4.76 000001081377-3562500480
2023 10 FD52 00 E122 U 7614002U 106 4/10/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR041N1062309605765 $332.85 000001081377-3562500480
2023 10 FD52 00 E122 U 7614002U 106 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605765 $52.27 000001081377-3562500480
2023 10 FD52 00 E123 U 7614002U 106 4/10/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR041N1062309605765 $73.73 000001081377-3562500480
2023 10 FD52 00 E123 U 7614002U 106 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605765 $10.85 000001081377-3562500480
2023 10 FD52 00 E111 U 7614002U 106 4/10/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR041N1062309605765 $426.68 000001081377-3562500480
2023 10 FD52 00 E111 U 7614002U 106 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605765 $67.01 000001081377-3562500480
2023 10 FD52 00 E121 U 7614002U 106 4/10/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR041N1062309605765 $30.29 000001081377-3562500480
2023 9 FD52 00 E111 U 7614002U 106 3/27/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR032N1062308304640 $289.41 000001081377-3562500480
2023 9 FD52 00 E111 U 7614002U 106 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304640 $25.73 000001081377-3562500480
2023 9 FD52 00 E121 U 7614002U 106 3/27/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR032N1062308304640 $20.48 000001081377-3562500480
2023 9 FD52 00 E121 U 7614002U 106 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304640 $1.81 000001081377-3562500480
2023 9 FD52 00 E122 U 7614002U 106 3/27/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR032N1062308304640 $225.79 000001081377-3562500480
2023 9 FD52 00 E122 U 7614002U 106 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304640 $20.07 000001081377-3562500480
2023 9 FD52 00 E123 U 7614002U 106 3/27/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR032N1062308304640 $76.72 000001081377-3562500480
2023 9 FD52 00 E123 U 7614002U 106 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304640 $6.77 000001081377-3562500480
2023 9 FD52 00 E124 U 7614002U 106 3/27/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR032N1062308304640 $0.11 000001081377-3562500480
2023 9 FD52 00 E124 U 7614002U 106 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304640 $0.01 000001081377-3562500480
2023 9 FD52 05 E121 U 7614002U 106 3/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703675 $3.57 000001085746-3562505208
2023 9 FD52 05 E122 U 7614002U 106 3/15/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR031N1062306703675 $292.70 000001085746-3562505208
2023 9 FD52 05 E122 U 7614002U 106 3/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703675 $36.68 000001085746-3562505208
2023 9 FD52 05 E123 U 7614002U 106 3/15/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR031N1062306703675 $42.84 000001085746-3562505208
2023 9 FD52 05 E123 U 7614002U 106 3/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703675 $5.29 000001085746-3562505208
2023 9 FD52 05 E111 U 7614002U 106 3/15/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR031N1062306703675 $375.22 000001085746-3562505208
2023 9 FD52 05 E111 U 7614002U 106 3/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703675 $47.03 000001085746-3562505208
2023 9 FD52 05 E121 U 7614002U 106 3/15/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR031N1062306703675 $28.47 000001085746-3562505208
2023 7 FD52 05 E111 U 7614002U 106 1/9/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR011N1062300610270 $143.28 000001085746-3562505208
2023 7 FD52 05 E121 U 7614002U 106 1/9/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR011N1062300610270 $10.87 000001085746-3562505208
2023 7 FD52 05 E122 U 7614002U 106 1/9/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR011N1062300610270 $111.76 000001085746-3562505208
2023 7 FD52 05 E123 U 7614002U 106 1/9/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR011N1062300610270 $15.00 000001085746-3562505208
2023 7 FD52 05 E124 U 7614002U 106 1/9/2023 3040 INSPECTION&SUPER-UTILITIES CA-XR011N1062300610270 $0.04 000001085746-3562505208
2023 6 FD52 05 E111 U 7614002U 106 12/14/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR121M1062234208177 $368.44 000001009244-3562505208
2023 6 FD52 05 E111 U 7614002U 106 12/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208177 $117.90 000001009244-3562505208
2023 6 FD52 05 E121 U 7614002U 106 12/14/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR121M1062234208177 $27.96 000001009244-3562505208
2023 6 FD52 05 E121 U 7614002U 106 12/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208177 $8.94 000001009244-3562505208
2023 6 FD52 05 E122 U 7614002U 106 12/14/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR121M1062234208177 $287.38 000001009244-3562505208
2023 6 FD52 05 E122 U 7614002U 106 12/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208177 $91.96 000001009244-3562505208
2023 6 FD52 05 E123 U 7614002U 106 12/14/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR121M1062234208177 $38.74 000001009244-3562505208
2023 6 FD52 05 E123 U 7614002U 106 12/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208177 $12.16 000001009244-3562505208
2023 6 FD52 05 E111 U 7614002U 106 12/12/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR121M1062234208240 $78.41 000001085746-3562505208
2023 6 FD52 05 E111 U 7614002U 106 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208240 $47.31 000001085746-3562505208
2023 6 FD52 00 E111 U 7614002U 106 12/12/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR121M1062234208209 $80.48 000001081377-3562500480
2023 6 FD52 05 E121 U 7614002U 106 12/12/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR121M1062234208240 $5.77 000001085746-3562505208
2023 6 FD52 00 E111 U 7614002U 106 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208209 $25.09 000001081377-3562500480
2023 6 FD52 05 E121 U 7614002U 106 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208240 $3.47 000001085746-3562505208
2023 6 FD52 00 E121 U 7614002U 106 12/12/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR121M1062234208209 $5.69 000001081377-3562500480
2023 6 FD52 05 E122 U 7614002U 106 12/12/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR121M1062234208240 $61.10 000001085746-3562505208
2023 6 FD52 00 E121 U 7614002U 106 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208209 $1.78 000001081377-3562500480
2023 6 FD52 05 E122 U 7614002U 106 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208240 $36.90 000001085746-3562505208
2023 6 FD52 00 E122 U 7614002U 106 12/12/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR121M1062234208209 $63.63 000001081377-3562500480
2023 6 FD52 05 E123 U 7614002U 106 12/12/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR121M1062234208240 $10.81 000001085746-3562505208
2023 6 FD52 00 E122 U 7614002U 106 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208209 $19.57 000001081377-3562500480
2023 6 FD52 05 E123 U 7614002U 106 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208240 $6.37 000001085746-3562505208
2023 6 FD52 00 E123 U 7614002U 106 12/12/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR121M1062234208209 $19.12 000001081377-3562500480
2023 6 FD52 00 E123 U 7614002U 106 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208209 $5.78 000001081377-3562500480
2023 4 FD52 05 E111 U 7614002U 106 10/17/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR101M1062228003902 $102.38 000001009244-3562505208
2023 4 FD52 05 E111 U 7614002U 106 10/17/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003902 $103.57 000001009244-3562505208
2023 4 FD52 05 E121 U 7614002U 106 10/17/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR101M1062228003902 $7.76 000001009244-3562505208
2023 4 FD52 05 E121 U 7614002U 106 10/17/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003902 $7.86 000001009244-3562505208
2023 4 FD52 05 E122 U 7614002U 106 10/17/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR101M1062228003902 $80.10 000001009244-3562505208
2023 4 FD52 05 E122 U 7614002U 106 10/17/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003902 $80.79 000001009244-3562505208
2023 4 FD52 05 E123 U 7614002U 106 10/17/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR101M1062228003902 $10.96 000001009244-3562505208
2023 4 FD52 05 E123 U 7614002U 106 10/17/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003902 $10.68 000001009244-3562505208
2023 3 FD52 05 E111 U 7614002U 106 9/27/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR092M1062226602724 $102.30 000001009244-3562505208
2023 3 FD52 05 E111 U 7614002U 106 9/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602724 $14.33 000001009244-3562505208
2023 3 FD52 05 E121 U 7614002U 106 9/27/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR092M1062226602724 $7.76 000001009244-3562505208
2023 3 FD52 05 E121 U 7614002U 106 9/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602724 $1.08 000001009244-3562505208
2023 3 FD52 05 E122 U 7614002U 106 9/27/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR092M1062226602724 $79.47 000001009244-3562505208
2023 3 FD52 05 E122 U 7614002U 106 9/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602724 $11.18 000001009244-3562505208
2023 3 FD52 05 E123 U 7614002U 106 9/27/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR092M1062226602724 $10.67 000001009244-3562505208
2023 3 FD52 05 E123 U 7614002U 106 9/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602724 $1.48 000001009244-3562505208
2023 3 FD52 05 E124 U 7614002U 106 9/27/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR092M1062226602724 $0.06 000001009244-3562505208
2023 3 FD52 05 E111 U 7614002U 106 9/14/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR091M1062225101583 $30.04 000001009244-3562505208
2023 3 FD52 05 E111 U 7614002U 106 9/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101583 $6.00 000001009244-3562505208
2023 3 FD52 05 E121 U 7614002U 106 9/14/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR091M1062225101583 $2.26 000001009244-3562505208
2023 3 FD52 05 E121 U 7614002U 106 9/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101583 $0.44 000001009244-3562505208
2023 3 FD52 05 E122 U 7614002U 106 9/14/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR091M1062225101583 $23.42 000001009244-3562505208
2023 3 FD52 05 E122 U 7614002U 106 9/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101583 $4.68 000001009244-3562505208
2023 3 FD52 05 E123 U 7614002U 106 9/14/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR091M1062225101583 $3.94 000001009244-3562505208
2023 3 FD52 05 E123 U 7614002U 106 9/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101583 $0.78 000001009244-3562505208
2023 2 FD52 05 E111 U 7614002U 106 8/29/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500387 $60.60 000001009244-3562505208
2023 2 FD52 05 E121 U 7614002U 106 8/29/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR082M1062223500387 $54.31 000001009244-3562505208
2023 2 FD52 05 E121 U 7614002U 106 8/29/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500387 $4.59 000001009244-3562505208
2023 2 FD52 05 E122 U 7614002U 106 8/29/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR082M1062223500387 $558.85 000001009244-3562505208
2023 2 FD52 05 E122 U 7614002U 106 8/29/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500387 $47.27 000001009244-3562505208
2023 2 FD52 05 E123 U 7614002U 106 8/29/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR082M1062223500387 $85.80 000001009244-3562505208
2023 2 FD52 05 E123 U 7614002U 106 8/29/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500387 $7.31 000001009244-3562505208
2023 2 FD52 05 E124 U 7614002U 106 8/29/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR082M1062223500387 $0.24 000001009244-3562505208
2023 2 FD52 05 E124 U 7614002U 106 8/29/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500387 $0.03 000001009244-3562505208
2023 2 FD52 05 E111 U 7614002U 106 8/29/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR082M1062223500386 $716.48 000001009244-3562505208
2023 2 FD52 00 E111 U 7614002U 106 8/24/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR082M1062223500432 $88.45 000001081377-3562500480
2023 2 FD52 00 E111 U 7614002U 106 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500432 $7.39 000001081377-3562500480
2023 2 FD52 00 E121 U 7614002U 106 8/24/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR082M1062223500432 $6.26 000001081377-3562500480
2023 2 FD52 00 E121 U 7614002U 106 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500432 $0.53 000001081377-3562500480
2023 2 FD52 00 E122 U 7614002U 106 8/24/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR082M1062223500432 $68.99 000001081377-3562500480
2023 2 FD52 00 E122 U 7614002U 106 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500432 $5.76 000001081377-3562500480
2023 2 FD52 00 E123 U 7614002U 106 8/24/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR082M1062223500432 $20.60 000001081377-3562500480
2023 2 FD52 00 E123 U 7614002U 106 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500432 $1.71 000001081377-3562500480
2023 2 FD52 00 E124 U 7614002U 106 8/24/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR082M1062223500432 $0.03 000001081377-3562500480
2023 2 FD52 05 E111 U 7614002U 106 8/16/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR081M1062222110079 $562.95 000001009244-3562505208
2023 2 FD52 05 E111 U 7614002U 106 8/16/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110079 $81.51 000001009244-3562505208
2023 2 FD52 05 E121 U 7614002U 106 8/16/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR081M1062222110079 $42.72 000001009244-3562505208
2023 2 FD52 05 E121 U 7614002U 106 8/16/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110079 $6.19 000001009244-3562505208
2023 2 FD52 05 E122 U 7614002U 106 8/16/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR081M1062222110079 $439.39 000001009244-3562505208
2023 2 FD52 05 E122 U 7614002U 106 8/16/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110079 $63.58 000001009244-3562505208
2023 2 FD52 05 E123 U 7614002U 106 8/16/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR081M1062222110079 $59.05 000001009244-3562505208
2023 2 FD52 05 E123 U 7614002U 106 8/16/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110079 $8.41 000001009244-3562505208
2022 12 FD52 00 E111 U 7614002U 106 6/28/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR062M1062217506770 $89.35 000001081377-3562500480
2022 12 FD52 00 E111 U 7614002U 106 6/28/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506770 $47.36 000001081377-3562500480
2022 12 FD52 00 E121 U 7614002U 106 6/28/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR062M1062217506770 $6.28 000001081377-3562500480
2022 12 FD52 00 E121 U 7614002U 106 6/28/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506770 $3.33 000001081377-3562500480
2022 12 FD52 00 E122 U 7614002U 106 6/28/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR062M1062217506770 $75.03 000001081377-3562500480
2022 12 FD52 00 E122 U 7614002U 106 6/28/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506770 $39.76 000001081377-3562500480
2022 12 FD52 00 E123 U 7614002U 106 6/28/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR062M1062217506770 $22.55 000001081377-3562500480
2022 12 FD52 00 E123 U 7614002U 106 6/28/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506770 $11.81 000001081377-3562500480
2022 12 FD52 00 E124 U 7614002U 106 6/28/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR062M1062217506770 $0.04 000001081377-3562500480
2022 12 FD52 00 E124 U 7614002U 106 6/28/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506770 $0.02 000001081377-3562500480
2022 10 FD52 00 E111 U 7614002U 106 4/28/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR042M1062211202545 $56.52 000001081377-3562500480
2022 10 FD52 00 E111 U 7614002U 106 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202546 $7.07 000001081377-3562500480
2022 10 FD52 00 E121 U 7614002U 106 4/25/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR042M1062211202546 $3.96 000001081377-3562500480
2022 10 FD52 00 E121 U 7614002U 106 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202546 $0.49 000001081377-3562500480
2022 10 FD52 00 E122 U 7614002U 106 4/25/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR042M1062211202546 $47.49 000001081377-3562500480
2022 10 FD52 00 E122 U 7614002U 106 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202546 $5.94 000001081377-3562500480
2022 10 FD52 00 E123 U 7614002U 106 4/25/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR042M1062211202546 $14.99 000001081377-3562500480
2022 10 FD52 00 E123 U 7614002U 106 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202546 $1.85 000001081377-3562500480
2022 10 FD52 00 E124 U 7614002U 106 4/25/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR042M1062211202546 $0.02 000001081377-3562500480
2022 8 FD52 00 E111 U 7614002U 106 2/9/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR021M1062203907461 $70.75 000001081377-3562500480
2022 8 FD52 00 E111 U 7614002U 106 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907461 $19.23 000001081377-3562500480
2022 8 FD52 00 E121 U 7614002U 106 2/9/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR021M1062203907461 $4.95 000001081377-3562500480
2022 8 FD52 00 E121 U 7614002U 106 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907461 $1.34 000001081377-3562500480
2022 8 FD52 00 E122 U 7614002U 106 2/9/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR021M1062203907461 $59.37 000001081377-3562500480
2022 8 FD52 00 E122 U 7614002U 106 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907461 $16.15 000001081377-3562500480
2022 8 FD52 00 E123 U 7614002U 106 2/9/2022 3040 INSPECTION&SUPER-UTILITIES CA-XR021M1062203907461 $18.76 000001081377-3562500480
2022 8 FD52 00 E123 U 7614002U 106 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907461 $5.05 000001081377-3562500480