The Commonwealth pays employees on a semi-monthly basis with a scheduled pay day on the 15th and 30th of each month. The two monthly pay periods are from the 1st to the 15th of the month and the 16th through the last day of the month. Pay check distribution is delayed by one pay period to allow for system processing. For example work performed during the 1st to the 15th day of the month is paid to the employee on the 30th of the month. Accordingly the cost accounting charges for labor costs posting in eMARS to operating accounts and highway projects are also delayed by approximately one pay period.
A good rule of measure is that the cost accounting charges for the pay period ending on the 15th of the month will post to eMARS by the 25th and those for the pay period ending on the last day of the month will post to eMARS by the 10th of the following month.

x close panel
Detailed Project Expenditure Report
Total E-MARS Expenditures for 7356603D = $361,391.18
Click here for Labor Costs Information
Year Month PBU Charge District Object Phase Program Code County Date ACT Activity Name Trans ID Reference # Vendor Name Expenditure Line Description
2024 7 FD04 00 E111 D 7356603D 040 1/24/2024 0092 ENV STUDIES-PERMITTING CA-XR012O1062402306620 $141.69 000001089432-3562500061
2024 7 FD04 00 E111 D 7356603D 040 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306620 $31.40 000001089432-3562500061
2024 7 FD04 00 E121 D 7356603D 040 1/24/2024 0092 ENV STUDIES-PERMITTING CA-XR012O1062402306620 $10.59 000001089432-3562500061
2024 7 FD04 00 E121 D 7356603D 040 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306620 $2.35 000001089432-3562500061
2024 7 FD04 00 E122 D 7356603D 040 1/24/2024 0092 ENV STUDIES-PERMITTING CA-XR012O1062402306620 $93.73 000001089432-3562500061
2024 7 FD04 00 E122 D 7356603D 040 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306620 $20.78 000001089432-3562500061
2024 7 FD04 00 E123 D 7356603D 040 1/24/2024 0092 ENV STUDIES-PERMITTING CA-XR012O1062402306620 $31.72 000001089432-3562500061
2024 7 FD04 00 E123 D 7356603D 040 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306620 $6.93 000001089432-3562500061
2024 7 FD04 00 E124 D 7356603D 040 1/24/2024 0092 ENV STUDIES-PERMITTING CA-XR012O1062402306620 $0.07 000001089432-3562500061
2024 7 FD04 00 E124 D 7356603D 040 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306620 $0.02 000001089432-3562500061
2024 7 FD04 00 E111 D 7356603D 040 1/24/2024 0010 ENV STUDIES-UST/HZM CA-XR012O1062402306638 $218.55 000001090631-3562500061
2024 7 FD04 00 E111 D 7356603D 040 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306638 $48.66 000001090631-3562500061
2024 7 FD04 00 E121 D 7356603D 040 1/24/2024 0010 ENV STUDIES-UST/HZM CA-XR012O1062402306638 $15.33 000001090631-3562500061
2024 7 FD04 00 E121 D 7356603D 040 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306638 $3.42 000001090631-3562500061
2024 7 FD04 00 E122 D 7356603D 040 1/24/2024 0010 ENV STUDIES-UST/HZM CA-XR012O1062402306638 $144.61 000001090631-3562500061
2024 7 FD04 00 E122 D 7356603D 040 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306638 $32.20 000001090631-3562500061
2024 7 FD04 00 E123 D 7356603D 040 1/24/2024 0010 ENV STUDIES-UST/HZM CA-XR012O1062402306638 $76.92 000001090631-3562500061
2024 7 FD04 00 E123 D 7356603D 040 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306638 $16.99 000001090631-3562500061
2024 7 FD04 00 E124 D 7356603D 040 1/24/2024 0010 ENV STUDIES-UST/HZM CA-XR012O1062402306638 $0.10 000001090631-3562500061
2024 7 FD04 00 E124 D 7356603D 040 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306638 $0.02 000001090631-3562500061
2024 7 FD04 00 E111 D 7356603D 040 1/10/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011O1062400505702 $97.24 000001063906-3562500636
2024 7 FD04 00 E111 D 7356603D 040 1/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505702 $486.20 000001063906-3562500636
2024 7 FD04 00 E121 D 7356603D 040 1/10/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011O1062400505702 $6.88 000001063906-3562500636
2024 7 FD04 00 E121 D 7356603D 040 1/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505702 $34.41 000001063906-3562500636
2024 7 FD04 00 E122 D 7356603D 040 1/10/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011O1062400505702 $64.34 000001063906-3562500636
2024 7 FD04 00 E122 D 7356603D 040 1/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505702 $321.72 000001063906-3562500636
2024 7 FD04 00 E123 D 7356603D 040 1/10/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011O1062400505702 $23.21 000001063906-3562500636
2024 7 FD04 00 E123 D 7356603D 040 1/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505702 $111.94 000001063906-3562500636
2024 7 FD04 00 E111 D 7356603D 040 1/8/2024 0010 ENV STUDIES-UST/HZM CA-XR011O1062400505745 $240.52 000001090005-3562500061
2024 7 FD04 00 E111 D 7356603D 040 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505745 $102.89 000001090005-3562500061
2024 7 FD04 00 E121 D 7356603D 040 1/8/2024 0010 ENV STUDIES-UST/HZM CA-XR011O1062400505745 $16.21 000001090005-3562500061
2024 7 FD04 00 E121 D 7356603D 040 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505745 $6.94 000001090005-3562500061
2024 7 FD04 00 E122 D 7356603D 040 1/8/2024 0010 ENV STUDIES-UST/HZM CA-XR011O1062400505745 $159.08 000001090005-3562500061
2024 7 FD04 00 E122 D 7356603D 040 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505745 $68.08 000001090005-3562500061
2024 7 FD04 00 E123 D 7356603D 040 1/8/2024 0010 ENV STUDIES-UST/HZM CA-XR011O1062400505745 $84.69 000001090005-3562500061
2024 7 FD04 00 E123 D 7356603D 040 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505745 $35.93 000001090005-3562500061
2024 6 FD04 00 E111 D 7356603D 040 12/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122N1062335504582 $243.14 000001063906-3562500636
2024 6 FD04 00 E111 D 7356603D 040 12/22/2023 0092 ENV STUDIES-PERMITTING CA-XR122N1062335504647 $67.49 000001089432-3562500061
2024 6 FD04 00 E111 D 7356603D 040 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504582 $40.23 000001063906-3562500636
2024 6 FD04 00 E111 D 7356603D 040 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504647 $14.84 000001089432-3562500061
2024 6 FD04 00 E121 D 7356603D 040 12/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122N1062335504582 $17.58 000001063906-3562500636
2024 6 FD04 00 E121 D 7356603D 040 12/22/2023 0092 ENV STUDIES-PERMITTING CA-XR122N1062335504647 $5.03 000001089432-3562500061
2024 6 FD04 00 E121 D 7356603D 040 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504582 $2.91 000001063906-3562500636
2024 6 FD04 00 E121 D 7356603D 040 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504647 $1.12 000001089432-3562500061
2024 6 FD04 00 E122 D 7356603D 040 12/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122N1062335504582 $161.16 000001063906-3562500636
2024 6 FD04 00 E122 D 7356603D 040 12/22/2023 0092 ENV STUDIES-PERMITTING CA-XR122N1062335504647 $44.63 000001089432-3562500061
2024 6 FD04 00 E122 D 7356603D 040 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504582 $26.62 000001063906-3562500636
2024 6 FD04 00 E122 D 7356603D 040 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504647 $9.82 000001089432-3562500061
2024 6 FD04 00 E123 D 7356603D 040 12/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122N1062335504582 $46.99 000001063906-3562500636
2024 6 FD04 00 E123 D 7356603D 040 12/22/2023 0092 ENV STUDIES-PERMITTING CA-XR122N1062335504647 $13.77 000001089432-3562500061
2024 6 FD04 00 E123 D 7356603D 040 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504582 $7.70 000001063906-3562500636
2024 6 FD04 00 E123 D 7356603D 040 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504647 $2.98 000001089432-3562500061
2024 6 FD04 00 E124 D 7356603D 040 12/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122N1062335504582 $0.10 000001063906-3562500636
2024 6 FD04 00 E124 D 7356603D 040 12/22/2023 0092 ENV STUDIES-PERMITTING CA-XR122N1062335504647 $0.04 000001089432-3562500061
2024 6 FD04 00 E124 D 7356603D 040 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504582 $0.01 000001063906-3562500636
2024 6 FD04 00 E111 D 7356603D 040 12/11/2023 0092 ENV STUDIES-PERMITTING CA-XR121N1062334203649 $236.03 000001089432-3562500061
2024 6 FD04 00 E111 D 7356603D 040 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203649 $52.39 000001089432-3562500061
2024 6 FD04 00 E121 D 7356603D 040 12/11/2023 0092 ENV STUDIES-PERMITTING CA-XR121N1062334203649 $17.36 000001089432-3562500061
2024 6 FD04 00 E121 D 7356603D 040 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203649 $3.85 000001089432-3562500061
2024 6 FD04 00 E122 D 7356603D 040 12/11/2023 0092 ENV STUDIES-PERMITTING CA-XR121N1062334203649 $156.22 000001089432-3562500061
2024 6 FD04 00 E122 D 7356603D 040 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203649 $34.67 000001089432-3562500061
2024 6 FD04 00 E123 D 7356603D 040 12/11/2023 0092 ENV STUDIES-PERMITTING CA-XR121N1062334203649 $48.17 000001089432-3562500061
2024 6 FD04 00 E123 D 7356603D 040 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203649 $10.51 000001089432-3562500061
2024 5 FD04 00 E111 D 7356603D 040 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502553 $29.23 000001089432-3562500061
2024 5 FD04 00 E111 D 7356603D 040 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502566 $206.89 000001090005-3562500061
2024 5 FD04 00 E121 D 7356603D 040 11/22/2023 0092 ENV STUDIES-PERMITTING CA-XR112N1062332502553 $13.43 000001089432-3562500061
2024 5 FD04 00 E121 D 7356603D 040 11/22/2023 0010 ENV STUDIES-UST/HZM CA-XR112N1062332502566 $30.66 000001090005-3562500061
2024 5 FD04 00 E121 D 7356603D 040 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502553 $2.18 000001089432-3562500061
2024 5 FD04 00 E121 D 7356603D 040 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502566 $14.51 000001090005-3562500061
2024 5 FD04 00 E122 D 7356603D 040 11/22/2023 0092 ENV STUDIES-PERMITTING CA-XR112N1062332502553 $119.03 000001089432-3562500061
2024 5 FD04 00 E122 D 7356603D 040 11/22/2023 0010 ENV STUDIES-UST/HZM CA-XR112N1062332502566 $289.24 000001090005-3562500061
2024 5 FD04 00 E122 D 7356603D 040 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502553 $19.35 000001089432-3562500061
2024 5 FD04 00 E122 D 7356603D 040 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502566 $136.91 000001090005-3562500061
2024 5 FD04 00 E123 D 7356603D 040 11/22/2023 0092 ENV STUDIES-PERMITTING CA-XR112N1062332502553 $36.67 000001089432-3562500061
2024 5 FD04 00 E123 D 7356603D 040 11/22/2023 0010 ENV STUDIES-UST/HZM CA-XR112N1062332502566 $128.23 000001090005-3562500061
2024 5 FD04 00 E123 D 7356603D 040 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502553 $5.86 000001089432-3562500061
2024 5 FD04 00 E123 D 7356603D 040 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502566 $60.05 000001090005-3562500061
2024 5 FD04 00 E124 D 7356603D 040 11/22/2023 0092 ENV STUDIES-PERMITTING CA-XR112N1062332502553 $0.10 000001089432-3562500061
2024 5 FD04 00 E124 D 7356603D 040 11/22/2023 0010 ENV STUDIES-UST/HZM CA-XR112N1062332502566 $0.18 000001090005-3562500061
2024 5 FD04 00 E124 D 7356603D 040 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502553 $0.02 000001089432-3562500061
2024 5 FD04 00 E124 D 7356603D 040 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502566 $0.07 000001090005-3562500061
2024 5 FD04 00 E111 D 7356603D 040 11/22/2023 0092 ENV STUDIES-PERMITTING CA-XR112N1062332502552 $179.85 000001089432-3562500061
2024 5 FD04 00 E111 D 7356603D 040 11/22/2023 0010 ENV STUDIES-UST/HZM CA-XR112N1062332502565 $437.11 000001090005-3562500061
2024 4 FD04 00 E111 D 7356603D 040 10/13/2023 0092 ENV STUDIES-PERMITTING CA-XR101N1062328009734 $111.30 000001089432-3562500061
2024 4 FD04 00 E121 D 7356603D 040 10/13/2023 0092 ENV STUDIES-PERMITTING CA-XR101N1062328009734 $8.19 000001089432-3562500061
2024 4 FD04 00 E122 D 7356603D 040 10/13/2023 0092 ENV STUDIES-PERMITTING CA-XR101N1062328009734 $73.65 000001089432-3562500061
2024 4 FD04 00 E123 D 7356603D 040 10/13/2023 0092 ENV STUDIES-PERMITTING CA-XR101N1062328009734 $22.65 000001089432-3562500061
2023 9 FD04 00 E123 D 7356603D 040 3/2/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR022N1062305302460 $127.87 000001084227-3562500061
2023 9 FD04 00 E123 D 7356603D 040 3/2/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302460 $11.75 000001084227-3562500061
2023 9 FD04 00 E124 D 7356603D 040 3/2/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR022N1062305302460 $0.19 000001084227-3562500061
2023 9 FD04 00 E124 D 7356603D 040 3/2/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302460 $0.01 000001084227-3562500061
2023 8 FD04 00 E111 D 7356603D 040 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302418 $178.90 000001063906-3562500636
2023 8 FD04 00 E111 D 7356603D 040 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302418 $39.68 000001063906-3562500636
2023 8 FD04 00 E121 D 7356603D 040 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302418 $12.75 000001063906-3562500636
2023 8 FD04 00 E121 D 7356603D 040 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302418 $2.82 000001063906-3562500636
2023 8 FD04 00 E122 D 7356603D 040 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302418 $139.45 000001063906-3562500636
2023 8 FD04 00 E122 D 7356603D 040 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302418 $30.95 000001063906-3562500636
2023 8 FD04 00 E123 D 7356603D 040 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302418 $42.67 000001063906-3562500636
2023 8 FD04 00 E123 D 7356603D 040 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302418 $9.39 000001063906-3562500636
2023 8 FD04 00 E124 D 7356603D 040 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302418 $0.06 000001063906-3562500636
2023 8 FD04 00 E124 D 7356603D 040 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302418 $0.02 000001063906-3562500636
2023 8 FD04 00 E111 D 7356603D 040 2/23/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR022N1062305302459 $510.78 000001084227-3562500061
2023 8 FD04 00 E111 D 7356603D 040 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302459 $47.33 000001084227-3562500061
2023 8 FD04 00 E121 D 7356603D 040 2/23/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR022N1062305302459 $36.30 000001084227-3562500061
2023 8 FD04 00 E121 D 7356603D 040 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302459 $3.36 000001084227-3562500061
2023 8 FD04 00 E122 D 7356603D 040 2/23/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR022N1062305302459 $398.42 000001084227-3562500061
2023 8 FD04 00 E122 D 7356603D 040 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302459 $36.92 000001084227-3562500061
2023 6 FD04 00 E115 D 7356603D 040 12/22/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR122M1062235509179 $357.89 000001084227-3562505300
2023 6 FD04 00 E121 D 7356603D 040 12/22/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR122M1062235509179 $27.04 000001084227-3562505300
2023 6 FD04 00 E121 D 7356603D 040 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509179 $0.30 000001084227-3562505300
2023 6 FD04 00 E122 D 7356603D 040 12/22/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR122M1062235509179 $279.15 000001084227-3562505300
2023 6 FD04 00 E115 D 7356603D 040 12/12/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR121M1062234208224 $711.86 000001084227-3562505300
2023 6 FD04 00 E121 D 7356603D 040 12/12/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR121M1062234208224 $195.78 000001084227-3562505300
2023 6 FD04 00 E121 D 7356603D 040 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208224 $32.19 000001084227-3562505300
2023 6 FD04 00 E122 D 7356603D 040 12/12/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR121M1062234208224 $2,155.90 000001084227-3562505300
2023 6 FD04 00 E122 D 7356603D 040 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208224 $355.81 000001084227-3562505300
2023 6 FD04 00 E123 D 7356603D 040 12/12/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR121M1062234208224 $491.23 000001084227-3562505300
2023 6 FD04 00 E123 D 7356603D 040 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208224 $108.10 000001084227-3562505300
2023 6 FD04 00 E111 D 7356603D 040 12/12/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR121M1062234208223 $2,052.12 000001084227-3562505300
2023 6 FD04 00 E111 D 7356603D 040 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208223 $456.17 000001084227-3562505300
2023 5 FD04 00 E122 D 7356603D 040 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607172 $776.76 000001084227-3562505300
2023 5 FD04 00 E123 D 7356603D 040 11/23/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR112M1062232607172 $748.49 000001084227-3562505300
2023 5 FD04 00 E123 D 7356603D 040 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607172 $222.64 000001084227-3562505300
2023 5 FD04 00 E124 D 7356603D 040 11/23/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR112M1062232607172 $1.47 000001084227-3562505300
2023 5 FD04 00 E124 D 7356603D 040 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607172 $0.53 000001084227-3562505300
2023 5 FD04 00 E111 D 7356603D 040 11/23/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR112M1062232607171 $3,025.43 000001084227-3562505300
2023 5 FD04 00 E111 D 7356603D 040 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607171 $995.83 000001084227-3562505300
2023 5 FD04 00 E115 D 7356603D 040 11/23/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR112M1062232607171 $874.72 000001084227-3562505300
2023 5 FD04 00 E121 D 7356603D 040 11/23/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR112M1062232607171 $283.41 000001084227-3562505300
2023 5 FD04 00 E121 D 7356603D 040 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607171 $73.83 000001084227-3562505300
2023 5 FD04 00 E122 D 7356603D 040 11/23/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR112M1062232607171 $3,042.11 000001084227-3562505300
2023 4 FD04 00 E111 D 7356603D 040 10/24/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR102M1062229405068 $561.94 000001084227-3562500061
2023 4 FD04 00 E111 D 7356603D 040 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405068 $140.47 000001084227-3562500061
2023 4 FD04 00 E121 D 7356603D 040 10/24/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR102M1062229405068 $39.93 000001084227-3562500061
2023 4 FD04 00 E121 D 7356603D 040 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405068 $9.98 000001084227-3562500061
2023 4 FD04 00 E122 D 7356603D 040 10/24/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR102M1062229405068 $438.25 000001084227-3562500061
2023 4 FD04 00 E122 D 7356603D 040 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405068 $109.57 000001084227-3562500061
2023 4 FD04 00 E123 D 7356603D 040 10/24/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR102M1062229405068 $123.78 000001084227-3562500061
2023 4 FD04 00 E123 D 7356603D 040 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405068 $30.63 000001084227-3562500061
2023 4 FD04 00 E124 D 7356603D 040 10/24/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR102M1062229405068 $0.20 000001084227-3562500061
2023 4 FD04 00 E124 D 7356603D 040 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405068 $0.05 000001084227-3562500061
2023 4 FD04 00 E111 D 7356603D 040 10/10/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR101M1062228003955 $255.39 000001084227-3562500061
2023 4 FD04 00 E111 D 7356603D 040 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003955 $25.54 000001084227-3562500061
2023 4 FD04 00 E121 D 7356603D 040 10/10/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR101M1062228003955 $17.84 000001084227-3562500061
2023 4 FD04 00 E121 D 7356603D 040 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003955 $1.79 000001084227-3562500061
2023 4 FD04 00 E122 D 7356603D 040 10/10/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR101M1062228003955 $199.22 000001084227-3562500061
2023 4 FD04 00 E122 D 7356603D 040 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003955 $19.92 000001084227-3562500061
2023 4 FD04 00 E123 D 7356603D 040 10/10/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR101M1062228003955 $56.17 000001084227-3562500061
2023 4 FD04 00 E123 D 7356603D 040 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003955 $5.57 000001084227-3562500061
2023 3 FD04 00 E111 D 7356603D 040 9/12/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR091M1062225101647 $468.23 000001084227-3562500061
2023 3 FD04 00 E111 D 7356603D 040 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101647 $61.80 000001084227-3562500061
2023 3 FD04 00 E121 D 7356603D 040 9/12/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR091M1062225101647 $32.72 000001084227-3562500061
2023 3 FD04 00 E121 D 7356603D 040 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101647 $4.32 000001084227-3562500061
2023 3 FD04 00 E122 D 7356603D 040 9/12/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR091M1062225101647 $365.21 000001084227-3562500061
2023 3 FD04 00 E122 D 7356603D 040 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101647 $48.20 000001084227-3562500061
2023 3 FD04 00 E123 D 7356603D 040 9/12/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR091M1062225101647 $103.05 000001084227-3562500061
2023 3 FD04 00 E123 D 7356603D 040 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101647 $13.47 000001084227-3562500061
2023 2 FD04 00 E124 D 7356603D 040 8/24/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR082M1062223500467 $0.09 000001084227-3562500061
2023 2 FD04 00 E111 D 7356603D 040 8/24/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR082M1062223500466 $255.39 000001084227-3562500061
2023 2 FD04 00 E121 D 7356603D 040 8/24/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR082M1062223500466 $18.15 000001084227-3562500061
2023 2 FD04 00 E122 D 7356603D 040 8/24/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR082M1062223500466 $199.20 000001084227-3562500061
2023 2 FD04 00 E123 D 7356603D 040 8/24/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR082M1062223500466 $56.14 000001084227-3562500061
2023 1 FD04 00 E111 D 7356603D 040 7/12/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR071M1062219207878 $289.69 000001081338-3562500636
2023 1 FD04 00 E111 D 7356603D 040 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207878 $29.13 000001081338-3562500636
2023 1 FD04 00 E121 D 7356603D 040 7/12/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR071M1062219207878 $20.13 000001081338-3562500636
2023 1 FD04 00 E121 D 7356603D 040 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207878 $2.02 000001081338-3562500636
2023 1 FD04 00 E122 D 7356603D 040 7/12/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR071M1062219207878 $243.24 000001081338-3562500636
2023 1 FD04 00 E122 D 7356603D 040 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207878 $24.46 000001081338-3562500636
2023 1 FD04 00 E123 D 7356603D 040 7/12/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR071M1062219207878 $65.55 000001081338-3562500636
2023 1 FD04 00 E123 D 7356603D 040 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207878 $6.53 000001081338-3562500636
2022 8 FD04 00 E111 D 7356603D 040 2/9/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR021M1062203907458 $66.24 000001081338-3562500636
2022 8 FD04 00 E111 D 7356603D 040 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907458 $10.59 000001081338-3562500636
2022 8 FD04 00 E121 D 7356603D 040 2/9/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR021M1062203907458 $4.70 000001081338-3562500636
2022 8 FD04 00 E121 D 7356603D 040 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907458 $0.75 000001081338-3562500636
2022 8 FD04 00 E122 D 7356603D 040 2/9/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR021M1062203907458 $55.60 000001081338-3562500636
2022 8 FD04 00 E122 D 7356603D 040 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907458 $8.90 000001081338-3562500636
2022 8 FD04 00 E123 D 7356603D 040 2/9/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR021M1062203907458 $14.99 000001081338-3562500636
2022 8 FD04 00 E123 D 7356603D 040 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907458 $2.38 000001081338-3562500636
2022 1 FD04 07 E123 D 7356603D 040 7/1/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR061L1062116001446P $114.22 000001065468-3562507204
2022 1 FD04 07 E123 D 7356603D 040 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061L1062116001446P $12.12 000001065468-3562507204
2021 12 FD04 07 E122 D 7356603D 040 6/10/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR061L1062116001446 $443.30 000001065468-3562507204
2021 12 FD04 07 E122 D 7356603D 040 6/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061L1062116001446 $47.68 000001065468-3562507204
2021 12 FD04 07 E111 D 7356603D 040 6/10/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR061L1062116001445 $525.05 000001065468-3562507204
2021 12 FD04 07 E111 D 7356603D 040 6/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061L1062116001445 $56.47 000001065468-3562507204
2021 12 FD04 07 E121 D 7356603D 040 6/10/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR061L1062116001445 $34.83 000001065468-3562507204
2021 12 FD04 07 E121 D 7356603D 040 6/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061L1062116001445 $3.75 000001065468-3562507204
2021 11 FD04 07 E111 D 7356603D 040 5/24/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR052L1062114100369 $1,925.18 000001065468-3562507204
2021 11 FD04 07 E121 D 7356603D 040 5/24/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR052L1062114100369 $129.78 000001065468-3562507204
2021 11 FD04 07 E122 D 7356603D 040 5/24/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR052L1062114100369 $1,625.43 000001065468-3562507204
2021 11 FD04 07 E123 D 7356603D 040 5/24/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR052L1062114100369 $418.26 000001065468-3562507204
2021 11 FD04 07 E124 D 7356603D 040 5/24/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR052L1062114100369 $1.00 000001065468-3562507204
2021 11 FD04 07 E111 D 7356603D 040 5/10/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR051L1062112709719 $1,750.16 000001065468-3562507204
2021 11 FD04 07 E111 D 7356603D 040 5/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709719 $175.02 000001065468-3562507204
2021 11 FD04 07 E121 D 7356603D 040 5/10/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR051L1062112709719 $116.12 000001065468-3562507204
2021 11 FD04 07 E121 D 7356603D 040 5/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709719 $11.61 000001065468-3562507204
2021 11 FD04 07 E122 D 7356603D 040 5/10/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR051L1062112709719 $1,477.66 000001065468-3562507204
2021 11 FD04 07 E122 D 7356603D 040 5/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709719 $147.77 000001065468-3562507204
2021 11 FD04 07 E123 D 7356603D 040 5/10/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR051L1062112709719 $380.70 000001065468-3562507204
2021 11 FD04 07 E123 D 7356603D 040 5/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709719 $37.56 000001065468-3562507204
2021 10 FD04 07 E124 D 7356603D 040 4/29/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR042L1062111308629 $0.72 000001065468-3562507204
2021 10 FD04 07 E124 D 7356603D 040 4/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308629 $0.28 000001065468-3562507204
2021 10 FD04 07 E111 D 7356603D 040 4/29/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR042L1062111308629 $1,400.12 000001065468-3562507204
2021 10 FD04 07 E111 D 7356603D 040 4/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308629 $525.06 000001065468-3562507204
2021 10 FD04 07 E121 D 7356603D 040 4/29/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR042L1062111308629 $94.38 000001065468-3562507204
2021 10 FD04 07 E121 D 7356603D 040 4/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308629 $35.39 000001065468-3562507204
2021 10 FD04 07 E122 D 7356603D 040 4/29/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR042L1062111308629 $1,182.13 000001065468-3562507204
2021 10 FD04 07 E122 D 7356603D 040 4/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308629 $443.30 000001065468-3562507204
2021 10 FD04 07 E123 D 7356603D 040 4/29/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR042L1062111308629 $305.58 000001065468-3562507204
2021 10 FD04 07 E123 D 7356603D 040 4/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308629 $112.68 000001065468-3562507204
2021 10 FD04 07 E111 D 7356603D 040 4/12/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR041L1062109907614 $1,443.88 000001065468-3562507204
2021 10 FD04 07 E111 D 7356603D 040 4/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041L1062109907614 $481.30 000001065468-3562507204
2021 10 FD04 07 E121 D 7356603D 040 4/12/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR041L1062109907614 $95.80 000001065468-3562507204
2021 10 FD04 07 E121 D 7356603D 040 4/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041L1062109907614 $31.93 000001065468-3562507204
2021 10 FD04 07 E122 D 7356603D 040 4/12/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR041L1062109907614 $1,219.07 000001065468-3562507204
2021 10 FD04 07 E122 D 7356603D 040 4/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041L1062109907614 $406.36 000001065468-3562507204
2021 10 FD04 07 E123 D 7356603D 040 4/12/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR041L1062109907614 $314.97 000001065468-3562507204
2021 10 FD04 07 E123 D 7356603D 040 4/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041L1062109907614 $103.29 000001065468-3562507204
2021 9 FD04 07 E121 D 7356603D 040 3/24/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR032L1062108206538 $106.19 000001065468-3562507204
2021 9 FD04 07 E121 D 7356603D 040 3/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032L1062108206538 $23.59 000001065468-3562507204
2021 9 FD04 07 E122 D 7356603D 040 3/24/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR032L1062108206538 $1,329.90 000001065468-3562507204
2021 9 FD04 07 E122 D 7356603D 040 3/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032L1062108206538 $295.53 000001065468-3562507204
2021 9 FD04 07 E123 D 7356603D 040 3/24/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR032L1062108206538 $343.14 000001065468-3562507204
2021 9 FD04 07 E123 D 7356603D 040 3/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032L1062108206538 $75.12 000001065468-3562507204
2021 9 FD04 07 E124 D 7356603D 040 3/24/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR032L1062108206538 $0.82 000001065468-3562507204
2021 9 FD04 07 E124 D 7356603D 040 3/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032L1062108206538 $0.18 000001065468-3562507204
2021 9 FD04 07 E111 D 7356603D 040 3/24/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR032L1062108206538 $1,575.15 000001065468-3562507204
2021 9 FD04 07 E111 D 7356603D 040 3/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032L1062108206538 $350.03 000001065468-3562507204
2021 9 FD04 07 E111 D 7356603D 040 3/10/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR031L1062106805507 $1,925.18 000001065468-3562507204
2021 9 FD04 07 E121 D 7356603D 040 3/10/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR031L1062106805507 $127.73 000001065468-3562507204
2021 9 FD04 07 E122 D 7356603D 040 3/10/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR031L1062106805507 $1,625.43 000001065468-3562507204
2021 9 FD04 07 E123 D 7356603D 040 3/10/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR031L1062106805507 $418.26 000001065468-3562507204
2021 8 FD04 07 E111 D 7356603D 040 2/23/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR022L1062105304384 $1,470.14 000001065468-3562507204
2021 8 FD04 07 E111 D 7356603D 040 2/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304384 $455.04 000001065468-3562507204
2021 8 FD04 07 E121 D 7356603D 040 2/23/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR022L1062105304384 $99.11 000001065468-3562507204
2021 8 FD04 07 E121 D 7356603D 040 2/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304384 $30.67 000001065468-3562507204
2021 8 FD04 07 E122 D 7356603D 040 2/23/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR022L1062105304384 $1,241.24 000001065468-3562507204
2021 8 FD04 07 E122 D 7356603D 040 2/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304384 $384.19 000001065468-3562507204
2021 8 FD04 07 E123 D 7356603D 040 2/23/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR022L1062105304384 $320.60 000001065468-3562507204
2021 8 FD04 07 E123 D 7356603D 040 2/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304384 $97.66 000001065468-3562507204
2021 8 FD04 07 E124 D 7356603D 040 2/23/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR022L1062105304384 $0.76 000001065468-3562507204
2021 8 FD04 07 E124 D 7356603D 040 2/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304384 $0.24 000001065468-3562507204
2021 8 FD04 07 E111 D 7356603D 040 2/12/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR021L1062103603363 $1,347.62 000001065468-3562507204
2021 8 FD04 07 E111 D 7356603D 040 2/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021L1062103603363 $577.56 000001065468-3562507204
2021 8 FD04 07 E121 D 7356603D 040 2/12/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR021L1062103603363 $89.41 000001065468-3562507204
2021 8 FD04 07 E121 D 7356603D 040 2/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021L1062103603363 $38.31 000001065468-3562507204
2021 8 FD04 07 E122 D 7356603D 040 2/12/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR021L1062103603363 $1,137.80 000001065468-3562507204
2021 8 FD04 07 E122 D 7356603D 040 2/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021L1062103603363 $487.63 000001065468-3562507204
2021 8 FD04 07 E123 D 7356603D 040 2/12/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR021L1062103603363 $294.31 000001065468-3562507204
2021 8 FD04 07 E123 D 7356603D 040 2/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021L1062103603363 $123.95 000001065468-3562507204
2021 7 FD04 07 E111 D 7356603D 040 1/28/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR012L1062102202339 $1,750.16 000001065468-3562507204
2021 7 FD04 07 E111 D 7356603D 040 1/28/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012L1062102202339 $175.02 000001065468-3562507204
2021 7 FD04 07 E121 D 7356603D 040 1/28/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR012L1062102202339 $117.98 000001065468-3562507204
2021 7 FD04 07 E121 D 7356603D 040 1/28/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012L1062102202339 $11.80 000001065468-3562507204
2021 7 FD04 07 E122 D 7356603D 040 1/28/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR012L1062102202339 $1,477.66 000001065468-3562507204
2021 7 FD04 07 E122 D 7356603D 040 1/28/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012L1062102202339 $147.77 000001065468-3562507204
2021 7 FD04 07 E123 D 7356603D 040 1/28/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR012L1062102202339 $380.70 000001065468-3562507204
2021 7 FD04 07 E123 D 7356603D 040 1/28/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012L1062102202339 $37.56 000001065468-3562507204
2021 7 FD04 07 E124 D 7356603D 040 1/28/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR012L1062102202339 $0.91 000001065468-3562507204
2021 7 FD04 07 E124 D 7356603D 040 1/28/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012L1062102202339 $0.09 000001065468-3562507204
2021 7 FD04 07 E111 D 7356603D 040 1/15/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR011L1062100801429 $1,443.88 000001065468-3562507204
2021 7 FD04 07 E111 D 7356603D 040 1/15/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011L1062100801429 $481.30 000001065468-3562507204
2021 7 FD04 07 E121 D 7356603D 040 1/15/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR011L1062100801429 $95.80 000001065468-3562507204
2021 7 FD04 07 E121 D 7356603D 040 1/15/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011L1062100801429 $31.93 000001065468-3562507204
2021 7 FD04 07 E122 D 7356603D 040 1/15/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR011L1062100801429 $1,219.07 000001065468-3562507204
2021 7 FD04 07 E122 D 7356603D 040 1/15/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011L1062100801429 $406.36 000001065468-3562507204
2021 7 FD04 07 E123 D 7356603D 040 1/15/2021 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR011L1062100801429 $314.97 000001065468-3562507204
2021 7 FD04 07 E123 D 7356603D 040 1/15/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011L1062100801429 $103.29 000001065468-3562507204
2021 6 FD04 07 E111 D 7356603D 040 12/29/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR122K1062035700377 $1,925.18 000001065468-3562507204
2021 6 FD04 07 E121 D 7356603D 040 12/29/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR122K1062035700377 $113.64 000001065468-3562507204
2021 6 FD04 07 E122 D 7356603D 040 12/29/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR122K1062035700377 $1,625.43 000001065468-3562507204
2021 6 FD04 07 E123 D 7356603D 040 12/29/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR122K1062035700377 $406.21 000001065468-3562507204
2021 6 FD04 07 E124 D 7356603D 040 12/29/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR122K1062035700377 $1.00 000001065468-3562507204
2021 6 FD04 07 E122 D 7356603D 040 12/9/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR121K1062034309695 $1,719.13 000001065468-3562507204
2021 6 FD04 07 E122 D 7356603D 040 12/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309695 $515.65 000001065468-3562507204
2021 6 FD04 07 E123 D 7356603D 040 12/9/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR121K1062034309695 $391.20 000001065468-3562507204
2021 6 FD04 07 E123 D 7356603D 040 12/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309695 $115.37 000001065468-3562507204
2021 6 FD04 07 E111 D 7356603D 040 12/9/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR121K1062034309694 $2,036.15 000001065468-3562507204
2021 6 FD04 07 E111 D 7356603D 040 12/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309694 $610.75 000001065468-3562507204
2021 6 FD04 07 E121 D 7356603D 040 12/9/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR121K1062034309694 $132.43 000001065468-3562507204
2021 6 FD04 07 E121 D 7356603D 040 12/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309694 $39.83 000001065468-3562507204
2021 5 FD04 07 E111 D 7356603D 040 11/25/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR112K1062032508753 $1,948.05 000001065468-3562507204
2021 5 FD04 07 E111 D 7356603D 040 11/25/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508753 $486.98 000001065468-3562507204
2021 5 FD04 07 E121 D 7356603D 040 11/25/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR112K1062032508753 $140.55 000001065468-3562507204
2021 5 FD04 07 E121 D 7356603D 040 11/25/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508753 $35.14 000001065468-3562507204
2021 5 FD04 07 E122 D 7356603D 040 11/25/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR112K1062032508753 $1,644.61 000001065468-3562507204
2021 5 FD04 07 E122 D 7356603D 040 11/25/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508753 $411.16 000001065468-3562507204
2021 5 FD04 07 E123 D 7356603D 040 11/25/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR112K1062032508753 $343.30 000001065468-3562507204
2021 5 FD04 07 E123 D 7356603D 040 11/25/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508753 $84.87 000001065468-3562507204
2021 5 FD04 07 E124 D 7356603D 040 11/25/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR112K1062032508753 $0.60 000001065468-3562507204
2021 5 FD04 07 E124 D 7356603D 040 11/25/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032508753 $0.15 000001065468-3562507204
2021 5 FD04 07 E111 D 7356603D 040 11/9/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR111K1062031107762 $3,089.09 000001065468-3562507204
2021 5 FD04 07 E111 D 7356603D 040 11/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111K1062031107762 $157.41 000001065468-3562507204
2021 5 FD04 07 E121 D 7356603D 040 11/9/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR111K1062031107762 $218.36 000001065468-3562507204
2021 5 FD04 07 E121 D 7356603D 040 11/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111K1062031107762 $11.13 000001065468-3562507204
2021 5 FD04 07 E122 D 7356603D 040 11/9/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR111K1062031107762 $2,608.12 000001065468-3562507204
2021 5 FD04 07 E122 D 7356603D 040 11/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111K1062031107762 $132.90 000001065468-3562507204
2021 5 FD04 07 E123 D 7356603D 040 11/9/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR111K1062031107762 $543.47 000001065468-3562507204
2021 5 FD04 07 E123 D 7356603D 040 11/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111K1062031107762 $27.43 000001065468-3562507204
2021 4 FD04 07 E124 D 7356603D 040 10/26/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR102K1062029706697 $1.00 000001065468-3562507204
2021 4 FD04 07 E111 D 7356603D 040 10/26/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR102K1062029706696 $3,246.50 000001065468-3562507204
2021 4 FD04 07 E121 D 7356603D 040 10/26/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR102K1062029706696 $234.25 000001065468-3562507204
2021 4 FD04 07 E122 D 7356603D 040 10/26/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR102K1062029706696 $2,741.02 000001065468-3562507204
2021 4 FD04 07 E123 D 7356603D 040 10/26/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR102K1062029706696 $570.90 000001065468-3562507204
2021 4 FD04 07 E111 D 7356603D 040 10/12/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR101K1062028205680 $3,246.50 000001065468-3562507204
2021 4 FD04 07 E121 D 7356603D 040 10/12/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR101K1062028205680 $229.49 000001065468-3562507204
2021 4 FD04 07 E122 D 7356603D 040 10/12/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR101K1062028205680 $2,741.02 000001065468-3562507204
2021 4 FD04 07 E123 D 7356603D 040 10/12/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR101K1062028205680 $570.90 000001065468-3562507204
2021 3 FD04 07 E121 D 7356603D 040 9/24/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR092K1062026704590 $212.95 000001065468-3562507204
2021 3 FD04 07 E121 D 7356603D 040 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704590 $21.30 000001065468-3562507204
2021 3 FD04 07 E122 D 7356603D 040 9/24/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR092K1062026704590 $2,491.83 000001065468-3562507204
2021 3 FD04 07 E122 D 7356603D 040 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704590 $249.19 000001065468-3562507204
2021 3 FD04 07 E123 D 7356603D 040 9/24/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR092K1062026704590 $519.46 000001065468-3562507204
2021 3 FD04 07 E123 D 7356603D 040 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704590 $51.44 000001065468-3562507204
2021 3 FD04 07 E124 D 7356603D 040 9/24/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR092K1062026704590 $0.91 000001065468-3562507204
2021 3 FD04 07 E124 D 7356603D 040 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704590 $0.09 000001065468-3562507204
2021 3 FD04 07 E111 D 7356603D 040 9/24/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR092K1062026704589 $2,951.36 000001065468-3562507204
2021 3 FD04 07 E111 D 7356603D 040 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704589 $295.14 000001065468-3562507204
2021 3 FD04 00 E111 D 7356603D 040 9/15/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091K1062025303602 $248.30 000001063906-3562500636
2021 3 FD04 00 E111 D 7356603D 040 9/15/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091K1062025303602 $10.93 000001063906-3562500636
2021 3 FD04 00 E121 D 7356603D 040 9/15/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091K1062025303602 $17.37 000001063906-3562500636
2021 3 FD04 00 E121 D 7356603D 040 9/15/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091K1062025303602 $0.76 000001063906-3562500636
2021 3 FD04 00 E122 D 7356603D 040 9/15/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091K1062025303602 $209.64 000001063906-3562500636
2021 3 FD04 00 E122 D 7356603D 040 9/15/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091K1062025303602 $9.23 000001063906-3562500636
2021 3 FD04 00 E123 D 7356603D 040 9/15/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091K1062025303602 $51.92 000001063906-3562500636
2021 3 FD04 00 E123 D 7356603D 040 9/15/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091K1062025303602 $2.26 000001063906-3562500636
2021 3 FD04 07 E121 D 7356603D 040 9/10/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR091K1062025303604 $229.49 000001065468-3562507204
2021 3 FD04 07 E122 D 7356603D 040 9/10/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR091K1062025303604 $2,741.02 000001065468-3562507204
2021 3 FD04 07 E123 D 7356603D 040 9/10/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR091K1062025303604 $570.90 000001065468-3562507204
2021 3 FD04 07 E111 D 7356603D 040 9/10/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR091K1062025303604 $3,246.50 000001065468-3562507204
2021 2 FD04 07 E111 D 7356603D 040 8/24/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR082K1062023402521 $3,073.35 000001065468-3562507204
2021 2 FD04 07 E111 D 7356603D 040 8/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082K1062023402521 $173.15 000001065468-3562507204
2021 2 FD04 07 E121 D 7356603D 040 8/24/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR082K1062023402521 $221.75 000001065468-3562507204
2021 2 FD04 07 E121 D 7356603D 040 8/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082K1062023402521 $12.50 000001065468-3562507204
2021 2 FD04 07 E122 D 7356603D 040 8/24/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR082K1062023402521 $2,594.83 000001065468-3562507204
2021 2 FD04 07 E122 D 7356603D 040 8/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082K1062023402521 $146.19 000001065468-3562507204
2021 2 FD04 07 E123 D 7356603D 040 8/24/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR082K1062023402521 $540.72 000001065468-3562507204
2021 2 FD04 07 E123 D 7356603D 040 8/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082K1062023402521 $30.18 000001065468-3562507204
2021 2 FD04 07 E124 D 7356603D 040 8/24/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR082K1062023402521 $0.95 000001065468-3562507204
2021 2 FD04 07 E124 D 7356603D 040 8/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082K1062023402521 $0.05 000001065468-3562507204
2021 2 FD04 07 E111 D 7356603D 040 8/10/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR081K1062022001431 $3,930.80 000001065468-3562507204
2021 2 FD04 07 E121 D 7356603D 040 8/10/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR081K1062022001431 $261.90 000001065468-3562507204
2021 2 FD04 07 E122 D 7356603D 040 8/10/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR081K1062022001431 $3,318.77 000001065468-3562507204
2021 2 FD04 07 E123 D 7356603D 040 8/10/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR081K1062022001431 $734.77 000001065468-3562507204
2021 1 FD04 07 E111 D 7356603D 040 7/27/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR072K1062020600335 $3,549.14 000001065468-3562507204
2021 1 FD04 07 E111 D 7356603D 040 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600335 $381.66 000001065468-3562507204
2021 1 FD04 07 E121 D 7356603D 040 7/27/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR072K1062020600335 $238.03 000001065468-3562507204
2021 1 FD04 07 E121 D 7356603D 040 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600335 $25.82 000001065468-3562507204
2021 1 FD04 07 E122 D 7356603D 040 7/27/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR072K1062020600335 $2,996.54 000001065468-3562507204
2021 1 FD04 07 E122 D 7356603D 040 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600335 $322.23 000001065468-3562507204
2021 1 FD04 07 E123 D 7356603D 040 7/27/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR072K1062020600335 $664.97 000001065468-3562507204
2021 1 FD04 07 E123 D 7356603D 040 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600335 $69.80 000001065468-3562507204
2021 1 FD04 07 E124 D 7356603D 040 7/27/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR072K1062020600335 $1.81 000001065468-3562507204
2021 1 FD04 07 E124 D 7356603D 040 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600335 $0.19 000001065468-3562507204
2021 1 FD04 07 E111 D 7356603D 040 7/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071K1062019009314 $146.31 000001065468-3562507204
2021 1 FD04 07 E121 D 7356603D 040 7/9/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR071K1062019009314 $252.79 000001065468-3562507204
2021 1 FD04 07 E121 D 7356603D 040 7/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071K1062019009314 $9.11 000001065468-3562507204
2021 1 FD04 07 E122 D 7356603D 040 7/9/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR071K1062019009314 $3,157.40 000001065468-3562507204
2021 1 FD04 07 E122 D 7356603D 040 7/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071K1062019009314 $122.07 000001065468-3562507204
2021 1 FD04 07 E123 D 7356603D 040 7/9/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR071K1062019009314 $706.01 000001065468-3562507204
2021 1 FD04 07 E123 D 7356603D 040 7/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071K1062019009314 $28.76 000001065468-3562507204
2021 1 FD04 07 E111 D 7356603D 040 7/9/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR071K1062019009313 $3,784.49 000001065468-3562507204
2021 1 FD04 00 E111 D 7356603D 040 7/8/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062K1062017108289 $82.77 000001063906-3562500636
2021 1 FD04 00 E121 D 7356603D 040 7/8/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062K1062017108289 $5.91 000001063906-3562500636
2021 1 FD04 00 E122 D 7356603D 040 7/8/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062K1062017108289 $69.05 000001063906-3562500636
2021 1 FD04 00 E123 D 7356603D 040 7/8/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062K1062017108289 $17.30 000001063906-3562500636
2021 1 FD04 00 E124 D 7356603D 040 7/8/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062K1062017108289 $0.03 000001063906-3562500636
2020 13 FD04 08 E143 D 7356603D 069 7/2/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100001341 PON21200002239 STANTEC CONSULTING SERVICES INC $3,527.78 8-196.00
2021 1 FD04 07 E111 D 7356603D 040 7/2/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR062K1062017108291 $3,308.51 000001065468-3562507204
2021 1 FD04 07 E111 D 7356603D 040 7/2/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108291 $97.24 000001065468-3562507204
2021 1 FD04 07 E121 D 7356603D 040 7/2/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR062K1062017108291 $225.56 000001065468-3562507204
2021 1 FD04 07 E121 D 7356603D 040 7/2/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108291 $7.28 000001065468-3562507204
2021 1 FD04 07 E122 D 7356603D 040 7/2/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR062K1062017108291 $2,760.29 000001065468-3562507204
2021 1 FD04 07 E122 D 7356603D 040 7/2/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108291 $81.13 000001065468-3562507204
2021 1 FD04 07 E123 D 7356603D 040 7/2/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR062K1062017108291 $608.30 000001065468-3562507204
2021 1 FD04 07 E123 D 7356603D 040 7/2/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108291 $15.68 000001065468-3562507204
2021 1 FD04 07 E124 D 7356603D 040 7/2/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR062K1062017108291 $1.68 000001065468-3562507204
2021 1 FD04 07 E124 D 7356603D 040 7/2/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108291 $0.05 000001065468-3562507204
2021 1 FD04 07 E123 D 7356603D 040 7/1/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR061K1062016107380P $296.21 000001065468-3562507204
2021 1 FD04 07 E123 D 7356603D 040 7/1/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061K1062016107380P $32.35 000001065468-3562507204
2020 12 FD04 07 E111 D 7356603D 040 6/10/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR061K1062016107380 $1,805.06 000001065468-3562507204
2020 12 FD04 07 E111 D 7356603D 040 6/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061K1062016107380 $200.56 000001065468-3562507204
2020 12 FD04 07 E121 D 7356603D 040 6/10/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR061K1062016107380 $135.17 000001065468-3562507204
2020 12 FD04 07 E121 D 7356603D 040 6/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061K1062016107380 $15.02 000001065468-3562507204
2020 12 FD04 07 E122 D 7356603D 040 6/10/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR061K1062016107380 $1,505.96 000001065468-3562507204
2020 12 FD04 07 E122 D 7356603D 040 6/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061K1062016107380 $167.33 000001065468-3562507204
2020 11 FD04 08 E143 D 7356603D 069 5/29/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000201008 PON21200002239 STANTEC CONSULTING SERVICES INC $11,695.31 8-196.00
2020 11 FD04 07 E111 D 7356603D 040 5/26/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR052K1062014306393 $2,516.32 000001065468-3562507204
2020 11 FD04 07 E111 D 7356603D 040 5/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052K1062014306393 $128.83 000001065468-3562507204
2020 11 FD04 07 E121 D 7356603D 040 5/26/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR052K1062014306393 $189.91 000001065468-3562507204
2020 11 FD04 07 E121 D 7356603D 040 5/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052K1062014306393 $9.73 000001065468-3562507204
2020 11 FD04 07 E122 D 7356603D 040 5/26/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR052K1062014306393 $2,099.44 000001065468-3562507204
2020 11 FD04 07 E122 D 7356603D 040 5/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052K1062014306393 $107.48 000001065468-3562507204
2020 11 FD04 07 E123 D 7356603D 040 5/26/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR052K1062014306393 $279.86 000001065468-3562507204
2020 11 FD04 07 E123 D 7356603D 040 5/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052K1062014306393 $12.00 000001065468-3562507204
2020 11 FD04 07 E124 D 7356603D 040 5/26/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR052K1062014306393 $0.98 000001065468-3562507204
2020 11 FD04 07 E124 D 7356603D 040 5/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052K1062014306393 $0.04 000001065468-3562507204
2020 11 FD04 07 E122 D 7356603D 040 5/11/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051K1062012905489 $17.02 000001065468-3562507204
2020 11 FD04 07 E123 D 7356603D 040 5/11/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR051K1062012905489 $141.38 000001065468-3562507204
2020 11 FD04 07 E123 D 7356603D 040 5/11/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051K1062012905489 $2.75 000001065468-3562507204
2020 11 FD04 07 E111 D 7356603D 040 5/11/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR051K1062012905489 $996.02 000001065468-3562507204
2020 11 FD04 07 E111 D 7356603D 040 5/11/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051K1062012905489 $20.40 000001065468-3562507204
2020 11 FD04 07 E121 D 7356603D 040 5/11/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR051K1062012905489 $74.71 000001065468-3562507204
2020 11 FD04 07 E121 D 7356603D 040 5/11/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051K1062012905489 $1.53 000001065468-3562507204
2020 11 FD04 07 E122 D 7356603D 040 5/11/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR051K1062012905489 $830.84 000001065468-3562507204
2020 10 FD04 07 E122 D 7356603D 040 4/27/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042K1062011504448 $449.53 000001065937-3562507204
2020 10 FD04 07 E122 D 7356603D 040 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504448 $96.03 000001065937-3562507204
2020 10 FD04 07 E123 D 7356603D 040 4/27/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042K1062011504448 $60.34 000001065937-3562507204
2020 10 FD04 07 E123 D 7356603D 040 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504448 $10.06 000001065937-3562507204
2020 10 FD04 07 E124 D 7356603D 040 4/27/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042K1062011504448 $0.18 000001065937-3562507204
2020 10 FD04 07 E124 D 7356603D 040 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504448 $0.03 000001065937-3562507204
2020 10 FD04 07 E111 D 7356603D 040 4/27/2020 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR042K1062011504491 $808.30 000001073771-3562507204
2020 10 FD04 07 E111 D 7356603D 040 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504491 $55.37 000001073771-3562507204
2020 10 FD04 07 E121 D 7356603D 040 4/27/2020 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR042K1062011504491 $60.32 000001073771-3562507204
2020 10 FD04 07 E121 D 7356603D 040 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504491 $4.16 000001073771-3562507204
2020 10 FD04 07 E122 D 7356603D 040 4/27/2020 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR042K1062011504491 $674.76 000001073771-3562507204
2020 10 FD04 07 E122 D 7356603D 040 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504491 $46.19 000001073771-3562507204
2020 10 FD04 07 E123 D 7356603D 040 4/27/2020 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR042K1062011504491 $112.76 000001073771-3562507204
2020 10 FD04 07 E123 D 7356603D 040 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504491 $6.94 000001073771-3562507204
2020 10 FD04 07 E124 D 7356603D 040 4/27/2020 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR042K1062011504491 $0.27 000001073771-3562507204
2020 10 FD04 07 E111 D 7356603D 040 4/27/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042K1062011504448 $539.06 000001065937-3562507204
2020 10 FD04 07 E111 D 7356603D 040 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504448 $115.11 000001065937-3562507204
2020 10 FD04 07 E121 D 7356603D 040 4/27/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042K1062011504448 $40.84 000001065937-3562507204
2020 10 FD04 07 E121 D 7356603D 040 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504448 $8.72 000001065937-3562507204
2020 10 FD04 07 E111 D 7356603D 040 4/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041K1062009903461 $3,889.12 000001065937-3562507204
2020 10 FD04 07 E111 D 7356603D 040 4/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041K1062009903461 $299.60 000001065937-3562507204
2020 10 FD04 07 E121 D 7356603D 040 4/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041K1062009903461 $282.73 000001065937-3562507204
2020 10 FD04 07 E121 D 7356603D 040 4/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041K1062009903461 $22.36 000001065937-3562507204
2020 10 FD04 07 E122 D 7356603D 040 4/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041K1062009903461 $3,244.74 000001065937-3562507204
2020 10 FD04 07 E122 D 7356603D 040 4/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041K1062009903461 $249.95 000001065937-3562507204
2020 10 FD04 07 E123 D 7356603D 040 4/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041K1062009903461 $494.46 000001065937-3562507204
2020 10 FD04 07 E123 D 7356603D 040 4/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041K1062009903461 $39.70 000001065937-3562507204
2020 9 FD04 07 E229 D 7356603D 040 3/26/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF IET-XE13A162520085004710 $26.98
2020 9 FD04 07 E111 D 7356603D 040 3/25/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR032K1062008402476 $1,831.03 000001065468-3562507204
2020 9 FD04 07 E111 D 7356603D 040 3/25/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032K1062008402476 $285.59 000001065468-3562507204
2020 9 FD04 07 E121 D 7356603D 040 3/25/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR032K1062008402476 $131.87 000001065468-3562507204
2020 9 FD04 07 E121 D 7356603D 040 3/25/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032K1062008402476 $17.33 000001065468-3562507204
2020 9 FD04 07 E122 D 7356603D 040 3/25/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR032K1062008402476 $1,527.52 000001065468-3562507204
2020 9 FD04 07 E122 D 7356603D 040 3/25/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032K1062008402476 $238.27 000001065468-3562507204
2020 9 FD04 07 E123 D 7356603D 040 3/25/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR032K1062008402476 $216.08 000001065468-3562507204
2020 9 FD04 07 E123 D 7356603D 040 3/25/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032K1062008402476 $60.61 000001065468-3562507204
2020 9 FD04 07 E124 D 7356603D 040 3/25/2020 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR032K1062008402476 $0.68 000001065468-3562507204
2020 9 FD04 07 E124 D 7356603D 040 3/25/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032K1062008402476 $0.16 000001065468-3562507204
2020 9 FD04 07 E111 D 7356603D 040 3/25/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032K1062008402477 $2,340.63 000001065937-3562507204
2020 9 FD04 07 E111 D 7356603D 040 3/25/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032K1062008402477 $313.95 000001065937-3562507204
2020 9 FD04 07 E121 D 7356603D 040 3/25/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032K1062008402477 $168.38 000001065937-3562507204
2020 9 FD04 07 E121 D 7356603D 040 3/25/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032K1062008402477 $21.20 000001065937-3562507204
2020 9 FD04 07 E122 D 7356603D 040 3/25/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032K1062008402477 $1,952.87 000001065937-3562507204
2020 9 FD04 07 E122 D 7356603D 040 3/25/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032K1062008402477 $261.92 000001065937-3562507204
2020 9 FD04 07 E123 D 7356603D 040 3/25/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032K1062008402477 $313.63 000001065937-3562507204
2020 9 FD04 07 E123 D 7356603D 040 3/25/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032K1062008402477 $57.76 000001065937-3562507204
2020 9 FD04 07 E124 D 7356603D 040 3/25/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032K1062008402477 $0.93 000001065937-3562507204
2020 9 FD04 07 E124 D 7356603D 040 3/25/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032K1062008402477 $0.17 000001065937-3562507204
2020 9 FD04 07 E111 D 7356603D 040 3/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031K1062006601519 $3,282.05 000001065937-3562507204
2020 9 FD04 07 E111 D 7356603D 040 3/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031K1062006601519 $213.35 000001065937-3562507204
2020 9 FD04 07 E121 D 7356603D 040 3/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031K1062006601519 $234.47 000001065937-3562507204
2020 9 FD04 07 E121 D 7356603D 040 3/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031K1062006601519 $15.01 000001065937-3562507204
2020 9 FD04 07 E122 D 7356603D 040 3/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031K1062006601519 $2,738.10 000001065937-3562507204
2020 9 FD04 07 E122 D 7356603D 040 3/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031K1062006601519 $178.00 000001065937-3562507204
2020 9 FD04 07 E123 D 7356603D 040 3/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031K1062006601519 $399.21 000001065937-3562507204
2020 9 FD04 07 E123 D 7356603D 040 3/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031K1062006601519 $25.23 000001065937-3562507204
2020 8 FD04 07 E111 D 7356603D 040 2/24/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022K1062005200417 $2,292.81 000001065937-3562507204
2020 8 FD04 07 E111 D 7356603D 040 2/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022K1062005200417 $246.29 000001065937-3562507204
2020 8 FD04 07 E121 D 7356603D 040 2/24/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022K1062005200417 $167.07 000001065937-3562507204
2020 8 FD04 07 E121 D 7356603D 040 2/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022K1062005200417 $17.97 000001065937-3562507204
2020 8 FD04 07 E122 D 7356603D 040 2/24/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022K1062005200417 $1,912.85 000001065937-3562507204
2020 8 FD04 07 E122 D 7356603D 040 2/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022K1062005200417 $205.48 000001065937-3562507204
2020 8 FD04 07 E123 D 7356603D 040 2/24/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022K1062005200417 $307.80 000001065937-3562507204
2020 8 FD04 07 E123 D 7356603D 040 2/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022K1062005200417 $32.31 000001065937-3562507204
2020 8 FD04 07 E124 D 7356603D 040 2/24/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022K1062005200417 $0.87 000001065937-3562507204
2020 8 FD04 07 E124 D 7356603D 040 2/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022K1062005200417 $0.08 000001065937-3562507204
2020 7 FD04 07 E111 D 7356603D 040 1/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011K1062000807908 $722.51 000001065937-3562507204
2020 7 FD04 07 E111 D 7356603D 040 1/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011K1062000807908 $654.01 000001065937-3562507204
2020 7 FD04 07 E121 D 7356603D 040 1/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011K1062000807908 $51.11 000001065937-3562507204
2020 7 FD04 07 E121 D 7356603D 040 1/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011K1062000807908 $47.04 000001065937-3562507204
2020 7 FD04 07 E122 D 7356603D 040 1/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011K1062000807908 $602.85 000001065937-3562507204
2020 7 FD04 07 E122 D 7356603D 040 1/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011K1062000807908 $545.64 000001065937-3562507204
2020 7 FD04 07 E123 D 7356603D 040 1/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011K1062000807908 $127.33 000001065937-3562507204
2020 7 FD04 07 E123 D 7356603D 040 1/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011K1062000807908 $112.79 000001065937-3562507204
2020 6 FD04 07 E229 D 7356603D 040 12/26/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF IET-XE13A162519359004820 $22.04
2020 6 FD04 07 E123 D 7356603D 040 12/23/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122J1061935406851 $119.42 000001065937-3562507204
2020 6 FD04 07 E123 D 7356603D 040 12/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122J1061935406851 $28.43 000001065937-3562507204
2020 6 FD04 07 E124 D 7356603D 040 12/23/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122J1061935406851 $0.30 000001065937-3562507204
2020 6 FD04 07 E124 D 7356603D 040 12/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122J1061935406851 $0.08 000001065937-3562507204
2020 6 FD04 07 E111 D 7356603D 040 12/23/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122J1061935406850 $672.26 000001065937-3562507204
2020 6 FD04 07 E111 D 7356603D 040 12/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122J1061935406850 $162.13 000001065937-3562507204
2020 6 FD04 07 E121 D 7356603D 040 12/23/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122J1061935406850 $46.97 000001065937-3562507204
2020 6 FD04 07 E121 D 7356603D 040 12/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122J1061935406850 $11.30 000001065937-3562507204
2020 6 FD04 07 E122 D 7356603D 040 12/23/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122J1061935406850 $561.03 000001065937-3562507204
2020 6 FD04 07 E122 D 7356603D 040 12/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122J1061935406850 $135.27 000001065937-3562507204
2020 6 FD04 08 E143 D 7356603D 069 12/4/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000095159 PON21200002239 STANTEC CONSULTING SERVICES INC $1,443.99 8-196.00
2020 5 FD04 00 E123 D 7356603D 040 11/22/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112J1061932504736 $2.52 000001063906-3562500636
2020 5 FD04 00 E124 D 7356603D 040 11/22/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112J1061932504736 $0.02 000001063906-3562500636
2020 5 FD04 00 E111 D 7356603D 040 11/22/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112J1061932504735 $85.60 000001063906-3562500636
2020 5 FD04 00 E111 D 7356603D 040 11/22/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112J1061932504735 $27.04 000001063906-3562500636
2020 5 FD04 00 E121 D 7356603D 040 11/22/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112J1061932504735 $6.52 000001063906-3562500636
2020 5 FD04 00 E121 D 7356603D 040 11/22/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112J1061932504735 $2.04 000001063906-3562500636
2020 5 FD04 00 E122 D 7356603D 040 11/22/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112J1061932504735 $71.61 000001063906-3562500636
2020 5 FD04 00 E122 D 7356603D 040 11/22/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112J1061932504735 $22.56 000001063906-3562500636
2020 5 FD04 00 E123 D 7356603D 040 11/22/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112J1061932504735 $8.16 000001063906-3562500636
2020 5 FD04 08 E143 D 7356603D 069 11/7/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000079517 PON21200002239 STANTEC CONSULTING SERVICES INC $12,791.45 8-196.00
2020 3 FD04 07 E123 D 7356603D 040 9/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909290 $33.92 000001065937-3562507204
2020 3 FD04 07 E111 D 7356603D 040 9/9/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091J1061924909290 $1,434.67 000001065937-3562507204
2020 3 FD04 07 E111 D 7356603D 040 9/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909290 $234.81 000001065937-3562507204
2020 3 FD04 07 E111 D 7356603D 040 9/9/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR091J1061924909288 $1,640.87 000001065468-3562507204
2020 3 FD04 07 E111 D 7356603D 040 9/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909288 $243.39 000001065468-3562507204
2020 3 FD04 07 E121 D 7356603D 040 9/9/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR091J1061924909288 $121.65 000001065468-3562507204
2020 3 FD04 07 E115 D 7356603D 040 9/9/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091J1061924909290 $88.86 000001065937-3562507204
2020 3 FD04 07 E121 D 7356603D 040 9/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909288 $17.63 000001065468-3562507204
2020 3 FD04 07 E122 D 7356603D 040 9/9/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR091J1061924909288 $1,368.58 000001065468-3562507204
2020 3 FD04 07 E122 D 7356603D 040 9/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909288 $203.05 000001065468-3562507204
2020 3 FD04 07 E123 D 7356603D 040 9/9/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR091J1061924909288 $200.63 000001065468-3562507204
2020 3 FD04 07 E123 D 7356603D 040 9/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909288 $35.13 000001065468-3562507204
2020 3 FD04 07 E121 D 7356603D 040 9/9/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091J1061924909290 $112.21 000001065937-3562507204
2020 3 FD04 07 E121 D 7356603D 040 9/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909290 $17.03 000001065937-3562507204
2020 3 FD04 07 E122 D 7356603D 040 9/9/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091J1061924909290 $1,271.32 000001065937-3562507204
2020 3 FD04 07 E122 D 7356603D 040 9/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091J1061924909290 $195.90 000001065937-3562507204
2020 3 FD04 07 E123 D 7356603D 040 9/9/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091J1061924909290 $187.66 000001065937-3562507204
2020 2 FD04 07 E121 D 7356603D 040 8/26/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082J1061923508094 $64.43 000001065937-3562507204
2020 2 FD04 07 E121 D 7356603D 040 8/26/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082J1061923508094 $8.88 000001065937-3562507204
2020 2 FD04 07 E111 D 7356603D 040 8/26/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR082J1061923508092 $2,605.73 000001065468-3562507204
2020 2 FD04 07 E111 D 7356603D 040 8/26/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082J1061923508092 $383.43 000001065468-3562507204
2020 2 FD04 07 E121 D 7356603D 040 8/26/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR082J1061923508092 $190.58 000001065468-3562507204
2020 2 FD04 07 E121 D 7356603D 040 8/26/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082J1061923508092 $28.16 000001065468-3562507204
2020 2 FD04 07 E122 D 7356603D 040 8/26/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR082J1061923508092 $2,174.01 000001065468-3562507204
2020 2 FD04 07 E122 D 7356603D 040 8/26/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082J1061923508092 $319.88 000001065468-3562507204
2020 2 FD04 07 E123 D 7356603D 040 8/26/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR082J1061923508092 $322.67 000001065468-3562507204
2020 2 FD04 07 E123 D 7356603D 040 8/26/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082J1061923508092 $52.10 000001065468-3562507204
2020 2 FD04 07 E124 D 7356603D 040 8/26/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR082J1061923508092 $0.99 000001065468-3562507204
2020 2 FD04 07 E124 D 7356603D 040 8/26/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082J1061923508092 $0.16 000001065468-3562507204
2020 2 FD04 07 E122 D 7356603D 040 8/26/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082J1061923508094 $740.97 000001065937-3562507204
2020 2 FD04 07 E122 D 7356603D 040 8/26/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082J1061923508094 $101.76 000001065937-3562507204
2020 2 FD04 07 E123 D 7356603D 040 8/26/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082J1061923508094 $105.66 000001065937-3562507204
2020 2 FD04 07 E123 D 7356603D 040 8/26/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082J1061923508094 $16.18 000001065937-3562507204
2020 2 FD04 07 E124 D 7356603D 040 8/26/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082J1061923508094 $0.38 000001065937-3562507204
2020 2 FD04 07 E124 D 7356603D 040 8/26/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082J1061923508094 $0.04 000001065937-3562507204
2020 2 FD04 07 E111 D 7356603D 040 8/26/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082J1061923508093 $888.70 000001065937-3562507204
2020 2 FD04 07 E111 D 7356603D 040 8/26/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082J1061923508093 $121.98 000001065937-3562507204
2020 2 FD04 00 E111 D 7356603D 040 8/12/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081J1061922106919 $39.42 000001063906-3562500636
2020 2 FD04 00 E111 D 7356603D 040 8/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081J1061922106919 $40.92 000001063906-3562500636
2020 2 FD04 00 E121 D 7356603D 040 8/12/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081J1061922106919 $2.99 000001063906-3562500636
2020 2 FD04 07 E111 D 7356603D 040 8/12/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR081J1061922106925 $2,036.11 000001065468-3562507204
2020 2 FD04 00 E121 D 7356603D 040 8/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081J1061922106919 $3.11 000001063906-3562500636
2020 2 FD04 07 E111 D 7356603D 040 8/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081J1061922106925 $282.19 000001065468-3562507204
2020 2 FD04 00 E122 D 7356603D 040 8/12/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081J1061922106919 $33.48 000001063906-3562500636
2020 2 FD04 07 E121 D 7356603D 040 8/12/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR081J1061922106925 $149.40 000001065468-3562507204
2020 2 FD04 00 E122 D 7356603D 040 8/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081J1061922106919 $34.14 000001063906-3562500636
2020 2 FD04 07 E121 D 7356603D 040 8/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081J1061922106925 $20.82 000001065468-3562507204
2020 2 FD04 00 E123 D 7356603D 040 8/12/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081J1061922106919 $3.84 000001063906-3562500636
2020 2 FD04 07 E122 D 7356603D 040 8/12/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR081J1061922106925 $1,698.81 000001065468-3562507204
2020 2 FD04 00 E123 D 7356603D 040 8/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081J1061922106919 $3.81 000001063906-3562500636
2020 2 FD04 07 E122 D 7356603D 040 8/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081J1061922106925 $235.43 000001065468-3562507204
2020 2 FD04 07 E123 D 7356603D 040 8/12/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR081J1061922106925 $266.31 000001065468-3562507204
2020 2 FD04 07 E123 D 7356603D 040 8/12/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081J1061922106925 $27.64 000001065468-3562507204
2020 2 FD04 08 E143 D 7356603D 069 8/5/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-2000020842 PON21200002239 STANTEC CONSULTING SERVICES INC $1,722.57 8-196.00
2020 1 FD04 07 E121 D 7356603D 040 7/29/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072J1061920405818 $39.58 000001065937-3562507204
2020 1 FD04 07 E121 D 7356603D 040 7/29/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072J1061920405818 $10.50 000001065937-3562507204
2020 1 FD04 07 E122 D 7356603D 040 7/29/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072J1061920405818 $447.36 000001065937-3562507204
2020 1 FD04 07 E122 D 7356603D 040 7/29/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072J1061920405818 $119.91 000001065937-3562507204
2020 1 FD04 07 E123 D 7356603D 040 7/29/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072J1061920405818 $71.91 000001065937-3562507204
2020 1 FD04 07 E123 D 7356603D 040 7/29/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072J1061920405818 $21.81 000001065937-3562507204
2020 1 FD04 07 E124 D 7356603D 040 7/29/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072J1061920405818 $0.15 000001065937-3562507204
2020 1 FD04 07 E124 D 7356603D 040 7/29/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072J1061920405818 $0.04 000001065937-3562507204
2020 1 FD04 00 E121 D 7356603D 040 7/24/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072J1061920405810 $6.52 000001063906-3562500636
2020 1 FD04 00 E121 D 7356603D 040 7/24/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072J1061920405810 $1.44 000001063906-3562500636
2020 1 FD04 00 E122 D 7356603D 040 7/24/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072J1061920405810 $71.61 000001063906-3562500636
2020 1 FD04 00 E122 D 7356603D 040 7/24/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072J1061920405810 $15.76 000001063906-3562500636
2020 1 FD04 00 E123 D 7356603D 040 7/24/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072J1061920405810 $8.15 000001063906-3562500636
2020 1 FD04 00 E123 D 7356603D 040 7/24/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072J1061920405810 $1.76 000001063906-3562500636
2020 1 FD04 07 E111 D 7356603D 040 7/24/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR072J1061920405815 $723.19 000001065468-3562507204
2020 1 FD04 07 E111 D 7356603D 040 7/24/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072J1061920405815 $104.62 000001065468-3562507204
2020 1 FD04 00 E124 D 7356603D 040 7/24/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072J1061920405810 $0.02 000001063906-3562500636
2020 1 FD04 07 E121 D 7356603D 040 7/24/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR072J1061920405815 $54.75 000001065468-3562507204
2020 1 FD04 07 E121 D 7356603D 040 7/24/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072J1061920405815 $7.93 000001065468-3562507204
2020 1 FD04 07 E122 D 7356603D 040 7/24/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR072J1061920405815 $603.37 000001065468-3562507204
2020 1 FD04 07 E122 D 7356603D 040 7/24/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072J1061920405815 $87.29 000001065468-3562507204
2020 1 FD04 07 E123 D 7356603D 040 7/24/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR072J1061920405815 $59.51 000001065468-3562507204
2020 1 FD04 07 E123 D 7356603D 040 7/24/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072J1061920405815 $8.46 000001065468-3562507204
2020 1 FD04 07 E124 D 7356603D 040 7/24/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR072J1061920405815 $0.18 000001065468-3562507204
2020 1 FD04 07 E124 D 7356603D 040 7/24/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072J1061920405815 $0.03 000001065468-3562507204
2020 1 FD04 00 E111 D 7356603D 040 7/24/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072J1061920405809 $85.83 000001063906-3562500636
2020 1 FD04 07 E111 D 7356603D 040 7/24/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072J1061920405817 $536.20 000001065937-3562507204
2020 1 FD04 00 E111 D 7356603D 040 7/24/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072J1061920405809 $18.88 000001063906-3562500636
2020 1 FD04 07 E111 D 7356603D 040 7/24/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072J1061920405817 $143.72 000001065937-3562507204
2020 1 FD04 07 E111 D 7356603D 040 7/10/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071J1061919004768 $817.34 000001065937-3562507204
2020 1 FD04 07 E111 D 7356603D 040 7/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071J1061919004768 $129.64 000001065937-3562507204
2020 1 FD04 07 E121 D 7356603D 040 7/10/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071J1061919004768 $58.68 000001065937-3562507204
2020 1 FD04 07 E121 D 7356603D 040 7/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071J1061919004768 $8.81 000001065937-3562507204
2020 1 FD04 07 E122 D 7356603D 040 7/10/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071J1061919004768 $681.95 000001065937-3562507204
2020 1 FD04 07 E122 D 7356603D 040 7/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071J1061919004768 $108.16 000001065937-3562507204
2020 1 FD04 07 E123 D 7356603D 040 7/10/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071J1061919004768 $107.25 000001065937-3562507204
2020 1 FD04 07 E123 D 7356603D 040 7/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071J1061919004768 $19.19 000001065937-3562507204
2020 1 FD04 07 E111 D 7356603D 040 7/10/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR071J1061919004766 $1,325.65 000001065468-3562507204
2020 1 FD04 07 E111 D 7356603D 040 7/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071J1061919004766 $142.71 000001065468-3562507204
2020 1 FD04 07 E121 D 7356603D 040 7/10/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR071J1061919004766 $99.10 000001065468-3562507204
2020 1 FD04 07 E121 D 7356603D 040 7/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071J1061919004766 $10.69 000001065468-3562507204
2020 1 FD04 07 E122 D 7356603D 040 7/10/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR071J1061919004766 $1,105.92 000001065468-3562507204
2020 1 FD04 07 E122 D 7356603D 040 7/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071J1061919004766 $119.06 000001065468-3562507204
2020 1 FD04 07 E123 D 7356603D 040 7/10/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR071J1061919004766 $155.85 000001065468-3562507204
2020 1 FD04 07 E123 D 7356603D 040 7/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071J1061919004766 $14.65 000001065468-3562507204
2020 1 FD04 00 E111 D 7356603D 040 7/10/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071J1061919004761 $118.02 000001063906-3562500636
2020 1 FD04 00 E111 D 7356603D 040 7/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071J1061919004761 $19.36 000001063906-3562500636
2020 1 FD04 00 E121 D 7356603D 040 7/10/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071J1061919004761 $8.97 000001063906-3562500636
2020 1 FD04 00 E121 D 7356603D 040 7/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071J1061919004761 $1.47 000001063906-3562500636
2020 1 FD04 00 E122 D 7356603D 040 7/10/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071J1061919004761 $98.47 000001063906-3562500636
2020 1 FD04 00 E122 D 7356603D 040 7/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071J1061919004761 $16.15 000001063906-3562500636
2020 1 FD04 00 E123 D 7356603D 040 7/10/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071J1061919004761 $11.20 000001063906-3562500636
2020 1 FD04 00 E123 D 7356603D 040 7/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071J1061919004761 $1.80 000001063906-3562500636
2020 1 FD04 07 E123 D 7356603D 040 7/1/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR061J1061915802525P $61.55 000001065468-3562507204
2020 1 FD04 07 E123 D 7356603D 040 7/1/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061J1061915802525P $21.90 000001065468-3562507204
2020 1 FD04 07 E111 D 7356603D 040 7/1/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR062J1061917103657 $992.90 000001065468-3562507204
2020 1 FD04 07 E111 D 7356603D 040 7/1/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062J1061917103657 $99.89 000001065468-3562507204
2020 1 FD04 07 E121 D 7356603D 040 7/1/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR062J1061917103657 $75.06 000001065468-3562507204
2020 1 FD04 07 E121 D 7356603D 040 7/1/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062J1061917103657 $7.56 000001065468-3562507204
2020 1 FD04 07 E122 D 7356603D 040 7/1/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR062J1061917103657 $828.35 000001065468-3562507204
2020 1 FD04 07 E122 D 7356603D 040 7/1/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062J1061917103657 $83.33 000001065468-3562507204
2020 1 FD04 07 E123 D 7356603D 040 7/1/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR062J1061917103657 $99.20 000001065468-3562507204
2020 1 FD04 07 E123 D 7356603D 040 7/1/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062J1061917103657 $9.04 000001065468-3562507204
2020 1 FD04 07 E124 D 7356603D 040 7/1/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR062J1061917103657 $0.30 000001065468-3562507204
2020 1 FD04 07 E124 D 7356603D 040 7/1/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062J1061917103657 $0.03 000001065468-3562507204
2019 12 FD04 07 E111 D 7356603D 040 6/10/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR061J1061915802525 $493.90 000001065468-3562507204
2019 12 FD04 07 E111 D 7356603D 040 6/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061J1061915802525 $190.29 000001065468-3562507204
2019 12 FD04 07 E121 D 7356603D 040 6/10/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR061J1061915802525 $34.73 000001065468-3562507204
2019 12 FD04 07 E121 D 7356603D 040 6/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061J1061915802525 $13.57 000001065468-3562507204
2019 12 FD04 07 E122 D 7356603D 040 6/10/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR061J1061915802525 $412.06 000001065468-3562507204
2019 12 FD04 07 E122 D 7356603D 040 6/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061J1061915802525 $158.76 000001065468-3562507204
2019 11 FD04 07 E111 D 7356603D 040 5/23/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR052J1061914201358 $378.66 000001065468-3562507200
2019 11 FD04 07 E111 D 7356603D 040 5/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201358 $25.75 000001065468-3562507200
2019 11 FD04 07 E121 D 7356603D 040 5/23/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR052J1061914201358 $28.01 000001065468-3562507200
2019 11 FD04 07 E121 D 7356603D 040 5/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201358 $1.91 000001065468-3562507200
2019 11 FD04 07 E122 D 7356603D 040 5/23/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR052J1061914201358 $315.92 000001065468-3562507200
2019 11 FD04 07 E122 D 7356603D 040 5/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201358 $21.48 000001065468-3562507200
2019 11 FD04 07 E123 D 7356603D 040 5/23/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR052J1061914201358 $39.20 000001065468-3562507200
2019 11 FD04 07 E123 D 7356603D 040 5/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201358 $2.64 000001065468-3562507200
2019 11 FD04 07 E124 D 7356603D 040 5/23/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR052J1061914201358 $0.08 000001065468-3562507200
2019 11 FD04 07 E124 D 7356603D 040 5/23/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052J1061914201358 $0.01 000001065468-3562507200
2019 11 FD04 00 E229 D 7356603D 040 5/17/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF IET-XE13A162519136003250 $28.00
2019 11 FD04 07 E121 D 7356603D 040 5/14/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR051J1061912800396 $205.04 000001065468-3562507204
2019 11 FD04 07 E121 D 7356603D 040 5/14/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051J1061912800396 $33.78 000001065468-3562507204
2019 11 FD04 07 E122 D 7356603D 040 5/14/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR051J1061912800396 $2,295.34 000001065468-3562507204
2019 11 FD04 07 E122 D 7356603D 040 5/14/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051J1061912800396 $375.67 000001065468-3562507200
2019 11 FD04 07 E123 D 7356603D 040 5/14/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR051J1061912800396 $338.99 000001065468-3562507204
2019 11 FD04 07 E123 D 7356603D 040 5/14/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051J1061912800396 $44.96 000001065468-3562507200
2019 11 FD04 07 E111 D 7356603D 040 5/14/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR051J1061912800396 $2,750.76 000001065468-3562507204
2019 11 FD04 07 E111 D 7356603D 040 5/14/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051J1061912800396 $450.28 000001065468-3562507204
2019 11 FD04 08 E143 D 7356603D 069 5/10/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-1900187373 PON21200002239 STANTEC CONSULTING SERVICES INC $7,442.92 8-196.00
2019 11 FD04 00 E111 D 7356603D 040 5/9/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051J1061912800386 $181.26 000001063906-3562500636
2019 11 FD04 00 E111 D 7356603D 040 5/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051J1061912800386 $36.25 000001063906-3562500636
2019 11 FD04 00 E121 D 7356603D 040 5/9/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051J1061912800386 $13.66 000001063906-3562500636
2019 11 FD04 00 E121 D 7356603D 040 5/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051J1061912800386 $2.73 000001063906-3562500636
2019 11 FD04 00 E122 D 7356603D 040 5/9/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051J1061912800386 $151.22 000001063906-3562500636
2019 11 FD04 00 E122 D 7356603D 040 5/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051J1061912800386 $30.24 000001063906-3562500636
2019 11 FD04 00 E123 D 7356603D 040 5/9/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051J1061912800386 $25.03 000001063906-3562500636
2019 11 FD04 00 E123 D 7356603D 040 5/9/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051J1061912800386 $4.92 000001063906-3562500636
2019 10 FD04 07 E111 D 7356603D 040 4/25/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR042J1061911410243 $1,638.13 000001065468-3562507204
2019 10 FD04 07 E111 D 7356603D 040 4/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042J1061911410243 $262.93 000001065468-3562507204
2019 10 FD04 07 E121 D 7356603D 040 4/25/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR042J1061911410243 $123.62 000001065468-3562507204
2019 10 FD04 07 E121 D 7356603D 040 4/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042J1061911410243 $19.89 000001065468-3562507204
2019 10 FD04 07 E122 D 7356603D 040 4/25/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR042J1061911410243 $1,366.88 000001065468-3562507204
2019 10 FD04 07 E122 D 7356603D 040 4/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042J1061911410243 $219.37 000001065468-3562507204
2019 10 FD04 07 E123 D 7356603D 040 4/25/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR042J1061911410243 $179.56 000001065468-3562507204
2019 10 FD04 07 E123 D 7356603D 040 4/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042J1061911410243 $22.07 000001065468-3562507204
2019 10 FD04 07 E124 D 7356603D 040 4/25/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR042J1061911410243 $0.54 000001065468-3562507204
2019 10 FD04 07 E124 D 7356603D 040 4/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042J1061911410243 $0.07 000001065468-3562507204
2019 10 FD04 07 E122 D 7356603D 040 4/10/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041J1061909909151 $333.86 000001065937-3562507204
2019 10 FD04 07 E122 D 7356603D 040 4/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041J1061909909151 $57.42 000001065937-3562507204
2019 10 FD04 07 E123 D 7356603D 040 4/10/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041J1061909909151 $32.95 000001065937-3562507204
2019 10 FD04 07 E111 D 7356603D 040 4/10/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR041J1061909909148 $983.60 000001065468-3562507204
2019 10 FD04 07 E111 D 7356603D 040 4/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041J1061909909148 $170.91 000001065468-3562507204
2019 10 FD04 07 E121 D 7356603D 040 4/10/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR041J1061909909148 $74.37 000001065468-3562507204
2019 10 FD04 07 E121 D 7356603D 040 4/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041J1061909909148 $12.92 000001065468-3562507204
2019 10 FD04 07 E122 D 7356603D 040 4/10/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR041J1061909909148 $820.70 000001065468-3562507204
2019 10 FD04 07 E122 D 7356603D 040 4/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041J1061909909148 $142.59 000001065468-3562507204
2019 10 FD04 07 E123 D 7356603D 040 4/10/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR041J1061909909148 $99.32 000001065468-3562507204
2019 10 FD04 07 E123 D 7356603D 040 4/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041J1061909909148 $17.09 000001065468-3562507204
2019 10 FD04 07 E123 D 7356603D 040 4/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041J1061909909151 $5.56 000001065937-3562507204
2019 10 FD04 07 E111 D 7356603D 040 4/10/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041J1061909909150 $400.08 000001065937-3562507204
2019 10 FD04 07 E111 D 7356603D 040 4/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041J1061909909150 $68.83 000001065937-3562507204
2019 10 FD04 07 E121 D 7356603D 040 4/10/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041J1061909909150 $30.30 000001065937-3562507204
2019 10 FD04 07 E121 D 7356603D 040 4/10/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041J1061909909150 $5.21 000001065937-3562507204
2019 9 FD04 07 E122 D 7356603D 040 3/29/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032J1061908107960 $141.86 000001065468-3562507204
2019 9 FD04 07 E123 D 7356603D 040 3/29/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR032J1061908107960 $126.72 000001065468-3562507204
2019 9 FD04 07 E123 D 7356603D 040 3/29/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032J1061908107960 $21.51 000001065468-3562507204
2019 9 FD04 07 E124 D 7356603D 040 3/29/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR032J1061908107960 $0.37 000001065468-3562507204
2019 9 FD04 07 E124 D 7356603D 040 3/29/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032J1061908107960 $0.06 000001065468-3562507204
2019 9 FD04 07 E111 D 7356603D 040 3/29/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR032J1061908107960 $1,266.30 000001065468-3562507204
2019 9 FD04 07 E111 D 7356603D 040 3/29/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032J1061908107960 $170.04 000001065468-3562507204
2019 9 FD04 07 E121 D 7356603D 040 3/29/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR032J1061908107960 $92.98 000001065468-3562507204
2019 9 FD04 07 E121 D 7356603D 040 3/29/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032J1061908107960 $11.88 000001065468-3562507204
2019 9 FD04 07 E122 D 7356603D 040 3/29/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR032J1061908107960 $1,056.17 000001065468-3562507204
2019 9 FD04 07 E111 D 7356603D 040 3/11/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR031J1061906706876 $3,852.92 000001065468-3562507204
2019 9 FD04 07 E111 D 7356603D 040 3/11/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031J1061906706876 $687.04 000001065468-3562507204
2019 9 FD04 07 E121 D 7356603D 040 3/11/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR031J1061906706876 $283.22 000001065468-3562507204
2019 9 FD04 07 E121 D 7356603D 040 3/11/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031J1061906706876 $49.63 000001065468-3562507204
2019 9 FD04 07 E122 D 7356603D 040 3/11/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR031J1061906706876 $3,214.53 000001065468-3562507204
2019 9 FD04 07 E122 D 7356603D 040 3/11/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031J1061906706876 $573.21 000001065468-3562507204
2019 9 FD04 07 E123 D 7356603D 040 3/11/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR031J1061906706876 $487.05 000001065468-3562507204
2019 9 FD04 07 E123 D 7356603D 040 3/11/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031J1061906706876 $110.65 000001065468-3562507204
2019 8 FD04 08 E143 D 7356603D 040 2/27/2019 1550 DESIGN CONTRACTS-CONSULTANT PRC-1900139439 PON21200002239 STANTEC CONSULTING SERVICES INC $40,401.98 8-196.00
2019 8 FD04 07 E121 D 7356603D 040 2/25/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR022J1061905305641 $27.55 000001065468-3562507204
2019 8 FD04 07 E121 D 7356603D 040 2/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022J1061905305641 $2.75 000001065468-3562507204
2019 8 FD04 07 E122 D 7356603D 040 2/25/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR022J1061905305641 $303.51 000001065468-3562507204
2019 8 FD04 07 E122 D 7356603D 040 2/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022J1061905305641 $30.35 000001065468-3562507204
2019 8 FD04 07 E123 D 7356603D 040 2/25/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR022J1061905305641 $29.92 000001065468-3562507204
2019 8 FD04 07 E123 D 7356603D 040 2/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022J1061905305641 $2.94 000001065468-3562507204
2019 8 FD04 07 E124 D 7356603D 040 2/25/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR022J1061905305641 $0.09 000001065468-3562507204
2019 8 FD04 07 E124 D 7356603D 040 2/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022J1061905305641 $0.01 000001065468-3562507204
2019 8 FD04 00 E111 D 7356603D 040 2/25/2019 0410 TRANSPORTATION PLANNING CA-XR022J1061905305669 $1,952.76 000001066587-3562500064
2019 8 FD04 07 E111 D 7356603D 040 2/25/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022J1061905305645 $363.79 000001065937-3562507204
2019 8 FD04 00 E111 D 7356603D 040 2/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022J1061905305669 $132.62 000001066587-3562500064
2019 8 FD04 07 E111 D 7356603D 040 2/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022J1061905305645 $36.38 000001065937-3562507204
2019 8 FD04 00 E121 D 7356603D 040 2/25/2019 0410 TRANSPORTATION PLANNING CA-XR022J1061905305669 $135.54 000001066587-3562500064
2019 8 FD04 07 E121 D 7356603D 040 2/25/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022J1061905305645 $27.55 000001065937-3562507204
2019 8 FD04 00 E121 D 7356603D 040 2/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022J1061905305669 $9.20 000001066587-3562500064
2019 8 FD04 07 E121 D 7356603D 040 2/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022J1061905305645 $2.75 000001065937-3562507204
2019 8 FD04 00 E122 D 7356603D 040 2/25/2019 0410 TRANSPORTATION PLANNING CA-XR022J1061905305669 $1,629.19 000001066587-3562500064
2019 8 FD04 07 E122 D 7356603D 040 2/25/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022J1061905305645 $303.51 000001065937-3562507204
2019 8 FD04 00 E122 D 7356603D 040 2/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022J1061905305669 $110.64 000001066587-3562500064
2019 8 FD04 07 E122 D 7356603D 040 2/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022J1061905305645 $30.35 000001065937-3562507204
2019 8 FD04 00 E123 D 7356603D 040 2/25/2019 0410 TRANSPORTATION PLANNING CA-XR022J1061905305669 $406.79 000001066587-3562500064
2019 8 FD04 07 E123 D 7356603D 040 2/25/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022J1061905305645 $29.92 000001065937-3562507204
2019 8 FD04 00 E123 D 7356603D 040 2/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022J1061905305669 $27.36 000001066587-3562500064
2019 8 FD04 07 E123 D 7356603D 040 2/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022J1061905305645 $2.94 000001065937-3562507204
2019 8 FD04 00 E124 D 7356603D 040 2/25/2019 0410 TRANSPORTATION PLANNING CA-XR022J1061905305669 $0.71 000001066587-3562500064
2019 8 FD04 07 E124 D 7356603D 040 2/25/2019 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022J1061905305645 $0.09 000001065937-3562507204
2019 8 FD04 00 E124 D 7356603D 040 2/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022J1061905305669 $0.05 000001066587-3562500064
2019 8 FD04 07 E124 D 7356603D 040 2/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022J1061905305645 $0.01 000001065937-3562507204
2019 8 FD04 07 E111 D 7356603D 040 2/25/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR022J1061905305641 $363.79 000001065468-3562507204
2019 8 FD04 07 E111 D 7356603D 040 2/25/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022J1061905305641 $36.38 000001065468-3562507204
2019 7 FD04 07 E111 D 7356603D 040 1/29/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR012J1061902303416 $363.79 000001065468-3562507204
2019 7 FD04 07 E111 D 7356603D 040 1/29/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012J1061902303416 $36.38 000001065468-3562507204
2019 7 FD04 07 E121 D 7356603D 040 1/29/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR012J1061902303416 $27.55 000001065468-3562507204
2019 7 FD04 07 E121 D 7356603D 040 1/29/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012J1061902303416 $2.75 000001065468-3562507204
2019 7 FD04 07 E122 D 7356603D 040 1/29/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR012J1061902303416 $303.51 000001065468-3562507204
2019 7 FD04 07 E122 D 7356603D 040 1/29/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012J1061902303416 $30.35 000001065468-3562507204
2019 7 FD04 07 E123 D 7356603D 040 1/29/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR012J1061902303416 $29.92 000001065468-3562507204
2019 7 FD04 07 E123 D 7356603D 040 1/29/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012J1061902303416 $2.94 000001065468-3562507204
2019 7 FD04 07 E124 D 7356603D 040 1/29/2019 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR012J1061902303416 $0.09 000001065468-3562507204
2019 7 FD04 07 E124 D 7356603D 040 1/29/2019 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012J1061902303416 $0.01 000001065468-3562507204
2019 6 FD04 07 E111 D 7356603D 040 12/26/2018 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122I1061835401373 $400.32 000001065937-3562507204
2019 6 FD04 07 E111 D 7356603D 040 12/26/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122I1061835401373 $61.36 000001065937-3562507204
2019 6 FD04 07 E121 D 7356603D 040 12/26/2018 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122I1061835401373 $30.29 000001065937-3562507204
2019 6 FD04 07 E121 D 7356603D 040 12/26/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122I1061835401373 $4.64 000001065937-3562507204
2019 6 FD04 07 E122 D 7356603D 040 12/26/2018 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122I1061835401373 $333.86 000001065937-3562507204
2019 6 FD04 07 E122 D 7356603D 040 12/26/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122I1061835401373 $51.19 000001065937-3562507204
2019 6 FD04 07 E123 D 7356603D 040 12/26/2018 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122I1061835401373 $32.94 000001065937-3562507204
2019 6 FD04 07 E123 D 7356603D 040 12/26/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122I1061835401373 $4.96 000001065937-3562507204
2019 6 FD04 07 E124 D 7356603D 040 12/26/2018 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122I1061835401373 $0.10 000001065937-3562507204
2019 6 FD04 07 E124 D 7356603D 040 12/26/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122I1061835401373 $0.02 000001065937-3562507204
2019 6 FD04 07 E111 D 7356603D 040 12/10/2018 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR121I1061834100367 $363.67 000001065468-3562507204
2019 6 FD04 07 E111 D 7356603D 040 12/10/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121I1061834100367 $97.99 000001065468-3562507204
2019 6 FD04 07 E121 D 7356603D 040 12/10/2018 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR121I1061834100367 $27.54 000001065468-3562507204
2019 6 FD04 07 E121 D 7356603D 040 12/10/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121I1061834100367 $7.41 000001065468-3562507204
2019 6 FD04 07 E122 D 7356603D 040 12/10/2018 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR121I1061834100367 $303.11 000001065468-3562507204
2019 6 FD04 07 E122 D 7356603D 040 12/10/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121I1061834100367 $81.75 000001065468-3562507204
2019 6 FD04 07 E123 D 7356603D 040 12/10/2018 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR121I1061834100367 $29.96 000001065468-3562507204
2019 6 FD04 07 E123 D 7356603D 040 12/10/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121I1061834100367 $7.92 000001065468-3562507204
2019 5 FD04 07 E111 D 7356603D 040 11/27/2018 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR112I1061833009501 $1,038.49 000001065468-3562507204
2019 5 FD04 07 E111 D 7356603D 040 11/27/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112I1061833009501 $365.11 000001065468-3562507204
2019 5 FD04 07 E121 D 7356603D 040 11/27/2018 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR112I1061833009501 $75.10 000001065468-3562507204
2019 5 FD04 07 E121 D 7356603D 040 11/27/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112I1061833009501 $25.79 000001065468-3562507204
2019 5 FD04 07 E122 D 7356603D 040 11/27/2018 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR112I1061833009501 $866.19 000001065468-3562507204
2019 5 FD04 07 E122 D 7356603D 040 11/27/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112I1061833009501 $304.60 000001065468-3562507204
2019 5 FD04 07 E123 D 7356603D 040 11/27/2018 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR112I1061833009501 $150.96 000001065468-3562507204
2019 5 FD04 07 E123 D 7356603D 040 11/27/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112I1061833009501 $59.55 000001065468-3562507204
2019 5 FD04 07 E124 D 7356603D 040 11/27/2018 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR112I1061833009501 $0.36 000001065468-3562507204
2019 5 FD04 07 E124 D 7356603D 040 11/27/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112I1061833009501 $0.14 000001065468-3562507204
2019 5 FD04 07 E111 D 7356603D 040 11/13/2018 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR111I1061831308381 $604.01 000001065468-3562507204
2019 5 FD04 07 E111 D 7356603D 040 11/13/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111I1061831308381 $93.37 000001065468-3562507204
2019 5 FD04 07 E121 D 7356603D 040 11/13/2018 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR111I1061831308381 $44.82 000001065468-3562507204
2019 5 FD04 07 E121 D 7356603D 040 11/13/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111I1061831308381 $6.85 000001065468-3562507204
2019 5 FD04 07 E122 D 7356603D 040 11/13/2018 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR111I1061831308381 $503.92 000001065468-3562507204
2019 5 FD04 07 E122 D 7356603D 040 11/13/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111I1061831308381 $77.90 000001065468-3562507204
2019 5 FD04 07 E123 D 7356603D 040 11/13/2018 1330 CONSULT SPV-RDWAY PLANS-FINAL CA-XR111I1061831308381 $75.09 000001065468-3562507204
2019 5 FD04 07 E123 D 7356603D 040 11/13/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111I1061831308381 $13.44 000001065468-3562507204
2019 2 FD04 00 E229 D 7356603D 040 8/13/2018 1040 ROADWAY PLANS-PRELIMINARY-OFF IET-XE13A162518222002970 $33.39
2019 2 FD04 00 E111 D 7356603D 040 8/9/2018 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081I1061822001500 $135.99 000001063906-3562500636
2019 2 FD04 00 E111 D 7356603D 040 8/9/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081I1061822001500 $3.93 000001063906-3562500636
2019 2 FD04 00 E121 D 7356603D 040 8/9/2018 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081I1061822001500 $10.24 000001063906-3562500636
2019 2 FD04 00 E121 D 7356603D 040 8/9/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081I1061822001500 $0.30 000001063906-3562500636
2019 2 FD04 00 E122 D 7356603D 040 8/9/2018 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081I1061822001500 $113.65 000001063906-3562500636
2019 2 FD04 00 E122 D 7356603D 040 8/9/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081I1061822001500 $3.28 000001063906-3562500636
2019 2 FD04 00 E123 D 7356603D 040 8/9/2018 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081I1061822001500 $18.79 000001063906-3562500636
2019 2 FD04 00 E123 D 7356603D 040 8/9/2018 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081I1061822001500 $0.53 000001063906-3562500636