The Commonwealth pays employees on a semi-monthly basis with a scheduled pay day on the 15th and 30th of each month. The two monthly pay periods are from the 1st to the 15th of the month and the 16th through the last day of the month. Pay check distribution is delayed by one pay period to allow for system processing. For example work performed during the 1st to the 15th day of the month is paid to the employee on the 30th of the month. Accordingly the cost accounting charges for labor costs posting in eMARS to operating accounts and highway projects are also delayed by approximately one pay period.
A good rule of measure is that the cost accounting charges for the pay period ending on the 15th of the month will post to eMARS by the 25th and those for the pay period ending on the last day of the month will post to eMARS by the 10th of the following month.

x close panel
Detailed Project Expenditure Report
Total E-MARS Expenditures for 6977704R = $3,594,682.21
Click here for Labor Costs Information
Year Month PBU Charge District Object Phase Program Code County Date ACT Activity Name Trans ID Reference # Vendor Name Expenditure Line Description
2024 10 FD52 06 E111 R 6977704R 059 4/26/2024 2050 NEGOTIATIONS CA-XR042O1062411502727 $2,623.52 000001078425-3562506206
2024 10 FD52 06 E121 R 6977704R 059 4/26/2024 2050 NEGOTIATIONS CA-XR042O1062411502727 $198.65 000001078425-3562506206
2024 10 FD52 06 E122 R 6977704R 059 4/26/2024 2050 NEGOTIATIONS CA-XR042O1062411502727 $1,735.98 000001078425-3562506206
2024 10 FD52 06 E123 R 6977704R 059 4/26/2024 2050 NEGOTIATIONS CA-XR042O1062411502727 $443.75 000001078425-3562506206
2024 10 FD52 06 E124 R 6977704R 059 4/26/2024 2050 NEGOTIATIONS CA-XR042O1062411502727 $1.00 000001078425-3562506206
2024 10 FD52 06 E111 R 6977704R 059 4/10/2024 2050 NEGOTIATIONS CA-XR041O1062410001615 $2,619.97 000001078425-3562506208
2024 10 FD52 06 E111 R 6977704R 059 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001615 $147.52 000001078425-3562506206
2024 10 FD52 06 E121 R 6977704R 059 4/10/2024 2050 NEGOTIATIONS CA-XR041O1062410001615 $197.60 000001078425-3562506206
2024 10 FD52 06 E121 R 6977704R 059 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001615 $11.06 000001078425-3562506206
2024 10 FD52 06 E122 R 6977704R 059 4/10/2024 2050 NEGOTIATIONS CA-XR041O1062410001615 $1,733.63 000001078425-3562506206
2024 10 FD52 06 E122 R 6977704R 059 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001615 $97.61 000001078425-3562506208
2024 10 FD52 06 E123 R 6977704R 059 4/10/2024 2050 NEGOTIATIONS CA-XR041O1062410001615 $440.88 000001078425-3562506208
2024 10 FD52 06 E123 R 6977704R 059 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001615 $24.35 000001078425-3562506208
2024 9 FD52 06 E792 R 6977704R 059 3/26/2024 2650 RELOCATION PAYMENTS GAX-2400075990 Alex Stamper $7,200.00 Rent Supplement
2024 9 FD52 06 E792 R 6977704R 059 3/26/2024 2650 RELOCATION PAYMENTS GAX-2400075990 Alex Stamper $46,140.00 Last Resort Housing
2024 9 FD52 06 E111 R 6977704R 059 3/11/2024 2050 NEGOTIATIONS CA-XR031O1062406810062 $3,078.67 000001078425-3562506200
2024 9 FD52 06 E111 R 6977704R 059 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810062 $18.90 000001078425-3562506200
2024 9 FD52 06 E121 R 6977704R 059 3/11/2024 2050 NEGOTIATIONS CA-XR031O1062406810062 $232.90 000001078425-3562506200
2024 9 FD52 06 E121 R 6977704R 059 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810062 $1.42 000001078425-3562506200
2024 9 FD52 06 E122 R 6977704R 059 3/11/2024 2050 NEGOTIATIONS CA-XR031O1062406810062 $2,037.07 000001078425-3562506206
2024 9 FD52 06 E122 R 6977704R 059 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810062 $12.51 000001078425-3562506200
2024 9 FD52 06 E123 R 6977704R 059 3/11/2024 2050 NEGOTIATIONS CA-XR031O1062406810062 $494.79 000001078425-3562506206
2024 9 FD52 06 E123 R 6977704R 059 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810062 $2.10 000001078425-3562506200
2024 8 FD52 06 E111 R 6977704R 059 2/26/2024 6110 SUIT ADMINISTRATION CA-XR022O1062405408906 $84.40 000001086220-3560700500
2024 8 FD52 06 E111 R 6977704R 059 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408906 $8.44 000001086220-3560700500
2024 8 FD52 06 E121 R 6977704R 059 2/26/2024 6110 SUIT ADMINISTRATION CA-XR022O1062405408906 $5.71 000001086220-3560700500
2024 8 FD52 06 E121 R 6977704R 059 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408906 $0.57 000001086220-3560700500
2024 8 FD52 06 E122 R 6977704R 059 2/26/2024 6110 SUIT ADMINISTRATION CA-XR022O1062405408906 $55.85 000001086220-3560700500
2024 8 FD52 06 E111 R 6977704R 059 2/26/2024 2050 NEGOTIATIONS CA-XR022O1062405408884 $3,100.81 000001078425-3562506200
2024 8 FD52 06 E122 R 6977704R 059 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408906 $5.59 000001086220-3560700500
2024 8 FD52 06 E111 R 6977704R 059 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408884 $5.73 000001078425-3562506200
2024 8 FD52 06 E123 R 6977704R 059 2/26/2024 6110 SUIT ADMINISTRATION CA-XR022O1062405408906 $40.98 000001086220-3560700500
2024 8 FD52 06 E121 R 6977704R 059 2/26/2024 2050 NEGOTIATIONS CA-XR022O1062405408884 $234.58 000001078425-3562506206
2024 8 FD52 06 E123 R 6977704R 059 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408906 $4.07 000001086220-3560700500
2024 8 FD52 06 E121 R 6977704R 059 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408884 $0.43 000001078425-3562506200
2024 8 FD52 06 E124 R 6977704R 059 2/26/2024 6110 SUIT ADMINISTRATION CA-XR022O1062405408906 $0.05 000001086220-3560700500
2024 8 FD52 06 E122 R 6977704R 059 2/26/2024 2050 NEGOTIATIONS CA-XR022O1062405408884 $2,051.81 000001078425-3562506206
2024 8 FD52 06 E122 R 6977704R 059 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408884 $3.79 000001078425-3562506200
2024 8 FD52 06 E123 R 6977704R 059 2/26/2024 2050 NEGOTIATIONS CA-XR022O1062405408884 $497.26 000001078425-3562506206
2024 8 FD52 06 E123 R 6977704R 059 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408884 $0.64 000001078425-3562506200
2024 8 FD52 06 E124 R 6977704R 059 2/26/2024 2050 NEGOTIATIONS CA-XR022O1062405408884 $1.10 000001078425-3562506206
2024 8 FD52 06 E143 R 6977704R 059 2/19/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400158964 PON22200001652 H W Lochner Inc $31,144.00 Kenton Co 6-162.1
2024 8 FD52 06 E229 R 6977704R 059 2/14/2024 2050 NEGOTIATIONS IET-XE13A162524041020590 $4.05
2024 8 FD52 06 E111 R 6977704R 059 2/9/2024 2050 NEGOTIATIONS CA-XR021O1062403907653 $656.36 000001078425-3562506200
2024 8 FD52 06 E111 R 6977704R 059 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907653 $77.55 000001078425-3562506206
2024 8 FD52 06 E121 R 6977704R 059 2/9/2024 2050 NEGOTIATIONS CA-XR021O1062403907653 $49.49 000001078425-3562506206
2024 8 FD52 06 E121 R 6977704R 059 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907653 $5.87 000001078425-3562506200
2024 8 FD52 06 E122 R 6977704R 059 2/9/2024 2050 NEGOTIATIONS CA-XR021O1062403907653 $435.34 000001078425-3562506200
2024 8 FD52 06 E122 R 6977704R 059 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907653 $51.31 000001078425-3562506206
2024 8 FD52 06 E123 R 6977704R 059 2/9/2024 2050 NEGOTIATIONS CA-XR021O1062403907653 $86.37 000001078425-3562506200
2024 8 FD52 06 E123 R 6977704R 059 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907653 $12.71 000001078425-3562506206
2024 8 FD52 06 E111 R 6977704R 059 2/9/2024 6110 SUIT ADMINISTRATION CA-XR021O1062403907672 $265.95 000001086220-3560700500
2024 8 FD52 06 E121 R 6977704R 059 2/9/2024 6110 SUIT ADMINISTRATION CA-XR021O1062403907672 $18.01 000001086220-3560700500
2024 8 FD52 06 E122 R 6977704R 059 2/9/2024 6110 SUIT ADMINISTRATION CA-XR021O1062403907672 $175.98 000001086220-3560700500
2024 8 FD52 06 E123 R 6977704R 059 2/9/2024 6110 SUIT ADMINISTRATION CA-XR021O1062403907672 $129.05 000001086220-3560700500
2024 7 FD52 06 E111 R 6977704R 059 1/24/2024 6110 SUIT ADMINISTRATION CA-XR012O1062402306597 $253.20 000001086220-3560700500
2024 7 FD52 06 E111 R 6977704R 059 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306597 $94.95 000001086220-3560700500
2024 7 FD52 06 E121 R 6977704R 059 1/24/2024 6110 SUIT ADMINISTRATION CA-XR012O1062402306597 $17.15 000001086220-3560700500
2024 7 FD52 06 E121 R 6977704R 059 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306597 $6.43 000001086220-3560700500
2024 7 FD52 06 E122 R 6977704R 059 1/24/2024 6110 SUIT ADMINISTRATION CA-XR012O1062402306597 $167.54 000001086220-3560700500
2024 7 FD52 06 E122 R 6977704R 059 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306597 $62.83 000001086220-3560700500
2024 7 FD52 06 E123 R 6977704R 059 1/24/2024 6110 SUIT ADMINISTRATION CA-XR012O1062402306597 $123.14 000001086220-3560700500
2024 7 FD52 06 E123 R 6977704R 059 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306597 $45.80 000001086220-3560700500
2024 7 FD52 06 E124 R 6977704R 059 1/24/2024 6110 SUIT ADMINISTRATION CA-XR012O1062402306597 $0.15 000001086220-3560700500
2024 7 FD52 06 E124 R 6977704R 059 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306597 $0.06 000001086220-3560700500
2024 7 FD52 06 E365 R 6977704R 059 1/22/2024 2640 RIGHT OF WAY PAYMENTS GAX-2400057034 Fox, Wood & Wood $50.00 Recording Fee Reimbursement
2024 7 FD52 06 E365 R 6977704R 059 1/22/2024 2640 RIGHT OF WAY PAYMENTS GAX-2400057044 Fox, Wood & Wood $51.50 Recording Fee Reimbursement
2024 7 FD52 06 E365 R 6977704R 059 1/22/2024 2640 RIGHT OF WAY PAYMENTS GAX-2400057047 Fox, Wood & Wood $57.50 Recording Fee Reimbursement
2024 7 FD52 06 E365 R 6977704R 059 1/17/2024 2640 RIGHT OF WAY PAYMENTS GAX-2400056401 Fox, Wood & Wood $50.00 Recording Fee Reimbursement
2024 7 FD52 06 E111 R 6977704R 059 1/11/2024 2050 NEGOTIATIONS CA-XR122N1062335504595 $231.89 000001078425-3562506208
2024 7 FD52 06 E111 R 6977704R 059 1/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504595 $32.02 000001078425-3562506208
2024 7 FD52 06 E121 R 6977704R 059 1/11/2024 2050 NEGOTIATIONS CA-XR122N1062335504595 $16.88 000001078425-3562506208
2024 7 FD52 06 E121 R 6977704R 059 1/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504595 $2.33 000001078425-3562506208
2024 7 FD52 06 E122 R 6977704R 059 1/11/2024 2050 NEGOTIATIONS CA-XR122N1062335504595 $153.55 000001078425-3562506208
2024 7 FD52 06 E122 R 6977704R 059 1/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504595 $21.19 000001078425-3562506208
2024 7 FD52 06 E123 R 6977704R 059 1/11/2024 2050 NEGOTIATIONS CA-XR122N1062335504595 $30.05 000001078425-3562506208
2024 7 FD52 06 E123 R 6977704R 059 1/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504595 $4.10 000001078425-3562506208
2024 7 FD52 06 E124 R 6977704R 059 1/11/2024 2050 NEGOTIATIONS CA-XR122N1062335504595 $0.06 000001078425-3562506208
2024 7 FD52 06 E124 R 6977704R 059 1/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504595 $0.01 000001078425-3562506208
2024 7 FD52 06 E111 R 6977704R 059 1/8/2024 6110 SUIT ADMINISTRATION CA-XR011O1062400505726 $185.68 000001086220-3560700500
2024 7 FD52 06 E111 R 6977704R 059 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505726 $123.71 000001086220-3560700500
2024 7 FD52 06 E121 R 6977704R 059 1/8/2024 6110 SUIT ADMINISTRATION CA-XR011O1062400505726 $12.57 000001086220-3560700500
2024 7 FD52 06 E121 R 6977704R 059 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505726 $8.38 000001086220-3560700500
2024 7 FD52 06 E122 R 6977704R 059 1/8/2024 6110 SUIT ADMINISTRATION CA-XR011O1062400505726 $122.87 000001086220-3560700500
2024 7 FD52 06 E122 R 6977704R 059 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505726 $81.86 000001086220-3560700500
2024 7 FD52 06 E123 R 6977704R 059 1/8/2024 6110 SUIT ADMINISTRATION CA-XR011O1062400505726 $90.46 000001086220-3560700500
2024 7 FD52 06 E123 R 6977704R 059 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505726 $59.67 000001086220-3560700500
2024 7 FD52 06 E111 R 6977704R 059 1/3/2024 6110 SUIT ADMINISTRATION CA-XR121N1062334203630 $400.51 000001086220-3560700500
2024 6 FD52 06 E111 R 6977704R 059 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504623 $56.12 000001086220-3560700500
2024 6 FD52 06 E121 R 6977704R 059 12/22/2023 6110 SUIT ADMINISTRATION CA-XR122N1062335504623 $17.15 000001086220-3560700500
2024 6 FD52 06 E121 R 6977704R 059 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504623 $3.80 000001086220-3560700500
2024 6 FD52 06 E122 R 6977704R 059 12/22/2023 6110 SUIT ADMINISTRATION CA-XR122N1062335504623 $167.83 000001086220-3560700500
2024 6 FD52 06 E122 R 6977704R 059 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504623 $37.14 000001086220-3560700500
2024 6 FD52 06 E123 R 6977704R 059 12/22/2023 6110 SUIT ADMINISTRATION CA-XR122N1062335504623 $102.56 000001086220-3560700500
2024 6 FD52 06 E123 R 6977704R 059 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504623 $22.50 000001086220-3560700500
2024 6 FD52 06 E124 R 6977704R 059 12/22/2023 6110 SUIT ADMINISTRATION CA-XR122N1062335504623 $0.15 000001086220-3560700500
2024 6 FD52 06 E124 R 6977704R 059 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504623 $0.04 000001086220-3560700500
2024 6 FD52 06 E111 R 6977704R 059 12/22/2023 6110 SUIT ADMINISTRATION CA-XR122N1062335504622 $253.30 000001086220-3560700500
2024 6 FD52 06 E111 R 6977704R 059 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203631 $125.16 000001086220-3560700500
2024 6 FD52 06 E121 R 6977704R 059 12/11/2023 6110 SUIT ADMINISTRATION CA-XR121N1062334203631 $27.59 000001086220-3560700500
2024 6 FD52 06 E121 R 6977704R 059 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203631 $8.65 000001086220-3560700500
2024 6 FD52 06 E122 R 6977704R 059 12/11/2023 6110 SUIT ADMINISTRATION CA-XR121N1062334203631 $265.05 000001086220-3560700500
2024 6 FD52 06 E122 R 6977704R 059 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203631 $82.82 000001086220-3560700500
2024 6 FD52 06 E123 R 6977704R 059 12/11/2023 6110 SUIT ADMINISTRATION CA-XR121N1062334203631 $132.33 000001086220-3560700500
2024 6 FD52 06 E123 R 6977704R 059 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203631 $40.00 000001086220-3560700500
2024 5 FD52 06 E111 R 6977704R 059 11/22/2023 6110 SUIT ADMINISTRATION CA-XR112N1062332502526 $784.00 000001086220-3560700500
2024 5 FD52 06 E111 R 6977704R 059 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502526 $180.23 000001086220-3560700500
2024 5 FD52 06 E121 R 6977704R 059 11/22/2023 6110 SUIT ADMINISTRATION CA-XR112N1062332502526 $56.65 000001086220-3560700500
2024 5 FD52 06 E121 R 6977704R 059 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502526 $13.03 000001086220-3560700500
2024 5 FD52 06 E122 R 6977704R 059 11/22/2023 6110 SUIT ADMINISTRATION CA-XR112N1062332502526 $518.82 000001086220-3560700500
2024 5 FD52 06 E122 R 6977704R 059 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502526 $119.25 000001086220-3560700500
2024 5 FD52 06 E123 R 6977704R 059 11/22/2023 6110 SUIT ADMINISTRATION CA-XR112N1062332502526 $153.60 000001086220-3560700500
2024 5 FD52 06 E123 R 6977704R 059 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502526 $34.68 000001086220-3560700500
2024 5 FD52 06 E124 R 6977704R 059 11/22/2023 6110 SUIT ADMINISTRATION CA-XR112N1062332502526 $0.21 000001086220-3560700500
2024 5 FD52 06 E124 R 6977704R 059 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502526 $0.04 000001086220-3560700500
2024 5 FD52 06 E143 R 6977704R 059 11/20/2023 0510 ENV STUDIES-UST/HZM PRC-2400100199 PON22200004658 LINEBACH FUNKHOUSER INC $2,463.00 Letter Agreement 61-CHC
2024 5 FD52 06 E121 R 6977704R 059 11/9/2023 6110 SUIT ADMINISTRATION CA-XR111N1062331201490 $21.62 000001086220-3560700500
2024 5 FD52 06 E121 R 6977704R 059 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201490 $0.74 000001086220-3560700500
2024 5 FD52 06 E122 R 6977704R 059 11/9/2023 6110 SUIT ADMINISTRATION CA-XR111N1062331201490 $211.04 000001086220-3560700500
2024 5 FD52 06 E122 R 6977704R 059 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201490 $7.29 000001086220-3560700500
2024 5 FD52 06 E123 R 6977704R 059 11/9/2023 6110 SUIT ADMINISTRATION CA-XR111N1062331201490 $128.82 000001086220-3560700500
2024 5 FD52 06 E123 R 6977704R 059 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201490 $4.42 000001086220-3560700500
2024 5 FD52 00 E111 R 6977704R 059 11/9/2023 0010 ENV STUDIES-UST/HZM CA-XR111N1062331201473 $638.24 000001081050-3562500061
2024 5 FD52 00 E121 R 6977704R 059 11/9/2023 0010 ENV STUDIES-UST/HZM CA-XR111N1062331201473 $45.41 000001081050-3562500061
2024 5 FD52 00 E122 R 6977704R 059 11/9/2023 0010 ENV STUDIES-UST/HZM CA-XR111N1062331201473 $422.32 000001081050-3562500061
2024 5 FD52 00 E123 R 6977704R 059 11/9/2023 0010 ENV STUDIES-UST/HZM CA-XR111N1062331201473 $124.35 000001081050-3562500061
2024 5 FD52 06 E111 R 6977704R 059 11/9/2023 6110 SUIT ADMINISTRATION CA-XR111N1062331201490 $319.10 000001086220-3560700500
2024 5 FD52 06 E111 R 6977704R 059 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201490 $11.02 000001086220-3560700500
2024 5 FD52 06 E365 R 6977704R 059 11/8/2023 2640 RIGHT OF WAY PAYMENTS GAX-2400037687 BEN HEUSER $1,714.62 Tax Reimbursements
2024 4 FD52 06 E365 R 6977704R 059 10/30/2023 2640 RIGHT OF WAY PAYMENTS GAX-2400033862 NICOLE E CARNEY $672.46 Tax Reimbursement
2024 4 FD52 06 E111 R 6977704R 059 10/9/2023 6110 SUIT ADMINISTRATION CA-XR101N1062328009704 $313.33 000001086220-3560700500
2024 4 FD52 06 E121 R 6977704R 059 10/9/2023 6110 SUIT ADMINISTRATION CA-XR101N1062328009704 $21.22 000001086220-3560700500
2024 4 FD52 06 E122 R 6977704R 059 10/9/2023 6110 SUIT ADMINISTRATION CA-XR101N1062328009704 $207.33 000001086220-3560700500
2024 4 FD52 06 E123 R 6977704R 059 10/9/2023 6110 SUIT ADMINISTRATION CA-XR101N1062328009704 $126.51 000001086220-3560700500
2024 3 FD52 00 E111 R 6977704R 059 9/29/2023 0010 ENV STUDIES-UST/HZM CA-XR092N1062327208406 $198.93 000001081050-3562500061
2024 3 FD52 00 E111 R 6977704R 059 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208406 $19.89 000001081050-3562500061
2024 3 FD52 00 E121 R 6977704R 059 9/29/2023 0010 ENV STUDIES-UST/HZM CA-XR092N1062327208406 $14.15 000001081050-3562500061
2024 3 FD52 00 E121 R 6977704R 059 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208406 $1.42 000001081050-3562500061
2024 3 FD52 00 E122 R 6977704R 059 9/29/2023 0010 ENV STUDIES-UST/HZM CA-XR092N1062327208406 $131.63 000001081050-3562500061
2024 3 FD52 00 E122 R 6977704R 059 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208406 $13.16 000001081050-3562500061
2024 3 FD52 00 E123 R 6977704R 059 9/29/2023 0010 ENV STUDIES-UST/HZM CA-XR092N1062327208406 $38.79 000001081050-3562500061
2024 3 FD52 00 E123 R 6977704R 059 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208406 $3.84 000001081050-3562500061
2024 3 FD52 00 E124 R 6977704R 059 9/29/2023 0010 ENV STUDIES-UST/HZM CA-XR092N1062327208406 $0.06 000001081050-3562500061
2024 3 FD52 00 E124 R 6977704R 059 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208406 $0.01 000001081050-3562500061
2024 3 FD52 06 E111 R 6977704R 059 9/29/2023 6110 SUIT ADMINISTRATION CA-XR092N1062327208425 $250.60 000001086220-3560700500
2024 3 FD52 06 E111 R 6977704R 059 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208425 $23.50 000001086220-3560700500
2024 3 FD52 06 E121 R 6977704R 059 9/29/2023 6110 SUIT ADMINISTRATION CA-XR092N1062327208425 $16.96 000001086220-3560700500
2024 3 FD52 06 E121 R 6977704R 059 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208425 $1.59 000001086220-3560700500
2024 3 FD52 06 E122 R 6977704R 059 9/29/2023 6110 SUIT ADMINISTRATION CA-XR092N1062327208425 $165.80 000001086220-3560700500
2024 3 FD52 06 E122 R 6977704R 059 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208425 $15.55 000001086220-3560700500
2024 3 FD52 06 E123 R 6977704R 059 9/29/2023 6110 SUIT ADMINISTRATION CA-XR092N1062327208425 $101.24 000001086220-3560700500
2024 3 FD52 06 E123 R 6977704R 059 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208425 $9.42 000001086220-3560700500
2024 3 FD52 06 E124 R 6977704R 059 9/29/2023 6110 SUIT ADMINISTRATION CA-XR092N1062327208425 $0.13 000001086220-3560700500
2024 3 FD52 06 E124 R 6977704R 059 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208425 $0.01 000001086220-3560700500
2024 3 FD52 00 E111 R 6977704R 059 9/28/2023 0010 ENV STUDIES-UST/HZM CA-XR092N1062326507055 ($198.93) 000001081050-3562500061
2024 3 FD52 00 E111 R 6977704R 059 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507055 ($19.89) 000001081050-3562500061
2024 3 FD52 00 E121 R 6977704R 059 9/28/2023 0010 ENV STUDIES-UST/HZM CA-XR092N1062326507055 ($14.15) 000001081050-3562500061
2024 3 FD52 00 E121 R 6977704R 059 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507055 ($1.42) 000001081050-3562500061
2024 3 FD52 00 E122 R 6977704R 059 9/28/2023 0010 ENV STUDIES-UST/HZM CA-XR092N1062326507055 ($131.63) 000001081050-3562500061
2024 3 FD52 00 E122 R 6977704R 059 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507055 ($13.16) 000001081050-3562500061
2024 3 FD52 00 E123 R 6977704R 059 9/28/2023 0010 ENV STUDIES-UST/HZM CA-XR092N1062326507055 ($38.79) 000001081050-3562500061
2024 3 FD52 00 E123 R 6977704R 059 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507055 ($3.84) 000001081050-3562500061
2024 3 FD52 00 E124 R 6977704R 059 9/28/2023 0010 ENV STUDIES-UST/HZM CA-XR092N1062326507055 ($0.06) 000001081050-3562500061
2024 3 FD52 00 E124 R 6977704R 059 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507055 ($0.01) 000001081050-3562500061
2024 3 FD52 06 E111 R 6977704R 059 9/28/2023 6110 SUIT ADMINISTRATION CA-XR092N1062326507074 ($250.60) 000001086220-3560700500
2024 3 FD52 06 E111 R 6977704R 059 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507074 ($23.50) 000001086220-3560700500
2024 3 FD52 06 E121 R 6977704R 059 9/28/2023 6110 SUIT ADMINISTRATION CA-XR092N1062326507074 ($16.96) 000001086220-3560700500
2024 3 FD52 06 E121 R 6977704R 059 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507074 ($1.59) 000001086220-3560700500
2024 3 FD52 06 E122 R 6977704R 059 9/28/2023 6110 SUIT ADMINISTRATION CA-XR092N1062326507074 ($165.80) 000001086220-3560700500
2024 3 FD52 06 E122 R 6977704R 059 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507074 ($15.55) 000001086220-3560700500
2024 3 FD52 06 E123 R 6977704R 059 9/28/2023 6110 SUIT ADMINISTRATION CA-XR092N1062326507074 ($101.24) 000001086220-3560700500
2024 3 FD52 06 E123 R 6977704R 059 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507074 ($9.42) 000001086220-3560700500
2024 3 FD52 06 E124 R 6977704R 059 9/28/2023 6110 SUIT ADMINISTRATION CA-XR092N1062326507074 ($0.13) 000001086220-3560700500
2024 3 FD52 06 E124 R 6977704R 059 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507074 ($0.01) 000001086220-3560700500
2024 3 FD52 00 E111 R 6977704R 059 9/25/2023 0010 ENV STUDIES-UST/HZM CA-XR092N1062326507055 $198.93 000001081050-3562500061
2024 3 FD52 00 E111 R 6977704R 059 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507055 $19.89 000001081050-3562500061
2024 3 FD52 00 E121 R 6977704R 059 9/25/2023 0010 ENV STUDIES-UST/HZM CA-XR092N1062326507055 $14.15 000001081050-3562500061
2024 3 FD52 00 E121 R 6977704R 059 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507055 $1.42 000001081050-3562500061
2024 3 FD52 00 E122 R 6977704R 059 9/25/2023 0010 ENV STUDIES-UST/HZM CA-XR092N1062326507055 $131.63 000001081050-3562500061
2024 3 FD52 00 E122 R 6977704R 059 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507055 $13.16 000001081050-3562500061
2024 3 FD52 00 E123 R 6977704R 059 9/25/2023 0010 ENV STUDIES-UST/HZM CA-XR092N1062326507055 $38.79 000001081050-3562500061
2024 3 FD52 00 E123 R 6977704R 059 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507055 $3.84 000001081050-3562500061
2024 3 FD52 00 E124 R 6977704R 059 9/25/2023 0010 ENV STUDIES-UST/HZM CA-XR092N1062326507055 $0.06 000001081050-3562500061
2024 3 FD52 00 E124 R 6977704R 059 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507055 $0.01 000001081050-3562500061
2024 3 FD52 06 E111 R 6977704R 059 9/25/2023 6110 SUIT ADMINISTRATION CA-XR092N1062326507074 $250.60 000001086220-3560700500
2024 3 FD52 06 E111 R 6977704R 059 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507074 $23.50 000001086220-3560700500
2024 3 FD52 06 E121 R 6977704R 059 9/25/2023 6110 SUIT ADMINISTRATION CA-XR092N1062326507074 $16.96 000001086220-3560700500
2024 3 FD52 06 E121 R 6977704R 059 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507074 $1.59 000001086220-3560700500
2024 3 FD52 06 E122 R 6977704R 059 9/25/2023 6110 SUIT ADMINISTRATION CA-XR092N1062326507074 $165.80 000001086220-3560700500
2024 3 FD52 06 E122 R 6977704R 059 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507074 $15.55 000001086220-3560700500
2024 3 FD52 06 E123 R 6977704R 059 9/25/2023 6110 SUIT ADMINISTRATION CA-XR092N1062326507074 $101.24 000001086220-3560700500
2024 3 FD52 06 E123 R 6977704R 059 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507074 $9.42 000001086220-3560700500
2024 3 FD52 06 E124 R 6977704R 059 9/25/2023 6110 SUIT ADMINISTRATION CA-XR092N1062326507074 $0.13 000001086220-3560700500
2024 3 FD52 06 E124 R 6977704R 059 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507074 $0.01 000001086220-3560700500
2024 3 FD52 06 E111 R 6977704R 059 9/11/2023 6110 SUIT ADMINISTRATION CA-XR091N1062325106105 $338.44 000001086220-3560700500
2024 3 FD52 06 E111 R 6977704R 059 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106105 $15.67 000001086220-3560700500
2024 3 FD52 06 E121 R 6977704R 059 9/11/2023 6110 SUIT ADMINISTRATION CA-XR091N1062325106105 $22.93 000001086220-3560700500
2024 3 FD52 06 E121 R 6977704R 059 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106105 $1.06 000001086220-3560700500
2024 3 FD52 06 E122 R 6977704R 059 9/11/2023 6110 SUIT ADMINISTRATION CA-XR091N1062325106105 $223.97 000001086220-3560700500
2024 3 FD52 06 E122 R 6977704R 059 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106105 $10.37 000001086220-3560700500
2024 3 FD52 06 E123 R 6977704R 059 9/11/2023 6110 SUIT ADMINISTRATION CA-XR091N1062325106105 $136.71 000001086220-3560700500
2024 3 FD52 06 E123 R 6977704R 059 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106105 $6.28 000001086220-3560700500
2024 3 FD52 06 E305 R 6977704R 059 9/8/2023 2640 RIGHT OF WAY PAYMENTS IET-1252400000147 $5.00 August Billing Period
2024 2 FD52 06 E111 R 6977704R 059 8/24/2023 6110 SUIT ADMINISTRATION CA-XR082N1062323504954 $337.60 000001086220-3560700500
2024 2 FD52 06 E121 R 6977704R 059 8/24/2023 6110 SUIT ADMINISTRATION CA-XR082N1062323504954 $22.86 000001086220-3560700500
2024 2 FD52 06 E122 R 6977704R 059 8/24/2023 6110 SUIT ADMINISTRATION CA-XR082N1062323504954 $223.39 000001086220-3560700500
2024 2 FD52 06 E123 R 6977704R 059 8/24/2023 6110 SUIT ADMINISTRATION CA-XR082N1062323504954 $136.30 000001086220-3560700500
2024 2 FD52 06 E124 R 6977704R 059 8/24/2023 6110 SUIT ADMINISTRATION CA-XR082N1062323504954 $0.19 000001086220-3560700500
2024 2 FD52 06 E375 R 6977704R 059 8/21/2023 6110 SUIT ADMINISTRATION GAX-2400014751 KENTON COUNTY CIRCUIT CLERK $1,050.00 Com vs Helfst condemnation suit
2024 2 FD52 06 E365 R 6977704R 059 8/14/2023 2640 RIGHT OF WAY PAYMENTS GAX-2400012934 Fox, Wood & Wood $200.85 Day Pass Reimbursement to access deed portal
2024 2 FD52 06 E111 R 6977704R 059 8/9/2023 6110 SUIT ADMINISTRATION CA-XR081N1062322003870 $474.75 000001086220-3560700500
2024 2 FD52 06 E121 R 6977704R 059 8/9/2023 6110 SUIT ADMINISTRATION CA-XR081N1062322003870 $32.16 000001086220-3560700500
2024 2 FD52 06 E122 R 6977704R 059 8/9/2023 6110 SUIT ADMINISTRATION CA-XR081N1062322003870 $314.14 000001086220-3560700500
2024 2 FD52 06 E123 R 6977704R 059 8/9/2023 6110 SUIT ADMINISTRATION CA-XR081N1062322003870 $191.67 000001086220-3560700500
2024 2 FD52 06 E143 R 6977704R 059 8/7/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400024258 PON22200001652 H W Lochner Inc $6,090.13 Kenton Co 6-162.1
2024 2 FD52 06 E792 R 6977704R 059 8/7/2023 2650 RELOCATION PAYMENTS GAX-2400010543 Alex Stamper $2,500.00 Move Expense
2024 2 FD52 06 E796 R 6977704R 059 8/7/2023 2640 RIGHT OF WAY PAYMENTS CR5-RD24-0137-625 KENTON COUNTY CIRCUIT CLERK ($13,000.00)
2024 1 FD52 06 E796 R 6977704R 059 7/31/2023 2640 RIGHT OF WAY PAYMENTS GAX-2400008495 KENTON COUNTY CIRCUIT CLERK $12,000.00 Commissioners Award
2024 1 FD52 06 E365 R 6977704R 059 7/26/2023 2640 RIGHT OF WAY PAYMENTS GAX-2400007599 Fox, Wood & Wood $120.50 Recording Fee Reimbursement
2024 1 FD52 06 E111 R 6977704R 059 7/24/2023 6110 SUIT ADMINISTRATION CA-XR072N1062320202694 $278.57 000001086220-3560700500
2024 1 FD52 06 E111 R 6977704R 059 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202694 $119.30 000001086220-3560700500
2024 1 FD52 06 E121 R 6977704R 059 7/24/2023 6110 SUIT ADMINISTRATION CA-XR072N1062320202694 $18.87 000001086220-3560700500
2024 1 FD52 06 E121 R 6977704R 059 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202694 $8.08 000001086220-3560700500
2024 1 FD52 06 E122 R 6977704R 059 7/24/2023 6110 SUIT ADMINISTRATION CA-XR072N1062320202694 $184.30 000001086220-3560700500
2024 1 FD52 06 E122 R 6977704R 059 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202694 $78.94 000001086220-3560700500
2024 1 FD52 06 E123 R 6977704R 059 7/24/2023 6110 SUIT ADMINISTRATION CA-XR072N1062320202694 $112.80 000001086220-3560700500
2024 1 FD52 06 E123 R 6977704R 059 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202694 $47.82 000001086220-3560700500
2024 1 FD52 06 E124 R 6977704R 059 7/24/2023 6110 SUIT ADMINISTRATION CA-XR072N1062320202694 $0.16 000001086220-3560700500
2024 1 FD52 06 E124 R 6977704R 059 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202694 $0.07 000001086220-3560700500
2024 1 FD52 06 E365 R 6977704R 059 7/11/2023 2640 RIGHT OF WAY PAYMENTS GAX-2400002652 Fox, Wood & Wood $64.50 Recording Fee Reimbursement
2024 1 FD52 06 E111 R 6977704R 059 7/11/2023 6110 SUIT ADMINISTRATION CA-XR071N1062319101558 $179.15 000001086220-3560700500
2024 1 FD52 06 E111 R 6977704R 059 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101558 $149.29 000001086220-3560700500
2024 1 FD52 06 E121 R 6977704R 059 7/11/2023 6110 SUIT ADMINISTRATION CA-XR071N1062319101558 $12.04 000001086220-3560700500
2024 1 FD52 06 E121 R 6977704R 059 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101558 $10.03 000001086220-3560700500
2024 1 FD52 06 E122 R 6977704R 059 7/11/2023 6110 SUIT ADMINISTRATION CA-XR071N1062319101558 $139.74 000001086220-3560700500
2024 1 FD52 06 E122 R 6977704R 059 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101558 $116.45 000001086220-3560700500
2024 1 FD52 06 E123 R 6977704R 059 7/11/2023 6110 SUIT ADMINISTRATION CA-XR071N1062319101558 $77.13 000001086220-3560700500
2024 1 FD52 06 E123 R 6977704R 059 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101558 $63.43 000001086220-3560700500
2024 1 FD52 06 E375 R 6977704R 059 7/7/2023 6110 SUIT ADMINISTRATION GAX-2400001412 KENTON COUNTY CIRCUIT CLERK $1,050.00 Com vs Estate of Alberta Borne condemnation suit
2023 12 FD52 06 E111 R 6977704R 059 6/26/2023 6110 SUIT ADMINISTRATION CA-XR062N1062317400452 $398.11 000001086220-3560700500
2023 12 FD52 06 E121 R 6977704R 059 6/26/2023 6110 SUIT ADMINISTRATION CA-XR062N1062317400452 $26.75 000001086220-3560700500
2023 12 FD52 06 E122 R 6977704R 059 6/26/2023 6110 SUIT ADMINISTRATION CA-XR062N1062317400452 $310.53 000001086220-3560700500
2023 12 FD52 06 E123 R 6977704R 059 6/26/2023 6110 SUIT ADMINISTRATION CA-XR062N1062317400452 $170.38 000001086220-3560700500
2023 12 FD52 06 E124 R 6977704R 059 6/26/2023 6110 SUIT ADMINISTRATION CA-XR062N1062317400452 $0.24 000001086220-3560700500
2023 12 FD52 06 E111 R 6977704R 059 6/8/2023 6110 SUIT ADMINISTRATION CA-XR061N1062315810157 $464.77 000001086220-3560700500
2023 12 FD52 06 E111 R 6977704R 059 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810157 $65.38 000001086220-3560700500
2023 12 FD52 06 E121 R 6977704R 059 6/8/2023 6110 SUIT ADMINISTRATION CA-XR061N1062315810157 $32.07 000001086220-3560700500
2023 12 FD52 06 E121 R 6977704R 059 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810157 $4.50 000001086220-3560700500
2023 12 FD52 06 E122 R 6977704R 059 6/8/2023 6110 SUIT ADMINISTRATION CA-XR061N1062315810157 $362.46 000001086220-3560700500
2023 12 FD52 06 E122 R 6977704R 059 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810157 $51.00 000001086220-3560700500
2023 12 FD52 06 E123 R 6977704R 059 6/8/2023 6110 SUIT ADMINISTRATION CA-XR061N1062315810157 $144.62 000001086220-3560700500
2023 12 FD52 06 E123 R 6977704R 059 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810157 $20.62 000001086220-3560700500
2023 12 FD52 06 E796 R 6977704R 059 6/7/2023 2640 RIGHT OF WAY PAYMENTS GAX-2300097655 KENTON COUNTY CIRCUIT CLERK $30,000.00 Commissioners Award
2023 12 FD52 06 E792 R 6977704R 059 6/1/2023 2650 RELOCATION PAYMENTS GAX-2300095253 MICHAEL PHILLIPS $1,200.00 Move Expense
2023 10 FD52 06 E792 R 6977704R 059 4/27/2023 2650 RELOCATION PAYMENTS GAX-2300085560 BEN HEUSER $16,431.30 Reestablishment
2023 10 FD52 06 E796 R 6977704R 059 4/21/2023 2640 RIGHT OF WAY PAYMENTS GAX-2300084045 KENTON COUNTY CIRCUIT CLERK $13,000.00 Commissioners Award
2023 10 FD52 06 E143 R 6977704R 059 4/18/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300198221 PON22200001652 H W Lochner Inc $2,842.68 Kenton Co 6-162.1
2023 10 FD52 06 E365 R 6977704R 059 4/12/2023 2640 RIGHT OF WAY PAYMENTS GAX-2300081092 Fox, Wood & Wood $106.50 Recording Fee Reimbursement
2023 10 FD52 06 E365 R 6977704R 059 4/11/2023 2640 RIGHT OF WAY PAYMENTS GAX-2300080155 Fox, Wood & Wood $58.00 Recording Fee Reimbursement
2023 10 FD52 06 E365 R 6977704R 059 4/11/2023 2640 RIGHT OF WAY PAYMENTS GAX-2300080160 Fox, Wood & Wood $50.00 Recording Fee Reimbursement
2023 10 FD52 06 E365 R 6977704R 059 4/10/2023 2640 RIGHT OF WAY PAYMENTS GAX-2300080159 Fox, Wood & Wood $53.50 Recording Fee Reimbursement
2023 10 FD52 06 E365 R 6977704R 059 4/10/2023 2640 RIGHT OF WAY PAYMENTS GAX-2300080164 Fox, Wood & Wood $55.00 Recording Fee Reimbursement
2023 9 FD52 06 E792 R 6977704R 059 3/31/2023 2650 RELOCATION PAYMENTS GAX-2300077637 COLEMAN WORLD GROUP LLC $28,219.72 Move Expense
2023 9 FD52 06 E375 R 6977704R 059 3/28/2023 6110 SUIT ADMINISTRATION GAX-2300075631 KENTON COUNTY SHERIFF $60.00 Com v Estate of Albera Borne new condemnation suit
2023 9 FD52 06 E375 R 6977704R 059 3/28/2023 6110 SUIT ADMINISTRATION GAX-2300075627 KENTON COUNTY CLERK $46.00 Com v Estate of Alberta Borne condemnation suit
2023 9 FD52 06 E375 R 6977704R 059 3/28/2023 6110 SUIT ADMINISTRATION GAX-2300075623 KENTON COUNTY CIRCUIT CLERK $198.00 com v Estate of Alberta Borne condemnation suit
2023 9 FD52 06 E375 R 6977704R 059 3/28/2023 6110 SUIT ADMINISTRATION GAX-2300075626 KENTON COUNTY CIRCUIT CLERK $25.02 com v Estate of Alberta Borne condemnation suit
2023 9 FD52 06 E111 R 6977704R 059 3/27/2023 2050 NEGOTIATIONS CA-XR032N1062308304632 $1,800.01 000001078425-3562506206
2023 9 FD52 06 E121 R 6977704R 059 3/27/2023 2050 NEGOTIATIONS CA-XR032N1062308304632 $136.22 000001078425-3562506206
2023 9 FD52 06 E122 R 6977704R 059 3/27/2023 2050 NEGOTIATIONS CA-XR032N1062308304632 $1,404.01 000001078425-3562506206
2023 9 FD52 06 E123 R 6977704R 059 3/27/2023 2050 NEGOTIATIONS CA-XR032N1062308304632 $279.91 000001078425-3562506206
2023 9 FD52 06 E124 R 6977704R 059 3/27/2023 2050 NEGOTIATIONS CA-XR032N1062308304632 $0.73 000001078425-3562506206
2023 9 FD52 06 E121 R 6977704R 059 3/9/2023 2050 NEGOTIATIONS CA-XR031N1062306703652 $187.29 000001078425-3562506206
2023 9 FD52 06 E122 R 6977704R 059 3/9/2023 2050 NEGOTIATIONS CA-XR031N1062306703652 $1,930.51 000001078425-3562506206
2023 9 FD52 06 E123 R 6977704R 059 3/9/2023 2050 NEGOTIATIONS CA-XR031N1062306703652 $384.88 000001078425-3562506206
2023 9 FD52 06 E111 R 6977704R 059 3/9/2023 2050 NEGOTIATIONS CA-XR031N1062306703651 $2,475.01 000001078425-3562506206
2023 8 FD52 06 E365 R 6977704R 059 2/28/2023 2640 RIGHT OF WAY PAYMENTS GAX-2300068106 Fox, Wood & Wood $540.00 Recording Fee Reimbursement
2023 8 FD52 06 E111 R 6977704R 059 2/23/2023 2050 NEGOTIATIONS CA-XR022N1062305302434 $2,475.01 000001078425-3562506206
2023 8 FD52 06 E121 R 6977704R 059 2/23/2023 2050 NEGOTIATIONS CA-XR022N1062305302434 $187.29 000001078425-3562506206
2023 8 FD52 06 E122 R 6977704R 059 2/23/2023 2050 NEGOTIATIONS CA-XR022N1062305302434 $1,930.51 000001078425-3562506206
2023 8 FD52 06 E123 R 6977704R 059 2/23/2023 2050 NEGOTIATIONS CA-XR022N1062305302434 $384.88 000001078425-3562506206
2023 8 FD52 06 E124 R 6977704R 059 2/23/2023 2050 NEGOTIATIONS CA-XR022N1062305302434 $1.00 000001078425-3562506206
2023 8 FD52 06 E792 R 6977704R 059 2/22/2023 2650 RELOCATION PAYMENTS GAX-2300066660 Michael Brooks $2,900.00 Move Expense
2023 8 FD52 06 E143 R 6977704R 059 2/21/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300157707 PON22200001652 H W Lochner Inc $32,622.00 Kenton Co 6-162.1
2023 8 FD52 06 E143 R 6977704R 059 2/21/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300158119 PON22200001652 H W Lochner Inc $39,998.00 Kenton Co 6-162.1
2023 8 FD52 06 E365 R 6977704R 059 2/21/2023 2640 RIGHT OF WAY PAYMENTS GAX-2300066263 Fox, Wood & Wood $280.00 Recording Fee Reimbursements
2023 8 FD52 06 E365 R 6977704R 059 2/21/2023 2640 RIGHT OF WAY PAYMENTS GAX-2300066383 DAVID JACKSON $238.18 Tax Reimbursement
2023 8 FD52 06 E792 R 6977704R 059 2/15/2023 2650 RELOCATION PAYMENTS GAX-2300064733 Shahrzad Ansari-Koenig $4,208.00 Incidental Expense
2023 8 FD52 06 E111 R 6977704R 059 2/9/2023 2050 NEGOTIATIONS CA-XR021N1062303901406 $2,268.76 000001078425-3562506206
2023 8 FD52 06 E111 R 6977704R 059 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901406 $206.25 000001078425-3562506206
2023 8 FD52 06 E121 R 6977704R 059 2/9/2023 2050 NEGOTIATIONS CA-XR021N1062303901406 $171.68 000001078425-3562506206
2023 8 FD52 06 E121 R 6977704R 059 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901406 $15.61 000001078425-3562506206
2023 8 FD52 06 E122 R 6977704R 059 2/9/2023 2050 NEGOTIATIONS CA-XR021N1062303901406 $1,769.63 000001078425-3562506206
2023 8 FD52 06 E122 R 6977704R 059 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901406 $160.88 000001078425-3562506206
2023 8 FD52 06 E123 R 6977704R 059 2/9/2023 2050 NEGOTIATIONS CA-XR021N1062303901406 $353.23 000001078425-3562506206
2023 8 FD52 06 E123 R 6977704R 059 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901406 $31.65 000001078425-3562506206
2023 8 FD52 06 E143 R 6977704R 059 2/2/2023 0510 ENV STUDIES-UST/HZM PRC-2300138005 PON22200004656 FRANKLIN PRICE INC $1,380.00 Letter Agreement 28-CHC
2023 7 FD52 06 E794 R 6977704R 059 1/25/2023 2640 RIGHT OF WAY PAYMENTS GAX-2300057693 Hari-Kishan Koduru $1,500.00 Deed of Conveyance
2023 7 FD52 06 E794 R 6977704R 059 1/25/2023 2640 RIGHT OF WAY PAYMENTS GAX-2300057698 Hari-Kishan Koduru $7,025.00 Deed of Conveyance
2023 7 FD52 06 E365 R 6977704R 059 1/25/2023 2640 RIGHT OF WAY PAYMENTS GAX-2300057691 Fox, Wood & Wood $480.00 Recording Fee Reimbursement
2023 7 FD52 06 E365 R 6977704R 059 1/25/2023 2640 RIGHT OF WAY PAYMENTS GAX-2300057700 Fox, Wood & Wood $470.50 Recording Fee Reimbursement
2023 7 FD52 06 E365 R 6977704R 059 1/25/2023 2640 RIGHT OF WAY PAYMENTS GAX-2300058041 Fox, Wood & Wood $61.00 Recording Fee Reimbursement
2023 7 FD52 06 E365 R 6977704R 059 1/25/2023 2640 RIGHT OF WAY PAYMENTS GAX-2300058043 Fox, Wood & Wood $335.00 Recording Fee Reimbursement
2023 7 FD52 06 E221 R 6977704R 059 1/25/2023 2640 RIGHT OF WAY PAYMENTS GAX-2300058040 Hari-Kishan Koduru $1,300.00 Temporary Easement
2023 7 FD52 00 E111 R 6977704R 059 1/24/2023 0010 ENV STUDIES-UST/HZM CA-XR012N1062302300413 $144.51 000001081050-3562500061
2023 7 FD52 00 E111 R 6977704R 059 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300413 $18.17 000001081050-3562500061
2023 7 FD52 06 E111 R 6977704R 059 1/24/2023 2050 NEGOTIATIONS CA-XR012N1062302300404 $1,980.01 000001078425-3562506206
2023 7 FD52 00 E121 R 6977704R 059 1/24/2023 0010 ENV STUDIES-UST/HZM CA-XR012N1062302300413 $10.24 000001081050-3562500061
2023 7 FD52 06 E111 R 6977704R 059 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300404 $495.00 000001078425-3562506206
2023 7 FD52 00 E121 R 6977704R 059 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300413 $1.29 000001081050-3562500061
2023 7 FD52 06 E121 R 6977704R 059 1/24/2023 2050 NEGOTIATIONS CA-XR012N1062302300404 $149.83 000001078425-3562506206
2023 7 FD52 00 E122 R 6977704R 059 1/24/2023 0010 ENV STUDIES-UST/HZM CA-XR012N1062302300413 $112.72 000001081050-3562500061
2023 7 FD52 06 E121 R 6977704R 059 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300404 $37.46 000001078425-3562506206
2023 7 FD52 00 E122 R 6977704R 059 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300413 $14.17 000001081050-3562500061
2023 7 FD52 06 E122 R 6977704R 059 1/24/2023 2050 NEGOTIATIONS CA-XR012N1062302300404 $1,544.41 000001078425-3562506206
2023 7 FD52 00 E123 R 6977704R 059 1/24/2023 0010 ENV STUDIES-UST/HZM CA-XR012N1062302300413 $29.88 000001081050-3562500061
2023 7 FD52 06 E122 R 6977704R 059 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300404 $386.10 000001078425-3562506206
2023 7 FD52 00 E123 R 6977704R 059 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300413 $3.72 000001081050-3562500061
2023 7 FD52 06 E123 R 6977704R 059 1/24/2023 2050 NEGOTIATIONS CA-XR012N1062302300404 $308.92 000001078425-3562506206
2023 7 FD52 00 E124 R 6977704R 059 1/24/2023 0010 ENV STUDIES-UST/HZM CA-XR012N1062302300413 $0.05 000001081050-3562500061
2023 7 FD52 06 E123 R 6977704R 059 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300404 $75.96 000001078425-3562506206
2023 7 FD52 00 E124 R 6977704R 059 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300413 $0.01 000001081050-3562500061
2023 7 FD52 06 E124 R 6977704R 059 1/24/2023 2050 NEGOTIATIONS CA-XR012N1062302300404 $0.80 000001078425-3562506206
2023 7 FD52 06 E124 R 6977704R 059 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300404 $0.20 000001078425-3562506206
2023 7 FD52 06 E792 R 6977704R 059 1/23/2023 2650 RELOCATION PAYMENTS GAX-2300056349 Shahrzad Ansari-Koenig $1,390.00 INCIDENTAL EXPENSE
2023 7 FD52 06 E794 R 6977704R 059 1/18/2023 2640 RIGHT OF WAY PAYMENTS GAX-2300056092 Hari-Kishan Koduru $2,400.00 Deed of Conveyance
2023 7 FD52 00 E111 R 6977704R 059 1/9/2023 0010 ENV STUDIES-UST/HZM CA-XR011N1062300610249 $412.93 000001081050-3562500061
2023 7 FD52 00 E111 R 6977704R 059 1/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011N1062300610249 $154.64 000001081050-3562500061
2023 7 FD52 00 E121 R 6977704R 059 1/9/2023 0010 ENV STUDIES-UST/HZM CA-XR011N1062300610249 $29.24 000001081050-3562500061
2023 7 FD52 00 E121 R 6977704R 059 1/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011N1062300610249 $10.96 000001081050-3562500061
2023 7 FD52 00 E122 R 6977704R 059 1/9/2023 0010 ENV STUDIES-UST/HZM CA-XR011N1062300610249 $322.34 000001081050-3562500061
2023 7 FD52 06 E111 R 6977704R 059 1/9/2023 2050 NEGOTIATIONS CA-XR011N1062300610242 $900.10 000001078425-3562506206
2023 7 FD52 00 E122 R 6977704R 059 1/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011N1062300610249 $120.62 000001081050-3562500061
2023 7 FD52 06 E111 R 6977704R 059 1/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011N1062300610242 $337.50 000001078425-3562506206
2023 7 FD52 00 E123 R 6977704R 059 1/9/2023 0010 ENV STUDIES-UST/HZM CA-XR011N1062300610249 $85.61 000001081050-3562500061
2023 7 FD52 06 E121 R 6977704R 059 1/9/2023 2050 NEGOTIATIONS CA-XR011N1062300610242 $68.11 000001078425-3562506206
2023 7 FD52 00 E123 R 6977704R 059 1/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011N1062300610249 $31.68 000001081050-3562500061
2023 7 FD52 06 E121 R 6977704R 059 1/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011N1062300610242 $25.54 000001078425-3562506206
2023 7 FD52 06 E122 R 6977704R 059 1/9/2023 2050 NEGOTIATIONS CA-XR011N1062300610242 $702.24 000001078425-3562506206
2023 7 FD52 06 E122 R 6977704R 059 1/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011N1062300610242 $263.25 000001078425-3562506206
2023 7 FD52 06 E123 R 6977704R 059 1/9/2023 2050 NEGOTIATIONS CA-XR011N1062300610242 $140.69 000001078425-3562506206
2023 7 FD52 06 E123 R 6977704R 059 1/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011N1062300610242 $51.79 000001078425-3562506206
2023 6 FD52 06 E375 R 6977704R 059 12/27/2022 6110 SUIT ADMINISTRATION GAX-2300048891 KENTON COUNTY CLERK $46.00 Com v Helfst condemnation suit
2023 6 FD52 06 E375 R 6977704R 059 12/27/2022 6110 SUIT ADMINISTRATION GAX-2300048896 FRANKLIN COUNTY SHERIFF $120.00 Com v Helfst new condemnation suit
2023 6 FD52 06 E375 R 6977704R 059 12/27/2022 6110 SUIT ADMINISTRATION GAX-2300048887 KENTON COUNTY SHERIFF $60.00 Com v Helfst new condemnation suit
2023 6 FD52 06 E375 R 6977704R 059 12/27/2022 6110 SUIT ADMINISTRATION GAX-2300048894 KENTON COUNTY CIRCUIT CLERK $198.00 com v Helfst condemnation suit
2023 6 FD52 06 E794 R 6977704R 059 12/13/2022 2640 RIGHT OF WAY PAYMENTS GAX-2300046326 David McKinney $25,700.00 Deed of Conveyance
2023 6 FD52 06 E365 R 6977704R 059 12/13/2022 2640 RIGHT OF WAY PAYMENTS GAX-2300046329 Darrell Ray Caldwell $2,917.98 Tax Reimbursements
2023 6 FD52 06 E365 R 6977704R 059 12/9/2022 2640 RIGHT OF WAY PAYMENTS GAX-2300045522 Shahrzad Ansari-Koenig $1,062.79 Tax Reimbursement
2023 6 FD52 06 E794 R 6977704R 059 12/8/2022 2640 RIGHT OF WAY PAYMENTS GAX-2300044469 Adeana, LLC $282,000.00 Deed of Conveyance
2023 6 FD52 06 E792 R 6977704R 059 12/2/2022 2650 RELOCATION PAYMENTS GAX-2300042101 Darrell Ray Caldwell $6,430.05 Increased Interest
2023 6 FD52 06 E792 R 6977704R 059 12/2/2022 2650 RELOCATION PAYMENTS GAX-2300042101 Darrell Ray Caldwell $40,247.81 Last Resort Housing
2023 5 FD52 06 E365 R 6977704R 059 11/29/2022 2640 RIGHT OF WAY PAYMENTS GAX-2300041461 MICHAEL PHILLIPS $777.37 Property Tax Reimbursement
2023 5 FD52 06 E792 R 6977704R 059 11/21/2022 2650 RELOCATION PAYMENTS GAX-2300039983 H JOHNSON MOVING CO., LLC $4,058.25 MOVE EXPENSE
2023 5 FD52 06 E794 R 6977704R 059 11/18/2022 2640 RIGHT OF WAY PAYMENTS GAX-2300039613 Gwen D McCormack $9,800.00 Deed of Conveyance
2023 5 FD52 06 E794 R 6977704R 059 11/2/2022 2640 RIGHT OF WAY PAYMENTS GAX-2300035036 Michael Brooks $360,500.00 Deed of Conveyance
2023 5 FD52 06 E365 R 6977704R 059 11/2/2022 2640 RIGHT OF WAY PAYMENTS GAX-2300035035 Fox, Wood & Wood $440.00 Recording Fee Reimbursement
2023 4 FD52 06 E365 R 6977704R 059 10/27/2022 2640 RIGHT OF WAY PAYMENTS GAX-2300033439 Fox, Wood & Wood $130.00 Deed Recording Reimbursement
2023 4 FD52 06 E365 R 6977704R 059 10/27/2022 2640 RIGHT OF WAY PAYMENTS GAX-2300033441 Fox, Wood & Wood $72.50 Deed Recording Reimbursement
2023 4 FD52 06 E365 R 6977704R 059 10/27/2022 2640 RIGHT OF WAY PAYMENTS GAX-2300033444 Fox, Wood & Wood $99.00 Deed Recording Reimbursement
2023 4 FD52 06 E792 R 6977704R 059 10/27/2022 2650 RELOCATION PAYMENTS GAX-2300033636 Shahrzad Ansari-Koenig $1,000.00 Move Expense
2023 4 FD52 06 E792 R 6977704R 059 10/26/2022 2650 RELOCATION PAYMENTS GAX-2300033216 MICHAEL PHILLIPS $975.00 Incidental Expense
2023 4 FD52 06 E143 R 6977704R 059 10/24/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300073246 PON22200001652 H W Lochner Inc $14,382.00 Kenton Co 6-162.1
2023 4 FD52 06 E365 R 6977704R 059 10/21/2022 2640 RIGHT OF WAY PAYMENTS GAX-2300031716 Fox, Wood & Wood $59.00 Reimbursement for Recording Fees
2023 4 FD52 06 E365 R 6977704R 059 10/21/2022 2640 RIGHT OF WAY PAYMENTS GAX-2300031717 Fox, Wood & Wood $59.50 Reimbursement for Recording Fees
2023 4 FD52 06 E365 R 6977704R 059 10/21/2022 2640 RIGHT OF WAY PAYMENTS GAX-2300031718 Fox, Wood & Wood $50.00 Reimbursement for Recording Fees
2023 4 FD52 06 E365 R 6977704R 059 10/21/2022 2640 RIGHT OF WAY PAYMENTS GAX-2300031720 Fox, Wood & Wood $50.00 Reimbursement for Recording Fees
2023 4 FD52 06 E365 R 6977704R 059 10/18/2022 2640 RIGHT OF WAY PAYMENTS GAX-2300030500 Fox, Wood & Wood $564.50 Deed Recording Fee & Mortgage Release Fee Reimbursement
2023 4 FD52 06 E143 R 6977704R 059 10/17/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300068467 PON22200001652 H W Lochner Inc $20,079.00 Kenton Co 6-162.1
2023 4 FD52 06 E794 R 6977704R 059 10/10/2022 2640 RIGHT OF WAY PAYMENTS GAX-2300028061 Leah Marie Jetter $8,000.00 Deed of Conveyance
2023 4 FD52 06 E794 R 6977704R 059 10/10/2022 2640 RIGHT OF WAY PAYMENTS GAX-2300028066 Shahrzad Ansari-Koenig $427,500.00 Deed of Conveyance
2023 3 FD52 06 E111 R 6977704R 059 9/26/2022 2050 NEGOTIATIONS CA-XR092M1062226602756 $719.15 000001078425-3562506206
2023 3 FD52 06 E111 R 6977704R 059 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602756 $75.21 000001078425-3562506206
2023 3 FD52 06 E121 R 6977704R 059 9/26/2022 2050 NEGOTIATIONS CA-XR092M1062226602756 $52.00 000001078425-3562506206
2023 3 FD52 06 E121 R 6977704R 059 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602756 $5.43 000001078425-3562506206
2023 3 FD52 06 E122 R 6977704R 059 9/26/2022 2050 NEGOTIATIONS CA-XR092M1062226602756 $560.94 000001078425-3562506206
2023 3 FD52 06 E122 R 6977704R 059 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602756 $58.66 000001078425-3562506206
2023 3 FD52 06 E123 R 6977704R 059 9/26/2022 2050 NEGOTIATIONS CA-XR092M1062226602756 $125.57 000001078425-3562506206
2023 3 FD52 06 E123 R 6977704R 059 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602756 $13.17 000001078425-3562506206
2023 3 FD52 06 E124 R 6977704R 059 9/26/2022 2050 NEGOTIATIONS CA-XR092M1062226602756 $0.36 000001078425-3562506206
2023 3 FD52 06 E124 R 6977704R 059 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602756 $0.04 000001078425-3562506206
2023 3 FD52 06 E794 R 6977704R 059 9/15/2022 2640 RIGHT OF WAY PAYMENTS GAX-2300021515 MICHAEL PHILLIPS $392,250.00 Deed of Conveyance
2023 3 FD52 06 E111 R 6977704R 059 9/12/2022 2050 NEGOTIATIONS CA-XR091M1062225101610 $4,037.81 000001078425-3562506206
2023 3 FD52 06 E121 R 6977704R 059 9/12/2022 2050 NEGOTIATIONS CA-XR091M1062225101610 $285.52 000001078425-3562506206
2023 3 FD52 06 E122 R 6977704R 059 9/12/2022 2050 NEGOTIATIONS CA-XR091M1062225101610 $3,149.49 000001078425-3562506206
2023 3 FD52 06 E123 R 6977704R 059 9/12/2022 2050 NEGOTIATIONS CA-XR091M1062225101610 $710.21 000001078425-3562506206
2023 3 FD52 06 E794 R 6977704R 059 9/8/2022 2640 RIGHT OF WAY PAYMENTS GAX-2300019356 Beechgrove Homeowners Association, Inc. $10,700.00 Deed of Conveyance
2023 3 FD52 06 E794 R 6977704R 059 9/1/2022 2640 RIGHT OF WAY PAYMENTS GAX-2300017409 Craig S Jobe $7,100.00 Deed of Conveyance
2023 3 FD52 06 E792 R 6977704R 059 9/1/2022 2650 RELOCATION PAYMENTS GAX-2300017456 Darrell Ray Caldwell $5,569.95 INCIDENTAL EXPENSE
2023 2 FD52 06 E121 R 6977704R 059 8/24/2022 2050 NEGOTIATIONS CA-XR082M1062223500418 $202.59 000001078425-3562506206
2023 2 FD52 06 E121 R 6977704R 059 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500418 $89.12 000001078425-3562506206
2023 2 FD52 06 E122 R 6977704R 059 8/24/2022 2050 NEGOTIATIONS CA-XR082M1062223500418 $2,161.18 000001078425-3562506206
2023 2 FD52 06 E122 R 6977704R 059 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500418 $988.31 000001078425-3562506206
2023 2 FD52 06 E123 R 6977704R 059 8/24/2022 2050 NEGOTIATIONS CA-XR082M1062223500418 $423.85 000001078425-3562506206
2023 2 FD52 06 E123 R 6977704R 059 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500418 $286.36 000001078425-3562506206
2023 2 FD52 06 E124 R 6977704R 059 8/24/2022 2050 NEGOTIATIONS CA-XR082M1062223500418 $1.46 000001078425-3562506206
2023 2 FD52 06 E124 R 6977704R 059 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500418 $0.54 000001078425-3562506206
2023 2 FD52 06 E111 R 6977704R 059 8/24/2022 2050 NEGOTIATIONS CA-XR082M1062223500418 $2,770.74 000001078425-3562506206
2023 2 FD52 06 E111 R 6977704R 059 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500418 $1,267.07 000001078425-3562506206
2023 2 FD52 06 E794 R 6977704R 059 8/18/2022 2640 RIGHT OF WAY PAYMENTS GAX-2300013648 Beechgrove Homeowners Association, Inc. $14,325.00 Deed of Conveyance
2023 2 FD52 06 E111 R 6977704R 059 8/10/2022 2050 NEGOTIATIONS CA-XR081M1062222110107 $3,311.01 000001078425-3562506206
2023 2 FD52 06 E111 R 6977704R 059 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110107 $587.82 000001078425-3562506206
2023 2 FD52 06 E121 R 6977704R 059 8/10/2022 2050 NEGOTIATIONS CA-XR081M1062222110107 $234.13 000001078425-3562506206
2023 2 FD52 06 E121 R 6977704R 059 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110107 $40.75 000001078425-3562506206
2023 2 FD52 06 E122 R 6977704R 059 8/10/2022 2050 NEGOTIATIONS CA-XR081M1062222110107 $2,582.59 000001078425-3562506206
2023 2 FD52 06 E122 R 6977704R 059 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110107 $458.50 000001078425-3562506206
2023 2 FD52 06 E123 R 6977704R 059 8/10/2022 2050 NEGOTIATIONS CA-XR081M1062222110107 $583.76 000001078425-3562506206
2023 2 FD52 06 E123 R 6977704R 059 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110107 $118.22 000001078425-3562506206
2023 2 FD52 06 E794 R 6977704R 059 8/9/2022 2640 RIGHT OF WAY PAYMENTS GAX-2300010362 MARVIN L CALLAHAN $9,150.00 Deed of Conveyance
2023 2 FD52 06 E794 R 6977704R 059 8/9/2022 2640 RIGHT OF WAY PAYMENTS GAX-2300010356 PATRICIA F COOPER $8,825.00 Deed of Conveyance
2023 2 FD52 06 E792 R 6977704R 059 8/1/2022 2650 RELOCATION PAYMENTS GAX-2300008073 Russ Corman $600.00 MOVE EXPENSE
2023 1 FD52 06 E111 R 6977704R 059 7/25/2022 2050 NEGOTIATIONS CA-XR072M1062220308978 $3,388.91 000001078425-3562506206
2023 1 FD52 06 E111 R 6977704R 059 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308978 $586.39 000001078425-3562506206
2023 1 FD52 06 E121 R 6977704R 059 7/25/2022 2050 NEGOTIATIONS CA-XR072M1062220308978 $245.21 000001078425-3562506206
2023 1 FD52 06 E121 R 6977704R 059 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308978 $41.74 000001078425-3562506206
2023 1 FD52 06 E122 R 6977704R 059 7/25/2022 2050 NEGOTIATIONS CA-XR072M1062220308978 $2,643.35 000001078425-3562506206
2023 1 FD52 06 E122 R 6977704R 059 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308978 $457.38 000001078425-3562506206
2023 1 FD52 06 E123 R 6977704R 059 7/25/2022 2050 NEGOTIATIONS CA-XR072M1062220308978 $587.51 000001078425-3562506206
2023 1 FD52 06 E123 R 6977704R 059 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308978 $119.00 000001078425-3562506206
2023 1 FD52 06 E124 R 6977704R 059 7/25/2022 2050 NEGOTIATIONS CA-XR072M1062220308978 $1.69 000001078425-3562506206
2023 1 FD52 06 E124 R 6977704R 059 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308978 $0.27 000001078425-3562506206
2023 1 FD52 06 E792 R 6977704R 059 7/12/2022 2650 RELOCATION PAYMENTS GAX-2300003340 H JOHNSON MOVING CO., LLC $8,161.75 MOVE EXPENSE
2023 1 FD52 06 E111 R 6977704R 059 7/12/2022 2050 NEGOTIATIONS CA-XR071M1062219207864 $3,686.08 000001078425-3562506206
2023 1 FD52 06 E121 R 6977704R 059 7/12/2022 2050 NEGOTIATIONS CA-XR071M1062219207864 $258.61 000001078425-3562506206
2023 1 FD52 06 E122 R 6977704R 059 7/12/2022 2050 NEGOTIATIONS CA-XR071M1062219207864 $3,095.21 000001078425-3562506206
2023 1 FD52 06 E123 R 6977704R 059 7/12/2022 2050 NEGOTIATIONS CA-XR071M1062219207864 $706.84 000001078425-3562506206
2023 1 FD52 06 E143 R 6977704R 059 7/8/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300004526 PON22200001652 H W Lochner Inc $41,356.00 Kenton Co 6-162.1
2023 1 FD52 06 E794 R 6977704R 059 7/6/2022 2640 RIGHT OF WAY PAYMENTS GAX-2300001121 CAROL RANDMAN $81,300.00 Deed of Conveyance
2023 1 FD52 06 E794 R 6977704R 059 7/6/2022 2640 RIGHT OF WAY PAYMENTS GAX-2300001141 Miscellaneous Corporation $81,300.00 Deed of Conveyance
2022 12 FD52 06 E121 R 6977704R 059 6/27/2022 2050 NEGOTIATIONS CA-XR062M1062217506752 $154.12 000001078425-3562506206
2022 12 FD52 06 E121 R 6977704R 059 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506752 $110.29 000001078425-3562506206
2022 12 FD52 06 E122 R 6977704R 059 6/27/2022 2050 NEGOTIATIONS CA-XR062M1062217506752 $1,760.17 000001078425-3562506206
2022 12 FD52 06 E122 R 6977704R 059 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506752 $1,330.62 000001078425-3562506206
2022 12 FD52 06 E123 R 6977704R 059 6/27/2022 2050 NEGOTIATIONS CA-XR062M1062217506752 $309.09 000001078425-3562506206
2022 12 FD52 06 E123 R 6977704R 059 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506752 $397.42 000001078425-3562506206
2022 12 FD52 06 E124 R 6977704R 059 6/27/2022 2050 NEGOTIATIONS CA-XR062M1062217506752 $1.23 000001078425-3562506206
2022 12 FD52 06 E124 R 6977704R 059 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506752 $0.73 000001078425-3562506206
2022 12 FD52 06 E111 R 6977704R 059 6/27/2022 2050 NEGOTIATIONS CA-XR062M1062217506751 $2,096.19 000001078425-3562506206
2022 12 FD52 06 E111 R 6977704R 059 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506751 $1,584.63 000001078425-3562506206
2022 12 FD52 06 E794 R 6977704R 059 6/24/2022 2640 RIGHT OF WAY PAYMENTS GAX-2200098860 MICHELE GOODRICH $24,335.00 Deed of Conveyance
2022 12 FD52 06 E794 R 6977704R 059 6/9/2022 2640 RIGHT OF WAY PAYMENTS GAX-2200092749 AZA Construction, Inc. $48,450.00 Deed of Conveyance
2022 12 FD52 06 E794 R 6977704R 059 6/9/2022 2640 RIGHT OF WAY PAYMENTS GAX-2200094641 WILLIAM WALTON $1,450.00 Deed of Conveyance
2022 12 FD52 06 E792 R 6977704R 059 6/9/2022 2650 RELOCATION PAYMENTS GAX-2200094664 Darrell Ray Caldwell $19,000.00 Purchase Supplement
2022 12 FD52 06 E111 R 6977704R 059 6/9/2022 2050 NEGOTIATIONS CA-XR061M1062215905708 $3,003.70 000001078425-3562506206
2022 12 FD52 06 E111 R 6977704R 059 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905708 $677.12 000001078425-3562506206
2022 12 FD52 06 E121 R 6977704R 059 6/9/2022 2050 NEGOTIATIONS CA-XR061M1062215905708 $210.96 000001078425-3562506206
2022 12 FD52 06 E121 R 6977704R 059 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905708 $47.26 000001078425-3562506206
2022 12 FD52 06 E122 R 6977704R 059 6/9/2022 2050 NEGOTIATIONS CA-XR061M1062215905708 $2,522.20 000001078425-3562506206
2022 12 FD52 06 E122 R 6977704R 059 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905708 $568.57 000001078425-3562506206
2022 12 FD52 06 E123 R 6977704R 059 6/9/2022 2050 NEGOTIATIONS CA-XR061M1062215905708 $573.42 000001078425-3562506206
2022 12 FD52 06 E123 R 6977704R 059 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905708 $133.09 000001078425-3562506206
2022 12 FD52 06 E794 R 6977704R 059 6/2/2022 2640 RIGHT OF WAY PAYMENTS GAX-2200092335 Darrell Ray Caldwell $486,500.00 Deed of Conveyance
2022 11 FD52 06 E794 R 6977704R 059 5/26/2022 2640 RIGHT OF WAY PAYMENTS GAX-2200090851 NICOLE E CARNEY $96,950.00 Deed of Conveyance
2022 11 FD52 06 E794 R 6977704R 059 5/25/2022 2640 RIGHT OF WAY PAYMENTS GAX-2200090399 BRADLEY GAMM $14,035.00 Deed of Conveyance
2022 11 FD52 06 E794 R 6977704R 059 5/25/2022 2640 RIGHT OF WAY PAYMENTS CR5-RD22-1147-625 BRADLEY GAMM ($14,035.00)
2022 11 FD52 06 E111 R 6977704R 059 5/23/2022 2050 NEGOTIATIONS CA-XR052M1062214004658 $3,622.94 000001078425-3562506206
2022 11 FD52 06 E111 R 6977704R 059 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004658 $75.05 000001078425-3562506206
2022 11 FD52 06 E121 R 6977704R 059 5/23/2022 2050 NEGOTIATIONS CA-XR052M1062214004658 $259.98 000001078425-3562506206
2022 11 FD52 06 E121 R 6977704R 059 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004658 $5.74 000001078425-3562506206
2022 11 FD52 06 E122 R 6977704R 059 5/23/2022 2050 NEGOTIATIONS CA-XR052M1062214004658 $3,042.19 000001078425-3562506206
2022 11 FD52 06 E122 R 6977704R 059 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004658 $63.02 000001078425-3562506206
2022 11 FD52 06 E123 R 6977704R 059 5/23/2022 2050 NEGOTIATIONS CA-XR052M1062214004658 $703.07 000001078425-3562506206
2022 11 FD52 06 E123 R 6977704R 059 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004658 $4.54 000001078425-3562506206
2022 11 FD52 06 E124 R 6977704R 059 5/23/2022 2050 NEGOTIATIONS CA-XR052M1062214004658 $1.92 000001078425-3562506206
2022 11 FD52 06 E124 R 6977704R 059 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004658 $0.05 000001078425-3562506206
2022 11 FD52 06 E111 R 6977704R 059 5/13/2022 2050 NEGOTIATIONS CA-XR051M1062212603644 $3,700.11 000001078425-3562506206
2022 11 FD52 06 E121 R 6977704R 059 5/13/2022 2050 NEGOTIATIONS CA-XR051M1062212603644 $265.88 000001078425-3562506206
2022 11 FD52 06 E122 R 6977704R 059 5/13/2022 2050 NEGOTIATIONS CA-XR051M1062212603644 $3,106.99 000001078425-3562506206
2022 11 FD52 06 E123 R 6977704R 059 5/13/2022 2050 NEGOTIATIONS CA-XR051M1062212603644 $707.74 000001078425-3562506206
2022 11 FD52 06 E143 R 6977704R 059 5/4/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200199804 PON22200001652 H W Lochner Inc $46,223.00 Kenton Co 6-162.1
2022 10 FD52 06 E792 R 6977704R 059 4/27/2022 2650 RELOCATION PAYMENTS GAX-2200081561 Rachael Stemple $1,900.00 Move Expense
2022 10 FD52 06 E111 R 6977704R 059 4/25/2022 2050 NEGOTIATIONS CA-XR042M1062211202523 $2,368.16 000001078425-3562506206
2022 10 FD52 06 E111 R 6977704R 059 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202523 $1,094.99 000001078425-3562506206
2022 10 FD52 06 E121 R 6977704R 059 4/25/2022 2050 NEGOTIATIONS CA-XR042M1062211202523 $171.81 000001078425-3562506206
2022 10 FD52 06 E121 R 6977704R 059 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202523 $75.96 000001078425-3562506206
2022 10 FD52 06 E122 R 6977704R 059 4/25/2022 2050 NEGOTIATIONS CA-XR042M1062211202523 $1,988.55 000001078425-3562506206
2022 10 FD52 06 E122 R 6977704R 059 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202523 $919.46 000001078425-3562506206
2022 10 FD52 06 E123 R 6977704R 059 4/25/2022 2050 NEGOTIATIONS CA-XR042M1062211202523 $410.95 000001078425-3562506206
2022 10 FD52 06 E123 R 6977704R 059 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202523 $281.63 000001078425-3562506206
2022 10 FD52 06 E124 R 6977704R 059 4/25/2022 2050 NEGOTIATIONS CA-XR042M1062211202523 $1.31 000001078425-3562506206
2022 10 FD52 06 E124 R 6977704R 059 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202523 $0.50 000001078425-3562506206
2022 10 FD52 06 E794 R 6977704R 059 4/21/2022 2640 RIGHT OF WAY PAYMENTS GAX-2200080070 DEBRA MARVIN $3,400.00 Deed of Conveyance
2022 10 FD52 06 E794 R 6977704R 059 4/21/2022 2640 RIGHT OF WAY PAYMENTS GAX-2200080073 RAYMOND MILLER $4,625.00 Deed of Conveyance
2022 10 FD52 06 E794 R 6977704R 059 4/19/2022 2640 RIGHT OF WAY PAYMENTS GAX-2200079397 BEN HEUSER $228,600.00 Deed of Conveyance
2022 10 FD52 06 E143 R 6977704R 059 4/19/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200187632 PON22100001433 Thoroughbred Real Estate Services LLC $2,100.00 Letter Agreement 3
2022 10 FD52 06 E792 R 6977704R 059 4/18/2022 2650 RELOCATION PAYMENTS GAX-2200078878 Russ Corman $900.00 Move Expense
2022 10 FD52 00 E121 R 6977704R 059 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801474 $4.50 000001079708-3562500670
2022 10 FD52 00 E122 R 6977704R 059 4/11/2022 2110 RIGHT OF WAY SUPERVISION CA-XR041M1062209801474 $430.77 000001079708-3562500670
2022 10 FD52 00 E122 R 6977704R 059 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801474 $50.83 000001079708-3562500670
2022 10 FD52 00 E123 R 6977704R 059 4/11/2022 2110 RIGHT OF WAY SUPERVISION CA-XR041M1062209801474 $64.22 000001079708-3562500670
2022 10 FD52 06 E111 R 6977704R 059 4/11/2022 2050 NEGOTIATIONS CA-XR041M1062209801464 $2,341.87 000001078425-3562506206
2022 10 FD52 06 E111 R 6977704R 059 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801464 $190.97 000001078425-3562506206
2022 10 FD52 00 E123 R 6977704R 059 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801474 $7.47 000001079708-3562500670
2022 10 FD52 06 E121 R 6977704R 059 4/11/2022 2050 NEGOTIATIONS CA-XR041M1062209801464 $176.92 000001078425-3562506206
2022 10 FD52 06 E121 R 6977704R 059 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801464 $15.12 000001078425-3562506206
2022 10 FD52 06 E122 R 6977704R 059 4/11/2022 2050 NEGOTIATIONS CA-XR041M1062209801464 $1,966.47 000001078425-3562506206
2022 10 FD52 06 E122 R 6977704R 059 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801464 $160.36 000001078425-3562506206
2022 10 FD52 06 E123 R 6977704R 059 4/11/2022 2050 NEGOTIATIONS CA-XR041M1062209801464 $582.00 000001078425-3562506206
2022 10 FD52 06 E123 R 6977704R 059 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801464 $51.04 000001078425-3562506206
2022 10 FD52 00 E111 R 6977704R 059 4/11/2022 2110 RIGHT OF WAY SUPERVISION CA-XR041M1062209801473 $512.91 000001079708-3562500670
2022 10 FD52 00 E111 R 6977704R 059 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801473 $60.53 000001079708-3562500670
2022 10 FD52 00 E121 R 6977704R 059 4/11/2022 2110 RIGHT OF WAY SUPERVISION CA-XR041M1062209801473 $38.16 000001079708-3562500670
2022 10 FD52 06 E794 R 6977704R 059 4/8/2022 2640 RIGHT OF WAY PAYMENTS GAX-2200076265 BRADLEY GAMM $14,035.00 Deed of Conveyance
2022 10 FD52 06 E792 R 6977704R 059 4/8/2022 2650 RELOCATION PAYMENTS GAX-2200075899 Rachael Stemple $7,200.00 Rent Supplement
2022 10 FD52 06 E792 R 6977704R 059 4/8/2022 2650 RELOCATION PAYMENTS GAX-2200075914 Russ Corman $4,620.00 Rent Supplement
2022 10 FD52 06 E792 R 6977704R 059 4/8/2022 2650 RELOCATION PAYMENTS GAX-2200075899 Rachael Stemple $5,420.00 Last Resort Housing
2022 10 FD52 06 E794 R 6977704R 059 4/7/2022 2640 RIGHT OF WAY PAYMENTS GAX-2200075587 DAVID JACKSON $40,000.00 Deed of Conveyance
2022 10 FD52 06 E794 R 6977704R 059 4/7/2022 2640 RIGHT OF WAY PAYMENTS GAX-2200075585 FRANCES JACKSON $40,000.00 Deed of Conveyance
2022 9 FD52 06 E111 R 6977704R 059 3/24/2022 2050 NEGOTIATIONS CA-XR032M1062208200381 $1,703.90 000001078425-3562506206
2022 9 FD52 06 E111 R 6977704R 059 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200381 $232.89 000001078425-3562506206
2022 9 FD52 06 E121 R 6977704R 059 3/24/2022 2050 NEGOTIATIONS CA-XR032M1062208200381 $86.79 000001078425-3562506206
2022 9 FD52 06 E121 R 6977704R 059 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200381 $11.59 000001078425-3562506206
2022 9 FD52 06 E122 R 6977704R 059 3/24/2022 2050 NEGOTIATIONS CA-XR032M1062208200381 $1,430.77 000001078425-3562506206
2022 9 FD52 06 E122 R 6977704R 059 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200381 $195.55 000001078425-3562506206
2022 9 FD52 06 E123 R 6977704R 059 3/24/2022 2050 NEGOTIATIONS CA-XR032M1062208200381 $556.85 000001078425-3562506206
2022 9 FD52 06 E123 R 6977704R 059 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200381 $78.05 000001078425-3562506206
2022 9 FD52 06 E124 R 6977704R 059 3/24/2022 2050 NEGOTIATIONS CA-XR032M1062208200381 $1.05 000001078425-3562506206
2022 9 FD52 06 E124 R 6977704R 059 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200381 $0.14 000001078425-3562506206
2022 9 FD52 06 E794 R 6977704R 059 3/23/2022 2640 RIGHT OF WAY PAYMENTS GAX-2200071136 LLOYD SPEGAL $19,040.00 Deed of Conveyance
2022 9 FD52 06 E143 R 6977704R 059 3/11/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200161136 PON22200001652 H W Lochner Inc $37,307.00 Kenton Co 6-162.1
2022 9 FD52 06 E111 R 6977704R 059 3/9/2022 2050 NEGOTIATIONS CA-XR031M1062206709450 $648.02 000001078425-3562506206
2022 9 FD52 06 E121 R 6977704R 059 3/9/2022 2050 NEGOTIATIONS CA-XR031M1062206709450 $49.29 000001078425-3562506206
2022 9 FD52 06 E122 R 6977704R 059 3/9/2022 2050 NEGOTIATIONS CA-XR031M1062206709450 $544.15 000001078425-3562506206
2022 9 FD52 06 E123 R 6977704R 059 3/9/2022 2050 NEGOTIATIONS CA-XR031M1062206709450 $72.66 000001078425-3562506206
2022 8 FD52 06 E111 R 6977704R 059 2/23/2022 2050 NEGOTIATIONS CA-XR022M1062205308408 $2,372.33 000001078425-3562506206
2022 8 FD52 06 E111 R 6977704R 059 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308408 $13.68 000001078425-3562506206
2022 8 FD52 06 E121 R 6977704R 059 2/23/2022 2050 NEGOTIATIONS CA-XR022M1062205308408 $164.08 000001078425-3562506206
2022 8 FD52 06 E121 R 6977704R 059 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308408 $1.05 000001078425-3562506206
2022 8 FD52 06 E122 R 6977704R 059 2/23/2022 2050 NEGOTIATIONS CA-XR022M1062205308408 $1,992.00 000001078425-3562506206
2022 8 FD52 06 E122 R 6977704R 059 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308408 $11.49 000001078425-3562506206
2022 8 FD52 06 E123 R 6977704R 059 2/23/2022 2050 NEGOTIATIONS CA-XR022M1062205308408 $688.33 000001078425-3562506206
2022 8 FD52 06 E123 R 6977704R 059 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308408 $0.83 000001078425-3562506206
2022 8 FD52 06 E124 R 6977704R 059 2/23/2022 2050 NEGOTIATIONS CA-XR022M1062205308408 $1.39 000001078425-3562506206
2022 8 FD52 06 E124 R 6977704R 059 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308408 $0.01 000001078425-3562506206
2022 8 FD52 00 E799 R 6977704R 059 2/10/2022 6530 TITLE UPDATE-CONSULT PRC-2200137711 PON22000003669 REIMER LAW CO $6,646.64
2022 8 FD52 06 E111 R 6977704R 059 2/9/2022 2050 NEGOTIATIONS CA-XR021M1062203907429 $2,989.29 000001078425-3562506206
2022 8 FD52 06 E111 R 6977704R 059 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907429 $410.86 000001078425-3562506206
2022 8 FD52 06 E121 R 6977704R 059 2/9/2022 2050 NEGOTIATIONS CA-XR021M1062203907429 $213.03 000001078425-3562506206
2022 8 FD52 06 E121 R 6977704R 059 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907429 $29.62 000001078425-3562506206
2022 8 FD52 06 E122 R 6977704R 059 2/9/2022 2050 NEGOTIATIONS CA-XR021M1062203907429 $2,510.00 000001078425-3562506206
2022 8 FD52 06 E122 R 6977704R 059 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907429 $345.00 000001078425-3562506206
2022 8 FD52 06 E123 R 6977704R 059 2/9/2022 2050 NEGOTIATIONS CA-XR021M1062203907429 $640.34 000001078425-3562506206
2022 8 FD52 06 E123 R 6977704R 059 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907429 $76.27 000001078425-3562506206
2022 7 FD52 06 E143 R 6977704R 059 1/27/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200131350 PON22100001433 Thoroughbred Real Estate Services LLC $10,425.00 Letter Agreement 3
2022 7 FD52 06 E791 R 6977704R 059 1/27/2022 2640 RIGHT OF WAY PAYMENTS GAX-2200054625 BRENT TOLES $230.00 Miscellaneous-Taxable
2022 7 FD52 06 E111 R 6977704R 059 1/24/2022 2050 NEGOTIATIONS CA-XR012M1062202106439 $2,512.71 000001078425-3562506206
2022 7 FD52 06 E111 R 6977704R 059 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106439 $106.95 000001078425-3562506206
2022 7 FD52 06 E121 R 6977704R 059 1/24/2022 2050 NEGOTIATIONS CA-XR012M1062202106439 $175.85 000001078425-3562506206
2022 7 FD52 06 E121 R 6977704R 059 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106439 $7.38 000001078425-3562506206
2022 7 FD52 06 E122 R 6977704R 059 1/24/2022 2050 NEGOTIATIONS CA-XR012M1062202106439 $2,109.93 000001078425-3562506206
2022 7 FD52 06 E122 R 6977704R 059 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106439 $89.81 000001078425-3562506206
2022 7 FD52 06 E123 R 6977704R 059 1/24/2022 2050 NEGOTIATIONS CA-XR012M1062202106439 $610.01 000001078425-3562506206
2022 7 FD52 06 E123 R 6977704R 059 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106439 $28.59 000001078425-3562506206
2022 7 FD52 06 E124 R 6977704R 059 1/24/2022 2050 NEGOTIATIONS CA-XR012M1062202106439 $1.18 000001078425-3562506206
2022 7 FD52 06 E124 R 6977704R 059 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106439 $0.05 000001078425-3562506206
2022 7 FD52 00 E122 R 6977704R 059 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705564 $86.94 000001081050-3562500061
2022 7 FD52 00 E123 R 6977704R 059 1/10/2022 0010 ENV STUDIES-UST/HZM CA-XR011M1062200705564 $40.78 000001081050-3562500061
2022 7 FD52 00 E123 R 6977704R 059 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705564 $20.11 000001081050-3562500061
2022 7 FD52 00 E111 R 6977704R 059 1/10/2022 2110 RIGHT OF WAY SUPERVISION CA-XR011M1062200705550 $256.50 000001079708-3562500670
2022 7 FD52 00 E111 R 6977704R 059 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705550 $359.10 000001079708-3562500670
2022 7 FD52 00 E121 R 6977704R 059 1/10/2022 2110 RIGHT OF WAY SUPERVISION CA-XR011M1062200705550 $19.08 000001079708-3562500670
2022 7 FD52 00 E121 R 6977704R 059 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705550 $26.71 000001079708-3562500670
2022 7 FD52 00 E122 R 6977704R 059 1/10/2022 2110 RIGHT OF WAY SUPERVISION CA-XR011M1062200705550 $215.38 000001079708-3562500670
2022 7 FD52 00 E122 R 6977704R 059 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705550 $301.54 000001079708-3562500670
2022 7 FD52 00 E123 R 6977704R 059 1/10/2022 2110 RIGHT OF WAY SUPERVISION CA-XR011M1062200705550 $32.65 000001079708-3562500670
2022 7 FD52 00 E123 R 6977704R 059 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705550 $44.29 000001079708-3562500670
2022 7 FD52 00 E111 R 6977704R 059 1/10/2022 0010 ENV STUDIES-UST/HZM CA-XR011M1062200705564 $207.08 000001081050-3562500061
2022 7 FD52 00 E111 R 6977704R 059 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705564 $103.54 000001081050-3562500061
2022 7 FD52 06 E111 R 6977704R 059 1/10/2022 2050 NEGOTIATIONS CA-XR011M1062200705540 $1,069.38 000001078425-3562506206
2022 7 FD52 06 E111 R 6977704R 059 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705540 $1,731.48 000001078425-3562506206
2022 7 FD52 06 E121 R 6977704R 059 1/10/2022 2050 NEGOTIATIONS CA-XR011M1062200705540 $76.08 000001078425-3562506206
2022 7 FD52 06 E121 R 6977704R 059 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705540 $121.00 000001078425-3562506206
2022 7 FD52 06 E122 R 6977704R 059 1/10/2022 2050 NEGOTIATIONS CA-XR011M1062200705540 $897.95 000001078425-3562506206
2022 7 FD52 06 E122 R 6977704R 059 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705540 $1,453.92 000001078425-3562506206
2022 7 FD52 06 E123 R 6977704R 059 1/10/2022 2050 NEGOTIATIONS CA-XR011M1062200705540 $229.53 000001078425-3562506206
2022 7 FD52 06 E123 R 6977704R 059 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705540 $420.66 000001078425-3562506206
2022 7 FD52 00 E121 R 6977704R 059 1/10/2022 0010 ENV STUDIES-UST/HZM CA-XR011M1062200705564 $14.57 000001081050-3562500061
2022 7 FD52 00 E121 R 6977704R 059 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705564 $7.29 000001081050-3562500061
2022 7 FD52 00 E122 R 6977704R 059 1/10/2022 0010 ENV STUDIES-UST/HZM CA-XR011M1062200705564 $173.88 000001081050-3562500061
2022 6 FD52 06 E111 R 6977704R 059 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504482 $724.44 000001078425-3562506206
2022 6 FD52 06 E121 R 6977704R 059 12/22/2021 2050 NEGOTIATIONS CA-XR122L1062135504482 $178.17 000001078425-3562506206
2022 6 FD52 06 E121 R 6977704R 059 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504482 $54.01 000001078425-3562506206
2022 6 FD52 00 E111 R 6977704R 059 12/22/2021 2110 RIGHT OF WAY SUPERVISION CA-XR122L1062135504497 $279.82 000001079708-3562500670
2022 6 FD52 06 E122 R 6977704R 059 12/22/2021 2050 NEGOTIATIONS CA-XR122L1062135504482 $1,999.36 000001078425-3562506206
2022 6 FD52 00 E121 R 6977704R 059 12/22/2021 2110 RIGHT OF WAY SUPERVISION CA-XR122L1062135504497 $20.83 000001079708-3562500670
2022 6 FD52 06 E122 R 6977704R 059 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504482 $608.32 000001078425-3562506206
2022 6 FD52 00 E122 R 6977704R 059 12/22/2021 2110 RIGHT OF WAY SUPERVISION CA-XR122L1062135504497 $234.96 000001079708-3562500670
2022 6 FD52 06 E123 R 6977704R 059 12/22/2021 2050 NEGOTIATIONS CA-XR122L1062135504482 $394.73 000001078425-3562506206
2022 6 FD52 00 E123 R 6977704R 059 12/22/2021 2110 RIGHT OF WAY SUPERVISION CA-XR122L1062135504497 $34.12 000001079708-3562500670
2022 6 FD52 06 E123 R 6977704R 059 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504482 $125.65 000001078425-3562506206
2022 6 FD52 00 E124 R 6977704R 059 12/22/2021 2110 RIGHT OF WAY SUPERVISION CA-XR122L1062135504497 $0.10 000001079708-3562500670
2022 6 FD52 06 E124 R 6977704R 059 12/22/2021 2050 NEGOTIATIONS CA-XR122L1062135504482 $1.13 000001078425-3562506206
2022 6 FD52 06 E124 R 6977704R 059 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504482 $0.34 000001078425-3562506206
2022 6 FD52 06 E111 R 6977704R 059 12/22/2021 2050 NEGOTIATIONS CA-XR122L1062135504482 $2,380.99 000001078425-3562506206
2022 6 FD52 06 E143 R 6977704R 059 12/17/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200103768 PON22100001433 Thoroughbred Real Estate Services LLC $12,675.00 Letter Agreement 3
2022 6 FD52 06 E111 R 6977704R 059 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103551 $664.66 000001078425-3562506206
2022 6 FD52 06 E121 R 6977704R 059 12/8/2021 2050 NEGOTIATIONS CA-XR121L1062134103551 $165.52 000001078425-3562506206
2022 6 FD52 06 E121 R 6977704R 059 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103551 $49.29 000001078425-3562506206
2022 6 FD52 06 E122 R 6977704R 059 12/8/2021 2050 NEGOTIATIONS CA-XR121L1062134103551 $1,870.20 000001078425-3562506206
2022 6 FD52 06 E122 R 6977704R 059 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103551 $558.12 000001078425-3562506206
2022 6 FD52 06 E123 R 6977704R 059 12/8/2021 2050 NEGOTIATIONS CA-XR121L1062134103551 $369.27 000001078425-3562506206
2022 6 FD52 06 E123 R 6977704R 059 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103551 $112.95 000001078425-3562506206
2022 6 FD52 00 E111 R 6977704R 059 12/8/2021 2110 RIGHT OF WAY SUPERVISION CA-XR121L1062134103563 $280.01 000001079708-3562500670
2022 6 FD52 00 E111 R 6977704R 059 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103563 $159.68 000001079708-3562500670
2022 6 FD52 00 E121 R 6977704R 059 12/8/2021 2110 RIGHT OF WAY SUPERVISION CA-XR121L1062134103563 $20.71 000001079708-3562500670
2022 6 FD52 00 E121 R 6977704R 059 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103563 $11.81 000001079708-3562500670
2022 6 FD52 00 E122 R 6977704R 059 12/8/2021 2110 RIGHT OF WAY SUPERVISION CA-XR121L1062134103563 $234.97 000001079708-3562500670
2022 6 FD52 00 E122 R 6977704R 059 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103563 $134.08 000001079708-3562500670
2022 6 FD52 00 E123 R 6977704R 059 12/8/2021 2110 RIGHT OF WAY SUPERVISION CA-XR121L1062134103563 $34.40 000001079708-3562500670
2022 6 FD52 00 E123 R 6977704R 059 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103563 $19.21 000001079708-3562500670
2022 6 FD52 06 E111 R 6977704R 059 12/8/2021 2050 NEGOTIATIONS CA-XR121L1062134103551 $2,227.22 000001078425-3562506206
2022 5 FD52 06 E122 R 6977704R 059 11/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602515 $261.04 000001078425-3562506206
2022 5 FD52 06 E123 R 6977704R 059 11/29/2021 2050 NEGOTIATIONS CA-XR112L1062132602515 $518.78 000001078425-3562506206
2022 5 FD52 06 E123 R 6977704R 059 11/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602515 $51.07 000001078425-3562506206
2022 5 FD52 06 E124 R 6977704R 059 11/29/2021 2050 NEGOTIATIONS CA-XR112L1062132602515 $1.43 000001078425-3562506206
2022 5 FD52 06 E124 R 6977704R 059 11/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602515 $0.14 000001078425-3562506206
2022 5 FD52 06 E111 R 6977704R 059 11/23/2021 2050 NEGOTIATIONS CA-XR112L1062132602514 $3,108.65 000001078425-3562506206
2022 5 FD52 06 E111 R 6977704R 059 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602514 $310.86 000001078425-3562506206
2022 5 FD52 06 E121 R 6977704R 059 11/23/2021 2050 NEGOTIATIONS CA-XR112L1062132602514 $232.68 000001078425-3562506206
2022 5 FD52 06 E121 R 6977704R 059 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602514 $23.26 000001078425-3562506206
2022 5 FD52 06 E122 R 6977704R 059 11/23/2021 2050 NEGOTIATIONS CA-XR112L1062132602514 $2,610.35 000001078425-3562506206
2022 5 FD52 06 E111 R 6977704R 059 11/8/2021 2050 NEGOTIATIONS CA-XR111L1062130901511 $3,045.66 000001078425-3562506206
2022 5 FD52 06 E111 R 6977704R 059 11/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901511 $229.17 000001078425-3562506206
2022 5 FD52 06 E121 R 6977704R 059 11/8/2021 2050 NEGOTIATIONS CA-XR111L1062130901511 $226.71 000001078425-3562506206
2022 5 FD52 06 E121 R 6977704R 059 11/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901511 $16.89 000001078425-3562506206
2022 5 FD52 06 E122 R 6977704R 059 11/8/2021 2050 NEGOTIATIONS CA-XR111L1062130901511 $2,557.45 000001078425-3562506206
2022 5 FD52 06 E122 R 6977704R 059 11/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901511 $192.43 000001078425-3562506206
2022 5 FD52 06 E123 R 6977704R 059 11/8/2021 2050 NEGOTIATIONS CA-XR111L1062130901511 $516.72 000001078425-3562506206
2022 5 FD52 06 E123 R 6977704R 059 11/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901511 $43.87 000001078425-3562506206
2022 5 FD52 06 E143 R 6977704R 059 11/4/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200070209 PON22100001433 Thoroughbred Real Estate Services LLC $8,400.00 Letter Agreement 3
2022 4 FD52 06 E111 R 6977704R 059 10/25/2021 2050 NEGOTIATIONS CA-XR102L1062129500407 $3,076.92 000001078425-3562506206
2022 4 FD52 06 E111 R 6977704R 059 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500407 $209.91 000001078425-3562506206
2022 4 FD52 06 E121 R 6977704R 059 10/25/2021 2050 NEGOTIATIONS CA-XR102L1062129500407 $230.16 000001078425-3562506206
2022 4 FD52 06 E121 R 6977704R 059 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500407 $15.89 000001078425-3562506206
2022 4 FD52 06 E122 R 6977704R 059 10/25/2021 2050 NEGOTIATIONS CA-XR102L1062129500407 $2,583.69 000001078425-3562506206
2022 4 FD52 06 E122 R 6977704R 059 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500407 $176.26 000001078425-3562506206
2022 4 FD52 06 E123 R 6977704R 059 10/25/2021 2050 NEGOTIATIONS CA-XR102L1062129500407 $510.17 000001078425-3562506206
2022 4 FD52 06 E123 R 6977704R 059 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500407 $22.71 000001078425-3562506206
2022 4 FD52 06 E124 R 6977704R 059 10/25/2021 2050 NEGOTIATIONS CA-XR102L1062129500407 $1.47 000001078425-3562506206
2022 4 FD52 06 E124 R 6977704R 059 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500407 $0.12 000001078425-3562506206
2022 4 FD52 06 E121 R 6977704R 059 10/11/2021 2050 NEGOTIATIONS CA-XR101L1062128110125 $224.71 000001078425-3562506206
2022 4 FD52 06 E121 R 6977704R 059 10/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110125 $2.05 000001078425-3562506206
2022 4 FD52 06 E122 R 6977704R 059 10/11/2021 2050 NEGOTIATIONS CA-XR101L1062128110125 $2,541.04 000001078425-3562506206
2022 4 FD52 06 E122 R 6977704R 059 10/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110125 $23.33 000001078425-3562506206
2022 4 FD52 06 E123 R 6977704R 059 10/11/2021 2050 NEGOTIATIONS CA-XR101L1062128110125 $536.23 000001078425-3562506206
2022 4 FD52 06 E123 R 6977704R 059 10/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110125 $5.32 000001078425-3562506206
2022 4 FD52 06 E111 R 6977704R 059 10/11/2021 2050 NEGOTIATIONS CA-XR101L1062128110124 $3,026.12 000001078425-3562506206
2022 4 FD52 06 E111 R 6977704R 059 10/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110124 $27.78 000001078425-3562506206
2022 3 FD52 00 E111 R 6977704R 059 9/30/2021 2110 RIGHT OF WAY SUPERVISION CA-XR092L1062126709070 $279.75 000001079708-3562500670
2022 3 FD52 00 E111 R 6977704R 059 9/30/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709070 $38.80 000001079708-3562500670
2022 3 FD52 00 E121 R 6977704R 059 9/30/2021 2110 RIGHT OF WAY SUPERVISION CA-XR092L1062126709070 $20.83 000001079708-3562500670
2022 3 FD52 00 E121 R 6977704R 059 9/30/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709070 $2.90 000001079708-3562500670
2022 3 FD52 00 E122 R 6977704R 059 9/30/2021 2110 RIGHT OF WAY SUPERVISION CA-XR092L1062126709070 $234.97 000001079708-3562500670
2022 3 FD52 00 E122 R 6977704R 059 9/30/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709070 $32.57 000001079708-3562500670
2022 3 FD52 00 E123 R 6977704R 059 9/30/2021 2110 RIGHT OF WAY SUPERVISION CA-XR092L1062126709070 $34.20 000001079708-3562500670
2022 3 FD52 00 E123 R 6977704R 059 9/30/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709070 $4.67 000001079708-3562500670
2022 3 FD52 00 E124 R 6977704R 059 9/30/2021 2110 RIGHT OF WAY SUPERVISION CA-XR092L1062126709070 $0.09 000001079708-3562500670
2022 3 FD52 00 E124 R 6977704R 059 9/30/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709070 $0.01 000001079708-3562500670
2022 3 FD52 00 E111 R 6977704R 059 9/27/2021 1410 DESIGN PART IN R/W PHASE CA-XR092L1062126709059 $126.07 000001079457-3562500636
2022 3 FD52 00 E111 R 6977704R 059 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709059 $58.02 000001079457-3562500636
2022 3 FD52 00 E121 R 6977704R 059 9/27/2021 1410 DESIGN PART IN R/W PHASE CA-XR092L1062126709059 $8.95 000001079457-3562500636
2022 3 FD52 00 E121 R 6977704R 059 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709059 $4.11 000001079457-3562500636
2022 3 FD52 00 E122 R 6977704R 059 9/27/2021 1410 DESIGN PART IN R/W PHASE CA-XR092L1062126709059 $105.90 000001079457-3562500636
2022 3 FD52 00 E122 R 6977704R 059 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709059 $48.72 000001079457-3562500636
2022 3 FD52 00 E123 R 6977704R 059 9/27/2021 1410 DESIGN PART IN R/W PHASE CA-XR092L1062126709059 $28.62 000001079457-3562500636
2022 3 FD52 00 E123 R 6977704R 059 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709059 $13.00 000001079457-3562500636
2022 3 FD52 00 E124 R 6977704R 059 9/27/2021 1410 DESIGN PART IN R/W PHASE CA-XR092L1062126709059 $0.05 000001079457-3562500636
2022 3 FD52 00 E124 R 6977704R 059 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709059 $0.03 000001079457-3562500636
2022 3 FD52 06 E111 R 6977704R 059 9/27/2021 2050 NEGOTIATIONS CA-XR092L1062126709042 $2,504.30 000001078425-3562506206
2022 3 FD52 06 E111 R 6977704R 059 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709042 $250.43 000001078425-3562506206
2022 3 FD52 06 E121 R 6977704R 059 9/27/2021 2050 NEGOTIATIONS CA-XR092L1062126709042 $186.90 000001078425-3562506206
2022 3 FD52 06 E121 R 6977704R 059 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709042 $18.69 000001078425-3562506206
2022 3 FD52 06 E122 R 6977704R 059 9/27/2021 2050 NEGOTIATIONS CA-XR092L1062126709042 $2,102.85 000001078425-3562506206
2022 3 FD52 06 E122 R 6977704R 059 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709042 $210.29 000001078425-3562506206
2022 3 FD52 06 E123 R 6977704R 059 9/27/2021 2050 NEGOTIATIONS CA-XR092L1062126709042 $431.00 000001078425-3562506206
2022 3 FD52 06 E123 R 6977704R 059 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709042 $42.43 000001078425-3562506206
2022 3 FD52 06 E124 R 6977704R 059 9/27/2021 2050 NEGOTIATIONS CA-XR092L1062126709042 $1.20 000001078425-3562506206
2022 3 FD52 06 E124 R 6977704R 059 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709042 $0.12 000001078425-3562506206
2022 3 FD52 06 E121 R 6977704R 059 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207986 $13.06 000001078425-3562506206
2022 3 FD52 00 E111 R 6977704R 059 9/13/2021 1410 DESIGN PART IN R/W PHASE CA-XR091L1062125208004 $101.16 000001079457-3562500636
2022 3 FD52 00 E111 R 6977704R 059 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125208004 $1.74 000001079457-3562500636
2022 3 FD52 06 E122 R 6977704R 059 9/13/2021 2050 NEGOTIATIONS CA-XR091L1062125207986 $2,535.49 000001078425-3562506206
2022 3 FD52 00 E121 R 6977704R 059 9/13/2021 1410 DESIGN PART IN R/W PHASE CA-XR091L1062125208004 $6.98 000001079457-3562500636
2022 3 FD52 00 E121 R 6977704R 059 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125208004 $0.12 000001079457-3562500636
2022 3 FD52 00 E122 R 6977704R 059 9/13/2021 1410 DESIGN PART IN R/W PHASE CA-XR091L1062125208004 $84.94 000001079457-3562500636
2022 3 FD52 00 E122 R 6977704R 059 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125208004 $1.46 000001079457-3562500636
2022 3 FD52 00 E123 R 6977704R 059 9/13/2021 1410 DESIGN PART IN R/W PHASE CA-XR091L1062125208004 $22.86 000001079457-3562500636
2022 3 FD52 00 E123 R 6977704R 059 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125208004 $0.39 000001079457-3562500636
2022 3 FD52 06 E122 R 6977704R 059 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207986 $145.26 000001078425-3562506206
2022 3 FD52 06 E123 R 6977704R 059 9/13/2021 2050 NEGOTIATIONS CA-XR091L1062125207986 $505.10 000001078425-3562506206
2022 3 FD52 06 E123 R 6977704R 059 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207986 $18.80 000001078425-3562506206
2022 3 FD52 06 E111 R 6977704R 059 9/13/2021 2050 NEGOTIATIONS CA-XR091L1062125207985 $3,019.51 000001078425-3562506206
2022 3 FD52 06 E111 R 6977704R 059 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207985 $172.99 000001078425-3562506206
2022 3 FD52 06 E121 R 6977704R 059 9/13/2021 2050 NEGOTIATIONS CA-XR091L1062125207985 $224.55 000001078425-3562506206
2022 2 FD52 06 E111 R 6977704R 059 8/25/2021 2050 NEGOTIATIONS CA-XR082L1062123606977 $2,032.51 000001078425-3562506206
2022 2 FD52 06 E111 R 6977704R 059 8/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082L1062123606977 $1,145.84 000001078425-3562506206
2022 2 FD52 06 E121 R 6977704R 059 8/25/2021 2050 NEGOTIATIONS CA-XR082L1062123606977 $152.41 000001078425-3562506206
2022 2 FD52 06 E121 R 6977704R 059 8/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082L1062123606977 $85.09 000001078425-3562506206
2022 2 FD52 06 E122 R 6977704R 059 8/25/2021 2050 NEGOTIATIONS CA-XR082L1062123606977 $1,706.71 000001078425-3562506206
2022 2 FD52 06 E122 R 6977704R 059 8/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082L1062123606977 $962.16 000001078425-3562506206
2022 2 FD52 06 E123 R 6977704R 059 8/25/2021 2050 NEGOTIATIONS CA-XR082L1062123606977 $335.06 000001078425-3562506206
2022 2 FD52 06 E123 R 6977704R 059 8/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082L1062123606977 $219.35 000001078425-3562506206
2022 2 FD52 06 E124 R 6977704R 059 8/25/2021 2050 NEGOTIATIONS CA-XR082L1062123606977 $0.91 000001078425-3562506206
2022 2 FD52 06 E124 R 6977704R 059 8/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082L1062123606977 $0.50 000001078425-3562506206
2022 2 FD52 06 E111 R 6977704R 059 8/9/2021 2050 NEGOTIATIONS CA-XR081L1062121805833 $2,635.84 000001078425-3562506206
2022 2 FD52 06 E111 R 6977704R 059 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805833 $208.33 000001078425-3562506206
2022 2 FD52 06 E121 R 6977704R 059 8/9/2021 2050 NEGOTIATIONS CA-XR081L1062121805833 $195.82 000001078425-3562506206
2022 2 FD52 06 E121 R 6977704R 059 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805833 $15.35 000001078425-3562506206
2022 2 FD52 06 E122 R 6977704R 059 8/9/2021 2050 NEGOTIATIONS CA-XR081L1062121805833 $2,213.31 000001078425-3562506206
2022 2 FD52 06 E122 R 6977704R 059 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805833 $174.94 000001078425-3562506206
2022 2 FD52 06 E123 R 6977704R 059 8/9/2021 2050 NEGOTIATIONS CA-XR081L1062121805833 $439.28 000001078425-3562506206
2022 2 FD52 06 E123 R 6977704R 059 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805833 $39.88 000001078425-3562506206
2022 1 FD52 06 E111 R 6977704R 059 7/26/2021 2050 NEGOTIATIONS CA-XR072L1062120404709 $3,148.51 000001078425-3562506206
2022 1 FD52 06 E111 R 6977704R 059 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404709 $338.88 000001078425-3562506206
2022 1 FD52 06 E121 R 6977704R 059 7/26/2021 2050 NEGOTIATIONS CA-XR072L1062120404709 $235.96 000001078425-3562506206
2022 1 FD52 06 E121 R 6977704R 059 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404709 $25.44 000001078425-3562506206
2022 1 FD52 06 E122 R 6977704R 059 7/26/2021 2050 NEGOTIATIONS CA-XR072L1062120404709 $2,643.80 000001078425-3562506206
2022 1 FD52 06 E122 R 6977704R 059 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404709 $284.56 000001078425-3562506206
2022 1 FD52 06 E123 R 6977704R 059 7/26/2021 2050 NEGOTIATIONS CA-XR072L1062120404709 $496.99 000001078425-3562506206
2022 1 FD52 06 E123 R 6977704R 059 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404709 $50.27 000001078425-3562506206
2022 1 FD52 06 E124 R 6977704R 059 7/26/2021 2050 NEGOTIATIONS CA-XR072L1062120404709 $1.55 000001078425-3562506206
2022 1 FD52 06 E124 R 6977704R 059 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404709 $0.18 000001078425-3562506206
2022 1 FD52 06 E111 R 6977704R 059 7/12/2021 2050 NEGOTIATIONS CA-XR071L1062119003570 $398.77 000001078425-3562506206
2022 1 FD52 06 E111 R 6977704R 059 7/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003570 $95.89 000001078425-3562506206
2022 1 FD52 06 E121 R 6977704R 059 7/12/2021 2050 NEGOTIATIONS CA-XR071L1062119003570 $30.27 000001078425-3562506206
2022 1 FD52 06 E121 R 6977704R 059 7/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003570 $7.27 000001078425-3562506206
2022 1 FD52 06 E122 R 6977704R 059 7/12/2021 2050 NEGOTIATIONS CA-XR071L1062119003570 $337.01 000001078425-3562506206
2022 1 FD52 06 E122 R 6977704R 059 7/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003570 $80.96 000001078425-3562506206
2022 1 FD52 06 E123 R 6977704R 059 7/12/2021 2050 NEGOTIATIONS CA-XR071L1062119003570 $50.29 000001078425-3562506206
2022 1 FD52 06 E123 R 6977704R 059 7/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003570 $12.02 000001078425-3562506206