The Commonwealth pays employees on a semi-monthly basis with a scheduled pay day on the 15th and 30th of each month. The two monthly pay periods are from the 1st to the 15th of the month and the 16th through the last day of the month. Pay check distribution is delayed by one pay period to allow for system processing. For example work performed during the 1st to the 15th day of the month is paid to the employee on the 30th of the month. Accordingly the cost accounting charges for labor costs posting in eMARS to operating accounts and highway projects are also delayed by approximately one pay period.
A good rule of measure is that the cost accounting charges for the pay period ending on the 15th of the month will post to eMARS by the 25th and those for the pay period ending on the last day of the month will post to eMARS by the 10th of the following month.

x close panel
Detailed Project Expenditure Report
Total E-MARS Expenditures for 6780813R = $11,188,457.62
Click here for Labor Costs Information
Year Month PBU Charge District Object Phase Program Code County Date ACT Activity Name Trans ID Reference # Vendor Name Expenditure Line Description
2024 3 FD52 08 E111 R 6780813R 100 9/19/2023 6010 LEGAL ACTIVITY ON PROJECT CA-XR091N1062325106498 $232.51 67808132-3560700500
2024 3 FD52 08 E111 R 6780813R 100 9/19/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106498 $72.44 67808132-3560700500
2024 3 FD52 08 E121 R 6780813R 100 9/19/2023 6010 LEGAL ACTIVITY ON PROJECT CA-XR091N1062325106498 $17.42 67808132-3560700500
2024 3 FD52 08 E121 R 6780813R 100 9/19/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106498 $5.42 67808132-3560700500
2024 3 FD52 08 E122 R 6780813R 100 9/19/2023 6010 LEGAL ACTIVITY ON PROJECT CA-XR091N1062325106498 $153.83 67808132-3560700500
2024 3 FD52 08 E122 R 6780813R 100 9/19/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106498 $47.94 67808132-3560700500
2024 3 FD52 08 E123 R 6780813R 100 9/11/2023 6010 LEGAL ACTIVITY ON PROJECT CA-XR091N1062325106499 $32.20 67808132-3560700500
2024 3 FD52 08 E123 R 6780813R 100 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106499 $9.41 67808132-3560700500
2024 3 FD52 08 E111 R 6780813R 100 9/5/2023 6010 LEGAL ACTIVITY ON PROJECT CA-XR082N1062323505568 $23.37 67808132-3560700500
2024 3 FD52 08 E111 R 6780813R 100 9/5/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323505568 $13.35 67808132-3560700500
2024 3 FD52 08 E121 R 6780813R 100 9/5/2023 6010 LEGAL ACTIVITY ON PROJECT CA-XR082N1062323505568 $1.77 67808132-3560700500
2024 3 FD52 08 E121 R 6780813R 100 9/5/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323505568 $1.01 67808132-3560700500
2024 3 FD52 08 E122 R 6780813R 100 9/5/2023 6010 LEGAL ACTIVITY ON PROJECT CA-XR082N1062323505568 $15.50 67808132-3560700500
2024 3 FD52 08 E122 R 6780813R 100 9/5/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323505568 $8.84 67808132-3560700500
2024 3 FD52 08 E123 R 6780813R 100 9/5/2023 6010 LEGAL ACTIVITY ON PROJECT CA-XR082N1062323505568 $4.70 67808132-3560700500
2024 3 FD52 08 E123 R 6780813R 100 9/5/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323505568 $2.63 67808132-3560700500
2024 3 FD52 08 E124 R 6780813R 100 9/5/2023 6010 LEGAL ACTIVITY ON PROJECT CA-XR082N1062323505568 $0.01 67808132-3560700500
2024 2 FD52 08 E111 R 6780813R 100 8/24/2023 2110 RIGHT OF WAY SUPERVISION CA-XR082N1062323504987 $284.38 000001088867-3562508206
2024 2 FD52 08 E111 R 6780813R 100 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504987 $39.47 000001088867-3562508206
2024 2 FD52 08 E121 R 6780813R 100 8/24/2023 2110 RIGHT OF WAY SUPERVISION CA-XR082N1062323504987 $21.46 000001088867-3562508206
2024 2 FD52 08 E121 R 6780813R 100 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504987 $2.97 000001088867-3562508206
2024 2 FD52 08 E122 R 6780813R 100 8/24/2023 2110 RIGHT OF WAY SUPERVISION CA-XR082N1062323504987 $188.29 000001088867-3562508206
2024 2 FD52 08 E122 R 6780813R 100 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504987 $26.12 000001088867-3562508206
2024 2 FD52 08 E123 R 6780813R 100 8/24/2023 2110 RIGHT OF WAY SUPERVISION CA-XR082N1062323504987 $34.37 000001088867-3562508206
2024 2 FD52 08 E123 R 6780813R 100 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504987 $4.69 000001088867-3562508206
2024 2 FD52 08 E124 R 6780813R 100 8/24/2023 2110 RIGHT OF WAY SUPERVISION CA-XR082N1062323504987 $0.09 000001088867-3562508206
2024 2 FD52 08 E124 R 6780813R 100 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504987 $0.01 000001088867-3562508206
2024 2 FD52 08 E375 R 6780813R 100 8/7/2023 6010 LEGAL ACTIVITY ON PROJECT GAX-2400009534 PULASKI COUNTY CLERK $515.00 KYTC v. Nick A. Cooley - Record deed
2024 1 FD52 08 E111 R 6780813R 100 7/24/2023 6010 LEGAL ACTIVITY ON PROJECT CA-XR072N1062320203325 $531.96 67808132-3560700500
2024 1 FD52 08 E111 R 6780813R 100 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320203325 $137.01 67808132-3560700500
2024 1 FD52 08 E121 R 6780813R 100 7/24/2023 6010 LEGAL ACTIVITY ON PROJECT CA-XR072N1062320203325 $40.11 67808132-3560700500
2024 1 FD52 08 E121 R 6780813R 100 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320203325 $10.33 67808132-3560700500
2024 1 FD52 08 E122 R 6780813R 100 7/24/2023 6010 LEGAL ACTIVITY ON PROJECT CA-XR072N1062320203325 $352.13 67808132-3560700500
2024 1 FD52 08 E122 R 6780813R 100 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320203325 $90.66 67808132-3560700500
2024 1 FD52 08 E123 R 6780813R 100 7/24/2023 6010 LEGAL ACTIVITY ON PROJECT CA-XR072N1062320203325 $72.09 67808132-3560700500
2024 1 FD52 08 E123 R 6780813R 100 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320203325 $18.48 67808132-3560700500
2024 1 FD52 08 E124 R 6780813R 100 7/24/2023 6010 LEGAL ACTIVITY ON PROJECT CA-XR072N1062320203325 $0.19 67808132-3560700500
2024 1 FD52 08 E124 R 6780813R 100 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320203325 $0.04 67808132-3560700500
2024 1 FD52 08 E111 R 6780813R 100 7/11/2023 6010 LEGAL ACTIVITY ON PROJECT CA-XR071N1062319102125 $938.22 67808132-3560700500
2024 1 FD52 08 E121 R 6780813R 100 7/11/2023 6010 LEGAL ACTIVITY ON PROJECT CA-XR071N1062319102125 $70.00 67808132-3560700500
2024 1 FD52 08 E122 R 6780813R 100 7/11/2023 6010 LEGAL ACTIVITY ON PROJECT CA-XR071N1062319102125 $731.81 67808132-3560700500
2024 1 FD52 08 E123 R 6780813R 100 7/11/2023 6010 LEGAL ACTIVITY ON PROJECT CA-XR071N1062319102125 $104.97 67808132-3560700500
2024 1 FD52 08 E796 R 6780813R 100 7/7/2023 2640 RIGHT OF WAY PAYMENTS GAX-2400001143 PULASKI COUNTY CIRCUIT CLERK $242,500.00 Recommendation of Settlement
2023 11 FD52 08 E111 R 6780813R 100 5/24/2023 2010 RIGHT OF WAY ESTIMATES CA-XR052N1062314309019 $214.76 000001073455-3562508206
2023 11 FD52 08 E111 R 6780813R 100 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309019 $3.94 000001073455-3562508206
2023 11 FD52 08 E121 R 6780813R 100 5/24/2023 2010 RIGHT OF WAY ESTIMATES CA-XR052N1062314309019 $16.18 000001073455-3562508206
2023 11 FD52 08 E121 R 6780813R 100 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309019 $0.30 000001073455-3562508206
2023 11 FD52 08 E122 R 6780813R 100 5/24/2023 2010 RIGHT OF WAY ESTIMATES CA-XR052N1062314309019 $167.51 000001073455-3562508206
2023 11 FD52 08 E122 R 6780813R 100 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309019 $3.07 000001073455-3562508206
2023 11 FD52 08 E123 R 6780813R 100 5/24/2023 2010 RIGHT OF WAY ESTIMATES CA-XR052N1062314309019 $27.45 000001073455-3562508206
2023 11 FD52 08 E123 R 6780813R 100 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309019 $0.50 000001073455-3562508206
2023 11 FD52 08 E124 R 6780813R 100 5/24/2023 2010 RIGHT OF WAY ESTIMATES CA-XR052N1062314309019 $0.07 000001073455-3562508206
2023 11 FD52 08 E111 R 6780813R 100 5/16/2023 6010 LEGAL ACTIVITY ON PROJECT CA-XR051N1062312808493 $305.72 67808132-3560700500
2023 11 FD52 08 E111 R 6780813R 100 5/16/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808493 $2.67 67808132-3560700500
2023 11 FD52 08 E121 R 6780813R 100 5/16/2023 6010 LEGAL ACTIVITY ON PROJECT CA-XR051N1062312808493 $22.91 67808132-3560700500
2023 11 FD52 08 E121 R 6780813R 100 5/16/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808493 $0.20 67808132-3560700500
2023 11 FD52 08 E122 R 6780813R 100 5/16/2023 6010 LEGAL ACTIVITY ON PROJECT CA-XR051N1062312808493 $238.46 67808132-3560700500
2023 11 FD52 08 E122 R 6780813R 100 5/16/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808493 $2.08 67808132-3560700500
2023 11 FD52 08 E123 R 6780813R 100 5/16/2023 6010 LEGAL ACTIVITY ON PROJECT CA-XR051N1062312808493 $47.48 67808132-3560700500
2023 11 FD52 08 E123 R 6780813R 100 5/16/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808493 $0.56 67808132-3560700500
2023 10 FD52 08 E111 R 6780813R 100 4/28/2023 6010 LEGAL ACTIVITY ON PROJECT CA-XR042N1062311107540 $317.74 67808132-3560700500
2023 10 FD52 08 E111 R 6780813R 100 4/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311107540 $16.52 67808132-3560700500
2023 10 FD52 08 E121 R 6780813R 100 4/28/2023 6010 LEGAL ACTIVITY ON PROJECT CA-XR042N1062311107540 $23.86 67808132-3560700500
2023 10 FD52 08 E121 R 6780813R 100 4/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311107540 $1.25 67808132-3560700500
2023 10 FD52 08 E122 R 6780813R 100 4/28/2023 6010 LEGAL ACTIVITY ON PROJECT CA-XR042N1062311107540 $247.78 67808132-3560700500
2023 10 FD52 08 E122 R 6780813R 100 4/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311107540 $12.88 67808132-3560700500
2023 10 FD52 08 E123 R 6780813R 100 4/28/2023 6010 LEGAL ACTIVITY ON PROJECT CA-XR042N1062311107540 $38.52 67808132-3560700500
2023 10 FD52 08 E123 R 6780813R 100 4/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311107540 $1.97 67808132-3560700500
2023 10 FD52 08 E124 R 6780813R 100 4/28/2023 6010 LEGAL ACTIVITY ON PROJECT CA-XR042N1062311107540 $0.10 67808132-3560700500
2023 10 FD52 08 E124 R 6780813R 100 4/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311107540 $0.01 67808132-3560700500
2023 10 FD52 08 E111 R 6780813R 100 4/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309606379 $55.77 67808132-3560700500
2023 10 FD52 08 E121 R 6780813R 100 4/14/2023 6010 LEGAL ACTIVITY ON PROJECT CA-XR041N1062309606379 $9.19 67808132-3560700500
2023 10 FD52 08 E121 R 6780813R 100 4/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309606379 $4.15 67808132-3560700500
2023 10 FD52 08 E122 R 6780813R 100 4/14/2023 6010 LEGAL ACTIVITY ON PROJECT CA-XR041N1062309606379 $96.35 67808132-3560700500
2023 10 FD52 08 E122 R 6780813R 100 4/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309606379 $43.50 67808132-3560700500
2023 10 FD52 08 E123 R 6780813R 100 4/14/2023 6010 LEGAL ACTIVITY ON PROJECT CA-XR041N1062309606379 $15.05 67808132-3560700500
2023 10 FD52 08 E123 R 6780813R 100 4/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309606379 $6.67 67808132-3560700500
2023 10 FD52 08 E111 R 6780813R 100 4/14/2023 6010 LEGAL ACTIVITY ON PROJECT CA-XR041N1062309606378 $123.54 67808132-3560700500
2023 9 FD52 08 E794 R 6780813R 100 3/8/2023 2640 RIGHT OF WAY PAYMENTS GAX-2300070849 GIlbert Edwards, Jr. $5,550.00 Deed of Conveyance
2023 7 FD52 08 E794 R 6780813R 100 1/25/2023 2640 RIGHT OF WAY PAYMENTS GAX-2300057711 RICHARD L DYER $11,000.00 Deed of Conveyance
2023 2 FD52 08 E111 R 6780813R 100 8/10/2022 6010 LEGAL ACTIVITY ON PROJECT CA-XR081M1062222110649 $427.12 67808132-3560700500
2023 2 FD52 08 E111 R 6780813R 100 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110649 $12.16 67808132-3560700500
2023 2 FD52 08 E121 R 6780813R 100 8/10/2022 6010 LEGAL ACTIVITY ON PROJECT CA-XR081M1062222110649 $31.91 67808132-3560700500
2023 2 FD52 08 E121 R 6780813R 100 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110649 $0.91 67808132-3560700500
2023 2 FD52 08 E122 R 6780813R 100 8/10/2022 6010 LEGAL ACTIVITY ON PROJECT CA-XR081M1062222110649 $333.11 67808132-3560700500
2023 2 FD52 08 E122 R 6780813R 100 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110649 $9.48 67808132-3560700500
2023 2 FD52 08 E123 R 6780813R 100 8/10/2022 6010 LEGAL ACTIVITY ON PROJECT CA-XR081M1062222110649 $56.61 67808132-3560700500
2023 2 FD52 08 E123 R 6780813R 100 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110649 $2.32 67808132-3560700500
2022 12 FD52 08 E799 R 6780813R 100 6/21/2022 2050 NEGOTIATIONS PRCC-PCD2200027596 PULASKI COUNTY CLERK $3.62
2022 11 FD52 08 E794 R 6780813R 100 5/25/2022 2640 RIGHT OF WAY PAYMENTS GAX-2200090414 CUMBERLAND LAKE SHELL INC $27,918.50 Deed of Conveyance
2022 10 FD52 08 E792 R 6780813R 100 4/8/2022 2650 RELOCATION PAYMENTS GAX-2200076049 NICK COOLEY $24,897.37 Reestablishment
2022 6 FD52 08 E121 R 6780813R 100 12/22/2021 2060 RELOCATION ASSISTANCE CA-XR122L1062135504462 $15.91 000001073456-3562508206
2022 6 FD52 08 E121 R 6780813R 100 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504462 $0.70 000001073456-3562508206
2022 6 FD52 08 E122 R 6780813R 100 12/22/2021 2060 RELOCATION ASSISTANCE CA-XR122L1062135504462 $178.12 000001073456-3562508206
2022 6 FD52 08 E122 R 6780813R 100 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504462 $7.84 000001073456-3562508206
2022 6 FD52 08 E123 R 6780813R 100 12/22/2021 2060 RELOCATION ASSISTANCE CA-XR122L1062135504462 $29.56 000001073456-3562508206
2022 6 FD52 08 E123 R 6780813R 100 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504462 $1.28 000001073456-3562508206
2022 6 FD52 08 E124 R 6780813R 100 12/22/2021 2060 RELOCATION ASSISTANCE CA-XR122L1062135504462 $0.09 000001073456-3562508206
2022 6 FD52 08 E111 R 6780813R 100 12/22/2021 2060 RELOCATION ASSISTANCE CA-XR122L1062135504462 $212.13 000001073456-3562508206
2022 6 FD52 08 E111 R 6780813R 100 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504462 $9.33 000001073456-3562508206
2022 6 FD52 08 E792 R 6780813R 100 12/7/2021 2650 RELOCATION PAYMENTS GAX-2200040755 ALVA HANSFORD $6,984.16 REESTABLISHMENT
2022 5 FD52 08 E111 R 6780813R 100 11/23/2021 6010 LEGAL ACTIVITY ON PROJECT CA-XR112L1062132603026 $640.71 67808132-3560700500
2022 5 FD52 08 E111 R 6780813R 100 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132603026 $226.77 67808132-3560700500
2022 5 FD52 08 E121 R 6780813R 100 11/23/2021 6010 LEGAL ACTIVITY ON PROJECT CA-XR112L1062132603026 $48.24 67808132-3560700500
2022 5 FD52 08 E121 R 6780813R 100 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132603026 $17.07 67808132-3560700500
2022 5 FD52 08 E122 R 6780813R 100 11/23/2021 6010 LEGAL ACTIVITY ON PROJECT CA-XR112L1062132603026 $537.69 67808132-3560700500
2022 5 FD52 08 E122 R 6780813R 100 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132603026 $190.43 67808132-3560700500
2022 5 FD52 08 E123 R 6780813R 100 11/23/2021 6010 LEGAL ACTIVITY ON PROJECT CA-XR112L1062132603026 $82.44 67808132-3560700500
2022 5 FD52 08 E123 R 6780813R 100 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132603026 $32.04 67808132-3560700500
2022 5 FD52 08 E124 R 6780813R 100 11/23/2021 6010 LEGAL ACTIVITY ON PROJECT CA-XR112L1062132603026 $0.09 67808132-3560700500
2022 5 FD52 08 E124 R 6780813R 100 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132603026 $0.02 67808132-3560700500
2022 4 FD52 08 E149 R 6780813R 100 10/22/2021 2030 APPRAISING PRC-2200068738 PON22000002549 JOHN DANIEL LYONS $1,000.00 Statewide Appraiser Contracts
2022 4 FD52 08 E149 R 6780813R 100 10/22/2021 2030 APPRAISING PRC-2200069437 PON22000002549 JOHN DANIEL LYONS $3,000.00 Statewide Appraiser Contracts
2022 4 FD52 08 E149 R 6780813R 100 10/21/2021 2030 APPRAISING PRC-2200068148 PON22000002549 JOHN DANIEL LYONS $4,500.00 Statewide Appraiser Contracts
2022 4 FD52 08 E794 R 6780813R 100 10/5/2021 2640 RIGHT OF WAY PAYMENTS CR-2200013944 CUMBERLAND LAKE SHELL INC ($27,918.50) STALE DATE GAX 625 21*4900
2022 2 FD52 08 E111 R 6780813R 100 8/27/2021 6010 LEGAL ACTIVITY ON PROJECT CA-XR082L1062123607470 $294.14 67808122-3560700500
2022 2 FD52 08 E111 R 6780813R 100 8/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082L1062123607470 $32.55 67808122-3560700500
2022 2 FD52 08 E121 R 6780813R 100 8/27/2021 6010 LEGAL ACTIVITY ON PROJECT CA-XR082L1062123607470 $22.26 67808122-3560700500
2022 2 FD52 08 E121 R 6780813R 100 8/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082L1062123607470 $2.47 67808122-3560700500
2022 2 FD52 08 E122 R 6780813R 100 8/27/2021 6010 LEGAL ACTIVITY ON PROJECT CA-XR082L1062123607470 $246.99 67808122-3560700500
2022 2 FD52 08 E122 R 6780813R 100 8/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082L1062123607470 $27.33 67808122-3560700500
2022 2 FD52 08 E123 R 6780813R 100 8/27/2021 6010 LEGAL ACTIVITY ON PROJECT CA-XR082L1062123607470 $34.56 67808122-3560700500
2022 2 FD52 08 E123 R 6780813R 100 8/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082L1062123607470 $3.76 67808122-3560700500
2022 2 FD52 08 E124 R 6780813R 100 8/27/2021 6010 LEGAL ACTIVITY ON PROJECT CA-XR082L1062123607470 $0.10 67808122-3560700500
2022 2 FD52 08 E124 R 6780813R 100 8/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082L1062123607470 $0.01 67808122-3560700500
2022 2 FD52 08 E799 R 6780813R 100 8/23/2021 2050 NEGOTIATIONS PRCC-PCD2200003482 PULASKI COUNTY CLERK $3.62
2022 2 FD52 08 E111 R 6780813R 100 8/9/2021 2060 RELOCATION ASSISTANCE CA-XR081L1062121805809 $212.12 000001073456-3562508206
2022 2 FD52 08 E121 R 6780813R 100 8/9/2021 2060 RELOCATION ASSISTANCE CA-XR081L1062121805809 $15.56 000001073456-3562508206
2022 2 FD52 08 E122 R 6780813R 100 8/9/2021 2060 RELOCATION ASSISTANCE CA-XR081L1062121805809 $178.11 000001073456-3562508206
2022 2 FD52 08 E123 R 6780813R 100 8/9/2021 2060 RELOCATION ASSISTANCE CA-XR081L1062121805809 $30.75 000001073456-3562508206
2022 1 FD52 08 E123 R 6780813R 100 7/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120405307 $12.36 67808122-3560700500
2022 1 FD52 08 E124 R 6780813R 100 7/29/2021 6010 LEGAL ACTIVITY ON PROJECT CA-XR072L1062120405307 $0.36 67808122-3560700500
2022 1 FD52 08 E124 R 6780813R 100 7/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120405307 $0.04 67808122-3560700500
2022 1 FD52 08 E111 R 6780813R 100 7/29/2021 6010 LEGAL ACTIVITY ON PROJECT CA-XR072L1062120405307 $1,069.59 67808122-3560700500
2022 1 FD52 00 E111 R 6780813R 100 7/29/2021 2110 RIGHT OF WAY SUPERVISION CA-XR072L1062120404672 $328.38 000001073609-3562500670
2022 1 FD52 00 E111 R 6780813R 100 7/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404672 $32.84 000001073609-3562500670
2022 1 FD52 08 E111 R 6780813R 100 7/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120405307 $106.96 67808122-3560700500
2022 1 FD52 00 E121 R 6780813R 100 7/29/2021 2110 RIGHT OF WAY SUPERVISION CA-XR072L1062120404672 $24.83 000001073609-3562500670
2022 1 FD52 00 E121 R 6780813R 100 7/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404672 $2.48 000001073609-3562500670
2022 1 FD52 00 E122 R 6780813R 100 7/29/2021 2110 RIGHT OF WAY SUPERVISION CA-XR072L1062120404672 $275.75 000001073609-3562500670
2022 1 FD52 00 E122 R 6780813R 100 7/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404672 $27.58 000001073609-3562500670
2022 1 FD52 00 E123 R 6780813R 100 7/29/2021 2110 RIGHT OF WAY SUPERVISION CA-XR072L1062120404672 $35.09 000001073609-3562500670
2022 1 FD52 00 E123 R 6780813R 100 7/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404672 $3.46 000001073609-3562500670
2022 1 FD52 00 E124 R 6780813R 100 7/29/2021 2110 RIGHT OF WAY SUPERVISION CA-XR072L1062120404672 $0.09 000001073609-3562500670
2022 1 FD52 00 E124 R 6780813R 100 7/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404672 $0.01 000001073609-3562500670
2022 1 FD52 08 E121 R 6780813R 100 7/29/2021 6010 LEGAL ACTIVITY ON PROJECT CA-XR072L1062120405307 $80.96 67808122-3560700500
2022 1 FD52 08 E121 R 6780813R 100 7/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120405307 $8.09 67808122-3560700500
2022 1 FD52 08 E122 R 6780813R 100 7/29/2021 6010 LEGAL ACTIVITY ON PROJECT CA-XR072L1062120405307 $898.14 67808122-3560700500
2022 1 FD52 08 E122 R 6780813R 100 7/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120405307 $89.81 67808122-3560700500
2022 1 FD52 08 E123 R 6780813R 100 7/29/2021 6010 LEGAL ACTIVITY ON PROJECT CA-XR072L1062120405307 $125.65 67808122-3560700500
2022 1 FD52 00 E111 R 6780813R 100 7/1/2021 2110 RIGHT OF WAY SUPERVISION CA-XR062L1062117302459 $656.75 000001073609-3562500670
2022 1 FD52 00 E121 R 6780813R 100 7/1/2021 2110 RIGHT OF WAY SUPERVISION CA-XR062L1062117302459 $49.65 000001073609-3562500670
2022 1 FD52 00 E122 R 6780813R 100 7/1/2021 2110 RIGHT OF WAY SUPERVISION CA-XR062L1062117302459 $554.49 000001073609-3562500670
2022 1 FD52 00 E123 R 6780813R 100 7/1/2021 2110 RIGHT OF WAY SUPERVISION CA-XR062L1062117302459 $70.09 000001073609-3562500670
2022 1 FD52 00 E124 R 6780813R 100 7/1/2021 2110 RIGHT OF WAY SUPERVISION CA-XR062L1062117302459 $0.18 000001073609-3562500670
2021 12 FD52 08 E799 R 6780813R 100 6/21/2021 2050 NEGOTIATIONS PRCC-PCD2100026797 PULASKI COUNTY CLERK $9.32
2021 11 FD52 08 E792 R 6780813R 100 5/24/2021 2650 RELOCATION PAYMENTS GAX-2100085008 SOMERSET PULASKI ECONOMIC DEVELOPMENT AUTHORITY $46,332.00 Move Expense
2021 11 FD52 00 E111 R 6780813R 100 5/24/2021 2110 RIGHT OF WAY SUPERVISION CA-XR052L1062114100380 $722.43 000001073609-3562500670
2021 11 FD52 00 E121 R 6780813R 100 5/24/2021 2110 RIGHT OF WAY SUPERVISION CA-XR052L1062114100380 $54.61 000001073609-3562500670
2021 11 FD52 00 E122 R 6780813R 100 5/24/2021 2110 RIGHT OF WAY SUPERVISION CA-XR052L1062114100380 $609.95 000001073609-3562500670
2021 11 FD52 00 E123 R 6780813R 100 5/24/2021 2110 RIGHT OF WAY SUPERVISION CA-XR052L1062114100380 $77.10 000001073609-3562500670
2021 11 FD52 00 E124 R 6780813R 100 5/24/2021 2110 RIGHT OF WAY SUPERVISION CA-XR052L1062114100380 $0.20 000001073609-3562500670
2021 11 FD52 08 E792 R 6780813R 100 5/21/2021 2650 RELOCATION PAYMENTS GAX-2100084708 SBA TOWERS IX, LLC $1,267,231.62 MOVE EXPENSE
2021 11 FD52 08 E792 R 6780813R 100 5/4/2021 2650 RELOCATION PAYMENTS GAX-2100079561 ROBERT MURDOCH $25,000.00 REESTABLISHMENT
2021 8 FD52 08 E111 R 6780813R 100 2/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304988 $69.52 67808122-3560700500
2021 8 FD52 08 E121 R 6780813R 100 2/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304988 $5.26 67808122-3560700500
2021 8 FD52 08 E122 R 6780813R 100 2/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304988 $58.70 67808122-3560700500
2021 8 FD52 08 E123 R 6780813R 100 2/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304988 $8.03 67808122-3560700500
2021 8 FD52 08 E124 R 6780813R 100 2/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304988 $0.02 67808122-3560700500
2021 7 FD52 08 E792 R 6780813R 100 1/22/2021 2650 RELOCATION PAYMENTS GAX-2100053368 ALVA HANSFORD $17,682.84 REESTABLISHMENT
2021 7 FD52 08 E229 R 6780813R 100 1/11/2021 2010 RIGHT OF WAY ESTIMATES IET-XE13A162521010003160 $63.00
2021 6 FD52 08 E229 R 6780813R 100 12/28/2020 2010 RIGHT OF WAY ESTIMATES IET-XE13A162520360004220 $63.00
2021 6 FD52 08 E121 R 6780813R 100 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700393 $6.18 000001073455-3562508206
2021 6 FD52 08 E122 R 6780813R 100 12/23/2020 2010 RIGHT OF WAY ESTIMATES CA-XR122K1062035700393 $2,945.30 000001073455-3562508206
2021 6 FD52 08 E122 R 6780813R 100 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700393 $76.76 000001073455-3562508206
2021 6 FD52 08 E123 R 6780813R 100 12/23/2020 2010 RIGHT OF WAY ESTIMATES CA-XR122K1062035700393 $625.06 000001073455-3562500670
2021 6 FD52 08 E123 R 6780813R 100 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700393 $30.86 000001073455-3562508206
2021 6 FD52 08 E124 R 6780813R 100 12/23/2020 2010 RIGHT OF WAY ESTIMATES CA-XR122K1062035700393 $1.55 000001073455-3562508206
2021 6 FD52 08 E124 R 6780813R 100 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700393 $0.05 000001073455-3562508206
2021 6 FD52 08 E111 R 6780813R 100 12/23/2020 2060 RELOCATION ASSISTANCE CA-XR122K1062035700393 $132.58 000001073592-3562504206
2021 6 FD52 08 E121 R 6780813R 100 12/23/2020 2060 RELOCATION ASSISTANCE CA-XR122K1062035700393 $10.14 000001073592-3562504206
2021 6 FD52 08 E122 R 6780813R 100 12/23/2020 2060 RELOCATION ASSISTANCE CA-XR122K1062035700393 $111.94 000001073592-3562504206
2021 6 FD52 08 E123 R 6780813R 100 12/23/2020 2060 RELOCATION ASSISTANCE CA-XR122K1062035700393 $8.41 000001073592-3562504206
2021 6 FD52 08 E124 R 6780813R 100 12/23/2020 2060 RELOCATION ASSISTANCE CA-XR122K1062035700393 $0.09 000001073592-3562504206
2021 6 FD52 08 E111 R 6780813R 100 12/23/2020 2010 RIGHT OF WAY ESTIMATES CA-XR122K1062035700393 $3,488.46 000001073455-3562500670
2021 6 FD52 08 E111 R 6780813R 100 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700393 $90.91 000001073455-3562508206
2021 6 FD52 08 E121 R 6780813R 100 12/23/2020 2010 RIGHT OF WAY ESTIMATES CA-XR122K1062035700393 $256.62 000001073455-3562500670
2021 6 FD52 08 E791 R 6780813R 100 12/10/2020 2090 PROPERTY MANAGEMENT PRC-2100085196 CT2100000121 RAYBURN EXCAVATING LLC $69,650.00 Pulaski County 8-59.25 Multiple Parcels
2021 5 FD52 08 E111 R 6780813R 100 11/23/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR112K1062032509202 $588.27 67808132-3560700500
2021 5 FD52 08 E111 R 6780813R 100 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032509202 $147.07 67808132-3560700500
2021 5 FD52 08 E121 R 6780813R 100 11/23/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR112K1062032509202 $44.19 67808132-3560700500
2021 5 FD52 08 E121 R 6780813R 100 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032509202 $11.04 67808132-3560700500
2021 5 FD52 08 E122 R 6780813R 100 11/23/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR112K1062032509202 $496.68 67808132-3560700500
2021 5 FD52 08 E122 R 6780813R 100 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032509202 $124.17 67808132-3560700500
2021 5 FD52 08 E123 R 6780813R 100 11/23/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR112K1062032509202 $67.27 67808132-3560700500
2021 5 FD52 08 E123 R 6780813R 100 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032509202 $16.50 67808132-3560700500
2021 5 FD52 08 E124 R 6780813R 100 11/23/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR112K1062032509202 $0.20 67808132-3560700500
2021 5 FD52 08 E124 R 6780813R 100 11/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112K1062032509202 $0.05 67808132-3560700500
2021 5 FD52 08 E792 R 6780813R 100 11/18/2020 2650 RELOCATION PAYMENTS GAX-2100036924 BLACKBOARD INC $3,888.00 Move Expense
2021 5 FD52 08 E111 R 6780813R 100 11/9/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR111K1062031108240 $267.40 67808132-3560700500
2021 5 FD52 08 E121 R 6780813R 100 11/9/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR111K1062031108240 $19.90 67808132-3560700500
2021 5 FD52 08 E122 R 6780813R 100 11/9/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR111K1062031108240 $225.77 67808132-3560700500
2021 5 FD52 08 E123 R 6780813R 100 11/9/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR111K1062031108240 $30.46 67808132-3560700500
2021 4 FD52 08 E111 R 6780813R 100 10/26/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR102K1062029707261 $534.79 67808132-3560700500
2021 4 FD52 08 E121 R 6780813R 100 10/26/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR102K1062029707261 $40.16 67808132-3560700500
2021 4 FD52 08 E122 R 6780813R 100 10/26/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR102K1062029707261 $451.52 67808132-3560700500
2021 4 FD52 08 E123 R 6780813R 100 10/26/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR102K1062029707261 $60.92 67808132-3560700500
2021 4 FD52 08 E124 R 6780813R 100 10/26/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR102K1062029707261 $0.19 67808132-3560700500
2021 4 FD52 00 E229 R 6780813R 100 10/15/2020 2110 RIGHT OF WAY SUPERVISION IET-XE13A162520289002380 $36.96
2021 4 FD52 08 E111 R 6780813R 100 10/12/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR101K1062028206179 $1,069.59 67808132-3560700500
2021 4 FD52 08 E121 R 6780813R 100 10/12/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR101K1062028206179 $79.63 67808132-3560700500
2021 4 FD52 08 E122 R 6780813R 100 10/12/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR101K1062028206179 $903.06 67808132-3560700500
2021 4 FD52 08 E111 R 6780813R 100 10/12/2020 2010 RIGHT OF WAY ESTIMATES CA-XR101K1062028205697 $2,518.69 000001073455-3562508206
2021 4 FD52 08 E123 R 6780813R 100 10/12/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR101K1062028206179 $121.86 67808132-3560700500
2021 4 FD52 08 E111 R 6780813R 100 10/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101K1062028205697 $166.65 000001073455-3562508206
2021 4 FD52 08 E121 R 6780813R 100 10/12/2020 2010 RIGHT OF WAY ESTIMATES CA-XR101K1062028205697 $177.76 000001073455-3562508206
2021 4 FD52 08 E121 R 6780813R 100 10/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101K1062028205697 $12.59 000001073455-3562508206
2021 4 FD52 08 E122 R 6780813R 100 10/12/2020 2010 RIGHT OF WAY ESTIMATES CA-XR101K1062028205697 $2,126.54 000001073455-3562508206
2021 4 FD52 08 E122 R 6780813R 100 10/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101K1062028205697 $140.70 000001073455-3562508206
2021 4 FD52 08 E123 R 6780813R 100 10/12/2020 2010 RIGHT OF WAY ESTIMATES CA-XR101K1062028205697 $709.41 000001073455-3562508206
2021 4 FD52 08 E123 R 6780813R 100 10/12/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101K1062028205697 $26.60 000001073455-3562508206
2021 4 FD52 08 E111 R 6780813R 100 10/12/2020 2060 RELOCATION ASSISTANCE CA-XR101K1062028205697 $2,333.34 000001073456-3562508206
2021 4 FD52 08 E121 R 6780813R 100 10/12/2020 2060 RELOCATION ASSISTANCE CA-XR101K1062028205697 $175.94 000001073456-3562508206
2021 4 FD52 08 E122 R 6780813R 100 10/12/2020 2060 RELOCATION ASSISTANCE CA-XR101K1062028205697 $1,970.04 000001073456-3562508206
2021 4 FD52 08 E123 R 6780813R 100 10/12/2020 2060 RELOCATION ASSISTANCE CA-XR101K1062028205697 $313.38 000001073456-3562508206
2021 4 FD52 08 E111 R 6780813R 100 10/12/2020 2050 NEGOTIATIONS CA-XR101K1062028206183 $2,333.34
2021 4 FD52 08 E121 R 6780813R 100 10/12/2020 2050 NEGOTIATIONS CA-XR101K1062028206183 $171.32
2021 4 FD52 08 E122 R 6780813R 100 10/12/2020 2050 NEGOTIATIONS CA-XR101K1062028206183 $1,970.04
2021 4 FD52 08 E123 R 6780813R 100 10/12/2020 2050 NEGOTIATIONS CA-XR101K1062028206183 $328.56
2021 4 FD52 00 E111 R 6780813R 100 10/12/2020 2110 RIGHT OF WAY SUPERVISION CA-XR101K1062028205697 $312.74 000001073609-3562500670
2021 4 FD52 00 E121 R 6780813R 100 10/12/2020 2110 RIGHT OF WAY SUPERVISION CA-XR101K1062028205697 $23.64 000001073609-3562500670
2021 4 FD52 00 E122 R 6780813R 100 10/12/2020 2110 RIGHT OF WAY SUPERVISION CA-XR101K1062028205697 $264.05 000001073609-3562500670
2021 4 FD52 00 E123 R 6780813R 100 10/12/2020 2110 RIGHT OF WAY SUPERVISION CA-XR101K1062028205697 $34.03 000001073609-3562500670
2021 3 FD52 08 E229 R 6780813R 100 9/28/2020 2010 RIGHT OF WAY ESTIMATES IET-XE13A162520269004300 $139.00
2021 3 FD52 00 E122 R 6780813R 100 9/24/2020 2110 RIGHT OF WAY SUPERVISION CA-XR092K1062026704616 $264.05 000001073609-3562500670
2021 3 FD52 08 E122 R 6780813R 100 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704615 $237.32 000001073455-3562508206
2021 3 FD52 08 E123 R 6780813R 100 9/24/2020 2010 RIGHT OF WAY ESTIMATES CA-XR092K1062026704615 $702.56 000001073455-3562508206
2021 3 FD52 08 E123 R 6780813R 100 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704615 $72.12 000001073455-3562508206
2021 3 FD52 08 E124 R 6780813R 100 9/24/2020 2010 RIGHT OF WAY ESTIMATES CA-XR092K1062026704615 $1.45 000001073455-3562508206
2021 3 FD52 08 E124 R 6780813R 100 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704615 $0.16 000001073455-3562508206
2021 3 FD52 08 E111 R 6780813R 100 9/24/2020 2060 RELOCATION ASSISTANCE CA-XR092K1062026704615 $1,060.61 000001073456-3562508206
2021 3 FD52 08 E111 R 6780813R 100 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704615 $1,272.73 000001073456-3562508206
2021 3 FD52 08 E121 R 6780813R 100 9/24/2020 2060 RELOCATION ASSISTANCE CA-XR092K1062026704615 $79.97 000001073456-3562508206
2021 3 FD52 08 E121 R 6780813R 100 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704615 $95.96 000001073456-3562508206
2021 3 FD52 08 E122 R 6780813R 100 9/24/2020 2060 RELOCATION ASSISTANCE CA-XR092K1062026704615 $895.48 000001073456-3562508206
2021 3 FD52 00 E122 R 6780813R 100 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704616 $26.40 000001073609-3562500670
2021 3 FD52 08 E122 R 6780813R 100 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704615 $1,074.56 000001073456-3562508206
2021 3 FD52 08 E123 R 6780813R 100 9/24/2020 2060 RELOCATION ASSISTANCE CA-XR092K1062026704615 $145.21 000001073456-3562508206
2021 3 FD52 08 E123 R 6780813R 100 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704615 $168.17 000001073456-3562508206
2021 3 FD52 08 E124 R 6780813R 100 9/24/2020 2060 RELOCATION ASSISTANCE CA-XR092K1062026704615 $0.46 000001073456-3562508206
2021 3 FD52 08 E124 R 6780813R 100 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704615 $0.54 000001073456-3562508206
2021 3 FD52 00 E123 R 6780813R 100 9/24/2020 2110 RIGHT OF WAY SUPERVISION CA-XR092K1062026704616 $34.08 000001073609-3562500670
2021 3 FD52 00 E123 R 6780813R 100 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704616 $3.36 000001073609-3562500670
2021 3 FD52 08 E111 R 6780813R 100 9/24/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR092K1062026705190 $267.40 67808132-3560700500
2021 3 FD52 08 E111 R 6780813R 100 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026705190 $222.84 67808132-3560700500
2021 3 FD52 08 E121 R 6780813R 100 9/24/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR092K1062026705190 $20.09 67808132-3560700500
2021 3 FD52 08 E121 R 6780813R 100 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026705190 $16.73 67808132-3560700500
2021 3 FD52 08 E122 R 6780813R 100 9/24/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR092K1062026705190 $225.77 67808132-3560700500
2021 3 FD52 08 E122 R 6780813R 100 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026705190 $188.14 67808132-3560700500
2021 3 FD52 08 E123 R 6780813R 100 9/24/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR092K1062026705190 $30.85 67808132-3560700500
2021 3 FD52 08 E123 R 6780813R 100 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026705190 $25.00 67808132-3560700500
2021 3 FD52 08 E124 R 6780813R 100 9/24/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR092K1062026705190 $0.09 67808132-3560700500
2021 3 FD52 00 E124 R 6780813R 100 9/24/2020 2110 RIGHT OF WAY SUPERVISION CA-XR092K1062026704616 $0.09 000001073609-3562500670
2021 3 FD52 08 E111 R 6780813R 100 9/24/2020 2010 RIGHT OF WAY ESTIMATES CA-XR092K1062026704615 $2,642.83 000001073455-3562508206
2021 3 FD52 08 E124 R 6780813R 100 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026705190 $0.08 67808132-3560700500
2021 3 FD52 00 E124 R 6780813R 100 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704616 $0.01 000001073609-3562500670
2021 3 FD52 08 E111 R 6780813R 100 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704615 $281.08 000001073455-3562508206
2021 3 FD52 08 E111 R 6780813R 100 9/24/2020 2050 NEGOTIATIONS CA-XR092K1062026705196 $2,121.22
2021 3 FD52 08 E111 R 6780813R 100 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026705196 $212.12
2021 3 FD52 08 E121 R 6780813R 100 9/24/2020 2050 NEGOTIATIONS CA-XR092K1062026705196 $159.33
2021 3 FD52 08 E121 R 6780813R 100 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026705196 $15.93
2021 3 FD52 08 E122 R 6780813R 100 9/24/2020 2050 NEGOTIATIONS CA-XR092K1062026705196 $1,790.95
2021 3 FD52 08 E121 R 6780813R 100 9/24/2020 2010 RIGHT OF WAY ESTIMATES CA-XR092K1062026704615 $188.29 000001073455-3562508206
2021 3 FD52 08 E122 R 6780813R 100 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026705196 $179.09
2021 3 FD52 08 E123 R 6780813R 100 9/24/2020 2050 NEGOTIATIONS CA-XR092K1062026705196 $299.15
2021 3 FD52 08 E123 R 6780813R 100 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026705196 $29.41
2021 3 FD52 08 E124 R 6780813R 100 9/24/2020 2050 NEGOTIATIONS CA-XR092K1062026705196 $0.91
2021 3 FD52 00 E111 R 6780813R 100 9/24/2020 0010 ENV STUDIES-UST/HZM CA-XR092K1062026704633 $295.15 000001075226-3562500061
2021 3 FD52 08 E124 R 6780813R 100 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026705196 $0.09
2021 3 FD52 00 E111 R 6780813R 100 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704633 $82.72 000001075226-3562500061
2021 3 FD52 00 E121 R 6780813R 100 9/24/2020 0010 ENV STUDIES-UST/HZM CA-XR092K1062026704633 $20.89 000001075226-3562500061
2021 3 FD52 00 E121 R 6780813R 100 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704633 $5.85 000001075226-3562500061
2021 3 FD52 00 E122 R 6780813R 100 9/24/2020 0010 ENV STUDIES-UST/HZM CA-XR092K1062026704633 $249.42 000001075226-3562500061
2021 3 FD52 00 E122 R 6780813R 100 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704633 $69.84 000001075226-3562500061
2021 3 FD52 08 E121 R 6780813R 100 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704615 $20.10 000001073455-3562508206
2021 3 FD52 00 E123 R 6780813R 100 9/24/2020 0010 ENV STUDIES-UST/HZM CA-XR092K1062026704633 $53.68 000001075226-3562500061
2021 3 FD52 00 E123 R 6780813R 100 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704633 $14.83 000001075226-3562500061
2021 3 FD52 00 E124 R 6780813R 100 9/24/2020 0010 ENV STUDIES-UST/HZM CA-XR092K1062026704633 $0.10 000001075226-3562500061
2021 3 FD52 00 E124 R 6780813R 100 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704633 $0.02 000001075226-3562500061
2021 3 FD52 08 E122 R 6780813R 100 9/24/2020 2010 RIGHT OF WAY ESTIMATES CA-XR092K1062026704615 $2,231.34 000001073455-3562508206
2021 3 FD52 00 E111 R 6780813R 100 9/24/2020 2110 RIGHT OF WAY SUPERVISION CA-XR092K1062026704615 $312.74 000001073609-3562500670
2021 3 FD52 00 E111 R 6780813R 100 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704615 $31.27 000001073609-3562500670
2021 3 FD52 00 E121 R 6780813R 100 9/24/2020 2110 RIGHT OF WAY SUPERVISION CA-XR092K1062026704615 $23.64 000001073609-3562500670
2021 3 FD52 00 E121 R 6780813R 100 9/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092K1062026704615 $2.37 000001073609-3562500670
2021 3 FD52 00 E121 R 6780813R 024 9/10/2020 0010 ENV STUDIES-UST/HZM CA-XR091K1062025303637 $63.90 000001075393-3562500061
2021 3 FD52 00 E122 R 6780813R 024 9/10/2020 0010 ENV STUDIES-UST/HZM CA-XR091K1062025303637 $762.92 000001075393-3562500061
2021 3 FD52 00 E123 R 6780813R 024 9/10/2020 0010 ENV STUDIES-UST/HZM CA-XR091K1062025303637 $163.75 000001075393-3562500061
2021 3 FD52 08 E111 R 6780813R 100 9/10/2020 2050 NEGOTIATIONS CA-XR091K1062025304070 $3,222.96
2021 3 FD52 08 E111 R 6780813R 100 9/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091K1062025304070 $82.45
2021 3 FD52 08 E121 R 6780813R 100 9/10/2020 2050 NEGOTIATIONS CA-XR091K1062025304070 $238.54
2021 3 FD52 08 E121 R 6780813R 100 9/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091K1062025304070 $6.23
2021 3 FD52 08 E122 R 6780813R 100 9/10/2020 2050 NEGOTIATIONS CA-XR091K1062025304070 $2,721.15
2021 3 FD52 08 E122 R 6780813R 100 9/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091K1062025304070 $69.61
2021 3 FD52 08 E123 R 6780813R 100 9/10/2020 2050 NEGOTIATIONS CA-XR091K1062025304070 $472.96
2021 3 FD52 08 E123 R 6780813R 100 9/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091K1062025304070 $13.16
2021 3 FD52 08 E111 R 6780813R 100 9/10/2020 2010 RIGHT OF WAY ESTIMATES CA-XR091K1062025303621 $1,666.67 000001073455-3562508206
2021 3 FD52 08 E121 R 6780813R 100 9/10/2020 2010 RIGHT OF WAY ESTIMATES CA-XR091K1062025303621 $113.39 000001073455-3562508206
2021 3 FD52 08 E122 R 6780813R 100 9/10/2020 2010 RIGHT OF WAY ESTIMATES CA-XR091K1062025303621 $1,407.17 000001073455-3562508206
2021 3 FD52 08 E123 R 6780813R 100 9/10/2020 2010 RIGHT OF WAY ESTIMATES CA-XR091K1062025303621 $570.90 000001073455-3562508206
2021 3 FD52 08 E111 R 6780813R 100 9/10/2020 2060 RELOCATION ASSISTANCE CA-XR091K1062025303621 $2,333.34 000001073456-3562508206
2021 3 FD52 08 E121 R 6780813R 100 9/10/2020 2060 RELOCATION ASSISTANCE CA-XR091K1062025303621 $175.94 000001073456-3562508206
2021 3 FD52 08 E122 R 6780813R 100 9/10/2020 2060 RELOCATION ASSISTANCE CA-XR091K1062025303621 $1,970.04 000001073456-3562508206
2021 3 FD52 08 E111 R 6780813R 100 9/10/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR091K1062025304066 $802.19 67808132-3560700500
2021 3 FD52 08 E123 R 6780813R 100 9/10/2020 2060 RELOCATION ASSISTANCE CA-XR091K1062025303621 $313.38 000001073456-3562508206
2021 3 FD52 08 E121 R 6780813R 100 9/10/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR091K1062025304066 $59.72 67808132-3560700500
2021 3 FD52 08 E122 R 6780813R 100 9/10/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR091K1062025304066 $677.29 67808132-3560700500
2021 3 FD52 08 E123 R 6780813R 100 9/10/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR091K1062025304066 $91.40 67808132-3560700500
2021 3 FD52 00 E111 R 6780813R 024 9/10/2020 0010 ENV STUDIES-UST/HZM CA-XR091K1062025303637 $903.61 000001075393-3562500061
2021 3 FD52 08 E143 R 6780813R 100 9/9/2020 0510 ENV STUDIES-UST/HZM PRC-2100036006 PON22000004301 FRANKLIN PRICE INC $11,382.00 Pulaski County 8-59
2021 2 FD52 08 E792 R 6780813R 100 8/28/2020 2650 RELOCATION PAYMENTS GAX-2100014710 Gator Made Inc $13,159.00
2021 2 FD52 00 E229 R 6780813R 100 8/26/2020 2110 RIGHT OF WAY SUPERVISION IET-XE13A162520238001760 $70.62
2021 2 FD52 08 E111 R 6780813R 100 8/24/2020 2010 RIGHT OF WAY ESTIMATES CA-XR082K1062023402541 $1,666.67 000001073455-3562508206
2021 2 FD52 08 E121 R 6780813R 100 8/24/2020 2010 RIGHT OF WAY ESTIMATES CA-XR082K1062023402541 $113.39 000001073455-3562508206
2021 2 FD52 08 E122 R 6780813R 100 8/24/2020 2010 RIGHT OF WAY ESTIMATES CA-XR082K1062023402541 $1,407.17 000001073455-3562508206
2021 2 FD52 08 E123 R 6780813R 100 8/24/2020 2010 RIGHT OF WAY ESTIMATES CA-XR082K1062023402541 $570.90 000001073455-3562508206
2021 2 FD52 08 E124 R 6780813R 100 8/24/2020 2010 RIGHT OF WAY ESTIMATES CA-XR082K1062023402541 $1.00 000001073455-3562508206
2021 2 FD52 08 E111 R 6780813R 100 8/24/2020 2060 RELOCATION ASSISTANCE CA-XR082K1062023402541 $2,333.34 000001073456-3562508206
2021 2 FD52 08 E121 R 6780813R 100 8/24/2020 2060 RELOCATION ASSISTANCE CA-XR082K1062023402541 $175.94 000001073456-3562508206
2021 2 FD52 08 E122 R 6780813R 100 8/24/2020 2060 RELOCATION ASSISTANCE CA-XR082K1062023402541 $1,970.04 000001073456-3562508206
2021 2 FD52 08 E123 R 6780813R 100 8/24/2020 2060 RELOCATION ASSISTANCE CA-XR082K1062023402541 $313.38 000001073456-3562508206
2021 2 FD52 08 E124 R 6780813R 100 8/24/2020 2060 RELOCATION ASSISTANCE CA-XR082K1062023402541 $1.00 000001073456-3562508206
2021 2 FD52 08 E111 R 6780813R 100 8/24/2020 2050 NEGOTIATIONS CA-XR082K1062023403115 $3,367.05
2021 2 FD52 08 E111 R 6780813R 100 8/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082K1062023403115 $17.64
2021 2 FD52 08 E121 R 6780813R 100 8/24/2020 2050 NEGOTIATIONS CA-XR082K1062023403115 $253.37
2021 2 FD52 08 E121 R 6780813R 100 8/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082K1062023403115 $1.33
2021 2 FD52 08 E122 R 6780813R 100 8/24/2020 2050 NEGOTIATIONS CA-XR082K1062023403115 $2,842.81
2021 2 FD52 08 E122 R 6780813R 100 8/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082K1062023403115 $14.89
2021 2 FD52 08 E123 R 6780813R 100 8/24/2020 2050 NEGOTIATIONS CA-XR082K1062023403115 $496.15
2021 2 FD52 08 E123 R 6780813R 100 8/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082K1062023403115 $2.82
2021 2 FD52 08 E124 R 6780813R 100 8/24/2020 2050 NEGOTIATIONS CA-XR082K1062023403115 $1.50
2021 2 FD52 08 E124 R 6780813R 100 8/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082K1062023403115 $0.01
2021 2 FD52 08 E111 R 6780813R 100 8/24/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR082K1062023403110 $1,176.55 67808132-3560700500
2021 2 FD52 08 E121 R 6780813R 100 8/24/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR082K1062023403110 $88.37 67808132-3560700500
2021 2 FD52 08 E122 R 6780813R 100 8/24/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR082K1062023403110 $993.36 67808132-3560700500
2021 2 FD52 08 E123 R 6780813R 100 8/24/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR082K1062023403110 $134.04 67808132-3560700500
2021 2 FD52 08 E124 R 6780813R 100 8/24/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR082K1062023403110 $0.40 67808132-3560700500
2021 2 FD52 00 E111 R 6780813R 100 8/24/2020 0010 ENV STUDIES-UST/HZM CA-XR082K1062023402557 $860.09 000001075196-3562500061
2021 2 FD52 00 E111 R 6780813R 100 8/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082K1062023402557 $215.23 000001075196-3562500061
2021 2 FD52 00 E121 R 6780813R 100 8/24/2020 0010 ENV STUDIES-UST/HZM CA-XR082K1062023402557 $60.83 000001075196-3562500061
2021 2 FD52 00 E121 R 6780813R 100 8/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082K1062023402557 $15.21 000001075196-3562500061
2021 2 FD52 00 E122 R 6780813R 100 8/24/2020 0010 ENV STUDIES-UST/HZM CA-XR082K1062023402557 $726.24 000001075196-3562500061
2021 2 FD52 00 E122 R 6780813R 100 8/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082K1062023402557 $181.72 000001075196-3562500061
2021 2 FD52 00 E123 R 6780813R 100 8/24/2020 0010 ENV STUDIES-UST/HZM CA-XR082K1062023402557 $156.26 000001075196-3562500061
2021 2 FD52 00 E123 R 6780813R 100 8/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082K1062023402557 $38.62 000001075196-3562500061
2021 2 FD52 00 E124 R 6780813R 100 8/24/2020 0010 ENV STUDIES-UST/HZM CA-XR082K1062023402557 $0.30 000001075196-3562500061
2021 2 FD52 00 E111 R 6780813R 100 8/24/2020 2110 RIGHT OF WAY SUPERVISION CA-XR082K1062023402541 $688.03 000001073609-3562500670
2021 2 FD52 00 E124 R 6780813R 100 8/24/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082K1062023402557 $0.08 000001075196-3562500061
2021 2 FD52 00 E121 R 6780813R 100 8/24/2020 2110 RIGHT OF WAY SUPERVISION CA-XR082K1062023402541 $52.01 000001073609-3562500670
2021 2 FD52 00 E122 R 6780813R 100 8/24/2020 2110 RIGHT OF WAY SUPERVISION CA-XR082K1062023402541 $580.90 000001073609-3562500670
2021 2 FD52 00 E123 R 6780813R 100 8/24/2020 2110 RIGHT OF WAY SUPERVISION CA-XR082K1062023402541 $74.88 000001073609-3562500670
2021 2 FD52 00 E124 R 6780813R 100 8/24/2020 2110 RIGHT OF WAY SUPERVISION CA-XR082K1062023402541 $0.20 000001073609-3562500670
2021 2 FD52 08 E799 R 6780813R 100 8/21/2020 2050 NEGOTIATIONS PRCC-PCD2100002494 PULASKI COUNTY CLERK $286.25
2021 2 FD52 08 E365 R 6780813R 100 8/17/2020 2640 RIGHT OF WAY PAYMENTS GAX-2100011478 BARNESBUGLERS, LLC $20.07 Tax Reimbursement
2021 2 FD52 08 E365 R 6780813R 100 8/17/2020 2640 RIGHT OF WAY PAYMENTS GAX-2100011493 HOGUE MYERS PROPERTIES LLC $9.78 Tax Reimbursement
2021 2 FD52 08 E365 R 6780813R 100 8/17/2020 2640 RIGHT OF WAY PAYMENTS GAX-2100011476 JAMES R VAUGHT $9.78 Tax Reimbursement
2021 2 FD52 08 E365 R 6780813R 100 8/17/2020 2640 RIGHT OF WAY PAYMENTS GAX-2100011494 ROBERT MURDOCH $189.53 Tax Reimbursement
2021 2 FD52 00 E229 R 6780813R 100 8/11/2020 2110 RIGHT OF WAY SUPERVISION IET-XE13A162520223002120 $66.00
2021 2 FD52 08 E792 R 6780813R 100 8/10/2020 2650 RELOCATION PAYMENTS GAX-2100008696 FLAT LICK PROPERTIES INC $6,887.88
2021 2 FD52 08 E111 R 6780813R 100 8/10/2020 2010 RIGHT OF WAY ESTIMATES CA-XR081K1062022001452 $1,527.78 000001073455-3562508206
2021 2 FD52 08 E111 R 6780813R 100 8/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081K1062022001452 $138.89 000001073455-3562508206
2021 2 FD52 08 E121 R 6780813R 100 8/10/2020 2010 RIGHT OF WAY ESTIMATES CA-XR081K1062022001452 $103.94 000001073455-3562508206
2021 2 FD52 08 E121 R 6780813R 100 8/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081K1062022001452 $9.45 000001073455-3562508206
2021 2 FD52 08 E122 R 6780813R 100 8/10/2020 2010 RIGHT OF WAY ESTIMATES CA-XR081K1062022001452 $1,289.90 000001073455-3562508206
2021 2 FD52 08 E122 R 6780813R 100 8/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081K1062022001452 $117.27 000001073455-3562508206
2021 2 FD52 08 E123 R 6780813R 100 8/10/2020 2010 RIGHT OF WAY ESTIMATES CA-XR081K1062022001452 $523.75 000001073455-3562508206
2021 2 FD52 08 E123 R 6780813R 100 8/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081K1062022001452 $47.15 000001073455-3562508206
2021 2 FD52 08 E111 R 6780813R 100 8/10/2020 2060 RELOCATION ASSISTANCE CA-XR081K1062022001452 $1,555.56 000001073456-3562508206
2021 2 FD52 08 E121 R 6780813R 100 8/10/2020 2060 RELOCATION ASSISTANCE CA-XR081K1062022001452 $117.29 000001073456-3562508206
2021 2 FD52 08 E122 R 6780813R 100 8/10/2020 2060 RELOCATION ASSISTANCE CA-XR081K1062022001452 $1,313.36 000001073456-3562508206
2021 2 FD52 08 E123 R 6780813R 100 8/10/2020 2060 RELOCATION ASSISTANCE CA-XR081K1062022001452 $208.92 000001073456-3562508206
2021 2 FD52 00 E111 R 6780813R 100 8/10/2020 2110 RIGHT OF WAY SUPERVISION CA-XR081K1062022001452 $854.81 000001073609-3562500670
2021 2 FD52 08 E111 R 6780813R 100 8/10/2020 2050 NEGOTIATIONS CA-XR081K1062022001970 $4,666.68
2021 2 FD52 00 E121 R 6780813R 100 8/10/2020 2110 RIGHT OF WAY SUPERVISION CA-XR081K1062022001452 $64.61 000001073609-3562500670
2021 2 FD52 08 E121 R 6780813R 100 8/10/2020 2050 NEGOTIATIONS CA-XR081K1062022001970 $349.82
2021 2 FD52 00 E122 R 6780813R 100 8/10/2020 2110 RIGHT OF WAY SUPERVISION CA-XR081K1062022001452 $721.72 000001073609-3562500670
2021 2 FD52 08 E111 R 6780813R 100 8/10/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR081K1062022001965 $490.23 67808132-3560700500
2021 2 FD52 08 E122 R 6780813R 100 8/10/2020 2050 NEGOTIATIONS CA-XR081K1062022001970 $3,940.08
2021 2 FD52 00 E123 R 6780813R 100 8/10/2020 2110 RIGHT OF WAY SUPERVISION CA-XR081K1062022001452 $93.60 000001073609-3562500670
2021 2 FD52 08 E121 R 6780813R 100 8/10/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR081K1062022001965 $36.50 67808132-3560700500
2021 2 FD52 08 E123 R 6780813R 100 8/10/2020 2050 NEGOTIATIONS CA-XR081K1062022001970 $328.56
2021 2 FD52 08 E122 R 6780813R 100 8/10/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR081K1062022001965 $413.90 67808132-3560700500
2021 2 FD52 08 E123 R 6780813R 100 8/10/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR081K1062022001965 $55.85 67808132-3560700500
2021 2 FD52 08 E792 R 6780813R 100 8/5/2020 2650 RELOCATION PAYMENTS CR-2100004213 ($2,500.00) SALVAGE VALUE - PULASKI 08-59-25 KY 80 TO BUCK CREEK CHECK NO. 1118891
2021 1 FD52 08 E111 R 6780813R 100 7/30/2020 2050 NEGOTIATIONS CA-XR072K1062020600944 $4,618.33
2021 1 FD52 08 E111 R 6780813R 100 7/30/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600944 $521.97
2021 1 FD52 08 E121 R 6780813R 100 7/30/2020 2050 NEGOTIATIONS CA-XR072K1062020600944 $347.06
2021 1 FD52 08 E121 R 6780813R 100 7/30/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600944 $39.24
2021 1 FD52 08 E122 R 6780813R 100 7/30/2020 2050 NEGOTIATIONS CA-XR072K1062020600944 $3,899.26
2021 1 FD52 08 E122 R 6780813R 100 7/30/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600944 $440.69
2021 1 FD52 08 E123 R 6780813R 100 7/30/2020 2050 NEGOTIATIONS CA-XR072K1062020600944 $659.46
2021 1 FD52 08 E123 R 6780813R 100 7/30/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600944 $74.42
2021 1 FD52 08 E124 R 6780813R 100 7/30/2020 2050 NEGOTIATIONS CA-XR072K1062020600944 $2.00
2021 1 FD52 08 E124 R 6780813R 100 7/30/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600944 $0.22
2021 1 FD52 08 E796 R 6780813R 100 7/28/2020 2640 RIGHT OF WAY PAYMENTS GAX-2100006178 PULASKI COUNTY CIRCUIT CLERK $3,670.42 Pulaski Co 8-59.25 P 68
2021 1 FD52 08 E229 R 6780813R 100 7/28/2020 2050 NEGOTIATIONS IET-XE13A162520207003240 $37.00
2021 1 FD52 04 E123 R 6780813R 100 7/27/2020 2090 PROPERTY MANAGEMENT CA-XR072K1062020600393 $30.57 000001075105-3562504206
2021 1 FD52 04 E123 R 6780813R 100 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600393 $6.64 000001075105-3562504206
2021 1 FD52 04 E124 R 6780813R 100 7/27/2020 2090 PROPERTY MANAGEMENT CA-XR072K1062020600393 $0.09 000001075105-3562504206
2021 1 FD52 04 E124 R 6780813R 100 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600393 $0.02 000001075105-3562504206
2021 1 FD52 08 E111 R 6780813R 100 7/27/2020 2010 RIGHT OF WAY ESTIMATES CA-XR072K1062020600363 $1,363.63 000001073455-3562508206
2021 1 FD52 08 E111 R 6780813R 100 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600363 $303.04 000001073455-3562508206
2021 1 FD52 08 E121 R 6780813R 100 7/27/2020 2010 RIGHT OF WAY ESTIMATES CA-XR072K1062020600363 $92.77 000001073455-3562508206
2021 1 FD52 08 E121 R 6780813R 100 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600363 $20.60 000001073455-3562508206
2021 1 FD52 08 E122 R 6780813R 100 7/27/2020 2010 RIGHT OF WAY ESTIMATES CA-XR072K1062020600363 $1,151.31 000001073455-3562508206
2021 1 FD52 08 E111 R 6780813R 100 7/27/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR072K1062020600938 $1,069.59 67808132-3560700500
2021 1 FD52 08 E122 R 6780813R 100 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600363 $255.86 000001073455-3562508206
2021 1 FD52 08 E111 R 6780813R 100 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600938 $106.96 67808132-3560700500
2021 1 FD52 08 E123 R 6780813R 100 7/27/2020 2010 RIGHT OF WAY ESTIMATES CA-XR072K1062020600363 $468.02 000001073455-3562508206
2021 1 FD52 08 E121 R 6780813R 100 7/27/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR072K1062020600938 $80.34 67808132-3560700500
2021 1 FD52 08 E123 R 6780813R 100 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600363 $102.88 000001073455-3562508206
2021 1 FD52 08 E121 R 6780813R 100 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600938 $8.03 67808132-3560700500
2021 1 FD52 08 E124 R 6780813R 100 7/27/2020 2010 RIGHT OF WAY ESTIMATES CA-XR072K1062020600363 $0.82 000001073455-3562508206
2021 1 FD52 08 E122 R 6780813R 100 7/27/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR072K1062020600938 $903.06 67808132-3560700500
2021 1 FD52 08 E124 R 6780813R 100 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600363 $0.18 000001073455-3562508206
2021 1 FD52 08 E122 R 6780813R 100 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600938 $90.31 67808132-3560700500
2021 1 FD52 08 E111 R 6780813R 100 7/27/2020 2060 RELOCATION ASSISTANCE CA-XR072K1062020600363 $1,909.10 000001073456-3562508206
2021 1 FD52 08 E123 R 6780813R 100 7/27/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR072K1062020600938 $122.04 67808132-3560700500
2021 1 FD52 08 E111 R 6780813R 100 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600363 $190.91 000001073456-3562508206
2021 1 FD52 08 E123 R 6780813R 100 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600938 $12.00 67808132-3560700500
2021 1 FD52 08 E121 R 6780813R 100 7/27/2020 2060 RELOCATION ASSISTANCE CA-XR072K1062020600363 $143.94 000001073456-3562508206
2021 1 FD52 08 E124 R 6780813R 100 7/27/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR072K1062020600938 $0.36 67808132-3560700500
2021 1 FD52 00 E111 R 6780813R 100 7/27/2020 2110 RIGHT OF WAY SUPERVISION CA-XR072K1062020600364 $310.84 000001073609-3562500670
2021 1 FD52 08 E121 R 6780813R 100 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600363 $14.40 000001073456-3562508206
2021 1 FD52 08 E124 R 6780813R 100 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600938 $0.04 67808132-3560700500
2021 1 FD52 00 E111 R 6780813R 100 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600364 $259.04 000001073609-3562500670
2021 1 FD52 08 E122 R 6780813R 100 7/27/2020 2060 RELOCATION ASSISTANCE CA-XR072K1062020600363 $1,611.85 000001073456-3562508206
2021 1 FD52 00 E121 R 6780813R 100 7/27/2020 2110 RIGHT OF WAY SUPERVISION CA-XR072K1062020600364 $23.49 000001073609-3562500670
2021 1 FD52 08 E122 R 6780813R 100 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600363 $161.18 000001073456-3562508206
2021 1 FD52 00 E121 R 6780813R 100 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600364 $19.57 000001073609-3562500670
2021 1 FD52 08 E123 R 6780813R 100 7/27/2020 2060 RELOCATION ASSISTANCE CA-XR072K1062020600363 $256.82 000001073456-3562508206
2021 1 FD52 00 E122 R 6780813R 100 7/27/2020 2110 RIGHT OF WAY SUPERVISION CA-XR072K1062020600364 $262.45 000001073609-3562500670
2021 1 FD52 08 E123 R 6780813R 100 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600363 $25.22 000001073456-3562508206
2021 1 FD52 00 E122 R 6780813R 100 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600364 $218.70 000001073609-3562500670
2021 1 FD52 08 E124 R 6780813R 100 7/27/2020 2060 RELOCATION ASSISTANCE CA-XR072K1062020600363 $0.82 000001073456-3562508206
2021 1 FD52 00 E123 R 6780813R 100 7/27/2020 2110 RIGHT OF WAY SUPERVISION CA-XR072K1062020600364 $34.42 000001073609-3562500670
2021 1 FD52 08 E124 R 6780813R 100 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600363 $0.08 000001073456-3562508206
2021 1 FD52 00 E123 R 6780813R 100 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600364 $27.98 000001073609-3562500670
2021 1 FD52 00 E124 R 6780813R 100 7/27/2020 2110 RIGHT OF WAY SUPERVISION CA-XR072K1062020600364 $0.09 000001073609-3562500670
2021 1 FD52 00 E124 R 6780813R 100 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600364 $0.08 000001073609-3562500670
2021 1 FD52 04 E111 R 6780813R 100 7/27/2020 2090 PROPERTY MANAGEMENT CA-XR072K1062020600392 $162.27 000001075105-3562504206
2021 1 FD52 04 E111 R 6780813R 100 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600392 $35.92 000001075105-3562504206
2021 1 FD52 04 E121 R 6780813R 100 7/27/2020 2090 PROPERTY MANAGEMENT CA-XR072K1062020600392 $12.24 000001075105-3562504206
2021 1 FD52 04 E121 R 6780813R 100 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600392 $2.72 000001075105-3562504206
2021 1 FD52 04 E122 R 6780813R 100 7/27/2020 2090 PROPERTY MANAGEMENT CA-XR072K1062020600392 $137.01 000001075105-3562504206
2021 1 FD52 04 E122 R 6780813R 100 7/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072K1062020600392 $30.32 000001075105-3562504206
2021 1 FD52 08 E382 R 6780813R 100 7/23/2020 2640 RIGHT OF WAY PAYMENTS GAX-2100005780 PULASKI COUNTY CLERK $2,410.00 Deed Recoding Fees
2021 1 FD52 08 E792 R 6780813R 100 7/23/2020 2650 RELOCATION PAYMENTS GAX-2100004952 SOMERSET PULASKI ECONOMIC DEVELOPMENT AUTHORITY $113,133.50
2021 1 FD52 08 E794 R 6780813R 100 7/22/2020 2640 RIGHT OF WAY PAYMENTS GAX-2100004895 CITY OF SOMERSET $561,500.00 City of Somerset's lift station
2021 1 FD52 08 E794 R 6780813R 100 7/22/2020 2640 RIGHT OF WAY PAYMENTS GAX-2100004896 CUMBERLAND LAKE SHELL INC $1,122,081.50 Deed of Conveyance
2021 1 FD52 08 E794 R 6780813R 100 7/22/2020 2640 RIGHT OF WAY PAYMENTS GAX-2100004906 CUMBERLAND LAKE SHELL INC $187,500.00 Deed of Conveyance
2021 1 FD52 08 E794 R 6780813R 100 7/22/2020 2640 RIGHT OF WAY PAYMENTS GAX-2100004894 Steven H Brock $575,000.00 Deed of Conveyance
2021 1 FD52 08 E794 R 6780813R 100 7/22/2020 2640 RIGHT OF WAY PAYMENTS GAX-2100004898 CUMBERLAND LAKE SHELL INC $10,400.00 Leasehold Interest
2021 1 FD52 08 E794 R 6780813R 100 7/22/2020 2640 RIGHT OF WAY PAYMENTS GAX-2100004901 UNITED OUTDOOR MEDIA, LLC $45,000.00 Leasehold Interest
2021 1 FD52 08 E794 R 6780813R 100 7/22/2020 2640 RIGHT OF WAY PAYMENTS GAX-2100004900 CUMBERLAND LAKE SHELL INC $27,918.50 Tax lien
2021 1 FD52 08 E111 R 6780813R 100 7/14/2020 2050 NEGOTIATIONS CA-XR071K1062019009816 $4,282.33
2021 1 FD52 08 E111 R 6780813R 100 7/14/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071K1062019009816 $1,235.63
2021 1 FD52 08 E121 R 6780813R 100 7/14/2020 2050 NEGOTIATIONS CA-XR071K1062019009816 $317.07
2021 1 FD52 08 E121 R 6780813R 100 7/14/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071K1062019009816 $90.89
2021 1 FD52 08 E122 R 6780813R 100 7/14/2020 2050 NEGOTIATIONS CA-XR071K1062019009816 $3,572.76
2021 1 FD52 08 E122 R 6780813R 100 7/14/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071K1062019009816 $1,030.89
2021 1 FD52 08 E123 R 6780813R 100 7/14/2020 2050 NEGOTIATIONS CA-XR071K1062019009816 $622.51
2021 1 FD52 08 E123 R 6780813R 100 7/14/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071K1062019009816 $172.59
2021 1 FD52 00 E229 R 6780813R 100 7/13/2020 2110 RIGHT OF WAY SUPERVISION IET-XE13A162520192001200 $58.08
2021 1 FD52 08 E229 R 6780813R 100 7/13/2020 2050 NEGOTIATIONS IET-XE13A162520192002640 $58.00
2021 1 FD52 08 E792 R 6780813R 100 7/10/2020 2650 RELOCATION PAYMENTS GAX-2100002632 LAMAR TEXAS LIMITED PARTNERSHIP $93,500.00
2021 1 FD52 08 E111 R 6780813R 100 7/9/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR071K1062019009812 $1,337.08 67808132-3560700500
2021 1 FD52 08 E111 R 6780813R 100 7/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071K1062019009812 $68.10 67808132-3560700500
2021 1 FD52 08 E121 R 6780813R 100 7/9/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR071K1062019009812 $99.55 67808132-3560700500
2021 1 FD52 08 E121 R 6780813R 100 7/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071K1062019009812 $5.07 67808132-3560700500
2021 1 FD52 08 E122 R 6780813R 100 7/9/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR071K1062019009812 $1,115.45 67808132-3560700500
2021 1 FD52 08 E122 R 6780813R 100 7/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071K1062019009812 $56.81 67808132-3560700500
2021 1 FD52 08 E123 R 6780813R 100 7/9/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR071K1062019009812 $152.44 67808132-3560700500
2021 1 FD52 08 E123 R 6780813R 100 7/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071K1062019009812 $7.64 67808132-3560700500
2021 1 FD52 00 E111 R 6780813R 100 7/9/2020 2110 RIGHT OF WAY SUPERVISION CA-XR071K1062019009337 $932.51 000001073609-3562500670
2021 1 FD52 00 E121 R 6780813R 100 7/9/2020 2110 RIGHT OF WAY SUPERVISION CA-XR071K1062019009337 $70.48 000001073609-3562500670
2021 1 FD52 00 E122 R 6780813R 100 7/9/2020 2110 RIGHT OF WAY SUPERVISION CA-XR071K1062019009337 $777.99 000001073609-3562500670
2021 1 FD52 00 E123 R 6780813R 100 7/9/2020 2110 RIGHT OF WAY SUPERVISION CA-XR071K1062019009337 $102.11 000001073609-3562500670
2021 1 FD52 08 E111 R 6780813R 100 7/9/2020 2010 RIGHT OF WAY ESTIMATES CA-XR071K1062019009336 $1,515.15 000001073455-3562508206
2021 1 FD52 08 E111 R 6780813R 100 7/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071K1062019009336 $151.52 000001073455-3562508206
2021 1 FD52 08 E121 R 6780813R 100 7/9/2020 2010 RIGHT OF WAY ESTIMATES CA-XR071K1062019009336 $103.09 000001073455-3562508206
2021 1 FD52 08 E121 R 6780813R 100 7/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071K1062019009336 $10.31 000001073455-3562508206
2021 1 FD52 08 E122 R 6780813R 100 7/9/2020 2010 RIGHT OF WAY ESTIMATES CA-XR071K1062019009336 $1,264.09 000001073455-3562508206
2021 1 FD52 08 E122 R 6780813R 100 7/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071K1062019009336 $126.41 000001073455-3562508206
2021 1 FD52 08 E123 R 6780813R 100 7/9/2020 2010 RIGHT OF WAY ESTIMATES CA-XR071K1062019009336 $519.46 000001073455-3562508206
2021 1 FD52 08 E123 R 6780813R 100 7/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071K1062019009336 $51.44 000001073455-3562508206
2021 1 FD52 08 E111 R 6780813R 100 7/9/2020 2060 RELOCATION ASSISTANCE CA-XR071K1062019009336 $1,909.10 000001073456-3562508206
2021 1 FD52 08 E121 R 6780813R 100 7/9/2020 2060 RELOCATION ASSISTANCE CA-XR071K1062019009336 $143.95 000001073456-3562508206
2021 1 FD52 08 E122 R 6780813R 100 7/9/2020 2060 RELOCATION ASSISTANCE CA-XR071K1062019009336 $1,592.77 000001073456-3562508206
2021 1 FD52 08 E123 R 6780813R 100 7/9/2020 2060 RELOCATION ASSISTANCE CA-XR071K1062019009336 $256.41 000001073456-3562508206
2021 1 FD52 08 E792 R 6780813R 100 7/8/2020 2650 RELOCATION PAYMENTS GAX-2100000768 UNITED OUTDOOR MEDIA, LLC $65,000.00 Move Expense
2021 1 FD52 08 E111 R 6780813R 100 7/8/2020 2050 NEGOTIATIONS CA-XR062K1062017108814 $4,945.87
2021 1 FD52 08 E111 R 6780813R 100 7/8/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108814 $848.49
2021 1 FD52 08 E121 R 6780813R 100 7/8/2020 2050 NEGOTIATIONS CA-XR062K1062017108814 $372.00
2021 1 FD52 08 E121 R 6780813R 100 7/8/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108814 $63.73
2021 1 FD52 08 E122 R 6780813R 100 7/8/2020 2050 NEGOTIATIONS CA-XR062K1062017108814 $4,126.34
2021 1 FD52 08 E122 R 6780813R 100 7/8/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108814 $707.90
2021 1 FD52 08 E123 R 6780813R 100 7/8/2020 2050 NEGOTIATIONS CA-XR062K1062017108814 $722.27
2021 1 FD52 08 E123 R 6780813R 100 7/8/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108814 $117.63
2021 1 FD52 08 E124 R 6780813R 100 7/8/2020 2050 NEGOTIATIONS CA-XR062K1062017108814 $2.19
2021 1 FD52 08 E124 R 6780813R 100 7/8/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108814 $0.36
2021 1 FD52 08 E123 R 6780813R 100 7/6/2020 2050 NEGOTIATIONS CA-XR061K1062016107791P $626.01
2021 1 FD52 08 E123 R 6780813R 100 7/6/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061K1062016107791P $69.49
2021 1 FD52 08 E123 R 6780813R 100 7/6/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR061K1062016107786P $134.27 67808132-3560700500
2021 1 FD52 08 E123 R 6780813R 100 7/6/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061K1062016107786P $14.65 67808132-3560700500
2021 1 FD52 08 E121 R 6780813R 100 7/2/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108321 $10.30 000001073455-3562508206
2021 1 FD52 08 E122 R 6780813R 100 7/2/2020 2010 RIGHT OF WAY ESTIMATES CA-XR062K1062017108321 $1,264.09 000001073455-3562508206
2021 1 FD52 08 E122 R 6780813R 100 7/2/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108321 $126.41 000001073455-3562508206
2021 1 FD52 08 E123 R 6780813R 100 7/2/2020 2010 RIGHT OF WAY ESTIMATES CA-XR062K1062017108321 $519.46 000001073455-3562508206
2021 1 FD52 08 E123 R 6780813R 100 7/2/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108321 $51.44 000001073455-3562508206
2021 1 FD52 00 E111 R 6780813R 100 7/2/2020 2110 RIGHT OF WAY SUPERVISION CA-XR062K1062017108322 $310.84 000001073609-3562500670
2021 1 FD52 08 E124 R 6780813R 100 7/2/2020 2010 RIGHT OF WAY ESTIMATES CA-XR062K1062017108321 $0.91 000001073455-3562508206
2021 1 FD52 00 E111 R 6780813R 100 7/2/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108322 $15.75 000001073609-3562500670
2021 1 FD52 08 E124 R 6780813R 100 7/2/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108321 $0.09 000001073455-3562508206
2021 1 FD52 00 E121 R 6780813R 100 7/2/2020 2110 RIGHT OF WAY SUPERVISION CA-XR062K1062017108322 $23.49 000001073609-3562500670
2021 1 FD52 08 E111 R 6780813R 100 7/2/2020 2060 RELOCATION ASSISTANCE CA-XR062K1062017108321 $2,220.21 000001073456-3562508206
2021 1 FD52 00 E123 R 6780813R 100 7/2/2020 2110 RIGHT OF WAY SUPERVISION CA-XR061K1062016107408P $37.49 000001073609-3562500670
2021 1 FD52 00 E121 R 6780813R 100 7/2/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108322 $1.19 000001073609-3562500670
2021 1 FD52 08 E111 R 6780813R 100 7/2/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108321 $113.13 000001073456-3562508206
2021 1 FD52 00 E123 R 6780813R 100 7/2/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061K1062016107408P $4.09 000001073609-3562500670
2021 1 FD52 00 E122 R 6780813R 100 7/2/2020 2110 RIGHT OF WAY SUPERVISION CA-XR062K1062017108322 $259.34 000001073609-3562500670
2021 1 FD52 08 E121 R 6780813R 100 7/2/2020 2060 RELOCATION ASSISTANCE CA-XR062K1062017108321 $167.41 000001073456-3562508206
2021 1 FD52 00 E122 R 6780813R 100 7/2/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108322 $13.14 000001073609-3562500670
2021 1 FD52 08 E121 R 6780813R 100 7/2/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108321 $8.53 000001073456-3562508206
2021 1 FD52 00 E123 R 6780813R 100 7/2/2020 2110 RIGHT OF WAY SUPERVISION CA-XR062K1062017108322 $34.06 000001073609-3562500670
2021 1 FD52 08 E122 R 6780813R 100 7/2/2020 2060 RELOCATION ASSISTANCE CA-XR062K1062017108321 $1,852.33 000001073456-3562508206
2021 1 FD52 00 E123 R 6780813R 100 7/2/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108322 $1.70 000001073609-3562500670
2021 1 FD52 08 E122 R 6780813R 100 7/2/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108321 $94.38 000001073456-3562508206
2021 1 FD52 00 E124 R 6780813R 100 7/2/2020 2110 RIGHT OF WAY SUPERVISION CA-XR062K1062017108322 $0.09 000001073609-3562500670
2021 1 FD52 08 E123 R 6780813R 100 7/2/2020 2060 RELOCATION ASSISTANCE CA-XR062K1062017108321 $298.43 000001073456-3562508206
2021 1 FD52 08 E123 R 6780813R 100 7/2/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108321 $14.95 000001073456-3562508206
2021 1 FD52 08 E124 R 6780813R 100 7/2/2020 2060 RELOCATION ASSISTANCE CA-XR062K1062017108321 $0.95 000001073456-3562508206
2021 1 FD52 08 E123 R 6780813R 100 7/2/2020 2010 RIGHT OF WAY ESTIMATES CA-XR061K1062016107406P $514.32 000001073455-3562508206
2021 1 FD52 08 E124 R 6780813R 100 7/2/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108321 $0.05 000001073456-3562508206
2021 1 FD52 08 E123 R 6780813R 100 7/2/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061K1062016107406P $56.58 000001073455-3562508206
2021 1 FD52 08 E123 R 6780813R 100 7/2/2020 2060 RELOCATION ASSISTANCE CA-XR061K1062016107406P $282.55 000001073456-3562508206
2021 1 FD52 08 E123 R 6780813R 100 7/2/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061K1062016107406P $30.83 000001073456-3562508206
2021 1 FD52 08 E111 R 6780813R 100 7/2/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR062K1062017108809 $1,604.38 67808132-3560700500
2021 1 FD52 08 E121 R 6780813R 100 7/2/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR062K1062017108809 $120.50 67808132-3560700500
2021 1 FD52 08 E122 R 6780813R 100 7/2/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR062K1062017108809 $1,338.54 67808132-3560700500
2021 1 FD52 08 E123 R 6780813R 100 7/2/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR062K1062017108809 $182.78 67808132-3560700500
2021 1 FD52 08 E124 R 6780813R 100 7/2/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR062K1062017108809 $0.55 67808132-3560700500
2021 1 FD52 08 E111 R 6780813R 100 7/2/2020 2010 RIGHT OF WAY ESTIMATES CA-XR062K1062017108321 $1,515.15 000001073455-3562508206
2021 1 FD52 08 E111 R 6780813R 100 7/2/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062K1062017108321 $151.52 000001073455-3562508206
2021 1 FD52 08 E121 R 6780813R 100 7/2/2020 2010 RIGHT OF WAY ESTIMATES CA-XR062K1062017108321 $103.09 000001073455-3562508206
2020 12 FD52 00 E111 R 6780813R 100 6/10/2020 2110 RIGHT OF WAY SUPERVISION CA-XR061K1062016107408 $341.92 000001073609-3562500670
2020 12 FD52 00 E111 R 6780813R 100 6/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061K1062016107408 $37.84 000001073609-3562500670
2020 12 FD52 00 E121 R 6780813R 100 6/10/2020 2110 RIGHT OF WAY SUPERVISION CA-XR061K1062016107408 $25.84 000001073609-3562500670
2020 12 FD52 00 E121 R 6780813R 100 6/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061K1062016107408 $2.86 000001073609-3562500670
2020 12 FD52 00 E122 R 6780813R 100 6/10/2020 2110 RIGHT OF WAY SUPERVISION CA-XR061K1062016107408 $285.26 000001073609-3562500670
2020 12 FD52 00 E122 R 6780813R 100 6/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061K1062016107408 $31.57 000001073609-3562500670
2020 12 FD52 08 E111 R 6780813R 100 6/10/2020 2010 RIGHT OF WAY ESTIMATES CA-XR061K1062016107406 $1,500.00 000001073455-3562508206
2020 12 FD52 08 E111 R 6780813R 100 6/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061K1062016107406 $166.67 000001073455-3562508206
2020 12 FD52 08 E121 R 6780813R 100 6/10/2020 2010 RIGHT OF WAY ESTIMATES CA-XR061K1062016107406 $102.05 000001073455-3562508206
2020 12 FD52 08 E121 R 6780813R 100 6/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061K1062016107406 $11.34 000001073455-3562508206
2020 12 FD52 08 E122 R 6780813R 100 6/10/2020 2010 RIGHT OF WAY ESTIMATES CA-XR061K1062016107406 $1,251.45 000001073455-3562508206
2020 12 FD52 08 E111 R 6780813R 100 6/10/2020 2050 NEGOTIATIONS CA-XR061K1062016107791 $4,406.76
2020 12 FD52 08 E122 R 6780813R 100 6/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061K1062016107406 $139.05 000001073455-3562508206
2020 12 FD52 08 E111 R 6780813R 100 6/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061K1062016107791 $496.71
2020 12 FD52 08 E121 R 6780813R 100 6/10/2020 2050 NEGOTIATIONS CA-XR061K1062016107791 $324.89
2020 12 FD52 08 E121 R 6780813R 100 6/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061K1062016107791 $36.64
2020 12 FD52 08 E111 R 6780813R 100 6/10/2020 2060 RELOCATION ASSISTANCE CA-XR061K1062016107406 $2,100.01 000001073456-3562508206
2020 12 FD52 08 E122 R 6780813R 100 6/10/2020 2050 NEGOTIATIONS CA-XR061K1062016107791 $3,676.58
2020 12 FD52 08 E111 R 6780813R 100 6/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061K1062016107406 $233.33 000001073456-3562508206
2020 12 FD52 08 E122 R 6780813R 100 6/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061K1062016107791 $414.41
2020 12 FD52 08 E121 R 6780813R 100 6/10/2020 2060 RELOCATION ASSISTANCE CA-XR061K1062016107406 $158.35 000001073456-3562508206
2020 12 FD52 08 E121 R 6780813R 100 6/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061K1062016107406 $17.59 000001073456-3562508206
2020 12 FD52 08 E122 R 6780813R 100 6/10/2020 2060 RELOCATION ASSISTANCE CA-XR061K1062016107406 $1,752.04 000001073456-3562508206
2020 12 FD52 08 E122 R 6780813R 100 6/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061K1062016107406 $194.67 000001073456-3562508206
2020 12 FD52 08 E111 R 6780813R 100 6/10/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR061K1062016107786 $1,176.68 67808132-3560700500
2020 12 FD52 08 E111 R 6780813R 100 6/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061K1062016107786 $130.60 67808132-3560700500
2020 12 FD52 08 E121 R 6780813R 100 6/10/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR061K1062016107786 $87.59 67808132-3560700500
2020 12 FD52 08 E121 R 6780813R 100 6/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061K1062016107786 $9.72 67808132-3560700500
2020 12 FD52 08 E122 R 6780813R 100 6/10/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR061K1062016107786 $981.59 67808132-3560700500
2020 12 FD52 08 E122 R 6780813R 100 6/10/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061K1062016107786 $108.96 67808132-3560700500
2020 12 FD52 08 E792 R 6780813R 100 6/2/2020 2650 RELOCATION PAYMENTS GAX-2000090117 Gator Made Inc $15,000.00 Move Expense
2020 11 FD52 08 E229 R 6780813R 100 5/26/2020 2050 NEGOTIATIONS IET-XE13A162520146003850 $88.50
2020 11 FD52 08 E124 R 6780813R 100 5/26/2020 2010 RIGHT OF WAY ESTIMATES CA-XR052K1062014306420 $0.82 000001073455-3562508206
2020 11 FD52 08 E122 R 6780813R 100 5/26/2020 2060 RELOCATION ASSISTANCE CA-XR052K1062014306421 $135.39 000001073592-3562504206
2020 11 FD52 08 E124 R 6780813R 100 5/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052K1062014306420 $0.18 000001073455-3562508206
2020 11 FD52 08 E123 R 6780813R 100 5/26/2020 2060 RELOCATION ASSISTANCE CA-XR052K1062014306421 $30.46 000001073592-3562504206
2020 11 FD52 08 E124 R 6780813R 100 5/26/2020 2060 RELOCATION ASSISTANCE CA-XR052K1062014306421 $0.10 000001073592-3562504206
2020 11 FD52 08 E111 R 6780813R 100 5/26/2020 2010 RIGHT OF WAY ESTIMATES CA-XR052K1062014306420 $1,363.64 000001073455-3562508206
2020 11 FD52 08 E111 R 6780813R 100 5/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052K1062014306420 $303.03 000001073455-3562508206
2020 11 FD52 08 E121 R 6780813R 100 5/26/2020 2010 RIGHT OF WAY ESTIMATES CA-XR052K1062014306420 $92.77 000001073455-3562508206
2020 11 FD52 00 E111 R 6780813R 100 5/26/2020 2110 RIGHT OF WAY SUPERVISION CA-XR052K1062014306421 $1,243.35 000001073609-3562500670
2020 11 FD52 00 E111 R 6780813R 100 5/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052K1062014306421 $63.41 000001073609-3562500670
2020 11 FD52 00 E121 R 6780813R 100 5/26/2020 2110 RIGHT OF WAY SUPERVISION CA-XR052K1062014306421 $93.97 000001073609-3562500670
2020 11 FD52 08 E121 R 6780813R 100 5/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052K1062014306420 $20.62 000001073455-3562508206
2020 11 FD52 00 E121 R 6780813R 100 5/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052K1062014306421 $4.79 000001073609-3562500670
2020 11 FD52 00 E122 R 6780813R 100 5/26/2020 2110 RIGHT OF WAY SUPERVISION CA-XR052K1062014306421 $1,037.34 000001073609-3562500670
2020 11 FD52 00 E122 R 6780813R 100 5/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052K1062014306421 $52.90 000001073609-3562500670
2020 11 FD52 00 E123 R 6780813R 100 5/26/2020 2110 RIGHT OF WAY SUPERVISION CA-XR052K1062014306421 $136.24 000001073609-3562500670
2020 11 FD52 00 E123 R 6780813R 100 5/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052K1062014306421 $6.85 000001073609-3562500670
2020 11 FD52 00 E124 R 6780813R 100 5/26/2020 2110 RIGHT OF WAY SUPERVISION CA-XR052K1062014306421 $0.36 000001073609-3562500670
2020 11 FD52 00 E124 R 6780813R 100 5/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052K1062014306421 $0.02 000001073609-3562500670
2020 11 FD52 08 E122 R 6780813R 100 5/26/2020 2010 RIGHT OF WAY ESTIMATES CA-XR052K1062014306420 $1,137.68 000001073455-3562508206
2020 11 FD52 08 E111 R 6780813R 100 5/26/2020 2050 NEGOTIATIONS CA-XR052K1062014306892 $7,000.02
2020 11 FD52 08 E121 R 6780813R 100 5/26/2020 2050 NEGOTIATIONS CA-XR052K1062014306892 $526.46
2020 11 FD52 08 E122 R 6780813R 100 5/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052K1062014306420 $252.82 000001073455-3562508206
2020 11 FD52 08 E122 R 6780813R 100 5/26/2020 2050 NEGOTIATIONS CA-XR052K1062014306892 $5,840.13
2020 11 FD52 08 E123 R 6780813R 100 5/26/2020 2050 NEGOTIATIONS CA-XR052K1062014306892 $970.50
2020 11 FD52 08 E124 R 6780813R 100 5/26/2020 2050 NEGOTIATIONS CA-XR052K1062014306892 $3.00
2020 11 FD52 08 E123 R 6780813R 100 5/26/2020 2010 RIGHT OF WAY ESTIMATES CA-XR052K1062014306420 $468.02 000001073455-3562508206
2020 11 FD52 08 E111 R 6780813R 100 5/26/2020 2060 RELOCATION ASSISTANCE CA-XR052K1062014306421 $162.27 000001073592-3562504206
2020 11 FD52 08 E111 R 6780813R 100 5/26/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR052K1062014306887 $1,069.59 67808132-3560700500
2020 11 FD52 08 E121 R 6780813R 100 5/26/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR052K1062014306887 $80.34 67808132-3560700500
2020 11 FD52 08 E122 R 6780813R 100 5/26/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR052K1062014306887 $892.36 67808132-3560700500
2020 11 FD52 08 E123 R 6780813R 100 5/26/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR052K1062014306887 $121.86 67808132-3560700500
2020 11 FD52 08 E124 R 6780813R 100 5/26/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR052K1062014306887 $0.36 67808132-3560700500
2020 11 FD52 08 E123 R 6780813R 100 5/26/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052K1062014306420 $102.88 000001073455-3562508206
2020 11 FD52 08 E121 R 6780813R 100 5/26/2020 2060 RELOCATION ASSISTANCE CA-XR052K1062014306421 $12.24 000001073592-3562504206
2020 11 FD52 08 E792 R 6780813R 100 5/14/2020 2650 RELOCATION PAYMENTS GAX-2000086617 SOMERSET PULASKI ECONOMIC DEVELOPMENT AUTHORITY $245,885.85 Move Expense
2020 11 FD52 08 E792 R 6780813R 100 5/12/2020 2650 RELOCATION PAYMENTS GAX-2000085922 JANNETTE LEE PHELPS $12,005.00 Reestablishment
2020 11 FD52 00 E229 R 6780813R 100 5/11/2020 2110 RIGHT OF WAY SUPERVISION IET-XE13A162520131002260 $74.58
2020 11 FD52 08 E229 R 6780813R 100 5/11/2020 2050 NEGOTIATIONS IET-XE13A162520131004520 $20.65
2020 11 FD52 08 E111 R 6780813R 100 5/11/2020 2050 NEGOTIATIONS CA-XR051K1062012905898 $4,145.74
2020 11 FD52 08 E111 R 6780813R 100 5/11/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051K1062012905898 $18.79
2020 11 FD52 08 E121 R 6780813R 100 5/11/2020 2050 NEGOTIATIONS CA-XR051K1062012905898 $306.45
2020 11 FD52 08 E121 R 6780813R 100 5/11/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051K1062012905898 $1.42
2020 11 FD52 08 E122 R 6780813R 100 5/11/2020 2050 NEGOTIATIONS CA-XR051K1062012905898 $3,458.80
2020 11 FD52 08 E111 R 6780813R 100 5/11/2020 2010 RIGHT OF WAY ESTIMATES CA-XR051K1062012905509 $1,666.67 000001073455-3562508206
2020 11 FD52 08 E122 R 6780813R 100 5/11/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051K1062012905898 $15.68
2020 11 FD52 08 E121 R 6780813R 100 5/11/2020 2010 RIGHT OF WAY ESTIMATES CA-XR051K1062012905509 $113.39 000001073455-3562508206
2020 11 FD52 08 E123 R 6780813R 100 5/11/2020 2050 NEGOTIATIONS CA-XR051K1062012905898 $599.81
2020 11 FD52 08 E122 R 6780813R 100 5/11/2020 2010 RIGHT OF WAY ESTIMATES CA-XR051K1062012905509 $1,390.50 000001073455-3562508206
2020 11 FD52 08 E123 R 6780813R 100 5/11/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051K1062012905898 $3.00
2020 11 FD52 08 E123 R 6780813R 100 5/11/2020 2010 RIGHT OF WAY ESTIMATES CA-XR051K1062012905509 $570.90 000001073455-3562508206
2020 11 FD52 08 E111 R 6780813R 100 5/11/2020 2060 RELOCATION ASSISTANCE CA-XR051K1062012905509 $2,333.34 000001073456-3562508206
2020 11 FD52 08 E121 R 6780813R 100 5/11/2020 2060 RELOCATION ASSISTANCE CA-XR051K1062012905509 $175.94 000001073456-3562508206
2020 11 FD52 08 E122 R 6780813R 100 5/11/2020 2060 RELOCATION ASSISTANCE CA-XR051K1062012905509 $1,946.71 000001073456-3562508206
2020 11 FD52 00 E111 R 6780813R 100 5/11/2020 2110 RIGHT OF WAY SUPERVISION CA-XR051K1062012905510 $1,243.35 000001073609-3562500670
2020 11 FD52 08 E123 R 6780813R 100 5/11/2020 2060 RELOCATION ASSISTANCE CA-XR051K1062012905509 $313.38 000001073456-3562508206
2020 11 FD52 00 E121 R 6780813R 100 5/11/2020 2110 RIGHT OF WAY SUPERVISION CA-XR051K1062012905510 $93.97 000001073609-3562500670
2020 11 FD52 00 E122 R 6780813R 100 5/11/2020 2110 RIGHT OF WAY SUPERVISION CA-XR051K1062012905510 $1,037.33 000001073609-3562500670
2020 11 FD52 00 E123 R 6780813R 100 5/11/2020 2110 RIGHT OF WAY SUPERVISION CA-XR051K1062012905510 $136.14 000001073609-3562500670
2020 11 FD52 08 E111 R 6780813R 100 5/11/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR051K1062012905893 $802.19 67808132-3560700500
2020 11 FD52 08 E121 R 6780813R 100 5/11/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR051K1062012905893 $59.72 67808132-3560700500
2020 11 FD52 08 E122 R 6780813R 100 5/11/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR051K1062012905893 $669.27 67808132-3560700500
2020 11 FD52 08 E123 R 6780813R 100 5/11/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR051K1062012905893 $91.40 67808132-3560700500
2020 10 FD52 00 E121 R 6780813R 100 4/29/2020 2110 RIGHT OF WAY SUPERVISION CA-XR042K1062011504490 $70.48 000001073609-3562500670
2020 10 FD52 00 E121 R 6780813R 100 4/29/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504490 $3.36 000001073609-3562500670
2020 10 FD52 00 E122 R 6780813R 100 4/29/2020 2110 RIGHT OF WAY SUPERVISION CA-XR042K1062011504490 $777.98 000001073609-3562500670
2020 10 FD52 00 E122 R 6780813R 100 4/29/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504490 $37.00 000001073609-3562500670
2020 10 FD52 00 E123 R 6780813R 100 4/29/2020 2110 RIGHT OF WAY SUPERVISION CA-XR042K1062011504490 $102.18 000001073609-3562500670
2020 10 FD52 00 E123 R 6780813R 100 4/29/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504490 $4.79 000001073609-3562500670
2020 10 FD52 00 E124 R 6780813R 100 4/29/2020 2110 RIGHT OF WAY SUPERVISION CA-XR042K1062011504490 $0.28 000001073609-3562500670
2020 10 FD52 00 E124 R 6780813R 100 4/29/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504490 $0.01 000001073609-3562500670
2020 10 FD52 08 E229 R 6780813R 100 4/27/2020 2010 RIGHT OF WAY ESTIMATES IET-XE13A162520116003090 $16.45
2020 10 FD52 08 E111 R 6780813R 100 4/27/2020 2010 RIGHT OF WAY ESTIMATES CA-XR042K1062011504486 $1,590.91 000001073455-3562508206
2020 10 FD52 08 E111 R 6780813R 100 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504486 $75.76 000001073455-3562508206
2020 10 FD52 08 E111 R 6780813R 100 4/27/2020 2060 RELOCATION ASSISTANCE CA-XR042K1062011504489 $324.55 000001073592-3562504206
2020 10 FD52 08 E121 R 6780813R 100 4/27/2020 2010 RIGHT OF WAY ESTIMATES CA-XR042K1062011504486 $108.23 000001073455-3562508206
2020 10 FD52 08 E111 R 6780813R 100 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504489 $15.36 000001073592-3562504206
2020 10 FD52 08 E121 R 6780813R 100 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504486 $5.16 000001073455-3562508206
2020 10 FD52 08 E121 R 6780813R 100 4/27/2020 2060 RELOCATION ASSISTANCE CA-XR042K1062011504489 $24.47 000001073592-3562504206
2020 10 FD52 08 E122 R 6780813R 100 4/27/2020 2010 RIGHT OF WAY ESTIMATES CA-XR042K1062011504486 $1,327.29 000001073455-3562508206
2020 10 FD52 08 E121 R 6780813R 100 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504489 $1.16 000001073592-3562504206
2020 10 FD52 08 E122 R 6780813R 100 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504486 $63.21 000001073455-3562508206
2020 10 FD52 08 E122 R 6780813R 100 4/27/2020 2060 RELOCATION ASSISTANCE CA-XR042K1062011504489 $270.77 000001073592-3562504206
2020 10 FD52 08 E123 R 6780813R 100 4/27/2020 2010 RIGHT OF WAY ESTIMATES CA-XR042K1062011504486 $545.18 000001073455-3562508206
2020 10 FD52 08 E122 R 6780813R 100 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504489 $12.81 000001073592-3562504206
2020 10 FD52 08 E123 R 6780813R 100 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504486 $25.72 000001073455-3562508206
2020 10 FD52 08 E123 R 6780813R 100 4/27/2020 2060 RELOCATION ASSISTANCE CA-XR042K1062011504489 $60.97 000001073592-3562504206
2020 10 FD52 08 E124 R 6780813R 100 4/27/2020 2010 RIGHT OF WAY ESTIMATES CA-XR042K1062011504486 $0.95 000001073455-3562508206
2020 10 FD52 08 E123 R 6780813R 100 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504489 $2.84 000001073592-3562504206
2020 10 FD52 08 E124 R 6780813R 100 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504486 $0.05 000001073455-3562508206
2020 10 FD52 08 E124 R 6780813R 100 4/27/2020 2060 RELOCATION ASSISTANCE CA-XR042K1062011504489 $0.18 000001073592-3562504206
2020 10 FD52 08 E111 R 6780813R 100 4/27/2020 2060 RELOCATION ASSISTANCE CA-XR042K1062011504486 $2,227.28 000001073456-3562508206
2020 10 FD52 08 E124 R 6780813R 100 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504489 $0.01 000001073592-3562504206
2020 10 FD52 08 E111 R 6780813R 100 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504486 $106.06 000001073456-3562508206
2020 10 FD52 08 E121 R 6780813R 100 4/27/2020 2060 RELOCATION ASSISTANCE CA-XR042K1062011504486 $167.94 000001073456-3562508206
2020 10 FD52 08 E121 R 6780813R 100 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504486 $8.00 000001073456-3562508206
2020 10 FD52 08 E122 R 6780813R 100 4/27/2020 2060 RELOCATION ASSISTANCE CA-XR042K1062011504486 $1,858.22 000001073456-3562508206
2020 10 FD52 08 E122 R 6780813R 100 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504486 $88.49 000001073456-3562508206
2020 10 FD52 08 E123 R 6780813R 100 4/27/2020 2060 RELOCATION ASSISTANCE CA-XR042K1062011504486 $299.37 000001073456-3562508206
2020 10 FD52 08 E123 R 6780813R 100 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504486 $14.01 000001073456-3562508206
2020 10 FD52 08 E124 R 6780813R 100 4/27/2020 2060 RELOCATION ASSISTANCE CA-XR042K1062011504486 $0.95 000001073456-3562508206
2020 10 FD52 08 E124 R 6780813R 100 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504486 $0.05 000001073456-3562508206
2020 10 FD52 08 E111 R 6780813R 100 4/27/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR042K1062011505006 $1,203.29 67808132-3560700500
2020 10 FD52 08 E111 R 6780813R 100 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011505006 $57.40 67808132-3560700500
2020 10 FD52 08 E121 R 6780813R 100 4/27/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR042K1062011505006 $90.38 67808132-3560700500
2020 10 FD52 08 E121 R 6780813R 100 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011505006 $4.31 67808132-3560700500
2020 10 FD52 08 E122 R 6780813R 100 4/27/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR042K1062011505006 $1,003.90 67808132-3560700500
2020 10 FD52 08 E122 R 6780813R 100 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011505006 $47.89 67808132-3560700500
2020 10 FD52 08 E123 R 6780813R 100 4/27/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR042K1062011505006 $137.19 67808132-3560700500
2020 10 FD52 08 E123 R 6780813R 100 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011505006 $6.44 67808132-3560700500
2020 10 FD52 08 E124 R 6780813R 100 4/27/2020 6010 LEGAL ACTIVITY ON PROJECT CA-XR042K1062011505006 $0.41 67808132-3560700500
2020 10 FD52 08 E124 R 6780813R 100 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011505006 $0.02 67808132-3560700500
2020 10 FD52 08 E111 R 6780813R 100 4/27/2020 2050 NEGOTIATIONS CA-XR042K1062011505011 $2,227.28
2020 10 FD52 08 E111 R 6780813R 100 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011505011 $106.06
2020 10 FD52 08 E121 R 6780813R 100 4/27/2020 2050 NEGOTIATIONS CA-XR042K1062011505011 $167.29
2020 10 FD52 08 E121 R 6780813R 100 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011505011 $7.97
2020 10 FD52 08 E122 R 6780813R 100 4/27/2020 2050 NEGOTIATIONS CA-XR042K1062011505011 $1,858.22
2020 10 FD52 08 E122 R 6780813R 100 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011505011 $88.49
2020 10 FD52 08 E123 R 6780813R 100 4/27/2020 2050 NEGOTIATIONS CA-XR042K1062011505011 $313.86
2020 10 FD52 08 E123 R 6780813R 100 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011505011 $14.70
2020 10 FD52 00 E111 R 6780813R 100 4/27/2020 2110 RIGHT OF WAY SUPERVISION CA-XR042K1062011504489 $932.51 000001073609-3562500670
2020 10 FD52 08 E124 R 6780813R 100 4/27/2020 2050 NEGOTIATIONS CA-XR042K1062011505011 $0.95
2020 10 FD52 00 E111 R 6780813R 100 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011504489 $44.35 000001073609-3562500670
2020 10 FD52 08 E124 R 6780813R 100 4/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042K1062011505011 $0.05
2020 10 FD52 08 E792 R 6780813R 100 4/24/2020 2650 RELOCATION PAYMENTS GAX-2000082151 BOSWELL CONTRACTING INC $1,250.00 Move Expense
2020 10 FD52 08 E375 R 6780813R 100 4/22/2020 6010 LEGAL ACTIVITY ON PROJECT GAX-2000081370 WAYNE COUNTY SHERIFF $60.00 Filing Fee for Wayne Co. Sheriff - Nick Cooley Case
2020 10 FD52 08 E792 R 6780813R 100 4/21/2020 2650 RELOCATION PAYMENTS GAX-2000081114 ALVA HANSFORD $8,350.00 Move Expense
2020 10 FD52 08 E799 R 6780813R 121 4/21/2020 2050 NEGOTIATIONS PRCC-PCD2000019377 PULASKI COUNTY CLERK $193.75
2020 10 FD52 08 E799 R 6780813R 100 4/21/2020 2050 NEGOTIATIONS PRCC-PCD2000020098 PULASKI COUNTY CLERK $230.75
2020 10 FD52 08 E799 R 6780813R 100 4/21/2020 2050 NEGOTIATIONS PRCC-PCD2000020415 PULASKI COUNTY CLERK $630.25
2020 10 FD52 08 E799 R 6780813R 100 4/20/2020 6110 SUIT ADMINISTRATION GAX-2000080524 Miscellaneous Individual $250.00 Comm. Fees - Micl Cooley 20-CI-0284 (Mark Vaught)
2020 10 FD52 08 E799 R 6780813R 100 4/20/2020 6110 SUIT ADMINISTRATION GAX-2000080523 Miscellaneous Individual $250.00 Comm. Fees - Micl Cooley 20-CI-0284 (Marvin Wheeldon)
2020 10 FD52 08 E799 R 6780813R 100 4/20/2020 6110 SUIT ADMINISTRATION GAX-2000080525 Miscellaneous Individual $250.00 Comm. Fees - Micl Cooley 20-CI-0284 (Toby King)
2020 10 FD52 08 E799 R 6780813R 100 4/20/2020 6110 SUIT ADMINISTRATION GAX-2000080522 Miscellaneous Individual $250.00 Comm. Fees - Ronnie Nevius Jr Case 20-CI-0283 (Ryan Childers)
2020 10 FD52 08 E365 R 6780813R 100 4/20/2020 2640 RIGHT OF WAY PAYMENTS GAX-2000080794 NATHAN ELDRIDGE $515.00 Mortgage Release Appraisal
2020 10 FD52 08 E792 R 6780813R 100 4/16/2020 2650 RELOCATION PAYMENTS GAX-2000080045 JAMES R VAUGHT $2,000.00 Move Expense
2020 10 FD52 00 E111 R 6780813R 100 4/14/2020 2110 RIGHT OF WAY SUPERVISION CA-XR041K1062009903495 $1,063.77 000001073609-3562500670
2020 10 FD52 00 E111 R 6780813R 100 4/14/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041K1062009903495 $397.76 000001073609-3562500670
2020 10 FD52 00 E121 R 6780813R 100 4/14/2020 2110 RIGHT OF WAY SUPERVISION CA-XR041K1062009903495 $80.40 000001073609-3562500670
2020 10 FD52 00 E121 R 6780813R 100 4/14/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041K1062009903495 $30.07 000001073609-3562500670
2020 10 FD52 00 E122 R 6780813R 100 4/14/2020 2110 RIGHT OF WAY SUPERVISION CA-XR041K1062009903495 $887.50 000001073609-3562500670
2020 10 FD52 00 E122 R 6780813R 100 4/14/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041K1062009903495 $331.85 000001073609-3562500670
2020 10 FD52 00 E123 R 6780813R 100 4/14/2020 2110 RIGHT OF WAY SUPERVISION CA-XR041K1062009903495 $117.07 000001073609-3562500670
2020 10 FD52 00 E123 R 6780813R 100 4/14/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041K1062009903495 $42.96 000001073609-3562500670
2020 10 FD52 08 E229 R 6780813R 100 4/13/2020 2010 RIGHT OF WAY ESTIMATES IET-XE13A162520101005790 $39.90
2020 10 FD52 08 E792 R 6780813R 100 4/10/2020 2650 RELOCATION PAYMENTS GAX-2000078979 CITY OF SOMERSET $68,449.63 Move Expense
2020 10 FD52 08 E796 R 6780813R 100 4/9/2020 2640 RIGHT OF WAY PAYMENTS GAX-2000077880 PULASKI COUNTY CIRCUIT CLERK $222,500.00 Commissioners Award
2020 10 FD52 08 E796 R 6780813R 100 4/9/2020 2640 RIGHT OF WAY PAYMENTS GAX-2000077884 PULASKI COUNTY CIRCUIT CLERK $15,000.00 Commissioners Award
2020 10 FD52 08 E111 R 6780813R 100 4/9/2020 2010 RIGHT OF WAY ESTIMATES CA-XR041K1062009903489 $1,666.67 000001073455-3562508206
2020 10 FD52 08 E121 R 6780813R 100 4/9/2020 2010 RIGHT OF WAY ESTIMATES CA-XR041K1062009903489 $113.39 000001073455-3562508206
2020 10 FD52 08 E122 R 6780813R 100 4/9/2020 2010 RIGHT OF WAY ESTIMATES CA-XR041K1062009903489 $1,390.50 000001073455-3562508206
2020 10 FD52 08 E123 R 6780813R 100 4/9/2020 2010 RIGHT OF WAY ESTIMATES CA-XR041K1062009903489 $570.90 000001073455-3562508206
2020 10 FD52 08 E111 R 6780813R 100 4/9/2020 2060 RELOCATION ASSISTANCE CA-XR041K1062009903489 $2,333.34 000001073456-3562508206
2020 10 FD52 08 E111 R 6780813R 100 4/9/2020 2050 NEGOTIATIONS CA-XR041K1062009903926 $4,483.30
2020 10 FD52 08 E121 R 6780813R 100 4/9/2020 2060 RELOCATION ASSISTANCE CA-XR041K1062009903489 $175.94 000001073456-3562508206
2020 10 FD52 08 E111 R 6780813R 100 4/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041K1062009903926 $306.35
2020 10 FD52 08 E122 R 6780813R 100 4/9/2020 2060 RELOCATION ASSISTANCE CA-XR041K1062009903489 $1,946.71 000001073456-3562508206
2020 10 FD52 08 E121 R 6780813R 100 4/9/2020 2050 NEGOTIATIONS CA-XR041K1062009903926 $333.46
2020 10 FD52 08 E123 R 6780813R 100 4/9/2020 2060 RELOCATION ASSISTANCE CA-XR041K1062009903489 $313.38 000001073456-3562508206
2020 10 FD52 08 E121 R 6780813R 100 4/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041K1062009903926 $22.78
2020 10 FD52 08 E122 R 6780813R 100 4/9/2020 2050 NEGOTIATIONS CA-XR041K1062009903926 $3,740.43
2020 10 FD52 08 E122 R 6780813R 100 4/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041K1062009903926 $255.58
2020 10 FD52 08 E123 R 6780813R 100 4/9/2020 2050 NEGOTIATIONS CA-XR041K1062009903926 $673.06
2020 10 FD52 08 E123 R 6780813R 100 4/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041K1062009903926 $45.36
2020 10 FD52 00 E111 R 6780813R 100 4/9/2020 2110 RIGHT OF WAY SUPERVISION CA-XR041K1062009903489 $307.80 000001073465-3562500670
2020 10 FD52 00 E111 R 6780813R 100 4/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041K1062009903489 $34.06 000001073465-3562500670
2020 10 FD52 00 E121 R 6780813R 100 4/9/2020 2110 RIGHT OF WAY SUPERVISION CA-XR041K1062009903489 $22.93 000001073465-3562500670
2020 10 FD52 00 E121 R 6780813R 100 4/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041K1062009903489 $2.54 000001073465-3562500670
2020 10 FD52 00 E122 R 6780813R 100 4/9/2020 2110 RIGHT OF WAY SUPERVISION CA-XR041K1062009903489 $256.80 000001073465-3562500670
2020 10 FD52 00 E122 R 6780813R 100 4/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041K1062009903489 $28.42 000001073465-3562500670
2020 10 FD52 00 E123 R 6780813R 100 4/9/2020 2110 RIGHT OF WAY SUPERVISION CA-XR041K1062009903489 $36.52 000001073465-3562500670
2020 10 FD52 00 E123 R 6780813R 100 4/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041K1062009903489 $3.98 000001073465-3562500670
2020 10 FD52 00 E124 R 6780813R 100 4/9/2020 2110 RIGHT OF WAY SUPERVISION CA-XR041K1062009903489 $0.10 000001073465-3562500670
2020 10 FD52 00 E124 R 6780813R 100 4/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041K1062009903489 $0.01 000001073465-3562500670
2020 10 FD52 08 E792 R 6780813R 100 4/6/2020 2650 RELOCATION PAYMENTS GAX-2000077435 JANNETTE LEE PHELPS $3,259.49 Reestablishment
2020 9 FD52 08 E794 R 6780813R 100 3/31/2020 2640 RIGHT OF WAY PAYMENTS GAX-2000076064 SOMERSET PULASKI ECONOMIC DEVELOPMENT AUTHORITY $21,000.00 Deed of Conveyance
2020 9 FD52 08 E794 R 6780813R 100 3/31/2020 2640 RIGHT OF WAY PAYMENTS GAX-2000076065 SOMERSET PULASKI ECONOMIC DEVELOPMENT AUTHORITY $176,200.00 Deed of Conveyance
2020 9 FD52 08 E794 R 6780813R 100 3/31/2020 2640 RIGHT OF WAY PAYMENTS GAX-2000076066 SOMERSET PULASKI ECONOMIC DEVELOPMENT AUTHORITY $103,000.00 Deed of Conveyance
2020 9 FD52 00 E124 R 6780813R 100 3/27/2020 2110 RIGHT OF WAY SUPERVISION CA-XR032K1062008402480 $0.10 000001066441-3562500670
2020 9 FD52 00 E124 R 6780813R 100 3/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032K1062008402480 $0.01 000001066441-3562500670
2020 9 FD52 08 E111 R 6780813R 100 3/27/2020 2010 RIGHT OF WAY ESTIMATES CA-XR032K1062008402520 $1,588.89 000001073455-3562508206
2020 9 FD52 08 E111 R 6780813R 100 3/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032K1062008402520 $77.78 000001073455-3562508206
2020 9 FD52 08 E121 R 6780813R 100 3/27/2020 2010 RIGHT OF WAY ESTIMATES CA-XR032K1062008402520 $108.10 000001073455-3562508206
2020 9 FD52 08 E121 R 6780813R 100 3/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032K1062008402520 $5.29 000001073455-3562508206
2020 9 FD52 08 E122 R 6780813R 100 3/27/2020 2010 RIGHT OF WAY ESTIMATES CA-XR032K1062008402520 $1,325.61 000001073455-3562508206
2020 9 FD52 08 E122 R 6780813R 100 3/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032K1062008402520 $64.89 000001073455-3562508206
2020 9 FD52 08 E123 R 6780813R 100 3/27/2020 2010 RIGHT OF WAY ESTIMATES CA-XR032K1062008402520 $544.49 000001073455-3562508206
2020 9 FD52 08 E123 R 6780813R 100 3/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032K1062008402520 $26.41 000001073455-3562508206
2020 9 FD52 08 E124 R 6780813R 100 3/27/2020 2010 RIGHT OF WAY ESTIMATES CA-XR032K1062008402520 $0.95 000001073455-3562508206
2020 9 FD52 08 E124 R 6780813R 100 3/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032K1062008402520 $0.05 000001073455-3562508206
2020 9 FD52 08 E111 R 6780813R 100 3/27/2020 2060 RELOCATION ASSISTANCE CA-XR032K1062008402520 $2,100.01 000001073456-3562508206
2020 9 FD52 08 E121 R 6780813R 100 3/27/2020 2060 RELOCATION ASSISTANCE CA-XR032K1062008402520 $158.34 000001073456-3562508206
2020 9 FD52 08 E122 R 6780813R 100 3/27/2020 2060 RELOCATION ASSISTANCE CA-XR032K1062008402520 $1,752.04 000001073456-3562508206
2020 9 FD52 08 E123 R 6780813R 100 3/27/2020 2060 RELOCATION ASSISTANCE CA-XR032K1062008402520 $282.04 000001073456-3562508206
2020 9 FD52 08 E124 R 6780813R 100 3/27/2020 2060 RELOCATION ASSISTANCE CA-XR032K1062008402520 $0.90 000001073456-3562508206
2020 9 FD52 00 E111 R 6780813R 100 3/27/2020 2110 RIGHT OF WAY SUPERVISION CA-XR032K1062008402520 $683.84 000001073465-3562500670
2020 9 FD52 00 E111 R 6780813R 100 3/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032K1062008402520 $683.85 000001073465-3562500670
2020 9 FD52 00 E121 R 6780813R 100 3/27/2020 2110 RIGHT OF WAY SUPERVISION CA-XR032K1062008402520 $51.69 000001073465-3562500670
2020 9 FD52 00 E121 R 6780813R 100 3/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032K1062008402520 $51.69 000001073465-3562500670
2020 9 FD52 00 E122 R 6780813R 100 3/27/2020 2110 RIGHT OF WAY SUPERVISION CA-XR032K1062008402520 $570.53 000001073465-3562500670
2020 9 FD52 00 E122 R 6780813R 100 3/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032K1062008402520 $570.54 000001073465-3562500670
2020 9 FD52 00 E123 R 6780813R 100 3/27/2020 2110 RIGHT OF WAY SUPERVISION CA-XR032K1062008402520 $75.89 000001073465-3562500670
2020 9 FD52 00 E123 R 6780813R 100 3/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032K1062008402520 $73.86 000001073465-3562500670
2020 9 FD52 00 E124 R 6780813R 100 3/27/2020 2110 RIGHT OF WAY SUPERVISION CA-XR032K1062008402520 $0.20 000001073465-3562500670
2020 9 FD52 00 E124 R 6780813R 100 3/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032K1062008402520 $0.20 000001073465-3562500670
2020 9 FD52 08 E111 R 6780813R 100 3/27/2020 2050 NEGOTIATIONS CA-XR032K1062008402982 $3,725.28
2020 9 FD52 08 E111 R 6780813R 100 3/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032K1062008402982 $1,172.02
2020 9 FD52 08 E121 R 6780813R 100 3/27/2020 2050 NEGOTIATIONS CA-XR032K1062008402982 $276.53
2020 9 FD52 08 E121 R 6780813R 100 3/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032K1062008402982 $86.21
2020 9 FD52 08 E122 R 6780813R 100 3/27/2020 2050 NEGOTIATIONS CA-XR032K1062008402982 $3,108.01
2020 9 FD52 00 E111 R 6780813R 100 3/27/2020 2110 RIGHT OF WAY SUPERVISION CA-XR032K1062008402479 $307.80 000001066441-3562500670
2020 9 FD52 08 E122 R 6780813R 100 3/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032K1062008402982 $977.82
2020 9 FD52 00 E111 R 6780813R 100 3/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032K1062008402479 $34.06 000001066441-3562500670
2020 9 FD52 08 E123 R 6780813R 100 3/27/2020 2050 NEGOTIATIONS CA-XR032K1062008402982 $615.31
2020 9 FD52 00 E121 R 6780813R 100 3/27/2020 2110 RIGHT OF WAY SUPERVISION CA-XR032K1062008402479 $22.93 000001066441-3562500670
2020 9 FD52 08 E123 R 6780813R 100 3/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032K1062008402982 $195.92
2020 9 FD52 00 E121 R 6780813R 100 3/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032K1062008402479 $2.54 000001066441-3562500670
2020 9 FD52 08 E124 R 6780813R 100 3/27/2020 2050 NEGOTIATIONS CA-XR032K1062008402982 $1.69
2020 9 FD52 00 E122 R 6780813R 100 3/27/2020 2110 RIGHT OF WAY SUPERVISION CA-XR032K1062008402479 $256.80 000001066441-3562500670
2020 9 FD52 08 E124 R 6780813R 100 3/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032K1062008402982 $0.52
2020 9 FD52 00 E122 R 6780813R 100 3/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032K1062008402479 $28.42 000001066441-3562500670
2020 9 FD52 00 E123 R 6780813R 100 3/27/2020 2110 RIGHT OF WAY SUPERVISION CA-XR032K1062008402479 $36.52 000001066441-3562500670
2020 9 FD52 00 E123 R 6780813R 100 3/27/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032K1062008402479 $3.98 000001066441-3562500670
2020 9 FD52 08 E799 R 6780813R 100 3/25/2020 6110 SUIT ADMINISTRATION GAX-2000073894 Miscellaneous Individual $250.00 Comm. Fees - Billy & Jeanne Todd 19-CI-1249 (M. Vaught)
2020 9 FD52 08 E799 R 6780813R 100 3/25/2020 6110 SUIT ADMINISTRATION GAX-2000074935 Miscellaneous Individual $250.00 Comm. Fees - Billy & Jeanne Todd 19-CI-1249 (Ryan Childers)
2020 9 FD52 08 E799 R 6780813R 100 3/25/2020 6110 SUIT ADMINISTRATION GAX-2000074871 Miscellaneous Individual $250.00 Comm. Fees - Billy & Jeanne Todd 19-CI-1249 (Toby King)
2020 9 FD52 08 E799 R 6780813R 100 3/25/2020 6110 SUIT ADMINISTRATION GAX-2000074972 Miscellaneous Individual $250.00 Comm. Fees - Jeanne Roseann Todd Rev Liv Trust 19-CIi-1250(Marvin Wheeldon)
2020 9 FD52 08 E799 R 6780813R 100 3/25/2020 6110 SUIT ADMINISTRATION GAX-2000074970 Miscellaneous Individual $250.00 Comm. Fees - Jeanne Roseann Todd Rev Liv Trust 19-CIi-1250(Toby King)
2020 9 FD52 08 E799 R 6780813R 100 3/25/2020 6110 SUIT ADMINISTRATION GAX-2000074967 Miscellaneous Individual $250.00 Comm. Fees - Jeanne Roseann Todd Rev Liv Trust 19-Ci-1250(Ryan Childers)
2020 9 FD52 08 E221 R 6780813R 100 3/25/2020 2640 RIGHT OF WAY PAYMENTS GAX-2000073904 PERFORMANCE FOOD GROUP INC $2,700.00 Temporary Easement
2020 9 FD52 08 E799 R 6780813R 100 3/23/2020 2050 NEGOTIATIONS PRCC-PCD2000017846 Miscellaneous Individual $117.75
2020 9 FD52 08 E794 R 6780813R 100 3/19/2020 2640 RIGHT OF WAY PAYMENTS GAX-2000072596 B J BROWN JR $124,855.00 Deed of Conveyance
2020 9 FD52 00 E111 R 6780813R 100 3/13/2020 2110 RIGHT OF WAY SUPERVISION JV2E-2000005501 $7,422.76 Moving charges from 6780812R to 6780813R-
2020 9 FD52 00 E121 R 6780813R 100 3/13/2020 2110 RIGHT OF WAY SUPERVISION JV2E-2000005502 $561.07 Moving charges from 6780812R to 6780813R-
2020 9 FD52 00 E124 R 6780813R 100 3/13/2020 2110 RIGHT OF WAY SUPERVISION JV2E-2000005512 $0.97 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E792 R 6780813R 100 3/13/2020 2650 RELOCATION PAYMENTS JV2E-2000005526 $1,809.30 Moving charges from 6780812R to 6780813R
2020 9 FD52 08 E122 R 6780813R 100 3/13/2020 2060 RELOCATION ASSISTANCE JV2E-2000005507 $11,855.48 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E229 R 6780813R 100 3/13/2020 2060 RELOCATION ASSISTANCE JV2E-2000005523 $61.25 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E123 R 6780813R 100 3/13/2020 2060 RELOCATION ASSISTANCE JV2E-2000005533 $188.03 Moving charges from 6780812R to 6780813R-
2020 9 FD52 00 E122 R 6780813R 100 3/13/2020 2110 RIGHT OF WAY SUPERVISION JV2E-2000005507 $6,192.89 Moving charges from 6780812R to 6780813R-
2020 9 FD52 00 E123 R 6780813R 100 3/13/2020 2110 RIGHT OF WAY SUPERVISION JV2E-2000005509 $583.39 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E792 R 6780813R 100 3/13/2020 2650 RELOCATION PAYMENTS JV2E-2000005526 $54,115.00 Moving charges from 6780812R to 6780813R
2020 9 FD52 08 E111 R 6780813R 100 3/13/2020 2120 RIGHT OF WAY MISCELLANEOUS JV2E-2000005501 $9,281.88 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E121 R 6780813R 100 3/13/2020 2120 RIGHT OF WAY MISCELLANEOUS JV2E-2000005502 $724.36 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E124 R 6780813R 100 3/13/2020 2120 RIGHT OF WAY MISCELLANEOUS JV2E-2000005512 $3.30 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E229 R 6780813R 100 3/13/2020 2120 RIGHT OF WAY MISCELLANEOUS JV2E-2000005523 $14.35 Moving charges from 6780812R to 6780813R-
2020 9 FD52 00 E111 R 6780813R 100 3/13/2020 2120 RIGHT OF WAY MISCELLANEOUS JV2E-2000005501 $11,207.06 Moving charges from 6780812R to 6780813R-
2020 9 FD52 00 E121 R 6780813R 100 3/13/2020 2120 RIGHT OF WAY MISCELLANEOUS JV2E-2000005502 $821.60 Moving charges from 6780812R to 6780813R-
2020 9 FD52 00 E124 R 6780813R 100 3/13/2020 2120 RIGHT OF WAY MISCELLANEOUS JV2E-2000005512 $2.75 Moving charges from 6780812R to 6780813R-
2020 9 FD52 00 E229 R 6780813R 100 3/13/2020 2120 RIGHT OF WAY MISCELLANEOUS JV2E-2000005523 $196.58 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E792 R 6780813R 100 3/13/2020 2650 RELOCATION PAYMENTS JV2E-2000005526 $16,464.00 Moving charges from 6780812R to 6780813R
2020 9 FD52 08 E122 R 6780813R 100 3/13/2020 2120 RIGHT OF WAY MISCELLANEOUS JV2E-2000005507 $8,907.25 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E123 R 6780813R 100 3/13/2020 2050 NEGOTIATIONS JV2E-2000005509 $1,010.16 Moving charges from 6780812R to 6780813R-
2020 9 FD52 00 E122 R 6780813R 100 3/13/2020 2120 RIGHT OF WAY MISCELLANEOUS JV2E-2000005507 $9,350.06 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E792 R 6780813R 100 3/13/2020 2650 RELOCATION PAYMENTS JV2E-2000005526 $10,210.00 Moving charges from 6780812R to 6780813R
2020 9 FD52 08 E111 R 6780813R 100 3/13/2020 4250 SIGNING PLANS-TRAF JV2E-2000005501 $587.57 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E121 R 6780813R 100 3/13/2020 4250 SIGNING PLANS-TRAF JV2E-2000005502 $42.94 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E123 R 6780813R 100 3/13/2020 2110 RIGHT OF WAY SUPERVISION JV2E-2000005509 $677.07 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E124 R 6780813R 100 3/13/2020 4250 SIGNING PLANS-TRAF JV2E-2000005512 $0.09 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E792 R 6780813R 100 3/13/2020 2650 RELOCATION PAYMENTS JV2E-2000005526 $2,100.00 Moving charges from 6780812R to 6780813R
2020 9 FD52 08 E111 R 6780813R 100 3/13/2020 6010 LEGAL ACTIVITY ON PROJECT JV2E-2000005501 $6,394.94 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E121 R 6780813R 100 3/13/2020 6010 LEGAL ACTIVITY ON PROJECT JV2E-2000005502 $477.82 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E122 R 6780813R 100 3/13/2020 4250 SIGNING PLANS-TRAF JV2E-2000005507 $490.20 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E123 R 6780813R 100 3/13/2020 2120 RIGHT OF WAY MISCELLANEOUS JV2E-2000005509 $3,804.08 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E124 R 6780813R 100 3/13/2020 6010 LEGAL ACTIVITY ON PROJECT JV2E-2000005512 $1.08 Moving charges from 6780812R to 6780813R-
2020 9 FD52 00 E111 R 6780813R 100 3/13/2020 2040 REVIEW OF APPRAISALS JV2E-2000005501 $2,516.62 Moving charges from 6780812R to 6780813R-
2020 9 FD52 00 E122 R 6780813R 100 3/13/2020 2040 REVIEW OF APPRAISALS JV2E-2000005507 $2,099.73 Moving charges from 6780812R to 6780813R-
2020 9 FD52 00 E123 R 6780813R 100 3/13/2020 2040 REVIEW OF APPRAISALS JV2E-2000005509 $247.96 Moving charges from 6780812R to 6780813R-
2020 9 FD52 00 E124 R 6780813R 100 3/13/2020 2040 REVIEW OF APPRAISALS JV2E-2000005512 $0.19 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E365 R 6780813R 100 3/13/2020 2640 RIGHT OF WAY PAYMENTS JV2E-2000005526 $126.00 Moving charges from 6780812R to 6780813R
2020 9 FD52 08 E151 R 6780813R 100 3/13/2020 6050 TRIAL PREPARATION JV2E-2000005544 $2,800.00 Moving charges from 6780812R to 6780813R
2020 9 FD52 08 E121 R 6780813R 100 3/13/2020 2060 RELOCATION ASSISTANCE JV2E-2000005502 $241.62 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E221 R 6780813R 100 3/13/2020 2640 RIGHT OF WAY PAYMENTS JV2E-2000005523 $162,600.00 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E111 R 6780813R 100 3/13/2020 2060 RELOCATION ASSISTANCE JV2E-2000005533 $1,400.00 Moving charges from 6780812R to 6780813R-
2020 9 FD52 00 E123 R 6780813R 100 3/13/2020 2120 RIGHT OF WAY MISCELLANEOUS JV2E-2000005509 $1,553.64 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E794 R 6780813R 100 3/13/2020 2640 RIGHT OF WAY PAYMENTS JV2E-2000005526 $1,195,850.00 Moving charges from 6780812R to 6780813R
2020 9 FD52 08 E122 R 6780813R 100 3/13/2020 6010 LEGAL ACTIVITY ON PROJECT JV2E-2000005507 $5,335.13 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E151 R 6780813R 100 3/13/2020 6050 TRIAL PREPARATION JV2E-2000005512 $6,370.00 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E796 R 6780813R 100 3/13/2020 2640 RIGHT OF WAY PAYMENTS JV2E-2000005526 $34,000.00 Moving charges from 6780812R to 6780813R
2020 9 FD52 08 E123 R 6780813R 100 3/13/2020 4250 SIGNING PLANS-TRAF JV2E-2000005509 $65.52 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E799 R 6780813R 100 3/13/2020 2050 NEGOTIATIONS JV2E-2000005526 $3,131.53 Moving charges from 6780812R to 6780813R
2020 9 FD52 08 E123 R 6780813R 100 3/13/2020 6010 LEGAL ACTIVITY ON PROJECT JV2E-2000005509 $761.84 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E799 R 6780813R 100 3/13/2020 6010 LEGAL ACTIVITY ON PROJECT JV2E-2000005526 $62.75 Moving charges from 6780812R to 6780813R
2020 9 FD52 08 E123 R 6780813R 100 3/13/2020 2110 RIGHT OF WAY SUPERVISION JV2E-2000005509 ($444.56) Moving charges from 6780812R to 6780813R-
2020 9 FD52 00 E229 R 6780813R 100 3/13/2020 2040 REVIEW OF APPRAISALS JV2E-2000005523 $183.92 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E365 R 6780813R 100 3/13/2020 2640 RIGHT OF WAY PAYMENTS JV2E-2000005526 $1,398.87 Moving charges from 6780812R to 6780813R
2020 9 FD52 08 E111 R 6780813R 100 3/13/2020 2050 NEGOTIATIONS JV2E-2000005501 $45,130.41 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E121 R 6780813R 100 3/13/2020 2050 NEGOTIATIONS JV2E-2000005502 $3,326.25 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E122 R 6780813R 100 3/13/2020 2050 NEGOTIATIONS JV2E-2000005507 $77.31 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E123 R 6780813R 100 3/13/2020 2050 NEGOTIATIONS JV2E-2000005509 $6,895.52 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E124 R 6780813R 100 3/13/2020 2050 NEGOTIATIONS JV2E-2000005512 $11.19 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E111 R 6780813R 100 3/13/2020 2120 RIGHT OF WAY MISCELLANEOUS JV2E-2000005533 $1,394.45 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E375 R 6780813R 100 3/13/2020 6010 LEGAL ACTIVITY ON PROJECT JV2E-2000005526 $32.00 Moving charges from 6780812R to 6780813R
2020 9 FD52 08 E111 R 6780813R 100 3/13/2020 2060 RELOCATION ASSISTANCE JV2E-2000005501 $3,206.96 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E121 R 6780813R 100 3/13/2020 2060 RELOCATION ASSISTANCE JV2E-2000005502 $1,070.71 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E122 R 6780813R 100 3/13/2020 2050 NEGOTIATIONS JV2E-2000005507 $37,575.00 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E123 R 6780813R 100 3/13/2020 2060 RELOCATION ASSISTANCE JV2E-2000005509 $612.61 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E124 R 6780813R 100 3/13/2020 2060 RELOCATION ASSISTANCE JV2E-2000005512 $0.86 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E229 R 6780813R 100 3/13/2020 2050 NEGOTIATIONS JV2E-2000005523 $1,137.75 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E121 R 6780813R 100 3/13/2020 2060 RELOCATION ASSISTANCE JV2E-2000005533 $105.56 Moving charges from 6780812R to 6780813R-
2020 9 FD52 00 E121 R 6780813R 100 3/13/2020 2040 REVIEW OF APPRAISALS JV2E-2000005502 $189.83 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E792 R 6780813R 100 3/13/2020 2650 RELOCATION PAYMENTS JV2E-2000005526 $982.04 Moving charges from 6780812R to 6780813R
2020 9 FD52 08 E111 R 6780813R 100 3/13/2020 2060 RELOCATION ASSISTANCE JV2E-2000005501 $14,210.06 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E122 R 6780813R 100 3/13/2020 2060 RELOCATION ASSISTANCE JV2E-2000005507 $2,675.51 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E123 R 6780813R 100 3/13/2020 2060 RELOCATION ASSISTANCE JV2E-2000005509 $2,019.46 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E124 R 6780813R 100 3/13/2020 2060 RELOCATION ASSISTANCE JV2E-2000005512 $3.49 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E229 R 6780813R 100 3/13/2020 2060 RELOCATION ASSISTANCE JV2E-2000005523 $691.64 Moving charges from 6780812R to 6780813R-
2020 9 FD52 08 E122 R 6780813R 100 3/13/2020 2060 RELOCATION ASSISTANCE JV2E-2000005533 $1,168.02 Moving charges from 6780812R to 6780813R-
2020 4 FD52 08 E111 R 6780813R 100 10/23/2019 2060 RELOCATION ASSISTANCE JV2E-2000002341 $5,712.23 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E792 R 6780813R 100 10/23/2019 2650 RELOCATION PAYMENTS JV2E-2000002370 $38,490.00 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E111 R 6780813R 100 10/23/2019 2060 RELOCATION ASSISTANCE JV2E-2000002341 $6,374.29 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E792 R 6780813R 100 10/23/2019 2650 RELOCATION PAYMENTS JV2E-2000002370 $43,112.12 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E111 R 6780813R 100 10/23/2019 2110 RIGHT OF WAY SUPERVISION JV2E-2000002341 $5,338.98 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E792 R 6780813R 100 10/23/2019 2650 RELOCATION PAYMENTS JV2E-2000002370 $30,200.00 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E111 R 6780813R 100 10/23/2019 2120 RIGHT OF WAY MISCELLANEOUS JV2E-2000002341 $4,293.75 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E792 R 6780813R 100 10/23/2019 2650 RELOCATION PAYMENTS JV2E-2000002370 $7,140.00 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 00 E121 R 6780813R 100 10/23/2019 2040 REVIEW OF APPRAISALS JV2E-2000002341 $1,178.93 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E794 R 6780813R 100 10/23/2019 2640 RIGHT OF WAY PAYMENTS JV2E-2000002370 $3,057,965.00 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 00 E111 R 6780813R 100 10/23/2019 2040 REVIEW OF APPRAISALS JV2E-2000002341 $15,635.26 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E382 R 6780813R 100 10/23/2019 2640 RIGHT OF WAY PAYMENTS JV2E-2000002370 $1,312.00 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E121 R 6780813R 100 10/23/2019 2050 NEGOTIATIONS JV2E-2000002341 $6.95 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E799 R 6780813R 100 10/23/2019 2050 NEGOTIATIONS JV2E-2000002370 $691.50 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E799 R 6780813R 100 10/23/2019 2120 RIGHT OF WAY MISCELLANEOUS JV2E-2000002370 $424.50 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 00 E111 R 6780813R 100 10/23/2019 2110 RIGHT OF WAY SUPERVISION JV2E-2000002341 $2,927.25 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E121 R 6780813R 100 10/23/2019 2050 NEGOTIATIONS JV2E-2000002341 $1,444.85 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E111 R 6780813R 100 10/23/2019 2050 NEGOTIATIONS JV2E-2000002341 $92.68 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E792 R 6780813R 100 10/23/2019 2650 RELOCATION PAYMENTS JV2E-2000002370 $7,200.00 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E111 R 6780813R 100 10/23/2019 2050 NEGOTIATIONS JV2E-2000002341 $19,743.63 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E792 R 6780813R 100 10/23/2019 2650 RELOCATION PAYMENTS JV2E-2000002370 $720.00 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E111 R 6780813R 100 10/23/2019 2060 RELOCATION ASSISTANCE JV2E-2000002341 $4,963.36 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E792 R 6780813R 100 10/23/2019 2650 RELOCATION PAYMENTS JV2E-2000002370 $56,670.00 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 00 E121 R 6780813R 100 10/22/2019 2110 RIGHT OF WAY SUPERVISION JV2E-2000002350 $219.04 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 00 E123 R 6780813R 100 10/22/2019 2040 REVIEW OF APPRAISALS JV2E-2000002360 $1,590.31 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E124 R 6780813R 100 10/22/2019 2050 NEGOTIATIONS JV2E-2000002366 $4.46 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E229 R 6780813R 100 10/22/2019 2060 RELOCATION ASSISTANCE JV2E-2000002368 $761.60 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E121 R 6780813R 100 10/22/2019 2120 RIGHT OF WAY MISCELLANEOUS JV2E-2000002350 $304.12 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E123 R 6780813R 100 10/22/2019 2050 NEGOTIATIONS JV2E-2000002360 $24.38 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E124 R 6780813R 100 10/22/2019 2060 RELOCATION ASSISTANCE JV2E-2000002366 $1.95 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E229 R 6780813R 100 10/22/2019 2060 RELOCATION ASSISTANCE JV2E-2000002368 $192.20 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 00 E122 R 6780813R 100 10/22/2019 2040 REVIEW OF APPRAISALS JV2E-2000002350 $13,044.50 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E123 R 6780813R 100 10/22/2019 2050 NEGOTIATIONS JV2E-2000002360 $4,026.68 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E124 R 6780813R 100 10/22/2019 2060 RELOCATION ASSISTANCE JV2E-2000002366 $1.52 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E229 R 6780813R 100 10/22/2019 2110 RIGHT OF WAY SUPERVISION JV2E-2000002368 $156.80 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E122 R 6780813R 100 10/22/2019 2050 NEGOTIATIONS JV2E-2000002350 $16,549.43 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E123 R 6780813R 100 10/22/2019 2060 RELOCATION ASSISTANCE JV2E-2000002360 $1,107.80 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E124 R 6780813R 100 10/22/2019 2060 RELOCATION ASSISTANCE JV2E-2000002366 $1.64 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E122 R 6780813R 100 10/22/2019 2060 RELOCATION ASSISTANCE JV2E-2000002350 $4,141.01 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E123 R 6780813R 100 10/22/2019 2060 RELOCATION ASSISTANCE JV2E-2000002360 $1,307.32 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E124 R 6780813R 100 10/22/2019 2110 RIGHT OF WAY SUPERVISION JV2E-2000002366 $0.89 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 00 E229 R 6780813R 100 10/22/2019 2040 REVIEW OF APPRAISALS JV2E-2000002368 $254.60 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E121 R 6780813R 100 10/22/2019 2060 RELOCATION ASSISTANCE JV2E-2000002350 $373.45 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E122 R 6780813R 100 10/22/2019 2060 RELOCATION ASSISTANCE JV2E-2000002360 $5,318.07 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E123 R 6780813R 100 10/22/2019 2110 RIGHT OF WAY SUPERVISION JV2E-2000002366 $754.36 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 00 E124 R 6780813R 100 10/22/2019 2110 RIGHT OF WAY SUPERVISION JV2E-2000002366 $0.33 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E122 R 6780813R 100 10/22/2019 2060 RELOCATION ASSISTANCE JV2E-2000002350 $4,765.64 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E123 R 6780813R 100 10/22/2019 2060 RELOCATION ASSISTANCE JV2E-2000002360 $1,047.14 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E124 R 6780813R 100 10/22/2019 2120 RIGHT OF WAY MISCELLANEOUS JV2E-2000002366 $1.49 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E143 R 6780813R 100 10/22/2019 1550 DESIGN CONTRACTS-CONSULTANT JV2E-2000002366 $118,880.00 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E221 R 6780813R 100 10/22/2019 2640 RIGHT OF WAY PAYMENTS JV2E-2000002366 $58,000.00 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E124 R 6780813R 100 10/22/2019 2050 NEGOTIATIONS JV2E-2000002366 $0.07 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 00 E123 R 6780813R 100 10/22/2019 2110 RIGHT OF WAY SUPERVISION JV2E-2000002366 $355.48 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E121 R 6780813R 100 10/22/2019 2060 RELOCATION ASSISTANCE JV2E-2000002350 $429.49 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E122 R 6780813R 100 10/22/2019 2110 RIGHT OF WAY SUPERVISION JV2E-2000002360 $4,454.31 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E229 R 6780813R 100 10/22/2019 2050 NEGOTIATIONS JV2E-2000002368 $526.63 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 00 E122 R 6780813R 100 10/22/2019 2110 RIGHT OF WAY SUPERVISION JV2E-2000002360 $2,442.23 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E121 R 6780813R 100 10/22/2019 2060 RELOCATION ASSISTANCE JV2E-2000002350 $479.41 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E123 R 6780813R 100 10/22/2019 2120 RIGHT OF WAY MISCELLANEOUS JV2E-2000002366 $1,544.00 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 00 E124 R 6780813R 100 10/22/2019 2040 REVIEW OF APPRAISALS JV2E-2000002366 $2.26 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E121 R 6780813R 100 10/22/2019 2110 RIGHT OF WAY SUPERVISION JV2E-2000002350 $402.28 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E122 R 6780813R 100 10/22/2019 2120 RIGHT OF WAY MISCELLANEOUS JV2E-2000002360 $3,582.42 Move expenditures from 12R to 13R 100% road fund
2020 4 FD52 08 E229 R 6780813R 100 10/22/2019 2060 RELOCATION ASSISTANCE JV2E-2000002368 $293.66 Move expenditures from 12R to 13R 100% road fund
2019 11 FD52 08 E794 R 6780813R 100 5/24/2019 2640 RIGHT OF WAY PAYMENTS GAX-1900092695 GREG HANSFORD $2,100.00 EXCESS
2019 11 FD52 08 E794 R 6780813R 100 5/24/2019 2640 RIGHT OF WAY PAYMENTS GAX-1900092694 SHEILA HANSFORD $2,100.00 EXCESS