2023 |
2 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
8/10/2022 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR081M1062222110252 |
|
|
$0.02 |
10790161-3562508302 |
2023 |
2 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
8/10/2022 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR081M1062222110252 |
|
|
$0.05 |
10790161-3562508302 |
2022 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/9/2022 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021M1062203907469 |
|
|
$0.02 |
10517666-3562508302 |
2022 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021M1062203907469 |
|
|
$0.01 |
10517666-3562508302 |
2022 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/9/2022 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021M1062203907469 |
|
|
($1.33) |
10517666-3562508302 |
2022 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021M1062203907469 |
|
|
($0.57) |
10517666-3562508302 |
2021 |
10 |
FD52 |
00 |
E229 |
C |
6780801C |
100 |
4/5/2021 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
JV2E-2100006212 |
|
|
($266.57) |
Move IET's from 6780801C to 08C - Inaccurate Fed Funding |
2021 |
10 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
4/5/2021 |
5213 |
ASPHALT MIX DESIGN |
JV2E-2100006210 |
|
|
($2,538.50) |
Shift CA's from 6780801C to 6780808C-Inaccurate Federal Funding. See Extended Description for detail |
2021 |
10 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
4/5/2021 |
4580 |
CONSTRUCTION CONTRACTS |
JV2E-2100006184 |
|
|
($38,072.27) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
08 |
E389 |
C |
6780801C |
100 |
4/5/2021 |
4260 |
SIGNAL PLANS-TRAF |
JV2E-2100006213 |
|
|
($24,043.29) |
Move IET XM005162521041003860 from 6780801C to 07C |
2021 |
10 |
FD52 |
08 |
E143 |
C |
6780801C |
100 |
4/5/2021 |
0094 |
ENV STUDIES-PERMIT IN-LIEU FEE |
JV2E-2100006222 |
SC2000001676 |
|
($1,899,040.00) |
Move PRCI 2100000588 from 6780801C to 08C. See Extended Description for details |
2021 |
10 |
FD52 |
08 |
E143 |
C |
6780801C |
100 |
4/5/2021 |
0550 |
ENV STUDIES-TERRES ECOL-CONSUL |
JV2E-2100006218 |
PON22000002505 |
|
($236,376.00) |
Shift various trans. from 6780801C to 6780808C. See the attached spreadsheet & Extend. Desc. detail |
2021 |
10 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
4/5/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006210 |
|
|
($604.78) |
Shift CA's from 6780801C to 6780808C-Inaccurate Federal Funding. See Extended Description for detail |
2021 |
10 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
4/5/2021 |
4580 |
CONSTRUCTION CONTRACTS |
JV2E-2100006184 |
|
|
($8,721.54) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
08 |
E797 |
C |
6780801C |
100 |
4/5/2021 |
4580 |
CONSTRUCTION CONTRACTS |
JV2E-2100006218 |
CTXCONST0922013050001K |
|
($4,647,544.99) |
Shift various trans. from 6780801C to 6780807C. See the attached spreadsheet & Extend. Desc. detail |
2021 |
10 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
4/5/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006210 |
|
|
($45.15) |
Shift CA's from 6780801C to 6780808C-Inaccurate Federal Funding. See Extended Description for detail |
2021 |
10 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
4/5/2021 |
4580 |
CONSTRUCTION CONTRACTS |
JV2E-2100006184 |
|
|
($10.81) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
4/5/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006210 |
|
|
($510.62) |
Shift CA's from 6780801C to 6780808C-Inaccurate Federal Funding. See Extended Description for detail |
2021 |
10 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
4/5/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006184 |
|
|
($9,005.73) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
4/5/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006210 |
|
|
($95.09) |
Shift CA's from 6780801C to 6780808C-Inaccurate Federal Funding. See Extended Description for detail |
2021 |
10 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
4/5/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006184 |
|
|
($650.06) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
4/5/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006210 |
|
|
($0.16) |
Shift CA's from 6780801C to 6780808C-Inaccurate Federal Funding. See Extended Description for detail |
2021 |
10 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
4/5/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006184 |
|
|
($7,603.39) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
4/5/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
JV2E-2100006210 |
|
|
($15,127.87) |
Shift CA's from 6780801C to 6780808C-Inaccurate Federal Funding. See Extended Description for detail |
2021 |
10 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
4/5/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006184 |
|
|
($1,916.95) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E115 |
C |
6780801C |
100 |
4/5/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
JV2E-2100006210 |
|
|
($1,295.87) |
Shift CA's from 6780801C to 6780808C-Inaccurate Federal Funding. See Extended Description for detail |
2021 |
10 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
4/5/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006184 |
|
|
($1.62) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
4/5/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
JV2E-2100006184 |
|
|
($320.94) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
4/5/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
JV2E-2100006210 |
|
|
($1,182.28) |
Shift CA's from 6780801C to 6780808C-Inaccurate Federal Funding. See Extended Description for detail |
2021 |
10 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
4/5/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
JV2E-2100006184 |
|
|
($21.88) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
4/5/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
JV2E-2100006210 |
|
|
($13,866.34) |
Shift CA's from 6780801C to 6780808C-Inaccurate Federal Funding. See Extended Description for detail |
2021 |
10 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
4/5/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
JV2E-2100006184 |
|
|
($271.15) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
4/5/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
JV2E-2100006210 |
|
|
($2,441.54) |
Shift CA's from 6780801C to 6780808C-Inaccurate Federal Funding. See Extended Description for detail |
2021 |
10 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
4/5/2021 |
5213 |
ASPHALT MIX DESIGN |
JV2E-2100006210 |
|
|
($190.69) |
Shift CA's from 6780801C to 6780808C-Inaccurate Federal Funding. See Extended Description for detail |
2021 |
10 |
FD52 |
00 |
E361 |
C |
6780801C |
100 |
4/5/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
JV2E-2100006218 |
|
|
($18.00) |
Shift various trans. from 6780801C to 6780808C. See the attached spreadsheet & Extend. Desc. detail |
2021 |
10 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
4/5/2021 |
4580 |
CONSTRUCTION CONTRACTS |
JV2E-2100006184 |
|
|
($5,585.23) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
08 |
E229 |
C |
6780801C |
100 |
4/5/2021 |
5182 |
INSP-MISCELLANEOUS MATERIALS |
JV2E-2100006212 |
|
|
($45.12) |
Move IET's from 6780801C to 08C - Inaccurate Fed Funding |
2021 |
10 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
4/5/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
JV2E-2100006184 |
|
|
($57.22) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
4/5/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
JV2E-2100006210 |
|
|
($3.42) |
Shift CA's from 6780801C to 6780808C-Inaccurate Federal Funding. See Extended Description for detail |
2021 |
10 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
4/5/2021 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
JV2E-2100006184 |
|
|
($0.10) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
4/5/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006210 |
|
|
($3,523.72) |
Shift CA's from 6780801C to 6780808C-Inaccurate Federal Funding. See Extended Description for detail |
2021 |
10 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
4/5/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006184 |
|
|
($80.50) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
4/5/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006210 |
|
|
($252.96) |
Shift CA's from 6780801C to 6780808C-Inaccurate Federal Funding. See Extended Description for detail |
2021 |
10 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
4/5/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006184 |
|
|
($5.49) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
4/5/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006210 |
|
|
($2,975.10) |
Shift CA's from 6780801C to 6780808C-Inaccurate Federal Funding. See Extended Description for detail |
2021 |
10 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
4/5/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006184 |
|
|
($67.97) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
4/5/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006210 |
|
|
($562.61) |
Shift CA's from 6780801C to 6780808C-Inaccurate Federal Funding. See Extended Description for detail |
2021 |
10 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
4/5/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006184 |
|
|
($14.18) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
4/5/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006210 |
|
|
($0.51) |
Shift CA's from 6780801C to 6780808C-Inaccurate Federal Funding. See Extended Description for detail |
2021 |
10 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
4/5/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006184 |
|
|
($0.03) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
4/5/2021 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
JV2E-2100006184 |
|
|
($345.45) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E115 |
C |
6780801C |
100 |
4/5/2021 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
JV2E-2100006184 |
|
|
($52.62) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
4/5/2021 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
JV2E-2100006184 |
|
|
($28.77) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E229 |
C |
6780801C |
100 |
4/5/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
JV2E-2100006212 |
|
|
($9,575.00) |
Move IET's from 6780801C to 08C - Inaccurate Fed Funding |
2021 |
10 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
4/5/2021 |
5213 |
ASPHALT MIX DESIGN |
JV2E-2100006210 |
|
|
($2,143.39) |
Shift CA's from 6780801C to 6780808C-Inaccurate Federal Funding. See Extended Description for detail |
2021 |
10 |
FD52 |
08 |
E116 |
C |
6780801C |
100 |
4/5/2021 |
4580 |
CONSTRUCTION CONTRACTS |
JV2E-2100006184 |
|
|
($426.00) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
08 |
E797 |
C |
6780801C |
100 |
4/5/2021 |
4010 |
CONSTRUCTION ENGINEERING |
JV2E-2100006218 |
PON22100000777 |
|
($1,335.00) |
Shift various trans. from 6780801C to 6780808C. See the attached spreadsheet & Extend. Desc. detail |
2021 |
10 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
4/5/2021 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
JV2E-2100006184 |
|
|
($336.09) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
4/5/2021 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
JV2E-2100006184 |
|
|
($73.51) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
4/5/2021 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
JV2E-2100006184 |
|
|
($0.18) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
4/5/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006184 |
|
|
($34.55) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
4/5/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006184 |
|
|
($2.49) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
4/5/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006184 |
|
|
($29.17) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
4/5/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006184 |
|
|
($7.25) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
4/5/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006184 |
|
|
($0.02) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
4/5/2021 |
5182 |
INSP-MISCELLANEOUS MATERIALS |
JV2E-2100006184 |
|
|
($1,171.45) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
4/5/2021 |
5182 |
INSP-MISCELLANEOUS MATERIALS |
JV2E-2100006184 |
|
|
($87.82) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
4/5/2021 |
5213 |
ASPHALT MIX DESIGN |
JV2E-2100006210 |
|
|
($403.39) |
Shift CA's from 6780801C to 6780808C-Inaccurate Federal Funding. See Extended Description for detail |
2021 |
10 |
FD52 |
05 |
E797 |
C |
6780801C |
100 |
4/5/2021 |
4010 |
CONSTRUCTION ENGINEERING |
JV2E-2100006218 |
PON22100000777 |
|
($712.00) |
Shift various trans. from 6780801C to 6780808C. See the attached spreadsheet & Extend. Desc. detail |
2021 |
10 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
4/5/2021 |
4580 |
CONSTRUCTION CONTRACTS |
JV2E-2100006184 |
|
|
($3,203.64) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
4/5/2021 |
5182 |
INSP-MISCELLANEOUS MATERIALS |
JV2E-2100006184 |
|
|
($989.06) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
4/5/2021 |
5182 |
INSP-MISCELLANEOUS MATERIALS |
JV2E-2100006184 |
|
|
($267.01) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
4/5/2021 |
5182 |
INSP-MISCELLANEOUS MATERIALS |
JV2E-2100006184 |
|
|
($0.63) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
4/5/2021 |
5203 |
TESTING OF ASPHALT MIXTURES |
JV2E-2100006184 |
|
|
($1,908.42) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E115 |
C |
6780801C |
100 |
4/5/2021 |
5203 |
TESTING OF ASPHALT MIXTURES |
JV2E-2100006184 |
|
|
($529.87) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
4/5/2021 |
5203 |
TESTING OF ASPHALT MIXTURES |
JV2E-2100006184 |
|
|
($184.11) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
4/5/2021 |
5203 |
TESTING OF ASPHALT MIXTURES |
JV2E-2100006184 |
|
|
($2,058.59) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
4/5/2021 |
5203 |
TESTING OF ASPHALT MIXTURES |
JV2E-2100006184 |
|
|
($256.45) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
4/5/2021 |
5203 |
TESTING OF ASPHALT MIXTURES |
JV2E-2100006184 |
|
|
($0.63) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
4/5/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006184 |
|
|
($306.50) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
4/5/2021 |
5213 |
ASPHALT MIX DESIGN |
JV2E-2100006210 |
|
|
($0.58) |
Shift CA's from 6780801C to 6780808C-Inaccurate Federal Funding. See Extended Description for detail |
2021 |
10 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
4/5/2021 |
4580 |
CONSTRUCTION CONTRACTS |
JV2E-2100006184 |
|
|
($36,906.24) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
08 |
E797 |
C |
6780801C |
100 |
4/5/2021 |
4010 |
CONSTRUCTION ENGINEERING |
JV2E-2100006218 |
PON21900002065 |
|
($7,441.52) |
Shift various trans. from 6780801C to 6780808C. See the attached spreadsheet & Extend. Desc. detail |
2021 |
10 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
4/5/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006184 |
|
|
($23.19) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
4/5/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006184 |
|
|
($258.78) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
4/5/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006184 |
|
|
($38.96) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
4/5/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006184 |
|
|
($0.10) |
Move CA's from 6780801C to 08C due to incorrect Fed Funding.
See Extended Description for details. |
2021 |
10 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
4/2/2021 |
1060 |
RDWAY PLANS-FINAL-DRAINAGE SEC |
JV2E-2100006154 |
|
|
($82.44) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
4/2/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006154 |
|
|
($27.02) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
4/2/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006154 |
|
|
($1.98) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
4/2/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006154 |
|
|
($22.82) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
4/2/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006154 |
|
|
($3.78) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
4/2/2021 |
1620 |
BRIDGE DESIGN & PLANS |
JV2E-2100006154 |
|
|
($658.72) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
4/2/2021 |
1620 |
BRIDGE DESIGN & PLANS |
JV2E-2100006154 |
|
|
($49.80) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
4/2/2021 |
1620 |
BRIDGE DESIGN & PLANS |
JV2E-2100006154 |
|
|
($556.16) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
4/2/2021 |
1620 |
BRIDGE DESIGN & PLANS |
JV2E-2100006154 |
|
|
($70.18) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
4/2/2021 |
1620 |
BRIDGE DESIGN & PLANS |
JV2E-2100006154 |
|
|
($0.18) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
4/2/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006154 |
|
|
($65.87) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
4/2/2021 |
1060 |
RDWAY PLANS-FINAL-DRAINAGE SEC |
JV2E-2100006154 |
|
|
($6.03) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
4/2/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006154 |
|
|
($4.98) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
4/2/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006154 |
|
|
($55.61) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
4/2/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006154 |
|
|
($6.92) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
4/2/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006154 |
|
|
($0.02) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
4/2/2021 |
4010 |
CONSTRUCTION ENGINEERING |
JV2E-2100006154 |
|
|
($3,103.42) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
4/2/2021 |
4010 |
CONSTRUCTION ENGINEERING |
JV2E-2100006154 |
|
|
($223.86) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
4/2/2021 |
4010 |
CONSTRUCTION ENGINEERING |
JV2E-2100006154 |
|
|
($2,620.30) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
4/2/2021 |
4010 |
CONSTRUCTION ENGINEERING |
JV2E-2100006154 |
|
|
($525.31) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
4/2/2021 |
4010 |
CONSTRUCTION ENGINEERING |
JV2E-2100006154 |
|
|
($0.73) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
4/2/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006154 |
|
|
($519.77) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
4/2/2021 |
1060 |
RDWAY PLANS-FINAL-DRAINAGE SEC |
JV2E-2100006154 |
|
|
($69.56) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
4/2/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006154 |
|
|
($37.28) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
4/2/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006154 |
|
|
($438.84) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
4/2/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006154 |
|
|
($87.53) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
4/2/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006154 |
|
|
($0.07) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
4/2/2021 |
4260 |
SIGNAL PLANS-TRAF |
JV2E-2100006154 |
|
|
($1,415.38) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
4/2/2021 |
4260 |
SIGNAL PLANS-TRAF |
JV2E-2100006154 |
|
|
($105.58) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
4/2/2021 |
4260 |
SIGNAL PLANS-TRAF |
JV2E-2100006154 |
|
|
($1,195.01) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
4/2/2021 |
4260 |
SIGNAL PLANS-TRAF |
JV2E-2100006154 |
|
|
($147.83) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
4/2/2021 |
4260 |
SIGNAL PLANS-TRAF |
JV2E-2100006154 |
|
|
($0.02) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
4/2/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006154 |
|
|
($23.72) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
4/2/2021 |
1060 |
RDWAY PLANS-FINAL-DRAINAGE SEC |
JV2E-2100006154 |
|
|
($11.74) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
4/2/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006154 |
|
|
($1.79) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
4/2/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006154 |
|
|
($20.03) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
4/2/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006154 |
|
|
($2.46) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
4/2/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
JV2E-2100006154 |
|
|
($0.01) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
10 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
4/2/2021 |
1060 |
RDWAY PLANS-FINAL-DRAINAGE SEC |
JV2E-2100006154 |
|
|
($0.03) |
Shift CA's from 6780801C to 6780808C due to incorrect federal program. See Extended Descript. detail |
2021 |
9 |
FD52 |
08 |
E797 |
C |
6780801C |
100 |
3/31/2021 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092201305P009K |
CTXCONST0922013050001K |
BIZZACK CONSTRUCTION LLC |
$2,457,913.89 |
|
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/29/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR032L1062108206566 |
|
|
$312.44 |
000001076194-3562500680 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/29/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR032L1062108206566 |
|
|
$22.58 |
000001076194-3562500680 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/29/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR032L1062108206566 |
|
|
$263.79 |
000001076194-3562500680 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/29/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR032L1062108206566 |
|
|
$53.44 |
000001076194-3562500680 |
2021 |
9 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
3/29/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR032L1062108206566 |
|
|
$0.09 |
000001076194-3562500680 |
2021 |
9 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
3/29/2021 |
5213 |
ASPHALT MIX DESIGN |
CA-XR032L1062108206566 |
|
|
$494.44 |
000001076210-3562500640 |
2021 |
9 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
3/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206566 |
|
|
$109.74 |
000001076210-3562500640 |
2021 |
9 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
3/29/2021 |
5213 |
ASPHALT MIX DESIGN |
CA-XR032L1062108206566 |
|
|
$37.45 |
000001076210-3562500640 |
2021 |
9 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
3/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206566 |
|
|
$8.32 |
000001076210-3562500640 |
2021 |
9 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
3/29/2021 |
5213 |
ASPHALT MIX DESIGN |
CA-XR032L1062108206566 |
|
|
$417.65 |
000001076210-3562500640 |
2021 |
9 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
3/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206566 |
|
|
$92.65 |
000001076210-3562500640 |
2021 |
9 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
3/29/2021 |
5213 |
ASPHALT MIX DESIGN |
CA-XR032L1062108206566 |
|
|
$62.99 |
000001076210-3562500640 |
2021 |
9 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
3/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206566 |
|
|
$13.72 |
000001076210-3562500640 |
2021 |
9 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
3/29/2021 |
5213 |
ASPHALT MIX DESIGN |
CA-XR032L1062108206566 |
|
|
$0.19 |
000001076210-3562500640 |
2021 |
9 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
3/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206566 |
|
|
$0.04 |
000001076210-3562500640 |
2021 |
9 |
FD52 |
08 |
E229 |
C |
6780801C |
100 |
3/26/2021 |
5182 |
INSP-MISCELLANEOUS MATERIALS |
IET-XE13A162521084016230 |
|
|
$45.12 |
|
2021 |
9 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108207008 |
|
|
$0.63 |
10542207-3562508340 |
2021 |
9 |
FD52 |
00 |
E115 |
C |
6780801C |
100 |
3/24/2021 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR032L1062108206573 |
|
|
$211.95 |
000001076851-3562500640 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206688 |
|
|
$26.55 |
10536360-3562508300 |
2021 |
9 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206763 |
|
|
$0.09 |
10537869-3562508302 |
2021 |
9 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206846 |
|
|
$11.52 |
10539410-3562508302 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108207055 |
|
|
$103.44 |
10543081-3562508300 |
2021 |
9 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
3/24/2021 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR032L1062108206573 |
|
|
$141.12 |
000001076851-3562500640 |
2021 |
9 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206688 |
|
|
$0.20 |
10536360-3562508300 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206846 |
|
|
$9.88 |
10539410-3562508302 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108207055 |
|
|
$25.43 |
10543081-3562508200 |
2021 |
9 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206573 |
|
|
$20.80 |
000001076851-3562500640 |
2021 |
9 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206688 |
|
|
$0.06 |
10536360-3562508300 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206846 |
|
|
$113.49 |
10539410-3562508302 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108207055 |
|
|
$7.34 |
10543081-3562508300 |
2021 |
9 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
3/24/2021 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR032L1062108206573 |
|
|
$1,574.83 |
000001076851-3562500640 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206846 |
|
|
$40.34 |
10539410-3562508302 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108207055 |
|
|
$293.41 |
10543081-3562508300 |
2021 |
9 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206573 |
|
|
$231.78 |
000001076851-3562500640 |
2021 |
9 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206846 |
|
|
$0.09 |
10539410-3562508302 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206937 |
|
|
$122.90 |
10540959-3562508302 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108207055 |
|
|
$87.33 |
10543081-3562508300 |
2021 |
9 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
3/24/2021 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR032L1062108206573 |
|
|
$218.85 |
000001076851-3562500640 |
2021 |
9 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206937 |
|
|
$69.13 |
10540959-3562508302 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108207055 |
|
|
$67.83 |
10543081-3562508200 |
2021 |
9 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206573 |
|
|
$34.32 |
000001076851-3562500640 |
2021 |
9 |
FD52 |
08 |
E116 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206937 |
|
|
$6.75 |
10540959-3562508302 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108207055 |
|
|
$20.44 |
10543081-3562508300 |
2021 |
9 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
3/24/2021 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR032L1062108206573 |
|
|
$0.63 |
000001076851-3562500640 |
2021 |
9 |
FD52 |
08 |
E116 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206845 |
|
|
$19.50 |
10539383-3562508300 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206937 |
|
|
$14.60 |
10540959-3562508302 |
2021 |
9 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108207055 |
|
|
$0.18 |
10543081-3562508300 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/24/2021 |
5182 |
INSP-MISCELLANEOUS MATERIALS |
CA-XR032L1062108207120 |
|
|
$1,171.45 |
|
2021 |
9 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206573 |
|
|
$0.10 |
000001076851-3562500640 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206845 |
|
|
$1.33 |
10539383-3562508300 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206937 |
|
|
$167.83 |
10540959-3562508302 |
2021 |
9 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108207055 |
|
|
$0.05 |
10543081-3562508300 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/24/2021 |
5182 |
INSP-MISCELLANEOUS MATERIALS |
CA-XR032L1062108207120 |
|
|
$87.82 |
|
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206845 |
|
|
$16.46 |
10539383-3562508300 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206937 |
|
|
$40.34 |
10540959-3562508302 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/24/2021 |
5182 |
INSP-MISCELLANEOUS MATERIALS |
CA-XR032L1062108207120 |
|
|
$989.06 |
|
2021 |
9 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108207008 |
|
|
$0.05 |
10542207-3562508300 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206845 |
|
|
$6.67 |
10539383-3562508300 |
2021 |
9 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206937 |
|
|
$0.09 |
10540959-3562508302 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/24/2021 |
5182 |
INSP-MISCELLANEOUS MATERIALS |
CA-XR032L1062108207120 |
|
|
$267.01 |
|
2021 |
9 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206845 |
|
|
$0.01 |
10539383-3562508300 |
2021 |
9 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
3/24/2021 |
5182 |
INSP-MISCELLANEOUS MATERIALS |
CA-XR032L1062108207120 |
|
|
$0.63 |
|
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108207078 |
|
|
$122.90 |
10543578-3562508302 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108207078 |
|
|
$9.03 |
10543578-3562508302 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108207078 |
|
|
$103.81 |
10543578-3562508302 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206894 |
|
|
$122.90 |
10540133-3562508302 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108207078 |
|
|
$40.40 |
10543578-3562508302 |
2021 |
9 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206894 |
|
|
$23.04 |
10540133-3562508302 |
2021 |
9 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108207078 |
|
|
$0.10 |
10543578-3562508302 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206894 |
|
|
$10.72 |
10540133-3562508302 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206894 |
|
|
$123.21 |
10540133-3562508302 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206688 |
|
|
$381.93 |
10536360-3562508200 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206894 |
|
|
$40.34 |
10540133-3562508302 |
2021 |
9 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206894 |
|
|
$0.09 |
10540133-3562508302 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206688 |
|
|
$121.29 |
10536360-3562508300 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206763 |
|
|
$122.90 |
10537869-3562508302 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206805 |
|
|
$485.45 |
10538560-3562508300 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206805 |
|
|
$174.84 |
10538560-3562508300 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108207076 |
|
|
$485.45 |
10543545-3562508300 |
2021 |
9 |
FD52 |
08 |
E116 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206805 |
|
|
$1.50 |
10538560-3562508300 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108207076 |
|
|
$174.81 |
10543545-3562508300 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206805 |
|
|
$34.98 |
10538560-3562508300 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108207076 |
|
|
$34.88 |
10543545-3562508200 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206805 |
|
|
$12.23 |
10538560-3562508300 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108207076 |
|
|
$12.23 |
10543545-3562508300 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206805 |
|
|
$411.22 |
10538560-3562508200 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108207076 |
|
|
$409.37 |
10543545-3562508300 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206805 |
|
|
$147.61 |
10538560-3562508300 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108207076 |
|
|
$147.61 |
10543545-3562508300 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206805 |
|
|
$116.28 |
10538560-3562508300 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108207076 |
|
|
$115.75 |
10543545-3562508300 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206805 |
|
|
$44.88 |
10538560-3562508300 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108207076 |
|
|
$44.88 |
10543545-3562508300 |
2021 |
9 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206805 |
|
|
$0.27 |
10538560-3562508200 |
2021 |
9 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108207076 |
|
|
$0.28 |
10543545-3562508200 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206688 |
|
|
$27.79 |
10536360-3562508200 |
2021 |
9 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206763 |
|
|
$46.09 |
10537869-3562508302 |
2021 |
9 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
3/24/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-XR032L1062108206568 |
|
|
$291.95 |
000001076423-3562500610 |
2021 |
9 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206805 |
|
|
$0.10 |
10538560-3562508300 |
2021 |
9 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108207076 |
|
|
$0.10 |
10543545-3562508300 |
2021 |
9 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206568 |
|
|
$29.20 |
000001076423-3562500610 |
2021 |
9 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
3/24/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-XR032L1062108206568 |
|
|
$20.72 |
000001076423-3562500610 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206844 |
|
|
$304.71 |
10539358-3562508200 |
2021 |
9 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206568 |
|
|
$2.07 |
000001076423-3562500610 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206844 |
|
|
$71.40 |
10539358-3562508300 |
2021 |
9 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
3/24/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-XR032L1062108206568 |
|
|
$246.50 |
000001076423-3562500610 |
2021 |
9 |
FD52 |
08 |
E116 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206844 |
|
|
$3.00 |
10539358-3562508300 |
2021 |
9 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206568 |
|
|
$24.65 |
000001076423-3562500610 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206844 |
|
|
$22.26 |
10539358-3562508200 |
2021 |
9 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
3/24/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-XR032L1062108206568 |
|
|
$53.49 |
000001076423-3562500610 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206844 |
|
|
$4.89 |
10539358-3562508300 |
2021 |
9 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206568 |
|
|
$5.30 |
000001076423-3562500610 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206844 |
|
|
$259.80 |
10539358-3562508300 |
2021 |
9 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
3/24/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-XR032L1062108206568 |
|
|
$0.09 |
000001076423-3562500610 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206844 |
|
|
$60.28 |
10539358-3562508300 |
2021 |
9 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206568 |
|
|
$0.01 |
000001076423-3562500610 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206844 |
|
|
$80.33 |
10539358-3562508200 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206688 |
|
|
$8.56 |
10536360-3562508300 |
2021 |
9 |
FD52 |
08 |
E116 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206763 |
|
|
$2.25 |
10537869-3562508302 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206844 |
|
|
$24.44 |
10539358-3562508300 |
2021 |
9 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206844 |
|
|
$0.18 |
10539358-3562508300 |
2021 |
9 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206844 |
|
|
$0.05 |
10539358-3562508300 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206728 |
|
|
$347.42 |
10537195-3562508200 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206970 |
|
|
$122.90 |
10541554-3562508302 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206728 |
|
|
$103.44 |
10537195-3562508300 |
2021 |
9 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206970 |
|
|
$69.13 |
10541554-3562508302 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206728 |
|
|
$25.43 |
10537195-3562508200 |
2021 |
9 |
FD52 |
08 |
E116 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206970 |
|
|
$6.75 |
10541554-3562508302 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206728 |
|
|
$7.34 |
10537195-3562508300 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206970 |
|
|
$14.60 |
10541554-3562508302 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206728 |
|
|
$293.41 |
10537195-3562508300 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206970 |
|
|
$167.83 |
10541554-3562508302 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206728 |
|
|
$87.33 |
10537195-3562508300 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206970 |
|
|
$40.34 |
10541554-3562508302 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206688 |
|
|
$322.55 |
10536360-3562508300 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206763 |
|
|
$12.58 |
10537869-3562508302 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206728 |
|
|
$67.83 |
10537195-3562508300 |
2021 |
9 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206970 |
|
|
$0.09 |
10541554-3562508302 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206728 |
|
|
$20.44 |
10537195-3562508300 |
2021 |
9 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206728 |
|
|
$0.18 |
10537195-3562508200 |
2021 |
9 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206728 |
|
|
$0.05 |
10537195-3562508300 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206730 |
|
|
$122.90 |
10537232-3562508302 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206892 |
|
|
$304.71 |
10540115-3562508300 |
2021 |
9 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206730 |
|
|
$23.04 |
10537232-3562508302 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206761 |
|
|
$304.71 |
10537845-3562508300 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206892 |
|
|
$71.40 |
10540115-3562508300 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206730 |
|
|
$10.72 |
10537232-3562508302 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206761 |
|
|
$71.40 |
10537845-3562508300 |
2021 |
9 |
FD52 |
08 |
E116 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206892 |
|
|
$4.50 |
10540115-3562508300 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206730 |
|
|
$123.21 |
10537232-3562508302 |
2021 |
9 |
FD52 |
08 |
E116 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206761 |
|
|
$1.50 |
10537845-3562508300 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206892 |
|
|
$22.36 |
10540115-3562508200 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206730 |
|
|
$40.34 |
10537232-3562508302 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206761 |
|
|
$22.15 |
10537845-3562508200 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206892 |
|
|
$4.89 |
10540115-3562508300 |
2021 |
9 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206730 |
|
|
$0.09 |
10537232-3562508302 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206761 |
|
|
$4.89 |
10537845-3562508300 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206892 |
|
|
$261.07 |
10540115-3562508300 |
2021 |
9 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
3/24/2021 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR032L1062108206573 |
|
|
$1,653.41 |
000001076851-3562500640 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206688 |
|
|
$102.40 |
10536360-3562508300 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206763 |
|
|
$144.57 |
10537869-3562508302 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206761 |
|
|
$258.54 |
10537845-3562508200 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206892 |
|
|
$60.28 |
10540115-3562508300 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206761 |
|
|
$60.28 |
10537845-3562508300 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206892 |
|
|
$80.84 |
10540115-3562508300 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108207055 |
|
|
$122.90 |
10543090-3562508302 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206761 |
|
|
$79.81 |
10537845-3562508200 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206892 |
|
|
$24.44 |
10540115-3562508300 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108207055 |
|
|
$9.03 |
10543090-3562508302 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206761 |
|
|
$24.44 |
10537845-3562508300 |
2021 |
9 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206892 |
|
|
$0.18 |
10540115-3562508300 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108207055 |
|
|
$103.76 |
10543090-3562508302 |
2021 |
9 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206761 |
|
|
$0.18 |
10537845-3562508200 |
2021 |
9 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206892 |
|
|
$0.05 |
10540115-3562508300 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108207055 |
|
|
$40.34 |
10543090-3562508302 |
2021 |
9 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206761 |
|
|
$0.05 |
10537845-3562508300 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206968 |
|
|
$485.45 |
10541533-3562508300 |
2021 |
9 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108207055 |
|
|
$0.09 |
10543090-3562508302 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206968 |
|
|
$174.84 |
10541533-3562508300 |
2021 |
9 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206968 |
|
|
$101.55 |
10541533-3562508200 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206968 |
|
|
$42.56 |
10541533-3562508200 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206968 |
|
|
$12.23 |
10541533-3562508300 |
2021 |
9 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206573 |
|
|
$274.52 |
000001076851-3562500640 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206688 |
|
|
$79.82 |
10536360-3562508300 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206763 |
|
|
$40.34 |
10537869-3562508302 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206846 |
|
|
$122.90 |
10539410-3562508302 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108207055 |
|
|
$347.42 |
10543081-3562508200 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206968 |
|
|
$495.69 |
10541533-3562508300 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108207007 |
|
|
$1,396.36 |
10542207-3562508340 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206968 |
|
|
$147.61 |
10541533-3562508300 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108207007 |
|
|
$103.44 |
10542207-3562508300 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206968 |
|
|
$115.77 |
10541533-3562508200 |
2021 |
9 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108207007 |
|
|
$67.70 |
10542207-3562508200 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206968 |
|
|
$44.88 |
10541533-3562508300 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108207007 |
|
|
$107.05 |
10542207-3562508340 |
2021 |
9 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108206968 |
|
|
$0.27 |
10541533-3562508300 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108207007 |
|
|
$7.34 |
10542207-3562508300 |
2021 |
9 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108206968 |
|
|
$0.10 |
10541533-3562508300 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108207007 |
|
|
$1,236.21 |
10542207-3562508340 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108207007 |
|
|
$87.33 |
10542207-3562508300 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/24/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR032L1062108207007 |
|
|
$250.71 |
10542207-3562508200 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032L1062108207007 |
|
|
$20.44 |
10542207-3562508300 |
2021 |
9 |
FD52 |
05 |
E797 |
C |
6780801C |
100 |
3/19/2021 |
4010 |
CONSTRUCTION ENGINEERING |
PRC-2100153736 |
PON22100000777 |
QK4 INC |
$712.00 |
SW HWY & Bridge Construction Inspection Services |
2021 |
9 |
FD52 |
08 |
E797 |
C |
6780801C |
100 |
3/17/2021 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092201305P008K |
CTXCONST0922013050001K |
BIZZACK CONSTRUCTION LLC |
$281,348.24 |
|
2021 |
9 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
3/15/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-XR031L1062106805530 |
|
|
$1,702.17 |
000001076423-3562500610 |
2021 |
9 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
3/15/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805530 |
|
|
$88.18 |
000001076423-3562500610 |
2021 |
9 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
3/15/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-XR031L1062106805530 |
|
|
$120.75 |
000001076423-3562500610 |
2021 |
9 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
3/15/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805530 |
|
|
$6.18 |
000001076423-3562500610 |
2021 |
9 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
3/15/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-XR031L1062106805530 |
|
|
$1,437.13 |
000001076423-3562500610 |
2021 |
9 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
3/15/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805530 |
|
|
$74.45 |
000001076423-3562500610 |
2021 |
9 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
3/15/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-XR031L1062106805530 |
|
|
$302.49 |
000001076423-3562500610 |
2021 |
9 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
3/15/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805530 |
|
|
$16.09 |
000001076423-3562500610 |
2021 |
9 |
FD52 |
08 |
E797 |
C |
6780801C |
100 |
3/11/2021 |
4010 |
CONSTRUCTION ENGINEERING |
PRC-2100146926 |
PON22100000777 |
QK4 INC |
$1,335.00 |
SW HWY & Bridge Construction Inspection Services |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805592 |
|
|
$0.04 |
10520487-3562508300 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805679 |
|
|
$0.10 |
10525161-3562508300 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805760 |
|
|
$339.60 |
10529014-3562508300 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/10/2021 |
4260 |
SIGNAL PLANS-TRAF |
CA-XR031L1062106805529 |
|
|
$1,320.52 |
000001076183-3562500463 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805760 |
|
|
$76.50 |
10529014-3562508300 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/10/2021 |
4260 |
SIGNAL PLANS-TRAF |
CA-XR031L1062106805529 |
|
|
$98.41 |
000001076183-3562500463 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805760 |
|
|
$82.12 |
10529014-3562508300 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/10/2021 |
4260 |
SIGNAL PLANS-TRAF |
CA-XR031L1062106805529 |
|
|
$1,114.92 |
000001076183-3562500463 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805760 |
|
|
$18.51 |
10529014-3562508300 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/10/2021 |
4260 |
SIGNAL PLANS-TRAF |
CA-XR031L1062106805529 |
|
|
$137.82 |
000001076183-3562500463 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805814 |
|
|
$402.24 |
10530822-3562508300 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805998 |
|
|
$562.78 |
10535360-3562508200 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805814 |
|
|
$90.61 |
10530822-3562508300 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805998 |
|
|
$40.35 |
10535360-3562508200 |
2021 |
9 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
3/10/2021 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR031L1062106805535 |
|
|
$255.01 |
000001076851-3562500640 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805814 |
|
|
$28.48 |
10530822-3562508300 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805998 |
|
|
$414.44 |
10535360-3562508200 |
2021 |
9 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
3/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805535 |
|
|
$31.98 |
000001076851-3562500640 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805814 |
|
|
$6.42 |
10530822-3562508300 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805998 |
|
|
$137.96 |
10535360-3562508300 |
2021 |
9 |
FD52 |
00 |
E115 |
C |
6780801C |
100 |
3/10/2021 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR031L1062106805535 |
|
|
$105.97 |
000001076851-3562500640 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805814 |
|
|
$339.60 |
10530822-3562508300 |
2021 |
9 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
3/10/2021 |
5213 |
ASPHALT MIX DESIGN |
CA-XR031L1062106805529 |
|
|
$302.09 |
000001076210-3562500640 |
2021 |
9 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
3/10/2021 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR031L1062106805535 |
|
|
$27.04 |
000001076851-3562500640 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805814 |
|
|
$76.50 |
10530822-3562508300 |
2021 |
9 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
3/10/2021 |
5213 |
ASPHALT MIX DESIGN |
CA-XR031L1062106805529 |
|
|
$22.89 |
000001076210-3562500640 |
2021 |
9 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
3/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805535 |
|
|
$2.39 |
000001076851-3562500640 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805814 |
|
|
$82.12 |
10530822-3562508300 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805896 |
|
|
$562.78 |
10532918-3562508300 |
2021 |
9 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
3/10/2021 |
5213 |
ASPHALT MIX DESIGN |
CA-XR031L1062106805529 |
|
|
$255.05 |
000001076210-3562500640 |
2021 |
9 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
3/10/2021 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR031L1062106805535 |
|
|
$304.57 |
000001076851-3562500640 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805814 |
|
|
$18.51 |
10530822-3562508300 |
2021 |
9 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805896 |
|
|
$18.36 |
10532918-3562508300 |
2021 |
9 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
3/10/2021 |
5213 |
ASPHALT MIX DESIGN |
CA-XR031L1062106805529 |
|
|
$38.32 |
000001076210-3562500640 |
2021 |
9 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
3/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805535 |
|
|
$27.00 |
000001076851-3562500640 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805896 |
|
|
$41.65 |
10532918-3562508300 |
2021 |
9 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
3/10/2021 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR031L1062106805535 |
|
|
$37.60 |
000001076851-3562500640 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805896 |
|
|
$429.98 |
10532918-3562508200 |
2021 |
9 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
3/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805535 |
|
|
$4.64 |
000001076851-3562500640 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805896 |
|
|
$138.07 |
10532918-3562508200 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805611 |
|
|
$0.05 |
10521490-3562508300 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805611 |
|
|
$0.36 |
10521490-3562508300 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805611 |
|
|
$0.04 |
10521490-3562508300 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805835 |
|
|
$402.24 |
10531332-3562508300 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805835 |
|
|
$90.61 |
10531332-3562508300 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805835 |
|
|
$28.48 |
10531332-3562508300 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805835 |
|
|
$6.42 |
10531332-3562508300 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805814 |
|
|
$402.24 |
10530829-3562508300 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805835 |
|
|
$339.60 |
10531332-3562508300 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805814 |
|
|
$90.61 |
10530829-3562508300 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805835 |
|
|
$76.50 |
10531332-3562508300 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805814 |
|
|
$28.48 |
10530829-3562508300 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805835 |
|
|
$82.12 |
10531332-3562508300 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805814 |
|
|
$6.42 |
10530829-3562508300 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805835 |
|
|
$18.51 |
10531332-3562508300 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805814 |
|
|
$339.60 |
10530829-3562508300 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805814 |
|
|
$76.50 |
10530829-3562508300 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805932 |
|
|
$122.90 |
10533750-3562508302 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805814 |
|
|
$82.12 |
10530829-3562508300 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805932 |
|
|
$8.72 |
10533750-3562508302 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805623 |
|
|
$0.03 |
10522126-3562508300 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805814 |
|
|
$18.51 |
10530829-3562508300 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805932 |
|
|
$103.76 |
10533750-3562508302 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805623 |
|
|
$0.36 |
10522126-3562508300 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805932 |
|
|
$49.31 |
10533750-3562508302 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805679 |
|
|
$0.08 |
10525161-3562508300 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805623 |
|
|
$0.04 |
10522126-3562508300 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805657 |
|
|
$0.03 |
10523987-3562508300 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805679 |
|
|
$0.01 |
10525161-3562508300 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805760 |
|
|
$402.24 |
10529014-3562508300 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805657 |
|
|
$0.36 |
10523987-3562508300 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805718 |
|
|
$0.03 |
10527378-3562508300 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805656 |
|
|
$0.04 |
10523947-3562508300 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805657 |
|
|
$0.04 |
10523987-3562508300 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805718 |
|
|
$0.36 |
10527378-3562508300 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805656 |
|
|
$0.36 |
10523947-3562508300 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805718 |
|
|
$0.04 |
10527378-3562508300 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805656 |
|
|
$0.04 |
10523947-3562508300 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805673 |
|
|
$0.03 |
10524823-3562508300 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805679 |
|
|
($0.01) |
10525161-3562508300 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805760 |
|
|
$90.61 |
10529014-3562508300 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805867 |
|
|
$562.78 |
10532323-3562508300 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805867 |
|
|
$40.35 |
10532323-3562508300 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805867 |
|
|
$414.48 |
10532323-3562508200 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805867 |
|
|
$138.07 |
10532323-3562508300 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805673 |
|
|
$0.37 |
10524823-3562508300 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805679 |
|
|
($0.01) |
10525161-3562508300 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805760 |
|
|
$28.48 |
10529014-3562508300 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805996 |
|
|
$562.78 |
10535303-3562508300 |
2021 |
9 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805996 |
|
|
$180.75 |
10535303-3562508200 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805996 |
|
|
$53.32 |
10535303-3562508300 |
2021 |
9 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805930 |
|
|
$424.75 |
10533705-3562508200 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805996 |
|
|
$557.01 |
10535303-3562508300 |
2021 |
9 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805930 |
|
|
$146.90 |
10533705-3562508300 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805996 |
|
|
$138.07 |
10535303-3562508200 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805930 |
|
|
$41.51 |
10533705-3562508300 |
2021 |
9 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805930 |
|
|
$421.97 |
10533705-3562508200 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805930 |
|
|
$82.59 |
10533705-3562508300 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805673 |
|
|
$0.04 |
10524823-3562508300 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805679 |
|
|
$0.92 |
10525161-3562508300 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805760 |
|
|
$6.42 |
10529014-3562508300 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805657 |
|
|
$0.01 |
10524003-3562508302 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805657 |
|
|
$0.13 |
10524003-3562508302 |
2021 |
9 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805591 |
|
|
$0.03 |
10520487-3562508300 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031L1062106805657 |
|
|
$0.03 |
10524003-3562508302 |
2021 |
9 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
3/10/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR031L1062106805591 |
|
|
$0.36 |
10520487-3562508300 |
2021 |
9 |
FD52 |
08 |
E797 |
C |
6780801C |
100 |
3/3/2021 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092201305P007K |
CTXCONST0922013050001K |
BIZZACK CONSTRUCTION LLC |
$106,431.79 |
|
2021 |
8 |
FD52 |
00 |
E229 |
C |
6780801C |
100 |
2/26/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
IET-XE13A162521056012110 |
|
|
$60.00 |
|
2021 |
8 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
2/26/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-XR022L1062105304423 |
|
|
$1,563.85 |
000001076423-3562500610 |
2021 |
8 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
2/26/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304423 |
|
|
$273.03 |
000001076423-3562500610 |
2021 |
8 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
2/26/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-XR022L1062105304423 |
|
|
$114.85 |
000001076423-3562500610 |
2021 |
8 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
2/26/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304423 |
|
|
$20.01 |
000001076423-3562500610 |
2021 |
8 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
2/26/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-XR022L1062105304423 |
|
|
$1,320.25 |
000001076423-3562500610 |
2021 |
8 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
2/26/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304423 |
|
|
$230.52 |
000001076423-3562500610 |
2021 |
8 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
2/26/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-XR022L1062105304423 |
|
|
$245.73 |
000001076423-3562500610 |
2021 |
8 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
2/26/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304423 |
|
|
$42.25 |
000001076423-3562500610 |
2021 |
8 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
2/26/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-XR022L1062105304423 |
|
|
$0.59 |
000001076423-3562500610 |
2021 |
8 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
2/26/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304423 |
|
|
$0.10 |
000001076423-3562500610 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304691 |
|
|
$115.22 |
10522126-3562508300 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304783 |
|
|
$485.60 |
10523947-3562508200 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304783 |
|
|
$55.58 |
10523947-3562508200 |
2021 |
8 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304783 |
|
|
$143.57 |
10523947-3562508300 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304787 |
|
|
$122.90 |
10524003-3562508302 |
2021 |
8 |
FD52 |
08 |
E116 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304783 |
|
|
$2.25 |
10523947-3562508300 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304787 |
|
|
$29.43 |
10524003-3562508302 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304783 |
|
|
$46.00 |
10523947-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304787 |
|
|
$9.07 |
10524003-3562508302 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304783 |
|
|
$4.07 |
10523947-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304787 |
|
|
$2.17 |
10524003-3562508302 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304691 |
|
|
$13.00 |
10522126-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304783 |
|
|
$533.07 |
10523947-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304787 |
|
|
$103.76 |
10524003-3562508302 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304783 |
|
|
$46.92 |
10523947-3562508300 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304786 |
|
|
$485.60 |
10523987-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304787 |
|
|
$24.85 |
10524003-3562508302 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304783 |
|
|
$115.22 |
10523947-3562508300 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304786 |
|
|
$55.58 |
10523987-3562508300 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304787 |
|
|
$39.04 |
10524003-3562508302 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304783 |
|
|
$13.00 |
10523947-3562508200 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304786 |
|
|
$35.51 |
10523987-3562508300 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304787 |
|
|
$9.21 |
10524003-3562508302 |
2021 |
8 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304783 |
|
|
$0.27 |
10523947-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304786 |
|
|
$4.07 |
10523987-3562508300 |
2021 |
8 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304787 |
|
|
$0.09 |
10524003-3562508302 |
2021 |
8 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304783 |
|
|
$0.03 |
10523947-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304786 |
|
|
$409.95 |
10523987-3562508300 |
2021 |
8 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304787 |
|
|
$0.02 |
10524003-3562508302 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304786 |
|
|
$46.92 |
10523987-3562508300 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304786 |
|
|
$115.22 |
10523987-3562508300 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304786 |
|
|
$13.00 |
10523987-3562508200 |
2021 |
8 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304786 |
|
|
$0.27 |
10523987-3562508300 |
2021 |
8 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304691 |
|
|
$0.27 |
10522126-3562508300 |
2021 |
8 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304786 |
|
|
$0.03 |
10523987-3562508300 |
2021 |
8 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304691 |
|
|
$0.03 |
10522126-3562508200 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304829 |
|
|
$485.60 |
10524823-3562508300 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304829 |
|
|
$55.58 |
10524823-3562508300 |
2021 |
8 |
FD52 |
08 |
E116 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304829 |
|
|
$1.50 |
10524823-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304829 |
|
|
$35.62 |
10524823-3562508300 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304600 |
|
|
$318.89 |
10520487-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304829 |
|
|
$4.07 |
10524823-3562508300 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304600 |
|
|
$36.47 |
10520487-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304829 |
|
|
$411.22 |
10524823-3562508300 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304934 |
|
|
$485.59 |
10527378-3562508300 |
2021 |
8 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304600 |
|
|
$128.54 |
10520487-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304829 |
|
|
$46.92 |
10524823-3562508200 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304844 |
|
|
$727.54 |
10525161-3562508300 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304934 |
|
|
$55.58 |
10527378-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304600 |
|
|
$32.22 |
10520487-3562508300 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304829 |
|
|
$115.73 |
10524823-3562508300 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304844 |
|
|
$88.85 |
10525161-3562508200 |
2021 |
8 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304934 |
|
|
$91.81 |
10527378-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304600 |
|
|
$2.63 |
10520487-3562508300 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304829 |
|
|
$13.00 |
10524823-3562508300 |
2021 |
8 |
FD52 |
08 |
E116 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304844 |
|
|
$3.00 |
10525161-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304934 |
|
|
$42.16 |
10527378-3562508300 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/23/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR022L1062105304420 |
|
|
$624.78 |
000001076194-3562500680 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304600 |
|
|
$377.75 |
10520487-3562508300 |
2021 |
8 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304829 |
|
|
$0.27 |
10524823-3562508200 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304844 |
|
|
$54.05 |
10525161-3562508200 |
2021 |
8 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304887 |
|
|
$65.82 |
10526219-3562508200 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304934 |
|
|
$4.07 |
10527378-3562508200 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304420 |
|
|
$76.65 |
000001076194-3562500680 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304600 |
|
|
$30.79 |
10520487-3562508300 |
2021 |
8 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304829 |
|
|
$0.03 |
10524823-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304844 |
|
|
$6.59 |
10525161-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304887 |
|
|
$4.96 |
10526219-3562508200 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304934 |
|
|
$487.47 |
10527378-3562508200 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/23/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR022L1062105304420 |
|
|
$45.16 |
000001076194-3562500680 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304600 |
|
|
$83.80 |
10520487-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304844 |
|
|
$616.76 |
10525161-3562508200 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304887 |
|
|
$55.58 |
10526219-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304934 |
|
|
$46.92 |
10527378-3562508200 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304420 |
|
|
$5.54 |
000001076194-3562500680 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304600 |
|
|
$9.46 |
10520487-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304844 |
|
|
$75.03 |
10525161-3562508300 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304934 |
|
|
$115.22 |
10527378-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/23/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR022L1062105304420 |
|
|
$527.57 |
000001076194-3562500680 |
2021 |
8 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304600 |
|
|
$0.18 |
10520487-3562508300 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304844 |
|
|
$150.04 |
10525161-3562508300 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304934 |
|
|
$13.00 |
10527378-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304420 |
|
|
$64.72 |
000001076194-3562500680 |
2021 |
8 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304600 |
|
|
$0.02 |
10520487-3562508300 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304844 |
|
|
$17.75 |
10525161-3562508300 |
2021 |
8 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304934 |
|
|
$0.27 |
10527378-3562508300 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/23/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR022L1062105304420 |
|
|
$107.00 |
000001076194-3562500680 |
2021 |
8 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304844 |
|
|
$0.40 |
10525161-3562508300 |
2021 |
8 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304934 |
|
|
$0.03 |
10527378-3562508300 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304420 |
|
|
$13.00 |
000001076194-3562500680 |
2021 |
8 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304844 |
|
|
$0.05 |
10525161-3562508300 |
2021 |
8 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
2/23/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR022L1062105304420 |
|
|
$0.18 |
000001076194-3562500680 |
2021 |
8 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304420 |
|
|
$0.02 |
000001076194-3562500680 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304654 |
|
|
$485.60 |
10521490-3562508200 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304654 |
|
|
$55.58 |
10521490-3562508200 |
2021 |
8 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304654 |
|
|
$219.12 |
10521490-3562508300 |
2021 |
8 |
FD52 |
08 |
E116 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304654 |
|
|
$4.50 |
10521490-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304654 |
|
|
$51.58 |
10521490-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304654 |
|
|
$4.07 |
10521490-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304654 |
|
|
$598.76 |
10521490-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304654 |
|
|
$46.92 |
10521490-3562508300 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304654 |
|
|
$115.22 |
10521490-3562508300 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304654 |
|
|
$13.00 |
10521490-3562508300 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304555 |
|
|
$180.86 |
10519552-3562508300 |
2021 |
8 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304654 |
|
|
$0.27 |
10521490-3562508200 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304555 |
|
|
$20.74 |
10519552-3562508300 |
2021 |
8 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304654 |
|
|
$0.03 |
10521490-3562508300 |
2021 |
8 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304555 |
|
|
$18.36 |
10519552-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304555 |
|
|
$14.43 |
10519552-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304555 |
|
|
$1.51 |
10519552-3562508300 |
2021 |
8 |
FD52 |
00 |
E115 |
C |
6780801C |
100 |
2/23/2021 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR022L1062105304433 |
|
|
$211.95 |
000001076851-3562500640 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304555 |
|
|
$168.18 |
10519552-3562508300 |
2021 |
8 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
2/23/2021 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR022L1062105304433 |
|
|
$15.95 |
000001076851-3562500640 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304555 |
|
|
$17.51 |
10519552-3562508300 |
2021 |
8 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
2/23/2021 |
5203 |
TESTING OF ASPHALT MIXTURES |
CA-XR022L1062105304433 |
|
|
$179.19 |
000001076851-3562500640 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304555 |
|
|
$36.26 |
10519552-3562508300 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304555 |
|
|
$4.10 |
10519552-3562508300 |
2021 |
8 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304555 |
|
|
$0.09 |
10519552-3562508300 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304690 |
|
|
$485.60 |
10522126-3562508200 |
2021 |
8 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304555 |
|
|
$0.01 |
10519552-3562508300 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304690 |
|
|
$55.58 |
10522126-3562508300 |
2021 |
8 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304690 |
|
|
$222.12 |
10522126-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304690 |
|
|
$51.79 |
10522126-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304690 |
|
|
$4.07 |
10522126-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/23/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR022L1062105304690 |
|
|
$597.49 |
10522126-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022L1062105304690 |
|
|
$46.92 |
10522126-3562508300 |
2021 |
8 |
FD52 |
08 |
E797 |
C |
6780801C |
100 |
2/17/2021 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092201305P006K |
CTXCONST0922013050001K |
BIZZACK CONSTRUCTION LLC |
$184,550.73 |
|
2021 |
8 |
FD52 |
00 |
E229 |
C |
6780801C |
100 |
2/12/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
IET-XE13A162521041008630 |
|
|
$1,880.00 |
|
2021 |
8 |
FD52 |
08 |
E389 |
C |
6780801C |
100 |
2/12/2021 |
4260 |
SIGNAL PLANS-TRAF |
IET-XM005162521041003860 |
|
|
$24,043.29 |
|
2021 |
8 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-XR021L1062103603397 |
|
|
$412.92 |
000001076423-3562500610 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603465 |
|
|
($0.39) |
10508617-3562508302 |
2021 |
8 |
FD52 |
08 |
E116 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603479 |
|
|
$0.75 |
10509834-3562508300 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603448 |
|
|
$0.02 |
10507153-3562508302 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603837 |
|
|
$520.26 |
10518468-3562508300 |
2021 |
8 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
2/8/2021 |
5213 |
ASPHALT MIX DESIGN |
CA-XR021L1062103603394 |
|
|
$407.74 |
000001076210-3562500640 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603837 |
|
|
$65.69 |
10518468-3562508300 |
2021 |
8 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603394 |
|
|
$45.40 |
000001076210-3562500640 |
2021 |
8 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603837 |
|
|
$130.63 |
10518468-3562508300 |
2021 |
8 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603397 |
|
|
$122.16 |
000001076423-3562500610 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603465 |
|
|
$0.02 |
10508617-3562508302 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603479 |
|
|
$11.61 |
10509834-3562508300 |
2021 |
8 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603488 |
|
|
$177.88 |
10510573-3562508200 |
2021 |
8 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603506 |
|
|
$36.73 |
10511350-3562508300 |
2021 |
8 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
5213 |
ASPHALT MIX DESIGN |
CA-XR021L1062103603394 |
|
|
$31.32 |
000001076210-3562500640 |
2021 |
8 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603488 |
|
|
$20.90 |
10510581-3562508302 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603837 |
|
|
$46.58 |
10518468-3562508300 |
2021 |
8 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603394 |
|
|
$3.49 |
000001076210-3562500640 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603488 |
|
|
$1.57 |
10510581-3562508302 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603837 |
|
|
$4.75 |
10518468-3562508300 |
2021 |
8 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
5213 |
ASPHALT MIX DESIGN |
CA-XR021L1062103603394 |
|
|
$344.25 |
000001076210-3562500640 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603488 |
|
|
$17.65 |
10510581-3562508302 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603837 |
|
|
$549.15 |
10518468-3562508300 |
2021 |
8 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603394 |
|
|
$38.33 |
000001076210-3562500640 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603488 |
|
|
$0.14 |
10510581-3562508302 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603837 |
|
|
$55.49 |
10518468-3562508300 |
2021 |
8 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
5213 |
ASPHALT MIX DESIGN |
CA-XR021L1062103603394 |
|
|
$83.76 |
000001076210-3562500640 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603488 |
|
|
$0.02 |
10510581-3562508302 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603837 |
|
|
$127.80 |
10518468-3562508300 |
2021 |
8 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603394 |
|
|
$9.20 |
000001076210-3562500640 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603837 |
|
|
$15.48 |
10518468-3562508200 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603594 |
|
|
$520.25 |
10513376-3562508200 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603594 |
|
|
$65.72 |
10513376-3562508300 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603662 |
|
|
$459.14 |
10514841-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603479 |
|
|
$0.01 |
10509834-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603488 |
|
|
$13.26 |
10510573-3562508200 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603506 |
|
|
$2.64 |
10511350-3562508300 |
2021 |
8 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603594 |
|
|
$128.54 |
10513376-3562508300 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603662 |
|
|
$56.18 |
10514841-3562508300 |
2021 |
8 |
FD52 |
08 |
E116 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603594 |
|
|
$1.50 |
10513376-3562508300 |
2021 |
8 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603662 |
|
|
$91.81 |
10514841-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603430 |
|
|
$0.16 |
10505100-3562508300 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603555 |
|
|
$122.90 |
10512607-3562508302 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603594 |
|
|
$46.70 |
10513376-3562508300 |
2021 |
8 |
FD52 |
08 |
E116 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603662 |
|
|
$1.50 |
10514841-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603430 |
|
|
$0.01 |
10505100-3562508300 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603555 |
|
|
$30.72 |
10512607-3562508302 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603594 |
|
|
$4.75 |
10513376-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603662 |
|
|
$39.46 |
10514841-3562508300 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603700 |
|
|
$520.25 |
10515545-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603430 |
|
|
($0.01) |
10505100-3562508300 |
2021 |
8 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603555 |
|
|
$23.04 |
10512607-3562508302 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603594 |
|
|
$549.08 |
10513376-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603662 |
|
|
$4.04 |
10514841-3562508300 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603700 |
|
|
$65.72 |
10515545-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603430 |
|
|
$0.01 |
10505100-3562508200 |
2021 |
8 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603479 |
|
|
$41.80 |
10509844-3562508302 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603555 |
|
|
$10.31 |
10512607-3562508302 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603594 |
|
|
$55.49 |
10513376-3562508200 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603662 |
|
|
$466.48 |
10514841-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603700 |
|
|
$37.38 |
10515545-3562508200 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603802 |
|
|
$520.26 |
10517659-3562508300 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603430 |
|
|
$0.05 |
10505100-3562508300 |
2021 |
8 |
FD52 |
08 |
E116 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603479 |
|
|
$0.75 |
10509844-3562508302 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603555 |
|
|
$2.18 |
10512607-3562508302 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603594 |
|
|
$128.49 |
10513376-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603662 |
|
|
$47.43 |
10514841-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603700 |
|
|
$4.75 |
10515545-3562508300 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603802 |
|
|
$65.72 |
10517659-3562508300 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603430 |
|
|
$0.01 |
10505100-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603479 |
|
|
$3.15 |
10509844-3562508302 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603555 |
|
|
$123.21 |
10512607-3562508302 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603594 |
|
|
$15.48 |
10513376-3562508300 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603662 |
|
|
$116.96 |
10514841-3562508200 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603700 |
|
|
$439.29 |
10515545-3562508200 |
2021 |
8 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603802 |
|
|
$88.49 |
10517659-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603479 |
|
|
$35.92 |
10509844-3562508302 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603555 |
|
|
$25.94 |
10512607-3562508302 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603662 |
|
|
$13.72 |
10514841-3562508200 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603700 |
|
|
$55.49 |
10515545-3562508300 |
2021 |
8 |
FD52 |
08 |
E116 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603802 |
|
|
$2.25 |
10517659-3562508300 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603479 |
|
|
($0.39) |
10509844-3562508302 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603555 |
|
|
$43.01 |
10512607-3562508302 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603700 |
|
|
$127.92 |
10515545-3562508200 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603733 |
|
|
$520.26 |
10516147-3562508200 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603802 |
|
|
$43.65 |
10517659-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603479 |
|
|
$131.93 |
10509834-3562508200 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603488 |
|
|
$0.01 |
10510573-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603506 |
|
|
$31.01 |
10511350-3562508300 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603479 |
|
|
$0.02 |
10509844-3562508302 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603555 |
|
|
$10.60 |
10512607-3562508302 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603624 |
|
|
$122.90 |
10513994-3562508302 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603700 |
|
|
$15.48 |
10515545-3562508300 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603733 |
|
|
$65.72 |
10516147-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603802 |
|
|
$4.75 |
10517659-3562508300 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603624 |
|
|
$30.72 |
10513994-3562508302 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603733 |
|
|
$37.38 |
10516147-3562508200 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603802 |
|
|
$515.90 |
10517659-3562508200 |
2021 |
8 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603624 |
|
|
$23.04 |
10513994-3562508302 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603733 |
|
|
$4.75 |
10516147-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603802 |
|
|
$55.49 |
10517659-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603624 |
|
|
$10.31 |
10513994-3562508302 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603733 |
|
|
$439.29 |
10516147-3562508300 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603802 |
|
|
$127.92 |
10517659-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603624 |
|
|
$2.18 |
10513994-3562508302 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603733 |
|
|
$55.49 |
10516147-3562508200 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603802 |
|
|
$15.48 |
10517659-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603437 |
|
|
$0.21 |
10505851-3562508200 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603624 |
|
|
$123.21 |
10513994-3562508302 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603733 |
|
|
$127.92 |
10516147-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603437 |
|
|
$0.01 |
10505851-3562508300 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603554 |
|
|
$520.25 |
10512594-3562508200 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603624 |
|
|
$25.94 |
10513994-3562508302 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603733 |
|
|
$15.48 |
10516147-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603437 |
|
|
($0.01) |
10505851-3562508300 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603554 |
|
|
$65.72 |
10512594-3562508300 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603624 |
|
|
$43.01 |
10513994-3562508302 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603437 |
|
|
$0.01 |
10505851-3562508200 |
2021 |
8 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603554 |
|
|
$128.54 |
10512594-3562508300 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603624 |
|
|
$10.60 |
10513994-3562508302 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603437 |
|
|
$0.05 |
10505851-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603554 |
|
|
$46.60 |
10512594-3562508300 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603623 |
|
|
$520.25 |
10513980-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603479 |
|
|
$0.01 |
10509834-3562508200 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603488 |
|
|
$150.18 |
10510573-3562508300 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603437 |
|
|
$0.01 |
10505851-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603447 |
|
|
$0.20 |
10507102-3562508200 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603554 |
|
|
$4.75 |
10512594-3562508300 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603623 |
|
|
$65.72 |
10513980-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603447 |
|
|
$0.01 |
10507102-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603554 |
|
|
$547.81 |
10512594-3562508200 |
2021 |
8 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603623 |
|
|
$128.54 |
10513980-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603447 |
|
|
($0.01) |
10507102-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603554 |
|
|
$55.49 |
10512594-3562508200 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603623 |
|
|
$46.60 |
10513980-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603447 |
|
|
$0.01 |
10507102-3562508200 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603554 |
|
|
$127.92 |
10512594-3562508200 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603623 |
|
|
$4.75 |
10513980-3562508200 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603447 |
|
|
$0.05 |
10507102-3562508300 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603554 |
|
|
$15.48 |
10512594-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603623 |
|
|
$547.81 |
10513980-3562508200 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603430 |
|
|
$0.05 |
10505118-3562508302 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603447 |
|
|
$0.01 |
10507102-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603623 |
|
|
$55.49 |
10513980-3562508300 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603430 |
|
|
$0.14 |
10505118-3562508302 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603623 |
|
|
$127.92 |
10513980-3562508200 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603430 |
|
|
$0.02 |
10505118-3562508302 |
2021 |
8 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603502 |
|
|
$142.58 |
10511225-3562508200 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603623 |
|
|
$15.48 |
10513980-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603502 |
|
|
$10.65 |
10511225-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603502 |
|
|
$0.01 |
10511225-3562508300 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603479 |
|
|
($0.47) |
10509834-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603488 |
|
|
$0.01 |
10510573-3562508200 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603502 |
|
|
$120.37 |
10511225-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603502 |
|
|
$0.01 |
10511225-3562508200 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603502 |
|
|
$0.01 |
10511225-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603447 |
|
|
$0.20 |
10507121-3562508200 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603502 |
|
|
$0.01 |
10511225-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603447 |
|
|
$0.01 |
10507121-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603447 |
|
|
($0.01) |
10507121-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603447 |
|
|
$0.01 |
10507121-3562508200 |
2021 |
8 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603471 |
|
|
$142.58 |
10509216-3562508200 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603447 |
|
|
$0.05 |
10507121-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603471 |
|
|
$10.65 |
10509216-3562508300 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603447 |
|
|
$0.01 |
10507121-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603471 |
|
|
$0.01 |
10509216-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603471 |
|
|
$120.37 |
10509216-3562508300 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603479 |
|
|
$0.01 |
10509834-3562508300 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603488 |
|
|
$0.02 |
10510573-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603471 |
|
|
$0.01 |
10509216-3562508200 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603471 |
|
|
$0.05 |
10509216-3562508300 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603471 |
|
|
$0.01 |
10509216-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603455 |
|
|
$0.22 |
10507875-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603455 |
|
|
$0.01 |
10507875-3562508300 |
2021 |
8 |
FD52 |
00 |
E115 |
C |
6780801C |
100 |
2/8/2021 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
CA-XR021L1062103603399 |
|
|
$52.62 |
000001076558-3562500640 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603455 |
|
|
($0.01) |
10507875-3562508300 |
2021 |
8 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
CA-XR021L1062103603399 |
|
|
$3.83 |
000001076558-3562500640 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603455 |
|
|
$0.01 |
10507875-3562508200 |
2021 |
8 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
CA-XR021L1062103603399 |
|
|
$44.43 |
000001076558-3562500640 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603455 |
|
|
$0.05 |
10507875-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603448 |
|
|
$0.05 |
10507153-3562508302 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603455 |
|
|
$0.01 |
10507875-3562508300 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603464 |
|
|
$0.14 |
10508607-3562508200 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603464 |
|
|
$0.01 |
10508607-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603464 |
|
|
($0.01) |
10508607-3562508300 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603464 |
|
|
$0.01 |
10508607-3562508200 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603464 |
|
|
$0.05 |
10508607-3562508300 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603464 |
|
|
$0.01 |
10508607-3562508300 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603802 |
|
|
$3,867.35 |
10517666-3562508302 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603448 |
|
|
$0.14 |
10507153-3562508302 |
2021 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603802 |
|
|
$944.68 |
10517666-3562508302 |
2021 |
8 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603802 |
|
|
$699.90 |
10517666-3562508302 |
2021 |
8 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
2/8/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-XR021L1062103603396 |
|
|
$2,560.27 |
000001076423-3562500610 |
2021 |
8 |
FD52 |
08 |
E116 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603802 |
|
|
$320.25 |
10517666-3562508302 |
2021 |
8 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603396 |
|
|
$753.53 |
000001076423-3562500610 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603802 |
|
|
$357.17 |
10517666-3562508302 |
2021 |
8 |
FD52 |
00 |
E115 |
C |
6780801C |
100 |
2/8/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-XR021L1062103603396 |
|
|
$1,295.87 |
000001076423-3562500610 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603802 |
|
|
$68.31 |
10517666-3562508302 |
2021 |
8 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-XR021L1062103603396 |
|
|
$280.17 |
000001076423-3562500610 |
2021 |
8 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603464 |
|
|
$41.80 |
10508617-3562508302 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603802 |
|
|
$4,126.65 |
10517666-3562508302 |
2021 |
8 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603396 |
|
|
$54.59 |
000001076423-3562500610 |
2021 |
8 |
FD52 |
08 |
E116 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603464 |
|
|
$0.75 |
10508617-3562508302 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603802 |
|
|
$797.58 |
10517666-3562508302 |
2021 |
8 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-XR021L1062103603396 |
|
|
$3,255.76 |
000001076423-3562500610 |
2021 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603464 |
|
|
$3.15 |
10508617-3562508302 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603802 |
|
|
$937.78 |
10517666-3562508302 |
2021 |
8 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603396 |
|
|
$636.22 |
000001076423-3562500610 |
2021 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603464 |
|
|
$35.92 |
10508617-3562508302 |
2021 |
8 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
2/8/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021L1062103603478 |
|
|
$155.52 |
10509834-3562508300 |
2021 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021L1062103603802 |
|
|
$223.44 |
10517666-3562508302 |
2021 |
8 |
FD52 |
08 |
E797 |
C |
6780801C |
100 |
2/3/2021 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092201305P005K |
CTXCONST0922013050001K |
BIZZACK CONSTRUCTION LLC |
$235,507.23 |
|
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/28/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR012L1062102202378 |
|
|
$312.44 |
000001076194-3562500680 |
2021 |
7 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
1/28/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-XR012L1062102202383 |
|
|
$4,198.24 |
000001076423-3562500610 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/28/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202378 |
|
|
$31.24 |
000001076194-3562500680 |
2021 |
7 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
1/28/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202383 |
|
|
$834.83 |
000001076423-3562500610 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/28/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR012L1062102202378 |
|
|
$22.58 |
000001076194-3562500680 |
2021 |
7 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
1/28/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-XR012L1062102202383 |
|
|
$301.53 |
000001076423-3562500610 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/28/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202378 |
|
|
$2.26 |
000001076194-3562500680 |
2021 |
7 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
1/28/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202383 |
|
|
$59.98 |
000001076423-3562500610 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/28/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR012L1062102202378 |
|
|
$263.79 |
000001076194-3562500680 |
2021 |
7 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
1/28/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-XR012L1062102202383 |
|
|
$3,544.67 |
000001076423-3562500610 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/28/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202378 |
|
|
$26.38 |
000001076194-3562500680 |
2021 |
7 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
1/28/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202383 |
|
|
$704.85 |
000001076423-3562500610 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/28/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR012L1062102202378 |
|
|
$53.49 |
000001076194-3562500680 |
2021 |
7 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
1/28/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-XR012L1062102202383 |
|
|
$770.11 |
000001076423-3562500610 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/28/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202378 |
|
|
$5.30 |
000001076194-3562500680 |
2021 |
7 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
1/28/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202383 |
|
|
$156.65 |
000001076423-3562500610 |
2021 |
7 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
1/28/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR012L1062102202378 |
|
|
$0.09 |
000001076194-3562500680 |
2021 |
7 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
1/28/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-XR012L1062102202383 |
|
|
$1.65 |
000001076423-3562500610 |
2021 |
7 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
1/28/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202378 |
|
|
$0.01 |
000001076194-3562500680 |
2021 |
7 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
1/28/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202383 |
|
|
$0.35 |
000001076423-3562500610 |
2021 |
7 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
1/28/2021 |
1060 |
RDWAY PLANS-FINAL-DRAINAGE SEC |
CA-XR012L1062102202391 |
|
|
$82.44 |
000001076588-3562500630 |
2021 |
7 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
1/28/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202391 |
|
|
$27.02 |
000001076588-3562500630 |
2021 |
7 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
1/28/2021 |
1060 |
RDWAY PLANS-FINAL-DRAINAGE SEC |
CA-XR012L1062102202391 |
|
|
$6.03 |
000001076588-3562500630 |
2021 |
7 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
1/28/2021 |
5213 |
ASPHALT MIX DESIGN |
CA-XR012L1062102202378 |
|
|
$370.60 |
000001076210-3562500640 |
2021 |
7 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
1/28/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202391 |
|
|
$1.98 |
000001076588-3562500630 |
2021 |
7 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
1/28/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202378 |
|
|
$139.13 |
000001076210-3562500640 |
2021 |
7 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
1/28/2021 |
1060 |
RDWAY PLANS-FINAL-DRAINAGE SEC |
CA-XR012L1062102202391 |
|
|
$69.56 |
000001076588-3562500630 |
2021 |
7 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
1/28/2021 |
5213 |
ASPHALT MIX DESIGN |
CA-XR012L1062102202378 |
|
|
$27.37 |
000001076210-3562500640 |
2021 |
7 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
1/28/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202391 |
|
|
$22.82 |
000001076588-3562500630 |
2021 |
7 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
1/28/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202378 |
|
|
$10.28 |
000001076210-3562500640 |
2021 |
7 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
1/28/2021 |
1060 |
RDWAY PLANS-FINAL-DRAINAGE SEC |
CA-XR012L1062102202391 |
|
|
$11.74 |
000001076588-3562500630 |
2021 |
7 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
1/28/2021 |
5213 |
ASPHALT MIX DESIGN |
CA-XR012L1062102202378 |
|
|
$312.74 |
000001076210-3562500640 |
2021 |
7 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
1/28/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202391 |
|
|
$3.78 |
000001076588-3562500630 |
2021 |
7 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
1/28/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202378 |
|
|
$117.47 |
000001076210-3562500640 |
2021 |
7 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
1/28/2021 |
1060 |
RDWAY PLANS-FINAL-DRAINAGE SEC |
CA-XR012L1062102202391 |
|
|
$0.03 |
000001076588-3562500630 |
2021 |
7 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
1/28/2021 |
5213 |
ASPHALT MIX DESIGN |
CA-XR012L1062102202378 |
|
|
$62.23 |
000001076210-3562500640 |
2021 |
7 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
1/28/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202378 |
|
|
$22.90 |
000001076210-3562500640 |
2021 |
7 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
1/28/2021 |
5213 |
ASPHALT MIX DESIGN |
CA-XR012L1062102202378 |
|
|
$0.19 |
000001076210-3562500640 |
2021 |
7 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
1/28/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202378 |
|
|
$0.07 |
000001076210-3562500640 |
2021 |
7 |
FD52 |
00 |
E229 |
C |
6780801C |
100 |
1/26/2021 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
IET-XE13A162521025002250 |
|
|
$266.57 |
|
2021 |
7 |
FD52 |
00 |
E229 |
C |
6780801C |
100 |
1/26/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
IET-XE13A162521025008520 |
|
|
$6,635.00 |
|
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202602 |
|
|
$3.97 |
10507153-3562508302 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202812 |
|
|
$3.97 |
10510581-3562508302 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202520 |
|
|
$564.09 |
10505851-3562508300 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202598 |
|
|
$46.88 |
10507102-3562508300 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202690 |
|
|
$40.78 |
10508617-3562508302 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202520 |
|
|
$49.52 |
10505851-3562508300 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202598 |
|
|
$4.22 |
10507102-3562508200 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202690 |
|
|
$3.97 |
10508617-3562508302 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202520 |
|
|
$116.28 |
10505851-3562508300 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202598 |
|
|
$548.59 |
10507102-3562508300 |
2021 |
7 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202690 |
|
|
$0.09 |
10508617-3562508302 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202520 |
|
|
$14.99 |
10505851-3562508300 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202598 |
|
|
$49.52 |
10507102-3562508200 |
2021 |
7 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202690 |
|
|
$0.01 |
10508617-3562508302 |
2021 |
7 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202520 |
|
|
$0.27 |
10505851-3562508300 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202598 |
|
|
$116.28 |
10507102-3562508300 |
2021 |
7 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202520 |
|
|
$0.03 |
10505851-3562508300 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202598 |
|
|
$14.99 |
10507102-3562508200 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202599 |
|
|
$485.55 |
10507121-3562508300 |
2021 |
7 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202598 |
|
|
$0.27 |
10507102-3562508300 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202599 |
|
|
$58.67 |
10507121-3562508300 |
2021 |
7 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202598 |
|
|
$0.03 |
10507102-3562508200 |
2021 |
7 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202599 |
|
|
$246.56 |
10507121-3562508200 |
2021 |
7 |
FD52 |
08 |
E116 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202599 |
|
|
$2.25 |
10507121-3562508300 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202599 |
|
|
$53.27 |
10507121-3562508300 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202811 |
|
|
$399.28 |
10510573-3562508200 |
2021 |
7 |
FD52 |
00 |
E361 |
C |
6780801C |
100 |
1/25/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
TP-2100012393 |
|
|
$18.00 |
|
2021 |
7 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202602 |
|
|
$0.09 |
10507153-3562508302 |
2021 |
7 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202812 |
|
|
$0.09 |
10510581-3562508302 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202599 |
|
|
$4.22 |
10507121-3562508200 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202811 |
|
|
$43.72 |
10510573-3562508300 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202599 |
|
|
$620.04 |
10507121-3562508300 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202811 |
|
|
$29.20 |
10510573-3562508300 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202599 |
|
|
$49.52 |
10507121-3562508300 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202811 |
|
|
$3.20 |
10510573-3562508300 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202599 |
|
|
$116.28 |
10507121-3562508200 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202766 |
|
|
$485.55 |
10509834-3562508300 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202811 |
|
|
$337.12 |
10510573-3562508300 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202599 |
|
|
$14.99 |
10507121-3562508300 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202766 |
|
|
$58.67 |
10509834-3562508200 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202811 |
|
|
$36.90 |
10510573-3562508300 |
2021 |
7 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202599 |
|
|
$0.27 |
10507121-3562508300 |
2021 |
7 |
FD52 |
08 |
E116 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202766 |
|
|
$1.50 |
10509834-3562508300 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202811 |
|
|
$85.89 |
10510573-3562508200 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202840 |
|
|
$485.55 |
10511225-3562508300 |
2021 |
7 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202599 |
|
|
$0.03 |
10507121-3562508300 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202640 |
|
|
$485.55 |
10507875-3562508200 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202766 |
|
|
$35.28 |
10509834-3562508300 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202811 |
|
|
$9.78 |
10510573-3562508200 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202840 |
|
|
$58.72 |
10511225-3562508200 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202640 |
|
|
$58.67 |
10507875-3562508300 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202766 |
|
|
$4.22 |
10509834-3562508200 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202767 |
|
|
$111.47 |
10509844-3562508302 |
2021 |
7 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202811 |
|
|
$0.21 |
10510573-3562508300 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202840 |
|
|
$35.18 |
10511225-3562508300 |
2021 |
7 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202640 |
|
|
$198.72 |
10507875-3562508300 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202766 |
|
|
$411.23 |
10509834-3562508300 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202767 |
|
|
$11.15 |
10509844-3562508302 |
2021 |
7 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202811 |
|
|
$0.02 |
10510573-3562508200 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202840 |
|
|
$4.22 |
10511225-3562508300 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202640 |
|
|
$49.63 |
10507875-3562508300 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202766 |
|
|
$49.52 |
10509834-3562508200 |
2021 |
7 |
FD52 |
08 |
E116 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202767 |
|
|
$1.50 |
10509844-3562508302 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202840 |
|
|
$410.05 |
10511225-3562508300 |
2021 |
7 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202602 |
|
|
$0.01 |
10507153-3562508302 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202690 |
|
|
$111.47 |
10508617-3562508302 |
2021 |
7 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202812 |
|
|
$0.01 |
10510581-3562508302 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202640 |
|
|
$4.22 |
10507875-3562508200 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202766 |
|
|
$116.80 |
10509834-3562508300 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202767 |
|
|
$8.23 |
10509844-3562508302 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202840 |
|
|
$49.52 |
10511225-3562508300 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202640 |
|
|
$577.74 |
10507875-3562508200 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202766 |
|
|
$14.99 |
10509834-3562508200 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202767 |
|
|
$0.81 |
10509844-3562508302 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202840 |
|
|
$116.47 |
10511225-3562508300 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202640 |
|
|
$49.52 |
10507875-3562508300 |
2021 |
7 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202766 |
|
|
$0.27 |
10509834-3562508200 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202767 |
|
|
$95.38 |
10509844-3562508302 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202840 |
|
|
$14.99 |
10511225-3562508300 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202640 |
|
|
$116.28 |
10507875-3562508200 |
2021 |
7 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202766 |
|
|
$0.03 |
10509834-3562508300 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202767 |
|
|
$9.41 |
10509844-3562508302 |
2021 |
7 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202840 |
|
|
$0.34 |
10511225-3562508200 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202640 |
|
|
$14.99 |
10507875-3562508300 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202767 |
|
|
$40.78 |
10509844-3562508302 |
2021 |
7 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202840 |
|
|
$0.03 |
10511225-3562508300 |
2021 |
7 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202640 |
|
|
$0.27 |
10507875-3562508200 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202767 |
|
|
$3.97 |
10509844-3562508302 |
2021 |
7 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202640 |
|
|
$0.03 |
10507875-3562508300 |
2021 |
7 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202767 |
|
|
$0.09 |
10509844-3562508302 |
2021 |
7 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202767 |
|
|
$0.01 |
10509844-3562508302 |
2021 |
7 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
1/25/2021 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
CA-XR012L1062102202390 |
|
|
$345.45 |
000001076558-3562500640 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202520 |
|
|
$485.55 |
10505851-3562508300 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202690 |
|
|
$11.15 |
10508617-3562508302 |
2021 |
7 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202390 |
|
|
$34.55 |
000001076558-3562500640 |
2021 |
7 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
1/25/2021 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
CA-XR012L1062102202390 |
|
|
$24.94 |
000001076558-3562500640 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202689 |
|
|
$485.55 |
10508607-3562508300 |
2021 |
7 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202390 |
|
|
$2.49 |
000001076558-3562500640 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202689 |
|
|
$58.67 |
10508607-3562508300 |
2021 |
7 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
1/25/2021 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
CA-XR012L1062102202390 |
|
|
$291.66 |
000001076558-3562500640 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202689 |
|
|
$35.18 |
10508607-3562508200 |
2021 |
7 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202390 |
|
|
$29.17 |
000001076558-3562500640 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202689 |
|
|
$4.22 |
10508607-3562508300 |
2021 |
7 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
1/25/2021 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
CA-XR012L1062102202390 |
|
|
$73.51 |
000001076558-3562500640 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202689 |
|
|
$409.96 |
10508607-3562508200 |
2021 |
7 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202390 |
|
|
$7.25 |
000001076558-3562500640 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202689 |
|
|
$49.52 |
10508607-3562508300 |
2021 |
7 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
1/25/2021 |
5062 |
SAMPLINGS & TESTING-AGGREGATE |
CA-XR012L1062102202390 |
|
|
$0.18 |
000001076558-3562500640 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202689 |
|
|
$116.28 |
10508607-3562508200 |
2021 |
7 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202390 |
|
|
$0.02 |
000001076558-3562500640 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202689 |
|
|
$14.99 |
10508607-3562508300 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202479 |
|
|
$111.47 |
10505118-3562508302 |
2021 |
7 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202689 |
|
|
$0.27 |
10508607-3562508300 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202520 |
|
|
$58.67 |
10505851-3562508300 |
2021 |
7 |
FD52 |
08 |
E116 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202690 |
|
|
$1.50 |
10508617-3562508302 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202479 |
|
|
$11.15 |
10505118-3562508302 |
2021 |
7 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202689 |
|
|
$0.03 |
10508607-3562508200 |
2021 |
7 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202479 |
|
|
$20.90 |
10505118-3562508302 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202479 |
|
|
$9.64 |
10505118-3562508302 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202479 |
|
|
$0.81 |
10505118-3562508302 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202479 |
|
|
$111.76 |
10505118-3562508302 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202479 |
|
|
$9.41 |
10505118-3562508302 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202479 |
|
|
$40.25 |
10505118-3562508302 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202479 |
|
|
$3.97 |
10505118-3562508302 |
2021 |
7 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202479 |
|
|
$0.09 |
10505118-3562508302 |
2021 |
7 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202479 |
|
|
$0.01 |
10505118-3562508302 |
2021 |
7 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202520 |
|
|
$180.30 |
10505851-3562508300 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202598 |
|
|
$485.55 |
10507102-3562508200 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202690 |
|
|
$8.23 |
10508617-3562508302 |
2021 |
7 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
1/25/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR012L1062102202392 |
|
|
$658.72 |
000001076599-3562500610 |
2021 |
7 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202392 |
|
|
$65.87 |
000001076599-3562500610 |
2021 |
7 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
1/25/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR012L1062102202392 |
|
|
$49.80 |
000001076599-3562500610 |
2021 |
7 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202392 |
|
|
$4.98 |
000001076599-3562500610 |
2021 |
7 |
FD52 |
08 |
E116 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202520 |
|
|
$2.25 |
10505851-3562508300 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202598 |
|
|
$58.67 |
10507102-3562508200 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202690 |
|
|
$0.81 |
10508617-3562508302 |
2021 |
7 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
1/25/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR012L1062102202392 |
|
|
$556.16 |
000001076599-3562500610 |
2021 |
7 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202392 |
|
|
$55.61 |
000001076599-3562500610 |
2021 |
7 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
1/25/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR012L1062102202392 |
|
|
$70.18 |
000001076599-3562500610 |
2021 |
7 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202392 |
|
|
$6.92 |
000001076599-3562500610 |
2021 |
7 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
1/25/2021 |
1620 |
BRIDGE DESIGN & PLANS |
CA-XR012L1062102202392 |
|
|
$0.18 |
000001076599-3562500610 |
2021 |
7 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202392 |
|
|
$0.02 |
000001076599-3562500610 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202520 |
|
|
$48.20 |
10505851-3562508200 |
2021 |
7 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202598 |
|
|
$161.94 |
10507102-3562508300 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202690 |
|
|
$95.38 |
10508617-3562508302 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202477 |
|
|
$485.55 |
10505100-3562508300 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202477 |
|
|
$58.67 |
10505100-3562508300 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202727 |
|
|
$485.55 |
10509216-3562508300 |
2021 |
7 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202477 |
|
|
$62.61 |
10505100-3562508300 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202727 |
|
|
$58.67 |
10509216-3562508200 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202477 |
|
|
$39.62 |
10505100-3562508300 |
2021 |
7 |
FD52 |
08 |
E116 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202727 |
|
|
$1.50 |
10509216-3562508300 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202477 |
|
|
$4.22 |
10505100-3562508200 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202727 |
|
|
$35.28 |
10509216-3562508200 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202477 |
|
|
$462.82 |
10505100-3562508200 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202727 |
|
|
$4.22 |
10509216-3562508200 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202477 |
|
|
$49.52 |
10505100-3562508300 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202727 |
|
|
$411.23 |
10509216-3562508300 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202477 |
|
|
$116.28 |
10505100-3562508300 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202727 |
|
|
$49.52 |
10509216-3562508300 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202520 |
|
|
$4.22 |
10505851-3562508200 |
2021 |
7 |
FD52 |
08 |
E116 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202598 |
|
|
$2.25 |
10507102-3562508300 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202690 |
|
|
$9.41 |
10508617-3562508302 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202477 |
|
|
$14.99 |
10505100-3562508200 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202601 |
|
|
$111.47 |
10507153-3562508302 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202727 |
|
|
$116.80 |
10509216-3562508300 |
2021 |
7 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202477 |
|
|
$0.27 |
10505100-3562508300 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202601 |
|
|
$11.15 |
10507153-3562508302 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202727 |
|
|
$14.99 |
10509216-3562508200 |
2021 |
7 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202477 |
|
|
$0.03 |
10505100-3562508300 |
2021 |
7 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202601 |
|
|
$41.80 |
10507153-3562508302 |
2021 |
7 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202727 |
|
|
$0.27 |
10509216-3562508300 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202811 |
|
|
$111.47 |
10510581-3562508302 |
2021 |
7 |
FD52 |
08 |
E116 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202601 |
|
|
$2.25 |
10507153-3562508302 |
2021 |
7 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202727 |
|
|
$0.03 |
10509216-3562508200 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202811 |
|
|
$11.15 |
10510581-3562508302 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202601 |
|
|
$11.33 |
10507153-3562508302 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202811 |
|
|
$8.12 |
10510581-3562508302 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202601 |
|
|
$0.81 |
10507153-3562508302 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202811 |
|
|
$0.81 |
10510581-3562508302 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202601 |
|
|
$131.30 |
10507153-3562508302 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202811 |
|
|
$94.11 |
10510581-3562508302 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202601 |
|
|
$9.41 |
10507153-3562508302 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012L1062102202811 |
|
|
$9.41 |
10510581-3562508302 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202601 |
|
|
$40.25 |
10507153-3562508302 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/25/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR012L1062102202811 |
|
|
$40.25 |
10510581-3562508302 |
2021 |
7 |
FD52 |
08 |
E143 |
C |
6780801C |
100 |
1/22/2021 |
0094 |
ENV STUDIES-PERMIT IN-LIEU FEE |
PRCI-2100000588 |
SC2000001676 |
KY DEPT OF FISH & WILDLIFE RESOURCES |
$1,899,040.00 |
Re-establish Contract with KDFWR |
2021 |
7 |
FD52 |
08 |
E797 |
C |
6780801C |
100 |
1/21/2021 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092201305P004K |
CTXCONST0922013050001K |
BIZZACK CONSTRUCTION LLC |
$196,435.40 |
|
2021 |
7 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
1/15/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801636 |
|
|
$110.18 |
10500290-3562508300 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/15/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801636 |
|
|
$19.44 |
10500290-3562508300 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/15/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801636 |
|
|
$35.04 |
10500290-3562508300 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/15/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801636 |
|
|
$232.98 |
10500290-3562508300 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/15/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801636 |
|
|
$419.88 |
10500290-3562508300 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/15/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801636 |
|
|
$34.46 |
10500290-3562508300 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/15/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801636 |
|
|
$98.29 |
10500290-3562508300 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/15/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801729 |
|
|
$639.89 |
10502196-3562508300 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/15/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801729 |
|
|
$337.14 |
10502196-3562508300 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/15/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801729 |
|
|
$46.82 |
10502196-3562508300 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/15/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801729 |
|
|
$24.94 |
10502196-3562508300 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/15/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801729 |
|
|
$540.34 |
10502196-3562508300 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/15/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801729 |
|
|
$284.65 |
10502196-3562508200 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/15/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801729 |
|
|
$126.11 |
10502196-3562508300 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/15/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801729 |
|
|
$60.00 |
10502196-3562508300 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/15/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801636 |
|
|
$165.77 |
10500290-3562508300 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/15/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801636 |
|
|
$497.31 |
10500290-3562508300 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/15/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801729 |
|
|
$639.89 |
10502206-3562508300 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/15/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801729 |
|
|
$337.14 |
10502206-3562508300 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/15/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801729 |
|
|
$46.82 |
10502206-3562508300 |
2021 |
7 |
FD52 |
00 |
E229 |
C |
6780801C |
100 |
1/11/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
IET-XE13A162521010007140 |
|
|
$500.00 |
|
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801489 |
|
|
$0.01 |
10491544-3562508300 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801506 |
|
|
$0.06 |
10494589-3562508300 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801534 |
|
|
$0.01 |
10498036-3562508300 |
2021 |
7 |
FD52 |
08 |
E116 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801676 |
|
|
$1.50 |
10500987-3562508300 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801730 |
|
|
$24.94 |
10502206-3562508300 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801804 |
|
|
$33.98 |
10503961-3562508300 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801805 |
|
|
$31.37 |
10504011-3562508302 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801805 |
|
|
$35.75 |
10504011-3562508302 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801805 |
|
|
$11.73 |
10504011-3562508302 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801506 |
|
|
$0.01 |
10494589-3562508300 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801534 |
|
|
$85.18 |
10498036-3562508300 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801676 |
|
|
$35.39 |
10500987-3562508300 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801730 |
|
|
$540.34 |
10502206-3562508300 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801576 |
|
|
$514.93 |
10499115-3562508300 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801576 |
|
|
$729.56 |
10499115-3562508300 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801576 |
|
|
$37.72 |
10499115-3562508300 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801576 |
|
|
$52.46 |
10499115-3562508300 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801576 |
|
|
$434.76 |
10499115-3562508300 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801576 |
|
|
$615.97 |
10499115-3562508300 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801576 |
|
|
$88.01 |
10499115-3562508300 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801576 |
|
|
$133.01 |
10499115-3562508300 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801506 |
|
|
$0.02 |
10494593-3562508300 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801534 |
|
|
($0.57) |
10498036-3562508300 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801676 |
|
|
$20.50 |
10500987-3562508300 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801730 |
|
|
$284.65 |
10502206-3562508200 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801515 |
|
|
$0.02 |
10496668-3562508300 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801515 |
|
|
$0.01 |
10496668-3562508300 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801515 |
|
|
$0.06 |
10496668-3562508300 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801515 |
|
|
$0.01 |
10496668-3562508300 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801506 |
|
|
$0.01 |
10494593-3562508300 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801534 |
|
|
$0.01 |
10498036-3562508300 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801676 |
|
|
$412.61 |
10500987-3562508300 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801730 |
|
|
$126.11 |
10502206-3562508300 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801804 |
|
|
$415.16 |
10503985-3562508300 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801804 |
|
|
$143.61 |
10503985-3562508300 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801804 |
|
|
$29.87 |
10503985-3562508300 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801804 |
|
|
$10.36 |
10503985-3562508300 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801506 |
|
|
$0.06 |
10494593-3562508300 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801676 |
|
|
$234.94 |
10500987-3562508300 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801730 |
|
|
$60.00 |
10502206-3562508300 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801805 |
|
|
$111.47 |
10504011-3562508302 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801804 |
|
|
$349.88 |
10503985-3562508300 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801804 |
|
|
$121.22 |
10503985-3562508300 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801804 |
|
|
$89.25 |
10503985-3562508300 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801804 |
|
|
$30.31 |
10503985-3562508300 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801506 |
|
|
$0.01 |
10494593-3562508300 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801676 |
|
|
$97.41 |
10500987-3562508300 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801805 |
|
|
$37.16 |
10504011-3562508302 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801760 |
|
|
$466.09 |
10502938-3562508300 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801760 |
|
|
$163.34 |
10502938-3562508300 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801637 |
|
|
$514.93 |
10500317-3562508300 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801760 |
|
|
$33.72 |
10502938-3562508300 |
2021 |
7 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
1/11/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-XR011L1062100801463 |
|
|
$1,397.55 |
000001076423-3562500610 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801637 |
|
|
$729.56 |
10500317-3562508300 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801760 |
|
|
$11.84 |
10502938-3562508300 |
2021 |
7 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801463 |
|
|
$1,421.11 |
000001076423-3562500610 |
2021 |
7 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801637 |
|
|
$122.77 |
10500317-3562508300 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801760 |
|
|
$393.60 |
10502938-3562508300 |
2021 |
7 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
1/11/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-XR011L1062100801463 |
|
|
$103.17 |
000001076423-3562500610 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801637 |
|
|
$46.53 |
10500317-3562508300 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801760 |
|
|
$137.91 |
10502938-3562508300 |
2021 |
7 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801463 |
|
|
$101.20 |
000001076423-3562500610 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801637 |
|
|
$52.46 |
10500317-3562508300 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801760 |
|
|
$99.23 |
10502938-3562508300 |
2021 |
7 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
1/11/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-XR011L1062100801463 |
|
|
$1,179.74 |
000001076423-3562500610 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801637 |
|
|
$538.41 |
10500317-3562508300 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801760 |
|
|
$33.98 |
10502938-3562508300 |
2021 |
7 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801463 |
|
|
$1,199.85 |
000001076423-3562500610 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801637 |
|
|
$615.97 |
10500317-3562508300 |
2021 |
7 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
1/11/2021 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-XR011L1062100801463 |
|
|
$127.02 |
000001076423-3562500610 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801637 |
|
|
$88.02 |
10500317-3562508300 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801676 |
|
|
$49.08 |
10500987-3562508300 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801805 |
|
|
$7.82 |
10504011-3562508302 |
2021 |
7 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801463 |
|
|
$204.54 |
000001076423-3562500610 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801637 |
|
|
$133.01 |
10500317-3562508300 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801488 |
|
|
$0.02 |
10491496-3562508300 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801805 |
|
|
$2.60 |
10504011-3562508302 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801488 |
|
|
$0.01 |
10491496-3562508300 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801488 |
|
|
$0.06 |
10491496-3562508300 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801488 |
|
|
$0.01 |
10491496-3562508300 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801805 |
|
|
$111.47 |
10504055-3562508302 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801805 |
|
|
$37.14 |
10504055-3562508302 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801805 |
|
|
$7.82 |
10504055-3562508302 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801805 |
|
|
$2.60 |
10504055-3562508302 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/11/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR011L1062100801459 |
|
|
$572.68 |
000001076194-3562500680 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801805 |
|
|
$94.15 |
10504055-3562508302 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801459 |
|
|
$286.78 |
000001076194-3562500680 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801805 |
|
|
$31.37 |
10504055-3562508302 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/11/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR011L1062100801459 |
|
|
$40.80 |
000001076194-3562500680 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801805 |
|
|
$35.67 |
10504055-3562508302 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801459 |
|
|
$20.42 |
000001076194-3562500680 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801805 |
|
|
$11.73 |
10504055-3562508302 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801805 |
|
|
$94.11 |
10504011-3562508302 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/11/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR011L1062100801459 |
|
|
$483.61 |
000001076194-3562500680 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801459 |
|
|
$242.12 |
000001076194-3562500680 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/11/2021 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR011L1062100801459 |
|
|
$98.41 |
000001076194-3562500680 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801803 |
|
|
$466.09 |
10503961-3562508300 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801459 |
|
|
$48.63 |
000001076194-3562500680 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801803 |
|
|
$163.34 |
10503961-3562508200 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801803 |
|
|
$33.72 |
10503961-3562508300 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801803 |
|
|
$11.84 |
10503961-3562508300 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801488 |
|
|
$0.02 |
10491544-3562508300 |
2021 |
7 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801533 |
|
|
$98.64 |
10498036-3562508300 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801803 |
|
|
$393.60 |
10503961-3562508200 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801488 |
|
|
$0.01 |
10491544-3562508300 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801505 |
|
|
$0.02 |
10494589-3562508300 |
2021 |
7 |
FD52 |
08 |
E116 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801533 |
|
|
$2.25 |
10498036-3562508300 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801675 |
|
|
$487.19 |
10500987-3562508300 |
2021 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801803 |
|
|
$137.91 |
10503961-3562508300 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801488 |
|
|
$0.06 |
10491544-3562508300 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801505 |
|
|
$0.01 |
10494589-3562508300 |
2021 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801533 |
|
|
$7.53 |
10498036-3562508300 |
2021 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011L1062100801675 |
|
|
$278.26 |
10500987-3562508300 |
2021 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/11/2021 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011L1062100801803 |
|
|
$99.23 |
10503961-3562508200 |
2021 |
7 |
FD52 |
08 |
E797 |
C |
6780801C |
100 |
1/6/2021 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092201305P003K |
CTXCONST0922013050001K |
BIZZACK CONSTRUCTION LLC |
$129,037.79 |
|
2021 |
6 |
FD52 |
00 |
E229 |
C |
6780801C |
100 |
12/28/2020 |
5341 |
GEOTECHNICAL INVEST (CONST) |
IET-XE13A162520360008860 |
|
|
$500.00 |
|
2021 |
6 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700747 |
|
|
$111.86 |
10494593-3562508300 |
2021 |
6 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
12/23/2020 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-XR122K1062035700420 |
|
|
$241.09 |
000001076423-3562500610 |
2021 |
6 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700594 |
|
|
$94.44 |
10491496-3562508300 |
2021 |
6 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700747 |
|
|
$0.06 |
10494593-3562508300 |
2021 |
6 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700420 |
|
|
$8.93 |
000001076423-3562500610 |
2021 |
6 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700594 |
|
|
$93.71 |
10491496-3562508300 |
2021 |
6 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
12/23/2020 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-XR122K1062035700420 |
|
|
$2,882.29 |
000001076423-3562500610 |
2021 |
6 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700594 |
|
|
$17.88 |
10491496-3562508300 |
2021 |
6 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700420 |
|
|
$104.56 |
000001076423-3562500610 |
2021 |
6 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700594 |
|
|
$0.27 |
10491496-3562508300 |
2021 |
6 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
12/23/2020 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-XR122K1062035700420 |
|
|
$529.78 |
000001076423-3562500610 |
2021 |
6 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700594 |
|
|
$0.06 |
10491496-3562508300 |
2021 |
6 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700420 |
|
|
$15.62 |
000001076423-3562500610 |
2021 |
6 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
12/23/2020 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-XR122K1062035700420 |
|
|
$1.09 |
000001076423-3562500610 |
2021 |
6 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700420 |
|
|
$0.05 |
000001076423-3562500610 |
2021 |
6 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
12/23/2020 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR122K1062035700412 |
|
|
$937.31 |
000001076194-3562500680 |
2021 |
6 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700747 |
|
|
$73.45 |
10494593-3562508300 |
2021 |
6 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700596 |
|
|
$530.00 |
10491544-3562508300 |
2021 |
6 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700596 |
|
|
$111.86 |
10491544-3562508300 |
2021 |
6 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700596 |
|
|
$87.97 |
10491544-3562508300 |
2021 |
6 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700596 |
|
|
$45.68 |
10491544-3562508300 |
2021 |
6 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700596 |
|
|
$8.37 |
10491544-3562508300 |
2021 |
6 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700596 |
|
|
$521.75 |
10491544-3562508300 |
2021 |
6 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700596 |
|
|
$94.44 |
10491544-3562508300 |
2021 |
6 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
12/23/2020 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR122K1062035700412 |
|
|
$67.85 |
000001076194-3562500680 |
2021 |
6 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700747 |
|
|
$44.57 |
10494593-3562508300 |
2021 |
6 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700596 |
|
|
$93.71 |
10491544-3562508300 |
2021 |
6 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700596 |
|
|
$17.88 |
10491544-3562508300 |
2021 |
6 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700596 |
|
|
$0.27 |
10491544-3562508300 |
2021 |
6 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700596 |
|
|
$0.06 |
10491544-3562508300 |
2021 |
6 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
12/23/2020 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR122K1062035700412 |
|
|
$791.37 |
000001076194-3562500680 |
2021 |
6 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700747 |
|
|
$8.37 |
10494593-3562508300 |
2021 |
6 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700929 |
|
|
$508.28 |
10498036-3562508300 |
2021 |
6 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700929 |
|
|
$102.70 |
10498036-3562508300 |
2021 |
6 |
FD52 |
08 |
E116 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700929 |
|
|
$4.50 |
10498036-3562508300 |
2021 |
6 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
12/23/2020 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR122K1062035700412 |
|
|
$155.70 |
000001076194-3562500680 |
2021 |
6 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700594 |
|
|
$530.00 |
10491496-3562508300 |
2021 |
6 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700747 |
|
|
$509.49 |
10494593-3562508300 |
2021 |
6 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700929 |
|
|
$37.92 |
10498036-3562508300 |
2021 |
6 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700929 |
|
|
$7.69 |
10498036-3562508300 |
2021 |
6 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700929 |
|
|
$432.92 |
10498036-3562508300 |
2021 |
6 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700929 |
|
|
$86.75 |
10498036-3562508300 |
2021 |
6 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700929 |
|
|
$90.70 |
10498036-3562508300 |
2021 |
6 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700929 |
|
|
$16.40 |
10498036-3562508300 |
2021 |
6 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700929 |
|
|
$0.28 |
10498036-3562508300 |
2021 |
6 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700929 |
|
|
$0.05 |
10498036-3562508300 |
2021 |
6 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700746 |
|
|
$530.00 |
10494589-3562508300 |
2021 |
6 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700746 |
|
|
$111.86 |
10494589-3562508300 |
2021 |
6 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700894 |
|
|
$180.84 |
10497384-3562508300 |
2021 |
6 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
12/23/2020 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR122K1062035700412 |
|
|
$0.27 |
000001076194-3562500680 |
2021 |
6 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700594 |
|
|
$111.86 |
10491496-3562508300 |
2021 |
6 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700747 |
|
|
$94.44 |
10494593-3562508300 |
2021 |
6 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700746 |
|
|
$39.23 |
10494589-3562508300 |
2021 |
6 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700894 |
|
|
$13.15 |
10497384-3562508300 |
2021 |
6 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700746 |
|
|
$8.37 |
10494589-3562508300 |
2021 |
6 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700894 |
|
|
$152.68 |
10497384-3562508300 |
2021 |
6 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700746 |
|
|
$447.48 |
10494589-3562508300 |
2021 |
6 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700894 |
|
|
$36.93 |
10497384-3562508300 |
2021 |
6 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700746 |
|
|
$94.44 |
10494589-3562508300 |
2021 |
6 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700894 |
|
|
$0.09 |
10497384-3562508300 |
2021 |
6 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700746 |
|
|
$93.71 |
10494589-3562508300 |
2021 |
6 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700746 |
|
|
$17.88 |
10494589-3562508300 |
2021 |
6 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700746 |
|
|
$0.27 |
10494589-3562508300 |
2021 |
6 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700892 |
|
|
$180.84 |
10497347-3562508300 |
2021 |
6 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700674 |
|
|
$180.84 |
10493106-3562508300 |
2021 |
6 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700746 |
|
|
$0.06 |
10494589-3562508300 |
2021 |
6 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700857 |
|
|
$180.84 |
10496718-3562508300 |
2021 |
6 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700892 |
|
|
$146.90 |
10497347-3562508300 |
2021 |
6 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700674 |
|
|
$91.81 |
10493106-3562508300 |
2021 |
6 |
FD52 |
08 |
E115 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700857 |
|
|
$91.81 |
10496718-3562508300 |
2021 |
6 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700892 |
|
|
$23.83 |
10497347-3562508300 |
2021 |
6 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700674 |
|
|
$19.82 |
10493106-3562508300 |
2021 |
6 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700857 |
|
|
$19.82 |
10496718-3562508300 |
2021 |
6 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700892 |
|
|
$276.71 |
10497347-3562508300 |
2021 |
6 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700594 |
|
|
$39.23 |
10491496-3562508300 |
2021 |
6 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700747 |
|
|
$93.71 |
10494593-3562508300 |
2021 |
6 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700674 |
|
|
$230.19 |
10493106-3562508300 |
2021 |
6 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700857 |
|
|
$230.19 |
10496718-3562508300 |
2021 |
6 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700892 |
|
|
$36.93 |
10497347-3562508300 |
2021 |
6 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700674 |
|
|
$36.93 |
10493106-3562508300 |
2021 |
6 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700857 |
|
|
$36.93 |
10496718-3562508300 |
2021 |
6 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700892 |
|
|
$0.09 |
10497347-3562508300 |
2021 |
6 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700674 |
|
|
$0.09 |
10493106-3562508300 |
2021 |
6 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700857 |
|
|
$0.09 |
10496718-3562508300 |
2021 |
6 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700855 |
|
|
$508.28 |
10496668-3562508300 |
2021 |
6 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700855 |
|
|
$102.74 |
10496668-3562508300 |
2021 |
6 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700855 |
|
|
$37.59 |
10496668-3562508300 |
2021 |
6 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
12/23/2020 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-XR122K1062035700420 |
|
|
$3,413.84 |
000001076423-3562500610 |
2021 |
6 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700594 |
|
|
$8.37 |
10491496-3562508300 |
2021 |
6 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700747 |
|
|
$17.88 |
10494593-3562508300 |
2021 |
6 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700855 |
|
|
$7.69 |
10496668-3562508300 |
2021 |
6 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700855 |
|
|
$429.14 |
10496668-3562508300 |
2021 |
6 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700855 |
|
|
$86.75 |
10496668-3562508300 |
2021 |
6 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700855 |
|
|
$90.11 |
10496668-3562508300 |
2021 |
6 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700855 |
|
|
$16.40 |
10496668-3562508300 |
2021 |
6 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700855 |
|
|
$0.26 |
10496668-3562508300 |
2021 |
6 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700855 |
|
|
$0.05 |
10496668-3562508300 |
2021 |
6 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
12/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122K1062035700420 |
|
|
$123.84 |
000001076423-3562500610 |
2021 |
6 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700594 |
|
|
$447.48 |
10491496-3562508300 |
2021 |
6 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700747 |
|
|
$0.27 |
10494593-3562508300 |
2021 |
6 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
12/23/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR122K1062035700746 |
|
|
$530.00 |
10494593-3562508300 |
2021 |
6 |
FD52 |
08 |
E797 |
C |
6780801C |
100 |
12/16/2020 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092201305P002K |
CTXCONST0922013050001K |
BIZZACK CONSTRUCTION LLC |
$70,633.14 |
|
2021 |
6 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
12/14/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034309731 |
|
|
$176.10 |
000001076210-3562500640 |
2021 |
6 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
12/14/2020 |
5213 |
ASPHALT MIX DESIGN |
CA-XR121K1062034309731 |
|
|
$90.12 |
000001076210-3562500640 |
2021 |
6 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
12/14/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034309731 |
|
|
$33.10 |
000001076210-3562500640 |
2021 |
6 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
12/14/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR121K1062034310087 |
|
|
$180.98 |
10489557-3562508300 |
2021 |
6 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
12/14/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034310087 |
|
|
$103.20 |
10489557-3562508300 |
2021 |
6 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
12/14/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR121K1062034310087 |
|
|
$12.80 |
10489557-3562508300 |
2021 |
6 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
12/14/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034310087 |
|
|
$7.30 |
10489557-3562508300 |
2021 |
6 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
12/14/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR121K1062034310087 |
|
|
$153.59 |
10489557-3562508300 |
2021 |
6 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
12/14/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034310087 |
|
|
$87.12 |
10489557-3562508300 |
2021 |
6 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
12/14/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR121K1062034310087 |
|
|
$37.41 |
10489557-3562508300 |
2021 |
6 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
12/14/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034310087 |
|
|
$20.80 |
10489557-3562508300 |
2021 |
6 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
12/9/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR121K1062034309991 |
|
|
$826.79 |
10487458-3562508300 |
2021 |
6 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
12/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034309991 |
|
|
$324.25 |
10487458-3562508300 |
2021 |
6 |
FD52 |
08 |
E116 |
C |
6780801C |
100 |
12/9/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR121K1062034309991 |
|
|
$18.00 |
10487458-3562508300 |
2021 |
6 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
12/9/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR121K1062034309991 |
|
|
$62.45 |
10487458-3562508300 |
2021 |
6 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
12/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034309991 |
|
|
$23.86 |
10487458-3562508300 |
2021 |
6 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
12/9/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR121K1062034309991 |
|
|
$713.20 |
10487458-3562508300 |
2021 |
6 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
12/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034309991 |
|
|
$273.76 |
10487458-3562508300 |
2021 |
6 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
12/9/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR121K1062034309991 |
|
|
$158.44 |
10487458-3562508300 |
2021 |
6 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
12/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034309991 |
|
|
$59.81 |
10487458-3562508300 |
2021 |
6 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
12/9/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR121K1062034310048 |
|
|
$451.75 |
10488642-3562508300 |
2021 |
6 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
12/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034310048 |
|
|
$177.07 |
10488642-3562508300 |
2021 |
6 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
12/9/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR121K1062034310048 |
|
|
$33.21 |
10488642-3562508300 |
2021 |
6 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
12/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034310048 |
|
|
$12.86 |
10488642-3562508300 |
2021 |
6 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
12/9/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR121K1062034310048 |
|
|
$381.35 |
10488642-3562508200 |
2021 |
6 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
12/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034310048 |
|
|
$149.49 |
10488642-3562508300 |
2021 |
6 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
12/9/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR121K1062034310048 |
|
|
$92.47 |
10488642-3562508300 |
2021 |
6 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
12/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034310048 |
|
|
$35.79 |
10488642-3562508200 |
2021 |
6 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
12/9/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR121K1062034309987 |
|
|
$180.98 |
10487404-3562508300 |
2021 |
6 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
12/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034309987 |
|
|
$103.20 |
10487404-3562508300 |
2021 |
6 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
12/9/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR121K1062034309987 |
|
|
$12.80 |
10487404-3562508300 |
2021 |
6 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
12/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034309987 |
|
|
$7.30 |
10487404-3562508300 |
2021 |
6 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
12/9/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR121K1062034309987 |
|
|
$152.68 |
10487404-3562508300 |
2021 |
6 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
12/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034309987 |
|
|
$87.12 |
10487404-3562508300 |
2021 |
6 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
12/9/2020 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR121K1062034309987 |
|
|
$37.20 |
10487404-3562508300 |
2021 |
6 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
12/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034309987 |
|
|
$20.80 |
10487404-3562508300 |
2021 |
6 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
12/9/2020 |
5213 |
ASPHALT MIX DESIGN |
CA-XR121K1062034309730 |
|
|
$555.89 |
000001076210-3562500640 |
2021 |
6 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
12/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034309730 |
|
|
$208.57 |
000001076210-3562500640 |
2021 |
6 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
12/9/2020 |
5213 |
ASPHALT MIX DESIGN |
CA-XR121K1062034309730 |
|
|
$41.12 |
000001076210-3562500640 |
2021 |
6 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
12/9/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121K1062034309730 |
|
|
$15.42 |
000001076210-3562500640 |
2021 |
6 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
12/9/2020 |
5213 |
ASPHALT MIX DESIGN |
CA-XR121K1062034309730 |
|
|
$469.44 |
000001076210-3562500640 |
2021 |
6 |
FD52 |
08 |
E797 |
C |
6780801C |
100 |
12/2/2020 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092201305P001K |
CTXCONST0922013050001K |
BIZZACK CONSTRUCTION LLC |
$985,686.78 |
|
2021 |
5 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
11/25/2020 |
4260 |
SIGNAL PLANS-TRAF |
CA-XR112K1062032508801 |
|
|
$94.86 |
000001076183-3562500463 |
2021 |
5 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
11/25/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508801 |
|
|
$23.72 |
000001076183-3562500463 |
2021 |
5 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
11/25/2020 |
4260 |
SIGNAL PLANS-TRAF |
CA-XR112K1062032508801 |
|
|
$7.17 |
000001076183-3562500463 |
2021 |
5 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
11/25/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508801 |
|
|
$1.79 |
000001076183-3562500463 |
2021 |
5 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
11/25/2020 |
4260 |
SIGNAL PLANS-TRAF |
CA-XR112K1062032508801 |
|
|
$80.09 |
000001076183-3562500463 |
2021 |
5 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
11/25/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508801 |
|
|
$20.03 |
000001076183-3562500463 |
2021 |
5 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
11/25/2020 |
4260 |
SIGNAL PLANS-TRAF |
CA-XR112K1062032508801 |
|
|
$10.01 |
000001076183-3562500463 |
2021 |
5 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
11/25/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508801 |
|
|
$2.46 |
000001076183-3562500463 |
2021 |
5 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
11/25/2020 |
4260 |
SIGNAL PLANS-TRAF |
CA-XR112K1062032508801 |
|
|
$0.02 |
000001076183-3562500463 |
2021 |
5 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
11/25/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508801 |
|
|
$0.01 |
000001076183-3562500463 |
2021 |
5 |
FD52 |
08 |
E797 |
C |
6780801C |
100 |
11/24/2020 |
4010 |
CONSTRUCTION ENGINEERING |
PRC-2100078550 |
PON21900002065 |
LYNN BLUE PRINT AND SUPPLY CO |
$7,441.52 |
ePlan Room Services |
2021 |
5 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
11/23/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR112K1062032508804 |
|
|
$320.94 |
000001076224-3562500610 |
2021 |
5 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508804 |
|
|
$80.50 |
000001076224-3562500610 |
2021 |
5 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
11/23/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR112K1062032508804 |
|
|
$21.88 |
000001076224-3562500610 |
2021 |
5 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508804 |
|
|
$5.49 |
000001076224-3562500610 |
2021 |
5 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
11/23/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR112K1062032508804 |
|
|
$271.15 |
000001076224-3562500610 |
2021 |
5 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508804 |
|
|
$67.97 |
000001076224-3562500610 |
2021 |
5 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
11/23/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR112K1062032508804 |
|
|
$57.22 |
000001076224-3562500610 |
2021 |
5 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508804 |
|
|
$14.18 |
000001076224-3562500610 |
2021 |
5 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
11/23/2020 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-XR112K1062032508804 |
|
|
$0.10 |
000001076224-3562500610 |
2021 |
5 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508804 |
|
|
$0.03 |
000001076224-3562500610 |
2021 |
5 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
11/23/2020 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR112K1062032508802 |
|
|
$343.77 |
000001076194-3562500680 |
2021 |
5 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508802 |
|
|
$125.10 |
000001076194-3562500680 |
2021 |
5 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
11/23/2020 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR112K1062032508802 |
|
|
$24.89 |
000001076194-3562500680 |
2021 |
5 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508802 |
|
|
$9.06 |
000001076194-3562500680 |
2021 |
5 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
11/23/2020 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR112K1062032508802 |
|
|
$290.17 |
000001076194-3562500680 |
2021 |
5 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508802 |
|
|
$105.62 |
000001076194-3562500680 |
2021 |
5 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
11/23/2020 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR112K1062032508802 |
|
|
$57.27 |
000001076194-3562500680 |
2021 |
5 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508802 |
|
|
$20.60 |
000001076194-3562500680 |
2021 |
5 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
11/23/2020 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR112K1062032508802 |
|
|
$0.10 |
000001076194-3562500680 |
2021 |
5 |
FD52 |
08 |
E124 |
C |
6780801C |
100 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508802 |
|
|
$0.04 |
000001076194-3562500680 |
2021 |
5 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
11/23/2020 |
5213 |
ASPHALT MIX DESIGN |
CA-XR112K1062032508803 |
|
|
$407.74 |
000001076210-3562500640 |
2021 |
5 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508803 |
|
|
$101.94 |
000001076210-3562500640 |
2021 |
5 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
11/23/2020 |
5213 |
ASPHALT MIX DESIGN |
CA-XR112K1062032508803 |
|
|
$30.54 |
000001076210-3562500640 |
2021 |
5 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508803 |
|
|
$7.64 |
000001076210-3562500640 |
2021 |
5 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
11/23/2020 |
5213 |
ASPHALT MIX DESIGN |
CA-XR112K1062032508803 |
|
|
$344.26 |
000001076210-3562500640 |
2021 |
5 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508803 |
|
|
$86.07 |
000001076210-3562500640 |
2021 |
5 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
11/23/2020 |
5213 |
ASPHALT MIX DESIGN |
CA-XR112K1062032508803 |
|
|
$65.97 |
000001076210-3562500640 |
2021 |
5 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508803 |
|
|
$16.17 |
000001076210-3562500640 |
2021 |
5 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
11/23/2020 |
5213 |
ASPHALT MIX DESIGN |
CA-XR112K1062032508803 |
|
|
$0.20 |
000001076210-3562500640 |
2021 |
5 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
11/23/2020 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112K1062032508803 |
|
|
$0.05 |
000001076210-3562500640 |
2021 |
5 |
FD52 |
08 |
E143 |
C |
6780801C |
100 |
11/12/2020 |
0550 |
ENV STUDIES-TERRES ECOL-CONSUL |
PRC-2100068328 |
PON22000002505 |
KENTUCKY NATURAL LANDS TRUST |
$236,376.00 |
Reestablish Contract with Ky Natural Land Trust |
2017 |
7 |
FD52 |
08 |
E797 |
C |
6780801C |
100 |
1/18/2017 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092041014F088K |
PO2XCONST092041014CV01K |
BIZZACK INC |
$99,797.28 |
|
2017 |
6 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
12/12/2016 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR121G1061634310102 |
|
|
$272.64 |
09730555-3562508300 |
2017 |
6 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
12/12/2016 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR121G1061634310102 |
|
|
$19.56 |
09730555-3562508300 |
2017 |
6 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
12/12/2016 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR121G1061634310102 |
|
|
$132.44 |
09730555-3562508300 |
2017 |
6 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
12/12/2016 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR121G1061634310102 |
|
|
$47.42 |
09730555-3562508300 |
2016 |
7 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
1/11/2016 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011G1061600808444 |
|
|
$536.45 |
09540081-3562508300 |
2016 |
7 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
1/11/2016 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011G1061600808444 |
|
|
$38.55 |
09540081-3562508300 |
2016 |
7 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
1/11/2016 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011G1061600808444 |
|
|
$207.98 |
09540081-3562508300 |
2016 |
7 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
1/11/2016 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR011G1061600808444 |
|
|
$55.62 |
09540081-3562508300 |
2016 |
2 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
8/14/2015 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR081F1061521909446 |
|
|
$295.78 |
000001011715-3562500680 |
2016 |
2 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
8/14/2015 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR081F1061521909446 |
|
|
$20.43 |
000001011715-3562500680 |
2016 |
2 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
8/14/2015 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR081F1061521909446 |
|
|
$114.73 |
000001011715-3562500680 |
2016 |
2 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
8/14/2015 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR081F1061521909446 |
|
|
$45.61 |
000001011715-3562500680 |
2016 |
2 |
FD52 |
00 |
E229 |
C |
6780801C |
100 |
8/11/2015 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162515222011810 |
|
|
$150.40 |
|
2015 |
6 |
FD52 |
00 |
E229 |
C |
6780801C |
100 |
12/30/2014 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162514359012390 |
|
|
$103.04 |
|
2015 |
6 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
12/22/2014 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR122E1061435206354 |
|
|
$982.71 |
000001011715-3562500680 |
2015 |
6 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
12/22/2014 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR122E1061435206354 |
|
|
$67.35 |
000001011715-3562500680 |
2015 |
6 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
12/22/2014 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR122E1061435206354 |
|
|
$380.98 |
000001011715-3562500680 |
2015 |
6 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
12/22/2014 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR122E1061435206354 |
|
|
$145.28 |
000001011715-3562500680 |
2015 |
6 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
12/22/2014 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR122E1061435206354 |
|
|
$0.46 |
000001011715-3562500680 |
2014 |
9 |
FD52 |
08 |
E229 |
C |
6780801C |
100 |
3/13/2014 |
4580 |
CONSTRUCTION CONTRACTS |
IET-XE13A162514069004980 |
|
|
$130.00 |
|
2014 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/10/2014 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021E1061403904717 |
|
|
$473.34 |
09119336-3562508300 |
2014 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/10/2014 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021E1061403904717 |
|
|
$33.94 |
09119336-3562508300 |
2014 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/10/2014 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021E1061403904717 |
|
|
$126.84 |
09119336-3562508300 |
2014 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/10/2014 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021E1061403904717 |
|
|
$59.27 |
09119336-3562508300 |
2014 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/10/2014 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021E1061403904732 |
|
|
$473.34 |
09120324-3562508300 |
2014 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/10/2014 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021E1061403904732 |
|
|
$33.94 |
09120324-3562508300 |
2014 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/10/2014 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021E1061403904732 |
|
|
$126.84 |
09120324-3562508300 |
2014 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/10/2014 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021E1061403904732 |
|
|
$59.27 |
09120324-3562508300 |
2014 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/10/2014 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021E1061403904704 |
|
|
$458.81 |
09118329-3562508300 |
2014 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/10/2014 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021E1061403904704 |
|
|
$32.90 |
09118329-3562508300 |
2014 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/10/2014 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021E1061403904704 |
|
|
$122.95 |
09118329-3562508300 |
2014 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/10/2014 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021E1061403904704 |
|
|
$57.51 |
09118329-3562508300 |
2014 |
8 |
FD52 |
08 |
E111 |
C |
6780801C |
100 |
2/10/2014 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021E1061403904681 |
|
|
$255.39 |
09116870-3562508300 |
2014 |
8 |
FD52 |
08 |
E121 |
C |
6780801C |
100 |
2/10/2014 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021E1061403904681 |
|
|
$18.29 |
09116870-3562508300 |
2014 |
8 |
FD52 |
08 |
E122 |
C |
6780801C |
100 |
2/10/2014 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021E1061403904681 |
|
|
$68.42 |
09116870-3562508300 |
2014 |
8 |
FD52 |
08 |
E123 |
C |
6780801C |
100 |
2/10/2014 |
4580 |
CONSTRUCTION CONTRACTS |
CA-XR021E1061403904681 |
|
|
$32.78 |
09116870-3562508300 |
2013 |
8 |
FD52 |
00 |
E143 |
C |
6780801C |
100 |
2/21/2013 |
0510 |
ENV STUDIES-UST/HZM |
JV2E-1300004798 |
PON20600001610 |
|
($39,825.00) |
Moving PRC 07*394240 to the correct program 6780806R |
2013 |
4 |
FD52 |
08 |
E146 |
C |
6780801C |
100 |
10/25/2012 |
1640 |
BRIDGE-REVIEW OF PLANS |
PRC-1300078073 |
PON2C-01167628-6 |
JOHNSON DEPP AND |
$215.00 |
Checking of Shop Plans |
2012 |
9 |
FD52 |
00 |
E229 |
C |
6780801C |
100 |
3/14/2012 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162512074012230 |
|
|
$79.83 |
|
2012 |
7 |
FD52 |
08 |
E146 |
C |
6780801C |
100 |
1/13/2012 |
1640 |
BRIDGE-REVIEW OF PLANS |
PRC-1200107334 |
PON2C-01167628-6 |
JOHNSON DEPP AND |
$525.00 |
Checking of Shop Plans |
2012 |
7 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
1/9/2012 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR011C1061200801430 |
|
|
$40.82 |
000001011715-3562500680 |
2012 |
7 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
1/9/2012 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR011C1061200801430 |
|
|
$2.95 |
000001011715-3562500680 |
2012 |
7 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
1/9/2012 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR011C1061200801430 |
|
|
$8.09 |
000001011715-3562500680 |
2012 |
7 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
1/9/2012 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR011C1061200801430 |
|
|
$4.18 |
000001011715-3562500680 |
2012 |
7 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
1/9/2012 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR011C1061200801430 |
|
|
$0.02 |
000001011715-3562500680 |
2012 |
6 |
FD52 |
00 |
E111 |
C |
6780801C |
100 |
12/19/2011 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR122B1061135200449 |
|
|
$355.77 |
000001011715-3562500680 |
2012 |
6 |
FD52 |
00 |
E121 |
C |
6780801C |
100 |
12/19/2011 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR122B1061135200449 |
|
|
$25.71 |
000001011715-3562500680 |
2012 |
6 |
FD52 |
00 |
E122 |
C |
6780801C |
100 |
12/19/2011 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR122B1061135200449 |
|
|
$70.52 |
000001011715-3562500680 |
2012 |
6 |
FD52 |
00 |
E123 |
C |
6780801C |
100 |
12/19/2011 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR122B1061135200449 |
|
|
$36.40 |
000001011715-3562500680 |
2012 |
6 |
FD52 |
00 |
E124 |
C |
6780801C |
100 |
12/19/2011 |
4010 |
CONSTRUCTION ENGINEERING |
CA-XR122B1061135200449 |
|
|
$0.16 |
000001011715-3562500680 |
2011 |
7 |
FD52 |
08 |
E797 |
C |
6780801C |
100 |
1/20/2011 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092041014P086K |
PO2XCONST092041014CV01K |
BIZZACK INC |
$175,428.96 |
|
2011 |
5 |
FD52 |
00 |
E229 |
C |
6780801C |
100 |
11/29/2010 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162510329015940 |
|
|
$108.67 |
|
2011 |
5 |
FD52 |
00 |
E154 |
C |
6780801C |
100 |
11/22/2010 |
4010 |
CONSTRUCTION ENGINEERING |
CA-X011190991032300200P |
|
|
$520.07 |
REG PAYROLL FOR PERIOD ENDING 11/15/10 *** LABOR DIST-LOC 00-CRW 680 |
2011 |
5 |
FD52 |
08 |
E797 |
C |
6780801C |
100 |
11/10/2010 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092041014P085K |
PO2XCONST092041014CV01K |
BIZZACK INC |
$123,644.30 |
|
2010 |
9 |
FD52 |
08 |
E146 |
C |
6780801C |
100 |
3/26/2010 |
1640 |
BRIDGE-REVIEW OF PLANS |
PRC-1000181522 |
PON2C-01167628-6 |
JOHNSON DEPP AND |
$13,217.98 |
Checking of Shop Plans |
2010 |
3 |
FD52 |
00 |
E154 |
C |
6780801C |
100 |
9/9/2009 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-X010090990924700273P |
|
|
$207.36 |
REG PAYROLL FOR PERIOD ENDING 08/31/09 *** LABOR DIST-LOC 00-CRW 610 |
2010 |
2 |
FD52 |
08 |
E797 |
C |
6780801C |
100 |
8/27/2009 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092041014P084K |
PO2XCONST092041014CV01K |
BIZZACK INC |
$1,403.32 |
|
2010 |
2 |
FD52 |
00 |
E154 |
C |
6780801C |
100 |
8/21/2009 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-X010070990923200256P |
|
|
$204.65 |
REG PAYROLL FOR PERIOD ENDING 08/15/09 *** LABOR DIST-LOC 00-CRW 610 |
2010 |
1 |
FD52 |
00 |
E154 |
C |
6780801C |
100 |
7/14/2009 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-X010010990918800250P |
|
|
$687.03 |
REG PAYROLL FOR PERIOD ENDING 06/30/09 *** LABOR DIST-LOC 00-CRW 610 |
2009 |
12 |
FD52 |
00 |
E154 |
C |
6780801C |
100 |
6/10/2009 |
1620 |
BRIDGE DESIGN & PLANS |
CA-X009450990915600279P |
|
|
$203.57 |
REG PAYROLL FOR PERIOD ENDING 05/31/09 *** LABOR DIST-LOC 00-CRW 610 |
2009 |
12 |
FD52 |
00 |
E154 |
C |
6780801C |
100 |
6/10/2009 |
1640 |
BRIDGE-REVIEW OF PLANS |
CA-X009450990915600280P |
|
|
$615.40 |
REG PAYROLL FOR PERIOD ENDING 05/31/09 *** LABOR DIST-LOC 00-CRW 610 |
2009 |
12 |
FD52 |
00 |
E154 |
C |
6780801C |
100 |
6/10/2009 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-X009450990915600281P |
|
|
$211.18 |
REG PAYROLL FOR PERIOD ENDING 05/31/09 *** LABOR DIST-LOC 00-CRW 610 |
2009 |
12 |
FD52 |
00 |
E229 |
C |
6780801C |
100 |
6/8/2009 |
1620 |
BRIDGE DESIGN & PLANS |
IET-XE13A162509155042030 |
|
|
$1,550.00 |
|
2009 |
12 |
FD52 |
00 |
E154 |
C |
6780801C |
100 |
6/1/2009 |
1640 |
BRIDGE-REVIEW OF PLANS |
CA-X009430990914200261P |
|
|
$1,118.90 |
REG PAYROLL FOR PERIOD ENDING 05/15/09 *** LABOR DIST-LOC 00-CRW 610 |
2009 |
11 |
FD52 |
00 |
E229 |
C |
6780801C |
100 |
5/21/2009 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162509128C39140 |
|
|
($117.84) |
|
2009 |
11 |
FD52 |
00 |
E229 |
C |
6780801C |
100 |
5/8/2009 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162509128039140 |
|
|
$117.84 |
|
2009 |
8 |
FD52 |
00 |
E154 |
C |
6780801C |
100 |
2/12/2009 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-X009290990904000261P |
|
|
$1,454.03 |
REG PAYROLL FOR PERIOD ENDING 01/31/09 *** LABOR DIST-LOC 00-CRW 610 |
2009 |
8 |
FD52 |
00 |
E154 |
C |
6780801C |
100 |
2/12/2009 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-X009290990904000262P |
|
|
$456.81 |
REG PAYROLL FOR PERIOD ENDING 01/31/09 *** LABOR DIST-LOC 00-CRW 610 |
2009 |
8 |
FD52 |
00 |
E154 |
C |
6780801C |
090 |
2/12/2009 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-X009290990904000274P |
|
|
$675.62 |
REG PAYROLL FOR PERIOD ENDING 01/31/09 *** LABOR DIST-LOC 00-CRW 610 |
2009 |
8 |
FD52 |
00 |
E154 |
C |
6780801C |
106 |
2/12/2009 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-X009290990904000276P |
|
|
$1,229.65 |
REG PAYROLL FOR PERIOD ENDING 01/31/09 *** LABOR DIST-LOC 00-CRW 610 |
2009 |
8 |
FD52 |
00 |
E154 |
C |
6780801C |
100 |
2/10/2009 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-X009270990902200560P |
|
|
$1,198.13 |
REG PAYROLL FOR PERIOD ENDING 01/15/09 *** LABOR DIST-LOC 00-CRW 009 |
2009 |
8 |
FD52 |
00 |
E154 |
C |
6780801C |
100 |
2/10/2009 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-X009270990902200217P |
|
|
$6,240.23 |
REG PAYROLL FOR PERIOD ENDING 01/15/09 *** LABOR DIST-LOC 00-CRW 610 |
2009 |
8 |
FD52 |
00 |
E154 |
C |
6780801C |
100 |
2/10/2009 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-X009270990902200218P |
|
|
$456.81 |
REG PAYROLL FOR PERIOD ENDING 01/15/09 *** LABOR DIST-LOC 00-CRW 610 |
2009 |
7 |
FD52 |
00 |
E361 |
C |
6780801C |
100 |
1/30/2009 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
TP-0900298126 |
|
|
$38.00 |
|
2009 |
7 |
FD52 |
00 |
E361 |
C |
6780801C |
100 |
1/30/2009 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
TP-0900298132 |
|
|
$172.00 |
|
2009 |
7 |
FD52 |
00 |
E361 |
C |
6780801C |
100 |
1/30/2009 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
TP-0900297479 |
|
|
$45.00 |
|
2009 |
7 |
FD52 |
00 |
E361 |
C |
6780801C |
100 |
1/30/2009 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
TP-0900298056 |
|
|
$76.00 |
|
2009 |
7 |
FD52 |
00 |
E229 |
C |
6780801C |
100 |
1/23/2009 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
IET-XE13A162509022033850 |
|
|
$5,288.59 |
|
2009 |
7 |
FD52 |
00 |
E229 |
C |
6780801C |
100 |
1/23/2009 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
IET-XE13A162509022033900 |
|
|
$530.00 |
|
2009 |
7 |
FD52 |
00 |
E361 |
C |
6780801C |
100 |
1/16/2009 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
TP-0900295731 |
|
|
$98.00 |
|
2009 |
7 |
FD52 |
00 |
E154 |
C |
6780801C |
121 |
1/13/2009 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-X009250990900800177P |
|
|
$329.50 |
REG PAYROLL FOR PERIOD ENDING 12/31/08 *** LABOR DIST-LOC 00-CRW 610 |
2009 |
7 |
FD52 |
00 |
E154 |
C |
6780801C |
100 |
1/13/2009 |
1620 |
BRIDGE DESIGN & PLANS |
CA-X009250990900800221P |
|
|
$966.53 |
REG PAYROLL FOR PERIOD ENDING 12/31/08 *** LABOR DIST-LOC 00-CRW 610 |
2009 |
7 |
FD52 |
00 |
E154 |
C |
6780801C |
100 |
1/13/2009 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-X009250990900800222P |
|
|
$2,242.46 |
REG PAYROLL FOR PERIOD ENDING 12/31/08 *** LABOR DIST-LOC 00-CRW 610 |
2009 |
7 |
FD52 |
00 |
E154 |
C |
6780801C |
100 |
1/13/2009 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-X009250990900800223P |
|
|
$2,792.64 |
REG PAYROLL FOR PERIOD ENDING 12/31/08 *** LABOR DIST-LOC 00-CRW 610 |
2009 |
7 |
FD52 |
00 |
E154 |
C |
6780801C |
090 |
1/13/2009 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-X009250990900800230P |
|
|
$360.98 |
REG PAYROLL FOR PERIOD ENDING 12/31/08 *** LABOR DIST-LOC 00-CRW 610 |
2009 |
7 |
FD52 |
00 |
E154 |
C |
6780801C |
106 |
1/13/2009 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-X009250990900800231P |
|
|
$166.22 |
REG PAYROLL FOR PERIOD ENDING 12/31/08 *** LABOR DIST-LOC 00-CRW 610 |
2009 |
7 |
FD52 |
00 |
E361 |
C |
6780801C |
100 |
1/12/2009 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
TP-0800291076 |
|
|
$105.00 |
|
2009 |
7 |
FD52 |
00 |
E361 |
C |
6780801C |
100 |
1/12/2009 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
TP-0800291099 |
|
|
$98.00 |
|
2009 |
7 |
FD52 |
00 |
E229 |
C |
6780801C |
100 |
1/9/2009 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
IET-XE13A162509008041000 |
|
|
$2,750.00 |
|
2009 |
7 |
FD52 |
00 |
E229 |
C |
6780801C |
100 |
1/9/2009 |
5341 |
GEOTECHNICAL INVEST (CONST) |
IET-XE13A162509008041010 |
|
|
$117.73 |
|
2009 |
7 |
FD52 |
00 |
E229 |
C |
6780801C |
100 |
1/9/2009 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
IET-XE13A162509008041030 |
|
|
$350.00 |
|
2009 |
6 |
FD52 |
00 |
E229 |
C |
6780801C |
100 |
12/19/2008 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
IET-XE13A162508352032310 |
|
|
$525.00 |
|
2009 |
6 |
FD52 |
00 |
E229 |
C |
6780801C |
100 |
12/19/2008 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
IET-XE13A162508352032390 |
|
|
$100.00 |
|
2009 |
6 |
FD52 |
08 |
E797 |
C |
6780801C |
100 |
12/19/2008 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092041014P083K |
PO2XCONST092041014CV01K |
BIZZACK INC |
($9,514.44) |
|
2009 |
6 |
FD52 |
00 |
E154 |
C |
6780801C |
100 |
12/18/2008 |
1620 |
BRIDGE DESIGN & PLANS |
CA-X009230990835200233P |
|
|
$359.45 |
REG PAYROLL FOR PERIOD ENDING 12/15/08 *** LABOR DIST-LOC 00-CRW 610 |
2009 |
6 |
FD52 |
00 |
E154 |
C |
6780801C |
100 |
12/18/2008 |
5021 |
GEOTECH INVEST STRUCTURE (DESI |
CA-X009230990835200234P |
|
|
$1,185.42 |
REG PAYROLL FOR PERIOD ENDING 12/15/08 *** LABOR DIST-LOC 00-CRW 610 |
2009 |
6 |
FD52 |
00 |
E154 |
C |
6780801C |
100 |
12/18/2008 |
5341 |
GEOTECHNICAL INVEST (CONST) |
CA-X009230990835200235P |
|
|
$456.81 |
REG PAYROLL FOR PERIOD ENDING 12/15/08 *** LABOR DIST-LOC 00-CRW 610 |
2009 |
4 |
FD52 |
08 |
E797 |
C |
6780801C |
100 |
10/22/2008 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092041014P082K |
PO2XCONST092041014CV01K |
BIZZACK INC |
$67,784.04 |
|
2009 |
3 |
FD52 |
08 |
E211 |
C |
6780801C |
100 |
9/16/2008 |
4010 |
CONSTRUCTION ENGINEERING |
JV2E-0800030452 |
|
|
($31.70) |
MOVE INDIRECT CHARGES TO INELIGIBLE ACCOUNT CODE. |
2009 |
3 |
FD52 |
08 |
E211 |
C |
6780801C |
100 |
9/16/2008 |
7999 |
INDIRECT COST |
JV2E-0800030452 |
|
|
$31.70 |
MOVE INDIRECT CHARGES TO INELIGIBLE ACCOUNT CODE. |
2009 |
2 |
FD52 |
00 |
E229 |
C |
6780801C |
100 |
8/25/2008 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162508234055150 |
|
|
$117.84 |
|
2009 |
2 |
FD52 |
00 |
E154 |
C |
6780801C |
100 |
8/22/2008 |
5153 |
INSP-ASPHALT PLANTS & PAVING M |
CA-X009070990823400158P |
|
|
$196.26 |
REG PAYROLL FOR PERIOD ENDING 08/15/08 *** LABOR DIST-LOC 00-CRW 640 |
2009 |
2 |
FD52 |
00 |
E154 |
C |
6780801C |
100 |
8/22/2008 |
4010 |
CONSTRUCTION ENGINEERING |
CA-X009070990823400118P |
|
|
$480.22 |
REG PAYROLL FOR PERIOD ENDING 08/15/08 *** LABOR DIST-LOC 00-CRW 680 |
2009 |
1 |
FD52 |
00 |
E154 |
C |
6780801C |
100 |
7/22/2008 |
4010 |
CONSTRUCTION ENGINEERING |
CA-X009030990820300143P |
|
|
$480.22 |
REG PAYROLL FOR PERIOD ENDING 07/15/08 *** LABOR DIST-LOC 00-CRW 680 |
2008 |
12 |
FD52 |
00 |
E154 |
C |
6780801C |
100 |
6/20/2008 |
4010 |
CONSTRUCTION ENGINEERING |
CA-X008470990817100118P |
|
|
$356.02 |
REG PAYROLL FOR PERIOD ENDING 06/15/08 *** LABOR DIST-LOC 00-CRW 680 |
2008 |
12 |
FD52 |
00 |
E154 |
C |
6780801C |
100 |
6/9/2008 |
4010 |
CONSTRUCTION ENGINEERING |
CA-X008450990815700166P |
|
|
$339.92 |
REG PAYROLL FOR PERIOD ENDING 05/31/08 *** LABOR DIST-LOC 00-CRW 680 |
2008 |
12 |
FD52 |
00 |
E229 |
C |
6780801C |
100 |
6/9/2008 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162508157057980 |
|
|
$82.19 |
|
2008 |
12 |
FD52 |
08 |
E797 |
C |
6780801C |
100 |
6/4/2008 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092041014P081K |
PO2XCONST092041014CV01K |
BIZZACK INC |
$129,393.92 |
|
2008 |
11 |
FD52 |
00 |
E154 |
C |
6780801C |
100 |
5/26/2008 |
4010 |
CONSTRUCTION ENGINEERING |
CA-X008430990814200144P |
|
|
$551.37 |
REG PAYROLL FOR PERIOD ENDING 05/15/08 *** LABOR DIST-LOC 00-CRW 680 |
2008 |
11 |
FD52 |
08 |
E146 |
C |
6780801C |
100 |
5/12/2008 |
1640 |
BRIDGE-REVIEW OF PLANS |
PRC-0800502042 |
PON2C-01167628-6 |
JOHNSON DEPP AND |
$7,435.12 |
|
2008 |
11 |
FD52 |
08 |
E211 |
C |
6780801C |
100 |
5/12/2008 |
4010 |
CONSTRUCTION ENGINEERING |
PRC2-PRO0800045367 |
|
SOMERSET PULASKI CO EMS |
$31.70 |
|
2008 |
11 |
FD52 |
08 |
E797 |
C |
6780801C |
100 |
5/7/2008 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092041014P080K |
PO2XCONST092041014CV01K |
BIZZACK INC |
$2,102.27 |
|
2008 |
10 |
FD52 |
08 |
E797 |
C |
6780801C |
100 |
4/23/2008 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092041014P079K |
PO2XCONST092041014CV01K |
BIZZACK INC |
$313.89 |
|
2008 |
10 |
FD52 |
00 |
E154 |
C |
6780801C |
100 |
4/22/2008 |
1430 |
DESIGN PART-CONSTRUCTION PHASE |
CA-X008390990811200367P |
|
|
$367.04 |
REG PAYROLL FOR PERIOD ENDING 04/15/08 *** LABOR DIST-LOC 00-CRW 636 |
2008 |
10 |
FD52 |
00 |
E154 |
C |
6780801C |
100 |
4/22/2008 |
4010 |
CONSTRUCTION ENGINEERING |
CA-X008390990811200126P |
|
|
$532.14 |
REG PAYROLL FOR PERIOD ENDING 04/15/08 *** LABOR DIST-LOC 00-CRW 680 |
2008 |
10 |
FD52 |
08 |
E793 |
C |
6780801C |
100 |
4/9/2008 |
5272 |
PHYSICAL TESTING UNIT |
CA-XMTEST0980810000003M |
|
|
$141.57 |
Feb 2008 -Materials Test Charges - Physical - 041014 - 6780801C |
2008 |
10 |
FD52 |
08 |
E797 |
C |
6780801C |
100 |
4/9/2008 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092041014P078K |
PO2XCONST092041014CV01K |
BIZZACK INC |
($49,666.96) |
|
2008 |
9 |
FD52 |
00 |
E154 |
C |
6780801C |
100 |
3/21/2008 |
1640 |
BRIDGE-REVIEW OF PLANS |
CA-X008350990808000255P |
|
|
$1,167.90 |
REG PAYROLL FOR PERIOD ENDING 03/15/08 *** LABOR DIST-LOC 00-CRW 610 |
2008 |
8 |
FD52 |
08 |
E793 |
C |
6780801C |
100 |
2/27/2008 |
5292 |
AGGREGATE TESTING UNIT |
CA-XMTEST0980805800003M |
|
|
$756.12 |
Jan 2008 -Materials Test Charges - Aggregate - 041014 - 6780801C |
2008 |
7 |
FD52 |
08 |
E154 |
C |
6780801C |
100 |
1/24/2008 |
4010 |
CONSTRUCTION ENGINEERING |
CA-X008270990802206127P |
|
|
$1,696.99 |
REG PAYROLL FOR PERIOD ENDING 01/15/08 *** LABOR DIST-LOC 08-CRW 319 |
2008 |
7 |
FD52 |
08 |
E793 |
C |
6780801C |
100 |
1/23/2008 |
5302 |
CHEMICAL TESTING UNIT |
CA-XMTEST0980802300004M |
|
|
$129.85 |
Dec 2007 -Materials Test Charges - Chemistry - 041014 - 6780801C |
2008 |
7 |
FD52 |
08 |
E793 |
C |
6780801C |
100 |
1/23/2008 |
5302 |
CHEMICAL TESTING UNIT |
CA-XMTEST0980802300005M |
|
|
$447.35 |
Dec 2007 -Materials Test Charges - Chemistry - 041014 - 6780801C |
2008 |
7 |
FD52 |
08 |
E793 |
C |
6780801C |
100 |
1/23/2008 |
5242 |
CONCRETE TESTING UNIT |
CA-XMTEST0980802300005M |
|
|
$302.35 |
Dec 2007 -Materials Test Charges - Conc./Cem. - 041014 - 6780801C |
2008 |
7 |
FD52 |
08 |
E229 |
C |
6780801C |
100 |
1/22/2008 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162508019027130 |
|
|
$89.82 |
|
2008 |
7 |
FD52 |
08 |
E797 |
C |
6780801C |
100 |
1/17/2008 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092041014P076K |
PO2XCONST092041014CV01K |
BIZZACK INC |
$245,136.42 |
|
2008 |
7 |
FD52 |
08 |
E793 |
C |
6780801C |
100 |
1/16/2008 |
5302 |
CHEMICAL TESTING UNIT |
CA-XMTEST0980801500003M |
|
|
$470.48 |
Nov 2007 -Materials Test Charges - Chemistry - 041014 - 6780801C |
2008 |
7 |
FD52 |
08 |
E797 |
C |
6780801C |
100 |
1/4/2008 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092041014P075K |
PO2XCONST092041014CV01K |
BIZZACK INC |
$21,760.00 |
|
2008 |
6 |
FD52 |
08 |
E229 |
C |
6780801C |
100 |
12/21/2007 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162507349016640 |
|
|
$187.98 |
|
2008 |
6 |
FD52 |
08 |
E797 |
C |
6780801C |
100 |
12/19/2007 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092041014P074K |
PO2XCONST092041014CV01K |
BIZZACK INC |
$7,915.00 |
|
2008 |
6 |
FD52 |
00 |
E154 |
C |
6780801C |
100 |
12/18/2007 |
4010 |
CONSTRUCTION ENGINEERING |
CA-X008230990735100152P |
|
|
$408.97 |
REG PAYROLL FOR PERIOD ENDING 12/15/07 *** LABOR DIST-LOC 00-CRW 680 |
2008 |
6 |
FD52 |
08 |
E154 |
C |
6780801C |
100 |
12/18/2007 |
4010 |
CONSTRUCTION ENGINEERING |
CA-X008230990735105672P |
|
|
$2,788.29 |
REG PAYROLL FOR PERIOD ENDING 12/15/07 *** LABOR DIST-LOC 08-CRW 319 |
2008 |
6 |
FD52 |
08 |
E229 |
C |
6780801C |
100 |
12/14/2007 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162507340036310 |
|
|
$39.16 |
|
2008 |
6 |
FD52 |
08 |
E154 |
C |
6780801C |
100 |
12/7/2007 |
4010 |
CONSTRUCTION ENGINEERING |
CA-X008210990734005806P |
|
|
$270.43 |
REG PAYROLL FOR PERIOD ENDING 11/30/07 *** LABOR DIST-LOC 08-CRW 319 |
2008 |
6 |
FD52 |
08 |
E797 |
C |
6780801C |
100 |
12/5/2007 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092041014P073K |
PO2XCONST092041014CV01K |
BIZZACK INC |
$17,925.18 |
|
2008 |
5 |
FD52 |
08 |
E793 |
C |
6780801C |
100 |
11/26/2007 |
5272 |
PHYSICAL TESTING UNIT |
CA-XMTEST0980833000003M |
|
|
$113.94 |
Oct 2007 -Materials Test Charges - Physical - 041014 - 6780801C |
2008 |
5 |
FD52 |
08 |
E793 |
C |
6780801C |
100 |
11/26/2007 |
5272 |
PHYSICAL TESTING UNIT |
CA-XMTEST0980833000004M |
|
|
$947.77 |
Oct 2007 -Materials Test Charges - Physical - 041014 - 6780801C |
2008 |
5 |
FD52 |
08 |
E229 |
C |
6780801C |
100 |
11/26/2007 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162507324031240 |
|
|
$147.75 |
|
2008 |
5 |
FD52 |
08 |
E154 |
C |
6780801C |
100 |
11/21/2007 |
4010 |
CONSTRUCTION ENGINEERING |
CA-X008190990732406618P |
|
|
$2,938.59 |
REG PAYROLL FOR PERIOD ENDING 11/15/07 *** LABOR DIST-LOC 08-CRW 319 |
2008 |
5 |
FD52 |
08 |
E797 |
C |
6780801C |
100 |
11/21/2007 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092041014P072K |
PO2XCONST092041014CV01K |
BIZZACK INC |
$64,398.68 |
|
2008 |
5 |
FD52 |
08 |
E154 |
C |
6780801C |
100 |
11/9/2007 |
4010 |
CONSTRUCTION ENGINEERING |
CA-X008170990731006818P |
|
|
$3,401.87 |
REG PAYROLL FOR PERIOD ENDING 10/31/07 *** LABOR DIST-LOC 08-CRW 319 |
2008 |
5 |
FD52 |
08 |
E229 |
C |
6780801C |
100 |
11/9/2007 |
4010 |
CONSTRUCTION ENGINEERING |
IET-XE13A162507310036730 |
|
|
$96.66 |
|
2008 |
5 |
FD52 |
08 |
E797 |
C |
6780801C |
100 |
11/8/2007 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092041014P071K |
PO2XCONST092041014CV01K |
BIZZACK INC |
$103,305.68 |
|
2008 |
4 |
FD52 |
08 |
E154 |
C |
6780801C |
100 |
10/30/2007 |
4010 |
CONSTRUCTION ENGINEERING |
CA-X008150990729606410P |
|
|
$3,401.07 |
REG PAYROLL FOR PERIOD ENDING 10/15/07 *** LABOR DIST-LOC 08-CRW 319 |
2008 |
4 |
FD52 |
08 |
E154 |
C |
6780801C |
100 |
10/26/2007 |
4010 |
CONSTRUCTION ENGINEERING |
CA-X008130990729606308P |
|
|
$608.63 |
REG PAYROLL FOR PERIOD ENDING 09/30/07 *** LABOR DIST-LOC 08-CRW 319 |
2008 |
4 |
FD52 |
08 |
E154 |
C |
6780801C |
100 |
10/25/2007 |
4010 |
CONSTRUCTION ENGINEERING |
CA-X008110990727406255P |
|
|
$2,400.56 |
REG PAYROLL FOR PERIOD ENDING 09/15/07 *** LABOR DIST-LOC 08-CRW 200 |
2008 |
4 |
FD52 |
08 |
E793 |
C |
6780801C |
100 |
10/25/2007 |
5302 |
CHEMICAL TESTING UNIT |
CA-XMTEST0980829800004M |
|
|
$288.74 |
Sep 2007 -Materials Test Charges - Chemistry - 041014 - 6780801C |
2008 |
4 |
FD52 |
08 |
E793 |
C |
6780801C |
100 |
10/25/2007 |
5272 |
PHYSICAL TESTING UNIT |
CA-XMTEST0980829800003M |
|
|
$335.67 |
Sep 2007 -Materials Test Charges - Physical - 041014 - 6780801C |
2008 |
4 |
FD52 |
08 |
E797 |
C |
6780801C |
100 |
10/24/2007 |
4580 |
CONSTRUCTION CONTRACTS |
PRC-XCONST092041014P070K |
PO2XCONST092041014CV01K |
BIZZACK INC |
$280,789.56 |
|