2024 |
10 |
FD04 |
10 |
E143 |
D |
4829102D |
097 |
4/5/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400198018 |
PON22200001263 |
HMB Engineers Inc |
$83,687.90 |
Perry Co. 10-269.2 |
2024 |
9 |
FD04 |
10 |
E143 |
D |
4829102D |
097 |
3/11/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400181713 |
PON22200001263 |
HMB Engineers Inc |
$57,854.95 |
Perry Co. 10-269.2 |
2024 |
8 |
FD04 |
10 |
E143 |
D |
4829102D |
097 |
2/7/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400158118 |
PON22200001263 |
HMB Engineers Inc |
$25,663.80 |
Perry Co. 10-269.2 |
2024 |
7 |
FD04 |
10 |
E143 |
D |
4829102D |
097 |
1/11/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400131646 |
PON22200001263 |
HMB Engineers Inc |
$59,934.35 |
Perry Co. 10-269.2 |
2024 |
6 |
FD04 |
10 |
E143 |
D |
4829102D |
097 |
12/4/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400109940 |
PON22200001263 |
HMB Engineers Inc |
$42,773.00 |
Perry Co. 10-269.2 |
2023 |
12 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
6/26/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062N1062317400422 |
|
|
$75.86 |
000001079367-3562500636 |
2023 |
12 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
6/26/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062N1062317400422 |
|
|
$46.63 |
000001079367-3562500636 |
2023 |
12 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
6/26/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062N1062317400422 |
|
|
$5.43 |
000001079367-3562500636 |
2023 |
12 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
6/26/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062N1062317400422 |
|
|
$3.34 |
000001079367-3562500636 |
2023 |
12 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
6/26/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062N1062317400422 |
|
|
$59.13 |
000001079367-3562500636 |
2023 |
12 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
6/26/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062N1062317400422 |
|
|
$36.37 |
000001079367-3562500636 |
2023 |
12 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
6/26/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062N1062317400422 |
|
|
$17.11 |
000001079367-3562500636 |
2023 |
12 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
6/26/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062N1062317400422 |
|
|
$10.40 |
000001079367-3562500636 |
2023 |
12 |
FD04 |
00 |
E124 |
D |
4829102D |
097 |
6/26/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062N1062317400422 |
|
|
$0.02 |
000001079367-3562500636 |
2023 |
12 |
FD04 |
00 |
E124 |
D |
4829102D |
097 |
6/26/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062N1062317400422 |
|
|
$0.01 |
000001079367-3562500636 |
2023 |
12 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
6/8/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR061N1062315810128 |
|
|
$34.81 |
000001079367-3562500636 |
2023 |
12 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
6/8/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061N1062315810128 |
|
|
$7.30 |
000001079367-3562500636 |
2023 |
12 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
6/8/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR061N1062315810128 |
|
|
$2.43 |
000001079367-3562500636 |
2023 |
12 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
6/8/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061N1062315810128 |
|
|
$0.52 |
000001079367-3562500636 |
2023 |
12 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
6/8/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR061N1062315810128 |
|
|
$27.65 |
000001079367-3562500636 |
2023 |
12 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
6/8/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061N1062315810128 |
|
|
$5.70 |
000001079367-3562500636 |
2023 |
12 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
6/8/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR061N1062315810128 |
|
|
$8.00 |
000001079367-3562500636 |
2023 |
12 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
6/8/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061N1062315810128 |
|
|
$1.63 |
000001079367-3562500636 |
2023 |
11 |
FD04 |
10 |
E143 |
D |
4829102D |
097 |
5/3/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300208015 |
PON22200001263 |
HMB Engineers Inc |
$12,440.50 |
Perry Co. 10-269.2 |
2023 |
8 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
2/23/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR022N1062305302446 |
|
|
$491.41 |
000001081776-3562500061 |
2023 |
8 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
2/23/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022N1062305302446 |
|
|
$83.54 |
000001081776-3562500061 |
2023 |
8 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
2/23/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR022N1062305302446 |
|
|
$36.67 |
000001081776-3562500061 |
2023 |
8 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
2/23/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022N1062305302446 |
|
|
$6.23 |
000001081776-3562500061 |
2023 |
8 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
2/23/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR022N1062305302446 |
|
|
$383.29 |
000001081776-3562500061 |
2023 |
8 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
2/23/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022N1062305302446 |
|
|
$65.16 |
000001081776-3562500061 |
2023 |
8 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
2/23/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR022N1062305302446 |
|
|
$70.14 |
000001081776-3562500061 |
2023 |
8 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
2/23/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022N1062305302446 |
|
|
$11.74 |
000001081776-3562500061 |
2023 |
8 |
FD04 |
00 |
E124 |
D |
4829102D |
097 |
2/23/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR022N1062305302446 |
|
|
$0.18 |
000001081776-3562500061 |
2023 |
8 |
FD04 |
00 |
E124 |
D |
4829102D |
097 |
2/23/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022N1062305302446 |
|
|
$0.03 |
000001081776-3562500061 |
2023 |
8 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
2/9/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR021N1062303901417 |
|
|
$225.27 |
000001081776-3562500061 |
2023 |
8 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
2/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021N1062303901417 |
|
|
$20.42 |
000001081776-3562500061 |
2023 |
8 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
2/9/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR021N1062303901417 |
|
|
$16.58 |
000001081776-3562500061 |
2023 |
8 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
2/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021N1062303901417 |
|
|
$1.51 |
000001081776-3562500061 |
2023 |
8 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
2/9/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR021N1062303901417 |
|
|
$175.93 |
000001081776-3562500061 |
2023 |
8 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
2/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021N1062303901417 |
|
|
$15.93 |
000001081776-3562500061 |
2023 |
8 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
2/9/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR021N1062303901417 |
|
|
$32.15 |
000001081776-3562500061 |
2023 |
8 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
2/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021N1062303901417 |
|
|
$2.87 |
000001081776-3562500061 |
2023 |
7 |
FD04 |
10 |
E143 |
D |
4829102D |
097 |
1/13/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300125510 |
PON22200001263 |
HMB Engineers Inc |
$26,353.00 |
Perry Co. 10-269.2 |
2023 |
7 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
1/12/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011N1062300610245 |
|
|
$71.51 |
000001079367-3562500636 |
2023 |
7 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
1/12/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011N1062300610245 |
|
|
$715.11 |
000001079367-3562500636 |
2023 |
7 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
1/12/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011N1062300610245 |
|
|
$4.97 |
000001079367-3562500636 |
2023 |
7 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
1/12/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011N1062300610245 |
|
|
$49.74 |
000001079367-3562500636 |
2023 |
7 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
1/12/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011N1062300610245 |
|
|
$55.79 |
000001079367-3562500636 |
2023 |
7 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
1/12/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011N1062300610245 |
|
|
$557.79 |
000001079367-3562500636 |
2023 |
7 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
1/12/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011N1062300610245 |
|
|
$18.28 |
000001079367-3562500636 |
2023 |
7 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
1/12/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011N1062300610245 |
|
|
$169.14 |
000001079367-3562500636 |
2023 |
7 |
FD04 |
10 |
E111 |
D |
4829102D |
097 |
1/9/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011N1062300610274 |
|
|
$407.94 |
000001085946-3562510200 |
2023 |
7 |
FD04 |
10 |
E111 |
D |
4829102D |
097 |
1/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011N1062300610274 |
|
|
$220.62 |
000001085946-3562510200 |
2023 |
7 |
FD04 |
10 |
E121 |
D |
4829102D |
097 |
1/9/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011N1062300610274 |
|
|
$30.39 |
000001085946-3562510200 |
2023 |
7 |
FD04 |
10 |
E121 |
D |
4829102D |
097 |
1/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011N1062300610274 |
|
|
$16.44 |
000001085946-3562510200 |
2023 |
7 |
FD04 |
10 |
E122 |
D |
4829102D |
097 |
1/9/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011N1062300610274 |
|
|
$317.98 |
000001085946-3562510200 |
2023 |
7 |
FD04 |
10 |
E122 |
D |
4829102D |
097 |
1/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011N1062300610274 |
|
|
$172.08 |
000001085946-3562510200 |
2023 |
7 |
FD04 |
10 |
E123 |
D |
4829102D |
097 |
1/9/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011N1062300610274 |
|
|
$44.60 |
000001085946-3562510200 |
2023 |
7 |
FD04 |
10 |
E123 |
D |
4829102D |
097 |
1/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011N1062300610274 |
|
|
$23.70 |
000001085946-3562510200 |
2023 |
6 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
12/12/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121M1062234208203 |
|
|
$35.71 |
000001079367-3562500636 |
2023 |
6 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
12/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121M1062234208203 |
|
|
$13.95 |
000001079367-3562500636 |
2023 |
6 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
12/12/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121M1062234208203 |
|
|
$2.49 |
000001079367-3562500636 |
2023 |
6 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
12/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121M1062234208203 |
|
|
$0.96 |
000001079367-3562500636 |
2023 |
6 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
12/12/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121M1062234208203 |
|
|
$27.89 |
000001079367-3562500636 |
2023 |
6 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
12/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121M1062234208203 |
|
|
$10.88 |
000001079367-3562500636 |
2023 |
6 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
12/12/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121M1062234208203 |
|
|
$7.52 |
000001079367-3562500636 |
2023 |
6 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
12/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121M1062234208203 |
|
|
$2.90 |
000001079367-3562500636 |
2023 |
5 |
FD04 |
10 |
E143 |
D |
4829102D |
097 |
11/30/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300097576 |
PON22200001263 |
HMB Engineers Inc |
$31,499.25 |
Perry Co. 10-269.2 |
2023 |
4 |
FD04 |
10 |
E143 |
D |
4829102D |
097 |
10/26/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300074982 |
PON22200001263 |
HMB Engineers Inc |
$13,333.68 |
Perry Co. 10-269.2 |
2023 |
2 |
FD04 |
10 |
E143 |
D |
4829102D |
097 |
8/25/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300023319 |
PON22200001263 |
HMB Engineers Inc |
$59,716.47 |
Perry Co. 10-269.2 |
2023 |
2 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
8/10/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR081M1062222110114 |
|
|
$124.20 |
000001079975-3562500061 |
2023 |
2 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
8/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081M1062222110114 |
|
|
$81.67 |
000001079975-3562500061 |
2023 |
2 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
8/10/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR081M1062222110114 |
|
|
$453.60 |
000001079975-3562500061 |
2023 |
2 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
8/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081M1062222110114 |
|
|
$302.40 |
000001079975-3562500061 |
2023 |
2 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
8/10/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR081M1062222110114 |
|
|
$30.41 |
000001079975-3562500061 |
2023 |
2 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
8/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081M1062222110114 |
|
|
$20.27 |
000001079975-3562500061 |
2023 |
2 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
8/10/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR081M1062222110114 |
|
|
$353.81 |
000001079975-3562500061 |
2023 |
2 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
8/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081M1062222110114 |
|
|
$235.87 |
000001079975-3562500061 |
2023 |
1 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
7/12/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR071M1062219207881 |
|
|
$227.50 |
000001081776-3562500061 |
2023 |
1 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207881 |
|
|
$22.75 |
000001081776-3562500061 |
2023 |
1 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
7/12/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR071M1062219207881 |
|
|
$16.71 |
000001081776-3562500061 |
2023 |
1 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207881 |
|
|
$1.67 |
000001081776-3562500061 |
2023 |
1 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
7/12/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR071M1062219207881 |
|
|
$191.03 |
000001081776-3562500061 |
2023 |
1 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207881 |
|
|
$19.10 |
000001081776-3562500061 |
2023 |
1 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
7/12/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR071M1062219207881 |
|
|
$32.18 |
000001081776-3562500061 |
2023 |
1 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207881 |
|
|
$3.17 |
000001081776-3562500061 |
2023 |
1 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
7/12/2022 |
0091 |
ENV STUDIES-ENV PROJ MGR (EPM) |
CA-XR071M1062219207903 |
|
|
$303.03 |
000001083461-3562500061 |
2023 |
1 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
7/12/2022 |
0091 |
ENV STUDIES-ENV PROJ MGR (EPM) |
CA-XR071M1062219207903 |
|
|
$22.35 |
000001083461-3562500061 |
2023 |
1 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
7/12/2022 |
0091 |
ENV STUDIES-ENV PROJ MGR (EPM) |
CA-XR071M1062219207903 |
|
|
$254.45 |
000001083461-3562500061 |
2023 |
1 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
7/12/2022 |
0091 |
ENV STUDIES-ENV PROJ MGR (EPM) |
CA-XR071M1062219207903 |
|
|
$64.28 |
000001083461-3562500061 |
2022 |
11 |
FD04 |
10 |
E143 |
D |
4829102D |
097 |
5/24/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200212488 |
PON22200001263 |
HMB Engineers Inc |
$19,764.75 |
Perry Co. 10-269.2 |
2022 |
11 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
5/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052M1062214004667 |
|
|
$122.32 |
000001079367-3562500636 |
2022 |
11 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
5/23/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR052M1062214004670 |
|
|
$420.00 |
000001079975-3562500061 |
2022 |
11 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
5/23/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR052M1062214004670 |
|
|
$29.08 |
000001079975-3562500061 |
2022 |
11 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
5/23/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR052M1062214004670 |
|
|
$352.67 |
000001079975-3562500061 |
2022 |
11 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
5/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052M1062214004667 |
|
|
$32.94 |
000001079367-3562500636 |
2022 |
11 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
5/23/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR052M1062214004670 |
|
|
$123.52 |
000001079975-3562500061 |
2022 |
11 |
FD04 |
00 |
E124 |
D |
4829102D |
097 |
5/23/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR052M1062214004670 |
|
|
$0.20 |
000001079975-3562500061 |
2022 |
11 |
FD04 |
00 |
E124 |
D |
4829102D |
097 |
5/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052M1062214004667 |
|
|
$0.05 |
000001079367-3562500636 |
2022 |
11 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
5/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052M1062214004666 |
|
|
$145.67 |
000001079367-3562500636 |
2022 |
11 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
5/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052M1062214004666 |
|
|
$10.33 |
000001079367-3562500636 |
2022 |
10 |
FD04 |
10 |
E143 |
D |
4829102D |
097 |
4/26/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200192849 |
PON22200001263 |
HMB Engineers Inc |
$102,973.33 |
Perry Co. 10-269.2 |
2022 |
10 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
4/11/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR041M1062209801488 |
|
|
$208.54 |
000001081776-3562500061 |
2022 |
10 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
4/11/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR041M1062209801488 |
|
|
$15.52 |
000001081776-3562500061 |
2022 |
10 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
4/11/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR041M1062209801488 |
|
|
$175.11 |
000001081776-3562500061 |
2022 |
10 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
4/11/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR041M1062209801488 |
|
|
$29.45 |
000001081776-3562500061 |
2022 |
9 |
FD04 |
10 |
E143 |
D |
4829102D |
097 |
3/31/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200176741 |
PON22200001263 |
HMB Engineers Inc |
$19,793.18 |
Perry Co. 10-269.2 |
2022 |
9 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
3/24/2022 |
0410 |
TRANSPORTATION PLANNING |
CA-XR032M1062208200425 |
|
|
$92.58 |
000001082045-3562500064 |
2022 |
9 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200425 |
|
|
$8.95 |
000001082045-3562500064 |
2022 |
9 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
3/24/2022 |
0410 |
TRANSPORTATION PLANNING |
CA-XR032M1062208200425 |
|
|
$7.01 |
000001082045-3562500064 |
2022 |
9 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200425 |
|
|
$0.68 |
000001082045-3562500064 |
2022 |
9 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
3/24/2022 |
0410 |
TRANSPORTATION PLANNING |
CA-XR032M1062208200425 |
|
|
$77.74 |
000001082045-3562500064 |
2022 |
9 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200425 |
|
|
$7.52 |
000001082045-3562500064 |
2022 |
9 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
3/24/2022 |
0410 |
TRANSPORTATION PLANNING |
CA-XR032M1062208200425 |
|
|
$12.87 |
000001082045-3562500064 |
2022 |
9 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200425 |
|
|
$1.23 |
000001082045-3562500064 |
2022 |
9 |
FD04 |
00 |
E124 |
D |
4829102D |
097 |
3/24/2022 |
0410 |
TRANSPORTATION PLANNING |
CA-XR032M1062208200425 |
|
|
$0.04 |
000001082045-3562500064 |
2022 |
9 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
3/24/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR032M1062208200413 |
|
|
$227.50 |
000001081776-3562500061 |
2022 |
9 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
3/24/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR032M1062208200413 |
|
|
$16.94 |
000001081776-3562500061 |
2022 |
9 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
3/24/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR032M1062208200413 |
|
|
$191.03 |
000001081776-3562500061 |
2022 |
9 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
3/24/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR032M1062208200413 |
|
|
$32.13 |
000001081776-3562500061 |
2022 |
9 |
FD04 |
00 |
E124 |
D |
4829102D |
097 |
3/24/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR032M1062208200413 |
|
|
$0.09 |
000001081776-3562500061 |
2022 |
9 |
FD04 |
10 |
E143 |
D |
4829102D |
097 |
3/21/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200167856 |
PON22200000987 |
HDR ENGINEERING INC |
$16,229.52 |
Letter Agreement 1 |
2022 |
9 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
3/9/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031M1062206709457 |
|
|
$465.34 |
000001079367-3562500636 |
2022 |
9 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
3/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709457 |
|
|
$35.20 |
000001079367-3562500636 |
2022 |
9 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
3/9/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031M1062206709457 |
|
|
$32.99 |
000001079367-3562500636 |
2022 |
9 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
3/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709457 |
|
|
$2.49 |
000001079367-3562500636 |
2022 |
9 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
3/9/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031M1062206709457 |
|
|
$390.75 |
000001079367-3562500636 |
2022 |
9 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
3/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709457 |
|
|
$29.56 |
000001079367-3562500636 |
2022 |
9 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
3/9/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031M1062206709457 |
|
|
$105.28 |
000001079367-3562500636 |
2022 |
9 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
3/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709457 |
|
|
$7.89 |
000001079367-3562500636 |
2022 |
8 |
FD04 |
10 |
E143 |
D |
4829102D |
097 |
2/25/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200152600 |
PON22200000987 |
HDR ENGINEERING INC |
$45,752.48 |
Letter Agreement 1 |
2022 |
8 |
FD04 |
10 |
E143 |
D |
4829102D |
097 |
2/25/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200153030 |
PON22200001263 |
HMB Engineers Inc |
$43,233.75 |
Perry Co. 10-269.2 |
2022 |
8 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
2/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022M1062205308417 |
|
|
$7.79 |
000001079367-3562500636 |
2022 |
8 |
FD04 |
00 |
E124 |
D |
4829102D |
097 |
2/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022M1062205308417 |
|
|
$0.13 |
000001079367-3562500636 |
2022 |
8 |
FD04 |
00 |
E124 |
D |
4829102D |
097 |
2/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022M1062205308417 |
|
|
$0.01 |
000001079367-3562500636 |
2022 |
8 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
2/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022M1062205308417 |
|
|
$347.62 |
000001079367-3562500636 |
2022 |
8 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
2/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022M1062205308417 |
|
|
$34.76 |
000001079367-3562500636 |
2022 |
8 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
2/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022M1062205308417 |
|
|
$24.65 |
000001079367-3562500636 |
2022 |
8 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
2/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022M1062205308417 |
|
|
$2.47 |
000001079367-3562500636 |
2022 |
8 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
2/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022M1062205308417 |
|
|
$291.90 |
000001079367-3562500636 |
2022 |
8 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
2/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022M1062205308417 |
|
|
$29.19 |
000001079367-3562500636 |
2022 |
8 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
2/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022M1062205308417 |
|
|
$78.66 |
000001079367-3562500636 |
2022 |
8 |
FD04 |
00 |
E143 |
D |
4829102D |
097 |
2/2/2022 |
0410 |
TRANSPORTATION PLANNING |
PRC-2200133731 |
PON22000004360 |
HMB Engineers Inc |
$3,783.80 |
Letter Agreement F-04 Lee Co. |
2022 |
7 |
FD04 |
10 |
E143 |
D |
4829102D |
097 |
1/26/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200130395 |
PON22200001263 |
HMB Engineers Inc |
$53,213.87 |
Perry Co. 10-269.2 |
2022 |
7 |
FD04 |
00 |
E143 |
D |
4829102D |
097 |
1/11/2022 |
0410 |
TRANSPORTATION PLANNING |
PRC-2200108803 |
PON22000004360 |
HMB Engineers Inc |
$15,135.20 |
1P/LA #F-04 10-269.2/097 |
2022 |
6 |
FD04 |
10 |
E143 |
D |
4829102D |
097 |
12/20/2021 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200108353 |
PON22200001263 |
HMB Engineers Inc |
$15,749.62 |
Perry Co. 10-269.2 |
2022 |
6 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
12/8/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121L1062134103560 |
|
|
$264.86 |
000001079367-3562500636 |
2022 |
6 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
12/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103560 |
|
|
$84.76 |
000001079367-3562500636 |
2022 |
6 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
12/8/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121L1062134103560 |
|
|
$18.37 |
000001079367-3562500636 |
2022 |
6 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
12/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103560 |
|
|
$5.88 |
000001079367-3562500636 |
2022 |
6 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
12/8/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121L1062134103560 |
|
|
$222.40 |
000001079367-3562500636 |
2022 |
6 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
12/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103560 |
|
|
$71.17 |
000001079367-3562500636 |
2022 |
6 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
12/8/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121L1062134103560 |
|
|
$57.16 |
000001079367-3562500636 |
2022 |
6 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
12/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103560 |
|
|
$18.08 |
000001079367-3562500636 |
2022 |
6 |
FD04 |
10 |
E143 |
D |
4829102D |
097 |
12/1/2021 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200090735 |
PON22200001263 |
HMB Engineers Inc |
$18,322.75 |
Perry Co. 10-269.2 |
2022 |
5 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
11/29/2021 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR112L1062132602532 |
|
|
$5.65 |
000001079748-3562500610 |
2022 |
5 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
11/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602532 |
|
|
$0.57 |
000001079748-3562500610 |
2022 |
5 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
11/29/2021 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR112L1062132602532 |
|
|
$71.81 |
000001079748-3562500610 |
2022 |
5 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
11/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602532 |
|
|
$7.18 |
000001079748-3562500610 |
2022 |
5 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
11/29/2021 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR112L1062132602532 |
|
|
$14.27 |
000001079748-3562500610 |
2022 |
5 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
11/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602532 |
|
|
$1.41 |
000001079748-3562500610 |
2022 |
5 |
FD04 |
00 |
E124 |
D |
4829102D |
097 |
11/29/2021 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR112L1062132602532 |
|
|
$0.02 |
000001079748-3562500610 |
2022 |
5 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
11/29/2021 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR112L1062132602532 |
|
|
$85.52 |
000001079748-3562500610 |
2022 |
5 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
11/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602532 |
|
|
$8.55 |
000001079748-3562500610 |
2022 |
5 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
11/23/2021 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR112L1062132602534 |
|
|
$323.07 |
000001079975-3562500061 |
2022 |
5 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
11/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602534 |
|
|
$71.96 |
000001079975-3562500061 |
2022 |
5 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
11/23/2021 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR112L1062132602534 |
|
|
$21.52 |
000001079975-3562500061 |
2022 |
5 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
11/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602534 |
|
|
$4.78 |
000001079975-3562500061 |
2022 |
5 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
11/23/2021 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR112L1062132602534 |
|
|
$271.36 |
000001079975-3562500061 |
2022 |
5 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
11/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602534 |
|
|
$60.42 |
000001079975-3562500061 |
2022 |
5 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
11/23/2021 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR112L1062132602534 |
|
|
$99.82 |
000001079975-3562500061 |
2022 |
5 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
11/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602534 |
|
|
$21.98 |
000001079975-3562500061 |
2022 |
5 |
FD04 |
00 |
E124 |
D |
4829102D |
097 |
11/23/2021 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR112L1062132602534 |
|
|
$0.18 |
000001079975-3562500061 |
2022 |
5 |
FD04 |
00 |
E124 |
D |
4829102D |
097 |
11/23/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602534 |
|
|
$0.04 |
000001079975-3562500061 |
2022 |
5 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
11/8/2021 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR111L1062130901524 |
|
|
$505.65 |
000001079748-3562500610 |
2022 |
5 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
11/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111L1062130901524 |
|
|
$32.46 |
000001079748-3562500610 |
2022 |
5 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
11/8/2021 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR111L1062130901524 |
|
|
$32.84 |
000001079748-3562500610 |
2022 |
5 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
11/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111L1062130901524 |
|
|
$2.11 |
000001079748-3562500610 |
2022 |
5 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
11/8/2021 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR111L1062130901524 |
|
|
$424.59 |
000001079748-3562500610 |
2022 |
5 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
11/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111L1062130901524 |
|
|
$27.26 |
000001079748-3562500610 |
2022 |
5 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
11/8/2021 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR111L1062130901524 |
|
|
$84.32 |
000001079748-3562500610 |
2022 |
5 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
11/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111L1062130901524 |
|
|
$5.36 |
000001079748-3562500610 |
2022 |
5 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
11/8/2021 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR111L1062130901525 |
|
|
$355.47 |
000001079975-3562500061 |
2022 |
5 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
11/8/2021 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR111L1062130901525 |
|
|
$22.39 |
000001079975-3562500061 |
2022 |
5 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
11/8/2021 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR111L1062130901525 |
|
|
$298.49 |
000001079975-3562500061 |
2022 |
5 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
11/8/2021 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR111L1062130901525 |
|
|
$109.58 |
000001079975-3562500061 |
2022 |
4 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
10/25/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR102L1062129500419 |
|
|
$297.93 |
000001079367-3562500636 |
2022 |
4 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500419 |
|
|
$15.23 |
000001079367-3562500636 |
2022 |
4 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
10/25/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR102L1062129500419 |
|
|
$21.21 |
000001079367-3562500636 |
2022 |
4 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500419 |
|
|
$1.09 |
000001079367-3562500636 |
2022 |
4 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
10/25/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR102L1062129500419 |
|
|
$250.21 |
000001079367-3562500636 |
2022 |
4 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500419 |
|
|
$12.79 |
000001079367-3562500636 |
2022 |
4 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
10/25/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR102L1062129500419 |
|
|
$64.16 |
000001079367-3562500636 |
2022 |
4 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500419 |
|
|
$3.25 |
000001079367-3562500636 |
2022 |
4 |
FD04 |
00 |
E124 |
D |
4829102D |
097 |
10/25/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR102L1062129500419 |
|
|
$0.11 |
000001079367-3562500636 |
2022 |
4 |
FD04 |
00 |
E124 |
D |
4829102D |
097 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500419 |
|
|
$0.01 |
000001079367-3562500636 |
2022 |
4 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
10/25/2021 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR102L1062129500427 |
|
|
$161.58 |
000001079975-3562500061 |
2022 |
4 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
10/25/2021 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR102L1062129500427 |
|
|
$10.76 |
000001079975-3562500061 |
2022 |
4 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
10/25/2021 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR102L1062129500427 |
|
|
$135.65 |
000001079975-3562500061 |
2022 |
4 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
10/25/2021 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR102L1062129500427 |
|
|
$49.80 |
000001079975-3562500061 |
2022 |
4 |
FD04 |
00 |
E124 |
D |
4829102D |
097 |
10/25/2021 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR102L1062129500427 |
|
|
$0.10 |
000001079975-3562500061 |
2022 |
4 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
10/25/2021 |
0060 |
ENV STUDIES-ARCHAEOLOGY |
CA-XR102L1062129500427 |
|
|
$280.85 |
000001079977-3562500061 |
2022 |
4 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500427 |
|
|
$36.39 |
000001079977-3562500061 |
2022 |
4 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
10/25/2021 |
0060 |
ENV STUDIES-ARCHAEOLOGY |
CA-XR102L1062129500427 |
|
|
$21.18 |
000001079977-3562500061 |
2022 |
4 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500427 |
|
|
$2.75 |
000001079977-3562500061 |
2022 |
4 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
10/25/2021 |
0060 |
ENV STUDIES-ARCHAEOLOGY |
CA-XR102L1062129500427 |
|
|
$235.79 |
000001079977-3562500061 |
2022 |
4 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500427 |
|
|
$30.55 |
000001079977-3562500061 |
2022 |
4 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
10/25/2021 |
0060 |
ENV STUDIES-ARCHAEOLOGY |
CA-XR102L1062129500427 |
|
|
$52.37 |
000001079977-3562500061 |
2022 |
4 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500427 |
|
|
$6.67 |
000001079977-3562500061 |
2022 |
4 |
FD04 |
00 |
E124 |
D |
4829102D |
097 |
10/25/2021 |
0060 |
ENV STUDIES-ARCHAEOLOGY |
CA-XR102L1062129500427 |
|
|
$0.15 |
000001079977-3562500061 |
2022 |
4 |
FD04 |
00 |
E124 |
D |
4829102D |
097 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500427 |
|
|
$0.02 |
000001079977-3562500061 |
2022 |
4 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
10/25/2021 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR102L1062129500427 |
|
|
$554.09 |
000001079978-3562500061 |
2022 |
4 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500427 |
|
|
$247.96 |
000001079978-3562500061 |
2022 |
4 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
10/25/2021 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR102L1062129500427 |
|
|
$40.84 |
000001079978-3562500061 |
2022 |
4 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500427 |
|
|
$18.28 |
000001079978-3562500061 |
2022 |
4 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
10/25/2021 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR102L1062129500427 |
|
|
$465.27 |
000001079978-3562500061 |
2022 |
4 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500427 |
|
|
$208.21 |
000001079978-3562500061 |
2022 |
4 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
10/25/2021 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR102L1062129500427 |
|
|
$50.51 |
000001079978-3562500061 |
2022 |
4 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500427 |
|
|
$22.13 |
000001079978-3562500061 |
2022 |
4 |
FD04 |
00 |
E124 |
D |
4829102D |
097 |
10/25/2021 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR102L1062129500427 |
|
|
$0.15 |
000001079978-3562500061 |
2022 |
4 |
FD04 |
00 |
E124 |
D |
4829102D |
097 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500427 |
|
|
$0.07 |
000001079978-3562500061 |
2022 |
4 |
FD04 |
10 |
E111 |
D |
4829102D |
097 |
10/14/2021 |
0410 |
TRANSPORTATION PLANNING |
CA-XR101L1062128110152 |
|
|
$197.57 |
000001079968-3562500064 |
2022 |
4 |
FD04 |
10 |
E121 |
D |
4829102D |
097 |
10/14/2021 |
0410 |
TRANSPORTATION PLANNING |
CA-XR101L1062128110152 |
|
|
$15.11 |
000001079968-3562500064 |
2022 |
4 |
FD04 |
10 |
E122 |
D |
4829102D |
097 |
10/14/2021 |
0410 |
TRANSPORTATION PLANNING |
CA-XR101L1062128110152 |
|
|
$165.90 |
000001079968-3562500064 |
2022 |
4 |
FD04 |
10 |
E123 |
D |
4829102D |
097 |
10/14/2021 |
0410 |
TRANSPORTATION PLANNING |
CA-XR101L1062128110152 |
|
|
$5.05 |
000001079968-3562500064 |
2022 |
4 |
FD04 |
10 |
E229 |
D |
4829102D |
097 |
10/12/2021 |
0410 |
TRANSPORTATION PLANNING |
IET-XE13A162521283014890 |
|
|
$23.00 |
|
2022 |
3 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
9/30/2021 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR092L1062126709072 |
|
|
$204.90 |
000001079744-3562500636 |
2022 |
3 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
9/30/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092L1062126709072 |
|
|
$94.28 |
000001079744-3562500636 |
2022 |
3 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
9/30/2021 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR092L1062126709072 |
|
|
$14.53 |
000001079744-3562500636 |
2022 |
3 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
9/30/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092L1062126709072 |
|
|
$6.68 |
000001079744-3562500636 |
2022 |
3 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
9/30/2021 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR092L1062126709072 |
|
|
$172.10 |
000001079744-3562500636 |
2022 |
3 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
9/30/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092L1062126709072 |
|
|
$79.16 |
000001079744-3562500636 |
2022 |
3 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
9/27/2021 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR092L1062126709073 |
|
|
$46.51 |
000001079744-3562500636 |
2022 |
3 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
9/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092L1062126709073 |
|
|
$21.13 |
000001079744-3562500636 |
2022 |
3 |
FD04 |
00 |
E124 |
D |
4829102D |
097 |
9/27/2021 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR092L1062126709073 |
|
|
$0.08 |
000001079744-3562500636 |
2022 |
3 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
9/27/2021 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR092L1062126709073 |
|
|
$160.51 |
000001079748-3562500610 |
2022 |
3 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
9/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092L1062126709073 |
|
|
$43.62 |
000001079748-3562500610 |
2022 |
3 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
9/27/2021 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR092L1062126709073 |
|
|
$10.60 |
000001079748-3562500610 |
2022 |
3 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
9/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092L1062126709073 |
|
|
$2.88 |
000001079748-3562500610 |
2022 |
3 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
9/27/2021 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR092L1062126709073 |
|
|
$134.66 |
000001079748-3562500610 |
2022 |
3 |
FD04 |
00 |
E124 |
D |
4829102D |
097 |
9/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092L1062126709073 |
|
|
$0.04 |
000001079744-3562500636 |
2022 |
3 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
9/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092L1062126709073 |
|
|
$36.63 |
000001079748-3562500610 |
2022 |
3 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
9/27/2021 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR092L1062126709073 |
|
|
$26.79 |
000001079748-3562500610 |
2022 |
3 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
9/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092L1062126709073 |
|
|
$7.21 |
000001079748-3562500610 |
2022 |
3 |
FD04 |
00 |
E124 |
D |
4829102D |
097 |
9/27/2021 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR092L1062126709073 |
|
|
$0.05 |
000001079748-3562500610 |
2022 |
3 |
FD04 |
00 |
E124 |
D |
4829102D |
097 |
9/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092L1062126709073 |
|
|
$0.02 |
000001079748-3562500610 |
2022 |
2 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
8/27/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082L1062123607001 |
|
|
$138.74 |
000001079367-3562500636 |
2022 |
2 |
FD04 |
00 |
E111 |
D |
4829102D |
097 |
8/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082L1062123607001 |
|
|
$246.95 |
000001079367-3562500636 |
2022 |
2 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
8/27/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082L1062123607001 |
|
|
$9.83 |
000001079367-3562500636 |
2022 |
2 |
FD04 |
00 |
E121 |
D |
4829102D |
097 |
8/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082L1062123607001 |
|
|
$17.51 |
000001079367-3562500636 |
2022 |
2 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
8/27/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082L1062123607001 |
|
|
$116.49 |
000001079367-3562500636 |
2022 |
2 |
FD04 |
00 |
E122 |
D |
4829102D |
097 |
8/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082L1062123607001 |
|
|
$207.37 |
000001079367-3562500636 |
2022 |
2 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
8/27/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082L1062123607001 |
|
|
$31.84 |
000001079367-3562500636 |
2022 |
2 |
FD04 |
00 |
E123 |
D |
4829102D |
097 |
8/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082L1062123607001 |
|
|
$55.32 |
000001079367-3562500636 |
2022 |
2 |
FD04 |
00 |
E124 |
D |
4829102D |
097 |
8/27/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082L1062123607001 |
|
|
$0.05 |
000001079367-3562500636 |
2022 |
2 |
FD04 |
00 |
E124 |
D |
4829102D |
097 |
8/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082L1062123607001 |
|
|
$0.09 |
000001079367-3562500636 |