The Commonwealth pays employees on a semi-monthly basis with a scheduled pay day on the 15th and 30th of each month. The two monthly pay periods are from the 1st to the 15th of the month and the 16th through the last day of the month. Pay check distribution is delayed by one pay period to allow for system processing. For example work performed during the 1st to the 15th day of the month is paid to the employee on the 30th of the month. Accordingly the cost accounting charges for labor costs posting in eMARS to operating accounts and highway projects are also delayed by approximately one pay period.
A good rule of measure is that the cost accounting charges for the pay period ending on the 15th of the month will post to eMARS by the 25th and those for the pay period ending on the last day of the month will post to eMARS by the 10th of the following month.

x close panel
Detailed Project Expenditure Report
Total E-MARS Expenditures for 1358001D = $1,005,100.50
Click here for Labor Costs Information
Year Month PBU Charge District Object Phase Program Code County Date ACT Activity Name Trans ID Reference # Vendor Name Expenditure Line Description
2024 10 FD04 00 E111 D 1358001D 018 4/26/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR042O1062411502759 $260.44 000001088093-3562500061
2024 10 FD04 00 E111 D 1358001D 018 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502759 $14.93 000001088093-3562500061
2024 10 FD04 00 E121 D 1358001D 018 4/26/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR042O1062411502759 $19.46 000001088093-3562500061
2024 10 FD04 00 E121 D 1358001D 018 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502759 $1.11 000001088093-3562500061
2024 10 FD04 00 E122 D 1358001D 018 4/26/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR042O1062411502759 $172.33 000001088093-3562500061
2024 10 FD04 00 E122 D 1358001D 018 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502759 $9.88 000001088093-3562500061
2024 10 FD04 00 E123 D 1358001D 018 4/26/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR042O1062411502759 $40.37 000001088093-3562500061
2024 10 FD04 00 E123 D 1358001D 018 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502759 $2.29 000001088093-3562500061
2024 10 FD04 00 E124 D 1358001D 018 4/26/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR042O1062411502759 $0.09 000001088093-3562500061
2024 10 FD04 00 E124 D 1358001D 018 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502759 $0.01 000001088093-3562500061
2024 10 FD04 00 E123 D 1358001D 018 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001643 $4.74 000001088093-3562500061
2024 10 FD04 00 E111 D 1358001D 018 4/10/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR041O1062410001642 $219.54 000001088093-3562500061
2024 10 FD04 00 E111 D 1358001D 018 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001642 $30.95 000001088093-3562500061
2024 10 FD04 00 E121 D 1358001D 018 4/10/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR041O1062410001642 $16.20 000001088093-3562500061
2024 10 FD04 00 E121 D 1358001D 018 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001642 $2.29 000001088093-3562500061
2024 10 FD04 00 E122 D 1358001D 018 4/10/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR041O1062410001642 $145.34 000001088093-3562500061
2024 10 FD04 00 E122 D 1358001D 018 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001642 $20.48 000001088093-3562500061
2024 10 FD04 00 E123 D 1358001D 018 4/10/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR041O1062410001642 $34.08 000001088093-3562500061
2024 9 FD04 01 E143 D 1358001D 018 3/11/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400176397 PON22200001225 STRAND ASSOCIATES INC $2,610.64 Calloway County 1-8952
2024 9 FD04 00 E111 D 1358001D 018 3/11/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR031O1062406810087 $105.01 000001087906-3562500636
2024 9 FD04 00 E121 D 1358001D 018 3/11/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR031O1062406810087 $7.87 000001087906-3562500636
2024 9 FD04 00 E122 D 1358001D 018 3/11/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR031O1062406810087 $69.46 000001087906-3562500636
2024 9 FD04 00 E123 D 1358001D 018 3/11/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR031O1062406810087 $11.84 000001087906-3562500636
2024 8 FD04 01 E143 D 1358001D 018 2/8/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400138320 PON22200001225 STRAND ASSOCIATES INC $1,300.12 Calloway County 1-8952
2024 8 FD04 01 E143 D 1358001D 018 2/8/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400150847 PON22200001225 STRAND ASSOCIATES INC $40,010.00 Calloway County 1-8952
2024 7 FD04 01 E111 D 1358001D 018 1/24/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR012O1062402306607 $88.45 000001087907-3560700500
2024 7 FD04 01 E111 D 1358001D 018 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306607 $19.45 000001087907-3560700500
2024 7 FD04 01 E121 D 1358001D 018 1/24/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR012O1062402306607 $6.48 000001087907-3560700500
2024 7 FD04 01 E121 D 1358001D 018 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306607 $1.42 000001087907-3560700500
2024 7 FD04 01 E122 D 1358001D 018 1/24/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR012O1062402306607 $58.78 000001087907-3560700500
2024 7 FD04 01 E122 D 1358001D 018 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306607 $12.87 000001087907-3560700500
2024 7 FD04 01 E123 D 1358001D 018 1/24/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR012O1062402306607 $10.62 000001087907-3560700500
2024 7 FD04 01 E123 D 1358001D 018 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306607 $2.29 000001087907-3560700500
2024 7 FD04 01 E124 D 1358001D 018 1/24/2024 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR012O1062402306607 $0.01 000001087907-3560700500
2024 7 FD04 01 E124 D 1358001D 018 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306607 $0.01 000001087907-3560700500
2024 6 FD04 00 E111 D 1358001D 018 12/22/2023 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR122N1062335504627 $477.64 000001087071-3562500610
2024 6 FD04 00 E111 D 1358001D 018 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504627 $47.76 000001087071-3562500610
2024 6 FD04 00 E121 D 1358001D 018 12/22/2023 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR122N1062335504627 $35.77 000001087071-3562500610
2024 6 FD04 00 E121 D 1358001D 018 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504627 $3.58 000001087071-3562500610
2024 6 FD04 00 E122 D 1358001D 018 12/22/2023 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR122N1062335504627 $316.06 000001087071-3562500610
2024 6 FD04 00 E122 D 1358001D 018 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504627 $31.60 000001087071-3562500610
2024 6 FD04 00 E123 D 1358001D 018 12/22/2023 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR122N1062335504627 $45.07 000001087071-3562500610
2024 6 FD04 00 E123 D 1358001D 018 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504627 $4.46 000001087071-3562500610
2024 6 FD04 00 E124 D 1358001D 018 12/22/2023 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR122N1062335504627 $0.09 000001087071-3562500610
2024 6 FD04 00 E124 D 1358001D 018 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504627 $0.01 000001087071-3562500610
2024 6 FD04 01 E111 D 1358001D 018 12/22/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR122N1062335504633 $489.20 000001087907-3560700500
2024 6 FD04 01 E111 D 1358001D 018 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504633 $108.49 000001087907-3560700500
2024 6 FD04 01 E121 D 1358001D 018 12/22/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR122N1062335504633 $36.74 000001087907-3560700500
2024 6 FD04 01 E121 D 1358001D 018 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504633 $8.14 000001087907-3560700500
2024 6 FD04 01 E122 D 1358001D 018 12/22/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR122N1062335504633 $323.65 000001087907-3560700500
2024 6 FD04 01 E122 D 1358001D 018 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504633 $71.79 000001087907-3560700500
2024 6 FD04 01 E123 D 1358001D 018 12/22/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR122N1062335504633 $75.70 000001087907-3560700500
2024 6 FD04 01 E123 D 1358001D 018 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504633 $16.51 000001087907-3560700500
2024 6 FD04 01 E124 D 1358001D 018 12/22/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR122N1062335504633 $0.20 000001087907-3560700500
2024 6 FD04 01 E124 D 1358001D 018 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504633 $0.04 000001087907-3560700500
2024 6 FD04 01 E143 D 1358001D 018 12/18/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400102971 PON22200001225 STRAND ASSOCIATES INC $3,158.16 Calloway County 1-8952
2024 5 FD04 00 E111 D 1358001D 018 11/9/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR111N1062331201498 $87.51 000001087906-3562500636
2024 5 FD04 00 E111 D 1358001D 018 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201498 $5.69 000001087906-3562500636
2024 5 FD04 00 E121 D 1358001D 018 11/9/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR111N1062331201498 $6.56 000001087906-3562500636
2024 5 FD04 00 E121 D 1358001D 018 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201498 $0.43 000001087906-3562500636
2024 5 FD04 00 E122 D 1358001D 018 11/9/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR111N1062331201498 $57.91 000001087906-3562500636
2024 5 FD04 00 E122 D 1358001D 018 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201498 $3.77 000001087906-3562500636
2024 5 FD04 00 E123 D 1358001D 018 11/9/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR111N1062331201498 $8.56 000001087906-3562500636
2024 5 FD04 00 E123 D 1358001D 018 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201498 $0.55 000001087906-3562500636
2024 5 FD04 01 E143 D 1358001D 018 11/8/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400087259 PON22200001225 STRAND ASSOCIATES INC $1,908.22 Calloway County 1-8952
2024 4 FD04 00 E111 D 1358001D 018 10/30/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR102N1062329600441 $286.56 000001088093-3562500061
2024 4 FD04 00 E111 D 1358001D 018 10/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102N1062329600441 $74.49 000001088093-3562500061
2024 4 FD04 00 E111 D 1358001D 018 10/30/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR102N1062329600438 $78.76 000001087906-3562500636
2024 4 FD04 00 E121 D 1358001D 018 10/30/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR102N1062329600441 $21.41 000001088093-3562500061
2024 4 FD04 00 E111 D 1358001D 018 10/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102N1062329600438 $5.78 000001087906-3562500636
2024 4 FD04 00 E121 D 1358001D 018 10/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102N1062329600441 $5.56 000001088093-3562500061
2024 4 FD04 00 E121 D 1358001D 018 10/30/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR102N1062329600438 $5.98 000001087906-3562500636
2024 4 FD04 00 E122 D 1358001D 018 10/30/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR102N1062329600441 $189.57 000001088093-3562500061
2024 4 FD04 00 E121 D 1358001D 018 10/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102N1062329600438 $0.44 000001087906-3562500636
2024 4 FD04 00 E122 D 1358001D 018 10/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102N1062329600441 $49.29 000001088093-3562500061
2024 4 FD04 00 E122 D 1358001D 018 10/30/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR102N1062329600438 $52.12 000001087906-3562500636
2024 4 FD04 00 E123 D 1358001D 018 10/30/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR102N1062329600441 $38.62 000001088093-3562500061
2024 4 FD04 00 E122 D 1358001D 018 10/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102N1062329600438 $3.83 000001087906-3562500636
2024 4 FD04 00 E123 D 1358001D 018 10/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102N1062329600441 $9.87 000001088093-3562500061
2024 4 FD04 00 E123 D 1358001D 018 10/30/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR102N1062329600438 $7.71 000001087906-3562500636
2024 4 FD04 00 E124 D 1358001D 018 10/30/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR102N1062329600441 $0.10 000001088093-3562500061
2024 4 FD04 00 E123 D 1358001D 018 10/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102N1062329600438 $0.56 000001087906-3562500636
2024 4 FD04 00 E124 D 1358001D 018 10/30/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102N1062329600441 $0.03 000001088093-3562500061
2024 4 FD04 00 E124 D 1358001D 018 10/30/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR102N1062329600438 $0.02 000001087906-3562500636
2024 4 FD04 01 E111 D 1358001D 018 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009712 $2.21 000001087907-3560700500
2024 4 FD04 01 E121 D 1358001D 018 10/9/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR101N1062328009712 $8.16 000001087907-3560700500
2024 4 FD04 01 E121 D 1358001D 018 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009712 $0.16 000001087907-3560700500
2024 4 FD04 01 E122 D 1358001D 018 10/9/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR101N1062328009712 $73.11 000001087907-3560700500
2024 4 FD04 01 E122 D 1358001D 018 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009712 $1.46 000001087907-3560700500
2024 4 FD04 01 E123 D 1358001D 018 10/9/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR101N1062328009712 $12.83 000001087907-3560700500
2024 4 FD04 01 E123 D 1358001D 018 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009712 $0.25 000001087907-3560700500
2024 4 FD04 00 E111 D 1358001D 018 10/9/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR101N1062328009712 $661.13 000001087929-3562500061
2024 4 FD04 00 E121 D 1358001D 018 10/9/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR101N1062328009712 $49.17 000001087929-3562500061
2024 4 FD04 00 E122 D 1358001D 018 10/9/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR101N1062328009712 $437.47 000001087929-3562500061
2024 4 FD04 00 E123 D 1358001D 018 10/9/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR101N1062328009712 $115.46 000001087929-3562500061
2024 4 FD04 00 E111 D 1358001D 018 10/9/2023 0060 ENV STUDIES-ARCHAEOLOGY CA-XR101N1062328009695 $2,170.36 000001084331-3562500061
2024 4 FD04 00 E121 D 1358001D 018 10/9/2023 0060 ENV STUDIES-ARCHAEOLOGY CA-XR101N1062328009695 $158.01 000001084331-3562500061
2024 4 FD04 00 E122 D 1358001D 018 10/9/2023 0060 ENV STUDIES-ARCHAEOLOGY CA-XR101N1062328009695 $1,436.13 000001084331-3562500061
2024 4 FD04 00 E123 D 1358001D 018 10/9/2023 0060 ENV STUDIES-ARCHAEOLOGY CA-XR101N1062328009695 $344.08 000001084331-3562500061
2024 4 FD04 01 E111 D 1358001D 018 10/9/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR101N1062328009712 $110.60 000001087907-3560700500
2024 3 FD04 00 E111 D 1358001D 018 9/29/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092N1062327208437 $95.38 000001087906-3562500636
2024 3 FD04 00 E111 D 1358001D 018 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208437 $109.30 000001087906-3562500636
2024 3 FD04 00 E121 D 1358001D 018 9/29/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092N1062327208437 $7.25 000001087906-3562500636
2024 3 FD04 00 E121 D 1358001D 018 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208437 $8.32 000001087906-3562500636
2024 3 FD04 00 E122 D 1358001D 018 9/29/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092N1062327208437 $62.88 000001087906-3562500636
2024 3 FD04 00 E122 D 1358001D 018 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208437 $72.32 000001087906-3562500636
2024 3 FD04 00 E123 D 1358001D 018 9/29/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092N1062327208437 $9.43 000001087906-3562500636
2024 3 FD04 00 E123 D 1358001D 018 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208437 $10.53 000001087906-3562500636
2024 3 FD04 00 E124 D 1358001D 018 9/29/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092N1062327208437 $0.06 000001087906-3562500636
2024 3 FD04 00 E124 D 1358001D 018 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208437 $0.02 000001087906-3562500636
2024 3 FD04 00 E111 D 1358001D 018 9/28/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092N1062326507086 ($95.38) 000001087906-3562500636
2024 3 FD04 00 E111 D 1358001D 018 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507086 ($109.30) 000001087906-3562500636
2024 3 FD04 00 E121 D 1358001D 018 9/28/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092N1062326507086 ($7.25) 000001087906-3562500636
2024 3 FD04 00 E121 D 1358001D 018 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507086 ($8.32) 000001087906-3562500636
2024 3 FD04 00 E122 D 1358001D 018 9/28/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092N1062326507086 ($62.88) 000001087906-3562500636
2024 3 FD04 00 E122 D 1358001D 018 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507086 ($72.32) 000001087906-3562500636
2024 3 FD04 00 E123 D 1358001D 018 9/28/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092N1062326507086 ($9.43) 000001087906-3562500636
2024 3 FD04 00 E123 D 1358001D 018 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507086 ($10.53) 000001087906-3562500636
2024 3 FD04 00 E124 D 1358001D 018 9/28/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092N1062326507086 ($0.06) 000001087906-3562500636
2024 3 FD04 00 E124 D 1358001D 018 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507086 ($0.02) 000001087906-3562500636
2024 3 FD04 00 E111 D 1358001D 018 9/25/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092N1062326507086 $95.38 000001087906-3562500636
2024 3 FD04 00 E111 D 1358001D 018 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507086 $109.30 000001087906-3562500636
2024 3 FD04 00 E121 D 1358001D 018 9/25/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092N1062326507086 $7.25 000001087906-3562500636
2024 3 FD04 00 E121 D 1358001D 018 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507086 $8.32 000001087906-3562500636
2024 3 FD04 00 E122 D 1358001D 018 9/25/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092N1062326507086 $62.88 000001087906-3562500636
2024 3 FD04 00 E122 D 1358001D 018 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507086 $72.32 000001087906-3562500636
2024 3 FD04 00 E123 D 1358001D 018 9/25/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092N1062326507086 $9.43 000001087906-3562500636
2024 3 FD04 00 E123 D 1358001D 018 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507086 $10.53 000001087906-3562500636
2024 3 FD04 00 E124 D 1358001D 018 9/25/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092N1062326507086 $0.06 000001087906-3562500636
2024 3 FD04 00 E124 D 1358001D 018 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507086 $0.02 000001087906-3562500636
2024 3 FD04 01 E143 D 1358001D 018 9/18/2023 0510 ENV STUDIES-UST/HZM PRC-2400049309 PON22200004656 FRANKLIN PRICE INC $3,358.50 Letter Agreement 46-CHC
2024 3 FD04 00 E111 D 1358001D 018 9/11/2023 0010 ENV STUDIES-UST/HZM CA-XR091N1062325106119 $54.71 000001088264-3562500061
2024 3 FD04 00 E121 D 1358001D 018 9/11/2023 0010 ENV STUDIES-UST/HZM CA-XR091N1062325106119 $3.89 000001088264-3562500061
2024 3 FD04 00 E122 D 1358001D 018 9/11/2023 0010 ENV STUDIES-UST/HZM CA-XR091N1062325106119 $36.19 000001088264-3562500061
2024 3 FD04 00 E123 D 1358001D 018 9/11/2023 0010 ENV STUDIES-UST/HZM CA-XR091N1062325106119 $10.63 000001088264-3562500061
2024 3 FD04 01 E111 D 1358001D 018 9/11/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR091N1062325106115 $55.25 000001087907-3560700500
2024 3 FD04 01 E111 D 1358001D 018 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106115 $2.21 000001087907-3560700500
2024 3 FD04 01 E121 D 1358001D 018 9/11/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR091N1062325106115 $4.07 000001087907-3560700500
2024 3 FD04 01 E121 D 1358001D 018 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106115 $0.16 000001087907-3560700500
2024 3 FD04 01 E122 D 1358001D 018 9/11/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR091N1062325106115 $36.56 000001087907-3560700500
2024 3 FD04 01 E122 D 1358001D 018 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106115 $1.46 000001087907-3560700500
2024 3 FD04 01 E123 D 1358001D 018 9/11/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR091N1062325106115 $6.42 000001087907-3560700500
2024 3 FD04 01 E123 D 1358001D 018 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106115 $0.25 000001087907-3560700500
2024 2 FD04 01 E111 D 1358001D 018 8/24/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR082N1062323504968 $200.90 000001087907-3560700500
2024 2 FD04 01 E121 D 1358001D 018 8/24/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR082N1062323504968 $14.95 000001087907-3560700500
2024 2 FD04 01 E122 D 1358001D 018 8/24/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR082N1062323504968 $132.93 000001087907-3560700500
2024 2 FD04 01 E123 D 1358001D 018 8/24/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR082N1062323504968 $23.33 000001087907-3560700500
2024 2 FD04 01 E124 D 1358001D 018 8/24/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR082N1062323504968 $0.06 000001087907-3560700500
2024 2 FD04 00 E111 D 1358001D 018 8/24/2023 0010 ENV STUDIES-UST/HZM CA-XR082N1062323504972 $358.08 000001088264-3562500061
2024 2 FD04 00 E121 D 1358001D 018 8/24/2023 0010 ENV STUDIES-UST/HZM CA-XR082N1062323504972 $25.48 000001088264-3562500061
2024 2 FD04 00 E122 D 1358001D 018 8/24/2023 0010 ENV STUDIES-UST/HZM CA-XR082N1062323504972 $236.94 000001088264-3562500061
2024 2 FD04 00 E123 D 1358001D 018 8/24/2023 0010 ENV STUDIES-UST/HZM CA-XR082N1062323504972 $69.77 000001088264-3562500061
2024 2 FD04 00 E124 D 1358001D 018 8/24/2023 0010 ENV STUDIES-UST/HZM CA-XR082N1062323504972 $0.11 000001088264-3562500061
2024 2 FD04 01 E143 D 1358001D 018 8/23/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400034637 PON22200001225 STRAND ASSOCIATES INC $12,082.42 Calloway County 1-8952
2024 2 FD04 00 E111 D 1358001D 018 8/15/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR081N1062322003859 $286.40 000001083469-3562500630
2024 2 FD04 00 E111 D 1358001D 018 8/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003859 $61.09 000001083469-3562500630
2024 2 FD04 00 E121 D 1358001D 018 8/15/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR081N1062322003859 $21.15 000001083469-3562500630
2024 2 FD04 00 E121 D 1358001D 018 8/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003859 $4.51 000001083469-3562500630
2024 2 FD04 00 E122 D 1358001D 018 8/15/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR081N1062322003859 $189.51 000001083469-3562500630
2024 2 FD04 00 E122 D 1358001D 018 8/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003859 $40.42 000001083469-3562500630
2024 2 FD04 00 E123 D 1358001D 018 8/15/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR081N1062322003859 $28.07 000001083469-3562500630
2024 2 FD04 00 E123 D 1358001D 018 8/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003859 $5.89 000001083469-3562500630
2024 2 FD04 00 E111 D 1358001D 018 8/9/2023 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR081N1062322003875 $1,104.10 000001087071-3562500610
2024 2 FD04 00 E111 D 1358001D 018 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003875 $193.29 000001087071-3562500610
2024 2 FD04 00 E121 D 1358001D 018 8/9/2023 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR081N1062322003875 $71.40 000001087071-3562500610
2024 2 FD04 00 E121 D 1358001D 018 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003875 $13.75 000001087071-3562500610
2024 2 FD04 00 E122 D 1358001D 018 8/9/2023 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR081N1062322003875 $730.59 000001087071-3562500610
2024 2 FD04 00 E122 D 1358001D 018 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003875 $127.90 000001087071-3562500610
2024 2 FD04 00 E123 D 1358001D 018 8/9/2023 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR081N1062322003875 $222.02 000001087071-3562500610
2024 2 FD04 00 E123 D 1358001D 018 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003875 $25.59 000001087071-3562500610
2024 2 FD04 00 E111 D 1358001D 018 8/9/2023 0010 ENV STUDIES-UST/HZM CA-XR081N1062322003885 $59.68 000001088264-3562500061
2024 2 FD04 00 E111 D 1358001D 018 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003885 $0.40 000001088264-3562500061
2024 2 FD04 00 E121 D 1358001D 018 8/9/2023 0010 ENV STUDIES-UST/HZM CA-XR081N1062322003885 $4.24 000001088264-3562500061
2024 2 FD04 00 E121 D 1358001D 018 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003885 $0.03 000001088264-3562500061
2024 2 FD04 00 E122 D 1358001D 018 8/9/2023 0010 ENV STUDIES-UST/HZM CA-XR081N1062322003885 $39.50 000001088264-3562500061
2024 2 FD04 00 E122 D 1358001D 018 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003885 $0.26 000001088264-3562500061
2024 2 FD04 00 E123 D 1358001D 018 8/9/2023 0010 ENV STUDIES-UST/HZM CA-XR081N1062322003885 $11.64 000001088264-3562500061
2024 2 FD04 00 E123 D 1358001D 018 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003885 $0.08 000001088264-3562500061
2024 2 FD04 01 E111 D 1358001D 018 8/9/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR081N1062322003880 $281.25 000001087907-3560700500
2024 2 FD04 01 E121 D 1358001D 018 8/9/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR081N1062322003880 $20.75 000001087907-3560700500
2024 2 FD04 01 E122 D 1358001D 018 8/9/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR081N1062322003880 $186.10 000001087907-3560700500
2024 2 FD04 01 E123 D 1358001D 018 8/9/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR081N1062322003880 $32.65 000001087907-3560700500
2024 1 FD04 00 E111 D 1358001D 018 7/28/2023 0010 ENV STUDIES-UST/HZM CA-XR072N1062320202717 $284.48 000001088264-3562500061
2024 1 FD04 00 E111 D 1358001D 018 7/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202717 $70.90 000001088264-3562500061
2024 1 FD04 00 E121 D 1358001D 018 7/28/2023 0010 ENV STUDIES-UST/HZM CA-XR072N1062320202717 $20.24 000001088264-3562500061
2024 1 FD04 00 E121 D 1358001D 018 7/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202717 $5.04 000001088264-3562500061
2024 1 FD04 00 E122 D 1358001D 018 7/28/2023 0010 ENV STUDIES-UST/HZM CA-XR072N1062320202717 $188.24 000001088264-3562500061
2024 1 FD04 00 E122 D 1358001D 018 7/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202717 $46.92 000001088264-3562500061
2024 1 FD04 00 E123 D 1358001D 018 7/28/2023 0010 ENV STUDIES-UST/HZM CA-XR072N1062320202717 $55.54 000001088264-3562500061
2024 1 FD04 00 E111 D 1358001D 018 7/28/2023 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR072N1062320202700 $4,271.25 000001087071-3562500610
2024 1 FD04 00 E123 D 1358001D 018 7/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202717 $13.70 000001088264-3562500061
2024 1 FD04 00 E111 D 1358001D 018 7/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202700 $2,331.15 000001087071-3562500610
2024 1 FD04 00 E124 D 1358001D 018 7/28/2023 0010 ENV STUDIES-UST/HZM CA-XR072N1062320202717 $0.09 000001088264-3562500061
2024 1 FD04 00 E115 D 1358001D 018 7/28/2023 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR072N1062320202700 $440.91 000001087071-3562500610
2024 1 FD04 00 E124 D 1358001D 018 7/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202717 $0.02 000001088264-3562500061
2024 1 FD04 00 E121 D 1358001D 018 7/28/2023 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR072N1062320202700 $341.32 000001087071-3562500610
2024 1 FD04 00 E121 D 1358001D 018 7/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202700 $160.79 000001087071-3562500610
2024 1 FD04 00 E122 D 1358001D 018 7/28/2023 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR072N1062320202700 $3,170.30 000001087071-3562500610
2024 1 FD04 00 E122 D 1358001D 018 7/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202700 $1,542.51 000001087071-3562500610
2024 1 FD04 00 E123 D 1358001D 018 7/28/2023 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR072N1062320202700 $560.20 000001087071-3562500610
2024 1 FD04 00 E123 D 1358001D 018 7/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202700 $392.15 000001087071-3562500610
2024 1 FD04 00 E124 D 1358001D 018 7/28/2023 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR072N1062320202700 $1.52 000001087071-3562500610
2024 1 FD04 00 E124 D 1358001D 018 7/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202700 $0.84 000001087071-3562500610
2024 1 FD04 01 E143 D 1358001D 018 7/27/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400018445 PON22200001225 STRAND ASSOCIATES INC $87,115.86 Calloway County 1-8952
2024 1 FD04 01 E375 D 1358001D 018 7/25/2023 6010 LEGAL ACTIVITY ON PROJECT PRCC-PCD2400000495 Miscellaneous Individual $79.00
2024 1 FD04 01 E111 D 1358001D 018 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202708 $94.68 000001087907-3560700500
2024 1 FD04 01 E121 D 1358001D 018 7/24/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR072N1062320202708 $49.32 000001087907-3560700500
2024 1 FD04 01 E121 D 1358001D 018 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202708 $7.07 000001087907-3560700500
2024 1 FD04 01 E122 D 1358001D 018 7/24/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR072N1062320202708 $437.68 000001087907-3560700500
2024 1 FD04 01 E122 D 1358001D 018 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202708 $62.65 000001087907-3560700500
2024 1 FD04 01 E123 D 1358001D 018 7/24/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR072N1062320202708 $79.44 000001087907-3560700500
2024 1 FD04 01 E123 D 1358001D 018 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202708 $11.92 000001087907-3560700500
2024 1 FD04 01 E124 D 1358001D 018 7/24/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR072N1062320202708 $0.20 000001087907-3560700500
2024 1 FD04 01 E124 D 1358001D 018 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202708 $0.02 000001087907-3560700500
2024 1 FD04 00 E111 D 1358001D 018 7/24/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR072N1062320202712 $286.48 000001088093-3562500061
2024 1 FD04 00 E111 D 1358001D 018 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202712 $180.29 000001088093-3562500061
2024 1 FD04 00 E121 D 1358001D 018 7/24/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR072N1062320202712 $21.41 000001088093-3562500061
2024 1 FD04 00 E121 D 1358001D 018 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202712 $13.46 000001088093-3562500061
2024 1 FD04 00 E122 D 1358001D 018 7/24/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR072N1062320202712 $189.57 000001088093-3562500061
2024 1 FD04 00 E122 D 1358001D 018 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202712 $119.31 000001088093-3562500061
2024 1 FD04 00 E123 D 1358001D 018 7/24/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR072N1062320202712 $38.81 000001088093-3562500061
2024 1 FD04 00 E123 D 1358001D 018 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202712 $23.91 000001088093-3562500061
2024 1 FD04 00 E124 D 1358001D 018 7/24/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR072N1062320202712 $0.10 000001088093-3562500061
2024 1 FD04 00 E124 D 1358001D 018 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202712 $0.07 000001088093-3562500061
2024 1 FD04 01 E111 D 1358001D 018 7/24/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR072N1062320202708 $661.80 000001087907-3560700500
2024 1 FD04 01 E111 D 1358001D 018 7/14/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR071N1062319101571 $1,463.46 000001087907-3560700500
2024 1 FD04 01 E111 D 1358001D 018 7/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101571 $89.49 000001087907-3560700500
2024 1 FD04 01 E121 D 1358001D 018 7/14/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR071N1062319101571 $108.18 000001087907-3560700500
2024 1 FD04 01 E121 D 1358001D 018 7/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101571 $6.63 000001087907-3560700500
2024 1 FD04 01 E122 D 1358001D 018 7/14/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR071N1062319101571 $1,141.50 000001087907-3560700500
2024 1 FD04 01 E122 D 1358001D 018 7/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101571 $69.80 000001087907-3560700500
2024 1 FD04 01 E123 D 1358001D 018 7/14/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR071N1062319101571 $216.55 000001087907-3560700500
2024 1 FD04 01 E123 D 1358001D 018 7/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101571 $14.44 000001087907-3560700500
2024 1 FD04 00 E111 D 1358001D 018 7/14/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR071N1062319101547 $2,026.34 000001083469-3562500630
2024 1 FD04 00 E111 D 1358001D 018 7/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101547 $37.38 000001083469-3562500630
2024 1 FD04 00 E121 D 1358001D 018 7/14/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR071N1062319101547 $149.33 000001083469-3562500630
2024 1 FD04 00 E121 D 1358001D 018 7/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101547 $2.75 000001083469-3562500630
2024 1 FD04 00 E122 D 1358001D 018 7/14/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR071N1062319101547 $1,580.24 000001083469-3562500630
2024 1 FD04 00 E122 D 1358001D 018 7/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101547 $29.16 000001083469-3562500630
2024 1 FD04 00 E123 D 1358001D 018 7/14/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR071N1062319101547 $209.95 000001083469-3562500630
2024 1 FD04 00 E123 D 1358001D 018 7/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101547 $3.82 000001083469-3562500630
2024 1 FD04 00 E123 D 1358001D 018 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101564 $81.79 000001087071-3562500610
2024 1 FD04 00 E111 D 1358001D 018 7/11/2023 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR071N1062319101564 $4,292.18 000001087071-3562500610
2024 1 FD04 00 E111 D 1358001D 018 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101564 $614.53 000001087071-3562500610
2024 1 FD04 00 E121 D 1358001D 018 7/11/2023 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR071N1062319101564 $316.74 000001087071-3562500610
2024 1 FD04 00 E121 D 1358001D 018 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101564 $45.36 000001087071-3562500610
2024 1 FD04 00 E111 D 1358001D 018 7/11/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR071N1062319101576 $245.78 000001088093-3562500061
2024 1 FD04 00 E111 D 1358001D 018 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101576 $68.47 000001088093-3562500061
2024 1 FD04 00 E122 D 1358001D 018 7/11/2023 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR071N1062319101564 $3,346.22 000001087071-3562500610
2024 1 FD04 00 E121 D 1358001D 018 7/11/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR071N1062319101576 $18.09 000001088093-3562500061
2024 1 FD04 00 E121 D 1358001D 018 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101576 $5.05 000001088093-3562500061
2024 1 FD04 00 E122 D 1358001D 018 7/11/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR071N1062319101576 $191.64 000001088093-3562500061
2024 1 FD04 00 E122 D 1358001D 018 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101576 $53.41 000001088093-3562500061
2024 1 FD04 00 E123 D 1358001D 018 7/11/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR071N1062319101576 $35.12 000001088093-3562500061
2024 1 FD04 00 E123 D 1358001D 018 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101576 $9.62 000001088093-3562500061
2024 1 FD04 00 E122 D 1358001D 018 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101564 $479.33 000001087071-3562500610
2024 1 FD04 00 E123 D 1358001D 018 7/11/2023 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR071N1062319101564 $604.41 000001087071-3562500610
2023 12 FD04 01 E375 D 1358001D 018 6/30/2023 6010 LEGAL ACTIVITY ON PROJECT PRCC-PCD2300028980 Miscellaneous Individual $79.00
2023 12 FD04 01 E375 D 1358001D 018 6/30/2023 6010 LEGAL ACTIVITY ON PROJECT PRCC-PCD2300029071 Miscellaneous Individual ($79.00)
2023 12 FD04 00 E111 D 1358001D 018 6/28/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR062N1062317400436 $880.16 000001083469-3562500630
2023 12 FD04 00 E111 D 1358001D 018 6/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400436 $107.67 000001083469-3562500630
2023 12 FD04 00 E121 D 1358001D 018 6/28/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR062N1062317400436 $65.56 000001083469-3562500630
2023 12 FD04 00 E121 D 1358001D 018 6/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400436 $8.02 000001083469-3562500630
2023 12 FD04 00 E122 D 1358001D 018 6/28/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR062N1062317400436 $686.52 000001083469-3562500630
2023 12 FD04 00 E122 D 1358001D 018 6/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400436 $83.98 000001083469-3562500630
2023 12 FD04 00 E123 D 1358001D 018 6/28/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR062N1062317400436 $100.46 000001083469-3562500630
2023 12 FD04 00 E123 D 1358001D 018 6/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400436 $12.10 000001083469-3562500630
2023 12 FD04 00 E124 D 1358001D 018 6/28/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR062N1062317400436 $0.26 000001083469-3562500630
2023 12 FD04 00 E124 D 1358001D 018 6/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400436 $0.03 000001083469-3562500630
2023 12 FD04 01 E143 D 1358001D 018 6/26/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300251471 PON22200001225 STRAND ASSOCIATES INC $56,287.45 Calloway County 1-8952
2023 12 FD04 01 E375 D 1358001D 018 6/26/2023 6010 LEGAL ACTIVITY ON PROJECT PRCC-PCD2300026634 Miscellaneous Individual $79.00
2023 12 FD04 00 E111 D 1358001D 018 6/26/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR062N1062317400473 $368.48 000001087906-3562500636
2023 12 FD04 00 E111 D 1358001D 018 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400473 $56.49 000001087906-3562500636
2023 12 FD04 00 E121 D 1358001D 018 6/26/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR062N1062317400473 $27.96 000001087906-3562500636
2023 12 FD04 00 E121 D 1358001D 018 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400473 $4.28 000001087906-3562500636
2023 12 FD04 00 E122 D 1358001D 018 6/26/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR062N1062317400473 $287.38 000001087906-3562500636
2023 12 FD04 00 E122 D 1358001D 018 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400473 $44.06 000001087906-3562500636
2023 12 FD04 00 E123 D 1358001D 018 6/26/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR062N1062317400473 $42.07 000001087906-3562500636
2023 12 FD04 00 E123 D 1358001D 018 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400473 $6.35 000001087906-3562500636
2023 12 FD04 00 E124 D 1358001D 018 6/26/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR062N1062317400473 $0.11 000001087906-3562500636
2023 12 FD04 00 E124 D 1358001D 018 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400473 $0.02 000001087906-3562500636
2023 12 FD04 01 E111 D 1358001D 018 6/26/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR062N1062317400473 $573.35 000001087907-3560700500
2023 12 FD04 01 E111 D 1358001D 018 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400473 $127.52 000001087907-3560700500
2023 12 FD04 01 E121 D 1358001D 018 6/26/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR062N1062317400473 $43.01 000001087907-3560700500
2023 12 FD04 01 E121 D 1358001D 018 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400473 $9.58 000001087907-3560700500
2023 12 FD04 01 E122 D 1358001D 018 6/26/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR062N1062317400473 $447.16 000001087907-3560700500
2023 12 FD04 01 E122 D 1358001D 018 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400473 $99.46 000001087907-3560700500
2023 12 FD04 01 E123 D 1358001D 018 6/26/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR062N1062317400473 $94.05 000001087907-3560700500
2023 12 FD04 01 E123 D 1358001D 018 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400473 $20.58 000001087907-3560700500
2023 12 FD04 01 E124 D 1358001D 018 6/26/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR062N1062317400473 $0.25 000001087907-3560700500
2023 12 FD04 01 E124 D 1358001D 018 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400473 $0.06 000001087907-3560700500
2023 12 FD04 00 E111 D 1358001D 018 6/26/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR062N1062317400473 $343.64 000001087929-3562500061
2023 12 FD04 00 E121 D 1358001D 018 6/26/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR062N1062317400473 $25.92 000001087929-3562500061
2023 12 FD04 00 E122 D 1358001D 018 6/26/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR062N1062317400473 $268.04 000001087929-3562500061
2023 12 FD04 00 E123 D 1358001D 018 6/26/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR062N1062317400473 $69.98 000001087929-3562500061
2023 12 FD04 00 E124 D 1358001D 018 6/26/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR062N1062317400473 $0.18 000001087929-3562500061
2023 12 FD04 00 E361 D 1358001D 018 6/23/2023 5011 GEOTECH INVEST ROADWAY (DESIGN TP-2300056094 $262.05
2023 12 FD04 01 E361 D 1358001D 018 6/23/2023 5011 GEOTECH INVEST ROADWAY (DESIGN TP-2300056018 $229.80
2023 12 FD04 00 E111 D 1358001D 018 6/8/2023 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR061N1062315810162 $537.42 000001087071-3562500610
2023 12 FD04 00 E111 D 1358001D 018 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810162 $91.58 000001087071-3562500610
2023 12 FD04 00 E121 D 1358001D 018 6/8/2023 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR061N1062315810162 $39.49 000001087071-3562500610
2023 12 FD04 01 E111 D 1358001D 018 6/8/2023 4010 CONSTRUCTION ENGINEERING CA-XR061N1062315810175 $1,070.45 000001087747-3562501320
2023 12 FD04 01 E111 D 1358001D 018 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810175 $173.36 000001087747-3562501320
2023 12 FD04 01 E121 D 1358001D 018 6/8/2023 4010 CONSTRUCTION ENGINEERING CA-XR061N1062315810175 $81.90 000001087747-3562501320
2023 12 FD04 01 E121 D 1358001D 018 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810175 $13.26 000001087747-3562501320
2023 12 FD04 00 E121 D 1358001D 018 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810162 $6.69 000001087071-3562500610
2023 12 FD04 01 E122 D 1358001D 018 6/8/2023 4010 CONSTRUCTION ENGINEERING CA-XR061N1062315810175 $834.94 000001087747-3562501320
2023 12 FD04 01 E122 D 1358001D 018 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810175 $135.22 000001087747-3562501320
2023 12 FD04 00 E122 D 1358001D 018 6/8/2023 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR061N1062315810162 $419.25 000001087071-3562500610
2023 12 FD04 00 E122 D 1358001D 018 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810162 $71.44 000001087071-3562500610
2023 12 FD04 00 E123 D 1358001D 018 6/8/2023 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR061N1062315810162 $73.50 000001087071-3562500610
2023 12 FD04 00 E123 D 1358001D 018 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810162 $13.12 000001087071-3562500610
2023 11 FD04 01 E143 D 1358001D 018 5/25/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300229016 PON22200001225 STRAND ASSOCIATES INC $49,437.40 Calloway County 1-8952
2023 11 FD04 01 E321 D 1358001D 018 5/23/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF PRCC-PCD2300024452 PADUCAH BLUEPRINT $238.40
2023 11 FD04 00 E111 D 1358001D 018 5/9/2023 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR051N1062312808090 $411.50 000001087071-3562500610
2023 11 FD04 00 E111 D 1358001D 018 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808090 $20.02 000001087071-3562500610
2023 11 FD04 00 E121 D 1358001D 018 5/9/2023 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR051N1062312808090 $21.69 000001087071-3562500610
2023 11 FD04 00 E121 D 1358001D 018 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808090 $1.06 000001087071-3562500610
2023 11 FD04 00 E122 D 1358001D 018 5/9/2023 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR051N1062312808090 $320.92 000001087071-3562500610
2023 11 FD04 00 E122 D 1358001D 018 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808090 $15.62 000001087071-3562500610
2023 11 FD04 00 E123 D 1358001D 018 5/9/2023 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR051N1062312808090 $140.61 000001087071-3562500610
2023 11 FD04 00 E123 D 1358001D 018 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808090 $6.79 000001087071-3562500610
2023 11 FD04 01 E143 D 1358001D 018 5/5/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300212412 PON22200001225 STRAND ASSOCIATES INC $195,790.89 Calloway County 1-8952
2023 10 FD04 01 E321 D 1358001D 018 4/19/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF PRCC-PCD2300021911 SJN Data Center LLC $194.00
2023 9 FD04 01 E143 D 1358001D 018 3/30/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300184163 PON22200001225 STRAND ASSOCIATES INC $36,969.69 Calloway County 1-8952
2023 9 FD04 01 E143 D 1358001D 018 3/7/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300163727 PON22200001225 STRAND ASSOCIATES INC $24,737.99 Calloway County 1-8952
2023 8 FD04 01 E143 D 1358001D 018 2/10/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300146201 PON22200001225 STRAND ASSOCIATES INC $1,097.26 Calloway County 1-8952
2023 8 FD04 00 E111 D 1358001D 018 2/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021N1062303901416 $168.90 000001081685-3562500636
2023 8 FD04 00 E111 D 1358001D 018 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901416 $27.39 000001081685-3562500636
2023 8 FD04 00 E121 D 1358001D 018 2/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021N1062303901416 $12.61 000001081685-3562500636
2023 8 FD04 00 E121 D 1358001D 018 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901416 $2.04 000001081685-3562500636
2023 8 FD04 00 E122 D 1358001D 018 2/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021N1062303901416 $131.72 000001081685-3562500636
2023 8 FD04 00 E122 D 1358001D 018 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901416 $21.36 000001081685-3562500636
2023 8 FD04 00 E123 D 1358001D 018 2/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021N1062303901416 $19.29 000001081685-3562500636
2023 8 FD04 00 E123 D 1358001D 018 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901416 $3.08 000001081685-3562500636
2023 7 FD04 01 E143 D 1358001D 018 1/26/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300132453 PON22200001225 STRAND ASSOCIATES INC $1,039.17 Calloway County 1-8952
2023 3 FD04 01 E321 D 1358001D 018 9/26/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF PRCC-PCD2300006302 SJN Data Center LLC $1,291.68
2023 3 FD04 01 E111 D 1358001D 059 9/26/2022 4260 SIGNAL PLANS-TRAF CA-XR092M1062226602809 $139.71 000001084669-3562500463
2023 3 FD04 01 E111 D 1358001D 059 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602809 $13.97 000001084669-3562500463
2023 3 FD04 01 E121 D 1358001D 059 9/26/2022 4260 SIGNAL PLANS-TRAF CA-XR092M1062226602809 $10.41 000001084669-3562500463
2023 3 FD04 01 E121 D 1358001D 059 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602809 $1.04 000001084669-3562500463
2023 3 FD04 01 E122 D 1358001D 059 9/26/2022 4260 SIGNAL PLANS-TRAF CA-XR092M1062226602809 $108.96 000001084669-3562500463
2023 3 FD04 01 E122 D 1358001D 059 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602809 $10.90 000001084669-3562500463
2023 3 FD04 01 E123 D 1358001D 059 9/26/2022 4260 SIGNAL PLANS-TRAF CA-XR092M1062226602809 $16.55 000001084669-3562500463
2023 3 FD04 01 E123 D 1358001D 059 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602809 $1.64 000001084669-3562500463
2023 3 FD04 01 E124 D 1358001D 059 9/26/2022 4260 SIGNAL PLANS-TRAF CA-XR092M1062226602809 $0.04 000001084669-3562500463
2023 3 FD04 01 E143 D 1358001D 018 9/21/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300051270 PON22200001225 STRAND ASSOCIATES INC $30,287.58 Calloway County 1-8952
2023 3 FD04 01 E143 D 1358001D 018 9/21/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300051288 PON22200001225 STRAND ASSOCIATES INC $34,742.42 Calloway County 1-8952
2023 3 FD04 00 E111 D 1358001D 018 9/12/2022 0060 ENV STUDIES-ARCHAEOLOGY CA-XR091M1062225101650 $374.21 000001084331-3562500061
2023 3 FD04 00 E121 D 1358001D 018 9/12/2022 0060 ENV STUDIES-ARCHAEOLOGY CA-XR091M1062225101650 $27.96 000001084331-3562500061
2023 3 FD04 00 E122 D 1358001D 018 9/12/2022 0060 ENV STUDIES-ARCHAEOLOGY CA-XR091M1062225101650 $291.89 000001084331-3562500061
2023 3 FD04 00 E123 D 1358001D 018 9/12/2022 0060 ENV STUDIES-ARCHAEOLOGY CA-XR091M1062225101650 $49.38 000001084331-3562500061
2023 1 FD04 00 E111 D 1358001D 018 7/13/2022 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR071M1062219207904 $303.29 000001083469-3562500630
2023 1 FD04 00 E111 D 1358001D 018 7/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207904 $3.79 000001083469-3562500630
2023 1 FD04 00 E121 D 1358001D 018 7/13/2022 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR071M1062219207904 $22.36 000001083469-3562500630
2023 1 FD04 00 E121 D 1358001D 018 7/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207904 $0.28 000001083469-3562500630
2023 1 FD04 00 E122 D 1358001D 018 7/13/2022 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR071M1062219207904 $254.63 000001083469-3562500630
2023 1 FD04 00 E122 D 1358001D 018 7/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207904 $3.18 000001083469-3562500630
2023 1 FD04 00 E123 D 1358001D 018 7/13/2022 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR071M1062219207904 $34.29 000001083469-3562500630
2023 1 FD04 00 E123 D 1358001D 018 7/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207904 $0.42 000001083469-3562500630
2022 12 FD04 01 E143 D 1358001D 018 6/22/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200236494 PON22200001225 STRAND ASSOCIATES INC $86,450.00 Calloway County 1-8952
2022 12 FD04 01 E147 D 1358001D 018 6/13/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF PRC-2200227301 MURRAY NEWSPAPERS INC $198.00
2022 12 FD04 01 E147 D 1358001D 018 6/13/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF PRC-2200227301 MURRAY NEWSPAPERS INC $198.00
2022 12 FD04 01 E147 D 1358001D 018 6/13/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF PRC-2200227301 MURRAY NEWSPAPERS INC $179.00
2022 12 FD04 01 E143 D 1358001D 018 6/7/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200218784 PON22200001225 STRAND ASSOCIATES INC $60,320.00 Calloway County 1-8952
2022 11 FD04 01 E143 D 1358001D 018 5/5/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200198750 PON22200001225 STRAND ASSOCIATES INC $99,380.00 Calloway County 1-8952
2022 9 FD04 00 E111 D 1358001D 018 3/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031M1062206709477 $401.35 000001081685-3562500636
2022 9 FD04 00 E111 D 1358001D 018 3/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709477 $5.89 000001081685-3562500636
2022 9 FD04 00 E121 D 1358001D 018 3/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031M1062206709477 $30.33 000001081685-3562500636
2022 9 FD04 00 E121 D 1358001D 018 3/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709477 $0.44 000001081685-3562500636
2022 9 FD04 00 E122 D 1358001D 018 3/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031M1062206709477 $337.00 000001081685-3562500636
2022 9 FD04 00 E122 D 1358001D 018 3/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709477 $4.95 000001081685-3562500636
2022 9 FD04 00 E123 D 1358001D 018 3/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031M1062206709477 $43.90 000001081685-3562500636
2022 9 FD04 00 E123 D 1358001D 018 3/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709477 $0.64 000001081685-3562500636
2022 8 FD04 01 E143 D 1358001D 018 2/22/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200149539 PON22200001225 STRAND ASSOCIATES INC $38,955.00 Calloway County 1-8952
2022 7 FD04 01 E143 D 1358001D 018 1/26/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200130508 PON22200001225 STRAND ASSOCIATES INC $24,614.00 Calloway County 1-8952
2022 7 FD04 01 E143 D 1358001D 018 1/11/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200113806 PON22200001225 STRAND ASSOCIATES INC $15,000.00 Calloway County 1-8952