2024 |
7 |
FD04 |
03 |
E143 |
D |
1356001D |
002 |
1/8/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400133377 |
PON22200003830 |
BURGESS AND NIPLE INC |
$8,656.00 |
Allen County 3-8902 |
2023 |
12 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
6/8/2023 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR061N1062315810176 |
|
|
$468.22 |
000001087760-3562500061 |
2023 |
12 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
6/8/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061N1062315810176 |
|
|
$82.40 |
000001087760-3562500061 |
2023 |
12 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
6/8/2023 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR061N1062315810176 |
|
|
$33.28 |
000001087760-3562500061 |
2023 |
12 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
6/8/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061N1062315810176 |
|
|
$5.85 |
000001087760-3562500061 |
2023 |
12 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
6/8/2023 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR061N1062315810176 |
|
|
$365.21 |
000001087760-3562500061 |
2023 |
12 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
6/8/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061N1062315810176 |
|
|
$64.27 |
000001087760-3562500061 |
2023 |
12 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
6/8/2023 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR061N1062315810176 |
|
|
$117.29 |
000001087760-3562500061 |
2023 |
12 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
6/8/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061N1062315810176 |
|
|
$20.46 |
000001087760-3562500061 |
2023 |
11 |
FD04 |
03 |
E143 |
D |
1356001D |
002 |
5/26/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300231212 |
PON22200003830 |
BURGESS AND NIPLE INC |
$30,573.00 |
Allen County 3-8902 |
2023 |
11 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
5/9/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR051N1062312808075 |
|
|
$806.95 |
000001084656-3562500610 |
2023 |
11 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
5/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051N1062312808075 |
|
|
$37.82 |
000001084656-3562500610 |
2023 |
11 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
5/9/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR051N1062312808075 |
|
|
$56.82 |
000001084656-3562500610 |
2023 |
11 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
5/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051N1062312808075 |
|
|
$2.65 |
000001084656-3562500610 |
2023 |
11 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
5/9/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR051N1062312808075 |
|
|
$629.59 |
000001084656-3562500610 |
2023 |
11 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
5/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051N1062312808075 |
|
|
$29.49 |
000001084656-3562500610 |
2023 |
11 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
5/9/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR051N1062312808075 |
|
|
$162.71 |
000001084656-3562500610 |
2023 |
11 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
5/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051N1062312808075 |
|
|
$7.57 |
000001084656-3562500610 |
2023 |
10 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
4/24/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR042N1062311106948 |
|
|
$693.78 |
000001084656-3562500610 |
2023 |
10 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
4/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042N1062311106948 |
|
|
$36.53 |
000001084656-3562500610 |
2023 |
10 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
4/24/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR042N1062311106948 |
|
|
$48.74 |
000001084656-3562500610 |
2023 |
10 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
4/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042N1062311106948 |
|
|
$2.57 |
000001084656-3562500610 |
2023 |
10 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
4/24/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR042N1062311106948 |
|
|
$541.08 |
000001084656-3562500610 |
2023 |
10 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
4/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042N1062311106948 |
|
|
$28.49 |
000001084656-3562500610 |
2023 |
10 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
4/24/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR042N1062311106948 |
|
|
$140.61 |
000001084656-3562500610 |
2023 |
10 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
4/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042N1062311106948 |
|
|
$7.35 |
000001084656-3562500610 |
2023 |
10 |
FD04 |
00 |
E124 |
D |
1356001D |
002 |
4/24/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR042N1062311106948 |
|
|
$0.20 |
000001084656-3562500610 |
2023 |
10 |
FD04 |
00 |
E124 |
D |
1356001D |
002 |
4/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042N1062311106948 |
|
|
$0.01 |
000001084656-3562500610 |
2023 |
10 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
4/14/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR041N1062309605763 |
|
|
$225.25 |
000001080741-3562500630 |
2023 |
10 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
4/14/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041N1062309605763 |
|
|
$37.90 |
000001080741-3562500630 |
2023 |
10 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
4/14/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR041N1062309605763 |
|
|
$15.60 |
000001080741-3562500630 |
2023 |
10 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
4/14/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041N1062309605763 |
|
|
$2.63 |
000001080741-3562500630 |
2023 |
10 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
4/14/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR041N1062309605763 |
|
|
$175.92 |
000001080741-3562500630 |
2023 |
10 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
4/14/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041N1062309605763 |
|
|
$29.56 |
000001080741-3562500630 |
2023 |
10 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
4/14/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR041N1062309605763 |
|
|
$46.98 |
000001080741-3562500630 |
2023 |
10 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
4/14/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041N1062309605763 |
|
|
$7.83 |
000001080741-3562500630 |
2023 |
10 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
4/10/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR041N1062309605779 |
|
|
$289.04 |
000001084656-3562500610 |
2023 |
10 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
4/10/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR041N1062309605779 |
|
|
$20.31 |
000001084656-3562500610 |
2023 |
10 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
4/10/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR041N1062309605779 |
|
|
$225.45 |
000001084656-3562500610 |
2023 |
10 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
4/10/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR041N1062309605779 |
|
|
$58.56 |
000001084656-3562500610 |
2023 |
9 |
FD04 |
03 |
E111 |
D |
1356001D |
121 |
3/27/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR032N1062308304684 |
|
|
$734.85 |
000001086955-3562500632 |
2023 |
9 |
FD04 |
03 |
E121 |
D |
1356001D |
121 |
3/27/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR032N1062308304684 |
|
|
$56.22 |
000001086955-3562500632 |
2023 |
9 |
FD04 |
03 |
E143 |
D |
1356001D |
002 |
3/17/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300174506 |
PON22200003830 |
BURGESS AND NIPLE INC |
$38,369.00 |
Allen County 3-8902 |
2023 |
9 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
3/9/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR031N1062306703670 |
|
|
$86.33 |
000001084656-3562500610 |
2023 |
9 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
3/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031N1062306703670 |
|
|
$27.94 |
000001084656-3562500610 |
2023 |
9 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
3/9/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR031N1062306703670 |
|
|
$6.12 |
000001084656-3562500610 |
2023 |
9 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
3/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031N1062306703670 |
|
|
$1.98 |
000001084656-3562500610 |
2023 |
9 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
3/9/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR031N1062306703670 |
|
|
$67.39 |
000001084656-3562500610 |
2023 |
9 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
3/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031N1062306703670 |
|
|
$21.79 |
000001084656-3562500610 |
2023 |
9 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
3/9/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR031N1062306703670 |
|
|
$17.18 |
000001084656-3562500610 |
2023 |
9 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
3/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031N1062306703670 |
|
|
$5.46 |
000001084656-3562500610 |
2023 |
8 |
FD04 |
03 |
E793 |
D |
1356001D |
002 |
2/23/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
PRCC-PCD2300016636 |
|
Central Mine Equipment Company |
$1,153.34 |
|
2023 |
8 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
2/23/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022N1062305302463 |
|
|
$11.81 |
000001084656-3562500610 |
2023 |
8 |
FD04 |
00 |
E124 |
D |
1356001D |
002 |
2/23/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR022N1062305302463 |
|
|
$0.72 |
000001084656-3562500610 |
2023 |
8 |
FD04 |
00 |
E124 |
D |
1356001D |
002 |
2/23/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022N1062305302463 |
|
|
$0.02 |
000001084656-3562500610 |
2023 |
8 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
2/23/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR022N1062305302463 |
|
|
$2,078.42 |
000001084656-3562500610 |
2023 |
8 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
2/23/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022N1062305302463 |
|
|
$46.39 |
000001084656-3562500610 |
2023 |
8 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
2/23/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR022N1062305302463 |
|
|
$142.41 |
000001084656-3562500610 |
2023 |
8 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
2/23/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022N1062305302463 |
|
|
$2.99 |
000001084656-3562500610 |
2023 |
8 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
2/23/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022N1062305302441 |
|
|
$171.68 |
000001080741-3562500636 |
2023 |
8 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
2/23/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022N1062305302441 |
|
|
$76.90 |
000001080741-3562500636 |
2023 |
8 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
2/23/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022N1062305302441 |
|
|
$13.14 |
000001080741-3562500636 |
2023 |
8 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
2/23/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR022N1062305302463 |
|
|
$1,621.22 |
000001084656-3562500610 |
2023 |
8 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
2/23/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022N1062305302441 |
|
|
$5.88 |
000001080741-3562500636 |
2023 |
8 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
2/23/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022N1062305302441 |
|
|
$124.77 |
000001080741-3562500636 |
2023 |
8 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
2/23/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022N1062305302441 |
|
|
$55.84 |
000001080741-3562500636 |
2023 |
8 |
FD04 |
00 |
E124 |
D |
1356001D |
002 |
2/23/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022N1062305302441 |
|
|
$0.05 |
000001080741-3562500636 |
2023 |
8 |
FD04 |
00 |
E124 |
D |
1356001D |
002 |
2/23/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022N1062305302441 |
|
|
$0.02 |
000001080741-3562500636 |
2023 |
8 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
2/23/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022N1062305302463 |
|
|
$36.19 |
000001084656-3562500610 |
2023 |
8 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
2/23/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR022N1062305302463 |
|
|
$459.27 |
000001084656-3562500610 |
2023 |
8 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
2/9/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR021N1062303901435 |
|
|
$957.26 |
000001084656-3562500610 |
2023 |
8 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
2/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021N1062303901435 |
|
|
$164.44 |
000001084656-3562500610 |
2023 |
8 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
2/9/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR021N1062303901435 |
|
|
$299.59 |
000001084656-3562500610 |
2023 |
8 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
2/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021N1062303901435 |
|
|
$50.51 |
000001084656-3562500610 |
2023 |
8 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
2/9/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR021N1062303901434 |
|
|
$1,227.24 |
000001084656-3562500610 |
2023 |
8 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
2/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021N1062303901434 |
|
|
$210.81 |
000001084656-3562500610 |
2023 |
8 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
2/9/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR021N1062303901434 |
|
|
$80.32 |
000001084656-3562500610 |
2023 |
8 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
2/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021N1062303901434 |
|
|
$13.84 |
000001084656-3562500610 |
2023 |
7 |
FD04 |
03 |
E143 |
D |
1356001D |
002 |
1/27/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300139249 |
PON22200003830 |
BURGESS AND NIPLE INC |
$44,337.00 |
Allen County 3-8902 |
2023 |
7 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
1/24/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR012N1062302300435 |
|
|
$3,278.88 |
000001084656-3562500610 |
2023 |
7 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
1/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012N1062302300435 |
|
|
$1,023.13 |
000001084656-3562500610 |
2023 |
7 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
1/24/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR012N1062302300435 |
|
|
$243.14 |
000001084656-3562500610 |
2023 |
7 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
1/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012N1062302300435 |
|
|
$76.03 |
000001084656-3562500610 |
2023 |
7 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
1/24/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR012N1062302300435 |
|
|
$2,557.51 |
000001084656-3562500610 |
2023 |
7 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
1/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012N1062302300435 |
|
|
$798.05 |
000001084656-3562500610 |
2023 |
7 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
1/24/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR012N1062302300435 |
|
|
$593.34 |
000001084656-3562500610 |
2023 |
7 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
1/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012N1062302300435 |
|
|
$188.31 |
000001084656-3562500610 |
2023 |
7 |
FD04 |
00 |
E124 |
D |
1356001D |
002 |
1/24/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR012N1062302300435 |
|
|
$1.29 |
000001084656-3562500610 |
2023 |
7 |
FD04 |
00 |
E124 |
D |
1356001D |
002 |
1/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012N1062302300435 |
|
|
$0.40 |
000001084656-3562500610 |
2023 |
7 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
1/12/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011N1062300610248 |
|
|
$42.99 |
000001080741-3562500636 |
2023 |
7 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
1/12/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011N1062300610248 |
|
|
$143.48 |
000001080741-3562500636 |
2023 |
7 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
1/12/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011N1062300610248 |
|
|
$2.97 |
000001080741-3562500636 |
2023 |
7 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
1/12/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011N1062300610248 |
|
|
$9.96 |
000001080741-3562500636 |
2023 |
7 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
1/12/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011N1062300610248 |
|
|
$33.51 |
000001080741-3562500636 |
2023 |
7 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
1/12/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011N1062300610248 |
|
|
$111.91 |
000001080741-3562500636 |
2023 |
7 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
1/12/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011N1062300610248 |
|
|
$8.73 |
000001080741-3562500636 |
2023 |
7 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
1/12/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011N1062300610248 |
|
|
$28.25 |
000001080741-3562500636 |
2023 |
7 |
FD04 |
00 |
E361 |
D |
1356001D |
002 |
1/11/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
JV2E-2300004296 |
|
|
$654.85 |
Correcting prog chrg from FG03 to FD04/1356001D
IET67023*1172
IET67023*1174
IET67023*1175 |
2023 |
7 |
FD04 |
00 |
E361 |
D |
1356001D |
002 |
1/11/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
JV2E-2300004297 |
|
|
$748.40 |
Correcting prog chrg from FG03 to FD04/1356001D
IET67023*1249
IET67023*1250 |
2023 |
7 |
FD04 |
00 |
E361 |
D |
1356001D |
002 |
1/11/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
JV2E-2300004298 |
|
|
$1,403.25 |
Correcting prog chrg from FG03 to FD04/1356001D
IET67023*1251
IET67023*1278
IET67023*1292 and1293 |
2023 |
7 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
1/9/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR011N1062300610264 |
|
|
$3,547.47 |
000001084656-3562500610 |
2023 |
7 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
1/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011N1062300610264 |
|
|
$5,113.67 |
000001084656-3562500610 |
2023 |
7 |
FD04 |
00 |
E115 |
D |
1356001D |
002 |
1/9/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR011N1062300610264 |
|
|
$1,011.65 |
000001084656-3562500610 |
2023 |
7 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
1/9/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR011N1062300610264 |
|
|
$337.74 |
000001084656-3562500610 |
2023 |
7 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
1/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011N1062300610264 |
|
|
$370.55 |
000001084656-3562500610 |
2023 |
7 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
1/9/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR011N1062300610264 |
|
|
$3,556.04 |
000001084656-3562500610 |
2023 |
7 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
1/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011N1062300610264 |
|
|
$3,988.69 |
000001084656-3562500610 |
2023 |
7 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
1/9/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR011N1062300610264 |
|
|
$655.35 |
000001084656-3562500610 |
2023 |
7 |
FD04 |
00 |
E361 |
D |
1356001D |
002 |
1/9/2023 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
TP-2300026518 |
|
|
$118.00 |
|
2023 |
7 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
1/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011N1062300610264 |
|
|
$1,146.89 |
000001084656-3562500610 |
2023 |
6 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
12/22/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR122M1062235509183 |
|
|
$722.52 |
000001084656-3562500610 |
2023 |
6 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
12/22/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122M1062235509183 |
|
|
$20.03 |
000001084656-3562500610 |
2023 |
6 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
12/22/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR122M1062235509183 |
|
|
$7,708.48 |
000001084656-3562500610 |
2023 |
6 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
12/22/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122M1062235509183 |
|
|
$219.20 |
000001084656-3562500610 |
2023 |
6 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
12/22/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR122M1062235509183 |
|
|
$1,690.94 |
000001084656-3562500610 |
2023 |
6 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
12/22/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122M1062235509183 |
|
|
$54.50 |
000001084656-3562500610 |
2023 |
6 |
FD04 |
00 |
E124 |
D |
1356001D |
002 |
12/22/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR122M1062235509183 |
|
|
$3.44 |
000001084656-3562500610 |
2023 |
6 |
FD04 |
00 |
E124 |
D |
1356001D |
002 |
12/22/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122M1062235509183 |
|
|
$0.10 |
000001084656-3562500610 |
2023 |
6 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
12/22/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR122M1062235509183 |
|
|
$8,803.14 |
000001084656-3562500610 |
2023 |
6 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
12/22/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122M1062235509183 |
|
|
$281.01 |
000001084656-3562500610 |
2023 |
6 |
FD04 |
00 |
E115 |
D |
1356001D |
002 |
12/22/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR122M1062235509183 |
|
|
$1,079.53 |
000001084656-3562500610 |
2023 |
6 |
FD04 |
00 |
E361 |
D |
1356001D |
002 |
12/21/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
TP-2300026682 |
|
|
$236.00 |
|
2023 |
6 |
FD04 |
00 |
E361 |
D |
1356001D |
002 |
12/21/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
TP-2300026692 |
|
|
$118.00 |
|
2023 |
6 |
FD04 |
00 |
E361 |
D |
1356001D |
002 |
12/21/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
TP-2300026504 |
|
|
$46.00 |
|
2023 |
6 |
FD04 |
00 |
E361 |
D |
1356001D |
002 |
12/20/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
TP-2300026513 |
|
|
$298.00 |
|
2023 |
6 |
FD04 |
00 |
E361 |
D |
1356001D |
002 |
12/20/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
TP-2300026688 |
|
|
$298.00 |
|
2023 |
6 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
12/12/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR121M1062234208227 |
|
|
$1,749.86 |
000001084656-3562500610 |
2023 |
6 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
12/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121M1062234208227 |
|
|
$1,338.21 |
000001084656-3562500610 |
2023 |
6 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
12/12/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR121M1062234208227 |
|
|
$124.00 |
000001084656-3562500610 |
2023 |
6 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
12/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121M1062234208227 |
|
|
$93.01 |
000001084656-3562500610 |
2023 |
6 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
12/12/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR121M1062234208227 |
|
|
$1,364.89 |
000001084656-3562500610 |
2023 |
6 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
12/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121M1062234208227 |
|
|
$1,043.81 |
000001084656-3562500610 |
2023 |
6 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
12/12/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR121M1062234208227 |
|
|
$382.68 |
000001084656-3562500610 |
2023 |
6 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
12/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121M1062234208227 |
|
|
$283.43 |
000001084656-3562500610 |
2023 |
6 |
FD04 |
03 |
E143 |
D |
1356001D |
002 |
12/6/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300100840 |
PON22200003830 |
BURGESS AND NIPLE INC |
$13,966.00 |
Allen County 3-8902 |
2023 |
5 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
11/23/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR112M1062232607177 |
|
|
$13.88 |
000001084656-3562500463 |
2023 |
5 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
11/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112M1062232607177 |
|
|
$2.26 |
000001084656-3562500463 |
2023 |
5 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
11/23/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR112M1062232607177 |
|
|
$145.30 |
000001084656-3562500463 |
2023 |
5 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
11/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112M1062232607177 |
|
|
$23.61 |
000001084656-3562500463 |
2023 |
5 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
11/23/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR112M1062232607177 |
|
|
$22.09 |
000001084656-3562500463 |
2023 |
5 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
11/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112M1062232607177 |
|
|
$3.54 |
000001084656-3562500463 |
2023 |
5 |
FD04 |
00 |
E124 |
D |
1356001D |
002 |
11/23/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR112M1062232607177 |
|
|
$0.05 |
000001084656-3562500463 |
2023 |
5 |
FD04 |
00 |
E124 |
D |
1356001D |
002 |
11/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112M1062232607177 |
|
|
$0.01 |
000001084656-3562500463 |
2023 |
5 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
11/23/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR112M1062232607177 |
|
|
$186.16 |
000001084656-3562500463 |
2023 |
5 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
11/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112M1062232607177 |
|
|
$30.27 |
000001084656-3562500463 |
2023 |
5 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
11/14/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR111M1062230806176 |
|
|
$1,265.17 |
000001084656-3562500610 |
2023 |
5 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
11/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111M1062230806176 |
|
|
$17.19 |
000001084656-3562500610 |
2023 |
5 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
11/14/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR111M1062230806176 |
|
|
$79.10 |
000001084656-3562500610 |
2023 |
5 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
11/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111M1062230806176 |
|
|
$1.26 |
000001084656-3562500610 |
2023 |
5 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
11/14/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR111M1062230806176 |
|
|
$986.77 |
000001084656-3562500610 |
2023 |
5 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
11/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111M1062230806176 |
|
|
$13.41 |
000001084656-3562500610 |
2023 |
5 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
11/14/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR111M1062230806176 |
|
|
$299.02 |
000001084656-3562500610 |
2023 |
5 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
11/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111M1062230806176 |
|
|
$2.29 |
000001084656-3562500610 |
2023 |
5 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
11/7/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111M1062230806154 |
|
|
$85.87 |
000001080741-3562500636 |
2023 |
5 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
11/7/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111M1062230806154 |
|
|
$3.44 |
000001080741-3562500636 |
2023 |
5 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
11/7/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111M1062230806154 |
|
|
$5.97 |
000001080741-3562500636 |
2023 |
5 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
11/7/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111M1062230806154 |
|
|
$0.24 |
000001080741-3562500636 |
2023 |
5 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
11/7/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111M1062230806154 |
|
|
$67.02 |
000001080741-3562500636 |
2023 |
5 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
11/7/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111M1062230806154 |
|
|
$2.68 |
000001080741-3562500636 |
2023 |
5 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
11/7/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111M1062230806154 |
|
|
$14.98 |
000001080741-3562500636 |
2023 |
5 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
11/7/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111M1062230806154 |
|
|
$0.59 |
000001080741-3562500636 |
2023 |
4 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
10/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR102M1062229405045 |
|
|
$70.88 |
000001080741-3562500636 |
2023 |
4 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
10/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102M1062229405045 |
|
|
$70.88 |
000001080741-3562500636 |
2023 |
4 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
10/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR102M1062229405045 |
|
|
$4.95 |
000001080741-3562500636 |
2023 |
4 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
10/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102M1062229405045 |
|
|
$4.95 |
000001080741-3562500636 |
2023 |
4 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
10/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR102M1062229405045 |
|
|
$55.29 |
000001080741-3562500636 |
2023 |
4 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
10/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102M1062229405045 |
|
|
$55.28 |
000001080741-3562500636 |
2023 |
4 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
10/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR102M1062229405045 |
|
|
$12.45 |
000001080741-3562500636 |
2023 |
4 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
10/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102M1062229405045 |
|
|
$12.25 |
000001080741-3562500636 |
2023 |
4 |
FD04 |
00 |
E124 |
D |
1356001D |
002 |
10/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR102M1062229405045 |
|
|
$0.02 |
000001080741-3562500636 |
2023 |
4 |
FD04 |
00 |
E124 |
D |
1356001D |
002 |
10/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102M1062229405045 |
|
|
$0.02 |
000001080741-3562500636 |
2023 |
4 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
10/10/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR101M1062228003962 |
|
|
$0.11 |
000001084656-3562500610 |
2023 |
4 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
10/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101M1062228003962 |
|
|
$0.01 |
000001084656-3562500610 |
2023 |
4 |
FD04 |
03 |
E143 |
D |
1356001D |
002 |
10/6/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300059969 |
PON22200003830 |
BURGESS AND NIPLE INC |
$15,911.00 |
Allen County 3-8902 |
2023 |
3 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
9/26/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092M1062226602808 |
|
|
$3.49 |
000001084656-3562500610 |
2023 |
3 |
FD04 |
00 |
E124 |
D |
1356001D |
002 |
9/26/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR092M1062226602808 |
|
|
$0.27 |
000001084656-3562500610 |
2023 |
3 |
FD04 |
00 |
E124 |
D |
1356001D |
002 |
9/26/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092M1062226602808 |
|
|
$0.17 |
000001084656-3562500610 |
2023 |
3 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
9/26/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092M1062226602766 |
|
|
$43.11 |
000001080741-3562500636 |
2023 |
3 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
9/26/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092M1062226602766 |
|
|
$23.20 |
000001080741-3562500636 |
2023 |
3 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
9/26/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092M1062226602766 |
|
|
$3.00 |
000001080741-3562500636 |
2023 |
3 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
9/26/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092M1062226602766 |
|
|
$1.62 |
000001080741-3562500636 |
2023 |
3 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
9/26/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092M1062226602766 |
|
|
$33.51 |
000001080741-3562500636 |
2023 |
3 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
9/26/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092M1062226602766 |
|
|
$18.10 |
000001080741-3562500636 |
2023 |
3 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
9/26/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092M1062226602766 |
|
|
$7.52 |
000001080741-3562500636 |
2023 |
3 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
9/26/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092M1062226602766 |
|
|
$4.01 |
000001080741-3562500636 |
2023 |
3 |
FD04 |
00 |
E124 |
D |
1356001D |
002 |
9/26/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092M1062226602766 |
|
|
$0.01 |
000001080741-3562500636 |
2023 |
3 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
9/26/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR092M1062226602807 |
|
|
$788.20 |
000001084656-3562500610 |
2023 |
3 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
9/26/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092M1062226602807 |
|
|
$514.46 |
000001084656-3562500610 |
2023 |
3 |
FD04 |
00 |
E112 |
D |
1356001D |
002 |
9/26/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR092M1062226602807 |
|
|
$202.03 |
000001084656-3562500610 |
2023 |
3 |
FD04 |
00 |
E112 |
D |
1356001D |
002 |
9/26/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092M1062226602807 |
|
|
$20.20 |
000001084656-3562500610 |
2023 |
3 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
9/26/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR092M1062226602807 |
|
|
$74.67 |
000001084656-3562500610 |
2023 |
3 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
9/26/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092M1062226602807 |
|
|
$40.79 |
000001084656-3562500610 |
2023 |
3 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
9/26/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR092M1062226602807 |
|
|
$614.78 |
000001084656-3562500610 |
2023 |
3 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
9/26/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092M1062226602807 |
|
|
$401.28 |
000001084656-3562500610 |
2023 |
3 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
9/26/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR092M1062226602807 |
|
|
$37.12 |
000001084656-3562500610 |
2023 |
3 |
FD04 |
00 |
E361 |
D |
1356001D |
002 |
9/12/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
TP-2300010480 |
|
|
$28.00 |
|
2023 |
3 |
FD04 |
00 |
E361 |
D |
1356001D |
002 |
9/12/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
TP-2300010427 |
|
|
$64.00 |
|
2023 |
3 |
FD04 |
00 |
E111 |
D |
1356001D |
009 |
9/12/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR091M1062225101659 |
|
|
$500.50 |
000001084496-3562500610 |
2023 |
3 |
FD04 |
00 |
E121 |
D |
1356001D |
009 |
9/12/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR091M1062225101659 |
|
|
$34.00 |
000001084496-3562500610 |
2023 |
3 |
FD04 |
00 |
E122 |
D |
1356001D |
009 |
9/12/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR091M1062225101659 |
|
|
$390.39 |
000001084496-3562500610 |
2023 |
3 |
FD04 |
00 |
E123 |
D |
1356001D |
009 |
9/12/2022 |
5011 |
GEOTECH INVEST ROADWAY (DESIGN |
CA-XR091M1062225101659 |
|
|
$80.94 |
000001084496-3562500610 |
2023 |
3 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
9/12/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091M1062225101619 |
|
|
$213.01 |
000001080741-3562500630 |
2023 |
3 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
9/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091M1062225101619 |
|
|
$40.71 |
000001080741-3562500630 |
2023 |
3 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
9/12/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091M1062225101619 |
|
|
$14.78 |
000001080741-3562500636 |
2023 |
3 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
9/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091M1062225101619 |
|
|
$2.82 |
000001080741-3562500630 |
2023 |
3 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
9/12/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091M1062225101619 |
|
|
$166.61 |
000001080741-3562500636 |
2023 |
3 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
9/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091M1062225101619 |
|
|
$31.75 |
000001080741-3562500636 |
2023 |
3 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
9/12/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091M1062225101619 |
|
|
$37.93 |
000001080741-3562500636 |
2023 |
3 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
9/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091M1062225101619 |
|
|
$7.14 |
000001080741-3562500636 |
2023 |
2 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
8/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082M1062223500429 |
|
|
$86.00 |
000001080741-3562500636 |
2023 |
2 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
8/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500429 |
|
|
$10.31 |
000001080741-3562500636 |
2023 |
2 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
8/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082M1062223500429 |
|
|
$5.98 |
000001080741-3562500636 |
2023 |
2 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
8/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500429 |
|
|
$0.72 |
000001080741-3562500636 |
2023 |
2 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
8/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082M1062223500429 |
|
|
$67.02 |
000001080741-3562500636 |
2023 |
2 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
8/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500429 |
|
|
$8.04 |
000001080741-3562500636 |
2023 |
2 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
8/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082M1062223500429 |
|
|
$14.99 |
000001080741-3562500636 |
2023 |
2 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
8/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500429 |
|
|
$1.78 |
000001080741-3562500636 |
2023 |
2 |
FD04 |
00 |
E124 |
D |
1356001D |
002 |
8/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082M1062223500429 |
|
|
$0.02 |
000001080741-3562500636 |
2023 |
2 |
FD04 |
03 |
E143 |
D |
1356001D |
002 |
8/12/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300026158 |
PON22200003830 |
BURGESS AND NIPLE INC |
$49,401.00 |
Allen County 3-8902 |
2023 |
2 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
8/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081M1062222110116 |
|
|
$141.76 |
000001080741-3562500636 |
2023 |
2 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
8/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081M1062222110116 |
|
|
$9.84 |
000001080741-3562500636 |
2023 |
2 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
8/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081M1062222110116 |
|
|
$110.57 |
000001080741-3562500636 |
2023 |
2 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
8/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081M1062222110116 |
|
|
$24.70 |
000001080741-3562500636 |
2022 |
12 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
6/27/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062M1062217506766 |
|
|
$39.80 |
000001080741-3562500636 |
2022 |
12 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506766 |
|
|
$13.52 |
000001080741-3562500636 |
2022 |
12 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
6/27/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062M1062217506766 |
|
|
$2.75 |
000001080741-3562500636 |
2022 |
12 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506766 |
|
|
$0.94 |
000001080741-3562500636 |
2022 |
12 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
6/27/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062M1062217506766 |
|
|
$33.40 |
000001080741-3562500636 |
2022 |
12 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506766 |
|
|
$11.35 |
000001080741-3562500636 |
2022 |
12 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
6/27/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062M1062217506766 |
|
|
$7.50 |
000001080741-3562500636 |
2022 |
12 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506766 |
|
|
$2.52 |
000001080741-3562500636 |
2022 |
12 |
FD04 |
00 |
E124 |
D |
1356001D |
002 |
6/27/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062M1062217506766 |
|
|
$0.01 |
000001080741-3562500636 |
2022 |
11 |
FD04 |
00 |
E124 |
D |
1356001D |
002 |
5/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052M1062214004674 |
|
|
$0.02 |
000001080741-3562500636 |
2022 |
11 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
5/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052M1062214004673 |
|
|
$65.66 |
000001080741-3562500636 |
2022 |
11 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004673 |
|
|
$9.63 |
000001080741-3562500636 |
2022 |
11 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
5/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052M1062214004673 |
|
|
$4.54 |
000001080741-3562500636 |
2022 |
11 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004673 |
|
|
$0.67 |
000001080741-3562500636 |
2022 |
11 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
5/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052M1062214004673 |
|
|
$55.11 |
000001080741-3562500636 |
2022 |
11 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004673 |
|
|
$8.09 |
000001080741-3562500636 |
2022 |
11 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
5/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052M1062214004673 |
|
|
$12.37 |
000001080741-3562500636 |
2022 |
11 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004673 |
|
|
$1.80 |
000001080741-3562500636 |
2022 |
11 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
5/9/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051M1062212603656 |
|
|
$87.55 |
000001080741-3562500636 |
2022 |
11 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
5/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603656 |
|
|
$5.26 |
000001080741-3562500636 |
2022 |
11 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
5/9/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051M1062212603656 |
|
|
$6.06 |
000001080741-3562500636 |
2022 |
11 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
5/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603656 |
|
|
$0.36 |
000001080741-3562500636 |
2022 |
11 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
5/9/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051M1062212603656 |
|
|
$73.48 |
000001080741-3562500636 |
2022 |
11 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
5/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603656 |
|
|
$4.42 |
000001080741-3562500636 |
2022 |
11 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
5/9/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051M1062212603656 |
|
|
$16.47 |
000001080741-3562500636 |
2022 |
11 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
5/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603656 |
|
|
$0.98 |
000001080741-3562500636 |
2022 |
10 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801480 |
|
|
$51.04 |
000001080741-3562500636 |
2022 |
10 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
4/11/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR041M1062209801480 |
|
|
$5.05 |
000001080741-3562500636 |
2022 |
10 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801480 |
|
|
$3.53 |
000001080741-3562500636 |
2022 |
10 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
4/11/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR041M1062209801480 |
|
|
$61.23 |
000001080741-3562500636 |
2022 |
10 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801480 |
|
|
$42.86 |
000001080741-3562500636 |
2022 |
10 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
4/11/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR041M1062209801480 |
|
|
$13.80 |
000001080741-3562500636 |
2022 |
10 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801480 |
|
|
$9.52 |
000001080741-3562500636 |
2022 |
10 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
4/11/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR041M1062209801479 |
|
|
$73.08 |
000001080741-3562500636 |
2022 |
9 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
3/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR032M1062208200400 |
|
|
$5.50 |
000001080741-3562500636 |
2022 |
9 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200400 |
|
|
$1.73 |
000001080741-3562500636 |
2022 |
9 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
3/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR032M1062208200400 |
|
|
$66.80 |
000001080741-3562500636 |
2022 |
9 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200400 |
|
|
$21.04 |
000001080741-3562500636 |
2022 |
9 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
3/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR032M1062208200400 |
|
|
$15.01 |
000001080741-3562500636 |
2022 |
9 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200400 |
|
|
$4.68 |
000001080741-3562500636 |
2022 |
9 |
FD04 |
00 |
E124 |
D |
1356001D |
002 |
3/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR032M1062208200400 |
|
|
$0.02 |
000001080741-3562500636 |
2022 |
9 |
FD04 |
00 |
E124 |
D |
1356001D |
002 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200400 |
|
|
$0.01 |
000001080741-3562500636 |
2022 |
9 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
3/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR032M1062208200400 |
|
|
$79.48 |
000001080741-3562500636 |
2022 |
9 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200400 |
|
|
$25.06 |
000001080741-3562500636 |
2022 |
9 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
3/9/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031M1062206709466 |
|
|
$48.73 |
000001080741-3562500636 |
2022 |
9 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
3/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709466 |
|
|
$3.90 |
000001080741-3562500636 |
2022 |
9 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
3/9/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031M1062206709466 |
|
|
$3.37 |
000001080741-3562500636 |
2022 |
9 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
3/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709466 |
|
|
$0.28 |
000001080741-3562500636 |
2022 |
9 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
3/9/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031M1062206709466 |
|
|
$40.83 |
000001080741-3562500636 |
2022 |
9 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
3/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709466 |
|
|
$3.28 |
000001080741-3562500636 |
2022 |
9 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
3/9/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031M1062206709466 |
|
|
$9.15 |
000001080741-3562500636 |
2022 |
9 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
3/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709466 |
|
|
$0.72 |
000001080741-3562500636 |
2022 |
9 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
3/9/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR031M1062206709476 |
|
|
$63.72 |
000001081677-3562500061 |
2022 |
9 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
3/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709476 |
|
|
$31.86 |
000001081677-3562500061 |
2022 |
9 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
3/9/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR031M1062206709476 |
|
|
$4.48 |
000001081677-3562500061 |
2022 |
9 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
3/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709476 |
|
|
$2.24 |
000001081677-3562500061 |
2022 |
9 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
3/9/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR031M1062206709476 |
|
|
$53.51 |
000001081677-3562500061 |
2022 |
9 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
3/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709476 |
|
|
$26.75 |
000001081677-3562500061 |
2022 |
9 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
3/9/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR031M1062206709476 |
|
|
$12.55 |
000001081677-3562500061 |
2022 |
9 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
3/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709476 |
|
|
$6.19 |
000001081677-3562500061 |
2022 |
8 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
2/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022M1062205308427 |
|
|
$39.78 |
000001080741-3562500636 |
2022 |
8 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
2/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022M1062205308427 |
|
|
$2.75 |
000001080741-3562500636 |
2022 |
8 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
2/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022M1062205308427 |
|
|
$33.40 |
000001080741-3562500636 |
2022 |
8 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
2/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022M1062205308427 |
|
|
$7.48 |
000001080741-3562500636 |
2022 |
8 |
FD04 |
00 |
E124 |
D |
1356001D |
002 |
2/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022M1062205308427 |
|
|
$0.01 |
000001080741-3562500636 |
2022 |
7 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
1/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012M1062202106460 |
|
|
$43.61 |
000001080741-3562500636 |
2022 |
7 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
1/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106460 |
|
|
$8.32 |
000001080741-3562500636 |
2022 |
7 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
1/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012M1062202106460 |
|
|
$3.02 |
000001080741-3562500636 |
2022 |
7 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
1/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106460 |
|
|
$0.58 |
000001080741-3562500636 |
2022 |
7 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
1/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012M1062202106460 |
|
|
$36.74 |
000001080741-3562500636 |
2022 |
7 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
1/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106460 |
|
|
$6.99 |
000001080741-3562500636 |
2022 |
7 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
1/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012M1062202106460 |
|
|
$8.25 |
000001080741-3562500636 |
2022 |
7 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
1/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106460 |
|
|
$1.55 |
000001080741-3562500636 |
2022 |
7 |
FD04 |
00 |
E124 |
D |
1356001D |
002 |
1/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012M1062202106460 |
|
|
$0.01 |
000001080741-3562500636 |
2022 |
6 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
12/22/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR122L1062135504509 |
|
|
$19.81 |
000001080741-3562500636 |
2022 |
6 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504509 |
|
|
$11.53 |
000001080741-3562500636 |
2022 |
6 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
12/22/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR122L1062135504509 |
|
|
$1.38 |
000001080741-3562500636 |
2022 |
6 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504509 |
|
|
$0.79 |
000001080741-3562500636 |
2022 |
6 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
12/22/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR122L1062135504509 |
|
|
$16.70 |
000001080741-3562500636 |
2022 |
6 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504509 |
|
|
$9.68 |
000001080741-3562500636 |
2022 |
6 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
12/22/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR122L1062135504509 |
|
|
$3.58 |
000001080741-3562500636 |
2022 |
6 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504509 |
|
|
$2.05 |
000001080741-3562500636 |
2022 |
6 |
FD04 |
00 |
E124 |
D |
1356001D |
002 |
12/22/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR122L1062135504509 |
|
|
$0.01 |
000001080741-3562500636 |
2022 |
6 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
12/8/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121L1062134103577 |
|
|
$39.72 |
000001080741-3562500636 |
2022 |
6 |
FD04 |
00 |
E111 |
D |
1356001D |
002 |
12/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103577 |
|
|
$13.53 |
000001080741-3562500636 |
2022 |
6 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
12/8/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121L1062134103577 |
|
|
$2.75 |
000001080741-3562500636 |
2022 |
6 |
FD04 |
00 |
E121 |
D |
1356001D |
002 |
12/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103577 |
|
|
$0.93 |
000001080741-3562500636 |
2022 |
6 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
12/8/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121L1062134103577 |
|
|
$33.40 |
000001080741-3562500636 |
2022 |
6 |
FD04 |
00 |
E122 |
D |
1356001D |
002 |
12/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103577 |
|
|
$11.36 |
000001080741-3562500636 |
2022 |
6 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
12/8/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121L1062134103577 |
|
|
$7.14 |
000001080741-3562500636 |
2022 |
6 |
FD04 |
00 |
E123 |
D |
1356001D |
002 |
12/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103577 |
|
|
$2.41 |
000001080741-3562500636 |