2024 |
10 |
FD52 |
05 |
E143 |
D |
1303201D |
056 |
4/29/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400221114 |
PON22200000427 |
GRESHAM SMITH |
$2,781.65 |
Preliminary Engineering Services |
2024 |
10 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
4/26/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042O1062411502726 |
|
|
$71.54 |
000001077851-3562500636 |
2024 |
10 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
4/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042O1062411502726 |
|
|
$10.50 |
000001077851-3562500636 |
2024 |
10 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
4/26/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042O1062411502726 |
|
|
$5.44 |
000001077851-3562500636 |
2024 |
10 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
4/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042O1062411502726 |
|
|
$0.80 |
000001077851-3562500636 |
2024 |
10 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
4/26/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042O1062411502726 |
|
|
$47.38 |
000001077851-3562500636 |
2024 |
10 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
4/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042O1062411502726 |
|
|
$6.95 |
000001077851-3562500636 |
2024 |
10 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
4/26/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042O1062411502726 |
|
|
$8.09 |
000001077851-3562500636 |
2024 |
10 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
4/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042O1062411502726 |
|
|
$1.17 |
000001077851-3562500636 |
2024 |
10 |
FD52 |
00 |
E124 |
D |
1303201D |
056 |
4/26/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042O1062411502726 |
|
|
$0.02 |
000001077851-3562500636 |
2024 |
10 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
4/26/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042O1062411502726 |
|
|
$971.43 |
000001078063-3562505204 |
2024 |
10 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
4/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042O1062411502726 |
|
|
$47.84 |
000001078063-3562505204 |
2024 |
10 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
4/26/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042O1062411502726 |
|
|
$66.78 |
000001078063-3562505204 |
2024 |
10 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
4/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042O1062411502726 |
|
|
$3.36 |
000001078063-3562505204 |
2024 |
10 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
4/26/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042O1062411502726 |
|
|
$642.82 |
000001078063-3562505204 |
2024 |
10 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
4/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042O1062411502726 |
|
|
$31.66 |
000001078063-3562505204 |
2024 |
10 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
4/26/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042O1062411502726 |
|
|
$210.35 |
000001078063-3562505204 |
2024 |
10 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
4/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042O1062411502726 |
|
|
$9.40 |
000001078063-3562505204 |
2024 |
10 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
4/26/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042O1062411502726 |
|
|
$0.29 |
000001078063-3562505204 |
2024 |
10 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
4/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042O1062411502726 |
|
|
$0.01 |
000001078063-3562505204 |
2024 |
10 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
4/10/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR041O1062410001614 |
|
|
$328.49 |
000001078063-3562505204 |
2024 |
10 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
4/10/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041O1062410001614 |
|
|
$138.42 |
000001078063-3562505204 |
2024 |
10 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
4/10/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR041O1062410001614 |
|
|
$21.61 |
000001078063-3562505204 |
2024 |
10 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
4/10/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041O1062410001614 |
|
|
$9.10 |
000001078063-3562505204 |
2024 |
10 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
4/10/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR041O1062410001614 |
|
|
$217.37 |
000001078063-3562505204 |
2024 |
10 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
4/10/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041O1062410001614 |
|
|
$91.59 |
000001078063-3562505204 |
2024 |
10 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
4/10/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR041O1062410001614 |
|
|
$74.19 |
000001078063-3562505204 |
2024 |
10 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
4/10/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041O1062410001614 |
|
|
$30.95 |
000001078063-3562505204 |
2024 |
9 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
3/15/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031O1062406810061 |
|
|
$105.01 |
000001077851-3562500636 |
2024 |
9 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
3/15/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031O1062406810061 |
|
|
$7.87 |
000001077851-3562500636 |
2024 |
9 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
3/15/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031O1062406810061 |
|
|
$69.49 |
000001077851-3562500636 |
2024 |
9 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
3/15/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031O1062406810061 |
|
|
$11.84 |
000001077851-3562500636 |
2024 |
9 |
FD52 |
05 |
E143 |
D |
1303201D |
056 |
3/11/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400174399 |
PON22200000427 |
GRESHAM SMITH |
$5,816.72 |
Preliminary Engineering Services |
2024 |
9 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
3/11/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031O1062406810062 |
|
|
$215.21 |
000001078063-3562505204 |
2024 |
9 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
3/11/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031O1062406810062 |
|
|
$2.63 |
000001078063-3562505204 |
2024 |
9 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
3/11/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031O1062406810062 |
|
|
$1,007.30 |
000001078063-3562505204 |
2024 |
9 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
3/11/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031O1062406810062 |
|
|
$19.42 |
000001078063-3562505204 |
2024 |
9 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
3/11/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031O1062406810062 |
|
|
$67.22 |
000001078063-3562505204 |
2024 |
9 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
3/11/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031O1062406810062 |
|
|
$1.42 |
000001078063-3562505204 |
2024 |
9 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
3/11/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031O1062406810062 |
|
|
$666.51 |
000001078063-3562505204 |
2024 |
9 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
3/11/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031O1062406810062 |
|
|
$12.85 |
000001078063-3562505204 |
2024 |
8 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
2/29/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022O1062405408883 |
|
|
$1,520.89 |
000001078063-3562505204 |
2024 |
8 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
2/29/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022O1062405408883 |
|
|
$147.79 |
000001078063-3562505204 |
2024 |
8 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
2/29/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022O1062405408883 |
|
|
$104.63 |
000001078063-3562505204 |
2024 |
8 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
2/29/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022O1062405408882 |
|
|
$214.85 |
000001077851-3562500636 |
2024 |
8 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
2/29/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022O1062405408883 |
|
|
$10.14 |
000001078063-3562505204 |
2024 |
8 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
2/29/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022O1062405408882 |
|
|
$55.85 |
000001077851-3562500636 |
2024 |
8 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
2/29/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022O1062405408883 |
|
|
$1,006.39 |
000001078063-3562505204 |
2024 |
8 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
2/29/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022O1062405408882 |
|
|
$16.32 |
000001077851-3562500636 |
2024 |
8 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
2/29/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022O1062405408883 |
|
|
$97.79 |
000001078063-3562505204 |
2024 |
8 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
2/29/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022O1062405408882 |
|
|
$4.25 |
000001077851-3562500636 |
2024 |
8 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
2/29/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022O1062405408883 |
|
|
$327.89 |
000001078063-3562505204 |
2024 |
8 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
2/29/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022O1062405408882 |
|
|
$142.13 |
000001077851-3562500636 |
2024 |
8 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
2/29/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022O1062405408883 |
|
|
$31.95 |
000001078063-3562505204 |
2024 |
8 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
2/29/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022O1062405408882 |
|
|
$36.95 |
000001077851-3562500636 |
2024 |
8 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
2/29/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022O1062405408883 |
|
|
$0.46 |
000001078063-3562505204 |
2024 |
8 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
2/29/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022O1062405408882 |
|
|
$24.28 |
000001077851-3562500636 |
2024 |
8 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
2/29/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022O1062405408883 |
|
|
$0.04 |
000001078063-3562505204 |
2024 |
8 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
2/29/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022O1062405408882 |
|
|
$6.22 |
000001077851-3562500636 |
2024 |
8 |
FD52 |
00 |
E124 |
D |
1303201D |
056 |
2/29/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022O1062405408882 |
|
|
$0.05 |
000001077851-3562500636 |
2024 |
8 |
FD52 |
00 |
E124 |
D |
1303201D |
056 |
2/29/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022O1062405408882 |
|
|
$0.01 |
000001077851-3562500636 |
2024 |
8 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
2/9/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR021O1062403907652 |
|
|
$525.07 |
000001077851-3562500636 |
2024 |
8 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
2/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021O1062403907652 |
|
|
$105.01 |
000001077851-3562500636 |
2024 |
8 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
2/9/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR021O1062403907652 |
|
|
$39.34 |
000001077851-3562500636 |
2024 |
8 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
2/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021O1062403907652 |
|
|
$7.87 |
000001077851-3562500636 |
2024 |
8 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
2/9/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR021O1062403907652 |
|
|
$347.43 |
000001077851-3562500636 |
2024 |
8 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
2/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021O1062403907652 |
|
|
$69.48 |
000001077851-3562500636 |
2024 |
8 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
2/9/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR021O1062403907652 |
|
|
$59.31 |
000001077851-3562500636 |
2024 |
8 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
2/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021O1062403907652 |
|
|
$11.70 |
000001077851-3562500636 |
2024 |
8 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
2/9/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR021O1062403907652 |
|
|
$1,145.80 |
000001078063-3562505204 |
2024 |
8 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
2/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021O1062403907652 |
|
|
$409.67 |
000001078063-3562505204 |
2024 |
8 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
2/9/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR021O1062403907652 |
|
|
$77.63 |
000001078063-3562505204 |
2024 |
8 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
2/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021O1062403907652 |
|
|
$27.51 |
000001078063-3562505204 |
2024 |
8 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
2/9/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR021O1062403907652 |
|
|
$758.16 |
000001078063-3562505204 |
2024 |
8 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
2/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021O1062403907652 |
|
|
$271.09 |
000001078063-3562505204 |
2024 |
8 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
2/9/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR021O1062403907652 |
|
|
$231.51 |
000001078063-3562505204 |
2024 |
8 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
2/9/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021O1062403907652 |
|
|
$84.74 |
000001078063-3562505204 |
2024 |
7 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
1/31/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012O1062402306571 |
|
|
$119.30 |
000001078063-3562505204 |
2024 |
7 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
1/31/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306571 |
|
|
$56.32 |
000001078063-3562505204 |
2024 |
7 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
1/31/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012O1062402306571 |
|
|
$8.83 |
000001078063-3562505204 |
2024 |
7 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
1/31/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306571 |
|
|
$4.18 |
000001078063-3562505204 |
2024 |
7 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
1/31/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012O1062402306571 |
|
|
$78.96 |
000001078063-3562505204 |
2024 |
7 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
1/31/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306571 |
|
|
$37.26 |
000001078063-3562505204 |
2024 |
7 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
1/31/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012O1062402306571 |
|
|
$16.39 |
000001078063-3562505204 |
2024 |
7 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
1/31/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306571 |
|
|
$7.62 |
000001078063-3562505204 |
2024 |
7 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
1/31/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012O1062402306571 |
|
|
$0.03 |
000001078063-3562505204 |
2024 |
7 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
1/31/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012O1062402306571 |
|
|
$0.01 |
000001078063-3562505204 |
2024 |
7 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
1/8/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011O1062400505710 |
|
|
$315.04 |
000001078063-3562505204 |
2024 |
7 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
1/8/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011O1062400505710 |
|
|
$174.85 |
000001078063-3562505204 |
2024 |
7 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
1/8/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011O1062400505710 |
|
|
$23.05 |
000001078063-3562505204 |
2024 |
7 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
1/8/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011O1062400505710 |
|
|
$12.80 |
000001078063-3562505204 |
2024 |
7 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
1/8/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011O1062400505710 |
|
|
$208.46 |
000001078063-3562505204 |
2024 |
7 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
1/8/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011O1062400505710 |
|
|
$115.70 |
000001078063-3562505204 |
2024 |
7 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
1/8/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011O1062400505710 |
|
|
$43.28 |
000001078063-3562505204 |
2024 |
7 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
1/8/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011O1062400505710 |
|
|
$23.67 |
000001078063-3562505204 |
2024 |
7 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
1/4/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR122N1062335504594 |
|
|
$686.98 |
000001078063-3562505204 |
2024 |
7 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
1/4/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122N1062335504594 |
|
|
$238.41 |
000001078063-3562505204 |
2024 |
7 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
1/4/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR122N1062335504594 |
|
|
$47.16 |
000001078063-3562505204 |
2024 |
7 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
1/4/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122N1062335504594 |
|
|
$16.33 |
000001078063-3562505204 |
2024 |
7 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
1/4/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR122N1062335504594 |
|
|
$455.10 |
000001078063-3562505204 |
2024 |
7 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
1/4/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122N1062335504594 |
|
|
$157.76 |
000001078063-3562505204 |
2024 |
7 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
1/4/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR122N1062335504594 |
|
|
$129.94 |
000001078063-3562505204 |
2024 |
7 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
1/4/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122N1062335504594 |
|
|
$45.10 |
000001078063-3562505204 |
2024 |
7 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
1/4/2024 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR122N1062335504594 |
|
|
$0.20 |
000001078063-3562505204 |
2024 |
7 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
1/4/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122N1062335504594 |
|
|
$0.06 |
000001078063-3562505204 |
2024 |
6 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
12/11/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121N1062334203608 |
|
|
$1,051.08 |
000001078063-3562505204 |
2024 |
6 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
12/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121N1062334203608 |
|
|
$809.95 |
000001078063-3562505204 |
2024 |
6 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
12/11/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121N1062334203608 |
|
|
$70.72 |
000001078063-3562505204 |
2024 |
6 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
12/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121N1062334203608 |
|
|
$54.11 |
000001078063-3562505204 |
2024 |
6 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
12/11/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121N1062334203608 |
|
|
$695.43 |
000001078063-3562505204 |
2024 |
6 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
12/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121N1062334203608 |
|
|
$535.93 |
000001078063-3562505204 |
2024 |
6 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
12/11/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121N1062334203608 |
|
|
$189.88 |
000001078063-3562505204 |
2024 |
6 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
12/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121N1062334203608 |
|
|
$148.16 |
000001078063-3562505204 |
2024 |
5 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
11/22/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112N1062332502500 |
|
|
$1,174.55 |
000001078063-3562505204 |
2024 |
5 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
11/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112N1062332502500 |
|
|
$362.00 |
000001078063-3562505204 |
2024 |
5 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
11/22/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112N1062332502500 |
|
|
$81.09 |
000001078063-3562505204 |
2024 |
5 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
11/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112N1062332502500 |
|
|
$24.93 |
000001078063-3562505204 |
2024 |
5 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
11/22/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112N1062332502500 |
|
|
$777.13 |
000001078063-3562505204 |
2024 |
5 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
11/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112N1062332502500 |
|
|
$239.54 |
000001078063-3562505204 |
2024 |
5 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
11/22/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112N1062332502500 |
|
|
$216.03 |
000001078063-3562505204 |
2024 |
5 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
11/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112N1062332502500 |
|
|
$66.77 |
000001078063-3562505204 |
2024 |
5 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
11/22/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112N1062332502500 |
|
|
$0.35 |
000001078063-3562505204 |
2024 |
5 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
11/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112N1062332502500 |
|
|
$0.11 |
000001078063-3562505204 |
2024 |
5 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
11/22/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112N1062332502499 |
|
|
$95.35 |
000001077851-3562500636 |
2024 |
5 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
11/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112N1062332502499 |
|
|
$21.96 |
000001077851-3562500636 |
2024 |
5 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
11/22/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112N1062332502499 |
|
|
$7.25 |
000001077851-3562500636 |
2024 |
5 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
11/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112N1062332502499 |
|
|
$1.66 |
000001077851-3562500636 |
2024 |
5 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
11/22/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112N1062332502499 |
|
|
$63.17 |
000001077851-3562500636 |
2024 |
5 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
11/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112N1062332502499 |
|
|
$14.53 |
000001077851-3562500636 |
2024 |
5 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
11/22/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112N1062332502499 |
|
|
$9.36 |
000001077851-3562500636 |
2024 |
5 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
11/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112N1062332502499 |
|
|
$2.11 |
000001077851-3562500636 |
2024 |
5 |
FD52 |
00 |
E124 |
D |
1303201D |
056 |
11/22/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112N1062332502499 |
|
|
$0.02 |
000001077851-3562500636 |
2024 |
5 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
11/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201468 |
|
|
$91.28 |
000001078063-3562505204 |
2024 |
5 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
11/9/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR111N1062331201472 |
|
|
$30.21 |
000001080226-3562505200 |
2024 |
5 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
11/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201472 |
|
|
$2.43 |
000001080226-3562505200 |
2024 |
5 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
11/9/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR111N1062331201472 |
|
|
$10.66 |
000001080226-3562505200 |
2024 |
5 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
11/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201472 |
|
|
$0.85 |
000001080226-3562505200 |
2024 |
5 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
11/9/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111N1062331201468 |
|
|
$188.66 |
000001078063-3562505204 |
2024 |
5 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
11/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201468 |
|
|
$25.37 |
000001078063-3562505204 |
2024 |
5 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
11/9/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111N1062331201467 |
|
|
$109.39 |
000001077851-3562500636 |
2024 |
5 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
11/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201467 |
|
|
$7.00 |
000001077851-3562500636 |
2024 |
5 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
11/9/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111N1062331201467 |
|
|
$8.19 |
000001077851-3562500636 |
2024 |
5 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
11/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201467 |
|
|
$0.53 |
000001077851-3562500636 |
2024 |
5 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
11/9/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111N1062331201467 |
|
|
$72.38 |
000001077851-3562500636 |
2024 |
5 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
11/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201467 |
|
|
$4.63 |
000001077851-3562500636 |
2024 |
5 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
11/9/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111N1062331201467 |
|
|
$10.70 |
000001077851-3562500636 |
2024 |
5 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
11/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201467 |
|
|
$0.68 |
000001077851-3562500636 |
2024 |
5 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
11/9/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR111N1062331201472 |
|
|
$45.60 |
000001080226-3562505200 |
2024 |
5 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
11/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201472 |
|
|
$3.66 |
000001080226-3562505200 |
2024 |
5 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
11/9/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR111N1062331201472 |
|
|
$3.11 |
000001080226-3562505200 |
2024 |
5 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
11/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201472 |
|
|
$0.25 |
000001080226-3562505200 |
2024 |
5 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
11/9/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111N1062331201467 |
|
|
$999.89 |
000001078063-3562505204 |
2024 |
5 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
11/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201467 |
|
|
$137.95 |
000001078063-3562505204 |
2024 |
5 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
11/9/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111N1062331201467 |
|
|
$66.42 |
000001078063-3562505204 |
2024 |
5 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
11/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201467 |
|
|
$9.20 |
000001078063-3562505204 |
2024 |
5 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
11/9/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111N1062331201467 |
|
|
$661.71 |
000001078063-3562505204 |
2024 |
4 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
10/9/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR101N1062328009682 |
|
|
$904.24 |
000001078063-3562505204 |
2024 |
4 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
10/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101N1062328009682 |
|
|
$295.74 |
000001078063-3562505204 |
2024 |
4 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
10/9/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR101N1062328009682 |
|
|
$58.60 |
000001078063-3562505204 |
2024 |
4 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
10/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101N1062328009682 |
|
|
$19.17 |
000001078063-3562505204 |
2024 |
4 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
10/9/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR101N1062328009682 |
|
|
$598.52 |
000001078063-3562505204 |
2024 |
4 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
10/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101N1062328009682 |
|
|
$195.70 |
000001078063-3562505204 |
2024 |
4 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
10/9/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR101N1062328009682 |
|
|
$192.91 |
000001078063-3562505204 |
2024 |
4 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
10/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101N1062328009682 |
|
|
$62.41 |
000001078063-3562505204 |
2024 |
3 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
9/29/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092N1062327208399 |
|
|
$2,336.48 |
000001078063-3562505204 |
2024 |
3 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208399 |
|
|
$620.29 |
000001078063-3562505204 |
2024 |
3 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
9/29/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092N1062327208399 |
|
|
$157.96 |
000001078063-3562505204 |
2024 |
3 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208399 |
|
|
$41.90 |
000001078063-3562505204 |
2024 |
3 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
9/29/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092N1062327208399 |
|
|
$1,546.02 |
000001078063-3562505204 |
2024 |
3 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208399 |
|
|
$410.45 |
000001078063-3562505204 |
2024 |
3 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
9/29/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092N1062327208399 |
|
|
$491.32 |
000001078063-3562505204 |
2024 |
3 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208399 |
|
|
$129.87 |
000001078063-3562505204 |
2024 |
3 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
9/29/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092N1062327208399 |
|
|
$0.77 |
000001078063-3562505204 |
2024 |
3 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208399 |
|
|
$0.20 |
000001078063-3562505204 |
2024 |
3 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
9/28/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092N1062326507048 |
|
|
($2,336.48) |
000001078063-3562505204 |
2024 |
3 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
9/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507048 |
|
|
($620.29) |
000001078063-3562505204 |
2024 |
3 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
9/28/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092N1062326507048 |
|
|
($157.96) |
000001078063-3562505204 |
2024 |
3 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
9/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507048 |
|
|
($41.90) |
000001078063-3562505204 |
2024 |
3 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
9/28/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092N1062326507048 |
|
|
($1,546.02) |
000001078063-3562505204 |
2024 |
3 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
9/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507048 |
|
|
($410.45) |
000001078063-3562505204 |
2024 |
3 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
9/28/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092N1062326507048 |
|
|
($491.32) |
000001078063-3562505204 |
2024 |
3 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
9/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507048 |
|
|
($129.87) |
000001078063-3562505204 |
2024 |
3 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
9/28/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092N1062326507048 |
|
|
($0.77) |
000001078063-3562505204 |
2024 |
3 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
9/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507048 |
|
|
($0.20) |
000001078063-3562505204 |
2024 |
3 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
9/25/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092N1062326507048 |
|
|
$2,336.48 |
000001078063-3562505204 |
2024 |
3 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
9/25/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507048 |
|
|
$620.29 |
000001078063-3562505204 |
2024 |
3 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
9/25/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092N1062326507048 |
|
|
$157.96 |
000001078063-3562505204 |
2024 |
3 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
9/25/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507048 |
|
|
$41.90 |
000001078063-3562505204 |
2024 |
3 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
9/25/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092N1062326507048 |
|
|
$1,546.02 |
000001078063-3562505204 |
2024 |
3 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
9/25/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507048 |
|
|
$410.45 |
000001078063-3562505204 |
2024 |
3 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
9/25/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092N1062326507048 |
|
|
$491.32 |
000001078063-3562505204 |
2024 |
3 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
9/25/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507048 |
|
|
$129.87 |
000001078063-3562505204 |
2024 |
3 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
9/25/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092N1062326507048 |
|
|
$0.77 |
000001078063-3562505204 |
2024 |
3 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
9/25/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507048 |
|
|
$0.20 |
000001078063-3562505204 |
2024 |
3 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
9/18/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091N1062325106079 |
|
|
$437.59 |
000001077851-3562500636 |
2024 |
3 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
9/18/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091N1062325106079 |
|
|
$25.81 |
000001077851-3562500636 |
2024 |
3 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
9/18/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091N1062325106079 |
|
|
$32.79 |
000001077851-3562500636 |
2024 |
3 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
9/18/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091N1062325106079 |
|
|
$1.93 |
000001077851-3562500636 |
2024 |
3 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
9/18/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091N1062325106079 |
|
|
$289.53 |
000001077851-3562500636 |
2024 |
3 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
9/18/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091N1062325106079 |
|
|
$17.07 |
000001077851-3562500636 |
2024 |
3 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
9/18/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091N1062325106079 |
|
|
$42.80 |
000001077851-3562500636 |
2024 |
3 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
9/18/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091N1062325106079 |
|
|
$2.49 |
000001077851-3562500636 |
2024 |
3 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
9/18/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091N1062325106079 |
|
|
$1,426.85 |
000001078063-3562505204 |
2024 |
3 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
9/18/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091N1062325106079 |
|
|
$161.55 |
000001078063-3562505204 |
2024 |
3 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
9/18/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091N1062325106079 |
|
|
$93.22 |
000001078063-3562505204 |
2024 |
3 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
9/18/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091N1062325106079 |
|
|
$10.50 |
000001078063-3562505204 |
2024 |
3 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
9/18/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091N1062325106079 |
|
|
$944.20 |
000001078063-3562505204 |
2024 |
3 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
9/18/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091N1062325106079 |
|
|
$106.91 |
000001078063-3562505204 |
2024 |
3 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
9/18/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091N1062325106079 |
|
|
$295.57 |
000001078063-3562505204 |
2024 |
3 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
9/18/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091N1062325106079 |
|
|
$33.77 |
000001078063-3562505204 |
2024 |
2 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
8/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082N1062323504926 |
|
|
$5.60 |
000001078063-3562505204 |
2024 |
2 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
8/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082N1062323504932 |
|
|
$0.08 |
000001080226-3562505200 |
2024 |
2 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
8/24/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082N1062323504926 |
|
|
$181.29 |
000001078063-3562505204 |
2024 |
2 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
8/24/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR082N1062323504932 |
|
|
$0.02 |
000001080226-3562505200 |
2024 |
2 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
8/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082N1062323504926 |
|
|
$50.52 |
000001078063-3562505204 |
2024 |
2 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
8/24/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082N1062323504926 |
|
|
$42.55 |
000001078063-3562505204 |
2024 |
2 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
8/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082N1062323504926 |
|
|
$11.70 |
000001078063-3562505204 |
2024 |
2 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
8/24/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082N1062323504926 |
|
|
$0.09 |
000001078063-3562505204 |
2024 |
2 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
8/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082N1062323504926 |
|
|
$0.02 |
000001078063-3562505204 |
2024 |
2 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
8/24/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR082N1062323504931 |
|
|
$66.40 |
000001080226-3562505200 |
2024 |
2 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
8/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082N1062323504931 |
|
|
$0.33 |
000001080226-3562505200 |
2024 |
2 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
8/24/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR082N1062323504931 |
|
|
$4.65 |
000001080226-3562505200 |
2024 |
2 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
8/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082N1062323504931 |
|
|
$0.02 |
000001080226-3562505200 |
2024 |
2 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
8/24/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082N1062323504925 |
|
|
$273.92 |
000001078063-3562505204 |
2024 |
2 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
8/24/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR082N1062323504931 |
|
|
$43.95 |
000001080226-3562505200 |
2024 |
2 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
8/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082N1062323504925 |
|
|
$76.34 |
000001078063-3562505204 |
2024 |
2 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
8/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082N1062323504931 |
|
|
$0.22 |
000001080226-3562505200 |
2024 |
2 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
8/24/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082N1062323504925 |
|
|
$20.08 |
000001078063-3562505204 |
2024 |
2 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
8/24/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR082N1062323504931 |
|
|
$15.50 |
000001080226-3562505200 |
2024 |
2 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
8/15/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081N1062322003847 |
|
|
$546.48 |
000001078063-3562505204 |
2024 |
2 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
8/15/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081N1062322003847 |
|
|
$8.59 |
000001078063-3562505204 |
2024 |
2 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
8/15/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081N1062322003847 |
|
|
$39.20 |
000001078063-3562505204 |
2024 |
2 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
8/15/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081N1062322003847 |
|
|
$0.62 |
000001078063-3562505204 |
2024 |
2 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
8/15/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081N1062322003847 |
|
|
$361.61 |
000001078063-3562505204 |
2024 |
2 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
8/15/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081N1062322003847 |
|
|
$5.69 |
000001078063-3562505204 |
2024 |
2 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
8/15/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081N1062322003847 |
|
|
$82.03 |
000001078063-3562505204 |
2024 |
2 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
8/15/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081N1062322003847 |
|
|
$1.01 |
000001078063-3562505204 |
2024 |
2 |
FD52 |
05 |
E229 |
D |
1303201D |
056 |
8/11/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
IET-XE13A162523222004610 |
|
|
$2.85 |
|
2024 |
1 |
FD52 |
05 |
E229 |
D |
1303201D |
056 |
7/26/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
IET-XE13A162523206002300 |
|
|
$3.40 |
|
2024 |
1 |
FD52 |
05 |
E229 |
D |
1303201D |
056 |
7/12/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
IET-XE13A162523191004610 |
|
|
$3.40 |
|
2024 |
1 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
7/11/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR071N1062319101535 |
|
|
$233.26 |
000001078063-3562505204 |
2024 |
1 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
7/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071N1062319101535 |
|
|
$104.23 |
000001078063-3562505204 |
2024 |
1 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
7/11/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR071N1062319101535 |
|
|
$16.81 |
000001078063-3562505204 |
2024 |
1 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
7/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071N1062319101535 |
|
|
$7.42 |
000001078063-3562505204 |
2024 |
1 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
7/11/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR071N1062319101535 |
|
|
$181.89 |
000001078063-3562505204 |
2024 |
1 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
7/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071N1062319101535 |
|
|
$81.30 |
000001078063-3562505204 |
2024 |
1 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
7/11/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR071N1062319101535 |
|
|
$34.13 |
000001078063-3562505204 |
2024 |
1 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
7/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071N1062319101535 |
|
|
$16.79 |
000001078063-3562505204 |
2023 |
12 |
FD52 |
05 |
E229 |
D |
1303201D |
056 |
6/26/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
IET-XE13A162523176006430 |
|
|
$3.40 |
|
2023 |
12 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
6/26/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062N1062317400418 |
|
|
$232.07 |
000001078063-3562505204 |
2023 |
12 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
6/26/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062N1062317400418 |
|
|
$76.35 |
000001078063-3562505204 |
2023 |
12 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
6/26/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062N1062317400418 |
|
|
$16.87 |
000001078063-3562505204 |
2023 |
12 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
6/26/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062N1062317400418 |
|
|
$5.56 |
000001078063-3562505204 |
2023 |
12 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
6/26/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062N1062317400418 |
|
|
$181.06 |
000001078063-3562505204 |
2023 |
12 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
6/26/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062N1062317400418 |
|
|
$59.55 |
000001078063-3562505204 |
2023 |
12 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
6/26/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062N1062317400418 |
|
|
$42.58 |
000001078063-3562505204 |
2023 |
12 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
6/26/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062N1062317400418 |
|
|
$13.93 |
000001078063-3562505204 |
2023 |
12 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
6/26/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062N1062317400418 |
|
|
$0.08 |
000001078063-3562505204 |
2023 |
12 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
6/26/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062N1062317400418 |
|
|
$0.03 |
000001078063-3562505204 |
2023 |
12 |
FD52 |
05 |
E229 |
D |
1303201D |
056 |
6/13/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
IET-XE13A262523161000320 |
|
|
$3.40 |
|
2023 |
11 |
FD52 |
05 |
E229 |
D |
1303201D |
056 |
5/26/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
IET-XE13A162523145004640 |
|
|
$3.40 |
|
2023 |
11 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
5/24/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052N1062314309028 |
|
|
$29.42 |
000001078063-3562505204 |
2023 |
11 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
5/24/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052N1062314309028 |
|
|
$2.13 |
000001078063-3562505204 |
2023 |
11 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
5/24/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052N1062314309028 |
|
|
$22.94 |
000001078063-3562505204 |
2023 |
11 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
5/24/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052N1062314309028 |
|
|
$5.67 |
000001078063-3562505204 |
2023 |
11 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
5/24/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052N1062314309028 |
|
|
$0.02 |
000001078063-3562505204 |
2023 |
11 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
5/24/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR052N1062314309034 |
|
|
$235.00 |
000001080226-3562505200 |
2023 |
11 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
5/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052N1062314309034 |
|
|
$36.03 |
000001080226-3562505200 |
2023 |
11 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
5/24/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR052N1062314309034 |
|
|
$16.35 |
000001080226-3562505200 |
2023 |
11 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
5/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052N1062314309034 |
|
|
$2.50 |
000001080226-3562505200 |
2023 |
11 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
5/24/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR052N1062314309034 |
|
|
$183.28 |
000001080226-3562505200 |
2023 |
11 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
5/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052N1062314309034 |
|
|
$28.10 |
000001080226-3562505200 |
2023 |
11 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
5/24/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR052N1062314309034 |
|
|
$58.21 |
000001080226-3562505200 |
2023 |
11 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
5/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052N1062314309034 |
|
|
$8.84 |
000001080226-3562505200 |
2023 |
11 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
5/24/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR052N1062314309034 |
|
|
$0.09 |
000001080226-3562505200 |
2023 |
11 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
5/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052N1062314309034 |
|
|
$0.01 |
000001080226-3562505200 |
2023 |
11 |
FD52 |
05 |
E229 |
D |
1303201D |
056 |
5/15/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
IET-XE13A162523130005330 |
|
|
$3.40 |
|
2023 |
11 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
5/15/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051N1062312808055 |
|
|
$255.36 |
000001078063-3562505204 |
2023 |
11 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
5/15/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051N1062312808055 |
|
|
$2.70 |
000001078063-3562505204 |
2023 |
11 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
5/15/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051N1062312808055 |
|
|
$18.05 |
000001078063-3562505204 |
2023 |
11 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
5/15/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051N1062312808055 |
|
|
$0.20 |
000001078063-3562505204 |
2023 |
11 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
5/15/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051N1062312808055 |
|
|
$199.18 |
000001078063-3562505204 |
2023 |
11 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
5/15/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051N1062312808055 |
|
|
$2.10 |
000001078063-3562505204 |
2023 |
11 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
5/15/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051N1062312808055 |
|
|
$46.67 |
000001078063-3562505204 |
2023 |
11 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
5/15/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051N1062312808055 |
|
|
$0.37 |
000001078063-3562505204 |
2023 |
11 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
5/9/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR051N1062312808060 |
|
|
$310.17 |
000001080226-3562505200 |
2023 |
11 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
5/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051N1062312808060 |
|
|
$10.68 |
000001080226-3562505200 |
2023 |
11 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
5/9/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR051N1062312808060 |
|
|
$20.95 |
000001080226-3562505200 |
2023 |
11 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
5/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051N1062312808060 |
|
|
$0.72 |
000001080226-3562505200 |
2023 |
11 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
5/9/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR051N1062312808060 |
|
|
$241.93 |
000001080226-3562505200 |
2023 |
11 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
5/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051N1062312808060 |
|
|
$8.33 |
000001080226-3562505200 |
2023 |
11 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
5/9/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR051N1062312808060 |
|
|
$76.76 |
000001080226-3562505200 |
2023 |
11 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
5/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051N1062312808060 |
|
|
$2.62 |
000001080226-3562505200 |
2023 |
10 |
FD52 |
05 |
E229 |
D |
1303201D |
056 |
4/27/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
IET-XE13A162523115004320 |
|
|
$3.40 |
|
2023 |
10 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
4/24/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042N1062311106920 |
|
|
$235.55 |
000001078063-3562505204 |
2023 |
10 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
4/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042N1062311106920 |
|
|
$37.36 |
000001078063-3562505204 |
2023 |
10 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
4/24/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042N1062311106920 |
|
|
$17.19 |
000001078063-3562505204 |
2023 |
10 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
4/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042N1062311106920 |
|
|
$2.73 |
000001078063-3562505204 |
2023 |
10 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
4/24/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042N1062311106920 |
|
|
$183.83 |
000001078063-3562505204 |
2023 |
10 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
4/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042N1062311106920 |
|
|
$29.13 |
000001078063-3562505204 |
2023 |
10 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
4/24/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042N1062311106920 |
|
|
$40.52 |
000001078063-3562505204 |
2023 |
10 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
4/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042N1062311106920 |
|
|
$6.22 |
000001078063-3562505204 |
2023 |
10 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
4/24/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042N1062311106920 |
|
|
$0.09 |
000001078063-3562505204 |
2023 |
10 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
4/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042N1062311106920 |
|
|
$0.01 |
000001078063-3562505204 |
2023 |
10 |
FD52 |
05 |
E229 |
D |
1303201D |
056 |
4/14/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
IET-XE13A162523100003310 |
|
|
$3.40 |
|
2023 |
10 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
4/14/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR041N1062309605756 |
|
|
$364.02 |
000001078063-3562505204 |
2023 |
10 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
4/14/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041N1062309605756 |
|
|
$33.17 |
000001078063-3562505204 |
2023 |
10 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
4/14/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR041N1062309605756 |
|
|
$25.59 |
000001078063-3562505204 |
2023 |
10 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
4/14/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041N1062309605756 |
|
|
$2.33 |
000001078063-3562505204 |
2023 |
10 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
4/14/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR041N1062309605756 |
|
|
$283.94 |
000001078063-3562505204 |
2023 |
10 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
4/14/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041N1062309605756 |
|
|
$25.87 |
000001078063-3562505204 |
2023 |
10 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
4/14/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR041N1062309605756 |
|
|
$70.07 |
000001078063-3562505204 |
2023 |
10 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
4/14/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041N1062309605756 |
|
|
$6.31 |
000001078063-3562505204 |
2023 |
9 |
FD52 |
05 |
E229 |
D |
1303201D |
056 |
3/29/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
IET-XE13A162523084004900 |
|
|
$3.40 |
|
2023 |
9 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
3/27/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR032N1062308304631 |
|
|
$1,646.66 |
000001078063-3562505204 |
2023 |
9 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
3/27/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032N1062308304631 |
|
|
$19.24 |
000001078063-3562505204 |
2023 |
9 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
3/27/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR032N1062308304631 |
|
|
$119.50 |
000001078063-3562505204 |
2023 |
9 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
3/27/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032N1062308304631 |
|
|
$1.41 |
000001078063-3562505204 |
2023 |
9 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
3/27/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR032N1062308304631 |
|
|
$1,284.42 |
000001078063-3562505204 |
2023 |
9 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
3/27/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032N1062308304631 |
|
|
$15.01 |
000001078063-3562505204 |
2023 |
9 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
3/27/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR032N1062308304631 |
|
|
$311.17 |
000001078063-3562505204 |
2023 |
9 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
3/27/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032N1062308304631 |
|
|
$2.63 |
000001078063-3562505204 |
2023 |
9 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
3/27/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR032N1062308304631 |
|
|
$0.67 |
000001078063-3562505204 |
2023 |
9 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
3/27/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR032N1062308304637 |
|
|
$62.66 |
000001080226-3562505200 |
2023 |
9 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
3/27/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032N1062308304637 |
|
|
$109.66 |
000001080226-3562505200 |
2023 |
9 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
3/27/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR032N1062308304637 |
|
|
$4.36 |
000001080226-3562505200 |
2023 |
9 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
3/27/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032N1062308304637 |
|
|
$7.62 |
000001080226-3562505200 |
2023 |
9 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
3/27/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR032N1062308304637 |
|
|
$48.87 |
000001080226-3562505200 |
2023 |
9 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
3/27/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032N1062308304637 |
|
|
$85.53 |
000001080226-3562505200 |
2023 |
9 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
3/27/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR032N1062308304637 |
|
|
$15.72 |
000001080226-3562505200 |
2023 |
9 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
3/27/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032N1062308304637 |
|
|
$26.92 |
000001080226-3562505200 |
2023 |
9 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
3/27/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR032N1062308304637 |
|
|
$0.02 |
000001080226-3562505200 |
2023 |
9 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
3/27/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032N1062308304637 |
|
|
$0.04 |
000001080226-3562505200 |
2023 |
9 |
FD52 |
05 |
E229 |
D |
1303201D |
056 |
3/17/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
IET-XE13A162523069003830 |
|
|
$3.40 |
|
2023 |
9 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
3/9/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031N1062306703651 |
|
|
$1,159.49 |
000001078063-3562505204 |
2023 |
9 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
3/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031N1062306703651 |
|
|
$809.67 |
000001078063-3562505204 |
2023 |
9 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
3/9/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031N1062306703651 |
|
|
$81.50 |
000001078063-3562505204 |
2023 |
9 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
3/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031N1062306703651 |
|
|
$56.91 |
000001078063-3562505204 |
2023 |
9 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
3/9/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031N1062306703651 |
|
|
$904.40 |
000001078063-3562505204 |
2023 |
9 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
3/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031N1062306703651 |
|
|
$631.54 |
000001078063-3562505204 |
2023 |
9 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
3/9/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031N1062306703651 |
|
|
$224.68 |
000001078063-3562505204 |
2023 |
9 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
3/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031N1062306703651 |
|
|
$154.01 |
000001078063-3562505204 |
2023 |
9 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
3/9/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR031N1062306703655 |
|
|
$134.02 |
000001080226-3562505200 |
2023 |
9 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
3/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031N1062306703655 |
|
|
$4.98 |
000001080226-3562505200 |
2023 |
9 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
3/9/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR031N1062306703655 |
|
|
$9.05 |
000001080226-3562505200 |
2023 |
9 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
3/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031N1062306703655 |
|
|
$0.33 |
000001080226-3562505200 |
2023 |
9 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
3/9/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR031N1062306703655 |
|
|
$104.53 |
000001080226-3562505200 |
2023 |
9 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
3/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031N1062306703655 |
|
|
$3.89 |
000001080226-3562505200 |
2023 |
9 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
3/9/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR031N1062306703655 |
|
|
$33.17 |
000001080226-3562505200 |
2023 |
9 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
3/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031N1062306703655 |
|
|
$1.22 |
000001080226-3562505200 |
2023 |
8 |
FD52 |
05 |
E229 |
D |
1303201D |
056 |
2/27/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
IET-XE13A162523056003830 |
|
|
$3.40 |
|
2023 |
8 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
2/23/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022N1062305302433 |
|
|
$830.72 |
000001078063-3562505204 |
2023 |
8 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
2/23/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022N1062305302433 |
|
|
$19.65 |
000001078063-3562505204 |
2023 |
8 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
2/23/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022N1062305302433 |
|
|
$60.55 |
000001078063-3562505204 |
2023 |
8 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
2/23/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022N1062305302433 |
|
|
$1.44 |
000001078063-3562505204 |
2023 |
8 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
2/23/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022N1062305302433 |
|
|
$648.00 |
000001078063-3562505204 |
2023 |
8 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
2/23/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022N1062305302433 |
|
|
$15.33 |
000001078063-3562505204 |
2023 |
8 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
2/23/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022N1062305302433 |
|
|
$144.28 |
000001078063-3562505204 |
2023 |
8 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
2/23/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022N1062305302433 |
|
|
$2.69 |
000001078063-3562505204 |
2023 |
8 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
2/23/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022N1062305302433 |
|
|
$0.30 |
000001078063-3562505204 |
2023 |
8 |
FD52 |
05 |
E229 |
D |
1303201D |
056 |
2/14/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
IET-XE13A162523041005980 |
|
|
$3.40 |
|
2023 |
8 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
2/9/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR021N1062303901405 |
|
|
$1,067.60 |
000001078063-3562505204 |
2023 |
8 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
2/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021N1062303901405 |
|
|
$343.82 |
000001078063-3562505204 |
2023 |
8 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
2/9/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR021N1062303901405 |
|
|
$75.15 |
000001078063-3562505204 |
2023 |
8 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
2/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021N1062303901405 |
|
|
$24.17 |
000001078063-3562505204 |
2023 |
8 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
2/9/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR021N1062303901405 |
|
|
$833.84 |
000001078063-3562505204 |
2023 |
8 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
2/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021N1062303901405 |
|
|
$268.16 |
000001078063-3562505204 |
2023 |
8 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
2/9/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR021N1062303901405 |
|
|
$203.16 |
000001078063-3562505204 |
2023 |
8 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
2/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021N1062303901405 |
|
|
$65.03 |
000001078063-3562505204 |
2023 |
8 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
2/9/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR021N1062303901411 |
|
|
$100.62 |
000001080226-3562505200 |
2023 |
8 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
2/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021N1062303901411 |
|
|
$23.26 |
000001080226-3562505200 |
2023 |
8 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
2/9/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR021N1062303901411 |
|
|
$6.79 |
000001080226-3562505200 |
2023 |
8 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
2/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021N1062303901411 |
|
|
$1.57 |
000001080226-3562505200 |
2023 |
8 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
2/9/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR021N1062303901411 |
|
|
$78.41 |
000001080226-3562505200 |
2023 |
8 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
2/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021N1062303901411 |
|
|
$18.15 |
000001080226-3562505200 |
2023 |
8 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
2/9/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR021N1062303901411 |
|
|
$24.91 |
000001080226-3562505200 |
2023 |
8 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
2/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021N1062303901411 |
|
|
$5.72 |
000001080226-3562505200 |
2023 |
7 |
FD52 |
05 |
E229 |
D |
1303201D |
056 |
1/26/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
IET-XE13A162523025004390 |
|
|
$3.40 |
|
2023 |
7 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
1/24/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR012N1062302300410 |
|
|
$654.92 |
000001080226-3562505200 |
2023 |
7 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
1/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012N1062302300410 |
|
|
$192.31 |
000001080226-3562505200 |
2023 |
7 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
1/24/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR012N1062302300410 |
|
|
$45.54 |
000001080226-3562505200 |
2023 |
7 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
1/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012N1062302300410 |
|
|
$13.38 |
000001080226-3562505200 |
2023 |
7 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
1/24/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR012N1062302300410 |
|
|
$510.74 |
000001080226-3562505200 |
2023 |
7 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
1/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012N1062302300410 |
|
|
$150.01 |
000001080226-3562505200 |
2023 |
7 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
1/24/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR012N1062302300410 |
|
|
$162.40 |
000001080226-3562505200 |
2023 |
7 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
1/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012N1062302300410 |
|
|
$47.20 |
000001080226-3562505200 |
2023 |
7 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
1/24/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR012N1062302300410 |
|
|
$0.25 |
000001080226-3562505200 |
2023 |
7 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
1/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012N1062302300410 |
|
|
$0.07 |
000001080226-3562505200 |
2023 |
7 |
FD52 |
05 |
E229 |
D |
1303201D |
056 |
1/11/2023 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
IET-XE13A162523010003900 |
|
|
$3.40 |
|
2023 |
7 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
1/9/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR011N1062300610247 |
|
|
$187.92 |
000001080226-3562505200 |
2023 |
7 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
1/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011N1062300610247 |
|
|
$501.28 |
000001080226-3562505200 |
2023 |
7 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
1/9/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR011N1062300610247 |
|
|
$12.70 |
000001080226-3562505200 |
2023 |
7 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
1/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011N1062300610247 |
|
|
$33.87 |
000001080226-3562505200 |
2023 |
7 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
1/9/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR011N1062300610247 |
|
|
$146.62 |
000001080226-3562505200 |
2023 |
7 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
1/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011N1062300610247 |
|
|
$390.99 |
000001080226-3562505200 |
2023 |
7 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
1/9/2023 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR011N1062300610247 |
|
|
$47.50 |
000001080226-3562505200 |
2023 |
7 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
1/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011N1062300610247 |
|
|
$123.04 |
000001080226-3562505200 |
2023 |
6 |
FD52 |
05 |
E229 |
D |
1303201D |
056 |
12/27/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
IET-XE13A162522359003930 |
|
|
$3.40 |
|
2023 |
6 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
12/22/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR122M1062235509157 |
|
|
$46.99 |
000001080226-3562505200 |
2023 |
6 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
12/22/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122M1062235509157 |
|
|
$12.85 |
000001080226-3562505200 |
2023 |
6 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
12/22/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR122M1062235509157 |
|
|
$3.25 |
000001080226-3562505200 |
2023 |
6 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
12/22/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122M1062235509157 |
|
|
$0.90 |
000001080226-3562505200 |
2023 |
6 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
12/22/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR122M1062235509157 |
|
|
$36.66 |
000001080226-3562505200 |
2023 |
6 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
12/22/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122M1062235509157 |
|
|
$10.02 |
000001080226-3562505200 |
2023 |
6 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
12/22/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR122M1062235509157 |
|
|
$10.25 |
000001080226-3562505200 |
2023 |
6 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
12/22/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122M1062235509157 |
|
|
$2.77 |
000001080226-3562505200 |
2023 |
6 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
12/22/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR122M1062235509157 |
|
|
$0.02 |
000001080226-3562505200 |
2023 |
6 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
12/22/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR122M1062235509148 |
|
|
$1,663.98 |
000001078063-3562505204 |
2023 |
6 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
12/22/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122M1062235509148 |
|
|
$203.50 |
000001078063-3562505204 |
2023 |
6 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
12/22/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR122M1062235509148 |
|
|
$120.82 |
000001078063-3562505204 |
2023 |
6 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
12/22/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122M1062235509148 |
|
|
$14.76 |
000001078063-3562505204 |
2023 |
6 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
12/22/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR122M1062235509148 |
|
|
$1,297.90 |
000001078063-3562505204 |
2023 |
6 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
12/22/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122M1062235509148 |
|
|
$158.73 |
000001078063-3562505204 |
2023 |
6 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
12/22/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR122M1062235509148 |
|
|
$286.14 |
000001078063-3562505204 |
2023 |
6 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
12/22/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122M1062235509148 |
|
|
$34.56 |
000001078063-3562505204 |
2023 |
6 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
12/22/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR122M1062235509148 |
|
|
$0.67 |
000001078063-3562505204 |
2023 |
6 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
12/22/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122M1062235509148 |
|
|
$0.08 |
000001078063-3562505204 |
2023 |
6 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
12/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121M1062234208199 |
|
|
$295.99 |
000001078063-3562505204 |
2023 |
6 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
12/14/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121M1062234208199 |
|
|
$151.38 |
000001078063-3562505204 |
2023 |
6 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
12/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121M1062234208199 |
|
|
$61.14 |
000001078063-3562505204 |
2023 |
6 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
12/14/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121M1062234208199 |
|
|
$899.16 |
000001078063-3562505204 |
2023 |
6 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
12/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121M1062234208199 |
|
|
$379.48 |
000001078063-3562505204 |
2023 |
6 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
12/14/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121M1062234208199 |
|
|
$63.68 |
000001078063-3562505204 |
2023 |
6 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
12/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121M1062234208199 |
|
|
$26.94 |
000001078063-3562505204 |
2023 |
6 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
12/14/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121M1062234208199 |
|
|
$701.34 |
000001078063-3562505204 |
2023 |
6 |
FD52 |
05 |
E229 |
D |
1303201D |
056 |
12/13/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
IET-XE13A162522344004220 |
|
|
$3.40 |
|
2023 |
6 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
12/12/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR121M1062234208205 |
|
|
$47.00 |
000001080226-3562505200 |
2023 |
6 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
12/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121M1062234208205 |
|
|
$36.34 |
000001080226-3562505200 |
2023 |
6 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
12/12/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR121M1062234208205 |
|
|
$3.16 |
000001080226-3562505200 |
2023 |
6 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
12/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121M1062234208205 |
|
|
$2.44 |
000001080226-3562505200 |
2023 |
6 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
12/12/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR121M1062234208205 |
|
|
$36.65 |
000001080226-3562505200 |
2023 |
6 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
12/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121M1062234208205 |
|
|
$28.34 |
000001080226-3562505200 |
2023 |
6 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
12/12/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR121M1062234208205 |
|
|
$10.28 |
000001080226-3562505200 |
2023 |
6 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
12/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121M1062234208205 |
|
|
$7.83 |
000001080226-3562505200 |
2023 |
5 |
FD52 |
05 |
E229 |
D |
1303201D |
056 |
11/30/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
IET-XE13A162522329003170 |
|
|
$3.40 |
|
2023 |
5 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
11/29/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112M1062232607136 |
|
|
$225.19 |
000001077851-3562500636 |
2023 |
5 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
11/29/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112M1062232607136 |
|
|
$47.89 |
000001077851-3562500636 |
2023 |
5 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
11/29/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112M1062232607136 |
|
|
$17.09 |
000001077851-3562500636 |
2023 |
5 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
11/29/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112M1062232607136 |
|
|
$3.64 |
000001077851-3562500636 |
2023 |
5 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
11/29/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112M1062232607136 |
|
|
$175.62 |
000001077851-3562500636 |
2023 |
5 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
11/29/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112M1062232607136 |
|
|
$37.36 |
000001077851-3562500636 |
2023 |
5 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
11/29/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112M1062232607136 |
|
|
$23.64 |
000001077851-3562500636 |
2023 |
5 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
11/29/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112M1062232607136 |
|
|
$4.94 |
000001077851-3562500636 |
2023 |
5 |
FD52 |
00 |
E124 |
D |
1303201D |
056 |
11/29/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112M1062232607136 |
|
|
$0.07 |
000001077851-3562500636 |
2023 |
5 |
FD52 |
00 |
E124 |
D |
1303201D |
056 |
11/29/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112M1062232607136 |
|
|
$0.01 |
000001077851-3562500636 |
2023 |
5 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
11/29/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR112M1062232607145 |
|
|
$97.93 |
000001080226-3562505200 |
2023 |
5 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
11/29/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112M1062232607145 |
|
|
$21.01 |
000001080226-3562505200 |
2023 |
5 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
11/29/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR112M1062232607145 |
|
|
$6.69 |
000001080226-3562505200 |
2023 |
5 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
11/29/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112M1062232607145 |
|
|
$1.43 |
000001080226-3562505200 |
2023 |
5 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
11/29/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR112M1062232607145 |
|
|
$76.48 |
000001080226-3562505200 |
2023 |
5 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
11/29/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112M1062232607145 |
|
|
$16.40 |
000001080226-3562505200 |
2023 |
5 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
11/29/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR112M1062232607145 |
|
|
$23.89 |
000001080226-3562505200 |
2023 |
5 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
11/29/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112M1062232607145 |
|
|
$5.06 |
000001080226-3562505200 |
2023 |
5 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
11/29/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR112M1062232607145 |
|
|
$0.04 |
000001080226-3562505200 |
2023 |
5 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
11/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112M1062232607137 |
|
|
$1,749.42 |
000001078063-3562505204 |
2023 |
5 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
11/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112M1062232607137 |
|
|
$570.08 |
000001078063-3562505204 |
2023 |
5 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
11/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112M1062232607137 |
|
|
$126.97 |
000001078063-3562505204 |
2023 |
5 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
11/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112M1062232607137 |
|
|
$41.41 |
000001078063-3562505204 |
2023 |
5 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
11/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112M1062232607137 |
|
|
$1,364.73 |
000001078063-3562505204 |
2023 |
5 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
11/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112M1062232607137 |
|
|
$444.66 |
000001078063-3562505204 |
2023 |
5 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
11/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112M1062232607137 |
|
|
$305.06 |
000001078063-3562505204 |
2023 |
5 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
11/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112M1062232607137 |
|
|
$95.67 |
000001078063-3562505204 |
2023 |
5 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
11/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112M1062232607137 |
|
|
$0.71 |
000001078063-3562505204 |
2023 |
5 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
11/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112M1062232607137 |
|
|
$0.21 |
000001078063-3562505204 |
2023 |
5 |
FD52 |
05 |
E143 |
D |
1303201D |
056 |
11/21/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300091550 |
PON22200000427 |
GRESHAM SMITH |
$5,046.91 |
Preliminary Engineering Services |
2023 |
5 |
FD52 |
05 |
E229 |
D |
1303201D |
056 |
11/14/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
IET-XE13A162522314005870 |
|
|
$3.40 |
|
2023 |
5 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
11/14/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111M1062230806145 |
|
|
$1,958.72 |
000001078063-3562505204 |
2023 |
5 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
11/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111M1062230806145 |
|
|
$200.79 |
000001078063-3562505204 |
2023 |
5 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
11/14/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111M1062230806145 |
|
|
$138.06 |
000001078063-3562505204 |
2023 |
5 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
11/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111M1062230806145 |
|
|
$14.16 |
000001078063-3562505204 |
2023 |
5 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
11/14/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111M1062230806145 |
|
|
$1,527.83 |
000001078063-3562505204 |
2023 |
5 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
11/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111M1062230806145 |
|
|
$156.62 |
000001078063-3562505204 |
2023 |
5 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
11/14/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111M1062230806145 |
|
|
$343.29 |
000001078063-3562505204 |
2023 |
5 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
11/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111M1062230806145 |
|
|
$34.50 |
000001078063-3562505204 |
2023 |
5 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
11/7/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR111M1062230806152 |
|
|
$140.15 |
000001080226-3562505200 |
2023 |
5 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
11/7/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111M1062230806152 |
|
|
$16.25 |
000001080226-3562505200 |
2023 |
5 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
11/7/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR111M1062230806152 |
|
|
$9.25 |
000001080226-3562505200 |
2023 |
5 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
11/7/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111M1062230806152 |
|
|
$1.08 |
000001080226-3562505200 |
2023 |
5 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
11/7/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR111M1062230806152 |
|
|
$109.26 |
000001080226-3562505200 |
2023 |
5 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
11/7/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111M1062230806152 |
|
|
$12.68 |
000001080226-3562505200 |
2023 |
5 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
11/7/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR111M1062230806152 |
|
|
$34.10 |
000001080226-3562505200 |
2023 |
5 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
11/7/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111M1062230806152 |
|
|
$3.91 |
000001080226-3562505200 |
2023 |
4 |
FD52 |
05 |
E229 |
D |
1303201D |
056 |
10/27/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
IET-XE13A162522298006000 |
|
|
$3.40 |
|
2023 |
4 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
10/24/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR102M1062229405044 |
|
|
$261.97 |
000001080226-3562505200 |
2023 |
4 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
10/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR102M1062229405036 |
|
|
$1,992.90 |
000001078063-3562505204 |
2023 |
4 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
10/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102M1062229405044 |
|
|
$65.64 |
000001080226-3562505200 |
2023 |
4 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
10/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102M1062229405036 |
|
|
$190.65 |
000001078063-3562505204 |
2023 |
4 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
10/24/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR102M1062229405044 |
|
|
$17.88 |
000001080226-3562505200 |
2023 |
4 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
10/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR102M1062229405036 |
|
|
$144.54 |
000001078063-3562505204 |
2023 |
4 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
10/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102M1062229405044 |
|
|
$4.48 |
000001080226-3562505200 |
2023 |
4 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
10/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102M1062229405036 |
|
|
$13.89 |
000001078063-3562505204 |
2023 |
4 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
10/24/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR102M1062229405044 |
|
|
$204.31 |
000001080226-3562505200 |
2023 |
4 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
10/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR102M1062229405036 |
|
|
$1,554.41 |
000001078063-3562505204 |
2023 |
4 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
10/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102M1062229405044 |
|
|
$51.20 |
000001080226-3562505200 |
2023 |
4 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
10/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102M1062229405036 |
|
|
$148.70 |
000001078063-3562505204 |
2023 |
4 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
10/24/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR102M1062229405044 |
|
|
$63.84 |
000001080226-3562505200 |
2023 |
4 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
10/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR102M1062229405036 |
|
|
$348.96 |
000001078063-3562505204 |
2023 |
4 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
10/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102M1062229405044 |
|
|
$15.82 |
000001080226-3562505200 |
2023 |
4 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
10/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102M1062229405036 |
|
|
$30.66 |
000001078063-3562505204 |
2023 |
4 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
10/24/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR102M1062229405044 |
|
|
$0.11 |
000001080226-3562505200 |
2023 |
4 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
10/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR102M1062229405036 |
|
|
$0.81 |
000001078063-3562505204 |
2023 |
4 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
10/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102M1062229405044 |
|
|
$0.03 |
000001080226-3562505200 |
2023 |
4 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
10/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102M1062229405036 |
|
|
$0.07 |
000001078063-3562505204 |
2023 |
4 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
10/17/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR101M1062228003925 |
|
|
$225.23 |
000001077851-3562500636 |
2023 |
4 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
10/17/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101M1062228003925 |
|
|
$44.21 |
000001077851-3562500636 |
2023 |
4 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
10/17/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR101M1062228003925 |
|
|
$16.83 |
000001077851-3562500636 |
2023 |
4 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
10/17/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101M1062228003925 |
|
|
$3.31 |
000001077851-3562500636 |
2023 |
4 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
10/17/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR101M1062228003925 |
|
|
$175.62 |
000001077851-3562500636 |
2023 |
4 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
10/17/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101M1062228003925 |
|
|
$34.49 |
000001077851-3562500636 |
2023 |
4 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
10/17/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR101M1062228003925 |
|
|
$23.64 |
000001077851-3562500636 |
2023 |
4 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
10/17/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101M1062228003925 |
|
|
$4.56 |
000001077851-3562500636 |
2023 |
4 |
FD52 |
05 |
E229 |
D |
1303201D |
056 |
10/12/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
IET-XE13A162522283005440 |
|
|
$3.40 |
|
2023 |
4 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
10/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR101M1062228003926 |
|
|
$984.76 |
000001078063-3562505204 |
2023 |
4 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
10/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101M1062228003926 |
|
|
$258.72 |
000001078063-3562505204 |
2023 |
4 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
10/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR101M1062228003926 |
|
|
$69.58 |
000001078063-3562505204 |
2023 |
4 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
10/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101M1062228003926 |
|
|
$18.23 |
000001078063-3562505204 |
2023 |
4 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
10/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR101M1062228003926 |
|
|
$768.17 |
000001078063-3562505204 |
2023 |
4 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
10/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101M1062228003926 |
|
|
$201.80 |
000001078063-3562505204 |
2023 |
4 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
10/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR101M1062228003926 |
|
|
$169.38 |
000001078063-3562505204 |
2023 |
4 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
10/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101M1062228003926 |
|
|
$44.96 |
000001078063-3562505204 |
2023 |
3 |
FD52 |
05 |
E229 |
D |
1303201D |
056 |
9/29/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
IET-XE13A162522268004950 |
|
|
$3.40 |
|
2023 |
3 |
FD52 |
05 |
E143 |
D |
1303201D |
056 |
9/28/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300033642 |
PON22200000427 |
GRESHAM SMITH |
$2,066.25 |
Preliminary Engineering Services |
2023 |
3 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
9/26/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092M1062226602755 |
|
|
$800.26 |
000001078063-3562505204 |
2023 |
3 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
9/26/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092M1062226602755 |
|
|
$89.73 |
000001078063-3562505204 |
2023 |
3 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
9/26/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092M1062226602755 |
|
|
$58.16 |
000001078063-3562505204 |
2023 |
3 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
9/26/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092M1062226602755 |
|
|
$6.50 |
000001078063-3562505204 |
2023 |
3 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
9/26/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092M1062226602755 |
|
|
$624.28 |
000001078063-3562505204 |
2023 |
3 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
9/26/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092M1062226602755 |
|
|
$70.00 |
000001078063-3562505204 |
2023 |
3 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
9/26/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092M1062226602755 |
|
|
$141.55 |
000001078063-3562505204 |
2023 |
3 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
9/26/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092M1062226602755 |
|
|
$15.66 |
000001078063-3562505204 |
2023 |
3 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
9/26/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092M1062226602755 |
|
|
$0.36 |
000001078063-3562505204 |
2023 |
3 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
9/26/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092M1062226602755 |
|
|
$0.04 |
000001078063-3562505204 |
2023 |
3 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
9/26/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR092M1062226602795 |
|
|
$1,310.41 |
000001084290-3562500061 |
2023 |
3 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
9/26/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092M1062226602795 |
|
|
$234.00 |
000001084290-3562500061 |
2023 |
3 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
9/26/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR092M1062226602795 |
|
|
$91.90 |
000001084290-3562500061 |
2023 |
3 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
9/26/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092M1062226602795 |
|
|
$16.41 |
000001084290-3562500061 |
2023 |
3 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
9/26/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR092M1062226602795 |
|
|
$1,022.12 |
000001084290-3562500061 |
2023 |
3 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
9/26/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092M1062226602795 |
|
|
$182.52 |
000001084290-3562500061 |
2023 |
3 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
9/26/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR092M1062226602795 |
|
|
$231.98 |
000001084290-3562500061 |
2023 |
3 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
9/26/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092M1062226602795 |
|
|
$40.88 |
000001084290-3562500061 |
2023 |
3 |
FD52 |
00 |
E124 |
D |
1303201D |
056 |
9/26/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR092M1062226602795 |
|
|
$0.51 |
000001084290-3562500061 |
2023 |
3 |
FD52 |
00 |
E124 |
D |
1303201D |
056 |
9/26/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092M1062226602795 |
|
|
$0.09 |
000001084290-3562500061 |
2023 |
3 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
9/26/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092M1062226602753 |
|
|
$266.09 |
000001077851-3562500636 |
2023 |
3 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
9/26/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092M1062226602753 |
|
|
$227.20 |
000001077851-3562500636 |
2023 |
3 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
9/26/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092M1062226602753 |
|
|
$20.20 |
000001077851-3562500636 |
2023 |
3 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
9/26/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092M1062226602753 |
|
|
$17.24 |
000001077851-3562500636 |
2023 |
3 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
9/26/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092M1062226602753 |
|
|
$207.55 |
000001077851-3562500636 |
2023 |
3 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
9/26/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092M1062226602753 |
|
|
$177.21 |
000001077851-3562500636 |
2023 |
3 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
9/26/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092M1062226602753 |
|
|
$28.19 |
000001077851-3562500636 |
2023 |
3 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
9/26/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092M1062226602753 |
|
|
$23.44 |
000001077851-3562500636 |
2023 |
3 |
FD52 |
00 |
E124 |
D |
1303201D |
056 |
9/26/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092M1062226602753 |
|
|
$0.08 |
000001077851-3562500636 |
2023 |
3 |
FD52 |
00 |
E124 |
D |
1303201D |
056 |
9/26/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092M1062226602753 |
|
|
$0.07 |
000001077851-3562500636 |
2023 |
3 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
9/15/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR091M1062225101649 |
|
|
$915.21 |
000001084290-3562500061 |
2023 |
3 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
9/15/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091M1062225101649 |
|
|
$77.22 |
000001084290-3562500061 |
2023 |
3 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
9/15/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR091M1062225101649 |
|
|
$61.66 |
000001084290-3562500061 |
2023 |
3 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
9/15/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091M1062225101649 |
|
|
$5.19 |
000001084290-3562500061 |
2023 |
3 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
9/15/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR091M1062225101649 |
|
|
$713.86 |
000001084290-3562500061 |
2023 |
3 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
9/15/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091M1062225101649 |
|
|
$60.23 |
000001084290-3562500061 |
2023 |
3 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
9/15/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR091M1062225101649 |
|
|
$161.85 |
000001084290-3562500061 |
2023 |
3 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
9/15/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091M1062225101649 |
|
|
$13.49 |
000001084290-3562500061 |
2023 |
3 |
FD52 |
05 |
E229 |
D |
1303201D |
056 |
9/14/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
IET-XE13A162522253004610 |
|
|
$3.40 |
|
2023 |
3 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
9/14/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091M1062225101608 |
|
|
$13.81 |
000001077851-3562500636 |
2023 |
3 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
9/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091M1062225101608 |
|
|
$0.46 |
000001077851-3562500636 |
2023 |
3 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
9/14/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091M1062225101608 |
|
|
$131.36 |
000001077851-3562500636 |
2023 |
3 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
9/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091M1062225101608 |
|
|
$4.50 |
000001077851-3562500636 |
2023 |
3 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
9/14/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091M1062225101608 |
|
|
$9.81 |
000001077851-3562500636 |
2023 |
3 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
9/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091M1062225101608 |
|
|
$0.33 |
000001077851-3562500636 |
2023 |
3 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
9/14/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091M1062225101608 |
|
|
$102.77 |
000001077851-3562500636 |
2023 |
3 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
9/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091M1062225101608 |
|
|
$3.51 |
000001077851-3562500636 |
2023 |
3 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
9/14/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091M1062225101608 |
|
|
$1,905.74 |
000001078063-3562505204 |
2023 |
3 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
9/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091M1062225101608 |
|
|
$18.39 |
000001078063-3562505204 |
2023 |
3 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
9/14/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091M1062225101608 |
|
|
$134.44 |
000001078063-3562505204 |
2023 |
3 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
9/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091M1062225101609 |
|
|
$1.34 |
000001078063-3562505204 |
2023 |
3 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
9/12/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091M1062225101609 |
|
|
$1,486.48 |
000001078063-3562505204 |
2023 |
3 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
9/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091M1062225101609 |
|
|
$14.35 |
000001078063-3562505204 |
2023 |
3 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
9/12/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091M1062225101609 |
|
|
$331.00 |
000001078063-3562505204 |
2023 |
3 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
9/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091M1062225101609 |
|
|
$2.30 |
000001078063-3562505204 |
2023 |
3 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
9/12/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR091M1062225101632 |
|
|
$222.72 |
000001083211-3562500061 |
2023 |
3 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
9/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091M1062225101632 |
|
|
$61.45 |
000001083211-3562500061 |
2023 |
3 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
9/12/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR091M1062225101632 |
|
|
$16.07 |
000001083211-3562500061 |
2023 |
3 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
9/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091M1062225101632 |
|
|
$4.43 |
000001083211-3562500061 |
2023 |
3 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
9/12/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR091M1062225101632 |
|
|
$173.89 |
000001083211-3562500061 |
2023 |
3 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
9/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091M1062225101632 |
|
|
$47.93 |
000001083211-3562500061 |
2023 |
3 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
9/12/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR091M1062225101632 |
|
|
$36.40 |
000001083211-3562500061 |
2023 |
3 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
9/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091M1062225101632 |
|
|
$9.88 |
000001083211-3562500061 |
2023 |
3 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
9/12/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR091M1062225101617 |
|
|
$179.74 |
000001080226-3562505200 |
2023 |
3 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
9/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091M1062225101617 |
|
|
$24.91 |
000001080226-3562505200 |
2023 |
3 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
9/12/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR091M1062225101617 |
|
|
$11.88 |
000001080226-3562505200 |
2023 |
3 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
9/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091M1062225101617 |
|
|
$1.64 |
000001080226-3562505200 |
2023 |
3 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
9/12/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR091M1062225101617 |
|
|
$140.21 |
000001080226-3562505200 |
2023 |
3 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
9/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091M1062225101617 |
|
|
$19.43 |
000001080226-3562505200 |
2023 |
3 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
9/12/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR091M1062225101617 |
|
|
$43.77 |
000001080226-3562505200 |
2023 |
3 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
9/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091M1062225101617 |
|
|
$6.00 |
000001080226-3562505200 |
2023 |
2 |
FD52 |
05 |
E229 |
D |
1303201D |
056 |
8/29/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
IET-XE13A162522237004190 |
|
|
$3.40 |
|
2023 |
2 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
8/24/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR082M1062223500427 |
|
|
$20.07 |
000001080226-3562505200 |
2023 |
2 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
8/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500427 |
|
|
$2.77 |
000001080226-3562505200 |
2023 |
2 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
8/24/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR082M1062223500427 |
|
|
$229.44 |
000001080226-3562505200 |
2023 |
2 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
8/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500427 |
|
|
$31.69 |
000001080226-3562505200 |
2023 |
2 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
8/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082M1062223500416 |
|
|
$1,887.87 |
000001078063-3562505204 |
2023 |
2 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
8/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500416 |
|
|
$685.60 |
000001078063-3562505204 |
2023 |
2 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
8/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082M1062223500416 |
|
|
$136.99 |
000001078063-3562505204 |
2023 |
2 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
8/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500416 |
|
|
$49.74 |
000001078063-3562505204 |
2023 |
2 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
8/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082M1062223500416 |
|
|
$1,472.47 |
000001078063-3562505204 |
2023 |
2 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
8/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500416 |
|
|
$534.77 |
000001078063-3562505204 |
2023 |
2 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
8/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082M1062223500416 |
|
|
$328.71 |
000001078063-3562505204 |
2023 |
2 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
8/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500416 |
|
|
$118.48 |
000001078063-3562505204 |
2023 |
2 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
8/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082M1062223500416 |
|
|
$0.77 |
000001078063-3562505204 |
2023 |
2 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
8/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500416 |
|
|
$0.28 |
000001078063-3562505204 |
2023 |
2 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
8/24/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR082M1062223500427 |
|
|
$71.63 |
000001080226-3562505200 |
2023 |
2 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
8/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500427 |
|
|
$9.79 |
000001080226-3562505200 |
2023 |
2 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
8/24/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR082M1062223500427 |
|
|
$0.13 |
000001080226-3562505200 |
2023 |
2 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
8/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500427 |
|
|
$0.01 |
000001080226-3562505200 |
2023 |
2 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
8/24/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR082M1062223500426 |
|
|
$294.12 |
000001080226-3562505200 |
2023 |
2 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
8/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500426 |
|
|
$40.63 |
000001080226-3562505200 |
2023 |
2 |
FD52 |
05 |
E143 |
D |
1303201D |
056 |
8/19/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300012752 |
PON22200000427 |
GRESHAM SMITH |
$21,912.66 |
Preliminary Engineering Services |
2023 |
2 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
8/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081M1062222110106 |
|
|
$737.27 |
000001078063-3562505204 |
2023 |
2 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
8/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081M1062222110106 |
|
|
$119.03 |
000001078063-3562505204 |
2023 |
2 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
8/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081M1062222110106 |
|
|
$52.11 |
000001078063-3562505204 |
2023 |
2 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
8/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081M1062222110106 |
|
|
$8.43 |
000001078063-3562505204 |
2023 |
2 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
8/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081M1062222110106 |
|
|
$575.03 |
000001078063-3562505204 |
2023 |
2 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
8/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081M1062222110106 |
|
|
$92.84 |
000001078063-3562505204 |
2023 |
2 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
8/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081M1062222110106 |
|
|
$125.96 |
000001078063-3562505204 |
2023 |
2 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
8/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081M1062222110106 |
|
|
$19.82 |
000001078063-3562505204 |
2023 |
1 |
FD52 |
10 |
E143 |
D |
1303201D |
056 |
7/31/2022 |
0510 |
ENV STUDIES-UST/HZM |
PRC-2300014997 |
PON22000004290 |
LINEBACH FUNKHOUSER INC |
$8,046.00 |
Letter Agreement 65-CHC |
2023 |
1 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220309014 |
|
|
$8.89 |
000001083373-3562505206 |
2023 |
1 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
7/25/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR072M1062220308987 |
|
|
$56.06 |
000001080226-3562505200 |
2023 |
1 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
7/25/2022 |
2010 |
RIGHT OF WAY ESTIMATES |
CA-XR072M1062220309014 |
|
|
$379.91 |
000001083373-3562505206 |
2023 |
1 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308987 |
|
|
$17.08 |
000001080226-3562505200 |
2023 |
1 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
7/25/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR072M1062220308987 |
|
|
$3.83 |
000001080226-3562505200 |
2023 |
1 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308987 |
|
|
$1.17 |
000001080226-3562505200 |
2023 |
1 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
7/25/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR072M1062220308977 |
|
|
$1,195.95 |
000001078063-3562505204 |
2023 |
1 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
7/25/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR072M1062220308987 |
|
|
$43.70 |
000001080226-3562505200 |
2023 |
1 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308977 |
|
|
$253.17 |
000001078063-3562505204 |
2023 |
1 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308987 |
|
|
$13.32 |
000001080226-3562505200 |
2023 |
1 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
7/25/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR072M1062220308977 |
|
|
$86.95 |
000001078063-3562505204 |
2023 |
1 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
7/25/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR072M1062220308987 |
|
|
$13.66 |
000001080226-3562505200 |
2023 |
1 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308977 |
|
|
$18.38 |
000001078063-3562505204 |
2023 |
1 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308987 |
|
|
$4.12 |
000001080226-3562505200 |
2023 |
1 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
7/25/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR072M1062220308977 |
|
|
$932.79 |
000001078063-3562505204 |
2023 |
1 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
7/25/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR072M1062220308987 |
|
|
$0.02 |
000001080226-3562505200 |
2023 |
1 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308977 |
|
|
$197.48 |
000001078063-3562505204 |
2023 |
1 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
7/25/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR072M1062220308977 |
|
|
$200.52 |
000001078063-3562505204 |
2023 |
1 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220309014 |
|
|
$91.63 |
000001083373-3562505206 |
2023 |
1 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308977 |
|
|
$42.36 |
000001078063-3562505204 |
2023 |
1 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
7/25/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR072M1062220308977 |
|
|
$0.47 |
000001078063-3562505204 |
2023 |
1 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308977 |
|
|
$0.09 |
000001078063-3562505204 |
2023 |
1 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
7/25/2022 |
2010 |
RIGHT OF WAY ESTIMATES |
CA-XR072M1062220309014 |
|
|
$73.10 |
000001083373-3562505206 |
2023 |
1 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220309014 |
|
|
$17.32 |
000001083373-3562505206 |
2023 |
1 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
7/25/2022 |
2010 |
RIGHT OF WAY ESTIMATES |
CA-XR072M1062220309014 |
|
|
$0.21 |
000001083373-3562505206 |
2023 |
1 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220309014 |
|
|
$0.05 |
000001083373-3562505206 |
2023 |
1 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
7/25/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR072M1062220309009 |
|
|
$56.30 |
000001083211-3562500061 |
2023 |
1 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220309009 |
|
|
$5.63 |
000001083211-3562500061 |
2023 |
1 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
7/25/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR072M1062220309009 |
|
|
$3.99 |
000001083211-3562500061 |
2023 |
1 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220309009 |
|
|
$0.40 |
000001083211-3562500061 |
2023 |
1 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
7/25/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR072M1062220309009 |
|
|
$43.91 |
000001083211-3562500061 |
2023 |
1 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220309009 |
|
|
$4.39 |
000001083211-3562500061 |
2023 |
1 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
7/25/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR072M1062220309009 |
|
|
$10.23 |
000001083211-3562500061 |
2023 |
1 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220309009 |
|
|
$1.01 |
000001083211-3562500061 |
2023 |
1 |
FD52 |
00 |
E124 |
D |
1303201D |
056 |
7/25/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR072M1062220309009 |
|
|
$0.02 |
000001083211-3562500061 |
2023 |
1 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
7/25/2022 |
2010 |
RIGHT OF WAY ESTIMATES |
CA-XR072M1062220309013 |
|
|
$486.93 |
000001083373-3562505206 |
2023 |
1 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220309013 |
|
|
$117.47 |
000001083373-3562505206 |
2023 |
1 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
7/25/2022 |
2010 |
RIGHT OF WAY ESTIMATES |
CA-XR072M1062220309013 |
|
|
$36.84 |
000001083373-3562505206 |
2023 |
1 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
7/12/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR071M1062219207873 |
|
|
$20.48 |
000001080226-3562505200 |
2023 |
1 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
7/12/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR071M1062219207862 |
|
|
$208.47 |
000001077851-3562500636 |
2023 |
1 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207873 |
|
|
$4.46 |
000001080226-3562505200 |
2023 |
1 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
7/12/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR071M1062219207862 |
|
|
$15.55 |
000001077851-3562500636 |
2023 |
1 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
7/12/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR071M1062219207862 |
|
|
$175.06 |
000001077851-3562500636 |
2023 |
1 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
7/12/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR071M1062219207862 |
|
|
$23.57 |
000001077851-3562500636 |
2023 |
1 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
7/12/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR071M1062219207863 |
|
|
$1,533.27 |
000001078063-3562505204 |
2023 |
1 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207863 |
|
|
$209.45 |
000001078063-3562505204 |
2023 |
1 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
7/12/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR071M1062219207863 |
|
|
$107.38 |
000001078063-3562505204 |
2023 |
1 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
7/12/2022 |
2010 |
RIGHT OF WAY ESTIMATES |
CA-XR071M1062219207899 |
|
|
$66.36 |
000001083373-3562505206 |
2023 |
1 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207863 |
|
|
$14.69 |
000001078063-3562505204 |
2023 |
1 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207899 |
|
|
$3.19 |
000001083373-3562505206 |
2023 |
1 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
7/12/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR071M1062219207863 |
|
|
$1,287.26 |
000001078063-3562505204 |
2023 |
1 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
7/12/2022 |
2010 |
RIGHT OF WAY ESTIMATES |
CA-XR071M1062219207899 |
|
|
$5.01 |
000001083373-3562505206 |
2023 |
1 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207863 |
|
|
$175.87 |
000001078063-3562505204 |
2023 |
1 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207899 |
|
|
$0.24 |
000001083373-3562505206 |
2023 |
1 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
7/12/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR071M1062219207863 |
|
|
$288.80 |
000001078063-3562505204 |
2023 |
1 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
7/12/2022 |
2010 |
RIGHT OF WAY ESTIMATES |
CA-XR071M1062219207899 |
|
|
$55.69 |
000001083373-3562505206 |
2023 |
1 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207863 |
|
|
$39.02 |
000001078063-3562505204 |
2023 |
1 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207899 |
|
|
$2.68 |
000001083373-3562505206 |
2023 |
1 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
7/12/2022 |
2010 |
RIGHT OF WAY ESTIMATES |
CA-XR071M1062219207899 |
|
|
$10.72 |
000001083373-3562505206 |
2023 |
1 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207899 |
|
|
$0.51 |
000001083373-3562505206 |
2023 |
1 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
7/12/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR071M1062219207893 |
|
|
$86.89 |
000001083211-3562500061 |
2023 |
1 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
7/12/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR071M1062219207893 |
|
|
$6.12 |
000001083211-3562500061 |
2023 |
1 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
7/12/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR071M1062219207893 |
|
|
$72.96 |
000001083211-3562500061 |
2023 |
1 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
7/12/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR071M1062219207893 |
|
|
$17.03 |
000001083211-3562500061 |
2023 |
1 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
7/12/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR071M1062219207873 |
|
|
$77.86 |
000001080226-3562505200 |
2023 |
1 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207873 |
|
|
$17.12 |
000001080226-3562505200 |
2023 |
1 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
7/12/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR071M1062219207873 |
|
|
$5.08 |
000001080226-3562505200 |
2023 |
1 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207873 |
|
|
$1.12 |
000001080226-3562505200 |
2023 |
1 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
7/12/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR071M1062219207873 |
|
|
$65.34 |
000001080226-3562505200 |
2023 |
1 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
7/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207873 |
|
|
$14.38 |
000001080226-3562505200 |
2022 |
12 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
6/28/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062M1062217506748 |
|
|
$416.95 |
000001077851-3562500636 |
2022 |
12 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
6/28/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062M1062217506748 |
|
|
$31.62 |
000001077851-3562500636 |
2022 |
12 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
6/28/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062M1062217506748 |
|
|
$350.12 |
000001077851-3562500636 |
2022 |
12 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
6/28/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062M1062217506748 |
|
|
$47.14 |
000001077851-3562500636 |
2022 |
12 |
FD52 |
00 |
E124 |
D |
1303201D |
056 |
6/28/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062M1062217506748 |
|
|
$0.13 |
000001077851-3562500636 |
2022 |
12 |
FD52 |
05 |
E143 |
D |
1303201D |
056 |
6/27/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200234638 |
PON22200000427 |
GRESHAM SMITH |
$72,088.01 |
Preliminary Engineering Services |
2022 |
12 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
6/27/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062M1062217506750 |
|
|
$1,552.52 |
000001078063-3562505204 |
2022 |
12 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506750 |
|
|
$402.84 |
000001078063-3562505204 |
2022 |
12 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
6/27/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062M1062217506750 |
|
|
$112.05 |
000001078063-3562505204 |
2022 |
12 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506750 |
|
|
$29.07 |
000001078063-3562505204 |
2022 |
12 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
6/27/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062M1062217506750 |
|
|
$1,303.65 |
000001078063-3562505204 |
2022 |
12 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506750 |
|
|
$338.26 |
000001078063-3562505204 |
2022 |
12 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
6/27/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062M1062217506750 |
|
|
$297.03 |
000001078063-3562505204 |
2022 |
12 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506750 |
|
|
$75.92 |
000001078063-3562505204 |
2022 |
12 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
6/27/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062M1062217506750 |
|
|
$0.69 |
000001078063-3562505204 |
2022 |
12 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506750 |
|
|
$0.18 |
000001078063-3562505204 |
2022 |
12 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
6/27/2022 |
0060 |
ENV STUDIES-ARCHAEOLOGY |
CA-XR062M1062217506792 |
|
|
$336.95 |
000001083209-3562500061 |
2022 |
12 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
6/27/2022 |
0060 |
ENV STUDIES-ARCHAEOLOGY |
CA-XR062M1062217506792 |
|
|
$25.41 |
000001083209-3562500061 |
2022 |
12 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
6/27/2022 |
0060 |
ENV STUDIES-ARCHAEOLOGY |
CA-XR062M1062217506792 |
|
|
$282.94 |
000001083209-3562500061 |
2022 |
12 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
6/27/2022 |
0060 |
ENV STUDIES-ARCHAEOLOGY |
CA-XR062M1062217506792 |
|
|
$64.28 |
000001083209-3562500061 |
2022 |
12 |
FD52 |
00 |
E124 |
D |
1303201D |
056 |
6/27/2022 |
0060 |
ENV STUDIES-ARCHAEOLOGY |
CA-XR062M1062217506792 |
|
|
$0.18 |
000001083209-3562500061 |
2022 |
12 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
6/27/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR062M1062217506764 |
|
|
$415.03 |
000001080226-3562505200 |
2022 |
12 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506764 |
|
|
$41.50 |
000001080226-3562505200 |
2022 |
12 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
6/27/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR062M1062217506764 |
|
|
$28.04 |
000001080226-3562505200 |
2022 |
12 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506764 |
|
|
$2.80 |
000001080226-3562505200 |
2022 |
12 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
6/27/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR062M1062217506764 |
|
|
$348.50 |
000001080226-3562505200 |
2022 |
12 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
6/27/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR062M1062217506792 |
|
|
$139.02 |
000001083211-3562500061 |
2022 |
12 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506764 |
|
|
$34.85 |
000001080226-3562505200 |
2022 |
12 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
6/27/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR062M1062217506792 |
|
|
$9.78 |
000001083211-3562500061 |
2022 |
12 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
6/27/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR062M1062217506764 |
|
|
$109.11 |
000001080226-3562505200 |
2022 |
12 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
6/27/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR062M1062217506792 |
|
|
$116.74 |
000001083211-3562500061 |
2022 |
12 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506764 |
|
|
$10.80 |
000001080226-3562505200 |
2022 |
12 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
6/27/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR062M1062217506792 |
|
|
$27.26 |
000001083211-3562500061 |
2022 |
12 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
6/27/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR062M1062217506764 |
|
|
$0.19 |
000001080226-3562505200 |
2022 |
12 |
FD52 |
00 |
E124 |
D |
1303201D |
056 |
6/27/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR062M1062217506792 |
|
|
$0.05 |
000001083211-3562500061 |
2022 |
12 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506764 |
|
|
$0.02 |
000001080226-3562505200 |
2022 |
12 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
6/13/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905719 |
|
|
$9.38 |
000001080226-3562505200 |
2022 |
12 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
6/13/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR061M1062215905719 |
|
|
$15.64 |
000001080226-3562505200 |
2022 |
12 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
6/13/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905719 |
|
|
$2.90 |
000001080226-3562505200 |
2022 |
12 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
6/13/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR061M1062215905706 |
|
|
$1,145.32 |
000001078063-3562505204 |
2022 |
12 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
6/13/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905706 |
|
|
$311.07 |
000001078063-3562505204 |
2022 |
12 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
6/13/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR061M1062215905706 |
|
|
$80.38 |
000001078063-3562505204 |
2022 |
12 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
6/13/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905706 |
|
|
$21.83 |
000001078063-3562505204 |
2022 |
12 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
6/13/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR061M1062215905706 |
|
|
$961.68 |
000001078063-3562505204 |
2022 |
12 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
6/13/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905706 |
|
|
$261.19 |
000001078063-3562505204 |
2022 |
12 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
6/13/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR061M1062215905706 |
|
|
$212.60 |
000001078063-3562505204 |
2022 |
12 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
6/13/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905706 |
|
|
$56.65 |
000001078063-3562505204 |
2022 |
12 |
FD52 |
05 |
E143 |
D |
1303201D |
056 |
6/10/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200215771 |
PON22200000427 |
GRESHAM SMITH |
$66,784.87 |
Preliminary Engineering Services |
2022 |
12 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
6/9/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR061M1062215905718 |
|
|
$59.36 |
000001080226-3562505200 |
2022 |
12 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
6/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905718 |
|
|
$11.18 |
000001080226-3562505200 |
2022 |
12 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
6/9/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR061M1062215905718 |
|
|
$3.88 |
000001080226-3562505200 |
2022 |
12 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
6/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905718 |
|
|
$0.73 |
000001080226-3562505200 |
2022 |
12 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
6/9/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR061M1062215905718 |
|
|
$49.92 |
000001080226-3562505200 |
2022 |
11 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
5/23/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR052M1062214004671 |
|
|
$28.58 |
000001080226-3562505200 |
2022 |
11 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004671 |
|
|
$5.99 |
000001080226-3562505200 |
2022 |
11 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
5/23/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR052M1062214004671 |
|
|
$1.93 |
000001080226-3562505200 |
2022 |
11 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004671 |
|
|
$0.41 |
000001080226-3562505200 |
2022 |
11 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
5/23/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR052M1062214004671 |
|
|
$24.46 |
000001080226-3562505200 |
2022 |
11 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004671 |
|
|
$5.03 |
000001080226-3562505200 |
2022 |
11 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
5/23/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR052M1062214004671 |
|
|
$7.68 |
000001080226-3562505200 |
2022 |
11 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004671 |
|
|
$1.56 |
000001080226-3562505200 |
2022 |
11 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
5/23/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR052M1062214004671 |
|
|
$0.05 |
000001080226-3562505200 |
2022 |
11 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
5/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052M1062214004656 |
|
|
$1,059.70 |
000001078063-3562505204 |
2022 |
11 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004656 |
|
|
$176.24 |
000001078063-3562505204 |
2022 |
11 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
5/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052M1062214004656 |
|
|
$76.65 |
000001078063-3562505204 |
2022 |
11 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004656 |
|
|
$12.76 |
000001078063-3562505204 |
2022 |
11 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
5/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052M1062214004656 |
|
|
$889.83 |
000001078063-3562505204 |
2022 |
11 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004656 |
|
|
$147.99 |
000001078063-3562505204 |
2022 |
11 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
5/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052M1062214004656 |
|
|
$194.68 |
000001078063-3562505204 |
2022 |
11 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004656 |
|
|
$31.40 |
000001078063-3562505204 |
2022 |
11 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
5/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052M1062214004656 |
|
|
$0.45 |
000001078063-3562505204 |
2022 |
11 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004656 |
|
|
$0.08 |
000001078063-3562505204 |
2022 |
11 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
5/9/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051M1062212603642 |
|
|
$1,200.43 |
000001078063-3562505204 |
2022 |
11 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
5/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603642 |
|
|
$123.91 |
000001078063-3562505204 |
2022 |
11 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
5/9/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051M1062212603642 |
|
|
$86.98 |
000001078063-3562505204 |
2022 |
11 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
5/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603642 |
|
|
$8.97 |
000001078063-3562505204 |
2022 |
11 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
5/9/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051M1062212603642 |
|
|
$1,008.04 |
000001078063-3562505204 |
2022 |
11 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
5/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603642 |
|
|
$104.05 |
000001078063-3562505204 |
2022 |
11 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
5/9/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051M1062212603642 |
|
|
$214.57 |
000001078063-3562505204 |
2022 |
11 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
5/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603642 |
|
|
$22.19 |
000001078063-3562505204 |
2022 |
11 |
FD52 |
05 |
E143 |
D |
1303201D |
056 |
5/3/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200192613 |
PON22200000427 |
GRESHAM SMITH |
$98,777.27 |
Preliminary Engineering Services |
2022 |
10 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
4/28/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042M1062211202519 |
|
|
$37.17 |
000001077851-3562500636 |
2022 |
10 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
4/28/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202519 |
|
|
$6.32 |
000001077851-3562500636 |
2022 |
10 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
4/28/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042M1062211202519 |
|
|
$2.81 |
000001077851-3562500636 |
2022 |
10 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
4/28/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202519 |
|
|
$0.48 |
000001077851-3562500636 |
2022 |
10 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
4/28/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042M1062211202519 |
|
|
$31.17 |
000001077851-3562500636 |
2022 |
10 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
4/28/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202519 |
|
|
$5.30 |
000001077851-3562500636 |
2022 |
10 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
4/28/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042M1062211202519 |
|
|
$4.29 |
000001077851-3562500636 |
2022 |
10 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
4/28/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202519 |
|
|
$0.71 |
000001077851-3562500636 |
2022 |
10 |
FD52 |
00 |
E124 |
D |
1303201D |
056 |
4/28/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042M1062211202519 |
|
|
$0.01 |
000001077851-3562500636 |
2022 |
10 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
4/25/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042M1062211202520 |
|
|
$1,225.86 |
000001078063-3562505204 |
2022 |
10 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202520 |
|
|
$360.34 |
000001078063-3562505204 |
2022 |
10 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
4/25/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042M1062211202520 |
|
|
$88.46 |
000001078063-3562505204 |
2022 |
10 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202520 |
|
|
$26.01 |
000001078063-3562505204 |
2022 |
10 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
4/25/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042M1062211202520 |
|
|
$1,029.20 |
000001078063-3562505204 |
2022 |
10 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202520 |
|
|
$302.57 |
000001078063-3562505204 |
2022 |
10 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
4/25/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042M1062211202520 |
|
|
$234.59 |
000001078063-3562505204 |
2022 |
10 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202520 |
|
|
$67.90 |
000001078063-3562505204 |
2022 |
10 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
4/25/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR042M1062211202520 |
|
|
$0.55 |
000001078063-3562505204 |
2022 |
10 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202520 |
|
|
$0.15 |
000001078063-3562505204 |
2022 |
10 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
4/13/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR041M1062209801477 |
|
|
$95.08 |
000001080226-3562505200 |
2022 |
10 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
4/13/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801477 |
|
|
$79.67 |
000001080226-3562505200 |
2022 |
10 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
4/13/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR041M1062209801477 |
|
|
$6.43 |
000001080226-3562505200 |
2022 |
10 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
4/13/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801477 |
|
|
$5.39 |
000001080226-3562505200 |
2022 |
10 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
4/13/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR041M1062209801477 |
|
|
$79.86 |
000001080226-3562505200 |
2022 |
10 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
4/13/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801477 |
|
|
$66.89 |
000001080226-3562505200 |
2022 |
10 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
4/13/2022 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR041M1062209801477 |
|
|
$25.17 |
000001080226-3562505200 |
2022 |
10 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
4/13/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801477 |
|
|
$20.74 |
000001080226-3562505200 |
2022 |
10 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
4/11/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR041M1062209801461 |
|
|
$408.33 |
000001077851-3562500636 |
2022 |
10 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801461 |
|
|
$45.26 |
000001077851-3562500636 |
2022 |
10 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
4/11/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR041M1062209801461 |
|
|
$30.97 |
000001077851-3562500636 |
2022 |
10 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801461 |
|
|
$3.43 |
000001077851-3562500636 |
2022 |
10 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
4/11/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR041M1062209801461 |
|
|
$342.88 |
000001077851-3562500636 |
2022 |
10 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801461 |
|
|
$38.01 |
000001077851-3562500636 |
2022 |
10 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
4/11/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR041M1062209801461 |
|
|
$47.22 |
000001077851-3562500636 |
2022 |
10 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801461 |
|
|
$5.15 |
000001077851-3562500636 |
2022 |
10 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
4/11/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR041M1062209801462 |
|
|
$1,091.11 |
000001078063-3562505204 |
2022 |
10 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801462 |
|
|
$16.76 |
000001078063-3562505204 |
2022 |
10 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
4/11/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR041M1062209801462 |
|
|
$78.88 |
000001078063-3562505204 |
2022 |
10 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801462 |
|
|
$1.23 |
000001078063-3562505204 |
2022 |
10 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
4/11/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR041M1062209801462 |
|
|
$916.14 |
000001078063-3562505204 |
2022 |
10 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801462 |
|
|
$14.07 |
000001078063-3562505204 |
2022 |
10 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
4/11/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR041M1062209801462 |
|
|
$202.42 |
000001078063-3562505204 |
2022 |
10 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801462 |
|
|
$2.35 |
000001078063-3562505204 |
2022 |
9 |
FD52 |
05 |
E143 |
D |
1303201D |
056 |
3/28/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200168364 |
PON22200000427 |
GRESHAM SMITH |
$34,756.38 |
Preliminary Engineering Services |
2022 |
9 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200379 |
|
|
$84.44 |
000001078063-3562505204 |
2022 |
9 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
3/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR032M1062208200379 |
|
|
$44.23 |
000001078063-3562505204 |
2022 |
9 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200379 |
|
|
$6.10 |
000001078063-3562505204 |
2022 |
9 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
3/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR032M1062208200379 |
|
|
$514.60 |
000001078063-3562505204 |
2022 |
9 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200379 |
|
|
$70.90 |
000001078063-3562505204 |
2022 |
9 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
3/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR032M1062208200379 |
|
|
$117.08 |
000001078063-3562505204 |
2022 |
9 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200379 |
|
|
$15.91 |
000001078063-3562505204 |
2022 |
9 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
3/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR032M1062208200379 |
|
|
$0.27 |
000001078063-3562505204 |
2022 |
9 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200379 |
|
|
$0.04 |
000001078063-3562505204 |
2022 |
9 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
3/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR032M1062208200379 |
|
|
$612.92 |
000001078063-3562505204 |
2022 |
9 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
3/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031M1062206709448 |
|
|
$1,173.47 |
000001078063-3562505204 |
2022 |
9 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
3/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709448 |
|
|
$40.61 |
000001078063-3562505204 |
2022 |
9 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
3/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031M1062206709448 |
|
|
$84.69 |
000001078063-3562505204 |
2022 |
9 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
3/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709448 |
|
|
$2.94 |
000001078063-3562505204 |
2022 |
9 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
3/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031M1062206709448 |
|
|
$985.36 |
000001078063-3562505204 |
2022 |
9 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
3/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709448 |
|
|
$34.10 |
000001078063-3562505204 |
2022 |
9 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
3/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031M1062206709448 |
|
|
$223.91 |
000001078063-3562505204 |
2022 |
9 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
3/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709448 |
|
|
$7.65 |
000001078063-3562505204 |
2022 |
8 |
FD52 |
05 |
E143 |
D |
1303201D |
056 |
2/24/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200147834 |
PON22200000427 |
GRESHAM SMITH |
$26,326.75 |
Preliminary Engineering Services |
2022 |
8 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
2/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022M1062205308406 |
|
|
$13.10 |
000001078063-3562505204 |
2022 |
8 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
2/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022M1062205308406 |
|
|
$686.13 |
000001078063-3562505204 |
2022 |
8 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
2/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022M1062205308406 |
|
|
$152.32 |
000001078063-3562505204 |
2022 |
8 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
2/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022M1062205308406 |
|
|
$156.27 |
000001078063-3562505204 |
2022 |
8 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
2/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022M1062205308406 |
|
|
$34.18 |
000001078063-3562505204 |
2022 |
8 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
2/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022M1062205308406 |
|
|
$0.36 |
000001078063-3562505204 |
2022 |
8 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
2/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022M1062205308406 |
|
|
$0.08 |
000001078063-3562505204 |
2022 |
8 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
2/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022M1062205308405 |
|
|
$817.29 |
000001078063-3562505204 |
2022 |
8 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
2/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022M1062205308405 |
|
|
$181.40 |
000001078063-3562505204 |
2022 |
8 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
2/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022M1062205308405 |
|
|
$58.98 |
000001078063-3562505204 |
2022 |
8 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
2/9/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR021M1062203907427 |
|
|
$2,042.78 |
000001078063-3562505204 |
2022 |
8 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
2/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021M1062203907427 |
|
|
$204.28 |
000001078063-3562505204 |
2022 |
8 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
2/9/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR021M1062203907427 |
|
|
$147.44 |
000001078063-3562505204 |
2022 |
8 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
2/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021M1062203907427 |
|
|
$14.74 |
000001078063-3562505204 |
2022 |
8 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
2/9/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR021M1062203907427 |
|
|
$1,715.33 |
000001078063-3562505204 |
2022 |
8 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
2/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021M1062203907427 |
|
|
$171.53 |
000001078063-3562505204 |
2022 |
8 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
2/9/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR021M1062203907427 |
|
|
$390.09 |
000001078063-3562505204 |
2022 |
8 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
2/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021M1062203907427 |
|
|
$38.50 |
000001078063-3562505204 |
2022 |
8 |
FD52 |
05 |
E143 |
D |
1303201D |
056 |
2/1/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200127548 |
PON22200000427 |
GRESHAM SMITH |
$12,230.81 |
Preliminary Engineering Services |
2022 |
7 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
1/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012M1062202106437 |
|
|
$2,022.36 |
000001078063-3562505204 |
2022 |
7 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
1/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106437 |
|
|
$224.70 |
000001078063-3562505204 |
2022 |
7 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
1/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012M1062202106437 |
|
|
$145.97 |
000001078063-3562505204 |
2022 |
7 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
1/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106437 |
|
|
$16.22 |
000001078063-3562505204 |
2022 |
7 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
1/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012M1062202106437 |
|
|
$1,698.18 |
000001078063-3562505204 |
2022 |
7 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
1/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106437 |
|
|
$188.68 |
000001078063-3562505204 |
2022 |
7 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
1/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012M1062202106437 |
|
|
$386.24 |
000001078063-3562505204 |
2022 |
7 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
1/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106437 |
|
|
$42.35 |
000001078063-3562505204 |
2022 |
7 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
1/24/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR012M1062202106437 |
|
|
$0.90 |
000001078063-3562505204 |
2022 |
7 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
1/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106437 |
|
|
$0.10 |
000001078063-3562505204 |
2022 |
7 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
1/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011M1062200705538 |
|
|
$561.77 |
000001078063-3562505204 |
2022 |
7 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
1/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011M1062200705538 |
|
|
$401.23 |
000001078063-3562505204 |
2022 |
7 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
1/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011M1062200705538 |
|
|
$40.54 |
000001078063-3562505204 |
2022 |
7 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
1/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011M1062200705538 |
|
|
$28.96 |
000001078063-3562505204 |
2022 |
7 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
1/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011M1062200705538 |
|
|
$471.71 |
000001078063-3562505204 |
2022 |
7 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
1/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011M1062200705538 |
|
|
$336.91 |
000001078063-3562505204 |
2022 |
7 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
1/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR011M1062200705538 |
|
|
$108.06 |
000001078063-3562505204 |
2022 |
7 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
1/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011M1062200705538 |
|
|
$75.62 |
000001078063-3562505204 |
2022 |
6 |
FD52 |
05 |
E143 |
D |
1303201D |
056 |
12/29/2021 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200109352 |
PON22200000427 |
GRESHAM SMITH |
$15,894.10 |
Preliminary Engineering Services |
2022 |
6 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
12/22/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR122L1062135504479 |
|
|
$709.00 |
000001078063-3562505204 |
2022 |
6 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504479 |
|
|
$893.58 |
000001078063-3562505204 |
2022 |
6 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
12/22/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR122L1062135504479 |
|
|
$159.58 |
000001078063-3562505204 |
2022 |
6 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504479 |
|
|
$195.67 |
000001078063-3562505204 |
2022 |
6 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
12/22/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR122L1062135504477 |
|
|
$148.48 |
000001077851-3562500636 |
2022 |
6 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504477 |
|
|
$12.62 |
000001077851-3562500636 |
2022 |
6 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
12/22/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR122L1062135504477 |
|
|
$11.19 |
000001077851-3562500636 |
2022 |
6 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
12/22/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR122L1062135504479 |
|
|
$0.38 |
000001078063-3562505204 |
2022 |
6 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504477 |
|
|
$0.95 |
000001077851-3562500636 |
2022 |
6 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
12/22/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR122L1062135504477 |
|
|
$124.68 |
000001077851-3562500636 |
2022 |
6 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504477 |
|
|
$10.60 |
000001077851-3562500636 |
2022 |
6 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
12/22/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR122L1062135504477 |
|
|
$16.42 |
000001077851-3562500636 |
2022 |
6 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504477 |
|
|
$1.37 |
000001077851-3562500636 |
2022 |
6 |
FD52 |
00 |
E124 |
D |
1303201D |
056 |
12/22/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR122L1062135504477 |
|
|
$0.05 |
000001077851-3562500636 |
2022 |
6 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504479 |
|
|
$0.47 |
000001078063-3562505204 |
2022 |
6 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
12/22/2021 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR122L1062135504502 |
|
|
$64.85 |
000001080226-3562505200 |
2022 |
6 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
12/22/2021 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR122L1062135504502 |
|
|
$4.40 |
000001080226-3562505200 |
2022 |
6 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
12/22/2021 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR122L1062135504502 |
|
|
$54.45 |
000001080226-3562505200 |
2022 |
6 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
12/22/2021 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR122L1062135504502 |
|
|
$16.21 |
000001080226-3562505200 |
2022 |
6 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
12/22/2021 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR122L1062135504502 |
|
|
$0.03 |
000001080226-3562505200 |
2022 |
6 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
12/22/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR122L1062135504478 |
|
|
$844.34 |
000001078063-3562505204 |
2022 |
6 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504478 |
|
|
$1,064.16 |
000001078063-3562505204 |
2022 |
6 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
12/22/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR122L1062135504478 |
|
|
$61.02 |
000001078063-3562505204 |
2022 |
6 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504478 |
|
|
$76.90 |
000001078063-3562505204 |
2022 |
6 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
12/8/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121L1062134103548 |
|
|
$394.93 |
000001078063-3562505204 |
2022 |
6 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
12/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103548 |
|
|
$148.17 |
000001078063-3562505204 |
2022 |
6 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
12/8/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121L1062134103548 |
|
|
$27.65 |
000001078063-3562505204 |
2022 |
6 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
12/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103548 |
|
|
$10.37 |
000001078063-3562505204 |
2022 |
6 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
12/8/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121L1062134103548 |
|
|
$331.63 |
000001078063-3562505204 |
2022 |
6 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
12/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103548 |
|
|
$124.42 |
000001078063-3562505204 |
2022 |
6 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
12/8/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR121L1062134103548 |
|
|
$73.85 |
000001078063-3562505204 |
2022 |
6 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
12/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103548 |
|
|
$27.24 |
000001078063-3562505204 |
2022 |
6 |
FD52 |
05 |
E143 |
D |
1303201D |
056 |
12/3/2021 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200090259 |
PON22200000427 |
GRESHAM SMITH |
$15,710.80 |
Preliminary Engineering Services |
2022 |
5 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
11/29/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112L1062132602511 |
|
|
$1,579.76 |
000001078063-3562505204 |
2022 |
5 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
11/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602511 |
|
|
$409.91 |
000001078063-3562505204 |
2022 |
5 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
11/29/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112L1062132602511 |
|
|
$114.15 |
000001078063-3562505204 |
2022 |
5 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
11/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602511 |
|
|
$29.63 |
000001078063-3562505204 |
2022 |
5 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
11/29/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112L1062132602511 |
|
|
$1,326.52 |
000001078063-3562505204 |
2022 |
5 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
11/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602511 |
|
|
$344.20 |
000001078063-3562505204 |
2022 |
5 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
11/29/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112L1062132602511 |
|
|
$294.98 |
000001078063-3562505204 |
2022 |
5 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
11/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602511 |
|
|
$75.37 |
000001078063-3562505204 |
2022 |
5 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
11/29/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR112L1062132602511 |
|
|
$0.70 |
000001078063-3562505204 |
2022 |
5 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
11/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112L1062132602511 |
|
|
$0.18 |
000001078063-3562505204 |
2022 |
5 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
11/12/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111L1062130901508 |
|
|
$554.28 |
000001078063-3562505204 |
2022 |
5 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
11/12/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111L1062130901508 |
|
|
$31.16 |
000001078063-3562505204 |
2022 |
5 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
11/12/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111L1062130901508 |
|
|
$38.81 |
000001078063-3562505204 |
2022 |
5 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
11/12/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111L1062130901508 |
|
|
$2.18 |
000001078063-3562505204 |
2022 |
5 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
11/12/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111L1062130901508 |
|
|
$465.42 |
000001078063-3562505204 |
2022 |
5 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
11/12/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111L1062130901508 |
|
|
$26.17 |
000001078063-3562505204 |
2022 |
5 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
11/12/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR111L1062130901508 |
|
|
$103.23 |
000001078063-3562505204 |
2022 |
5 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
11/12/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111L1062130901508 |
|
|
$5.73 |
000001078063-3562505204 |
2022 |
4 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
10/29/2021 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR102L1062129500444 |
|
|
$64.87 |
000001080226-3562505200 |
2022 |
4 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
10/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500444 |
|
|
$15.04 |
000001080226-3562505200 |
2022 |
4 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
10/29/2021 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR102L1062129500444 |
|
|
$4.40 |
000001080226-3562505200 |
2022 |
4 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
10/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500444 |
|
|
$1.02 |
000001080226-3562505200 |
2022 |
4 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
10/29/2021 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR102L1062129500444 |
|
|
$54.45 |
000001080226-3562505200 |
2022 |
4 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
10/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500444 |
|
|
$12.63 |
000001080226-3562505200 |
2022 |
4 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
10/29/2021 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR102L1062129500444 |
|
|
$16.25 |
000001080226-3562505200 |
2022 |
4 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
10/29/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500444 |
|
|
$3.73 |
000001080226-3562505200 |
2022 |
4 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
10/29/2021 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR102L1062129500444 |
|
|
$0.03 |
000001080226-3562505200 |
2022 |
4 |
FD52 |
05 |
E143 |
D |
1303201D |
056 |
10/12/2021 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200062524 |
PON22200000427 |
GRESHAM SMITH |
$33,421.70 |
Preliminary Engineering Services |
2022 |
3 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
9/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092L1062126709039 |
|
|
$12.82 |
000001078063-3562505204 |
2022 |
3 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
9/27/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092L1062126709039 |
|
|
$0.14 |
000001078063-3562505204 |
2022 |
3 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
9/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092L1062126709039 |
|
|
$0.04 |
000001078063-3562505204 |
2022 |
3 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
9/27/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092L1062126709038 |
|
|
$313.24 |
000001078063-3562505204 |
2022 |
3 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
9/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092L1062126709038 |
|
|
$69.72 |
000001078063-3562505204 |
2022 |
3 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
9/27/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092L1062126709038 |
|
|
$22.64 |
000001078063-3562505204 |
2022 |
3 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
9/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092L1062126709038 |
|
|
$5.04 |
000001078063-3562505204 |
2022 |
3 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
9/27/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092L1062126709038 |
|
|
$263.02 |
000001078063-3562505204 |
2022 |
3 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
9/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092L1062126709038 |
|
|
$58.54 |
000001078063-3562505204 |
2022 |
3 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
9/27/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092L1062126709038 |
|
|
$58.46 |
000001078063-3562505204 |
2022 |
3 |
FD52 |
05 |
E143 |
D |
1303201D |
056 |
9/21/2021 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200045043 |
PON22200000427 |
GRESHAM SMITH |
$2,333.12 |
Preliminary Engineering Services |
2022 |
3 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
9/13/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091L1062125207982 |
|
|
$137.32 |
000001078063-3562505204 |
2022 |
3 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
9/13/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091L1062125207982 |
|
|
$27.46 |
000001078063-3562505204 |
2022 |
3 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
9/13/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091L1062125207982 |
|
|
$9.61 |
000001078063-3562505204 |
2022 |
3 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
9/13/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091L1062125207982 |
|
|
$1.92 |
000001078063-3562505204 |
2022 |
3 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
9/13/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091L1062125207982 |
|
|
$115.31 |
000001078063-3562505204 |
2022 |
3 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
9/13/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091L1062125207982 |
|
|
$23.06 |
000001078063-3562505204 |
2022 |
3 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
9/13/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR091L1062125207982 |
|
|
$25.62 |
000001078063-3562505204 |
2022 |
3 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
9/13/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091L1062125207982 |
|
|
$5.04 |
000001078063-3562505204 |
2022 |
2 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
8/27/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082L1062123606973 |
|
|
$374.50 |
000001078063-3562505204 |
2022 |
2 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
8/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082L1062123606973 |
|
|
$44.65 |
000001078063-3562505204 |
2022 |
2 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
8/27/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082L1062123606973 |
|
|
$27.06 |
000001078063-3562505204 |
2022 |
2 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
8/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082L1062123606973 |
|
|
$3.23 |
000001078063-3562505204 |
2022 |
2 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
8/25/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082L1062123606974 |
|
|
$314.48 |
000001078063-3562505204 |
2022 |
2 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
8/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082L1062123606974 |
|
|
$37.50 |
000001078063-3562505204 |
2022 |
2 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
8/25/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082L1062123606974 |
|
|
$69.81 |
000001078063-3562505204 |
2022 |
2 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
8/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082L1062123606974 |
|
|
$8.21 |
000001078063-3562505204 |
2022 |
2 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
8/25/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR082L1062123606974 |
|
|
$0.17 |
000001078063-3562505204 |
2022 |
2 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
8/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082L1062123606974 |
|
|
$0.02 |
000001078063-3562505204 |
2022 |
2 |
FD52 |
00 |
E143 |
D |
1303201D |
056 |
8/11/2021 |
4010 |
CONSTRUCTION ENGINEERING |
PRC-2200019768 |
PON22000004360 |
HMB Engineers Inc |
$28,135.00 |
2F/LA #F-03 5-80001/056 |
2022 |
2 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
8/9/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081L1062121805829 |
|
|
$204.16 |
000001078063-3562505204 |
2022 |
2 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
8/9/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081L1062121805829 |
|
|
$71.91 |
000001078063-3562505204 |
2022 |
2 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
8/9/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081L1062121805829 |
|
|
$14.30 |
000001078063-3562505204 |
2022 |
2 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
8/9/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081L1062121805829 |
|
|
$5.03 |
000001078063-3562505204 |
2022 |
2 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
8/9/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081L1062121805829 |
|
|
$171.53 |
000001078063-3562505204 |
2022 |
2 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
8/9/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081L1062121805829 |
|
|
$60.38 |
000001078063-3562505204 |
2022 |
2 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
8/9/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081L1062121805829 |
|
|
$38.19 |
000001078063-3562505204 |
2022 |
2 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
8/9/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081L1062121805829 |
|
|
$13.23 |
000001078063-3562505204 |
2022 |
2 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
8/9/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081L1062121805827 |
|
|
$530.30 |
000001077851-3562500636 |
2022 |
2 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
8/9/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081L1062121805827 |
|
|
$57.28 |
000001077851-3562500636 |
2022 |
2 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
8/9/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081L1062121805827 |
|
|
$39.25 |
000001077851-3562500636 |
2022 |
2 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
8/9/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081L1062121805827 |
|
|
$4.24 |
000001077851-3562500636 |
2022 |
2 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
8/9/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081L1062121805827 |
|
|
$445.30 |
000001077851-3562500636 |
2022 |
2 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
8/9/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081L1062121805827 |
|
|
$48.10 |
000001077851-3562500636 |
2022 |
2 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
8/9/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR081L1062121805827 |
|
|
$61.61 |
000001077851-3562500636 |
2022 |
2 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
8/9/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081L1062121805827 |
|
|
$6.54 |
000001077851-3562500636 |
2022 |
1 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
7/26/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR072L1062120404704 |
|
|
$1,606.99 |
000001078063-3562505204 |
2022 |
1 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
7/26/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072L1062120404704 |
|
|
$160.70 |
000001078063-3562505204 |
2022 |
1 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
7/26/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR072L1062120404704 |
|
|
$116.12 |
000001078063-3562505204 |
2022 |
1 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
7/26/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072L1062120404704 |
|
|
$11.61 |
000001078063-3562505204 |
2022 |
1 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
7/26/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR072L1062120404704 |
|
|
$1,349.40 |
000001078063-3562505204 |
2022 |
1 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
7/26/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072L1062120404704 |
|
|
$134.94 |
000001078063-3562505204 |
2022 |
1 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
7/26/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR072L1062120404704 |
|
|
$299.48 |
000001078063-3562505204 |
2022 |
1 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
7/26/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072L1062120404704 |
|
|
$29.55 |
000001078063-3562505204 |
2022 |
1 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
7/26/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR072L1062120404704 |
|
|
$0.72 |
000001078063-3562505204 |
2022 |
1 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
7/26/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072L1062120404704 |
|
|
$0.07 |
000001078063-3562505204 |
2022 |
1 |
FD52 |
00 |
E143 |
D |
1303201D |
056 |
7/22/2021 |
0410 |
TRANSPORTATION PLANNING |
PRC-2200011537 |
PON22000004360 |
HMB Engineers Inc |
$20,865.00 |
1P/LA #F-03 5-80001/056 |
2022 |
1 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
7/12/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR071L1062119003565 |
|
|
$100.12 |
000001078063-3562505204 |
2022 |
1 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
7/12/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071L1062119003565 |
|
|
$37.55 |
000001078063-3562505204 |
2022 |
1 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
7/12/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR071L1062119003565 |
|
|
$1,207.30 |
000001078063-3562505204 |
2022 |
1 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
7/12/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071L1062119003565 |
|
|
$452.80 |
000001078063-3562505204 |
2022 |
1 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
7/12/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR071L1062119003565 |
|
|
$267.38 |
000001078063-3562505204 |
2022 |
1 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
7/12/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071L1062119003565 |
|
|
$98.61 |
000001078063-3562505204 |
2022 |
1 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
7/12/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR071L1062119003564 |
|
|
$1,429.95 |
000001078063-3562505204 |
2022 |
1 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
7/12/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071L1062119003564 |
|
|
$536.30 |
000001078063-3562505204 |
2022 |
1 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
7/1/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062L1062117302488 |
|
|
$247.50 |
000001077851-3562500636 |
2022 |
1 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
7/1/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062L1062117302488 |
|
|
$44.20 |
000001077851-3562500636 |
2022 |
1 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
7/1/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062L1062117302488 |
|
|
$18.64 |
000001077851-3562500636 |
2022 |
1 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
7/1/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062L1062117302488 |
|
|
$3.33 |
000001077851-3562500636 |
2022 |
1 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
7/1/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062L1062117302488 |
|
|
$208.94 |
000001077851-3562500636 |
2022 |
1 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
7/1/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062L1062117302488 |
|
|
$37.32 |
000001077851-3562500636 |
2022 |
1 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
7/1/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062L1062117302488 |
|
|
$28.78 |
000001077851-3562500636 |
2022 |
1 |
FD52 |
00 |
E123 |
D |
1303201D |
056 |
7/1/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062L1062117302488 |
|
|
$5.05 |
000001077851-3562500636 |
2022 |
1 |
FD52 |
00 |
E124 |
D |
1303201D |
056 |
7/1/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062L1062117302488 |
|
|
$0.08 |
000001077851-3562500636 |
2022 |
1 |
FD52 |
00 |
E124 |
D |
1303201D |
056 |
7/1/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062L1062117302488 |
|
|
$0.02 |
000001077851-3562500636 |
2022 |
1 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
7/1/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR061L1062116001489P |
|
|
$248.89 |
000001078063-3562505204 |
2022 |
1 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
7/1/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061L1062116001489P |
|
|
$37.76 |
000001078063-3562505204 |
2022 |
1 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
7/1/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062L1062117302490 |
|
|
$1,348.24 |
000001078063-3562505204 |
2022 |
1 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
7/1/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062L1062117302490 |
|
|
$68.64 |
000001078063-3562505204 |
2022 |
1 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
7/1/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062L1062117302490 |
|
|
$97.43 |
000001078063-3562505204 |
2022 |
1 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
7/1/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062L1062117302490 |
|
|
$4.96 |
000001078063-3562505204 |
2022 |
1 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
7/1/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062L1062117302490 |
|
|
$1,138.32 |
000001078063-3562505204 |
2022 |
1 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
7/1/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062L1062117302490 |
|
|
$57.95 |
000001078063-3562505204 |
2022 |
1 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
7/1/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062L1062117302490 |
|
|
$251.12 |
000001078063-3562505204 |
2022 |
1 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
7/1/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062L1062117302490 |
|
|
$12.62 |
000001078063-3562505204 |
2022 |
1 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
7/1/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR062L1062117302490 |
|
|
$0.60 |
000001078063-3562505204 |
2022 |
1 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
7/1/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062L1062117302490 |
|
|
$0.03 |
000001078063-3562505204 |
2021 |
12 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
6/10/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR061L1062116001489 |
|
|
$1,334.69 |
000001078063-3562505204 |
2021 |
12 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
6/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061L1062116001489 |
|
|
$205.37 |
000001078063-3562505204 |
2021 |
12 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
6/10/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR061L1062116001489 |
|
|
$93.45 |
000001078063-3562505204 |
2021 |
12 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
6/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061L1062116001489 |
|
|
$14.38 |
000001078063-3562505204 |
2021 |
12 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
6/10/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR061L1062116001489 |
|
|
$1,126.82 |
000001078063-3562505204 |
2021 |
12 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
6/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061L1062116001489 |
|
|
$173.39 |
000001078063-3562505204 |
2021 |
11 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
5/24/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052L1062114100419 |
|
|
$554.34 |
000001078063-3562505204 |
2021 |
11 |
FD52 |
05 |
E111 |
D |
1303201D |
056 |
5/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052L1062114100419 |
|
|
$31.16 |
000001078063-3562505204 |
2021 |
11 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
5/24/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052L1062114100419 |
|
|
$40.05 |
000001078063-3562505204 |
2021 |
11 |
FD52 |
05 |
E121 |
D |
1303201D |
056 |
5/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052L1062114100419 |
|
|
$2.25 |
000001078063-3562505204 |
2021 |
11 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
5/24/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052L1062114100419 |
|
|
$468.23 |
000001078063-3562505204 |
2021 |
11 |
FD52 |
05 |
E122 |
D |
1303201D |
056 |
5/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052L1062114100419 |
|
|
$26.31 |
000001078063-3562505204 |
2021 |
11 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
5/24/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052L1062114100419 |
|
|
$103.30 |
000001078063-3562505204 |
2021 |
11 |
FD52 |
05 |
E123 |
D |
1303201D |
056 |
5/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052L1062114100419 |
|
|
$5.73 |
000001078063-3562505204 |
2021 |
11 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
5/24/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR052L1062114100419 |
|
|
$0.24 |
000001078063-3562505204 |
2021 |
11 |
FD52 |
05 |
E124 |
D |
1303201D |
056 |
5/24/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052L1062114100419 |
|
|
$0.01 |
000001078063-3562505204 |
2021 |
11 |
FD52 |
00 |
E111 |
D |
1303201D |
056 |
5/10/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051L1062112709761 |
|
|
$88.38 |
000001077851-3562500636 |
2021 |
11 |
FD52 |
00 |
E121 |
D |
1303201D |
056 |
5/10/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051L1062112709761 |
|
|
$6.76 |
000001077851-3562500636 |
2021 |
11 |
FD52 |
00 |
E122 |
D |
1303201D |
056 |
5/10/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR051L1062112709761 |
|
|
$74.62 |
000001077851-3562500636 |