The Commonwealth pays employees on a semi-monthly basis with a scheduled pay day on the 15th and 30th of each month. The two monthly pay periods are from the 1st to the 15th of the month and the 16th through the last day of the month. Pay check distribution is delayed by one pay period to allow for system processing. For example work performed during the 1st to the 15th day of the month is paid to the employee on the 30th of the month. Accordingly the cost accounting charges for labor costs posting in eMARS to operating accounts and highway projects are also delayed by approximately one pay period.
A good rule of measure is that the cost accounting charges for the pay period ending on the 15th of the month will post to eMARS by the 25th and those for the pay period ending on the last day of the month will post to eMARS by the 10th of the following month.

x close panel
Detailed Project Expenditure Report
Total E-MARS Expenditures for 1302801D = $633,707.90
Click here for Labor Costs Information
Year Month PBU Charge District Object Phase Program Code County Date ACT Activity Name Trans ID Reference # Vendor Name Expenditure Line Description
2024 10 FD52 05 E111 D 1302801D 108 4/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042O1062411502729 $157.84 000001079193-3562505204
2024 10 FD52 05 E111 D 1302801D 108 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502729 $19.85 000001079193-3562505204
2024 10 FD52 05 E121 D 1302801D 108 4/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042O1062411502729 $11.93 000001079193-3562505204
2024 10 FD52 05 E121 D 1302801D 108 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502729 $1.49 000001079193-3562505204
2024 10 FD52 05 E122 D 1302801D 108 4/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042O1062411502729 $104.48 000001079193-3562505204
2024 10 FD52 05 E122 D 1302801D 108 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502729 $13.14 000001079193-3562505204
2024 10 FD52 05 E123 D 1302801D 108 4/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042O1062411502729 $18.48 000001079193-3562505204
2024 10 FD52 05 E123 D 1302801D 108 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502729 $2.30 000001079193-3562505204
2024 10 FD52 05 E124 D 1302801D 108 4/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042O1062411502729 $0.04 000001079193-3562505204
2024 10 FD52 05 E111 D 1302801D 108 4/10/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041O1062410001616 $198.66 000001079193-3562505204
2024 10 FD52 05 E111 D 1302801D 108 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001616 $49.63 000001079193-3562505204
2024 10 FD52 05 E121 D 1302801D 108 4/10/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041O1062410001616 $15.00 000001079193-3562505204
2024 10 FD52 05 E121 D 1302801D 108 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001616 $3.75 000001079193-3562505204
2024 10 FD52 05 E122 D 1302801D 108 4/10/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041O1062410001616 $132.01 000001079193-3562505204
2024 10 FD52 05 E122 D 1302801D 108 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001616 $32.84 000001079193-3562505204
2024 10 FD52 05 E123 D 1302801D 108 4/10/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041O1062410001616 $23.37 000001079193-3562505204
2024 10 FD52 05 E123 D 1302801D 108 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001616 $5.73 000001079193-3562505204
2024 9 FD52 05 E111 D 1302801D 108 3/11/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031O1062406810064 $149.02 000001079193-3562505204
2024 9 FD52 05 E111 D 1302801D 108 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810064 $16.38 000001079193-3562505204
2024 9 FD52 05 E121 D 1302801D 108 3/11/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031O1062406810064 $11.25 000001079193-3562505204
2024 9 FD52 05 E121 D 1302801D 108 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810064 $1.23 000001079193-3562505204
2024 9 FD52 05 E122 D 1302801D 108 3/11/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031O1062406810064 $98.51 000001079193-3562505204
2024 9 FD52 05 E122 D 1302801D 108 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810064 $10.84 000001079193-3562505204
2024 9 FD52 05 E123 D 1302801D 108 3/11/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031O1062406810064 $17.43 000001079193-3562505204
2024 9 FD52 05 E123 D 1302801D 108 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810064 $1.89 000001079193-3562505204
2024 8 FD52 05 E111 D 1302801D 108 2/16/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021O1062403907655 $144.78 000001079193-3562505204
2024 8 FD52 05 E111 D 1302801D 108 2/16/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907655 $37.22 000001079193-3562505204
2024 8 FD52 05 E121 D 1302801D 108 2/16/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021O1062403907655 $10.94 000001079193-3562505204
2024 8 FD52 05 E121 D 1302801D 108 2/16/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907655 $2.81 000001079193-3562505204
2024 8 FD52 05 E122 D 1302801D 108 2/16/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021O1062403907655 $95.78 000001079193-3562505204
2024 8 FD52 05 E122 D 1302801D 108 2/16/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907655 $24.63 000001079193-3562505204
2024 8 FD52 05 E123 D 1302801D 108 2/16/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021O1062403907655 $16.97 000001079193-3562505204
2024 8 FD52 05 E123 D 1302801D 108 2/16/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907655 $4.30 000001079193-3562505204
2024 7 FD52 05 E111 D 1302801D 108 1/24/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012O1062402306575 $112.60 000001079193-3562505204
2024 7 FD52 05 E111 D 1302801D 108 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306575 $70.83 000001079193-3562505204
2024 7 FD52 05 E121 D 1302801D 108 1/24/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012O1062402306575 $8.53 000001079193-3562505204
2024 7 FD52 05 E121 D 1302801D 108 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306575 $5.36 000001079193-3562505204
2024 7 FD52 05 E122 D 1302801D 108 1/24/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012O1062402306575 $74.63 000001079193-3562505204
2024 7 FD52 05 E122 D 1302801D 108 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306575 $46.86 000001079193-3562505204
2024 7 FD52 05 E123 D 1302801D 108 1/24/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012O1062402306575 $13.28 000001079193-3562505204
2024 7 FD52 05 E123 D 1302801D 108 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306575 $8.19 000001079193-3562505204
2024 7 FD52 05 E124 D 1302801D 108 1/24/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012O1062402306575 $0.03 000001079193-3562505204
2024 7 FD52 05 E124 D 1302801D 108 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306575 $0.01 000001079193-3562505204
2024 6 FD52 05 E124 D 1302801D 108 12/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122N1062335504598 $0.04 000001079193-3562505204
2024 6 FD52 05 E124 D 1302801D 108 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504598 $0.01 000001079193-3562505204
2024 6 FD52 05 E111 D 1302801D 108 12/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122N1062335504598 $112.72 000001079193-3562505204
2024 6 FD52 05 E111 D 1302801D 108 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504598 $64.51 000001079193-3562505204
2024 6 FD52 05 E121 D 1302801D 108 12/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122N1062335504598 $8.53 000001079193-3562505204
2024 6 FD52 05 E121 D 1302801D 108 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504598 $4.86 000001079193-3562505204
2024 6 FD52 05 E122 D 1302801D 108 12/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122N1062335504598 $74.32 000001079193-3562505204
2024 6 FD52 05 E122 D 1302801D 108 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504598 $42.69 000001079193-3562505204
2024 6 FD52 05 E123 D 1302801D 108 12/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122N1062335504598 $11.48 000001079193-3562505204
2024 6 FD52 05 E123 D 1302801D 108 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504598 $6.44 000001079193-3562505204
2024 6 FD52 05 E122 D 1302801D 108 12/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121N1062334203611 $141.80 000001079193-3562505204
2024 6 FD52 05 E122 D 1302801D 108 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203611 $31.64 000001079193-3562505204
2024 6 FD52 05 E123 D 1302801D 108 12/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121N1062334203611 $21.79 000001079193-3562505204
2024 6 FD52 05 E123 D 1302801D 108 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203611 $4.78 000001079193-3562505204
2024 6 FD52 00 E111 D 1302801D 108 12/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121N1062334203608 $95.38 000001078330-3562500636
2024 6 FD52 00 E111 D 1302801D 108 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203608 $24.82 000001078330-3562500636
2024 6 FD52 00 E121 D 1302801D 108 12/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121N1062334203608 $7.16 000001078330-3562500636
2024 6 FD52 00 E121 D 1302801D 108 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203608 $1.85 000001078330-3562500636
2024 6 FD52 00 E122 D 1302801D 108 12/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121N1062334203608 $63.17 000001078330-3562500636
2024 6 FD52 00 E122 D 1302801D 108 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203608 $16.42 000001078330-3562500636
2024 6 FD52 00 E123 D 1302801D 108 12/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121N1062334203608 $9.37 000001078330-3562500636
2024 6 FD52 00 E123 D 1302801D 108 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203608 $2.40 000001078330-3562500636
2024 6 FD52 05 E111 D 1302801D 108 12/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121N1062334203610 $214.29 000001079193-3562505204
2024 6 FD52 05 E111 D 1302801D 108 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203610 $47.82 000001079193-3562505204
2024 6 FD52 05 E121 D 1302801D 108 12/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121N1062334203610 $16.20 000001079193-3562505204
2024 6 FD52 05 E121 D 1302801D 108 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203610 $3.62 000001079193-3562505204
2024 4 FD52 05 E111 D 1302801D 108 10/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101N1062328009684 $74.44 000001079193-3562505204
2024 4 FD52 05 E111 D 1302801D 108 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009684 $8.44 000001079193-3562505204
2024 4 FD52 05 E121 D 1302801D 108 10/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101N1062328009684 $5.63 000001079193-3562505204
2024 4 FD52 05 E121 D 1302801D 108 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009684 $0.64 000001079193-3562505204
2024 4 FD52 05 E122 D 1302801D 108 10/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101N1062328009684 $49.26 000001079193-3562505204
2024 4 FD52 05 E122 D 1302801D 108 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009684 $5.59 000001079193-3562505204
2024 4 FD52 05 E123 D 1302801D 108 10/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101N1062328009684 $7.56 000001079193-3562505204
2024 4 FD52 05 E123 D 1302801D 108 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009684 $0.84 000001079193-3562505204
2024 3 FD52 05 E111 D 1302801D 108 9/29/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062327208401 $950.62 000001079193-3562505204
2024 3 FD52 05 E111 D 1302801D 108 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208401 $613.97 000001079193-3562505204
2024 3 FD52 05 E121 D 1302801D 108 9/29/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062327208401 $71.43 000001079193-3562505204
2024 3 FD52 05 E121 D 1302801D 108 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208401 $46.34 000001079193-3562505204
2024 3 FD52 05 E122 D 1302801D 108 9/29/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062327208401 $628.96 000001079193-3562505204
2024 3 FD52 05 E122 D 1302801D 108 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208401 $406.26 000001079193-3562505204
2024 3 FD52 05 E123 D 1302801D 108 9/29/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062327208401 $101.70 000001079193-3562505204
2024 3 FD52 05 E123 D 1302801D 108 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208401 $62.10 000001079193-3562505204
2024 3 FD52 05 E124 D 1302801D 108 9/29/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062327208401 $0.25 000001079193-3562505204
2024 3 FD52 05 E124 D 1302801D 108 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208401 $0.16 000001079193-3562505204
2024 3 FD52 05 E111 D 1302801D 108 9/28/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062326507050 ($950.62) 000001079193-3562505204
2024 3 FD52 05 E111 D 1302801D 108 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507050 ($613.97) 000001079193-3562505204
2024 3 FD52 05 E121 D 1302801D 108 9/28/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062326507050 ($71.43) 000001079193-3562505204
2024 3 FD52 05 E121 D 1302801D 108 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507050 ($46.34) 000001079193-3562505204
2024 3 FD52 05 E122 D 1302801D 108 9/28/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062326507050 ($628.96) 000001079193-3562505204
2024 3 FD52 05 E122 D 1302801D 108 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507050 ($406.26) 000001079193-3562505204
2024 3 FD52 05 E123 D 1302801D 108 9/28/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062326507050 ($101.70) 000001079193-3562505204
2024 3 FD52 05 E123 D 1302801D 108 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507050 ($62.10) 000001079193-3562505204
2024 3 FD52 05 E124 D 1302801D 108 9/28/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062326507050 ($0.25) 000001079193-3562505204
2024 3 FD52 05 E124 D 1302801D 108 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507050 ($0.16) 000001079193-3562505204
2024 3 FD52 05 E111 D 1302801D 108 9/25/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062326507050 $950.62 000001079193-3562505204
2024 3 FD52 05 E111 D 1302801D 108 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507050 $613.97 000001079193-3562505204
2024 3 FD52 05 E121 D 1302801D 108 9/25/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062326507050 $71.43 000001079193-3562505204
2024 3 FD52 05 E121 D 1302801D 108 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507050 $46.34 000001079193-3562505204
2024 3 FD52 05 E122 D 1302801D 108 9/25/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062326507050 $628.96 000001079193-3562505204
2024 3 FD52 05 E122 D 1302801D 108 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507050 $406.26 000001079193-3562505204
2024 3 FD52 05 E123 D 1302801D 108 9/25/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062326507050 $101.70 000001079193-3562505204
2024 3 FD52 05 E123 D 1302801D 108 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507050 $62.10 000001079193-3562505204
2024 3 FD52 05 E124 D 1302801D 108 9/25/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062326507050 $0.25 000001079193-3562505204
2024 3 FD52 05 E124 D 1302801D 108 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507050 $0.16 000001079193-3562505204
2024 3 FD52 00 E111 D 1302801D 108 9/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091N1062325106080 $153.18 000001078330-3562500636
2024 3 FD52 00 E111 D 1302801D 108 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106080 $8.75 000001078330-3562500636
2024 3 FD52 00 E121 D 1302801D 108 9/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091N1062325106080 $11.48 000001078330-3562500636
2024 3 FD52 00 E121 D 1302801D 108 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106080 $0.66 000001078330-3562500636
2024 3 FD52 00 E122 D 1302801D 108 9/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091N1062325106080 $101.33 000001078330-3562500636
2024 3 FD52 00 E122 D 1302801D 108 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106080 $5.79 000001078330-3562500636
2024 3 FD52 00 E123 D 1302801D 108 9/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091N1062325106080 $14.98 000001078330-3562500636
2024 3 FD52 00 E123 D 1302801D 108 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106080 $0.85 000001078330-3562500636
2024 3 FD52 05 E111 D 1302801D 108 9/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091N1062325106082 $1,448.97 000001079193-3562505204
2024 3 FD52 05 E111 D 1302801D 108 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106082 $255.24 000001079193-3562505204
2024 3 FD52 05 E121 D 1302801D 108 9/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091N1062325106082 $109.01 000001079193-3562505204
2024 3 FD52 05 E121 D 1302801D 108 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106082 $19.29 000001079193-3562505204
2024 3 FD52 05 E122 D 1302801D 108 9/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091N1062325106082 $958.86 000001079193-3562505204
2024 3 FD52 05 E122 D 1302801D 108 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106082 $168.90 000001079193-3562505204
2024 3 FD52 05 E123 D 1302801D 108 9/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091N1062325106082 $151.00 000001079193-3562505204
2024 3 FD52 05 E123 D 1302801D 108 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106082 $25.69 000001079193-3562505204
2024 2 FD52 05 E111 D 1302801D 108 8/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082N1062323504929 $1,503.16 000001079193-3562505204
2024 2 FD52 05 E111 D 1302801D 108 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504929 $152.22 000001079193-3562505204
2024 2 FD52 05 E121 D 1302801D 108 8/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082N1062323504929 $113.20 000001079193-3562505204
2024 2 FD52 05 E121 D 1302801D 108 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504929 $11.46 000001079193-3562505204
2024 2 FD52 05 E122 D 1302801D 108 8/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082N1062323504929 $994.65 000001079193-3562505204
2024 2 FD52 05 E122 D 1302801D 108 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504929 $100.72 000001079193-3562505204
2024 2 FD52 05 E123 D 1302801D 108 8/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082N1062323504929 $157.10 000001079193-3562505204
2024 2 FD52 05 E123 D 1302801D 108 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504929 $15.71 000001079193-3562505204
2024 2 FD52 05 E124 D 1302801D 108 8/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082N1062323504929 $0.40 000001079193-3562505204
2024 2 FD52 05 E124 D 1302801D 108 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504929 $0.04 000001079193-3562505204
2024 2 FD52 00 E111 D 1302801D 108 8/9/2023 0010 ENV STUDIES-UST/HZM CA-XR081N1062322003851 $417.76 000001079766-3562500061
2024 2 FD52 00 E111 D 1302801D 108 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003851 $2.39 000001079766-3562500061
2024 2 FD52 00 E121 D 1302801D 108 8/9/2023 0010 ENV STUDIES-UST/HZM CA-XR081N1062322003851 $29.72 000001079766-3562500061
2024 2 FD52 00 E121 D 1302801D 108 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003851 $0.17 000001079766-3562500061
2024 2 FD52 00 E122 D 1302801D 108 8/9/2023 0010 ENV STUDIES-UST/HZM CA-XR081N1062322003851 $276.43 000001079766-3562500061
2024 2 FD52 00 E122 D 1302801D 108 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003851 $1.58 000001079766-3562500061
2024 2 FD52 00 E123 D 1302801D 108 8/9/2023 0010 ENV STUDIES-UST/HZM CA-XR081N1062322003851 $81.40 000001079766-3562500061
2024 2 FD52 00 E123 D 1302801D 108 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003851 $0.46 000001079766-3562500061
2024 2 FD52 05 E111 D 1302801D 108 8/9/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR081N1062322003851 $348.70 000001080043-3562505200
2024 2 FD52 05 E111 D 1302801D 108 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003851 $34.87 000001080043-3562505200
2024 2 FD52 05 E121 D 1302801D 108 8/9/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR081N1062322003851 $23.73 000001080043-3562505200
2024 2 FD52 05 E121 D 1302801D 108 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003851 $2.37 000001080043-3562505200
2024 2 FD52 05 E122 D 1302801D 108 8/9/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR081N1062322003851 $230.74 000001080043-3562505200
2024 2 FD52 05 E122 D 1302801D 108 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003851 $23.07 000001080043-3562505200
2024 2 FD52 05 E123 D 1302801D 108 8/9/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR081N1062322003851 $81.46 000001080043-3562505200
2024 2 FD52 05 E123 D 1302801D 108 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003851 $8.07 000001080043-3562505200
2024 2 FD52 05 E111 D 1302801D 108 8/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081N1062322003849 $1,172.87 000001079193-3562505204
2024 2 FD52 05 E111 D 1302801D 108 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003849 $130.38 000001079193-3562505204
2024 2 FD52 05 E121 D 1302801D 108 8/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081N1062322003849 $88.66 000001079193-3562505204
2024 2 FD52 05 E121 D 1302801D 108 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003849 $9.86 000001079193-3562505204
2024 2 FD52 05 E122 D 1302801D 108 8/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081N1062322003849 $776.15 000001079193-3562505204
2024 2 FD52 05 E122 D 1302801D 108 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003849 $86.27 000001079193-3562505204
2024 2 FD52 05 E123 D 1302801D 108 8/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081N1062322003849 $119.11 000001079193-3562505204
2024 2 FD52 05 E123 D 1302801D 108 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003849 $13.04 000001079193-3562505204
2024 1 FD52 05 E111 D 1302801D 108 7/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072N1062320202666 $347.39 000001079193-3562505204
2024 1 FD52 05 E111 D 1302801D 108 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202666 $148.86 000001079193-3562505204
2024 1 FD52 05 E121 D 1302801D 108 7/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072N1062320202666 $26.26 000001079193-3562505204
2024 1 FD52 05 E121 D 1302801D 108 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202666 $11.25 000001079193-3562505204
2024 1 FD52 05 E122 D 1302801D 108 7/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072N1062320202666 $229.86 000001079193-3562505204
2024 1 FD52 05 E122 D 1302801D 108 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202666 $98.49 000001079193-3562505204
2024 1 FD52 05 E123 D 1302801D 108 7/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072N1062320202666 $35.42 000001079193-3562505204
2024 1 FD52 05 E123 D 1302801D 108 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202666 $14.88 000001079193-3562505204
2024 1 FD52 05 E124 D 1302801D 108 7/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072N1062320202666 $0.09 000001079193-3562505204
2024 1 FD52 05 E124 D 1302801D 108 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202666 $0.03 000001079193-3562505204
2024 1 FD52 05 E143 D 1302801D 108 7/14/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400005758 PON22200001178 PARSONS TRANSPORTATION GROUP INC $50,000.00 Spencer Co.
2024 1 FD52 05 E122 D 1302801D 108 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101538 $149.92 000001079193-3562505204
2024 1 FD52 05 E123 D 1302801D 108 7/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071N1062319101538 $221.32 000001079193-3562505204
2024 1 FD52 05 E123 D 1302801D 108 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101538 $20.46 000001079193-3562505204
2024 1 FD52 05 E143 D 1302801D 108 7/11/2023 0350 RESEARCH AGREEMENT PRC-2400006609 PON22200002512 UNIVERSITY OF KENTUCKY RESEARCH FOUNDATION $1,620.33
2024 1 FD52 05 E111 D 1302801D 108 7/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071N1062319101538 $2,030.31 000001079193-3562505204
2024 1 FD52 05 E111 D 1302801D 108 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101538 $192.21 000001079193-3562505204
2024 1 FD52 05 E121 D 1302801D 108 7/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071N1062319101538 $152.94 000001079193-3562505204
2024 1 FD52 05 E121 D 1302801D 108 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101538 $14.50 000001079193-3562505204
2024 1 FD52 05 E122 D 1302801D 108 7/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071N1062319101538 $1,583.60 000001079193-3562505204
2023 12 FD52 05 E143 D 1302801D 108 6/30/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300225280 PON22200001178 PARSONS TRANSPORTATION GROUP INC ($50,000.00) Spencer Co.
2023 12 FD52 05 E111 D 1302801D 108 6/26/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR062N1062317400424 $47.00 000001080043-3562505200
2023 12 FD52 05 E121 D 1302801D 108 6/26/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR062N1062317400424 $3.27 000001080043-3562505200
2023 12 FD52 05 E122 D 1302801D 108 6/26/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR062N1062317400424 $36.63 000001080043-3562505200
2023 12 FD52 05 E123 D 1302801D 108 6/26/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR062N1062317400424 $11.59 000001080043-3562505200
2023 12 FD52 05 E124 D 1302801D 108 6/26/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR062N1062317400424 $0.02 000001080043-3562505200
2023 12 FD52 05 E111 D 1302801D 108 6/26/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062N1062317400421 $287.33 000001079193-3562505204
2023 12 FD52 05 E111 D 1302801D 108 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400421 $82.99 000001079193-3562505204
2023 12 FD52 05 E121 D 1302801D 108 6/26/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062N1062317400421 $21.70 000001079193-3562505204
2023 12 FD52 05 E121 D 1302801D 108 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400421 $6.27 000001079193-3562505204
2023 12 FD52 05 E122 D 1302801D 108 6/26/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062N1062317400421 $224.08 000001079193-3562505204
2023 12 FD52 05 E122 D 1302801D 108 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400421 $64.73 000001079193-3562505204
2023 12 FD52 05 E123 D 1302801D 108 6/26/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062N1062317400421 $31.00 000001079193-3562505204
2023 12 FD52 05 E123 D 1302801D 108 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400421 $8.79 000001079193-3562505204
2023 12 FD52 05 E124 D 1302801D 108 6/26/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062N1062317400421 $0.08 000001079193-3562505204
2023 12 FD52 05 E124 D 1302801D 108 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317400421 $0.02 000001079193-3562505204
2023 12 FD52 05 E121 D 1302801D 108 6/8/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061N1062315810128 $30.93 000001079193-3562505204
2023 12 FD52 05 E121 D 1302801D 108 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810128 $7.48 000001079193-3562505204
2023 12 FD52 05 E122 D 1302801D 108 6/8/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061N1062315810128 $319.52 000001079193-3562505204
2023 12 FD52 05 E122 D 1302801D 108 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810128 $77.29 000001079193-3562505204
2023 12 FD52 05 E123 D 1302801D 108 6/8/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061N1062315810128 $44.17 000001079193-3562505204
2023 12 FD52 05 E111 D 1302801D 108 6/8/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR061N1062315810130 $28.67 000001080043-3562505200
2023 12 FD52 05 E123 D 1302801D 108 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810128 $10.51 000001079193-3562505204
2023 12 FD52 05 E111 D 1302801D 108 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810130 $8.04 000001080043-3562505200
2023 12 FD52 05 E121 D 1302801D 108 6/8/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR061N1062315810130 $1.94 000001080043-3562505200
2023 12 FD52 05 E121 D 1302801D 108 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810130 $0.53 000001080043-3562505200
2023 12 FD52 05 E122 D 1302801D 108 6/8/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR061N1062315810130 $22.40 000001080043-3562505200
2023 12 FD52 05 E122 D 1302801D 108 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810130 $6.28 000001080043-3562505200
2023 12 FD52 05 E123 D 1302801D 108 6/8/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR061N1062315810130 $7.12 000001080043-3562505200
2023 12 FD52 05 E123 D 1302801D 108 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810130 $1.98 000001080043-3562505200
2023 12 FD52 05 E111 D 1302801D 108 6/8/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061N1062315810128 $409.65 000001079193-3562505204
2023 12 FD52 05 E111 D 1302801D 108 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810128 $99.09 000001079193-3562505204
2023 11 FD52 05 E143 D 1302801D 108 5/25/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300225280 PON22200001178 PARSONS TRANSPORTATION GROUP INC $50,000.00 Spencer Co.
2023 11 FD52 05 E123 D 1302801D 108 5/24/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR052N1062314309034 $11.69 000001080043-3562505200
2023 11 FD52 05 E123 D 1302801D 108 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309034 $1.77 000001080043-3562505200
2023 11 FD52 05 E124 D 1302801D 108 5/24/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR052N1062314309034 $0.03 000001080043-3562505200
2023 11 FD52 05 E111 D 1302801D 108 5/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052N1062314309031 $851.38 000001079193-3562505204
2023 11 FD52 05 E111 D 1302801D 108 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309031 $319.20 000001079193-3562505204
2023 11 FD52 05 E121 D 1302801D 108 5/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052N1062314309031 $64.29 000001079193-3562505204
2023 11 FD52 05 E121 D 1302801D 108 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309031 $24.11 000001079193-3562505204
2023 11 FD52 05 E122 D 1302801D 108 5/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052N1062314309031 $663.94 000001079193-3562505204
2023 11 FD52 05 E122 D 1302801D 108 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309031 $248.98 000001079193-3562505204
2023 11 FD52 05 E123 D 1302801D 108 5/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052N1062314309031 $91.94 000001079193-3562505204
2023 11 FD52 05 E123 D 1302801D 108 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309031 $33.84 000001079193-3562505204
2023 11 FD52 05 E124 D 1302801D 108 5/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052N1062314309031 $0.24 000001079193-3562505204
2023 11 FD52 05 E124 D 1302801D 108 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309031 $0.09 000001079193-3562505204
2023 11 FD52 05 E111 D 1302801D 108 5/24/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR052N1062314309033 $47.02 000001080043-3562505200
2023 11 FD52 05 E111 D 1302801D 108 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309033 $7.21 000001080043-3562505200
2023 11 FD52 05 E121 D 1302801D 108 5/24/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR052N1062314309033 $3.27 000001080043-3562505200
2023 11 FD52 05 E121 D 1302801D 108 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309033 $0.50 000001080043-3562505200
2023 11 FD52 05 E122 D 1302801D 108 5/24/2023 0640 ENV STUDIES-GEN-CONSULT CA-XR052N1062314309033 $36.88 000001080043-3562505200
2023 11 FD52 05 E122 D 1302801D 108 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309033 $5.62 000001080043-3562505200
2023 11 FD52 05 E111 D 1302801D 108 5/15/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051N1062312808058 $596.91 000001079193-3562505204
2023 11 FD52 05 E111 D 1302801D 108 5/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808058 $12.17 000001079193-3562505204
2023 11 FD52 05 E121 D 1302801D 108 5/15/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051N1062312808058 $45.09 000001079193-3562505204
2023 11 FD52 05 E121 D 1302801D 108 5/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808058 $0.92 000001079193-3562505204
2023 11 FD52 05 E122 D 1302801D 108 5/15/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051N1062312808058 $465.59 000001079193-3562505204
2023 11 FD52 05 E122 D 1302801D 108 5/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808058 $9.49 000001079193-3562505204
2023 11 FD52 05 E123 D 1302801D 108 5/15/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051N1062312808058 $64.16 000001079193-3562505204
2023 11 FD52 05 E123 D 1302801D 108 5/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808058 $1.29 000001079193-3562505204
2023 10 FD52 05 E111 D 1302801D 108 4/27/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042N1062311106923 $117.24 000001079193-3562505204
2023 10 FD52 05 E111 D 1302801D 108 4/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106923 $40.74 000001079193-3562505204
2023 10 FD52 05 E121 D 1302801D 108 4/27/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042N1062311106923 $8.83 000001079193-3562505204
2023 10 FD52 05 E121 D 1302801D 108 4/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106923 $3.07 000001079193-3562505204
2023 10 FD52 05 E122 D 1302801D 108 4/27/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042N1062311106923 $91.29 000001079193-3562505204
2023 10 FD52 05 E122 D 1302801D 108 4/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106923 $31.78 000001079193-3562505204
2023 10 FD52 05 E123 D 1302801D 108 4/27/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042N1062311106923 $12.64 000001079193-3562505204
2023 10 FD52 05 E123 D 1302801D 108 4/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106923 $4.32 000001079193-3562505204
2023 10 FD52 05 E124 D 1302801D 108 4/27/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042N1062311106923 $0.03 000001079193-3562505204
2023 10 FD52 05 E111 D 1302801D 108 4/14/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041N1062309605759 $282.85 000001079193-3562505204
2023 10 FD52 05 E111 D 1302801D 108 4/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605759 $75.69 000001079193-3562505204
2023 10 FD52 05 E121 D 1302801D 108 4/14/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041N1062309605759 $21.36 000001079193-3562505204
2023 10 FD52 05 E121 D 1302801D 108 4/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605759 $5.71 000001079193-3562505204
2023 10 FD52 05 E122 D 1302801D 108 4/14/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041N1062309605759 $220.61 000001079193-3562505204
2023 10 FD52 05 E122 D 1302801D 108 4/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605759 $59.04 000001079193-3562505204
2023 10 FD52 05 E123 D 1302801D 108 4/14/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041N1062309605759 $30.53 000001079193-3562505204
2023 10 FD52 05 E123 D 1302801D 108 4/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605759 $8.02 000001079193-3562505204
2023 10 FD52 05 E143 D 1302801D 108 4/3/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300183560 PON22200001178 PARSONS TRANSPORTATION GROUP INC $5,000.00 Spencer Co.
2023 9 FD52 05 E111 D 1302801D 108 3/31/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304635 $58.74 000001079193-3562505204
2023 9 FD52 05 E121 D 1302801D 108 3/31/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032N1062308304635 $20.09 000001079193-3562505204
2023 9 FD52 05 E121 D 1302801D 108 3/31/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304635 $4.44 000001079193-3562505204
2023 9 FD52 05 E122 D 1302801D 108 3/31/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032N1062308304635 $206.79 000001079193-3562505204
2023 9 FD52 05 E122 D 1302801D 108 3/31/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304635 $45.82 000001079193-3562505204
2023 9 FD52 05 E123 D 1302801D 108 3/31/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032N1062308304635 $28.60 000001079193-3562505204
2023 9 FD52 05 E123 D 1302801D 108 3/31/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304635 $6.22 000001079193-3562505204
2023 9 FD52 05 E124 D 1302801D 108 3/31/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032N1062308304635 $0.08 000001079193-3562505204
2023 9 FD52 05 E124 D 1302801D 108 3/31/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304635 $0.02 000001079193-3562505204
2023 9 FD52 05 E111 D 1302801D 108 3/31/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032N1062308304635 $265.90 000001079193-3562505204
2023 9 FD52 05 E111 D 1302801D 108 3/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031N1062306703654 $130.10 000001079193-3562505204
2023 9 FD52 05 E111 D 1302801D 108 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703654 $26.53 000001079193-3562505204
2023 9 FD52 05 E121 D 1302801D 108 3/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031N1062306703654 $9.82 000001079193-3562505204
2023 9 FD52 05 E121 D 1302801D 108 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703654 $2.00 000001079193-3562505204
2023 9 FD52 05 E122 D 1302801D 108 3/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031N1062306703654 $101.43 000001079193-3562505204
2023 9 FD52 05 E122 D 1302801D 108 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703654 $20.69 000001079193-3562505204
2023 9 FD52 05 E123 D 1302801D 108 3/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031N1062306703654 $14.02 000001079193-3562505204
2023 9 FD52 05 E123 D 1302801D 108 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703654 $2.81 000001079193-3562505204
2023 8 FD52 05 E111 D 1302801D 108 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302437 $212.80 000001079193-3562505204
2023 8 FD52 05 E111 D 1302801D 108 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302437 $47.66 000001079193-3562505204
2023 8 FD52 05 E121 D 1302801D 108 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302437 $16.08 000001079193-3562505204
2023 8 FD52 05 E121 D 1302801D 108 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302437 $3.60 000001079193-3562505204
2023 8 FD52 05 E122 D 1302801D 108 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302437 $165.99 000001079193-3562505204
2023 8 FD52 05 E122 D 1302801D 108 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302437 $37.18 000001079193-3562505204
2023 8 FD52 05 E123 D 1302801D 108 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302437 $22.94 000001079193-3562505204
2023 8 FD52 05 E123 D 1302801D 108 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302437 $5.06 000001079193-3562505204
2023 8 FD52 05 E124 D 1302801D 108 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302437 $0.06 000001079193-3562505204
2023 8 FD52 05 E124 D 1302801D 108 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305302437 $0.02 000001079193-3562505204
2023 8 FD52 05 E111 D 1302801D 108 2/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021N1062303901408 $331.61 000001079193-3562505204
2023 8 FD52 05 E111 D 1302801D 108 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901408 $66.32 000001079193-3562505204
2023 8 FD52 05 E121 D 1302801D 108 2/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021N1062303901408 $25.05 000001079193-3562505204
2023 8 FD52 05 E121 D 1302801D 108 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901408 $5.00 000001079193-3562505204
2023 8 FD52 05 E122 D 1302801D 108 2/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021N1062303901408 $258.66 000001079193-3562505204
2023 8 FD52 05 E122 D 1302801D 108 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901408 $51.72 000001079193-3562505204
2023 8 FD52 05 E123 D 1302801D 108 2/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021N1062303901408 $35.74 000001079193-3562505204
2023 8 FD52 05 E123 D 1302801D 108 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901408 $7.04 000001079193-3562505204
2023 6 FD52 05 E111 D 1302801D 108 12/22/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122M1062235509153 $319.19 000001079193-3562505204
2023 6 FD52 05 E111 D 1302801D 108 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509153 $70.66 000001079193-3562505204
2023 6 FD52 05 E121 D 1302801D 108 12/22/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122M1062235509153 $24.11 000001079193-3562505204
2023 6 FD52 05 E121 D 1302801D 108 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509153 $5.34 000001079193-3562505204
2023 6 FD52 05 E122 D 1302801D 108 12/22/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122M1062235509153 $248.98 000001079193-3562505204
2023 6 FD52 05 E122 D 1302801D 108 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509153 $55.12 000001079193-3562505204
2023 6 FD52 05 E123 D 1302801D 108 12/22/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122M1062235509153 $31.62 000001079193-3562505204
2023 6 FD52 05 E123 D 1302801D 108 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509153 $6.88 000001079193-3562505204
2023 6 FD52 05 E124 D 1302801D 108 12/22/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122M1062235509153 $0.09 000001079193-3562505204
2023 6 FD52 05 E124 D 1302801D 108 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509153 $0.02 000001079193-3562505204
2023 6 FD52 05 E111 D 1302801D 108 12/22/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR122M1062235509156 $93.99 000001080043-3562505200
2023 6 FD52 05 E111 D 1302801D 108 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509156 $25.68 000001080043-3562505200
2023 6 FD52 05 E121 D 1302801D 108 12/22/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR122M1062235509156 $6.49 000001080043-3562505200
2023 6 FD52 05 E121 D 1302801D 108 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509156 $1.76 000001080043-3562505200
2023 6 FD52 05 E122 D 1302801D 108 12/22/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR122M1062235509156 $73.31 000001080043-3562505200
2023 6 FD52 05 E122 D 1302801D 108 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509156 $20.03 000001080043-3562505200
2023 6 FD52 05 E123 D 1302801D 108 12/22/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR122M1062235509156 $20.49 000001080043-3562505200
2023 6 FD52 05 E123 D 1302801D 108 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509156 $5.53 000001080043-3562505200
2023 6 FD52 05 E124 D 1302801D 108 12/22/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR122M1062235509156 $0.04 000001080043-3562505200
2023 6 FD52 05 E124 D 1302801D 108 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509156 $0.01 000001080043-3562505200
2023 6 FD52 00 E111 D 1302801D 108 12/14/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121M1062234208199 $163.81 000001078330-3562500636
2023 6 FD52 00 E111 D 1302801D 108 12/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208199 $86.38 000001078330-3562500636
2023 6 FD52 00 E121 D 1302801D 108 12/14/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121M1062234208199 $12.24 000001078330-3562500636
2023 6 FD52 00 E121 D 1302801D 108 12/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208199 $6.45 000001078330-3562500636
2023 6 FD52 00 E122 D 1302801D 108 12/14/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121M1062234208199 $127.73 000001078330-3562500636
2023 6 FD52 00 E122 D 1302801D 108 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208200 $67.38 000001078330-3562500636
2023 6 FD52 00 E123 D 1302801D 108 12/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121M1062234208200 $17.27 000001078330-3562500636
2023 6 FD52 00 E123 D 1302801D 108 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208200 $8.92 000001078330-3562500636
2023 6 FD52 05 E111 D 1302801D 108 12/12/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR121M1062234208205 $78.33 000001080043-3562505200
2023 6 FD52 05 E111 D 1302801D 108 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208205 $60.78 000001080043-3562505200
2023 6 FD52 05 E121 D 1302801D 108 12/12/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR121M1062234208205 $5.27 000001080043-3562505200
2023 6 FD52 05 E121 D 1302801D 108 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208205 $4.08 000001080043-3562505200
2023 6 FD52 05 E122 D 1302801D 108 12/12/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR121M1062234208205 $61.10 000001080043-3562505200
2023 6 FD52 05 E122 D 1302801D 108 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208205 $47.41 000001080043-3562505200
2023 6 FD52 05 E123 D 1302801D 108 12/12/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR121M1062234208205 $17.15 000001080043-3562505200
2023 6 FD52 05 E123 D 1302801D 108 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208205 $13.09 000001080043-3562505200
2023 6 FD52 05 E111 D 1302801D 108 12/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121M1062234208202 $723.48 000001079193-3562505204
2023 6 FD52 05 E111 D 1302801D 108 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208202 $271.53 000001079193-3562505204
2023 6 FD52 05 E121 D 1302801D 108 12/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121M1062234208202 $54.65 000001079193-3562505204
2023 6 FD52 05 E121 D 1302801D 108 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208202 $20.51 000001079193-3562505204
2023 6 FD52 05 E122 D 1302801D 108 12/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121M1062234208202 $564.35 000001079193-3562505204
2023 6 FD52 05 E122 D 1302801D 108 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208202 $211.80 000001079193-3562505204
2023 6 FD52 05 E123 D 1302801D 108 12/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121M1062234208202 $71.82 000001079193-3562505204
2023 6 FD52 05 E123 D 1302801D 108 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208202 $26.41 000001079193-3562505204
2023 5 FD52 05 E111 D 1302801D 108 11/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112M1062232607142 $659.69 000001079193-3562505204
2023 5 FD52 05 E111 D 1302801D 108 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607142 $211.09 000001079193-3562505204
2023 5 FD52 05 E121 D 1302801D 108 11/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112M1062232607142 $49.82 000001079193-3562505204
2023 5 FD52 05 E121 D 1302801D 108 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607142 $15.94 000001079193-3562505204
2023 5 FD52 05 E122 D 1302801D 108 11/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112M1062232607142 $514.56 000001079193-3562505204
2023 5 FD52 05 E122 D 1302801D 108 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607142 $164.66 000001079193-3562505204
2023 5 FD52 05 E123 D 1302801D 108 11/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112M1062232607142 $65.42 000001079193-3562505204
2023 5 FD52 05 E123 D 1302801D 108 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607142 $20.53 000001079193-3562505204
2023 5 FD52 05 E124 D 1302801D 108 11/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112M1062232607142 $0.19 000001079193-3562505204
2023 5 FD52 05 E124 D 1302801D 108 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607142 $0.05 000001079193-3562505204
2023 5 FD52 05 E111 D 1302801D 108 11/14/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111M1062230806149 $404.20 000001079193-3562505204
2023 5 FD52 05 E111 D 1302801D 108 11/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806149 $90.22 000001079193-3562505204
2023 5 FD52 05 E121 D 1302801D 108 11/14/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111M1062230806149 $30.54 000001079193-3562505204
2023 5 FD52 05 E121 D 1302801D 108 11/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806149 $6.82 000001079193-3562505204
2023 5 FD52 05 E122 D 1302801D 108 11/14/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111M1062230806149 $315.37 000001079193-3562505204
2023 5 FD52 05 E122 D 1302801D 108 11/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806149 $70.36 000001079193-3562505204
2023 5 FD52 05 E123 D 1302801D 108 11/14/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111M1062230806149 $40.05 000001079193-3562505204
2023 5 FD52 05 E123 D 1302801D 108 11/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806149 $8.78 000001079193-3562505204
2023 4 FD52 00 E111 D 1302801D 108 10/31/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102M1062229405037 $270.19 000001078330-3562500636
2023 4 FD52 00 E121 D 1302801D 108 10/31/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102M1062229405037 $20.51 000001078330-3562500636
2023 4 FD52 00 E122 D 1302801D 108 10/31/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102M1062229405037 $210.75 000001078330-3562500636
2023 4 FD52 00 E123 D 1302801D 108 10/31/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102M1062229405037 $28.28 000001078330-3562500636
2023 4 FD52 00 E124 D 1302801D 108 10/31/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102M1062229405037 $0.08 000001078330-3562500636
2023 4 FD52 05 E111 D 1302801D 108 10/31/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102M1062229405040 $866.17 000001079193-3562505204
2023 4 FD52 05 E111 D 1302801D 108 10/31/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405040 $55.24 000001079193-3562505204
2023 4 FD52 05 E121 D 1302801D 108 10/31/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102M1062229405040 $65.42 000001079193-3562505204
2023 4 FD52 05 E121 D 1302801D 108 10/31/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405040 $4.17 000001079193-3562505204
2023 4 FD52 05 E122 D 1302801D 108 10/31/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102M1062229405040 $675.56 000001079193-3562505204
2023 4 FD52 05 E122 D 1302801D 108 10/31/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405040 $43.09 000001079193-3562505204
2023 4 FD52 05 E123 D 1302801D 108 10/31/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102M1062229405040 $85.58 000001079193-3562505204
2023 4 FD52 05 E123 D 1302801D 108 10/31/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405040 $5.38 000001079193-3562505204
2023 4 FD52 05 E124 D 1302801D 108 10/31/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102M1062229405040 $0.25 000001079193-3562505204
2023 4 FD52 05 E124 D 1302801D 108 10/31/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405040 $0.02 000001079193-3562505204
2023 4 FD52 05 E111 D 1302801D 108 10/17/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101M1062228003930 $798.01 000001079193-3562505204
2023 4 FD52 05 E111 D 1302801D 108 10/17/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003930 $222.59 000001079193-3562505204
2023 4 FD52 05 E121 D 1302801D 108 10/17/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101M1062228003930 $60.28 000001079193-3562505204
2023 4 FD52 05 E121 D 1302801D 108 10/17/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003930 $16.82 000001079193-3562505204
2023 4 FD52 05 E122 D 1302801D 108 10/17/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101M1062228003930 $622.45 000001079193-3562505204
2023 4 FD52 05 E122 D 1302801D 108 10/17/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003930 $173.62 000001079193-3562505204
2023 4 FD52 05 E123 D 1302801D 108 10/17/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101M1062228003930 $79.10 000001079193-3562505204
2023 4 FD52 05 E123 D 1302801D 108 10/17/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003930 $21.65 000001079193-3562505204
2023 4 FD52 05 E111 D 1302801D 056 10/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101M1062228003929 $40.89 000001078956-3562505204
2023 4 FD52 05 E111 D 1302801D 056 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003929 $1.64 000001078956-3562505204
2023 4 FD52 05 E121 D 1302801D 056 10/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101M1062228003929 $2.97 000001078956-3562505204
2023 4 FD52 05 E121 D 1302801D 056 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003929 $0.12 000001078956-3562505204
2023 4 FD52 05 E122 D 1302801D 056 10/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101M1062228003929 $31.93 000001078956-3562505204
2023 4 FD52 05 E122 D 1302801D 056 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003929 $1.28 000001078956-3562505204
2023 4 FD52 05 E123 D 1302801D 056 10/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101M1062228003929 $5.19 000001078956-3562505204
2023 4 FD52 05 E123 D 1302801D 056 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003929 $0.21 000001078956-3562505204
2023 4 FD52 05 E143 D 1302801D 108 10/5/2022 0350 RESEARCH AGREEMENT PRC-2300053230 PON22200002512 UNIVERSITY OF KENTUCKY RESEARCH FOUNDATION $3,891.68
2023 3 FD52 05 E143 D 1302801D 108 9/29/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300050319 PON22200001178 PARSONS TRANSPORTATION GROUP INC $63,350.00 Spencer Co.
2023 3 FD52 05 E111 D 1302801D 108 9/28/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092M1062226602760 $42.56 000001079193-3562505204
2023 3 FD52 05 E111 D 1302801D 108 9/28/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602760 $9.36 000001079193-3562505204
2023 3 FD52 05 E121 D 1302801D 108 9/28/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092M1062226602760 $3.22 000001079193-3562505204
2023 3 FD52 05 E121 D 1302801D 108 9/28/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602760 $0.72 000001079193-3562505204
2023 3 FD52 05 E122 D 1302801D 108 9/28/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092M1062226602760 $33.20 000001079193-3562505204
2023 3 FD52 05 E122 D 1302801D 108 9/28/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602760 $7.30 000001079193-3562505204
2023 3 FD52 05 E123 D 1302801D 108 9/28/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092M1062226602760 $4.22 000001079193-3562505204
2023 3 FD52 05 E123 D 1302801D 108 9/28/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602760 $0.92 000001079193-3562505204
2023 3 FD52 05 E124 D 1302801D 108 9/28/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092M1062226602760 $0.01 000001079193-3562505204
2023 3 FD52 05 E122 D 1302801D 108 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101614 $21.30 000001079193-3562505204
2023 3 FD52 05 E123 D 1302801D 108 9/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091M1062225101614 $13.52 000001079193-3562505204
2023 3 FD52 05 E123 D 1302801D 108 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101614 $2.66 000001079193-3562505204
2023 3 FD52 05 E111 D 1302801D 108 9/12/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR091M1062225101617 $154.06 000001080043-3562505200
2023 3 FD52 05 E111 D 1302801D 108 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101617 $21.57 000001080043-3562505200
2023 3 FD52 05 E121 D 1302801D 108 9/12/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR091M1062225101617 $10.18 000001080043-3562505200
2023 3 FD52 05 E121 D 1302801D 108 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101617 $1.43 000001080043-3562505200
2023 3 FD52 05 E122 D 1302801D 108 9/12/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR091M1062225101617 $120.18 000001080043-3562505200
2023 3 FD52 05 E122 D 1302801D 108 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101617 $16.83 000001080043-3562505200
2023 3 FD52 05 E123 D 1302801D 108 9/12/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR091M1062225101617 $37.52 000001080043-3562505200
2023 3 FD52 05 E123 D 1302801D 108 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101617 $5.20 000001080043-3562505200
2023 3 FD52 00 E111 D 1302801D 108 9/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091M1062225101610 $112.61 000001078330-3562500636
2023 3 FD52 00 E111 D 1302801D 108 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101610 $3.75 000001078330-3562500636
2023 3 FD52 00 E121 D 1302801D 108 9/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091M1062225101610 $8.41 000001078330-3562500636
2023 3 FD52 00 E121 D 1302801D 108 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101610 $0.28 000001078330-3562500636
2023 3 FD52 00 E122 D 1302801D 108 9/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091M1062225101610 $87.81 000001078330-3562500636
2023 3 FD52 00 E122 D 1302801D 108 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101610 $2.92 000001078330-3562500636
2023 3 FD52 00 E123 D 1302801D 108 9/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091M1062225101610 $11.79 000001078330-3562500636
2023 3 FD52 00 E123 D 1302801D 108 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101610 $0.39 000001078330-3562500636
2023 3 FD52 05 E111 D 1302801D 108 9/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091M1062225101614 $136.42 000001079193-3562505204
2023 3 FD52 05 E111 D 1302801D 108 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101614 $27.32 000001079193-3562505204
2023 3 FD52 05 E121 D 1302801D 108 9/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091M1062225101614 $10.32 000001079193-3562505204
2023 3 FD52 05 E111 D 1302801D 108 9/12/2022 2010 RIGHT OF WAY ESTIMATES CA-XR091M1062225101631 $78.74 000001083094-3562505206
2023 3 FD52 05 E111 D 1302801D 108 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101631 $9.20 000001083094-3562505206
2023 3 FD52 05 E121 D 1302801D 108 9/12/2022 2010 RIGHT OF WAY ESTIMATES CA-XR091M1062225101631 $5.96 000001083094-3562505206
2023 3 FD52 05 E121 D 1302801D 108 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101631 $0.70 000001083094-3562505206
2023 3 FD52 05 E122 D 1302801D 108 9/12/2022 2010 RIGHT OF WAY ESTIMATES CA-XR091M1062225101631 $61.46 000001083094-3562505206
2023 3 FD52 05 E122 D 1302801D 108 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101631 $7.17 000001083094-3562505206
2023 3 FD52 05 E121 D 1302801D 108 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101614 $2.08 000001079193-3562505204
2023 3 FD52 05 E123 D 1302801D 108 9/12/2022 2010 RIGHT OF WAY ESTIMATES CA-XR091M1062225101631 $11.80 000001083094-3562505206
2023 3 FD52 05 E123 D 1302801D 108 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101631 $1.35 000001083094-3562505206
2023 3 FD52 05 E122 D 1302801D 108 9/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091M1062225101614 $106.51 000001079193-3562505204
2023 2 FD52 05 E123 D 1302801D 108 8/24/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR082M1062223500426 $23.88 000001080043-3562505200
2023 2 FD52 05 E123 D 1302801D 108 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500443 $0.29 000001083094-3562505206
2023 2 FD52 05 E123 D 1302801D 108 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500426 $3.24 000001080043-3562505200
2023 2 FD52 05 E124 D 1302801D 108 8/24/2022 2010 RIGHT OF WAY ESTIMATES CA-XR082M1062223500443 $0.02 000001083094-3562505206
2023 2 FD52 05 E124 D 1302801D 108 8/24/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR082M1062223500426 $0.04 000001080043-3562505200
2023 2 FD52 05 E111 D 1302801D 108 8/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082M1062223500422 $1,372.72 000001079193-3562505204
2023 2 FD52 05 E111 D 1302801D 108 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500422 $304.74 000001079193-3562505204
2023 2 FD52 05 E121 D 1302801D 108 8/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082M1062223500422 $103.66 000001079193-3562505204
2023 2 FD52 05 E121 D 1302801D 108 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500422 $23.02 000001079193-3562505204
2023 2 FD52 05 E122 D 1302801D 108 8/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082M1062223500422 $1,070.61 000001079193-3562505204
2023 2 FD52 05 E122 D 1302801D 108 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500422 $237.70 000001079193-3562505204
2023 2 FD52 05 E123 D 1302801D 108 8/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082M1062223500422 $135.94 000001079193-3562505204
2023 2 FD52 05 E123 D 1302801D 108 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500422 $29.64 000001079193-3562505204
2023 2 FD52 05 E124 D 1302801D 108 8/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082M1062223500422 $0.39 000001079193-3562505204
2023 2 FD52 05 E124 D 1302801D 108 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500422 $0.08 000001079193-3562505204
2023 2 FD52 00 E111 D 1302801D 108 8/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082M1062223500417 $204.69 000001078330-3562500636
2023 2 FD52 00 E121 D 1302801D 108 8/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082M1062223500417 $15.53 000001078330-3562500636
2023 2 FD52 00 E122 D 1302801D 108 8/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082M1062223500417 $159.66 000001078330-3562500636
2023 2 FD52 00 E123 D 1302801D 108 8/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082M1062223500417 $21.43 000001078330-3562500636
2023 2 FD52 00 E124 D 1302801D 108 8/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082M1062223500417 $0.06 000001078330-3562500636
2023 2 FD52 05 E111 D 1302801D 108 8/24/2022 2010 RIGHT OF WAY ESTIMATES CA-XR082M1062223500442 $14.33 000001083094-3562505206
2023 2 FD52 05 E111 D 1302801D 108 8/24/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR082M1062223500425 $98.01 000001080043-3562505200
2023 2 FD52 05 E111 D 1302801D 108 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500442 $2.00 000001083094-3562505206
2023 2 FD52 05 E111 D 1302801D 108 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500425 $13.45 000001080043-3562505200
2023 2 FD52 05 E121 D 1302801D 108 8/24/2022 2010 RIGHT OF WAY ESTIMATES CA-XR082M1062223500442 $1.09 000001083094-3562505206
2023 2 FD52 05 E121 D 1302801D 108 8/24/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR082M1062223500425 $6.69 000001080043-3562505200
2023 2 FD52 05 E121 D 1302801D 108 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500442 $0.15 000001083094-3562505206
2023 2 FD52 05 E121 D 1302801D 108 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500425 $0.92 000001080043-3562505200
2023 2 FD52 05 E122 D 1302801D 108 8/24/2022 2010 RIGHT OF WAY ESTIMATES CA-XR082M1062223500442 $11.19 000001083094-3562505206
2023 2 FD52 05 E122 D 1302801D 108 8/24/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR082M1062223500425 $76.48 000001080043-3562505200
2023 2 FD52 05 E122 D 1302801D 108 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500442 $1.56 000001083094-3562505206
2023 2 FD52 05 E122 D 1302801D 108 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500425 $10.49 000001080043-3562505200
2023 2 FD52 05 E123 D 1302801D 108 8/24/2022 2010 RIGHT OF WAY ESTIMATES CA-XR082M1062223500442 $2.14 000001083094-3562505206
2023 2 FD52 05 E111 D 1302801D 108 8/16/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR081M1062222110104 $959.74 000001077821-3562505204
2023 2 FD52 05 E121 D 1302801D 108 8/16/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR081M1062222110104 $72.49 000001077821-3562505204
2023 2 FD52 05 E122 D 1302801D 108 8/16/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR081M1062222110104 $748.60 000001077821-3562505204
2023 2 FD52 05 E123 D 1302801D 108 8/16/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR081M1062222110104 $94.74 000001077821-3562505204
2023 2 FD52 05 E111 D 1302801D 108 8/10/2022 2010 RIGHT OF WAY ESTIMATES CA-XR081M1062222110129 $362.50 000001083094-3562505206
2023 2 FD52 05 E111 D 1302801D 108 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110129 $47.59 000001083094-3562505206
2023 2 FD52 05 E121 D 1302801D 108 8/10/2022 2010 RIGHT OF WAY ESTIMATES CA-XR081M1062222110129 $27.41 000001083094-3562505206
2023 2 FD52 05 E121 D 1302801D 108 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110129 $3.59 000001083094-3562505206
2023 2 FD52 05 E122 D 1302801D 108 8/10/2022 2010 RIGHT OF WAY ESTIMATES CA-XR081M1062222110129 $282.70 000001083094-3562505206
2023 2 FD52 05 E122 D 1302801D 108 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110129 $37.13 000001083094-3562505206
2023 2 FD52 05 E123 D 1302801D 108 8/10/2022 2010 RIGHT OF WAY ESTIMATES CA-XR081M1062222110129 $54.31 000001083094-3562505206
2023 2 FD52 05 E123 D 1302801D 108 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110129 $7.02 000001083094-3562505206
2023 1 FD52 05 E123 D 1302801D 108 7/28/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308976 $30.84 000001077821-3562505204
2023 1 FD52 05 E124 D 1302801D 108 7/28/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR072M1062220308976 $0.23 000001077821-3562505204
2023 1 FD52 05 E124 D 1302801D 108 7/28/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308976 $0.09 000001077821-3562505204
2023 1 FD52 05 E111 D 1302801D 108 7/28/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR072M1062220308975 $819.29 000001077821-3562505204
2023 1 FD52 05 E111 D 1302801D 108 7/28/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308975 $317.07 000001077821-3562505204
2023 1 FD52 05 E121 D 1302801D 108 7/28/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR072M1062220308975 $61.88 000001077821-3562505204
2023 1 FD52 05 E121 D 1302801D 108 7/28/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308975 $23.95 000001077821-3562505204
2023 1 FD52 05 E122 D 1302801D 108 7/28/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR072M1062220308975 $639.05 000001077821-3562505204
2023 1 FD52 05 E122 D 1302801D 108 7/28/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308975 $247.32 000001077821-3562505204
2023 1 FD52 05 E123 D 1302801D 108 7/28/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR072M1062220308975 $81.34 000001077821-3562505204
2023 1 FD52 05 E111 D 1302801D 108 7/25/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR072M1062220308986 $84.07 000001080043-3562505200
2023 1 FD52 05 E111 D 1302801D 108 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308986 $24.92 000001080043-3562505200
2023 1 FD52 05 E121 D 1302801D 108 7/25/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR072M1062220308986 $5.74 000001080043-3562505200
2023 1 FD52 05 E111 D 1302801D 108 7/25/2022 2010 RIGHT OF WAY ESTIMATES CA-XR072M1062220309007 $57.16 000001083094-3562505206
2023 1 FD52 05 E121 D 1302801D 108 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308986 $1.70 000001080043-3562505200
2023 1 FD52 05 E111 D 1302801D 108 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220309007 $14.04 000001083094-3562505206
2023 1 FD52 05 E122 D 1302801D 108 7/25/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR072M1062220308986 $65.84 000001080043-3562505200
2023 1 FD52 05 E121 D 1302801D 108 7/25/2022 2010 RIGHT OF WAY ESTIMATES CA-XR072M1062220309007 $4.33 000001083094-3562505206
2023 1 FD52 05 E122 D 1302801D 108 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308986 $19.43 000001080043-3562505200
2023 1 FD52 05 E121 D 1302801D 108 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220309007 $1.06 000001083094-3562505206
2023 1 FD52 05 E123 D 1302801D 108 7/25/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR072M1062220308986 $20.62 000001080043-3562505200
2023 1 FD52 05 E122 D 1302801D 108 7/25/2022 2010 RIGHT OF WAY ESTIMATES CA-XR072M1062220309007 $44.69 000001083094-3562505206
2023 1 FD52 05 E123 D 1302801D 108 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308986 $6.00 000001080043-3562505200
2023 1 FD52 05 E122 D 1302801D 108 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220309007 $10.95 000001083094-3562505206
2023 1 FD52 05 E124 D 1302801D 108 7/25/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR072M1062220308986 $0.09 000001080043-3562505200
2023 1 FD52 05 E123 D 1302801D 108 7/25/2022 2010 RIGHT OF WAY ESTIMATES CA-XR072M1062220309007 $8.60 000001083094-3562505206
2023 1 FD52 05 E123 D 1302801D 108 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220309007 $2.07 000001083094-3562505206
2023 1 FD52 05 E124 D 1302801D 108 7/25/2022 2010 RIGHT OF WAY ESTIMATES CA-XR072M1062220309007 $0.02 000001083094-3562505206
2023 1 FD52 05 E111 D 1302801D 108 7/13/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR071M1062219207861 $58.98 000001077821-3562505204
2023 1 FD52 05 E111 D 1302801D 108 7/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207861 $13.40 000001077821-3562505204
2023 1 FD52 05 E121 D 1302801D 108 7/13/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR071M1062219207861 $4.46 000001077821-3562505204
2023 1 FD52 05 E121 D 1302801D 108 7/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207861 $1.02 000001077821-3562505204
2023 1 FD52 05 E122 D 1302801D 108 7/13/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR071M1062219207861 $49.63 000001077821-3562505204
2023 1 FD52 05 E122 D 1302801D 108 7/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207861 $11.26 000001077821-3562505204
2023 1 FD52 05 E123 D 1302801D 108 7/13/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR071M1062219207861 $6.32 000001077821-3562505204
2023 1 FD52 05 E123 D 1302801D 108 7/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207861 $1.40 000001077821-3562505204
2023 1 FD52 05 E111 D 1302801D 108 7/12/2022 2010 RIGHT OF WAY ESTIMATES CA-XR071M1062219207891 $92.88 000001083094-3562505206
2023 1 FD52 05 E111 D 1302801D 108 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207891 $4.24 000001083094-3562505206
2023 1 FD52 05 E121 D 1302801D 108 7/12/2022 2010 RIGHT OF WAY ESTIMATES CA-XR071M1062219207891 $7.02 000001083094-3562505206
2023 1 FD52 05 E121 D 1302801D 108 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207891 $0.32 000001083094-3562505206
2023 1 FD52 05 E122 D 1302801D 108 7/12/2022 2010 RIGHT OF WAY ESTIMATES CA-XR071M1062219207891 $77.97 000001083094-3562505206
2023 1 FD52 05 E122 D 1302801D 108 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207891 $3.56 000001083094-3562505206
2023 1 FD52 05 E123 D 1302801D 108 7/12/2022 2010 RIGHT OF WAY ESTIMATES CA-XR071M1062219207891 $15.01 000001083094-3562505206
2023 1 FD52 05 E123 D 1302801D 108 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207891 $0.68 000001083094-3562505206
2023 1 FD52 00 E111 D 1302801D 108 7/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071M1062219207864 $37.90 000001078330-3562500636
2023 1 FD52 00 E121 D 1302801D 108 7/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071M1062219207864 $2.83 000001078330-3562500636
2023 1 FD52 00 E122 D 1302801D 108 7/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071M1062219207864 $31.83 000001078330-3562500636
2023 1 FD52 00 E123 D 1302801D 108 7/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071M1062219207864 $4.28 000001078330-3562500636
2022 12 FD52 05 E111 D 1302801D 108 6/28/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR062M1062217506748 $788.15 000001077821-3562505204
2022 12 FD52 05 E111 D 1302801D 108 6/28/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506748 $78.81 000001077821-3562505204
2022 12 FD52 05 E121 D 1302801D 108 6/28/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR062M1062217506748 $59.46 000001077821-3562505204
2022 12 FD52 05 E121 D 1302801D 108 6/28/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506748 $5.95 000001077821-3562505204
2022 12 FD52 05 E122 D 1302801D 108 6/28/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR062M1062217506748 $661.81 000001077821-3562505204
2022 12 FD52 05 E122 D 1302801D 108 6/28/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506748 $66.18 000001077821-3562505204
2022 12 FD52 05 E123 D 1302801D 108 6/28/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR062M1062217506748 $84.15 000001077821-3562505204
2022 12 FD52 05 E123 D 1302801D 108 6/28/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506748 $8.28 000001077821-3562505204
2022 12 FD52 05 E124 D 1302801D 108 6/28/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR062M1062217506748 $0.24 000001077821-3562505204
2022 12 FD52 05 E124 D 1302801D 108 6/28/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506748 $0.02 000001077821-3562505204
2022 12 FD52 05 E143 D 1302801D 108 6/27/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200236218 PON22200001178 PARSONS TRANSPORTATION GROUP INC $13,810.00 Spencer Co.
2022 12 FD52 00 E111 D 1302801D 108 6/27/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062M1062217506751 $246.38 000001078330-3562500636
2022 12 FD52 00 E121 D 1302801D 108 6/27/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062M1062217506751 $18.68 000001078330-3562500636
2022 12 FD52 00 E122 D 1302801D 108 6/27/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062M1062217506751 $206.89 000001078330-3562500636
2022 12 FD52 00 E123 D 1302801D 108 6/27/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062M1062217506751 $27.85 000001078330-3562500636
2022 12 FD52 00 E124 D 1302801D 108 6/27/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062M1062217506751 $0.08 000001078330-3562500636
2022 12 FD52 05 E111 D 1302801D 108 6/27/2022 2010 RIGHT OF WAY ESTIMATES CA-XR062M1062217506786 $79.59 000001083094-3562505206
2022 12 FD52 05 E111 D 1302801D 108 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506786 $13.00 000001083094-3562505206
2022 12 FD52 05 E121 D 1302801D 108 6/27/2022 2010 RIGHT OF WAY ESTIMATES CA-XR062M1062217506786 $6.01 000001083094-3562505206
2022 12 FD52 05 E121 D 1302801D 108 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506786 $0.98 000001083094-3562505206
2022 12 FD52 05 E122 D 1302801D 108 6/27/2022 2010 RIGHT OF WAY ESTIMATES CA-XR062M1062217506786 $66.85 000001083094-3562505206
2022 12 FD52 05 E122 D 1302801D 108 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506786 $10.91 000001083094-3562505206
2022 12 FD52 05 E123 D 1302801D 108 6/27/2022 2010 RIGHT OF WAY ESTIMATES CA-XR062M1062217506786 $12.90 000001083094-3562505206
2022 12 FD52 05 E123 D 1302801D 108 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506786 $2.07 000001083094-3562505206
2022 12 FD52 05 E124 D 1302801D 108 6/27/2022 2010 RIGHT OF WAY ESTIMATES CA-XR062M1062217506786 $0.04 000001083094-3562505206
2022 12 FD52 05 E111 D 1302801D 056 6/27/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062M1062217506757 $75.75 000001078956-3562505204
2022 12 FD52 05 E111 D 1302801D 056 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506757 $97.79 000001078956-3562505204
2022 12 FD52 05 E121 D 1302801D 056 6/27/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062M1062217506757 $5.56 000001078956-3562505204
2022 12 FD52 05 E121 D 1302801D 056 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506757 $7.18 000001078956-3562505204
2022 12 FD52 05 E111 D 1302801D 108 6/27/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR062M1062217506763 $103.76 000001080043-3562505200
2022 12 FD52 05 E122 D 1302801D 056 6/27/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062M1062217506757 $63.66 000001078956-3562505204
2022 12 FD52 05 E111 D 1302801D 108 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506763 $10.37 000001080043-3562505200
2022 12 FD52 05 E122 D 1302801D 056 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506757 $82.12 000001078956-3562505204
2022 12 FD52 05 E121 D 1302801D 108 6/27/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR062M1062217506763 $7.01 000001080043-3562505200
2022 12 FD52 05 E123 D 1302801D 056 6/27/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062M1062217506757 $10.55 000001078956-3562505204
2022 12 FD52 05 E121 D 1302801D 108 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506763 $0.70 000001080043-3562505200
2022 12 FD52 05 E123 D 1302801D 056 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506757 $13.24 000001078956-3562505204
2022 12 FD52 05 E122 D 1302801D 108 6/27/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR062M1062217506763 $87.13 000001080043-3562505200
2022 12 FD52 05 E124 D 1302801D 056 6/27/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062M1062217506757 $0.02 000001078956-3562505204
2022 12 FD52 05 E122 D 1302801D 108 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506763 $8.71 000001080043-3562505200
2022 12 FD52 05 E124 D 1302801D 056 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506757 $0.03 000001078956-3562505204
2022 12 FD52 05 E123 D 1302801D 108 6/27/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR062M1062217506763 $27.28 000001080043-3562505200
2022 12 FD52 05 E123 D 1302801D 108 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506763 $2.70 000001080043-3562505200
2022 12 FD52 05 E124 D 1302801D 108 6/27/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR062M1062217506763 $0.05 000001080043-3562505200
2022 12 FD52 05 E143 D 1302801D 108 6/10/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200216171 PON22200001178 PARSONS TRANSPORTATION GROUP INC $34,112.00 Spencer Co.
2022 12 FD52 05 E111 D 1302801D 108 6/9/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR061M1062215905718 $59.36 000001080043-3562505200
2022 12 FD52 05 E111 D 1302801D 108 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905718 $11.18 000001080043-3562505200
2022 12 FD52 05 E121 D 1302801D 108 6/9/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR061M1062215905718 $3.88 000001080043-3562505200
2022 12 FD52 05 E121 D 1302801D 108 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905718 $0.73 000001080043-3562505200
2022 12 FD52 05 E122 D 1302801D 108 6/9/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR061M1062215905718 $49.92 000001080043-3562505200
2022 12 FD52 05 E122 D 1302801D 108 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905718 $9.38 000001080043-3562505200
2022 12 FD52 05 E123 D 1302801D 108 6/9/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR061M1062215905718 $15.64 000001080043-3562505200
2022 12 FD52 00 E111 D 1302801D 108 6/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061M1062215905708 $255.11 000001078330-3562500636
2022 12 FD52 05 E123 D 1302801D 108 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905718 $2.90 000001080043-3562505200
2022 12 FD52 00 E111 D 1302801D 108 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905708 $87.78 000001078330-3562500636
2022 12 FD52 00 E121 D 1302801D 108 6/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061M1062215905708 $19.03 000001078330-3562500636
2022 12 FD52 00 E121 D 1302801D 108 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905708 $6.54 000001078330-3562500636
2022 12 FD52 00 E122 D 1302801D 108 6/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061M1062215905708 $214.30 000001078330-3562500636
2022 12 FD52 05 E111 D 1302801D 108 6/9/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR061M1062215905705 $568.88 000001077821-3562505204
2022 12 FD52 00 E122 D 1302801D 108 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905708 $73.72 000001078330-3562500636
2022 12 FD52 05 E111 D 1302801D 108 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905705 $237.33 000001077821-3562505204
2022 12 FD52 00 E123 D 1302801D 108 6/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061M1062215905708 $29.60 000001078330-3562500636
2022 12 FD52 05 E121 D 1302801D 108 6/9/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR061M1062215905705 $42.93 000001077821-3562505204
2022 12 FD52 00 E123 D 1302801D 108 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905708 $9.98 000001078330-3562500636
2022 12 FD52 05 E121 D 1302801D 108 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905705 $17.91 000001077821-3562505204
2022 12 FD52 05 E122 D 1302801D 108 6/9/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR061M1062215905705 $477.74 000001077821-3562505204
2022 12 FD52 05 E122 D 1302801D 108 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905705 $199.29 000001077821-3562505204
2022 12 FD52 05 E123 D 1302801D 108 6/9/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR061M1062215905705 $61.02 000001077821-3562505204
2022 12 FD52 05 E123 D 1302801D 108 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905705 $24.94 000001077821-3562505204
2022 11 FD52 05 E121 D 1302801D 108 5/25/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR052M1062214004655 $32.71 000001077821-3562505204
2022 11 FD52 05 E121 D 1302801D 108 5/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004655 $12.30 000001077821-3562505204
2022 11 FD52 05 E122 D 1302801D 108 5/25/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR052M1062214004655 $363.99 000001077821-3562505204
2022 11 FD52 05 E122 D 1302801D 108 5/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004655 $136.86 000001077821-3562505204
2022 11 FD52 05 E123 D 1302801D 108 5/25/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR052M1062214004655 $46.47 000001077821-3562505204
2022 11 FD52 05 E123 D 1302801D 108 5/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004655 $17.12 000001077821-3562505204
2022 11 FD52 05 E124 D 1302801D 108 5/25/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR052M1062214004655 $0.13 000001077821-3562505204
2022 11 FD52 05 E124 D 1302801D 108 5/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004655 $0.05 000001077821-3562505204
2022 11 FD52 05 E111 D 1302801D 108 5/25/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR052M1062214004655 $433.55 000001077821-3562505204
2022 11 FD52 05 E111 D 1302801D 108 5/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004655 $162.99 000001077821-3562505204
2022 11 FD52 00 E111 D 1302801D 108 5/13/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051M1062212603644 $40.83 000001078330-3562500636
2022 11 FD52 00 E121 D 1302801D 108 5/13/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051M1062212603644 $3.10 000001078330-3562500636
2022 11 FD52 00 E122 D 1302801D 108 5/13/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051M1062212603644 $34.28 000001078330-3562500636
2022 11 FD52 00 E123 D 1302801D 108 5/13/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051M1062212603644 $4.72 000001078330-3562500636
2022 11 FD52 05 E111 D 1302801D 108 5/9/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR051M1062212603640 $390.13 000001077821-3562505204
2022 11 FD52 05 E111 D 1302801D 108 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603640 $132.21 000001077821-3562505204
2022 11 FD52 05 E121 D 1302801D 108 5/9/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR051M1062212603640 $29.44 000001077821-3562505204
2022 11 FD52 05 E121 D 1302801D 108 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603640 $9.98 000001077821-3562505204
2022 11 FD52 05 E122 D 1302801D 108 5/9/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR051M1062212603640 $327.59 000001077821-3562505204
2022 11 FD52 05 E122 D 1302801D 108 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603640 $111.01 000001077821-3562505204
2022 11 FD52 05 E123 D 1302801D 108 5/9/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR051M1062212603640 $41.80 000001077821-3562505204
2022 11 FD52 05 E123 D 1302801D 108 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603640 $13.88 000001077821-3562505204
2022 11 FD52 05 E143 D 1302801D 108 5/5/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200200549 PON22200001178 PARSONS TRANSPORTATION GROUP INC $79,561.00 Spencer Co.
2022 11 FD52 05 E143 D 1302801D 108 5/5/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200200549 PON22200001178 PARSONS TRANSPORTATION GROUP INC $11,374.00 Spencer Co.
2022 10 FD52 00 E111 D 1302801D 108 4/25/2022 0010 ENV STUDIES-UST/HZM CA-XR042M1062211202535 $89.96 000001079766-3562500061
2022 10 FD52 00 E111 D 1302801D 108 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202535 $9.30 000001079766-3562500061
2022 10 FD52 00 E121 D 1302801D 108 4/25/2022 0010 ENV STUDIES-UST/HZM CA-XR042M1062211202535 $6.64 000001079766-3562500061
2022 10 FD52 00 E111 D 1302801D 108 4/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042M1062211202522 $148.54 000001078330-3562500636
2022 10 FD52 00 E121 D 1302801D 108 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202535 $0.69 000001079766-3562500061
2022 10 FD52 00 E111 D 1302801D 108 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202522 $25.98 000001078330-3562500636
2022 10 FD52 00 E122 D 1302801D 108 4/25/2022 0010 ENV STUDIES-UST/HZM CA-XR042M1062211202535 $75.53 000001079766-3562500061
2022 10 FD52 00 E121 D 1302801D 108 4/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042M1062211202522 $11.26 000001078330-3562500636
2022 10 FD52 00 E122 D 1302801D 108 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202535 $7.81 000001079766-3562500061
2022 10 FD52 00 E121 D 1302801D 108 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202522 $1.97 000001078330-3562500636
2022 10 FD52 00 E123 D 1302801D 108 4/25/2022 0010 ENV STUDIES-UST/HZM CA-XR042M1062211202535 $15.83 000001079766-3562500061
2022 10 FD52 00 E122 D 1302801D 108 4/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042M1062211202522 $124.69 000001078330-3562500636
2022 10 FD52 00 E123 D 1302801D 108 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202535 $1.61 000001079766-3562500061
2022 10 FD52 00 E122 D 1302801D 108 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202522 $21.81 000001078330-3562500636
2022 10 FD52 00 E124 D 1302801D 108 4/25/2022 0010 ENV STUDIES-UST/HZM CA-XR042M1062211202535 $0.04 000001079766-3562500061
2022 10 FD52 00 E123 D 1302801D 108 4/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042M1062211202522 $17.18 000001078330-3562500636
2022 10 FD52 00 E123 D 1302801D 108 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202522 $2.96 000001078330-3562500636
2022 10 FD52 00 E124 D 1302801D 108 4/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042M1062211202522 $0.05 000001078330-3562500636
2022 10 FD52 05 E111 D 1302801D 056 4/25/2022 0310 PROJECT DEVELOPMENT CA-XR042M1062211202563 $142.65 000001082397-3562505200
2022 10 FD52 05 E111 D 1302801D 056 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202563 $65.89 000001082397-3562505200
2022 10 FD52 05 E121 D 1302801D 056 4/25/2022 0310 PROJECT DEVELOPMENT CA-XR042M1062211202563 $9.64 000001082397-3562505200
2022 10 FD52 05 E121 D 1302801D 056 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202563 $4.45 000001082397-3562505200
2022 10 FD52 05 E122 D 1302801D 056 4/25/2022 0310 PROJECT DEVELOPMENT CA-XR042M1062211202563 $119.80 000001082397-3562505200
2022 10 FD52 05 E122 D 1302801D 056 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202563 $55.33 000001082397-3562505200
2022 10 FD52 05 E111 D 1302801D 056 4/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042M1062211202529 $91.41 000001078956-3562505204
2022 10 FD52 05 E123 D 1302801D 056 4/25/2022 0310 PROJECT DEVELOPMENT CA-XR042M1062211202563 $37.63 000001082397-3562505200
2022 10 FD52 05 E111 D 1302801D 056 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202529 $17.18 000001078956-3562505204
2022 10 FD52 05 E123 D 1302801D 056 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202563 $17.16 000001082397-3562505200
2022 10 FD52 05 E121 D 1302801D 056 4/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042M1062211202529 $6.70 000001078956-3562505204
2022 10 FD52 05 E124 D 1302801D 056 4/25/2022 0310 PROJECT DEVELOPMENT CA-XR042M1062211202563 $0.07 000001082397-3562505200
2022 10 FD52 05 E121 D 1302801D 056 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202529 $1.26 000001078956-3562505204
2022 10 FD52 05 E124 D 1302801D 056 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202563 $0.02 000001082397-3562505200
2022 10 FD52 05 E122 D 1302801D 056 4/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042M1062211202529 $76.76 000001078956-3562505204
2022 10 FD52 05 E122 D 1302801D 056 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202529 $14.43 000001078956-3562505204
2022 10 FD52 05 E123 D 1302801D 056 4/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042M1062211202529 $13.01 000001078956-3562505204
2022 10 FD52 05 E123 D 1302801D 056 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202529 $2.41 000001078956-3562505204
2022 10 FD52 05 E124 D 1302801D 056 4/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042M1062211202529 $0.03 000001078956-3562505204
2022 10 FD52 05 E111 D 1302801D 108 4/25/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR042M1062211202518 $384.17 000001077821-3562505204
2022 10 FD52 05 E111 D 1302801D 108 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202518 $256.54 000001077821-3562505204
2022 10 FD52 05 E121 D 1302801D 108 4/25/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR042M1062211202518 $28.99 000001077821-3562505204
2022 10 FD52 05 E121 D 1302801D 108 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202518 $19.35 000001077821-3562505204
2022 10 FD52 05 E122 D 1302801D 108 4/25/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR042M1062211202518 $322.64 000001077821-3562505204
2022 10 FD52 05 E122 D 1302801D 108 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202518 $215.42 000001077821-3562505204
2022 10 FD52 05 E123 D 1302801D 108 4/25/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR042M1062211202518 $41.36 000001077821-3562505204
2022 10 FD52 05 E123 D 1302801D 108 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202518 $26.95 000001077821-3562505204
2022 10 FD52 05 E124 D 1302801D 108 4/25/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR042M1062211202518 $0.12 000001077821-3562505204
2022 10 FD52 05 E124 D 1302801D 108 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202518 $0.08 000001077821-3562505204
2022 10 FD52 00 E111 D 1302801D 108 4/11/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041M1062209801464 $238.20 000001078330-3562500636
2022 10 FD52 00 E111 D 1302801D 108 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801464 $26.54 000001078330-3562500636
2022 10 FD52 00 E121 D 1302801D 108 4/11/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041M1062209801464 $18.06 000001078330-3562500636
2022 10 FD52 00 E121 D 1302801D 108 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801464 $2.01 000001078330-3562500636
2022 10 FD52 05 E111 D 1302801D 108 4/11/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR041M1062209801461 $442.45 000001077821-3562505204
2022 10 FD52 00 E122 D 1302801D 108 4/11/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041M1062209801464 $200.02 000001078330-3562500636
2022 10 FD52 05 E111 D 1302801D 108 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801461 $2.53 000001077821-3562505204
2022 10 FD52 00 E122 D 1302801D 108 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801464 $22.29 000001078330-3562500636
2022 10 FD52 05 E121 D 1302801D 108 4/11/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR041M1062209801461 $33.39 000001077821-3562505204
2022 10 FD52 00 E123 D 1302801D 108 4/11/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041M1062209801464 $27.54 000001078330-3562500636
2022 10 FD52 05 E121 D 1302801D 108 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801461 $0.19 000001077821-3562505204
2022 10 FD52 00 E123 D 1302801D 108 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801464 $3.02 000001078330-3562500636
2022 10 FD52 05 E122 D 1302801D 108 4/11/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR041M1062209801461 $371.58 000001077821-3562505204
2022 10 FD52 05 E122 D 1302801D 108 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801461 $2.12 000001077821-3562505204
2022 10 FD52 05 E123 D 1302801D 108 4/11/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR041M1062209801461 $47.18 000001077821-3562505204
2022 10 FD52 05 E123 D 1302801D 108 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801461 $0.27 000001077821-3562505204
2022 10 FD52 00 E111 D 1302801D 108 4/11/2022 0010 ENV STUDIES-UST/HZM CA-XR041M1062209801474 $357.34 000001079766-3562500061
2022 10 FD52 00 E111 D 1302801D 108 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801474 $39.58 000001079766-3562500061
2022 10 FD52 00 E121 D 1302801D 108 4/11/2022 0010 ENV STUDIES-UST/HZM CA-XR041M1062209801474 $26.36 000001079766-3562500061
2022 10 FD52 00 E121 D 1302801D 108 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801474 $2.92 000001079766-3562500061
2022 10 FD52 00 E122 D 1302801D 108 4/11/2022 0010 ENV STUDIES-UST/HZM CA-XR041M1062209801474 $300.06 000001079766-3562500061
2022 10 FD52 00 E122 D 1302801D 108 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801474 $33.23 000001079766-3562500061
2022 10 FD52 00 E123 D 1302801D 108 4/11/2022 0010 ENV STUDIES-UST/HZM CA-XR041M1062209801474 $62.88 000001079766-3562500061
2022 10 FD52 00 E123 D 1302801D 108 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801474 $6.87 000001079766-3562500061
2022 9 FD52 05 E143 D 1302801D 108 3/28/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200168398 PON22200001178 PARSONS TRANSPORTATION GROUP INC $67,065.00 Spencer Co.
2022 9 FD52 05 E111 D 1302801D 108 3/24/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR032M1062208200377 $19.87 000001077821-3562505204
2022 9 FD52 05 E111 D 1302801D 108 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200377 $7.09 000001077821-3562505204
2022 9 FD52 05 E121 D 1302801D 108 3/24/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR032M1062208200377 $1.49 000001077821-3562505204
2022 9 FD52 05 E121 D 1302801D 108 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200377 $0.53 000001077821-3562505204
2022 9 FD52 05 E122 D 1302801D 108 3/24/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR032M1062208200377 $16.55 000001077821-3562505204
2022 9 FD52 05 E122 D 1302801D 108 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200377 $5.95 000001077821-3562505204
2022 9 FD52 05 E123 D 1302801D 108 3/24/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR032M1062208200377 $2.11 000001077821-3562505204
2022 9 FD52 05 E123 D 1302801D 108 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200377 $0.75 000001077821-3562505204
2022 9 FD52 05 E111 D 1302801D 056 3/24/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR032M1062208200425 $129.67 000001082026-3562505200
2022 9 FD52 05 E124 D 1302801D 108 3/24/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR032M1062208200377 $0.01 000001077821-3562505204
2022 9 FD52 05 E111 D 1302801D 056 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200425 $3.89 000001082026-3562505200
2022 9 FD52 05 E121 D 1302801D 056 3/24/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR032M1062208200425 $8.76 000001082026-3562505200
2022 9 FD52 05 E121 D 1302801D 056 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200425 $0.27 000001082026-3562505200
2022 9 FD52 05 E122 D 1302801D 056 3/24/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR032M1062208200425 $108.91 000001082026-3562505200
2022 9 FD52 05 E122 D 1302801D 056 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200425 $3.27 000001082026-3562505200
2022 9 FD52 05 E123 D 1302801D 056 3/24/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR032M1062208200425 $34.08 000001082026-3562505200
2022 9 FD52 05 E123 D 1302801D 056 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200425 $1.02 000001082026-3562505200
2022 9 FD52 05 E124 D 1302801D 056 3/24/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR032M1062208200425 $0.06 000001082026-3562505200
2022 9 FD52 00 E111 D 1302801D 108 3/10/2022 0010 ENV STUDIES-UST/HZM CA-XR031M1062206709460 $274.87 000001079766-3562500061
2022 9 FD52 00 E111 D 1302801D 108 3/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709460 $56.44 000001079766-3562500061
2022 9 FD52 00 E121 D 1302801D 108 3/10/2022 0010 ENV STUDIES-UST/HZM CA-XR031M1062206709460 $20.27 000001079766-3562500061
2022 9 FD52 00 E121 D 1302801D 108 3/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709460 $4.16 000001079766-3562500061
2022 9 FD52 00 E122 D 1302801D 108 3/10/2022 0010 ENV STUDIES-UST/HZM CA-XR031M1062206709460 $230.82 000001079766-3562500061
2022 9 FD52 00 E122 D 1302801D 108 3/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709460 $47.39 000001079766-3562500061
2022 9 FD52 00 E123 D 1302801D 108 3/10/2022 0010 ENV STUDIES-UST/HZM CA-XR031M1062206709460 $48.42 000001079766-3562500061
2022 9 FD52 00 E123 D 1302801D 108 3/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709460 $9.80 000001079766-3562500061
2022 9 FD52 05 E111 D 1302801D 108 3/10/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR031M1062206709447 $1,180.05 000001077821-3562505204
2022 9 FD52 05 E111 D 1302801D 108 3/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709447 $17.82 000001077821-3562505204
2022 9 FD52 05 E121 D 1302801D 108 3/10/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR031M1062206709447 $89.03 000001077821-3562505204
2022 9 FD52 05 E121 D 1302801D 108 3/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709447 $1.34 000001077821-3562505204
2022 9 FD52 05 E122 D 1302801D 108 3/10/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR031M1062206709447 $990.88 000001077821-3562505204
2022 9 FD52 05 E122 D 1302801D 108 3/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709447 $14.96 000001077821-3562505204
2022 9 FD52 05 E123 D 1302801D 108 3/10/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR031M1062206709447 $125.84 000001077821-3562505204
2022 9 FD52 05 E123 D 1302801D 108 3/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709447 $1.87 000001077821-3562505204
2022 9 FD52 00 E111 D 1302801D 108 3/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031M1062206709450 $249.54 000001078330-3562500636
2022 9 FD52 00 E111 D 1302801D 108 3/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709450 $38.56 000001078330-3562500636
2022 9 FD52 00 E121 D 1302801D 108 3/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031M1062206709450 $18.93 000001078330-3562500636
2022 9 FD52 00 E121 D 1302801D 108 3/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709450 $2.92 000001078330-3562500636
2022 9 FD52 00 E122 D 1302801D 108 3/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031M1062206709450 $209.54 000001078330-3562500636
2022 9 FD52 00 E122 D 1302801D 108 3/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709450 $32.38 000001078330-3562500636
2022 9 FD52 00 E123 D 1302801D 108 3/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031M1062206709450 $28.87 000001078330-3562500636
2022 9 FD52 00 E123 D 1302801D 108 3/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709450 $4.38 000001078330-3562500636
2022 9 FD52 05 E111 D 1302801D 056 3/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031M1062206709455 $402.20 000001078956-3562505204
2022 9 FD52 05 E111 D 1302801D 056 3/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709455 $25.47 000001078956-3562505204
2022 9 FD52 05 E121 D 1302801D 056 3/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031M1062206709455 $29.48 000001078956-3562505204
2022 9 FD52 05 E121 D 1302801D 056 3/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709455 $1.86 000001078956-3562505204
2022 9 FD52 05 E122 D 1302801D 056 3/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031M1062206709455 $337.73 000001078956-3562505204
2022 9 FD52 05 E122 D 1302801D 056 3/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709455 $21.39 000001078956-3562505204
2022 9 FD52 05 E123 D 1302801D 056 3/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031M1062206709455 $57.19 000001078956-3562505204
2022 9 FD52 05 E123 D 1302801D 056 3/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709455 $3.58 000001078956-3562505204
2022 9 FD52 05 E111 D 1302801D 108 3/9/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR031M1062206709461 $221.93 000001080043-3562505200
2022 9 FD52 05 E111 D 1302801D 108 3/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709461 $40.90 000001080043-3562505200
2022 9 FD52 05 E121 D 1302801D 108 3/9/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR031M1062206709461 $14.99 000001080043-3562505200
2022 9 FD52 05 E121 D 1302801D 108 3/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709461 $2.76 000001080043-3562505200
2022 9 FD52 05 E122 D 1302801D 108 3/9/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR031M1062206709461 $186.36 000001080043-3562505200
2022 9 FD52 05 E122 D 1302801D 108 3/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709461 $34.34 000001080043-3562505200
2022 9 FD52 05 E123 D 1302801D 108 3/9/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR031M1062206709461 $58.39 000001080043-3562505200
2022 9 FD52 05 E123 D 1302801D 108 3/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709461 $10.65 000001080043-3562505200
2022 8 FD52 05 E229 D 1302801D 056 2/28/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF IET-XE13A162522056000110 $10.29
2022 8 FD52 05 E111 D 1302801D 108 2/25/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR022M1062205308404 $788.07 000001077821-3562505204
2022 8 FD52 05 E111 D 1302801D 108 2/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308404 $295.56 000001077821-3562505204
2022 8 FD52 05 E121 D 1302801D 108 2/25/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR022M1062205308404 $59.46 000001077821-3562505204
2022 8 FD52 05 E121 D 1302801D 108 2/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308404 $22.30 000001077821-3562505204
2022 8 FD52 05 E122 D 1302801D 108 2/25/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR022M1062205308404 $661.81 000001077821-3562505204
2022 8 FD52 05 E122 D 1302801D 108 2/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308404 $248.19 000001077821-3562505204
2022 8 FD52 05 E123 D 1302801D 108 2/25/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR022M1062205308404 $84.49 000001077821-3562505204
2022 8 FD52 05 E123 D 1302801D 108 2/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308404 $31.05 000001077821-3562505204
2022 8 FD52 05 E124 D 1302801D 108 2/25/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR022M1062205308404 $0.24 000001077821-3562505204
2022 8 FD52 05 E124 D 1302801D 108 2/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308404 $0.09 000001077821-3562505204
2022 8 FD52 05 E111 D 1302801D 108 2/23/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR022M1062205308421 $38.91 000001080043-3562505200
2022 8 FD52 05 E111 D 1302801D 108 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308421 $3.89 000001080043-3562505200
2022 8 FD52 05 E121 D 1302801D 108 2/23/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR022M1062205308421 $2.63 000001080043-3562505200
2022 8 FD52 05 E121 D 1302801D 108 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308421 $0.26 000001080043-3562505200
2022 8 FD52 05 E122 D 1302801D 108 2/23/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR022M1062205308421 $32.67 000001080043-3562505200
2022 8 FD52 05 E122 D 1302801D 108 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308421 $3.27 000001080043-3562505200
2022 8 FD52 05 E123 D 1302801D 108 2/23/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR022M1062205308421 $10.23 000001080043-3562505200
2022 8 FD52 05 E123 D 1302801D 108 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308421 $1.01 000001080043-3562505200
2022 8 FD52 05 E124 D 1302801D 108 2/23/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR022M1062205308421 $0.02 000001080043-3562505200
2022 8 FD52 05 E143 D 1302801D 108 2/21/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200147564 PON22200001178 PARSONS TRANSPORTATION GROUP INC $129,760.50 Spencer Co.
2022 8 FD52 05 E111 D 1302801D 108 2/9/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR021M1062203907426 $433.32 000001077821-3562505204
2022 8 FD52 05 E111 D 1302801D 108 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907426 $116.65 000001077821-3562505204
2022 8 FD52 05 E121 D 1302801D 108 2/9/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR021M1062203907426 $32.71 000001077821-3562505204
2022 8 FD52 05 E121 D 1302801D 108 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907426 $8.81 000001077821-3562505204
2022 8 FD52 05 E122 D 1302801D 108 2/9/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR021M1062203907426 $363.99 000001077821-3562505204
2022 8 FD52 05 E122 D 1302801D 108 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907426 $97.96 000001077821-3562505204
2022 8 FD52 05 E123 D 1302801D 108 2/9/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR021M1062203907426 $46.39 000001077821-3562505204
2022 8 FD52 05 E123 D 1302801D 108 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907426 $12.26 000001077821-3562505204
2022 8 FD52 05 E143 D 1302801D 108 2/1/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200126373 PON22200001178 PARSONS TRANSPORTATION GROUP INC $30,000.00 Spencer Co.
2022 7 FD52 05 E111 D 1302801D 108 1/27/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR012M1062202106435 $671.83 000001077821-3562505204
2022 7 FD52 05 E111 D 1302801D 108 1/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106435 $204.60 000001077821-3562505204
2022 7 FD52 05 E121 D 1302801D 108 1/27/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR012M1062202106435 $50.70 000001077821-3562505204
2022 7 FD52 05 E111 D 1302801D 108 1/27/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR012M1062202106454 $42.80 000001080043-3562505200
2022 7 FD52 05 E121 D 1302801D 108 1/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106435 $15.43 000001077821-3562505204
2022 7 FD52 05 E111 D 1302801D 108 1/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106454 $2.57 000001080043-3562505200
2022 7 FD52 05 E122 D 1302801D 108 1/27/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR012M1062202106435 $564.19 000001077821-3562505204
2022 7 FD52 05 E121 D 1302801D 108 1/27/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR012M1062202106454 $2.89 000001080043-3562505200
2022 7 FD52 05 E122 D 1302801D 108 1/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106435 $171.80 000001077821-3562505204
2022 7 FD52 05 E121 D 1302801D 108 1/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106454 $0.17 000001080043-3562505200
2022 7 FD52 05 E123 D 1302801D 108 1/27/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR012M1062202106435 $71.95 000001077821-3562505204
2022 7 FD52 05 E122 D 1302801D 108 1/27/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR012M1062202106454 $35.94 000001080043-3562505200
2022 7 FD52 05 E123 D 1302801D 108 1/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106435 $21.49 000001077821-3562505204
2022 7 FD52 05 E122 D 1302801D 108 1/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106454 $2.16 000001080043-3562505200
2022 7 FD52 05 E124 D 1302801D 108 1/27/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR012M1062202106435 $0.21 000001077821-3562505204
2022 7 FD52 05 E123 D 1302801D 108 1/27/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR012M1062202106454 $11.25 000001080043-3562505200
2022 7 FD52 05 E124 D 1302801D 108 1/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106435 $0.07 000001077821-3562505204
2022 7 FD52 05 E123 D 1302801D 108 1/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106454 $0.67 000001080043-3562505200
2022 7 FD52 05 E124 D 1302801D 108 1/27/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR012M1062202106454 $0.02 000001080043-3562505200
2022 7 FD52 05 E111 D 1302801D 056 1/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012M1062202106446 $180.96 000001078956-3562505204
2022 7 FD52 05 E111 D 1302801D 056 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106446 $34.59 000001078956-3562505204
2022 7 FD52 05 E121 D 1302801D 056 1/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012M1062202106446 $13.26 000001078956-3562505204
2022 7 FD52 05 E121 D 1302801D 056 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106446 $2.53 000001078956-3562505204
2022 7 FD52 05 E122 D 1302801D 056 1/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012M1062202106446 $151.98 000001078956-3562505204
2022 7 FD52 05 E122 D 1302801D 056 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106446 $29.05 000001078956-3562505204
2022 7 FD52 05 E123 D 1302801D 056 1/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012M1062202106446 $25.77 000001078956-3562505204
2022 7 FD52 05 E123 D 1302801D 056 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106446 $4.86 000001078956-3562505204
2022 7 FD52 05 E124 D 1302801D 056 1/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012M1062202106446 $0.06 000001078956-3562505204
2022 7 FD52 05 E124 D 1302801D 056 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106446 $0.01 000001078956-3562505204
2022 7 FD52 00 E111 D 1302801D 108 1/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012M1062202106439 $408.33 000001078330-3562500636
2022 7 FD52 00 E111 D 1302801D 108 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106439 $20.01 000001078330-3562500636
2022 7 FD52 00 E121 D 1302801D 108 1/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012M1062202106439 $30.96 000001078330-3562500636
2022 7 FD52 00 E121 D 1302801D 108 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106439 $1.52 000001078330-3562500636
2022 7 FD52 00 E122 D 1302801D 108 1/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012M1062202106439 $342.88 000001078330-3562500636
2022 7 FD52 00 E122 D 1302801D 108 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106439 $16.80 000001078330-3562500636
2022 7 FD52 00 E123 D 1302801D 108 1/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012M1062202106439 $47.17 000001078330-3562500636
2022 7 FD52 00 E123 D 1302801D 108 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106439 $2.28 000001078330-3562500636
2022 7 FD52 00 E124 D 1302801D 108 1/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012M1062202106439 $0.13 000001078330-3562500636
2022 7 FD52 00 E124 D 1302801D 108 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106439 $0.01 000001078330-3562500636
2022 7 FD52 05 E111 D 1302801D 108 1/14/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR011M1062200705537 $677.32 000001077821-3562505204
2022 7 FD52 05 E111 D 1302801D 108 1/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705537 $1,354.64 000001077821-3562505204
2022 7 FD52 05 E121 D 1302801D 108 1/14/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR011M1062200705537 $51.11 000001077821-3562505204
2022 7 FD52 05 E121 D 1302801D 108 1/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705537 $102.22 000001077821-3562505204
2022 7 FD52 05 E122 D 1302801D 108 1/14/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR011M1062200705537 $568.75 000001077821-3562505204
2022 7 FD52 05 E122 D 1302801D 108 1/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705537 $1,137.50 000001077821-3562505204
2022 7 FD52 05 E123 D 1302801D 108 1/14/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR011M1062200705537 $74.34 000001077821-3562505204
2022 7 FD52 05 E123 D 1302801D 108 1/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705537 $142.30 000001077821-3562505204
2022 7 FD52 00 E111 D 1302801D 108 1/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011M1062200705540 $85.07 000001078330-3562500636
2022 7 FD52 00 E111 D 1302801D 108 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705540 $133.73 000001078330-3562500636
2022 7 FD52 00 E121 D 1302801D 108 1/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011M1062200705540 $6.45 000001078330-3562500636
2022 7 FD52 00 E121 D 1302801D 108 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705540 $10.15 000001078330-3562500636
2022 7 FD52 00 E122 D 1302801D 108 1/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011M1062200705540 $71.43 000001078330-3562500636
2022 7 FD52 00 E122 D 1302801D 108 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705540 $112.30 000001078330-3562500636
2022 7 FD52 00 E123 D 1302801D 108 1/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011M1062200705540 $10.04 000001078330-3562500636
2022 7 FD52 00 E123 D 1302801D 108 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705540 $15.21 000001078330-3562500636
2022 7 FD52 05 E111 D 1302801D 108 1/10/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR011M1062200705552 $59.42 000001080043-3562505200
2022 7 FD52 05 E111 D 1302801D 108 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705552 $49.70 000001080043-3562505200
2022 7 FD52 05 E121 D 1302801D 108 1/10/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR011M1062200705552 $4.02 000001080043-3562505200
2022 7 FD52 05 E121 D 1302801D 108 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705552 $3.36 000001080043-3562505200
2022 7 FD52 05 E122 D 1302801D 108 1/10/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR011M1062200705552 $49.92 000001080043-3562505200
2022 7 FD52 05 E122 D 1302801D 108 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705552 $41.73 000001080043-3562505200
2022 7 FD52 05 E123 D 1302801D 108 1/10/2022 0640 ENV STUDIES-GEN-CONSULT CA-XR011M1062200705552 $15.73 000001080043-3562505200
2022 7 FD52 05 E123 D 1302801D 108 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705552 $12.93 000001080043-3562505200
2022 6 FD52 05 E143 D 1302801D 108 12/29/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200109029 PON22200001178 PARSONS TRANSPORTATION GROUP INC $26,136.00 Spencer Co.
2022 6 FD52 05 E143 D 1302801D 108 12/29/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200109029 PON22200001178 PARSONS TRANSPORTATION GROUP INC $3,864.00 Spencer Co.
2022 6 FD52 05 E111 D 1302801D 108 12/22/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR122L1062135504477 $581.26 000001077821-3562505204
2022 6 FD52 05 E121 D 1302801D 108 12/22/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR122L1062135504477 $43.87 000001077821-3562505204
2022 6 FD52 05 E122 D 1302801D 108 12/22/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR122L1062135504477 $488.08 000001077821-3562505204
2022 6 FD52 05 E123 D 1302801D 108 12/22/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR122L1062135504477 $60.48 000001077821-3562505204
2022 6 FD52 05 E124 D 1302801D 108 12/22/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR122L1062135504477 $0.18 000001077821-3562505204
2022 6 FD52 00 E111 D 1302801D 108 12/8/2021 0410 TRANSPORTATION PLANNING CA-XR121L1062134103581 $123.45 000001080804-3562500064
2022 6 FD52 00 E111 D 1302801D 108 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103581 $52.16 000001080804-3562500064
2022 6 FD52 00 E121 D 1302801D 108 12/8/2021 0410 TRANSPORTATION PLANNING CA-XR121L1062134103581 $9.28 000001080804-3562500064
2022 6 FD52 00 E121 D 1302801D 108 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103581 $3.92 000001080804-3562500064
2022 6 FD52 00 E122 D 1302801D 108 12/8/2021 0410 TRANSPORTATION PLANNING CA-XR121L1062134103581 $103.66 000001080804-3562500064
2022 6 FD52 00 E122 D 1302801D 108 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103581 $43.80 000001080804-3562500064
2022 6 FD52 00 E123 D 1302801D 108 12/8/2021 0410 TRANSPORTATION PLANNING CA-XR121L1062134103581 $16.50 000001080804-3562500064
2022 6 FD52 00 E123 D 1302801D 108 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103581 $6.83 000001080804-3562500064
2022 6 FD52 05 E111 D 1302801D 108 12/8/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR121L1062134103546 $147.70 000001077821-3562505204
2022 6 FD52 05 E111 D 1302801D 108 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103546 $58.72 000001077821-3562505204
2022 6 FD52 05 E121 D 1302801D 108 12/8/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR121L1062134103546 $11.15 000001077821-3562505204
2022 6 FD52 05 E121 D 1302801D 108 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103546 $4.43 000001077821-3562505204
2022 6 FD52 05 E122 D 1302801D 108 12/8/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR121L1062134103546 $124.09 000001077821-3562505204
2022 6 FD52 05 E122 D 1302801D 108 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103546 $49.31 000001077821-3562505204
2022 6 FD52 05 E123 D 1302801D 108 12/8/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR121L1062134103546 $15.46 000001077821-3562505204
2022 6 FD52 05 E123 D 1302801D 108 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103546 $6.02 000001077821-3562505204
2022 4 FD52 05 E111 D 1302801D 108 10/29/2021 0640 ENV STUDIES-GEN-CONSULT CA-XR102L1062129500430 $64.87 000001080043-3562505200
2022 4 FD52 05 E111 D 1302801D 108 10/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500430 $15.04 000001080043-3562505200
2022 4 FD52 05 E121 D 1302801D 108 10/29/2021 0640 ENV STUDIES-GEN-CONSULT CA-XR102L1062129500430 $4.40 000001080043-3562505200
2022 4 FD52 05 E121 D 1302801D 108 10/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500430 $1.02 000001080043-3562505200
2022 4 FD52 05 E122 D 1302801D 108 10/29/2021 0640 ENV STUDIES-GEN-CONSULT CA-XR102L1062129500430 $54.45 000001080043-3562505200
2022 4 FD52 05 E122 D 1302801D 108 10/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500430 $12.63 000001080043-3562505200
2022 4 FD52 05 E123 D 1302801D 108 10/29/2021 0640 ENV STUDIES-GEN-CONSULT CA-XR102L1062129500430 $16.25 000001080043-3562505200
2022 4 FD52 05 E123 D 1302801D 108 10/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500430 $3.73 000001080043-3562505200
2022 4 FD52 05 E124 D 1302801D 108 10/29/2021 0640 ENV STUDIES-GEN-CONSULT CA-XR102L1062129500430 $0.03 000001080043-3562505200
2022 4 FD52 00 E111 D 1302801D 108 10/25/2021 0060 ENV STUDIES-ARCHAEOLOGY CA-XR102L1062129500425 $134.83 000001079841-3562500061
2022 4 FD52 00 E111 D 1302801D 108 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500425 $17.52 000001079841-3562500061
2022 4 FD52 00 E121 D 1302801D 108 10/25/2021 0060 ENV STUDIES-ARCHAEOLOGY CA-XR102L1062129500425 $10.17 000001079841-3562500061
2022 4 FD52 00 E121 D 1302801D 108 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500425 $1.32 000001079841-3562500061
2022 4 FD52 00 E122 D 1302801D 108 10/25/2021 0060 ENV STUDIES-ARCHAEOLOGY CA-XR102L1062129500425 $113.17 000001079841-3562500061
2022 4 FD52 00 E122 D 1302801D 108 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500425 $14.71 000001079841-3562500061
2022 4 FD52 00 E123 D 1302801D 108 10/25/2021 0060 ENV STUDIES-ARCHAEOLOGY CA-XR102L1062129500425 $25.14 000001079841-3562500061
2022 4 FD52 00 E123 D 1302801D 108 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500425 $3.22 000001079841-3562500061
2022 4 FD52 00 E124 D 1302801D 108 10/25/2021 0060 ENV STUDIES-ARCHAEOLOGY CA-XR102L1062129500425 $0.07 000001079841-3562500061
2022 4 FD52 00 E124 D 1302801D 108 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500425 $0.01 000001079841-3562500061
2022 4 FD52 00 E111 D 1302801D 108 10/25/2021 0010 ENV STUDIES-UST/HZM CA-XR102L1062129500423 $225.90 000001079766-3562500061
2022 4 FD52 00 E121 D 1302801D 108 10/25/2021 0010 ENV STUDIES-UST/HZM CA-XR102L1062129500423 $15.94 000001079766-3562500061
2022 4 FD52 00 E122 D 1302801D 108 10/25/2021 0010 ENV STUDIES-UST/HZM CA-XR102L1062129500423 $189.69 000001079766-3562500061
2022 4 FD52 00 E123 D 1302801D 108 10/25/2021 0010 ENV STUDIES-UST/HZM CA-XR102L1062129500423 $42.15 000001079766-3562500061
2022 4 FD52 00 E124 D 1302801D 108 10/25/2021 0010 ENV STUDIES-UST/HZM CA-XR102L1062129500423 $0.08 000001079766-3562500061
2022 4 FD52 00 E111 D 1302801D 108 10/11/2021 0010 ENV STUDIES-UST/HZM CA-XR101L1062128110143 $427.35 000001079766-3562500061
2022 4 FD52 00 E111 D 1302801D 108 10/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110143 $119.21 000001079766-3562500061
2022 4 FD52 00 E121 D 1302801D 108 10/11/2021 0010 ENV STUDIES-UST/HZM CA-XR101L1062128110143 $27.71 000001079766-3562500061
2022 4 FD52 00 E121 D 1302801D 108 10/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110143 $8.17 000001079766-3562500061
2022 4 FD52 00 E122 D 1302801D 108 10/11/2021 0010 ENV STUDIES-UST/HZM CA-XR101L1062128110143 $358.60 000001079766-3562500061
2022 4 FD52 00 E122 D 1302801D 108 10/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110143 $100.10 000001079766-3562500061
2022 4 FD52 00 E123 D 1302801D 108 10/11/2021 0010 ENV STUDIES-UST/HZM CA-XR101L1062128110143 $119.24 000001079766-3562500061
2022 4 FD52 00 E123 D 1302801D 108 10/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110143 $25.93 000001079766-3562500061
2022 4 FD52 05 E111 D 1302801D 108 10/11/2021 0640 ENV STUDIES-GEN-CONSULT CA-XR101L1062128110154 $64.83 000001080043-3562505200
2022 4 FD52 00 E111 D 1302801D 108 10/11/2021 0060 ENV STUDIES-ARCHAEOLOGY CA-XR101L1062128110147 $729.96 000001079841-3562500061
2022 4 FD52 05 E111 D 1302801D 108 10/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110154 $11.15 000001080043-3562505200
2022 4 FD52 00 E111 D 1302801D 108 10/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110147 $47.17 000001079841-3562500061
2022 4 FD52 05 E121 D 1302801D 108 10/11/2021 0640 ENV STUDIES-GEN-CONSULT CA-XR101L1062128110154 $4.26 000001080043-3562505200
2022 4 FD52 00 E121 D 1302801D 108 10/11/2021 0060 ENV STUDIES-ARCHAEOLOGY CA-XR101L1062128110147 $53.86 000001079841-3562500061
2022 4 FD52 05 E121 D 1302801D 108 10/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110154 $0.73 000001080043-3562505200
2022 4 FD52 00 E121 D 1302801D 108 10/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110147 $3.48 000001079841-3562500061
2022 4 FD52 05 E122 D 1302801D 108 10/11/2021 0640 ENV STUDIES-GEN-CONSULT CA-XR101L1062128110154 $54.45 000001080043-3562505200
2022 4 FD52 00 E122 D 1302801D 108 10/11/2021 0060 ENV STUDIES-ARCHAEOLOGY CA-XR101L1062128110147 $613.03 000001079841-3562500061
2022 4 FD52 05 E122 D 1302801D 108 10/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110154 $9.36 000001080043-3562505200
2022 4 FD52 00 E122 D 1302801D 108 10/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110147 $39.61 000001079841-3562500061
2022 4 FD52 05 E123 D 1302801D 108 10/11/2021 0640 ENV STUDIES-GEN-CONSULT CA-XR101L1062128110154 $16.24 000001080043-3562505200
2022 4 FD52 00 E123 D 1302801D 108 10/11/2021 0060 ENV STUDIES-ARCHAEOLOGY CA-XR101L1062128110147 $136.05 000001079841-3562500061
2022 4 FD52 05 E123 D 1302801D 108 10/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110154 $2.76 000001080043-3562505200
2022 4 FD52 00 E123 D 1302801D 108 10/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110147 $8.66 000001079841-3562500061
2022 3 FD52 05 E111 D 1302801D 108 9/15/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR091L1062125207980 $785.58 000001077821-3562505204
2022 3 FD52 05 E111 D 1302801D 108 9/15/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207980 $71.52 000001077821-3562505204
2022 3 FD52 05 E121 D 1302801D 108 9/15/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR091L1062125207980 $59.30 000001077821-3562505204
2022 3 FD52 05 E121 D 1302801D 108 9/15/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207980 $5.39 000001077821-3562505204
2022 3 FD52 05 E122 D 1302801D 108 9/15/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR091L1062125207980 $659.74 000001077821-3562505204
2022 3 FD52 05 E122 D 1302801D 108 9/15/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207980 $60.06 000001077821-3562505204
2022 3 FD52 05 E123 D 1302801D 108 9/15/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR091L1062125207980 $81.86 000001077821-3562505204
2022 3 FD52 05 E123 D 1302801D 108 9/15/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207980 $7.33 000001077821-3562505204
2022 3 FD52 00 E111 D 1302801D 108 9/13/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091L1062125207985 $340.34 000001078330-3562500636
2022 3 FD52 00 E111 D 1302801D 108 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207985 $70.97 000001078330-3562500636
2022 3 FD52 00 E121 D 1302801D 108 9/13/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091L1062125207985 $25.19 000001078330-3562500636
2022 3 FD52 00 E121 D 1302801D 108 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207985 $5.25 000001078330-3562500636
2022 3 FD52 00 E122 D 1302801D 108 9/13/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091L1062125207985 $285.73 000001078330-3562500636
2022 3 FD52 00 E122 D 1302801D 108 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207985 $59.59 000001078330-3562500636
2022 3 FD52 05 E111 D 1302801D 056 9/13/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091L1062125207992 $134.11 000001078956-3562505204
2022 3 FD52 00 E123 D 1302801D 108 9/13/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091L1062125207985 $39.59 000001078330-3562500636
2022 3 FD52 05 E111 D 1302801D 056 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207992 $75.75 000001078956-3562505204
2022 3 FD52 00 E123 D 1302801D 108 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207985 $8.10 000001078330-3562500636
2022 3 FD52 05 E121 D 1302801D 056 9/13/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091L1062125207992 $9.84 000001078956-3562505204
2022 3 FD52 05 E121 D 1302801D 056 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207992 $5.56 000001078956-3562505204
2022 3 FD52 05 E122 D 1302801D 056 9/13/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091L1062125207992 $112.58 000001078956-3562505204
2022 3 FD52 05 E122 D 1302801D 056 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207992 $63.61 000001078956-3562505204
2022 3 FD52 05 E123 D 1302801D 056 9/13/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091L1062125207992 $19.85 000001078956-3562505204
2022 3 FD52 05 E123 D 1302801D 056 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207992 $11.02 000001078956-3562505204
2022 2 FD52 05 E111 D 1302801D 108 8/25/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR082L1062123606971 $1,864.06 000001077821-3562505204
2022 2 FD52 05 E111 D 1302801D 108 8/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082L1062123606971 $64.15 000001077821-3562505204
2022 2 FD52 05 E121 D 1302801D 108 8/25/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR082L1062123606971 $140.68 000001077821-3562505204
2022 2 FD52 05 E121 D 1302801D 108 8/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082L1062123606971 $4.84 000001077821-3562505204
2022 2 FD52 05 E122 D 1302801D 108 8/25/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR082L1062123606971 $1,565.18 000001077821-3562505204
2022 2 FD52 05 E122 D 1302801D 108 8/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082L1062123606971 $53.87 000001077821-3562505204
2022 2 FD52 05 E123 D 1302801D 108 8/25/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR082L1062123606971 $194.04 000001077821-3562505204
2022 2 FD52 00 E111 D 1302801D 108 8/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082L1062123606977 $155.55 000001078330-3562500636
2022 2 FD52 05 E123 D 1302801D 108 8/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082L1062123606971 $6.57 000001077821-3562505204
2022 2 FD52 05 E124 D 1302801D 108 8/25/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR082L1062123606971 $0.57 000001077821-3562505204
2022 2 FD52 05 E124 D 1302801D 108 8/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082L1062123606971 $0.02 000001077821-3562505204
2022 2 FD52 00 E121 D 1302801D 108 8/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082L1062123606977 $11.72 000001078330-3562500636
2022 2 FD52 00 E122 D 1302801D 108 8/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082L1062123606977 $130.61 000001078330-3562500636
2022 2 FD52 05 E111 D 1302801D 056 8/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082L1062123606985 $150.83 000001078956-3562505204
2022 2 FD52 05 E111 D 1302801D 056 8/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082L1062123606985 $242.53 000001078956-3562505204
2022 2 FD52 05 E121 D 1302801D 056 8/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082L1062123606985 $10.81 000001078956-3562505204
2022 2 FD52 05 E121 D 1302801D 056 8/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082L1062123606985 $17.39 000001078956-3562505204
2022 2 FD52 05 E122 D 1302801D 056 8/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082L1062123606985 $126.65 000001078956-3562505204
2022 2 FD52 05 E122 D 1302801D 056 8/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082L1062123606985 $203.65 000001078956-3562505204
2022 2 FD52 05 E123 D 1302801D 056 8/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082L1062123606985 $29.81 000001078956-3562505204
2022 2 FD52 05 E123 D 1302801D 056 8/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082L1062123606985 $46.86 000001078956-3562505204
2022 2 FD52 05 E124 D 1302801D 056 8/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082L1062123606985 $0.05 000001078956-3562505204
2022 2 FD52 00 E123 D 1302801D 108 8/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082L1062123606977 $18.04 000001078330-3562500636
2022 2 FD52 05 E124 D 1302801D 056 8/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082L1062123606985 $0.08 000001078956-3562505204
2022 2 FD52 00 E124 D 1302801D 108 8/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082L1062123606977 $0.05 000001078330-3562500636
2022 2 FD52 00 E111 D 1302801D 108 8/25/2021 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR082L1062123606994 $327.47 000001079277-3562500610
2022 2 FD52 00 E111 D 1302801D 108 8/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082L1062123606994 $8.96 000001079277-3562500610
2022 2 FD52 00 E121 D 1302801D 108 8/25/2021 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR082L1062123606994 $24.39 000001079277-3562500610
2022 2 FD52 00 E121 D 1302801D 108 8/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082L1062123606994 $0.67 000001079277-3562500610
2022 2 FD52 00 E122 D 1302801D 108 8/25/2021 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR082L1062123606994 $274.75 000001079277-3562500610
2022 2 FD52 00 E122 D 1302801D 108 8/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082L1062123606994 $7.52 000001079277-3562500610
2022 2 FD52 00 E123 D 1302801D 108 8/25/2021 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR082L1062123606994 $44.82 000001079277-3562500610
2022 2 FD52 00 E123 D 1302801D 108 8/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082L1062123606994 $1.45 000001079277-3562500610
2022 2 FD52 00 E124 D 1302801D 108 8/25/2021 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR082L1062123606994 $0.12 000001079277-3562500610
2022 2 FD52 05 E123 D 1302801D 108 8/9/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR081L1062121805827 $93.43 000001077821-3562505204
2022 2 FD52 05 E123 D 1302801D 108 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805827 $9.21 000001077821-3562505204
2022 2 FD52 05 E111 D 1302801D 108 8/9/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081L1062121805853 $237.54 000001079193-3562505204
2022 2 FD52 05 E111 D 1302801D 108 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805853 $171.12 000001079193-3562505204
2022 2 FD52 05 E121 D 1302801D 108 8/9/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081L1062121805853 $16.55 000001079193-3562505204
2022 2 FD52 05 E121 D 1302801D 108 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805853 $11.92 000001079193-3562505204
2022 2 FD52 05 E122 D 1302801D 108 8/9/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081L1062121805853 $199.57 000001079193-3562505204
2022 2 FD52 05 E122 D 1302801D 108 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805853 $143.69 000001079193-3562505204
2022 2 FD52 05 E123 D 1302801D 108 8/9/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081L1062121805853 $46.61 000001079193-3562505204
2022 2 FD52 05 E123 D 1302801D 108 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805853 $33.06 000001079193-3562505204
2022 2 FD52 05 E111 D 1302801D 108 8/9/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR081L1062121805826 $896.45 000001077821-3562505204
2022 2 FD52 05 E111 D 1302801D 108 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805826 $89.85 000001077821-3562505204
2022 2 FD52 05 E121 D 1302801D 108 8/9/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR081L1062121805826 $67.67 000001077821-3562505204
2022 2 FD52 05 E121 D 1302801D 108 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805826 $6.79 000001077821-3562505204
2022 2 FD52 05 E122 D 1302801D 108 8/9/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR081L1062121805826 $752.81 000001077821-3562505204
2022 2 FD52 05 E122 D 1302801D 108 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805826 $75.45 000001077821-3562505204
2022 1 FD52 05 E111 D 1302801D 108 7/26/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR072L1062120404700 $1,044.44 000001077821-3562505204
2022 1 FD52 05 E111 D 1302801D 108 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404700 $231.72 000001077821-3562505204
2022 1 FD52 05 E121 D 1302801D 108 7/26/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR072L1062120404700 $78.82 000001077821-3562505204
2022 1 FD52 05 E121 D 1302801D 108 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404700 $17.50 000001077821-3562505204
2022 1 FD52 05 E122 D 1302801D 108 7/26/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR072L1062120404700 $876.90 000001077821-3562505204
2022 1 FD52 05 E122 D 1302801D 108 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404700 $194.58 000001077821-3562505204
2022 1 FD52 05 E123 D 1302801D 108 7/26/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR072L1062120404700 $109.02 000001077821-3562505204
2022 1 FD52 05 E123 D 1302801D 108 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404700 $23.74 000001077821-3562505204
2022 1 FD52 05 E124 D 1302801D 108 7/26/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR072L1062120404700 $0.32 000001077821-3562505204
2022 1 FD52 05 E124 D 1302801D 108 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404700 $0.08 000001077821-3562505204
2022 1 FD52 05 E111 D 1302801D 056 7/26/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072L1062120404727 $237.56 000001078956-3562505204
2022 1 FD52 05 E111 D 1302801D 056 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404727 $115.91 000001078956-3562505204
2022 1 FD52 05 E121 D 1302801D 056 7/26/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072L1062120404727 $17.78 000001078956-3562505204
2022 1 FD52 05 E121 D 1302801D 056 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404727 $8.68 000001078956-3562505204
2022 1 FD52 05 E122 D 1302801D 056 7/26/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072L1062120404727 $199.56 000001078956-3562505204
2022 1 FD52 05 E122 D 1302801D 056 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404727 $97.33 000001078956-3562505204
2022 1 FD52 05 E123 D 1302801D 056 7/26/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072L1062120404727 $46.52 000001078956-3562505204
2022 1 FD52 05 E123 D 1302801D 056 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404727 $22.39 000001078956-3562505204
2022 1 FD52 05 E124 D 1302801D 056 7/26/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072L1062120404727 $0.08 000001078956-3562505204
2022 1 FD52 05 E124 D 1302801D 056 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404727 $0.04 000001078956-3562505204
2022 1 FD52 05 E111 D 1302801D 108 7/12/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR071L1062119003562 $246.29 000001077821-3562505204
2022 1 FD52 05 E111 D 1302801D 108 7/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003562 $24.83 000001077821-3562505204
2022 1 FD52 05 E121 D 1302801D 108 7/12/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR071L1062119003562 $18.58 000001077821-3562505204
2022 1 FD52 05 E121 D 1302801D 108 7/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003562 $1.88 000001077821-3562505204
2022 1 FD52 05 E122 D 1302801D 108 7/12/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR071L1062119003562 $207.95 000001077821-3562505204
2022 1 FD52 05 E122 D 1302801D 108 7/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003562 $20.96 000001077821-3562505204
2022 1 FD52 05 E123 D 1302801D 108 7/12/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR071L1062119003562 $25.67 000001077821-3562505204
2022 1 FD52 05 E123 D 1302801D 108 7/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003562 $2.54 000001077821-3562505204
2022 1 FD52 05 E123 D 1302801D 108 7/2/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR061L1062116001485P $150.17 000001077821-3562505204
2022 1 FD52 05 E123 D 1302801D 108 7/2/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061L1062116001485P $32.80 000001077821-3562505204
2022 1 FD52 00 E111 D 1302801D 108 7/1/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062L1062117302498 $123.78 000001078330-3562500636
2022 1 FD52 00 E111 D 1302801D 108 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302498 $21.92 000001078330-3562500636
2022 1 FD52 00 E121 D 1302801D 108 7/1/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062L1062117302498 $9.33 000001078330-3562500636
2022 1 FD52 00 E121 D 1302801D 108 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302498 $1.66 000001078330-3562500636
2022 1 FD52 00 E122 D 1302801D 108 7/1/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062L1062117302498 $104.47 000001078330-3562500636
2022 1 FD52 00 E122 D 1302801D 108 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302498 $18.50 000001078330-3562500636
2022 1 FD52 00 E123 D 1302801D 108 7/1/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062L1062117302498 $14.40 000001078330-3562500636
2022 1 FD52 00 E123 D 1302801D 108 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302498 $2.50 000001078330-3562500636
2022 1 FD52 00 E124 D 1302801D 108 7/1/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062L1062117302498 $0.04 000001078330-3562500636
2022 1 FD52 05 E111 D 1302801D 108 7/1/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR062L1062117302487 $1,201.95 000001077821-3562505204
2022 1 FD52 05 E111 D 1302801D 108 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302487 $120.19 000001077821-3562505204
2022 1 FD52 05 E121 D 1302801D 108 7/1/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR062L1062117302487 $90.70 000001077821-3562505204
2022 1 FD52 05 E121 D 1302801D 108 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302487 $9.07 000001077821-3562505204
2022 1 FD52 05 E122 D 1302801D 108 7/1/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR062L1062117302487 $1,014.80 000001077821-3562505204
2022 1 FD52 05 E122 D 1302801D 108 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302487 $101.48 000001077821-3562505204
2022 1 FD52 05 E123 D 1302801D 108 7/1/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR062L1062117302487 $125.25 000001077821-3562505204
2022 1 FD52 05 E123 D 1302801D 108 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302487 $12.32 000001077821-3562505204
2022 1 FD52 05 E124 D 1302801D 108 7/1/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR062L1062117302487 $0.37 000001077821-3562505204
2022 1 FD52 05 E124 D 1302801D 108 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302487 $0.04 000001077821-3562505204
2022 1 FD52 00 E123 D 1302801D 108 7/1/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061L1062116001501P $34.91 000001078330-3562500636
2022 1 FD52 00 E123 D 1302801D 108 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061L1062116001501P $3.43 000001078330-3562500636
2021 12 FD52 05 E111 D 1302801D 108 6/10/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR061L1062116001485 $1,438.38 000001077821-3562505204
2021 12 FD52 05 E111 D 1302801D 108 6/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061L1062116001485 $319.98 000001077821-3562505204
2021 12 FD52 05 E121 D 1302801D 108 6/10/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR061L1062116001485 $108.57 000001077821-3562505204
2021 12 FD52 05 E121 D 1302801D 108 6/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061L1062116001485 $24.16 000001077821-3562505204
2021 12 FD52 05 E122 D 1302801D 108 6/10/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR061L1062116001485 $1,214.43 000001077821-3562505204
2021 12 FD52 05 E122 D 1302801D 108 6/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061L1062116001485 $270.16 000001077821-3562505204
2021 12 FD52 00 E111 D 1302801D 108 6/10/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061L1062116001501 $300.51 000001078330-3562500636
2021 12 FD52 00 E111 D 1302801D 108 6/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061L1062116001501 $30.05 000001078330-3562500636
2021 12 FD52 00 E121 D 1302801D 108 6/10/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061L1062116001501 $22.25 000001078330-3562500636
2021 12 FD52 00 E121 D 1302801D 108 6/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061L1062116001501 $2.22 000001078330-3562500636
2021 12 FD52 00 E122 D 1302801D 108 6/10/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061L1062116001501 $253.72 000001078330-3562500636
2021 12 FD52 00 E122 D 1302801D 108 6/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061L1062116001501 $25.37 000001078330-3562500636
2021 11 FD52 05 E111 D 1302801D 108 5/24/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR052L1062114100410 $487.67 000001077821-3562505204
2021 11 FD52 05 E121 D 1302801D 108 5/24/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR052L1062114100410 $36.81 000001077821-3562505204
2021 11 FD52 05 E122 D 1302801D 108 5/24/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR052L1062114100410 $411.74 000001077821-3562505204
2021 11 FD52 05 E123 D 1302801D 108 5/24/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR052L1062114100410 $50.75 000001077821-3562505204
2021 11 FD52 05 E124 D 1302801D 108 5/24/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR052L1062114100410 $0.15 000001077821-3562505204
2021 11 FD52 05 E111 D 1302801D 108 5/13/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR051L1062112709760 $443.40 000001077821-3562505204
2021 11 FD52 05 E111 D 1302801D 108 5/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709760 $13.79 000001077821-3562505204
2021 11 FD52 05 E121 D 1302801D 108 5/13/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR051L1062112709760 $33.46 000001077821-3562505204
2021 11 FD52 05 E121 D 1302801D 108 5/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709760 $1.04 000001077821-3562505204
2021 11 FD52 05 E122 D 1302801D 108 5/13/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR051L1062112709760 $374.31 000001077821-3562505204
2021 11 FD52 05 E122 D 1302801D 108 5/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709760 $11.64 000001077821-3562505204
2021 11 FD52 05 E123 D 1302801D 108 5/13/2021 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR051L1062112709760 $46.15 000001077821-3562505204
2021 11 FD52 05 E123 D 1302801D 108 5/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709760 $1.41 000001077821-3562505204
2021 11 FD52 00 E111 D 1302801D 056 5/13/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051L1062112709759 $236.47 000001077760-3562500636
2021 11 FD52 00 E111 D 1302801D 056 5/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709759 $22.07 000001077760-3562500636
2021 11 FD52 00 E121 D 1302801D 056 5/13/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051L1062112709759 $16.32 000001077760-3562500636
2021 11 FD52 00 E121 D 1302801D 056 5/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709759 $1.52 000001077760-3562500636
2021 11 FD52 00 E122 D 1302801D 056 5/13/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051L1062112709759 $199.66 000001077760-3562500636
2021 11 FD52 00 E122 D 1302801D 056 5/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709759 $18.63 000001077760-3562500636
2021 11 FD52 00 E123 D 1302801D 056 5/13/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051L1062112709759 $53.49 000001077760-3562500636
2021 11 FD52 00 E123 D 1302801D 056 5/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709759 $4.94 000001077760-3562500636