2024 |
10 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
4/26/2024 |
0091 |
ENV STUDIES-ENV PROJ MGR (EPM) |
CA-XR042O1062411502739 |
|
|
$298.23 |
000001083802-3562500061 |
2024 |
10 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
4/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042O1062411502739 |
|
|
$112.23 |
000001083802-3562500061 |
2024 |
10 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
4/26/2024 |
0091 |
ENV STUDIES-ENV PROJ MGR (EPM) |
CA-XR042O1062411502739 |
|
|
$21.45 |
000001083802-3562500061 |
2024 |
10 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
4/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042O1062411502739 |
|
|
$8.07 |
000001083802-3562500061 |
2024 |
10 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
4/26/2024 |
0091 |
ENV STUDIES-ENV PROJ MGR (EPM) |
CA-XR042O1062411502739 |
|
|
$197.50 |
000001083802-3562500061 |
2024 |
10 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
4/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042O1062411502739 |
|
|
$74.26 |
000001083802-3562500061 |
2024 |
10 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
4/26/2024 |
0091 |
ENV STUDIES-ENV PROJ MGR (EPM) |
CA-XR042O1062411502739 |
|
|
$76.97 |
000001083802-3562500061 |
2024 |
10 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
4/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042O1062411502739 |
|
|
$28.70 |
000001083802-3562500061 |
2024 |
10 |
FD52 |
00 |
E124 |
D |
1300201D |
034 |
4/26/2024 |
0091 |
ENV STUDIES-ENV PROJ MGR (EPM) |
CA-XR042O1062411502739 |
|
|
$0.09 |
000001083802-3562500061 |
2024 |
10 |
FD52 |
00 |
E124 |
D |
1300201D |
034 |
4/26/2024 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042O1062411502739 |
|
|
$0.03 |
000001083802-3562500061 |
2024 |
9 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
3/11/2024 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR031O1062406810065 |
|
|
$954.96 |
000001079833-3562500061 |
2024 |
9 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
3/11/2024 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR031O1062406810065 |
|
|
$64.41 |
000001079833-3562500061 |
2024 |
9 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
3/11/2024 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR031O1062406810065 |
|
|
$631.90 |
000001079833-3562500061 |
2024 |
9 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
3/11/2024 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR031O1062406810065 |
|
|
$269.00 |
000001079833-3562500061 |
2024 |
8 |
FD52 |
07 |
E143 |
D |
1300201D |
034 |
2/5/2024 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400154320 |
PON22200001262 |
PALMER ENGINEERING CO |
$3,832.50 |
Fayette/US60 |
2024 |
6 |
FD52 |
07 |
E143 |
D |
1300201D |
034 |
12/19/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400121291 |
PON22200001262 |
PALMER ENGINEERING CO |
$4,841.62 |
Fayette Co. 7-80150 |
2024 |
6 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
12/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121N1062334203612 |
|
|
$9.97 |
000001079833-3562500061 |
2024 |
6 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
12/11/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR121N1062334203611 |
|
|
$132.41 |
000001079833-3562500061 |
2024 |
6 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
12/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121N1062334203611 |
|
|
$44.31 |
000001079833-3562500061 |
2024 |
6 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
12/11/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR121N1062334203611 |
|
|
$8.77 |
000001079833-3562500061 |
2024 |
6 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
12/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121N1062334203611 |
|
|
$2.94 |
000001079833-3562500061 |
2024 |
6 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
12/11/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR121N1062334203611 |
|
|
$87.54 |
000001079833-3562500061 |
2024 |
6 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
12/11/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121N1062334203611 |
|
|
$29.32 |
000001079833-3562500061 |
2024 |
6 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
12/11/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR121N1062334203611 |
|
|
$30.12 |
000001079833-3562500061 |
2024 |
5 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
11/22/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR112N1062332502503 |
|
|
$2,341.39 |
000001079500-3562507204 |
2024 |
5 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
11/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112N1062332502503 |
|
|
$770.11 |
000001079500-3562507204 |
2024 |
5 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
11/22/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR112N1062332502503 |
|
|
$166.43 |
000001079500-3562507204 |
2024 |
5 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
11/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112N1062332502503 |
|
|
$54.63 |
000001079500-3562507204 |
2024 |
5 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
11/22/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR112N1062332502503 |
|
|
$1,549.56 |
000001079500-3562507204 |
2024 |
5 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
11/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112N1062332502503 |
|
|
$509.57 |
000001079500-3562507204 |
2024 |
5 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
11/22/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR112N1062332502503 |
|
|
$585.07 |
000001079500-3562507204 |
2024 |
5 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
11/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112N1062332502503 |
|
|
$195.61 |
000001079500-3562507204 |
2024 |
5 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
11/22/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR112N1062332502503 |
|
|
$0.83 |
000001079500-3562507204 |
2024 |
5 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
11/22/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112N1062332502503 |
|
|
$0.28 |
000001079500-3562507204 |
2024 |
5 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
11/20/2023 |
0060 |
ENV STUDIES-ARCHAEOLOGY |
CA-XR111N1062331201521 |
|
|
$528.82 |
000001089733-3562500061 |
2024 |
5 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
11/20/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201521 |
|
|
$81.45 |
000001089733-3562500061 |
2024 |
5 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
11/20/2023 |
0060 |
ENV STUDIES-ARCHAEOLOGY |
CA-XR111N1062331201521 |
|
|
$39.55 |
000001089733-3562500061 |
2024 |
5 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
11/20/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201521 |
|
|
$6.08 |
000001089733-3562500061 |
2024 |
5 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
11/20/2023 |
0060 |
ENV STUDIES-ARCHAEOLOGY |
CA-XR111N1062331201521 |
|
|
$349.97 |
000001089733-3562500061 |
2024 |
5 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
11/20/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201521 |
|
|
$53.89 |
000001089733-3562500061 |
2024 |
5 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
11/20/2023 |
0060 |
ENV STUDIES-ARCHAEOLOGY |
CA-XR111N1062331201521 |
|
|
$71.81 |
000001089733-3562500061 |
2024 |
5 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
11/20/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201521 |
|
|
$10.91 |
000001089733-3562500061 |
2024 |
5 |
FD52 |
07 |
E229 |
D |
1300201D |
034 |
11/14/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
IET-XE13A162523314009710 |
|
|
$5.60 |
|
2024 |
5 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
11/9/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR111N1062331201471 |
|
|
$454.81 |
000001079833-3562500061 |
2024 |
5 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
11/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201471 |
|
|
$73.07 |
000001079833-3562500061 |
2024 |
5 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
11/9/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR111N1062331201471 |
|
|
$30.17 |
000001079833-3562500061 |
2024 |
5 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
11/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201471 |
|
|
$4.84 |
000001079833-3562500061 |
2024 |
5 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
11/9/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR111N1062331201471 |
|
|
$300.90 |
000001079833-3562500061 |
2024 |
5 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
11/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201471 |
|
|
$48.35 |
000001079833-3562500061 |
2024 |
5 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
11/9/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR111N1062331201471 |
|
|
$103.40 |
000001079833-3562500061 |
2024 |
5 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
11/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201471 |
|
|
$16.46 |
000001079833-3562500061 |
2024 |
5 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
11/9/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR111N1062331201470 |
|
|
$3,074.47 |
000001079500-3562507204 |
2024 |
5 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
11/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201470 |
|
|
$135.48 |
000001079500-3562507204 |
2024 |
5 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
11/9/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR111N1062331201470 |
|
|
$216.41 |
000001079500-3562507204 |
2024 |
5 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
11/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201470 |
|
|
$9.54 |
000001079500-3562507204 |
2024 |
5 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
11/9/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR111N1062331201470 |
|
|
$2,034.39 |
000001079500-3562507204 |
2024 |
5 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
11/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201470 |
|
|
$89.65 |
000001079500-3562507204 |
2024 |
5 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
11/9/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR111N1062331201470 |
|
|
$756.32 |
000001079500-3562507204 |
2024 |
5 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
11/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111N1062331201470 |
|
|
$32.88 |
000001079500-3562507204 |
2024 |
4 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
10/30/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR102N1062329600408 |
|
|
$136.49 |
000001079833-3562500061 |
2024 |
4 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
10/30/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102N1062329600408 |
|
|
$28.74 |
000001079833-3562500061 |
2024 |
4 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
10/30/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR102N1062329600408 |
|
|
$9.25 |
000001079833-3562500061 |
2024 |
4 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
10/30/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102N1062329600408 |
|
|
$1.95 |
000001079833-3562500061 |
2024 |
4 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
10/30/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR102N1062329600408 |
|
|
$90.53 |
000001079833-3562500061 |
2024 |
4 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
10/30/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102N1062329600408 |
|
|
$19.01 |
000001079833-3562500061 |
2024 |
4 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
10/30/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR102N1062329600408 |
|
|
$31.11 |
000001079833-3562500061 |
2024 |
4 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
10/30/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102N1062329600408 |
|
|
$6.47 |
000001079833-3562500061 |
2024 |
4 |
FD52 |
00 |
E124 |
D |
1300201D |
034 |
10/30/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR102N1062329600408 |
|
|
$0.06 |
000001079833-3562500061 |
2024 |
4 |
FD52 |
00 |
E124 |
D |
1300201D |
034 |
10/30/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102N1062329600408 |
|
|
$0.01 |
000001079833-3562500061 |
2024 |
4 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
10/9/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR101N1062328009685 |
|
|
$1,543.01 |
000001079500-3562507204 |
2024 |
4 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
10/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101N1062328009685 |
|
|
$301.28 |
000001079500-3562507204 |
2024 |
4 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
10/9/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR101N1062328009685 |
|
|
$109.04 |
000001079500-3562507204 |
2024 |
4 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
10/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101N1062328009685 |
|
|
$21.29 |
000001079500-3562507204 |
2024 |
4 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
10/9/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR101N1062328009685 |
|
|
$1,021.02 |
000001079500-3562507204 |
2024 |
4 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
10/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101N1062328009685 |
|
|
$199.35 |
000001079500-3562507204 |
2024 |
4 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
10/9/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR101N1062328009685 |
|
|
$415.25 |
000001079500-3562507204 |
2024 |
4 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
10/9/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR101N1062328009686 |
|
|
$545.69 |
000001079833-3562500061 |
2024 |
4 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
10/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101N1062328009685 |
|
|
$80.37 |
000001079500-3562507204 |
2024 |
4 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
10/9/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR101N1062328009686 |
|
|
$36.21 |
000001079833-3562500061 |
2024 |
4 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
10/9/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR101N1062328009686 |
|
|
$361.08 |
000001079833-3562500061 |
2024 |
4 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
10/9/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR101N1062328009686 |
|
|
$123.91 |
000001079833-3562500061 |
2024 |
3 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
9/29/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR092N1062327208402 |
|
|
$237.68 |
000001079500-3562507204 |
2024 |
3 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
9/29/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR092N1062327208403 |
|
|
$496.21 |
000001079833-3562500061 |
2024 |
3 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208402 |
|
|
$55.16 |
000001079500-3562507204 |
2024 |
3 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208403 |
|
|
$200.09 |
000001079833-3562500061 |
2024 |
3 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
9/29/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR092N1062327208402 |
|
|
$16.80 |
000001079500-3562507204 |
2024 |
3 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
9/29/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR092N1062327208403 |
|
|
$33.66 |
000001079833-3562500061 |
2024 |
3 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208402 |
|
|
$3.92 |
000001079500-3562507204 |
2024 |
3 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208403 |
|
|
$13.57 |
000001079833-3562500061 |
2024 |
3 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
9/29/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR092N1062327208402 |
|
|
$157.12 |
000001079500-3562507204 |
2024 |
3 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
9/29/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR092N1062327208403 |
|
|
$328.26 |
000001079833-3562500061 |
2024 |
3 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208402 |
|
|
$36.50 |
000001079500-3562507204 |
2024 |
3 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208403 |
|
|
$132.40 |
000001079833-3562500061 |
2024 |
3 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
9/29/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR092N1062327208402 |
|
|
$63.94 |
000001079500-3562507204 |
2024 |
3 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
9/29/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR092N1062327208403 |
|
|
$113.02 |
000001079833-3562500061 |
2024 |
3 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208402 |
|
|
$14.71 |
000001079500-3562507204 |
2024 |
3 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208403 |
|
|
$45.07 |
000001079833-3562500061 |
2024 |
3 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
9/29/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR092N1062327208402 |
|
|
$0.08 |
000001079500-3562507204 |
2024 |
3 |
FD52 |
00 |
E124 |
D |
1300201D |
034 |
9/29/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR092N1062327208403 |
|
|
$0.18 |
000001079833-3562500061 |
2024 |
3 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208402 |
|
|
$0.02 |
000001079500-3562507204 |
2024 |
3 |
FD52 |
00 |
E124 |
D |
1300201D |
034 |
9/29/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062327208403 |
|
|
$0.07 |
000001079833-3562500061 |
2024 |
3 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
9/28/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR092N1062326507051 |
|
|
($237.68) |
000001079500-3562507204 |
2024 |
3 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
9/28/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR092N1062326507052 |
|
|
($496.21) |
000001079833-3562500061 |
2024 |
3 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
9/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507051 |
|
|
($55.16) |
000001079500-3562507204 |
2024 |
3 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
9/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507052 |
|
|
($200.09) |
000001079833-3562500061 |
2024 |
3 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
9/28/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR092N1062326507051 |
|
|
($16.80) |
000001079500-3562507204 |
2024 |
3 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
9/28/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR092N1062326507052 |
|
|
($33.66) |
000001079833-3562500061 |
2024 |
3 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
9/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507051 |
|
|
($3.92) |
000001079500-3562507204 |
2024 |
3 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
9/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507052 |
|
|
($13.57) |
000001079833-3562500061 |
2024 |
3 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
9/28/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR092N1062326507051 |
|
|
($157.12) |
000001079500-3562507204 |
2024 |
3 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
9/28/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR092N1062326507052 |
|
|
($328.26) |
000001079833-3562500061 |
2024 |
3 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
9/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507051 |
|
|
($36.50) |
000001079500-3562507204 |
2024 |
3 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
9/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507052 |
|
|
($132.40) |
000001079833-3562500061 |
2024 |
3 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
9/28/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR092N1062326507051 |
|
|
($63.94) |
000001079500-3562507204 |
2024 |
3 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
9/28/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR092N1062326507052 |
|
|
($113.02) |
000001079833-3562500061 |
2024 |
3 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
9/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507051 |
|
|
($14.71) |
000001079500-3562507204 |
2024 |
3 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
9/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507052 |
|
|
($45.07) |
000001079833-3562500061 |
2024 |
3 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
9/28/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR092N1062326507051 |
|
|
($0.08) |
000001079500-3562507204 |
2024 |
3 |
FD52 |
00 |
E124 |
D |
1300201D |
034 |
9/28/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR092N1062326507052 |
|
|
($0.18) |
000001079833-3562500061 |
2024 |
3 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
9/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507051 |
|
|
($0.02) |
000001079500-3562507204 |
2024 |
3 |
FD52 |
00 |
E124 |
D |
1300201D |
034 |
9/28/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507052 |
|
|
($0.07) |
000001079833-3562500061 |
2024 |
3 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
9/25/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR092N1062326507051 |
|
|
$237.68 |
000001079500-3562507204 |
2024 |
3 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
9/25/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR092N1062326507052 |
|
|
$496.21 |
000001079833-3562500061 |
2024 |
3 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
9/25/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507051 |
|
|
$55.16 |
000001079500-3562507204 |
2024 |
3 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
9/25/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507052 |
|
|
$200.09 |
000001079833-3562500061 |
2024 |
3 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
9/25/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR092N1062326507051 |
|
|
$16.80 |
000001079500-3562507204 |
2024 |
3 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
9/25/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR092N1062326507052 |
|
|
$33.66 |
000001079833-3562500061 |
2024 |
3 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
9/25/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507051 |
|
|
$3.92 |
000001079500-3562507204 |
2024 |
3 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
9/25/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507052 |
|
|
$13.57 |
000001079833-3562500061 |
2024 |
3 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
9/25/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR092N1062326507051 |
|
|
$157.12 |
000001079500-3562507204 |
2024 |
3 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
9/25/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR092N1062326507052 |
|
|
$328.26 |
000001079833-3562500061 |
2024 |
3 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
9/25/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507051 |
|
|
$36.50 |
000001079500-3562507204 |
2024 |
3 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
9/25/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507052 |
|
|
$132.40 |
000001079833-3562500061 |
2024 |
3 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
9/25/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR092N1062326507051 |
|
|
$63.94 |
000001079500-3562507204 |
2024 |
3 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
9/25/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR092N1062326507052 |
|
|
$113.02 |
000001079833-3562500061 |
2024 |
3 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
9/25/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507051 |
|
|
$14.71 |
000001079500-3562507204 |
2024 |
3 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
9/25/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507052 |
|
|
$45.07 |
000001079833-3562500061 |
2024 |
3 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
9/25/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR092N1062326507051 |
|
|
$0.08 |
000001079500-3562507204 |
2024 |
3 |
FD52 |
00 |
E124 |
D |
1300201D |
034 |
9/25/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR092N1062326507052 |
|
|
$0.18 |
000001079833-3562500061 |
2024 |
3 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
9/25/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507051 |
|
|
$0.02 |
000001079500-3562507204 |
2024 |
3 |
FD52 |
00 |
E124 |
D |
1300201D |
034 |
9/25/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092N1062326507052 |
|
|
$0.07 |
000001079833-3562500061 |
2024 |
2 |
FD52 |
07 |
E143 |
D |
1300201D |
034 |
8/9/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2400027028 |
PON22200001262 |
PALMER ENGINEERING CO |
$66,154.36 |
Fayette Co. 7-80150 |
2024 |
2 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
8/9/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR081N1062322003850 |
|
|
$2,973.29 |
000001079500-3562507204 |
2024 |
2 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
8/9/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR081N1062322003850 |
|
|
$213.20 |
000001079500-3562507204 |
2024 |
2 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
8/9/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR081N1062322003850 |
|
|
$1,967.43 |
000001079500-3562507204 |
2024 |
2 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
8/9/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR081N1062322003850 |
|
|
$511.14 |
000001079500-3562507204 |
2024 |
1 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
7/24/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR072N1062320202667 |
|
|
$2,722.56 |
000001079500-3562507204 |
2024 |
1 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
7/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072N1062320202667 |
|
|
$928.52 |
000001079500-3562507204 |
2024 |
1 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
7/24/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR072N1062320202667 |
|
|
$198.42 |
000001079500-3562507204 |
2024 |
1 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
7/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072N1062320202667 |
|
|
$67.76 |
000001079500-3562507204 |
2024 |
1 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
7/24/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR072N1062320202667 |
|
|
$1,801.54 |
000001079500-3562507204 |
2024 |
1 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
7/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072N1062320202667 |
|
|
$614.40 |
000001079500-3562507204 |
2024 |
1 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
7/24/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR072N1062320202667 |
|
|
$455.58 |
000001079500-3562507204 |
2024 |
1 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
7/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072N1062320202667 |
|
|
$149.50 |
000001079500-3562507204 |
2024 |
1 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
7/24/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR072N1062320202667 |
|
|
$0.65 |
000001079500-3562507204 |
2024 |
1 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
7/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072N1062320202667 |
|
|
$0.21 |
000001079500-3562507204 |
2024 |
1 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
7/11/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR071N1062319101538 |
|
|
$2,103.74 |
000001079500-3562507204 |
2024 |
1 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
7/11/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR071N1062319101538 |
|
|
$150.25 |
000001079500-3562507204 |
2024 |
1 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
7/11/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR071N1062319101538 |
|
|
$1,640.91 |
000001079500-3562507204 |
2024 |
1 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
7/11/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR071N1062319101538 |
|
|
$383.35 |
000001079500-3562507204 |
2023 |
12 |
FD52 |
07 |
E143 |
D |
1300201D |
034 |
6/19/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300247520 |
PON22200001262 |
PALMER ENGINEERING CO |
$30.00 |
Fayette Co. 7-80150 |
2023 |
11 |
FD52 |
07 |
E143 |
D |
1300201D |
034 |
5/25/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300226634 |
PON22200001262 |
PALMER ENGINEERING CO |
$27,137.35 |
Fayette Co. 7-80150 |
2023 |
11 |
FD52 |
07 |
E143 |
D |
1300201D |
034 |
5/25/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300226634 |
PON22200001262 |
PALMER ENGINEERING CO |
$5,336.88 |
Fayette Co. 7-80150 |
2023 |
11 |
FD52 |
07 |
E143 |
D |
1300201D |
034 |
5/24/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300226609 |
PON22200001262 |
PALMER ENGINEERING CO |
$10,583.50 |
Fayette Co. 7-80150 |
2023 |
11 |
FD52 |
07 |
E143 |
D |
1300201D |
034 |
5/10/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300216745 |
PON22200001262 |
PALMER ENGINEERING CO |
$12,727.79 |
Fayette Co. 7-80150 |
2023 |
10 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
4/24/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR042N1062311106924 |
|
|
$207.92 |
000001079500-3562507204 |
2023 |
10 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
4/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042N1062311106924 |
|
|
$32.71 |
000001079500-3562507204 |
2023 |
10 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
4/24/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR042N1062311106924 |
|
|
$14.75 |
000001079500-3562507204 |
2023 |
10 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
4/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042N1062311106924 |
|
|
$2.31 |
000001079500-3562507204 |
2023 |
10 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
4/24/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR042N1062311106924 |
|
|
$162.18 |
000001079500-3562507204 |
2023 |
10 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
4/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042N1062311106924 |
|
|
$25.51 |
000001079500-3562507204 |
2023 |
10 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
4/24/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR042N1062311106924 |
|
|
$46.75 |
000001079500-3562507204 |
2023 |
10 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
4/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042N1062311106924 |
|
|
$7.27 |
000001079500-3562507204 |
2023 |
10 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
4/24/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR042N1062311106924 |
|
|
$0.10 |
000001079500-3562507204 |
2023 |
10 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
4/24/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042N1062311106924 |
|
|
$0.02 |
000001079500-3562507204 |
2023 |
10 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
4/10/2023 |
0040 |
ENV STUDIES-AQUATIC ECOLOGY |
CA-XR041N1062309605804 |
|
|
$175.09 |
000001087111-3562500061 |
2023 |
10 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
4/10/2023 |
0040 |
ENV STUDIES-AQUATIC ECOLOGY |
CA-XR041N1062309605804 |
|
|
$12.31 |
000001087111-3562500061 |
2023 |
10 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
4/10/2023 |
0040 |
ENV STUDIES-AQUATIC ECOLOGY |
CA-XR041N1062309605804 |
|
|
$136.57 |
000001087111-3562500061 |
2023 |
10 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
4/10/2023 |
0040 |
ENV STUDIES-AQUATIC ECOLOGY |
CA-XR041N1062309605804 |
|
|
$62.91 |
000001087111-3562500061 |
2023 |
9 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
3/31/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR032N1062308304635 |
|
|
$318.75 |
000001079500-3562507204 |
2023 |
9 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
3/31/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR032N1062308304635 |
|
|
$23.00 |
000001079500-3562507204 |
2023 |
9 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
3/31/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR032N1062308304635 |
|
|
$248.63 |
000001079500-3562507204 |
2023 |
9 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
3/27/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR032N1062308304636 |
|
|
$63.89 |
000001079500-3562507204 |
2023 |
9 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
3/27/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR032N1062308304637 |
|
|
$273.78 |
000001079833-3562500061 |
2023 |
9 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
3/27/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032N1062308304637 |
|
|
$136.76 |
000001079833-3562500061 |
2023 |
9 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
3/27/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR032N1062308304637 |
|
|
$84.83 |
000001079833-3562500061 |
2023 |
9 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
3/27/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032N1062308304637 |
|
|
$41.85 |
000001079833-3562500061 |
2023 |
9 |
FD52 |
00 |
E124 |
D |
1300201D |
034 |
3/27/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR032N1062308304637 |
|
|
$0.14 |
000001079833-3562500061 |
2023 |
9 |
FD52 |
00 |
E124 |
D |
1300201D |
034 |
3/27/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032N1062308304637 |
|
|
$0.07 |
000001079833-3562500061 |
2023 |
9 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
3/27/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR032N1062308304636 |
|
|
$0.09 |
000001079500-3562507204 |
2023 |
9 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
3/27/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR032N1062308304637 |
|
|
$351.13 |
000001079833-3562500061 |
2023 |
9 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
3/27/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032N1062308304637 |
|
|
$175.33 |
000001079833-3562500061 |
2023 |
9 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
3/27/2023 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR032N1062308304637 |
|
|
$23.63 |
000001079833-3562500061 |
2023 |
9 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
3/27/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032N1062308304637 |
|
|
$11.80 |
000001079833-3562500061 |
2023 |
9 |
FD52 |
07 |
E143 |
D |
1300201D |
034 |
3/8/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300164488 |
PON22200001262 |
PALMER ENGINEERING CO |
$7,260.96 |
Fayette Co. 7-80150 |
2023 |
9 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
3/1/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR022N1062305302438 |
|
|
$68.99 |
000001079500-3562507204 |
2023 |
9 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
3/1/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022N1062305302438 |
|
|
$1.28 |
000001079500-3562507204 |
2023 |
9 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
3/1/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR022N1062305302438 |
|
|
$745.87 |
000001079500-3562507204 |
2023 |
9 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
3/1/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022N1062305302438 |
|
|
$13.92 |
000001079500-3562507204 |
2023 |
9 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
3/1/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR022N1062305302438 |
|
|
$191.70 |
000001079500-3562507204 |
2023 |
9 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
3/1/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022N1062305302438 |
|
|
$3.55 |
000001079500-3562507204 |
2023 |
9 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
3/1/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR022N1062305302438 |
|
|
$0.27 |
000001079500-3562507204 |
2023 |
9 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
3/1/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022N1062305302438 |
|
|
$0.01 |
000001079500-3562507204 |
2023 |
8 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
2/23/2023 |
0091 |
ENV STUDIES-ENV PROJ MGR (EPM) |
CA-XR022N1062305302457 |
|
|
$63.94 |
000001083802-3562500061 |
2023 |
8 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
2/23/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022N1062305302457 |
|
|
$5.91 |
000001083802-3562500061 |
2023 |
8 |
FD52 |
00 |
E124 |
D |
1300201D |
034 |
2/23/2023 |
0091 |
ENV STUDIES-ENV PROJ MGR (EPM) |
CA-XR022N1062305302457 |
|
|
$0.09 |
000001083802-3562500061 |
2023 |
8 |
FD52 |
00 |
E124 |
D |
1300201D |
034 |
2/23/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022N1062305302457 |
|
|
$0.01 |
000001083802-3562500061 |
2023 |
8 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
2/23/2023 |
0091 |
ENV STUDIES-ENV PROJ MGR (EPM) |
CA-XR022N1062305302456 |
|
|
$255.39 |
000001083802-3562500061 |
2023 |
8 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
2/23/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022N1062305302456 |
|
|
$23.83 |
000001083802-3562500061 |
2023 |
8 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
2/23/2023 |
0091 |
ENV STUDIES-ENV PROJ MGR (EPM) |
CA-XR022N1062305302456 |
|
|
$18.15 |
000001083802-3562500061 |
2023 |
8 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
2/23/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022N1062305302456 |
|
|
$1.71 |
000001083802-3562500061 |
2023 |
8 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
2/23/2023 |
0091 |
ENV STUDIES-ENV PROJ MGR (EPM) |
CA-XR022N1062305302456 |
|
|
$199.20 |
000001083802-3562500061 |
2023 |
8 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
2/23/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR022N1062305302437 |
|
|
$956.24 |
000001079500-3562507204 |
2023 |
8 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
2/23/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022N1062305302456 |
|
|
$18.58 |
000001083802-3562500061 |
2023 |
8 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
2/23/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022N1062305302437 |
|
|
$17.85 |
000001079500-3562507204 |
2023 |
8 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
2/9/2023 |
0091 |
ENV STUDIES-ENV PROJ MGR (EPM) |
CA-XR021N1062303901428 |
|
|
$234.21 |
000001083802-3562500061 |
2023 |
8 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
2/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021N1062303901428 |
|
|
$21.23 |
000001083802-3562500061 |
2023 |
8 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
2/9/2023 |
0091 |
ENV STUDIES-ENV PROJ MGR (EPM) |
CA-XR021N1062303901428 |
|
|
$16.35 |
000001083802-3562500061 |
2023 |
8 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
2/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021N1062303901428 |
|
|
$1.48 |
000001083802-3562500061 |
2023 |
8 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
2/9/2023 |
0091 |
ENV STUDIES-ENV PROJ MGR (EPM) |
CA-XR021N1062303901428 |
|
|
$183.09 |
000001083802-3562500061 |
2023 |
8 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
2/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021N1062303901428 |
|
|
$16.56 |
000001083802-3562500061 |
2023 |
8 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
2/9/2023 |
0091 |
ENV STUDIES-ENV PROJ MGR (EPM) |
CA-XR021N1062303901428 |
|
|
$58.74 |
000001083802-3562500061 |
2023 |
8 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
2/9/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021N1062303901428 |
|
|
$5.27 |
000001083802-3562500061 |
2023 |
8 |
FD52 |
07 |
E143 |
D |
1300201D |
034 |
2/2/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300140904 |
PON22200001262 |
PALMER ENGINEERING CO |
$42,502.75 |
Agreement No. 2022-01-03 |
2023 |
8 |
FD52 |
07 |
E143 |
D |
1300201D |
034 |
2/2/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300141619 |
PON22200001262 |
PALMER ENGINEERING CO |
$52,191.56 |
Agreement No. 2022-01-03 |
2023 |
8 |
FD52 |
07 |
E143 |
D |
1300201D |
034 |
2/2/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300141574 |
PON22200001262 |
PALMER ENGINEERING CO |
$75,744.78 |
Agreement No: 2022-01-3 |
2023 |
7 |
FD52 |
07 |
E143 |
D |
1300201D |
034 |
1/24/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300120455 |
PON22200001262 |
PALMER ENGINEERING CO |
$20,098.60 |
Agreement No. 2022-01-03 |
2023 |
7 |
FD52 |
07 |
E143 |
D |
1300201D |
034 |
1/24/2023 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300129627 |
PON22200001262 |
PALMER ENGINEERING CO |
$141,089.03 |
Agreement No. 2022-01-3 |
2023 |
7 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
1/12/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR011N1062300610245 |
|
|
$342.78 |
000001079500-3562507204 |
2023 |
7 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
1/12/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011N1062300610245 |
|
|
$285.65 |
000001079500-3562507204 |
2023 |
7 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
1/12/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR011N1062300610245 |
|
|
$23.45 |
000001079500-3562507204 |
2023 |
7 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
1/12/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011N1062300610245 |
|
|
$19.54 |
000001079500-3562507204 |
2023 |
7 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
1/12/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR011N1062300610245 |
|
|
$267.37 |
000001079500-3562507204 |
2023 |
7 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
1/12/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011N1062300610245 |
|
|
$222.80 |
000001079500-3562507204 |
2023 |
7 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
1/12/2023 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR011N1062300610245 |
|
|
$128.56 |
000001079500-3562507204 |
2023 |
7 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
1/12/2023 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011N1062300610245 |
|
|
$105.71 |
000001079500-3562507204 |
2023 |
6 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
12/12/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR121M1062234208203 |
|
|
$1,860.50 |
000001079500-3562507204 |
2023 |
6 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
12/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121M1062234208203 |
|
|
$1,063.13 |
000001079500-3562507204 |
2023 |
6 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
12/12/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR121M1062234208203 |
|
|
$126.78 |
000001079500-3562507204 |
2023 |
6 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
12/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121M1062234208203 |
|
|
$72.45 |
000001079500-3562507204 |
2023 |
6 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
12/12/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR121M1062234208203 |
|
|
$1,451.19 |
000001079500-3562507204 |
2023 |
6 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
12/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121M1062234208203 |
|
|
$829.24 |
000001079500-3562507204 |
2023 |
6 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
12/12/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR121M1062234208203 |
|
|
$291.25 |
000001079500-3562507204 |
2023 |
6 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
12/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121M1062234208203 |
|
|
$163.52 |
000001079500-3562507204 |
2023 |
5 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
11/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112M1062232607143 |
|
|
$103.56 |
000001079500-3562507204 |
2023 |
5 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
11/23/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR112M1062232607143 |
|
|
$0.77 |
000001079500-3562507204 |
2023 |
5 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
11/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112M1062232607143 |
|
|
$0.23 |
000001079500-3562507204 |
2023 |
5 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
11/23/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR112M1062232607142 |
|
|
$412.44 |
000001079499-3562500061 |
2023 |
5 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
11/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112M1062232607142 |
|
|
$123.16 |
000001079499-3562500061 |
2023 |
5 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
11/23/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR112M1062232607142 |
|
|
$28.78 |
000001079499-3562500061 |
2023 |
5 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
11/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112M1062232607142 |
|
|
$8.58 |
000001079499-3562500061 |
2023 |
5 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
11/23/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR112M1062232607142 |
|
|
$321.65 |
000001079499-3562500061 |
2023 |
5 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
11/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112M1062232607142 |
|
|
$96.05 |
000001079499-3562500061 |
2023 |
5 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
11/23/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR112M1062232607142 |
|
|
$112.57 |
000001079499-3562500061 |
2023 |
5 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
11/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112M1062232607142 |
|
|
$33.26 |
000001079499-3562500061 |
2023 |
5 |
FD52 |
00 |
E124 |
D |
1300201D |
034 |
11/23/2022 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR112M1062232607142 |
|
|
$0.18 |
000001079499-3562500061 |
2023 |
5 |
FD52 |
00 |
E124 |
D |
1300201D |
034 |
11/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112M1062232607142 |
|
|
$0.05 |
000001079499-3562500061 |
2023 |
5 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
11/23/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR112M1062232607142 |
|
|
$2,250.32 |
000001079500-3562507204 |
2023 |
5 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
11/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112M1062232607142 |
|
|
$673.31 |
000001079500-3562507204 |
2023 |
5 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
11/23/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR112M1062232607142 |
|
|
$155.85 |
000001079500-3562507204 |
2023 |
5 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
11/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112M1062232607142 |
|
|
$46.64 |
000001079500-3562507204 |
2023 |
5 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
11/23/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR112M1062232607142 |
|
|
$1,755.25 |
000001079500-3562507204 |
2023 |
5 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
11/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR112M1062232607142 |
|
|
$525.18 |
000001079500-3562507204 |
2023 |
5 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
11/23/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR112M1062232607142 |
|
|
$351.21 |
000001079500-3562507204 |
2023 |
5 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
11/14/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR111M1062230806149 |
|
|
$2,445.03 |
000001079500-3562507204 |
2023 |
5 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
11/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111M1062230806149 |
|
|
$286.15 |
000001079500-3562507204 |
2023 |
5 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
11/14/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR111M1062230806149 |
|
|
$167.51 |
000001079500-3562507204 |
2023 |
5 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
11/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111M1062230806149 |
|
|
$19.71 |
000001079500-3562507204 |
2023 |
5 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
11/14/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR111M1062230806149 |
|
|
$1,907.11 |
000001079500-3562507204 |
2023 |
5 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
11/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111M1062230806149 |
|
|
$223.20 |
000001079500-3562507204 |
2023 |
5 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
11/14/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR111M1062230806149 |
|
|
$387.37 |
000001079500-3562507204 |
2023 |
5 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
11/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111M1062230806149 |
|
|
$45.54 |
000001079500-3562507204 |
2023 |
4 |
FD52 |
07 |
E116 |
D |
1300201D |
034 |
10/24/2022 |
3040 |
INSPECTION&SUPER-UTILITIES |
CA-XR102M1062229405060 |
|
|
$21.38 |
000001083334-3562511304 |
2023 |
4 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
10/24/2022 |
3040 |
INSPECTION&SUPER-UTILITIES |
CA-XR102M1062229405060 |
|
|
$1.60 |
000001083334-3562511304 |
2023 |
4 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
10/24/2022 |
3040 |
INSPECTION&SUPER-UTILITIES |
CA-XR102M1062229405060 |
|
|
$16.68 |
000001083334-3562511304 |
2023 |
4 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
10/24/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR102M1062229405041 |
|
|
$2,104.80 |
000001079500-3562507204 |
2023 |
4 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
10/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102M1062229405041 |
|
|
$440.88 |
000001079500-3562507204 |
2023 |
4 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
10/24/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR102M1062229405041 |
|
|
$146.76 |
000001079500-3562507204 |
2023 |
4 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
10/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102M1062229405041 |
|
|
$30.54 |
000001079500-3562507204 |
2023 |
4 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
10/24/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR102M1062229405041 |
|
|
$1,641.74 |
000001079500-3562507204 |
2023 |
4 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
10/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102M1062229405041 |
|
|
$343.88 |
000001079500-3562507204 |
2023 |
4 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
10/24/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR102M1062229405041 |
|
|
$335.38 |
000001079500-3562507204 |
2023 |
4 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
10/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102M1062229405041 |
|
|
$67.86 |
000001079500-3562507204 |
2023 |
4 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
10/24/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR102M1062229405041 |
|
|
$0.70 |
000001079500-3562507204 |
2023 |
4 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
10/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102M1062229405041 |
|
|
$0.15 |
000001079500-3562507204 |
2023 |
4 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
10/17/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR101M1062228003931 |
|
|
$3,049.35 |
000001079500-3562507204 |
2023 |
4 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
10/17/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101M1062228003931 |
|
|
$456.87 |
000001079500-3562507204 |
2023 |
4 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
10/17/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR101M1062228003931 |
|
|
$216.39 |
000001079500-3562507204 |
2023 |
4 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
10/17/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101M1062228003931 |
|
|
$32.43 |
000001079500-3562507204 |
2023 |
4 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
10/17/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR101M1062228003931 |
|
|
$2,378.49 |
000001079500-3562507204 |
2023 |
4 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
10/17/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101M1062228003931 |
|
|
$356.36 |
000001079500-3562507204 |
2023 |
4 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
10/17/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR101M1062228003931 |
|
|
$537.80 |
000001079500-3562507204 |
2023 |
4 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
10/17/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101M1062228003931 |
|
|
$79.81 |
000001079500-3562507204 |
2023 |
3 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
9/26/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR092M1062226602761 |
|
|
$2,160.70 |
000001079500-3562507204 |
2023 |
3 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
9/26/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092M1062226602761 |
|
|
$450.96 |
000001079500-3562507204 |
2023 |
3 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
9/26/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR092M1062226602761 |
|
|
$151.36 |
000001079500-3562507204 |
2023 |
3 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
9/26/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092M1062226602761 |
|
|
$31.75 |
000001079500-3562507204 |
2023 |
3 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
9/26/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR092M1062226602761 |
|
|
$1,685.41 |
000001079500-3562507204 |
2023 |
3 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
9/26/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092M1062226602761 |
|
|
$351.75 |
000001079500-3562507204 |
2023 |
3 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
9/26/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR092M1062226602761 |
|
|
$398.37 |
000001079500-3562507204 |
2023 |
3 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
9/26/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092M1062226602761 |
|
|
$81.58 |
000001079500-3562507204 |
2023 |
3 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
9/26/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR092M1062226602761 |
|
|
$0.72 |
000001079500-3562507204 |
2023 |
3 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
9/26/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092M1062226602761 |
|
|
$0.15 |
000001079500-3562507204 |
2023 |
3 |
FD52 |
07 |
E143 |
D |
1300201D |
034 |
9/23/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300030949 |
PON22200001262 |
PALMER ENGINEERING CO |
$26,363.67 |
Agreement No. 2022-01-3- |
2023 |
3 |
FD52 |
07 |
E143 |
D |
1300201D |
034 |
9/23/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300030949 |
PON22200001262 |
PALMER ENGINEERING CO |
$5,979.00 |
Agreement No. 2022-01-03/DBE- |
2023 |
3 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
9/12/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR091M1062225101614 |
|
|
$2,921.85 |
000001079500-3562507204 |
2023 |
3 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
9/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091M1062225101614 |
|
|
$584.37 |
000001079500-3562507204 |
2023 |
3 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
9/12/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR091M1062225101614 |
|
|
$207.35 |
000001079500-3562507204 |
2023 |
3 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
9/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091M1062225101614 |
|
|
$41.47 |
000001079500-3562507204 |
2023 |
3 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
9/12/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR091M1062225101614 |
|
|
$2,279.04 |
000001079500-3562507204 |
2023 |
3 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
9/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091M1062225101614 |
|
|
$455.81 |
000001079500-3562507204 |
2023 |
3 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
9/12/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR091M1062225101614 |
|
|
$515.52 |
000001079500-3562507204 |
2023 |
3 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
9/12/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091M1062225101614 |
|
|
$102.09 |
000001079500-3562507204 |
2023 |
2 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
8/24/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR082M1062223500425 |
|
|
$498.66 |
000001079833-3562500061 |
2023 |
2 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
8/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500425 |
|
|
$101.96 |
000001079833-3562500061 |
2023 |
2 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
8/24/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR082M1062223500425 |
|
|
$139.88 |
000001079833-3562500061 |
2023 |
2 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
8/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500425 |
|
|
$28.28 |
000001079833-3562500061 |
2023 |
2 |
FD52 |
00 |
E124 |
D |
1300201D |
034 |
8/24/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR082M1062223500425 |
|
|
$0.26 |
000001079833-3562500061 |
2023 |
2 |
FD52 |
00 |
E124 |
D |
1300201D |
034 |
8/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500425 |
|
|
$0.05 |
000001079833-3562500061 |
2023 |
2 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
8/24/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR082M1062223500423 |
|
|
$3,187.47 |
000001079500-3562507204 |
2023 |
2 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
8/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500423 |
|
|
$318.75 |
000001079500-3562507204 |
2023 |
2 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
8/24/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR082M1062223500423 |
|
|
$229.97 |
000001079500-3562507204 |
2023 |
2 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
8/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500423 |
|
|
$23.00 |
000001079500-3562507204 |
2023 |
2 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
8/24/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR082M1062223500423 |
|
|
$2,486.22 |
000001079500-3562507204 |
2023 |
2 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
8/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500423 |
|
|
$248.63 |
000001079500-3562507204 |
2023 |
2 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
8/24/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR082M1062223500423 |
|
|
$561.93 |
000001079500-3562507204 |
2023 |
2 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
8/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500423 |
|
|
$55.68 |
000001079500-3562507204 |
2023 |
2 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
8/24/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR082M1062223500423 |
|
|
$0.91 |
000001079500-3562507204 |
2023 |
2 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
8/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500423 |
|
|
$0.09 |
000001079500-3562507204 |
2023 |
2 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
8/24/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR082M1062223500425 |
|
|
$639.53 |
000001079833-3562500061 |
2023 |
2 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
8/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500425 |
|
|
$130.73 |
000001079833-3562500061 |
2023 |
2 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
8/24/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR082M1062223500425 |
|
|
$44.12 |
000001079833-3562500061 |
2023 |
2 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
8/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082M1062223500425 |
|
|
$9.02 |
000001079833-3562500061 |
2023 |
2 |
FD52 |
07 |
E143 |
D |
1300201D |
034 |
8/15/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300027480 |
PON22200001262 |
PALMER ENGINEERING CO |
$55,019.45 |
Agreement No. 2022-01-03 |
2023 |
2 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
8/10/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR081M1062222110112 |
|
|
$701.25 |
000001079500-3562507204 |
2023 |
2 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
8/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081M1062222110112 |
|
|
$2,804.97 |
000001079500-3562507204 |
2023 |
2 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
8/10/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR081M1062222110112 |
|
|
$49.76 |
000001079500-3562507204 |
2023 |
2 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
8/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081M1062222110112 |
|
|
$199.06 |
000001079500-3562507204 |
2023 |
2 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
8/10/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR081M1062222110112 |
|
|
$546.98 |
000001079500-3562507204 |
2023 |
2 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
8/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081M1062222110112 |
|
|
$2,187.87 |
000001079500-3562507204 |
2023 |
2 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
8/10/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR081M1062222110112 |
|
|
$127.60 |
000001079500-3562507204 |
2023 |
2 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
8/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081M1062222110112 |
|
|
$490.01 |
000001079500-3562507204 |
2023 |
2 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
8/10/2022 |
0091 |
ENV STUDIES-ENV PROJ MGR (EPM) |
CA-XR081M1062222110138 |
|
|
$280.93 |
000001083802-3562500061 |
2023 |
2 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
8/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081M1062222110138 |
|
|
$280.93 |
000001083802-3562500061 |
2023 |
2 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
8/10/2022 |
0091 |
ENV STUDIES-ENV PROJ MGR (EPM) |
CA-XR081M1062222110138 |
|
|
$19.63 |
000001083802-3562500061 |
2023 |
2 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
8/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081M1062222110138 |
|
|
$19.63 |
000001083802-3562500061 |
2023 |
2 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
8/10/2022 |
0091 |
ENV STUDIES-ENV PROJ MGR (EPM) |
CA-XR081M1062222110138 |
|
|
$219.13 |
000001083802-3562500061 |
2023 |
2 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
8/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081M1062222110138 |
|
|
$219.13 |
000001083802-3562500061 |
2023 |
2 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
8/10/2022 |
0091 |
ENV STUDIES-ENV PROJ MGR (EPM) |
CA-XR081M1062222110138 |
|
|
$62.27 |
000001083802-3562500061 |
2023 |
2 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
8/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR081M1062222110138 |
|
|
$61.25 |
000001083802-3562500061 |
2023 |
1 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
7/25/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR072M1062220309012 |
|
|
$101.40 |
000001083288-3562500630 |
2023 |
1 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220309012 |
|
|
$91.35 |
000001083288-3562500630 |
2023 |
1 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
7/25/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR072M1062220309012 |
|
|
$7.21 |
000001083288-3562500630 |
2023 |
1 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
7/25/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR072M1062220308984 |
|
|
$1,463.88 |
000001079500-3562507204 |
2023 |
1 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220309012 |
|
|
$6.50 |
000001083288-3562500630 |
2023 |
1 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308984 |
|
|
$1,601.06 |
000001079500-3562507204 |
2023 |
1 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
7/25/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR072M1062220309012 |
|
|
$79.18 |
000001083288-3562500630 |
2023 |
1 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
7/25/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR072M1062220308984 |
|
|
$106.35 |
000001079500-3562507204 |
2023 |
1 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220309012 |
|
|
$71.26 |
000001083288-3562500630 |
2023 |
1 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308984 |
|
|
$115.79 |
000001079500-3562507204 |
2023 |
1 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
7/25/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR072M1062220309012 |
|
|
$22.62 |
000001083288-3562500630 |
2023 |
1 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
7/25/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR072M1062220308984 |
|
|
$1,141.91 |
000001079500-3562507204 |
2023 |
1 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220309012 |
|
|
$20.05 |
000001083288-3562500630 |
2023 |
1 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308984 |
|
|
$1,248.83 |
000001079500-3562507204 |
2023 |
1 |
FD52 |
00 |
E124 |
D |
1300201D |
034 |
7/25/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR072M1062220309012 |
|
|
$0.04 |
000001083288-3562500630 |
2023 |
1 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
7/25/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR072M1062220308984 |
|
|
$258.96 |
000001079500-3562507204 |
2023 |
1 |
FD52 |
00 |
E124 |
D |
1300201D |
034 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220309012 |
|
|
$0.03 |
000001083288-3562500630 |
2023 |
1 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308984 |
|
|
$279.13 |
000001079500-3562507204 |
2023 |
1 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
7/25/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR072M1062220308984 |
|
|
$0.46 |
000001079500-3562507204 |
2023 |
1 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308984 |
|
|
$0.46 |
000001079500-3562507204 |
2023 |
1 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
7/25/2022 |
3020 |
PREL ENGINEERING-UTILITIES |
CA-XR072M1062220308996 |
|
|
$242.75 |
000001081951-3562507208 |
2023 |
1 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308996 |
|
|
$76.38 |
000001081951-3562507208 |
2023 |
1 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
7/25/2022 |
3020 |
PREL ENGINEERING-UTILITIES |
CA-XR072M1062220308996 |
|
|
$18.17 |
000001081951-3562507208 |
2023 |
1 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308996 |
|
|
$5.72 |
000001081951-3562507208 |
2023 |
1 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
7/25/2022 |
3020 |
PREL ENGINEERING-UTILITIES |
CA-XR072M1062220308996 |
|
|
$189.34 |
000001081951-3562507208 |
2023 |
1 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308996 |
|
|
$59.57 |
000001081951-3562507208 |
2023 |
1 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
7/25/2022 |
3020 |
PREL ENGINEERING-UTILITIES |
CA-XR072M1062220308996 |
|
|
$32.28 |
000001081951-3562507208 |
2023 |
1 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308996 |
|
|
$9.97 |
000001081951-3562507208 |
2023 |
1 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
7/25/2022 |
3020 |
PREL ENGINEERING-UTILITIES |
CA-XR072M1062220308996 |
|
|
$0.09 |
000001081951-3562507208 |
2023 |
1 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220308996 |
|
|
$0.03 |
000001081951-3562507208 |
2023 |
1 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
7/25/2022 |
0091 |
ENV STUDIES-ENV PROJ MGR (EPM) |
CA-XR072M1062220309027 |
|
|
$255.39 |
000001083802-3562500061 |
2023 |
1 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220309027 |
|
|
$25.54 |
000001083802-3562500061 |
2023 |
1 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
7/25/2022 |
0091 |
ENV STUDIES-ENV PROJ MGR (EPM) |
CA-XR072M1062220309027 |
|
|
$18.15 |
000001083802-3562500061 |
2023 |
1 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220309027 |
|
|
$1.81 |
000001083802-3562500061 |
2023 |
1 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
7/25/2022 |
0091 |
ENV STUDIES-ENV PROJ MGR (EPM) |
CA-XR072M1062220309027 |
|
|
$199.21 |
000001083802-3562500061 |
2023 |
1 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220309027 |
|
|
$19.92 |
000001083802-3562500061 |
2023 |
1 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
7/25/2022 |
0091 |
ENV STUDIES-ENV PROJ MGR (EPM) |
CA-XR072M1062220309027 |
|
|
$56.16 |
000001083802-3562500061 |
2023 |
1 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220309027 |
|
|
$5.57 |
000001083802-3562500061 |
2023 |
1 |
FD52 |
00 |
E124 |
D |
1300201D |
034 |
7/25/2022 |
0091 |
ENV STUDIES-ENV PROJ MGR (EPM) |
CA-XR072M1062220309027 |
|
|
$0.09 |
000001083802-3562500061 |
2023 |
1 |
FD52 |
00 |
E124 |
D |
1300201D |
034 |
7/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR072M1062220309027 |
|
|
$0.01 |
000001083802-3562500061 |
2023 |
1 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
7/13/2022 |
3040 |
INSPECTION&SUPER-UTILITIES |
CA-XR071M1062219207897 |
|
|
$74.92 |
000001083334-3562507208 |
2023 |
1 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
7/13/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207897 |
|
|
$17.08 |
000001083334-3562507208 |
2023 |
1 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
7/13/2022 |
3040 |
INSPECTION&SUPER-UTILITIES |
CA-XR071M1062219207897 |
|
|
$5.60 |
000001083334-3562507208 |
2023 |
1 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
7/13/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207897 |
|
|
$1.27 |
000001083334-3562507208 |
2023 |
1 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
7/13/2022 |
3040 |
INSPECTION&SUPER-UTILITIES |
CA-XR071M1062219207897 |
|
|
$62.91 |
000001083334-3562507208 |
2023 |
1 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
7/13/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207897 |
|
|
$14.34 |
000001083334-3562507208 |
2023 |
1 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
7/13/2022 |
3040 |
INSPECTION&SUPER-UTILITIES |
CA-XR071M1062219207897 |
|
|
$10.75 |
000001083334-3562507208 |
2023 |
1 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
7/13/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR071M1062219207897 |
|
|
$2.41 |
000001083334-3562507208 |
2023 |
1 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
7/12/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR071M1062219207869 |
|
|
$1,925.18 |
000001079500-3562507204 |
2023 |
1 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
7/12/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR071M1062219207869 |
|
|
$144.76 |
000001079500-3562507204 |
2023 |
1 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
7/12/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR071M1062219207869 |
|
|
$1,616.57 |
000001079500-3562507204 |
2023 |
1 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
7/12/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR071M1062219207869 |
|
|
$351.70 |
000001079500-3562507204 |
2023 |
1 |
FD52 |
07 |
E143 |
D |
1300201D |
034 |
7/8/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300005073 |
PON22200001262 |
PALMER ENGINEERING CO |
$52,207.81 |
Agreement No. 2022-01-03- |
2023 |
1 |
FD52 |
07 |
E143 |
D |
1300201D |
034 |
7/8/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2300005073 |
PON22200001262 |
PALMER ENGINEERING CO |
$11,958.00 |
Agreement No. 2022-01-03/DBE- |
2022 |
12 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
6/27/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR062M1062217506797 |
|
|
$45.09 |
000001083288-3562500630 |
2022 |
12 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506797 |
|
|
$20.49 |
000001083288-3562500630 |
2022 |
12 |
FD52 |
00 |
E124 |
D |
1300201D |
034 |
6/27/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR062M1062217506797 |
|
|
$0.07 |
000001083288-3562500630 |
2022 |
12 |
FD52 |
00 |
E124 |
D |
1300201D |
034 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506797 |
|
|
$0.03 |
000001083288-3562500630 |
2022 |
12 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
6/27/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR062M1062217506797 |
|
|
$187.98 |
000001083288-3562500630 |
2022 |
12 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506797 |
|
|
$86.47 |
000001083288-3562500630 |
2022 |
12 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
6/27/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR062M1062217506797 |
|
|
$13.26 |
000001083288-3562500630 |
2022 |
12 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
6/27/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR062M1062217506760 |
|
|
$1,017.36 |
000001079500-3562507204 |
2022 |
12 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506760 |
|
|
$324.59 |
000001079500-3562507204 |
2022 |
12 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
6/27/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR062M1062217506760 |
|
|
$73.67 |
000001079500-3562507204 |
2022 |
12 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506797 |
|
|
$6.11 |
000001083288-3562500630 |
2022 |
12 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506760 |
|
|
$23.71 |
000001079500-3562507204 |
2022 |
12 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
6/27/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR062M1062217506760 |
|
|
$854.18 |
000001079500-3562507204 |
2022 |
12 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506760 |
|
|
$272.56 |
000001079500-3562507204 |
2022 |
12 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
6/27/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR062M1062217506760 |
|
|
$179.37 |
000001079500-3562507204 |
2022 |
12 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506760 |
|
|
$56.66 |
000001079500-3562507204 |
2022 |
12 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
6/27/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR062M1062217506760 |
|
|
$0.47 |
000001079500-3562507204 |
2022 |
12 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506760 |
|
|
$0.15 |
000001079500-3562507204 |
2022 |
12 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
6/27/2022 |
1050 |
RDWAY PLANS-FINAL-PLANS & PROF |
CA-XR062M1062217506797 |
|
|
$157.85 |
000001083288-3562500630 |
2022 |
12 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
6/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR062M1062217506797 |
|
|
$72.61 |
000001083288-3562500630 |
2022 |
12 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
6/13/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR061M1062215905717 |
|
|
$291.40 |
000001079833-3562500061 |
2022 |
12 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
6/13/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905717 |
|
|
$42.64 |
000001079833-3562500061 |
2022 |
12 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
6/13/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR061M1062215905717 |
|
|
$19.43 |
000001079833-3562500061 |
2022 |
12 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
6/13/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905717 |
|
|
$2.84 |
000001079833-3562500061 |
2022 |
12 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
6/13/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR061M1062215905717 |
|
|
$244.60 |
000001079833-3562500061 |
2022 |
12 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
6/13/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905717 |
|
|
$35.80 |
000001079833-3562500061 |
2022 |
12 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
6/13/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR061M1062215905717 |
|
|
$68.79 |
000001079833-3562500061 |
2022 |
12 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
6/13/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905717 |
|
|
$9.97 |
000001079833-3562500061 |
2022 |
12 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
6/9/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR061M1062215905715 |
|
|
$1,545.84 |
000001079500-3562507204 |
2022 |
12 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
6/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905715 |
|
|
$515.17 |
000001079500-3562507204 |
2022 |
12 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
6/9/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR061M1062215905715 |
|
|
$101.45 |
000001079500-3562507204 |
2022 |
12 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
6/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905715 |
|
|
$33.41 |
000001079500-3562507204 |
2022 |
12 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
6/9/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR061M1062215905715 |
|
|
$1,298.05 |
000001079500-3562507204 |
2022 |
12 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
6/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905715 |
|
|
$432.59 |
000001079500-3562507204 |
2022 |
12 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
6/9/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR061M1062215905715 |
|
|
$297.14 |
000001079500-3562507204 |
2022 |
12 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
6/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR061M1062215905715 |
|
|
$102.54 |
000001079500-3562507204 |
2022 |
11 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004667 |
|
|
$410.90 |
000001079500-3562507204 |
2022 |
11 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
5/23/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR052M1062214004667 |
|
|
$313.14 |
000001079500-3562507204 |
2022 |
11 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004667 |
|
|
$28.75 |
000001079500-3562507204 |
2022 |
11 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
5/23/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR052M1062214004667 |
|
|
$3,827.57 |
000001079500-3562507204 |
2022 |
11 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004667 |
|
|
$345.03 |
000001079500-3562507204 |
2022 |
11 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
5/23/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR052M1062214004667 |
|
|
$920.89 |
000001079500-3562507204 |
2022 |
11 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004667 |
|
|
$80.22 |
000001079500-3562507204 |
2022 |
11 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
5/23/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR052M1062214004667 |
|
|
$1.76 |
000001079500-3562507204 |
2022 |
11 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004667 |
|
|
$0.14 |
000001079500-3562507204 |
2022 |
11 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
5/23/2022 |
3020 |
PREL ENGINEERING-UTILITIES |
CA-XR052M1062214004681 |
|
|
$49.46 |
000001081951-3562507208 |
2022 |
11 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004681 |
|
|
$3.96 |
000001081951-3562507208 |
2022 |
11 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
5/23/2022 |
3020 |
PREL ENGINEERING-UTILITIES |
CA-XR052M1062214004681 |
|
|
$3.70 |
000001081951-3562507208 |
2022 |
11 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004681 |
|
|
$0.30 |
000001081951-3562507208 |
2022 |
11 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
5/23/2022 |
3020 |
PREL ENGINEERING-UTILITIES |
CA-XR052M1062214004681 |
|
|
$41.52 |
000001081951-3562507208 |
2022 |
11 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004681 |
|
|
$3.33 |
000001081951-3562507208 |
2022 |
11 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
5/23/2022 |
3020 |
PREL ENGINEERING-UTILITIES |
CA-XR052M1062214004681 |
|
|
$7.08 |
000001081951-3562507208 |
2022 |
11 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004681 |
|
|
$0.56 |
000001081951-3562507208 |
2022 |
11 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
5/23/2022 |
3020 |
PREL ENGINEERING-UTILITIES |
CA-XR052M1062214004681 |
|
|
$0.02 |
000001081951-3562507208 |
2022 |
11 |
FD52 |
00 |
E111 |
D |
1300201D |
032 |
5/23/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR052M1062214004706 |
|
|
$476.67 |
000001082993-3562500061 |
2022 |
11 |
FD52 |
00 |
E111 |
D |
1300201D |
032 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004706 |
|
|
$179.22 |
000001082993-3562500061 |
2022 |
11 |
FD52 |
00 |
E121 |
D |
1300201D |
032 |
5/23/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR052M1062214004706 |
|
|
$32.59 |
000001082993-3562500061 |
2022 |
11 |
FD52 |
00 |
E121 |
D |
1300201D |
032 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004706 |
|
|
$12.25 |
000001082993-3562500061 |
2022 |
11 |
FD52 |
00 |
E122 |
D |
1300201D |
032 |
5/23/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR052M1062214004706 |
|
|
$400.26 |
000001082993-3562500061 |
2022 |
11 |
FD52 |
00 |
E122 |
D |
1300201D |
032 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004706 |
|
|
$150.49 |
000001082993-3562500061 |
2022 |
11 |
FD52 |
00 |
E123 |
D |
1300201D |
032 |
5/23/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR052M1062214004706 |
|
|
$112.80 |
000001082993-3562500061 |
2022 |
11 |
FD52 |
00 |
E123 |
D |
1300201D |
032 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004706 |
|
|
$41.89 |
000001082993-3562500061 |
2022 |
11 |
FD52 |
00 |
E124 |
D |
1300201D |
032 |
5/23/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR052M1062214004706 |
|
|
$0.20 |
000001082993-3562500061 |
2022 |
11 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
5/23/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR052M1062214004667 |
|
|
$4,558.25 |
000001079500-3562507204 |
2022 |
11 |
FD52 |
00 |
E124 |
D |
1300201D |
032 |
5/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR052M1062214004706 |
|
|
$0.08 |
000001082993-3562500061 |
2022 |
11 |
FD52 |
07 |
E143 |
D |
1300201D |
034 |
5/20/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200210422 |
PON22200001262 |
PALMER ENGINEERING CO |
$84,920.01 |
Agreement No. 2022-01-3 |
2022 |
11 |
FD52 |
07 |
E143 |
D |
1300201D |
034 |
5/20/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200210422 |
PON22200001262 |
PALMER ENGINEERING CO |
$2,223.70 |
Agreement #2022-01-3/DBE |
2022 |
11 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
5/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603651 |
|
|
$237.10 |
000001079500-3562507204 |
2022 |
11 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
5/9/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR051M1062212603651 |
|
|
$984.09 |
000001079500-3562507204 |
2022 |
11 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
5/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603651 |
|
|
$62.11 |
000001079500-3562507204 |
2022 |
11 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
5/9/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR051M1062212603651 |
|
|
$4,889.31 |
000001079500-3562507204 |
2022 |
11 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
5/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603651 |
|
|
$282.37 |
000001079500-3562507204 |
2022 |
11 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
5/9/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR051M1062212603651 |
|
|
$336.86 |
000001079500-3562507204 |
2022 |
11 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
5/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR051M1062212603651 |
|
|
$17.84 |
000001079500-3562507204 |
2022 |
11 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
5/9/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR051M1062212603651 |
|
|
$4,105.56 |
000001079500-3562507204 |
2022 |
11 |
FD52 |
07 |
E143 |
D |
1300201D |
034 |
5/5/2022 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200180079 |
PON22200001262 |
PALMER ENGINEERING CO |
$169,750.64 |
Fayette Co. 7-80150 |
2022 |
10 |
FD52 |
07 |
E229 |
D |
1300201D |
034 |
4/26/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
IET-XE13A162522115014790 |
|
|
$0.38 |
|
2022 |
10 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
4/25/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR042M1062211202536 |
|
|
$181.94 |
000001079833-3562500061 |
2022 |
10 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202536 |
|
|
$75.69 |
000001079833-3562500061 |
2022 |
10 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
4/25/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR042M1062211202536 |
|
|
$51.30 |
000001079833-3562500061 |
2022 |
10 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202536 |
|
|
$21.06 |
000001079833-3562500061 |
2022 |
10 |
FD52 |
00 |
E124 |
D |
1300201D |
034 |
4/25/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR042M1062211202536 |
|
|
$0.09 |
000001079833-3562500061 |
2022 |
10 |
FD52 |
00 |
E124 |
D |
1300201D |
034 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202536 |
|
|
$0.04 |
000001079833-3562500061 |
2022 |
10 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
4/25/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR042M1062211202533 |
|
|
$3,681.05 |
000001079500-3562507204 |
2022 |
10 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202533 |
|
|
$759.76 |
000001079500-3562507204 |
2022 |
10 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
4/25/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR042M1062211202533 |
|
|
$256.88 |
000001079500-3562507204 |
2022 |
10 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202533 |
|
|
$51.64 |
000001079500-3562507204 |
2022 |
10 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
4/25/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR042M1062211202533 |
|
|
$3,090.99 |
000001079500-3562507204 |
2022 |
10 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202533 |
|
|
$637.96 |
000001079500-3562507204 |
2022 |
10 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
4/25/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR042M1062211202533 |
|
|
$729.61 |
000001079500-3562507204 |
2022 |
10 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202533 |
|
|
$153.89 |
000001079500-3562507204 |
2022 |
10 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
4/25/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR042M1062211202533 |
|
|
$1.32 |
000001079500-3562507204 |
2022 |
10 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202533 |
|
|
$0.31 |
000001079500-3562507204 |
2022 |
10 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
4/25/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR042M1062211202536 |
|
|
$216.59 |
000001079833-3562500061 |
2022 |
10 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202536 |
|
|
$90.13 |
000001079833-3562500061 |
2022 |
10 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
4/25/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR042M1062211202536 |
|
|
$14.82 |
000001079833-3562500061 |
2022 |
10 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
4/25/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR042M1062211202536 |
|
|
$6.16 |
000001079833-3562500061 |
2022 |
10 |
FD52 |
07 |
E229 |
D |
1300201D |
034 |
4/13/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
IET-XE13A162522100018300 |
|
|
$0.38 |
|
2022 |
10 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
4/11/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR041M1062209801475 |
|
|
$46.88 |
000001079833-3562500061 |
2022 |
10 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801475 |
|
|
$5.32 |
000001079833-3562500061 |
2022 |
10 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
4/11/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR041M1062209801475 |
|
|
$198.61 |
000001079833-3562500061 |
2022 |
10 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801475 |
|
|
$22.78 |
000001079833-3562500061 |
2022 |
10 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
4/11/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR041M1062209801475 |
|
|
$13.58 |
000001079833-3562500061 |
2022 |
10 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
4/11/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR041M1062209801472 |
|
|
$2,849.71 |
000001079500-3562507204 |
2022 |
10 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801472 |
|
|
$115.43 |
000001079500-3562507204 |
2022 |
10 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
4/11/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR041M1062209801472 |
|
|
$204.61 |
000001079500-3562507204 |
2022 |
10 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801472 |
|
|
$8.29 |
000001079500-3562507204 |
2022 |
10 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
4/11/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR041M1062209801472 |
|
|
$2,392.90 |
000001079500-3562507204 |
2022 |
10 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801475 |
|
|
$1.56 |
000001079833-3562500061 |
2022 |
10 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801472 |
|
|
$96.93 |
000001079500-3562507204 |
2022 |
10 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
4/11/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR041M1062209801472 |
|
|
$542.31 |
000001079500-3562507204 |
2022 |
10 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801472 |
|
|
$21.78 |
000001079500-3562507204 |
2022 |
10 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
4/11/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR041M1062209801475 |
|
|
$166.77 |
000001079833-3562500061 |
2022 |
10 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
4/11/2022 |
3020 |
PREL ENGINEERING-UTILITIES |
CA-XR041M1062209801489 |
|
|
$82.38 |
000001081951-3562507208 |
2022 |
10 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801489 |
|
|
$4.40 |
000001081951-3562507208 |
2022 |
10 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
4/11/2022 |
3020 |
PREL ENGINEERING-UTILITIES |
CA-XR041M1062209801489 |
|
|
$6.16 |
000001081951-3562507208 |
2022 |
10 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801489 |
|
|
$0.33 |
000001081951-3562507208 |
2022 |
10 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
4/11/2022 |
3020 |
PREL ENGINEERING-UTILITIES |
CA-XR041M1062209801489 |
|
|
$69.20 |
000001081951-3562507208 |
2022 |
10 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801489 |
|
|
$3.70 |
000001081951-3562507208 |
2022 |
10 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
4/11/2022 |
3020 |
PREL ENGINEERING-UTILITIES |
CA-XR041M1062209801489 |
|
|
$11.79 |
000001081951-3562507208 |
2022 |
10 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801475 |
|
|
$19.13 |
000001079833-3562500061 |
2022 |
10 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
4/11/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR041M1062209801489 |
|
|
$0.62 |
000001081951-3562507208 |
2022 |
9 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
3/24/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR032M1062208200391 |
|
|
$2,860.51 |
000001079500-3562507204 |
2022 |
9 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200391 |
|
|
$271.88 |
000001079500-3562507204 |
2022 |
9 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
3/24/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR032M1062208200391 |
|
|
$206.35 |
000001079500-3562507204 |
2022 |
9 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200391 |
|
|
$19.55 |
000001079500-3562507204 |
2022 |
9 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
3/24/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR032M1062208200391 |
|
|
$2,401.97 |
000001079500-3562507204 |
2022 |
9 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200391 |
|
|
$228.30 |
000001079500-3562507204 |
2022 |
9 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
3/24/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR032M1062208200391 |
|
|
$514.18 |
000001079500-3562507204 |
2022 |
9 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200391 |
|
|
$50.35 |
000001079500-3562507204 |
2022 |
9 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
3/24/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR032M1062208200391 |
|
|
$0.91 |
000001079500-3562507204 |
2022 |
9 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200391 |
|
|
$0.08 |
000001079500-3562507204 |
2022 |
9 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
3/24/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR032M1062208200393 |
|
|
$144.51 |
000001079833-3562500061 |
2022 |
9 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200393 |
|
|
$22.82 |
000001079833-3562500061 |
2022 |
9 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
3/24/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR032M1062208200393 |
|
|
$9.88 |
000001079833-3562500061 |
2022 |
9 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200393 |
|
|
$1.56 |
000001079833-3562500061 |
2022 |
9 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
3/24/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR032M1062208200393 |
|
|
$121.29 |
000001079833-3562500061 |
2022 |
9 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200393 |
|
|
$19.16 |
000001079833-3562500061 |
2022 |
9 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
3/24/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR032M1062208200393 |
|
|
$34.12 |
000001079833-3562500061 |
2022 |
9 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200393 |
|
|
$5.34 |
000001079833-3562500061 |
2022 |
9 |
FD52 |
00 |
E124 |
D |
1300201D |
034 |
3/24/2022 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR032M1062208200393 |
|
|
$0.06 |
000001079833-3562500061 |
2022 |
9 |
FD52 |
00 |
E124 |
D |
1300201D |
034 |
3/24/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR032M1062208200393 |
|
|
$0.01 |
000001079833-3562500061 |
2022 |
9 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
3/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031M1062206709460 |
|
|
$121.39 |
000001079752-3562500636 |
2022 |
9 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
3/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709460 |
|
|
$5.66 |
000001079752-3562500636 |
2022 |
9 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
3/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031M1062206709460 |
|
|
$8.61 |
000001079752-3562500636 |
2022 |
9 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
3/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709460 |
|
|
$0.41 |
000001079752-3562500636 |
2022 |
9 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
3/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031M1062206709460 |
|
|
$101.93 |
000001079752-3562500636 |
2022 |
9 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
3/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709460 |
|
|
$4.75 |
000001079752-3562500636 |
2022 |
9 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
3/10/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR031M1062206709460 |
|
|
$27.46 |
000001079752-3562500636 |
2022 |
9 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
3/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709460 |
|
|
$1.27 |
000001079752-3562500636 |
2022 |
9 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
3/9/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR031M1062206709458 |
|
|
$2,272.55 |
000001079500-3562507204 |
2022 |
9 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
3/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709458 |
|
|
$973.95 |
000001079500-3562507204 |
2022 |
9 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
3/9/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR031M1062206709458 |
|
|
$163.17 |
000001079500-3562507204 |
2022 |
9 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
3/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709458 |
|
|
$69.93 |
000001079500-3562507204 |
2022 |
9 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
3/9/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR031M1062206709458 |
|
|
$1,908.26 |
000001079500-3562507204 |
2022 |
9 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
3/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709458 |
|
|
$817.83 |
000001079500-3562507204 |
2022 |
9 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
3/9/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR031M1062206709458 |
|
|
$433.86 |
000001079500-3562507204 |
2022 |
9 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
3/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709458 |
|
|
$183.75 |
000001079500-3562507204 |
2022 |
9 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
3/9/2022 |
1020 |
PREP OF CONSULTANT AGREEMENTS |
CA-XR031M1062206709476 |
|
|
$287.10 |
000001081680-3562500630 |
2022 |
9 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
3/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709476 |
|
|
$35.99 |
000001081680-3562500630 |
2022 |
9 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
3/9/2022 |
1020 |
PREP OF CONSULTANT AGREEMENTS |
CA-XR031M1062206709476 |
|
|
$20.27 |
000001081680-3562500630 |
2022 |
9 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
3/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709476 |
|
|
$2.54 |
000001081680-3562500630 |
2022 |
9 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
3/9/2022 |
1020 |
PREP OF CONSULTANT AGREEMENTS |
CA-XR031M1062206709476 |
|
|
$241.16 |
000001081680-3562500630 |
2022 |
9 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
3/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709476 |
|
|
$30.22 |
000001081680-3562500630 |
2022 |
9 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
3/9/2022 |
1020 |
PREP OF CONSULTANT AGREEMENTS |
CA-XR031M1062206709476 |
|
|
$68.70 |
000001081680-3562500630 |
2022 |
9 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
3/9/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR031M1062206709476 |
|
|
$8.53 |
000001081680-3562500630 |
2022 |
8 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
2/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022M1062205308420 |
|
|
$1.95 |
000001079752-3562500636 |
2022 |
8 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
2/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022M1062205308420 |
|
|
$166.80 |
000001079752-3562500636 |
2022 |
8 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
2/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022M1062205308420 |
|
|
$23.08 |
000001079752-3562500636 |
2022 |
8 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
2/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022M1062205308420 |
|
|
$44.97 |
000001079752-3562500636 |
2022 |
8 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
2/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022M1062205308420 |
|
|
$6.16 |
000001079752-3562500636 |
2022 |
8 |
FD52 |
00 |
E124 |
D |
1300201D |
034 |
2/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022M1062205308420 |
|
|
$0.07 |
000001079752-3562500636 |
2022 |
8 |
FD52 |
00 |
E124 |
D |
1300201D |
034 |
2/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022M1062205308420 |
|
|
$0.01 |
000001079752-3562500636 |
2022 |
8 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
2/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022M1062205308420 |
|
|
$198.64 |
000001079752-3562500636 |
2022 |
8 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
2/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022M1062205308420 |
|
|
$27.48 |
000001079752-3562500636 |
2022 |
8 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
2/23/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR022M1062205308417 |
|
|
$3,049.74 |
000001079500-3562507204 |
2022 |
8 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
2/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022M1062205308417 |
|
|
$196.76 |
000001079500-3562507204 |
2022 |
8 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
2/23/2022 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR022M1062205308420 |
|
|
$14.09 |
000001079752-3562500636 |
2022 |
8 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
2/23/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR022M1062205308417 |
|
|
$218.97 |
000001079500-3562507204 |
2022 |
8 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
2/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022M1062205308417 |
|
|
$14.13 |
000001079500-3562507204 |
2022 |
8 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
2/23/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR022M1062205308417 |
|
|
$2,560.87 |
000001079500-3562507204 |
2022 |
8 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
2/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022M1062205308417 |
|
|
$165.22 |
000001079500-3562507204 |
2022 |
8 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
2/23/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR022M1062205308417 |
|
|
$580.49 |
000001079500-3562507204 |
2022 |
8 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
2/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022M1062205308417 |
|
|
$37.12 |
000001079500-3562507204 |
2022 |
8 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
2/23/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR022M1062205308417 |
|
|
$0.94 |
000001079500-3562507204 |
2022 |
8 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
2/23/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR022M1062205308417 |
|
|
$0.06 |
000001079500-3562507204 |
2022 |
8 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
2/14/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR021M1062203907438 |
|
|
$4,700.08 |
000001079500-3562507204 |
2022 |
8 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
2/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021M1062203907438 |
|
|
$0.05 |
000001079500-3562507204 |
2022 |
8 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
2/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021M1062203907438 |
|
|
$477.06 |
000001079500-3562507204 |
2022 |
8 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
2/14/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR021M1062203907438 |
|
|
$331.61 |
000001079500-3562507204 |
2022 |
8 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
2/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021M1062203907438 |
|
|
$34.15 |
000001079500-3562507204 |
2022 |
8 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
2/14/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR021M1062203907438 |
|
|
$3,946.65 |
000001079500-3562507204 |
2022 |
8 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
2/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021M1062203907438 |
|
|
$400.59 |
000001079500-3562507204 |
2022 |
8 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
2/14/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR021M1062203907438 |
|
|
$1,140.48 |
000001079500-3562507204 |
2022 |
8 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
2/14/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR021M1062203907438 |
|
|
$95.85 |
000001079500-3562507204 |
2022 |
8 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
2/14/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR021M1062203907438 |
|
|
$0.95 |
000001079500-3562507204 |
2022 |
7 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
1/27/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR012M1062202106400 |
|
|
$0.95 |
000001023605-3562507204 |
2022 |
7 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
1/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106400 |
|
|
$0.05 |
000001023605-3562507204 |
2022 |
7 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
1/27/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR012M1062202106400 |
|
|
$1,573.83 |
000001023605-3562507204 |
2022 |
7 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
1/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106400 |
|
|
$88.67 |
000001023605-3562507204 |
2022 |
7 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
1/27/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR012M1062202106400 |
|
|
$105.95 |
000001023605-3562507204 |
2022 |
7 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
1/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106400 |
|
|
$5.97 |
000001023605-3562507204 |
2022 |
7 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
1/27/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR012M1062202106400 |
|
|
$1,321.54 |
000001023605-3562507204 |
2022 |
7 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
1/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106400 |
|
|
$74.46 |
000001023605-3562507204 |
2022 |
7 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
1/27/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR012M1062202106400 |
|
|
$584.94 |
000001023605-3562507204 |
2022 |
7 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
1/27/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR012M1062202106400 |
|
|
$32.67 |
000001023605-3562507204 |
2022 |
7 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
1/24/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR012M1062202106450 |
|
|
$3,246.50 |
000001079500-3562507204 |
2022 |
7 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
1/24/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR012M1062202106450 |
|
|
$233.10 |
000001079500-3562507204 |
2022 |
7 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
1/24/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR012M1062202106450 |
|
|
$2,726.09 |
000001079500-3562507204 |
2022 |
7 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
1/24/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR012M1062202106450 |
|
|
$617.61 |
000001079500-3562507204 |
2022 |
7 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
1/24/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR012M1062202106450 |
|
|
$1.00 |
000001079500-3562507204 |
2022 |
7 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
1/10/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR011M1062200705557 |
|
|
$433.60 |
000001080719-3562500061 |
2022 |
7 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
1/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011M1062200705557 |
|
|
$309.54 |
000001080719-3562500061 |
2022 |
7 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
1/10/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR011M1062200705557 |
|
|
$30.62 |
000001080719-3562500061 |
2022 |
7 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
1/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011M1062200705557 |
|
|
$21.87 |
000001080719-3562500061 |
2022 |
7 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
1/10/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR011M1062200705557 |
|
|
$364.03 |
000001080719-3562500061 |
2022 |
7 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
1/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011M1062200705557 |
|
|
$259.91 |
000001080719-3562500061 |
2022 |
7 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
1/10/2022 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR011M1062200705557 |
|
|
$103.54 |
000001080719-3562500061 |
2022 |
7 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
1/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011M1062200705557 |
|
|
$72.88 |
000001080719-3562500061 |
2022 |
7 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
1/10/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR011M1062200705548 |
|
|
$1,082.16 |
000001079500-3562507204 |
2022 |
7 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
1/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011M1062200705548 |
|
|
$2,164.34 |
000001079500-3562507204 |
2022 |
7 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
1/10/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR011M1062200705548 |
|
|
$77.70 |
000001079500-3562507204 |
2022 |
7 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
1/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011M1062200705548 |
|
|
$155.40 |
000001079500-3562507204 |
2022 |
7 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
1/10/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR011M1062200705548 |
|
|
$908.69 |
000001079500-3562507204 |
2022 |
7 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
1/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011M1062200705548 |
|
|
$1,817.40 |
000001079500-3562507204 |
2022 |
7 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
1/10/2022 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR011M1062200705548 |
|
|
$209.27 |
000001079500-3562507204 |
2022 |
7 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
1/10/2022 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR011M1062200705548 |
|
|
$408.34 |
000001079500-3562507204 |
2022 |
6 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
12/22/2021 |
0410 |
TRANSPORTATION PLANNING |
CA-XR122L1062135504522 |
|
|
$129.57 |
000001080979-3562500064 |
2022 |
6 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504522 |
|
|
$4.92 |
000001080979-3562500064 |
2022 |
6 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
12/22/2021 |
0410 |
TRANSPORTATION PLANNING |
CA-XR122L1062135504522 |
|
|
$20.51 |
000001080979-3562500064 |
2022 |
6 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504522 |
|
|
$0.77 |
000001080979-3562500064 |
2022 |
6 |
FD52 |
00 |
E124 |
D |
1300201D |
034 |
12/22/2021 |
0410 |
TRANSPORTATION PLANNING |
CA-XR122L1062135504522 |
|
|
$0.07 |
000001080979-3562500064 |
2022 |
6 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
12/22/2021 |
0410 |
TRANSPORTATION PLANNING |
CA-XR122L1062135504522 |
|
|
$154.31 |
000001080979-3562500064 |
2022 |
6 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504522 |
|
|
$5.86 |
000001080979-3562500064 |
2022 |
6 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
12/22/2021 |
0410 |
TRANSPORTATION PLANNING |
CA-XR122L1062135504522 |
|
|
$11.60 |
000001080979-3562500064 |
2022 |
6 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
12/22/2021 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR122L1062135504494 |
|
|
$3,148.12 |
000001079500-3562507204 |
2022 |
6 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504494 |
|
|
$98.38 |
000001079500-3562507204 |
2022 |
6 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
12/22/2021 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR122L1062135504494 |
|
|
$226.75 |
000001079500-3562507204 |
2022 |
6 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504494 |
|
|
$7.08 |
000001079500-3562507204 |
2022 |
6 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504522 |
|
|
$0.44 |
000001080979-3562500064 |
2022 |
6 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
12/22/2021 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR122L1062135504494 |
|
|
$2,643.48 |
000001079500-3562507204 |
2022 |
6 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504494 |
|
|
$82.61 |
000001079500-3562507204 |
2022 |
6 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
12/22/2021 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR122L1062135504494 |
|
|
$570.23 |
000001079500-3562507204 |
2022 |
6 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504494 |
|
|
$17.66 |
000001079500-3562507204 |
2022 |
6 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
12/22/2021 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR122L1062135504494 |
|
|
$0.97 |
000001079500-3562507204 |
2022 |
6 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
12/22/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR122L1062135504494 |
|
|
$0.03 |
000001079500-3562507204 |
2022 |
6 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
12/10/2021 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR121L1062134103561 |
|
|
$590.27 |
000001079500-3562507204 |
2022 |
6 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
12/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103561 |
|
|
$221.55 |
000001079500-3562507204 |
2022 |
6 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
12/10/2021 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR121L1062134103561 |
|
|
$41.59 |
000001079500-3562507204 |
2022 |
6 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
12/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103561 |
|
|
$15.62 |
000001079500-3562507204 |
2022 |
6 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
12/10/2021 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR121L1062134103561 |
|
|
$495.65 |
000001079500-3562507204 |
2022 |
6 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
12/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103561 |
|
|
$186.03 |
000001079500-3562507204 |
2022 |
6 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
12/10/2021 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR121L1062134103561 |
|
|
$107.23 |
000001079500-3562507204 |
2022 |
6 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
12/10/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103561 |
|
|
$39.77 |
000001079500-3562507204 |
2022 |
6 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
12/8/2021 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR121L1062134103575 |
|
|
$236.40 |
000001080719-3562500061 |
2022 |
6 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
12/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103575 |
|
|
$52.65 |
000001080719-3562500061 |
2022 |
6 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
12/8/2021 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR121L1062134103575 |
|
|
$16.46 |
000001080719-3562500061 |
2022 |
6 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
12/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103575 |
|
|
$3.66 |
000001080719-3562500061 |
2022 |
6 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
12/8/2021 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR121L1062134103575 |
|
|
$198.57 |
000001080719-3562500061 |
2022 |
6 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
12/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103575 |
|
|
$44.21 |
000001080719-3562500061 |
2022 |
6 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
12/8/2021 |
0092 |
ENV STUDIES-PERMITTING |
CA-XR121L1062134103575 |
|
|
$53.55 |
000001080719-3562500061 |
2022 |
6 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
12/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR121L1062134103575 |
|
|
$11.80 |
000001080719-3562500061 |
2022 |
5 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
11/8/2021 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR111L1062130901518 |
|
|
$520.30 |
000001079166-3562507200 |
2022 |
5 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
11/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111L1062130901518 |
|
|
$25.32 |
000001079166-3562507200 |
2022 |
5 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
11/8/2021 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR111L1062130901518 |
|
|
$36.22 |
000001079166-3562507200 |
2022 |
5 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
11/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111L1062130901518 |
|
|
$1.76 |
000001079166-3562507200 |
2022 |
5 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
11/8/2021 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR111L1062130901518 |
|
|
$436.85 |
000001079166-3562507200 |
2022 |
5 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
11/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111L1062130901518 |
|
|
$21.26 |
000001079166-3562507200 |
2022 |
5 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
11/8/2021 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR111L1062130901518 |
|
|
$117.63 |
000001079166-3562507200 |
2022 |
5 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
11/8/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR111L1062130901518 |
|
|
$5.67 |
000001079166-3562507200 |
2022 |
4 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
10/25/2021 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR102L1062129500417 |
|
|
$236.47 |
000001079166-3562507200 |
2022 |
4 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
10/25/2021 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR102L1062129500417 |
|
|
$16.77 |
000001079166-3562507200 |
2022 |
4 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
10/25/2021 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR102L1062129500417 |
|
|
$198.58 |
000001079166-3562507200 |
2022 |
4 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
10/25/2021 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR102L1062129500417 |
|
|
$53.45 |
000001079166-3562507200 |
2022 |
4 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
10/25/2021 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR102L1062129500417 |
|
|
$0.10 |
000001079166-3562507200 |
2022 |
4 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
10/25/2021 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR102L1062129500424 |
|
|
$216.75 |
000001079833-3562500061 |
2022 |
4 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500424 |
|
|
$54.02 |
000001079833-3562500061 |
2022 |
4 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
10/25/2021 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR102L1062129500424 |
|
|
$14.97 |
000001079833-3562500061 |
2022 |
4 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500424 |
|
|
$3.72 |
000001079833-3562500061 |
2022 |
4 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
10/25/2021 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR102L1062129500424 |
|
|
$181.94 |
000001079833-3562500061 |
2022 |
4 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500424 |
|
|
$45.36 |
000001079833-3562500061 |
2022 |
4 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
10/25/2021 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR102L1062129500424 |
|
|
$40.46 |
000001079833-3562500061 |
2022 |
4 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500424 |
|
|
$9.94 |
000001079833-3562500061 |
2022 |
4 |
FD52 |
00 |
E124 |
D |
1300201D |
034 |
10/25/2021 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR102L1062129500424 |
|
|
$0.09 |
000001079833-3562500061 |
2022 |
4 |
FD52 |
00 |
E124 |
D |
1300201D |
034 |
10/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR102L1062129500424 |
|
|
$0.02 |
000001079833-3562500061 |
2022 |
4 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
10/11/2021 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR101L1062128110134 |
|
|
$236.47 |
000001079166-3562507200 |
2022 |
4 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
10/11/2021 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR101L1062128110134 |
|
|
$16.47 |
000001079166-3562507200 |
2022 |
4 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
10/11/2021 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR101L1062128110134 |
|
|
$198.56 |
000001079166-3562507200 |
2022 |
4 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
10/11/2021 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR101L1062128110134 |
|
|
$53.44 |
000001079166-3562507200 |
2022 |
4 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
10/11/2021 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR101L1062128110146 |
|
|
$808.89 |
000001079833-3562500061 |
2022 |
4 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
10/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101L1062128110146 |
|
|
$217.53 |
000001079833-3562500061 |
2022 |
4 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
10/11/2021 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR101L1062128110146 |
|
|
$53.45 |
000001079833-3562500061 |
2022 |
4 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
10/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101L1062128110146 |
|
|
$14.37 |
000001079833-3562500061 |
2022 |
4 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
10/11/2021 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR101L1062128110146 |
|
|
$679.22 |
000001079833-3562500061 |
2022 |
4 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
10/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101L1062128110146 |
|
|
$182.66 |
000001079833-3562500061 |
2022 |
4 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
10/11/2021 |
0070 |
ENV STUDIES-HIST/CULTURAL |
CA-XR101L1062128110146 |
|
|
$151.10 |
000001079833-3562500061 |
2022 |
4 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
10/11/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR101L1062128110146 |
|
|
$40.04 |
000001079833-3562500061 |
2022 |
3 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
9/27/2021 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR092L1062126709060 |
|
|
$484.73 |
000001079499-3562500061 |
2022 |
3 |
FD52 |
00 |
E124 |
D |
1300201D |
034 |
9/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092L1062126709060 |
|
|
$0.03 |
000001079499-3562500061 |
2022 |
3 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
9/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092L1062126709060 |
|
|
$48.47 |
000001079499-3562500061 |
2022 |
3 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
9/27/2021 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR092L1062126709060 |
|
|
$32.28 |
000001079499-3562500061 |
2022 |
3 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
9/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092L1062126709060 |
|
|
$3.23 |
000001079499-3562500061 |
2022 |
3 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
9/27/2021 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR092L1062126709060 |
|
|
$407.03 |
000001079499-3562500061 |
2022 |
3 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
9/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092L1062126709060 |
|
|
$40.70 |
000001079499-3562500061 |
2022 |
3 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
9/27/2021 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR092L1062126709060 |
|
|
$149.56 |
000001079499-3562500061 |
2022 |
3 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
9/27/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092L1062126709073 |
|
|
$198.69 |
000001079752-3562500636 |
2022 |
3 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
9/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092L1062126709073 |
|
|
$86.07 |
000001079752-3562500636 |
2022 |
3 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
9/27/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092L1062126709073 |
|
|
$14.14 |
000001079752-3562500636 |
2022 |
3 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
9/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092L1062126709073 |
|
|
$6.13 |
000001079752-3562500636 |
2022 |
3 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
9/27/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092L1062126709073 |
|
|
$166.80 |
000001079752-3562500636 |
2022 |
3 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
9/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092L1062126709060 |
|
|
$14.80 |
000001079499-3562500061 |
2022 |
3 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
9/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092L1062126709073 |
|
|
$72.27 |
000001079752-3562500636 |
2022 |
3 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
9/27/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092L1062126709073 |
|
|
$42.91 |
000001079752-3562500636 |
2022 |
3 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
9/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092L1062126709073 |
|
|
$18.37 |
000001079752-3562500636 |
2022 |
3 |
FD52 |
00 |
E124 |
D |
1300201D |
034 |
9/27/2021 |
1040 |
ROADWAY PLANS-PRELIMINARY-OFF |
CA-XR092L1062126709073 |
|
|
$0.07 |
000001079752-3562500636 |
2022 |
3 |
FD52 |
00 |
E124 |
D |
1300201D |
034 |
9/27/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR092L1062126709073 |
|
|
$0.03 |
000001079752-3562500636 |
2022 |
3 |
FD52 |
00 |
E124 |
D |
1300201D |
034 |
9/27/2021 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR092L1062126709060 |
|
|
$0.27 |
000001079499-3562500061 |
2022 |
3 |
FD52 |
00 |
E111 |
D |
1300201D |
034 |
9/15/2021 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR091L1062125208006 |
|
|
$148.11 |
000001079499-3562500061 |
2022 |
3 |
FD52 |
00 |
E121 |
D |
1300201D |
034 |
9/15/2021 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR091L1062125208006 |
|
|
$9.33 |
000001079499-3562500061 |
2022 |
3 |
FD52 |
00 |
E122 |
D |
1300201D |
034 |
9/15/2021 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR091L1062125208006 |
|
|
$124.37 |
000001079499-3562500061 |
2022 |
3 |
FD52 |
00 |
E123 |
D |
1300201D |
034 |
9/15/2021 |
0010 |
ENV STUDIES-UST/HZM |
CA-XR091L1062125208006 |
|
|
$45.65 |
000001079499-3562500061 |
2022 |
3 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
9/15/2021 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR091L1062125208006 |
|
|
$270.66 |
000001079500-3562507204 |
2022 |
3 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
9/15/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091L1062125208006 |
|
|
$24.53 |
000001079500-3562507204 |
2022 |
3 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
9/15/2021 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR091L1062125208006 |
|
|
$19.06 |
000001079500-3562507204 |
2022 |
3 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
9/15/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091L1062125208006 |
|
|
$1.73 |
000001079500-3562507204 |
2022 |
3 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
9/15/2021 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR091L1062125208006 |
|
|
$227.46 |
000001079500-3562507204 |
2022 |
3 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
9/15/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091L1062125208006 |
|
|
$20.60 |
000001079500-3562507204 |
2022 |
3 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
9/15/2021 |
1330 |
CONSULT SPV-RDWAY PLANS-FINAL |
CA-XR091L1062125208006 |
|
|
$49.09 |
000001079500-3562507204 |
2022 |
3 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
9/15/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR091L1062125208006 |
|
|
$4.40 |
000001079500-3562507204 |
2022 |
2 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
8/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082L1062123606990 |
|
|
$1.74 |
000001079166-3562507200 |
2022 |
2 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
8/25/2021 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR082L1062123606990 |
|
|
$18.45 |
000001079166-3562507200 |
2022 |
2 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
8/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082L1062123606990 |
|
|
$0.12 |
000001079166-3562507200 |
2022 |
2 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
8/25/2021 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR082L1062123606990 |
|
|
$218.42 |
000001079166-3562507200 |
2022 |
2 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
8/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082L1062123606990 |
|
|
$1.46 |
000001079166-3562507200 |
2022 |
2 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
8/25/2021 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR082L1062123606990 |
|
|
$58.79 |
000001079166-3562507200 |
2022 |
2 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
8/25/2021 |
7777 |
FEDERAL NON-PARTICIPATING LEAVE COSTS |
CA-XR082L1062123606990 |
|
|
$0.39 |
000001079166-3562507200 |
2022 |
2 |
FD52 |
07 |
E124 |
D |
1300201D |
034 |
8/25/2021 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR082L1062123606990 |
|
|
$0.10 |
000001079166-3562507200 |
2022 |
2 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
8/25/2021 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR082L1062123606990 |
|
|
$260.12 |
000001079166-3562507200 |
2022 |
2 |
FD52 |
07 |
E143 |
D |
1300201D |
034 |
8/19/2021 |
1550 |
DESIGN CONTRACTS-CONSULTANT |
PRC-2200029272 |
PON22000003822 |
QUANTUM SPATIAL INC |
$45,893.24 |
Letter Agreement |
2022 |
2 |
FD52 |
07 |
E111 |
D |
1300201D |
034 |
8/11/2021 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR081L1062121805852 |
|
|
$472.94 |
000001079166-3562507200 |
2022 |
2 |
FD52 |
07 |
E121 |
D |
1300201D |
034 |
8/11/2021 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR081L1062121805852 |
|
|
$32.93 |
000001079166-3562507200 |
2022 |
2 |
FD52 |
07 |
E122 |
D |
1300201D |
034 |
8/11/2021 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR081L1062121805852 |
|
|
$397.13 |
000001079166-3562507200 |
2022 |
2 |
FD52 |
07 |
E123 |
D |
1300201D |
034 |
8/11/2021 |
0640 |
ENV STUDIES-GEN-CONSULT |
CA-XR081L1062121805852 |
|
|
$106.89 |
000001079166-3562507200 |