The Commonwealth pays employees on a semi-monthly basis with a scheduled pay day on the 15th and 30th of each month. The two monthly pay periods are from the 1st to the 15th of the month and the 16th through the last day of the month. Pay check distribution is delayed by one pay period to allow for system processing. For example work performed during the 1st to the 15th day of the month is paid to the employee on the 30th of the month. Accordingly the cost accounting charges for labor costs posting in eMARS to operating accounts and highway projects are also delayed by approximately one pay period.
A good rule of measure is that the cost accounting charges for the pay period ending on the 15th of the month will post to eMARS by the 25th and those for the pay period ending on the last day of the month will post to eMARS by the 10th of the following month.

x close panel
Detailed Project Expenditure Report
Total E-MARS Expenditures for 1237401C = $7,488,169.44
Click here for Labor Costs Information
Year Month PBU Charge District Object Phase Program Code County Date ACT Activity Name Trans ID Reference # Vendor Name Expenditure Line Description
2024 10 FD52 06 E229 C 1237401C 008 4/26/2024 4010 CONSTRUCTION ENGINEERING IET-XE13A162524116010170 $19.50
2024 10 FD52 06 E111 C 1237401C 008 4/26/2024 4010 CONSTRUCTION ENGINEERING CA-XR042O1062411503035 $725.19 11117320-3562506340
2024 10 FD52 06 E111 C 1237401C 008 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411503035 $17.89 11117320-3562506340
2024 10 FD52 06 E121 C 1237401C 008 4/26/2024 4010 CONSTRUCTION ENGINEERING CA-XR042O1062411503035 $55.10 11117320-3562506340
2024 10 FD52 06 E121 C 1237401C 008 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411503035 $1.36 11117320-3562506340
2024 10 FD52 06 E122 C 1237401C 008 4/26/2024 4010 CONSTRUCTION ENGINEERING CA-XR042O1062411503035 $479.86 11117320-3562506340
2024 10 FD52 06 E122 C 1237401C 008 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411503035 $11.84 11117320-3562506340
2024 10 FD52 06 E123 C 1237401C 008 4/26/2024 4010 CONSTRUCTION ENGINEERING CA-XR042O1062411503035 $80.70 11117320-3562506340
2024 10 FD52 06 E123 C 1237401C 008 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411503035 $1.97 11117320-3562506340
2024 10 FD52 06 E124 C 1237401C 008 4/26/2024 4010 CONSTRUCTION ENGINEERING CA-XR042O1062411503035 $0.18 11117320-3562506340
2024 10 FD52 06 E797 C 1237401C 008 4/25/2024 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P041K CTXCONST0922213090001K EATON ASPHALT PAVING CO $10,638.00
2024 10 FD52 06 E797 C 1237401C 008 4/10/2024 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P040K CTXCONST0922213090001K EATON ASPHALT PAVING CO $29,787.50
2024 10 FD52 06 E111 C 1237401C 008 4/10/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR041O1062410001629 $907.02 000001085420-3562506210
2024 10 FD52 06 E111 C 1237401C 008 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001629 $180.92 000001085420-3562506210
2024 10 FD52 06 E121 C 1237401C 008 4/10/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR041O1062410001629 $63.97 000001085420-3562506210
2024 10 FD52 06 E121 C 1237401C 008 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001629 $12.59 000001085420-3562506210
2024 10 FD52 06 E122 C 1237401C 008 4/10/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR041O1062410001629 $600.08 000001085420-3562506210
2024 10 FD52 06 E122 C 1237401C 008 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001629 $119.71 000001085420-3562506210
2024 10 FD52 06 E123 C 1237401C 008 4/10/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR041O1062410001629 $161.79 000001085420-3562506210
2024 10 FD52 06 E123 C 1237401C 008 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001629 $34.34 000001085420-3562506210
2024 10 FD52 06 E111 C 1237401C 008 4/10/2024 5242 CONCRETE TESTING UNIT CA-XR041O1062410001629 $590.57 000001085422-3562506210
2024 10 FD52 06 E111 C 1237401C 008 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001629 $164.05 000001085422-3562506210
2024 10 FD52 06 E121 C 1237401C 008 4/10/2024 5242 CONCRETE TESTING UNIT CA-XR041O1062410001629 $41.46 000001085422-3562506210
2024 10 FD52 06 E121 C 1237401C 008 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001629 $11.39 000001085422-3562506210
2024 10 FD52 06 E122 C 1237401C 008 4/10/2024 5242 CONCRETE TESTING UNIT CA-XR041O1062410001629 $390.68 000001085422-3562506210
2024 10 FD52 06 E122 C 1237401C 008 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001629 $108.55 000001085422-3562506210
2024 10 FD52 06 E123 C 1237401C 008 4/10/2024 5242 CONCRETE TESTING UNIT CA-XR041O1062410001629 $107.94 000001085422-3562506210
2024 10 FD52 06 E123 C 1237401C 008 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001629 $31.49 000001085422-3562506210
2024 10 FD52 06 E797 C 1237401C 008 4/1/2024 4580 CONSTRUCTION CONTRACTS JVC-2400000585 CTXCONST0922213090001K ($151,953.80) Move expenses from 25_Y240 to 55_M240
2024 10 FD52 06 E797 C 1237401C 008 4/1/2024 4580 CONSTRUCTION CONTRACTS JVC-2400000585 CTXCONST0922213090001K ($37,988.48) Move expenses from 25_Y240 to 55_M240
2024 10 FD52 06 E797 C 1237401C 008 4/1/2024 4580 CONSTRUCTION CONTRACTS JVC-2400000585 CTXCONST0922213090001K $151,953.80 Move expenses from 25_Y240 to 55_M240
2024 10 FD52 06 E797 C 1237401C 008 4/1/2024 4580 CONSTRUCTION CONTRACTS JVC-2400000585 CTXCONST0922213090001K $37,988.48 Move expenses from 25_Y240 to 55_M240
2024 9 FD52 06 E797 C 1237401C 008 3/27/2024 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P039K CTXCONST0922213090001K EATON ASPHALT PAVING CO $7,757.20
2024 9 FD52 06 E122 C 1237401C 094 3/15/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR031O1062406810076 $1,121.24 000001084734-3562506210
2024 9 FD52 06 E797 C 1237401C 008 3/15/2024 4010 CONSTRUCTION ENGINEERING PRC-2400179234 PON22400001008 H W Lochner Inc $9,180.00 SW Highway & Bridge Construction Inspection R3
2024 9 FD52 06 E797 C 1237401C 008 3/15/2024 4010 CONSTRUCTION ENGINEERING PRC-2400179234 PON22400001008 H W Lochner Inc $14,472.00 SW Highway & Bridge Construction Inspection R3
2024 9 FD52 06 E797 C 1237401C 008 3/15/2024 4010 CONSTRUCTION ENGINEERING PRC-2400179234 PON22400001008 H W Lochner Inc $7,437.50 SW Highway & Bridge Construction Inspection R3
2024 9 FD52 06 E123 C 1237401C 094 3/15/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR031O1062406810076 $279.05 000001084734-3562506210
2024 9 FD52 06 E797 C 1237401C 008 3/15/2024 4010 CONSTRUCTION ENGINEERING PRC-2400179234 PON22400001008 H W Lochner Inc $702.00 SW Highway & Bridge Construction Inspection R3
2024 9 FD52 06 E797 C 1237401C 008 3/15/2024 4010 CONSTRUCTION ENGINEERING PRC-2400179234 PON22400001008 H W Lochner Inc $10,422.00 SW Highway & Bridge Construction Inspection R3
2024 9 FD52 06 E111 C 1237401C 094 3/15/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR031O1062406810075 $1,694.63 000001084734-3562506210
2024 9 FD52 06 E121 C 1237401C 094 3/15/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR031O1062406810075 $123.36 000001084734-3562506210
2024 9 FD52 06 E797 C 1237401C 008 3/14/2024 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P038K CTXCONST0922213090001K EATON ASPHALT PAVING CO $56,841.60
2024 9 FD52 06 E229 C 1237401C 008 3/12/2024 4010 CONSTRUCTION ENGINEERING IET-XE13A162524070008710 $19.50
2024 9 FD52 00 E111 C 1237401C 008 3/11/2024 5341 GEOTECHNICAL INVEST (CONST) CA-XR031O1062406810073 $525.11 000001084083-3562500610
2024 9 FD52 00 E111 C 1237401C 008 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810073 $5.61 000001084083-3562500610
2024 9 FD52 00 E121 C 1237401C 008 3/11/2024 5341 GEOTECHNICAL INVEST (CONST) CA-XR031O1062406810073 $39.28 000001084083-3562500610
2024 9 FD52 00 E121 C 1237401C 008 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810073 $0.42 000001084083-3562500610
2024 9 FD52 00 E122 C 1237401C 008 3/11/2024 5341 GEOTECHNICAL INVEST (CONST) CA-XR031O1062406810073 $347.66 000001084083-3562500610
2024 9 FD52 00 E122 C 1237401C 008 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810073 $3.71 000001084083-3562500610
2024 9 FD52 00 E123 C 1237401C 008 3/11/2024 5341 GEOTECHNICAL INVEST (CONST) CA-XR031O1062406810073 $57.13 000001084083-3562500610
2024 9 FD52 00 E123 C 1237401C 008 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810073 $0.60 000001084083-3562500610
2024 9 FD52 06 E111 C 1237401C 008 3/11/2024 4010 CONSTRUCTION ENGINEERING CA-XR031O1062406810586 $398.86 11098516-3562506340
2024 9 FD52 06 E111 C 1237401C 008 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810586 $7.98 11098516-3562506340
2024 9 FD52 06 E121 C 1237401C 008 3/11/2024 4010 CONSTRUCTION ENGINEERING CA-XR031O1062406810586 $30.09 11098516-3562506340
2024 9 FD52 06 E121 C 1237401C 008 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810586 $0.60 11098516-3562506340
2024 9 FD52 06 E122 C 1237401C 008 3/11/2024 4010 CONSTRUCTION ENGINEERING CA-XR031O1062406810586 $263.92 11098516-3562506340
2024 9 FD52 06 E122 C 1237401C 008 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810586 $5.28 11098516-3562506340
2024 9 FD52 06 E123 C 1237401C 008 3/11/2024 4010 CONSTRUCTION ENGINEERING CA-XR031O1062406810586 $44.39 11098516-3562506340
2024 9 FD52 06 E123 C 1237401C 008 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810586 $0.88 11098516-3562506340
2024 9 FD52 06 E111 C 1237401C 008 3/11/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR031O1062406810077 $2,165.23 000001085420-3562506210
2024 9 FD52 06 E111 C 1237401C 008 3/11/2024 4010 CONSTRUCTION ENGINEERING CA-XR031O1062406810073 $237.81 000001084158-3562506200
2024 9 FD52 06 E111 C 1237401C 008 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810077 $290.26 000001085420-3562506210
2024 9 FD52 06 E111 C 1237401C 008 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810073 $18.70 000001084158-3562506200
2024 9 FD52 06 E121 C 1237401C 008 3/11/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR031O1062406810077 $154.39 000001085420-3562506210
2024 9 FD52 06 E121 C 1237401C 008 3/11/2024 4010 CONSTRUCTION ENGINEERING CA-XR031O1062406810073 $17.88 000001084158-3562506200
2024 9 FD52 06 E121 C 1237401C 008 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810077 $20.20 000001085420-3562506210
2024 9 FD52 06 E121 C 1237401C 008 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810073 $1.41 000001084158-3562506200
2024 9 FD52 06 E122 C 1237401C 008 3/11/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR031O1062406810077 $1,432.65 000001085420-3562506210
2024 9 FD52 06 E122 C 1237401C 008 3/11/2024 4010 CONSTRUCTION ENGINEERING CA-XR031O1062406810073 $157.32 000001084158-3562506200
2024 9 FD52 06 E122 C 1237401C 008 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810077 $192.07 000001085420-3562506210
2024 9 FD52 06 E122 C 1237401C 008 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810073 $12.37 000001084158-3562506200
2024 9 FD52 06 E123 C 1237401C 008 3/11/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR031O1062406810077 $387.20 000001085420-3562506210
2024 9 FD52 06 E123 C 1237401C 008 3/11/2024 4010 CONSTRUCTION ENGINEERING CA-XR031O1062406810073 $44.41 000001084158-3562506200
2024 9 FD52 06 E123 C 1237401C 008 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810077 $55.66 000001085420-3562506210
2024 9 FD52 06 E123 C 1237401C 008 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810073 $3.45 000001084158-3562506200
2024 8 FD52 06 E122 C 1237401C 008 2/29/2024 5242 CONCRETE TESTING UNIT CA-XR022O1062405408894 $1,497.88 000001082809-3562506210
2024 8 FD52 06 E123 C 1237401C 008 2/29/2024 5242 CONCRETE TESTING UNIT CA-XR022O1062405408894 $455.18 000001082809-3562506210
2024 8 FD52 06 E124 C 1237401C 008 2/29/2024 5242 CONCRETE TESTING UNIT CA-XR022O1062405408894 $0.81 000001082809-3562506210
2024 8 FD52 06 E111 C 1237401C 008 2/29/2024 5242 CONCRETE TESTING UNIT CA-XR022O1062405408894 $2,263.68 000001082809-3562506210
2024 8 FD52 06 E111 C 1237401C 094 2/29/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR022O1062405408899 $1,002.33 000001084734-3562506210
2024 8 FD52 06 E121 C 1237401C 094 2/29/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR022O1062405408899 $75.35 000001084734-3562506210
2024 8 FD52 06 E122 C 1237401C 094 2/29/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR022O1062405408899 $663.29 000001084734-3562506210
2024 8 FD52 06 E123 C 1237401C 094 2/29/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR022O1062405408899 $145.42 000001084734-3562506210
2024 8 FD52 06 E124 C 1237401C 094 2/29/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR022O1062405408899 $0.25 000001084734-3562506210
2024 8 FD52 06 E121 C 1237401C 008 2/29/2024 5242 CONCRETE TESTING UNIT CA-XR022O1062405408894 $164.13 000001082809-3562506210
2024 8 FD52 06 E797 C 1237401C 008 2/28/2024 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P037K CTXCONST0922213090001K EATON ASPHALT PAVING CO $39,808.95
2024 8 FD52 06 E111 C 1237401C 008 2/26/2024 4010 CONSTRUCTION ENGINEERING CA-XR022O1062405409171 $362.61 11084964-3562506340
2024 8 FD52 06 E111 C 1237401C 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405409171 $77.35 11084964-3562506340
2024 8 FD52 06 E121 C 1237401C 008 2/26/2024 4010 CONSTRUCTION ENGINEERING CA-XR022O1062405409171 $27.55 11084964-3562506340
2024 8 FD52 06 E121 C 1237401C 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405409171 $5.87 11084964-3562506340
2024 8 FD52 06 E122 C 1237401C 008 2/26/2024 4010 CONSTRUCTION ENGINEERING CA-XR022O1062405409171 $239.93 11084964-3562506340
2024 8 FD52 06 E122 C 1237401C 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405409171 $51.18 11084964-3562506340
2024 8 FD52 06 E123 C 1237401C 008 2/26/2024 4010 CONSTRUCTION ENGINEERING CA-XR022O1062405409171 $40.44 11084964-3562506340
2024 8 FD52 06 E123 C 1237401C 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405409171 $8.51 11084964-3562506340
2024 8 FD52 06 E124 C 1237401C 008 2/26/2024 4010 CONSTRUCTION ENGINEERING CA-XR022O1062405409171 $0.09 11084964-3562506340
2024 8 FD52 06 E124 C 1237401C 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405409171 $0.02 11084964-3562506340
2024 8 FD52 06 E111 C 1237401C 008 2/26/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR022O1062405408901 $2,633.90 000001085420-3562506210
2024 8 FD52 06 E111 C 1237401C 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408901 $216.86 000001085420-3562506210
2024 8 FD52 06 E121 C 1237401C 008 2/26/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR022O1062405408901 $188.48 000001085420-3562506210
2024 8 FD52 06 E121 C 1237401C 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408901 $15.09 000001085420-3562506210
2024 8 FD52 06 E122 C 1237401C 008 2/26/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR022O1062405408901 $1,742.90 000001085420-3562506210
2024 8 FD52 06 E122 C 1237401C 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408901 $143.50 000001085420-3562506210
2024 8 FD52 06 E123 C 1237401C 008 2/26/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR022O1062405408901 $539.06 000001085420-3562506210
2024 8 FD52 06 E123 C 1237401C 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408901 $65.99 000001085420-3562506210
2024 8 FD52 06 E124 C 1237401C 008 2/26/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR022O1062405408901 $0.88 000001085420-3562506210
2024 8 FD52 06 E124 C 1237401C 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408901 $0.08 000001085420-3562506210
2024 8 FD52 06 E111 C 1237401C 008 2/26/2024 5242 CONCRETE TESTING UNIT CA-XR022O1062405408901 $1,001.61 000001085422-3562506210
2024 8 FD52 06 E111 C 1237401C 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408901 $178.34 000001085422-3562506210
2024 8 FD52 06 E121 C 1237401C 008 2/26/2024 5242 CONCRETE TESTING UNIT CA-XR022O1062405408901 $71.35 000001085422-3562506210
2024 8 FD52 06 E121 C 1237401C 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408901 $12.55 000001085422-3562506210
2024 8 FD52 06 E122 C 1237401C 008 2/26/2024 5242 CONCRETE TESTING UNIT CA-XR022O1062405408901 $662.79 000001085422-3562506210
2024 8 FD52 06 E122 C 1237401C 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408901 $118.01 000001085422-3562506210
2024 8 FD52 06 E123 C 1237401C 008 2/26/2024 5242 CONCRETE TESTING UNIT CA-XR022O1062405408901 $216.66 000001085422-3562506210
2024 8 FD52 06 E123 C 1237401C 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408901 $46.17 000001085422-3562506210
2024 8 FD52 06 E124 C 1237401C 008 2/26/2024 5242 CONCRETE TESTING UNIT CA-XR022O1062405408901 $0.38 000001085422-3562506210
2024 8 FD52 06 E124 C 1237401C 008 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408901 $0.07 000001085422-3562506210
2024 8 FD52 06 E797 C 1237401C 008 2/19/2024 4010 CONSTRUCTION ENGINEERING PRC-2400165579 PON22400001008 H W Lochner Inc $1,836.00 SW Highway & Bridge Construction Inspection R3
2024 8 FD52 06 E797 C 1237401C 008 2/19/2024 4010 CONSTRUCTION ENGINEERING PRC-2400165579 PON22400001008 H W Lochner Inc $300.00 SW Highway & Bridge Construction Inspection R3
2024 8 FD52 06 E797 C 1237401C 008 2/19/2024 4010 CONSTRUCTION ENGINEERING PRC-2400165579 PON22400001008 H W Lochner Inc $6,125.00 SW Highway & Bridge Construction Inspection R3
2024 8 FD52 06 E797 C 1237401C 008 2/19/2024 4010 CONSTRUCTION ENGINEERING PRC-2400165579 PON22400001008 H W Lochner Inc $4,806.00 SW Highway & Bridge Construction Inspection R3
2024 8 FD52 06 E797 C 1237401C 008 2/19/2024 4010 CONSTRUCTION ENGINEERING PRC-2400165579 PON22400001008 H W Lochner Inc $486.00 SW Highway & Bridge Construction Inspection R3
2024 8 FD52 06 E797 C 1237401C 008 2/14/2024 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P036K CTXCONST0922213090001K EATON ASPHALT PAVING CO $264,913.49
2024 8 FD52 06 E111 C 1237401C 008 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403908041 $7.53 11076145-3562506340
2024 8 FD52 06 E121 C 1237401C 008 2/9/2024 4010 CONSTRUCTION ENGINEERING CA-XR021O1062403908041 $25.07 11076145-3562506340
2024 8 FD52 06 E111 C 1237401C 008 2/9/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR021O1062403907668 $1,241.35 000001085420-3562506210
2024 8 FD52 06 E111 C 1237401C 008 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907668 $188.34 000001085420-3562506210
2024 8 FD52 06 E121 C 1237401C 008 2/9/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR021O1062403907668 $88.49 000001085420-3562506210
2024 8 FD52 06 E121 C 1237401C 008 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907668 $13.20 000001085420-3562506210
2024 8 FD52 06 E122 C 1237401C 008 2/9/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR021O1062403907668 $821.46 000001085420-3562506210
2024 8 FD52 06 E122 C 1237401C 008 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907668 $124.63 000001085420-3562506210
2024 8 FD52 06 E123 C 1237401C 008 2/9/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR021O1062403907668 $238.35 000001085420-3562506210
2024 8 FD52 06 E123 C 1237401C 008 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907668 $38.56 000001085420-3562506210
2024 8 FD52 06 E121 C 1237401C 008 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403908041 $0.57 11076145-3562506340
2024 8 FD52 06 E111 C 1237401C 008 2/9/2024 5242 CONCRETE TESTING UNIT CA-XR021O1062403907668 $984.11 000001085422-3562506210
2024 8 FD52 06 E111 C 1237401C 008 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907668 $1.22 000001085422-3562506210
2024 8 FD52 06 E121 C 1237401C 008 2/9/2024 5242 CONCRETE TESTING UNIT CA-XR021O1062403907668 $70.45 000001085422-3562506210
2024 8 FD52 06 E121 C 1237401C 008 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907668 $0.09 000001085422-3562506210
2024 8 FD52 06 E122 C 1237401C 008 2/9/2024 5242 CONCRETE TESTING UNIT CA-XR021O1062403907668 $651.15 000001085422-3562506210
2024 8 FD52 06 E122 C 1237401C 008 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907668 $0.81 000001085422-3562506210
2024 8 FD52 06 E123 C 1237401C 008 2/9/2024 5242 CONCRETE TESTING UNIT CA-XR021O1062403907668 $182.17 000001085422-3562506210
2024 8 FD52 06 E123 C 1237401C 008 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907668 $0.24 000001085422-3562506210
2024 8 FD52 06 E122 C 1237401C 008 2/9/2024 4010 CONSTRUCTION ENGINEERING CA-XR021O1062403908041 $219.94 11076145-3562506340
2024 8 FD52 06 E122 C 1237401C 008 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403908041 $4.98 11076145-3562506340
2024 8 FD52 06 E123 C 1237401C 008 2/9/2024 4010 CONSTRUCTION ENGINEERING CA-XR021O1062403908041 $36.98 11076145-3562506340
2024 8 FD52 06 E123 C 1237401C 008 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403908041 $0.83 11076145-3562506340
2024 8 FD52 06 E111 C 1237401C 008 2/9/2024 4010 CONSTRUCTION ENGINEERING CA-XR021O1062403908040 $332.39 11076145-3562506340
2024 7 FD52 06 E797 C 1237401C 008 1/31/2024 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P035K CTXCONST0922213090001K EATON ASPHALT PAVING CO $4,324.14
2024 7 FD52 06 E229 C 1237401C 008 1/29/2024 4010 CONSTRUCTION ENGINEERING IET-XE13A162524025007240 $5.85
2024 7 FD52 06 E797 C 1237401C 008 1/25/2024 4010 CONSTRUCTION ENGINEERING PRC-2400147197 PON22200004163 H W Lochner Inc $693.00 SW HWY & Bridge Construction Inspection Region 1
2024 7 FD52 06 E797 C 1237401C 008 1/25/2024 4010 CONSTRUCTION ENGINEERING PRC-2400147197 PON22200004163 H W Lochner Inc $714.00 SW HWY & Bridge Construction Inspection Region 1
2024 7 FD52 06 E797 C 1237401C 008 1/25/2024 4010 CONSTRUCTION ENGINEERING PRC-2400147197 PON22200004163 H W Lochner Inc $14,382.00 SW HWY & Bridge Construction Inspection Region 1
2024 7 FD52 06 E797 C 1237401C 008 1/25/2024 4010 CONSTRUCTION ENGINEERING PRC-2400147197 PON22200004163 H W Lochner Inc $5,518.00 SW HWY & Bridge Construction Inspection Region 1
2024 7 FD52 06 E797 C 1237401C 008 1/25/2024 4010 CONSTRUCTION ENGINEERING PRC-2400147197 PON22200004163 H W Lochner Inc $765.00 SW HWY & Bridge Construction Inspection Region 1
2024 7 FD52 06 E797 C 1237401C 008 1/25/2024 4010 CONSTRUCTION ENGINEERING PRC-2400147197 PON22200004163 H W Lochner Inc $3,876.00 SW HWY & Bridge Construction Inspection Region 1
2024 7 FD52 06 E797 C 1237401C 008 1/25/2024 4010 CONSTRUCTION ENGINEERING PRC-2400147197 PON22200004163 H W Lochner Inc $6,222.00 SW HWY & Bridge Construction Inspection Region 1
2024 7 FD52 06 E797 C 1237401C 008 1/25/2024 4010 CONSTRUCTION ENGINEERING PRC-2400147197 PON22200004163 H W Lochner Inc $1,632.00 SW HWY & Bridge Construction Inspection Region 1
2024 7 FD52 06 E797 C 1237401C 008 1/25/2024 4010 CONSTRUCTION ENGINEERING PRC-2400147197 PON22200004163 H W Lochner Inc $7,650.00 SW HWY & Bridge Construction Inspection Region 1
2024 7 FD52 06 E797 C 1237401C 008 1/25/2024 4010 CONSTRUCTION ENGINEERING PRC-2400147197 PON22200004163 H W Lochner Inc $4,845.00 SW HWY & Bridge Construction Inspection Region 1
2024 7 FD52 06 E797 C 1237401C 008 1/25/2024 4010 CONSTRUCTION ENGINEERING PRC-2400147197 PON22200004163 H W Lochner Inc $5,355.00 SW HWY & Bridge Construction Inspection Region 1
2024 7 FD52 06 E797 C 1237401C 008 1/25/2024 4010 CONSTRUCTION ENGINEERING PRC-2400147197 PON22200004163 H W Lochner Inc $12,580.00 SW HWY & Bridge Construction Inspection Region 1
2024 7 FD52 00 E124 C 1237401C 008 1/24/2024 5341 GEOTECHNICAL INVEST (CONST) CA-XR012O1062402306588 $0.02 000001084083-3562500610
2024 7 FD52 06 E111 C 1237401C 008 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306972 $119.90 11068030-3562506340
2024 7 FD52 06 E111 C 1237401C 008 1/24/2024 4010 CONSTRUCTION ENGINEERING CA-XR012O1062402306972 $362.60 11068030-3562506340
2024 7 FD52 06 E111 C 1237401C 008 1/24/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR012O1062402306592 $996.29 000001085420-3562506210
2024 7 FD52 06 E121 C 1237401C 008 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306972 $9.11 11068030-3562506340
2024 7 FD52 06 E111 C 1237401C 008 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306592 $283.94 000001085420-3562506210
2024 7 FD52 06 E121 C 1237401C 008 1/24/2024 4010 CONSTRUCTION ENGINEERING CA-XR012O1062402306972 $27.55 11068030-3562506340
2024 7 FD52 06 E121 C 1237401C 008 1/24/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR012O1062402306592 $70.40 000001085420-3562506210
2024 7 FD52 06 E122 C 1237401C 008 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306972 $79.33 11068030-3562506340
2024 7 FD52 06 E121 C 1237401C 008 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306592 $19.99 000001085420-3562506210
2024 7 FD52 06 E122 C 1237401C 008 1/24/2024 4010 CONSTRUCTION ENGINEERING CA-XR012O1062402306972 $239.95 11068030-3562506340
2024 7 FD52 06 E122 C 1237401C 008 1/24/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR012O1062402306592 $659.25 000001085420-3562506210
2024 7 FD52 06 E123 C 1237401C 008 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306972 $13.18 11068030-3562506340
2024 7 FD52 06 E122 C 1237401C 008 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306592 $187.89 000001085420-3562506210
2024 7 FD52 06 E123 C 1237401C 008 1/24/2024 4010 CONSTRUCTION ENGINEERING CA-XR012O1062402306972 $40.52 11068030-3562506340
2024 7 FD52 06 E123 C 1237401C 008 1/24/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR012O1062402306592 $233.09 000001085420-3562506210
2024 7 FD52 06 E124 C 1237401C 008 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306972 $0.03 11068030-3562506340
2024 7 FD52 06 E123 C 1237401C 008 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306592 $70.43 000001085420-3562506210
2024 7 FD52 06 E124 C 1237401C 008 1/24/2024 4010 CONSTRUCTION ENGINEERING CA-XR012O1062402306972 $0.09 11068030-3562506340
2024 7 FD52 06 E124 C 1237401C 008 1/24/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR012O1062402306592 $0.36 000001085420-3562506210
2024 7 FD52 06 E124 C 1237401C 008 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306592 $0.09 000001085420-3562506210
2024 7 FD52 06 E111 C 1237401C 008 1/24/2024 5242 CONCRETE TESTING UNIT CA-XR012O1062402306592 $1,820.77 000001085422-3562506210
2024 7 FD52 06 E111 C 1237401C 008 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306592 $589.68 000001085422-3562506210
2024 7 FD52 06 E121 C 1237401C 008 1/24/2024 5242 CONCRETE TESTING UNIT CA-XR012O1062402306592 $131.18 000001085422-3562506210
2024 7 FD52 06 E121 C 1237401C 008 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306592 $42.66 000001085422-3562506210
2024 7 FD52 06 E122 C 1237401C 008 1/24/2024 5242 CONCRETE TESTING UNIT CA-XR012O1062402306592 $1,204.77 000001085422-3562506210
2024 7 FD52 06 E122 C 1237401C 008 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306592 $390.20 000001085422-3562506210
2024 7 FD52 06 E123 C 1237401C 008 1/24/2024 5242 CONCRETE TESTING UNIT CA-XR012O1062402306592 $355.57 000001085422-3562506210
2024 7 FD52 06 E123 C 1237401C 008 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306592 $115.11 000001085422-3562506210
2024 7 FD52 06 E124 C 1237401C 008 1/24/2024 5242 CONCRETE TESTING UNIT CA-XR012O1062402306592 $0.64 000001085422-3562506210
2024 7 FD52 06 E124 C 1237401C 008 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306592 $0.21 000001085422-3562506210
2024 7 FD52 06 E111 C 1237401C 008 1/24/2024 5203 TESTING OF ASPHALT MIXTURES CA-XR012O1062402306603 $249.13 000001087272-3562506210
2024 7 FD52 06 E111 C 1237401C 008 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306603 $153.76 000001087272-3562506210
2024 7 FD52 06 E121 C 1237401C 008 1/24/2024 5203 TESTING OF ASPHALT MIXTURES CA-XR012O1062402306603 $17.83 000001087272-3562506210
2024 7 FD52 06 E121 C 1237401C 008 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306603 $11.01 000001087272-3562506210
2024 7 FD52 06 E122 C 1237401C 008 1/24/2024 5203 TESTING OF ASPHALT MIXTURES CA-XR012O1062402306603 $164.81 000001087272-3562506210
2024 7 FD52 06 E122 C 1237401C 008 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306603 $101.74 000001087272-3562506210
2024 7 FD52 06 E123 C 1237401C 008 1/24/2024 5203 TESTING OF ASPHALT MIXTURES CA-XR012O1062402306603 $49.22 000001087272-3562506210
2024 7 FD52 06 E123 C 1237401C 008 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306603 $29.92 000001087272-3562506210
2024 7 FD52 06 E124 C 1237401C 008 1/24/2024 5203 TESTING OF ASPHALT MIXTURES CA-XR012O1062402306603 $0.09 000001087272-3562506210
2024 7 FD52 06 E124 C 1237401C 008 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306603 $0.05 000001087272-3562506210
2024 7 FD52 00 E111 C 1237401C 008 1/24/2024 5341 GEOTECHNICAL INVEST (CONST) CA-XR012O1062402306587 $95.54 000001084083-3562500610
2024 7 FD52 00 E111 C 1237401C 008 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306587 $33.11 000001084083-3562500610
2024 7 FD52 00 E121 C 1237401C 008 1/24/2024 5341 GEOTECHNICAL INVEST (CONST) CA-XR012O1062402306587 $7.14 000001084083-3562500610
2024 7 FD52 00 E121 C 1237401C 008 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306587 $2.48 000001084083-3562500610
2024 7 FD52 00 E122 C 1237401C 008 1/24/2024 5341 GEOTECHNICAL INVEST (CONST) CA-XR012O1062402306587 $63.21 000001084083-3562500610
2024 7 FD52 00 E122 C 1237401C 008 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306587 $21.91 000001084083-3562500610
2024 7 FD52 00 E123 C 1237401C 008 1/24/2024 5341 GEOTECHNICAL INVEST (CONST) CA-XR012O1062402306587 $10.41 000001084083-3562500610
2024 7 FD52 00 E123 C 1237401C 008 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306587 $3.57 000001084083-3562500610
2024 7 FD52 06 E229 C 1237401C 008 1/11/2024 4010 CONSTRUCTION ENGINEERING IET-XE13A162524010008920 $9.75
2024 7 FD52 00 E111 C 1237401C 008 1/11/2024 5341 GEOTECHNICAL INVEST (CONST) CA-XR122N1062335504611 $477.64 000001084083-3562500610
2024 7 FD52 00 E111 C 1237401C 008 1/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504611 $47.76 000001084083-3562500610
2024 7 FD52 00 E121 C 1237401C 008 1/11/2024 5341 GEOTECHNICAL INVEST (CONST) CA-XR122N1062335504611 $35.77 000001084083-3562500610
2024 7 FD52 00 E121 C 1237401C 008 1/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504611 $3.58 000001084083-3562500610
2024 7 FD52 00 E122 C 1237401C 008 1/11/2024 5341 GEOTECHNICAL INVEST (CONST) CA-XR122N1062335504611 $316.06 000001084083-3562500610
2024 7 FD52 00 E122 C 1237401C 008 1/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504611 $31.60 000001084083-3562500610
2024 7 FD52 00 E123 C 1237401C 008 1/11/2024 5341 GEOTECHNICAL INVEST (CONST) CA-XR122N1062335504611 $45.07 000001084083-3562500610
2024 7 FD52 00 E123 C 1237401C 008 1/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504611 $4.46 000001084083-3562500610
2024 7 FD52 00 E124 C 1237401C 008 1/11/2024 5341 GEOTECHNICAL INVEST (CONST) CA-XR122N1062335504611 $0.09 000001084083-3562500610
2024 7 FD52 00 E124 C 1237401C 008 1/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504611 $0.01 000001084083-3562500610
2024 7 FD52 06 E111 C 1237401C 008 1/10/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR011O1062400505723 $2,593.89 000001085420-3562506210
2024 7 FD52 06 E111 C 1237401C 008 1/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505723 $2,089.10 000001085420-3562506210
2024 7 FD52 06 E121 C 1237401C 008 1/10/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR011O1062400505723 $187.90 000001085420-3562506210
2024 7 FD52 06 E121 C 1237401C 008 1/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505723 $152.41 000001085420-3562506210
2024 7 FD52 06 E122 C 1237401C 008 1/10/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR011O1062400505723 $1,716.32 000001085420-3562506210
2024 7 FD52 06 E122 C 1237401C 008 1/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505723 $1,382.35 000001085420-3562506210
2024 7 FD52 06 E123 C 1237401C 008 1/10/2024 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR011O1062400505723 $456.88 000001085420-3562506210
2024 7 FD52 06 E123 C 1237401C 008 1/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505723 $352.22 000001085420-3562506210
2024 7 FD52 06 E111 C 1237401C 008 1/10/2024 5242 CONCRETE TESTING UNIT CA-XR011O1062400505723 $1,096.01 000001085422-3562506210
2024 7 FD52 06 E111 C 1237401C 008 1/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505723 $469.79 000001085422-3562506210
2024 7 FD52 06 E121 C 1237401C 008 1/10/2024 5242 CONCRETE TESTING UNIT CA-XR011O1062400505723 $81.74 000001085422-3562506210
2024 7 FD52 06 E121 C 1237401C 008 1/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505723 $35.04 000001085422-3562506210
2024 7 FD52 06 E122 C 1237401C 008 1/10/2024 5242 CONCRETE TESTING UNIT CA-XR011O1062400505723 $725.17 000001085422-3562506210
2024 7 FD52 06 E122 C 1237401C 008 1/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505723 $310.86 000001085422-3562506210
2024 7 FD52 06 E123 C 1237401C 008 1/10/2024 5242 CONCRETE TESTING UNIT CA-XR011O1062400505723 $229.35 000001085422-3562506210
2024 7 FD52 06 E123 C 1237401C 008 1/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505723 $97.07 000001085422-3562506210
2024 7 FD52 06 E111 C 1237401C 008 1/10/2024 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR011O1062400505723 $274.08 000001085423-3562506210
2024 7 FD52 06 E111 C 1237401C 008 1/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505723 $117.26 000001085423-3562506210
2024 7 FD52 06 E121 C 1237401C 008 1/10/2024 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR011O1062400505723 $20.43 000001085423-3562506210
2024 7 FD52 06 E121 C 1237401C 008 1/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505723 $8.75 000001085423-3562506210
2024 7 FD52 06 E122 C 1237401C 008 1/10/2024 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR011O1062400505723 $181.29 000001085423-3562506210
2024 7 FD52 06 E122 C 1237401C 008 1/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505723 $77.59 000001085423-3562506210
2024 7 FD52 06 E123 C 1237401C 008 1/10/2024 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR011O1062400505723 $57.34 000001085423-3562506210
2024 7 FD52 06 E123 C 1237401C 008 1/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505723 $24.23 000001085423-3562506210
2024 7 FD52 06 E111 C 1237401C 008 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505939 $270.69 11060206-3562506340
2024 7 FD52 06 E797 C 1237401C 008 1/8/2024 4010 CONSTRUCTION ENGINEERING PRC-2400121055 PON22200004163 H W Lochner Inc $748.00 SW HWY & Bridge Construction Inspection Region 1
2024 7 FD52 06 E122 C 1237401C 008 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505730 $338.17 000001087272-3562506210
2024 7 FD52 06 E123 C 1237401C 008 1/8/2024 5203 TESTING OF ASPHALT MIXTURES CA-XR011O1062400505730 $114.97 000001087272-3562506210
2024 7 FD52 06 E123 C 1237401C 008 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505730 $80.84 000001087272-3562506210
2024 7 FD52 06 E111 C 1237401C 008 1/8/2024 4010 CONSTRUCTION ENGINEERING CA-XR011O1062400505939 $212.61 11060206-3562506340
2024 7 FD52 06 E121 C 1237401C 008 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505939 $20.42 11060206-3562506340
2024 7 FD52 06 E797 C 1237401C 008 1/8/2024 4010 CONSTRUCTION ENGINEERING PRC-2400121055 PON22200004163 H W Lochner Inc $2,244.00 SW HWY & Bridge Construction Inspection Region 1
2024 7 FD52 06 E121 C 1237401C 008 1/8/2024 4010 CONSTRUCTION ENGINEERING CA-XR011O1062400505939 $16.05 11060206-3562506340
2024 7 FD52 06 E111 C 1237401C 008 1/8/2024 5203 TESTING OF ASPHALT MIXTURES CA-XR011O1062400505730 $667.87 000001087272-3562506210
2024 7 FD52 06 E122 C 1237401C 008 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505939 $179.12 11060206-3562506340
2024 7 FD52 06 E111 C 1237401C 008 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505730 $511.06 000001087272-3562506210
2024 7 FD52 06 E122 C 1237401C 008 1/8/2024 4010 CONSTRUCTION ENGINEERING CA-XR011O1062400505939 $140.76 11060206-3562506340
2024 7 FD52 06 E121 C 1237401C 008 1/8/2024 5203 TESTING OF ASPHALT MIXTURES CA-XR011O1062400505730 $50.03 000001087272-3562506210
2024 7 FD52 06 E123 C 1237401C 008 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505939 $29.77 11060206-3562506340
2024 7 FD52 06 E121 C 1237401C 008 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505730 $38.35 000001087272-3562506210
2024 7 FD52 06 E123 C 1237401C 008 1/8/2024 4010 CONSTRUCTION ENGINEERING CA-XR011O1062400505939 $24.01 11060206-3562506340
2024 7 FD52 06 E122 C 1237401C 008 1/8/2024 5203 TESTING OF ASPHALT MIXTURES CA-XR011O1062400505730 $441.87 000001087272-3562506210
2024 7 FD52 06 E797 C 1237401C 008 1/4/2024 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P034K CTXCONST0922213090001K EATON ASPHALT PAVING CO $74,135.39
2024 6 FD52 06 E229 C 1237401C 008 12/27/2023 4010 CONSTRUCTION ENGINEERING IET-XE13A162523359007350 $11.70
2024 6 FD52 06 E111 C 1237401C 008 12/22/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR122N1062335504617 $747.39 000001085420-3562506210
2024 6 FD52 06 E111 C 1237401C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504617 $426.74 000001085420-3562506210
2024 6 FD52 06 E121 C 1237401C 008 12/22/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR122N1062335504617 $53.25 000001085420-3562506210
2024 6 FD52 06 E121 C 1237401C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504617 $30.41 000001085420-3562506210
2024 6 FD52 06 E122 C 1237401C 008 12/22/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR122N1062335504617 $494.44 000001085420-3562506210
2024 6 FD52 06 E122 C 1237401C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504617 $282.38 000001085420-3562506210
2024 6 FD52 06 E111 C 1237401C 008 12/22/2023 5203 TESTING OF ASPHALT MIXTURES CA-XR122N1062335504629 $2,069.97 000001087272-3562506210
2024 6 FD52 06 E123 C 1237401C 008 12/22/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR122N1062335504617 $135.86 000001085420-3562506210
2024 6 FD52 06 E111 C 1237401C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504629 $324.22 000001087272-3562506210
2024 6 FD52 06 E123 C 1237401C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504617 $76.34 000001085420-3562506210
2024 6 FD52 06 E121 C 1237401C 008 12/22/2023 5203 TESTING OF ASPHALT MIXTURES CA-XR122N1062335504629 $152.88 000001087272-3562506210
2024 6 FD52 06 E124 C 1237401C 008 12/22/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR122N1062335504617 $0.27 000001085420-3562506210
2024 6 FD52 06 E121 C 1237401C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504629 $23.64 000001087272-3562506210
2024 6 FD52 06 E124 C 1237401C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504617 $0.16 000001085420-3562506210
2024 6 FD52 06 E122 C 1237401C 008 12/22/2023 5203 TESTING OF ASPHALT MIXTURES CA-XR122N1062335504629 $1,370.01 000001087272-3562506210
2024 6 FD52 06 E111 C 1237401C 008 12/22/2023 5242 CONCRETE TESTING UNIT CA-XR122N1062335504617 $2,185.64 000001085422-3562506210
2024 6 FD52 06 E122 C 1237401C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504629 $214.54 000001087272-3562506210
2024 6 FD52 06 E111 C 1237401C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504617 $218.56 000001085422-3562506210
2024 6 FD52 06 E123 C 1237401C 008 12/22/2023 5203 TESTING OF ASPHALT MIXTURES CA-XR122N1062335504629 $355.69 000001087272-3562506210
2024 6 FD52 06 E121 C 1237401C 008 12/22/2023 5242 CONCRETE TESTING UNIT CA-XR122N1062335504617 $159.09 000001085422-3562506210
2024 6 FD52 06 E123 C 1237401C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504629 $56.10 000001087272-3562506210
2024 6 FD52 06 E121 C 1237401C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504617 $15.90 000001085422-3562506210
2024 6 FD52 06 E124 C 1237401C 008 12/22/2023 5203 TESTING OF ASPHALT MIXTURES CA-XR122N1062335504629 $0.72 000001087272-3562506210
2024 6 FD52 06 E122 C 1237401C 008 12/22/2023 5242 CONCRETE TESTING UNIT CA-XR122N1062335504617 $1,446.24 000001085422-3562506210
2024 6 FD52 06 E124 C 1237401C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504629 $0.12 000001087272-3562506210
2024 6 FD52 06 E122 C 1237401C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504617 $144.62 000001085422-3562506210
2024 6 FD52 06 E123 C 1237401C 008 12/22/2023 5242 CONCRETE TESTING UNIT CA-XR122N1062335504617 $339.79 000001085422-3562506210
2024 6 FD52 06 E123 C 1237401C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504617 $33.57 000001085422-3562506210
2024 6 FD52 06 E124 C 1237401C 008 12/22/2023 5242 CONCRETE TESTING UNIT CA-XR122N1062335504617 $0.72 000001085422-3562506210
2024 6 FD52 06 E124 C 1237401C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504617 $0.08 000001085422-3562506210
2024 6 FD52 06 E111 C 1237401C 008 12/22/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR122N1062335504617 $249.24 000001085423-3562506210
2024 6 FD52 06 E111 C 1237401C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504617 $142.14 000001085423-3562506210
2024 6 FD52 06 E121 C 1237401C 008 12/22/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR122N1062335504617 $17.75 000001085423-3562506210
2024 6 FD52 06 E121 C 1237401C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504617 $10.13 000001085423-3562506210
2024 6 FD52 06 E122 C 1237401C 008 12/22/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR122N1062335504617 $164.81 000001085423-3562506210
2024 6 FD52 06 E122 C 1237401C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504617 $94.06 000001085423-3562506210
2024 6 FD52 06 E123 C 1237401C 008 12/22/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR122N1062335504617 $45.29 000001085423-3562506210
2024 6 FD52 06 E123 C 1237401C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504617 $25.43 000001085423-3562506210
2024 6 FD52 06 E124 C 1237401C 008 12/22/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR122N1062335504617 $0.09 000001085423-3562506210
2024 6 FD52 06 E124 C 1237401C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504617 $0.05 000001085423-3562506210
2024 6 FD52 06 E111 C 1237401C 008 12/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR122N1062335505026 $362.60 11054349-3562506340
2024 6 FD52 06 E111 C 1237401C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335505026 $116.03 11054349-3562506340
2024 6 FD52 06 E121 C 1237401C 008 12/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR122N1062335505026 $27.55 11054349-3562506340
2024 6 FD52 06 E121 C 1237401C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335505026 $8.83 11054349-3562506340
2024 6 FD52 06 E122 C 1237401C 008 12/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR122N1062335505026 $239.93 11054349-3562506340
2024 6 FD52 06 E122 C 1237401C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335505026 $76.78 11054349-3562506340
2024 6 FD52 06 E123 C 1237401C 008 12/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR122N1062335505026 $35.14 11054349-3562506340
2024 6 FD52 06 E123 C 1237401C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335505026 $11.04 11054349-3562506340
2024 6 FD52 06 E124 C 1237401C 008 12/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR122N1062335505026 $0.09 11054349-3562506340
2024 6 FD52 06 E124 C 1237401C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335505026 $0.03 11054349-3562506340
2024 6 FD52 06 E111 C 1237401C 008 12/22/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR122N1062335504664 $286.02 000001090317-3562506210
2024 6 FD52 06 E111 C 1237401C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504664 $42.49 000001090317-3562506210
2024 6 FD52 06 E121 C 1237401C 008 12/22/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR122N1062335504664 $21.53 000001090317-3562506210
2024 6 FD52 06 E121 C 1237401C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504664 $3.20 000001090317-3562506210
2024 6 FD52 06 E122 C 1237401C 008 12/22/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR122N1062335504664 $189.51 000001090317-3562506210
2024 6 FD52 06 E122 C 1237401C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504664 $28.12 000001090317-3562506210
2024 6 FD52 06 E123 C 1237401C 008 12/22/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR122N1062335504664 $36.07 000001090317-3562506210
2024 6 FD52 06 E123 C 1237401C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504664 $5.28 000001090317-3562506210
2024 6 FD52 06 E124 C 1237401C 008 12/22/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR122N1062335504664 $0.07 000001090317-3562506210
2024 6 FD52 06 E124 C 1237401C 008 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504664 $0.01 000001090317-3562506210
2024 6 FD52 06 E797 C 1237401C 008 12/20/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P033K CTXCONST0922213090001K EATON ASPHALT PAVING CO $765,148.40
2024 6 FD52 06 E121 C 1237401C 008 12/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203626 $6.00 000001085420-3562506210
2024 6 FD52 06 E122 C 1237401C 008 12/14/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR121N1062334203626 $236.61 000001085420-3562506210
2024 6 FD52 06 E122 C 1237401C 008 12/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203626 $52.74 000001085420-3562506210
2024 6 FD52 06 E123 C 1237401C 008 12/14/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR121N1062334203626 $45.06 000001085420-3562506210
2024 6 FD52 06 E123 C 1237401C 008 12/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203626 $9.92 000001085420-3562506210
2024 6 FD52 06 E111 C 1237401C 008 12/14/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR121N1062334203626 $946.36 000001085423-3562506210
2024 6 FD52 06 E111 C 1237401C 008 12/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203626 $340.41 000001085423-3562506210
2024 6 FD52 06 E121 C 1237401C 008 12/14/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR121N1062334203626 $68.06 000001085423-3562506210
2024 6 FD52 06 E121 C 1237401C 008 12/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203626 $24.02 000001085423-3562506210
2024 6 FD52 06 E122 C 1237401C 008 12/14/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR121N1062334203626 $626.28 000001085423-3562506210
2024 6 FD52 06 E122 C 1237401C 008 12/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203626 $225.26 000001085423-3562506210
2024 6 FD52 06 E123 C 1237401C 008 12/14/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR121N1062334203626 $169.13 000001085423-3562506210
2024 6 FD52 06 E123 C 1237401C 008 12/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203626 $60.31 000001085423-3562506210
2024 6 FD52 06 E111 C 1237401C 008 12/14/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR121N1062334203626 $357.94 000001085420-3562506210
2024 6 FD52 06 E111 C 1237401C 008 12/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203626 $79.71 000001085420-3562506210
2024 6 FD52 06 E121 C 1237401C 008 12/14/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR121N1062334203626 $26.91 000001085420-3562506210
2024 6 FD52 06 E111 C 1237401C 008 12/11/2023 5203 TESTING OF ASPHALT MIXTURES CA-XR121N1062334203635 $249.03 000001087272-3562506210
2024 6 FD52 06 E111 C 1237401C 008 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203635 $55.46 000001087272-3562506210
2024 6 FD52 06 E121 C 1237401C 008 12/11/2023 5203 TESTING OF ASPHALT MIXTURES CA-XR121N1062334203635 $18.57 000001087272-3562506210
2024 6 FD52 06 E121 C 1237401C 008 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203635 $4.13 000001087272-3562506210
2024 6 FD52 06 E122 C 1237401C 008 12/11/2023 5203 TESTING OF ASPHALT MIXTURES CA-XR121N1062334203635 $164.60 000001087272-3562506210
2024 6 FD52 06 E122 C 1237401C 008 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203635 $36.70 000001087272-3562506210
2024 6 FD52 06 E123 C 1237401C 008 12/11/2023 5203 TESTING OF ASPHALT MIXTURES CA-XR121N1062334203635 $45.06 000001087272-3562506210
2024 6 FD52 06 E123 C 1237401C 008 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203635 $9.92 000001087272-3562506210
2024 6 FD52 00 E111 C 1237401C 008 12/11/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR121N1062334203621 $1,378.36 000001084083-3562500610
2024 6 FD52 00 E111 C 1237401C 008 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203621 $480.53 000001084083-3562500610
2024 6 FD52 00 E121 C 1237401C 008 12/11/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR121N1062334203621 $103.04 000001084083-3562500610
2024 6 FD52 00 E121 C 1237401C 008 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203621 $35.93 000001084083-3562500610
2024 6 FD52 00 E122 C 1237401C 008 12/11/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR121N1062334203621 $912.11 000001084083-3562500610
2024 6 FD52 00 E122 C 1237401C 008 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203621 $317.96 000001084083-3562500610
2024 6 FD52 00 E123 C 1237401C 008 12/11/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR121N1062334203621 $115.48 000001084083-3562500610
2024 6 FD52 00 E123 C 1237401C 008 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203621 $40.19 000001084083-3562500610
2024 6 FD52 06 E797 C 1237401C 008 12/6/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P032K CTXCONST0922213090001K EATON ASPHALT PAVING CO $421,957.78
2024 5 FD52 06 E797 C 1237401C 008 11/30/2023 4580 CONSTRUCTION CONTRACTS PRC-2400106143 PON22200004163 H W Lochner Inc $1,071.00 SW HWY & Bridge Construction Inspection Region 1
2024 5 FD52 06 E797 C 1237401C 008 11/30/2023 4580 CONSTRUCTION CONTRACTS PRC-2400106143 PON22200004163 H W Lochner Inc $15,147.00 SW HWY & Bridge Construction Inspection Region 1
2024 5 FD52 06 E797 C 1237401C 008 11/30/2023 4580 CONSTRUCTION CONTRACTS PRC-2400106143 PON22200004163 H W Lochner Inc $320.00 SW HWY & Bridge Construction Inspection Region 1
2024 5 FD52 06 E797 C 1237401C 008 11/30/2023 4580 CONSTRUCTION CONTRACTS PRC-2400106143 PON22200004163 H W Lochner Inc $9,180.00 SW HWY & Bridge Construction Inspection Region 1
2024 5 FD52 06 E797 C 1237401C 008 11/30/2023 4580 CONSTRUCTION CONTRACTS PRC-2400106143 PON22200004163 H W Lochner Inc $2,160.00 SW HWY & Bridge Construction Inspection Region 1
2024 5 FD52 06 E797 C 1237401C 008 11/30/2023 4580 CONSTRUCTION CONTRACTS PRC-2400106143 PON22200004163 H W Lochner Inc $2,448.00 SW HWY & Bridge Construction Inspection Region 1
2024 5 FD52 06 E797 C 1237401C 008 11/30/2023 4580 CONSTRUCTION CONTRACTS PRC-2400106143 PON22200004163 H W Lochner Inc $5,950.00 SW HWY & Bridge Construction Inspection Region 1
2024 5 FD52 06 E797 C 1237401C 008 11/22/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P031K CTXCONST0922213090001K EATON ASPHALT PAVING CO $335,322.25
2024 5 FD52 06 E111 C 1237401C 008 11/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR112N1062332502513 $727.46 000001083292-3562500680
2024 5 FD52 06 E111 C 1237401C 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502513 $190.05 000001083292-3562500680
2024 5 FD52 06 E121 C 1237401C 008 11/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR112N1062332502513 $55.12 000001083292-3562500680
2024 5 FD52 06 E121 C 1237401C 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502513 $14.39 000001083292-3562500680
2024 5 FD52 06 E122 C 1237401C 008 11/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR112N1062332502513 $481.18 000001083292-3562500680
2024 5 FD52 06 E122 C 1237401C 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502513 $125.75 000001083292-3562500680
2024 5 FD52 06 E123 C 1237401C 008 11/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR112N1062332502513 $71.84 000001083292-3562500680
2024 5 FD52 06 E123 C 1237401C 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502513 $18.39 000001083292-3562500680
2024 5 FD52 06 E124 C 1237401C 008 11/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR112N1062332502513 $0.19 000001083292-3562500680
2024 5 FD52 06 E124 C 1237401C 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502513 $0.05 000001083292-3562500680
2024 5 FD52 06 E115 C 1237401C 008 11/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR112N1062332502626 $214.52 11035511-3562506340
2024 5 FD52 06 E116 C 1237401C 008 11/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR112N1062332502626 $4.13 11035511-3562506340
2024 5 FD52 06 E121 C 1237401C 008 11/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR112N1062332502626 $16.25 11035511-3562506340
2024 5 FD52 06 E121 C 1237401C 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502626 $0.01 11035511-3562506340
2024 5 FD52 06 E122 C 1237401C 008 11/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR112N1062332502626 $144.68 11035511-3562506340
2024 5 FD52 06 E123 C 1237401C 008 11/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR112N1062332502626 ($1.39) 11035511-3562506340
2024 5 FD52 06 E123 C 1237401C 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502626 $0.02 11035511-3562506340
2024 5 FD52 06 E111 C 1237401C 008 11/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR112N1062332503077 $362.68 11043603-3562506340
2024 5 FD52 06 E111 C 1237401C 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332503077 $58.50 11043603-3562506340
2024 5 FD52 06 E121 C 1237401C 008 11/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR112N1062332503077 $27.55 11043603-3562506340
2024 5 FD52 06 E121 C 1237401C 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332503077 $4.44 11043603-3562506340
2024 5 FD52 06 E122 C 1237401C 008 11/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR112N1062332503077 $240.26 11043603-3562506340
2024 5 FD52 06 E122 C 1237401C 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332503077 $38.71 11043603-3562506340
2024 5 FD52 06 E123 C 1237401C 008 11/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR112N1062332503077 $35.09 11043603-3562506340
2024 5 FD52 06 E123 C 1237401C 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332503077 $5.57 11043603-3562506340
2024 5 FD52 06 E124 C 1237401C 008 11/22/2023 4010 CONSTRUCTION ENGINEERING CA-XR112N1062332503077 $0.08 11043603-3562506340
2024 5 FD52 06 E124 C 1237401C 008 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332503077 $0.02 11043603-3562506340
2024 5 FD52 06 E229 C 1237401C 008 11/14/2023 4010 CONSTRUCTION ENGINEERING IET-XE13A162523314010450 $7.80
2024 5 FD52 00 E121 C 1237401C 008 11/9/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR111N1062331201481 $32.80 000001084083-3562500610
2024 5 FD52 00 E121 C 1237401C 008 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201481 $0.74 000001084083-3562500610
2024 5 FD52 00 E122 C 1237401C 008 11/9/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR111N1062331201481 $289.72 000001084083-3562500610
2024 5 FD52 00 E122 C 1237401C 008 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201481 $6.56 000001084083-3562500610
2024 5 FD52 00 E123 C 1237401C 008 11/9/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR111N1062331201481 $41.28 000001084083-3562500610
2024 5 FD52 00 E123 C 1237401C 008 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201481 $0.93 000001084083-3562500610
2024 5 FD52 06 E111 C 1237401C 008 11/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR111N1062331201478 $656.33 000001083292-3562500680
2024 5 FD52 06 E121 C 1237401C 008 11/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR111N1062331201478 $49.37 000001083292-3562500680
2024 5 FD52 06 E122 C 1237401C 008 11/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR111N1062331201478 $434.29 000001083292-3562500680
2024 5 FD52 06 E123 C 1237401C 008 11/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR111N1062331201478 $62.89 000001083292-3562500680
2024 5 FD52 06 E111 C 1237401C 008 11/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR111N1062331201955 $963.22 11035511-3562506340
2024 5 FD52 06 E111 C 1237401C 008 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201955 $169.60 11035511-3562506340
2024 5 FD52 06 E116 C 1237401C 008 11/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR111N1062331201955 $8.25 11035511-3562506340
2024 5 FD52 06 E121 C 1237401C 008 11/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR111N1062331201955 $72.82 11035511-3562506340
2024 5 FD52 06 E121 C 1237401C 008 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201955 $12.73 11035511-3562506340
2024 5 FD52 06 E122 C 1237401C 008 11/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR111N1062331201955 $642.81 11035511-3562506340
2024 5 FD52 06 E122 C 1237401C 008 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201955 $112.22 11035511-3562506340
2024 5 FD52 06 E123 C 1237401C 008 11/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR111N1062331201955 $124.58 11035511-3562506340
2024 5 FD52 06 E123 C 1237401C 008 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201955 $19.78 11035511-3562506340
2024 5 FD52 00 E111 C 1237401C 008 11/9/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR111N1062331201481 $437.85 000001084083-3562500610
2024 5 FD52 00 E111 C 1237401C 008 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201481 $9.92 000001084083-3562500610
2024 5 FD52 06 E797 C 1237401C 008 11/8/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P030K CTXCONST0922213090001K EATON ASPHALT PAVING CO $194,916.41
2024 4 FD52 06 E797 C 1237401C 008 10/27/2023 4580 CONSTRUCTION CONTRACTS PRC-2400083422 PON22200004163 H W Lochner Inc $408.00 SW HWY & Bridge Construction Inspection Region 1
2024 4 FD52 06 E229 C 1237401C 008 10/27/2023 4010 CONSTRUCTION ENGINEERING IET-XE13A162523298009940 $23.40
2024 4 FD52 06 E797 C 1237401C 008 10/25/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P029K CTXCONST0922213090001K EATON ASPHALT PAVING CO $143,169.67
2024 4 FD52 06 E797 C 1237401C 008 10/11/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P028K CTXCONST0922213090001K EATON ASPHALT PAVING CO $48,321.00
2024 4 FD52 06 E797 C 1237401C 008 10/5/2023 4580 CONSTRUCTION CONTRACTS PRC-2400049217 PON22200004163 H W Lochner Inc $6,018.00 SW HWY & Bridge Construction Inspection Region 1
2024 4 FD52 06 E797 C 1237401C 008 10/5/2023 4580 CONSTRUCTION CONTRACTS PRC-2400049217 PON22200004163 H W Lochner Inc $1,173.00 SW HWY & Bridge Construction Inspection Region 1
2024 4 FD52 06 E797 C 1237401C 008 10/5/2023 4580 CONSTRUCTION CONTRACTS PRC-2400049217 PON22200004163 H W Lochner Inc $480.00 SW HWY & Bridge Construction Inspection Region 1
2024 4 FD52 06 E797 C 1237401C 008 10/5/2023 4580 CONSTRUCTION CONTRACTS PRC-2400049217 PON22200004163 H W Lochner Inc $248.00 SW HWY & Bridge Construction Inspection Region 1
2024 4 FD52 06 E797 C 1237401C 008 10/5/2023 4580 CONSTRUCTION CONTRACTS PRC-2400049217 PON22200004163 H W Lochner Inc $1,364.00 SW HWY & Bridge Construction Inspection Region 1
2024 4 FD52 06 E797 C 1237401C 008 10/5/2023 4580 CONSTRUCTION CONTRACTS PRC-2400049217 PON22200004163 H W Lochner Inc $3,844.00 SW HWY & Bridge Construction Inspection Region 1
2024 4 FD52 06 E797 C 1237401C 008 10/5/2023 4580 CONSTRUCTION CONTRACTS PRC-2400049217 PON22200004163 H W Lochner Inc $1,836.00 SW HWY & Bridge Construction Inspection Region 1
2024 4 FD52 06 E797 C 1237401C 008 10/5/2023 4580 CONSTRUCTION CONTRACTS PRC-2400049217 PON22200004163 H W Lochner Inc $13,872.00 SW HWY & Bridge Construction Inspection Region 1
2024 4 FD52 06 E797 C 1237401C 008 10/5/2023 4580 CONSTRUCTION CONTRACTS PRC-2400049217 PON22200004163 H W Lochner Inc $1,020.00 SW HWY & Bridge Construction Inspection Region 1
2024 4 FD52 06 E797 C 1237401C 008 10/5/2023 4580 CONSTRUCTION CONTRACTS PRC-2400049217 PON22200004163 H W Lochner Inc $6,460.00 SW HWY & Bridge Construction Inspection Region 1
2024 4 FD52 06 E797 C 1237401C 008 10/5/2023 4580 CONSTRUCTION CONTRACTS PRC-2400049217 PON22200004163 H W Lochner Inc $1,955.00 SW HWY & Bridge Construction Inspection Region 1
2024 4 FD52 06 E797 C 1237401C 008 10/5/2023 4580 CONSTRUCTION CONTRACTS PRC-2400049217 PON22200004163 H W Lochner Inc $7,200.00 SW HWY & Bridge Construction Inspection Region 1
2024 4 FD52 06 E797 C 1237401C 008 10/5/2023 4580 CONSTRUCTION CONTRACTS PRC-2400049217 PON22200004163 H W Lochner Inc $385.00 SW HWY & Bridge Construction Inspection Region 1
2024 4 FD52 06 E797 C 1237401C 008 10/5/2023 4580 CONSTRUCTION CONTRACTS PRC-2400049217 PON22200004163 H W Lochner Inc $1,224.00 SW HWY & Bridge Construction Inspection Region 1
2024 4 FD52 00 E122 C 1237401C 008 10/2/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR092N1062327208415 $316.05 000001084083-3562500610
2024 4 FD52 00 E122 C 1237401C 008 10/2/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208415 $34.13 000001084083-3562500610
2024 4 FD52 00 E123 C 1237401C 008 10/2/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR092N1062327208415 $45.07 000001084083-3562500610
2024 4 FD52 00 E123 C 1237401C 008 10/2/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208415 $4.82 000001084083-3562500610
2024 4 FD52 00 E124 C 1237401C 008 10/2/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR092N1062327208415 $0.09 000001084083-3562500610
2024 4 FD52 00 E124 C 1237401C 008 10/2/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208415 $0.01 000001084083-3562500610
2024 4 FD52 00 E111 C 1237401C 008 10/2/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR092N1062327208415 $477.41 000001084083-3562500610
2024 4 FD52 00 E111 C 1237401C 008 10/2/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208415 $51.58 000001084083-3562500610
2024 4 FD52 00 E121 C 1237401C 008 10/2/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR092N1062327208415 $35.77 000001084083-3562500610
2024 4 FD52 00 E121 C 1237401C 008 10/2/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208415 $3.87 000001084083-3562500610
2024 3 FD52 06 E111 C 1237401C 008 9/29/2023 4010 CONSTRUCTION ENGINEERING CA-XR092N1062327208412 $501.21 000001083292-3562500680
2024 3 FD52 06 E111 C 1237401C 008 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208412 $111.70 000001083292-3562500680
2024 3 FD52 06 E121 C 1237401C 008 9/29/2023 4010 CONSTRUCTION ENGINEERING CA-XR092N1062327208412 $37.90 000001083292-3562500680
2024 3 FD52 06 E121 C 1237401C 008 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208412 $8.44 000001083292-3562500680
2024 3 FD52 06 E122 C 1237401C 008 9/29/2023 4010 CONSTRUCTION ENGINEERING CA-XR092N1062327208412 $331.65 000001083292-3562500680
2024 3 FD52 06 E122 C 1237401C 008 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208412 $73.90 000001083292-3562500680
2024 3 FD52 06 E123 C 1237401C 008 9/29/2023 4010 CONSTRUCTION ENGINEERING CA-XR092N1062327208412 $48.17 000001083292-3562500680
2024 3 FD52 06 E123 C 1237401C 008 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208412 $10.56 000001083292-3562500680
2024 3 FD52 06 E124 C 1237401C 008 9/29/2023 4010 CONSTRUCTION ENGINEERING CA-XR092N1062327208412 $0.13 000001083292-3562500680
2024 3 FD52 06 E124 C 1237401C 008 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208412 $0.02 000001083292-3562500680
2024 3 FD52 06 E111 C 1237401C 008 9/28/2023 4010 CONSTRUCTION ENGINEERING CA-XR092N1062326507061 ($501.21) 000001083292-3562500680
2024 3 FD52 06 E111 C 1237401C 008 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507061 ($111.70) 000001083292-3562500680
2024 3 FD52 06 E121 C 1237401C 008 9/28/2023 4010 CONSTRUCTION ENGINEERING CA-XR092N1062326507061 ($37.90) 000001083292-3562500680
2024 3 FD52 06 E121 C 1237401C 008 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507061 ($8.44) 000001083292-3562500680
2024 3 FD52 06 E122 C 1237401C 008 9/28/2023 4010 CONSTRUCTION ENGINEERING CA-XR092N1062326507061 ($331.65) 000001083292-3562500680
2024 3 FD52 06 E122 C 1237401C 008 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507061 ($73.90) 000001083292-3562500680
2024 3 FD52 06 E123 C 1237401C 008 9/28/2023 4010 CONSTRUCTION ENGINEERING CA-XR092N1062326507061 ($48.17) 000001083292-3562500680
2024 3 FD52 06 E123 C 1237401C 008 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507061 ($10.56) 000001083292-3562500680
2024 3 FD52 06 E124 C 1237401C 008 9/28/2023 4010 CONSTRUCTION ENGINEERING CA-XR092N1062326507061 ($0.13) 000001083292-3562500680
2024 3 FD52 06 E124 C 1237401C 008 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507061 ($0.02) 000001083292-3562500680
2024 3 FD52 06 E797 C 1237401C 008 9/27/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P027K CTXCONST0922213090001K EATON ASPHALT PAVING CO $61,541.74
2024 3 FD52 06 E111 C 1237401C 008 9/25/2023 4010 CONSTRUCTION ENGINEERING CA-XR092N1062326507061 $501.21 000001083292-3562500680
2024 3 FD52 06 E111 C 1237401C 008 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507061 $111.70 000001083292-3562500680
2024 3 FD52 06 E121 C 1237401C 008 9/25/2023 4010 CONSTRUCTION ENGINEERING CA-XR092N1062326507061 $37.90 000001083292-3562500680
2024 3 FD52 06 E121 C 1237401C 008 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507061 $8.44 000001083292-3562500680
2024 3 FD52 06 E122 C 1237401C 008 9/25/2023 4010 CONSTRUCTION ENGINEERING CA-XR092N1062326507061 $331.65 000001083292-3562500680
2024 3 FD52 06 E122 C 1237401C 008 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507061 $73.90 000001083292-3562500680
2024 3 FD52 06 E123 C 1237401C 008 9/25/2023 4010 CONSTRUCTION ENGINEERING CA-XR092N1062326507061 $48.17 000001083292-3562500680
2024 3 FD52 06 E123 C 1237401C 008 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507061 $10.56 000001083292-3562500680
2024 3 FD52 06 E124 C 1237401C 008 9/25/2023 4010 CONSTRUCTION ENGINEERING CA-XR092N1062326507061 $0.13 000001083292-3562500680
2024 3 FD52 06 E124 C 1237401C 008 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507061 $0.02 000001083292-3562500680
2024 3 FD52 06 E797 C 1237401C 008 9/13/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P026K CTXCONST0922213090001K EATON ASPHALT PAVING CO $42,480.60
2024 3 FD52 06 E797 C 1237401C 008 9/11/2023 4580 CONSTRUCTION CONTRACTS PRC-2400044213 PON22200004163 H W Lochner Inc $8,246.00 SW HWY & Bridge Construction Inspection Region 1
2024 3 FD52 06 E797 C 1237401C 008 9/11/2023 4580 CONSTRUCTION CONTRACTS PRC-2400044213 PON22200004163 H W Lochner Inc $160.00 SW HWY & Bridge Construction Inspection Region 1
2024 3 FD52 06 E797 C 1237401C 008 9/11/2023 4580 CONSTRUCTION CONTRACTS PRC-2400044213 PON22200004163 H W Lochner Inc $7,650.00 SW HWY & Bridge Construction Inspection Region 1
2024 3 FD52 00 E111 C 1237401C 008 9/11/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR091N1062325106095 $437.94 000001084083-3562500610
2024 3 FD52 00 E111 C 1237401C 008 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106095 $39.70 000001084083-3562500610
2024 3 FD52 00 E121 C 1237401C 008 9/11/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR091N1062325106095 $32.78 000001084083-3562500610
2024 3 FD52 00 E121 C 1237401C 008 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106095 $2.97 000001084083-3562500610
2024 3 FD52 00 E122 C 1237401C 008 9/11/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR091N1062325106095 $289.71 000001084083-3562500610
2024 3 FD52 06 E797 C 1237401C 008 9/11/2023 4580 CONSTRUCTION CONTRACTS PRC-2400044213 PON22200004163 H W Lochner Inc $8,160.00 SW HWY & Bridge Construction Inspection Region 1
2024 3 FD52 00 E122 C 1237401C 008 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106095 $26.27 000001084083-3562500610
2024 3 FD52 00 E123 C 1237401C 008 9/11/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR091N1062325106095 $41.30 000001084083-3562500610
2024 3 FD52 00 E123 C 1237401C 008 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106095 $3.70 000001084083-3562500610
2024 3 FD52 06 E111 C 1237401C 008 9/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR091N1062325106095 $260.54 000001084158-3562506200
2024 3 FD52 06 E111 C 1237401C 008 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106095 $23.62 000001084158-3562506200
2024 3 FD52 06 E121 C 1237401C 008 9/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR091N1062325106095 $19.26 000001084158-3562506200
2024 3 FD52 06 E121 C 1237401C 008 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106095 $1.75 000001084158-3562506200
2024 3 FD52 06 E797 C 1237401C 008 9/11/2023 4580 CONSTRUCTION CONTRACTS PRC-2400044213 PON22200004163 H W Lochner Inc $4,539.00 SW HWY & Bridge Construction Inspection Region 1
2024 3 FD52 06 E122 C 1237401C 008 9/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR091N1062325106095 $172.40 000001084158-3562506200
2024 3 FD52 06 E122 C 1237401C 008 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106095 $15.63 000001084158-3562506200
2024 3 FD52 06 E123 C 1237401C 008 9/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR091N1062325106095 $64.23 000001084158-3562506200
2024 3 FD52 06 E123 C 1237401C 008 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106095 $5.74 000001084158-3562506200
2024 3 FD52 06 E111 C 1237401C 008 9/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR091N1062325106092 $284.49 000001083292-3562500680
2024 3 FD52 06 E111 C 1237401C 008 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106092 $131.70 000001083292-3562500680
2024 3 FD52 06 E121 C 1237401C 008 9/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR091N1062325106092 $21.39 000001083292-3562500680
2024 3 FD52 06 E121 C 1237401C 008 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106092 $9.91 000001083292-3562500680
2024 3 FD52 06 E122 C 1237401C 008 9/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR091N1062325106092 $188.19 000001083292-3562500680
2024 3 FD52 06 E122 C 1237401C 008 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106092 $87.15 000001083292-3562500680
2024 3 FD52 06 E123 C 1237401C 008 9/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR091N1062325106092 $27.42 000001083292-3562500680
2024 3 FD52 06 E123 C 1237401C 008 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106092 $12.45 000001083292-3562500680
2024 3 FD52 06 E797 C 1237401C 008 9/11/2023 4580 CONSTRUCTION CONTRACTS PRC-2400044213 PON22200004163 H W Lochner Inc $1,275.00 SW HWY & Bridge Construction Inspection Region 1
2024 2 FD52 06 E797 C 1237401C 008 8/30/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P025K CTXCONST0922213090001K EATON ASPHALT PAVING CO $4,200.00
2024 2 FD52 06 E111 C 1237401C 008 8/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR082N1062323504940 $498.08 000001083292-3562500680
2024 2 FD52 06 E111 C 1237401C 008 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504940 $36.87 000001083292-3562500680
2024 2 FD52 06 E121 C 1237401C 008 8/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR082N1062323504940 $36.43 000001083292-3562500680
2024 2 FD52 06 E121 C 1237401C 008 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504940 $2.68 000001083292-3562500680
2024 2 FD52 06 E122 C 1237401C 008 8/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR082N1062323504940 $329.21 000001083292-3562500680
2024 2 FD52 06 E122 C 1237401C 008 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504940 $24.39 000001083292-3562500680
2024 2 FD52 06 E123 C 1237401C 008 8/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR082N1062323504940 $103.08 000001083292-3562500680
2024 2 FD52 06 E123 C 1237401C 008 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504940 $7.91 000001083292-3562500680
2024 2 FD52 06 E124 C 1237401C 008 8/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR082N1062323504940 $0.22 000001083292-3562500680
2024 2 FD52 06 E124 C 1237401C 008 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504940 $0.01 000001083292-3562500680
2024 2 FD52 06 E797 C 1237401C 008 8/14/2023 4580 CONSTRUCTION CONTRACTS PRC-2400011566 PON22200004163 H W Lochner Inc $16,473.00 SW HWY & Bridge Construction Inspection Region 1
2024 2 FD52 06 E797 C 1237401C 008 8/14/2023 4580 CONSTRUCTION CONTRACTS PRC-2400011566 PON22200004163 H W Lochner Inc $9,146.00 SW HWY & Bridge Construction Inspection Region 1
2024 2 FD52 06 E797 C 1237401C 008 8/14/2023 4580 CONSTRUCTION CONTRACTS PRC-2400011566 PON22200004163 H W Lochner Inc $6,138.00 SW HWY & Bridge Construction Inspection Region 1
2024 2 FD52 06 E797 C 1237401C 008 8/14/2023 4580 CONSTRUCTION CONTRACTS PRC-2400011566 PON22200004163 H W Lochner Inc $10,710.00 SW HWY & Bridge Construction Inspection Region 1
2024 2 FD52 06 E797 C 1237401C 008 8/14/2023 4580 CONSTRUCTION CONTRACTS PRC-2400011566 PON22200004163 H W Lochner Inc $6,732.00 SW HWY & Bridge Construction Inspection Region 1
2024 2 FD52 06 E797 C 1237401C 008 8/14/2023 4580 CONSTRUCTION CONTRACTS PRC-2400011566 PON22200004163 H W Lochner Inc $1,377.00 SW HWY & Bridge Construction Inspection Region 1
2024 2 FD52 06 E112 C 1237401C 008 8/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR081N1062322003862 $137.70 000001084158-3562500009
2024 2 FD52 06 E121 C 1237401C 008 8/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR081N1062322003862 $10.54 000001084158-3562500009
2024 2 FD52 00 E111 C 1237401C 008 8/9/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR081N1062322003861 $477.64 000001084083-3562500610
2024 2 FD52 00 E111 C 1237401C 008 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003861 $152.84 000001084083-3562500610
2024 2 FD52 06 E111 C 1237401C 008 8/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR081N1062322003858 $358.11 000001083292-3562500680
2024 2 FD52 00 E121 C 1237401C 008 8/9/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR081N1062322003861 $35.77 000001084083-3562500610
2024 2 FD52 06 E111 C 1237401C 008 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003858 $99.76 000001083292-3562500680
2024 2 FD52 00 E121 C 1237401C 008 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003861 $11.45 000001084083-3562500610
2024 2 FD52 06 E121 C 1237401C 008 8/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR081N1062322003858 $26.92 000001083292-3562500680
2024 2 FD52 00 E122 C 1237401C 008 8/9/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR081N1062322003861 $316.06 000001084083-3562500610
2024 2 FD52 06 E121 C 1237401C 008 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003858 $7.50 000001083292-3562500680
2024 2 FD52 00 E122 C 1237401C 008 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003861 $101.13 000001084083-3562500610
2024 2 FD52 06 E122 C 1237401C 008 8/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR081N1062322003858 $236.89 000001083292-3562500680
2024 2 FD52 00 E123 C 1237401C 008 8/9/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR081N1062322003861 $45.17 000001084083-3562500610
2024 2 FD52 06 E122 C 1237401C 008 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003858 $66.01 000001083292-3562500680
2024 2 FD52 00 E123 C 1237401C 008 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003861 $14.26 000001084083-3562500610
2024 2 FD52 06 E123 C 1237401C 008 8/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR081N1062322003858 $34.43 000001083292-3562500680
2024 2 FD52 06 E123 C 1237401C 008 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003858 $9.43 000001083292-3562500680
2024 2 FD52 06 E111 C 1237401C 008 8/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR081N1062322004134 $290.18 10981750-3562506340
2024 2 FD52 06 E111 C 1237401C 008 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322004134 $54.15 10981750-3562506340
2024 2 FD52 06 E121 C 1237401C 008 8/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR081N1062322004134 $21.89 10981750-3562506340
2024 2 FD52 06 E121 C 1237401C 008 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322004134 $4.08 10981750-3562506340
2024 2 FD52 06 E122 C 1237401C 008 8/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR081N1062322004134 $191.95 10981750-3562506340
2024 2 FD52 06 E122 C 1237401C 008 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322004134 $35.83 10981750-3562506340
2024 2 FD52 06 E123 C 1237401C 008 8/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR081N1062322004134 $28.06 10981750-3562506340
2024 2 FD52 06 E123 C 1237401C 008 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322004134 $5.16 10981750-3562506340
2024 1 FD52 06 E229 C 1237401C 008 7/26/2023 4010 CONSTRUCTION ENGINEERING IET-XE13A162523206007380 $31.20
2024 1 FD52 06 E111 C 1237401C 008 7/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR072N1062320202678 $629.95 000001083292-3562500680
2024 1 FD52 06 E111 C 1237401C 008 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202678 $157.52 000001083292-3562500680
2024 1 FD52 06 E121 C 1237401C 008 7/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR072N1062320202678 $47.65 000001083292-3562500680
2024 1 FD52 06 E121 C 1237401C 008 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202678 $11.92 000001083292-3562500680
2024 1 FD52 06 E122 C 1237401C 008 7/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR072N1062320202678 $416.92 000001083292-3562500680
2024 1 FD52 06 E122 C 1237401C 008 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202678 $104.24 000001083292-3562500680
2024 1 FD52 06 E123 C 1237401C 008 7/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR072N1062320202678 $60.58 000001083292-3562500680
2024 1 FD52 06 E123 C 1237401C 008 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202678 $14.90 000001083292-3562500680
2024 1 FD52 06 E124 C 1237401C 008 7/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR072N1062320202678 $0.16 000001083292-3562500680
2024 1 FD52 06 E124 C 1237401C 008 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202678 $0.04 000001083292-3562500680
2024 1 FD52 00 E111 C 1237401C 008 7/24/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR072N1062320202681 $525.57 000001084083-3562500610
2024 1 FD52 00 E111 C 1237401C 008 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202681 $71.45 000001084083-3562500610
2024 1 FD52 00 E121 C 1237401C 008 7/24/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR072N1062320202681 $39.35 000001084083-3562500610
2024 1 FD52 00 E121 C 1237401C 008 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202681 $5.35 000001084083-3562500610
2024 1 FD52 00 E122 C 1237401C 008 7/24/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR072N1062320202681 $347.66 000001084083-3562500610
2024 1 FD52 00 E122 C 1237401C 008 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202681 $47.28 000001084083-3562500610
2024 1 FD52 00 E123 C 1237401C 008 7/24/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR072N1062320202681 $49.59 000001084083-3562500610
2024 1 FD52 00 E123 C 1237401C 008 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202681 $6.66 000001084083-3562500610
2024 1 FD52 00 E124 C 1237401C 008 7/24/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR072N1062320202681 $0.10 000001084083-3562500610
2024 1 FD52 00 E124 C 1237401C 008 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202681 $0.01 000001084083-3562500610
2024 1 FD52 06 E111 C 1237401C 008 7/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR072N1062320203259 $398.86 10976603-3562506340
2024 1 FD52 06 E111 C 1237401C 008 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320203259 $155.29 10976603-3562506340
2024 1 FD52 06 E121 C 1237401C 008 7/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR072N1062320203259 $30.31 10976603-3562506340
2024 1 FD52 06 E121 C 1237401C 008 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320203259 $11.81 10976603-3562506340
2024 1 FD52 06 E122 C 1237401C 008 7/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR072N1062320203259 $263.92 10976603-3562506340
2024 1 FD52 06 E122 C 1237401C 008 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320203259 $102.76 10976603-3562506340
2024 1 FD52 06 E123 C 1237401C 008 7/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR072N1062320203259 $38.69 10976603-3562506340
2024 1 FD52 06 E123 C 1237401C 008 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320203259 $14.79 10976603-3562506340
2024 1 FD52 06 E124 C 1237401C 008 7/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR072N1062320203259 $0.10 10976603-3562506340
2024 1 FD52 06 E124 C 1237401C 008 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320203259 $0.04 10976603-3562506340
2024 1 FD52 06 E797 C 1237401C 008 7/19/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P024K CTXCONST0922213090001K EATON ASPHALT PAVING CO $122,180.00
2024 1 FD52 06 E229 C 1237401C 008 7/12/2023 4010 CONSTRUCTION ENGINEERING IET-XE13A162523191015830 $50.70
2024 1 FD52 06 E122 C 1237401C 008 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101980 $8.18 10968014-3562506340
2024 1 FD52 06 E123 C 1237401C 008 7/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR071N1062319101980 $35.01 10968014-3562506340
2024 1 FD52 06 E123 C 1237401C 008 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101980 $1.06 10968014-3562506340
2024 1 FD52 00 E111 C 1237401C 008 7/11/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR071N1062319101549 $450.38 000001084083-3562500610
2024 1 FD52 00 E111 C 1237401C 008 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101549 $11.42 000001084083-3562500610
2024 1 FD52 00 E121 C 1237401C 008 7/11/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR071N1062319101549 $33.70 000001084083-3562500610
2024 1 FD52 00 E121 C 1237401C 008 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101549 $0.85 000001084083-3562500610
2024 1 FD52 00 E122 C 1237401C 008 7/11/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR071N1062319101549 $351.46 000001084083-3562500610
2024 1 FD52 00 E122 C 1237401C 008 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101549 $8.91 000001084083-3562500610
2024 1 FD52 00 E123 C 1237401C 008 7/11/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR071N1062319101549 $45.04 000001084083-3562500610
2024 1 FD52 00 E123 C 1237401C 008 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101549 $1.13 000001084083-3562500610
2024 1 FD52 06 E111 C 1237401C 008 7/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR071N1062319101979 $342.17 10968014-3562506340
2024 1 FD52 06 E111 C 1237401C 008 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101979 $10.49 10968014-3562506340
2024 1 FD52 06 E121 C 1237401C 008 7/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR071N1062319101979 $25.79 10968014-3562506340
2024 1 FD52 06 E121 C 1237401C 008 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101979 $0.79 10968014-3562506340
2024 1 FD52 06 E122 C 1237401C 008 7/11/2023 4010 CONSTRUCTION ENGINEERING CA-XR071N1062319101979 $266.81 10968014-3562506340
2023 12 FD52 06 E111 C 1237401C 008 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317401014 $29.02 10962467-3562506340
2023 12 FD52 06 E121 C 1237401C 008 6/26/2023 4010 CONSTRUCTION ENGINEERING CA-XR062N1062317401014 $70.81 10962467-3562506340
2023 12 FD52 06 E121 C 1237401C 008 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317401014 $2.21 10962467-3562506340
2023 12 FD52 06 E122 C 1237401C 008 6/26/2023 4010 CONSTRUCTION ENGINEERING CA-XR062N1062317401014 $728.00 10962467-3562506340
2023 12 FD52 06 E122 C 1237401C 008 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317401014 $22.64 10962467-3562506340
2023 12 FD52 06 E123 C 1237401C 008 6/26/2023 4010 CONSTRUCTION ENGINEERING CA-XR062N1062317401014 $105.05 10962467-3562506340
2023 12 FD52 06 E123 C 1237401C 008 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317401014 $3.22 10962467-3562506340
2023 12 FD52 06 E124 C 1237401C 008 6/26/2023 4010 CONSTRUCTION ENGINEERING CA-XR062N1062317401014 $0.27 10962467-3562506340
2023 12 FD52 06 E124 C 1237401C 008 6/26/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062N1062317401014 $0.01 10962467-3562506340
2023 12 FD52 06 E111 C 1237401C 008 6/26/2023 4010 CONSTRUCTION ENGINEERING CA-XR062N1062317401013 $933.03 10962467-3562506340
2023 12 FD52 06 E797 C 1237401C 008 6/22/2023 4580 CONSTRUCTION CONTRACTS PRC-2300246664 PON22200004163 H W Lochner Inc $12,546.00 SW HWY & Bridge Construction Inspection Region 1
2023 12 FD52 06 E797 C 1237401C 008 6/22/2023 4580 CONSTRUCTION CONTRACTS PRC-2300246664 PON22200004163 H W Lochner Inc $154.00 SW HWY & Bridge Construction Inspection Region 1
2023 12 FD52 06 E797 C 1237401C 008 6/22/2023 4580 CONSTRUCTION CONTRACTS PRC-2300246664 PON22200004163 H W Lochner Inc $11,050.00 SW HWY & Bridge Construction Inspection Region 1
2023 12 FD52 06 E797 C 1237401C 008 6/22/2023 4580 CONSTRUCTION CONTRACTS PRC-2300246664 PON22200004163 H W Lochner Inc $6,630.00 SW HWY & Bridge Construction Inspection Region 1
2023 12 FD52 06 E797 C 1237401C 008 6/22/2023 4580 CONSTRUCTION CONTRACTS PRC-2300246664 PON22200004163 H W Lochner Inc $2,856.00 SW HWY & Bridge Construction Inspection Region 1
2023 12 FD52 06 E797 C 1237401C 008 6/22/2023 4580 CONSTRUCTION CONTRACTS PRC-2300246664 PON22200004163 H W Lochner Inc $1,530.00 SW HWY & Bridge Construction Inspection Region 1
2023 12 FD52 06 E797 C 1237401C 008 6/21/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P023K CTXCONST0922213090001K EATON ASPHALT PAVING CO $368,298.75
2023 12 FD52 06 E111 C 1237401C 008 6/8/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR061N1062315810151 $215.39 000001085423-3562506210
2023 12 FD52 06 E111 C 1237401C 008 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810151 $36.47 000001085423-3562506210
2023 12 FD52 06 E111 C 1237401C 008 6/8/2023 4010 CONSTRUCTION ENGINEERING CA-XR061N1062315810140 $75.16 000001083292-3562500680
2023 12 FD52 06 E121 C 1237401C 008 6/8/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR061N1062315810151 $14.82 000001085423-3562506210
2023 12 FD52 06 E111 C 1237401C 008 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810140 $15.75 000001083292-3562500680
2023 12 FD52 06 E121 C 1237401C 008 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810151 $2.51 000001085423-3562506210
2023 12 FD52 06 E121 C 1237401C 008 6/8/2023 4010 CONSTRUCTION ENGINEERING CA-XR061N1062315810140 $5.63 000001083292-3562500680
2023 12 FD52 06 E122 C 1237401C 008 6/8/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR061N1062315810151 $168.00 000001085423-3562506210
2023 12 FD52 06 E121 C 1237401C 008 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810140 $1.19 000001083292-3562500680
2023 12 FD52 06 E122 C 1237401C 008 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810151 $28.45 000001085423-3562506210
2023 12 FD52 06 E122 C 1237401C 008 6/8/2023 4010 CONSTRUCTION ENGINEERING CA-XR061N1062315810140 $58.54 000001083292-3562500680
2023 12 FD52 06 E123 C 1237401C 008 6/8/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR061N1062315810151 $38.97 000001085423-3562506210
2023 12 FD52 06 E122 C 1237401C 008 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810140 $12.28 000001083292-3562500680
2023 12 FD52 06 E123 C 1237401C 008 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810151 $6.51 000001085423-3562506210
2023 12 FD52 06 E123 C 1237401C 008 6/8/2023 4010 CONSTRUCTION ENGINEERING CA-XR061N1062315810140 $8.41 000001083292-3562500680
2023 12 FD52 06 E123 C 1237401C 008 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810140 $1.74 000001083292-3562500680
2023 12 FD52 00 E111 C 1237401C 008 6/8/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR061N1062315810144 $1,248.91 000001084083-3562500610
2023 12 FD52 00 E111 C 1237401C 008 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810144 $183.02 000001084083-3562500610
2023 12 FD52 00 E121 C 1237401C 008 6/8/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR061N1062315810144 $92.98 000001084083-3562500610
2023 12 FD52 00 E121 C 1237401C 008 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810144 $13.64 000001084083-3562500610
2023 12 FD52 00 E122 C 1237401C 008 6/8/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR061N1062315810144 $974.16 000001084083-3562500610
2023 12 FD52 00 E122 C 1237401C 008 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810144 $142.77 000001084083-3562500610
2023 12 FD52 00 E123 C 1237401C 008 6/8/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR061N1062315810144 $120.60 000001084083-3562500610
2023 12 FD52 00 E123 C 1237401C 008 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810144 $17.43 000001084083-3562500610
2023 12 FD52 06 E111 C 1237401C 008 6/8/2023 4010 CONSTRUCTION ENGINEERING CA-XR061N1062315810144 $364.88 000001084158-3562506200
2023 12 FD52 06 E111 C 1237401C 008 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810144 $94.14 000001084158-3562506200
2023 12 FD52 06 E112 C 1237401C 008 6/8/2023 4010 CONSTRUCTION ENGINEERING CA-XR061N1062315810144 $137.70 000001084158-3562500009
2023 12 FD52 06 E112 C 1237401C 008 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810144 $24.93 000001084158-3562500009
2023 12 FD52 06 E121 C 1237401C 008 6/8/2023 4010 CONSTRUCTION ENGINEERING CA-XR061N1062315810144 $38.24 000001084158-3562500009
2023 12 FD52 06 E111 C 1237401C 008 6/8/2023 4010 CONSTRUCTION ENGINEERING CA-XR061N1062315810418 $570.27 10948203-3562506340
2023 12 FD52 06 E121 C 1237401C 008 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810144 $9.10 000001084158-3562506200
2023 12 FD52 06 E111 C 1237401C 008 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810418 $152.41 10948203-3562506340
2023 12 FD52 06 E122 C 1237401C 008 6/8/2023 4010 CONSTRUCTION ENGINEERING CA-XR061N1062315810144 $284.66 000001084158-3562506200
2023 12 FD52 06 E121 C 1237401C 008 6/8/2023 4010 CONSTRUCTION ENGINEERING CA-XR061N1062315810418 $42.91 10948203-3562506340
2023 12 FD52 06 E122 C 1237401C 008 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810144 $73.43 000001084158-3562506200
2023 12 FD52 06 E121 C 1237401C 008 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810418 $11.47 10948203-3562506340
2023 12 FD52 06 E123 C 1237401C 008 6/8/2023 4010 CONSTRUCTION ENGINEERING CA-XR061N1062315810144 $40.00 000001084158-3562506200
2023 12 FD52 06 E122 C 1237401C 008 6/8/2023 4010 CONSTRUCTION ENGINEERING CA-XR061N1062315810418 $444.70 10948203-3562506340
2023 12 FD52 06 E123 C 1237401C 008 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810144 $5.92 000001084158-3562506200
2023 12 FD52 06 E122 C 1237401C 008 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810418 $118.88 10948203-3562506340
2023 12 FD52 06 E123 C 1237401C 008 6/8/2023 4010 CONSTRUCTION ENGINEERING CA-XR061N1062315810418 $64.38 10948203-3562506340
2023 12 FD52 06 E123 C 1237401C 008 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810418 $16.93 10948203-3562506340
2023 12 FD52 06 E797 C 1237401C 008 6/7/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P022K CTXCONST0922213090001K EATON ASPHALT PAVING CO $197,873.32
2023 11 FD52 06 E229 C 1237401C 008 5/26/2023 4010 CONSTRUCTION ENGINEERING IET-XE13A162523145008030 $27.30
2023 11 FD52 06 E797 C 1237401C 008 5/24/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P021K CTXCONST0922213090001K EATON ASPHALT PAVING CO $74,576.93
2023 11 FD52 00 E123 C 1237401C 008 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309049 $6.91 000001084083-3562500610
2023 11 FD52 00 E124 C 1237401C 008 5/24/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR052N1062314309049 $0.18 000001084083-3562500610
2023 11 FD52 00 E124 C 1237401C 008 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309049 $0.02 000001084083-3562500610
2023 11 FD52 00 E111 C 1237401C 008 5/24/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR052N1062314309049 $772.56 000001084083-3562500610
2023 11 FD52 00 E111 C 1237401C 008 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309049 $77.26 000001084083-3562500610
2023 11 FD52 00 E121 C 1237401C 008 5/24/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR052N1062314309049 $58.59 000001084083-3562500610
2023 11 FD52 00 E121 C 1237401C 008 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309049 $5.86 000001084083-3562500610
2023 11 FD52 06 E111 C 1237401C 008 5/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR052N1062314309582 $310.98 10944436-3562506340
2023 11 FD52 06 E121 C 1237401C 008 5/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR052N1062314309582 $23.60 10944436-3562506340
2023 11 FD52 00 E122 C 1237401C 008 5/24/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR052N1062314309049 $602.60 000001084083-3562500610
2023 11 FD52 06 E122 C 1237401C 008 5/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR052N1062314309582 $242.57 10944436-3562506340
2023 11 FD52 06 E123 C 1237401C 008 5/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR052N1062314309582 $34.98 10944436-3562506340
2023 11 FD52 06 E124 C 1237401C 008 5/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR052N1062314309582 $0.10 10944436-3562506340
2023 11 FD52 00 E122 C 1237401C 008 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309049 $60.26 000001084083-3562500610
2023 11 FD52 00 E123 C 1237401C 008 5/24/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR052N1062314309049 $70.07 000001084083-3562500610
2023 11 FD52 06 E797 C 1237401C 008 5/18/2023 4580 CONSTRUCTION CONTRACTS PRC-2300223201 PON22200004163 H W Lochner Inc $11,220.00 SW HWY & Bridge Construction Inspection Region 1
2023 11 FD52 06 E797 C 1237401C 008 5/18/2023 4580 CONSTRUCTION CONTRACTS PRC-2300223201 PON22200004163 H W Lochner Inc $12,206.00 SW HWY & Bridge Construction Inspection Region 1
2023 11 FD52 06 E797 C 1237401C 008 5/18/2023 4580 CONSTRUCTION CONTRACTS PRC-2300223201 PON22200004163 H W Lochner Inc $6,375.00 SW HWY & Bridge Construction Inspection Region 1
2023 11 FD52 06 E797 C 1237401C 008 5/18/2023 4580 CONSTRUCTION CONTRACTS PRC-2300223201 PON22200004163 H W Lochner Inc $2,448.00 SW HWY & Bridge Construction Inspection Region 1
2023 11 FD52 06 E797 C 1237401C 008 5/18/2023 4580 CONSTRUCTION CONTRACTS PRC-2300223201 PON22200004163 H W Lochner Inc $1,530.00 SW HWY & Bridge Construction Inspection Region 1
2023 11 FD52 06 E797 C 1237401C 008 5/18/2023 4580 CONSTRUCTION CONTRACTS PRC-2300223201 PON22200004163 H W Lochner Inc $1,190.00 SW HWY & Bridge Construction Inspection Region 1
2023 11 FD52 06 E111 C 1237401C 008 5/15/2023 4010 CONSTRUCTION ENGINEERING CA-XR051N1062312808069 $258.37 000001083292-3562500680
2023 11 FD52 06 E111 C 1237401C 008 5/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808069 $46.87 000001083292-3562500680
2023 11 FD52 06 E121 C 1237401C 008 5/15/2023 4010 CONSTRUCTION ENGINEERING CA-XR051N1062312808069 $19.78 000001083292-3562500680
2023 11 FD52 06 E121 C 1237401C 008 5/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808069 $3.58 000001083292-3562500680
2023 11 FD52 06 E122 C 1237401C 008 5/15/2023 4010 CONSTRUCTION ENGINEERING CA-XR051N1062312808069 $201.61 000001083292-3562500680
2023 11 FD52 06 E122 C 1237401C 008 5/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808069 $36.56 000001083292-3562500680
2023 11 FD52 06 E123 C 1237401C 008 5/15/2023 4010 CONSTRUCTION ENGINEERING CA-XR051N1062312808069 $9.35 000001083292-3562500680
2023 11 FD52 06 E123 C 1237401C 008 5/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808069 $1.59 000001083292-3562500680
2023 11 FD52 06 E797 C 1237401C 008 5/11/2023 4580 CONSTRUCTION CONTRACTS PRC-2300204529 PON22200004163 H W Lochner Inc $7,347.00 SW HWY & Bridge Construction Inspection Region 1
2023 11 FD52 06 E797 C 1237401C 008 5/11/2023 4580 CONSTRUCTION CONTRACTS PRC-2300204529 PON22200004163 H W Lochner Inc $5,270.00 SW HWY & Bridge Construction Inspection Region 1
2023 11 FD52 06 E797 C 1237401C 008 5/11/2023 4580 CONSTRUCTION CONTRACTS PRC-2300204529 PON22200004163 H W Lochner Inc $2,958.00 SW HWY & Bridge Construction Inspection Region 1
2023 11 FD52 06 E797 C 1237401C 008 5/11/2023 4580 CONSTRUCTION CONTRACTS PRC-2300204529 PON22200004163 H W Lochner Inc $663.00 SW HWY & Bridge Construction Inspection Region 1
2023 11 FD52 06 E797 C 1237401C 008 5/11/2023 4580 CONSTRUCTION CONTRACTS PRC-2300204529 PON22200004163 H W Lochner Inc $3,060.00 SW HWY & Bridge Construction Inspection Region 1
2023 11 FD52 06 E797 C 1237401C 008 5/10/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P020K CTXCONST0922213090001K EATON ASPHALT PAVING CO $282,647.04
2023 11 FD52 00 E121 C 1237401C 008 5/9/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR051N1062312808088 $526.03 000001086711-3562500640
2023 11 FD52 00 E121 C 1237401C 008 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808088 $49.76 000001086711-3562500640
2023 11 FD52 00 E122 C 1237401C 008 5/9/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR051N1062312808088 $5,749.27 000001086711-3562500640
2023 11 FD52 00 E122 C 1237401C 008 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808088 $548.52 000001086711-3562500640
2023 11 FD52 00 E123 C 1237401C 008 5/9/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR051N1062312808088 $1,616.27 000001086711-3562500640
2023 11 FD52 00 E123 C 1237401C 008 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808088 $161.95 000001086711-3562500640
2023 11 FD52 06 E111 C 1237401C 008 5/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR051N1062312808341 $1,026.10 10934002-3562506340
2023 11 FD52 06 E111 C 1237401C 008 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808341 $28.28 10934002-3562506340
2023 11 FD52 06 E121 C 1237401C 008 5/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR051N1062312808341 $77.24 10934002-3562506340
2023 11 FD52 06 E121 C 1237401C 008 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808341 $2.13 10934002-3562506340
2023 11 FD52 06 E122 C 1237401C 008 5/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR051N1062312808341 $800.45 10934002-3562506340
2023 11 FD52 06 E122 C 1237401C 008 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808341 $22.06 10934002-3562506340
2023 11 FD52 06 E123 C 1237401C 008 5/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR051N1062312808341 $115.50 10934002-3562506340
2023 11 FD52 06 E123 C 1237401C 008 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808341 $3.14 10934002-3562506340
2023 11 FD52 00 E111 C 1237401C 008 5/9/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR051N1062312808088 $7,004.79 000001086711-3562500640
2023 11 FD52 00 E111 C 1237401C 008 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808088 $703.23 000001086711-3562500640
2023 11 FD52 06 E111 C 1237401C 008 5/9/2023 5203 TESTING OF ASPHALT MIXTURES CA-XR051N1062312808093 $258.47 000001087272-3562506210
2023 11 FD52 06 E121 C 1237401C 008 5/9/2023 5203 TESTING OF ASPHALT MIXTURES CA-XR051N1062312808093 $17.60 000001087272-3562506210
2023 11 FD52 06 E122 C 1237401C 008 5/9/2023 5203 TESTING OF ASPHALT MIXTURES CA-XR051N1062312808093 $201.61 000001087272-3562506210
2023 11 FD52 06 E123 C 1237401C 008 5/9/2023 5203 TESTING OF ASPHALT MIXTURES CA-XR051N1062312808093 $49.52 000001087272-3562506210
2023 11 FD52 00 E115 C 1237401C 008 5/9/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR051N1062312808088 $366.09 000001086711-3562500640
2023 11 FD52 06 E111 C 1237401C 008 5/9/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR051N1062312808078 $1,113.14 000001085420-3562506210
2023 11 FD52 06 E121 C 1237401C 008 5/9/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR051N1062312808078 $79.76 000001085420-3562506210
2023 11 FD52 06 E122 C 1237401C 008 5/9/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR051N1062312808078 $868.25 000001085420-3562506210
2023 11 FD52 06 E123 C 1237401C 008 5/9/2023 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR051N1062312808078 $198.11 000001085420-3562506210
2023 10 FD52 06 E229 C 1237401C 008 4/27/2023 4010 CONSTRUCTION ENGINEERING IET-XE13A162523115007430 $74.10
2023 10 FD52 06 E797 C 1237401C 008 4/26/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P019K CTXCONST0922213090001K EATON ASPHALT PAVING CO $137,520.91
2023 10 FD52 06 E797 C 1237401C 008 4/25/2023 4580 CONSTRUCTION CONTRACTS PRC-2300178901 PON22200004163 H W Lochner Inc $408.00 SW HWY & Bridge Construction Inspection Region 1
2023 10 FD52 06 E797 C 1237401C 008 4/25/2023 4580 CONSTRUCTION CONTRACTS PRC-2300178901 PON22200004163 H W Lochner Inc $8,122.00 SW HWY & Bridge Construction Inspection Region 1
2023 10 FD52 06 E797 C 1237401C 008 4/25/2023 4580 CONSTRUCTION CONTRACTS PRC-2300178901 PON22200004163 H W Lochner Inc $4,930.00 SW HWY & Bridge Construction Inspection Region 1
2023 10 FD52 06 E797 C 1237401C 008 4/25/2023 4580 CONSTRUCTION CONTRACTS PRC-2300178901 PON22200004163 H W Lochner Inc $770.00 SW HWY & Bridge Construction Inspection Region 1
2023 10 FD52 06 E797 C 1237401C 008 4/25/2023 4580 CONSTRUCTION CONTRACTS PRC-2300178901 PON22200004163 H W Lochner Inc $1,020.00 SW HWY & Bridge Construction Inspection Region 1
2023 10 FD52 06 E797 C 1237401C 008 4/25/2023 4580 CONSTRUCTION CONTRACTS PRC-2300178901 PON22200004163 H W Lochner Inc $408.00 SW HWY & Bridge Construction Inspection Region 1
2023 10 FD52 00 E111 C 1237401C 008 4/24/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR042N1062311106965 $5,434.29 000001086711-3562500640
2023 10 FD52 00 E111 C 1237401C 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106965 $2,899.25 000001086711-3562500640
2023 10 FD52 00 E115 C 1237401C 008 4/24/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR042N1062311106965 $138.47 000001086711-3562500640
2023 10 FD52 00 E121 C 1237401C 008 4/24/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR042N1062311106965 $404.67 000001086711-3562500640
2023 10 FD52 00 E121 C 1237401C 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106965 $208.07 000001086711-3562500640
2023 10 FD52 00 E122 C 1237401C 008 4/24/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR042N1062311106965 $4,346.76 000001086711-3562500640
2023 10 FD52 00 E122 C 1237401C 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106965 $2,261.42 000001086711-3562500640
2023 10 FD52 00 E123 C 1237401C 008 4/24/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR042N1062311106965 $1,261.45 000001086711-3562500640
2023 10 FD52 00 E123 C 1237401C 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106965 $626.83 000001086711-3562500640
2023 10 FD52 00 E124 C 1237401C 008 4/24/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR042N1062311106965 $2.54 000001086711-3562500640
2023 10 FD52 00 E124 C 1237401C 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106965 $1.31 000001086711-3562500640
2023 10 FD52 06 E111 C 1237401C 008 4/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR042N1062311107307 $684.26 10926657-3562506340
2023 10 FD52 06 E111 C 1237401C 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311107307 $78.90 10926657-3562506340
2023 10 FD52 06 E121 C 1237401C 008 4/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR042N1062311107307 $51.93 10926657-3562506340
2023 10 FD52 06 E121 C 1237401C 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311107307 $5.99 10926657-3562506340
2023 10 FD52 06 E122 C 1237401C 008 4/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR042N1062311107307 $533.64 10926657-3562506340
2023 10 FD52 06 E122 C 1237401C 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311107307 $61.54 10926657-3562506340
2023 10 FD52 06 E123 C 1237401C 008 4/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR042N1062311107307 $77.10 10926657-3562506340
2023 10 FD52 06 E123 C 1237401C 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311107307 $8.76 10926657-3562506340
2023 10 FD52 06 E124 C 1237401C 008 4/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR042N1062311107307 $0.20 10926657-3562506340
2023 10 FD52 06 E124 C 1237401C 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311107307 $0.02 10926657-3562506340
2023 10 FD52 00 E111 C 1237401C 008 4/24/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR042N1062311106945 $450.55 000001084083-3562500610
2023 10 FD52 00 E111 C 1237401C 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106945 $30.64 000001084083-3562500610
2023 10 FD52 00 E121 C 1237401C 008 4/24/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR042N1062311106945 $33.94 000001084083-3562500610
2023 10 FD52 00 E121 C 1237401C 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106945 $2.30 000001084083-3562500610
2023 10 FD52 00 E122 C 1237401C 008 4/24/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR042N1062311106945 $351.47 000001084083-3562500610
2023 10 FD52 00 E122 C 1237401C 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106945 $23.90 000001084083-3562500610
2023 10 FD52 00 E123 C 1237401C 008 4/24/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR042N1062311106945 $49.55 000001084083-3562500610
2023 10 FD52 00 E123 C 1237401C 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106945 $3.33 000001084083-3562500610
2023 10 FD52 00 E124 C 1237401C 008 4/24/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR042N1062311106945 $0.10 000001084083-3562500610
2023 10 FD52 00 E124 C 1237401C 008 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106945 $0.01 000001084083-3562500610
2023 10 FD52 06 E111 C 1237401C 008 4/14/2023 4010 CONSTRUCTION ENGINEERING CA-XR041N1062309606378 $1,140.24 10924280-3562506340
2023 10 FD52 06 E121 C 1237401C 008 4/14/2023 4010 CONSTRUCTION ENGINEERING CA-XR041N1062309606378 $85.83 10924280-3562506340
2023 10 FD52 06 E122 C 1237401C 008 4/14/2023 4010 CONSTRUCTION ENGINEERING CA-XR041N1062309606378 $889.39 10924280-3562506340
2023 10 FD52 06 E123 C 1237401C 008 4/14/2023 4010 CONSTRUCTION ENGINEERING CA-XR041N1062309606378 $128.29 10924280-3562506340
2023 10 FD52 06 E797 C 1237401C 008 4/12/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P018K CTXCONST0922213090001K EATON ASPHALT PAVING CO $25,478.33
2023 10 FD52 00 E121 C 1237401C 008 4/10/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR041N1062309605777 $58.17 000001084083-3562500610
2023 10 FD52 00 E121 C 1237401C 008 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605777 $5.29 000001084083-3562500610
2023 10 FD52 00 E111 C 1237401C 008 4/10/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR041N1062309605794 $5,719.36 000001086711-3562500640
2023 10 FD52 00 E111 C 1237401C 008 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605794 $546.79 000001086711-3562500640
2023 10 FD52 00 E121 C 1237401C 008 4/10/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR041N1062309605794 $408.15 000001086711-3562500640
2023 10 FD52 00 E121 C 1237401C 008 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605794 $38.75 000001086711-3562500640
2023 10 FD52 00 E122 C 1237401C 008 4/10/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR041N1062309605794 $4,461.09 000001086711-3562500640
2023 10 FD52 00 E122 C 1237401C 008 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605794 $426.50 000001086711-3562500640
2023 10 FD52 00 E123 C 1237401C 008 4/10/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR041N1062309605794 $1,314.99 000001086711-3562500640
2023 10 FD52 00 E122 C 1237401C 008 4/10/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR041N1062309605777 $616.03 000001084083-3562500610
2023 10 FD52 00 E123 C 1237401C 008 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605794 $118.93 000001086711-3562500640
2023 10 FD52 00 E122 C 1237401C 008 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605777 $56.00 000001084083-3562500610
2023 10 FD52 00 E123 C 1237401C 008 4/10/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR041N1062309605777 $128.13 000001084083-3562500610
2023 10 FD52 00 E123 C 1237401C 008 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605777 $11.49 000001084083-3562500610
2023 10 FD52 00 E111 C 1237401C 008 4/10/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR041N1062309605776 $789.86 000001084083-3562500610
2023 10 FD52 00 E111 C 1237401C 008 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605776 $71.80 000001084083-3562500610
2023 9 FD52 06 E797 C 1237401C 008 3/29/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P017K CTXCONST0922213090001K EATON ASPHALT PAVING CO $169,458.87
2023 9 FD52 00 E122 C 1237401C 008 3/27/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR032N1062308304655 $806.44 000001084083-3562500610
2023 9 FD52 00 E122 C 1237401C 008 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304655 $80.64 000001084083-3562500610
2023 9 FD52 00 E123 C 1237401C 008 3/27/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR032N1062308304655 $167.75 000001084083-3562500610
2023 9 FD52 06 E111 C 1237401C 008 3/27/2023 4010 CONSTRUCTION ENGINEERING CA-XR032N1062308305222 $621.87 10914892-3562506340
2023 9 FD52 00 E123 C 1237401C 008 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304655 $16.55 000001084083-3562500610
2023 9 FD52 06 E111 C 1237401C 008 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308305222 $660.93 10914892-3562506340
2023 9 FD52 00 E124 C 1237401C 008 3/27/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR032N1062308304655 $0.40 000001084083-3562500610
2023 9 FD52 06 E121 C 1237401C 008 3/27/2023 4010 CONSTRUCTION ENGINEERING CA-XR032N1062308305222 $47.21 10914892-3562506340
2023 9 FD52 00 E124 C 1237401C 008 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304655 $0.04 000001084083-3562500610
2023 9 FD52 06 E121 C 1237401C 008 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308305222 $50.17 10914892-3562506340
2023 9 FD52 06 E122 C 1237401C 008 3/27/2023 4010 CONSTRUCTION ENGINEERING CA-XR032N1062308305222 $484.80 10914892-3562506340
2023 9 FD52 06 E122 C 1237401C 008 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308305222 $515.53 10914892-3562506340
2023 9 FD52 06 E123 C 1237401C 008 3/27/2023 4010 CONSTRUCTION ENGINEERING CA-XR032N1062308305222 $70.89 10914892-3562506340
2023 9 FD52 06 E123 C 1237401C 008 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308305222 $73.38 10914892-3562506340
2023 9 FD52 06 E124 C 1237401C 008 3/27/2023 4010 CONSTRUCTION ENGINEERING CA-XR032N1062308305222 $0.18 10914892-3562506340
2023 9 FD52 06 E124 C 1237401C 008 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308305222 $0.19 10914892-3562506340
2023 9 FD52 06 E111 C 1237401C 008 3/27/2023 4010 CONSTRUCTION ENGINEERING CA-XR032N1062308304650 $200.00 000001083292-3562500620
2023 9 FD52 06 E121 C 1237401C 008 3/27/2023 4010 CONSTRUCTION ENGINEERING CA-XR032N1062308304650 $14.99 000001083292-3562500620
2023 9 FD52 06 E122 C 1237401C 008 3/27/2023 4010 CONSTRUCTION ENGINEERING CA-XR032N1062308304650 $156.00 000001083292-3562500620
2023 9 FD52 06 E123 C 1237401C 008 3/27/2023 4010 CONSTRUCTION ENGINEERING CA-XR032N1062308304650 $34.30 000001083292-3562500620
2023 9 FD52 06 E124 C 1237401C 008 3/27/2023 4010 CONSTRUCTION ENGINEERING CA-XR032N1062308304650 $0.09 000001083292-3562500620
2023 9 FD52 00 E111 C 1237401C 008 3/27/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR032N1062308304655 $1,033.89 000001084083-3562500610
2023 9 FD52 00 E111 C 1237401C 008 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304655 $103.39 000001084083-3562500610
2023 9 FD52 00 E121 C 1237401C 008 3/27/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR032N1062308304655 $76.49 000001084083-3562500610
2023 9 FD52 00 E121 C 1237401C 008 3/27/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032N1062308304655 $7.65 000001084083-3562500610
2023 9 FD52 06 E797 C 1237401C 008 3/15/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P016K CTXCONST0922213090001K EATON ASPHALT PAVING CO $269,411.00
2023 9 FD52 00 E111 C 1237401C 008 3/15/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR031N1062306703687 $287.19 000001086711-3562500640
2023 9 FD52 00 E111 C 1237401C 008 3/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703687 $62.41 000001086711-3562500640
2023 9 FD52 00 E121 C 1237401C 008 3/15/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR031N1062306703687 $20.67 000001086711-3562500640
2023 9 FD52 00 E121 C 1237401C 008 3/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703687 $4.47 000001086711-3562500640
2023 9 FD52 00 E122 C 1237401C 008 3/15/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR031N1062306703687 $224.04 000001086711-3562500640
2023 9 FD52 00 E122 C 1237401C 008 3/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703687 $48.68 000001086711-3562500640
2023 9 FD52 00 E123 C 1237401C 008 3/15/2023 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR031N1062306703687 $55.16 000001086711-3562500640
2023 9 FD52 00 E123 C 1237401C 008 3/15/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703687 $11.84 000001086711-3562500640
2023 9 FD52 00 E111 C 1237401C 008 3/9/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR031N1062306703668 $944.07 000001084083-3562500610
2023 9 FD52 00 E111 C 1237401C 008 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703668 $14.48 000001084083-3562500610
2023 9 FD52 00 E121 C 1237401C 008 3/9/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR031N1062306703668 $70.23 000001084083-3562500610
2023 9 FD52 00 E121 C 1237401C 008 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703668 $1.07 000001084083-3562500610
2023 9 FD52 00 E122 C 1237401C 008 3/9/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR031N1062306703668 $736.50 000001084083-3562500610
2023 9 FD52 00 E122 C 1237401C 008 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703668 $11.30 000001084083-3562500610
2023 9 FD52 00 E123 C 1237401C 008 3/9/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR031N1062306703668 $85.55 000001084083-3562500610
2023 9 FD52 00 E123 C 1237401C 008 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703668 $1.29 000001084083-3562500610
2023 9 FD52 06 E111 C 1237401C 008 3/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR031N1062306703664 $287.24 000001083292-3562500680
2023 9 FD52 06 E111 C 1237401C 008 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703664 $18.00 000001083292-3562500680
2023 9 FD52 06 E121 C 1237401C 008 3/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR031N1062306703664 $21.98 000001083292-3562500680
2023 9 FD52 06 E121 C 1237401C 008 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703664 $1.38 000001083292-3562500680
2023 9 FD52 06 E122 C 1237401C 008 3/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR031N1062306703664 $224.01 000001083292-3562500680
2023 9 FD52 06 E122 C 1237401C 008 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703664 $14.04 000001083292-3562500680
2023 9 FD52 06 E123 C 1237401C 008 3/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR031N1062306703664 $10.32 000001083292-3562500680
2023 9 FD52 06 E123 C 1237401C 008 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703664 $0.61 000001083292-3562500680
2023 9 FD52 06 E111 C 1237401C 008 3/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR031N1062306704087 $380.08 10908004-3562506340
2023 9 FD52 06 E121 C 1237401C 008 3/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR031N1062306704087 $28.61 10908004-3562506340
2023 9 FD52 06 E122 C 1237401C 008 3/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR031N1062306704087 $296.46 10908004-3562506340
2023 9 FD52 06 E123 C 1237401C 008 3/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR031N1062306704087 $42.76 10908004-3562506340
2023 9 FD52 06 E797 C 1237401C 008 3/8/2023 4580 CONSTRUCTION CONTRACTS PRC-2300162082 PON22200004163 H W Lochner Inc $4,590.00 SW HWY & Bridge Construction Inspection Region 1
2023 9 FD52 06 E797 C 1237401C 008 3/8/2023 4580 CONSTRUCTION CONTRACTS PRC-2300162082 PON22200004163 H W Lochner Inc $816.00 SW HWY & Bridge Construction Inspection Region 1
2023 9 FD52 06 E797 C 1237401C 008 3/8/2023 4580 CONSTRUCTION CONTRACTS PRC-2300162082 PON22200004163 H W Lochner Inc $8,680.00 SW HWY & Bridge Construction Inspection Region 1
2023 9 FD52 06 E797 C 1237401C 008 3/8/2023 4580 CONSTRUCTION CONTRACTS PRC-2300162082 PON22200004163 H W Lochner Inc $6,630.00 SW HWY & Bridge Construction Inspection Region 1
2023 9 FD52 06 E797 C 1237401C 008 3/8/2023 4580 CONSTRUCTION CONTRACTS PRC-2300162082 PON22200004163 H W Lochner Inc $924.00 SW HWY & Bridge Construction Inspection Region 1
2023 9 FD52 06 E797 C 1237401C 008 3/8/2023 4580 CONSTRUCTION CONTRACTS PRC-2300162082 PON22200004163 H W Lochner Inc $1,173.00 SW HWY & Bridge Construction Inspection Region 1
2023 9 FD52 06 E797 C 1237401C 008 3/8/2023 4580 CONSTRUCTION CONTRACTS PRC-2300162082 PON22200004163 H W Lochner Inc $1,581.00 SW HWY & Bridge Construction Inspection Region 1
2023 9 FD52 06 E797 C 1237401C 008 3/8/2023 4580 CONSTRUCTION CONTRACTS PRC-2300162082 PON22200004163 H W Lochner Inc $688.50 SW HWY & Bridge Construction Inspection Region 1
2023 9 FD52 06 E797 C 1237401C 008 3/1/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P015K CTXCONST0922213090001K EATON ASPHALT PAVING CO $305,405.82
2023 8 FD52 06 E229 C 1237401C 008 2/27/2023 4010 CONSTRUCTION ENGINEERING IET-XE13A162523056006970 $46.74
2023 8 FD52 06 E123 C 1237401C 008 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305303048 $1.06 10898546-3562506340
2023 8 FD52 06 E124 C 1237401C 008 2/23/2023 4010 CONSTRUCTION ENGINEERING CA-XR022N1062305303048 $0.22 10898546-3562506340
2023 8 FD52 06 E111 C 1237401C 008 2/23/2023 4010 CONSTRUCTION ENGINEERING CA-XR022N1062305303048 $767.07 10898546-3562506340
2023 8 FD52 06 E111 C 1237401C 008 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305303048 $9.54 10898546-3562506340
2023 8 FD52 06 E111 C 1237401C 008 2/23/2023 4010 CONSTRUCTION ENGINEERING CA-XR022N1062305302459 $328.27 000001084158-3562506200
2023 8 FD52 06 E121 C 1237401C 008 2/23/2023 4010 CONSTRUCTION ENGINEERING CA-XR022N1062305302459 $25.11 000001084158-3562506200
2023 8 FD52 06 E122 C 1237401C 008 2/23/2023 4010 CONSTRUCTION ENGINEERING CA-XR022N1062305302459 $256.05 000001084158-3562506200
2023 8 FD52 06 E123 C 1237401C 008 2/23/2023 4010 CONSTRUCTION ENGINEERING CA-XR022N1062305302459 $8.43 000001084158-3562506200
2023 8 FD52 06 E124 C 1237401C 008 2/23/2023 4010 CONSTRUCTION ENGINEERING CA-XR022N1062305302459 $0.09 000001084158-3562506200
2023 8 FD52 06 E121 C 1237401C 008 2/23/2023 4010 CONSTRUCTION ENGINEERING CA-XR022N1062305303048 $58.22 10898546-3562506340
2023 8 FD52 06 E121 C 1237401C 008 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305303048 $0.73 10898546-3562506340
2023 8 FD52 06 E122 C 1237401C 008 2/23/2023 4010 CONSTRUCTION ENGINEERING CA-XR022N1062305303048 $598.32 10898546-3562506340
2023 8 FD52 06 E122 C 1237401C 008 2/23/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022N1062305303048 $7.44 10898546-3562506340
2023 8 FD52 06 E123 C 1237401C 008 2/23/2023 4010 CONSTRUCTION ENGINEERING CA-XR022N1062305303048 $86.32 10898546-3562506340
2023 8 FD52 06 E797 C 1237401C 008 2/15/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P014K CTXCONST0922213090001K EATON ASPHALT PAVING CO $193,610.00
2023 8 FD52 06 E229 C 1237401C 008 2/14/2023 4010 CONSTRUCTION ENGINEERING IET-XE13A162523041010470 $39.00
2023 8 FD52 00 E111 C 1237401C 008 2/9/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR021N1062303901430 $430.79 000001084083-3562500610
2023 8 FD52 00 E111 C 1237401C 008 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901430 $143.88 000001084083-3562500610
2023 8 FD52 00 E121 C 1237401C 008 2/9/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR021N1062303901430 $30.63 000001084083-3562500610
2023 8 FD52 00 E121 C 1237401C 008 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901430 $10.23 000001084083-3562500610
2023 8 FD52 00 E122 C 1237401C 008 2/9/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR021N1062303901430 $336.01 000001084083-3562500610
2023 8 FD52 00 E122 C 1237401C 008 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901430 $112.23 000001084083-3562500610
2023 8 FD52 00 E123 C 1237401C 008 2/9/2023 5341 GEOTECHNICAL INVEST (CONST) CA-XR021N1062303901430 $63.18 000001084083-3562500610
2023 8 FD52 00 E123 C 1237401C 008 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901430 $20.73 000001084083-3562500610
2023 8 FD52 06 E111 C 1237401C 008 2/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR021N1062303901424 $204.93 000001083292-3562500680
2023 8 FD52 06 E111 C 1237401C 008 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901424 $20.24 000001083292-3562500680
2023 8 FD52 06 E121 C 1237401C 008 2/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR021N1062303901424 $15.69 000001083292-3562500680
2023 8 FD52 06 E121 C 1237401C 008 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901424 $1.54 000001083292-3562500680
2023 8 FD52 06 E122 C 1237401C 008 2/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR021N1062303901424 $160.01 000001083292-3562500680
2023 8 FD52 06 E122 C 1237401C 008 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901424 $15.79 000001083292-3562500680
2023 8 FD52 06 E123 C 1237401C 008 2/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR021N1062303901424 $7.76 000001083292-3562500680
2023 8 FD52 06 E123 C 1237401C 008 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901424 $0.72 000001083292-3562500680
2023 8 FD52 06 E111 C 1237401C 008 2/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR021N1062303901679 $1,140.24 10886890-3562506340
2023 8 FD52 06 E111 C 1237401C 008 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901679 $103.76 10886890-3562506340
2023 8 FD52 06 E121 C 1237401C 008 2/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR021N1062303901679 $85.83 10886890-3562506340
2023 8 FD52 06 E121 C 1237401C 008 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901679 $7.81 10886890-3562506340
2023 8 FD52 06 E122 C 1237401C 008 2/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR021N1062303901679 $889.39 10886890-3562506340
2023 8 FD52 06 E122 C 1237401C 008 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901679 $80.93 10886890-3562506340
2023 8 FD52 06 E123 C 1237401C 008 2/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR021N1062303901679 $128.44 10886890-3562506340
2023 8 FD52 06 E123 C 1237401C 008 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901679 $11.52 10886890-3562506340
2023 8 FD52 06 E797 C 1237401C 008 2/2/2023 4580 CONSTRUCTION CONTRACTS PRC-2300139737 PON22200004163 H W Lochner Inc $5,952.00 SW HWY & Bridge Construction Inspection Region 1
2023 8 FD52 06 E797 C 1237401C 008 2/2/2023 4580 CONSTRUCTION CONTRACTS PRC-2300139737 PON22200004163 H W Lochner Inc $1,360.00 SW HWY & Bridge Construction Inspection Region 1
2023 8 FD52 06 E797 C 1237401C 008 2/2/2023 4580 CONSTRUCTION CONTRACTS PRC-2300139737 PON22200004163 H W Lochner Inc $1,224.00 SW HWY & Bridge Construction Inspection Region 1
2023 8 FD52 06 E797 C 1237401C 008 2/2/2023 4580 CONSTRUCTION CONTRACTS PRC-2300139737 PON22200004163 H W Lochner Inc $714.00 SW HWY & Bridge Construction Inspection Region 1
2023 8 FD52 06 E797 C 1237401C 008 2/1/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P013K CTXCONST0922213090001K EATON ASPHALT PAVING CO $113,672.95
2023 7 FD52 06 E229 C 1237401C 008 1/26/2023 4010 CONSTRUCTION ENGINEERING IET-XE13A162523025008430 $17.10
2023 7 FD52 06 E797 C 1237401C 008 1/24/2023 4580 CONSTRUCTION CONTRACTS PRC-2300123445 PON22200004163 H W Lochner Inc $612.00 SW HWY & Bridge Construction Inspection Region 1
2023 7 FD52 06 E797 C 1237401C 008 1/24/2023 4580 CONSTRUCTION CONTRACTS PRC-2300123445 PON22200004163 H W Lochner Inc $4,743.00 SW HWY & Bridge Construction Inspection Region 1
2023 7 FD52 06 E797 C 1237401C 008 1/24/2023 4580 CONSTRUCTION CONTRACTS PRC-2300123445 PON22200004163 H W Lochner Inc $2,210.00 SW HWY & Bridge Construction Inspection Region 1
2023 7 FD52 06 E797 C 1237401C 008 1/24/2023 4580 CONSTRUCTION CONTRACTS PRC-2300123445 PON22200004163 H W Lochner Inc $1,989.00 SW HWY & Bridge Construction Inspection Region 1
2023 7 FD52 06 E111 C 1237401C 008 1/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR012N1062302300785 $1,710.37 10881216-3562506340
2023 7 FD52 06 E111 C 1237401C 008 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300785 $190.19 10881216-3562506340
2023 7 FD52 06 E121 C 1237401C 008 1/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR012N1062302300785 $129.82 10881216-3562506340
2023 7 FD52 06 E121 C 1237401C 008 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300785 $14.44 10881216-3562506340
2023 7 FD52 06 E122 C 1237401C 008 1/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR012N1062302300785 $1,334.09 10881216-3562506340
2023 7 FD52 06 E122 C 1237401C 008 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300785 $148.35 10881216-3562506340
2023 7 FD52 06 E123 C 1237401C 008 1/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR012N1062302300785 $192.72 10881216-3562506340
2023 7 FD52 06 E123 C 1237401C 008 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300785 $21.12 10881216-3562506340
2023 7 FD52 06 E124 C 1237401C 008 1/24/2023 4010 CONSTRUCTION ENGINEERING CA-XR012N1062302300785 $0.50 10881216-3562506340
2023 7 FD52 06 E124 C 1237401C 008 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300785 $0.06 10881216-3562506340
2023 7 FD52 06 E797 C 1237401C 008 1/19/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P012K CTXCONST0922213090001K EATON ASPHALT PAVING CO $172,904.00
2023 7 FD52 06 E111 C 1237401C 008 1/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR011N1062300610610 $290.11 10874886-3562506340
2023 7 FD52 06 E111 C 1237401C 008 1/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011N1062300610610 $798.17 10874886-3562506340
2023 7 FD52 06 E121 C 1237401C 008 1/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR011N1062300610610 $21.85 10874886-3562506340
2023 7 FD52 06 E121 C 1237401C 008 1/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011N1062300610610 $60.08 10874886-3562506340
2023 7 FD52 06 E122 C 1237401C 008 1/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR011N1062300610610 $226.07 10874886-3562506340
2023 7 FD52 06 E122 C 1237401C 008 1/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011N1062300610610 $622.58 10874886-3562506340
2023 7 FD52 06 E123 C 1237401C 008 1/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR011N1062300610610 $33.81 10874886-3562506340
2023 7 FD52 06 E123 C 1237401C 008 1/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011N1062300610610 $88.61 10874886-3562506340
2023 7 FD52 06 E797 C 1237401C 008 1/5/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P011K CTXCONST0922213090001K EATON ASPHALT PAVING CO $74,000.00
2023 6 FD52 06 E111 C 1237401C 008 12/22/2022 4010 CONSTRUCTION ENGINEERING CA-XR122M1062235509172 $223.79 000001083292-3562500680
2023 6 FD52 06 E111 C 1237401C 008 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509172 $39.98 000001083292-3562500680
2023 6 FD52 06 E121 C 1237401C 008 12/22/2022 4010 CONSTRUCTION ENGINEERING CA-XR122M1062235509172 $17.11 000001083292-3562500680
2023 6 FD52 06 E121 C 1237401C 008 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509172 $3.06 000001083292-3562500680
2023 6 FD52 06 E122 C 1237401C 008 12/22/2022 4010 CONSTRUCTION ENGINEERING CA-XR122M1062235509172 $174.56 000001083292-3562500680
2023 6 FD52 06 E122 C 1237401C 008 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509172 $31.19 000001083292-3562500680
2023 6 FD52 06 E123 C 1237401C 008 12/22/2022 4010 CONSTRUCTION ENGINEERING CA-XR122M1062235509172 $8.50 000001083292-3562500680
2023 6 FD52 06 E123 C 1237401C 008 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509172 $1.43 000001083292-3562500680
2023 6 FD52 06 E124 C 1237401C 008 12/22/2022 4010 CONSTRUCTION ENGINEERING CA-XR122M1062235509172 $0.09 000001083292-3562500680
2023 6 FD52 06 E124 C 1237401C 008 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509172 $0.02 000001083292-3562500680
2023 6 FD52 06 E111 C 1237401C 008 12/22/2022 4010 CONSTRUCTION ENGINEERING CA-XR122M1062235509746 $310.98 10869704-3562506340
2023 6 FD52 06 E111 C 1237401C 008 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509746 $5.80 10869704-3562506340
2023 6 FD52 06 E121 C 1237401C 008 12/22/2022 4010 CONSTRUCTION ENGINEERING CA-XR122M1062235509746 $23.60 10869704-3562506340
2023 6 FD52 06 E121 C 1237401C 008 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509746 $0.44 10869704-3562506340
2023 6 FD52 06 E122 C 1237401C 008 12/22/2022 4010 CONSTRUCTION ENGINEERING CA-XR122M1062235509746 $242.56 10869704-3562506340
2023 6 FD52 06 E122 C 1237401C 008 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509746 $4.53 10869704-3562506340
2023 6 FD52 06 E123 C 1237401C 008 12/22/2022 4010 CONSTRUCTION ENGINEERING CA-XR122M1062235509746 $32.15 10869704-3562506340
2023 6 FD52 06 E123 C 1237401C 008 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509746 $0.59 10869704-3562506340
2023 6 FD52 06 E124 C 1237401C 008 12/22/2022 4010 CONSTRUCTION ENGINEERING CA-XR122M1062235509746 $0.09 10869704-3562506340
2023 6 FD52 06 E797 C 1237401C 008 12/21/2022 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P010K CTXCONST0922213090001K EATON ASPHALT PAVING CO $127,720.00
2023 6 FD52 06 E111 C 1237401C 008 12/15/2022 4010 CONSTRUCTION ENGINEERING CA-XR121M1062234208217 $223.83 000001083292-3562500680
2023 6 FD52 06 E111 C 1237401C 008 12/15/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208217 $53.71 000001083292-3562500680
2023 6 FD52 06 E115 C 1237401C 008 12/15/2022 4010 CONSTRUCTION ENGINEERING CA-XR121M1062234208217 $11.36 000001083292-3562500680
2023 6 FD52 06 E121 C 1237401C 008 12/15/2022 4010 CONSTRUCTION ENGINEERING CA-XR121M1062234208217 $17.98 000001083292-3562500680
2023 6 FD52 06 E121 C 1237401C 008 12/15/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208217 $4.11 000001083292-3562500680
2023 6 FD52 06 E122 C 1237401C 008 12/15/2022 4010 CONSTRUCTION ENGINEERING CA-XR121M1062234208217 $183.42 000001083292-3562500680
2023 6 FD52 06 E122 C 1237401C 008 12/15/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208217 $41.90 000001083292-3562500680
2023 6 FD52 06 E123 C 1237401C 008 12/15/2022 4010 CONSTRUCTION ENGINEERING CA-XR121M1062234208217 $8.53 000001083292-3562500680
2023 6 FD52 06 E123 C 1237401C 008 12/15/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208217 $1.91 000001083292-3562500680
2023 6 FD52 06 E797 C 1237401C 008 12/13/2022 4580 CONSTRUCTION CONTRACTS PRC-2300107199 PON22200004163 H W Lochner Inc $612.00 SW HWY & Bridge Construction Inspection Region 1
2023 6 FD52 06 E797 C 1237401C 008 12/13/2022 4580 CONSTRUCTION CONTRACTS PRC-2300107199 PON22200004163 H W Lochner Inc $10,819.00 SW HWY & Bridge Construction Inspection Region 1
2023 6 FD52 06 E797 C 1237401C 008 12/13/2022 4580 CONSTRUCTION CONTRACTS PRC-2300107199 PON22200004163 H W Lochner Inc $5,270.00 SW HWY & Bridge Construction Inspection Region 1
2023 6 FD52 06 E797 C 1237401C 008 12/13/2022 4580 CONSTRUCTION CONTRACTS PRC-2300107199 PON22200004163 H W Lochner Inc $4,641.00 SW HWY & Bridge Construction Inspection Region 1
2023 6 FD52 06 E797 C 1237401C 008 12/13/2022 4580 CONSTRUCTION CONTRACTS PRC-2300107199 PON22200004163 H W Lochner Inc $1,870.00 SW HWY & Bridge Construction Inspection Region 1
2023 6 FD52 06 E797 C 1237401C 008 12/12/2022 4580 CONSTRUCTION CONTRACTS PRC-2300102675 PON22200004163 H W Lochner Inc $1,122.00 SW HWY & Bridge Construction Inspection Region 1
2023 6 FD52 06 E797 C 1237401C 008 12/12/2022 4580 CONSTRUCTION CONTRACTS PRC-2300102675 PON22200004163 H W Lochner Inc $765.00 SW HWY & Bridge Construction Inspection Region 1
2023 6 FD52 06 E797 C 1237401C 008 12/12/2022 4580 CONSTRUCTION CONTRACTS PRC-2300102675 PON22200004163 H W Lochner Inc $10,385.00 SW HWY & Bridge Construction Inspection Region 1
2023 6 FD52 06 E121 C 1237401C 008 12/12/2022 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR121M1062234208233 $0.91 000001085420-3562506210
2023 6 FD52 06 E123 C 1237401C 008 12/12/2022 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR121M1062234208233 ($14.80) 000001085420-3562506210
2023 6 FD52 06 E111 C 1237401C 008 12/12/2022 5242 CONCRETE TESTING UNIT CA-XR121M1062234208233 $199.97 000001085422-3562506210
2023 6 FD52 06 E111 C 1237401C 008 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208233 $75.27 000001085422-3562506210
2023 6 FD52 06 E121 C 1237401C 008 12/12/2022 5242 CONCRETE TESTING UNIT CA-XR121M1062234208233 $16.65 000001085422-3562506210
2023 6 FD52 06 E121 C 1237401C 008 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208233 $5.72 000001085422-3562506210
2023 6 FD52 06 E797 C 1237401C 008 12/12/2022 4580 CONSTRUCTION CONTRACTS PRC-2300102675 PON22200004163 H W Lochner Inc $5,992.50 SW HWY & Bridge Construction Inspection Region 1
2023 6 FD52 06 E122 C 1237401C 008 12/12/2022 5242 CONCRETE TESTING UNIT CA-XR121M1062234208233 $156.13 000001085422-3562506210
2023 6 FD52 06 E122 C 1237401C 008 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208233 $58.71 000001085422-3562506210
2023 6 FD52 06 E123 C 1237401C 008 12/12/2022 5242 CONCRETE TESTING UNIT CA-XR121M1062234208233 $11.92 000001085422-3562506210
2023 6 FD52 06 E797 C 1237401C 008 12/12/2022 4580 CONSTRUCTION CONTRACTS PRC-2300102675 PON22200004163 H W Lochner Inc $269.50 SW HWY & Bridge Construction Inspection Region 1
2023 6 FD52 06 E123 C 1237401C 008 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208233 $12.98 000001085422-3562506210
2023 6 FD52 06 E797 C 1237401C 008 12/12/2022 4580 CONSTRUCTION CONTRACTS PRC-2300102675 PON22200004163 H W Lochner Inc $651.00 SW HWY & Bridge Construction Inspection Region 1
2023 6 FD52 06 E797 C 1237401C 008 12/7/2022 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P009K CTXCONST0922213090001K EATON ASPHALT PAVING CO $69,355.00
2023 5 FD52 06 E229 C 1237401C 008 11/30/2022 4010 CONSTRUCTION ENGINEERING IET-XE13A162522329005640 $29.73
2023 5 FD52 06 E797 C 1237401C 008 11/23/2022 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P008K CTXCONST0922213090001K EATON ASPHALT PAVING CO $15,133.75
2023 5 FD52 06 E111 C 1237401C 008 11/23/2022 4010 CONSTRUCTION ENGINEERING CA-XR112M1062232607637 $145.13 10853896-3562506340
2023 5 FD52 06 E111 C 1237401C 008 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607637 $23.63 10853896-3562506340
2023 5 FD52 06 E121 C 1237401C 008 11/23/2022 4010 CONSTRUCTION ENGINEERING CA-XR112M1062232607637 $11.02 10853896-3562506340
2023 5 FD52 06 E121 C 1237401C 008 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607637 $1.79 10853896-3562506340
2023 5 FD52 06 E122 C 1237401C 008 11/23/2022 4010 CONSTRUCTION ENGINEERING CA-XR112M1062232607637 $113.19 10853896-3562506340
2023 5 FD52 06 E122 C 1237401C 008 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607637 $18.42 10853896-3562506340
2023 5 FD52 06 E123 C 1237401C 008 11/23/2022 4010 CONSTRUCTION ENGINEERING CA-XR112M1062232607637 $15.03 10853896-3562506340
2023 5 FD52 06 E123 C 1237401C 008 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607637 $2.40 10853896-3562506340
2023 5 FD52 06 E124 C 1237401C 008 11/23/2022 4010 CONSTRUCTION ENGINEERING CA-XR112M1062232607637 $0.04 10853896-3562506340
2023 5 FD52 06 E111 C 1237401C 008 11/23/2022 4010 CONSTRUCTION ENGINEERING CA-XR112M1062232607678 $310.97 10854722-3562506340
2023 5 FD52 06 E111 C 1237401C 008 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607678 $50.17 10854722-3562506340
2023 5 FD52 06 E121 C 1237401C 008 11/23/2022 4010 CONSTRUCTION ENGINEERING CA-XR112M1062232607678 $23.60 10854722-3562506340
2023 5 FD52 06 E121 C 1237401C 008 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607678 $3.81 10854722-3562506340
2023 5 FD52 06 E111 C 1237401C 008 11/23/2022 4010 CONSTRUCTION ENGINEERING CA-XR112M1062232607170 $388.48 000001084158-3562506200
2023 5 FD52 06 E122 C 1237401C 008 11/23/2022 4010 CONSTRUCTION ENGINEERING CA-XR112M1062232607678 $242.60 10854722-3562506340
2023 5 FD52 06 E111 C 1237401C 008 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607170 $116.00 000001084158-3562506200
2023 5 FD52 06 E111 C 1237401C 008 11/23/2022 5242 CONCRETE TESTING UNIT CA-XR112M1062232607187 $505.60 000001085422-3562506210
2023 5 FD52 06 E122 C 1237401C 008 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607678 $39.13 10854722-3562506340
2023 5 FD52 06 E121 C 1237401C 008 11/23/2022 4010 CONSTRUCTION ENGINEERING CA-XR112M1062232607170 $29.71 000001084158-3562506200
2023 5 FD52 06 E111 C 1237401C 008 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607187 $84.99 000001085422-3562506210
2023 5 FD52 06 E123 C 1237401C 008 11/23/2022 4010 CONSTRUCTION ENGINEERING CA-XR112M1062232607678 $32.23 10854722-3562506340
2023 5 FD52 06 E121 C 1237401C 008 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607170 $8.86 000001084158-3562506200
2023 5 FD52 06 E121 C 1237401C 008 11/23/2022 5242 CONCRETE TESTING UNIT CA-XR112M1062232607187 $36.40 000001085422-3562506210
2023 5 FD52 06 E123 C 1237401C 008 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607678 $5.11 10854722-3562506340
2023 5 FD52 06 E122 C 1237401C 008 11/23/2022 4010 CONSTRUCTION ENGINEERING CA-XR112M1062232607170 $302.96 000001084158-3562506200
2023 5 FD52 06 E121 C 1237401C 008 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607187 $6.12 000001085422-3562506210
2023 5 FD52 06 E124 C 1237401C 008 11/23/2022 4010 CONSTRUCTION ENGINEERING CA-XR112M1062232607678 $0.08 10854722-3562506340
2023 5 FD52 06 E122 C 1237401C 008 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607170 $90.49 000001084158-3562506200
2023 5 FD52 06 E122 C 1237401C 008 11/23/2022 5242 CONCRETE TESTING UNIT CA-XR112M1062232607187 $394.29 000001085422-3562506210
2023 5 FD52 06 E124 C 1237401C 008 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607678 $0.02 10854722-3562506340
2023 5 FD52 06 E123 C 1237401C 008 11/23/2022 4010 CONSTRUCTION ENGINEERING CA-XR112M1062232607170 $17.11 000001084158-3562506200
2023 5 FD52 06 E122 C 1237401C 008 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607187 $66.30 000001085422-3562506210
2023 5 FD52 06 E123 C 1237401C 008 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607170 $4.76 000001084158-3562506200
2023 5 FD52 06 E123 C 1237401C 008 11/23/2022 5242 CONCRETE TESTING UNIT CA-XR112M1062232607187 $95.27 000001085422-3562506210
2023 5 FD52 06 E124 C 1237401C 008 11/23/2022 4010 CONSTRUCTION ENGINEERING CA-XR112M1062232607170 $0.18 000001084158-3562506200
2023 5 FD52 06 E123 C 1237401C 008 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607187 $15.87 000001085422-3562506210
2023 5 FD52 06 E124 C 1237401C 008 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607170 $0.05 000001084158-3562506200
2023 5 FD52 06 E124 C 1237401C 008 11/23/2022 5242 CONCRETE TESTING UNIT CA-XR112M1062232607187 $0.18 000001085422-3562506210
2023 5 FD52 06 E124 C 1237401C 008 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607187 $0.04 000001085422-3562506210
2023 5 FD52 06 E111 C 1237401C 008 11/23/2022 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR112M1062232607187 $660.51 000001085423-3562506210
2023 5 FD52 06 E111 C 1237401C 008 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607187 $123.59 000001085423-3562506210
2023 5 FD52 06 E121 C 1237401C 008 11/23/2022 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR112M1062232607187 $46.84 000001085423-3562506210
2023 5 FD52 06 E121 C 1237401C 008 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607187 $8.77 000001085423-3562506210
2023 5 FD52 06 E122 C 1237401C 008 11/23/2022 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR112M1062232607187 $515.25 000001085423-3562506210
2023 5 FD52 06 E122 C 1237401C 008 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607187 $96.41 000001085423-3562506210
2023 5 FD52 06 E123 C 1237401C 008 11/23/2022 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR112M1062232607187 $117.15 000001085423-3562506210
2023 5 FD52 06 E123 C 1237401C 008 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607187 $21.60 000001085423-3562506210
2023 5 FD52 06 E124 C 1237401C 008 11/23/2022 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR112M1062232607187 $0.27 000001085423-3562506210
2023 5 FD52 06 E124 C 1237401C 008 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607187 $0.06 000001085423-3562506210
2023 5 FD52 06 E229 C 1237401C 008 11/14/2022 4010 CONSTRUCTION ENGINEERING IET-XE13A162522314011030 $39.00
2023 5 FD52 00 E111 C 1237401C 008 11/14/2022 5203 TESTING OF ASPHALT MIXTURES CA-XR111M1062230806183 $967.58 000001085256-3562500640
2023 5 FD52 00 E111 C 1237401C 008 11/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806183 $67.02 000001085256-3562500640
2023 5 FD52 00 E121 C 1237401C 008 11/14/2022 5203 TESTING OF ASPHALT MIXTURES CA-XR111M1062230806183 $73.51 000001085256-3562500640
2023 5 FD52 00 E121 C 1237401C 008 11/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806183 $5.09 000001085256-3562500640
2023 5 FD52 00 E122 C 1237401C 008 11/14/2022 5203 TESTING OF ASPHALT MIXTURES CA-XR111M1062230806183 $754.70 000001085256-3562500640
2023 5 FD52 00 E122 C 1237401C 008 11/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806183 $52.28 000001085256-3562500640
2023 5 FD52 00 E123 C 1237401C 008 11/14/2022 5203 TESTING OF ASPHALT MIXTURES CA-XR111M1062230806183 $144.76 000001085256-3562500640
2023 5 FD52 00 E123 C 1237401C 008 11/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806183 $8.82 000001085256-3562500640
2023 5 FD52 06 E797 C 1237401C 008 11/10/2022 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P007K CTXCONST0922213090001K EATON ASPHALT PAVING CO $198,979.47
2023 5 FD52 06 E122 C 1237401C 008 11/7/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806594 $33.31 10847828-3562506340
2023 5 FD52 06 E123 C 1237401C 008 11/7/2022 4010 CONSTRUCTION ENGINEERING CA-XR111M1062230806594 $32.20 10847828-3562506340
2023 5 FD52 06 E123 C 1237401C 008 11/7/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806594 $4.35 10847828-3562506340
2023 5 FD52 06 E111 C 1237401C 008 11/7/2022 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR111M1062230806191 $505.50 000001085420-3562506210
2023 5 FD52 06 E121 C 1237401C 008 11/7/2022 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR111M1062230806191 $36.22 000001085420-3562506210
2023 5 FD52 06 E122 C 1237401C 008 11/7/2022 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR111M1062230806191 $394.29 000001085420-3562506210
2023 5 FD52 06 E123 C 1237401C 008 11/7/2022 5330 PROJ DOCUMENTN&MATRLS CERTIF CA-XR111M1062230806191 $95.10 000001085420-3562506210
2023 5 FD52 06 E111 C 1237401C 008 11/7/2022 5242 CONCRETE TESTING UNIT CA-XR111M1062230806191 $505.50 000001085422-3562506210
2023 5 FD52 06 E121 C 1237401C 008 11/7/2022 5242 CONCRETE TESTING UNIT CA-XR111M1062230806191 $36.22 000001085422-3562506210
2023 5 FD52 06 E122 C 1237401C 008 11/7/2022 5242 CONCRETE TESTING UNIT CA-XR111M1062230806191 $394.27 000001085422-3562506210
2023 5 FD52 06 E123 C 1237401C 008 11/7/2022 5242 CONCRETE TESTING UNIT CA-XR111M1062230806191 $95.10 000001085422-3562506210
2023 5 FD52 06 E111 C 1237401C 008 11/7/2022 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR111M1062230806191 $200.16 000001085423-3562506210
2023 5 FD52 06 E111 C 1237401C 008 11/7/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806191 $20.02 000001085423-3562506210
2023 5 FD52 06 E121 C 1237401C 008 11/7/2022 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR111M1062230806191 $14.93 000001085423-3562506210
2023 5 FD52 00 E111 C 1237401C 008 11/7/2022 5213 ASPHALT MIX DESIGN CA-XR111M1062230806177 $306.99 000001084785-3562500640
2023 5 FD52 06 E121 C 1237401C 008 11/7/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806191 $1.49 000001085423-3562506210
2023 5 FD52 00 E111 C 1237401C 008 11/7/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806177 $37.66 000001084785-3562500640
2023 5 FD52 06 E122 C 1237401C 008 11/7/2022 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR111M1062230806191 $156.13 000001085423-3562506210
2023 5 FD52 00 E121 C 1237401C 008 11/7/2022 5213 ASPHALT MIX DESIGN CA-XR111M1062230806177 $23.31 000001084785-3562500640
2023 5 FD52 06 E122 C 1237401C 008 11/7/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806191 $15.62 000001085423-3562506210
2023 5 FD52 00 E121 C 1237401C 008 11/7/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806177 $2.86 000001084785-3562500640
2023 5 FD52 06 E123 C 1237401C 008 11/7/2022 5062 SAMPLINGS & TESTING-AGGREGATE CA-XR111M1062230806191 $41.39 000001085423-3562506210
2023 5 FD52 00 E122 C 1237401C 008 11/7/2022 5213 ASPHALT MIX DESIGN CA-XR111M1062230806177 $239.48 000001084785-3562500640
2023 5 FD52 06 E123 C 1237401C 008 11/7/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806191 $4.09 000001085423-3562506210
2023 5 FD52 00 E122 C 1237401C 008 11/7/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806177 $29.38 000001084785-3562500640
2023 5 FD52 00 E123 C 1237401C 008 11/7/2022 5213 ASPHALT MIX DESIGN CA-XR111M1062230806177 $32.19 000001084785-3562500640
2023 5 FD52 06 E111 C 1237401C 008 11/7/2022 4010 CONSTRUCTION ENGINEERING CA-XR111M1062230806565 $311.08 10846811-3562506340
2023 5 FD52 00 E123 C 1237401C 008 11/7/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806177 $3.88 000001084785-3562500640
2023 5 FD52 06 E111 C 1237401C 008 11/7/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806565 $42.71 10846811-3562506340
2023 5 FD52 06 E121 C 1237401C 008 11/7/2022 4010 CONSTRUCTION ENGINEERING CA-XR111M1062230806565 $23.42 10846811-3562506340
2023 5 FD52 06 E121 C 1237401C 008 11/7/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806565 $3.22 10846811-3562506340
2023 5 FD52 06 E122 C 1237401C 008 11/7/2022 4010 CONSTRUCTION ENGINEERING CA-XR111M1062230806565 $242.56 10846811-3562506340
2023 5 FD52 06 E122 C 1237401C 008 11/7/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806565 $33.31 10846811-3562506340
2023 5 FD52 06 E123 C 1237401C 008 11/7/2022 4010 CONSTRUCTION ENGINEERING CA-XR111M1062230806565 $32.20 10846811-3562506340
2023 5 FD52 06 E123 C 1237401C 008 11/7/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806565 $4.35 10846811-3562506340
2023 5 FD52 06 E111 C 1237401C 008 11/7/2022 4010 CONSTRUCTION ENGINEERING CA-XR111M1062230806593 $311.08 10847828-3562506340
2023 5 FD52 06 E111 C 1237401C 008 11/7/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806593 $42.71 10847828-3562506340
2023 5 FD52 06 E121 C 1237401C 008 11/7/2022 4010 CONSTRUCTION ENGINEERING CA-XR111M1062230806593 $23.42 10847828-3562506340
2023 5 FD52 06 E121 C 1237401C 008 11/7/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806593 $3.22 10847828-3562506340
2023 5 FD52 06 E122 C 1237401C 008 11/7/2022 4010 CONSTRUCTION ENGINEERING CA-XR111M1062230806593 $242.56 10847828-3562506340
2023 4 FD52 00 E111 C 1237401C 008 10/31/2022 5203 TESTING OF ASPHALT MIXTURES CA-XR102M1062229405094 $337.73 000001085256-3562500640
2023 4 FD52 00 E121 C 1237401C 008 10/31/2022 5203 TESTING OF ASPHALT MIXTURES CA-XR102M1062229405094 $25.63 000001085256-3562500640
2023 4 FD52 00 E122 C 1237401C 008 10/31/2022 5203 TESTING OF ASPHALT MIXTURES CA-XR102M1062229405094 $263.43 000001085256-3562500640
2023 4 FD52 00 E123 C 1237401C 008 10/31/2022 5203 TESTING OF ASPHALT MIXTURES CA-XR102M1062229405094 $35.35 000001085256-3562500640
2023 4 FD52 00 E124 C 1237401C 008 10/31/2022 5203 TESTING OF ASPHALT MIXTURES CA-XR102M1062229405094 $0.10 000001085256-3562500640
2023 4 FD52 06 E797 C 1237401C 008 10/27/2022 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P006K CTXCONST0922213090001K EATON ASPHALT PAVING CO $228,519.05
2023 4 FD52 06 E229 C 1237401C 008 10/27/2022 4010 CONSTRUCTION ENGINEERING IET-XE13A162522298009420 $39.00
2023 4 FD52 06 E111 C 1237401C 008 10/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR102M1062229405555 $342.07 10837947-3562506340
2023 4 FD52 06 E111 C 1237401C 008 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405555 $146.41 10837947-3562506340
2023 4 FD52 06 E115 C 1237401C 008 10/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR102M1062229405555 $159.80 10837947-3562506340
2023 4 FD52 06 E116 C 1237401C 008 10/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR102M1062229405555 $20.25 10837947-3562506340
2023 4 FD52 06 E121 C 1237401C 008 10/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR102M1062229405555 $39.48 10837947-3562506340
2023 4 FD52 06 E121 C 1237401C 008 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405555 $11.12 10837947-3562506340
2023 4 FD52 06 E122 C 1237401C 008 10/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR102M1062229405555 $407.26 10837947-3562506340
2023 4 FD52 06 E122 C 1237401C 008 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405555 $114.20 10837947-3562506340
2023 4 FD52 06 E123 C 1237401C 008 10/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR102M1062229405555 $35.58 10837947-3562506340
2023 4 FD52 06 E123 C 1237401C 008 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405555 $14.91 10837947-3562506340
2023 4 FD52 06 E124 C 1237401C 008 10/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR102M1062229405555 $0.10 10837947-3562506340
2023 4 FD52 06 E124 C 1237401C 008 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405555 $0.04 10837947-3562506340
2023 4 FD52 00 E111 C 1237401C 008 10/24/2022 5213 ASPHALT MIX DESIGN CA-XR102M1062229405075 $337.73 000001084785-3562500640
2023 4 FD52 00 E121 C 1237401C 008 10/24/2022 5213 ASPHALT MIX DESIGN CA-XR102M1062229405075 $25.63 000001084785-3562500640
2023 4 FD52 00 E122 C 1237401C 008 10/24/2022 5213 ASPHALT MIX DESIGN CA-XR102M1062229405075 $263.43 000001084785-3562500640
2023 4 FD52 00 E123 C 1237401C 008 10/24/2022 5213 ASPHALT MIX DESIGN CA-XR102M1062229405075 $35.35 000001084785-3562500640
2023 4 FD52 00 E124 C 1237401C 008 10/24/2022 5213 ASPHALT MIX DESIGN CA-XR102M1062229405075 $0.10 000001084785-3562500640
2023 4 FD52 06 E111 C 1237401C 008 10/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR102M1062229405067 $291.53 000001084158-3562506200
2023 4 FD52 06 E111 C 1237401C 008 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405067 $324.39 000001084158-3562506200
2023 4 FD52 06 E121 C 1237401C 008 10/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR102M1062229405067 $22.05 000001084158-3562506200
2023 4 FD52 06 E121 C 1237401C 008 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405067 $24.54 000001084158-3562506200
2023 4 FD52 06 E122 C 1237401C 008 10/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR102M1062229405067 $227.40 000001084158-3562506200
2023 4 FD52 06 E122 C 1237401C 008 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405067 $253.02 000001084158-3562506200
2023 4 FD52 06 E123 C 1237401C 008 10/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR102M1062229405067 $25.82 000001084158-3562506200
2023 4 FD52 06 E123 C 1237401C 008 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405067 $27.87 000001084158-3562506200
2023 4 FD52 06 E124 C 1237401C 008 10/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR102M1062229405067 $0.07 000001084158-3562506200
2023 4 FD52 06 E124 C 1237401C 008 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405067 $0.08 000001084158-3562506200
2023 4 FD52 00 E121 C 1237401C 008 10/24/2022 5341 GEOTECHNICAL INVEST (CONST) CA-XR102M1062229405066 $0.06 000001084083-3562500610
2023 4 FD52 06 E797 C 1237401C 008 10/12/2022 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P005K CTXCONST0922213090001K EATON ASPHALT PAVING CO $129,957.77
2023 4 FD52 06 E111 C 1237401C 008 10/10/2022 4010 CONSTRUCTION ENGINEERING CA-XR101M1062228004490 $311.08 10832419-3562506340
2023 4 FD52 06 E111 C 1237401C 008 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228004490 $116.51 10832419-3562506340
2023 4 FD52 06 E121 C 1237401C 008 10/10/2022 4010 CONSTRUCTION ENGINEERING CA-XR101M1062228004490 $23.42 10832419-3562506340
2023 4 FD52 06 E121 C 1237401C 008 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228004490 $8.77 10832419-3562506340
2023 4 FD52 06 E122 C 1237401C 008 10/10/2022 4010 CONSTRUCTION ENGINEERING CA-XR101M1062228004490 $242.56 10832419-3562506340
2023 4 FD52 06 E122 C 1237401C 008 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228004490 $90.88 10832419-3562506340
2023 4 FD52 06 E123 C 1237401C 008 10/10/2022 4010 CONSTRUCTION ENGINEERING CA-XR101M1062228004490 $32.31 10832419-3562506340
2023 4 FD52 06 E123 C 1237401C 008 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228004490 $11.87 10832419-3562506340
2023 4 FD52 00 E111 C 1237401C 008 10/10/2022 5341 GEOTECHNICAL INVEST (CONST) CA-XR101M1062228003953 $1,163.86 000001084083-3562500610
2023 4 FD52 06 E111 C 1237401C 008 10/10/2022 4010 CONSTRUCTION ENGINEERING CA-XR101M1062228003947 $220.28 000001083292-3562500680
2023 4 FD52 00 E111 C 1237401C 008 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003953 $185.83 000001084083-3562500610
2023 4 FD52 06 E111 C 1237401C 008 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003947 $65.76 000001083292-3562500680
2023 4 FD52 00 E115 C 1237401C 008 10/10/2022 5341 GEOTECHNICAL INVEST (CONST) CA-XR101M1062228003953 $77.30 000001084083-3562500610
2023 4 FD52 06 E121 C 1237401C 008 10/10/2022 4010 CONSTRUCTION ENGINEERING CA-XR101M1062228003947 $16.84 000001083292-3562500680
2023 4 FD52 00 E121 C 1237401C 008 10/10/2022 5341 GEOTECHNICAL INVEST (CONST) CA-XR101M1062228003953 $92.53 000001084083-3562500610
2023 4 FD52 06 E121 C 1237401C 008 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003947 $5.03 000001083292-3562500680
2023 4 FD52 00 E121 C 1237401C 008 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003953 $13.82 000001084083-3562500610
2023 4 FD52 06 E122 C 1237401C 008 10/10/2022 4010 CONSTRUCTION ENGINEERING CA-XR101M1062228003947 $171.74 000001083292-3562500680
2023 4 FD52 00 E122 C 1237401C 008 10/10/2022 5341 GEOTECHNICAL INVEST (CONST) CA-XR101M1062228003953 $968.11 000001084083-3562500610
2023 4 FD52 06 E122 C 1237401C 008 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003947 $51.29 000001083292-3562500680
2023 4 FD52 00 E122 C 1237401C 008 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003953 $144.95 000001084083-3562500610
2023 4 FD52 06 E123 C 1237401C 008 10/10/2022 4010 CONSTRUCTION ENGINEERING CA-XR101M1062228003947 $8.55 000001083292-3562500680
2023 4 FD52 00 E123 C 1237401C 008 10/10/2022 5341 GEOTECHNICAL INVEST (CONST) CA-XR101M1062228003953 $166.55 000001084083-3562500610
2023 4 FD52 06 E123 C 1237401C 008 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003947 $2.38 000001083292-3562500680
2023 4 FD52 00 E123 C 1237401C 008 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003953 $26.20 000001084083-3562500610
2023 3 FD52 06 E229 C 1237401C 008 9/29/2022 4010 CONSTRUCTION ENGINEERING IET-XE13A162522268007690 $86.59
2023 3 FD52 06 E797 C 1237401C 008 9/28/2022 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P004K CTXCONST0922213090001K EATON ASPHALT PAVING CO $398,836.15
2023 3 FD52 06 E797 C 1237401C 008 9/28/2022 4580 CONSTRUCTION CONTRACTS PRC-2300055037 PON22200004163 H W Lochner Inc $680.00 SW HWY & Bridge Construction Inspection Region 1
2023 3 FD52 06 E797 C 1237401C 008 9/28/2022 4580 CONSTRUCTION CONTRACTS PRC-2300055037 PON22200004163 H W Lochner Inc $9,238.00 SW HWY & Bridge Construction Inspection Region 1
2023 3 FD52 06 E797 C 1237401C 008 9/28/2022 4580 CONSTRUCTION CONTRACTS PRC-2300055037 PON22200004163 H W Lochner Inc $4,717.50 SW HWY & Bridge Construction Inspection Region 1
2023 3 FD52 06 E797 C 1237401C 008 9/28/2022 4580 CONSTRUCTION CONTRACTS PRC-2300055037 PON22200004163 H W Lochner Inc $558.00 SW HWY & Bridge Construction Inspection Region 1
2023 3 FD52 06 E797 C 1237401C 008 9/28/2022 4580 CONSTRUCTION CONTRACTS PRC-2300055037 PON22200004163 H W Lochner Inc $2,091.00 SW HWY & Bridge Construction Inspection Region 1
2023 3 FD52 00 E111 C 1237401C 008 9/26/2022 5341 GEOTECHNICAL INVEST (CONST) CA-XR092M1062226602791 $2,761.39 000001084083-3562500610
2023 3 FD52 00 E111 C 1237401C 008 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602791 $853.63 000001084083-3562500610
2023 3 FD52 00 E121 C 1237401C 008 9/26/2022 5341 GEOTECHNICAL INVEST (CONST) CA-XR092M1062226602791 $204.10 000001084083-3562500610
2023 3 FD52 00 E121 C 1237401C 008 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602791 $63.32 000001084083-3562500610
2023 3 FD52 00 E122 C 1237401C 008 9/26/2022 5341 GEOTECHNICAL INVEST (CONST) CA-XR092M1062226602791 $2,153.88 000001084083-3562500610
2023 3 FD52 00 E122 C 1237401C 008 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602791 $665.84 000001084083-3562500610
2023 3 FD52 00 E123 C 1237401C 008 9/26/2022 5341 GEOTECHNICAL INVEST (CONST) CA-XR092M1062226602791 $430.73 000001084083-3562500610
2023 3 FD52 00 E123 C 1237401C 008 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602791 $126.36 000001084083-3562500610
2023 3 FD52 00 E124 C 1237401C 008 9/26/2022 5341 GEOTECHNICAL INVEST (CONST) CA-XR092M1062226602791 $1.19 000001084083-3562500610
2023 3 FD52 00 E124 C 1237401C 008 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602791 $0.36 000001084083-3562500610
2023 3 FD52 00 E111 C 1237401C 008 9/26/2022 5213 ASPHALT MIX DESIGN CA-XR092M1062226602818 $521.35 000001084785-3562500640
2023 3 FD52 00 E111 C 1237401C 008 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602818 $196.20 000001084785-3562500640
2023 3 FD52 06 E111 C 1237401C 008 9/26/2022 4010 CONSTRUCTION ENGINEERING CA-XR092M1062226603409 $621.95 10824984-3562506340
2023 3 FD52 00 E121 C 1237401C 008 9/26/2022 5213 ASPHALT MIX DESIGN CA-XR092M1062226602818 $39.15 000001084785-3562500640
2023 3 FD52 06 E111 C 1237401C 008 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226603409 $62.20 10824984-3562506340
2023 3 FD52 00 E121 C 1237401C 008 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602818 $14.73 000001084785-3562500640
2023 3 FD52 06 E121 C 1237401C 008 9/26/2022 4010 CONSTRUCTION ENGINEERING CA-XR092M1062226603409 $47.21 10824984-3562506340
2023 3 FD52 00 E122 C 1237401C 008 9/26/2022 5213 ASPHALT MIX DESIGN CA-XR092M1062226602818 $407.00 000001084785-3562500640
2023 3 FD52 06 E121 C 1237401C 008 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226603409 $4.72 10824984-3562506340
2023 3 FD52 00 E122 C 1237401C 008 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602818 $153.05 000001084785-3562500640
2023 3 FD52 06 E122 C 1237401C 008 9/26/2022 4010 CONSTRUCTION ENGINEERING CA-XR092M1062226603409 $485.12 10824984-3562506340
2023 3 FD52 00 E123 C 1237401C 008 9/26/2022 5213 ASPHALT MIX DESIGN CA-XR092M1062226602818 $67.46 000001084785-3562500640
2023 3 FD52 06 E122 C 1237401C 008 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226603409 $48.52 10824984-3562506340
2023 3 FD52 00 E123 C 1237401C 008 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602818 $24.90 000001084785-3562500640
2023 3 FD52 06 E123 C 1237401C 008 9/26/2022 4010 CONSTRUCTION ENGINEERING CA-XR092M1062226603409 $64.37 10824984-3562506340
2023 3 FD52 00 E124 C 1237401C 008 9/26/2022 5213 ASPHALT MIX DESIGN CA-XR092M1062226602818 $0.18 000001084785-3562500640
2023 3 FD52 06 E123 C 1237401C 008 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226603409 $6.34 10824984-3562506340
2023 3 FD52 00 E124 C 1237401C 008 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602818 $0.06 000001084785-3562500640
2023 3 FD52 06 E124 C 1237401C 008 9/26/2022 4010 CONSTRUCTION ENGINEERING CA-XR092M1062226603409 $0.18 10824984-3562506340
2023 3 FD52 06 E124 C 1237401C 008 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226603409 $0.02 10824984-3562506340
2023 3 FD52 06 E797 C 1237401C 008 9/14/2022 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P003K CTXCONST0922213090001K EATON ASPHALT PAVING CO $22,235.44
2023 3 FD52 06 E143 C 1237401C 008 9/13/2022 4580 CONSTRUCTION CONTRACTS PRC-2300042802 PON22200004163 H W Lochner Inc $1,020.00 SW HWY & Bridge Construction Inspection Region 1
2023 3 FD52 06 E143 C 1237401C 008 9/13/2022 4580 CONSTRUCTION CONTRACTS PRC-2300042802 PON22200004163 H W Lochner Inc $765.00 SW HWY & Bridge Construction Inspection Region 1
2023 3 FD52 06 E143 C 1237401C 008 9/13/2022 4580 CONSTRUCTION CONTRACTS PRC-2300042802 PON22200004163 H W Lochner Inc $6,448.00 SW HWY & Bridge Construction Inspection Region 1
2023 3 FD52 06 E143 C 1237401C 008 9/13/2022 4580 CONSTRUCTION CONTRACTS PRC-2300042802 PON22200004163 H W Lochner Inc $4,505.00 SW HWY & Bridge Construction Inspection Region 1
2023 3 FD52 06 E111 C 1237401C 008 9/12/2022 4010 CONSTRUCTION ENGINEERING CA-XR091M1062225102022 $1,007.22 10812927-3562506340
2023 3 FD52 06 E111 C 1237401C 008 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225102022 $40.67 10812927-3562506340
2023 3 FD52 06 E121 C 1237401C 008 9/12/2022 4010 CONSTRUCTION ENGINEERING CA-XR091M1062225102022 $75.85 10812927-3562506340
2023 3 FD52 06 E121 C 1237401C 008 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225102022 $3.06 10812927-3562506340
2023 3 FD52 06 E122 C 1237401C 008 9/12/2022 4010 CONSTRUCTION ENGINEERING CA-XR091M1062225102022 $785.63 10812927-3562506340
2023 3 FD52 06 E122 C 1237401C 008 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225102022 $31.72 10812927-3562506340
2023 3 FD52 06 E123 C 1237401C 008 9/12/2022 4010 CONSTRUCTION ENGINEERING CA-XR091M1062225102022 $104.15 10812927-3562506340
2023 3 FD52 06 E123 C 1237401C 008 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225102022 $4.14 10812927-3562506340
2023 3 FD52 00 E111 C 1237401C 008 9/12/2022 5341 GEOTECHNICAL INVEST (CONST) CA-XR091M1062225101644 $196.87 000001084083-3562504206
2023 3 FD52 00 E111 C 1237401C 008 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101644 $17.85 000001084083-3562504206
2023 3 FD52 00 E121 C 1237401C 008 9/12/2022 5341 GEOTECHNICAL INVEST (CONST) CA-XR091M1062225101644 $14.76 000001084083-3562504206
2023 3 FD52 00 E121 C 1237401C 008 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101644 $1.33 000001084083-3562504206
2023 3 FD52 00 E122 C 1237401C 008 9/12/2022 5341 GEOTECHNICAL INVEST (CONST) CA-XR091M1062225101644 $153.59 000001084083-3562504206
2023 3 FD52 00 E122 C 1237401C 008 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101644 $13.92 000001084083-3562504206
2023 3 FD52 00 E123 C 1237401C 008 9/12/2022 5341 GEOTECHNICAL INVEST (CONST) CA-XR091M1062225101644 $29.54 000001084083-3562504206
2023 3 FD52 00 E123 C 1237401C 008 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101644 $2.63 000001084083-3562504206
2023 3 FD52 06 E111 C 1237401C 008 9/12/2022 4010 CONSTRUCTION ENGINEERING CA-XR091M1062225101645 $180.21 000001084158-3562506200
2023 3 FD52 06 E111 C 1237401C 008 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101645 $8.36 000001084158-3562506200
2023 3 FD52 06 E121 C 1237401C 008 9/12/2022 4010 CONSTRUCTION ENGINEERING CA-XR091M1062225101645 $13.79 000001084158-3562506200
2023 3 FD52 06 E121 C 1237401C 008 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101645 $0.64 000001084158-3562506200
2023 3 FD52 06 E122 C 1237401C 008 9/12/2022 4010 CONSTRUCTION ENGINEERING CA-XR091M1062225101645 $140.59 000001084158-3562506200
2023 3 FD52 06 E122 C 1237401C 008 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101645 $6.52 000001084158-3562506200
2023 3 FD52 06 E123 C 1237401C 008 9/12/2022 4010 CONSTRUCTION ENGINEERING CA-XR091M1062225101645 $11.34 000001084158-3562506200
2023 3 FD52 06 E123 C 1237401C 008 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101645 $0.50 000001084158-3562506200
2023 3 FD52 06 E111 C 1237401C 008 9/12/2022 4010 CONSTRUCTION ENGINEERING CA-XR091M1062225101634 $201.74 000001083292-3562500680
2023 3 FD52 06 E111 C 1237401C 008 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101634 $2.96 000001083292-3562500680
2023 3 FD52 06 E121 C 1237401C 008 9/12/2022 4010 CONSTRUCTION ENGINEERING CA-XR091M1062225101634 $15.44 000001083292-3562500680
2023 3 FD52 06 E121 C 1237401C 008 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101634 $0.22 000001083292-3562500680
2023 3 FD52 06 E122 C 1237401C 008 9/12/2022 4010 CONSTRUCTION ENGINEERING CA-XR091M1062225101634 $157.43 000001083292-3562500680
2023 3 FD52 06 E122 C 1237401C 008 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101634 $2.31 000001083292-3562500680
2023 3 FD52 06 E123 C 1237401C 008 9/12/2022 4010 CONSTRUCTION ENGINEERING CA-XR091M1062225101634 $7.72 000001083292-3562500680
2023 3 FD52 06 E123 C 1237401C 008 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101634 $0.11 000001083292-3562500680
2023 3 FD52 06 E797 C 1237401C 008 9/8/2022 4580 CONSTRUCTION CONTRACTS PRC-2300025487 PON22200004163 H W Lochner Inc $204.00 SW HWY & Bridge Construction Inspection Region 1
2023 3 FD52 06 E797 C 1237401C 008 9/8/2022 4580 CONSTRUCTION CONTRACTS PRC-2300025487 PON22200004163 H W Lochner Inc $2,040.00 SW HWY & Bridge Construction Inspection Region 1
2023 2 FD52 06 E797 C 1237401C 008 8/31/2022 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P002K CTXCONST0922213090001K EATON ASPHALT PAVING CO $106,112.47
2023 2 FD52 06 E229 C 1237401C 008 8/29/2022 4010 CONSTRUCTION ENGINEERING IET-XE13A162522237007120 $210.57
2023 2 FD52 06 E121 C 1237401C 008 8/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR082M1062223500446 $37.87 000001083292-3562500680
2023 2 FD52 06 E122 C 1237401C 008 8/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR082M1062223500446 $395.10 000001083292-3562500680
2023 2 FD52 06 E111 C 1237401C 008 8/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR082M1062223500863 $1,554.88 10803675-3562506340
2023 2 FD52 06 E112 C 1237401C 008 8/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR082M1062223500863 $855.00 10803675-3562500009
2023 2 FD52 06 E112 C 1237401C 008 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500863 $85.50 10803675-3562500009
2023 2 FD52 06 E121 C 1237401C 008 8/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR082M1062223500863 $183.42 10803675-3562500009
2023 2 FD52 06 E121 C 1237401C 008 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500863 $6.54 10803675-3562500009
2023 2 FD52 06 E122 C 1237401C 008 8/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR082M1062223500863 $1,212.81 10803675-3562506340
2023 2 FD52 06 E123 C 1237401C 008 8/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR082M1062223500863 $160.69 10803675-3562506340
2023 2 FD52 06 E124 C 1237401C 008 8/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR082M1062223500863 $0.45 10803675-3562506340
2023 2 FD52 06 E123 C 1237401C 008 8/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR082M1062223500446 $44.32 000001083292-3562500680
2023 2 FD52 06 E124 C 1237401C 008 8/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR082M1062223500446 $0.18 000001083292-3562500680
2023 2 FD52 06 E111 C 1237401C 008 8/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR082M1062223500461 $670.33 000001084158-3562506200
2023 2 FD52 06 E111 C 1237401C 008 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500461 $67.03 000001084158-3562506200
2023 2 FD52 06 E121 C 1237401C 008 8/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR082M1062223500461 $51.28 000001084158-3562506200
2023 2 FD52 06 E121 C 1237401C 008 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500461 $5.13 000001084158-3562506200
2023 2 FD52 00 E111 C 1237401C 008 8/24/2022 5341 GEOTECHNICAL INVEST (CONST) CA-XR082M1062223500458 $2,696.68 000001084083-3562504206
2023 2 FD52 06 E122 C 1237401C 008 8/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR082M1062223500461 $522.86 000001084158-3562506200
2023 2 FD52 00 E111 C 1237401C 008 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500458 $269.67 000001084083-3562504206
2023 2 FD52 06 E122 C 1237401C 008 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500461 $52.28 000001084158-3562506200
2023 2 FD52 00 E121 C 1237401C 008 8/24/2022 5341 GEOTECHNICAL INVEST (CONST) CA-XR082M1062223500458 $191.04 000001084083-3562504206
2023 2 FD52 06 E123 C 1237401C 008 8/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR082M1062223500461 $42.32 000001084158-3562506200
2023 2 FD52 00 E121 C 1237401C 008 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500458 $19.10 000001084083-3562504206
2023 2 FD52 06 E123 C 1237401C 008 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500461 $3.98 000001084158-3562506200
2023 2 FD52 00 E122 C 1237401C 008 8/24/2022 5341 GEOTECHNICAL INVEST (CONST) CA-XR082M1062223500458 $2,103.41 000001084083-3562504206
2023 2 FD52 06 E124 C 1237401C 008 8/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR082M1062223500461 $0.45 000001084158-3562506200
2023 2 FD52 00 E122 C 1237401C 008 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500458 $210.34 000001084083-3562504206
2023 2 FD52 06 E124 C 1237401C 008 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500461 $0.05 000001084158-3562506200
2023 2 FD52 00 E123 C 1237401C 008 8/24/2022 5341 GEOTECHNICAL INVEST (CONST) CA-XR082M1062223500458 $561.93 000001084083-3562504206
2023 2 FD52 00 E123 C 1237401C 008 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500458 $55.68 000001084083-3562504206
2023 2 FD52 00 E124 C 1237401C 008 8/24/2022 5341 GEOTECHNICAL INVEST (CONST) CA-XR082M1062223500458 $0.91 000001084083-3562504206
2023 2 FD52 00 E124 C 1237401C 008 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500458 $0.09 000001084083-3562504206
2023 2 FD52 06 E111 C 1237401C 008 8/24/2022 4010 CONSTRUCTION ENGINEERING CA-XR082M1062223500445 $506.54 000001083292-3562500680
2023 2 FD52 06 E797 C 1237401C 008 8/17/2022 4580 CONSTRUCTION CONTRACTS PRC-XCONST092221309P001K CTXCONST0922213090001K EATON ASPHALT PAVING CO $313,226.25
2023 2 FD52 00 E111 C 1237401C 008 8/16/2022 5341 GEOTECHNICAL INVEST (CONST) CA-XR081M1062222110150 $180.08 000001084083-3562500610
2023 2 FD52 00 E111 C 1237401C 008 8/16/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110150 $18.46 000001084083-3562500610
2023 2 FD52 00 E121 C 1237401C 008 8/16/2022 5341 GEOTECHNICAL INVEST (CONST) CA-XR081M1062222110150 $13.78 000001084083-3562500610
2023 2 FD52 00 E121 C 1237401C 008 8/16/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110150 $1.41 000001084083-3562500610
2023 2 FD52 00 E122 C 1237401C 008 8/16/2022 5341 GEOTECHNICAL INVEST (CONST) CA-XR081M1062222110150 $140.49 000001084083-3562500610
2023 2 FD52 00 E122 C 1237401C 008 8/16/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110150 $14.40 000001084083-3562500610
2023 2 FD52 00 E123 C 1237401C 008 8/16/2022 5341 GEOTECHNICAL INVEST (CONST) CA-XR081M1062222110150 $4.97 000001084083-3562500610
2023 2 FD52 00 E123 C 1237401C 008 8/16/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110150 $0.48 000001084083-3562500610
2023 2 FD52 06 E389 C 1237401C 008 8/12/2022 4260 SIGNAL PLANS-TRAF IET-XM005162522222002200 $59,813.34
2023 2 FD52 06 E143 C 1237401C 008 8/6/2022 0550 ENV STUDIES-TERRES ECOL-CONSUL PRC-2300009863 PON22000002505 KENTUCKY NATURAL LANDS TRUST $7,080.00 Reestablish Contract with Ky Natural Land Trust
2023 2 FD52 06 E797 C 1237401C 008 8/3/2022 4010 CONSTRUCTION ENGINEERING PRC-2300020546 PON22100000155 LYNN BLUE PRINT AND SUPPLY CO $1,485.85 SW ePlan Room
2023 2 FD52 06 E389 C 1237401C 008 8/2/2022 4260 SIGNAL PLANS-TRAF PRC-2300016366 DO2300001281 IRON ARMOUR LLC $4,200.00
2023 2 FD52 06 E389 C 1237401C 008 8/2/2022 4260 SIGNAL PLANS-TRAF PRC-2300016366 DO2300001281 IRON ARMOUR LLC $19,650.00
2023 2 FD52 06 E389 C 1237401C 008 8/2/2022 4260 SIGNAL PLANS-TRAF PRC-2300016366 DO2300001281 IRON ARMOUR LLC $1,225.00
2023 2 FD52 06 E389 C 1237401C 008 8/2/2022 4260 SIGNAL PLANS-TRAF PRC-2300016366 DO2300001281 IRON ARMOUR LLC $1,120.00
2023 2 FD52 06 E389 C 1237401C 008 8/2/2022 4260 SIGNAL PLANS-TRAF PRC-2300016366 DO2300001281 IRON ARMOUR LLC $1,070.00
2023 2 FD52 06 E389 C 1237401C 008 8/2/2022 4260 SIGNAL PLANS-TRAF PRC-2300016366 DO2300001281 IRON ARMOUR LLC $798.00
2023 2 FD52 06 E389 C 1237401C 008 8/2/2022 4260 SIGNAL PLANS-TRAF PRC-2300016366 DO2300001281 IRON ARMOUR LLC $6,700.00
2023 2 FD52 06 E389 C 1237401C 008 8/2/2022 4260 SIGNAL PLANS-TRAF PRC-2300016366 DO2300001281 IRON ARMOUR LLC $2,450.00
2023 2 FD52 06 E389 C 1237401C 008 8/2/2022 4260 SIGNAL PLANS-TRAF PRC-2300016366 DO2300001281 IRON ARMOUR LLC $420.00
2023 2 FD52 06 E389 C 1237401C 008 8/2/2022 4260 SIGNAL PLANS-TRAF PRC-2300016366 DO2300001281 IRON ARMOUR LLC $450.00
2022 12 FD52 06 E111 C 1237401C 008 6/27/2022 4010 CONSTRUCTION ENGINEERING CA-XR062M1062217506797 $88.42 000001083292-3562500680
2022 12 FD52 06 E111 C 1237401C 008 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506797 $1.06 000001083292-3562500680
2022 12 FD52 06 E121 C 1237401C 008 6/27/2022 4010 CONSTRUCTION ENGINEERING CA-XR062M1062217506797 $6.47 000001083292-3562500680
2022 12 FD52 06 E121 C 1237401C 008 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506797 $0.07 000001083292-3562500680
2022 12 FD52 06 E122 C 1237401C 008 6/27/2022 4010 CONSTRUCTION ENGINEERING CA-XR062M1062217506797 $74.21 000001083292-3562500680
2022 12 FD52 06 E122 C 1237401C 008 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506797 $0.89 000001083292-3562500680
2022 12 FD52 06 E123 C 1237401C 008 6/27/2022 4010 CONSTRUCTION ENGINEERING CA-XR062M1062217506797 $11.97 000001083292-3562500680
2022 12 FD52 06 E123 C 1237401C 008 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506797 $0.14 000001083292-3562500680
2022 12 FD52 06 E124 C 1237401C 008 6/27/2022 4010 CONSTRUCTION ENGINEERING CA-XR062M1062217506797 $0.03 000001083292-3562500680