The Commonwealth pays employees on a semi-monthly basis with a scheduled pay day on the 15th and 30th of each month. The two monthly pay periods are from the 1st to the 15th of the month and the 16th through the last day of the month. Pay check distribution is delayed by one pay period to allow for system processing. For example work performed during the 1st to the 15th day of the month is paid to the employee on the 30th of the month. Accordingly the cost accounting charges for labor costs posting in eMARS to operating accounts and highway projects are also delayed by approximately one pay period.
A good rule of measure is that the cost accounting charges for the pay period ending on the 15th of the month will post to eMARS by the 25th and those for the pay period ending on the last day of the month will post to eMARS by the 10th of the following month.

x close panel
Detailed Project Expenditure Report
Total E-MARS Expenditures for 1209901D = $4,519,358.15
Click here for Labor Costs Information
Year Month PBU Charge District Object Phase Program Code County Date ACT Activity Name Trans ID Reference # Vendor Name Expenditure Line Description
2024 10 FD52 06 E143 D 1209901D 059 4/26/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400219756 PON22300001541 Innovative Contracting & Engineering LLC $14,665.79 Letter Agreement 1
2024 10 FD52 06 E143 D 1209901D 059 4/26/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400219761 PON22300001541 Innovative Contracting & Engineering LLC $6,123.09 Letter Agreement 1
2024 10 FD52 06 E122 D 1209901D 059 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502724 $18.81 000001076737-3562506200
2024 10 FD52 06 E123 D 1209901D 059 4/26/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR042O1062411502724 $45.14 000001076737-3562506200
2024 10 FD52 06 E123 D 1209901D 059 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502724 $4.46 000001076737-3562506200
2024 10 FD52 06 E124 D 1209901D 059 4/26/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR042O1062411502724 $0.09 000001076737-3562506200
2024 10 FD52 06 E124 D 1209901D 059 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502724 $0.01 000001076737-3562506200
2024 10 FD52 06 E111 D 1209901D 059 4/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042O1062411502722 $6,917.49 000001075668-3562506200
2024 10 FD52 06 E111 D 1209901D 059 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502722 $646.77 000001075668-3562506200
2024 10 FD52 06 E121 D 1209901D 059 4/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042O1062411502722 $509.39 000001075668-3562506200
2024 10 FD52 06 E121 D 1209901D 059 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502722 $46.22 000001075668-3562506200
2024 10 FD52 06 E122 D 1209901D 059 4/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042O1062411502722 $4,577.30 000001075668-3562506200
2024 10 FD52 06 E122 D 1209901D 059 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502722 $427.96 000001075668-3562506200
2024 10 FD52 06 E123 D 1209901D 059 4/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042O1062411502722 $811.51 000001075668-3562500022
2024 10 FD52 06 E123 D 1209901D 059 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502722 $91.74 000001075668-3562506208
2024 10 FD52 06 E124 D 1209901D 059 4/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042O1062411502722 $1.61 000001075668-3562506200
2024 10 FD52 06 E124 D 1209901D 059 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502722 $0.16 000001075668-3562506200
2024 10 FD52 06 E111 D 1209901D 059 4/26/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR042O1062411502724 $284.28 000001076737-3562506200
2024 10 FD52 06 E111 D 1209901D 059 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502724 $28.43 000001076737-3562506200
2024 10 FD52 06 E121 D 1209901D 059 4/26/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR042O1062411502724 $20.86 000001076737-3562506200
2024 10 FD52 06 E121 D 1209901D 059 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502724 $2.09 000001076737-3562506200
2024 10 FD52 06 E122 D 1209901D 059 4/26/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR042O1062411502724 $188.11 000001076737-3562506200
2024 10 FD52 06 E143 D 1209901D 059 4/23/2024 0550 ENV STUDIES-TERRES ECOL-CONSUL PRC-2400213443 PON22200001940 PALMER ENGINEERING CO $1,607.10 Letter Agreement 36-MEB
2024 10 FD52 02 E143 D 1209901D 059 4/19/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400210731 PON22200002102 American Structurepoint Inc $85,071.97 Letter Agreement 3, 3X & 3XX
2024 10 FD52 06 E797 D 1209901D 059 4/11/2024 4580 CONSTRUCTION CONTRACTS PRC-XCONST092229003P008K CTXCONST0922290030001K PCL Construction $356,567.60
2024 10 FD52 00 E111 D 1209901D 059 4/11/2024 0092 ENV STUDIES-PERMITTING CA-XR041O1062410001671 $1,191.14 000001091515-3562500061
2024 10 FD52 00 E111 D 1209901D 059 4/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001671 $62.73 000001091515-3562500061
2024 10 FD52 00 E121 D 1209901D 059 4/11/2024 0092 ENV STUDIES-PERMITTING CA-XR041O1062410001671 $85.01 000001091515-3562500061
2024 10 FD52 00 E121 D 1209901D 059 4/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001671 $4.48 000001091515-3562500061
2024 10 FD52 00 E122 D 1209901D 059 4/11/2024 0092 ENV STUDIES-PERMITTING CA-XR041O1062410001671 $788.18 000001091515-3562500061
2024 10 FD52 00 E122 D 1209901D 059 4/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001671 $41.51 000001091515-3562500061
2024 10 FD52 00 E123 D 1209901D 059 4/11/2024 0092 ENV STUDIES-PERMITTING CA-XR041O1062410001671 $337.98 000001091515-3562500061
2024 10 FD52 00 E123 D 1209901D 059 4/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001671 $17.69 000001091515-3562500061
2024 10 FD52 00 E111 D 1209901D 059 4/10/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR041O1062410001610 $441.82 000001075456-3562500061
2024 10 FD52 00 E111 D 1209901D 059 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001610 $43.75 000001075456-3562500061
2024 10 FD52 00 E121 D 1209901D 059 4/10/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR041O1062410001610 $31.40 000001075456-3562500061
2024 10 FD52 00 E121 D 1209901D 059 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001610 $3.11 000001075456-3562500061
2024 10 FD52 00 E122 D 1209901D 059 4/10/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR041O1062410001610 $292.45 000001075456-3562500061
2024 10 FD52 00 E122 D 1209901D 059 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001610 $28.95 000001075456-3562500061
2024 10 FD52 00 E123 D 1209901D 059 4/10/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR041O1062410001610 $102.54 000001075456-3562500061
2024 10 FD52 00 E123 D 1209901D 059 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001610 $10.08 000001075456-3562500061
2024 10 FD52 06 E111 D 1209901D 059 4/10/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR041O1062410001612 $312.57 000001076737-3562506200
2024 10 FD52 06 E111 D 1209901D 059 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001612 $102.57 000001076737-3562506200
2024 10 FD52 06 E121 D 1209901D 059 4/10/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR041O1062410001612 $22.85 000001076737-3562506200
2024 10 FD52 06 E121 D 1209901D 059 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001612 $7.49 000001076737-3562506200
2024 10 FD52 06 E122 D 1209901D 059 4/10/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR041O1062410001612 $206.93 000001076737-3562506200
2024 10 FD52 06 E122 D 1209901D 059 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001612 $67.88 000001076737-3562506200
2024 10 FD52 06 E123 D 1209901D 059 4/10/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR041O1062410001612 $49.77 000001076737-3562506200
2024 10 FD52 06 E123 D 1209901D 059 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001612 $16.09 000001076737-3562506200
2024 10 FD52 00 E111 D 1209901D 059 4/10/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041O1062410001611 $97.24 000001076308-3562500636
2024 10 FD52 00 E111 D 1209901D 059 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001611 $57.37 000001076308-3562500636
2024 10 FD52 00 E121 D 1209901D 059 4/10/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041O1062410001611 $6.90 000001076308-3562500636
2024 10 FD52 00 E121 D 1209901D 059 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001611 $4.07 000001076308-3562500636
2024 10 FD52 00 E122 D 1209901D 059 4/10/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041O1062410001611 $64.35 000001076308-3562500636
2024 10 FD52 00 E122 D 1209901D 059 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001611 $37.96 000001076308-3562500636
2024 10 FD52 00 E123 D 1209901D 059 4/10/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041O1062410001611 $22.60 000001076308-3562500636
2024 10 FD52 00 E123 D 1209901D 059 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001611 $13.21 000001076308-3562500636
2024 10 FD52 06 E111 D 1209901D 059 4/10/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041O1062410001610 $6,804.31 000001075668-3562506208
2024 10 FD52 06 E111 D 1209901D 059 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001610 $1,438.07 000001075668-3562500022
2024 10 FD52 06 E121 D 1209901D 059 4/10/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041O1062410001610 $493.04 000001075668-3562506208
2024 10 FD52 06 E121 D 1209901D 059 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001610 $105.58 000001075668-3562500022
2024 10 FD52 06 E122 D 1209901D 059 4/10/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041O1062410001610 $4,502.13 000001075668-3562500022
2024 10 FD52 06 E122 D 1209901D 059 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001610 $951.58 000001075668-3562506200
2024 10 FD52 06 E123 D 1209901D 059 4/10/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041O1062410001610 $840.29 000001075668-3562506200
2024 10 FD52 06 E123 D 1209901D 059 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001610 $163.14 000001075668-3562506208
2024 10 FD52 06 E143 D 1209901D 059 4/4/2024 0592 ENV STUDIES-PERMITTING-CONSUL PRC-2400200927 PON22200001938 QK4 INC $10,730.91 Letter Agreement 14-SRS
2024 10 FD52 00 E111 D 1209901D 059 4/1/2024 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR032O1062408200445 $1,351.20 000001090780-3562500610
2024 10 FD52 00 E121 D 1209901D 059 4/1/2024 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR032O1062408200445 $100.63 000001090780-3562500610
2024 10 FD52 00 E122 D 1209901D 059 4/1/2024 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR032O1062408200445 $894.09 000001090780-3562500610
2024 10 FD52 00 E123 D 1209901D 059 4/1/2024 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR032O1062408200445 $121.02 000001090780-3562500610
2024 10 FD52 06 E111 D 1209901D 059 4/1/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR032O1062408200391 $1,137.14 000001076737-3562506200
2024 10 FD52 00 E124 D 1209901D 059 4/1/2024 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR032O1062408200445 $0.27 000001090780-3562500610
2024 10 FD52 06 E111 D 1209901D 059 4/1/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032O1062408200391 $1,990.01 000001076737-3562506200
2024 10 FD52 06 E121 D 1209901D 059 4/1/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR032O1062408200391 $83.46 000001076737-3562506200
2024 10 FD52 06 E121 D 1209901D 059 4/1/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032O1062408200391 $146.04 000001076737-3562506200
2024 10 FD52 06 E122 D 1209901D 059 4/1/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR032O1062408200391 $752.45 000001076737-3562506200
2024 10 FD52 06 E122 D 1209901D 059 4/1/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032O1062408200391 $1,316.79 000001076737-3562506200
2024 10 FD52 06 E123 D 1209901D 059 4/1/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR032O1062408200391 $183.60 000001076737-3562506200
2024 10 FD52 06 E123 D 1209901D 059 4/1/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032O1062408200391 $312.38 000001076737-3562506200
2024 10 FD52 06 E124 D 1209901D 059 4/1/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR032O1062408200391 $0.36 000001076737-3562506200
2024 10 FD52 06 E124 D 1209901D 059 4/1/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032O1062408200391 $0.64 000001076737-3562506200
2024 10 FD52 06 E111 D 1209901D 059 4/1/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032O1062408200389 $7,558.84 000001075668-3562506208
2024 10 FD52 06 E111 D 1209901D 059 4/1/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032O1062408200389 $560.53 000001075668-3562506200
2024 10 FD52 00 E111 D 1209901D 059 4/1/2024 0060 ENV STUDIES-ARCHAEOLOGY CA-XR032O1062408200391 $260.44 000001076831-3562500061
2024 10 FD52 06 E121 D 1209901D 059 4/1/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032O1062408200389 $556.15 000001075668-3562506208
2024 10 FD52 00 E111 D 1209901D 059 4/1/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032O1062408200391 $31.95 000001076831-3562500061
2024 10 FD52 06 E121 D 1209901D 059 4/1/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032O1062408200389 $40.87 000001075668-3562500022
2024 10 FD52 00 E121 D 1209901D 059 4/1/2024 0060 ENV STUDIES-ARCHAEOLOGY CA-XR032O1062408200391 $19.62 000001076831-3562500061
2024 10 FD52 06 E122 D 1209901D 059 4/1/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032O1062408200389 $5,001.88 000001075668-3562500022
2024 10 FD52 00 E121 D 1209901D 059 4/1/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032O1062408200391 $2.41 000001076831-3562500061
2024 10 FD52 06 E122 D 1209901D 059 4/1/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032O1062408200389 $370.90 000001075668-3562506200
2024 10 FD52 00 E122 D 1209901D 059 4/1/2024 0060 ENV STUDIES-ARCHAEOLOGY CA-XR032O1062408200391 $172.32 000001076831-3562500061
2024 10 FD52 06 E123 D 1209901D 059 4/1/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032O1062408200389 $892.82 000001075668-3562500022
2024 10 FD52 00 E122 D 1209901D 059 4/1/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032O1062408200391 $21.14 000001076831-3562500061
2024 10 FD52 06 E123 D 1209901D 059 4/1/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032O1062408200389 $69.99 000001075668-3562506200
2024 10 FD52 00 E123 D 1209901D 059 4/1/2024 0060 ENV STUDIES-ARCHAEOLOGY CA-XR032O1062408200391 $39.61 000001076831-3562500061
2024 10 FD52 06 E124 D 1209901D 059 4/1/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032O1062408200389 $1.76 000001075668-3562506208
2024 10 FD52 00 E123 D 1209901D 059 4/1/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032O1062408200391 $4.79 000001076831-3562500061
2024 10 FD52 06 E124 D 1209901D 059 4/1/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032O1062408200389 $0.13 000001075668-3562506200
2024 10 FD52 00 E124 D 1209901D 059 4/1/2024 0060 ENV STUDIES-ARCHAEOLOGY CA-XR032O1062408200391 $0.09 000001076831-3562500061
2024 10 FD52 00 E124 D 1209901D 059 4/1/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032O1062408200391 $0.01 000001076831-3562500061
2024 9 FD52 06 E797 D 1209901D 059 3/28/2024 4580 CONSTRUCTION CONTRACTS PRC-XCONST092229003P007K CTXCONST0922290030001K PCL Construction $181,747.09
2024 9 FD52 00 E111 D 1209901D 059 3/15/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR031O1062406810057 $508.18 000001075456-3562500061
2024 9 FD52 00 E111 D 1209901D 059 3/15/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810057 $457.00 000001075456-3562500061
2024 9 FD52 00 E121 D 1209901D 059 3/15/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR031O1062406810057 $36.12 000001075456-3562500061
2024 9 FD52 00 E121 D 1209901D 059 3/15/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810057 $32.46 000001075456-3562500061
2024 9 FD52 00 E122 D 1209901D 059 3/15/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR031O1062406810057 $336.32 000001075456-3562500061
2024 9 FD52 06 E143 D 1209901D 059 3/13/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400184792 PON22300001541 Innovative Contracting & Engineering LLC $14,665.79 Letter Agreement 1
2024 9 FD52 06 E143 D 1209901D 059 3/12/2024 0592 ENV STUDIES-PERMITTING-CONSUL PRC-2400183987 PON22200001938 QK4 INC $3,787.38 Letter Agreement 14-SRS
2024 9 FD52 00 E122 D 1209901D 059 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810058 $302.40 000001075456-3562500061
2024 9 FD52 00 E111 D 1209901D 059 3/11/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031O1062406810059 $680.69 000001076308-3562500636
2024 9 FD52 06 E111 D 1209901D 059 3/11/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031O1062406810058 $7,699.15 000001075668-3562506208
2024 9 FD52 00 E111 D 1209901D 059 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810059 $92.87 000001076308-3562500636
2024 9 FD52 06 E111 D 1209901D 059 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810058 $354.43 000001075668-3562500022
2024 9 FD52 00 E121 D 1209901D 059 3/11/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031O1062406810059 $48.25 000001076308-3562500636
2024 9 FD52 06 E121 D 1209901D 059 3/11/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031O1062406810058 $562.76 000001075668-3562506200
2024 9 FD52 00 E121 D 1209901D 059 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810059 $6.58 000001076308-3562500636
2024 9 FD52 06 E121 D 1209901D 059 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810058 $25.31 000001075668-3562500022
2024 9 FD52 00 E123 D 1209901D 059 3/11/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR031O1062406810058 $118.54 000001075456-3562500061
2024 9 FD52 00 E122 D 1209901D 059 3/11/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031O1062406810059 $450.41 000001076308-3562500636
2024 9 FD52 06 E122 D 1209901D 059 3/11/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031O1062406810058 $5,094.38 000001075668-3562506208
2024 9 FD52 00 E122 D 1209901D 059 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810059 $61.46 000001076308-3562500636
2024 9 FD52 06 E122 D 1209901D 059 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810058 $234.53 000001075668-3562506200
2024 9 FD52 00 E123 D 1209901D 059 3/11/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031O1062406810059 $157.80 000001076308-3562500636
2024 9 FD52 06 E123 D 1209901D 059 3/11/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031O1062406810058 $920.28 000001075668-3562506200
2024 9 FD52 00 E123 D 1209901D 059 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810059 $21.38 000001076308-3562500636
2024 9 FD52 06 E123 D 1209901D 059 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810058 $46.97 000001075668-3562506200
2024 9 FD52 00 E111 D 1209901D 059 3/11/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR031O1062406810058 $859.41 000001075787-3562500061
2024 9 FD52 00 E111 D 1209901D 059 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810058 $42.02 000001075787-3562500061
2024 9 FD52 00 E123 D 1209901D 059 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810058 $105.25 000001075456-3562500061
2024 9 FD52 00 E121 D 1209901D 059 3/11/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR031O1062406810058 $63.42 000001075787-3562500061
2024 9 FD52 00 E121 D 1209901D 059 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810058 $3.10 000001075787-3562500061
2024 9 FD52 00 E122 D 1209901D 059 3/11/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR031O1062406810058 $568.71 000001075787-3562500061
2024 9 FD52 00 E122 D 1209901D 059 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810058 $27.80 000001075787-3562500061
2024 9 FD52 00 E123 D 1209901D 059 3/11/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR031O1062406810058 $133.19 000001075787-3562500061
2024 9 FD52 00 E123 D 1209901D 059 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810058 $6.43 000001075787-3562500061
2024 9 FD52 00 E111 D 1209901D 059 3/11/2024 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR031O1062406810114 $78.76 000001091239-3562500630
2024 9 FD52 00 E111 D 1209901D 059 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810114 $15.75 000001091239-3562500630
2024 9 FD52 00 E121 D 1209901D 059 3/11/2024 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR031O1062406810114 $5.77 000001091239-3562500630
2024 9 FD52 00 E121 D 1209901D 059 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810114 $1.16 000001091239-3562500630
2024 9 FD52 00 E122 D 1209901D 059 3/11/2024 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR031O1062406810114 $52.13 000001091239-3562500630
2024 9 FD52 00 E122 D 1209901D 059 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810114 $10.42 000001091239-3562500630
2024 9 FD52 00 E123 D 1209901D 059 3/11/2024 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR031O1062406810114 $8.89 000001091239-3562500630
2024 9 FD52 00 E123 D 1209901D 059 3/11/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031O1062406810114 $1.76 000001091239-3562500630
2024 9 FD52 06 E111 D 1209901D 059 3/11/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR031O1062406810059 $1,250.86 000001076737-3562506200
2024 9 FD52 06 E121 D 1209901D 059 3/11/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR031O1062406810059 $91.40 000001076737-3562506200
2024 9 FD52 06 E122 D 1209901D 059 3/11/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR031O1062406810059 $827.69 000001076737-3562506200
2024 9 FD52 06 E123 D 1209901D 059 3/11/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR031O1062406810059 $198.39 000001076737-3562506200
2024 9 FD52 06 E143 D 1209901D 059 3/8/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400181413 PON22300001541 Innovative Contracting & Engineering LLC $9,186.52 Letter Agreement 1
2024 9 FD52 02 E143 D 1209901D 059 3/7/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400178680 PON22200002102 American Structurepoint Inc $124,790.58 Letter Agreement 3, 3X & 3XX
2024 8 FD52 00 E111 D 1209901D 059 2/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022O1062405408879 $221.00 000001076308-3562500636
2024 8 FD52 06 E111 D 1209901D 059 2/26/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR022O1062405408880 $1,137.14 000001076737-3562506200
2024 8 FD52 00 E111 D 1209901D 059 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408879 $126.42 000001076308-3562500636
2024 8 FD52 06 E111 D 1209901D 059 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408880 $89.08 000001076737-3562506200
2024 8 FD52 00 E121 D 1209901D 059 2/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022O1062405408879 $15.98 000001076308-3562500636
2024 8 FD52 06 E121 D 1209901D 059 2/26/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR022O1062405408880 $80.75 000001076737-3562506200
2024 8 FD52 00 E121 D 1209901D 059 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408879 $9.14 000001076308-3562500636
2024 8 FD52 06 E121 D 1209901D 059 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408880 $6.29 000001076737-3562506200
2024 8 FD52 00 E122 D 1209901D 059 2/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022O1062405408879 $146.24 000001076308-3562500636
2024 8 FD52 06 E122 D 1209901D 059 2/26/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR022O1062405408880 $752.45 000001076737-3562506200
2024 8 FD52 00 E122 D 1209901D 059 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408879 $83.66 000001076308-3562500636
2024 8 FD52 06 E122 D 1209901D 059 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408880 $58.94 000001076737-3562506200
2024 8 FD52 00 E123 D 1209901D 059 2/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022O1062405408879 $51.38 000001076308-3562500636
2024 8 FD52 06 E123 D 1209901D 059 2/26/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR022O1062405408880 $180.50 000001076737-3562506200
2024 8 FD52 00 E123 D 1209901D 059 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408879 $29.10 000001076308-3562500636
2024 8 FD52 06 E123 D 1209901D 059 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408880 $13.98 000001076737-3562506200
2024 8 FD52 00 E124 D 1209901D 059 2/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022O1062405408879 $0.05 000001076308-3562500636
2024 8 FD52 06 E124 D 1209901D 059 2/26/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR022O1062405408880 $0.36 000001076737-3562506200
2024 8 FD52 00 E124 D 1209901D 059 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408879 $0.04 000001076308-3562500636
2024 8 FD52 06 E124 D 1209901D 059 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408880 $0.03 000001076737-3562506200
2024 8 FD52 06 E111 D 1209901D 059 2/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022O1062405408878 $6,940.57 000001075668-3562506200
2024 8 FD52 06 E111 D 1209901D 059 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408878 $88.18 000001075668-3562506208
2024 8 FD52 06 E121 D 1209901D 059 2/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022O1062405408878 $509.25 000001075668-3562500022
2024 8 FD52 06 E121 D 1209901D 059 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408878 $6.26 000001075668-3562506208
2024 8 FD52 06 E122 D 1209901D 059 2/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022O1062405408878 $4,592.57 000001075668-3562506208
2024 8 FD52 06 E122 D 1209901D 059 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408878 $58.35 000001075668-3562506208
2024 8 FD52 06 E123 D 1209901D 059 2/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022O1062405408878 $834.07 000001075668-3562506208
2024 8 FD52 06 E123 D 1209901D 059 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408878 $13.04 000001075668-3562506208
2024 8 FD52 06 E124 D 1209901D 059 2/26/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022O1062405408878 $1.65 000001075668-3562500022
2024 8 FD52 06 E124 D 1209901D 059 2/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022O1062405408878 $0.02 000001075668-3562506208
2024 8 FD52 06 E111 D 1209901D 059 2/16/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR021O1062403907650 $1,563.65 000001076737-3562506200
2024 8 FD52 06 E111 D 1209901D 059 2/16/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907650 $142.11 000001076737-3562506200
2024 8 FD52 06 E121 D 1209901D 059 2/16/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR021O1062403907650 $113.14 000001076737-3562506200
2024 8 FD52 06 E121 D 1209901D 059 2/16/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907650 $9.87 000001076737-3562506200
2024 8 FD52 06 E122 D 1209901D 059 2/16/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR021O1062403907650 $1,034.62 000001076737-3562506200
2024 8 FD52 06 E122 D 1209901D 059 2/16/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907650 $94.03 000001076737-3562506200
2024 8 FD52 06 E123 D 1209901D 059 2/16/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR021O1062403907650 $248.22 000001076737-3562506200
2024 8 FD52 06 E123 D 1209901D 059 2/16/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907650 $22.31 000001076737-3562506200
2024 8 FD52 00 E111 D 1209901D 059 2/16/2024 1640 BRIDGE-REVIEW OF PLANS CA-XR021O1062403907655 $1,140.66 000001079290-3562500610
2024 8 FD52 00 E111 D 1209901D 059 2/16/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907655 $107.47 000001079290-3562500610
2024 8 FD52 00 E121 D 1209901D 059 2/16/2024 1640 BRIDGE-REVIEW OF PLANS CA-XR021O1062403907655 $80.22 000001079290-3562500610
2024 8 FD52 00 E121 D 1209901D 059 2/16/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907655 $7.56 000001079290-3562500610
2024 8 FD52 09 E122 D 1209901D 059 2/16/2024 1640 BRIDGE-REVIEW OF PLANS CA-XR021O1062403907655 $755.09 000001079290-3562500610
2024 8 FD52 00 E122 D 1209901D 059 2/16/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907655 $71.11 000001079290-3562500610
2024 8 FD52 00 E123 D 1209901D 059 2/16/2024 1640 BRIDGE-REVIEW OF PLANS CA-XR021O1062403907655 $211.38 000001079290-3562500610
2024 8 FD52 00 E123 D 1209901D 059 2/16/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907655 $19.77 000001079290-3562500610
2024 8 FD52 00 E123 D 1209901D 059 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907648 $6.62 000001075456-3562500061
2024 8 FD52 02 E143 D 1209901D 059 2/9/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400160181 PON22200002102 American Structurepoint Inc $64,281.05 Letter Agreement 3, 3X & 3XX
2024 8 FD52 06 E143 D 1209901D 059 2/9/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400160134 PON22300001541 Innovative Contracting & Engineering LLC $12,116.27 Letter Agreement 1
2024 8 FD52 06 E111 D 1209901D 059 2/9/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021O1062403907648 $2,080.11 000001075668-3562506208
2024 8 FD52 06 E111 D 1209901D 059 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907648 $548.78 000001075668-3562506208
2024 8 FD52 06 E121 D 1209901D 059 2/9/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021O1062403907648 $154.84 000001075668-3562500022
2024 8 FD52 00 E111 D 1209901D 059 2/9/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021O1062403907649 $161.93 000001076308-3562500636
2024 8 FD52 06 E121 D 1209901D 059 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907648 $38.94 000001075668-3562500022
2024 8 FD52 00 E111 D 1209901D 059 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907649 $57.13 000001076308-3562500636
2024 8 FD52 06 E122 D 1209901D 059 2/9/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021O1062403907648 $1,376.33 000001075668-3562500022
2024 8 FD52 00 E121 D 1209901D 059 2/9/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021O1062403907649 $11.49 000001076308-3562500636
2024 8 FD52 06 E122 D 1209901D 059 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907648 $363.13 000001075668-3562506208
2024 8 FD52 00 E121 D 1209901D 059 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907649 $4.05 000001076308-3562500636
2024 8 FD52 06 E123 D 1209901D 059 2/9/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021O1062403907648 $226.88 000001075668-3562500022
2024 8 FD52 00 E122 D 1209901D 059 2/9/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021O1062403907649 $107.24 000001076308-3562500636
2024 8 FD52 06 E123 D 1209901D 059 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907648 $74.89 000001075668-3562506208
2024 8 FD52 00 E122 D 1209901D 059 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907649 $37.81 000001076308-3562500636
2024 8 FD52 00 E123 D 1209901D 059 2/9/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021O1062403907649 $37.63 000001076308-3562500636
2024 8 FD52 00 E123 D 1209901D 059 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907649 $13.16 000001076308-3562500636
2024 8 FD52 00 E111 D 1209901D 059 2/9/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR021O1062403907648 $716.22 000001075787-3562500061
2024 8 FD52 00 E121 D 1209901D 059 2/9/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR021O1062403907648 $52.86 000001075787-3562500061
2024 8 FD52 00 E122 D 1209901D 059 2/9/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR021O1062403907648 $473.93 000001075787-3562500061
2024 8 FD52 00 E123 D 1209901D 059 2/9/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR021O1062403907648 $110.94 000001075787-3562500061
2024 8 FD52 00 E111 D 1209901D 059 2/9/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR021O1062403907647 $294.65 000001075456-3562500061
2024 8 FD52 00 E111 D 1209901D 059 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907647 $28.73 000001075456-3562500061
2024 8 FD52 00 E121 D 1209901D 059 2/9/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR021O1062403907647 $20.94 000001075456-3562500061
2024 8 FD52 00 E121 D 1209901D 059 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907647 $2.04 000001075456-3562500061
2024 8 FD52 00 E122 D 1209901D 059 2/9/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR021O1062403907647 $194.97 000001075456-3562500061
2024 8 FD52 00 E122 D 1209901D 059 2/9/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021O1062403907647 $19.01 000001075456-3562500061
2024 8 FD52 00 E123 D 1209901D 059 2/9/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR021O1062403907647 $68.35 000001075456-3562500061
2024 8 FD52 06 E143 D 1209901D 059 2/7/2024 0592 ENV STUDIES-PERMITTING-CONSUL PRC-2400156402 PON22200001938 QK4 INC $1,698.03 Letter Agreement 14-SRS
2024 8 FD52 06 E143 D 1209901D 059 2/7/2024 0592 ENV STUDIES-PERMITTING-CONSUL PRC-2400157201 PON22200001938 QK4 INC $1,893.69 Letter Agreement 14-SRS
2024 8 FD52 06 E143 D 1209901D 059 2/6/2024 4010 CONSTRUCTION ENGINEERING PRC-2400153704 DO2400015869 Rasor Marketing Communications $7,500.00
2024 8 FD52 06 E143 D 1209901D 059 2/6/2024 4010 CONSTRUCTION ENGINEERING PRC-2400153704 DO2400015869 Rasor Marketing Communications $432.41
2024 8 FD52 06 E143 D 1209901D 059 2/6/2024 4010 CONSTRUCTION ENGINEERING PRC-2400153704 DO2400015869 Rasor Marketing Communications $2,737.50
2024 8 FD52 06 E143 D 1209901D 059 2/6/2024 4010 CONSTRUCTION ENGINEERING PRC-2400153704 DO2400015869 Rasor Marketing Communications $846.06
2024 8 FD52 06 E143 D 1209901D 059 2/6/2024 4010 CONSTRUCTION ENGINEERING PRC-2400153704 DO2400015869 Rasor Marketing Communications $4,350.00
2024 8 FD52 06 E143 D 1209901D 059 2/6/2024 4010 CONSTRUCTION ENGINEERING PRC-2400153704 DO2400015869 Rasor Marketing Communications $268.00
2024 8 FD52 06 E143 D 1209901D 059 2/6/2024 4010 CONSTRUCTION ENGINEERING PRC-2400153704 DO2400015869 Rasor Marketing Communications $3,300.00
2024 8 FD52 06 E143 D 1209901D 059 2/6/2024 4010 CONSTRUCTION ENGINEERING PRC-2400153704 DO2400015869 Rasor Marketing Communications $548.94
2024 8 FD52 06 E143 D 1209901D 059 2/5/2024 0550 ENV STUDIES-TERRES ECOL-CONSUL PRC-2400154100 PON22200001940 PALMER ENGINEERING CO $20,159.00 Letter Agreement 36-MEB
2024 8 FD52 06 E143 D 1209901D 059 2/5/2024 0550 ENV STUDIES-TERRES ECOL-CONSUL PRC-2400154100 PON22200001940 PALMER ENGINEERING CO $7,780.00 Letter Agreement 36-MEB
2024 7 FD52 06 E111 D 1209901D 059 1/31/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR012O1062402306567 $1,288.76 000001076737-3562506200
2024 7 FD52 06 E111 D 1209901D 059 1/31/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306567 $593.21 000001076737-3562506200
2024 7 FD52 06 E121 D 1209901D 059 1/31/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR012O1062402306567 $95.70 000001076737-3562506200
2024 7 FD52 06 E121 D 1209901D 059 1/31/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306567 $44.06 000001076737-3562506200
2024 7 FD52 06 E122 D 1209901D 059 1/31/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR012O1062402306567 $852.80 000001076737-3562506200
2024 7 FD52 06 E122 D 1209901D 059 1/31/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306567 $392.53 000001076737-3562506200
2024 7 FD52 06 E123 D 1209901D 059 1/31/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR012O1062402306567 $205.38 000001076737-3562506200
2024 7 FD52 06 E123 D 1209901D 059 1/31/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306567 $93.11 000001076737-3562506200
2024 7 FD52 06 E124 D 1209901D 059 1/31/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR012O1062402306567 $0.42 000001076737-3562506200
2024 7 FD52 06 E124 D 1209901D 059 1/31/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306567 $0.19 000001076737-3562506200
2024 7 FD52 00 E229 D 1209901D 059 1/29/2024 0070 ENV STUDIES-HIST/CULTURAL IET-XE13A162524025003720 $37.80
2024 7 FD52 06 E143 D 1209901D 059 1/25/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400146851 PON22300001541 Innovative Contracting & Engineering LLC $9,043.54 Letter Agreement 1
2024 7 FD52 06 E143 D 1209901D 059 1/25/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400146969 PON22300001541 Innovative Contracting & Engineering LLC $6,206.82 Letter Agreement 1
2024 7 FD52 06 E143 D 1209901D 059 1/25/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400146993 PON22300001541 Innovative Contracting & Engineering LLC $3,824.18 Letter Agreement 1
2024 7 FD52 00 E122 D 1209901D 059 1/24/2024 0060 ENV STUDIES-ARCHAEOLOGY CA-XR012O1062402306568 $369.06 000001076831-3562500061
2024 7 FD52 00 E122 D 1209901D 059 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306568 $315.35 000001076831-3562500061
2024 7 FD52 06 E111 D 1209901D 059 1/24/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012O1062402306566 $4,487.88 000001075668-3562506208
2024 7 FD52 00 E123 D 1209901D 059 1/24/2024 0060 ENV STUDIES-ARCHAEOLOGY CA-XR012O1062402306568 $87.94 000001076831-3562500061
2024 7 FD52 06 E111 D 1209901D 059 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306566 $1,339.06 000001075668-3562506208
2024 7 FD52 00 E123 D 1209901D 059 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306568 $73.73 000001076831-3562500061
2024 7 FD52 06 E121 D 1209901D 059 1/24/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012O1062402306566 $330.07 000001075668-3562506200
2024 7 FD52 00 E124 D 1209901D 059 1/24/2024 0060 ENV STUDIES-ARCHAEOLOGY CA-XR012O1062402306568 $0.18 000001076831-3562500061
2024 7 FD52 06 E121 D 1209901D 059 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306566 $98.35 000001075668-3562506200
2024 7 FD52 00 E124 D 1209901D 059 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306568 $0.15 000001076831-3562500061
2024 7 FD52 06 E122 D 1209901D 059 1/24/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012O1062402306566 $2,969.41 000001075668-3562506200
2024 7 FD52 06 E122 D 1209901D 059 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306566 $886.06 000001075668-3562506208
2024 7 FD52 06 E123 D 1209901D 059 1/24/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012O1062402306566 $537.98 000001075668-3562506208
2024 7 FD52 06 E123 D 1209901D 059 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306566 $159.49 000001075668-3562506208
2024 7 FD52 06 E124 D 1209901D 059 1/24/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012O1062402306566 $1.04 000001075668-3562506200
2024 7 FD52 06 E124 D 1209901D 059 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306566 $0.32 000001075668-3562506208
2024 7 FD52 00 E111 D 1209901D 059 1/24/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR012O1062402306566 $642.52 000001075787-3562500061
2024 7 FD52 00 E111 D 1209901D 059 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306566 $473.31 000001075787-3562500061
2024 7 FD52 00 E121 D 1209901D 059 1/24/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR012O1062402306566 $48.00 000001075787-3562500061
2024 7 FD52 00 E121 D 1209901D 059 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306566 $35.36 000001075787-3562500061
2024 7 FD52 00 E122 D 1209901D 059 1/24/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR012O1062402306566 $425.10 000001075787-3562500061
2024 7 FD52 00 E122 D 1209901D 059 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306566 $313.19 000001075787-3562500061
2024 7 FD52 00 E123 D 1209901D 059 1/24/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR012O1062402306566 $100.35 000001075787-3562500061
2024 7 FD52 00 E123 D 1209901D 059 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306566 $72.47 000001075787-3562500061
2024 7 FD52 00 E124 D 1209901D 059 1/24/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR012O1062402306566 $0.22 000001075787-3562500061
2024 7 FD52 00 E111 D 1209901D 059 1/24/2024 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR012O1062402306649 $1,879.78 000001090780-3562500610
2024 7 FD52 00 E124 D 1209901D 059 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306566 $0.16 000001075787-3562500061
2024 7 FD52 00 E111 D 1209901D 059 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306649 $423.02 000001090780-3562500610
2024 7 FD52 00 E121 D 1209901D 059 1/24/2024 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR012O1062402306649 $137.07 000001090780-3562500610
2024 7 FD52 00 E121 D 1209901D 059 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306649 $30.84 000001090780-3562500610
2024 7 FD52 00 E122 D 1209901D 059 1/24/2024 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR012O1062402306649 $1,243.84 000001090780-3562500610
2024 7 FD52 00 E122 D 1209901D 059 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306649 $279.91 000001090780-3562500610
2024 7 FD52 00 E123 D 1209901D 059 1/24/2024 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR012O1062402306649 $213.60 000001090780-3562500610
2024 7 FD52 00 E123 D 1209901D 059 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306649 $48.06 000001090780-3562500610
2024 7 FD52 00 E124 D 1209901D 059 1/24/2024 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR012O1062402306649 $0.38 000001090780-3562500610
2024 7 FD52 00 E124 D 1209901D 059 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306649 $0.08 000001090780-3562500610
2024 7 FD52 00 E111 D 1209901D 059 1/24/2024 0060 ENV STUDIES-ARCHAEOLOGY CA-XR012O1062402306568 $557.74 000001076831-3562500061
2024 7 FD52 00 E111 D 1209901D 059 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306568 $476.57 000001076831-3562500061
2024 7 FD52 00 E121 D 1209901D 059 1/24/2024 0060 ENV STUDIES-ARCHAEOLOGY CA-XR012O1062402306568 $42.09 000001076831-3562500061
2024 7 FD52 00 E111 D 1209901D 059 1/24/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012O1062402306566 $309.47 000001076308-3562500636
2024 7 FD52 00 E111 D 1209901D 059 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306566 $80.00 000001076308-3562500636
2024 7 FD52 00 E121 D 1209901D 059 1/24/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012O1062402306566 $22.37 000001076308-3562500636
2024 7 FD52 00 E121 D 1209901D 059 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306566 $5.78 000001076308-3562500636
2024 7 FD52 00 E122 D 1209901D 059 1/24/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012O1062402306566 $204.73 000001076308-3562500636
2024 7 FD52 00 E121 D 1209901D 059 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306568 $35.96 000001076831-3562500061
2024 7 FD52 00 E122 D 1209901D 059 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306566 $52.94 000001076308-3562500636
2024 7 FD52 00 E123 D 1209901D 059 1/24/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012O1062402306566 $71.79 000001076308-3562500636
2024 7 FD52 00 E123 D 1209901D 059 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306566 $18.42 000001076308-3562500636
2024 7 FD52 00 E124 D 1209901D 059 1/24/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012O1062402306566 $0.08 000001076308-3562500636
2024 7 FD52 00 E124 D 1209901D 059 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306566 $0.02 000001076308-3562500636
2024 7 FD52 06 E797 D 1209901D 059 1/18/2024 4580 CONSTRUCTION CONTRACTS PRC-XCONST092229003P006K CTXCONST0922290030001K PCL Construction $48,520.67
2024 7 FD52 02 E143 D 1209901D 059 1/17/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400140555 PON22200002102 American Structurepoint Inc $55,207.60 Letter Agreement 3, 3X & 3XX
2024 7 FD52 06 E111 D 1209901D 059 1/16/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR122N1062335504591 $2,103.73 000001076737-3562506200
2024 7 FD52 06 E111 D 1209901D 059 1/16/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504591 $357.82 000001076737-3562506200
2024 7 FD52 06 E121 D 1209901D 059 1/16/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR122N1062335504591 $154.82 000001076737-3562506200
2024 7 FD52 06 E121 D 1209901D 059 1/16/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504591 $26.33 000001076737-3562506200
2024 7 FD52 06 E122 D 1209901D 059 1/16/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR122N1062335504591 $1,392.03 000001076737-3562506200
2024 7 FD52 06 E122 D 1209901D 059 1/16/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504591 $236.77 000001076737-3562506200
2024 7 FD52 06 E123 D 1209901D 059 1/16/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR122N1062335504591 $289.92 000001076737-3562506200
2024 7 FD52 06 E123 D 1209901D 059 1/16/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504591 $48.63 000001076737-3562506200
2024 7 FD52 06 E124 D 1209901D 059 1/16/2024 1220 ENV IMPACT STATEMENT-GENERAL CA-XR122N1062335504591 $0.67 000001076737-3562506200
2024 7 FD52 06 E124 D 1209901D 059 1/16/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504591 $0.11 000001076737-3562506200
2024 7 FD52 06 E143 D 1209901D 059 1/12/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400130821 PON22300001541 Innovative Contracting & Engineering LLC $35,197.25 Letter Agreement 1
2024 7 FD52 06 E143 D 1209901D 059 1/10/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400114992 PON22300001541 Innovative Contracting & Engineering LLC $26,436.19 Letter Agreement 1
2024 7 FD52 06 E111 D 1209901D 059 1/8/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011O1062400505707 $913.58 000001075668-3562500022
2024 7 FD52 06 E111 D 1209901D 059 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505707 $2,243.28 000001075668-3562506208
2024 7 FD52 06 E121 D 1209901D 059 1/8/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011O1062400505707 $67.60 000001075668-3562500022
2024 7 FD52 06 E121 D 1209901D 059 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505707 $167.04 000001075668-3562506208
2024 7 FD52 06 E122 D 1209901D 059 1/8/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011O1062400505707 $604.42 000001075668-3562500022
2024 7 FD52 06 E122 D 1209901D 059 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505707 $1,484.37 000001075668-3562506208
2024 7 FD52 06 E123 D 1209901D 059 1/8/2024 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011O1062400505707 $102.14 000001075668-3562500022
2024 7 FD52 06 E123 D 1209901D 059 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505707 $232.83 000001075668-3562500022
2024 7 FD52 00 E111 D 1209901D 059 1/8/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR011O1062400505707 $515.69 000001075787-3562500061
2024 7 FD52 00 E111 D 1209901D 059 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505707 $1,633.37 000001075787-3562500061
2024 7 FD52 00 E121 D 1209901D 059 1/8/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR011O1062400505707 $38.05 000001075787-3562500061
2024 7 FD52 00 E121 D 1209901D 059 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505707 $120.55 000001075787-3562500061
2024 7 FD52 00 E122 D 1209901D 059 1/8/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR011O1062400505707 $341.23 000001075787-3562500061
2024 7 FD52 00 E122 D 1209901D 059 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505707 $1,080.81 000001075787-3562500061
2024 7 FD52 00 E123 D 1209901D 059 1/8/2024 0070 ENV STUDIES-HIST/CULTURAL CA-XR011O1062400505707 $82.79 000001075787-3562500061
2024 7 FD52 00 E123 D 1209901D 059 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505707 $250.10 000001075787-3562500061
2024 7 FD52 06 E797 D 1209901D 059 1/4/2024 4580 CONSTRUCTION CONTRACTS PRC-XCONST092229003P005K CTXCONST0922290030001K PCL Construction $103,618.57
2024 6 FD52 02 E143 D 1209901D 059 12/27/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400123596 PON22200002102 American Structurepoint Inc $58,062.35 Letter Agreement 3, 3X & 3XX
2024 6 FD52 00 E122 D 1209901D 059 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504590 $124.36 000001075787-3562510204
2024 6 FD52 00 E123 D 1209901D 059 12/22/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR122N1062335504590 $192.71 000001075787-3562500061
2024 6 FD52 00 E123 D 1209901D 059 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504590 $27.42 000001075787-3562510204
2024 6 FD52 00 E124 D 1209901D 059 12/22/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR122N1062335504590 $0.45 000001075787-3562500061
2024 6 FD52 00 E124 D 1209901D 059 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504590 $0.05 000001075787-3562500061
2024 6 FD52 06 E111 D 1209901D 059 12/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122N1062335504589 $2,680.10 000001075668-3562500022
2024 6 FD52 06 E111 D 1209901D 059 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504589 $268.01 000001075668-3562500022
2024 6 FD52 06 E121 D 1209901D 059 12/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122N1062335504589 $201.54 000001075668-3562500022
2024 6 FD52 06 E121 D 1209901D 059 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504589 $20.15 000001075668-3562500022
2024 6 FD52 06 E122 D 1209901D 059 12/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122N1062335504589 $1,773.42 000001075668-3562500022
2024 6 FD52 06 E122 D 1209901D 059 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504589 $177.34 000001075668-3562500022
2024 6 FD52 06 E123 D 1209901D 059 12/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122N1062335504589 $228.89 000001075668-3562500022
2024 6 FD52 06 E123 D 1209901D 059 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504589 $22.56 000001075668-3562500022
2024 6 FD52 06 E124 D 1209901D 059 12/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122N1062335504589 $0.59 000001075668-3562500022
2024 6 FD52 06 E124 D 1209901D 059 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504589 $0.06 000001075668-3562500022
2024 6 FD52 00 E111 D 1209901D 059 12/22/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR122N1062335504589 $1,313.02 000001075787-3562510204
2024 6 FD52 00 E111 D 1209901D 059 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504589 $187.93 000001075787-3562500061
2024 6 FD52 00 E121 D 1209901D 059 12/22/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR122N1062335504589 $97.35 000001075787-3562510204
2024 6 FD52 00 E121 D 1209901D 059 12/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122N1062335504589 $13.94 000001075787-3562500061
2024 6 FD52 00 E122 D 1209901D 059 12/22/2023 0070 ENV STUDIES-HIST/CULTURAL CA-XR122N1062335504589 $869.79 000001075787-3562510204
2024 6 FD52 06 E143 D 1209901D 059 12/18/2023 0592 ENV STUDIES-PERMITTING-CONSUL PRC-2400118538 PON22200001938 QK4 INC $2,720.58 Letter Agreement 14-CJC
2024 6 FD52 06 E111 D 1209901D 059 12/14/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR121N1062334203606 $473.81 000001076737-3562506200
2024 6 FD52 06 E111 D 1209901D 059 12/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203606 $230.47 000001076737-3562506200
2024 6 FD52 06 E121 D 1209901D 059 12/14/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR121N1062334203606 $34.72 000001076737-3562506200
2024 6 FD52 06 E121 D 1209901D 059 12/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203606 $16.89 000001076737-3562506200
2024 6 FD52 06 E122 D 1209901D 059 12/14/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR121N1062334203606 $313.52 000001076737-3562506200
2024 6 FD52 06 E122 D 1209901D 059 12/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203606 $152.51 000001076737-3562506200
2024 6 FD52 06 E123 D 1209901D 059 12/14/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR121N1062334203606 $65.54 000001076737-3562506200
2024 6 FD52 06 E123 D 1209901D 059 12/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203606 $31.32 000001076737-3562506200
2024 6 FD52 06 E111 D 1209901D 059 12/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121N1062334203604 $560.63 000001075668-3562500022
2024 6 FD52 06 E111 D 1209901D 059 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203604 $191.43 000001075668-3562500022
2024 6 FD52 06 E121 D 1209901D 059 12/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121N1062334203604 $42.16 000001075668-3562500022
2024 6 FD52 06 E121 D 1209901D 059 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203604 $14.39 000001075668-3562500022
2024 6 FD52 06 E122 D 1209901D 059 12/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121N1062334203604 $370.98 000001075668-3562500022
2024 6 FD52 06 E122 D 1209901D 059 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203604 $126.67 000001075668-3562500022
2024 6 FD52 06 E123 D 1209901D 059 12/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121N1062334203604 $48.04 000001075668-3562500022
2024 6 FD52 06 E123 D 1209901D 059 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203604 $16.11 000001075668-3562500022
2024 6 FD52 00 E111 D 1209901D 059 12/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121N1062334203605 $132.75 000001076308-3562500636
2024 6 FD52 00 E111 D 1209901D 059 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203605 $40.66 000001076308-3562500636
2024 6 FD52 00 E121 D 1209901D 059 12/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121N1062334203605 $9.40 000001076308-3562500636
2024 6 FD52 00 E121 D 1209901D 059 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203605 $2.87 000001076308-3562500636
2024 6 FD52 00 E122 D 1209901D 059 12/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121N1062334203605 $87.74 000001076308-3562500636
2024 6 FD52 00 E122 D 1209901D 059 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203605 $26.90 000001076308-3562500636
2024 6 FD52 00 E123 D 1209901D 059 12/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121N1062334203605 $25.61 000001076308-3562500636
2024 6 FD52 00 E123 D 1209901D 059 12/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121N1062334203605 $7.78 000001076308-3562500636
2024 5 FD52 06 E797 D 1209901D 059 11/22/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092229003P004K CTXCONST0922290030001K PCL Construction $171,405.34
2024 5 FD52 06 E111 D 1209901D 059 11/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112N1062332502494 $1,779.69 000001075668-3562506208
2024 5 FD52 06 E111 D 1209901D 059 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502494 $321.75 000001075668-3562506200
2024 5 FD52 06 E121 D 1209901D 059 11/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112N1062332502494 $133.23 000001075668-3562506208
2024 5 FD52 06 E121 D 1209901D 059 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502494 $24.09 000001075668-3562500022
2024 5 FD52 06 E122 D 1209901D 059 11/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112N1062332502494 $1,177.32 000001075668-3562500022
2024 5 FD52 06 E122 D 1209901D 059 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502494 $212.91 000001075668-3562500022
2024 5 FD52 06 E123 D 1209901D 059 11/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112N1062332502494 $170.59 000001075668-3562506200
2024 5 FD52 06 E123 D 1209901D 059 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502494 $30.87 000001075668-3562506200
2024 5 FD52 06 E124 D 1209901D 059 11/22/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112N1062332502494 $0.39 000001075668-3562506200
2024 5 FD52 06 E124 D 1209901D 059 11/22/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112N1062332502494 $0.06 000001075668-3562506208
2024 5 FD52 00 E229 D 1209901D 059 11/14/2023 0010 ENV STUDIES-UST/HZM IET-XE13A162523314012480 $31.80
2024 5 FD52 06 E143 D 1209901D 059 11/13/2023 0550 ENV STUDIES-TERRES ECOL-CONSUL PRC-2400088491 PON22200001940 PALMER ENGINEERING CO $12,928.90 Letter Agreement 36-MEB
2024 5 FD52 06 E143 D 1209901D 059 11/13/2023 0550 ENV STUDIES-TERRES ECOL-CONSUL PRC-2400088491 PON22200001940 PALMER ENGINEERING CO $7,160.00 Letter Agreement 36-MEB
2024 5 FD52 00 E111 D 1209901D 059 11/9/2023 0010 ENV STUDIES-UST/HZM CA-XR111N1062331201472 $824.95 000001080238-3562500061
2024 5 FD52 00 E111 D 1209901D 059 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201472 $21.80 000001080238-3562500061
2024 5 FD52 00 E121 D 1209901D 059 11/9/2023 0010 ENV STUDIES-UST/HZM CA-XR111N1062331201472 $60.49 000001080238-3562500061
2024 5 FD52 00 E121 D 1209901D 059 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201472 $1.65 000001080238-3562500061
2024 5 FD52 00 E122 D 1209901D 059 11/9/2023 0010 ENV STUDIES-UST/HZM CA-XR111N1062331201472 $545.95 000001080238-3562500061
2024 5 FD52 00 E122 D 1209901D 059 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201472 $14.42 000001080238-3562500061
2024 5 FD52 00 E123 D 1209901D 059 11/9/2023 0010 ENV STUDIES-UST/HZM CA-XR111N1062331201472 $99.67 000001080238-3562500061
2024 5 FD52 00 E123 D 1209901D 059 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201472 $0.60 000001080238-3562500061
2024 5 FD52 06 E111 D 1209901D 059 11/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111N1062331201463 $2,027.94 000001075668-3562500022
2024 5 FD52 06 E111 D 1209901D 059 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201463 $226.09 000001075668-3562506208
2024 5 FD52 06 E121 D 1209901D 059 11/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111N1062331201463 $152.16 000001075668-3562500022
2024 5 FD52 06 E121 D 1209901D 059 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201463 $16.93 000001075668-3562500022
2024 5 FD52 06 E122 D 1209901D 059 11/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111N1062331201463 $1,341.88 000001075668-3562506208
2024 5 FD52 06 E122 D 1209901D 059 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201463 $149.60 000001075668-3562506208
2024 5 FD52 06 E123 D 1209901D 059 11/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111N1062331201463 $176.98 000001075668-3562506208
2024 5 FD52 06 E123 D 1209901D 059 11/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111N1062331201463 $19.77 000001075668-3562506208
2024 5 FD52 02 E143 D 1209901D 059 11/6/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400090692 PON22200002102 American Structurepoint Inc $81,487.91 Letter Agreement 3, 3X & 3XX
2024 4 FD52 00 E229 D 1209901D 059 10/11/2023 0040 ENV STUDIES-AQUATIC ECOLOGY IET-XE13A162523283007420 $53.97
2024 4 FD52 06 E797 D 1209901D 059 10/11/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092229003P003K CTXCONST0922290030001K PCL Construction $215,565.15
2024 4 FD52 02 E143 D 1209901D 059 10/9/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400069888 PON22200002102 American Structurepoint Inc $94,766.66 Letter Agreement 3, 3X & 3XX
2024 4 FD52 06 E111 D 1209901D 059 10/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101N1062328009679 $1,843.87 000001075668-3562506208
2024 4 FD52 06 E111 D 1209901D 059 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009679 $42.43 000001075668-3562506200
2024 4 FD52 06 E111 D 1209901D 059 10/9/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR101N1062328009680 $525.02 000001076737-3562506200
2024 4 FD52 06 E121 D 1209901D 059 10/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101N1062328009679 $138.47 000001075668-3562506200
2024 4 FD52 06 E111 D 1209901D 059 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009680 $10.50 000001076737-3562506200
2024 4 FD52 06 E121 D 1209901D 059 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009679 $3.20 000001075668-3562500022
2024 4 FD52 06 E121 D 1209901D 059 10/9/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR101N1062328009680 $39.64 000001076737-3562506200
2024 4 FD52 06 E122 D 1209901D 059 10/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101N1062328009679 $1,220.16 000001075668-3562506208
2024 4 FD52 06 E121 D 1209901D 059 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009680 $0.79 000001076737-3562506200
2024 4 FD52 06 E122 D 1209901D 059 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009679 $28.08 000001075668-3562500022
2024 4 FD52 06 E122 D 1209901D 059 10/9/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR101N1062328009680 $347.41 000001076737-3562506200
2024 4 FD52 06 E123 D 1209901D 059 10/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101N1062328009679 $184.01 000001075668-3562500022
2024 4 FD52 06 E122 D 1209901D 059 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009680 $6.95 000001076737-3562506200
2024 4 FD52 06 E123 D 1209901D 059 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009679 $3.96 000001075668-3562506200
2024 4 FD52 06 E123 D 1209901D 059 10/9/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR101N1062328009680 $51.05 000001076737-3562506200
2024 4 FD52 06 E123 D 1209901D 059 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009680 $1.01 000001076737-3562506200
2024 4 FD52 00 E111 D 1209901D 059 10/9/2023 0040 ENV STUDIES-AQUATIC ECOLOGY CA-XR101N1062328009726 $1,431.01 000001089270-3562500061
2024 4 FD52 00 E111 D 1209901D 059 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009726 $245.82 000001089270-3562500061
2024 4 FD52 00 E121 D 1209901D 059 10/9/2023 0040 ENV STUDIES-AQUATIC ECOLOGY CA-XR101N1062328009726 $109.47 000001089270-3562500061
2024 4 FD52 00 E121 D 1209901D 059 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009726 $18.80 000001089270-3562500061
2024 4 FD52 00 E122 D 1209901D 059 10/9/2023 0040 ENV STUDIES-AQUATIC ECOLOGY CA-XR101N1062328009726 $586.18 000001089270-3562500061
2024 4 FD52 00 E122 D 1209901D 059 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009726 $100.69 000001089270-3562500061
2024 4 FD52 00 E123 D 1209901D 059 10/9/2023 0040 ENV STUDIES-AQUATIC ECOLOGY CA-XR101N1062328009726 $56.09 000001089270-3562500061
2024 4 FD52 00 E123 D 1209901D 059 10/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101N1062328009726 $9.02 000001089270-3562500061
2024 3 FD52 06 E111 D 1209901D 059 9/29/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062327208394 $1,338.64 000001075668-3562500022
2024 3 FD52 06 E111 D 1209901D 059 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208394 $150.01 000001075668-3562500022
2024 3 FD52 06 E121 D 1209901D 059 9/29/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062327208394 $100.81 000001075668-3562506200
2024 3 FD52 06 E121 D 1209901D 059 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208394 $11.29 000001075668-3562506200
2024 3 FD52 06 E122 D 1209901D 059 9/29/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062327208394 $885.85 000001075668-3562506200
2024 3 FD52 06 E122 D 1209901D 059 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208394 $99.25 000001075668-3562500022
2024 3 FD52 06 E123 D 1209901D 059 9/29/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062327208394 $120.04 000001075668-3562500022
2024 3 FD52 06 E123 D 1209901D 059 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208394 $13.20 000001075668-3562506200
2024 3 FD52 06 E124 D 1209901D 059 9/29/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062327208394 $0.28 000001075668-3562500022
2024 3 FD52 06 E124 D 1209901D 059 9/29/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208394 $0.03 000001075668-3562500022
2024 3 FD52 06 E111 D 1209901D 059 9/28/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062326507043 ($1,338.64) 000001075668-3562500022
2024 3 FD52 06 E111 D 1209901D 059 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507043 ($150.01) 000001075668-3562500022
2024 3 FD52 06 E121 D 1209901D 059 9/28/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062326507043 ($100.81) 000001075668-3562506200
2024 3 FD52 06 E121 D 1209901D 059 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507043 ($11.29) 000001075668-3562506200
2024 3 FD52 06 E122 D 1209901D 059 9/28/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062326507043 ($885.85) 000001075668-3562506200
2024 3 FD52 06 E122 D 1209901D 059 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507043 ($99.25) 000001075668-3562500022
2024 3 FD52 06 E123 D 1209901D 059 9/28/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062326507043 ($120.04) 000001075668-3562500022
2024 3 FD52 06 E123 D 1209901D 059 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507043 ($13.20) 000001075668-3562506200
2024 3 FD52 06 E124 D 1209901D 059 9/28/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062326507043 ($0.28) 000001075668-3562500022
2024 3 FD52 06 E124 D 1209901D 059 9/28/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507043 ($0.03) 000001075668-3562500022
2024 3 FD52 06 E797 D 1209901D 059 9/27/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092229003P002K CTXCONST0922290030001K PCL Construction $161,746.06
2024 3 FD52 06 E111 D 1209901D 059 9/25/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062326507043 $1,338.64 000001075668-3562500022
2024 3 FD52 06 E111 D 1209901D 059 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507043 $150.01 000001075668-3562500022
2024 3 FD52 06 E121 D 1209901D 059 9/25/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062326507043 $100.81 000001075668-3562506200
2024 3 FD52 06 E121 D 1209901D 059 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507043 $11.29 000001075668-3562506200
2024 3 FD52 06 E122 D 1209901D 059 9/25/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062326507043 $885.85 000001075668-3562506200
2024 3 FD52 06 E122 D 1209901D 059 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507043 $99.25 000001075668-3562500022
2024 3 FD52 06 E123 D 1209901D 059 9/25/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062326507043 $120.04 000001075668-3562500022
2024 3 FD52 06 E123 D 1209901D 059 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507043 $13.20 000001075668-3562506200
2024 3 FD52 06 E124 D 1209901D 059 9/25/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092N1062326507043 $0.28 000001075668-3562500022
2024 3 FD52 06 E124 D 1209901D 059 9/25/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062326507043 $0.03 000001075668-3562500022
2024 3 FD52 06 E143 D 1209901D 059 9/20/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400053508 PON22300001541 Innovative Contracting & Engineering LLC $18,675.86 Letter Agreement 1
2024 3 FD52 06 E143 D 1209901D 059 9/20/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400053510 PON22300001541 Innovative Contracting & Engineering LLC $16,718.79 Letter Agreement 1
2024 3 FD52 06 E143 D 1209901D 059 9/20/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400055192 PON22300001541 Innovative Contracting & Engineering LLC $35,653.09 Letter Agreement 1
2024 3 FD52 06 E143 D 1209901D 059 9/20/2023 0592 ENV STUDIES-PERMITTING-CONSUL PRC-2400052592 PON22200001938 QK4 INC $3,206.15 Letter Agreement 14-SRS
2024 3 FD52 06 E111 D 1209901D 059 9/11/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR091N1062325106077 $781.80 000001076737-3562506200
2024 3 FD52 06 E111 D 1209901D 059 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106077 $71.23 000001076737-3562506200
2024 3 FD52 06 E121 D 1209901D 059 9/11/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR091N1062325106077 $57.29 000001076737-3562506200
2024 3 FD52 06 E121 D 1209901D 059 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106077 $5.22 000001076737-3562506200
2024 3 FD52 06 E122 D 1209901D 059 9/11/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR091N1062325106077 $517.31 000001076737-3562506200
2024 3 FD52 06 E122 D 1209901D 059 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106077 $47.13 000001076737-3562506200
2024 3 FD52 06 E123 D 1209901D 059 9/11/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR091N1062325106077 $107.64 000001076737-3562506200
2024 3 FD52 06 E123 D 1209901D 059 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106077 $9.68 000001076737-3562506200
2024 3 FD52 00 E111 D 1209901D 059 9/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091N1062325106076 $303.88 000001076308-3562500636
2024 3 FD52 00 E111 D 1209901D 059 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106076 $11.34 000001076308-3562500636
2024 3 FD52 00 E121 D 1209901D 059 9/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091N1062325106076 $21.54 000001076308-3562500636
2024 3 FD52 00 E121 D 1209901D 059 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106076 $0.80 000001076308-3562500636
2024 3 FD52 00 E122 D 1209901D 059 9/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091N1062325106076 $201.08 000001076308-3562500636
2024 3 FD52 00 E122 D 1209901D 059 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106076 $7.50 000001076308-3562500636
2024 3 FD52 00 E123 D 1209901D 059 9/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091N1062325106076 $58.58 000001076308-3562500636
2024 3 FD52 00 E123 D 1209901D 059 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106076 $2.17 000001076308-3562500636
2024 3 FD52 06 E111 D 1209901D 059 9/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091N1062325106075 $2,197.21 000001075668-3562506200
2024 3 FD52 06 E111 D 1209901D 059 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106075 $30.60 000001075668-3562500022
2024 3 FD52 06 E121 D 1209901D 059 9/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091N1062325106075 $164.24 000001075668-3562500022
2024 3 FD52 06 E121 D 1209901D 059 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106075 $2.22 000001075668-3562506208
2024 3 FD52 06 E122 D 1209901D 059 9/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091N1062325106075 $1,453.66 000001075668-3562506200
2024 3 FD52 06 E122 D 1209901D 059 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106075 $20.25 000001075668-3562506208
2024 3 FD52 06 E123 D 1209901D 059 9/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091N1062325106075 $211.91 000001075668-3562506200
2024 3 FD52 06 E123 D 1209901D 059 9/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091N1062325106075 $3.44 000001075668-3562500022
2024 3 FD52 02 E143 D 1209901D 059 9/6/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400045687 PON22200002102 American Structurepoint Inc $81,447.17 Letter Agreement 3, 3X & 3XX
2024 3 FD52 06 E797 D 1209901D 059 9/6/2023 4580 CONSTRUCTION CONTRACTS PRC-XCONST092229003P001K CTXCONST0922290030001K PCL Construction $311,154.32
2024 3 FD52 06 E143 D 1209901D 059 9/1/2023 4010 CONSTRUCTION ENGINEERING PRC-2400040077 DO2300024946 Rasor Marketing Communications $3,092.75
2024 3 FD52 06 E143 D 1209901D 059 9/1/2023 4010 CONSTRUCTION ENGINEERING PRC-2400040077 DO2300024946 Rasor Marketing Communications $12.93
2024 2 FD52 06 E143 D 1209901D 059 8/24/2023 4010 CONSTRUCTION ENGINEERING PRC-2400037385 DO2300024946 Rasor Marketing Communications $9,521.50
2024 2 FD52 06 E111 D 1209901D 059 8/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082N1062323504921 $1,692.96 000001075668-3562500022
2024 2 FD52 06 E111 D 1209901D 059 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504921 $319.04 000001075668-3562506200
2024 2 FD52 06 E121 D 1209901D 059 8/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082N1062323504921 $127.59 000001075668-3562506200
2024 2 FD52 06 E121 D 1209901D 059 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504921 $24.01 000001075668-3562500022
2024 2 FD52 06 E122 D 1209901D 059 8/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082N1062323504921 $1,120.22 000001075668-3562500022
2024 2 FD52 06 E122 D 1209901D 059 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504921 $211.11 000001075668-3562506200
2024 2 FD52 06 E123 D 1209901D 059 8/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082N1062323504921 $156.14 000001075668-3562500022
2024 2 FD52 06 E123 D 1209901D 059 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504921 $27.76 000001075668-3562500022
2024 2 FD52 06 E124 D 1209901D 059 8/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082N1062323504921 $0.35 000001075668-3562500022
2024 2 FD52 06 E124 D 1209901D 059 8/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082N1062323504921 $0.06 000001075668-3562500022
2024 2 FD52 06 E143 D 1209901D 059 8/15/2023 0592 ENV STUDIES-PERMITTING-CONSUL PRC-2400021944 PON22200001938 QK4 INC $1,273.00 Letter Agreement 14-CJC
2024 2 FD52 06 E111 D 1209901D 059 8/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081N1062322003843 $2,471.17 000001075668-3562506208
2024 2 FD52 06 E111 D 1209901D 059 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003843 $290.41 000001075668-3562506208
2024 2 FD52 06 E121 D 1209901D 059 8/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081N1062322003843 $182.26 000001075668-3562506208
2024 2 FD52 06 E121 D 1209901D 059 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003843 $21.36 000001075668-3562500022
2024 2 FD52 06 E122 D 1209901D 059 8/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081N1062322003843 $1,635.26 000001075668-3562506208
2024 2 FD52 06 E122 D 1209901D 059 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003843 $192.16 000001075668-3562506208
2024 2 FD52 06 E123 D 1209901D 059 8/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081N1062322003843 $252.54 000001075668-3562500022
2024 2 FD52 06 E123 D 1209901D 059 8/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081N1062322003843 $29.96 000001075668-3562500022
2024 2 FD52 02 E143 D 1209901D 059 8/3/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400022952 PON22200002102 American Structurepoint Inc $38,434.74 Letter Agreement 3, 3X & 3XX
2024 1 FD52 06 E123 D 1209901D 059 7/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072N1062320202659 $13.09 000001075668-3562500022
2024 1 FD52 06 E123 D 1209901D 059 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202659 $23.50 000001075668-3562500022
2024 1 FD52 06 E124 D 1209901D 059 7/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072N1062320202659 $0.03 000001075668-3562500022
2024 1 FD52 06 E124 D 1209901D 059 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202659 $0.06 000001075668-3562500022
2024 1 FD52 06 E111 D 1209901D 059 7/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072N1062320202658 $150.31 000001075668-3562500022
2024 1 FD52 06 E111 D 1209901D 059 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202658 $279.17 000001075668-3562500022
2024 1 FD52 06 E121 D 1209901D 059 7/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072N1062320202658 $11.31 000001075668-3562500022
2024 1 FD52 06 E121 D 1209901D 059 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202658 $20.99 000001075668-3562500022
2024 1 FD52 06 E122 D 1209901D 059 7/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072N1062320202658 $99.14 000001075668-3562500022
2024 1 FD52 06 E122 D 1209901D 059 7/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072N1062320202658 $184.73 000001075668-3562500022
2024 1 FD52 02 E143 D 1209901D 059 7/18/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400011664 PON22200002102 American Structurepoint Inc $85,119.20 Letter Agreement 3, 3X & 3XX
2024 1 FD52 06 E111 D 1209901D 059 7/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071N1062319101531 $361.20 000001075668-3562500022
2024 1 FD52 06 E111 D 1209901D 059 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101531 $36.12 000001075668-3562500022
2024 1 FD52 06 E121 D 1209901D 059 7/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071N1062319101531 $27.13 000001075668-3562500022
2024 1 FD52 06 E121 D 1209901D 059 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101531 $2.71 000001075668-3562500022
2024 1 FD52 06 E122 D 1209901D 059 7/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071N1062319101531 $281.73 000001075668-3562500022
2024 1 FD52 06 E122 D 1209901D 059 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101531 $28.17 000001075668-3562500022
2024 1 FD52 06 E123 D 1209901D 059 7/11/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071N1062319101531 $32.70 000001075668-3562500022
2024 1 FD52 06 E123 D 1209901D 059 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101531 $3.22 000001075668-3562500022
2023 12 FD52 06 E143 D 1209901D 059 6/29/2023 0592 ENV STUDIES-PERMITTING-CONSUL PRC-2300259428 PON22200001938 QK4 INC $3,106.15 Letter Agreement 14-CJC
2023 12 FD52 06 E111 D 1209901D 059 6/28/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062N1062317400413 $187.64 000001075668-3562500022
2023 12 FD52 06 E121 D 1209901D 059 6/28/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062N1062317400413 $14.07 000001075668-3562500022
2023 12 FD52 06 E122 D 1209901D 059 6/28/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062N1062317400413 $146.36 000001075668-3562500022
2023 12 FD52 06 E123 D 1209901D 059 6/28/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062N1062317400413 $18.66 000001075668-3562500022
2023 12 FD52 06 E124 D 1209901D 059 6/28/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062N1062317400413 $0.05 000001075668-3562500022
2023 12 FD52 06 E143 D 1209901D 059 6/27/2023 4010 CONSTRUCTION ENGINEERING PRC-2300257358 DO2300024946 Rasor Marketing Communications $14,108.50
2023 12 FD52 06 E143 D 1209901D 059 6/27/2023 4010 CONSTRUCTION ENGINEERING PRC-2300257358 DO2300024946 Rasor Marketing Communications $597.52
2023 12 FD52 06 E111 D 1209901D 059 6/8/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061N1062315810121 $1,375.99 000001075668-3562500022
2023 12 FD52 06 E111 D 1209901D 059 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810121 $451.93 000001075668-3562500022
2023 12 FD52 06 E121 D 1209901D 059 6/8/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061N1062315810121 $103.18 000001075668-3562500022
2023 12 FD52 06 E121 D 1209901D 059 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810121 $33.88 000001075668-3562500022
2023 12 FD52 06 E122 D 1209901D 059 6/8/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061N1062315810121 $1,073.28 000001075668-3562500022
2023 12 FD52 06 E122 D 1209901D 059 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810121 $352.50 000001075668-3562500022
2023 12 FD52 06 E123 D 1209901D 059 6/8/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061N1062315810121 $137.44 000001075668-3562500022
2023 12 FD52 06 E123 D 1209901D 059 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810121 $44.36 000001075668-3562500022
2023 11 FD52 02 E143 D 1209901D 059 5/26/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300230452 PON22200002102 American Structurepoint Inc $75,269.80 Letter Agreement 3 & 3X
2023 11 FD52 00 E123 D 1209901D 059 5/24/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR052N1062314309022 $23.26 000001075456-3562500061
2023 11 FD52 00 E124 D 1209901D 059 5/24/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR052N1062314309022 $0.04 000001075456-3562500061
2023 11 FD52 06 E111 D 1209901D 059 5/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052N1062314309022 $1,269.48 000001075668-3562500022
2023 11 FD52 06 E111 D 1209901D 059 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309022 $171.97 000001075668-3562500022
2023 11 FD52 06 E121 D 1209901D 059 5/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052N1062314309022 $94.31 000001075668-3562500022
2023 11 FD52 06 E121 D 1209901D 059 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309022 $12.81 000001075668-3562500022
2023 11 FD52 06 E122 D 1209901D 059 5/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052N1062314309022 $990.11 000001075668-3562500022
2023 11 FD52 06 E122 D 1209901D 059 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309022 $134.13 000001075668-3562500022
2023 11 FD52 06 E123 D 1209901D 059 5/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052N1062314309022 $143.23 000001075668-3562500022
2023 11 FD52 06 E123 D 1209901D 059 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309022 $18.55 000001075668-3562506208
2023 11 FD52 06 E124 D 1209901D 059 5/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052N1062314309022 $0.34 000001075668-3562506208
2023 11 FD52 06 E124 D 1209901D 059 5/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052N1062314309022 $0.05 000001075668-3562500022
2023 11 FD52 00 E111 D 1209901D 059 5/24/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR052N1062314309021 $113.72 000001075456-3562500061
2023 11 FD52 00 E121 D 1209901D 059 5/24/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR052N1062314309021 $8.23 000001075456-3562500061
2023 11 FD52 00 E122 D 1209901D 059 5/24/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR052N1062314309021 $88.70 000001075456-3562500061
2023 11 FD52 06 E111 D 1209901D 059 5/9/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR051N1062312808052 $818.82 000001076737-3562506200
2023 11 FD52 06 E121 D 1209901D 059 5/9/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR051N1062312808052 $59.61 000001076737-3562506200
2023 11 FD52 06 E122 D 1209901D 059 5/9/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR051N1062312808052 $638.68 000001076737-3562506200
2023 11 FD52 06 E123 D 1209901D 059 5/9/2023 1220 ENV IMPACT STATEMENT-GENERAL CA-XR051N1062312808052 $129.03 000001076737-3562506200
2023 11 FD52 00 E111 D 1209901D 059 5/9/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR051N1062312808050 $271.02 000001075456-3562500061
2023 11 FD52 00 E121 D 1209901D 059 5/9/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR051N1062312808050 $19.16 000001075456-3562500061
2023 11 FD52 00 E122 D 1209901D 059 5/9/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR051N1062312808050 $211.39 000001075456-3562500061
2023 11 FD52 00 E123 D 1209901D 059 5/9/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR051N1062312808050 $55.43 000001075456-3562500061
2023 11 FD52 06 E111 D 1209901D 059 5/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051N1062312808050 $760.17 000001075668-3562500022
2023 11 FD52 06 E111 D 1209901D 059 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808050 $30.37 000001075668-3562506208
2023 11 FD52 06 E121 D 1209901D 059 5/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051N1062312808050 $56.93 000001075668-3562500022
2023 11 FD52 06 E121 D 1209901D 059 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808050 $2.27 000001075668-3562506200
2023 11 FD52 06 E122 D 1209901D 059 5/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051N1062312808050 $593.10 000001075668-3562506208
2023 11 FD52 06 E122 D 1209901D 059 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808050 $23.70 000001075668-3562500022
2023 11 FD52 06 E123 D 1209901D 059 5/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051N1062312808050 $84.99 000001075668-3562500022
2023 11 FD52 06 E123 D 1209901D 059 5/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051N1062312808050 $3.24 000001075668-3562506208
2023 11 FD52 02 E143 D 1209901D 059 5/4/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300211508 PON22200002102 American Structurepoint Inc $112,904.70 Letter Agreement 3 & 3X
2023 10 FD52 06 E111 D 1209901D 059 4/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042N1062311106914 $180.50 000001075668-3562500022
2023 10 FD52 06 E111 D 1209901D 059 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106914 $15.48 000001075668-3562500022
2023 10 FD52 06 E121 D 1209901D 059 4/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042N1062311106914 $13.55 000001075668-3562500022
2023 10 FD52 06 E121 D 1209901D 059 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106914 $1.17 000001075668-3562500022
2023 10 FD52 06 E122 D 1209901D 059 4/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042N1062311106914 $140.46 000001075668-3562500022
2023 10 FD52 06 E122 D 1209901D 059 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106914 $12.07 000001075668-3562500022
2023 10 FD52 06 E123 D 1209901D 059 4/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042N1062311106914 $17.93 000001075668-3562500022
2023 10 FD52 06 E123 D 1209901D 059 4/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042N1062311106914 $1.52 000001075668-3562500022
2023 10 FD52 06 E124 D 1209901D 059 4/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042N1062311106914 $0.03 000001075668-3562500022
2023 10 FD52 02 E143 D 1209901D 059 4/14/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300194973 PON22200002102 American Structurepoint Inc $75,269.80 Letter Agreement 3 & 3X
2023 10 FD52 06 E111 D 1209901D 059 4/10/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041N1062309605752 $1,851.12 000001075668-3562506200
2023 10 FD52 06 E111 D 1209901D 059 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605752 $10.50 000001075668-3562506200
2023 10 FD52 06 E121 D 1209901D 059 4/10/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041N1062309605752 $139.44 000001075668-3562506200
2023 10 FD52 06 E121 D 1209901D 059 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605752 $0.79 000001075668-3562506200
2023 10 FD52 06 E122 D 1209901D 059 4/10/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041N1062309605752 $1,443.86 000001075668-3562506200
2023 10 FD52 06 E122 D 1209901D 059 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605752 $8.19 000001075668-3562506200
2023 10 FD52 06 E123 D 1209901D 059 4/10/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041N1062309605752 $209.85 000001075668-3562506200
2023 10 FD52 06 E123 D 1209901D 059 4/10/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605752 $1.18 000001075668-3562506200
2023 9 FD52 06 E111 D 1209901D 019 3/27/2023 4010 CONSTRUCTION ENGINEERING CA-XR032N1062308304669 $192.75 000001086325-3562506200
2023 9 FD52 06 E121 D 1209901D 019 3/27/2023 4010 CONSTRUCTION ENGINEERING CA-XR032N1062308304669 $14.58 000001086325-3562506200
2023 9 FD52 06 E122 D 1209901D 019 3/27/2023 4010 CONSTRUCTION ENGINEERING CA-XR032N1062308304669 $150.34 000001086325-3562506200
2023 9 FD52 06 E123 D 1209901D 019 3/27/2023 4010 CONSTRUCTION ENGINEERING CA-XR032N1062308304669 $18.30 000001086325-3562506200
2023 9 FD52 06 E124 D 1209901D 019 3/27/2023 4010 CONSTRUCTION ENGINEERING CA-XR032N1062308304669 $0.05 000001086325-3562506200
2023 9 FD52 06 E111 D 1209901D 059 3/14/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031N1062306703646 $675.57 000001075668-3562506200
2023 9 FD52 06 E111 D 1209901D 059 3/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703646 $45.33 000001075668-3562506200
2023 9 FD52 06 E121 D 1209901D 059 3/14/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031N1062306703646 $49.87 000001075668-3562506200
2023 9 FD52 06 E121 D 1209901D 059 3/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703646 $3.29 000001075668-3562506200
2023 9 FD52 06 E122 D 1209901D 059 3/14/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031N1062306703646 $527.05 000001075668-3562506200
2023 9 FD52 06 E122 D 1209901D 059 3/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703646 $35.36 000001075668-3562506200
2023 9 FD52 06 E123 D 1209901D 059 3/14/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031N1062306703646 $99.58 000001075668-3562506200
2023 9 FD52 06 E123 D 1209901D 059 3/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703646 $7.91 000001075668-3562506200
2023 9 FD52 06 E123 D 1209901D 059 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703682 $0.28 000001086566-3562506200
2023 9 FD52 06 E111 D 1209901D 059 3/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR031N1062306703682 $176.53 000001086566-3562506200
2023 9 FD52 06 E111 D 1209901D 059 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703682 $2.95 000001086566-3562506200
2023 9 FD52 06 E121 D 1209901D 059 3/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR031N1062306703682 $13.36 000001086566-3562506200
2023 9 FD52 06 E121 D 1209901D 059 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703682 $0.22 000001086566-3562506200
2023 9 FD52 06 E122 D 1209901D 059 3/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR031N1062306703682 $137.81 000001086566-3562506200
2023 9 FD52 06 E122 D 1209901D 059 3/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031N1062306703682 $2.30 000001086566-3562506200
2023 9 FD52 06 E123 D 1209901D 059 3/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR031N1062306703682 $16.77 000001086566-3562506200
2023 9 FD52 06 E124 D 1209901D 059 3/1/2023 4010 CONSTRUCTION ENGINEERING CA-XR022N1062305302485 $0.36 000001086566-3562506200
2023 9 FD52 06 E111 D 1209901D 059 3/1/2023 4010 CONSTRUCTION ENGINEERING CA-XR022N1062305302484 $1,445.61 000001086566-3562506200
2023 9 FD52 06 E121 D 1209901D 059 3/1/2023 4010 CONSTRUCTION ENGINEERING CA-XR022N1062305302484 $109.35 000001086566-3562506200
2023 9 FD52 06 E122 D 1209901D 059 3/1/2023 4010 CONSTRUCTION ENGINEERING CA-XR022N1062305302484 $1,127.58 000001086566-3562506200
2023 9 FD52 06 E123 D 1209901D 059 3/1/2023 4010 CONSTRUCTION ENGINEERING CA-XR022N1062305302484 $137.21 000001086566-3562506200
2023 8 FD52 02 E143 D 1209901D 059 2/24/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300158839 PON22200002102 American Structurepoint Inc $37,634.90 Letter Agreement 3 & 3X
2023 8 FD52 06 E111 D 1209901D 059 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302427 $409.34 000001075668-3562506200
2023 8 FD52 06 E121 D 1209901D 059 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302427 $30.83 000001075668-3562506200
2023 8 FD52 06 E122 D 1209901D 059 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302427 $319.28 000001075668-3562506200
2023 8 FD52 06 E123 D 1209901D 059 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302427 $46.40 000001075668-3562506200
2023 8 FD52 06 E124 D 1209901D 059 2/23/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR022N1062305302427 $0.09 000001075668-3562506200
2023 8 FD52 02 E143 D 1209901D 059 2/10/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300149263 PON22200002102 American Structurepoint Inc $89,252.54 Letter Agreement 3 & 3X
2023 8 FD52 06 E122 D 1209901D 059 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901399 $192.61 000001075668-3562506200
2023 8 FD52 06 E123 D 1209901D 059 2/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021N1062303901399 $245.02 000001075668-3562506200
2023 8 FD52 06 E123 D 1209901D 059 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901399 $30.18 000001075668-3562506200
2023 8 FD52 06 E111 D 1209901D 019 2/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR021N1062303901457 $993.86 000001086325-3562506200
2023 8 FD52 06 E111 D 1209901D 019 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901457 $90.55 000001086325-3562506200
2023 8 FD52 06 E121 D 1209901D 019 2/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR021N1062303901457 $75.18 000001086325-3562506200
2023 8 FD52 06 E121 D 1209901D 019 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901457 $6.85 000001086325-3562506200
2023 8 FD52 06 E122 D 1209901D 019 2/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR021N1062303901457 $775.21 000001086325-3562506200
2023 8 FD52 06 E122 D 1209901D 019 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901457 $70.63 000001086325-3562506200
2023 8 FD52 06 E123 D 1209901D 019 2/9/2023 4010 CONSTRUCTION ENGINEERING CA-XR021N1062303901457 $94.45 000001086325-3562506200
2023 8 FD52 06 E123 D 1209901D 019 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901457 $8.48 000001086325-3562506200
2023 8 FD52 06 E111 D 1209901D 059 2/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021N1062303901399 $2,007.63 000001075668-3562506200
2023 8 FD52 06 E111 D 1209901D 059 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901399 $246.94 000001075668-3562506200
2023 8 FD52 06 E121 D 1209901D 059 2/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021N1062303901399 $150.47 000001075668-3562506200
2023 8 FD52 06 E121 D 1209901D 059 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901399 $18.50 000001075668-3562506200
2023 8 FD52 06 E122 D 1209901D 059 2/9/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021N1062303901399 $1,565.85 000001075668-3562506200
2023 7 FD52 06 E111 D 1209901D 059 1/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012N1062302300396 $1,037.50 000001075668-3562506200
2023 7 FD52 06 E111 D 1209901D 059 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300396 $166.78 000001075668-3562506200
2023 7 FD52 06 E121 D 1209901D 059 1/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012N1062302300396 $77.34 000001075668-3562506200
2023 7 FD52 06 E121 D 1209901D 059 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300396 $12.18 000001075668-3562506200
2023 7 FD52 06 E122 D 1209901D 059 1/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012N1062302300396 $809.14 000001075668-3562506200
2023 7 FD52 06 E122 D 1209901D 059 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300396 $130.09 000001075668-3562506200
2023 7 FD52 06 E123 D 1209901D 059 1/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012N1062302300396 $135.76 000001075668-3562506200
2023 7 FD52 06 E123 D 1209901D 059 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300396 $27.25 000001075668-3562506200
2023 7 FD52 06 E124 D 1209901D 059 1/24/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012N1062302300396 $0.29 000001075668-3562506200
2023 7 FD52 06 E124 D 1209901D 059 1/24/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012N1062302300396 $0.06 000001075668-3562506200
2023 7 FD52 02 E143 D 1209901D 059 1/13/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300124473 PON22200002102 American Structurepoint Inc $150,539.60 Letter Agreement 3
2023 7 FD52 02 E143 D 1209901D 059 1/13/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300124494 PON22200002102 American Structurepoint Inc $75,269.81 Letter Agreement 3
2023 7 FD52 06 E111 D 1209901D 059 1/12/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011N1062300610237 $95.51 000001075668-3562506200
2023 7 FD52 06 E111 D 1209901D 059 1/12/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011N1062300610237 $204.67 000001075668-3562506200
2023 7 FD52 06 E121 D 1209901D 059 1/12/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011N1062300610237 $7.19 000001075668-3562506200
2023 7 FD52 06 E121 D 1209901D 059 1/12/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011N1062300610237 $15.42 000001075668-3562506200
2023 7 FD52 06 E122 D 1209901D 059 1/12/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011N1062300610237 $74.50 000001075668-3562506200
2023 7 FD52 06 E122 D 1209901D 059 1/12/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011N1062300610237 $159.64 000001075668-3562506200
2023 7 FD52 06 E123 D 1209901D 059 1/12/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR011N1062300610237 $11.06 000001075668-3562506200
2023 7 FD52 06 E123 D 1209901D 059 1/12/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011N1062300610237 $22.97 000001075668-3562506200
2023 6 FD52 06 E111 D 1209901D 059 12/22/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122M1062235509143 $1,067.50 000001075668-3562506200
2023 6 FD52 06 E111 D 1209901D 059 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509143 $66.45 000001075668-3562506200
2023 6 FD52 06 E121 D 1209901D 059 12/22/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122M1062235509143 $78.63 000001075668-3562506200
2023 6 FD52 06 E121 D 1209901D 059 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509143 $4.84 000001075668-3562506200
2023 6 FD52 06 E122 D 1209901D 059 12/22/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122M1062235509143 $832.59 000001075668-3562506200
2023 6 FD52 06 E122 D 1209901D 059 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509143 $51.84 000001075668-3562506200
2023 6 FD52 06 E123 D 1209901D 059 12/22/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122M1062235509143 $141.06 000001075668-3562506200
2023 6 FD52 06 E123 D 1209901D 059 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509143 $10.43 000001075668-3562506200
2023 6 FD52 06 E124 D 1209901D 059 12/22/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122M1062235509143 $0.34 000001075668-3562506200
2023 6 FD52 06 E124 D 1209901D 059 12/22/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509143 $0.03 000001075668-3562506200
2023 6 FD52 06 E123 D 1209901D 059 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208194 $88.62 000001075668-3562506200
2023 6 FD52 06 E111 D 1209901D 059 12/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121M1062234208194 $1,639.32 000001075668-3562506200
2023 6 FD52 06 E111 D 1209901D 059 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208194 $547.10 000001075668-3562506200
2023 6 FD52 06 E121 D 1209901D 059 12/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121M1062234208194 $120.10 000001075668-3562506200
2023 6 FD52 06 E121 D 1209901D 059 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208194 $39.31 000001075668-3562506200
2023 6 FD52 06 E122 D 1209901D 059 12/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121M1062234208194 $1,278.75 000001075668-3562506200
2023 6 FD52 06 E122 D 1209901D 059 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208194 $426.73 000001075668-3562506200
2023 6 FD52 06 E123 D 1209901D 059 12/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121M1062234208194 $221.16 000001075668-3562506200
2023 5 FD52 00 E124 D 1209901D 059 11/29/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607129 $0.03 000001075456-3562500061
2023 5 FD52 06 E111 D 1209901D 059 11/29/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112M1062232607129 $1,515.23 000001075668-3562506200
2023 5 FD52 06 E111 D 1209901D 059 11/29/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607129 $302.40 000001075668-3562506200
2023 5 FD52 06 E121 D 1209901D 059 11/29/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112M1062232607129 $111.88 000001075668-3562506200
2023 5 FD52 06 E121 D 1209901D 059 11/29/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607129 $22.17 000001075668-3562506200
2023 5 FD52 06 E122 D 1209901D 059 11/29/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112M1062232607129 $1,181.74 000001075668-3562506200
2023 5 FD52 06 E122 D 1209901D 059 11/29/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607129 $235.87 000001075668-3562506200
2023 5 FD52 06 E123 D 1209901D 059 11/29/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112M1062232607129 $192.66 000001075668-3562506200
2023 5 FD52 06 E123 D 1209901D 059 11/29/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607129 $42.12 000001075668-3562506200
2023 5 FD52 06 E124 D 1209901D 059 11/29/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112M1062232607129 $0.46 000001075668-3562506200
2023 5 FD52 06 E124 D 1209901D 059 11/29/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607129 $0.10 000001075668-3562506200
2023 5 FD52 00 E111 D 1209901D 059 11/23/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR112M1062232607128 $327.32 000001075456-3562500061
2023 5 FD52 00 E111 D 1209901D 059 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607128 $82.02 000001075456-3562500061
2023 5 FD52 00 E121 D 1209901D 059 11/23/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR112M1062232607128 $23.55 000001075456-3562500061
2023 5 FD52 00 E121 D 1209901D 059 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607128 $5.91 000001075456-3562500061
2023 5 FD52 00 E122 D 1209901D 059 11/23/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR112M1062232607128 $255.37 000001075456-3562500061
2023 5 FD52 00 E122 D 1209901D 059 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607128 $63.97 000001075456-3562500061
2023 5 FD52 00 E123 D 1209901D 059 11/23/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR112M1062232607128 $64.87 000001075456-3562500061
2023 5 FD52 00 E123 D 1209901D 059 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607128 $16.07 000001075456-3562500061
2023 5 FD52 00 E124 D 1209901D 059 11/23/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR112M1062232607128 $0.12 000001075456-3562500061
2023 5 FD52 02 E143 D 1209901D 059 11/14/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300086426 PON22200002102 American Structurepoint Inc $112,904.70 Letter Agreement 3
2023 5 FD52 06 E111 D 1209901D 059 11/14/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR111M1062230806141 $496.25 000001076737-3562506200
2023 5 FD52 06 E111 D 1209901D 059 11/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806141 $80.39 000001076737-3562506200
2023 5 FD52 06 E121 D 1209901D 059 11/14/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR111M1062230806141 $36.37 000001076737-3562506200
2023 5 FD52 06 E121 D 1209901D 059 11/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806141 $5.89 000001076737-3562506200
2023 5 FD52 06 E122 D 1209901D 059 11/14/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR111M1062230806141 $387.07 000001076737-3562506200
2023 5 FD52 06 E122 D 1209901D 059 11/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806141 $62.70 000001076737-3562506200
2023 5 FD52 06 E123 D 1209901D 059 11/14/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR111M1062230806141 $71.97 000001076737-3562506200
2023 5 FD52 06 E123 D 1209901D 059 11/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806141 $11.48 000001076737-3562506200
2023 4 FD52 00 E111 D 1209901D 059 10/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102M1062229405031 $78.71 000001076308-3562500636
2023 4 FD52 00 E111 D 1209901D 059 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405031 $19.66 000001076308-3562500636
2023 4 FD52 00 E121 D 1209901D 059 10/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102M1062229405031 $5.61 000001076308-3562500636
2023 4 FD52 00 E121 D 1209901D 059 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405031 $1.41 000001076308-3562500636
2023 4 FD52 00 E122 D 1209901D 059 10/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102M1062229405031 $61.36 000001076308-3562500636
2023 4 FD52 00 E122 D 1209901D 059 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405031 $15.34 000001076308-3562500636
2023 4 FD52 00 E123 D 1209901D 059 10/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102M1062229405031 $16.50 000001076308-3562500636
2023 4 FD52 00 E123 D 1209901D 059 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405031 $4.09 000001076308-3562500636
2023 4 FD52 00 E124 D 1209901D 059 10/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102M1062229405031 $0.03 000001076308-3562500636
2023 4 FD52 02 E143 D 1209901D 059 10/6/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300060250 PON22200002102 American Structurepoint Inc $37,634.90 Letter Agreement 3
2023 3 FD52 00 E111 D 1209901D 059 9/28/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092M1062226602748 $375.62 000001076308-3562500636
2023 3 FD52 00 E111 D 1209901D 059 9/28/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602748 $187.72 000001076308-3562500636
2023 3 FD52 00 E121 D 1209901D 059 9/28/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092M1062226602748 $26.77 000001076308-3562500636
2023 3 FD52 00 E121 D 1209901D 059 9/28/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602748 $13.40 000001076308-3562500636
2023 3 FD52 00 E122 D 1209901D 059 9/28/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092M1062226602748 $292.84 000001076308-3562500636
2023 3 FD52 00 E122 D 1209901D 059 9/28/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602748 $146.42 000001076308-3562500636
2023 3 FD52 00 E123 D 1209901D 059 9/28/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092M1062226602748 $78.93 000001076308-3562500636
2023 3 FD52 00 E123 D 1209901D 059 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602749 $38.98 000001076308-3562500636
2023 3 FD52 00 E124 D 1209901D 059 9/26/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092M1062226602749 $0.13 000001076308-3562500636
2023 3 FD52 00 E124 D 1209901D 059 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602749 $0.06 000001076308-3562500636
2023 3 FD52 06 E111 D 1209901D 059 9/26/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092M1062226602747 $818.67 000001075668-3562506200
2023 3 FD52 06 E111 D 1209901D 059 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602747 $189.39 000001075668-3562506200
2023 3 FD52 06 E121 D 1209901D 059 9/26/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092M1062226602747 $61.11 000001075668-3562506200
2023 3 FD52 06 E121 D 1209901D 059 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602747 $14.14 000001075668-3562506200
2023 3 FD52 06 E122 D 1209901D 059 9/26/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092M1062226602747 $638.56 000001075668-3562506200
2023 3 FD52 06 E122 D 1209901D 059 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602747 $147.73 000001075668-3562506200
2023 3 FD52 06 E123 D 1209901D 059 9/26/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092M1062226602747 $85.43 000001075668-3562506200
2023 3 FD52 06 E123 D 1209901D 059 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602747 $19.50 000001075668-3562506200
2023 3 FD52 06 E124 D 1209901D 059 9/26/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092M1062226602747 $0.18 000001075668-3562506200
2023 3 FD52 06 E124 D 1209901D 059 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602747 $0.04 000001075668-3562506200
2023 3 FD52 00 E111 D 1209901D 059 9/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091M1062225101604 $131.00 000001076308-3562500636
2023 3 FD52 00 E111 D 1209901D 059 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101604 $13.77 000001076308-3562500636
2023 3 FD52 00 E121 D 1209901D 059 9/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091M1062225101604 $9.13 000001076308-3562500636
2023 3 FD52 06 E111 D 1209901D 059 9/12/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR091M1062225101605 $454.90 000001076737-3562506200
2023 3 FD52 00 E121 D 1209901D 059 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101604 $0.95 000001076308-3562500636
2023 3 FD52 06 E121 D 1209901D 059 9/12/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR091M1062225101605 $33.34 000001076737-3562506200
2023 3 FD52 00 E122 D 1209901D 059 9/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091M1062225101604 $102.26 000001076308-3562500636
2023 3 FD52 06 E122 D 1209901D 059 9/12/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR091M1062225101605 $354.82 000001076737-3562506200
2023 3 FD52 00 E122 D 1209901D 059 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101604 $10.74 000001076308-3562500636
2023 3 FD52 06 E123 D 1209901D 059 9/12/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR091M1062225101605 $65.84 000001076737-3562506200
2023 3 FD52 00 E123 D 1209901D 059 9/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091M1062225101604 $27.47 000001076308-3562500636
2023 3 FD52 00 E123 D 1209901D 059 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101604 $2.86 000001076308-3562500636
2023 2 FD52 06 E124 D 1209901D 059 8/24/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR082M1062223500412 $0.27 000001076737-3562506200
2023 2 FD52 06 E124 D 1209901D 059 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500412 $0.12 000001076737-3562506200
2023 2 FD52 06 E111 D 1209901D 059 8/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082M1062223500409 $409.34 000001075668-3562506200
2023 2 FD52 06 E121 D 1209901D 059 8/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082M1062223500409 $30.56 000001075668-3562506200
2023 2 FD52 06 E122 D 1209901D 059 8/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082M1062223500409 $319.28 000001075668-3562506200
2023 2 FD52 06 E123 D 1209901D 059 8/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082M1062223500409 $42.61 000001075668-3562506200
2023 2 FD52 06 E124 D 1209901D 059 8/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082M1062223500409 $0.09 000001075668-3562506200
2023 2 FD52 06 E111 D 1209901D 059 8/24/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR082M1062223500411 $639.85 000001076737-3562506200
2023 2 FD52 06 E111 D 1209901D 059 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500411 $295.15 000001076737-3562506200
2023 2 FD52 06 E121 D 1209901D 059 8/24/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR082M1062223500411 $46.46 000001076737-3562506200
2023 2 FD52 06 E121 D 1209901D 059 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500411 $21.48 000001076737-3562506200
2023 2 FD52 06 E122 D 1209901D 059 8/24/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR082M1062223500411 $499.02 000001076737-3562506200
2023 2 FD52 06 E122 D 1209901D 059 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500411 $230.21 000001076737-3562506200
2023 2 FD52 06 E123 D 1209901D 059 8/24/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR082M1062223500411 $104.59 000001076737-3562506200
2023 2 FD52 06 E123 D 1209901D 059 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500411 $46.36 000001076737-3562506200
2023 2 FD52 00 E111 D 1209901D 059 8/16/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081M1062222110100 $157.37 000001076308-3562500636
2023 2 FD52 00 E111 D 1209901D 059 8/16/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110100 $40.90 000001076308-3562500636
2023 2 FD52 00 E121 D 1209901D 059 8/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081M1062222110101 $10.96 000001076308-3562500636
2023 2 FD52 00 E121 D 1209901D 059 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110101 $2.85 000001076308-3562500636
2023 2 FD52 00 E122 D 1209901D 059 8/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081M1062222110101 $122.71 000001076308-3562500636
2023 2 FD52 00 E122 D 1209901D 059 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110101 $31.91 000001076308-3562500636
2023 2 FD52 00 E123 D 1209901D 059 8/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081M1062222110101 $33.01 000001076308-3562500636
2023 2 FD52 00 E123 D 1209901D 059 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110101 $8.49 000001076308-3562500636
2023 2 FD52 06 E143 D 1209901D 059 8/3/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300019619 PON22100001623 STANTEC CONSULTING SERVICES INC $163,079.94 Preliminary Engineering and Environmental Services
2023 2 FD52 06 E143 D 1209901D 059 8/3/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300019619 PON22100001623 STANTEC CONSULTING SERVICES INC $12,925.00 Preliminary Engineering and Environmental Services
2023 1 FD52 00 E111 D 1209901D 059 7/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072M1062220308970 $125.14 000001076308-3562500636
2023 1 FD52 00 E111 D 1209901D 059 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308970 $104.05 000001076308-3562500636
2023 1 FD52 00 E121 D 1209901D 059 7/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072M1062220308970 $8.92 000001076308-3562500636
2023 1 FD52 00 E121 D 1209901D 059 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308970 $7.43 000001076308-3562500636
2023 1 FD52 00 E122 D 1209901D 059 7/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072M1062220308970 $97.59 000001076308-3562500636
2023 1 FD52 00 E122 D 1209901D 059 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308970 $81.16 000001076308-3562500636
2023 1 FD52 00 E123 D 1209901D 059 7/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072M1062220308970 $26.39 000001076308-3562500636
2023 1 FD52 00 E123 D 1209901D 059 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308970 $21.61 000001076308-3562500636
2023 1 FD52 00 E124 D 1209901D 059 7/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072M1062220308970 $0.04 000001076308-3562500636
2023 1 FD52 00 E124 D 1209901D 059 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308970 $0.04 000001076308-3562500636
2023 1 FD52 06 E111 D 1209901D 059 7/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071M1062219207856 $1,137.04 000001075668-3562506200
2023 1 FD52 06 E111 D 1209901D 059 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207856 $113.71 000001075668-3562506200
2023 1 FD52 06 E121 D 1209901D 059 7/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071M1062219207856 $84.72 000001075668-3562506200
2023 1 FD52 06 E121 D 1209901D 059 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207856 $8.48 000001075668-3562506200
2023 1 FD52 06 E122 D 1209901D 059 7/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071M1062219207856 $954.78 000001075668-3562506200
2023 1 FD52 06 E122 D 1209901D 059 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207856 $95.48 000001075668-3562506200
2023 1 FD52 06 E123 D 1209901D 059 7/12/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071M1062219207856 $127.97 000001075668-3562506200
2023 1 FD52 06 E123 D 1209901D 059 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207856 $12.64 000001075668-3562506200
2023 1 FD52 06 E111 D 1209901D 059 7/12/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR071M1062219207858 $689.24 000001076737-3562506200
2023 1 FD52 06 E111 D 1209901D 059 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207858 $89.75 000001076737-3562506200
2023 1 FD52 06 E121 D 1209901D 059 7/12/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR071M1062219207858 $50.25 000001076737-3562506200
2023 1 FD52 06 E121 D 1209901D 059 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207858 $6.53 000001076737-3562506200
2023 1 FD52 06 E122 D 1209901D 059 7/12/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR071M1062219207858 $578.76 000001076737-3562506200
2023 1 FD52 06 E122 D 1209901D 059 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207858 $75.37 000001076737-3562506200
2023 1 FD52 06 E123 D 1209901D 059 7/12/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR071M1062219207858 $107.91 000001076737-3562506200
2023 1 FD52 06 E123 D 1209901D 059 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207858 $13.85 000001076737-3562506200
2022 12 FD52 00 E123 D 1209901D 059 6/28/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506741 $3.17 000001075787-3562500061
2022 12 FD52 00 E124 D 1209901D 059 6/28/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR062M1062217506741 $0.09 000001075787-3562500061
2022 12 FD52 00 E124 D 1209901D 059 6/28/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506741 $0.01 000001075787-3562500061
2022 12 FD52 00 E111 D 1209901D 059 6/27/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR062M1062217506740 $342.40 000001075456-3562500061
2022 12 FD52 00 E111 D 1209901D 059 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506740 $4.28 000001075456-3562500061
2022 12 FD52 00 E121 D 1209901D 059 6/27/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR062M1062217506740 $24.31 000001075456-3562500061
2022 12 FD52 00 E121 D 1209901D 059 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506740 $0.31 000001075456-3562500061
2022 12 FD52 00 E122 D 1209901D 059 6/27/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR062M1062217506740 $287.51 000001075456-3562500061
2022 12 FD52 00 E122 D 1209901D 059 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506740 $3.59 000001075456-3562500061
2022 12 FD52 00 E123 D 1209901D 059 6/27/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR062M1062217506740 $81.77 000001075456-3562500061
2022 12 FD52 00 E123 D 1209901D 059 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506740 $1.01 000001075456-3562500061
2022 12 FD52 00 E124 D 1209901D 059 6/27/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR062M1062217506740 $0.15 000001075456-3562500061
2022 12 FD52 00 E111 D 1209901D 059 6/27/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR062M1062217506740 $227.50 000001075787-3562500061
2022 12 FD52 00 E111 D 1209901D 059 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506740 $22.75 000001075787-3562500061
2022 12 FD52 00 E121 D 1209901D 059 6/27/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR062M1062217506740 $16.94 000001075787-3562500061
2022 12 FD52 00 E121 D 1209901D 059 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506740 $1.69 000001075787-3562500061
2022 12 FD52 00 E122 D 1209901D 059 6/27/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR062M1062217506740 $191.05 000001075787-3562500061
2022 12 FD52 00 E122 D 1209901D 059 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506740 $19.10 000001075787-3562500061
2022 12 FD52 00 E123 D 1209901D 059 6/27/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR062M1062217506740 $32.19 000001075787-3562500061
2022 12 FD52 00 E111 D 1209901D 059 6/9/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR061M1062215905698 $823.89 000001075456-3562500061
2022 12 FD52 00 E111 D 1209901D 059 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905698 $205.84 000001075456-3562500061
2022 12 FD52 00 E121 D 1209901D 059 6/9/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR061M1062215905698 $56.76 000001075456-3562500061
2022 12 FD52 00 E121 D 1209901D 059 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905698 $14.19 000001075456-3562500061
2022 12 FD52 00 E122 D 1209901D 059 6/9/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR061M1062215905698 $691.82 000001075456-3562500061
2022 12 FD52 00 E122 D 1209901D 059 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905698 $172.84 000001075456-3562500061
2022 12 FD52 00 E123 D 1209901D 059 6/9/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR061M1062215905698 $197.17 000001075456-3562500061
2022 12 FD52 00 E123 D 1209901D 059 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905698 $48.71 000001075456-3562500061
2022 12 FD52 06 E111 D 1209901D 059 6/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061M1062215905698 $1,204.77 000001075668-3562506200
2022 12 FD52 06 E111 D 1209901D 059 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905698 $210.94 000001075668-3562506200
2022 12 FD52 06 E121 D 1209901D 059 6/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061M1062215905698 $88.78 000001075668-3562506200
2022 12 FD52 06 E121 D 1209901D 059 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905698 $15.00 000001075668-3562506200
2022 12 FD52 06 E122 D 1209901D 059 6/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061M1062215905698 $1,011.60 000001075668-3562506200
2022 12 FD52 06 E122 D 1209901D 059 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905698 $177.13 000001075668-3562506200
2022 12 FD52 06 E123 D 1209901D 059 6/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061M1062215905698 $156.97 000001075668-3562506200
2022 12 FD52 06 E123 D 1209901D 059 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905698 $38.20 000001075668-3562506200
2022 11 FD52 06 E123 D 1209901D 059 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004652 $17.31 000001076737-3562506200
2022 11 FD52 06 E124 D 1209901D 059 5/23/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR052M1062214004652 $0.50 000001076737-3562506200
2022 11 FD52 06 E111 D 1209901D 059 5/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052M1062214004648 $590.72 000001075668-3562508320
2022 11 FD52 06 E111 D 1209901D 059 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004648 $6.77 000001075668-3562508320
2022 11 FD52 06 E121 D 1209901D 059 5/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052M1062214004648 $43.67 000001075668-3562506200
2022 11 FD52 06 E121 D 1209901D 059 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004648 $0.49 000001075668-3562508320
2022 11 FD52 06 E122 D 1209901D 059 5/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052M1062214004648 $496.01 000001075668-3562508320
2022 11 FD52 06 E122 D 1209901D 059 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004648 $5.68 000001075668-3562508320
2022 11 FD52 06 E123 D 1209901D 059 5/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052M1062214004648 $92.37 000001075668-3562506200
2022 11 FD52 06 E123 D 1209901D 059 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004648 $1.75 000001075668-3562508320
2022 11 FD52 06 E124 D 1209901D 059 5/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052M1062214004648 $0.20 000001075668-3562508320
2022 11 FD52 06 E124 D 1209901D 059 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004652 $0.04 000001076737-3562506200
2022 11 FD52 00 E111 D 1209901D 059 5/23/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR052M1062214004648 $250.30 000001075787-3562500061
2022 11 FD52 00 E111 D 1209901D 059 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004648 $14.01 000001075787-3562500061
2022 11 FD52 00 E111 D 1209901D 059 5/23/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR052M1062214004647 $172.66 000001075456-3562500061
2022 11 FD52 00 E121 D 1209901D 059 5/23/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR052M1062214004648 $18.63 000001075787-3562500061
2022 11 FD52 00 E111 D 1209901D 059 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004647 $8.48 000001075456-3562500061
2022 11 FD52 00 E121 D 1209901D 059 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004648 $1.05 000001075787-3562500061
2022 11 FD52 00 E121 D 1209901D 059 5/23/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR052M1062214004647 $12.25 000001075456-3562500061
2022 11 FD52 00 E122 D 1209901D 059 5/23/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR052M1062214004648 $210.14 000001075787-3562500061
2022 11 FD52 00 E121 D 1209901D 059 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004647 $0.60 000001075456-3562500061
2022 11 FD52 00 E122 D 1209901D 059 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004648 $11.76 000001075787-3562500061
2022 11 FD52 00 E122 D 1209901D 059 5/23/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR052M1062214004647 $145.20 000001075456-3562500061
2022 11 FD52 00 E123 D 1209901D 059 5/23/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR052M1062214004648 $35.38 000001075787-3562500061
2022 11 FD52 00 E122 D 1209901D 059 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004647 $7.13 000001075456-3562500061
2022 11 FD52 00 E123 D 1209901D 059 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004648 $1.95 000001075787-3562500061
2022 11 FD52 00 E123 D 1209901D 059 5/23/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR052M1062214004647 $41.33 000001075456-3562500061
2022 11 FD52 00 E124 D 1209901D 059 5/23/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR052M1062214004648 $0.10 000001075787-3562500061
2022 11 FD52 00 E123 D 1209901D 059 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004647 $2.00 000001075456-3562500061
2022 11 FD52 00 E124 D 1209901D 059 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004648 $0.01 000001075787-3562500061
2022 11 FD52 00 E124 D 1209901D 059 5/23/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR052M1062214004647 $0.09 000001075456-3562500061
2022 11 FD52 06 E111 D 1209901D 059 5/23/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR052M1062214004651 $1,427.80 000001076737-3562506200
2022 11 FD52 06 E111 D 1209901D 059 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004651 $112.21 000001076737-3562506200
2022 11 FD52 06 E121 D 1209901D 059 5/23/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR052M1062214004651 $104.88 000001076737-3562506200
2022 11 FD52 06 E121 D 1209901D 059 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004651 $8.19 000001076737-3562506200
2022 11 FD52 06 E122 D 1209901D 059 5/23/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR052M1062214004651 $1,198.93 000001076737-3562506200
2022 11 FD52 06 E122 D 1209901D 059 5/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004651 $94.22 000001076737-3562506200
2022 11 FD52 06 E123 D 1209901D 059 5/23/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR052M1062214004651 $205.10 000001076737-3562506200
2022 11 FD52 06 E111 D 1209901D 059 5/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051M1062212603634 $417.10 000001075668-3562506200
2022 11 FD52 06 E111 D 1209901D 059 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603634 $46.14 000001075668-3562506200
2022 11 FD52 06 E121 D 1209901D 059 5/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051M1062212603634 $31.06 000001075668-3562506200
2022 11 FD52 06 E121 D 1209901D 059 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603634 $3.44 000001075668-3562506200
2022 11 FD52 06 E122 D 1209901D 059 5/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051M1062212603634 $350.09 000001075668-3562506200
2022 11 FD52 06 E122 D 1209901D 059 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603634 $38.74 000001075668-3562506200
2022 11 FD52 06 E123 D 1209901D 059 5/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051M1062212603634 $46.93 000001075668-3562506200
2022 11 FD52 06 E123 D 1209901D 059 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603634 $5.13 000001075668-3562506200
2022 11 FD52 06 E111 D 1209901D 059 5/9/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR051M1062212603637 $505.44 000001076737-3562506200
2022 11 FD52 06 E111 D 1209901D 059 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603637 $159.72 000001076737-3562506200
2022 11 FD52 06 E121 D 1209901D 059 5/9/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR051M1062212603637 $36.91 000001076737-3562506200
2022 11 FD52 06 E121 D 1209901D 059 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603637 $11.67 000001076737-3562506200
2022 11 FD52 06 E122 D 1209901D 059 5/9/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR051M1062212603637 $424.42 000001076737-3562506200
2022 11 FD52 06 E122 D 1209901D 059 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603637 $134.11 000001076737-3562506200
2022 11 FD52 06 E123 D 1209901D 059 5/9/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR051M1062212603637 $79.32 000001076737-3562506200
2022 11 FD52 06 E123 D 1209901D 059 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603637 $24.65 000001076737-3562506200
2022 11 FD52 00 E111 D 1209901D 059 5/9/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR051M1062212603634 $633.90 000001075787-3562500061
2022 11 FD52 00 E111 D 1209901D 059 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603634 $132.80 000001075787-3562500061
2022 11 FD52 00 E121 D 1209901D 059 5/9/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR051M1062212603634 $47.21 000001075787-3562500061
2022 11 FD52 00 E121 D 1209901D 059 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603634 $9.88 000001075787-3562500061
2022 11 FD52 00 E122 D 1209901D 059 5/9/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR051M1062212603634 $532.34 000001075787-3562500061
2022 11 FD52 00 E122 D 1209901D 059 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603634 $111.51 000001075787-3562500061
2022 11 FD52 00 E123 D 1209901D 059 5/9/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR051M1062212603634 $89.83 000001075787-3562500061
2022 11 FD52 00 E123 D 1209901D 059 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603634 $18.49 000001075787-3562500061
2022 10 FD52 06 E123 D 1209901D 059 4/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042M1062211202511 $21.55 000001075668-3562506200
2022 10 FD52 06 E123 D 1209901D 059 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202511 $8.19 000001075668-3562506200
2022 10 FD52 06 E124 D 1209901D 059 4/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042M1062211202511 $0.06 000001075668-3562506200
2022 10 FD52 06 E124 D 1209901D 059 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202511 $0.02 000001075668-3562506200
2022 10 FD52 06 E111 D 1209901D 059 4/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042M1062211202511 $88.60 000001075668-3562506200
2022 10 FD52 00 E111 D 1209901D 059 4/25/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR042M1062211202511 $909.84 000001075787-3562500061
2022 10 FD52 00 E111 D 1209901D 059 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202511 $91.00 000001075787-3562500061
2022 10 FD52 00 E121 D 1209901D 059 4/25/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR042M1062211202511 $67.76 000001075787-3562500061
2022 10 FD52 00 E121 D 1209901D 059 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202511 $6.78 000001075787-3562500061
2022 10 FD52 00 E122 D 1209901D 059 4/25/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR042M1062211202511 $764.13 000001075787-3562500061
2022 10 FD52 00 E122 D 1209901D 059 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202511 $76.42 000001075787-3562500061
2022 10 FD52 00 E123 D 1209901D 059 4/25/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR042M1062211202511 $128.74 000001075787-3562500061
2022 10 FD52 06 E111 D 1209901D 059 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202511 $34.37 000001075668-3562506200
2022 10 FD52 00 E123 D 1209901D 059 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202511 $12.66 000001075787-3562500061
2022 10 FD52 00 E124 D 1209901D 059 4/25/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR042M1062211202511 $0.36 000001075787-3562500061
2022 10 FD52 00 E124 D 1209901D 059 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202511 $0.04 000001075787-3562500061
2022 10 FD52 06 E121 D 1209901D 059 4/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042M1062211202511 $6.19 000001075668-3562506200
2022 10 FD52 06 E121 D 1209901D 059 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202511 $2.40 000001075668-3562506200
2022 10 FD52 06 E122 D 1209901D 059 4/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042M1062211202511 $74.39 000001075668-3562506200
2022 10 FD52 06 E122 D 1209901D 059 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202511 $28.86 000001075668-3562506200
2022 10 FD52 00 E229 D 1209901D 059 4/13/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF IET-XE13A162522100018510 $68.78
2022 10 FD52 00 E111 D 1209901D 059 4/13/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041M1062209801455 $227.61 000001076308-3562500636
2022 10 FD52 00 E111 D 1209901D 059 4/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801455 $20.64 000001076308-3562500636
2022 10 FD52 00 E121 D 1209901D 059 4/11/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041M1062209801456 $16.14 000001076308-3562500636
2022 10 FD52 06 E111 D 1209901D 059 4/11/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041M1062209801454 $2,407.60 000001075668-3562506208
2022 10 FD52 06 E111 D 1209901D 059 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801454 $99.41 000001075668-3562506200
2022 10 FD52 06 E121 D 1209901D 059 4/11/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041M1062209801454 $176.10 000001075668-3562506200
2022 10 FD52 00 E121 D 1209901D 059 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801456 $1.47 000001076308-3562500636
2022 10 FD52 06 E121 D 1209901D 059 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801454 $6.96 000001075668-3562506204
2022 10 FD52 06 E122 D 1209901D 059 4/11/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041M1062209801454 $2,021.86 000001075668-3562506204
2022 10 FD52 06 E122 D 1209901D 059 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801454 $83.47 000001075668-3562506200
2022 10 FD52 06 E123 D 1209901D 059 4/11/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041M1062209801454 $354.74 000001075668-3562506204
2022 10 FD52 06 E123 D 1209901D 059 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801454 $23.54 000001075668-3562506200
2022 10 FD52 00 E122 D 1209901D 059 4/11/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041M1062209801456 $191.13 000001076308-3562500636
2022 10 FD52 00 E122 D 1209901D 059 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801456 $17.33 000001076308-3562500636
2022 10 FD52 00 E123 D 1209901D 059 4/11/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041M1062209801456 $51.50 000001076308-3562500636
2022 10 FD52 00 E123 D 1209901D 059 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801456 $4.63 000001076308-3562500636
2022 10 FD52 06 E111 D 1209901D 059 4/11/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR041M1062209801457 $678.63 000001076737-3562506200
2022 10 FD52 06 E121 D 1209901D 059 4/11/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR041M1062209801457 $49.67 000001076737-3562506200
2022 10 FD52 06 E122 D 1209901D 059 4/11/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR041M1062209801457 $569.85 000001076737-3562506200
2022 10 FD52 06 E123 D 1209901D 059 4/11/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR041M1062209801457 $110.54 000001076737-3562506200
2022 10 FD52 06 E143 D 1209901D 059 4/4/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200178179 PON22100001623 STANTEC CONSULTING SERVICES INC $115,428.59 Preliminary Engineering and Environmental Services
2022 9 FD52 06 E111 D 1209901D 059 3/28/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032M1062208200370 $379.02 000001075668-3562506200
2022 9 FD52 06 E121 D 1209901D 059 3/28/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032M1062208200370 $28.24 000001075668-3562506200
2022 9 FD52 06 E122 D 1209901D 059 3/28/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032M1062208200370 $318.26 000001075668-3562506200
2022 9 FD52 06 E123 D 1209901D 059 3/28/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032M1062208200370 $42.61 000001075668-3562506200
2022 9 FD52 06 E124 D 1209901D 059 3/28/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032M1062208200370 $0.09 000001075668-3562506200
2022 9 FD52 00 E111 D 1209901D 059 3/28/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR032M1062208200370 $455.00 000001075787-3562500061
2022 9 FD52 00 E121 D 1209901D 059 3/28/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR032M1062208200370 $33.88 000001075787-3562500061
2022 9 FD52 00 E122 D 1209901D 059 3/28/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR032M1062208200370 $382.07 000001075787-3562500061
2022 9 FD52 00 E123 D 1209901D 059 3/28/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR032M1062208200370 $64.28 000001075787-3562500061
2022 9 FD52 00 E124 D 1209901D 059 3/28/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR032M1062208200370 $0.18 000001075787-3562500061
2022 9 FD52 06 E111 D 1209901D 059 3/24/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR032M1062208200373 $229.75 000001076737-3562506200
2022 9 FD52 06 E111 D 1209901D 059 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200373 $131.11 000001076737-3562506200
2022 9 FD52 06 E121 D 1209901D 059 3/24/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR032M1062208200373 $16.78 000001076737-3562506200
2022 9 FD52 00 E111 D 1209901D 059 3/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032M1062208200371 $82.76 000001076308-3562500636
2022 9 FD52 06 E121 D 1209901D 059 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200373 $9.57 000001076737-3562506200
2022 9 FD52 00 E111 D 1209901D 059 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200371 $12.25 000001076308-3562500636
2022 9 FD52 06 E122 D 1209901D 059 3/24/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR032M1062208200373 $192.93 000001076737-3562506200
2022 9 FD52 00 E121 D 1209901D 059 3/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032M1062208200371 $5.87 000001076308-3562500636
2022 9 FD52 06 E122 D 1209901D 059 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200373 $110.10 000001076737-3562506200
2022 9 FD52 00 E121 D 1209901D 059 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200371 $0.87 000001076308-3562500636
2022 9 FD52 06 E123 D 1209901D 059 3/24/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR032M1062208200373 $36.19 000001076737-3562506200
2022 9 FD52 00 E122 D 1209901D 059 3/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032M1062208200371 $69.50 000001076308-3562500636
2022 9 FD52 06 E123 D 1209901D 059 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200373 $20.23 000001076737-3562506200
2022 9 FD52 00 E122 D 1209901D 059 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200371 $10.28 000001076308-3562500636
2022 9 FD52 06 E124 D 1209901D 059 3/24/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR032M1062208200373 $0.09 000001076737-3562506200
2022 9 FD52 00 E123 D 1209901D 059 3/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032M1062208200371 $18.74 000001076308-3562500636
2022 9 FD52 06 E124 D 1209901D 059 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200373 $0.05 000001076737-3562506200
2022 9 FD52 00 E123 D 1209901D 059 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200371 $2.74 000001076308-3562500636
2022 9 FD52 00 E124 D 1209901D 059 3/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032M1062208200371 $0.03 000001076308-3562500636
2022 9 FD52 00 E111 D 1209901D 059 3/10/2022 1640 BRIDGE-REVIEW OF PLANS CA-XR031M1062206709443 $402.56 000001076290-3562500610
2022 9 FD52 00 E111 D 1209901D 059 3/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709443 $10.73 000001076290-3562500610
2022 9 FD52 00 E121 D 1209901D 059 3/10/2022 1640 BRIDGE-REVIEW OF PLANS CA-XR031M1062206709443 $30.56 000001076290-3562500610
2022 9 FD52 00 E121 D 1209901D 059 3/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709443 $0.81 000001076290-3562500610
2022 9 FD52 00 E122 D 1209901D 059 3/10/2022 1640 BRIDGE-REVIEW OF PLANS CA-XR031M1062206709443 $338.02 000001076290-3562500610
2022 9 FD52 00 E122 D 1209901D 059 3/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709443 $9.01 000001076290-3562500610
2022 9 FD52 00 E123 D 1209901D 059 3/10/2022 1640 BRIDGE-REVIEW OF PLANS CA-XR031M1062206709443 $39.29 000001076290-3562500610
2022 9 FD52 00 E123 D 1209901D 059 3/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709443 $1.03 000001076290-3562500610
2022 9 FD52 06 E111 D 1209901D 059 3/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031M1062206709441 $1,088.90 000001075668-3562506200
2022 9 FD52 06 E111 D 1209901D 059 3/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709441 $59.12 000001075668-3562506200
2022 9 FD52 06 E121 D 1209901D 059 3/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031M1062206709441 $80.37 000001075668-3562506200
2022 9 FD52 06 E121 D 1209901D 059 3/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709441 $4.13 000001075668-3562506200
2022 9 FD52 06 E122 D 1209901D 059 3/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031M1062206709441 $914.35 000001075668-3562506200
2022 9 FD52 06 E122 D 1209901D 059 3/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709441 $49.64 000001075668-3562506200
2022 9 FD52 06 E123 D 1209901D 059 3/10/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031M1062206709441 $143.63 000001075668-3562506200
2022 9 FD52 06 E123 D 1209901D 059 3/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709441 $14.09 000001075668-3562506200
2022 9 FD52 06 E111 D 1209901D 059 3/9/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR031M1062206709444 $1,748.03 000001076737-3562506200
2022 9 FD52 06 E111 D 1209901D 059 3/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709444 $197.55 000001076737-3562506200
2022 9 FD52 06 E121 D 1209901D 059 3/9/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR031M1062206709444 $127.94 000001076737-3562506200
2022 9 FD52 06 E121 D 1209901D 059 3/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709444 $14.28 000001076737-3562506200
2022 9 FD52 06 E122 D 1209901D 059 3/9/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR031M1062206709444 $1,467.80 000001076737-3562506200
2022 9 FD52 06 E122 D 1209901D 059 3/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709444 $165.88 000001076737-3562506200
2022 9 FD52 06 E123 D 1209901D 059 3/9/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR031M1062206709444 $267.40 000001076737-3562506200
2022 9 FD52 06 E123 D 1209901D 059 3/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709444 $35.34 000001076737-3562506200
2022 9 FD52 00 E111 D 1209901D 059 3/7/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR022M1062205308395 $227.45 000001075787-3562500061
2022 9 FD52 00 E111 D 1209901D 059 3/7/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308395 $38.83 000001075787-3562500061
2022 9 FD52 00 E121 D 1209901D 059 3/7/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR022M1062205308395 $16.94 000001075787-3562500061
2022 9 FD52 00 E121 D 1209901D 059 3/7/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308395 $2.89 000001075787-3562500061
2022 9 FD52 00 E122 D 1209901D 059 3/7/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR022M1062205308395 $191.03 000001075787-3562500061
2022 9 FD52 00 E122 D 1209901D 059 3/7/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308395 $32.60 000001075787-3562500061
2022 9 FD52 00 E123 D 1209901D 059 3/7/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR022M1062205308395 $32.21 000001075787-3562500061
2022 9 FD52 00 E123 D 1209901D 059 3/7/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308395 $5.41 000001075787-3562500061
2022 9 FD52 00 E124 D 1209901D 059 3/7/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR022M1062205308395 $0.09 000001075787-3562500061
2022 9 FD52 00 E124 D 1209901D 059 3/7/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308395 $0.02 000001075787-3562500061
2022 8 FD52 06 E111 D 1209901D 059 2/25/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR022M1062205308399 $2,747.32 000001076737-3562506200
2022 8 FD52 06 E111 D 1209901D 059 2/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308399 $19.14 000001076737-3562506200
2022 8 FD52 06 E121 D 1209901D 059 2/25/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR022M1062205308399 $200.97 000001076737-3562506200
2022 8 FD52 06 E121 D 1209901D 059 2/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308399 $1.33 000001076737-3562506200
2022 8 FD52 06 E122 D 1209901D 059 2/25/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR022M1062205308399 $2,306.95 000001076737-3562506200
2022 8 FD52 06 E122 D 1209901D 059 2/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308399 $16.07 000001076737-3562506200
2022 8 FD52 06 E123 D 1209901D 059 2/25/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR022M1062205308399 $418.91 000001076737-3562506200
2022 8 FD52 06 E123 D 1209901D 059 2/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308399 $4.56 000001076737-3562506200
2022 8 FD52 06 E124 D 1209901D 059 2/25/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR022M1062205308399 $1.05 000001076737-3562506200
2022 8 FD52 06 E124 D 1209901D 059 2/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308399 $0.01 000001076737-3562506200
2022 8 FD52 00 E121 D 1209901D 059 2/23/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR022M1062205308394 $50.64 000001075456-3562500061
2022 8 FD52 00 E121 D 1209901D 059 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308394 $2.92 000001075456-3562500061
2022 8 FD52 00 E122 D 1209901D 059 2/23/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR022M1062205308394 $598.98 000001075456-3562500061
2022 8 FD52 00 E122 D 1209901D 059 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308394 $34.50 000001075456-3562500061
2022 8 FD52 00 E123 D 1209901D 059 2/23/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR022M1062205308394 $170.41 000001075456-3562500061
2022 8 FD52 00 E123 D 1209901D 059 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308394 $9.72 000001075456-3562500061
2022 8 FD52 00 E124 D 1209901D 059 2/23/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR022M1062205308394 $0.30 000001075456-3562500061
2022 8 FD52 00 E124 D 1209901D 059 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308394 $0.02 000001075456-3562500061
2022 8 FD52 00 E111 D 1209901D 059 2/23/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR022M1062205308394 $713.33 000001075456-3562500061
2022 8 FD52 00 E111 D 1209901D 059 2/23/2022 1640 BRIDGE-REVIEW OF PLANS CA-XR022M1062205308396 $636.77 000001076290-3562500610
2022 8 FD52 00 E111 D 1209901D 059 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308396 $3.95 000001076290-3562500610
2022 8 FD52 00 E121 D 1209901D 059 2/23/2022 1640 BRIDGE-REVIEW OF PLANS CA-XR022M1062205308396 $48.36 000001076290-3562500610
2022 8 FD52 00 E121 D 1209901D 059 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308396 $0.30 000001076290-3562500610
2022 8 FD52 00 E122 D 1209901D 059 2/23/2022 1640 BRIDGE-REVIEW OF PLANS CA-XR022M1062205308396 $534.68 000001076290-3562500610
2022 8 FD52 00 E122 D 1209901D 059 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308396 $3.32 000001076290-3562500610
2022 8 FD52 00 E123 D 1209901D 059 2/23/2022 1640 BRIDGE-REVIEW OF PLANS CA-XR022M1062205308396 $62.14 000001076290-3562500610
2022 8 FD52 00 E111 D 1209901D 059 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308394 $41.09 000001075456-3562500061
2022 8 FD52 00 E123 D 1209901D 059 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308396 $0.38 000001076290-3562500610
2022 8 FD52 00 E124 D 1209901D 059 2/23/2022 1640 BRIDGE-REVIEW OF PLANS CA-XR022M1062205308396 $0.19 000001076290-3562500610
2022 8 FD52 06 E111 D 1209901D 059 2/14/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR021M1062203907421 $459.49 000001076737-3562506200
2022 8 FD52 06 E111 D 1209901D 059 2/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907421 $45.95 000001076737-3562506200
2022 8 FD52 06 E121 D 1209901D 059 2/14/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR021M1062203907421 $33.56 000001076737-3562506200
2022 8 FD52 06 E121 D 1209901D 059 2/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907421 $3.36 000001076737-3562506200
2022 8 FD52 06 E122 D 1209901D 059 2/14/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR021M1062203907421 $385.84 000001076737-3562506200
2022 8 FD52 06 E122 D 1209901D 059 2/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907421 $38.58 000001076737-3562506200
2022 8 FD52 06 E123 D 1209901D 059 2/14/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR021M1062203907421 $71.91 000001076737-3562506200
2022 8 FD52 06 E123 D 1209901D 059 2/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907421 $7.09 000001076737-3562506200
2022 8 FD52 00 E111 D 1209901D 059 2/9/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR021M1062203907416 $570.60 000001075456-3562500061
2022 8 FD52 00 E111 D 1209901D 059 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907416 $74.18 000001075456-3562500061
2022 8 FD52 00 E111 D 1209901D 059 2/9/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR021M1062203907417 $227.49 000001075787-3562500061
2022 8 FD52 00 E121 D 1209901D 059 2/9/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR021M1062203907416 $40.51 000001075456-3562500061
2022 8 FD52 00 E111 D 1209901D 059 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907417 $50.36 000001075787-3562500061
2022 8 FD52 00 E121 D 1209901D 059 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907416 $5.27 000001075456-3562500061
2022 8 FD52 00 E121 D 1209901D 059 2/9/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR021M1062203907417 $16.94 000001075787-3562500061
2022 8 FD52 00 E122 D 1209901D 059 2/9/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR021M1062203907416 $479.18 000001075456-3562500061
2022 8 FD52 00 E121 D 1209901D 059 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907417 $3.76 000001075787-3562500061
2022 8 FD52 00 E122 D 1209901D 059 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907416 $62.28 000001075456-3562500061
2022 8 FD52 00 E122 D 1209901D 059 2/9/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR021M1062203907417 $191.03 000001075787-3562500061
2022 8 FD52 00 E123 D 1209901D 059 2/9/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR021M1062203907416 $136.42 000001075456-3562500061
2022 8 FD52 00 E122 D 1209901D 059 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907417 $42.28 000001075787-3562500061
2022 8 FD52 00 E123 D 1209901D 059 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907416 $17.55 000001075456-3562500061
2022 8 FD52 00 E123 D 1209901D 059 2/9/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR021M1062203907417 $32.24 000001075787-3562500061
2022 8 FD52 00 E123 D 1209901D 059 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907417 $7.02 000001075787-3562500061
2022 7 FD52 00 E121 D 1209901D 059 1/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106426 $2.14 000001075456-3562500061
2022 7 FD52 00 E122 D 1209901D 059 1/27/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR012M1062202106426 $197.41 000001075456-3562500061
2022 7 FD52 00 E122 D 1209901D 059 1/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106426 $25.30 000001075456-3562500061
2022 7 FD52 00 E123 D 1209901D 059 1/27/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR012M1062202106426 $56.17 000001075456-3562500061
2022 7 FD52 00 E123 D 1209901D 059 1/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106426 $7.13 000001075456-3562500061
2022 7 FD52 00 E124 D 1209901D 059 1/27/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR012M1062202106426 $0.12 000001075456-3562500061
2022 7 FD52 00 E124 D 1209901D 059 1/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106426 $0.01 000001075456-3562500061
2022 7 FD52 00 E124 D 1209901D 059 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106431 $0.01 000001076831-3562500061
2022 7 FD52 06 E111 D 1209901D 059 1/24/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR012M1062202106430 $252.72 000001076737-3562506200
2022 7 FD52 06 E121 D 1209901D 059 1/24/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR012M1062202106430 $18.46 000001076737-3562506200
2022 7 FD52 06 E122 D 1209901D 059 1/24/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR012M1062202106430 $212.21 000001076737-3562506200
2022 7 FD52 06 E123 D 1209901D 059 1/24/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR012M1062202106430 $39.50 000001076737-3562506200
2022 7 FD52 06 E124 D 1209901D 059 1/24/2022 1220 ENV IMPACT STATEMENT-GENERAL CA-XR012M1062202106430 $0.10 000001076737-3562506200
2022 7 FD52 00 E111 D 1209901D 059 1/24/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR012M1062202106427 $250.25 000001075787-3562500061
2022 7 FD52 00 E111 D 1209901D 059 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106427 $24.69 000001075787-3562500061
2022 7 FD52 00 E121 D 1209901D 059 1/24/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR012M1062202106427 $18.63 000001075787-3562500061
2022 7 FD52 00 E121 D 1209901D 059 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106427 $1.84 000001075787-3562500061
2022 7 FD52 00 E122 D 1209901D 059 1/24/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR012M1062202106427 $210.16 000001075787-3562500061
2022 7 FD52 00 E122 D 1209901D 059 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106427 $20.73 000001075787-3562500061
2022 7 FD52 00 E123 D 1209901D 059 1/24/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR012M1062202106427 $35.39 000001075787-3562500061
2022 7 FD52 00 E123 D 1209901D 059 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106427 $3.44 000001075787-3562500061
2022 7 FD52 00 E124 D 1209901D 059 1/24/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR012M1062202106427 $0.11 000001075787-3562500061
2022 7 FD52 00 E124 D 1209901D 059 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106427 $0.01 000001075787-3562500061
2022 7 FD52 00 E111 D 1209901D 059 1/24/2022 0060 ENV STUDIES-ARCHAEOLOGY CA-XR012M1062202106430 $277.10 000001076831-3562500061
2022 7 FD52 00 E111 D 1209901D 059 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106430 $19.96 000001076831-3562500061
2022 7 FD52 00 E121 D 1209901D 059 1/24/2022 0060 ENV STUDIES-ARCHAEOLOGY CA-XR012M1062202106430 $20.88 000001076831-3562500061
2022 7 FD52 00 E121 D 1209901D 059 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106430 $1.50 000001076831-3562500061
2022 7 FD52 00 E122 D 1209901D 059 1/24/2022 0060 ENV STUDIES-ARCHAEOLOGY CA-XR012M1062202106430 $232.44 000001076831-3562500061
2022 7 FD52 00 E122 D 1209901D 059 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106430 $16.76 000001076831-3562500061
2022 7 FD52 00 E111 D 1209901D 059 1/24/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR012M1062202106425 $235.36 000001075456-3562500061
2022 7 FD52 00 E123 D 1209901D 059 1/24/2022 0060 ENV STUDIES-ARCHAEOLOGY CA-XR012M1062202106430 $39.49 000001076831-3562500061
2022 7 FD52 00 E111 D 1209901D 059 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106425 $30.13 000001075456-3562500061
2022 7 FD52 00 E123 D 1209901D 059 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106430 $2.81 000001076831-3562500061
2022 7 FD52 00 E121 D 1209901D 059 1/24/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR012M1062202106425 $16.71 000001075456-3562500061
2022 7 FD52 00 E124 D 1209901D 059 1/24/2022 0060 ENV STUDIES-ARCHAEOLOGY CA-XR012M1062202106430 $0.11 000001076831-3562500061
2022 7 FD52 06 E111 D 1209901D 059 1/6/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122L1062135504466 $458.56 000001075668-3562506200
2022 7 FD52 06 E111 D 1209901D 059 1/6/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504466 $43.75 000001075668-3562506200
2022 7 FD52 06 E121 D 1209901D 059 1/6/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122L1062135504466 $34.47 000001075668-3562506200
2022 7 FD52 06 E121 D 1209901D 059 1/6/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504466 $3.16 000001075668-3562506200
2022 7 FD52 06 E122 D 1209901D 059 1/6/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122L1062135504466 $385.21 000001075668-3562506200
2022 7 FD52 06 E122 D 1209901D 059 1/6/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504466 $36.74 000001075668-3562506200
2022 7 FD52 06 E123 D 1209901D 059 1/6/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122L1062135504466 $60.54 000001075668-3562506200
2022 7 FD52 06 E123 D 1209901D 059 1/6/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504466 $9.30 000001075668-3562506200
2022 7 FD52 06 E124 D 1209901D 059 1/6/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122L1062135504466 $0.14 000001075668-3562506200
2022 7 FD52 06 E124 D 1209901D 059 1/6/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504466 $0.03 000001075668-3562506200
2022 6 FD52 00 E111 D 1209901D 059 12/22/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR122L1062135504467 $455.00 000001075787-3562500061
2022 6 FD52 00 E121 D 1209901D 059 12/22/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR122L1062135504467 $33.86 000001075787-3562500061
2022 6 FD52 00 E122 D 1209901D 059 12/22/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR122L1062135504467 $382.07 000001075787-3562500061
2022 6 FD52 00 E123 D 1209901D 059 12/22/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR122L1062135504467 $62.73 000001075787-3562500061
2022 6 FD52 00 E124 D 1209901D 059 12/22/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR122L1062135504467 $0.18 000001075787-3562500061
2022 6 FD52 06 E143 D 1209901D 059 12/17/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200102681 PON22100001623 STANTEC CONSULTING SERVICES INC $24,286.19 Preliminary Engineering and Environmental Services
2022 6 FD52 00 E111 D 1209901D 059 12/8/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR121L1062134103538 $682.51 000001075787-3562500061
2022 6 FD52 00 E111 D 1209901D 059 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103538 $568.76 000001075787-3562500061
2022 6 FD52 00 E121 D 1209901D 059 12/8/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR121L1062134103538 $50.09 000001075787-3562500061
2022 6 FD52 00 E121 D 1209901D 059 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103538 $41.74 000001075787-3562500061
2022 6 FD52 00 E122 D 1209901D 059 12/8/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR121L1062134103538 $573.10 000001075787-3562500061
2022 6 FD52 00 E122 D 1209901D 059 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103538 $477.58 000001075787-3562500061
2022 6 FD52 00 E123 D 1209901D 059 12/8/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR121L1062134103538 $95.26 000001075787-3562500061
2022 6 FD52 00 E123 D 1209901D 059 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103538 $77.25 000001075787-3562500061
2022 5 FD52 00 E111 D 1209901D 059 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602498 $31.85 000001075787-3562500061
2022 5 FD52 00 E121 D 1209901D 059 11/23/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR112L1062132602498 $23.70 000001075787-3562500061
2022 5 FD52 00 E121 D 1209901D 059 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602498 $2.37 000001075787-3562500061
2022 5 FD52 00 E122 D 1209901D 059 11/23/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR112L1062132602498 $267.45 000001075787-3562500061
2022 5 FD52 00 E122 D 1209901D 059 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602498 $26.74 000001075787-3562500061
2022 5 FD52 00 E123 D 1209901D 059 11/23/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR112L1062132602498 $43.97 000001075787-3562500061
2022 5 FD52 00 E123 D 1209901D 059 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602498 $4.33 000001075787-3562500061
2022 5 FD52 00 E124 D 1209901D 059 11/23/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR112L1062132602498 $0.13 000001075787-3562500061
2022 5 FD52 00 E124 D 1209901D 059 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602498 $0.01 000001075787-3562500061
2022 5 FD52 00 E111 D 1209901D 059 11/23/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR112L1062132602497 $318.50 000001075787-3562500061
2022 5 FD52 00 E111 D 1209901D 059 11/12/2021 0010 ENV STUDIES-UST/HZM CA-XR111L1062130901532 $382.30 000001080238-3562500061
2022 5 FD52 00 E121 D 1209901D 059 11/12/2021 0010 ENV STUDIES-UST/HZM CA-XR111L1062130901532 $26.98 000001080238-3562500061
2022 5 FD52 00 E122 D 1209901D 059 11/12/2021 0010 ENV STUDIES-UST/HZM CA-XR111L1062130901532 $321.02 000001080238-3562500061
2022 5 FD52 00 E123 D 1209901D 059 11/12/2021 0010 ENV STUDIES-UST/HZM CA-XR111L1062130901532 $71.34 000001080238-3562500061
2022 5 FD52 00 E111 D 1209901D 059 11/12/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR111L1062130901498 $467.14 000001075787-3562500061
2022 5 FD52 00 E111 D 1209901D 059 11/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901498 $116.79 000001075787-3562500061
2022 5 FD52 00 E121 D 1209901D 059 11/12/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR111L1062130901498 $34.29 000001075787-3562500061
2022 5 FD52 00 E121 D 1209901D 059 11/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901498 $8.57 000001075787-3562500061
2022 5 FD52 00 E122 D 1209901D 059 11/12/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR111L1062130901498 $392.25 000001075787-3562500061
2022 5 FD52 00 E122 D 1209901D 059 11/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901498 $98.07 000001075787-3562500061
2022 5 FD52 00 E123 D 1209901D 059 11/12/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR111L1062130901498 $64.61 000001075787-3562500061
2022 5 FD52 00 E123 D 1209901D 059 11/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901498 $15.86 000001075787-3562500061
2022 5 FD52 06 E111 D 1209901D 059 11/8/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR111L1062130901502 $252.72 000001076737-3562506200
2022 5 FD52 06 E111 D 1209901D 059 11/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901502 $168.48 000001076737-3562506200
2022 5 FD52 06 E121 D 1209901D 059 11/8/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR111L1062130901502 $18.31 000001076737-3562506200
2022 5 FD52 06 E121 D 1209901D 059 11/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901502 $12.20 000001076737-3562506200
2022 5 FD52 06 E122 D 1209901D 059 11/8/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR111L1062130901502 $212.21 000001076737-3562506200
2022 5 FD52 06 E122 D 1209901D 059 11/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901502 $141.47 000001076737-3562506200
2022 5 FD52 06 E123 D 1209901D 059 11/8/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR111L1062130901502 $38.89 000001076737-3562506200
2022 5 FD52 06 E123 D 1209901D 059 11/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901502 $25.36 000001076737-3562506200
2022 4 FD52 06 E121 D 1209901D 059 10/29/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR102L1062129500395 $0.70 000001076737-3562506200
2022 4 FD52 06 E121 D 1209901D 059 10/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500395 $0.11 000001076737-3562506200
2022 4 FD52 06 E111 D 1209901D 059 10/29/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102L1062129500390 $229.75 000001075668-3562506200
2022 4 FD52 06 E111 D 1209901D 059 10/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500390 $22.97 000001075668-3562506200
2022 4 FD52 06 E121 D 1209901D 059 10/29/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102L1062129500390 $16.78 000001075668-3562506200
2022 4 FD52 06 E121 D 1209901D 059 10/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500390 $1.68 000001075668-3562506200
2022 4 FD52 06 E122 D 1209901D 059 10/29/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102L1062129500390 $192.92 000001075668-3562506200
2022 4 FD52 06 E122 D 1209901D 059 10/29/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500390 $19.29 000001075668-3562506200
2022 4 FD52 06 E123 D 1209901D 059 10/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102L1062129500391 $35.09 000001075668-3562506200
2022 4 FD52 06 E123 D 1209901D 059 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500391 $3.46 000001075668-3562506200
2022 4 FD52 06 E124 D 1209901D 059 10/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102L1062129500391 $0.09 000001075668-3562506200
2022 4 FD52 06 E124 D 1209901D 059 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500391 $0.01 000001075668-3562506200
2022 4 FD52 06 E111 D 1209901D 059 10/11/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101L1062128110110 $741.66 000001075668-3562506200
2022 4 FD52 06 E111 D 1209901D 059 10/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110110 $172.20 000001075668-3562506200
2022 4 FD52 06 E121 D 1209901D 059 10/11/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101L1062128110110 $54.73 000001075668-3562506200
2022 4 FD52 06 E121 D 1209901D 059 10/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110110 $12.39 000001075668-3562506200
2022 4 FD52 06 E122 D 1209901D 059 10/11/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101L1062128110110 $622.80 000001075668-3562506200
2022 4 FD52 06 E122 D 1209901D 059 10/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110110 $144.59 000001075668-3562506200
2022 4 FD52 06 E123 D 1209901D 059 10/11/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101L1062128110110 $108.38 000001075668-3562506200
2022 4 FD52 06 E123 D 1209901D 059 10/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110110 $29.30 000001075668-3562506200
2022 3 FD52 00 E111 D 1209901D 059 9/27/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR092L1062126709022 $682.50 000001075787-3562500061
2022 3 FD52 00 E111 D 1209901D 059 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709022 $68.25 000001075787-3562500061
2022 3 FD52 00 E121 D 1209901D 059 9/27/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR092L1062126709022 $50.80 000001075787-3562500061
2022 3 FD52 00 E121 D 1209901D 059 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709022 $5.08 000001075787-3562500061
2022 3 FD52 00 E122 D 1209901D 059 9/27/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR092L1062126709022 $573.08 000001075787-3562500061
2022 3 FD52 00 E122 D 1209901D 059 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709022 $57.31 000001075787-3562500061
2022 3 FD52 00 E123 D 1209901D 059 9/27/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR092L1062126709022 $94.25 000001075787-3562500061
2022 3 FD52 00 E123 D 1209901D 059 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709022 $9.27 000001075787-3562500061
2022 3 FD52 00 E124 D 1209901D 059 9/27/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR092L1062126709022 $0.27 000001075787-3562500061
2022 3 FD52 00 E124 D 1209901D 059 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709022 $0.03 000001075787-3562500061
2022 3 FD52 06 E143 D 1209901D 059 9/23/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200051404 PON22100001623 STANTEC CONSULTING SERVICES INC $21,567.70 Preliminary Engineering and Environmental Services
2022 2 FD52 00 E111 D 1209901D 059 8/27/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR082L1062123606959 $250.25 000001075787-3562500061
2022 2 FD52 00 E121 D 1209901D 059 8/27/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR082L1062123606959 $18.62 000001075787-3562500061
2022 2 FD52 00 E122 D 1209901D 059 8/27/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR082L1062123606959 $210.14 000001075787-3562500061
2022 2 FD52 00 E123 D 1209901D 059 8/27/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR082L1062123606959 $34.50 000001075787-3562500061
2022 2 FD52 00 E124 D 1209901D 059 8/27/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR082L1062123606959 $0.10 000001075787-3562500061
2022 2 FD52 06 E143 D 1209901D 059 8/12/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200018467 PON22100001623 STANTEC CONSULTING SERVICES INC $132,459.05 Preliminary Engineering and Environmental Services
2022 2 FD52 06 E143 D 1209901D 059 8/12/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200018467 PON22100001623 STANTEC CONSULTING SERVICES INC $1,050.00 Preliminary Engineering and Environmental Services
2022 2 FD52 00 E121 D 1209901D 059 8/9/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR081L1062121805815 $16.70 000001075787-3562500061
2022 2 FD52 00 E122 D 1209901D 059 8/9/2021 1640 BRIDGE-REVIEW OF PLANS CA-XR081L1062121805817 $276.56 000001076290-3562500610
2022 2 FD52 00 E122 D 1209901D 059 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805817 $10.33 000001076290-3562500610
2022 2 FD52 00 E123 D 1209901D 059 8/9/2021 1640 BRIDGE-REVIEW OF PLANS CA-XR081L1062121805817 $31.38 000001076290-3562500610
2022 2 FD52 00 E123 D 1209901D 059 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805817 $1.15 000001076290-3562500610
2022 2 FD52 00 E122 D 1209901D 059 8/9/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR081L1062121805815 $191.03 000001075787-3562500061
2022 2 FD52 00 E111 D 1209901D 059 8/9/2021 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR081L1062121805814 $171.15 000001075456-3562500061
2022 2 FD52 00 E123 D 1209901D 059 8/9/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR081L1062121805815 $31.36 000001075787-3562500061
2022 2 FD52 00 E111 D 1209901D 059 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805814 $42.80 000001075456-3562500061
2022 2 FD52 00 E121 D 1209901D 059 8/9/2021 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR081L1062121805814 $11.77 000001075456-3562500061
2022 2 FD52 00 E121 D 1209901D 059 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805814 $2.94 000001075456-3562500061
2022 2 FD52 00 E122 D 1209901D 059 8/9/2021 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR081L1062121805814 $143.76 000001075456-3562500061
2022 2 FD52 00 E122 D 1209901D 059 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805814 $35.94 000001075456-3562500061
2022 2 FD52 00 E123 D 1209901D 059 8/9/2021 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR081L1062121805814 $42.85 000001075456-3562500061
2022 2 FD52 00 E123 D 1209901D 059 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805814 $10.60 000001075456-3562500061
2022 2 FD52 00 E111 D 1209901D 059 8/9/2021 1640 BRIDGE-REVIEW OF PLANS CA-XR081L1062121805817 $329.36 000001076290-3562500610
2022 2 FD52 00 E111 D 1209901D 059 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805817 $12.30 000001076290-3562500610
2022 2 FD52 00 E121 D 1209901D 059 8/9/2021 1640 BRIDGE-REVIEW OF PLANS CA-XR081L1062121805817 $24.92 000001076290-3562500610
2022 2 FD52 00 E121 D 1209901D 059 8/9/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805817 $0.93 000001076290-3562500610
2022 2 FD52 00 E111 D 1209901D 059 8/9/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR081L1062121805814 $227.50 000001075787-3562500061
2022 1 FD52 06 E124 D 1209901D 059 7/26/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR072L1062120404689 $0.08 000001076737-3562506200
2022 1 FD52 00 E111 D 1209901D 059 7/26/2021 0060 ENV STUDIES-ARCHAEOLOGY CA-XR072L1062120404690 $0.72 000001076831-3562500061
2022 1 FD52 06 E111 D 1209901D 059 7/26/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR072L1062120404689 $153.42 000001076737-3562506200
2022 1 FD52 00 E111 D 1209901D 059 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404690 $0.14 000001076831-3562500061
2022 1 FD52 00 E121 D 1209901D 059 7/26/2021 0060 ENV STUDIES-ARCHAEOLOGY CA-XR072L1062120404690 $0.05 000001076831-3562500061
2022 1 FD52 00 E121 D 1209901D 059 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404690 $0.01 000001076831-3562500061
2022 1 FD52 00 E122 D 1209901D 059 7/26/2021 0060 ENV STUDIES-ARCHAEOLOGY CA-XR072L1062120404690 $0.60 000001076831-3562500061
2022 1 FD52 00 E122 D 1209901D 059 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404690 $0.11 000001076831-3562500061
2022 1 FD52 06 E111 D 1209901D 059 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404689 $15.34 000001076737-3562506200
2022 1 FD52 06 E121 D 1209901D 059 7/26/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR072L1062120404689 $10.57 000001076737-3562506200
2022 1 FD52 06 E121 D 1209901D 059 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404689 $1.02 000001076737-3562506200
2022 1 FD52 06 E122 D 1209901D 059 7/26/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR072L1062120404689 $128.83 000001076737-3562506200
2022 1 FD52 06 E122 D 1209901D 059 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404689 $12.89 000001076737-3562506200
2022 1 FD52 06 E123 D 1209901D 059 7/26/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR072L1062120404689 $27.09 000001076737-3562506200
2022 1 FD52 06 E123 D 1209901D 059 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404689 $2.66 000001076737-3562506200
2022 1 FD52 00 E111 D 1209901D 059 7/14/2021 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR071L1062119003548 $285.40 000001075456-3562500061
2022 1 FD52 00 E111 D 1209901D 059 7/14/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003548 $58.21 000001075456-3562500061
2022 1 FD52 00 E121 D 1209901D 059 7/14/2021 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR071L1062119003548 $19.61 000001075456-3562500061
2022 1 FD52 00 E121 D 1209901D 059 7/14/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003548 $4.00 000001075456-3562500061
2022 1 FD52 00 E122 D 1209901D 059 7/14/2021 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR071L1062119003548 $241.15 000001075456-3562500061
2022 1 FD52 00 E122 D 1209901D 059 7/14/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003548 $49.15 000001075456-3562500061
2022 1 FD52 00 E123 D 1209901D 059 7/14/2021 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR071L1062119003548 $71.46 000001075456-3562500061
2022 1 FD52 00 E123 D 1209901D 059 7/14/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003548 $14.41 000001075456-3562500061
2022 1 FD52 06 E111 D 1209901D 059 7/14/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071L1062119003548 $248.30 000001075668-3562506204
2022 1 FD52 06 E121 D 1209901D 059 7/14/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071L1062119003548 $18.95 000001075668-3562506204
2022 1 FD52 06 E122 D 1209901D 059 7/14/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071L1062119003548 $209.64 000001075668-3562506204
2022 1 FD52 06 E123 D 1209901D 059 7/14/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071L1062119003548 $40.34 000001075668-3562506204
2022 1 FD52 00 E111 D 1209901D 059 7/12/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR071L1062119003549 $1,986.85 000001075787-3562500061
2022 1 FD52 00 E111 D 1209901D 059 7/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003549 $49.44 000001075787-3562500061
2022 1 FD52 00 E121 D 1209901D 059 7/12/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR071L1062119003549 $145.84 000001075787-3562500061
2022 1 FD52 00 E121 D 1209901D 059 7/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003549 $3.63 000001075787-3562500061
2022 1 FD52 00 E122 D 1209901D 059 7/12/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR071L1062119003549 $1,677.49 000001075787-3562500061
2022 1 FD52 00 E122 D 1209901D 059 7/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003549 $41.74 000001075787-3562500061
2022 1 FD52 00 E123 D 1209901D 059 7/12/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR071L1062119003549 $274.03 000001075787-3562500061
2022 1 FD52 00 E123 D 1209901D 059 7/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003549 $6.72 000001075787-3562500061
2022 1 FD52 06 E111 D 1209901D 059 7/12/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR071L1062119003554 $649.76 000001076737-3562506200
2022 1 FD52 06 E111 D 1209901D 059 7/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003554 $367.96 000001076737-3562506200
2022 1 FD52 06 E121 D 1209901D 059 7/12/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR071L1062119003554 $48.07 000001076737-3562506200
2022 1 FD52 06 E121 D 1209901D 059 7/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003554 $27.65 000001076737-3562506200
2022 1 FD52 06 E122 D 1209901D 059 7/12/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR071L1062119003554 $548.58 000001076737-3562506200
2022 1 FD52 06 E122 D 1209901D 059 7/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003554 $310.66 000001076737-3562506200
2022 1 FD52 06 E123 D 1209901D 059 7/12/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR071L1062119003554 $94.54 000001076737-3562506200
2022 1 FD52 06 E123 D 1209901D 059 7/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003554 $44.72 000001076737-3562506200
2022 1 FD52 06 E123 D 1209901D 059 7/1/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061L1062116001466P $73.08 000001075668-3562506200
2022 1 FD52 06 E123 D 1209901D 059 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061L1062116001466P $7.20 000001075668-3562506200
2022 1 FD52 06 E111 D 1209901D 059 7/1/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR062L1062117302477 $1,148.78 000001076737-3562506200
2022 1 FD52 06 E111 D 1209901D 059 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302477 $176.75 000001076737-3562506200
2022 1 FD52 06 E121 D 1209901D 059 7/1/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR062L1062117302477 $77.97 000001076737-3562506200
2022 1 FD52 06 E121 D 1209901D 059 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302477 $11.99 000001076737-3562506200
2022 1 FD52 06 E122 D 1209901D 059 7/1/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR062L1062117302477 $969.88 000001076737-3562506200
2022 1 FD52 06 E122 D 1209901D 059 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302477 $149.23 000001076737-3562506200
2022 1 FD52 06 E123 D 1209901D 059 7/1/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR062L1062117302477 $175.58 000001076737-3562506200
2022 1 FD52 06 E123 D 1209901D 059 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302477 $26.60 000001076737-3562506200
2022 1 FD52 06 E124 D 1209901D 059 7/1/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR062L1062117302477 $0.45 000001076737-3562506200
2022 1 FD52 06 E124 D 1209901D 059 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302477 $0.07 000001076737-3562506200
2022 1 FD52 00 E111 D 1209901D 059 7/1/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR062L1062117302469 $1,076.84 000001075787-3562500061
2022 1 FD52 00 E111 D 1209901D 059 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302469 $26.69 000001075787-3562500061
2022 1 FD52 00 E121 D 1209901D 059 7/1/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR062L1062117302469 $80.14 000001075787-3562500061
2022 1 FD52 00 E121 D 1209901D 059 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302469 $1.99 000001075787-3562500061
2022 1 FD52 00 E122 D 1209901D 059 7/1/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR062L1062117302469 $909.18 000001075787-3562500061
2022 1 FD52 00 E122 D 1209901D 059 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302469 $22.53 000001075787-3562500061
2022 1 FD52 00 E123 D 1209901D 059 7/1/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR062L1062117302469 $148.52 000001075787-3562500061
2022 1 FD52 00 E123 D 1209901D 059 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302469 $3.63 000001075787-3562500061
2022 1 FD52 00 E124 D 1209901D 059 7/1/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR062L1062117302469 $0.43 000001075787-3562500061
2022 1 FD52 00 E124 D 1209901D 059 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302469 $0.01 000001075787-3562500061
2021 12 FD52 06 E111 D 1209901D 059 6/14/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061L1062116001466 $511.90 000001075668-3562506200
2021 12 FD52 06 E111 D 1209901D 059 6/14/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061L1062116001466 $51.19 000001075668-3562506200
2021 12 FD52 06 E121 D 1209901D 059 6/14/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061L1062116001466 $38.09 000001075668-3562506200
2021 12 FD52 06 E121 D 1209901D 059 6/14/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061L1062116001466 $3.81 000001075668-3562506200
2021 12 FD52 06 E122 D 1209901D 059 6/14/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061L1062116001466 $432.21 000001075668-3562506200
2021 12 FD52 06 E122 D 1209901D 059 6/14/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061L1062116001466 $43.22 000001075668-3562506200
2021 11 FD52 00 E111 D 1209901D 059 5/24/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR052L1062114100390 $250.32 000001075787-3562500061
2021 11 FD52 00 E111 D 1209901D 059 5/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052L1062114100390 $27.70 000001075787-3562500061
2021 11 FD52 00 E121 D 1209901D 059 5/24/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR052L1062114100390 $18.62 000001075787-3562500061
2021 11 FD52 00 E121 D 1209901D 059 5/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052L1062114100390 $2.06 000001075787-3562500061
2021 11 FD52 00 E122 D 1209901D 059 5/24/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR052L1062114100390 $211.28 000001075787-3562500061
2021 11 FD52 00 E122 D 1209901D 059 5/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052L1062114100390 $23.39 000001075787-3562500061
2021 11 FD52 00 E123 D 1209901D 059 5/24/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR052L1062114100390 $34.56 000001075787-3562500061
2021 11 FD52 00 E123 D 1209901D 059 5/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052L1062114100390 $3.76 000001075787-3562500061
2021 11 FD52 00 E124 D 1209901D 059 5/24/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR052L1062114100390 $0.10 000001075787-3562500061
2021 11 FD52 00 E124 D 1209901D 059 5/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052L1062114100390 $0.01 000001075787-3562500061
2021 11 FD52 06 E143 D 1209901D 059 5/19/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100191632 PON22100001623 STANTEC CONSULTING SERVICES INC $118,152.18 Preliminary Engineering and Environmental Services
2021 11 FD52 06 E143 D 1209901D 059 5/19/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100191632 PON22100001623 STANTEC CONSULTING SERVICES INC $17,875.00 Preliminary Engineering and Environmental Services
2021 11 FD52 06 E111 D 1209901D 059 5/13/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051L1062112709737 $993.21 000001075668-3562506204
2021 11 FD52 06 E121 D 1209901D 059 5/13/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051L1062112709737 $75.80 000001075668-3562506204
2021 11 FD52 06 E122 D 1209901D 059 5/13/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051L1062112709737 $838.57 000001075668-3562506204
2021 11 FD52 06 E123 D 1209901D 059 5/13/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051L1062112709737 $161.38 000001075668-3562506204
2021 11 FD52 00 E111 D 1209901D 059 5/13/2021 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR051L1062112709736 $499.36 000001075456-3562500061
2021 11 FD52 00 E111 D 1209901D 059 5/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709736 $12.27 000001075456-3562500061
2021 11 FD52 00 E121 D 1209901D 059 5/13/2021 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR051L1062112709736 $34.32 000001075456-3562500061
2021 11 FD52 00 E121 D 1209901D 059 5/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709736 $0.84 000001075456-3562500061
2021 11 FD52 00 E122 D 1209901D 059 5/13/2021 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR051L1062112709736 $421.58 000001075456-3562500061
2021 11 FD52 00 E122 D 1209901D 059 5/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709736 $10.36 000001075456-3562500061
2021 11 FD52 00 E123 D 1209901D 059 5/13/2021 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR051L1062112709736 $124.73 000001075456-3562500061
2021 11 FD52 00 E123 D 1209901D 059 5/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709736 $3.04 000001075456-3562500061
2021 11 FD52 00 E121 D 1209901D 059 5/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709738 $6.49 000001075787-3562500061
2021 11 FD52 00 E122 D 1209901D 059 5/10/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR051L1062112709738 $486.60 000001075787-3562500061
2021 11 FD52 00 E122 D 1209901D 059 5/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709738 $74.79 000001075787-3562500061
2021 11 FD52 00 E123 D 1209901D 059 5/10/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR051L1062112709738 $79.64 000001075787-3562500061
2021 11 FD52 00 E123 D 1209901D 059 5/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709738 $12.03 000001075787-3562500061
2021 11 FD52 00 E111 D 1209901D 059 5/10/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR051L1062112709738 $576.40 000001075787-3562500061
2021 11 FD52 06 E111 D 1209901D 059 5/10/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR051L1062112709744 $2,311.30 000001076737-3562506200
2021 11 FD52 06 E111 D 1209901D 059 5/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709744 $116.34 000001076737-3562506200
2021 11 FD52 06 E121 D 1209901D 059 5/10/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR051L1062112709744 $165.63 000001076737-3562506200
2021 11 FD52 06 E121 D 1209901D 059 5/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709744 $7.93 000001076737-3562506200
2021 11 FD52 06 E122 D 1209901D 059 5/10/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR051L1062112709744 $1,951.55 000001076737-3562506200
2021 11 FD52 06 E122 D 1209901D 059 5/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709744 $98.23 000001076737-3562506200
2021 11 FD52 06 E123 D 1209901D 059 5/10/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR051L1062112709744 $315.26 000001076737-3562506200
2021 11 FD52 00 E111 D 1209901D 059 5/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709738 $88.57 000001075787-3562500061
2021 11 FD52 06 E123 D 1209901D 059 5/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051L1062112709744 $20.35 000001076737-3562506200
2021 11 FD52 00 E121 D 1209901D 059 5/10/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR051L1062112709738 $42.31 000001075787-3562500061
2021 10 FD52 00 E122 D 1209901D 059 4/26/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR042L1062111308658 $518.31 000001075787-3562500061
2021 10 FD52 00 E122 D 1209901D 059 4/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308658 $110.15 000001075787-3562500061
2021 10 FD52 00 E123 D 1209901D 059 4/26/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR042L1062111308658 $98.67 000001075787-3562500061
2021 10 FD52 00 E123 D 1209901D 059 4/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308658 $27.14 000001075787-3562500061
2021 10 FD52 00 E124 D 1209901D 059 4/26/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR042L1062111308658 $0.25 000001075787-3562500061
2021 10 FD52 00 E124 D 1209901D 059 4/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308658 $0.06 000001075787-3562500061
2021 10 FD52 00 E111 D 1209901D 059 4/26/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR042L1062111308657 $613.86 000001075787-3562500061
2021 10 FD52 00 E111 D 1209901D 059 4/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308657 $130.45 000001075787-3562500061
2021 10 FD52 00 E121 D 1209901D 059 4/26/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR042L1062111308657 $44.73 000001075787-3562500061
2021 10 FD52 00 E121 D 1209901D 059 4/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042L1062111308657 $9.04 000001075787-3562500061
2021 10 FD52 06 E111 D 1209901D 059 4/14/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041L1062109907635 $469.01 000001075668-3562506200
2021 10 FD52 06 E111 D 1209901D 059 4/14/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041L1062109907635 $49.96 000001075668-3562506200
2021 10 FD52 06 E121 D 1209901D 059 4/14/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041L1062109907635 $34.92 000001075668-3562506200
2021 10 FD52 06 E121 D 1209901D 059 4/14/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041L1062109907635 $3.73 000001075668-3562506200
2021 10 FD52 06 E122 D 1209901D 059 4/14/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041L1062109907635 $396.18 000001075668-3562506200
2021 10 FD52 06 E122 D 1209901D 059 4/14/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041L1062109907635 $42.18 000001075668-3562506200
2021 10 FD52 06 E123 D 1209901D 059 4/14/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR041L1062109907635 $66.95 000001075668-3562506200
2021 10 FD52 06 E123 D 1209901D 059 4/14/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041L1062109907635 $6.79 000001075668-3562506200
2021 10 FD52 00 E122 D 1209901D 059 4/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041L1062109907637 $42.90 000001075787-3562500061
2021 10 FD52 00 E123 D 1209901D 059 4/12/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR041L1062109907637 $130.95 000001075787-3562500061
2021 10 FD52 00 E123 D 1209901D 059 4/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041L1062109907637 $9.43 000001075787-3562500061
2021 10 FD52 00 E111 D 1209901D 059 4/12/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR041L1062109907636 $824.14 000001075787-3562500061
2021 10 FD52 00 E111 D 1209901D 059 4/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041L1062109907636 $50.82 000001075787-3562500061
2021 10 FD52 00 E121 D 1209901D 059 4/12/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR041L1062109907636 $59.16 000001075787-3562500061
2021 10 FD52 00 E121 D 1209901D 059 4/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041L1062109907636 $3.52 000001075787-3562500061
2021 10 FD52 00 E122 D 1209901D 059 4/12/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR041L1062109907636 $695.90 000001075787-3562500061
2021 9 FD52 06 E143 D 1209901D 059 3/29/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100159137 PON22100001623 STANTEC CONSULTING SERVICES INC $101,426.31 Preliminary Engineering and Environmental Services
2021 9 FD52 06 E143 D 1209901D 059 3/29/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100159137 PON22100001623 STANTEC CONSULTING SERVICES INC $3,500.00 Preliminary Engineering and Environmental Services
2021 9 FD52 00 E111 D 1209901D 059 3/24/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR032L1062108206564 $561.23 000001075787-3562500061
2021 9 FD52 00 E111 D 1209901D 059 3/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032L1062108206564 $168.05 000001075787-3562500061
2021 9 FD52 00 E121 D 1209901D 059 3/24/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR032L1062108206564 $41.77 000001075787-3562500061
2021 9 FD52 00 E121 D 1209901D 059 3/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032L1062108206564 $12.51 000001075787-3562500061
2021 9 FD52 00 E122 D 1209901D 059 3/24/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR032L1062108206564 $473.80 000001075787-3562500061
2021 9 FD52 00 E122 D 1209901D 059 3/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032L1062108206564 $141.89 000001075787-3562500061
2021 9 FD52 00 E123 D 1209901D 059 3/24/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR032L1062108206564 $77.71 000001075787-3562500061
2021 9 FD52 00 E123 D 1209901D 059 3/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032L1062108206564 $22.83 000001075787-3562500061
2021 9 FD52 00 E124 D 1209901D 059 3/24/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR032L1062108206564 $0.22 000001075787-3562500061
2021 9 FD52 00 E124 D 1209901D 059 3/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032L1062108206564 $0.07 000001075787-3562500061
2021 9 FD52 06 E111 D 1209901D 059 3/24/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032L1062108206563 $511.89 000001075668-3562506200
2021 9 FD52 06 E111 D 1209901D 059 3/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032L1062108206563 $16.30 000001075668-3562506200
2021 9 FD52 06 E121 D 1209901D 059 3/24/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032L1062108206563 $38.28 000001075668-3562506200
2021 9 FD52 06 E121 D 1209901D 059 3/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032L1062108206563 $1.17 000001075668-3562506200
2021 9 FD52 06 E122 D 1209901D 059 3/24/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032L1062108206563 $431.93 000001075668-3562506200
2021 9 FD52 06 E122 D 1209901D 059 3/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032L1062108206563 $13.77 000001075668-3562506200
2021 9 FD52 06 E123 D 1209901D 059 3/24/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032L1062108206563 $72.99 000001075668-3562506200
2021 9 FD52 06 E123 D 1209901D 059 3/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032L1062108206563 $3.79 000001075668-3562506200
2021 9 FD52 06 E124 D 1209901D 059 3/24/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032L1062108206563 $0.20 000001075668-3562506200
2021 9 FD52 06 E124 D 1209901D 059 3/24/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032L1062108206563 $0.01 000001075668-3562506200
2021 9 FD52 00 E123 D 1209901D 059 3/15/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031L1062106805527 $24.94 000001075787-3562500061
2021 9 FD52 00 E229 D 1209901D 059 3/11/2021 0070 ENV STUDIES-HIST/CULTURAL IET-XE13A162521069004650 $69.54
2021 9 FD52 06 E111 D 1209901D 059 3/10/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031L1062106805526 $625.71 000001075668-3562506200
2021 9 FD52 06 E111 D 1209901D 059 3/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031L1062106805526 $35.40 000001075668-3562506200
2021 9 FD52 06 E121 D 1209901D 059 3/10/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031L1062106805526 $46.56 000001075668-3562506200
2021 9 FD52 06 E121 D 1209901D 059 3/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031L1062106805526 $2.54 000001075668-3562506200
2021 9 FD52 06 E122 D 1209901D 059 3/10/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031L1062106805526 $528.24 000001075668-3562506200
2021 9 FD52 06 E122 D 1209901D 059 3/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031L1062106805526 $29.88 000001075668-3562506200
2021 9 FD52 06 E121 D 1209901D 059 3/10/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR031L1062106805533 $0.89 000001076737-3562506200
2021 9 FD52 06 E123 D 1209901D 059 3/10/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR031L1062106805526 $89.25 000001075668-3562506200
2021 9 FD52 06 E123 D 1209901D 059 3/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031L1062106805526 $6.93 000001075668-3562506200
2021 9 FD52 06 E121 D 1209901D 059 3/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031L1062106805533 $0.10 000001076737-3562506200
2021 9 FD52 00 E111 D 1209901D 059 3/10/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR031L1062106805526 $1,024.19 000001075787-3562500061
2021 9 FD52 00 E111 D 1209901D 059 3/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031L1062106805526 $139.26 000001075787-3562500061
2021 9 FD52 00 E121 D 1209901D 059 3/10/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR031L1062106805526 $72.01 000001075787-3562500061
2021 9 FD52 00 E121 D 1209901D 059 3/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031L1062106805526 $9.75 000001075787-3562500061
2021 9 FD52 00 E122 D 1209901D 059 3/10/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR031L1062106805526 $864.53 000001075787-3562500061
2021 9 FD52 00 E122 D 1209901D 059 3/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031L1062106805526 $117.59 000001075787-3562500061
2021 9 FD52 00 E123 D 1209901D 059 3/10/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR031L1062106805526 $181.99 000001075787-3562500061
2021 8 FD52 00 E111 D 1209901D 059 2/26/2021 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR022L1062105304415 $228.39 000001075456-3562500061
2021 8 FD52 00 E111 D 1209901D 059 2/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304415 $35.10 000001075456-3562500061
2021 8 FD52 00 E121 D 1209901D 059 2/26/2021 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR022L1062105304415 $16.05 000001075456-3562500061
2021 8 FD52 00 E121 D 1209901D 059 2/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304415 $2.48 000001075456-3562500061
2021 8 FD52 00 E122 D 1209901D 059 2/26/2021 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR022L1062105304415 $192.73 000001075456-3562500061
2021 8 FD52 00 E122 D 1209901D 059 2/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304415 $29.64 000001075456-3562500061
2021 8 FD52 00 E123 D 1209901D 059 2/26/2021 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR022L1062105304415 $57.08 000001075456-3562500061
2021 8 FD52 00 E123 D 1209901D 059 2/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304415 $8.69 000001075456-3562500061
2021 8 FD52 00 E124 D 1209901D 059 2/26/2021 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR022L1062105304415 $0.10 000001075456-3562500061
2021 8 FD52 00 E124 D 1209901D 059 2/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304415 $0.01 000001075456-3562500061
2021 8 FD52 06 E111 D 1209901D 059 2/26/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR022L1062105304427 $689.24 000001076737-3562506200
2021 8 FD52 06 E111 D 1209901D 059 2/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304427 $79.03 000001076737-3562506200
2021 8 FD52 06 E121 D 1209901D 059 2/26/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR022L1062105304427 $49.45 000001076737-3562506200
2021 8 FD52 06 E121 D 1209901D 059 2/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304427 $5.67 000001076737-3562506200
2021 8 FD52 06 E122 D 1209901D 059 2/26/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR022L1062105304427 $581.93 000001076737-3562506200
2021 8 FD52 06 E122 D 1209901D 059 2/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304427 $66.73 000001076737-3562506200
2021 8 FD52 06 E123 D 1209901D 059 2/26/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR022L1062105304427 $105.30 000001076737-3562506200
2021 8 FD52 06 E123 D 1209901D 059 2/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304427 $11.90 000001076737-3562506200
2021 8 FD52 06 E124 D 1209901D 059 2/26/2021 1220 ENV IMPACT STATEMENT-GENERAL CA-XR022L1062105304427 $0.27 000001076737-3562506200
2021 8 FD52 06 E124 D 1209901D 059 2/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304427 $0.03 000001076737-3562506200
2021 8 FD52 00 E121 D 1209901D 059 2/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304432 $1.37 000001076831-3562500061
2021 8 FD52 00 E111 D 1209901D 059 2/23/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR022L1062105304417 $803.83 000001075787-3562500061
2021 8 FD52 00 E111 D 1209901D 059 2/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304417 $123.76 000001075787-3562500061
2021 8 FD52 00 E121 D 1209901D 059 2/23/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR022L1062105304417 $59.83 000001075787-3562500061
2021 8 FD52 00 E121 D 1209901D 059 2/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304417 $9.21 000001075787-3562500061
2021 8 FD52 00 E122 D 1209901D 059 2/23/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR022L1062105304417 $678.68 000001075787-3562500061
2021 8 FD52 00 E122 D 1209901D 059 2/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304417 $104.49 000001075787-3562500061
2021 8 FD52 00 E123 D 1209901D 059 2/23/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR022L1062105304417 $111.08 000001075787-3562500061
2021 8 FD52 00 E122 D 1209901D 059 2/23/2021 0060 ENV STUDIES-ARCHAEOLOGY CA-XR022L1062105304432 $78.29 000001076831-3562500061
2021 8 FD52 00 E123 D 1209901D 059 2/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304417 $16.81 000001075787-3562500061
2021 8 FD52 00 E124 D 1209901D 059 2/23/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR022L1062105304417 $0.32 000001075787-3562500061
2021 8 FD52 00 E124 D 1209901D 059 2/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304417 $0.05 000001075787-3562500061
2021 8 FD52 00 E122 D 1209901D 059 2/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304432 $15.42 000001076831-3562500061
2021 8 FD52 00 E123 D 1209901D 059 2/23/2021 0060 ENV STUDIES-ARCHAEOLOGY CA-XR022L1062105304432 $15.23 000001076831-3562500061
2021 8 FD52 00 E123 D 1209901D 059 2/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304432 $2.95 000001076831-3562500061
2021 8 FD52 00 E124 D 1209901D 059 2/23/2021 0060 ENV STUDIES-ARCHAEOLOGY CA-XR022L1062105304432 $0.04 000001076831-3562500061
2021 8 FD52 00 E124 D 1209901D 059 2/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304432 $0.01 000001076831-3562500061
2021 8 FD52 00 E111 D 1209901D 059 2/23/2021 0060 ENV STUDIES-ARCHAEOLOGY CA-XR022L1062105304431 $92.65 000001076831-3562500061
2021 8 FD52 00 E111 D 1209901D 059 2/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022L1062105304431 $18.26 000001076831-3562500061
2021 8 FD52 00 E121 D 1209901D 059 2/23/2021 0060 ENV STUDIES-ARCHAEOLOGY CA-XR022L1062105304431 $6.97 000001076831-3562500061
2021 8 FD52 00 E123 D 1209901D 059 2/12/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR021L1062103603391 $34.65 000001075787-3562500061
2021 8 FD52 00 E123 D 1209901D 059 2/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021L1062103603391 $3.76 000001075787-3562500061
2021 8 FD52 00 E111 D 1209901D 059 2/8/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR021L1062103603390 $250.36 000001075787-3562500061
2021 8 FD52 00 E111 D 1209901D 059 2/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021L1062103603390 $27.70 000001075787-3562500061
2021 8 FD52 00 E121 D 1209901D 059 2/8/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR021L1062103603390 $18.37 000001075787-3562500061
2021 8 FD52 00 E121 D 1209901D 059 2/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021L1062103603390 $2.04 000001075787-3562500061
2021 8 FD52 00 E122 D 1209901D 059 2/8/2021 0070 ENV STUDIES-HIST/CULTURAL CA-XR021L1062103603390 $211.84 000001075787-3562500061
2021 8 FD52 00 E122 D 1209901D 059 2/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021L1062103603390 $23.39 000001075787-3562500061
2021 6 FD52 00 E111 D 1209901D 059 12/29/2020 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR122K1062035700405 $285.33 000001075456-3562500061
2021 6 FD52 00 E121 D 1209901D 059 12/29/2020 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR122K1062035700405 $20.11 000001075456-3562500061
2021 6 FD52 00 E122 D 1209901D 059 12/29/2020 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR122K1062035700405 $240.90 000001075456-3562500061
2021 6 FD52 00 E123 D 1209901D 059 12/29/2020 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR122K1062035700405 $69.20 000001075456-3562500061
2021 6 FD52 00 E124 D 1209901D 059 12/29/2020 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR122K1062035700405 $0.12 000001075456-3562500061
2021 6 FD52 06 E111 D 1209901D 059 12/29/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122K1062035700406 $1,535.71 000001075668-3562506200
2021 6 FD52 06 E111 D 1209901D 059 12/29/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700406 $42.95 000001075668-3562506200
2021 6 FD52 06 E121 D 1209901D 059 12/29/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122K1062035700406 $114.60 000001075668-3562506200
2021 6 FD52 06 E121 D 1209901D 059 12/29/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700406 $3.23 000001075668-3562506200
2021 6 FD52 06 E122 D 1209901D 059 12/29/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122K1062035700406 $1,296.59 000001075668-3562506200
2021 6 FD52 06 E122 D 1209901D 059 12/29/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700406 $36.26 000001075668-3562506200
2021 6 FD52 06 E123 D 1209901D 059 12/29/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122K1062035700406 $212.60 000001075668-3562506200
2021 6 FD52 06 E123 D 1209901D 059 12/29/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700406 $4.52 000001075668-3562506200
2021 6 FD52 06 E124 D 1209901D 059 12/29/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122K1062035700406 $0.54 000001075668-3562506200
2021 6 FD52 06 E124 D 1209901D 059 12/29/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700406 $0.01 000001075668-3562506200
2021 6 FD52 00 E111 D 1209901D 059 12/23/2020 0070 ENV STUDIES-HIST/CULTURAL CA-XR122K1062035700407 $454.88 000001075787-3562500061
2021 6 FD52 00 E111 D 1209901D 059 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700407 $62.79 000001075787-3562500061
2021 6 FD52 00 E121 D 1209901D 059 12/23/2020 0070 ENV STUDIES-HIST/CULTURAL CA-XR122K1062035700407 $33.59 000001075787-3562500061
2021 6 FD52 00 E121 D 1209901D 059 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700407 $4.63 000001075787-3562500061
2021 6 FD52 00 E122 D 1209901D 059 12/23/2020 0070 ENV STUDIES-HIST/CULTURAL CA-XR122K1062035700407 $384.16 000001075787-3562500061
2021 6 FD52 00 E122 D 1209901D 059 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700407 $53.02 000001075787-3562500061
2021 6 FD52 00 E123 D 1209901D 059 12/23/2020 0070 ENV STUDIES-HIST/CULTURAL CA-XR122K1062035700407 $61.05 000001075787-3562500061
2021 6 FD52 00 E123 D 1209901D 059 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700407 $8.28 000001075787-3562500061
2021 6 FD52 00 E124 D 1209901D 059 12/23/2020 0070 ENV STUDIES-HIST/CULTURAL CA-XR122K1062035700407 $0.18 000001075787-3562500061
2021 6 FD52 00 E124 D 1209901D 059 12/23/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122K1062035700407 $0.02 000001075787-3562500061
2021 6 FD52 00 E111 D 1209901D 059 12/14/2020 1640 BRIDGE-REVIEW OF PLANS CA-XR121K1062034309734 $1,207.52 000001076290-3562500610
2021 6 FD52 00 E111 D 1209901D 059 12/14/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309734 $325.41 000001076290-3562500610
2021 6 FD52 06 E111 D 1209901D 059 12/14/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121K1062034309724 $1,914.43 000001075668-3562506200
2021 6 FD52 00 E121 D 1209901D 059 12/14/2020 1640 BRIDGE-REVIEW OF PLANS CA-XR121K1062034309734 $91.01 000001076290-3562500610
2021 6 FD52 06 E111 D 1209901D 059 12/14/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309724 $543.04 000001075668-3562506200
2021 6 FD52 00 E121 D 1209901D 059 12/14/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309734 $24.51 000001076290-3562500610
2021 6 FD52 06 E121 D 1209901D 059 12/14/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121K1062034309724 $142.67 000001075668-3562506200
2021 6 FD52 00 E122 D 1209901D 059 12/14/2020 1640 BRIDGE-REVIEW OF PLANS CA-XR121K1062034309734 $1,019.29 000001076290-3562500610
2021 6 FD52 06 E121 D 1209901D 059 12/14/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309724 $40.31 000001075668-3562506200
2021 6 FD52 00 E122 D 1209901D 059 12/14/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309734 $274.74 000001076290-3562500610
2021 6 FD52 06 E122 D 1209901D 059 12/14/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121K1062034309724 $1,616.60 000001075668-3562506200
2021 6 FD52 00 E123 D 1209901D 059 12/14/2020 1640 BRIDGE-REVIEW OF PLANS CA-XR121K1062034309734 $125.21 000001076290-3562500610
2021 6 FD52 06 E122 D 1209901D 059 12/14/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309724 $458.49 000001075668-3562506200
2021 6 FD52 00 E123 D 1209901D 059 12/14/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309734 $33.18 000001076290-3562500610
2021 6 FD52 06 E123 D 1209901D 059 12/14/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121K1062034309724 $253.92 000001075668-3562506200
2021 6 FD52 06 E123 D 1209901D 059 12/14/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309724 $75.19 000001075668-3562506200
2021 6 FD52 00 E111 D 1209901D 059 12/9/2020 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR121K1062034309723 $285.33 000001075456-3562500061
2021 6 FD52 00 E111 D 1209901D 059 12/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309723 $63.34 000001075456-3562500061
2021 6 FD52 00 E121 D 1209901D 059 12/9/2020 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR121K1062034309723 $19.68 000001075456-3562500061
2021 6 FD52 00 E121 D 1209901D 059 12/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309723 $4.37 000001075456-3562500061
2021 6 FD52 00 E122 D 1209901D 059 12/9/2020 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR121K1062034309723 $240.91 000001075456-3562500061
2021 6 FD52 00 E111 D 1209901D 059 12/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121K1062034309735 $426.89 000001076308-3562500636
2021 6 FD52 00 E122 D 1209901D 059 12/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309723 $53.48 000001075456-3562500061
2021 6 FD52 00 E111 D 1209901D 059 12/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309735 $94.96 000001076308-3562500636
2021 6 FD52 00 E123 D 1209901D 059 12/9/2020 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR121K1062034309723 $69.33 000001075456-3562500061
2021 6 FD52 00 E121 D 1209901D 059 12/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121K1062034309735 $31.99 000001076308-3562500636
2021 6 FD52 00 E123 D 1209901D 059 12/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309723 $15.23 000001075456-3562500061
2021 6 FD52 00 E121 D 1209901D 059 12/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309735 $7.12 000001076308-3562500636
2021 6 FD52 00 E122 D 1209901D 059 12/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121K1062034309735 $360.34 000001076308-3562500636
2021 6 FD52 00 E122 D 1209901D 059 12/9/2020 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121K1062034309735 $80.18 000001076308-3562500636
2021 6 FD52 00 E123 D 1209901D 059 12/9/2020 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121K1062034309735 $43.18 000001076308-3562500636