The Commonwealth pays employees on a semi-monthly basis with a scheduled pay day on the 15th and 30th of each month. The two monthly pay periods are from the 1st to the 15th of the month and the 16th through the last day of the month. Pay check distribution is delayed by one pay period to allow for system processing. For example work performed during the 1st to the 15th day of the month is paid to the employee on the 30th of the month. Accordingly the cost accounting charges for labor costs posting in eMARS to operating accounts and highway projects are also delayed by approximately one pay period.
A good rule of measure is that the cost accounting charges for the pay period ending on the 15th of the month will post to eMARS by the 25th and those for the pay period ending on the last day of the month will post to eMARS by the 10th of the following month.

x close panel
Detailed Project Expenditure Report
Total E-MARS Expenditures for 1208201D = $850,974.35
Click here for Labor Costs Information
Year Month PBU Charge District Object Phase Program Code County Date ACT Activity Name Trans ID Reference # Vendor Name Expenditure Line Description
2024 10 FD52 00 E111 D 1208201D 054 4/26/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR042O1062411502740 $298.22 000001084147-3562500061
2024 10 FD52 00 E111 D 1208201D 054 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502740 $112.23 000001084147-3562500061
2024 10 FD52 00 E121 D 1208201D 054 4/26/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR042O1062411502740 $21.45 000001084147-3562500061
2024 10 FD52 00 E121 D 1208201D 054 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502740 $8.07 000001084147-3562500061
2024 10 FD52 00 E122 D 1208201D 054 4/26/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR042O1062411502740 $197.50 000001084147-3562500061
2024 10 FD52 00 E122 D 1208201D 054 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502740 $74.26 000001084147-3562500061
2024 10 FD52 00 E123 D 1208201D 054 4/26/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR042O1062411502740 $76.97 000001084147-3562500061
2024 10 FD52 00 E123 D 1208201D 054 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502740 $28.70 000001084147-3562500061
2024 10 FD52 00 E124 D 1208201D 054 4/26/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR042O1062411502740 $0.09 000001084147-3562500061
2024 10 FD52 00 E124 D 1208201D 054 4/26/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042O1062411502740 $0.03 000001084147-3562500061
2024 10 FD52 00 E111 D 1208201D 054 4/10/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR041O1062410001626 $164.16 000001084147-3562500061
2024 10 FD52 00 E111 D 1208201D 054 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001626 $12.26 000001084147-3562500061
2024 10 FD52 00 E121 D 1208201D 054 4/10/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR041O1062410001626 $11.62 000001084147-3562500061
2024 10 FD52 00 E121 D 1208201D 054 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001626 $0.87 000001084147-3562500061
2024 10 FD52 00 E122 D 1208201D 054 4/10/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR041O1062410001626 $108.60 000001084147-3562500061
2024 10 FD52 00 E122 D 1208201D 054 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001626 $8.12 000001084147-3562500061
2024 10 FD52 00 E123 D 1208201D 054 4/10/2024 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR041O1062410001626 $42.25 000001084147-3562500061
2024 10 FD52 00 E123 D 1208201D 054 4/10/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041O1062410001626 $3.13 000001084147-3562500061
2024 7 FD52 02 E797 D 1208201D 054 1/24/2024 3550 RAILROAD CONTRACTS PRC-2400146293 DO2200013895 CSX TRANSPORTATION INC $487.50
2024 7 FD52 00 E111 D 1208201D 054 1/24/2024 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR012O1062402306577 $572.76 000001080671-3562500630
2024 7 FD52 00 E111 D 1208201D 054 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306577 $137.95 000001080671-3562500630
2024 7 FD52 00 E121 D 1208201D 054 1/24/2024 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR012O1062402306577 $42.52 000001080671-3562500630
2024 7 FD52 00 E121 D 1208201D 054 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306577 $10.24 000001080671-3562500630
2024 7 FD52 00 E122 D 1208201D 054 1/24/2024 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR012O1062402306577 $379.02 000001080671-3562500630
2024 7 FD52 00 E122 D 1208201D 054 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306577 $91.28 000001080671-3562500630
2024 7 FD52 00 E123 D 1208201D 054 1/24/2024 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR012O1062402306577 $64.72 000001080671-3562500630
2024 7 FD52 00 E123 D 1208201D 054 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306577 $15.37 000001080671-3562500630
2024 7 FD52 00 E124 D 1208201D 054 1/24/2024 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR012O1062402306577 $0.15 000001080671-3562500630
2024 7 FD52 00 E124 D 1208201D 054 1/24/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012O1062402306577 $0.03 000001080671-3562500630
2024 7 FD52 02 E143 D 1208201D 054 1/11/2024 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400138012 PON22100003404 LESLIE M HANEY & ALBERT W GROSS PTR $27,185.60 Letter Agreement 5 Hopkins Co. 2-8305
2024 7 FD52 00 E111 D 1208201D 054 1/8/2024 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR011O1062400505714 $735.22 000001080671-3562500630
2024 7 FD52 00 E111 D 1208201D 054 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505714 $862.68 000001080671-3562500630
2024 7 FD52 00 E121 D 1208201D 054 1/8/2024 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR011O1062400505714 $53.89 000001080671-3562500630
2024 7 FD52 00 E121 D 1208201D 054 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505714 $63.25 000001080671-3562500630
2024 7 FD52 00 E122 D 1208201D 054 1/8/2024 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR011O1062400505714 $486.41 000001080671-3562500630
2024 7 FD52 00 E122 D 1208201D 054 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505714 $570.83 000001080671-3562500630
2024 7 FD52 00 E123 D 1208201D 054 1/8/2024 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR011O1062400505714 $83.95 000001080671-3562500630
2024 7 FD52 00 E123 D 1208201D 054 1/8/2024 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011O1062400505714 $96.10 000001080671-3562500630
2024 4 FD52 02 E143 D 1208201D 054 10/9/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2400069242 PON22100003404 LESLIE M HANEY & ALBERT W GROSS PTR $13,592.80 Letter Agreement 5 Hopkins Co. 2-8305
2024 4 FD52 00 E111 D 1208201D 054 10/9/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR101N1062328009694 $625.35 000001084147-3562500061
2024 4 FD52 00 E121 D 1208201D 054 10/9/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR101N1062328009694 $44.09 000001084147-3562500061
2024 4 FD52 00 E122 D 1208201D 054 10/9/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR101N1062328009694 $413.79 000001084147-3562500061
2024 4 FD52 00 E123 D 1208201D 054 10/9/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR101N1062328009694 $140.56 000001084147-3562500061
2024 4 FD52 00 E111 D 1208201D 054 10/2/2023 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR092N1062327208451 $867.18 000001088985-3562500061
2024 4 FD52 00 E111 D 1208201D 054 10/2/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208451 $242.25 000001088985-3562500061
2024 4 FD52 00 E121 D 1208201D 054 10/2/2023 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR092N1062327208451 $66.34 000001088985-3562500061
2024 4 FD52 00 E121 D 1208201D 054 10/2/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208451 $18.54 000001088985-3562500061
2024 4 FD52 00 E122 D 1208201D 054 10/2/2023 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR092N1062327208451 $573.88 000001088985-3562500061
2024 4 FD52 00 E122 D 1208201D 054 10/2/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208451 $160.30 000001088985-3562500061
2024 4 FD52 00 E123 D 1208201D 054 10/2/2023 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR092N1062327208451 $34.19 000001088985-3562500061
2024 4 FD52 00 E123 D 1208201D 054 10/2/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208451 $8.88 000001088985-3562500061
2024 4 FD52 00 E124 D 1208201D 054 10/2/2023 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR092N1062327208451 $0.36 000001088985-3562500061
2024 4 FD52 00 E124 D 1208201D 054 10/2/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092N1062327208451 $0.10 000001088985-3562500061
2024 3 FD52 00 E111 D 1208201D 054 9/19/2023 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR091N1062325106130 $2,186.27 000001088985-3562500061
2024 3 FD52 00 E121 D 1208201D 054 9/19/2023 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR091N1062325106130 $167.25 000001088985-3562500061
2024 3 FD52 00 E122 D 1208201D 054 9/19/2023 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR091N1062325106130 $1,446.66 000001088985-3562500061
2024 3 FD52 00 E123 D 1208201D 054 9/19/2023 0050 ENV STUDIES-TERRESTRIAL ECOL CA-XR091N1062325106130 $84.89 000001088985-3562500061
2024 3 FD52 00 E229 D 1208201D 054 9/13/2023 0050 ENV STUDIES-TERRESTRIAL ECOL IET-XE13A162523253011630 $163.08
2024 3 FD52 00 E361 D 1208201D 054 9/11/2023 0050 ENV STUDIES-TERRESTRIAL ECOL TP-2400008196 $82.00
2024 1 FD52 00 E122 D 1208201D 054 7/11/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR071N1062319101550 $398.40 000001084147-3562500061
2024 1 FD52 00 E122 D 1208201D 054 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101550 $15.14 000001084147-3562500061
2024 1 FD52 00 E123 D 1208201D 054 7/11/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR071N1062319101550 $127.81 000001084147-3562500061
2024 1 FD52 00 E123 D 1208201D 054 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101550 $4.82 000001084147-3562500061
2024 1 FD52 00 E111 D 1208201D 054 7/11/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR071N1062319101550 $510.73 000001084147-3562500061
2024 1 FD52 00 E111 D 1208201D 054 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101550 $19.41 000001084147-3562500061
2024 1 FD52 00 E121 D 1208201D 054 7/11/2023 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR071N1062319101550 $35.66 000001084147-3562500061
2024 1 FD52 00 E121 D 1208201D 054 7/11/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071N1062319101550 $1.36 000001084147-3562500061
2023 12 FD52 00 E111 D 1208201D 030 6/8/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061N1062315810177 $17.41 000001087780-3562500636
2023 12 FD52 00 E111 D 1208201D 030 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810177 $3.82 000001087780-3562500636
2023 12 FD52 00 E121 D 1208201D 030 6/8/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061N1062315810177 $1.31 000001087780-3562500636
2023 12 FD52 00 E121 D 1208201D 030 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810177 $0.27 000001087780-3562500636
2023 12 FD52 00 E122 D 1208201D 030 6/8/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061N1062315810177 $13.55 000001087780-3562500636
2023 12 FD52 00 E122 D 1208201D 030 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810177 $2.98 000001087780-3562500636
2023 12 FD52 00 E123 D 1208201D 030 6/8/2023 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061N1062315810177 $2.14 000001087780-3562500636
2023 12 FD52 00 E123 D 1208201D 030 6/8/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061N1062315810177 $0.46 000001087780-3562500636
2023 10 FD52 00 E121 D 1208201D 054 4/14/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR041N1062309605763 $33.05 000001080671-3562500630
2023 10 FD52 00 E121 D 1208201D 054 4/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605763 $1.16 000001080671-3562500630
2023 10 FD52 00 E122 D 1208201D 054 4/14/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR041N1062309605763 $351.24 000001080671-3562500630
2023 10 FD52 00 E122 D 1208201D 054 4/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605763 $12.30 000001080671-3562500630
2023 10 FD52 00 E123 D 1208201D 054 4/14/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR041N1062309605763 $51.34 000001080671-3562500630
2023 10 FD52 00 E123 D 1208201D 054 4/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605763 $1.78 000001080671-3562500630
2023 10 FD52 00 E111 D 1208201D 054 4/14/2023 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR041N1062309605763 $450.31 000001080671-3562500630
2023 10 FD52 00 E111 D 1208201D 054 4/14/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041N1062309605763 $15.76 000001080671-3562500630
2023 8 FD52 00 E111 D 1208201D 054 2/9/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR021N1062303901421 $78.78 000001082534-3562500636
2023 8 FD52 00 E111 D 1208201D 054 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901421 $44.50 000001082534-3562500636
2023 8 FD52 00 E121 D 1208201D 054 2/9/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR021N1062303901421 $5.47 000001082534-3562500636
2023 8 FD52 00 E121 D 1208201D 054 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901421 $3.08 000001082534-3562500636
2023 8 FD52 00 E122 D 1208201D 054 2/9/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR021N1062303901421 $61.69 000001082534-3562500636
2023 8 FD52 00 E122 D 1208201D 054 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901421 $34.71 000001082534-3562500636
2023 8 FD52 00 E123 D 1208201D 054 2/9/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR021N1062303901421 $15.70 000001082534-3562500636
2023 8 FD52 00 E123 D 1208201D 054 2/9/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021N1062303901421 $8.77 000001082534-3562500636
2023 7 FD52 02 E143 D 1208201D 054 1/26/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300124203 PON22100003404 LESLIE M HANEY & ALBERT W GROSS PTR $40,778.40 Letter Agreement 5 Hopkins Co. 2-8305
2023 7 FD52 02 E143 D 1208201D 054 1/13/2023 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300122368 PON22100001141 Integrated Engineering $24,524.00 Engineering and Related Services
2023 7 FD52 02 E797 D 1208201D 054 1/10/2023 3550 RAILROAD CONTRACTS PRC-2300117355 DO2200013895 CSX TRANSPORTATION INC $3,250.63
2023 7 FD52 00 E111 D 1208201D 054 1/3/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR122M1062235509167 $128.78 000001082534-3562500636
2023 7 FD52 00 E111 D 1208201D 054 1/3/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509167 $17.61 000001082534-3562500636
2023 7 FD52 00 E121 D 1208201D 054 1/3/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR122M1062235509167 $8.98 000001082534-3562500636
2023 7 FD52 00 E121 D 1208201D 054 1/3/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509167 $1.22 000001082534-3562500636
2023 7 FD52 00 E122 D 1208201D 054 1/3/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR122M1062235509167 $100.53 000001082534-3562500636
2023 7 FD52 00 E122 D 1208201D 054 1/3/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509167 $13.74 000001082534-3562500636
2023 7 FD52 00 E123 D 1208201D 054 1/3/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR122M1062235509167 $22.48 000001082534-3562500636
2023 7 FD52 00 E123 D 1208201D 054 1/3/2023 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122M1062235509167 $3.04 000001082534-3562500636
2023 7 FD52 00 E124 D 1208201D 054 1/3/2023 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR122M1062235509167 $0.04 000001082534-3562500636
2023 6 FD52 02 E143 D 1208201D 054 12/22/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300113029 PON22100003404 LESLIE M HANEY & ALBERT W GROSS PTR $163,113.60 Letter Agreement 5 Hopkins Co. 2-8305
2023 6 FD52 00 E111 D 1208201D 054 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208207 $239.07 000001080671-3562500630
2023 6 FD52 00 E122 D 1208201D 054 12/12/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR121M1062234208214 $251.31 000001082534-3562500636
2023 6 FD52 00 E121 D 1208201D 054 12/12/2022 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR121M1062234208207 $31.78 000001080671-3562500630
2023 6 FD52 00 E122 D 1208201D 054 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208214 $80.42 000001082534-3562500636
2023 6 FD52 00 E121 D 1208201D 054 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208207 $17.68 000001080671-3562500630
2023 6 FD52 00 E123 D 1208201D 054 12/12/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR121M1062234208214 $56.29 000001082534-3562500636
2023 6 FD52 00 E122 D 1208201D 054 12/12/2022 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR121M1062234208207 $335.28 000001080671-3562500630
2023 6 FD52 00 E123 D 1208201D 054 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208214 $17.81 000001082534-3562500636
2023 6 FD52 00 E122 D 1208201D 054 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208207 $186.48 000001080671-3562500630
2023 6 FD52 00 E123 D 1208201D 054 12/12/2022 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR121M1062234208207 $45.35 000001080671-3562500630
2023 6 FD52 00 E123 D 1208201D 054 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208207 $24.67 000001080671-3562500630
2023 6 FD52 00 E111 D 1208201D 054 12/12/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR121M1062234208214 $322.18 000001082534-3562500636
2023 6 FD52 00 E111 D 1208201D 054 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208214 $103.10 000001082534-3562500636
2023 6 FD52 00 E121 D 1208201D 054 12/12/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR121M1062234208214 $22.37 000001082534-3562500636
2023 6 FD52 00 E111 D 1208201D 054 12/12/2022 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR121M1062234208207 $429.76 000001080671-3562500630
2023 6 FD52 00 E121 D 1208201D 054 12/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121M1062234208214 $7.16 000001082534-3562500636
2023 5 FD52 00 E111 D 1208201D 054 11/29/2022 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR112M1062232607147 $245.67 000001080671-3562500630
2023 5 FD52 00 E111 D 1208201D 054 11/29/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607147 $112.99 000001080671-3562500630
2023 5 FD52 00 E121 D 1208201D 054 11/29/2022 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR112M1062232607147 $18.41 000001080671-3562500630
2023 5 FD52 00 E121 D 1208201D 054 11/29/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607147 $8.47 000001080671-3562500630
2023 5 FD52 00 E122 D 1208201D 054 11/29/2022 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR112M1062232607147 $191.89 000001080671-3562500630
2023 5 FD52 00 E122 D 1208201D 054 11/29/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607147 $88.14 000001080671-3562500630
2023 5 FD52 00 E123 D 1208201D 054 11/29/2022 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR112M1062232607147 $25.91 000001080671-3562500630
2023 5 FD52 00 E123 D 1208201D 054 11/29/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607147 $11.65 000001080671-3562500630
2023 5 FD52 00 E124 D 1208201D 054 11/29/2022 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR112M1062232607147 $0.10 000001080671-3562500630
2023 5 FD52 00 E124 D 1208201D 054 11/29/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607147 $0.03 000001080671-3562500630
2023 5 FD52 00 E111 D 1208201D 054 11/23/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR112M1062232607170 $510.78 000001084147-3562500061
2023 5 FD52 00 E111 D 1208201D 054 11/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112M1062232607137 $201.85 000001078123-3562500636
2023 5 FD52 00 E111 D 1208201D 054 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607170 $82.74 000001084147-3562500061
2023 5 FD52 00 E111 D 1208201D 054 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607137 $32.84 000001078123-3562500636
2023 5 FD52 00 E121 D 1208201D 054 11/23/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR112M1062232607170 $36.30 000001084147-3562500061
2023 5 FD52 00 E121 D 1208201D 054 11/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112M1062232607137 $15.34 000001078123-3562500636
2023 5 FD52 00 E121 D 1208201D 054 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607170 $5.88 000001084147-3562500061
2023 5 FD52 00 E121 D 1208201D 054 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607137 $2.50 000001078123-3562500636
2023 5 FD52 00 E122 D 1208201D 054 11/23/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR112M1062232607170 $398.41 000001084147-3562500061
2023 5 FD52 00 E122 D 1208201D 054 11/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112M1062232607137 $157.30 000001078123-3562500636
2023 5 FD52 00 E122 D 1208201D 054 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607170 $64.53 000001084147-3562500061
2023 5 FD52 00 E122 D 1208201D 054 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607137 $25.62 000001078123-3562500636
2023 5 FD52 00 E123 D 1208201D 054 11/23/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR112M1062232607170 $112.45 000001084147-3562500061
2023 5 FD52 00 E123 D 1208201D 054 11/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112M1062232607137 $15.03 000001078123-3562500636
2023 5 FD52 00 E123 D 1208201D 054 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607170 $18.04 000001084147-3562500061
2023 5 FD52 00 E123 D 1208201D 054 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607137 $2.40 000001078123-3562500636
2023 5 FD52 00 E124 D 1208201D 054 11/23/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR112M1062232607170 $0.18 000001084147-3562500061
2023 5 FD52 00 E124 D 1208201D 054 11/23/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112M1062232607137 $0.04 000001078123-3562500636
2023 5 FD52 00 E124 D 1208201D 054 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607170 $0.03 000001084147-3562500061
2023 5 FD52 00 E111 D 1208201D 054 11/23/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR112M1062232607156 $407.92 000001082534-3562500636
2023 5 FD52 00 E111 D 1208201D 054 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607156 $167.54 000001082534-3562500636
2023 5 FD52 00 E121 D 1208201D 054 11/23/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR112M1062232607156 $28.45 000001082534-3562500636
2023 5 FD52 00 E121 D 1208201D 054 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607156 $11.67 000001082534-3562500636
2023 5 FD52 00 E122 D 1208201D 054 11/23/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR112M1062232607156 $318.32 000001082534-3562500636
2023 5 FD52 00 E122 D 1208201D 054 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607156 $130.68 000001082534-3562500636
2023 5 FD52 00 E123 D 1208201D 054 11/23/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR112M1062232607156 $71.36 000001082534-3562500636
2023 5 FD52 00 E123 D 1208201D 054 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607156 $28.96 000001082534-3562500636
2023 5 FD52 00 E124 D 1208201D 054 11/23/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR112M1062232607156 $0.12 000001082534-3562500636
2023 5 FD52 00 E124 D 1208201D 054 11/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112M1062232607156 $0.04 000001082534-3562500636
2023 5 FD52 00 E111 D 1208201D 054 11/14/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR111M1062230806161 $85.87 000001082534-3562500636
2023 5 FD52 00 E111 D 1208201D 054 11/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806161 $3.44 000001082534-3562500636
2023 5 FD52 00 E121 D 1208201D 054 11/14/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR111M1062230806161 $5.97 000001082534-3562500636
2023 5 FD52 00 E121 D 1208201D 054 11/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806161 $0.24 000001082534-3562500636
2023 5 FD52 00 E122 D 1208201D 054 11/14/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR111M1062230806161 $67.02 000001082534-3562500636
2023 5 FD52 00 E122 D 1208201D 054 11/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806161 $2.68 000001082534-3562500636
2023 5 FD52 00 E123 D 1208201D 054 11/14/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR111M1062230806161 $14.98 000001082534-3562500636
2023 5 FD52 00 E123 D 1208201D 054 11/14/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111M1062230806161 $0.59 000001082534-3562500636
2023 4 FD52 00 E111 D 1208201D 054 10/24/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR102M1062229405054 $70.88 000001082534-3562500636
2023 4 FD52 00 E111 D 1208201D 054 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405054 $70.88 000001082534-3562500636
2023 4 FD52 00 E121 D 1208201D 054 10/24/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR102M1062229405054 $4.95 000001082534-3562500636
2023 4 FD52 00 E121 D 1208201D 054 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405054 $4.95 000001082534-3562500636
2023 4 FD52 00 E122 D 1208201D 054 10/24/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR102M1062229405054 $55.29 000001082534-3562500636
2023 4 FD52 00 E122 D 1208201D 054 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405054 $55.28 000001082534-3562500636
2023 4 FD52 00 E123 D 1208201D 054 10/24/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR102M1062229405054 $12.45 000001082534-3562500636
2023 4 FD52 00 E123 D 1208201D 054 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405054 $12.25 000001082534-3562500636
2023 4 FD52 00 E124 D 1208201D 054 10/24/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR102M1062229405054 $0.02 000001082534-3562500636
2023 4 FD52 00 E124 D 1208201D 054 10/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102M1062229405054 $0.02 000001082534-3562500636
2023 4 FD52 00 E111 D 1208201D 054 10/10/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR101M1062228003943 $64.42 000001082534-3562500636
2023 4 FD52 00 E111 D 1208201D 054 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003943 $26.63 000001082534-3562500636
2023 4 FD52 00 E121 D 1208201D 054 10/10/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR101M1062228003943 $4.48 000001082534-3562500636
2023 4 FD52 00 E121 D 1208201D 054 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003943 $1.85 000001082534-3562500636
2023 4 FD52 00 E122 D 1208201D 054 10/10/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR101M1062228003943 $50.26 000001082534-3562500636
2023 4 FD52 00 E122 D 1208201D 054 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003943 $20.77 000001082534-3562500636
2023 4 FD52 00 E123 D 1208201D 054 10/10/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR101M1062228003943 $11.27 000001082534-3562500636
2023 4 FD52 00 E123 D 1208201D 054 10/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101M1062228003943 $4.61 000001082534-3562500636
2023 3 FD52 00 E111 D 1208201D 054 9/26/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092M1062226602776 $64.59 000001082534-3562500636
2023 3 FD52 00 E111 D 1208201D 054 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602776 $34.79 000001082534-3562500636
2023 3 FD52 00 E121 D 1208201D 054 9/26/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092M1062226602776 $4.49 000001082534-3562500636
2023 3 FD52 00 E121 D 1208201D 054 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602776 $2.43 000001082534-3562500636
2023 3 FD52 00 E122 D 1208201D 054 9/26/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092M1062226602776 $50.26 000001082534-3562500636
2023 3 FD52 00 E122 D 1208201D 054 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602776 $27.14 000001082534-3562500636
2023 3 FD52 00 E123 D 1208201D 054 9/26/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092M1062226602776 $11.28 000001082534-3562500636
2023 3 FD52 00 E123 D 1208201D 054 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602776 $6.02 000001082534-3562500636
2023 3 FD52 00 E124 D 1208201D 054 9/26/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR092M1062226602776 $0.02 000001082534-3562500636
2023 3 FD52 00 E124 D 1208201D 054 9/26/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092M1062226602776 $0.01 000001082534-3562500636
2023 3 FD52 00 E111 D 1208201D 054 9/12/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR091M1062225101628 $118.13 000001082534-3562500636
2023 3 FD52 00 E111 D 1208201D 054 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101628 $23.63 000001082534-3562500636
2023 3 FD52 00 E121 D 1208201D 054 9/12/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR091M1062225101628 $8.20 000001082534-3562500636
2023 3 FD52 00 E121 D 1208201D 054 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101628 $1.64 000001082534-3562500636
2023 3 FD52 00 E122 D 1208201D 054 9/12/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR091M1062225101628 $92.14 000001082534-3562500636
2023 3 FD52 00 E122 D 1208201D 054 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101628 $18.43 000001082534-3562500636
2023 3 FD52 00 E123 D 1208201D 054 9/12/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR091M1062225101628 $20.62 000001082534-3562500636
2023 3 FD52 00 E123 D 1208201D 054 9/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091M1062225101628 $4.08 000001082534-3562500636
2023 2 FD52 00 E111 D 1208201D 054 8/24/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR082M1062223500439 $86.00 000001082534-3562500636
2023 2 FD52 00 E111 D 1208201D 054 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500439 $10.31 000001082534-3562500636
2023 2 FD52 00 E121 D 1208201D 054 8/24/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR082M1062223500439 $5.98 000001082534-3562500636
2023 2 FD52 00 E121 D 1208201D 054 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500439 $0.72 000001082534-3562500636
2023 2 FD52 00 E122 D 1208201D 054 8/24/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR082M1062223500439 $67.02 000001082534-3562500636
2023 2 FD52 00 E122 D 1208201D 054 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500439 $8.04 000001082534-3562500636
2023 2 FD52 00 E123 D 1208201D 054 8/24/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR082M1062223500439 $14.99 000001082534-3562500636
2023 2 FD52 00 E123 D 1208201D 054 8/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082M1062223500439 $1.78 000001082534-3562500636
2023 2 FD52 00 E124 D 1208201D 054 8/24/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR082M1062223500439 $0.02 000001082534-3562500636
2023 2 FD52 00 E111 D 1208201D 054 8/24/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR082M1062223500461 $510.78 000001084147-3562500061
2023 2 FD52 00 E121 D 1208201D 054 8/24/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR082M1062223500461 $36.30 000001084147-3562500061
2023 2 FD52 00 E122 D 1208201D 054 8/24/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR082M1062223500461 $398.41 000001084147-3562500061
2023 2 FD52 00 E123 D 1208201D 054 8/24/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR082M1062223500461 $112.30 000001084147-3562500061
2023 2 FD52 00 E124 D 1208201D 054 8/24/2022 0091 ENV STUDIES-ENV PROJ MGR (EPM) CA-XR082M1062223500461 $0.18 000001084147-3562500061
2023 2 FD52 00 E111 D 1208201D 054 8/10/2022 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR081M1062222110117 $1,234.93 000001080958-3562500610
2023 2 FD52 00 E111 D 1208201D 054 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110117 $122.35 000001080958-3562500610
2023 2 FD52 00 E121 D 1208201D 054 8/10/2022 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR081M1062222110117 $87.86 000001080958-3562500610
2023 2 FD52 00 E121 D 1208201D 054 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110117 $8.71 000001080958-3562500610
2023 2 FD52 00 E122 D 1208201D 054 8/10/2022 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR081M1062222110117 $963.26 000001080958-3562500610
2023 2 FD52 00 E122 D 1208201D 054 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110117 $95.44 000001080958-3562500610
2023 2 FD52 00 E123 D 1208201D 054 8/10/2022 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR081M1062222110117 $220.82 000001080958-3562500610
2023 2 FD52 00 E123 D 1208201D 054 8/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081M1062222110117 $21.63 000001080958-3562500610
2023 2 FD52 02 E143 D 1208201D 054 8/4/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2300020912 PON22100001141 Integrated Engineering $3,288.00 Engineering and Related Services
2023 1 FD52 00 E111 D 1208201D 054 7/25/2022 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR072M1062220308989 $1,793.83 000001080958-3562500610
2023 1 FD52 00 E111 D 1208201D 054 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308989 $254.59 000001080958-3562500610
2023 1 FD52 00 E121 D 1208201D 054 7/25/2022 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR072M1062220308989 $127.22 000001080958-3562500610
2023 1 FD52 00 E121 D 1208201D 054 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308989 $18.02 000001080958-3562500610
2023 1 FD52 00 E122 D 1208201D 054 7/25/2022 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR072M1062220308989 $1,398.51 000001080958-3562500610
2023 1 FD52 00 E122 D 1208201D 054 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308989 $198.58 000001080958-3562500610
2023 1 FD52 00 E123 D 1208201D 054 7/25/2022 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR072M1062220308989 $312.77 000001080958-3562500610
2023 1 FD52 00 E123 D 1208201D 054 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308989 $43.42 000001080958-3562500610
2023 1 FD52 00 E124 D 1208201D 054 7/25/2022 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR072M1062220308989 $0.49 000001080958-3562500610
2023 1 FD52 00 E124 D 1208201D 054 7/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072M1062220308989 $0.07 000001080958-3562500610
2023 1 FD52 00 E111 D 1208201D 054 7/12/2022 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR071M1062219207875 $1,607.91 000001080958-3562500610
2023 1 FD52 00 E111 D 1208201D 054 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207875 $241.56 000001080958-3562500610
2023 1 FD52 00 E121 D 1208201D 054 7/12/2022 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR071M1062219207875 $114.95 000001080958-3562500610
2023 1 FD52 00 E121 D 1208201D 054 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207875 $17.13 000001080958-3562500610
2023 1 FD52 00 E122 D 1208201D 054 7/12/2022 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR071M1062219207875 $1,349.95 000001080958-3562500610
2023 1 FD52 00 E122 D 1208201D 054 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207875 $202.84 000001080958-3562500610
2023 1 FD52 00 E123 D 1208201D 054 7/12/2022 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR071M1062219207875 $283.59 000001080958-3562500610
2023 1 FD52 00 E123 D 1208201D 054 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207875 $45.13 000001080958-3562500610
2023 1 FD52 00 E111 D 1208201D 054 7/12/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR071M1062219207885 $39.82 000001082534-3562500636
2023 1 FD52 00 E111 D 1208201D 054 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207885 $15.11 000001082534-3562500636
2023 1 FD52 00 E121 D 1208201D 054 7/12/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR071M1062219207885 $2.74 000001082534-3562500636
2023 1 FD52 00 E121 D 1208201D 054 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207885 $1.04 000001082534-3562500636
2023 1 FD52 00 E122 D 1208201D 054 7/12/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR071M1062219207885 $33.39 000001082534-3562500636
2023 1 FD52 00 E122 D 1208201D 054 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207885 $12.69 000001082534-3562500636
2023 1 FD52 00 E123 D 1208201D 054 7/12/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR071M1062219207885 $7.51 000001082534-3562500636
2023 1 FD52 00 E123 D 1208201D 054 7/12/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071M1062219207885 $2.82 000001082534-3562500636
2022 12 FD52 00 E121 D 1208201D 054 6/27/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR062M1062217506767 ($1.57) 000001080935-3562500610
2022 12 FD52 00 E111 D 1208201D 054 6/27/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR062M1062217506778 $119.35 000001082534-3562500636
2022 12 FD52 00 E111 D 1208201D 054 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506778 $41.37 000001082534-3562500636
2022 12 FD52 00 E121 D 1208201D 054 6/27/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR062M1062217506778 $8.26 000001082534-3562500636
2022 12 FD52 00 E121 D 1208201D 054 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506778 $2.86 000001082534-3562500636
2022 12 FD52 00 E122 D 1208201D 054 6/27/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR062M1062217506778 $100.20 000001082534-3562500636
2022 12 FD52 00 E122 D 1208201D 054 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506778 $34.74 000001082534-3562500636
2022 12 FD52 00 E123 D 1208201D 054 6/27/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR062M1062217506778 $22.52 000001082534-3562500636
2022 12 FD52 00 E123 D 1208201D 054 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506778 $7.72 000001082534-3562500636
2022 12 FD52 00 E124 D 1208201D 054 6/27/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR062M1062217506778 $0.04 000001082534-3562500636
2022 12 FD52 00 E124 D 1208201D 054 6/27/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062M1062217506778 $0.01 000001082534-3562500636
2022 12 FD52 00 E111 D 1208201D 054 6/13/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR061M1062215905731 $933.31 000001082267-3562500061
2022 12 FD52 00 E111 D 1208201D 054 6/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905731 $279.91 000001082267-3562500061
2022 12 FD52 00 E121 D 1208201D 054 6/13/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR061M1062215905731 $62.21 000001082267-3562500061
2022 12 FD52 00 E121 D 1208201D 054 6/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905731 $18.66 000001082267-3562500061
2022 12 FD52 00 E122 D 1208201D 054 6/13/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR061M1062215905731 $783.43 000001082267-3562500061
2022 12 FD52 00 E122 D 1208201D 054 6/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905731 $235.03 000001082267-3562500061
2022 12 FD52 00 E123 D 1208201D 054 6/13/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR061M1062215905731 $178.62 000001082267-3562500061
2022 12 FD52 00 E123 D 1208201D 054 6/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905731 $52.81 000001082267-3562500061
2022 12 FD52 00 E111 D 1208201D 054 6/13/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061M1062215905706 $54.69 000001078123-3562500636
2022 12 FD52 00 E111 D 1208201D 054 6/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905706 $19.69 000001078123-3562500636
2022 12 FD52 00 E121 D 1208201D 054 6/13/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061M1062215905706 $3.76 000001078123-3562500636
2022 12 FD52 00 E121 D 1208201D 054 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905707 $1.37 000001078123-3562500636
2022 12 FD52 00 E111 D 1208201D 054 6/9/2022 0092 ENV STUDIES-PERMITTING CA-XR061M1062215905739 $433.64 000001082902-3562500061
2022 12 FD52 00 E111 D 1208201D 054 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905739 $115.91 000001082902-3562500061
2022 12 FD52 00 E121 D 1208201D 054 6/9/2022 0092 ENV STUDIES-PERMITTING CA-XR061M1062215905739 $30.07 000001082902-3562500061
2022 12 FD52 00 E121 D 1208201D 054 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905739 $8.04 000001082902-3562500061
2022 12 FD52 00 E122 D 1208201D 054 6/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061M1062215905707 $45.92 000001078123-3562500636
2022 12 FD52 00 E122 D 1208201D 054 6/9/2022 0092 ENV STUDIES-PERMITTING CA-XR061M1062215905739 $364.04 000001082902-3562500061
2022 12 FD52 00 E122 D 1208201D 054 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905739 $97.33 000001082902-3562500061
2022 12 FD52 00 E123 D 1208201D 054 6/9/2022 0092 ENV STUDIES-PERMITTING CA-XR061M1062215905739 $103.16 000001082902-3562500061
2022 12 FD52 00 E123 D 1208201D 054 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905739 $27.29 000001082902-3562500061
2022 12 FD52 00 E122 D 1208201D 054 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905707 $16.54 000001078123-3562500636
2022 12 FD52 00 E123 D 1208201D 054 6/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061M1062215905707 $10.33 000001078123-3562500636
2022 12 FD52 00 E123 D 1208201D 054 6/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061M1062215905707 $3.68 000001078123-3562500636
2022 11 FD52 00 E111 D 1208201D 054 5/25/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR052M1062214004689 $87.54 000001082534-3562500636
2022 11 FD52 00 E111 D 1208201D 054 5/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004689 $12.69 000001082534-3562500636
2022 11 FD52 00 E121 D 1208201D 054 5/25/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR052M1062214004689 $6.06 000001082534-3562500636
2022 11 FD52 00 E121 D 1208201D 054 5/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004689 $0.87 000001082534-3562500636
2022 11 FD52 00 E122 D 1208201D 054 5/25/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR052M1062214004689 $73.48 000001082534-3562500636
2022 11 FD52 00 E122 D 1208201D 054 5/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004689 $10.66 000001082534-3562500636
2022 11 FD52 00 E123 D 1208201D 054 5/25/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR052M1062214004689 $16.49 000001082534-3562500636
2022 11 FD52 00 E123 D 1208201D 054 5/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052M1062214004689 $2.37 000001082534-3562500636
2022 11 FD52 00 E124 D 1208201D 054 5/25/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR052M1062214004689 $0.03 000001082534-3562500636
2022 11 FD52 02 E797 D 1208201D 054 5/23/2022 3550 RAILROAD CONTRACTS PRC-2200212206 DO2200013895 CSX TRANSPORTATION INC $1,229.73
2022 11 FD52 00 E112 D 1208201D 054 5/23/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR052M1062214004675 $763.49 000001080935-3562500610
2022 11 FD52 00 E121 D 1208201D 054 5/23/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR052M1062214004675 $126.58 000001080935-3562500610
2022 11 FD52 00 E122 D 1208201D 054 5/23/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR052M1062214004675 $809.02 000001080935-3562500610
2022 11 FD52 00 E123 D 1208201D 054 5/23/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR052M1062214004675 $185.28 000001080935-3562500610
2022 11 FD52 00 E124 D 1208201D 054 5/23/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR052M1062214004675 $0.30 000001080935-3562500610
2022 11 FD52 00 E111 D 1208201D 054 5/23/2022 0092 ENV STUDIES-PERMITTING CA-XR052M1062214004702 $260.12 000001082902-3562500061
2022 11 FD52 00 E121 D 1208201D 054 5/23/2022 0092 ENV STUDIES-PERMITTING CA-XR052M1062214004702 $18.37 000001082902-3562500061
2022 11 FD52 00 E122 D 1208201D 054 5/23/2022 0092 ENV STUDIES-PERMITTING CA-XR052M1062214004702 $218.41 000001082902-3562500061
2022 11 FD52 00 E123 D 1208201D 054 5/23/2022 0092 ENV STUDIES-PERMITTING CA-XR052M1062214004702 $61.77 000001082902-3562500061
2022 11 FD52 00 E111 D 1208201D 054 5/23/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR052M1062214004675 $963.46 000001080935-3562500610
2022 11 FD52 00 E124 D 1208201D 054 5/23/2022 0092 ENV STUDIES-PERMITTING CA-XR052M1062214004702 $0.10 000001082902-3562500061
2022 11 FD52 00 E122 D 1208201D 054 5/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603667 $49.10 000001082267-3562500061
2022 11 FD52 00 E123 D 1208201D 054 5/13/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR051M1062212603667 $227.50 000001082267-3562500061
2022 11 FD52 00 E123 D 1208201D 054 5/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603667 $11.03 000001082267-3562500061
2022 11 FD52 00 E111 D 1208201D 054 5/13/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR051M1062212603657 $2,565.13 000001080935-3562500610
2022 11 FD52 00 E111 D 1208201D 054 5/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603657 $1,370.98 000001080935-3562500610
2022 11 FD52 00 E121 D 1208201D 054 5/13/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR051M1062212603657 $189.00 000001080935-3562500610
2022 11 FD52 00 E121 D 1208201D 054 5/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603657 $103.55 000001080935-3562500610
2022 11 FD52 00 E122 D 1208201D 054 5/13/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR051M1062212603657 $2,153.93 000001080935-3562500610
2022 11 FD52 00 E122 D 1208201D 054 5/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603657 $1,151.21 000001080935-3562500610
2022 11 FD52 00 E123 D 1208201D 054 5/13/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR051M1062212603657 $414.82 000001080935-3562500610
2022 11 FD52 00 E123 D 1208201D 054 5/13/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603657 $213.58 000001080935-3562500610
2022 11 FD52 00 E111 D 1208201D 054 5/9/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR051M1062212603674 $21.91 000001082534-3562500636
2022 11 FD52 00 E111 D 1208201D 054 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603674 $0.88 000001082534-3562500636
2022 11 FD52 00 E121 D 1208201D 054 5/9/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR051M1062212603674 $1.52 000001082534-3562500636
2022 11 FD52 00 E121 D 1208201D 054 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603674 $0.06 000001082534-3562500636
2022 11 FD52 00 E122 D 1208201D 054 5/9/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR051M1062212603674 $18.37 000001082534-3562500636
2022 11 FD52 00 E122 D 1208201D 054 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603674 $0.74 000001082534-3562500636
2022 11 FD52 00 E123 D 1208201D 054 5/9/2022 1050 RDWAY PLANS-FINAL-PLANS & PROF CA-XR051M1062212603674 $4.12 000001082534-3562500636
2022 11 FD52 00 E123 D 1208201D 054 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603674 $0.16 000001082534-3562500636
2022 11 FD52 00 E111 D 1208201D 054 5/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051M1062212603642 $153.17 000001078123-3562500636
2022 11 FD52 00 E111 D 1208201D 054 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603642 $8.74 000001078123-3562500636
2022 11 FD52 00 E121 D 1208201D 054 5/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051M1062212603642 $10.60 000001078123-3562500636
2022 11 FD52 00 E121 D 1208201D 054 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603642 $0.62 000001078123-3562500636
2022 11 FD52 00 E122 D 1208201D 054 5/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051M1062212603642 $128.59 000001078123-3562500636
2022 11 FD52 00 E122 D 1208201D 054 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603642 $7.34 000001078123-3562500636
2022 11 FD52 00 E123 D 1208201D 054 5/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR051M1062212603642 $28.83 000001078123-3562500636
2022 11 FD52 00 E123 D 1208201D 054 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603642 $1.64 000001078123-3562500636
2022 11 FD52 00 E111 D 1208201D 054 5/9/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR051M1062212603666 $1,191.67 000001082267-3562500061
2022 11 FD52 00 E111 D 1208201D 054 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603666 $58.47 000001082267-3562500061
2022 11 FD52 00 E121 D 1208201D 054 5/9/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR051M1062212603666 $82.97 000001082267-3562500061
2022 11 FD52 00 E121 D 1208201D 054 5/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR051M1062212603666 $4.07 000001082267-3562500061
2022 11 FD52 00 E122 D 1208201D 054 5/9/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR051M1062212603666 $1,000.65 000001082267-3562500061
2022 10 FD52 00 E111 D 1208201D 054 4/25/2022 0060 ENV STUDIES-ARCHAEOLOGY CA-XR042M1062211202558 $789.58 000001082295-3562500061
2022 10 FD52 00 E111 D 1208201D 054 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202558 $428.05 000001082295-3562500061
2022 10 FD52 00 E121 D 1208201D 054 4/25/2022 0060 ENV STUDIES-ARCHAEOLOGY CA-XR042M1062211202558 $59.46 000001082295-3562500061
2022 10 FD52 00 E121 D 1208201D 054 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202558 $32.23 000001082295-3562500061
2022 10 FD52 00 E111 D 1208201D 054 4/25/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR042M1062211202556 $787.22 000001082267-3562500061
2022 10 FD52 00 E122 D 1208201D 054 4/25/2022 0060 ENV STUDIES-ARCHAEOLOGY CA-XR042M1062211202558 $663.00 000001082295-3562500061
2022 10 FD52 00 E111 D 1208201D 054 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202556 $208.28 000001082267-3562500061
2022 10 FD52 00 E122 D 1208201D 054 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202558 $359.43 000001082295-3562500061
2022 10 FD52 00 E121 D 1208201D 054 4/25/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR042M1062211202556 $54.81 000001082267-3562500061
2022 10 FD52 00 E123 D 1208201D 054 4/25/2022 0060 ENV STUDIES-ARCHAEOLOGY CA-XR042M1062211202558 $113.30 000001082295-3562500061
2022 10 FD52 00 E121 D 1208201D 054 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202556 $14.50 000001082267-3562500061
2022 10 FD52 00 E123 D 1208201D 054 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202558 $60.21 000001082295-3562500061
2022 10 FD52 00 E122 D 1208201D 054 4/25/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR042M1062211202556 $661.04 000001082267-3562500061
2022 10 FD52 00 E124 D 1208201D 054 4/25/2022 0060 ENV STUDIES-ARCHAEOLOGY CA-XR042M1062211202558 $0.29 000001082295-3562500061
2022 10 FD52 00 E122 D 1208201D 054 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202556 $174.89 000001082267-3562500061
2022 10 FD52 00 E124 D 1208201D 054 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202558 $0.15 000001082295-3562500061
2022 10 FD52 00 E123 D 1208201D 054 4/25/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR042M1062211202556 $150.66 000001082267-3562500061
2022 10 FD52 00 E111 D 1208201D 054 4/25/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR042M1062211202542 $1,464.53 000001080935-3562500610
2022 10 FD52 00 E123 D 1208201D 054 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202556 $39.30 000001082267-3562500061
2022 10 FD52 00 E111 D 1208201D 054 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202542 $645.94 000001080935-3562500610
2022 10 FD52 00 E124 D 1208201D 054 4/25/2022 0070 ENV STUDIES-HIST/CULTURAL CA-XR042M1062211202556 $0.32 000001082267-3562500061
2022 10 FD52 00 E112 D 1208201D 054 4/25/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR042M1062211202542 $508.99 000001080935-3562500610
2022 10 FD52 00 E124 D 1208201D 054 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202556 $0.09 000001082267-3562500061
2022 10 FD52 00 E112 D 1208201D 054 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202542 $72.72 000001080935-3562500610
2022 10 FD52 00 E121 D 1208201D 054 4/25/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR042M1062211202542 $146.66 000001080935-3562500610
2022 10 FD52 00 E121 D 1208201D 054 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202542 $53.44 000001080935-3562500610
2022 10 FD52 00 E122 D 1208201D 054 4/25/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR042M1062211202542 $1,229.72 000001080935-3562500610
2022 10 FD52 00 E122 D 1208201D 054 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202542 $542.39 000001080935-3562500610
2022 10 FD52 00 E123 D 1208201D 054 4/25/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR042M1062211202542 $251.00 000001080935-3562500610
2022 10 FD52 00 E123 D 1208201D 054 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202542 $106.46 000001080935-3562500610
2022 10 FD52 00 E124 D 1208201D 054 4/25/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR042M1062211202542 $0.54 000001080935-3562500610
2022 10 FD52 00 E124 D 1208201D 054 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202542 $0.26 000001080935-3562500610
2022 10 FD52 00 E111 D 1208201D 054 4/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042M1062211202520 $59.59 000001078123-3562500636
2022 10 FD52 00 E111 D 1208201D 054 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202520 $17.50 000001078123-3562500636
2022 10 FD52 00 E121 D 1208201D 054 4/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042M1062211202520 $4.13 000001078123-3562500636
2022 10 FD52 00 E121 D 1208201D 054 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202520 $1.23 000001078123-3562500636
2022 10 FD52 00 E122 D 1208201D 054 4/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042M1062211202520 $48.35 000001078123-3562500636
2022 10 FD52 00 E122 D 1208201D 054 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202520 $14.70 000001078123-3562500636
2022 10 FD52 00 E123 D 1208201D 054 4/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042M1062211202520 $10.79 000001078123-3562500636
2022 10 FD52 00 E123 D 1208201D 054 4/25/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR042M1062211202520 $3.27 000001078123-3562500636
2022 10 FD52 00 E124 D 1208201D 054 4/25/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR042M1062211202520 $0.18 000001078123-3562500636
2022 10 FD52 00 E229 D 1208201D 054 4/13/2022 5021 GEOTECH INVEST STRUCTURE (DESI IET-XE13A162522100020940 $315.00
2022 10 FD52 02 E143 D 1208201D 054 4/12/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200183306 PON22100001141 Integrated Engineering $7,263.00 Engineering and Related Services
2022 10 FD52 02 E143 D 1208201D 054 4/12/2022 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200183637 PON22100001141 Integrated Engineering $2,560.00 Engineering and Related Services
2022 10 FD52 00 E111 D 1208201D 054 4/11/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR041M1062209801481 $2,617.66 000001080935-3562500610
2022 10 FD52 00 E111 D 1208201D 054 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801481 $896.80 000001080935-3562500610
2022 10 FD52 00 E121 D 1208201D 054 4/11/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR041M1062209801481 $195.27 000001080935-3562500610
2022 10 FD52 00 E121 D 1208201D 054 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801481 $65.43 000001080935-3562500610
2022 10 FD52 00 E122 D 1208201D 054 4/11/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR041M1062209801481 $2,198.01 000001080935-3562500610
2022 10 FD52 00 E122 D 1208201D 054 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801481 $753.04 000001080935-3562500610
2022 10 FD52 00 E123 D 1208201D 054 4/11/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR041M1062209801481 $435.71 000001080935-3562500610
2022 10 FD52 00 E123 D 1208201D 054 4/11/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR041M1062209801481 $162.72 000001080935-3562500610
2022 9 FD52 00 E229 D 1208201D 054 3/28/2022 5021 GEOTECH INVEST STRUCTURE (DESI IET-XE13A162522084017160 $4,305.00
2022 9 FD52 00 E111 D 1208201D 054 3/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032M1062208200379 $39.71 000001078123-3562500636
2022 9 FD52 00 E111 D 1208201D 054 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200379 $12.32 000001078123-3562500636
2022 9 FD52 00 E121 D 1208201D 054 3/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032M1062208200379 $2.75 000001078123-3562500636
2022 9 FD52 00 E121 D 1208201D 054 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200379 $0.85 000001078123-3562500636
2022 9 FD52 00 E122 D 1208201D 054 3/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032M1062208200379 $33.40 000001078123-3562500636
2022 9 FD52 00 E122 D 1208201D 054 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200379 $10.34 000001078123-3562500636
2022 9 FD52 00 E111 D 1208201D 054 3/24/2022 1640 BRIDGE-REVIEW OF PLANS CA-XR032M1062208200408 $329.27 000001081582-3562500610
2022 9 FD52 00 E123 D 1208201D 054 3/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032M1062208200379 $7.50 000001078123-3562500636
2022 9 FD52 00 E111 D 1208201D 054 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200408 $73.34 000001081582-3562500610
2022 9 FD52 00 E123 D 1208201D 054 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200379 $2.30 000001078123-3562500636
2022 9 FD52 00 E121 D 1208201D 054 3/24/2022 1640 BRIDGE-REVIEW OF PLANS CA-XR032M1062208200408 $25.01 000001081582-3562500610
2022 9 FD52 00 E124 D 1208201D 054 3/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR032M1062208200379 $0.01 000001078123-3562500636
2022 9 FD52 00 E121 D 1208201D 054 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200408 $5.57 000001081582-3562500610
2022 9 FD52 00 E122 D 1208201D 054 3/24/2022 1640 BRIDGE-REVIEW OF PLANS CA-XR032M1062208200408 $276.56 000001081582-3562500610
2022 9 FD52 00 E122 D 1208201D 054 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200408 $61.58 000001081582-3562500610
2022 9 FD52 00 E123 D 1208201D 054 3/24/2022 1640 BRIDGE-REVIEW OF PLANS CA-XR032M1062208200408 $32.24 000001081582-3562500610
2022 9 FD52 00 E123 D 1208201D 054 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200408 $7.05 000001081582-3562500610
2022 9 FD52 00 E111 D 1208201D 054 3/24/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR032M1062208200401 $6,539.02 000001080935-3562500610
2022 9 FD52 00 E124 D 1208201D 054 3/24/2022 1640 BRIDGE-REVIEW OF PLANS CA-XR032M1062208200408 $0.09 000001081582-3562500610
2022 9 FD52 00 E111 D 1208201D 054 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200401 $609.30 000001080935-3562500610
2022 9 FD52 00 E124 D 1208201D 054 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200408 $0.02 000001081582-3562500610
2022 9 FD52 00 E112 D 1208201D 054 3/24/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR032M1062208200401 $508.99 000001080935-3562500610
2022 9 FD52 00 E115 D 1208201D 054 3/24/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR032M1062208200401 $834.94 000001080935-3562500610
2022 9 FD52 00 E121 D 1208201D 054 3/24/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR032M1062208200401 $575.93 000001080935-3562500610
2022 9 FD52 00 E121 D 1208201D 054 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200401 $44.82 000001080935-3562500610
2022 9 FD52 00 E122 D 1208201D 054 3/24/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR032M1062208200401 $6,192.01 000001080935-3562500610
2022 9 FD52 00 E122 D 1208201D 054 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200401 $511.64 000001080935-3562500610
2022 9 FD52 00 E123 D 1208201D 054 3/24/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR032M1062208200401 $1,298.88 000001080935-3562500610
2022 9 FD52 00 E123 D 1208201D 054 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200401 $103.14 000001080935-3562500610
2022 9 FD52 00 E124 D 1208201D 054 3/24/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR032M1062208200401 $2.88 000001080935-3562500610
2022 9 FD52 00 E124 D 1208201D 054 3/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR032M1062208200401 $0.27 000001080935-3562500610
2022 9 FD52 02 E143 D 1208201D 054 3/14/2022 0510 ENV STUDIES-UST/HZM PRC-2200160156 PON22000004290 LINEBACH FUNKHOUSER INC $8,450.00 Letter Agreement 51-CHC
2022 9 FD52 00 E229 D 1208201D 054 3/11/2022 5021 GEOTECH INVEST STRUCTURE (DESI IET-XE13A162522069019220 $7,460.00
2022 9 FD52 02 E255 D 1208201D 054 3/11/2022 1210 PUBLIC HEARINGS, ACTION PLAN PRC-2200155485 Greenwell Chisholm Printing Company $504.80
2022 9 FD52 00 E111 D 1208201D 054 3/9/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR031M1062206709467 $11,561.43 000001080935-3562500610
2022 9 FD52 00 E111 D 1208201D 054 3/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709467 $333.62 000001080935-3562500610
2022 9 FD52 00 E115 D 1208201D 054 3/9/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR031M1062206709467 $1,442.60 000001080935-3562500610
2022 9 FD52 00 E121 D 1208201D 054 3/9/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR031M1062206709467 $942.97 000001080935-3562500610
2022 9 FD52 00 E121 D 1208201D 054 3/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709467 $24.68 000001080935-3562500610
2022 9 FD52 00 E122 D 1208201D 054 3/9/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR031M1062206709467 $10,919.49 000001080935-3562500610
2022 9 FD52 00 E122 D 1208201D 054 3/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709467 $280.14 000001080935-3562500610
2022 9 FD52 00 E123 D 1208201D 054 3/9/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR031M1062206709467 $2,604.32 000001080935-3562500610
2022 9 FD52 00 E123 D 1208201D 054 3/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR031M1062206709467 $58.12 000001080935-3562500610
2022 9 FD52 00 E361 D 1208201D 054 3/7/2022 5021 GEOTECH INVEST STRUCTURE (DESI TP-2200025184 $571.40
2022 9 FD52 00 E361 D 1208201D 054 3/7/2022 5021 GEOTECH INVEST STRUCTURE (DESI TP-2200025189 $571.40
2022 9 FD52 00 E361 D 1208201D 054 3/2/2022 5021 GEOTECH INVEST STRUCTURE (DESI TP-2200024326 $571.40
2022 9 FD52 00 E361 D 1208201D 054 3/2/2022 5021 GEOTECH INVEST STRUCTURE (DESI TP-2200024335 $571.40
2022 8 FD52 00 E229 D 1208201D 054 2/28/2022 5021 GEOTECH INVEST STRUCTURE (DESI IET-XE13A162522056017140 $3,870.00
2022 8 FD52 00 E124 D 1208201D 054 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308445 $0.21 000001081582-3562500610
2022 8 FD52 00 E111 D 1208201D 054 2/23/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR022M1062205308429 $3,150.90 000001080935-3562500610
2022 8 FD52 00 E111 D 1208201D 054 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308429 $325.00 000001080935-3562500610
2022 8 FD52 00 E115 D 1208201D 054 2/23/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR022M1062205308429 $420.63 000001080935-3562500610
2022 8 FD52 00 E121 D 1208201D 054 2/23/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR022M1062205308429 $254.95 000001080935-3562500610
2022 8 FD52 00 E121 D 1208201D 054 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308429 $22.97 000001080935-3562500610
2022 8 FD52 00 E122 D 1208201D 054 2/23/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR022M1062205308429 $2,999.02 000001080935-3562500610
2022 8 FD52 00 E122 D 1208201D 054 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308429 $272.90 000001080935-3562500610
2022 8 FD52 00 E123 D 1208201D 054 2/23/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR022M1062205308429 $753.97 000001080935-3562500610
2022 8 FD52 00 E123 D 1208201D 054 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308429 $89.78 000001080935-3562500610
2022 8 FD52 00 E124 D 1208201D 054 2/23/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR022M1062205308429 $1.27 000001080935-3562500610
2022 8 FD52 00 E124 D 1208201D 054 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308429 $0.14 000001080935-3562500610
2022 8 FD52 00 E111 D 1208201D 054 2/23/2022 1640 BRIDGE-REVIEW OF PLANS CA-XR022M1062205308444 $7,672.70 000001081582-3562500610
2022 8 FD52 00 E111 D 1208201D 054 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308444 $489.77 000001081582-3562500610
2022 8 FD52 00 E121 D 1208201D 054 2/23/2022 1640 BRIDGE-REVIEW OF PLANS CA-XR022M1062205308444 $567.76 000001081582-3562500610
2022 8 FD52 00 E121 D 1208201D 054 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308444 $36.31 000001081582-3562500610
2022 8 FD52 00 E122 D 1208201D 054 2/23/2022 1640 BRIDGE-REVIEW OF PLANS CA-XR022M1062205308444 $6,442.75 000001081582-3562500610
2022 8 FD52 00 E122 D 1208201D 054 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308444 $411.27 000001081582-3562500610
2022 8 FD52 00 E123 D 1208201D 054 2/23/2022 1640 BRIDGE-REVIEW OF PLANS CA-XR022M1062205308444 $1,305.34 000001081582-3562500610
2022 8 FD52 00 E123 D 1208201D 054 2/23/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR022M1062205308444 $85.42 000001081582-3562500610
2022 8 FD52 00 E124 D 1208201D 054 2/23/2022 1640 BRIDGE-REVIEW OF PLANS CA-XR022M1062205308444 $3.24 000001081582-3562500610
2022 8 FD52 00 E361 D 1208201D 054 2/21/2022 5021 GEOTECH INVEST STRUCTURE (DESI TP-2200023742 $571.40
2022 8 FD52 00 E361 D 1208201D 054 2/21/2022 5021 GEOTECH INVEST STRUCTURE (DESI TP-2200023748 $571.40
2022 8 FD52 00 E361 D 1208201D 054 2/21/2022 5021 GEOTECH INVEST STRUCTURE (DESI TP-2200023740 $108.00
2022 8 FD52 00 E361 D 1208201D 054 2/21/2022 5021 GEOTECH INVEST STRUCTURE (DESI TP-2200023745 $108.00
2022 8 FD52 02 E797 D 1208201D 054 2/17/2022 3550 RAILROAD CONTRACTS PRC-2200143889 DO2200013895 CSX TRANSPORTATION INC $2,479.83
2022 8 FD52 00 E229 D 1208201D 054 2/11/2022 5021 GEOTECH INVEST STRUCTURE (DESI IET-XE13A162522041017300 $200.00
2022 8 FD52 00 E122 D 1208201D 054 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907433 $20.93 000001078766-3562500480
2022 8 FD52 00 E123 D 1208201D 054 2/9/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR021M1062203907433 $56.19 000001078766-3562500480
2022 8 FD52 00 E123 D 1208201D 054 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907433 $5.57 000001078766-3562500480
2022 8 FD52 00 E111 D 1208201D 054 2/9/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR021M1062203907449 $2,792.45 000001080935-3562500610
2022 8 FD52 00 E111 D 1208201D 054 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907449 $636.49 000001080935-3562500610
2022 8 FD52 00 E121 D 1208201D 054 2/9/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR021M1062203907449 $208.27 000001080935-3562500610
2022 8 FD52 00 E121 D 1208201D 054 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907449 $46.77 000001080935-3562500610
2022 8 FD52 00 E122 D 1208201D 054 2/9/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR021M1062203907449 $2,345.09 000001080935-3562500610
2022 8 FD52 00 E122 D 1208201D 054 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907449 $534.46 000001080935-3562500610
2022 8 FD52 00 E123 D 1208201D 054 2/9/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR021M1062203907449 $462.11 000001080935-3562500610
2022 8 FD52 00 E123 D 1208201D 054 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907449 $108.23 000001080935-3562500610
2022 8 FD52 00 E111 D 1208201D 054 2/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021M1062203907427 $79.66 000001078123-3562500636
2022 8 FD52 00 E111 D 1208201D 054 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907427 $73.19 000001078123-3562500636
2022 8 FD52 00 E121 D 1208201D 054 2/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021M1062203907427 $5.50 000001078123-3562500636
2022 8 FD52 00 E121 D 1208201D 054 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907427 $5.07 000001078123-3562500636
2022 8 FD52 00 E111 D 1208201D 054 2/9/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR021M1062203907432 $249.29 000001078766-3562500480
2022 8 FD52 00 E122 D 1208201D 054 2/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021M1062203907427 $66.80 000001078123-3562500636
2022 8 FD52 00 E111 D 1208201D 054 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907432 $24.93 000001078766-3562500480
2022 8 FD52 00 E122 D 1208201D 054 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907427 $61.46 000001078123-3562500636
2022 8 FD52 00 E121 D 1208201D 054 2/9/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR021M1062203907432 $17.40 000001078766-3562500480
2022 8 FD52 00 E123 D 1208201D 054 2/9/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR021M1062203907427 $15.09 000001078123-3562500636
2022 8 FD52 00 E121 D 1208201D 054 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907432 $1.74 000001078766-3562500480
2022 8 FD52 00 E123 D 1208201D 054 2/9/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR021M1062203907427 $13.67 000001078123-3562500636
2022 8 FD52 00 E122 D 1208201D 054 2/9/2022 3030 INSPECTION&SUPER-RAILROAD CA-XR021M1062203907432 $209.33 000001078766-3562500480
2022 7 FD52 00 E111 D 1208201D 054 1/24/2022 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR012M1062202106463 $2,758.84 000001080958-3562500610
2022 7 FD52 00 E111 D 1208201D 054 1/24/2022 0010 ENV STUDIES-UST/HZM CA-XR012M1062202106464 $210.26 000001081011-3562500061
2022 7 FD52 00 E111 D 1208201D 054 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106463 $63.49 000001080958-3562500610
2022 7 FD52 00 E111 D 1208201D 054 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106464 $2.68 000001081011-3562500061
2022 7 FD52 00 E121 D 1208201D 054 1/24/2022 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR012M1062202106463 $207.53 000001080958-3562500610
2022 7 FD52 00 E121 D 1208201D 054 1/24/2022 0010 ENV STUDIES-UST/HZM CA-XR012M1062202106464 $14.79 000001081011-3562500061
2022 7 FD52 00 E121 D 1208201D 054 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106463 $4.76 000001080958-3562500610
2022 7 FD52 00 E121 D 1208201D 054 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106464 $0.19 000001081011-3562500061
2022 7 FD52 00 E122 D 1208201D 054 1/24/2022 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR012M1062202106463 $2,315.33 000001080958-3562500610
2022 7 FD52 00 E122 D 1208201D 054 1/24/2022 0010 ENV STUDIES-UST/HZM CA-XR012M1062202106464 $176.55 000001081011-3562500061
2022 7 FD52 00 E122 D 1208201D 054 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106463 $53.31 000001080958-3562500610
2022 7 FD52 00 E122 D 1208201D 054 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106464 $2.25 000001081011-3562500061
2022 7 FD52 00 E123 D 1208201D 054 1/24/2022 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR012M1062202106463 $420.16 000001080958-3562500610
2022 7 FD52 00 E123 D 1208201D 054 1/24/2022 0010 ENV STUDIES-UST/HZM CA-XR012M1062202106464 $41.22 000001081011-3562500061
2022 7 FD52 00 E123 D 1208201D 054 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106463 $9.58 000001080958-3562500610
2022 7 FD52 00 E123 D 1208201D 054 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106464 $0.52 000001081011-3562500061
2022 7 FD52 00 E124 D 1208201D 054 1/24/2022 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR012M1062202106463 $1.19 000001080958-3562500610
2022 7 FD52 00 E124 D 1208201D 054 1/24/2022 0010 ENV STUDIES-UST/HZM CA-XR012M1062202106464 $0.07 000001081011-3562500061
2022 7 FD52 00 E124 D 1208201D 054 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106463 $0.02 000001080958-3562500610
2022 7 FD52 00 E111 D 1208201D 054 1/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012M1062202106437 $65.49 000001078123-3562500636
2022 7 FD52 00 E111 D 1208201D 054 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106437 $11.82 000001078123-3562500636
2022 7 FD52 00 E121 D 1208201D 054 1/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012M1062202106437 $4.54 000001078123-3562500636
2022 7 FD52 00 E121 D 1208201D 054 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106437 $0.81 000001078123-3562500636
2022 7 FD52 00 E122 D 1208201D 054 1/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012M1062202106437 $55.11 000001078123-3562500636
2022 7 FD52 00 E122 D 1208201D 054 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106437 $9.93 000001078123-3562500636
2022 7 FD52 00 E123 D 1208201D 054 1/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012M1062202106437 $12.37 000001078123-3562500636
2022 7 FD52 00 E123 D 1208201D 054 1/24/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR012M1062202106437 $2.20 000001078123-3562500636
2022 7 FD52 00 E124 D 1208201D 054 1/24/2022 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR012M1062202106437 $0.02 000001078123-3562500636
2022 7 FD52 00 E111 D 1208201D 054 1/24/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR012M1062202106462 $312.72 000001080935-3562500610
2022 7 FD52 00 E121 D 1208201D 054 1/24/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR012M1062202106462 $22.54 000001080935-3562500610
2022 7 FD52 00 E122 D 1208201D 054 1/24/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR012M1062202106462 $262.60 000001080935-3562500610
2022 7 FD52 00 E123 D 1208201D 054 1/24/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR012M1062202106462 $56.21 000001080935-3562500610
2022 7 FD52 00 E124 D 1208201D 054 1/24/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR012M1062202106462 $0.10 000001080935-3562500610
2022 7 FD52 00 E111 D 1208201D 054 1/10/2022 0010 ENV STUDIES-UST/HZM CA-XR011M1062200705562 $95.57 000001081011-3562500061
2022 7 FD52 00 E111 D 1208201D 054 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705562 $47.79 000001081011-3562500061
2022 7 FD52 00 E121 D 1208201D 054 1/10/2022 0010 ENV STUDIES-UST/HZM CA-XR011M1062200705562 $6.72 000001081011-3562500061
2022 7 FD52 00 E121 D 1208201D 054 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705562 $3.37 000001081011-3562500061
2022 7 FD52 00 E122 D 1208201D 054 1/10/2022 0010 ENV STUDIES-UST/HZM CA-XR011M1062200705562 $80.25 000001081011-3562500061
2022 7 FD52 00 E122 D 1208201D 054 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705562 $40.13 000001081011-3562500061
2022 7 FD52 00 E123 D 1208201D 054 1/10/2022 0010 ENV STUDIES-UST/HZM CA-XR011M1062200705562 $18.82 000001081011-3562500061
2022 7 FD52 00 E123 D 1208201D 054 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705562 $9.28 000001081011-3562500061
2022 7 FD52 00 E111 D 1208201D 054 1/10/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR011M1062200705560 $2,699.70 000001080935-3562500610
2022 7 FD52 00 E111 D 1208201D 054 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705560 $2,947.37 000001080935-3562500610
2022 7 FD52 00 E121 D 1208201D 054 1/10/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR011M1062200705560 $196.85 000001080935-3562500610
2022 7 FD52 00 E121 D 1208201D 054 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705560 $217.62 000001080935-3562500610
2022 7 FD52 00 E122 D 1208201D 054 1/10/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR011M1062200705560 $2,266.94 000001080935-3562500610
2022 7 FD52 00 E122 D 1208201D 054 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705560 $2,474.91 000001080935-3562500610
2022 7 FD52 00 E123 D 1208201D 054 1/10/2022 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR011M1062200705560 $466.46 000001080935-3562500610
2022 7 FD52 00 E123 D 1208201D 054 1/10/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR011M1062200705560 $475.79 000001080935-3562500610
2022 7 FD52 00 E123 D 1208201D 054 1/6/2022 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504521 $0.64 000001080958-3562500610
2022 7 FD52 00 E124 D 1208201D 054 1/6/2022 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR122L1062135504521 $0.18 000001080958-3562500610
2022 6 FD52 00 E111 D 1208201D 054 12/22/2021 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR122L1062135504519 $1,314.28 000001080935-3562500610
2022 6 FD52 00 E111 D 1208201D 054 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504519 $9.10 000001080935-3562500610
2022 6 FD52 00 E121 D 1208201D 054 12/22/2021 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR122L1062135504519 $94.69 000001080935-3562500610
2022 6 FD52 00 E121 D 1208201D 054 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504519 $0.68 000001080935-3562500610
2022 6 FD52 00 E122 D 1208201D 054 12/22/2021 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR122L1062135504519 $1,103.50 000001080935-3562500610
2022 6 FD52 00 E122 D 1208201D 054 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504519 $7.64 000001080935-3562500610
2022 6 FD52 00 E123 D 1208201D 054 12/22/2021 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR122L1062135504519 $213.40 000001080935-3562500610
2022 6 FD52 00 E123 D 1208201D 054 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504519 $0.96 000001080935-3562500610
2022 6 FD52 00 E124 D 1208201D 054 12/22/2021 5021 GEOTECH INVEST STRUCTURE (DESI CA-XR122L1062135504519 $0.40 000001080935-3562500610
2022 6 FD52 00 E111 D 1208201D 054 12/22/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122L1062135504479 $99.36 000001078123-3562500636
2022 6 FD52 00 E111 D 1208201D 054 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504479 $56.88 000001078123-3562500636
2022 6 FD52 00 E121 D 1208201D 054 12/22/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122L1062135504479 $6.90 000001078123-3562500636
2022 6 FD52 00 E121 D 1208201D 054 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504479 $3.95 000001078123-3562500636
2022 6 FD52 00 E122 D 1208201D 054 12/22/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122L1062135504479 $83.50 000001078123-3562500636
2022 6 FD52 00 E122 D 1208201D 054 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504479 $47.76 000001078123-3562500636
2022 6 FD52 00 E123 D 1208201D 054 12/22/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122L1062135504479 $17.90 000001078123-3562500636
2022 6 FD52 00 E123 D 1208201D 054 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504479 $10.11 000001078123-3562500636
2022 6 FD52 00 E124 D 1208201D 054 12/22/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR122L1062135504479 $0.03 000001078123-3562500636
2022 6 FD52 00 E124 D 1208201D 054 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504479 $0.02 000001078123-3562500636
2022 6 FD52 00 E111 D 1208201D 054 12/22/2021 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR122L1062135504520 $583.91 000001080958-3562500610
2022 6 FD52 00 E111 D 1208201D 054 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504520 $3.50 000001080958-3562500610
2022 6 FD52 00 E121 D 1208201D 054 12/22/2021 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR122L1062135504520 $41.44 000001080958-3562500610
2022 6 FD52 00 E121 D 1208201D 054 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504520 $0.25 000001080958-3562500610
2022 6 FD52 00 E122 D 1208201D 054 12/22/2021 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR122L1062135504520 $490.31 000001080958-3562500610
2022 6 FD52 00 E122 D 1208201D 054 12/22/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR122L1062135504520 $2.94 000001080958-3562500610
2022 6 FD52 00 E123 D 1208201D 054 12/22/2021 5011 GEOTECH INVEST ROADWAY (DESIGN CA-XR122L1062135504520 $106.89 000001080958-3562500610
2022 6 FD52 02 E143 D 1208201D 054 12/15/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200099874 PON22100001141 Integrated Engineering $16,654.00 Engineering and Related Services
2022 6 FD52 02 E143 D 1208201D 054 12/13/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200099037 PON22000000583 RHA LLC $9,780.64 Letter Agreement 3
2022 6 FD52 00 E111 D 1208201D 054 12/10/2021 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR121L1062134103573 $123.74 000001080671-3562500630
2022 6 FD52 00 E111 D 1208201D 054 12/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103573 $47.72 000001080671-3562500630
2022 6 FD52 00 E121 D 1208201D 054 12/10/2021 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR121L1062134103573 $8.64 000001080671-3562500630
2022 6 FD52 00 E121 D 1208201D 054 12/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103573 $3.33 000001080671-3562500630
2022 6 FD52 00 E122 D 1208201D 054 12/10/2021 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR121L1062134103573 $103.90 000001080671-3562500630
2022 6 FD52 00 E122 D 1208201D 054 12/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103573 $40.07 000001080671-3562500630
2022 6 FD52 00 E123 D 1208201D 054 12/10/2021 1060 RDWAY PLANS-FINAL-DRAINAGE SEC CA-XR121L1062134103573 $25.02 000001080671-3562500630
2022 6 FD52 00 E123 D 1208201D 054 12/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103573 $9.54 000001080671-3562500630
2022 6 FD52 00 E111 D 1208201D 054 12/8/2021 1620 BRIDGE DESIGN & PLANS CA-XR121L1062134103580 $77.78 000001080784-3562500610
2022 6 FD52 00 E111 D 1208201D 054 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103580 $29.11 000001080784-3562500610
2022 6 FD52 00 E121 D 1208201D 054 12/8/2021 1620 BRIDGE DESIGN & PLANS CA-XR121L1062134103580 $5.78 000001080784-3562500610
2022 6 FD52 00 E121 D 1208201D 054 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103580 $2.16 000001080784-3562500610
2022 6 FD52 00 E122 D 1208201D 054 12/8/2021 1620 BRIDGE DESIGN & PLANS CA-XR121L1062134103580 $65.31 000001080784-3562500610
2022 6 FD52 00 E122 D 1208201D 054 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103580 $24.44 000001080784-3562500610
2022 6 FD52 00 E123 D 1208201D 054 12/8/2021 1620 BRIDGE DESIGN & PLANS CA-XR121L1062134103580 $14.72 000001080784-3562500610
2022 6 FD52 00 E123 D 1208201D 054 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103580 $5.39 000001080784-3562500610
2022 6 FD52 00 E111 D 1208201D 054 12/8/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121L1062134103548 $159.06 000001078123-3562500636
2022 6 FD52 00 E111 D 1208201D 054 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103548 $54.49 000001078123-3562500636
2022 6 FD52 00 E121 D 1208201D 054 12/8/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121L1062134103548 $10.99 000001078123-3562500636
2022 6 FD52 00 E121 D 1208201D 054 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103548 $3.76 000001078123-3562500636
2022 6 FD52 00 E122 D 1208201D 054 12/8/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121L1062134103548 $133.60 000001078123-3562500636
2022 6 FD52 00 E122 D 1208201D 054 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103548 $45.75 000001078123-3562500636
2022 6 FD52 00 E123 D 1208201D 054 12/8/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR121L1062134103548 $28.59 000001078123-3562500636
2022 6 FD52 00 E123 D 1208201D 054 12/8/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR121L1062134103548 $9.67 000001078123-3562500636
2022 5 FD52 00 E111 D 1208201D 054 11/23/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112L1062132602512 $119.43 000001078123-3562500636
2022 5 FD52 00 E111 D 1208201D 054 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602512 $65.63 000001078123-3562500636
2022 5 FD52 00 E121 D 1208201D 054 11/23/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112L1062132602512 $8.28 000001078123-3562500636
2022 5 FD52 00 E121 D 1208201D 054 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602512 $4.55 000001078123-3562500636
2022 5 FD52 00 E122 D 1208201D 054 11/23/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112L1062132602512 $100.20 000001078123-3562500636
2022 5 FD52 00 E122 D 1208201D 054 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602512 $55.11 000001078123-3562500636
2022 5 FD52 00 E123 D 1208201D 054 11/23/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112L1062132602512 $21.48 000001078123-3562500636
2022 5 FD52 00 E123 D 1208201D 054 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602512 $11.66 000001078123-3562500636
2022 5 FD52 00 E124 D 1208201D 054 11/23/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR112L1062132602512 $0.04 000001078123-3562500636
2022 5 FD52 00 E124 D 1208201D 054 11/23/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR112L1062132602512 $0.02 000001078123-3562500636
2022 5 FD52 00 E111 D 1208201D 054 11/12/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111L1062130901508 $153.05 000001078123-3562500636
2022 5 FD52 00 E111 D 1208201D 054 11/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901508 $56.00 000001078123-3562500636
2022 5 FD52 00 E121 D 1208201D 054 11/12/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111L1062130901508 $10.58 000001078123-3562500636
2022 5 FD52 00 E121 D 1208201D 054 11/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901508 $3.86 000001078123-3562500636
2022 5 FD52 00 E122 D 1208201D 054 11/12/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111L1062130901508 $128.59 000001078123-3562500636
2022 5 FD52 00 E122 D 1208201D 054 11/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901508 $47.03 000001078123-3562500636
2022 5 FD52 00 E123 D 1208201D 054 11/12/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR111L1062130901508 $27.52 000001078123-3562500636
2022 5 FD52 00 E123 D 1208201D 054 11/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR111L1062130901508 $9.95 000001078123-3562500636
2022 4 FD52 00 E111 D 1208201D 054 10/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102L1062129500404 $178.97 000001078123-3562500636
2022 4 FD52 00 E111 D 1208201D 054 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500404 $39.78 000001078123-3562500636
2022 4 FD52 00 E121 D 1208201D 054 10/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102L1062129500404 $12.43 000001078123-3562500636
2022 4 FD52 00 E121 D 1208201D 054 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500404 $2.75 000001078123-3562500636
2022 4 FD52 00 E122 D 1208201D 054 10/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102L1062129500404 $150.30 000001078123-3562500636
2022 4 FD52 00 E122 D 1208201D 054 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500404 $33.40 000001078123-3562500636
2022 4 FD52 00 E123 D 1208201D 054 10/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102L1062129500404 $32.13 000001078123-3562500636
2022 4 FD52 00 E123 D 1208201D 054 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500404 $7.07 000001078123-3562500636
2022 4 FD52 00 E124 D 1208201D 054 10/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR102L1062129500404 $0.05 000001078123-3562500636
2022 4 FD52 00 E124 D 1208201D 054 10/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR102L1062129500404 $0.01 000001078123-3562500636
2022 4 FD52 00 E111 D 1208201D 054 10/14/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101L1062128110122 $79.45 000001078123-3562500636
2022 4 FD52 00 E111 D 1208201D 054 10/14/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110122 $2.39 000001078123-3562500636
2022 4 FD52 00 E121 D 1208201D 054 10/14/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101L1062128110122 $5.50 000001078123-3562500636
2022 4 FD52 00 E121 D 1208201D 054 10/14/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110122 $0.17 000001078123-3562500636
2022 4 FD52 00 E122 D 1208201D 054 10/14/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101L1062128110122 $66.80 000001078123-3562500636
2022 4 FD52 00 E122 D 1208201D 054 10/14/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110122 $2.01 000001078123-3562500636
2022 4 FD52 00 E123 D 1208201D 054 10/14/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR101L1062128110122 $14.26 000001078123-3562500636
2022 4 FD52 00 E123 D 1208201D 054 10/14/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR101L1062128110122 $0.42 000001078123-3562500636
2022 4 FD52 02 E143 D 1208201D 054 10/12/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200059862 PON22100001141 Integrated Engineering $11,758.00 Engineering and Related Services
2022 4 FD52 02 E143 D 1208201D 054 10/11/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200059871 PON22100001141 Integrated Engineering $18,579.00 Engineering and Related Services
2022 3 FD52 00 E111 D 1208201D 054 9/27/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092L1062126709039 $159.04 000001078123-3562500636
2022 3 FD52 00 E111 D 1208201D 054 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709039 $106.20 000001078123-3562500636
2022 3 FD52 00 E121 D 1208201D 054 9/27/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092L1062126709039 $11.04 000001078123-3562500636
2022 3 FD52 00 E121 D 1208201D 054 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709039 $7.36 000001078123-3562500636
2022 3 FD52 00 E122 D 1208201D 054 9/27/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092L1062126709039 $133.60 000001078123-3562500636
2022 3 FD52 00 E122 D 1208201D 054 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709039 $89.17 000001078123-3562500636
2022 3 FD52 00 E123 D 1208201D 054 9/27/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092L1062126709039 $28.67 000001078123-3562500636
2022 3 FD52 00 E123 D 1208201D 054 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709039 $18.86 000001078123-3562500636
2022 3 FD52 00 E124 D 1208201D 054 9/27/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR092L1062126709039 $0.05 000001078123-3562500636
2022 3 FD52 00 E124 D 1208201D 054 9/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR092L1062126709039 $0.04 000001078123-3562500636
2022 3 FD52 02 E143 D 1208201D 054 9/16/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2200046365 PON22000000583 RHA LLC $39,122.54 Letter Agreement 3
2022 3 FD52 00 E111 D 1208201D 054 9/13/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091L1062125207983 $291.67 000001078123-3562500636
2022 3 FD52 00 E111 D 1208201D 054 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207983 $13.49 000001078123-3562500636
2022 3 FD52 00 E121 D 1208201D 054 9/13/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091L1062125207983 $20.16 000001078123-3562500636
2022 3 FD52 00 E121 D 1208201D 054 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207983 $0.94 000001078123-3562500636
2022 3 FD52 00 E122 D 1208201D 054 9/13/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091L1062125207983 $244.93 000001078123-3562500636
2022 3 FD52 00 E122 D 1208201D 054 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207983 $11.33 000001078123-3562500636
2022 3 FD52 00 E123 D 1208201D 054 9/13/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR091L1062125207983 $52.27 000001078123-3562500636
2022 3 FD52 00 E123 D 1208201D 054 9/13/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR091L1062125207983 $2.40 000001078123-3562500636
2022 2 FD52 00 E111 D 1208201D 054 8/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082L1062123606974 $87.51 000001078123-3562500636
2022 2 FD52 00 E111 D 1208201D 054 8/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082L1062123606974 $87.51 000001078123-3562500636
2022 2 FD52 00 E121 D 1208201D 054 8/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082L1062123606974 $6.07 000001078123-3562500636
2022 2 FD52 00 E121 D 1208201D 054 8/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082L1062123606974 $6.07 000001078123-3562500636
2022 2 FD52 00 E122 D 1208201D 054 8/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082L1062123606974 $73.48 000001078123-3562500636
2022 2 FD52 00 E122 D 1208201D 054 8/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082L1062123606974 $73.48 000001078123-3562500636
2022 2 FD52 00 E123 D 1208201D 054 8/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082L1062123606974 $15.81 000001078123-3562500636
2022 2 FD52 00 E123 D 1208201D 054 8/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082L1062123606974 $15.54 000001078123-3562500636
2022 2 FD52 00 E124 D 1208201D 054 8/25/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR082L1062123606974 $0.03 000001078123-3562500636
2022 2 FD52 00 E124 D 1208201D 054 8/25/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR082L1062123606974 $0.03 000001078123-3562500636
2022 2 FD52 02 E255 D 1208201D 054 8/24/2021 1210 PUBLIC HEARINGS, ACTION PLAN PRC-2200021071 Greenwell Chisholm Printing Company $487.30
2022 2 FD52 00 E111 D 1208201D 054 8/11/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081L1062121805830 $318.21 000001078123-3562500636
2022 2 FD52 00 E111 D 1208201D 054 8/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805830 $67.61 000001078123-3562500636
2022 2 FD52 00 E121 D 1208201D 054 8/11/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081L1062121805830 $21.99 000001078123-3562500636
2022 2 FD52 00 E121 D 1208201D 054 8/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805830 $4.67 000001078123-3562500636
2022 2 FD52 00 E122 D 1208201D 054 8/11/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081L1062121805830 $267.20 000001078123-3562500636
2022 2 FD52 00 E122 D 1208201D 054 8/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805830 $56.78 000001078123-3562500636
2022 2 FD52 00 E123 D 1208201D 054 8/11/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR081L1062121805830 $57.11 000001078123-3562500636
2022 2 FD52 00 E123 D 1208201D 054 8/11/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR081L1062121805830 $12.01 000001078123-3562500636
2022 1 FD52 00 E111 D 1208201D 054 7/26/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072L1062120404705 $119.36 000001078123-3562500636
2022 1 FD52 00 E111 D 1208201D 054 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404705 $20.29 000001078123-3562500636
2022 1 FD52 00 E121 D 1208201D 054 7/26/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072L1062120404705 $8.28 000001078123-3562500636
2022 1 FD52 00 E121 D 1208201D 054 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404705 $1.42 000001078123-3562500636
2022 1 FD52 00 E122 D 1208201D 054 7/26/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072L1062120404705 $100.20 000001078123-3562500636
2022 1 FD52 00 E122 D 1208201D 054 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404705 $17.04 000001078123-3562500636
2022 1 FD52 00 E123 D 1208201D 054 7/26/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072L1062120404705 $21.41 000001078123-3562500636
2022 1 FD52 00 E123 D 1208201D 054 7/26/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR072L1062120404705 $3.60 000001078123-3562500636
2022 1 FD52 00 E124 D 1208201D 054 7/26/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR072L1062120404705 $0.04 000001078123-3562500636
2022 1 FD52 00 E111 D 1208201D 054 7/12/2021 3030 INSPECTION&SUPER-RAILROAD CA-XR071L1062119003584 $249.25 000001078766-3562500480
2022 1 FD52 00 E111 D 1208201D 054 7/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003584 $110.02 000001078766-3562500480
2022 1 FD52 00 E121 D 1208201D 054 7/12/2021 3030 INSPECTION&SUPER-RAILROAD CA-XR071L1062119003584 $17.16 000001078766-3562500480
2022 1 FD52 00 E121 D 1208201D 054 7/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003584 $7.58 000001078766-3562500480
2022 1 FD52 00 E122 D 1208201D 054 7/12/2021 3030 INSPECTION&SUPER-RAILROAD CA-XR071L1062119003584 $210.21 000001078766-3562500480
2022 1 FD52 00 E122 D 1208201D 054 7/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003584 $92.89 000001078766-3562500480
2022 1 FD52 00 E123 D 1208201D 054 7/12/2021 3030 INSPECTION&SUPER-RAILROAD CA-XR071L1062119003584 $53.60 000001078766-3562500480
2022 1 FD52 00 E123 D 1208201D 054 7/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003584 $23.38 000001078766-3562500480
2022 1 FD52 00 E111 D 1208201D 054 7/12/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071L1062119003565 $298.38 000001078123-3562500636
2022 1 FD52 00 E111 D 1208201D 054 7/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003565 $15.11 000001078123-3562500636
2022 1 FD52 00 E121 D 1208201D 054 7/12/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071L1062119003565 $20.62 000001078123-3562500636
2022 1 FD52 00 E121 D 1208201D 054 7/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003565 $1.05 000001078123-3562500636
2022 1 FD52 00 E122 D 1208201D 054 7/12/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071L1062119003565 $251.87 000001078123-3562500636
2022 1 FD52 00 E122 D 1208201D 054 7/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003565 $12.76 000001078123-3562500636
2022 1 FD52 00 E123 D 1208201D 054 7/12/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR071L1062119003565 $53.47 000001078123-3562500636
2022 1 FD52 00 E123 D 1208201D 054 7/12/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR071L1062119003565 $2.68 000001078123-3562500636
2022 1 FD52 00 E122 D 1208201D 054 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302492 $75.57 000001078123-3562500636
2022 1 FD52 00 E123 D 1208201D 054 7/1/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062L1062117302492 $3.70 000001078123-3562500636
2022 1 FD52 00 E123 D 1208201D 054 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302492 $15.89 000001078123-3562500636
2022 1 FD52 00 E124 D 1208201D 054 7/1/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062L1062117302492 $0.01 000001078123-3562500636
2022 1 FD52 00 E124 D 1208201D 054 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302492 $0.03 000001078123-3562500636
2022 1 FD52 00 E111 D 1208201D 054 7/1/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062L1062117302492 $19.90 000001078123-3562500636
2022 1 FD52 00 E123 D 1208201D 054 7/1/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061L1062116001491P $7.16 000001078123-3562500636
2022 1 FD52 00 E123 D 1208201D 054 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061L1062116001491P $4.38 000001078123-3562500636
2022 1 FD52 00 E111 D 1208201D 054 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302492 $89.50 000001078123-3562500636
2022 1 FD52 00 E121 D 1208201D 054 7/1/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062L1062117302492 $1.38 000001078123-3562500636
2022 1 FD52 00 E121 D 1208201D 054 7/1/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR062L1062117302492 $6.21 000001078123-3562500636
2022 1 FD52 00 E122 D 1208201D 054 7/1/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR062L1062117302492 $16.79 000001078123-3562500636
2021 12 FD52 02 E143 D 1208201D 054 6/15/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100206046 PON22100001141 Integrated Engineering $26,992.00 Engineering and Related Services
2021 12 FD52 00 E111 D 1208201D 054 6/10/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061L1062116001491 $39.68 000001078123-3562500636
2021 12 FD52 00 E111 D 1208201D 054 6/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061L1062116001491 $24.67 000001078123-3562500636
2021 12 FD52 00 E121 D 1208201D 054 6/10/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061L1062116001491 $2.75 000001078123-3562500636
2021 12 FD52 00 E121 D 1208201D 054 6/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061L1062116001491 $1.70 000001078123-3562500636
2021 12 FD52 00 E122 D 1208201D 054 6/10/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR061L1062116001491 $33.59 000001078123-3562500636
2021 12 FD52 00 E122 D 1208201D 054 6/10/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR061L1062116001491 $20.83 000001078123-3562500636
2021 12 FD52 02 E143 D 1208201D 054 6/2/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100197672 PON22100001141 Integrated Engineering $11,098.00 Engineering and Related Services
2021 11 FD52 00 E111 D 1208201D 054 5/27/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052L1062114100422 $109.34 000001078123-3562500636
2021 11 FD52 00 E111 D 1208201D 054 5/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052L1062114100422 $72.63 000001078123-3562500636
2021 11 FD52 00 E121 D 1208201D 054 5/27/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052L1062114100422 $7.59 000001078123-3562500636
2021 11 FD52 00 E121 D 1208201D 054 5/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052L1062114100422 $5.04 000001078123-3562500636
2021 11 FD52 00 E122 D 1208201D 054 5/27/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052L1062114100422 $92.35 000001078123-3562500636
2021 11 FD52 00 E122 D 1208201D 054 5/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052L1062114100422 $61.32 000001078123-3562500636
2021 11 FD52 00 E123 D 1208201D 054 5/27/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052L1062114100422 $19.71 000001078123-3562500636
2021 11 FD52 00 E123 D 1208201D 054 5/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052L1062114100422 $12.90 000001078123-3562500636
2021 11 FD52 00 E124 D 1208201D 054 5/27/2021 1040 ROADWAY PLANS-PRELIMINARY-OFF CA-XR052L1062114100422 $0.03 000001078123-3562500636
2021 11 FD52 00 E124 D 1208201D 054 5/27/2021 7777 FEDERAL NON-PARTICIPATING LEAVE COSTS CA-XR052L1062114100422 $0.02 000001078123-3562500636
2021 10 FD52 02 E143 D 1208201D 054 4/15/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100163812 PON22100001141 Integrated Engineering $39,219.00 Engineering and Related Services
2021 9 FD52 02 E143 D 1208201D 054 3/30/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100155194 PON22100001141 Integrated Engineering $34,915.00 Engineering and Related Services
2021 9 FD52 00 E143 D 1208201D 054 3/16/2021 0410 TRANSPORTATION PLANNING PRC-2100149952 PON22000004356 STANTEC CONSULTING SERVICES INC $8,092.80 2P/LA #F-01 70-0087.1/121
2021 8 FD52 02 E143 D 1208201D 054 2/17/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100127853 PON22100001141 Integrated Engineering $40,658.00 Engineering and Related Services
2021 7 FD52 02 E143 D 1208201D 054 1/25/2021 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100115017 PON22100001141 Integrated Engineering $19,778.00 Engineering and Related Services
2021 6 FD52 00 E143 D 1208201D 054 12/11/2020 0410 TRANSPORTATION PLANNING PRC-2100091286 PON22000004356 STANTEC CONSULTING SERVICES INC $12,139.20 1P.LA #F-01 2-8305 & 7-87.1/121/054-8305
2021 6 FD52 02 E143 D 1208201D 054 12/10/2020 1550 DESIGN CONTRACTS-CONSULTANT PRC-2100090966 PON22100001141 Integrated Engineering $62,212.00 Engineering and Related Services