RIVERSIDE EXPRESSWAY |
JEFFERSON |
$215,000.00 |
95048 - 3 |
4/13/2022 |
. |
I 64 |
RIVERSIDE EXPRESSWAY |
JEFFERSON |
$1,796,298.00 |
95048 - 2 |
7/13/2021 |
THIS AUTHORIZATION PROVIDES CONSTRUCTION FUNDS TO COVER THE LOW BID PLUS 15% FOR ENGINEERING. |
I 64 |
RIVERSIDE EXPRESSWAY |
JEFFERSON |
$5,285,344.00 |
95048 - 1 |
8/13/2020 |
THIS AUTHORIZATION PROVIDES CONSTRUCTION FUNDS TO COVER THE LOW BID PLUS 15% FOR ENGINEERING. |
I 64 |
RIVERSIDE EXPRESSWAY |
JEFFERSON |
$400,000.00 |
95048 - 0 |
10/26/2018 |
THIS AUTHORIZATION PROVIDES INITIAL DESIGN FUNDS FOR THE PROJECT. TJ |
I 64 |