US-79 |
TODD |
$1,250,000.00 |
94555 - 12 |
3/18/2024 |
THIS MODIFICATION PROVIDES ADDITIONAL FD52 NHPP FUNDS WITH STATE MATCHING FUNDS FOR RIGHT OF WAY FOR 3-80001.10, EMARS NO. 9455502R. |
US 79 |
US-79 |
TODD |
$3,435,000.00 |
94555 - 11 |
9/20/2022 |
THIS AUTHORIZATION PROVIDES INITIAL FD52 NHPP FUNDS WITH STATE MATCHING FUNDS FOR THE UTILITY PHASE FOR ITEM NO. 3-80001.10. |
US 79 |
US-79 |
TODD |
$11,063,319.00 |
94555 - 10 |
9/20/2022 |
THIS AUTHORIZATION PROVIDES FEDERAL BUILD GRANT CONSTRUCTION FUNDS TO COVER LOW-BID AND CEI. |
US 79 |
US-79 |
TODD |
$1,250,000.00 |
94555 - 9 |
5/9/2022 |
THIS AUTHORIZATION PROVIDES INITIAL FD52 NHPP RIGHT OF WAY FUNDS FOR ITEM NO. 3-80001.10, AND CORRECTS THE ITEM NO. FOR PREVIOUSLY AUTHORIZED RIGHT OF WAY FUNDS. (RW FUNDS PREVIOUSLY AUTHORIZED UNDER 3-80001.00 WERE FOR ITEM NO. 3-80001.20) |
US 79 |
US-79 |
TODD |
$515,000.00 |
94555 - 8 |
10/19/2021 |
THIS MODIFICATION PROVIDES ADDITIONAL $412,000 FD52 BUILD GRANT FUNDING WITH $103,000 STATE MATCHING FUNDS FOR UTILITIES. |
US 79 |
US-79 |
TODD |
$100,000.00 |
94555 - 7 |
9/13/2021 |
THIS MODIFICATION PROVIDES ADDITIONAL NHPP FUNDS WITH STATE MATCHING FUNDS FOR RIGHT OF WAY. |
US 79 |
US-79 |
TODD |
$1,345,000.00 |
94555 - 6 |
4/29/2021 |
THIS AUTHORIZATION PROVIDES $1,076,000 FD52 BUILD FUNDS WITH $269,000 STATE MATCHING FUNDS FOR THE UTILITY PHASE OF THE US 79 OVER THE CSX BRIDGE PORTION OF THE BUILD PROJECT (3-80001). FHWA APPROVAL TO USE ADVANCE CONSTRUCTION PROCEDURES AND TAPERED MATCH FOR THE US 79 BRIDGE REPLACEMENT BUILD PROJECT IN RUSSELLVILLE, KY IN MEMO SIGNED 4/2/21. |
US 79 |
US-79 |
TODD |
$350,000.00 |
94555 - 5 |
2/11/2021 |
THIS MODIFICATION PROVIDES $350,000 OF FD04 FUNDS TO COVER CONTRACT MOD. NO. 3 AND RR COORDINATION. |
US 79 |
US-79 |
TODD |
$270,000.00 |
94555 - 4 |
12/28/2020 |
THIS AUTHORIZATION PROVIDES FD52 NHPP FUNDS FOR THE R/W PHASE WITH STATE MATCHING FUNDS. (PROJECT IS PART OF BUILD PROJECT) |
US 79 |
US-79 |
TODD |
$535,000.00 |
94555 - 3 |
8/20/2020 |
THIS MODIFICATION PROVIDES ADDITIONAL FUNDS TO COMPLETE FINAL DESIGN. |
US 79 |
US-79 |
TODD |
$15,000.00 |
94555 - 2 |
5/8/2020 |
THIS MODIFICATION PROVIDES ADDITIONAL $15,000 FD04 FUNDS TO COMPLETE ENVIRONMENTAL. |
US 79 |
US-79 |
TODD |
$50,000.00 |
94555 - 1 |
10/7/2019 |
THIS MODIFICATION PROVIDES ADDITIONAL $50,000 FD04 FUNDS FOR DESIGN. |
US 79 |
US-79 |
TODD |
$600,000.00 |
94555 - 0 |
8/1/2018 |
THIS AUTHORIZATION PROVIDES INITIAL DESIGN FUNDS (FD04) FOR THE PROJECT. LC |
US 79 |