I-75 |
BOONE |
$20,000.00 |
80222 - 15 |
3/2/2022 |
THIS MODIFICATION PROVIDES ADDITIONAL FD52 NHPP FUNDS FOR DESIGN, TOLL CREDIT MATCH. |
I 75 |
I-75 |
BOONE |
$10,000.00 |
80222 - 14 |
5/25/2021 |
THIS MODIFICATION PROVIDES ADDITIONAL FD52 FUNDS TO COVER CURRENT EXPENDITURES, TOLL CREDIT MATCH. |
I 75 |
I-75 |
BOONE |
$75,000.00 |
80222 - 13 |
11/25/2020 |
THIS MODIFICATION PROVIDES ADDITIONAL FD52 FUNDS FOR DESIGN WITH TOLL CREDIT MATCH. |
I 75 |
I-75 |
BOONE |
$4,912,833.00 |
80222 - 12 |
12/5/2019 |
THIS MODIFICATION PROVIDES ADDITIONAL FD52 FUNDS WITH STATE MATCH TO COVER THE I-71/I-75 INFRA DESIGN-BUILD AWARD. |
I 75 |
I-75 |
BOONE |
$27,169,000.00 |
80222 - 11 |
9/9/2019 |
THIS AUTHORIZATION PROVIDES ADDITIONAL FEDERAL FUNDS FOR THE UTILITY PHASE AND INITIAL FEDERAL FUNDS FOR THE CONSTRUCTION PHASE FOR ITEM NO. 6-14.00 AS OUTLINED IN THE INFRA GRANT APPLICATION WITH STATE MATCHING FUNDS. DESIGN-BUILD PROJECT. |
I 75 |
I-75 |
BOONE |
$250,000.00 |
80222 - 10 |
6/28/2019 |
THIS MODIFICATION PROVIDES AN ADDITIONAL $250,000 (FD52) TO COVER CONTRACT MOD#5. PROGRAM 80222-03D (INFRA GRANT PROJECT) |
I 75 |
I-75 |
BOONE |
$21,747,000.00 |
80222 - 9 |
2/1/2019 |
THIS MOD. PROVIDES CONSTRUCTION FUNDS TO COVER THE LOW BID PLUS ENGINEERING. JAN. 25, 2019 LETTING CID-191001 ITEM NO 06-00014.50 EMARS 8022201C |
I 75 |
I-75 |
BOONE |
$315,000.00 |
80222 - 8 |
7/16/2018 |
THIS AUTHORIZATION PROVIDES INITIAL UTILITY FUNDS FOR ITEM NO. 6-14.00. UTILITY PHASE WILL BE MATCHED WITH STATE FUNDS TO PROVIDE REQUIRED NON-FEDERAL MATCHING FUNDS AS PER INFRA AGREEMENT. LC |
I 75 |
I-75 |
BOONE |
$535,000.00 |
80222 - 7 |
12/8/2017 |
THIS AUTHORIZATION PROVIDES INITIAL UTILITY FUNDS FOR THE PROJECT. LC |
I 75 |
I-75 |
BOONE |
$10,100,000.00 |
80222 - 6 |
9/22/2016 |
THIS AUTHORIZATION PROVIDES INITIAL RIGHT OF WAY FUNDS (41 PARCELS) FOR THE PROJECT UNDER ITEM NUMBER 6-14.0. TJ |
I 75 |
I-75 |
BOONE |
$2,000,000.00 |
80222 - 5 |
6/2/2014 |
THIS AUTHORIZATION PROVIDES INITIAL RIGHT OF WAY FUNDS (13 PARCELS) FOR THE PROJECT UNDER ITEM NUMBER 6-14.5. TJ |
I 75 |
I-75 |
BOONE |
$1,525,000.00 |
80222 - 4 |
11/26/2013 |
THIS MOD PROVIDES ADDITIONAL DESIGN FUNDS TO BEGIN PHASE 2 DESIGN WORK FOR ITEM NO 6-14.00. TJ. |
I 75 |
I-75 |
BOONE |
$1,500,000.00 |
80222 - 3 |
8/22/2010 |
THIS AUTHORIZATION PROVIDES INITAL DESIGN FUNDS FOR ITEM NO 6-14.50. DE |
I 75 |
I-75 |
BOONE |
$2,914,000.00 |
80222 - 2 |
6/28/2010 |
THIS AUTHORIZATION PROVIDES INITAL DESIGN FUNDS FOR ITEM NO 6-14.00. THIS MODIFICATION PROVIDES ADDITIONAL DESIGN FUNDS FOR ITEM NUMBER 6-14.01 TO COVER A NEGATIVE BALANCE, STATE FORCE CHARGES AND OUTSTANDING INVOICE. DE |
I 75 |
I-75 |
BOONE |
$45,000.00 |
80222 - 1 |
1/12/2009 |
THIS MODIFICATION PROVIDES DESIGN FUNDS FOR THE INTERCHANGE JUSTIFICATION STUDY ON 6-14.01 CONTRACT MOD #1. TOLL CREDITS WILL BE USED IN LIEU OF THE STATE MATCHING FUNDS. TB |
I 75 |
I-75 |
BOONE |
$700,000.00 |
80222 - 0 |
11/15/2006 |
THIS AUTHORIZATION PROVIDES FUNDING FOR PREPARATION OF A JOINT INTERCHANGE MODIFICATION REPORT (IMR) FOR BOTH THE MT. ZION AND RICHWOOD ROAD INTERCHANGES. TOLL CREDITS WILL BE USED IN LIEU OF THE STATE MATCHING FUNDS. BA |
I 75 |