I-64 |
SHELBY |
$1,025,000.00 |
76140 - 27 |
3/5/2021 |
THIS AUTHORIZATION PROVIDES FD52 NHPP FUNDS WITH STATE MATCHING FUNDS FOR UTILITIES FOR ITEM NO. 5-65.40. |
I 64 |
I-64 |
SHELBY |
$2,000,000.00 |
76140 - 26 |
6/25/2018 |
THIS AUTHORIZATION PROVIDES INITIAL DESIGN FUNDS FOR ITEM NO. 5-65.40. LC |
I 64 |
I-64 |
SHELBY |
$300,000.00 |
76140 - 25 |
12/2/2014 |
THIS MODIFICATION PROVIDES ADDITIONAL DESIGN FUNDS TO COVER CURRENT AND EXPECTED EXPENDITURES FOR 5-65.00, 7614001D. LC |
I 64 |
I-64 |
SHELBY |
$420,000.00 |
76140 - 24 |
11/18/2014 |
THIS MOD. PROVIDES ADDITIONAL CONSTRUCTION FUNDS TO COVER CHANGE ORDER #3 ($258,895.54) GRANULAR BACKFILL, ASPH BASE DGA BASE AND OTHER ITEMS. 05-65.25 CONTRACT ID 131008 AND $120,000 (FD39 FUNDS) FOR ADDITIONAL WORK ON KY 1399 CURVE IMPROVEMENTS AND KY 1848/KY 1933 INTERSECTION ENHANCEMENTS |
I 64 |
I-64 |
SHELBY |
$150,000.00 |
76140 - 23 |
7/3/2014 |
THIS MOD. PROVIDES ADDITIONAL CONSTRUCTION FUNDS TO COVER CHANGE ORDER #3 ($258,895.54) GRANULAR BACKFILL, ASPH BASE DGA BASE AND OTHER ITEMS. 05-65.25 CONTRACT ID 131008 |
I 64 |
I-64 |
SHELBY |
$1,098,531.00 |
76140 - 22 |
3/8/2013 |
THIS MODIFICATION ADJUSTS PREVIOUSLY AUTHORIZED CONSTRUCTION FUNDS TO COVER THE LOW BID PLUS 15% FOR ENGINEERING. ALSO INCLUDES $59,006 FOR EQUIPMENT TO BE SUPPLIED BY THE CABINET AND INSTALLED BY THE CONTRACTOR. |
I 64 |
I-64 |
SHELBY |
$2,380,000.00 |
76140 - 21 |
1/28/2013 |
THIS AUTHORIZATION PROVIDES CONSTRUCTION FUNDS BASED ON THE CURRENT ESTIMATE PRIOR TO THE PROJECT BEING LET FOR RECONSTRUCTION OF THE I-64/KY 1848 INTERCHANGE IN SHELBY COUNTY TO IMPROVE ACCESS CONTROL. |
I 64 |
I-64 |
SHELBY |
$580,000.00 |
76140 - 20 |
10/1/2012 |
THIS MOD. PROVIDES ADDITIONAL CONSTRUCTION FUNDS TO COVER CHANGE ORDER #10 (477,559.66) ASPHALT ADJUSTMENT, DGA BASE AND OTHER ITEMS FOR CONTRACT 091309 7614002C |
I 64 |
I-64 |
SHELBY |
$3,782,015.00 |
76140 - 19 |
7/31/2012 |
THIS MODIFICATION ADJUSTS PREVIOUSLY AUTHORIZED CONSTRUCTION FUNDS TO COVER THE LOW BID PLUS 10% FOR ENGINEERING ($41,282,015). A PORTION OF THIS PROJECT WILL BE FINANCED WITH GARVEE BOND FUNDS ($20,000,000). |
I 64 |
I-64 |
SHELBY |
$37,500,000.00 |
76140 - 18 |
6/28/2012 |
THIS AUTHORIZATION PROVIDES CONSTRUCTION FUNDS BASED ON THE CURRENT ESTIMATE PRIOR TO THE PROJECT BEING LET. A PORTION OF THIS PROJECT WILL BE FINANCED WITH GARVEE BOND FUNDS ($20,000,000). TOLL CREDITS WILL BE USED IN LIEU OF STATE MATCHING FUNDS. |
I 64 |
I-64 |
JEFFERSON |
$440,000.00 |
76140 - 17 |
6/11/2012 |
THIS MOD. PROVIDES ADDITIONAL CONSTRUCTION FUNDS TO COVER EXISTING OVERRUN AND FUTURE ENGINEERING $200,000 (7614002C) AND $115,000 (7614003C. ALSO THIS MOD. PROVIDES ADDITIONAL DESIGN FUNDS TO COVER (I-64/KY 1848) INTERCHANGE DESIGN CHANGES DUE TO OUTLET MALL DEVELOPMENT. TJ. |
I 64 |
I-64 |
JEFFERSON |
$1,000,000.00 |
76140 - 16 |
4/9/2012 |
THIS MOD. PROVIDES R/W FUNDS FOR ACQUISITION OF A PARCEL ON THE EAST SIDE OF JOYCE STATION ROAD FROM I-64 TO THE RAILROAD PROPERTY. |
I 64 |
I-64 |
JEFFERSON |
$340,000.00 |
76140 - 15 |
2/10/2012 |
THIS MOD. PROVIDES ADDITIONAL CONSTRUCTION FUNDS TO COVER EXISTING OVERRUN AND FUTURE ENGINEERING. (7614003C) |
I 64 |
I-64 |
JEFFERSON |
$200,000.00 |
76140 - 14 |
12/16/2011 |
THIS MOD. PROVIDES ADDITIONAL CONSTRUCTION FUNDS TO COVER CHANGE ORDER #7 ($190,144.46) FUEL AND ASPHALT ADJUSTMENTS. 7614002C |
I 64 |
I-64 |
JEFFERSON |
$1,710,000.00 |
76140 - 13 |
9/13/2011 |
THIS MOD. PROVIDES ADDITIONAL CONSTRUCTION FUNDS TO COVER CHANGE ORDER #6 ($399,020.50) ASPHALT ADJUSTMENT, CULVERT REPAIR, OTHER ITEMS AND CONSTRUCTION ENGINEERING TO COVER THE CURRENT EXPENDITURES AND FUTURE NEEDS. $1,110,000 (02C), $600,000 (03C) |
I 64 |
I-64 |
JEFFERSON |
$675,000.00 |
76140 - 12 |
3/1/2011 |
THIS MOD. PROVIDES ADDITIONAL CONSTRUCTION FUNDS TO COVER CHANGE ORDERS #4 ($123,044.67) AND #5 ($213,290.73) GRANULAR EMBANKMENT, SPECIAL EXCAVATION MEDIAN UNDERCUT, CRASH CUSHION, CONCRETE BARRIER WALL AND OTHER ITEMS. 7614003C ($675,000). |
I 64 |
I-64 |
JEFFERSON |
$1,500,000.00 |
76140 - 11 |
1/7/2011 |
THIS MOD. PROVIDES ADDITIONAL DESIGN FUNDS TO COVER PHASE II DESIGN SHELBY CO 5-65.30 & 5-65.40 SECTIONS. THIS AMOUNT WILL BE FOR PHASE II ROADWAY DESIGN, STRUCTURAL DESIGN, GEOTECH AND ENVIRONMENTAL WORK. THIS AMOUNT WILL ALSO COVER INTERAGENCY CHARGES. ___________________________________________________________________________DE. |
I 64 |
I-64 |
JEFFERSON |
$300,000.00 |
76140 - 10 |
10/25/2010 |
THIS MOD. PROVIDES ADDITIONAL DESIGN FUNDS TO COVER BREAK OUT OF THE ULTIMATE INTERCHANGE CONSTRUCTION AND CONSTRUCTION OF INTERSTATE WIDENING PORTION. BM |
I 64 |
I-64 |
JEFFERSON |
$2,822,000.00 |
76140 - 9 |
5/4/2010 |
THIS MOD. PROVIDES ADDITIONAL CONSTRUCTION FUNDS TO COVER CHANGE ORDER #1 ($2,565,074.69) UNDERCUT SOILS AND REPLACE WITH 1 FOOT OF GRANULAR EMBANKMENT WRAPPED WITH GEOTEXTILE FABRIC FROM STA 1781+00 TO STA 2044+00. IC |
I 64 |
I-64 |
JEFFERSON |
($11,211,766.00) |
76140 - 8 |
11/2/2009 |
THIS MODIFICATION ADJUSTS PREVIOUSLY AUTHORIZED CONSTRUCTION FUNDS TO COVER THE LOW BID PLUS 10% FOR ENGINEERING. I64 REHABILITATION FUNDS (JM03) ARE NOW BEING USED FOR THIS PHASE SO THE PREVIOUSLY AUTHORIZED FEDERAL (FD52) FUNDS HAVE BEEN REMOVED. TOLL CREDITS WILL BE USED IN LIEU OF STATE MATCHING FUNDS. LB |
I 64 |
I-64 |
JEFFERSON |
$50,450,000.00 |
76140 - 7 |
8/25/2009 |
THIS AUTHORIZATION PROVIDES CONSTRUCTION FUNDS BASED ON THE ENGINEER'S ESTIMATE PRIOR TO THE PROJECT BEING LET. TOLL CREDITS WILL BE USED IN LIEU OF STATE MATCHING FUNDS. LB |
I 64 |
I-64 |
JEFFERSON |
($99,700.00) |
76140 - 6 |
5/7/2009 |
THIS MODIFICATION ADJUSTS PREVIOUSLY AUTHORIZED CONSTRUCTION FUNDS TO COVER THE LOW BID PLUS 10% FOR ENGINEERING. TOLL CREDITS WILL BE USED IN LIEU OF STATE MATCHING FUNDS. LB |
I 64 |
I-64 |
JEFFERSON |
$800,000.00 |
76140 - 5 |
2/5/2009 |
THIS MODIFICATION PROVIDES ADDITIONAL DESIGN FUNDS TO CONDUCT FINAL STRUCTURES DESIGN ACTIVITIES. TOLL CREDITS WILL BE USED IN LIEU OF THE STATE MATCHING FUNDS. SAC |
I 64 |
I-64 |
JEFFERSON |
$5,090,000.00 |
76140 - 4 |
8/14/2008 |
THIS MODIFICATION PROVIDES ADDITIONAL DESIGN FUNDS TO COVER THE CONTRACT FOR WATERLINE RELOCATION DESIGN AND STATE FORCE CHARGES FOR PLAN REVIEW AND PROCESSING. THIS ALSO PROVIDES R/W AND UTILITY FUNDS. TOLL CREDITS WILL BE USED IN LIEU OF THE STATE MATCHING FUNDS. PR |
I 64 |
I-64 |
JEFFERSON |
$0.00 |
76140 - 3 |
10/31/2007 |
THIS MODIFICATON REMOVES THE "GARVEE" BOND FUNDS PREVIOUSLY AUTHORIZED AND PROVIDES FEDERAL FUNDS FOR THIS SECTION SCHEDULED FOR THE DECEMBER 14, 2007 LETTING. TOLL CREDITS WILL BE USED IN LIEU OF STATE MATCHING FUNDS. SECTION FROM JUST WEST OF THE SNYDER FREEWAY TO THE SHELBY COUNTY LINE. LB |
I 64 |
I-64 |
JEFFERSON |
$37,800,000.00 |
76140 - 2 |
7/16/2007 |
THIS AUTHORIZATION PROVIDES "GARVEE" BOND FUNDS FOR CONSTRUCTION OF THE SECTION FROM JUST WEST OF THE SNYDER FREEWAY TO THE SHELBY COUNTY LINE SCHEDULED FOR THE AUGUST 24, 2007 LETTING. LB |
I 64 |
I-64 |
JEFFERSON |
$4,300,000.00 |
76140 - 1 |
1/3/2006 |
THIS MODIFICATION PROVIDES PHASE II DESIGN FUNDS TO COVER THE CURRENT CONTRACT ($4,900,000) AND ADDITIONAL FUNDS FOR STATE FORCE CHARGES. TOLL CREDITS WILL BE USED FOR THE ADDITIONAL FUNDS IN LIEU OF STATE MATCH. BA |
I 64 |
I-64 |
JEFFERSON |
$1,800,000.00 |
76140 - 0 |
5/26/2004 |
THIS AUTHORIZATION PROVIDES DESIGN FUNDS FOR PE & ENVIRONMENTAL (PHASE I). |
I 64 |