Authorized to Date = $71,510,051.00
Route County Requested Amount Auth# and Mod Level Authorization Date Remarks Facility Name
KY 15 PERRY $400,000.00 48291 - 19 4/16/2024 THIS MODIFICATION PROVIDES ADDITIONAL FD52 NHPP FUNDS WITH STATE MATCHING FUNDS TO COVER CHANGE ORDER NO. 10 AND PROJECT OVERSIGHT.  KY 15
KY 15 PERRY $250,000.00 48291 - 18 2/27/2024 THIS MODIFICATION PROVIDES ADDITIONAL FD52 NHPP FUNDS WITH STATE MATCHING FUNDS TO COVER CURRENT CONSTRUCTION EXPENDITURES.  KY 15
KY 15 PERRY $2,000,000.00 48291 - 17 8/22/2022 THIS AUTHORIZATION PROVIDES AN ADDITIONAL $2,000,000 (FD04) FUNDS FOR THE DESIGN PHASE OF THE PROJECT.  KY 15
KY 15 PERRY $1,500,000.00 48291 - 16 7/26/2021 THIS AUTHORIZATION PROVIDES STATE (FD04) DESIGN FUNDS TO BEGIN PRELIMINARY ENGINEERING & ENVIRONMENTAL ACTIVITIES ON THE PROJECT. (FHWA APPROVED DESIGN FUNDING FOR FUTURE FEDERAL MATCH ON OTHER PHASES) JL  KY 15
KY 15 PERRY $110,000.00 48291 - 15 10/31/2018 THIS MOD. PROVIDES ADDITIONAL DESIGN FUNDS (FD04) TO COVER STRUCTURE DESIGN REVISIONS FOR (WALL#5). TJ  KY 15
KY 15 PERRY $7,264,000.00 48291 - 14 5/20/2018 THIS MOD. PROVIDES ADDITIONAL CONSTRUCTION FUNDS TO COVER CHANGE ORDER #4 ($6,863,703.84), ROADWAY EXCAVATION AND OTHER ITEMS TO EXTEND THE EXCAVATION LIMITS APPROXIMATELY 1000 FEET TO ALLOW FOR COMPLETE EXCAVATION (RATHER THAN PARTIAL) OF A SIDE HILL CUT.  KY 15
KY 15 PERRY $50,000.00 48291 - 13 8/28/2017 THIS MODIFICATION PROVIDES ADDITIONAL UTILITY FUNDS FOR THE PROJECT. TJ  KY 15
KY 15 PERRY $12,221,614.00 48291 - 12 4/4/2016 THIS MODIFICATION ADJUST PREVIOUSLY AUTHORIZED CONSTRUCTION FUNDS TO COVER THE LOW BID PLUS 10% FOR ENGINEERING.  KY 15
KY 15 PERRY $34,699,950.00 48291 - 11 9/30/2015 THIS AUTHORIZATION PROVIDES CONSTRUCTION FUNDS BASED ON THE ENGINEER'S ESTIMATE PRIOR TO THE PROJECT BEING LET.  KY 15
KY 15 PERRY $250,000.00 48291 - 10 7/24/2014 THIS MOD PROVIDES ADDITIONAL DESIGN FUNDS TO COVER PERMITS AND FINAL DESIGN COST. TJ  KY 15
KY 15 PERRY $500,000.00 48291 - 9 10/31/2013 THIS AUTHORIZATION PROVIDES ADDITIONAL DESIGN FUNDS TO COMPLETE THE DESIGN OF THE PROJECT. SLC  KY 15
KY 15 PERRY $9,725,000.00 48291 - 8 5/2/2013 THIS AUTHORIZATION PROVIDES INITIAL RIGHT OF WAY FUNDS, AND ALSO PROVIDES INITIAL UTILITY FUNDS FOR THE PROJECT. •FUNDS PREVIOUSLY APPROVED UNDER ITEM NO. 10-159.00•  KY 15
KY 15 PERRY $300,000.00 48291 - 7 7/20/2012 THIS MODIFICATION PROVIDES ADDITIONAL DESIGN FUNDS FOR PHASE II WORK. TJ.  KY 15
KY 15 PERRY $70,000.00 48291 - 6 3/3/2009 THIS MODIFICATION PROVIDES ADDITIONAL DESIGN FUNDS FOR PHASE - I WORK AND WAGE RATE ADJUSTMENTS FOR CM # 12. THE CONSULTANTS FEE IS $80,343. THE REMAINING BUDGET IS $18,543.11 AND $8,200.11 FOR STATE FORCES TO CLOSE THE CONTRACT. DE  KY 15
KY 15 PERRY ($6,299,513.00) 48291 - 5 12/8/2003 RIGHT OF WAY AND UTILITY ACTIVITIES HAVE BEEN STOPPED ON THIS PROJECT AND FUNDS BEYOND THOSE NECESSARY TO COVER CURRENT ENCUMBRANCES ARE BEING DEOBLIGATED TO MEET CASH FLOW NEEDS.  KY 15
KY 15 PERRY $444,000.00 48291 - 4 10/27/2000 THIS MOD. PROVIDES ADDDITIONAL DESIGN FUNS TO COVER A CONSULTANT CHANGE ORDER AND STATE FORCE ACTIVITIES.  KY 15
KY 15 PERRY $100,000.00 48291 - 3 6/26/1998 THIS MOD. PROVIDES ADDDITIONAL DESIGN FUNS TO COVER PENDING CHANGE ORDER AND STATE FORCE ACTIVITIES.  KY 15
KY 15 PERRY $125,000.00 48291 - 2 8/12/1997 THIS MOD. PROVIDES ADDDITIONAL DESIGN FUNS TO COVER PENDING CHANGE ORDERS AND STATE FORCE ACTIVITIES.  KY 15
KY 15 PERRY $6,300,000.00 48291 - 1 6/12/1997 THIS MOD. PROVIDES R/W AND UTILITY FUNDS.  KY 15
KY 15 $1,500,000.00 48291 - 0 8/24/1990 .  KY 15