KY 15 |
PERRY |
$400,000.00 |
48291 - 19 |
4/16/2024 |
THIS MODIFICATION PROVIDES ADDITIONAL FD52 NHPP FUNDS WITH STATE MATCHING FUNDS TO COVER CHANGE ORDER NO. 10 AND PROJECT OVERSIGHT. |
KY 15 |
KY 15 |
PERRY |
$250,000.00 |
48291 - 18 |
2/27/2024 |
THIS MODIFICATION PROVIDES ADDITIONAL FD52 NHPP FUNDS WITH STATE MATCHING FUNDS TO COVER CURRENT CONSTRUCTION EXPENDITURES. |
KY 15 |
KY 15 |
PERRY |
$2,000,000.00 |
48291 - 17 |
8/22/2022 |
THIS AUTHORIZATION PROVIDES AN ADDITIONAL $2,000,000 (FD04) FUNDS FOR THE DESIGN PHASE OF THE PROJECT. |
KY 15 |
KY 15 |
PERRY |
$1,500,000.00 |
48291 - 16 |
7/26/2021 |
THIS AUTHORIZATION PROVIDES STATE (FD04) DESIGN FUNDS TO BEGIN PRELIMINARY ENGINEERING & ENVIRONMENTAL ACTIVITIES ON THE PROJECT. (FHWA APPROVED DESIGN FUNDING FOR FUTURE FEDERAL MATCH ON OTHER PHASES) JL |
KY 15 |
KY 15 |
PERRY |
$110,000.00 |
48291 - 15 |
10/31/2018 |
THIS MOD. PROVIDES ADDITIONAL DESIGN FUNDS (FD04) TO COVER STRUCTURE DESIGN REVISIONS FOR (WALL#5). TJ |
KY 15 |
KY 15 |
PERRY |
$7,264,000.00 |
48291 - 14 |
5/20/2018 |
THIS MOD. PROVIDES ADDITIONAL CONSTRUCTION FUNDS TO COVER CHANGE ORDER #4 ($6,863,703.84), ROADWAY EXCAVATION AND OTHER ITEMS TO EXTEND THE EXCAVATION LIMITS APPROXIMATELY 1000 FEET TO ALLOW FOR COMPLETE EXCAVATION (RATHER THAN PARTIAL) OF A SIDE HILL CUT. |
KY 15 |
KY 15 |
PERRY |
$50,000.00 |
48291 - 13 |
8/28/2017 |
THIS MODIFICATION PROVIDES ADDITIONAL UTILITY FUNDS FOR THE PROJECT. TJ |
KY 15 |
KY 15 |
PERRY |
$12,221,614.00 |
48291 - 12 |
4/4/2016 |
THIS MODIFICATION ADJUST PREVIOUSLY AUTHORIZED CONSTRUCTION FUNDS TO COVER THE LOW BID PLUS 10% FOR ENGINEERING. |
KY 15 |
KY 15 |
PERRY |
$34,699,950.00 |
48291 - 11 |
9/30/2015 |
THIS AUTHORIZATION PROVIDES CONSTRUCTION FUNDS BASED ON THE ENGINEER'S ESTIMATE PRIOR TO THE PROJECT BEING LET. |
KY 15 |
KY 15 |
PERRY |
$250,000.00 |
48291 - 10 |
7/24/2014 |
THIS MOD PROVIDES ADDITIONAL DESIGN FUNDS TO COVER PERMITS AND FINAL DESIGN COST. TJ |
KY 15 |
KY 15 |
PERRY |
$500,000.00 |
48291 - 9 |
10/31/2013 |
THIS AUTHORIZATION PROVIDES ADDITIONAL DESIGN FUNDS TO COMPLETE THE DESIGN OF THE PROJECT. SLC |
KY 15 |
KY 15 |
PERRY |
$9,725,000.00 |
48291 - 8 |
5/2/2013 |
THIS AUTHORIZATION PROVIDES INITIAL RIGHT OF WAY FUNDS, AND ALSO PROVIDES INITIAL UTILITY FUNDS FOR THE PROJECT. •FUNDS PREVIOUSLY APPROVED UNDER ITEM NO. 10-159.00• |
KY 15 |
KY 15 |
PERRY |
$300,000.00 |
48291 - 7 |
7/20/2012 |
THIS MODIFICATION PROVIDES ADDITIONAL DESIGN FUNDS FOR PHASE II WORK. TJ. |
KY 15 |
KY 15 |
PERRY |
$70,000.00 |
48291 - 6 |
3/3/2009 |
THIS MODIFICATION PROVIDES ADDITIONAL DESIGN FUNDS FOR PHASE - I WORK AND WAGE RATE ADJUSTMENTS FOR CM # 12. THE CONSULTANTS FEE IS $80,343. THE REMAINING BUDGET IS $18,543.11 AND $8,200.11 FOR STATE FORCES TO CLOSE THE CONTRACT. DE |
KY 15 |
KY 15 |
PERRY |
($6,299,513.00) |
48291 - 5 |
12/8/2003 |
RIGHT OF WAY AND UTILITY ACTIVITIES HAVE BEEN STOPPED ON THIS PROJECT AND FUNDS BEYOND THOSE NECESSARY TO COVER CURRENT ENCUMBRANCES ARE BEING DEOBLIGATED TO MEET CASH FLOW NEEDS. |
KY 15 |
KY 15 |
PERRY |
$444,000.00 |
48291 - 4 |
10/27/2000 |
THIS MOD. PROVIDES ADDDITIONAL DESIGN FUNS TO COVER A CONSULTANT CHANGE ORDER AND STATE FORCE ACTIVITIES. |
KY 15 |
KY 15 |
PERRY |
$100,000.00 |
48291 - 3 |
6/26/1998 |
THIS MOD. PROVIDES ADDDITIONAL DESIGN FUNS TO COVER PENDING CHANGE ORDER AND STATE FORCE ACTIVITIES. |
KY 15 |
KY 15 |
PERRY |
$125,000.00 |
48291 - 2 |
8/12/1997 |
THIS MOD. PROVIDES ADDDITIONAL DESIGN FUNS TO COVER PENDING CHANGE ORDERS AND STATE FORCE ACTIVITIES. |
KY 15 |
KY 15 |
PERRY |
$6,300,000.00 |
48291 - 1 |
6/12/1997 |
THIS MOD. PROVIDES R/W AND UTILITY FUNDS. |
KY 15 |
KY 15 |
|
$1,500,000.00 |
48291 - 0 |
8/24/1990 |
. |
KY 15 |