Some critical dates have not been assigned. (Letting Date not Established)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Description: US-27 CORRIDOR FROM SOMERSET TO LEXINGTON. IMPROVE SAFETY AND REDUCE CONGESTION ON US-27 FROM KY-1247 TO EDUCATION WAY. (2022CCR) Location: Route 1 Lincoln County US-27 from MP 11.169 to MP 15.881 Route 2 County - from MP to MP Item #: 8-167.00 Project Manager: KYTC\JOSEPH.GOSSAGE Road Engineer: QK4, Inc. Type of Work: RECONSTRUCTION Concerns:
Bridge Engineer: Bridge Structure Number: 069B00048N Select the Structure Number for The NBI Kentucky Inventory and Appraisal Report Bridge Suff. Rate: 50.3 NBI Rating: Not Deficient Posting: YES |
Project Manager: KYTC\JOSEPH.GOSSAGE Item #: 8-167.00 Project Description: US-27 CORRIDOR FROM SOMERSET TO LEXINGTON. IMPROVE SAFETY AND REDUCE CONGESTION ON US-27 FROM KY-1247 TO EDUCATION WAY. (2022CCR) |
Milestones
|
Project Manager: KYTC\JOSEPH.GOSSAGE Item #: 8-167.00 Project Description: US-27 CORRIDOR FROM SOMERSET TO LEXINGTON. IMPROVE SAFETY AND REDUCE CONGESTION ON US-27 FROM KY-1247 TO EDUCATION WAY. (2022CCR) Authoritative Source for Environmental Data: EATS |
Requestor | Request Type | Request Date | Assigned Name | Assigned Date | Scheduled Completion Date |
Actual Completion Date | Expiration Date |
Design | CE LVL 3 | 2/14/2019 | Palmer Engineering | 1/7/2019 | 5/1/2020 |
Project Manager: KYTC\JOSEPH.GOSSAGE Item #: 8-167.00 Project Description: US-27 CORRIDOR FROM SOMERSET TO LEXINGTON. IMPROVE SAFETY AND REDUCE CONGESTION ON US-27 FROM KY-1247 TO EDUCATION WAY. (2022CCR) Authoritative Source for R/W Data: KROWDS View Communicating All Promises (CAP) Report for Item# 8-167.00 |
This Project has no Right Of Way Data available from RWMS.
This Project has no Right Of Way Data available from KROWDS.
|
Project Manager: KYTC\JOSEPH.GOSSAGE Item #: 8-167.00 Project Description: US-27 CORRIDOR FROM SOMERSET TO LEXINGTON. IMPROVE SAFETY AND REDUCE CONGESTION ON US-27 FROM KY-1247 TO EDUCATION WAY. (2022CCR) Authoritative Source for Utilities and Rail Tracking Data: KURTS |
Utility Companies | |
Utility Name | Facility Name |
Project Manager: KYTC\JOSEPH.GOSSAGE Item #: 8-167.00 Project Description: US-27 CORRIDOR FROM SOMERSET TO LEXINGTON. IMPROVE SAFETY AND REDUCE CONGESTION ON US-27 FROM KY-1247 TO EDUCATION WAY. (2022CCR) |
Phase | Vendor |
D | WOOLPERT INC |
D | GEOTECHNOLOGY INC |
D | QK4 INC |
D | QK4, Inc. |