Highway Plan Phase Info
Phase Funding FY Amount
Current Phase Info
Phase Funding Estimated Cost Scheduled FY Phase Funding Status
Authorized Date Authorized Amount
D SPP $0.00 2017 AUTHORIZED 1/31/2019 $1,900,000.00
R STP $8,400,000.00 NOTREQUIRED $0.00
U STP $3,120,000.00 AWARDED $0.00
C STP $33,750,000.00 AWARDED $0.00
Project Budget Info
Phase Authorization Number Program Code Project Budget Budget
Modifications
(e-MARS) Project Expenditures
(e-MARS) Encumbered Amount Remaining (e-MARS)
Unobligated Amount
D 91791 9179101D $750,002.70 $750,002.70 $774,618.82 $0.00 $0.00
D 91791 9179102D $0.00 $375,000.00 $0.00 $0.00 $0.00
D 91791 9179103D $399,997.30 $249,997.30 $338,945.61 $0.00 $61,458.10
D 91791 9179104D $750,000.00 $0.00 $742,037.49 $0.00 $7,962.51
R/W Clearance:
Utility Clearance:

Some critical dates have not been assigned. (Letting Date not Established)

Project Description: INTERCHANGE JUSTIFICATION STUDY AT I-275 AND GRAVES ROAD. BOONE COUNTY FISCAL COURT WILL PROVIDE A 50% MATCH ($375,000). (16CCN)
Location:
Route 1 Boone County PF-9999 from MP to MP
Route 2 County - from MP to MP
Item #: 6-8953.00
Project Manager: KYTC\MIKE.BEZOLD
Road Engineer: HMB, INC.
Type of Work: SAFETY(P)
Concerns:
Bridge Engineer: CONSULTANT
Bridge Structure Number:
Select the Structure Number for The NBI Kentucky Inventory and Appraisal Report
Bridge Suff. Rate:
NBI Rating:
Posting:
Project Manager: KYTC\MIKE.BEZOLD       Item #: 6-8953.00
Project Description: INTERCHANGE JUSTIFICATION STUDY AT I-275 AND GRAVES ROAD. BOONE COUNTY FISCAL COURT WILL PROVIDE A 50% MATCH ($375,000). (16CCN)

Milestones
Milestones Status Status Date Scheduled
Letting 01/01/1900
ROW Clearance 01/01/1900
Alternative Selection 01/01/1900
Railroad Clearance 01/01/1900
Final Design 01/01/1900
Utility Clearance 01/01/1900
Final Plans Submittal 01/01/1900
Planning 01/01/1900
Right of Way Acquisition 01/01/1900
Utility Agreement 01/01/1900
Structure Plans 01/01/1900
Roadway Plans 01/01/1900
Geotechnical - Roadway Design Investigation 01/01/1900
Preliminary Engineering 10/20/2021
Environmental Approval 10/20/2021
Right of Way Plans 01/01/1900
 
Project Manager: KYTC\MIKE.BEZOLD       Item #: 6-8953.00
Project Description: INTERCHANGE JUSTIFICATION STUDY AT I-275 AND GRAVES ROAD. BOONE COUNTY FISCAL COURT WILL PROVIDE A 50% MATCH ($375,000). (16CCN)
Authoritative Source for Environmental Data:  EATS
Environmental Status
Requestor Request Type Request Date Assigned Name Assigned Date Scheduled Completion Date
Actual Completion Date Expiration Date
CE LVL 3 RE 1/2/2020 3/31/2020 2/27/2020 2/27/2022
Environmental Analysis CE LVL 3 RE 9/4/2019 9/4/2019 11/15/2019 10/28/2019 10/28/2021
Environmental Analysis CE LVL 3 RE 7/2/2019 HMB Professional Engineers, Inc. 8/20/2019 8/16/2019 8/16/2021
Environmental Analysis CE LVL 3 9/8/2016 HMB Professional Engineers, Inc. 1/31/2019 3/1/2019 3/1/2021

No 401 – WQC Permit Data Available

402 – KPDES
Permit Sequence Number Applied Date Received Date Permit Number Permit Status Mitigation Type Unit Estimated Date Estimated Amnt (Unit) Estimated Dollar Amnt Actual Amnt (Unit) Actual Dollar Amnt Completion Date Bank Name Mitigation Remarks Permit Remarks
17616 NotApplicable NOT APPLICABLE 0 0 $0.00 0 $0.00

No 404 – USACE Permit Data Available

No Intergovernmental Review Permit Data Available

LOP
Permit Sequence Number Applied Date Received Date Permit Number Permit Status Mitigation Type Unit Estimated Date Estimated Amnt (Unit) Estimated Dollar Amnt Actual Amnt (Unit) Actual Dollar Amnt Completion Date Bank Name Mitigation Remarks Permit Remarks
5080 20-APR-19 15-AUG-19 2019-00371 Approved KYTC MITIGATION BANK – STREAM $0.00 $0.00 Dix River
5080 20-APR-19 15-AUG-19 2019-00371 Approved ILF WETLAND 0 0 $12,300.00 0 $0.00

Tennessee Valley Authority
LOP
Permit Sequence Number Applied Date Received Date Permit Number Permit Status Mitigation Type Unit Estimated Date Estimated Amnt (Unit) Estimated Dollar Amnt Actual Amnt (Unit) Actual Dollar Amnt Completion Date Bank Name Mitigation Remarks Permit Remarks
44683 NotApplicable NOT APPLICABLE 0 0 $0.00 0 $0.00
Project Manager: KYTC\MIKE.BEZOLD       Item #: 6-8953.00
Project Description: INTERCHANGE JUSTIFICATION STUDY AT I-275 AND GRAVES ROAD. BOONE COUNTY FISCAL COURT WILL PROVIDE A 50% MATCH ($375,000). (16CCN)
Authoritative Source for R/W Data: KROWDS
View Communicating All Promises (CAP) Report for Item# 6-8953.00
This Project has no Right Of Way Data available from RWMS.
This Project has no Right Of Way Data available from KROWDS.
Project Manager: KYTC\MIKE.BEZOLD       Item #: 6-8953.00
Project Description: INTERCHANGE JUSTIFICATION STUDY AT I-275 AND GRAVES ROAD. BOONE COUNTY FISCAL COURT WILL PROVIDE A 50% MATCH ($375,000). (16CCN)
Authoritative Source for Utilities and Rail Tracking Data: KURTS
Utility Companies
Utility Name Facility Name
This Project has no Utilities Data available.
Project Manager: KYTC\MIKE.BEZOLD       Item #: 6-8953.00
Project Description: INTERCHANGE JUSTIFICATION STUDY AT I-275 AND GRAVES ROAD. BOONE COUNTY FISCAL COURT WILL PROVIDE A 50% MATCH ($375,000). (16CCN)
Phase Vendor
D NOT ENTERED
D HMB PROFESSIONAL ENGINEERS INC
D HAWORTH MEYER BOLEYN INC