Highway Plan Phase Info
Phase Funding FY Amount
Current Phase Info
Phase Funding Estimated Cost Scheduled FY Phase Funding Status
Authorized Date Authorized Amount
D SPP $0.00 2017 AUTHORIZED 1/31/2019 $1,900,000.00
R STP $8,400,000.00 NOTREQUIRED $0.00
U STP $3,120,000.00 AWARDED $0.00
C STP $33,750,000.00 AWARDED $0.00
Project Budget Info
Phase Authorization Number Program Code Project Budget Budget
Modifications
(e-MARS) Project Expenditures
(e-MARS) Encumbered Amount Remaining (e-MARS)
Unobligated Amount
D 91791 9179101D $750,002.70 $750,002.70 $774,618.82 $0.00 $0.00
D 91791 9179102D $0.00 $375,000.00 $0.00 $0.00 $0.00
D 91791 9179103D $399,997.30 $249,997.30 $338,945.61 $0.00 $61,458.10
D 91791 9179104D $750,000.00 $0.00 $742,037.49 $0.00 $7,962.51
R/W Clearance:
Utility Clearance:

Some critical dates have not been assigned. (Letting Date not Established)

Project Description: INTERCHANGE JUSTIFICATION STUDY AT I-275 AND GRAVES ROAD. BOONE COUNTY FISCAL COURT WILL PROVIDE A 50% MATCH ($375,000). (16CCN)
Location:
Route 1 Boone County PF-9999 from MP to MP
Route 2 County - from MP to MP
Item #: 6-8953.00
Project Manager: KYTC\MIKE.BEZOLD
Road Engineer: HMB, INC.
Type of Work: SAFETY(P)
Concerns:
Bridge Engineer: CONSULTANT
Bridge Structure Number:
Select the Structure Number for The NBI Kentucky Inventory and Appraisal Report
Bridge Suff. Rate:
NBI Rating:
Posting:
Project Manager: KYTC\MIKE.BEZOLD       Item #: 6-8953.00
Project Description: INTERCHANGE JUSTIFICATION STUDY AT I-275 AND GRAVES ROAD. BOONE COUNTY FISCAL COURT WILL PROVIDE A 50% MATCH ($375,000). (16CCN)

Milestones
Milestones Status Status Date Scheduled
ADVANCE SITUATION TO CENTRAL OFFICE UNKNOWN 05/24/2016 05/24/2016
TRAFFIC PLANS - SIGNING UNKNOWN 05/24/2016 05/24/2016
TRAFFIC PLANS - TRAFFIC CONTROL UNKNOWN 05/24/2016 05/24/2016
GEOTEC ENGINEERING - ROADWAY UNKNOWN 05/24/2016 05/24/2016
PRELIMINARY LINE AND GRADE DES SUBMITTED 03/01/2019 03/01/2019
DRAINAGE INSPECTION NOT REQUIRED 10/18/2019 10/18/2019
BRIDGE AND STRUCTURE PLANS TO CENTRAL OFFICE UNKNOWN 05/24/2016 05/24/2016
RIGHT OF WAY PLANS TO CENTRAL OFFICE UNKNOWN 05/24/2016 05/24/2016
TRAFFIC PLANS - SIGNALS UNKNOWN 05/24/2016 05/24/2016
GEOTEC ENGINEERING - BRIDGES UNKNOWN 05/24/2016 05/24/2016
JOINT INSPECTION UNKNOWN 05/24/2016 05/24/2016
TRAFFIC PLANS - LIGHTING UNKNOWN 05/24/2016 05/24/2016
ROAD PLANS TO CENTRAL OFFICE UNKNOWN 05/24/2016 05/24/2016
 
Project Manager: KYTC\MIKE.BEZOLD       Item #: 6-8953.00
Project Description: INTERCHANGE JUSTIFICATION STUDY AT I-275 AND GRAVES ROAD. BOONE COUNTY FISCAL COURT WILL PROVIDE A 50% MATCH ($375,000). (16CCN)
Authoritative Source for Environmental Data:  EATS
Environmental Status
Requestor Request Type Request Date Assigned Name Assigned Date Scheduled Completion Date
Actual Completion Date Expiration Date
CE LVL 3 RE 1/2/2020 3/31/2020 2/27/2020 2/27/2022
Environmental Analysis CE LVL 3 RE 9/4/2019 9/4/2019 11/15/2019 10/28/2019 10/28/2021
Environmental Analysis CE LVL 3 RE 7/2/2019 HMB Professional Engineers, Inc. 8/20/2019 8/16/2019 8/16/2021
Environmental Analysis CE LVL 3 9/8/2016 HMB Professional Engineers, Inc. 1/31/2019 3/1/2019 3/1/2021

No 401 – WQC Permit Data Available

402 – KPDES
Permit Sequence Number Applied Date Received Date Permit Number Permit Status Mitigation Type Unit Estimated Date Estimated Amnt (Unit) Estimated Dollar Amnt Actual Amnt (Unit) Actual Dollar Amnt Completion Date Bank Name Mitigation Remarks Permit Remarks
17616 NotApplicable NOT APPLICABLE 0 0 $0.00 0 $0.00

No 404 – USACE Permit Data Available

No Intergovernmental Review Permit Data Available

LOP
Permit Sequence Number Applied Date Received Date Permit Number Permit Status Mitigation Type Unit Estimated Date Estimated Amnt (Unit) Estimated Dollar Amnt Actual Amnt (Unit) Actual Dollar Amnt Completion Date Bank Name Mitigation Remarks Permit Remarks
5080 20-APR-19 15-AUG-19 2019-00371 Approved KYTC MITIGATION BANK – STREAM $0.00 $0.00 Dix River
5080 20-APR-19 15-AUG-19 2019-00371 Approved ILF WETLAND 0 0 $12,300.00 0 $0.00

Tennessee Valley Authority
LOP
Permit Sequence Number Applied Date Received Date Permit Number Permit Status Mitigation Type Unit Estimated Date Estimated Amnt (Unit) Estimated Dollar Amnt Actual Amnt (Unit) Actual Dollar Amnt Completion Date Bank Name Mitigation Remarks Permit Remarks
44683 NotApplicable NOT APPLICABLE 0 0 $0.00 0 $0.00
Project Manager: KYTC\MIKE.BEZOLD       Item #: 6-8953.00
Project Description: INTERCHANGE JUSTIFICATION STUDY AT I-275 AND GRAVES ROAD. BOONE COUNTY FISCAL COURT WILL PROVIDE A 50% MATCH ($375,000). (16CCN)
Authoritative Source for R/W Data: KROWDS
View Communicating All Promises (CAP) Report for Item# 6-8953.00
This Project has no Right Of Way Data available from RWMS.
This Project has no Right Of Way Data available from KROWDS.
Project Manager: KYTC\MIKE.BEZOLD       Item #: 6-8953.00
Project Description: INTERCHANGE JUSTIFICATION STUDY AT I-275 AND GRAVES ROAD. BOONE COUNTY FISCAL COURT WILL PROVIDE A 50% MATCH ($375,000). (16CCN)
Authoritative Source for Utilities and Rail Tracking Data: KURTS
Utility Companies
Utility Name Facility Name
This Project has no Utilities Data available.
Project Manager: KYTC\MIKE.BEZOLD       Item #: 6-8953.00
Project Description: INTERCHANGE JUSTIFICATION STUDY AT I-275 AND GRAVES ROAD. BOONE COUNTY FISCAL COURT WILL PROVIDE A 50% MATCH ($375,000). (16CCN)
Phase Vendor
D HAWORTH MEYER BOLEYN INC
D NOT ENTERED
D HMB PROFESSIONAL ENGINEERS INC