Some critical dates have not been assigned. (Letting Date not Established)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Description: IMPROVE SAFETY, MOBILITY, OPERATIONS, AND GEOMETRICS AT THE JUNCTION OF I-75 AND I-275 AND THE SYSTEM-TO-SYSTEM RAMPS. Location: Route 1 Boone County I -75 from MP 182.978 to MP 183.312 Route 2 59 County I - from MP 183.312 to MP 185.3475 Item #: 6-79.00 Project Manager: KYTC\MIKE.BEZOLD Road Engineer: Burgess and Niple, Inc. Type of Work: CONGESTION MITIGATION Concerns:
Bridge Engineer: Bridge Structure Number: 059B00053L Select the Structure Number for The NBI Kentucky Inventory and Appraisal Report Bridge Suff. Rate: 96.3 NBI Rating: Not Deficient Posting: NO |
Project Manager: KYTC\MIKE.BEZOLD Item #: 6-79.00 Project Description: IMPROVE SAFETY, MOBILITY, OPERATIONS, AND GEOMETRICS AT THE JUNCTION OF I-75 AND I-275 AND THE SYSTEM-TO-SYSTEM RAMPS. |
Milestones
|
Project Manager: KYTC\MIKE.BEZOLD Item #: 6-79.00 Project Description: IMPROVE SAFETY, MOBILITY, OPERATIONS, AND GEOMETRICS AT THE JUNCTION OF I-75 AND I-275 AND THE SYSTEM-TO-SYSTEM RAMPS. Authoritative Source for Environmental Data: EATS |
Requestor | Request Type | Request Date | Assigned Name | Assigned Date | Scheduled Completion Date |
Actual Completion Date | Expiration Date |
District Office | CE LVL 3 | 9/1/2021 | Burgess & Niple, Inc. | 9/1/2021 | 4/30/2024 |
Project Manager: KYTC\MIKE.BEZOLD Item #: 6-79.00 Project Description: IMPROVE SAFETY, MOBILITY, OPERATIONS, AND GEOMETRICS AT THE JUNCTION OF I-75 AND I-275 AND THE SYSTEM-TO-SYSTEM RAMPS. Authoritative Source for R/W Data: KROWDS View Communicating All Promises (CAP) Report for Item# 6-79.00 |
This Project has no Right Of Way Data available from RWMS.
This Project has no Right Of Way Data available from KROWDS.
|
Project Manager: KYTC\MIKE.BEZOLD Item #: 6-79.00 Project Description: IMPROVE SAFETY, MOBILITY, OPERATIONS, AND GEOMETRICS AT THE JUNCTION OF I-75 AND I-275 AND THE SYSTEM-TO-SYSTEM RAMPS. Authoritative Source for Utilities and Rail Tracking Data: KURTS |
Utility Companies | |
Utility Name | Facility Name |
The Cincinnati, New Orleans and Texas Pacific Railway Company | Railroad |
Project Manager: KYTC\MIKE.BEZOLD Item #: 6-79.00 Project Description: IMPROVE SAFETY, MOBILITY, OPERATIONS, AND GEOMETRICS AT THE JUNCTION OF I-75 AND I-275 AND THE SYSTEM-TO-SYSTEM RAMPS. |
Phase | Vendor |
D | BURGESS AND NIPLE INC |