Some critical dates have not been assigned. (Letting Date not Established)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Description: REDUCE CONGESTION AND IMPROVE MOBILITY ON US 79 FROM MP 0 TO 3 IN GUTHRIE INCLUDING WIDENING THE BRIDGE OVER CSX RAILROAD (FOR NOVELIS). (NEEDS PBFS) (2020CCR) Location: Route 1 Todd County US-79 from MP 0 to MP 3 Route 2 County - from MP to MP Item #: 3-80001.00 Project Manager: KYTC\DAVID.ERICKSON Road Engineer: Type of Work: MINOR WIDENING(O) Concerns:
Bridge Engineer: Bridge Structure Number: 110B00011N Select the Structure Number for The NBI Kentucky Inventory and Appraisal Report Bridge Suff. Rate: 62.5 NBI Rating: Not Deficient Posting: YES |
Project Manager: KYTC\DAVID.ERICKSON Item #: 3-80001.00 Project Description: REDUCE CONGESTION AND IMPROVE MOBILITY ON US 79 FROM MP 0 TO 3 IN GUTHRIE INCLUDING WIDENING THE BRIDGE OVER CSX RAILROAD (FOR NOVELIS). (NEEDS PBFS) (2020CCR) |
Milestones
|
Project Manager: KYTC\DAVID.ERICKSON Item #: 3-80001.00 Project Description: REDUCE CONGESTION AND IMPROVE MOBILITY ON US 79 FROM MP 0 TO 3 IN GUTHRIE INCLUDING WIDENING THE BRIDGE OVER CSX RAILROAD (FOR NOVELIS). (NEEDS PBFS) (2020CCR) Authoritative Source for Environmental Data: EATS |
Requestor | Request Type | Request Date | Assigned Name | Assigned Date | Scheduled Completion Date |
Actual Completion Date | Expiration Date |
District Office | CE LVL 1 RE | 3/17/2022 | 3/17/2022 | 3/19/2022 | 6/8/2022 | 6/8/2024 | |
District Office | CE LVL 1 | 5/28/2021 | Palmer Engineering | 5/28/2021 | 5/28/2022 | 8/4/2020 | 8/4/2021 |
Overview | 11/26/2018 | Municipal Engineering Company | 11/30/2018 | 6/1/2019 | 8/4/2020 | 8/4/2022 |
Permit Sequence Number | Applied Date | Received Date | Permit Number | Permit Status | Mitigation Type | Unit | Estimated Date | Estimated Amnt (Unit) | Estimated Dollar Amnt | Actual Amnt (Unit) | Actual Dollar Amnt | Completion Date | Bank Name | Mitigation Remarks | Permit Remarks |
17634 | Required | ILF STREAM | 0 | 0 | $598,743.00 | 0 | $0.00 |
Project Manager: KYTC\DAVID.ERICKSON Item #: 3-80001.00 Project Description: REDUCE CONGESTION AND IMPROVE MOBILITY ON US 79 FROM MP 0 TO 3 IN GUTHRIE INCLUDING WIDENING THE BRIDGE OVER CSX RAILROAD (FOR NOVELIS). (NEEDS PBFS) (2020CCR) Authoritative Source for R/W Data: KROWDS View Communicating All Promises (CAP) Report for Item# 3-80001.00 |
This Project has no Right Of Way Data available from RWMS.
RIGHT OF WAY STATUS REPORT (KROWDS)
|
Project Manager: KYTC\DAVID.ERICKSON Item #: 3-80001.00 Project Description: REDUCE CONGESTION AND IMPROVE MOBILITY ON US 79 FROM MP 0 TO 3 IN GUTHRIE INCLUDING WIDENING THE BRIDGE OVER CSX RAILROAD (FOR NOVELIS). (NEEDS PBFS) (2020CCR) Authoritative Source for Utilities and Rail Tracking Data: KURTS |
Project Manager: KYTC\DAVID.ERICKSON Item #: 3-80001.00 Project Description: REDUCE CONGESTION AND IMPROVE MOBILITY ON US 79 FROM MP 0 TO 3 IN GUTHRIE INCLUDING WIDENING THE BRIDGE OVER CSX RAILROAD (FOR NOVELIS). (NEEDS PBFS) (2020CCR) |