Some critical dates have not been assigned. (Letting Date not Established)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Description: RELOCATE US-641 FROM SOUTH OF THE LYON/CALDWELL COUNTY LINE TO FREDONIA, 4.5 MILES. (2020CCN) (2022CCR) Location: Route 1 Caldwell County US-641 from MP 0 to MP 4.72 Route 2 72 County US - from MP 4.548 to MP 5.715641 Item #: 1-187.60 Project Manager: KYTC\PATSY.RAWLINS Road Engineer: Type of Work: NEW ROUTE Concerns:
Bridge Engineer: Bridge Structure Number: 017B00042N Select the Structure Number for The NBI Kentucky Inventory and Appraisal Report Bridge Suff. Rate: 62.7 NBI Rating: Not Deficient Posting: YES |
Project Manager: KYTC\PATSY.RAWLINS Item #: 1-187.60 Project Description: RELOCATE US-641 FROM SOUTH OF THE LYON/CALDWELL COUNTY LINE TO FREDONIA, 4.5 MILES. (2020CCN) (2022CCR) |
Milestones
|
Project Manager: KYTC\PATSY.RAWLINS Item #: 1-187.60 Project Description: RELOCATE US-641 FROM SOUTH OF THE LYON/CALDWELL COUNTY LINE TO FREDONIA, 4.5 MILES. (2020CCN) (2022CCR) Authoritative Source for Environmental Data: EATS |
Requestor | Request Type | Request Date | Assigned Name | Assigned Date | Scheduled Completion Date |
Actual Completion Date | Expiration Date |
FONSI RE | 9/21/2018 | ||||||
FONSI RE | 9/21/2018 | 9/26/2023 | 9/26/2025 | ||||
Environmental Analysis | EA | 12/14/2007 | American Engineers, Inc. | 1/1/2020 | 4/15/2020 | 7/1/2021 | 7/1/2023 |
Preliminary | 3/22/2001 | 3/24/2001 |
Project Manager: KYTC\PATSY.RAWLINS Item #: 1-187.60 Project Description: RELOCATE US-641 FROM SOUTH OF THE LYON/CALDWELL COUNTY LINE TO FREDONIA, 4.5 MILES. (2020CCN) (2022CCR) Authoritative Source for R/W Data: KROWDS View Communicating All Promises (CAP) Report for Item# 1-187.60 |
Authorized Amount for R/W Phase: 3500000 |
This Project has no Right Of Way Data available from RWMS.
This Project has no Right Of Way Data available from KROWDS.
|
Project Manager: KYTC\PATSY.RAWLINS Item #: 1-187.60 Project Description: RELOCATE US-641 FROM SOUTH OF THE LYON/CALDWELL COUNTY LINE TO FREDONIA, 4.5 MILES. (2020CCN) (2022CCR) Authoritative Source for Utilities and Rail Tracking Data: KURTS |
Utility Companies | |
Utility Name | Facility Name |
Project Manager: KYTC\PATSY.RAWLINS Item #: 1-187.60 Project Description: RELOCATE US-641 FROM SOUTH OF THE LYON/CALDWELL COUNTY LINE TO FREDONIA, 4.5 MILES. (2020CCN) (2022CCR) |
Phase | Vendor |
D | LESLIE M HANEY & ALBERT W GROSS PTR |